PEKERJAAN : PENINGKATAN JALAN LINGKUNGAN KEL. NAPABALANO
LOKASI : KAB.MUNA KEL. NAPABALANO KABUPATEN : MUNA TAHUN : 2019 A. UPAH TENAGA KERJA HARGA NO. Uraian SATUAN ('Rp.) 1 2 3 4 1 Pekerja OH 110,000.00 2 Mandor OH 120,000.00 3 Tukang Batu OH 120,000.00 4 Tukang Kayu OH 120,000.00 5 Tukang Besi OH 120,000.00 6 Tukang Cat OH 120,000.00 7 Tukang Listrik OH 120,000.00 8 Kepala Tukang Batu, Kayu, Besi, Cat, Listrik OH 150,000.00
B HARGA BAHAN / MATERIAL
HARGA NO Uraian SATUAN ('Rp.) 1 2 3 4 1 Tanah Timbunan (Batu Kapur) M3 77,275.00 2 Pasir Urug M3 154,500.00 3 Pasir Pasangan M3 154,500.00 4 Pasir Beton M3 232,200.00 5 Kerikil Beton 2/3 M3 540,000.00 6 Batu Gunung M3 175,400.00 7 Portland Cemen ( PC ) Kg 1,599.00 8 Portland Cemen ( PC ) Zak 79,950.00 9 Paku Biasa Kg 34,132.00 10 Minyak Bekisting Ltr 6,050.00 11 Besi beton Kg 15,473.00 12 Kawat bindrat/Beton Kg 27,089.00 13 Multipleks 9 mm Lbr 285,000.00 14 Kayu Dolken Dia 8-10 cm Btg 28,187.00 15 Bataco 20 x 40 x 10 cm Bh 4,800.00 16 Kayu Kayu Kelas III M3 2,492,185.00 17 Kayu Balok Kelas II M3 3,142,300.00 18 Kayu Balok 5/7 M3 2,889,307.00 19 Plamur M3 27,089.00 20 Cat minyak Kg 58,878.00 21 Kran Air Bh 43,342.00 22 Sealtipe Buah 8,500.00 23 Tripleks 3 mm Lbr 65,014.00 24 Paku Kg 21,671.00 25 List plafond Profil M 4,261.00 26 Paving Blok Pres Mesin Tek. 150 Kg Bh 2,976.60 27 Paving Blok M2 133,950.00 28 Semen Warna Kg 2,816.00 29 Air M3 70,000.00 30 Cat Tembok Kg 27,305.60
Raha, Maret 2019
Di Buat Oleh : CV. GEOMETRI ENGINEERING CONSULTANT