Anda di halaman 1dari 2

HARGA SATUAN KOTA BAUBAU

HARGA
NO. KLASIFIKASI / NAMA BARANG JASA KOMPOSISI/UKURAN SATUAN SATUAN

1.1. BATA, BATU DAN PASIR


1 Bata Beton Ringan Ex Celcon uk 9 x 19 x 39 cm Buah 9,900
2 Bata Merah uk 5 x 11 x 22 cm Buah 880
3 Batu Kali Batu belah pondasi M2 27,500
4 Batu Kerikil M2 247,500
5 Batu Split Pecah Mesin 1/2 M2 440,000
6 Batu Split Pecah Mesin 3/5 M2 334,719
7 Pasir Beton M2 409,200
8 Pasir Pasang M2 409,200
9 Pasir Urug M2 409,200
10 Tanah Urug M2 71,500
1.2. BAHAN PEREKAT
1 Semen (50 Kg) Semen Indonesia ZAK 77,000
2 Semen warna Semen Indonesia Kg 15,500
1.3 BAHAN BAJA
1 Besi Bton U-24 KS KG 24,200
2 Besi Bton U-39 KS KG 18,700
3 Besi Plat Rata-rata KS KG 2,400
4 Besi Tempa M2 247,500
5 Kawat Beton Kawat Beton KG 19,800
6 Rangka Atap Baja Ringan M2 247,500
1.4 BAHAN KAYU
1 Dolken 8 - 10 Cm P.4m BTNG 27,500
2 Kayu Kelas I Jati M2 5,500,000
3 Kayu Kelas II Kamper M2 4,950,000
4 Kayu Kelas III Meranti M2 1,870,000
5 Kayu Kelas IV Trembesi m2 1,850,000
1.5 BAHAN PELAPIS
1 Tripliks T.3 MM Uk 120 x 240 cm LBR 50,500
2 Tripliks T.4 MM Uk 120 x 240 cm LBR 88,000
3 Tripliks T.9 MM Uk 120 x 240 cm LBR 140,800
1.6 BAHAN PAKU DAN MUR BAUT
1 Paku 1 - 3 Cm KG 22,000
2 Paku 5 - 10 Cm KG 16,500
3 Paku 8 - 12 Cm KG 16,500
4 Paku Skrup BUAH 4,070
1.7 BAHAN FINISHING
1 Amplas Kayu LBR 5,500
2 Cat Kayu Besi KG 61,600
3 Cat Tembok KW 1 Warna standard KG 71,077
4 Cat Tembok KW 2 Warna standard KG 44,000
HARGA SATUAN KOTA BAUBAU
HARGA
NO. KLASIFIKASI / NAMA BARANG JASA KOMPOSISI/UKURAN SATUAN SATUAN
5 Kawas Cat BUAH 13,200
6 Lem Kayu KG 19,800
7 Meni Kayu KG 29,787
8 Minyak Bekisting LTR 25,916
9 Plamir Kayu KG 23,128
10 Plamir Tembok KG 11,000
11 Seal Tape BUAH 16,500
12 Thinner LTR 30,500
13 Wood Filler KG 38,500
1.8 BAHAN SALURAN AIR
1 Klep Diameter 3/4" Buah 71,500
2 Mesin Jet Pump Ka[ 250 Wat Unit 4,125,000
3 Mesin Pompa Tekan Kap 150 Wat Unit 806,000
4 Pelampung Otomatis Buah 27,500
5 Pipa PVC DIA 1" P.4 M M2 44,000
6 Pipa PVC Dia 1/2" P.4 M M2 27,500
7 Pipa PVC Dia 2" P.4 M M2 93,500
8 Pipa PVC Dia 3" P.4 M M2 182,500
9 Pipa PVC Dia 3/4" P.4 M M2 33,000
10 Pipa PVC Dia 4" P.4 M M2 297,000
11 Roof Drain Metal BH 38,500
12 Stop Koran Dia 1' Buah 176,000
13 Tangki Air 1000 Liter Buah 1,430,000
14 Tangki Air 500 Liter Buah 1,045,000
1.9 UPAH PEKERJA
1 Kepala Tukang Batu ORG/HARI 145,000
2 Kepala Tukang Besi ORG/HARI 145,000
3 Kepala Tukang Cat ORG/HARI 160,000
4 Kepala Tukang Kayu ORG/HARI 145,000
5 Kepala Tukang Listrik ORG/HARI 145,000
6 Mandor ORG/HARI 180,000
7 Pekerjaa ORG/HARI 145,000
8 Tukang Batu Halus Tukang Batu Halus (Bata plester, Aci) ORG/HARI 145,000
9 Tukang Batu Kasar Tukang Batu Kasar ORG/HARI 160,000
10 Tukang Besi Konstruksi ORG/HARI 145,000
11 Tukang Besi Tulangan ORG/HARI 150,000
12 Tukang Cat Biasa ORG/HARI 145,000
13 Tukang Kayu Halus Kusen ORG/HARI 160,000
14 Tukang Kayu Kasar Plafond, Kuda, R. Atap ORG/HARI 100,000
15 Tukang Listrik ORG/HARI 120,000

Anda mungkin juga menyukai