PERHITUNGAN BERAT BESI

KEGIATAN
PEKERJAAN
LOKASI
TAHUN

:
:
:
:

DED GEDUNG KORPRI PROPINSI RIAU T.A. 2010


PERENCANAAN GEDUNG KORPRI PROPINSI RIAU
JL.PETALA BUMI - PEKANBARU
2010

NO

DIMENSI

JUMLAH BESI

1 40/40 (Kolom)

2 40/40 (Kolom)

3 40/40 (Kolom)

4 40/40 (Kolom)

5 11/11 (Kolom pRAKTIS)

6 Plat Retaining Wall

7 25/60 (Sloof)

8 25/60 (Sloof)

9 25/30 (Sloof)

10 30/55 (Balok)

12 D 16
D 10 - 15

10 D 16
D 10 - 15

8 D 16
D 10 - 15

6 D 16
D 10 - 15

JUMLAH
BESI/
panjang
4
12
9.8

10
9.8

8
9.8

6
9.8

DIAM

BERAT
BESI

6
16
8

16
8

16
8

16
8

1.56
0.62

0.62
0.62

1.56
0.62

1.56
0.62

4 D 10
D 8 - 15

4
2.56

10
8

0.62
0.393

D 16 -15
D 16 -15
D 10 - 30

8
8
3

16
16
10

1.56
1.56
0.62

6 D 16
2 D 13
D 10 - 10

6 D 19
2 D 13
D 10 - 10

4 D 16
D 10 - 20

8 D 19
2 D 13
D 10 - 10

8
2
17.5

6
2
17.5

4
6.05

8
2
13.6

16
13
10

19
13
10

16
10

19
12
10

1.56
0.995
0.62

1.56
0.995
0.62

1.56
0.62

1.56
0.995
0.62

TOTAL
BERAT
BESI
7

BERAT
BESI/ M3

PAPAN
CETAK

18.72
6.076
24.796

154.975

12.5

6.2
6.076
12.276

76.725

12.5

12.48
6.076
18.556

115.975

12.5

9.36
6.076
15.436

96.475

12.5

2.48
1.00608
3.48608 288.10579 18.1818
12.48
12.48
1.86
26.82

134.1

10

12.48
1.99
10.85
25.32

168.8

9.36
1.99
10.85
22.2

148

6.24
3.751
9.991 166.51667

12.48
1.99
8.432
22.902

138.8 8.48485

11 30/40 (Balok)

8 D 19
D 10 - 10

8
11.2

19
10

1.56
0.62

12.48
6.944
19.424 161.86667 7.77778

12 25/30 (Balok)

5 D 16
D 10 - 10

5
8.8

16
10

1.56
0.62

7.8
5.456
13.256 176.74667

13 15/30 (Balok)

5 D 13
D 19 - 10

5
8.25

13
10

0.995
0.393

6.2963

4.975
3.24225
8.21725 182.60556 13.3333

14 POOR P1

D 16 -15
D 16 -15

40.7
40.7

16
16

1.56
1.56

15 POOR P2

D 16 -15
D 16 -15

27
27

16
16

1.56
1.56

16 POOR P3

17 POOR P4

18 Plat Lantai

D 16 -15
D 16 -15

D 16 -15
D 16 -15

D 10 -15
D 10 -15

18.2
18.2

71.5
45.5

8
8

16
16

16
16

10
10

1.56
1.56

1.56
1.56

0.56
0.56

63.492
63.492
126.984 141.09333 2.37037
42.12
42.12
84.24

134.784

28.392
28.392
56.784

141.96

111.54
70.98
182.52

108.16 1.33333

3.2

4.48
4.48
8.96 74.666667 16.6667

DAFTAR HARGA SATUAN UPAH DAN BAHAN


KOTA PEKANBARU TAHUN 2010
NO.

JENIS UPAH / BAHAN

SATUAN

HARGA
(Rp)

1
2
3
4
5
6
7
8
9
10

A. UPAH / OH
Pekerja
Tukang
Kepala Tukang
Mandor
Penjaga Malam
Operator
Pembantu Operator
Sopir
Mekanik
Pembantu Mekanik

1
1
1
1
1
1
1
1
1
1

Oh
Oh
Oh
Oh
Oh
Jam
Jam
Jam
Jam
Jam

75,000
100,000
125,000
125,000
75,000
9,375
7,000
7,500
10,000
6,750

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19

B. PERALATAN
Alat Bantu
Alat Bantu Beton
Alat Bantu Pancang
Bulldozer
Concrete Mixer
Concrete Vibrator
Crane
Dump Truck/ Trailler
Excavator Standard
Excavator Long Arm
Generator Set 250 KVA
Las Potong
Mesin Las
Mesin Potong Besi
Pile Driver Hammer
Scafolding
Stemper
Vibrator Roller
Water Pump 70 - 100 MM

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Ls
Ls
Ls
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Set
Jam
Jam
Jam

1,150
2,300
2,300
269,000
38,200
20,100
259,000
148,600
296,100
312,100
201,250
6,900
85,600
23,000
117,200
58,095
28,800
290,500
20,100

1
2
3
4
5
6

BAHAN PASIR DAN KERIKIL


Pasir / Plesteran
Pasir Cor / Pasang
Sirtu
Pasir Urug
Kerikil Cor
Tanah Urug

1
1
1
1
1
1

M3
M3
M3
M3
M3
M3

120,000
150,000
200,000
120,000
160,000
40,000

1
2
3
4
5
6
7
8

BAHAN BATU
Batu Bata
Batako Ukuran 10x15x30
Batako Ukuran 10x20x40
Batu Tempel
Batu Alam RTA 7 x15
Batu Pecah
Batu Pecah / Split Ukuran 2-3 cm
Batu Con Block tebal 8 cm Uk. 10x20

1
1
1
1
1
1
1
1

Bh
Bh
Bh
M2
M2
M3
M3
Bh

500
1,824
1,900
130,000
90,000
280,000
300,000
2,500

II

KETERANGA
N

1
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

2
BAHAN BATU ALAM
Andersit Ukuran 20x40
Andersit Ukuran 15x30
Andersit Ukuran 20x30
Batu Suka Bumi Ukuran 20x10
Batu Suka Bumi Ukuran 7x15
Batu RTA Ukuran 20x10
Batu RTA Ukuran 7x15
Batu Palemanan Ukuran 20x10
Batu Palemanan Ukuran 7x15
Batu Palemanan Ukuran 20x40
Batu Coral Sikat Panca Warna
Batu Coral Sikat Putih Itali
Batu Coral Sikat Hitam Bengkulu
Batu Gunung
Filler (Abu Batu)
Filler (Abu Batu)
Batu Kali / Batu Mangga

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Kg
Kg
Kg
M3
M3
M3
M3

220,000
210,000
210,000
130,000
130,000
130,000
130,000
130,000
130,000
220,000
6,000
8,000
6,000
100,000
290,000
375,000
200,000

1
2
3

BAHAN AGREGATE KASAR (COARSE AGGREGATE)


Untuk Hotmix (Batu Pecah)
1
Untuk Base A (Batu Pecah)
1
Untuk Base B (Batu Pecah)
1

M3
M3
M3

290,000
290,000
290,000

Pulau Padang
Pulau Padang
Pulau Padang

1
2
3

BAHAN AGREGATE HALUS (FINE AGGREGATE)


Untuk Hotmix (Batu Pecah)
Untuk Base A (Batu Pecah)
Untuk Base B (Batu Pecah)

1
1
1

M3
M3
M3

290,000
290,000
290,000

Pulau Padang
Pulau Padang
Pulau Padang

1
2

BAHAN AGREGATE KASAR (COARSE AGGREGATE)


Untuk Base A (Batu Pecah)
1
Untuk Base B (Batu Pecah)
1

M3
M3

285,000
285,000

Sitorajo Kari
Sitorajo Kari

VII
1
2

BAHAN AGREGATE HALUS (FINE AGGREGATE)


Untuk Base A (Batu Pecah)
Untuk Base B (Batu Pecah)

1
1

M3
M3

285,000
285,000

Pulau Padang
Pulau Padang

VIII
1
2
3

BAHAN SEMEN
Semen Type I 50 Kg/Zak
Semen Putih 40 Kg/Zak
Semen Warna

1
1
1

Kg
Kg
Kg

1,120
2,875
12,500

1
2

BAHAN ASPAL
Aspal
Aspal Atap (Water Proofing)

1
1

Kg
Kg

8,000
40,000

1
2
3
4
5
6
7
8
9

BAHAN LANTAI DAN KERAMIK


Keramik Warna Terang Ukuran 20x20 cm
Keramik Warna Terang Ukuran 20x25 cm
Keramik Warna Terang Ukuran 30x30 cm
Keramik Homogenous Ukuran 40x40 cm
Keramik Homogenous Ukuran 60x60 cm
Keramik Anti Slip Ukuran 30x30 cm
Keramik Anti Slip Ukuran 40x40 cm
Granito Warna Terang Ukuran 60x60 cm Setara Grani
Granito Warna Gelap Ukuran 60x60 cm (Isi: 1,44 M2)

1
1
1
1
1
1
1
1
1

Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk

IV

VI

IX

47,000
48,000
48,000
85,000
165,000
60,000
50,000
250,000
220,320

Sumbar
Pulau Padang
Sitorajo Kari

10
11
12

1
XI

Bon-bon Panjang 10 cm
Batu Terawang Keramik
Marmer Ukuran 100x100 cm

1
1
1

Bh
Bh
Bh

2
BAHAN SANITAIR
Kloset Jongkok Warna Terang Setara TOTO
Kloset Jongkok Warna Gelap Setara TOTO
Kloset Duduk Lengkap Setara INOVA
Westafel Komplit
Urinal Komplit
Bak Air Fiber Glass Besar
Bak Air Fiber Glass Kecil
Bak Air Fiber Glass Sudut Besar
Bak Air Fiber Glass Sudut Kecil
Tangki Fiber Glass Kavasitas 1 M3
Tempat Sabun Keramik
Kran Air Besi Stainless Steel 1"
Kran Air Besi Stainless Steel 3/4"
Kran Air Besi Stainless Steel 1/2"
Floor Drain Stainless Steel
Sower Kloset + Kran
Gantungan Handuk Stainless Steel

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

165,000
185,000
4,500,000
1,000,000
500,000
350,000
275,000
450,000
260,000
850,000
50,000
35,000
35,000
35,000
75,000
175,000
185,000

XII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22

BAHAN KAYU
Balok Kayu Kelas I
Papan Kayu Kelas I
Balok Kayu Kelas II
Papan Kayu Kelas II
Balok Kayu Kelas III
Papan Kayu Kelas III
Kayu Bakar
Kayu Cerocok 10-15 cm
Kayu Dolken 8-10 cm
Kayu Profil Uk. 3x3 cm/ Btg Panjang 4 M
Kayu Profil Uk. 4x5 cm/ Btg Panjang 4 M
Kayu Les Kaca
Triplek Tebal 3 mm
Triplek Tebal 3,6 mm
Triplek Tebal 6 mm
Triplek Tebal 9 mm
Triplek Tebal 12 mm
Lisplank Lebah Bergayut
Lisplank Papan Ukir
Lambersering 4 M (Kayu)
Gipsum Tebal 9 MM
Les Gipsum

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

M3
M3
M3
M3
M3
M3
M3
Btg
Btg
M1
M1
M1
Lbr
Lbr
Lbr
Lbr
Lbr
M1
M1
Lbr
Lbr
M1

2,800,000
2,800,000
2,000,000
2,000,000
1,700,000
1,700,000
300,000
15,000
7,500
3,250
3,750
2,000
40,000
50,000
74,000
110,000
150,000
120,000
175,000
13,000
60,000
15,000

XIII
1
2
3
4
5
6
7
8
9

BAHAN ATAP
Seng Plat BJLS 20 K
Seng Plat Aluminium
Atap Plastik Gelombang
Talang Karpet
Seng Gelombang Bjls 20 K 11 Gelombng
Seng Gelombang Bjls 20 K 9 Gelombng
Seng Gelombang Warna Bjls 20 K
Perabung Seng Plat L 20 K
Perabung Seng Plat L 30 K

1
1
1
1
1
1
1
1
1

Lbr
Lbr
Lbr
M1
Lbr
Lbr
Lbr
Lbr
Lbr

40,000
65,000
70,000
15,000
42,500
40,000
45,000
20,000
20,000

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

7,500
35,000
150,000

10
11
12
13
14

Genteng Metal Type Prima 0,4 mm


Genteng Metal Type Prima 0,30 mm
Genteng Metal Type Klasik 0,35 mm
Genteng Metal Type Klasik 0,30 mm
Perabung Genteng Metal Motif Raja Tebal 0,35 mm

1
1
1
1
1

2
Perabung Genteng Metal Motif Ratu Tebal 0,35 mm
Tutup Ujung Perabung Metal Tebal 0,35 mm
Atap Spandek Colorbond (Mono red) Tebal 0.4 mm
Flexalum Lineal Ceiling 84C ex Hunter Douglas, warn
Sisalation/ Aluminium Foil
Aluminium Composite Panel 0,30 MM
Atap Zincalume Tebal 0,40 MM
Atap Square Ribbet Roof - Alluminium Tebal 0,8 MM

XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
XV
1
2
3
4
5
6
7
8
9
10
11

1
15
16
17
18
19
20
21
22

M2
M2
M2
M2
M1

65,000
55,000
55,000
45,000
35,000

1
1
1
1
1
1
1
1

M1
M1
M2
M2
M2
M2
M2
M2

4
27,000
15,000
162,800
550,000
35,000
300,000
175,000
1,100,000

BAHAN BESI
Besi Beton Polos
Besi Beton Ulir
Besi C (Kanal) Tebal 2 mm panjang 10 M'
Besi C (Kanal) Tebal 3 mm panjang 10 M'
Besi Hollow Ukuran 20x20 mm
Besi Hollow Ukuran 30x30 mm
Besi Hollow Ukuran 40x40 mm
Besi Hollow Ukuran 30x50 mm
Besi Hollow Ukuran 20x40 mm
Besi Plat Polos Tebal 3 mm
Besi Plat Polos Tebal 5 mm
Besi Plat Bunga Tebal 3 mm
Besi Plat Siku Ukuran 30.30.3 panjang 6 m
Besi Plat Siku Ukuran 40.40.3 panjang 6 m
Besi Plat Siku Ukuran 50.50.5 panjang 6 m
Besi Plat Siku Ukuran 30.30.5 panjang 6 m
Besi Plat Siku Ukuran 40.40.5 panjang 6 m
Besi Plat Siku Ukuran 60.60.5 panjang 6 m
Kawat Harmonika Gas
Kawat Beton
Kawat Bronjong 3,4 mm
Kawat Las
Besi Pipa (Hitam) 2" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 3" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 4" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 5" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 6" Tebal 2,8 mm Panjang 6 m
Besi Pipa Galvanis 2" Tebal 1,7 mm Panjang 6 m
Besi Pipa Galvanis 2" Tebal 3 mm Panjang 6 m

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Kg
Kg
Btg
Btg
M1
M1
M1
M1
M1
Lbr
Lbr
Lbr
Btg
Btg
Btg
Btg
Btg
Btg
M1
Kg
Kg
Kg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

9,000
10,000
155,000
250,000
7,500
9,500
11,250
18,750
8,750
565,000
565,000
870,000
35,000
48,000
68,000
35,000
95,000
193,000
20,000
16,000
20,000
16,000
155,000
235,000
385,000
810,000
950,000
225,000
410,000

BAHAN PAKU DAN BAUT


Paku Beton
Paku Seng
Paku Triplek
Paku Biasa
Paku Skrup Fixer
Baut 1/2" Panjang 4
Baut 1/2" Panjang 6
Baut 1/2" Panjang 8
Baut 1/2" Panjang 10
Baut 3/4" Panjang 4
Baut 3/4" Panjang 6

1
1
1
1
1
1
1
1
1
1
1

Kg
Kg
Kg
Kg
Bh
Btg
Btg
Btg
Btg
Btg
Btg

35,000
25,000
18,000
16,000
7,500
4,000
6,000
8,000
10,000
6,000
9,000

12
13
14
15
16
17
18

Baut 3/4" Panjang 8


Baut 3/4" Panjang 10
Aluminium Uk. 4x10
Aluminium Uk. 4x7
Plat Aluminium
Rangka Atap Smartruss
Rangka Plafond Baja Ringan

1
1
1
1
1
1
1

Btg
Btg
M1
M1
M1
M2
M2

12,000
15,000
75,000
60,000
35,000
230,000
135,000

1
XVI
1
2
3
4
5
6
7
8
9
10
11

BAHAN PIPA SANITASI


Besi Pipa Galvanis 1/2" Panjang 4 m
Besi Pipa Galvanis 3/4" Panjang 4 m
Besi Pipa Galvanis 1" Panjang 4 m
Besi Pipa Galvanis 2" Panjang 4 m
Pipa PVC Type AW 1/2"
Pipa PVC Type AW 3/4"
Pipa PVC Type AW 1"
Pipa PVC Type AW 1,5"
Pipa PVC Type AW 2"
Pipa PVC Type AW 3"
Pipa PVC Type AW 4"

1
1
1
1
1
1
1
1
1
1
1

Btg
Btg
Btg
Btg
M1
M1
M1
M1
M1
M1
M1

XVII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

BAHAN GANTUNGAN
Kunci 2 Slaag
Kunci 1 Slaag
Grendel 4"
Grendel 2"
Engsel Pintu
Engsel Jendela
Hak Angin
Gembok
Handel Pintu
Handel Jendela
Door Closer
Floor Hinges setara CISA
Bottom Patch Fitting Swing Door
Top Patch Fitting Swing Door
Top Pin Patch Fitting Swing Door
Kunci Cisa Cylinder
Handel Pintu Aluminium
Pintu Aluminium uk. 2x0,9 m
Pintu Aluminium
Pintu Falding Gate Besi

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ps
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ps
Bh
M2
M2

82,000
80,000
40,000
10,000
10,000
12,000
8,000
20,000
75,000
30,000
250,000
900,000
125,000
125,000
125,000
150,000
135,000
1,500,000
850,000
600,000

XVIII
1
2
3
4
5
6
7
8
9

BAHAN KACA
Kaca Bening Tebal 3 mm
Kaca Bening Tebal 5 mm
Kaca Nako + Bingkai
Kaca Rayben Tebal 3 mm
Kaca Rayben Tebal 5 mm
Kaca Block Tebal 5 mm
Kaca Es/ Buram Tebal 3 mm
Kaca Es/ Buram Tebal 5 mm
Kaca Tempered Biru Tebal 5 mm yang transparan 50

1
1
1
1
1
1
1
1
1

M2
M2
M2
M2
M2
Bh
M2
M2
M2

75,000
85,000
83,000
90,000
92,000
19,000
60,000
90,000
175,000

140,000
180,000
212,000
415,000
4,000
5,000
12,000
13,000
15,200
27,500
40,000

Medan
Medan
Medan
Medan
Medan
Medan
Medan

10
11
12
13
14
15
16
17

Kaca Tempered Biru Tebal 8 mm yang transparan 50


Kaca Tempered Biru Tebal 10 mm yang transparan 5
Aluminium 3" warna coklat celub
Aluminium 4" warna coklat celub
Plat Stainless Steel Tebal 0,8 mm
Sealant
Skrup Fixer
Aluminium Strip

1
1
1
1
1
1
1
1

M2
M2
M1
M1
M2
Tube
Bh
M1

250,000
350,000
95,000
65,000
2,500,000
12,500
250
25,000

1
XIX
1
2
3
4
5
6
7
8
8
9
10
11
12
13
14
15
16
17
18

2
BAHAN LISTRIK
Pemasangan Instalasi/ Titik Api
MCB Setara Braco
Panel Box Lengkap
Bola Lampu Pijar 25 Watt Setara Philips
Bola Lampu Pijar 40 Watt Setara Philips
Bola Lampu Pijar 60 Watt Setara Philips
Bola Lampu Pijar 75 Watt Setara Philips
Bola Lampu Pijar 100 Watt Setara Philips
Bola Lampu Lilin 23 Watt Setara Philips
Bola Lampu Energi Super 20 Watt Setara Philips
Bola Lampu TL 2x36 Watt
Bola Lampu Office Light 2x20 Watt
Fitting Gantung
Fitting Duduk
Saklar Tunggal Setara Braco
Saklar Seri Setara Braco
Stop Kontak Biasa Setara Braco
Stop Kontak AC Setara Braco
Stop Kontak Tutup (Panasonic)

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh

172,500
75,000
2,500,000
10,000
10,000
10,000
10,000
80,000
30,000
105,000
175,000
125,000
4,000
4,000
25,000
25,000
25,000
40,000
15,000

XX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20

BAHAN FINISHING
Cat Minyak Dulux Brilo
Cat Perak Setara Brilo
Cat Dulux Exterior (Luar)
Cat Dulux Interior (Dalam)
Vernish/ Teak Oil
Cat Batu Alam
Minyak Cat
Residu
Minyak Bekisting
Dempul Kayu
Amplas Kayu
Amplas Besi
Plamir
Cat Meni Kayu
Menie Besi
Spirtus
Kuas Cat Biasa 3-4"
Kuas Cat Gulung
Ornamen Timbul GRC
Waterproofing

1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1

Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Ltr
Bh
Bh
M2
Kg

40,000
60,000
100,000
54,000
45,000
95,000
20,000
20,000
20,000
15,000
2,500
3,000
9,000
15,000
20,000
5,000
10,000
40,000
450,000
40,000

XXI
1
2
3

BAHAN PONDASI
Mini Pile Ukuran 20x20 cm
Mini Pile Ukuran 25x25 cm
Corrugated Sheet Pile W-325 Kelas B

1
1
1

M1
M1
M1

165,000
285,000
830,000

XXII
1
2

BAHAN BBM
Solar
Minyak Pelumas

1
1

Ltr
Ltr

4,500
30,000

1
XXIII
1
2
3
4
5
6
7
8
9
10
11
12

2
BAHAN TAMAN
Rumput Gajah Mini
Tanah Hitam
Bunga Palm Ekor Tupai tinggi 1-2 m
Bunga Bougenville 3-6 warna

Bunga
Bunga
Bunga
Bunga
Bunga
Bunga
Bunga
Bunga

Pucuk Merah tinggi 1,5-2 m


Korokot
Taiwan Beauty
Agave
Kacang-kacangan
Lili Paris
Kucai
Pulai

3
1
1
1
1
1
1
1
1
1
1
1
1

4
M2
M3
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg

32,500
30,000
780,000
455,000
400,000
3,250
3,250
97,500
3,250
3,250
3,250
250,000

DAFTAR ANALISA
HARGA SATUAN (SNI DT 91-0006-2007)
:
PROGRAM
:
KEGIATAN
:
LOKASI
TAHUN ANGGARAN :
:
SUMBER DANA

#REF!
#REF!
#REF!
2010
APBD-P
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN

NO.
1
1

URAIAN PEKERJAAN
1 M1

HARGA SATUAN
(Rp.)
4

VOLUME

2
PEK.PENGUKURAN DAN PEMASANGAN BOWPLANK
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu 5/7, Klas II
Paku Biasa 2'-5'
Kayu Papan 3/20

0.1000
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0120
0.0200
0.0070

M3
Kg
Kg

Rp.
Rp.
Rp.

2,000,000.00
16,000.00
2,000,000.00

UPAH
5

Rp.
Rp.
Rp.
Rp.

JUMLAH HARGA
BAHAN
6

7,500.00
10,000.00
1,250.00
625.00

Rp.

19,375.00

Rp.
Rp.
Rp.

7,500.00
6,250.00
13,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 M2

PEK.MEMBERSIHKAN LAPANGAN DAN PERALATAN


TENAGA
Pekerja
Mandor

0.1000
0.0500

OH
OH

Rp.
Rp.

75,000.00
125,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1M

PEK.PEMBUATAN KANTOR SEMENTARA / R. DIREKSI KEET


TENAGA
Pekerja
1.0000
Tukang Kayu
0.5000
Tukang Batu
1.0000
Kepala Tukang
0.3000
Mandor
0.0500
BAHAN
Kayu Bulat Dia. 8 - 10 / 400 cm
1.2500
Kayu Meranti
0.1100
Paku Biasa 2'-5'
0.8500
Besi Strip
1.1000
Semen Porland
35.0000
Pasir Pasang
0.1500
Pasir Cor
0.1000
Kerikil
0.1500
Bata Merah
30.0000
Seng Plat
0.2500
Jendela Nako
1.0000
Kaca Polos
0.0800
Kunci Tanam
0.1500
Pywood 3.6 mm
0.0600

OH
OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
100,000.00
125,000.00
125,000.00

Btg
M3
Kg
Kg
Kg
M3
M3
M3
Bh
Lbr
Bh
M2
Bh
Lbr

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,500.00
2,000,000.00
16,000.00
3,000.00
1,120.00
150,000.00
150,000.00
160,000.00
500.00
40,000.00
150,000.00
75,000.00
80,000.00
50,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

268,750.00

Rp.
Rp.

22,500.00
187.50

JUMLAH TOTAL
4

1M

PEK.PEMBUATAN BAK ADUKAN UK. 40x50x20 cm


TENAGA
Tukang Kayu
Mandor
BAHAN
Papan Kayu Meranti
Paku Biasa 2'-5'
Kayu Meranti 5/7

0.3000
0.0015

OH
OH

Rp.
Rp.

75,000.00
125,000.00

0.0360
0.0800
1.0000

M3
Kg
Btg

Rp.
Rp.
Rp.

2,000,000.00
16,000.00
2,000,000.00
Rp.

24,000.00
320.00
14,000.00
38,320.00
57,695.00
57,695.00
57,600.00
57,600.00

Rp.
Rp.
Rp.
Rp.

13,750.00
13,750.00
13,700.00
13,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,375.00
220,000.00
13,600.00
3,300.00
39,200.00
22,500.00
15,000.00
24,000.00
15,000.00
10,000.00
150,000.00
6,000.00
12,000.00
3,000.00
542,975.00
811,725.00
811,725.00
811,700.00
811,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

72,000.00
1,280.00
2,000,000.00
2,073,280.00
2,095,967.50
2,095,967.50
2,095,900.00
2,095,900.00

75,000.00
50,000.00
100,000.00
37,500.00
6,250.00

SUB TOTAL
JUMLAH
DIBULATKAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

22,687.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

ANALISA BIAYA KONSTRUKSI PEKERJAAN TANAH


1
1

1 M3

2
PEK.GALIAN TANAH BIASA SEDALAM 1 M
TENAGA
Pekerja
Mandor

0.7500
0.0250

OH
OH

Rp.
Rp.

75,000.00
125,000.00

Rp.
Rp.
Rp.

56,250.00
3,125.00
59,375.00

Rp.
Rp.
Rp.

90,000.00
5,625.00
95,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 M3

PEK.GALIAN TANAH LUMPUR SEDALAM 1 M


TENAGA
Pekerja
Mandor
SUB TOTAL
JUMLAH
DIBULATKAN

1.2000
0.0450

OH
OH

Rp.
Rp.

75,000.00
125,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

59,375.00
59,375.00
59,375.00
59,300.00
59,300.00

Rp.
Rp.
Rp.
Rp.

95,625.00
95,625.00
95,625.00
95,600.00

JUMLAH TOTAL

1 M3

PEK.MEMBUANG TANAH SEJAUH 30 METER


TENAGA
Pekerja
Mandor

0.3300
0.0100

OH
OH

Rp.
Rp.

75,000.00
125,000.00

Rp.
Rp.
Rp.

24,750.00
1,250.00
26,000.00

Rp.
Rp.
Rp.

18,750.00
1,041.67
19,791.67

Rp.
Rp.
Rp.

37,500.00
6,250.00
43,750.00

Rp.
Rp.

18,750.00
3,125.00

Rp.

21,875.00

Rp.
Rp.

22,500.00
1,250.00

Rp.

23,750.00

Rp.
Rp.

22,500.00
1,250.00

Rp.

23,750.00

Rp.
Rp.

75,000.00
12,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M3

PEK.URUGAN KEMBALI BEKAS GALIAN


TENAGA
Pekerja
Mandor

0.2500
0.0083

OH
OH

Rp.
Rp.

75,000.00
125,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 M3

PEK.MEMADATKAN TANAH (PER 20 CM)


TENAGA
Pekerja
Mandor

0.5000
0.0500

OH
OH

Rp.
Rp.

75,000.00
125,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1M

PEK.SIRTU DIPADAT UNTUK PENINGGIAN JALAN


TENAGA
Pekerja
Mandor
BAHAN
Sirtu

0.2500
0.0250

OH
OH

Rp.
Rp.

75,000.00
125,000.00

1.2000

M3

Rp.

200,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 M3

PEK.URUGAN PASIR
TENAGA
Pekerja
Mandor
BAHAN
Pasir Urug

0.3000
0.0100

OH
OH

Rp.
Rp.

75,000.00
125,000.00

1.2000

M3

Rp.

120,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1 M3

PEK.URUGAN TANAH
TENAGA
Pekerja
Mandor
BAHAN
Tanah Urug

0.3000
0.0100

OH
OH

Rp.
Rp.

75,000.00
125,000.00

1.2000

M3

Rp.

40,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1M

PEK.JALAN SEMENTARA TEBAL 25 CM


TENAGA
Pekerja
Mandor
BAHAN
Batu Pecah
Kerikil
Pasir

1.0000
0.1000

OH
OH

Rp.
Rp.

75,000.00
125,000.00

0.2750
0.0300
0.0500

M3
M3
M3

Rp.
Rp.
Rp.

280,000.00
160,000.00
150,000.00
Rp.

87,500.00

Rp.
Rp.
Rp.
Rp.

15,000.00
20,000.00
2,250.00
1,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10

1 M2

PEK.RABAT BETON 1 : 3 tebal 10 mm


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang

0.2000
0.2000
0.0180
0.0100

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

2.3400
0.0070

Kg
M3

Rp.
Rp.

1,120.00
150,000.00
Rp.

38,500.00

Rp.
Rp.
Rp.

86,250.00
2,000.00
250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11

1M

PEK.LANTAI KERJA 1 : 3 : 5
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang

1.1500 OH
0.0200 OH
0.0020 OH

Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00

Rp.

95,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

26,000.00
26,000.00
26,000.00
26,000.00
26,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

19,791.67
19,791.67
19,791.67
19,700.00
19,700.00

Rp.
Rp.
Rp.
Rp.
Rp.

43,750.00
43,750.00
43,750.00
43,700.00
43,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

240,000.00
240,000.00
261,875.00
261,875.00
261,800.00
261,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

144,000.00
144,000.00
167,750.00
167,750.00
167,700.00
167,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
48,000.00
71,750.00
71,750.00
71,700.00
71,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

77,000.00
4,800.00
7,500.00
89,300.00
176,800.00
176,800.00
176,800.00
176,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,620.80
1,050.00
3,670.80
42,170.80
42,170.80
42,100.00
42,100.00

Mandor

0.0060 OH

Rp.

125,000.00

Semen Portland
Pasir Beton
Kerikil Beton

0.2000 Zak
0.0260 M3
0.0440 M3

Rp.
Rp.
Rp.

1,120.00
150,000.00
160,000.00

Rp.

750.00

BAHAN

Rp.

89,250.00

Rp.
Rp.
Rp.
Rp.

123,750.00
25,000.00
3,125.00
10,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12

1 M3

PEK.MEMBUAT BETON 1 : 3 : 5
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Koral Beton

1.6500
0.2500
0.0250
0.0800

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

218.0000
0.5200
0.8700

Kg
M3
M3

Rp.
Rp.
Rp.

1,120.00
150,000.00
160,000.00
Rp.

161,875.00

Rp.
Rp.
Rp.
Rp.

525.00
700.00
87.50
37.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 KG

PEK.PEMBESIAN DENGAN BESI POLOS


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Besi Beton Polos
Kawat Beton

0.0070
0.0070
0.0007
0.0003

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0500
0.0150

Kg
Kg

Rp.
Rp.

9,000.00
16,000.00
Rp.

1,350.00

Rp.
Rp.
Rp.
Rp.

22,500.00
26,000.00
3,250.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14

1 M2

PEK.BEKISTING UNTUK PONDASI


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Kayu Meranti
Paku Biasa
Minyak Bekisting

0.3000
0.2600
0.0260
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0400
0.3000
0.1000

M3
M3
Ltr

Rp.
Rp.
Rp.

2,000,000.00
16,000.00
20,000.00
Rp.

52,375.00

Rp.
Rp.
Rp.
Rp.

172,500.00
100,000.00
12,500.00
37,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15

1 M3

PEK.MEMBUAT BETON DENGAN MUTU K-225


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil

2.3000
1.0000
0.1000
0.3000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

388.0000
0.6500
0.6500

Kg
M3
M3

Rp.
Rp.
Rp.

1,120.00
150,000.00
160,000.00
Rp.

322,500.00

Rp.
Rp.
Rp.
Rp.

172,500.00
100,000.00
12,500.00
37,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
16

1 M3

PEK.MEMBUAT BETON DENGAN MUTU K-275


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Kerikil

2.3000
1.0000
0.1000
0.3000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

400.0000
0.4000
0.8200

Kg
M3
M3

Rp.
Rp.
Rp.

1,120.00
150,000.00
160,000.00
Rp.

322,500.00

Rp.
Rp.
Rp.
Rp.

525.00
700.00
875.00
375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
17

1 Kg

PEK.PEMBESIAN DENGAN BESI ULIR


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Besi Ulir
Kawat Beton

0.007
0.007
0.007
0.003

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.050 Kg
0.015 Kg

Rp.
Rp.

10,000.00
16,000.00
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
18

1M

PEK.MEMBUAT PASANG BEKISTING UNTUK PONDASI

2,475.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

224.00
3,900.00
7,040.00
11,164.00
100,414.00
100,414.00
100,400.00
100,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

244,160.00
78,000.00
139,200.00
461,360.00
623,235.00
623,235.00
623,200.00
623,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,450.00
240.00
9,690.00
11,040.00
11,040.00
11,000.00
11,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80,000.00
4,800.00
2,000.00
86,800.00
139,175.00
139,175.00
139,100.00
139,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

434,560.00
97,500.00
104,000.00
636,060.00
958,560.00
958,560.00
958,500.00
958,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

448,000.00
60,000.00
131,200.00
639,200.00
961,700.00
961,700.00
961,700.00
961,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,500.00
240.00
10,740.00
13,215.00
13,215.00
13,200.00
13,200.00

TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang / kayu klas III
Paku biasa 2" - 5"
Minyak bekisting

0.300
0.260
0.026
0.005

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.040 M3
0.300 Kg
0.100 Ltr

Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00

Rp.
Rp.
Rp.
Rp.

22,500.00
26,000.00
3,250.00
625.00

Rp.

52,375.00

Rp.
Rp.
Rp.
Rp.

22,500.00
26,000.00
3,250.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
19

1M

PEK.MEMBUAT PASANG BEKISTING UNTUK SLOOF


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang/ kayu klas III
Paku biasa 2" - 5"
Minyak bekisting

0.300
0.260
0.026
0.005

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.040 M3
0.300 Kg
0.100 Ltr

Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
Rp.

52,375.00

Rp.
Rp.
Rp.
Rp.

22,500.00
26,000.00
3,250.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
20

1 M3

PEK.MEMBUAT PASANG BEKISTING UNTUK BALOK LANTAI


TENAGA
0.300 Oh
Pekerja
0.260 Oh
Tukang
0.026 Oh
Kepala Tukang
0.005 Oh
Mandor
BAHAN
Kayu terentang/ kayu klas III
0.045 M3
Paku biasa 2" - 5"
0.300 Kg
Minyak bekisting
0.100 Ltr

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
Rp.

52,375.00

Rp.
Rp.
Rp.
Rp.

22,500.00
33,000.00
4,125.00
750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
21

1 M3

PEK.MEMBUAT PASANG BEKISTING UNTUK KOLOM


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang/ kayu klas III
Paku biasa 2" - 5"
Minyak bekisting
Balok kayu meranti/ kayu klas II
Plywood tebal 3 mm
Dolken kayu galam 8 - 10/4 m

0.300
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.040
0.400
0.200
0.015
0.350
2.000

M3
Kg
Ltr
M3
Lbr
Btg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.

60,375.00

Rp.
Rp.
Rp.
Rp.

22,500.00
33,000.00
4,125.00
750.00

SUB TOTAL
JUMLAH
DIBULATKAN
22

1 M3

JUMLAH TOTAL
PEK.MEMBUAT PASANG BEKISTING UNTUK BALOK LANTAI
TENAGA
0.300
Pekerja
0.330
Tukang
0.033
Kepala Tukang
0.006
Mandor
BAHAN
Kayu terentang/ kayu klas III
0.040
Paku biasa 2" - 5"
0.400
Minyak bekisting
0.200
Balok kayu meranti/ kayu klas II
0.018
Plywood tebal 3 mm
0.350
Dolken kayu galam 8 - 10/4 m
2.000

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

M3
Kg
Ltr
M3
Lbr
Btg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.

60,375.00

Rp.
Rp.
Rp.
Rp.

22,500.00
33,000.00
4,125.00
750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
23

1M

PEK.MEMBUAT PASANG BEKISTING UNTUK RING BALOK


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang/ kayu klas III
Paku biasa 2" - 5"
Minyak bekisting
Balok kayu meranti/ kayu klas II
Plywood tebal 3 mm
Dolken kayu galam 8 - 10/4 m

0.300
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.040
0.400
0.200
0.018
0.350
2.000

M3
Kg
Ltr
M3
Lbr
Btg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.

60,375.00

Rp.

24,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

24

1 M3

PEK.MEMBUAT PASANG BEKISTING UNTUK PLAT LANTAI


TENAGA
Pekerja

0.320 Oh

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
4,800.00
2,000.00
74,800.00
127,175.00
127,175.00
127,100.00
127,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
4,800.00
2,000.00
74,800.00
127,175.00
127,175.00
127,100.00
127,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

76,500.00
4,800.00
2,000.00
83,300.00
135,675.00
135,675.00
135,600.00
135,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
15,000.00
137,400.00
197,775.00
197,775.00
197,700.00
197,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
6,400.00
4,000.00
36,000.00
14,000.00
15,000.00
143,400.00
203,775.00
203,775.00
203,700.00
203,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

68,000.00
6,400.00
4,000.00
36,000.00
14,000.00
15,000.00
143,400.00
203,775.00
203,775.00
203,700.00
203,700.00

BAHAN

Tukang
Kepala Tukang
Mandor

0.330 Oh
0.033 Oh
0.006 Oh

Rp.
Rp.
Rp.

100,000.00
125,000.00
125,000.00

Kayu terentang/ kayu klas III


Paku biasa 2" - 5"
Minyak bekisting
Balok kayu meranti/ kayu klas II
Plywood tebal 3 mm
Dolken kayu galam 8 - 10/4 m

0.040
0.400
0.200
0.015
0.350
6.000

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00

M3
Kg
Ltr
M3
Lbr
Btg

Rp.
Rp.
Rp.

33,000.00
4,125.00
750.00

Rp.

61,875.00

Rp.
Rp.
Rp.
Rp.

24,000.00
33,000.00
4,125.00
750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
25

1M

PEK.MEMBUAT PASANG BEKISTING UNTUK TANGGA


TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang/ kayu klas III
Paku biasa 2" - 5"
Minyak bekisting
Balok kayu meranti/ kayu klas II
Plywood tebal 3 mm
Dolken kayu galam 8 - 10/4 m

0.320
0.330
0.033
0.006

Oh
Oh
Oh
Oh

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.040
0.400
0.200
0.015
0.350
6.000

M3
Kg
Ltr
M3
Lbr
Btg

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.

61,875.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
26

1M

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
141.09 Kg
Rp.
13,200.00
Papan cetakan kayu kls III
2.37 M2
Rp.
127,100.00

Rp.
Rp.
Rp.
Rp.

958,500.00
1,862,432.00
301,274.07
3,122,206.07

JUMLAH TOTAL
1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
134.78 Kg
Rp.
13,200.00
2
Papan cetakan kayu kls III
3.20 M
Rp.
127,100.00

Rp.
Rp.
Rp.
Rp.

958,500.00
1,779,148.80
406,720.00
3,144,368.80

JUMLAH TOTAL
28

1M

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
141.96 Kg
Rp.
13,200.00
Papan cetakan kayu kls III
4.00 M2
Rp.
127,100.00

Rp.
Rp.
Rp.
Rp.

958,500.00
1,873,872.00
508,400.00
3,340,772.00

JUMLAH TOTAL
1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
108.16 Kg
Rp.
13,200.00
2
Papan cetakan kayu kls III
1.33 M
Rp.
127,100.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
45,000.00
167,400.00
229,275.00
229,275.00
229,200.00
229,200.00

Rp.
Rp.
Rp.
Rp.
Rp.

3,122,206.07
3,122,206.07
3,122,200.00
3,122,200.00

Rp.
Rp.
Rp.
Rp.
Rp.

3,144,368.80
3,144,368.80
3,144,300.00
3,144,300.00

Rp.
Rp.
Rp.
Rp.
Rp.

3,340,772.00
3,340,772.00
3,340,700.00
3,340,700.00

Rp.
Rp.
Rp.
Rp.
Rp.

2,555,678.67
2,555,678.67
2,555,600.00
2,555,600.00

STEMPAT TYPE P3)

SUB TOTAL
JUMLAH
DIBULATKAN

29

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

STEMPAT TYPE P2)

SUB TOTAL
JUMLAH
DIBULATKAN

68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
45,000.00
167,400.00
229,275.00
229,275.00
229,200.00
229,200.00

STEMPAT TYPE P1)

SUB TOTAL
JUMLAH
DIBULATKAN

27

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

STEMPAT TYPE P4)


Rp.
Rp.
Rp.
Rp.

958,500.00
1,427,712.00
169,466.67
2,555,678.67

30

1M

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S1 Uk. 25x60 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
168.80 Kg
Rp.
13,200.00 Rp.
2,228,160.00
Papan cetakan kayu kls III
4.00 M2
Rp.
203,700.00 Rp.
814,800.00
Rp. 4,001,460.00 Rp.
SUB TOTAL
Rp.
4,001,460.00
JUMLAH
Rp.
4,001,460.00
DIBULATKAN
Rp.
4,001,400.00
JUMLAH TOTAL
Rp.
4,001,400.00

31

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S2 Uk. 20x30 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
148.00 Kg
Rp.
13,200.00 Rp.
1,953,600.00
2
Papan cetakan kayu kls III
8.00 M
Rp.
203,700.00 Rp.
1,629,600.00
Rp. 4,541,700.00 Rp.
SUB TOTAL
Rp.
4,541,700.00
JUMLAH
Rp.
4,541,700.00
DIBULATKAN
Rp.
4,541,700.00
JUMLAH TOTAL
Rp.
4,541,700.00

32

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S3 Uk. 25x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
166.52 Kg
Rp.
13,200.00 Rp.
2,198,020.00
2
Papan cetakan kayu kls III
8.00 M
Rp.
203,700.00 Rp.
1,629,600.00
Rp. 4,786,120.00 Rp.

SUB TOTAL
JUMLAH
DIBULATKAN

Rp.
Rp.
Rp.
Rp.

4,786,120.00
4,786,120.00
4,786,100.00
4,786,100.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K1 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
161.87 Kg
Rp.
13,200.00 Rp.
2,136,640.00
Papan cetakan kayu kls III
6.25 M2
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 4,330,765.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

4,330,765.00
4,330,765.00
4,330,700.00
4,330,700.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K2 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
76.73 Kg
Rp.
13,200.00 Rp.
1,012,770.00
2
Papan cetakan kayu kls III
6.25 M
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 3,206,895.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

3,206,895.00
3,206,895.00
3,206,800.00
3,206,800.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K3 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
115.98 Kg
Rp.
13,200.00 Rp.
1,530,870.00
2
Papan cetakan kayu kls III
6.25 M
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 3,724,995.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

3,724,995.00
3,724,995.00
3,724,900.00
3,724,900.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K4 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
155.00 Kg
Rp.
13,200.00 Rp.
2,046,000.00
Papan cetakan kayu kls III
6.25 M2
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 4,240,125.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

4,240,125.00
4,240,125.00
4,240,100.00
4,240,100.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM PRAKTIS Uk. 11x11 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
288.11 Kg
Rp.
13,200.00 Rp.
3,802,996.36
2
Papan cetakan kayu kls III
18.18 M
Rp.
197,700.00 Rp.
3,594,545.45
Rp. 8,356,041.82 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.
JUMLAH TOTAL
Rp.

8,356,041.82
8,356,041.82
8,356,000.00
8,356,000.00

JUMLAH TOTAL

33

34

35

36

37

1 M3

1 M3

1 M3

1 M3

1 M3

38

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B1 Uk. 30x55 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
138.80 Kg
Rp.
13,200.00 Rp.
1,832,160.00
2
Papan cetakan kayu kls III
6.36 M
Rp.
203,700.00 Rp.
1,296,272.73
Rp. 4,086,932.73 Rp.
SUB TOTAL
Rp.
4,086,932.73
JUMLAH
Rp.
4,086,932.73
DIBULATKAN
Rp.
4,086,900.00
JUMLAH TOTAL
Rp.
4,086,900.00

39

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B2 Uk. 30x40 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
161.87 Kg
Rp.
13,200.00 Rp.
2,136,640.00
Papan cetakan kayu kls III
5.83 M2
Rp.
203,700.00 Rp.
1,188,250.00
Rp. 4,283,390.00 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.
JUMLAH TOTAL
Rp.

4,283,390.00
4,283,390.00
4,283,300.00
4,283,300.00

40

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B3 Uk. 25x35 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
176.75 Kg
Rp.
13,200.00 Rp.
2,333,056.00
Papan cetakan kayu kls III
4.72 M2
Rp.
203,700.00 Rp.
961,916.67
Rp. 4,253,472.67 Rp.
SUB TOTAL
Rp.
4,253,472.67
JUMLAH
Rp.
4,253,472.67
DIBULATKAN
Rp.
4,253,400.00
JUMLAH TOTAL
Rp.
4,253,400.00

41

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B4 Uk. 15x30 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
182.61 Kg
Rp.
13,200.00 Rp.
2,410,393.33
2
Papan cetakan kayu kls III
6.67 M
Rp.
203,700.00 Rp.
1,358,000.00
Rp. 4,726,893.33 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.

4,726,893.33
4,726,893.33
4,726,800.00

JUMLAH TOTAL
42

43

44

1M

1 M3

1 M3

Rp.

4,726,800.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT LANTAI TEBAL 12 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
74.67 Kg
Rp.
13,200.00 Rp.
985,600.00
2
Papan cetakan kayu kls III
8.33 M
Rp.
229,200.00 Rp.
1,910,000.00
Rp. 3,854,100.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

3,854,100.00
3,854,100.00
3,854,100.00
3,854,100.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT DINDING TEBAL 15 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
134.10 Kg
Rp.
13,200.00 Rp.
1,770,120.00
2
Papan cetakan kayu kls III
10.00 M
Rp.
229,200.00 Rp.
2,292,000.00
Rp. 5,020,620.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

5,020,620.00
5,020,620.00
5,020,600.00
5,020,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,697,700.00
1,697,700.00
1,697,700.00
1,697,700.00

PEK.MEMBUAT BETON BERTULANG STRUKTUR (PLAT LANTAI 1 TEBAL 7 cm)


BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
Besi Ulir
56.00 Kg
Rp.

958,500.00
13,200.00

Rp.
Rp.
Rp.

958,500.00
739,200.00
1,697,700.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
45

1M

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT BORDES TEBAL 12 cm untuk TANGGA )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
306.00 Kg
Rp.
13,200.00 Rp.
4,039,200.00
2
Papan cetakan kayu kls III
4.17 M
Rp.
229,200.00 Rp.
955,764.00
Rp. 5,953,464.00 Rp.
SUB TOTAL
Rp.
5,953,464.00
JUMLAH
Rp.
5,953,464.00
DIBULATKAN
Rp.
5,953,400.00
JUMLAH TOTAL
Rp.
5,953,400.00

46

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT TANGGA TEBAL 12 cm untuk TANGGA )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
444.00 Kg
Rp.
13,200.00 Rp.
5,860,800.00
2
Papan cetakan kayu kls III
4.17 M
Rp.
229,200.00 Rp.
955,764.00
Rp. 7,775,064.00 Rp.
SUB TOTAL
Rp.
7,775,064.00
JUMLAH
Rp.
7,775,064.00
DIBULATKAN
Rp.
7,775,000.00
JUMLAH TOTAL
Rp.
7,775,000.00

47

1 M3

PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (ANAK TANGGA untuk TANGGA
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
263.00 Kg
Rp.
13,200.00 Rp.
3,471,600.00
Papan cetakan kayu kls III
3.33 M2
Rp.
229,200.00 Rp.
763,236.00
Rp. 5,193,336.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

5,193,336.00
5,193,336.00
5,193,300.00
5,193,300.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP


1
1

1 M2

2
PEK.PASANG ATAP LONGSPAN ZINCKALUM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Atap Zincalume - Alluminium tebal 0,3 mm
Paku Atap Zincalume

0.2000
0.1000
0.0100
0.0010

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0200
0.2000

M2
Kg

Rp.
Rp.

85,000.00
25,000.00

Rp.
Rp.
Rp.
Rp.

15,000.00
10,000.00
1,250.00
125.00

Rp.

26,375.00

Rp.
Rp.
Rp.
Rp.

15,000.00
10,000.00
1,250.00
125.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK.PASANG ATAP GENTENG METAL TEBAL 0,4 MM


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Atap Genteng Metal tebal 0,4 mm
Paku Atap

0.2000
0.1000
0.0100
0.0010

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0200
0.2000

M2
Kg

Rp.
Rp.

65,000.00
25,000.00
Rp.

26,375.00

Rp.

18,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 M1

PEK.PASANG NOK ATAP GENTENG METAL


TENA:
Pekerja

0.2500

OH

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

86,700.00
5,000.00
91,700.00
118,075.00
118,075.00
118,000.00
118,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

66,300.00
5,000.00
71,300.00
97,675.00
97,675.00
97,600.00
97,600.00

Tukang Kayu
Kepala Tukang
Mandor

0.1500
0.0150
0.0130

OH
OH
OH

Rp.
Rp.
Rp.

100,000.00
125,000.00
125,000.00

Nok Genteng Metal


Paku Biasa

1.0000
0.0500

Lbr
Kg

Rp.
Rp.

35,000.000
16,000.000

Rp.
Rp.
Rp.

15,000.00
1,875.00
1,625.00

BAHAN

Rp.

37,250.00

Rp.
Rp.
Rp.
Rp.

15,000.00
15,000.00
1,875.00
1,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M1

PEK.PASANG JURAI DALAM


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Seng Plat
Plastik Got
Paku Biasa

0.2000
0.1500
0.0150
0.0130

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.1500
1.0000
0.0500

M2
M1
Kg

Rp.
Rp.
Rp.

40,000.000
15,000.000
16,000.000
Rp.

33,500.00

Rp.
Rp.
Rp.
Rp.

15,000.00
15,000.00
1,875.00
1,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 M1

PEK.PASANG BOLA-BOLA ATAP


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Bola - Bola Genteng
Paku Biasa

0.2000
0.1500
0.0150
0.0130

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.5000
0.0500

Lbr
Kg

Rp.
Rp.

15,000.000
16,000.000
Rp.

33,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

35,000.00
800.00
35,800.00
73,050.00
73,050.00
73,000.00
73,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,000.00
15,000.00
800.00
21,800.00
55,300.00
55,300.00
55,300.00
55,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,500.00
800.00
8,300.00
41,800.00
41,800.00
41,800.00
41,800.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI & ALUMUNIUM


1
1

1 M1

2
PEK.MEMASANG KUSEN PINTU ALLUMINIUM
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Alluminium 3"
Skrup Fixer
Sealant

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.

95,000.00
7,500.00
12,500.00

Rp.
Rp.
Rp.
Rp.

3,225.00
4,300.00
537.50
262.50

Rp.

8,325.00

Rp.
Rp.
Rp.
Rp.

6,375.00
8,500.00
1,125.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 M2

PEK.MEMASANG PINTU KACA RANGKA ALLUMINIUM


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Pintu Alluminium
Profil Kaca
Sealant

0.0850
0.0850
0.0090
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

4.5000 M1 Rp.
4.5000 M1 Rp.
0.2700 Tube Rp.

95,000.00
85,000.00
12,500.00
Rp.

16,625.00

Rp.
Rp.
Rp.
Rp.

15,000.00
40,000.00
3,125.00
1,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 M2

PEK.MEMASANG TALANG DATAR JURAI SENG BJLS 28 LEBAR 90 CM


TENAGA
Pekerja
0.2000 OH
Tukang Besi
0.4000 OH
Kepala Tukang
0.0250 OH
Mandor
0.0100 OH
BAHAN
Seng Plat
1.0500 M1
Paku 1 cm-2,5 cm
0.0150 Kg
Papan Kayu Klas II Atau Klas III
0.0190 M3

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.
Rp.

40,000.00
18,000.00
1,700,000.00
Rp.

59,375.00

Rp.
Rp.
Rp.
Rp.

11,250.00
30,000.00
3,750.00
1,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M2

PEK.MEMASANG TALANG 1/2 LINGKARAN D=15 CM, SENG PLAT BJLS 30 LEBAR
TENAGA
Pekerja
0.1500 OH Rp.
Tukang Besi
0.3000 OH Rp.
Kepala Tukang
0.0300 OH Rp.
Mandor
0.0080 OH Rp.
BAHAN
Seng Plat
1.0500 M1 Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

104,500.00
15,000.00
750.00
120,250.00
128,575.00
128,575.00
128,500.00
128,500.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

427,500.00
382,500.00
3,375.00
813,375.00
830,000.00
830,000.00
830,000.00
830,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

42,000.00
270.00
32,300.00
74,570.00
133,945.00
133,945.00
133,900.00
133,900.00

Rp.

42,000.00

45 CM
75,000.00
100,000.00
125,000.00
125,000.00
40,000.00

Paku 1 cm-2,5 cm
Besi Strip

0.0100
0.5000

Kg
Kg

Rp.
Rp.

18,000.00
3,000.00
Rp.

46,000.00

SUB TOTAL
OVERHEAD &PROFIT 10% X SUB JUMLAH
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

180.00
1,500.00
43,680.00
89,680.00
8,968.00
98,648.00
98,600.00
98,600.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANTAI DAN DINDING


1
1

1 M2

2
3
PEK.MEMASANG LANTAI KERAMIK, UKURAN (60 X 60) CM
TENAGA
Pekerja
0.7000
Tukang Kayu
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
BAHAN
Keramik 60 X 60 cm Homogenous
2.7778
Semen Type I/Portland Cement
10.0000
Semen Type I Warna
1.5000
Pasir Pasang
0.0450

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

90,000.25
1,120.00
12,500.00
150,000.00

Rp.
Rp.
Rp.
Rp.

52,500.00
35,000.00
4,375.00
4,375.00

Rp.

96,250.00

Rp.
Rp.
Rp.
Rp.

15,000.00
35,000.00
4,375.00
4,375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

1 M2

PEK.MEMASANG LANTAI KERAMIK, UKURAN (40 X 40) CM


TENAGA
Pekerja
0.2000
Tukang Kayu
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
BAHAN
Keramik 40 X 40 cm
1.0000
Semen Type I/Portland Cement
10.0000
Semen Type I Warna
1.5000
Pasir Pasang
0.0450

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

M2
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

85,000.00
1,120.00
12,500.00
150,000.00
Rp.

58,750.00

Rp.
Rp.
Rp.
Rp.

6,750.00
9,000.00
1,125.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1M

PEK.MEMASANG PLINT LANTAI KERAMIK UKURAN (10 X 40) CM


TENAGA
Pekerja
0.0900
Tukang Kayu
0.0900
Kepala Tukang
0.0090
Mandor
0.0050
BAHAN
Plint Keramik 10 x 40
3.5300
Semen Type I/Portland Cement
1.1400
Semen Type I Warna
0.1000
Pasir Pasang
0.0030

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

3,400.00
1,120.00
12,500.00
150,000.00
Rp.

17,500.00

Rp.
Rp.
Rp.
Rp.

6,750.00
9,000.00
1,125.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
4

1 M1

JUMLAH TOTAL
PEK.MEMASANG PLINT LANTAI KERAMIK UKURAN (10 X 60) CM
TENAGA
Pekerja
0.0900
Tukang Kayu
0.0900
Kepala Tukang
0.0090
Mandor
0.0050
BAHAN
Plint Keramik 10 x 60
1.7000
Semen Type I/Portland Cement
1.1400
Semen Type I Warna
0.1000
Pasir Pasang
0.0030

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

15,000.04
1,120.00
12,500.00
150,000.00
Rp.

17,500.00

Rp.
Rp.
Rp.
Rp.

6,750.00
9,000.00
1,125.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1M

PEK.MEMASANG PLINT LANTAI KERAMIK UKURAN (10 X 25) CM


TENAGA
Pekerja
0.0900
Tukang Kayu
0.0900
Kepala Tukang
0.0090
Mandor
0.0050
BAHAN
Plint Keramik 10 x 25
1.5000
Semen Type I/Portland Cement
1.1400
Semen Type I Warna
0.1000
Pasir Pasang
0.0030

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

1,200.00
1,120.00
12,500.00
150,000.00
Rp.

17,500.00

Rp.
Rp.

52,500.00
35,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1M

PEK.MEMASANG LANTAI KERAMIK, UKURAN (25 X 25) CM


TENAGA
Pekerja
0.7000
Tukang Kayu
0.3500

OH
OH

Rp.
Rp.

75,000.00
100,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

250,000.63
11,200.00
18,750.00
6,750.00
286,700.63
382,950.63
382,950.63
382,900.00
382,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

85,000.00
11,200.00
18,750.00
6,750.00
121,700.00
180,450.00
180,450.00
180,400.00
180,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

12,002.00
1,276.80
1,250.00
450.00
14,978.80
32,478.80
32,478.80
32,400.00
32,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,500.07
1,276.80
1,250.00
450.00
28,476.87
45,976.87
45,976.87
45,900.00
45,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,800.00
1,276.80
1,250.00
450.00
4,776.80
22,276.80
22,276.80
22,200.00
22,200.00

Kepala Tukang
Mandor

0.0350
0.0350

OH
OH

Rp.
Rp.

125,000.00
125,000.00

26.5000
10.4000
1.6200
0.0450

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

3,000.00
1,120.00
12,500.00
150,000.00

Rp.
Rp.

4,375.00
4,375.00

BAHAN
Keramik 25 X 25 cm
Semen Type I/Portland Cement
Semen Type I Warna
Pasir Pasang

Rp.

96,250.00

Rp.
Rp.
Rp.
Rp.

78,750.00
52,500.00
6,625.00
6,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 M2

PEK.MEMASANG LANTAI KERAMIK, UKURAN (10 X 40) CM, VARIASI/BORDES


TENAGA
Pekerja
1.0500 OH Rp.
Tukang Kayu
0.5250 OH Rp.
Kepala Tukang
0.0530 OH Rp.
Mandor
0.0530 OH Rp.
BAHAN
Keramik 10 X 40 cm
40.0000 Bh Rp.
Semen Type I/Portland Cement
9.8000 Kg Rp.
Semen Type I Warna
4.3700 Kg Rp.
Pasir Pasang
0.0450 M3 Rp.

75,000.00
100,000.00
125,000.00
125,000.00
3,400.00
1,120.00
12,500.00
150,000.00

Rp.

144,500.00

Rp.
Rp.
Rp.
Rp.

52,500.00
35,000.00
4,375.00
4,375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1 M2

PEK.MEMASANG LANTAI MARMER, UKURAN (100 X 100) CM


TENAGA
Pekerja
0.7000
Tukang Kayu
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
BAHAN
Marmer
1.0600
Semen Type I/Portland Cement
8.1900
Semen Type I Warna
0.6500
Pasir Pasang
0.0450

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

150,000.00
1,120.00
12,500.00
150,000.00
Rp.

96,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

1
9

1 M2

2
3
PEK.MEMASANG DINDING KERAMIK, UKURAN (11 X 11) CM
TENAGA
Pekerja
1.0000
Tukang Kayu
0.5000
Kepala Tukang
0.0500
Mandor
0.0500
BAHAN
Porselen
53.0000
Semen Type I/Portland Cement
9.3000
Semen Warna
1.5000
Pasir Pasang
0.0180

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

500.00
1,120.00
12,500.00
150,000.00

Rp.
Rp.
Rp.
Rp.

1M

PEK.MEMASANG DINDING KERAMIK, UKURAN (10 X 20) CM


TENAGA
Pekerja
0.9000
Tukang Kayu
0.4500
Kepala Tukang
0.0450
Mandor
0.0450
BAHAN
Keramik 10 x 20
53.0000
Semen Type I/Portland Cement
9.3000
Semen Warna
2.7500
Pasir Pasang
0.0180

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

940.00
1,120.00
12,500.00
150,000.00

Rp.

137,500.00

Rp.
Rp.
Rp.
Rp.

67,500.00
45,000.00
5,625.00
5,625.00

Rp.

123,750.00

Rp.
Rp.
Rp.
Rp.

67,500.00
45,000.00
5,625.00
5,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11

1M

PEK.MEMASANG DINDING KERAMIK, UKURAN (20 X 25) CM


TENAGA
Pekerja
0.9000
Tukang Kayu
0.4500
Kepala Tukang
0.0450
Mandor
0.0450
BAHAN
Keramik 20 x 25
26.0000
Semen Type I/Portland Cement
9.3000
Semen Warna
1.9400
Pasir Pasang
0.0180

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

2,400.00
1,120.00
12,500.00
150,000.00
Rp.

123,750.00

Rp.

22,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12

1M

PEK.MEMASANG DINDING KERAMIK, UKURAN (20 X 20) CM


TENAGA
Pekerja
0.3000

OH

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

136,000.00
10,976.00
54,625.00
6,750.00
208,351.00
352,851.00
352,851.00
352,800.00
352,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

159,000.00
9,172.80
8,125.00
6,750.00
183,047.80
279,297.80
279,297.80
279,200.00
279,200.00

75,000.00
50,000.00
6,250.00
6,250.00

JUMLAH TOTAL
10

79,500.00
11,648.00
20,250.00
6,750.00
118,148.00
214,398.00
214,398.00
214,300.00
214,300.00

SUB TOTAL
JUMLAH
DIBULATKAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

26,500.00
10,416.00
18,750.00
2,700.00
58,366.00
195,866.00
195,866.00
195,800.00
195,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

49,820.00
10,416.00
34,375.00
2,700.00
97,311.00
221,061.00
221,061.00
221,000.00
221,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

62,400.00
10,416.00
24,250.00
2,700.00
99,766.00
223,516.00
223,516.00
223,500.00
223,500.00

Tukang Kayu
Kepala Tukang
Mandor

0.3500
0.0450
0.0450

OH
OH
OH

Rp.
Rp.
Rp.

100,000.00
125,000.00
125,000.00

25.0000
9.3000
1.9400
0.0180

Bh
Kg
Kg
M3

Rp.
Rp.
Rp.
Rp.

1,920.00
1,120.00
12,500.00
150,000.00

Rp.
Rp.
Rp.

35,000.00
5,625.00
5,625.00

BAHAN
Keramik 20 x 20
Semen Type I/Portland Cement
Semen Warna
Pasir Pasang

Rp.

68,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
10,416.00
24,250.00
2,700.00
85,366.00
154,116.00
154,116.00
154,100.00
154,100.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING


1
1

1 M2

2
PEK.PASANGAN BATA MERAH TEBAL 1 BATA (1 : 2)
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Batu Bata
Semen Portland
Pasir Pasang

0.6500
0.2000
0.0200
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

175.0000
26.5500
0.0930

Bh
Kg
M3

Rp.
Rp.
Rp.

500.000
1,120.000
150,000.000

Rp.
Rp.
Rp.
Rp.

48,750.00
20,000.00
2,500.00
3,750.00

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.

24,000.00
10,000.00
1,250.00
1,875.00

SUB TOTAL
JUMLAH
DIBULATKAN
2

1 M2

JUMLAH TOTAL
PEK.PASANGAN BATA MERAH TEBAL 1/2 BATA (1 : 2)
TENAGA
Pekerja
0.3200
Tukang Kayu
0.1000
Kepala Tukang
0.0100
Mandor
0.0150
BAHAN
Batu Bata
102.0000
Semen Portland
18.9500
Pasir Pasang
0.0380

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
M3

Rp.
Rp.
Rp.

500.000
1,120.000
150,000.000
Rp.

37,125.00

Rp.
Rp.
Rp.
Rp.

24,000.00
10,000.00
1,250.00
1,875.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 M2

PEK.PASANGAN BATA MERAH TEBAL 1/2 BATA (1 : 4)


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Batu Bata
Semen Portland
Pasir Pasang

0.3200
0.1000
0.0100
0.0150

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

102.0000
11.5000
0.0430

Bh
Kg
M3

Rp.
Rp.
Rp.

500.00
1,120.00
150,000.00
Rp.

37,125.00

Rp.
Rp.
Rp.
Rp.

48,750.00
20,000.00
2,500.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M2

PEK.PASANGAN BATA MERAH TEBAL 1 BATA (1 : 4)


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Batu Bata
Semen Portland
Pasir Pasang

0.6500
0.2000
0.0200
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

175.0000
11.5000
0.0430

Bh
Kg
M3

Rp.
Rp.
Rp.

500.00
1,120.00
150,000.00
Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.

112,500.00
60,000.00
7,500.00
9,375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 M3

PEK.PASANGAN DINDING BATU KALI


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Kali
Semen Abu-abu
Pasir Pasang

1.5000
0.6000
0.0600
0.0750

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000
163.0000
0.5200

M3
Kg
M3

Rp.
Rp.
Rp.

200,000.00
1,120.00
150,000.00
Rp.

189,375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

87,500.00
29,736.00
13,950.00
131,186.00
206,186.00
206,186.00
206,100.00
206,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

51,000.00
21,224.00
5,700.00
77,924.00
115,049.00
115,049.00
115,000.00
115,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

51,000.00
12,880.00
6,450.00
70,330.00
107,455.00
107,455.00
107,400.00
107,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

87,500.00
12,880.00
6,450.00
106,830.00
181,830.00
181,830.00
181,800.00
181,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

220,000.00
182,560.00
78,000.00
480,560.00
669,935.00
669,935.00
669,900.00
669,900.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN


1
1

1 M2

2
PEK.PLESTERAN 1 : 2, TEBAL 20 MM
TENAGA
Pekerja
Tukang Kayu

0.2500
0.2000

OH
OH

Rp.
Rp.

75,000.00
100,000.00

Rp.
Rp.

18,750.00
20,000.00

Kepala Tukang
Mandor

0.0200
0.0125

OH
OH

Rp.
Rp.

125,000.00
125,000.00

14.2800
0.0230

Kg
M3

Rp.
Rp.

1,120.000
150,000.000

Rp.
Rp.

2,500.00
1,562.50

Rp.

42,812.50

Rp.
Rp.
Rp.
Rp.

18,750.00
20,000.00
2,500.00
1,562.50

BAHAN
Semen Portland
Pasir Pasang
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK.PLESTERAN 1 : 4, TEBAL 20 MM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang

0.2500
0.2000
0.0200
0.0125

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

8.6800
0.0280

Kg
M3

Rp.
Rp.

1,120.000
150,000.000
Rp.

42,812.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

1
3

1 M2

2
PEK.PLESTERAN BERAPEN 1 : 3, TEBAL 30 MM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang

0.1500
0.0700
0.0070
0.0080

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

7.0700
0.0210

Kg
M3

Rp.
Rp.

1,120.000
150,000.000

1M

PEK.PLESTERAN BETON 1 : 3, TEBAL 10 MM


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang

0.2000
0.2000
0.0180
0.0100

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

2.3400
0.0070

Kg
M3

Rp.
Rp.

1,120.000
150,000.000

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,721.60
4,200.00
13,921.60
56,734.10
56,734.10
56,700.00
56,700.00

Rp.
Rp.
Rp.
Rp.

11,250.00
7,000.00
875.00
1,000.00

Rp.

20,125.00

Rp.
Rp.
Rp.
Rp.

15,000.00
20,000.00
2,250.00
1,250.00

JUMLAH TOTAL
4

15,993.60
3,450.00
19,443.60
62,256.10
62,256.10
62,200.00
62,200.00

SUB TOTAL
JUMLAH
DIBULATKAN

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

Rp.

38,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,918.40
3,150.00
11,068.40
31,193.40
31,193.40
31,100.00
31,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,620.80
1,050.00
3,670.80
42,170.80
42,170.80
42,100.00
42,100.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN KUSEN PINTU DAN JENDELA


1
1

1 M2

2
PEK.MEMASANG PINTU ROLLING DOOR ALUMINIUM
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Pintu Gulung Besi

1.0000
1.0000
0.1000
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

M2

Rp.

400,000.00

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
12,500.00
625.00

Rp.

188,125.00

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
12,500.00
625.00

Rp.

188,125.00

Rp.
Rp.
Rp.
Rp.

3,225.00
4,300.00
537.50
262.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK.MEMASANG PINTU FALDING GATE (BOAT STORAGE)


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Pintu Falding Gate Besi

1.0000
1.0000
0.1000
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

M2

Rp.

600,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1M

PEK.MEMASANG KUZEN PINTU ALUMINIUM 3"


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Aluminium 3"
Skrup Fixer
Sealant

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.

95,000.00
250.00
12,500.00
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN

8,325.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

400,000.00
400,000.00
588,125.00
588,125.00
588,100.00
588,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

600,000.00
600,000.00
788,125.00
788,125.00
788,100.00
788,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

104,500.00
500.00
750.00
105,750.00
114,075.00
114,075.00
114,000.00

JUMLAH TOTAL
4

1M

PEK.MEMASANG KUZEN PINTU ALUMINIUM 4"


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Aluminium 4"
Skrup Fixer
Sealant

0.0430
0.0430
0.0043
0.0021

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.

65,000.00
250.00
12,500.00

Rp.
Rp.
Rp.
Rp.

Rp.

8,325.00

Rp.
Rp.
Rp.
Rp.

6,375.00
8,500.00
1,062.50
525.00

JUMLAH TOTAL
5

1M

PEK.MEMASANG PINTU ALUMINIUM STRIP LEBAR 8 CM


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Aluminium
Aluminium Strip

0.0850
0.0850
0.0085
0.0042

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

4.4000
14.6000

M1
M1

Rp.
Rp.

95,000.00
25,000.00
Rp.

16,462.50

Rp.
Rp.
Rp.
Rp.

6,375.00
8,500.00
1,000.00
500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1M

PEK. MEMASANG PINTU KACA RANGKA ALUMINIUM


TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Aluminium
Profil Kaca BeningT. 5 mm
Sealant

0.0850
0.0850
0.0080
0.0040

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

4.4000 M1 Rp.
4.5000 M1 Rp.
0.2700 Tube Rp.

95,000.00
111,600.00
12,500.00
Rp.

16,375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

1
7

2
1 UNIT PEK.PASANG KUZEN TYPE P-1
TENAGA + BAHAN :
Rangka Alluminium 4"
Pasang Pintu Kaca Tempered tebal 12mm
Pasang Kacabening 5 mm
Flour Hings
Pegangan Tangan Pintu
Kunci Pintu

10.0000
5.7600
0.7500
4.0000
4.0000
2.0000

M1
M2
M2
Bh
Ps
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

810,000.00
4,780,800.00
157,950.00
3,672,400.00
612,400.00
269,200.00
###

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

810,000.00
10,881,300.00
157,950.00
3,672,400.00
612,400.00
269,200.00
###

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

729,000.00
3,054,400.00
842,400.00
3,672,400.00
612,400.00
269,200.00
9,179,800.00

Rp.
Rp.
Rp.

729,000.00
3,245,300.00
775,008.00

JUMLAH TOTAL

1 UNIT PEK.PASANG KUZEN TYPE P-J1


TENAGA + BAHAN :
Rangka Alluminium 4"
Pasang Pintu Kaca Tempered tebal 12mm
Pasang Kacabening 5 mm
Flour Hings
Pegangan Tangan Pintu
Kunci Pintu

10.0000
13.1100
0.7500
4.0000
4.0000
2.0000

M1
M2
M2
Bh
Ps
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1 UNIT PEK.PASANG KUZEN TYPE P-2


TENAGA + BAHAN :
Rangka Alluminium 4"
Pasang Pintu Kaca Tempered tebal 12 mm
Pasang Kacabening 5 mm
Flour Hings
Pegangan Tangan Pintu
Kunci Pintu

9.0000
3.6800
4.0000
4.0000
4.0000
2.0000

M1
M2
M2
Bh
Ps
Bh

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

1 UNIT PEK.PASANG KUZEN TYPE P-3


TENAGA + BAHAN :
Rangka Alluminium 4"
Pasang Pintu Kaca Tempered tebal 12 mm
Pasang Kacabening 5 mm

9.0000
3.9100
3.6800

M1
M2
M2

Rp.
Rp.
Rp.

81,000.00
830,000.00
210,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

71,500.00
500.00
750.00
72,750.00
81,075.00
81,075.00
81,000.00
81,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

418,000.00
365,000.00
783,000.00
799,462.50
799,462.50
799,400.00
799,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

418,000.00
502,200.00
3,375.00
923,575.00
939,950.00
939,950.00
939,900.00
939,900.00

SUB TOTAL
JUMLAH
DIBULATKAN

114,000.00

3,225.00
4,300.00
537.50
262.50

SUB TOTAL
JUMLAH
DIBULATKAN

Rp.

Rp.
Rp.
Rp.
Rp.
Rp.

10,302,750.00
10,302,750.00
10,302,700.00
10,302,700.00

Rp.
Rp.
Rp.
Rp.
Rp.

16,403,250.00
16,403,250.00
16,403,200.00
16,403,200.00

Rp.
Rp.
Rp.
Rp.
Rp.

9,179,800.00
9,179,800.00
9,179,800.00
9,179,800.00

Flour Hings
Pegangan Tangan Pintu
Kunci Pintu

4.0000
4.0000
2.0000

Bh
Ps
Bh

Rp.
Rp.
Rp.

918,100.00
153,100.00
134,600.00

Rp.
Rp.
Rp.
Rp.

3,672,400.00
612,400.00
269,200.00
9,303,308.00

Rp.
Rp.
Rp.
Rp.
Rp.

173,600.00
445,500.00
708,750.00
134,600.00
1,462,450.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

13

1 UNIT PEK.PASANG KUZEN TYPE P-4


TENAGA + BAHAN :
Kayu
Sungkai Wood
Dauble Multiwood 9 mm
Kunci Pintu

0.0620
4.0500
4.0500
1.0000

M3
M2
M2
Bh

Rp.

2,800,000.000
110,000.000
175,000.000
134,600.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 UNIT PEK.PASANG KUZEN TYPE P-5


TENAGA + BAHAN :
Kayu
Sungkai Wood
Dauble Multiwood 9 mm
Kunci Pintu

0.0620
3.4500
3.4500
1.0000

M3
M2
M2
Bh

Rp.

2,800,000.000
110,000.000
175,000.000
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

173,600.00
379,500.00
603,750.00
134,600.00
1,291,450.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 UNIT PEK.PASANG KUZEN TYPE P-6


TENAGA + BAHAN :
Kayu
Sungkai Wood
Dauble Multiwood 9 mm
Kunci Pintu

0.0620
2.7600
2.7600
1.0000

M3
M2
M2
Bh

Rp.

2,800,000.000
110,000.000
175,000.000
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

173,600.00
303,600.00
483,000.00
134,600.00
1,094,800.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

13

1 UNIT PEK.PASANG KUZEN TYPE P-7


TENAGA + BAHAN :
Kayu
Sungkai Wood
Dauble Multiwood 9 mm
Kunci Pintu

0.0620
2.4000
2.4000
1.0000

M3
M2
M2
Bh

Rp.

2,800,000.000
110,000.000
175,000.000
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

173,600.00
264,000.00
420,000.00
134,600.00
992,200.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 UNIT PEK.PASANG KUZEN TYPE P-8


TENAGA + BAHAN :
Kayu
Sungkai Wood
Dauble Multiwood 9 mm
Kunci Pintu

0.0620
1.8400
1.8400
1.0000

M3
M2
M2
Bh

Rp.

2,800,000.000
110,000.000
175,000.000
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

173,600.00
202,400.00
322,000.00
134,600.00
832,600.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

14

1 UNIT PEK.PASANG KUZEN TYPE J1


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 5 mm

15.0000
2.0000

M1
M2

Rp.
Rp.

81,000.00
250,000.00

Rp.
Rp.
Rp.

1,215,000.00
500,000.00
1,715,000.00

Rp.
Rp.
Rp.

1,944,000.00
925,000.00
2,869,000.00

Rp.
Rp.

2,835,000.00
1,063,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15

1 UNIT PEK.PASANG KUZEN TYPE J2


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

24.0000
3.7000

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

16

1 UNIT PEK.PASANG KUZEN TYPE J3


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

35.0000
4.2550

M1
M2

Rp.
Rp.

81,000.00
250,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

9,303,308.00
9,303,308.00
9,303,300.00
9,303,300.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,462,450.00
1,462,450.00
1,462,400.00
1,462,400.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,291,450.00
1,291,450.00
1,291,400.00
1,291,400.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,094,800.00
1,094,800.00
1,094,800.00
1,094,800.00

Rp.
Rp.
Rp.
Rp.
Rp.

992,200.00
992,200.00
992,200.00
992,200.00

Rp.
Rp.
Rp.
Rp.
Rp.

832,600.00
832,600.00
832,600.00
832,600.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,715,000.00
3,430,000.00
3,430,000.00
3,430,000.00
3,430,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

2,869,000.00
5,738,000.00
5,738,000.00
5,738,000.00
5,738,000.00

Rp.

3,898,750.00

Rp.
Rp.
Rp.

5,265,000.00
1,650,000.00
6,915,000.00

Rp.
Rp.
Rp.

1,944,000.00
1,035,000.00
2,979,000.00

Rp.
Rp.
Rp.

5,427,000.00
2,160,000.00
7,587,000.00

Rp.
Rp.
Rp.

324,000.00
500,000.00
824,000.00

Rp.
Rp.
Rp.

777,600.00
525,000.00
1,302,600.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

17

1 UNIT PEK.PASANG KUZEN TYPE J4


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

65.0000
6.6000

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

18

1 UNIT PEK.PASANG KUZEN TYPE J5


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

24.0000
4.1400

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

19

1 UNIT PEK.PASANG KUZEN TYPE J6


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

67.0000
8.6400

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

31

1 UNIT PEK.PASANG KUZEN TYPE V1


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

4.0000
2.0000

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

32

1 UNIT PEK.PASANG KUZEN TYPE V2


TENAGA + BAHAN :
Rangka Alluminium Powder Coating
Pasang Kaca Polos 8 mm

9.6000
2.1000

M1
M2

Rp.
Rp.

81,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

3,898,750.00
7,797,500.00
7,797,500.00
7,797,500.00
7,797,500.00

Rp.
Rp.
Rp.
Rp.
Rp.

6,915,000.00
13,830,000.00
13,830,000.00
13,830,000.00
13,830,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

2,979,000.00
5,958,000.00
5,958,000.00
5,958,000.00
5,958,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

7,587,000.00
15,174,000.00
15,174,000.00
15,174,000.00
15,174,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

824,000.00
1,648,000.00
1,648,000.00
1,648,000.00
1,648,000.00

Rp.
Rp.
Rp.
Rp.
Rp.

1,302,600.00
2,605,200.00
2,605,200.00
2,605,200.00
2,605,200.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU


1
1

1 M3

2
PEK.PASANG KUSEN PINTU DAN JENDELA KAYU KULIM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Kulim
Paku Biasa

6.0000
18.0000
2.0000
0.3000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
0.1500

M3
Kg

Rp.
Rp.

2,800,000.00
16,000.00

Rp.
Rp.
Rp.
Rp.

450,000.00
1,800,000.00
250,000.00
37,500.00

Rp.

2,537,500.00

Rp.
Rp.
Rp.
Rp.

18,750.00
20,000.00
2,500.00
1,562.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK.PASANG JENDELA KACA BINGKAI (KACA 5 MM)


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Meranti
Kaca Bening 5 mm
Paku Biasa

0.2500
0.2000
0.0200
0.0125

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0200
1.2000
0.1500

M3
M2
Kg

Rp.
Rp.
Rp.

2,000,000.000
85,000.000
16,000.000
Rp.

42,812.50

Rp.
Rp.

75,000.00
250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 M2

PEK.PASANG PINTU PANEL KAYU SURIAN


TENAGA
Pekerja
Tukang Kayu

1.0000
2.5000

OH
OH

Rp.
Rp.

75,000.00
100,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,360,000.00
2,400.00
3,362,400.00
5,899,900.00
5,899,900.00
5,899,900.00
5,899,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
102,000.00
2,400.00
144,400.00
187,212.50
187,212.50
187,200.00
187,200.00

Kepala Tukang
Mandor

0.2500
0.0500

OH
OH

Rp.
Rp.

125,000.00
125,000.00

Kayu Surian
Paku Biasa

0.0400
0.1500

M3
Kg

Rp.
Rp.

2,000,000.000
16,000.000

Rp.
Rp.

31,250.00
6,250.00

BAHAN

Rp.

362,500.00

Rp.
Rp.
Rp.
Rp.

75,000.00
250,000.00
31,250.00
6,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M2

PEK.PASANG PINTU PANEL KAYU SURIAN LAPIS SENG PLAT


TENAGA
Pekerja
1.0000
Tukang Kayu
2.5000
Kepala Tukang
0.2500
Mandor
0.0500
BAHAN
Kayu Surian
0.0400
Seng Plat
1.2000
Paku Biasa
0.1700

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

M3
M2
Kg

Rp.
Rp.
Rp.

2,000,000.000
40,000.000
16,000.000
Rp.

362,500.00

Rp.
Rp.
Rp.
Rp.

37,500.00
200,000.00
25,000.00
3,125.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 M2

PEK.PASANG JALUSI MATI KAYU MERANTI


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Surian, Papan
Paku Biasa

0.5000
2.0000
0.2000
0.0250

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0600
0.1500

M3
Kg

Rp.
Rp.

2,000,000.000
16,000.000
Rp.

265,625.00

Rp.
Rp.
Rp.
Rp.

11,250.00
25,000.00
3,125.00
937.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1 M2

PEK.PASANG RANGKA LANGIT-LANGIT


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Meranti
Paku Biasa

0.1500
0.2500
0.0250
0.0075

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0120
0.1000

M3
Kg

Rp.
Rp.

2,000,000.00
16,000.00
Rp.

40,312.50

Rp.
Rp.
Rp.
Rp.

300,000.00
1,200,000.00
150,000.00
25,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 M3

PEK.PASANG KUDA-KUDA KAYU


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Meranti
Paku Biasa

4.0000
12.0000
1.2000
0.2000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000
0.8000

M3
Kg

Rp.
Rp.

2,000,000.00
16,000.00
Rp.

1,675,000.00

Rp.
Rp.
Rp.
Rp.

7,500.00
20,000.00
3,125.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1M

PEK.PASANG LISPLANK PAPAN LEBAH BERGAYUT


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Papan Lisplank Ukir
Paku Biasa

0.1000
0.2000
0.0250
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
0.0500

M1
Kg

Rp.
Rp.

175,000.000
16,000.000
Rp.

31,250.00

Rp.
Rp.
Rp.
Rp.

8,250.00
22,000.00
2,750.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1M

PEK.PASANG PAPAN SINGAP UKIR (GRC)


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
PapanSingap Ukir (GRC)
Paku Biasa

0.1100
0.2200
0.0220
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
0.0500

M2
Kg

Rp.
Rp.

350,000.000
16,000.000
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10

1M

PEK.PASANG LISPLANK UKURAN 2 x 2/20


TENAGA

33,625.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80,000.00
2,400.00
82,400.00
444,900.00
444,900.00
444,900.00
444,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

80,000.00
48,000.00
2,720.00
130,720.00
493,220.00
493,220.00
493,200.00
493,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

120,000.00
2,400.00
122,400.00
388,025.00
388,025.00
388,000.00
388,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

24,000.00
1,600.00
25,600.00
65,912.50
65,912.50
65,900.00
65,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,200,000.00
12,800.00
2,212,800.00
3,887,800.00
3,887,800.00
3,887,800.00
3,887,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

210,000.00
800.00
210,800.00
242,050.00
242,050.00
242,000.00
242,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

420,000.00
800.00
420,800.00
454,425.00
454,425.00
454,400.00
454,400.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.1000
0.1000
0.0100
0.0500

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Kayu Meranti
Paku Biasa

0.0080
0.0600

M3
Kg

Rp.
Rp.

2,000,000.000
16,000.000

Rp.
Rp.
Rp.
Rp.

7,500.00
10,000.00
1,250.00
6,250.00

BAHAN

Rp.

25,000.00

Rp.
Rp.
Rp.
Rp.

45,000.00
18,000.00
22,500.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11

1 M2

PEK.PASANG PIRI-PIRI / PLAFOND LAMBERSHIRING


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Lambershiring (Jelutung)
Paku Biasa

0.6000
0.1800
0.1800
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.0070
0.1000

M3
Kg

Rp.
Rp.

2,000,000.000
16,000.000
Rp.

89,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,000.00
960.00
16,960.00
41,960.00
41,960.00
41,900.00
41,900.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,000.00
1,600.00
15,600.00
104,850.00
104,850.00
104,800.00
104,800.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT-LANGIT


1
1

1 M2

2
PEK.MEMASANG RANGKA PLAFOND FURRING
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Rangka Furing

0.0800
0.0080
0.0800
0.0040

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

M1

Rp.

23,500.00

Rp.
Rp.
Rp.
Rp.

6,000.00
800.00
10,000.00
500.00

Rp.

17,300.00

Rp.
Rp.
Rp.
Rp.

1,200.00
1,600.00
875.00
1,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 M2

PEK.PASANG BESI HOLLOW + PERAKITAN


TENAGA
Pekerja
Tukang Las
Kepala Tukang
Mandor
BAHAN
Besi Hollow 40.40.1,4
Solar
Minyak Pelumas
Kawat Las
Sewa Alat

0.0160
0.0160
0.0070
0.0080

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1500
1.0000
0.1000
0.0500
0.8000

Kg
Ltr
Ltr
Kg
Jam

Rp.
Rp.
Rp.
Rp.
Rp.

5,000.00
4,500.00
30,000.00
16,000.00
15,000.00
Rp.

4,675.00

Rp.
Rp.
Rp.
Rp.

7,500.00
5,000.00
625.00
625.00

Rp.

13,750.00

Rp.
Rp.
Rp.
Rp.

7,500.00
5,000.00
625.00
625.00

Rp.

13,750.00

Rp.
Rp.
Rp.
Rp.

7,500.00
10,000.00
1,250.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1M

PEK.PASANG LANGIT-LANGIT GYBSUM BOARD


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Gybsum Board 9 mm
Paku

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.3640
0.1100

Lbr
Kg

Rp.
Rp.

70,000.00
18,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M2

PEK.PASANG ALUMINIUM COMPOSITE PANEL 0,3 mm


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Aluminium Composite Panel 0,30 mm
Perlengkapan (18% dari harga bak fiberglass)

0.1000
0.0500
0.0050
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
1.0000

Lbr
Ls

Rp.
Rp.

300,000.000
54,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 M2

PEK. MEMASANG LANGIT-LANGIT TRIPLEK, UKURAN (120 X 120) CM, TEBAL 3,6 MM
TENAGA
Pekerja
0.1000 OH Rp.
75,000.00
Tukang Kayu
0.1000 OH Rp.
100,000.00
Kepala Tukang
0.0100 OH Rp.
125,000.00
Mandor
0.0050 OH Rp.
125,000.00
BAHAN
Tripleks
0.3750 Lbr Rp.
50,000.00
Paku Triplek
0.0300 Kg Rp.
18,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

23,500.00
23,500.00
40,800.00
40,800.00
40,800.00
40,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

5,750.00
4,500.00
3,000.00
800.00
12,000.00
26,050.00
30,725.00
30,725.00
30,700.00
30,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

25,480.00
1,980.00
27,460.00
41,210.00
41,210.00
41,200.00
41,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

300,000.00
54,000.00
354,000.00
367,750.00
367,750.00
367,700.00
367,700.00

Rp.
Rp.

18,750.00
540.00

Rp.

19,375.00

Rp.
Rp.
Rp.
Rp.

60,000.00
80,000.00
10,000.00
5,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1M

PEK. MEMASANG LANGIT-LANGIT LAMBRIZIRING KAYU, TEBAL 9 MM


TENAGA
Pekerja
0.8000 OH
Tukang Kayu
0.8000 OH
Kepala Tukang
0.0800 OH
Mandor
0.0400 OH
BAHAN
Papan Kayu
0.0150 M3
Paku Triplek
0.0100 Kg

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.

2,000,000.00
18,000.00
Rp.

155,000.00

Rp.
Rp.
Rp.
Rp.

7,500.00
5,000.00
625.00
625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1M

PEK. MEMASANG LANGIT-LANGIT GYPSUM BOARD, UKURAN (120X240X9) MM, TEBAL 9 MM


TENAGA
Pekerja
0.1000 OH Rp.
75,000.00
Tukang Kayu
0.0500 OH Rp.
100,000.00
Kepala Tukang
0.0050 OH Rp.
125,000.00
Mandor
0.0050 OH Rp.
125,000.00
BAHAN
Gypsum Board 9 mm
0.3640 Lbr Rp.
60,000.00
Paku Skrup
0.1100 Kg Rp.
20,000.00

Rp.

13,750.00

Rp.
Rp.
Rp.
Rp.

3,750.00
5,000.00
625.00
375.00

SUB TOTAL
JUMLAH
DIBULATKAN
8

1 M1

JUMLAH TOTAL
PEK. MEMASANG LIST LANGIT-LANGIT KAYU PROFIL, UKURAN (5 X 5) CM
TENAGA
Pekerja
0.0500 OH Rp.
Tukang Kayu
0.0500 OH Rp.
Kepala Tukang
0.0050 OH Rp.
Mandor
0.0030 OH Rp.
BAHAN
List Kayu Profil K2 ( 5 x 5) cm
1.0500 M1 Rp.
Paku
0.0100 Kg Rp.

75,000.00
100,000.00
125,000.00
125,000.00
3,750.00
16,000.00

Rp.

9,750.00

Rp.
Rp.
Rp.
Rp.

3,750.00
5,000.00
625.00
375.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1M

PEK.PASANG LIST LANGIT-LANGIT PROFIL GYPSUM


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
List Profil Gypsum
Paku Gypsum

0.0500
0.0500
0.0050
0.0030

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000
0.0100

Lbr
Kg

Rp.
Rp.

15,000.000
18,000.000
Rp.

9,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.

19,290.00
38,665.00
38,665.00
38,600.00
38,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

30,000.00
180.00
30,180.00
185,180.00
185,180.00
185,100.00
185,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

21,840.00
2,200.00
24,040.00
37,790.00
37,790.00
37,700.00
37,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,937.50
160.00
4,097.50
13,847.50
13,847.50
13,800.00
13,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

16,500.00
180.00
16,680.00
26,430.00
26,430.00
26,400.00
26,400.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN SANITAIR


1
1

2
1 SET PEK.PASANG 1 BUAH KLOSET JONGKOK STANDARD
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Jongkok
Semen Portland
Pasir Pasang

0.5000
0.5000
0.0500
0.1000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
5.0000
0.0100

Bh
Kg
M3

Rp.
Rp.
Rp.

165,000.000
1,120.000
150,000.000

Rp.
Rp.
Rp.
Rp.

37,500.00
50,000.00
6,250.00
12,500.00

Rp.

106,250.00

Rp.
Rp.
Rp.
Rp.

37,500.00
50,000.00
6,250.00
12,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 SET PEK.PASANG 1 BUAH KLOSET DUDUK STANDARD


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Duduk
Semen Portland
Pasir Pasang

0.5000
0.5000
0.0500
0.1000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
5.0000
0.0100

Bh
Kg
M3

Rp.
Rp.
Rp.

4,500,000.00
1,120.00
150,000.00
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 SET PEK.PASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 0.3 M3


TENAGA

106,250.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

165,000.00
5,600.00
1,500.00
172,100.00
278,350.00
278,350.00
278,300.00
278,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,500,000.00
5,600.00
1,500.00
4,507,100.00
4,613,350.00
4,613,350.00
4,613,300.00
4,613,300.00

Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.5000
0.5000
0.0500
0.1000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bak Fiberglass
Perlengkapan (18% dari harga bak fiberglass)

1.0000
1.0000

Bh
Ls

Rp.
Rp.

350,000.000
63,000.000

Rp.
Rp.
Rp.
Rp.

37,500.00
50,000.00
6,250.00
12,500.00

BAHAN

Rp.

106,250.00

Rp.
Rp.
Rp.
Rp.

37,500.00
50,000.00
6,250.00
12,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 SET PEK.PASANG 1 BUAH BAK MANDI FIBERGLASS KAPASITAS 1 M3


TENAGA
Pekerja
0.5000
Tukang Kayu
0.5000
Kepala Tukang
0.0500
Mandor
0.1000
BAHAN
Bak Fiberglass
1.0000
Perlengkapan (18% dari harga bak fiberglass)
1.0000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Ls

Rp.
Rp.

850,000.000
153,000.000
Rp.

106,250.00

Rp.
Rp.
Rp.
Rp.

106,500.00
47,300.00
5,875.00
8,875.00

SUB TOTAL
JUMLAH
DIBULATKAN
5

1 BH

JUMLAH TOTAL
PEK.PASANG 1 BUAH BAK KONTROL PAS.BATU BATA (45 x 45) TINGGI 50 CM
TENAGA
Pekerja
1.4200 OH Rp.
Tukang Kayu
0.4730 OH Rp.
Kepala Tukang
0.0470 OH Rp.
Mandor
0.0710 OH Rp.
BAHAN
Batu Bata
250.0000 Bh Rp.
Semen Portland
77.0000 Kg Rp.
Pasir Pasang
0.1300 M3 Rp.
Batu Kerikil
0.0200 M3 Rp.
Besi Beton
2.6000 Kg Rp.
Pasir Beton
0.0900 M3 Rp.

75,000.00
100,000.00
125,000.00
125,000.00
500.000
1,120.000
150,000.000
160,000.000
9,000.000
150,000.000

Rp.

168,550.00

Rp.
Rp.
Rp.
Rp.

2,700.00
6,000.00
750.00
225.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 1/2"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

4,000.000
1,400.000
Rp.

9,675.00

Rp.
Rp.
Rp.
Rp.

2,700.00
6,000.00
750.00
225.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 3/4"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

5,000.000
1,750.000
Rp.

9,675.00

Rp.
Rp.
Rp.
Rp.

2,700.00
6,000.00
750.00
225.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 1"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

12,000.000
4,200.000
Rp.

9,675.00

Rp.
Rp.
Rp.
Rp.

2,700.00
6,000.00
750.00
225.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 2"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0360
0.0600
0.0060
0.0018

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

15,200.000
5,320.000
Rp.

SUB TOTAL
JUMLAH

9,675.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

350,000.00
63,000.00
413,000.00
519,250.00
519,250.00
519,200.00
519,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

850,000.00
153,000.00
1,003,000.00
1,109,250.00
1,109,250.00
1,109,200.00
1,109,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

125,000.00
86,240.00
19,500.00
3,200.00
23,400.00
13,500.00
270,840.00
439,390.00
439,390.00
439,300.00
439,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,800.00
1,400.00
6,200.00
15,875.00
15,875.00
15,800.00
15,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,000.00
1,750.00
7,750.00
17,425.00
17,425.00
17,400.00
17,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,400.00
4,200.00
18,600.00
28,275.00
28,275.00
28,200.00
28,200.00

Rp.
Rp.
Rp.
Rp.
Rp.

18,240.00
5,320.00
23,560.00
33,235.00
33,235.00

DIBULATKAN
JUMLAH TOTAL
10

1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 3"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

27,500.000
9,625.000

Rp.
Rp.
Rp.
Rp.

Rp.

21,775.00

Rp.
Rp.
Rp.
Rp.

6,075.00
13,500.00
1,687.50
512.50

JUMLAH TOTAL
1 M1

PEK.PASANG PIPA PVC TYPE AW DIA. 4"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Pipa PVC
Perlengkapan (35%)

0.0810
0.1350
0.0135
0.0041

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.2000
1.0000

M1
Ls

Rp.
Rp.

40,000.000
14,000.000
Rp.

21,775.00

Rp.
Rp.
Rp.
Rp.

750.00
10,000.00
1,250.00
625.00

Rp.

12,625.00

Rp.
Rp.
Rp.
Rp.

750.00
10,000.00
1,250.00
625.00

Rp.

12,625.00

Rp.
Rp.
Rp.
Rp.

90,000.00
145,000.00
18,750.00
12,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12

1 BH

PEK.PASANG KRAN DIA. 1/2" ATAU 3/4"


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kran Air Besi Stainless Steel
Seal Tape

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
0.0250

Bh
Bh

Rp.
Rp.

35,000.000
1,500.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 BH

PEK.PASANG FLOOR DRAIN


TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Floordrain Stainless Steel

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

75,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14

1 SET PEK.PASANG 1 BUAH WASTAFEL LENGKAP SETARA TOTO


TENAGA
Pekerja
1.2000
Tukang Batu
1.4500
Kepala Tukang
0.1500
Mandor
0.1000
BAHAN
Wastafel
1.0000
Semen Portland
6.0000
Pasir Pasang
0.0100
Perlengkapan (12%)
1.0000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh
Kg
M3
Ls

Rp.
Rp.
Rp.
Rp.

1,000,000.00
1,120.00
150,000.00
120,000.00
Rp.

266,250.00

Rp.
Rp.
Rp.
Rp.

90,000.00
145,000.00
18,750.00
12,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15

1 SET PEK.PASANG 1 BUAH URINOIR LENGKAP SETARA TOTO


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Urinoir
Semen Portland
Pasir Pasang
Perlengkapan (12%)

1.2000
1.4500
0.1500
0.1000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
6.0000
0.0100
1.0000

Bh
Kg
M3
Ls

Rp.
Rp.
Rp.
Rp.

500,000.00
1,120.00
120,000.00
60,000.00
Rp.

33,200.00
33,200.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

33,000.00
9,625.00
42,625.00
64,400.00
64,400.00
64,400.00
64,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

48,000.00
14,000.00
62,000.00
83,775.00
83,775.00
83,700.00
83,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

35,000.00
37.50
35,037.50
47,662.50
47,662.50
47,600.00
47,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

75,000.00
75,000.00
87,625.00
87,625.00
87,600.00
87,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,000,000.00
6,720.00
1,500.00
120,000.00
1,128,220.00
1,394,470.00
1,394,470.00
1,394,400.00
1,394,400.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

500,000.00
6,720.00
1,200.00
60,000.00
567,920.00
834,170.00
834,170.00
834,100.00
834,100.00

6,075.00
13,500.00
1,687.50
512.50

SUB TOTAL
JUMLAH
DIBULATKAN
11

Rp.
Rp.

266,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

ANALISA BIAYA KONSTRUKSI PEKERJAAN PASANGAN KUNCI DAN GANTUNGAN


1
1

1 BH

2
PEK.PASANG KUNCI TANAM BIASA
TENAGA
Pekerja
Tukang Batu

0.0100
0.5000

OH
OH

Rp.
Rp.

75,000.00
100,000.00

Rp.
Rp.

750.00
50,000.00

Kepala Tukang
Mandor

0.0100
0.0050

OH
OH

Rp.
Rp.

125,000.00
125,000.00

Kunci Tanam Biasa

1.0000

Bh

Rp.

82,000.000

Rp.
Rp.

1,250.00
625.00

Rp.

52,625.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

750.00
10,000.00
1,250.00
625.00

Rp.

12,625.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

BAHAN

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1 BH

PEK.PASANG ENGSEL PINTU


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Engsel Pintu

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

10,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 BH

PEK.PASANG ENGSEL JENDELA


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Engsel Jendela 3"

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

12,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 BH

PEK.PASANG KAIT ANGIN / HAK ANGIN


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kait Angin

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

8,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 BH

PEK.PASANG TARIKAN TANGAN JENDELA


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pegangan Tangan Jendela

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

30,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1 BH PEK. PASANG TARIKAN TANGAN PINTU


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pegangan Tangan Pintu

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

135,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1 BH PEK. PASANG DOOR CLOOSHER


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Door Cloosher

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

250,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 BH PEK. PASANG FLOOR HINGS


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Floor Hings

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

900,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

82,000.00
82,000.00
134,625.00
134,625.00
134,600.00
134,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
10,000.00
28,100.00
28,100.00
28,100.00
28,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

12,000.00
12,000.00
24,625.00
24,625.00
24,600.00
24,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

8,000.00
8,000.00
26,100.00
26,100.00
26,100.00
26,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

30,000.00
30,000.00
48,100.00
48,100.00
48,100.00
48,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

135,000.00
135,000.00
153,100.00
153,100.00
153,100.00
153,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

250,000.00
250,000.00
268,100.00
268,100.00
268,100.00
268,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900,000.00
900,000.00
918,100.00
918,100.00
918,100.00
918,100.00

1 BH

PEK.PASANG GRENDEL JENDELA


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Grendel Jendela 2"

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

10,000.000

Rp.
Rp.
Rp.
Rp.

750.00
10,000.00
1,250.00
625.00

Rp.

12,625.00

Rp.
Rp.
Rp.
Rp.

750.00
10,000.00
1,250.00
625.00

Rp.

12,625.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

1,125.00
15,000.00
1,875.00
100.00

Rp.

18,100.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1 BH

PEK.PASANG GRENDEL PINTU


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Grendel Pintu 4"

0.0100
0.1000
0.0100
0.0050

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000

Bh

Rp.

40,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10

1M

PEK. PASANG KACA TOPSOIL BIRU TRANSPARAN 50% TEBAL 5 MM


TENAGA
Pekerja
0.0150
Tukang Batu
0.1500
Kepala Tukang
0.0150
Mandor
0.0008
BAHAN
Kaca Topsoil Biru Transparan 50% tebal 5 mm
1.1000

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Bh

Rp.

175,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

11

1 M2

PEK. PASANG KACA 5 MM


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kaca 5 mm Bening

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000

Bh

Rp.

85,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12

1M

PEK. PASANG KACA 5 MM


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kaca 5 mm Embun

0.0150
0.1500
0.0150
0.0008

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.1000

Bh

Rp.

90,000.000

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 M2

PEK. PASANG BATU ALAM (CANDI)


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Candi
Semen Abu-abu
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0500
11.7500
0.0350

M2
Kg
M3

Rp.
Rp.
Rp.

150,000.000
1,120.000
150,000.000
Rp.

89,625.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14

1 M2

PEK. PASANG BATU ALAM ANDERSIT


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

10,000.00
10,000.00
22,625.00
22,625.00
22,600.00
22,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

40,000.00
40,000.00
52,625.00
52,625.00
52,600.00
52,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

192,500.00
192,500.00
210,600.00
210,600.00
210,600.00
210,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

93,500.00
93,500.00
111,600.00
111,600.00
111,600.00
111,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

99,000.00
99,000.00
117,100.00
117,100.00
117,100.00
117,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

157,500.0
13,160.0
5,250.0
175,910.00
265,535.00
265,535.00
265,500.00
265,500.00

Batu Andersit
Semen Abu-abu
Pasir Pasang

1.0500
11.7500
0.0350

M2
Kg
M3

Rp.
Rp.
Rp.

220,000.00
1,120.00
150,000.00
Rp.

89,625.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15

1 M2

PEK. PASANG BATU ALAM (PALIMANAN)


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu Palimanan
Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0500
11.7500
0.0350

Bh
Kg
M3

Rp.
Rp.
Rp.

125,000.00
1,120.00
150,000.00
Rp.

89,625.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

231,000.0
13,160.0
5,250.0
249,410.00
339,035.00
339,035.00
339,000.00
339,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

131,250.0
13,160.0
5,250.0
149,660.00
239,285.00
239,285.00
239,200.00
239,200.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN


1
1

1 M2

2
3
4
PEK. PENGECATAN BIDANG KAYU BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja
0.0700 OH Rp.
75,000.00
Tukang Batu
0.0090 OH Rp.
100,000.00
Kepala Tukang
0.0060 OH Rp.
125,000.00
Mandor
0.0025 OH Rp.
125,000.00
BAHAN
Cat Meni
0.2000 Kg Rp.
15,000.00
Plamir
0.1500 Kg Rp.
9,000.00
Cat Dasar
0.1700 Kg Rp.
40,000.00
Cat Penutup 2 x
0.2600 Kg Rp.
40,000.00

Rp.
Rp.
Rp.
Rp.

5,250.00
900.00
750.00
312.50

Rp.

7,212.50

Rp.
Rp.
Rp.
Rp.

12,000.00
16,000.00
2,000.00
312.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK. PENGECATAN VERNIS


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Vernis
Dempul
Amplas
Kuas

0.1600
0.1600
0.0160
0.0025

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.1500
0.0500
0.1000
0.0100

Ltr
Kg
Lbr
Bh

Rp.
Rp.
Rp.
Rp.

45,000.00
15,000.00
2,500.00
10,000.00
Rp.

30,312.50

Rp.
Rp.
Rp.
Rp.

1,500.00
20,000.00
2,500.00
1,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1M

PEK. PENGECATAN BAJA DENGAN MENIE BESI


TENAGA
Pekerja
Tukang Cat
Kepala Tukang
Mandor
BAHAN
Menie Besi
Kuas

0.0200
0.2000
0.0200
0.0100

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

0.1000
0.0100

Kg
Bh

Rp.
Rp.

20,000.00
10,000.00
Rp.

25,250.00

Rp.
Rp.
Rp.
Rp.

1,500.00
6,300.00
787.50
312.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1M

PEK. PENGECATAN BIDANG TEMBOK BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja
0.0200 OH Rp.
75,000.00
Tukang Batu
0.0630 OH Rp.
100,000.00
Kepala Tukang
0.0063 OH Rp.
125,000.00
Mandor
0.0025 OH Rp.
125,000.00
BAHAN
Plamir
0.1000 Kg Rp.
9,000.00
Cat Dasar
0.1000 Kg Rp.
54,000.00
Cat Penutup 2 x
0.2600 Kg Rp.
54,000.00

Rp.

8,900.00

Rp.

7,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5

1M

PEK. RESIDU
TENAGA
Pekerja

0.1000

OH

Rp.

75,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

3,000.0
1,350.0
6,800.0
10,400.0
21,550.00
28,762.50
28,762.50
28,700.00
28,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

6,750.0
750.0
250.0
100.0
7,850.00
38,162.50
38,162.50
38,100.00
38,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

2,000.0
100.0
2,100.00
27,350.00
27,350.00
27,300.00
27,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

900.0
5,400.0
14,040.0
20,340.00
29,240.00
29,240.00
29,200.00
29,200.00

Mandor

0.0060

OH

Rp.

125,000.00

Residu

0.3500

Ltr

Rp.

20,000.00

Rp.

750.00

Rp.

8,250.00

BAHAN

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,000.0
7,000.00
15,250.00
15,250.00
15,200.00
15,200.00

ANALISA BIAYA KONSTRUKSI PEKERJAAN LAIN-LAIN


1
1

2
1 M2

PEK. CON BLOCK


TENAGA
Pekerja
Mandor
BAHAN
Con Block
Pasir Pasang

1.0000
0.0500

OH
OH

Rp.
Rp.

75,000.00
125,000.00

50.0000
0.0070

Bh
M3

Rp.
Rp.

2,500.00
150,000.00

Rp.
Rp.

75,000.00
6,250.00

Rp.

81,250.00

Rp.
Rp.
Rp.

2,250.00
10,000.00
1,250.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2

1M

PEK. TANAM RUMPUT


TENAGA
Pekerja
Tukang
Mandor
BAHAN
Rumput Gajah Mini
Tanah Hitam

0.0300
0.1000
0.0100

OH
OH
OH

Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00

1.0500
0.0500

M2
M3

Rp.
Rp.

32,500.00
30,000.00
Rp.

13,500.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3

1 M1

PEK. PEMBUATAN PARIT KELILING BANGUNAN


BAHAN + UPAH
Galian Tanah
Urugan Pasir
Cor Lantai Kerja
Pasangan 1/2 Bata
Plesteran

0.1200
0.0200
0.0200
0.7000
1.4000

M3
M3
M3
M2
M2

Rp.
Rp.
Rp.
Rp.
Rp.

59,300.000
167,700.000
100,400.000
107,400.000
62,200.000
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4

1 M3

PEK. PONDASI STAAL CAMPUR 1 PC : 5 PP


TENAGA
Pekerja
Tukang Batu
Kepala Tukang Batu
Mandor
BAHAN
Batu Bata
Semen Portland
Pasir Pasang

2.7300
0.9100
0.0900
0.1360

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

630.0000
88.0000
0.4500

Bh
Kg
M3

Rp.
Rp.
Rp.

500.00
1,120.00
150,000.00

Rp.
Rp.
Rp.
Rp.

Rp.

324,000.00

Rp.
Rp.

22,500.00
1,875.00

JUMLAH TOTAL
1 M2

PEK. PAS. WATERPROFING


TENAGA
Pekerja
Mandor
BAHAN
Semen Portland
Waterprofing
Pasir Pasang

0.3000
0.0150

OH
OH

Rp.
Rp.

75,000.00
125,000.00

0.0100
0.2900
0.0060

Kg
Kg
M3

Rp.
Rp.
Rp.

1,120.00
40,000.00
150,000.00
Rp.

24,375.00

Rp.
Rp.
Rp.
Rp.

60,000.00
50,000.00
6,250.00
5,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6

1 M'

PEK. PENGADAAN + PEMASANGAN TIANG PANCANG BETON 25 X 25


TENAGA
0.8000 OH
Pekerja
0.5000 OH
Tukang Kayu
0.0500 OH
Kepala Tukang
0.0400 OH
Mandor
BAHAN
Tiang Pancang Beton
1.0000 M'
Besi + Las
1.0000 Ls
Alat Pancang
1.0000 Ls

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.
Rp.

285,000.00
5,000.00
15,000.00
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7

1 M'

PEK. PEMASANGAN TIANG PANCANG BETON 25 X 25

125,000.0
1,050.0
126,050.00
207,300.00
207,300.00
207,300.00
207,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

34,125.0
1,500.0
35,625.00
49,125.00
49,125.00
49,100.00
49,100.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

7,116.0
3,354.0
2,008.0
75,180.0
87,080.0
174,738.00
174,738.00
174,738.00
174,700.00
174,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

315,000.00
98,560.00
67,500.00
481,060.00
805,060.00
805,060.00
805,000.00
805,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11.20
11,600.00
900.00
12,511.20
36,886.20
36,886.20
36,800.00
36,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

285,000.00
5,000.00
15,000.00
305,000.00
426,250.00
426,250.00
426,200.00
426,200.00

204,750.00
91,000.00
11,250.00
17,000.00

SUB TOTAL
JUMLAH
DIBULATKAN
5

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

121,250.00

TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Tiang Pancang 25x25 cm K.400
Besi + Las
Alat Pancang

0.8000
0.5000
0.0500
0.0400

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
1.0000
1.0000

M'
Ls
Ls

Rp.
Rp.
Rp.

170,000.00
5,000.00
46,400.00

Rp.
Rp.
Rp.
Rp.

60,000.00
50,000.00
6,250.00
5,000.00

Rp.

121,250.00

Rp.
Rp.
Rp.
Rp.

7,500.00
1,000.00
18,725.00
1,250.00

Rp.

28,475.00

Rp.
Rp.
Rp.
Rp.

450.00
6,000.00
750.00
37.50

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8

1 Btg PEK. PAS. TIANG PANCANG CERUCUK DIA 12- 15 CM, PANJANG 6 M
TENAGA
Pekerja
0.1000 OH
Tukang Kayu
0.0100 OH
Kepala Tukang
0.1498 OH
Mandor
0.0100 OH
BAHAN
Cerucuk Katu
1.0000 Btg
Alat Bantu
1.0000 Ls

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.

15,000.00
2,300.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9

1 Kg PEK. PASANG RANGKA BAJA


TENAGA
Pekerja
Tukang besi
Kepala Tukang
Mandor
BAHAN
Besi
Perlengkapan

0.006
0.060
0.006
0.000

OH
OH
OH
OH

1.100 Kg
0.080 Kg

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

Rp.
Rp.

10,000.00
1,150.00
Rp.

7,237.50

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10

1 M2

PEK. PASANG KORAL SIKAT (ALOR ITALY)


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Koral sikat alor italy
Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
11.7500
0.0350

M2
Kg
M3

Rp.
Rp.
Rp.

220,000.000
1,120.000
150,000.000
Rp.

89,625.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11

1 M2

PEK. PASANG KORAL SIKAT (ALOR HITAM)


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Koral sikat alor hitam
Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
11.7500
0.0350

M2
Kg
M3

Rp.
Rp.
Rp.

150,000.000
1,120.000
150,000.000
Rp.

89,625.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12

1 M2

PEK. PASANG PAVING BLOCK ANTI SLIP


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Pavin Block anti slip
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
0.0350

M2
M3

Rp.
Rp.

65,000.000
150,000.000
Rp.

89,625.00

Rp.
Rp.
Rp.
Rp.

46,500.00
35,000.00
4,375.00
3,750.00

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13

1 M2

PEK. PASANG BATU CANDI


TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Batu candi
Semen
Pasir Pasang

0.6200
0.3500
0.0350
0.0300

OH
OH
OH
OH

Rp.
Rp.
Rp.
Rp.

75,000.00
100,000.00
125,000.00
125,000.00

1.0000
11.7500
0.0350

M2
Kg
M3

Rp.
Rp.
Rp.

250,000.000
1,120.000
150,000.000
Rp.

SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL

89,625.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

170,000.00
5,000.00
46,400.00
221,400.00
342,650.00
342,650.00
342,600.00
342,600.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

15,000.00
2,300.00
17,300.00
45,775.00
45,775.00
45,700.00
45,700.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

11,000.00
92.00
11,092.00
18,329.50
18,329.50
18,300.00
18,300.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

220,000.0
13,160.0
5,250.0
238,410.00
328,035.00
328,035.00
328,000.00
328,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

150,000.0
13,160.0
5,250.0
168,410.00
258,035.00
258,035.00
258,000.00
258,000.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

65,000.0
5,250.0
70,250.00
159,875.00
159,875.00
159,800.00
159,800.00

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

250,000.0
13,160.0
5,250.0
268,410.00
358,035.00
358,035.00
358,000.00
358,000.00

Engineer Estimate (EE)


PROGRAM

: PENGEMBANGAN DESTINASI WISATA

PEKERJAAN

: PENDOPO

NO

URAIAN PEKERJAAN

VOLUME

1
2
3
4
5
6

I. PEKERJAAN KUDA-KUDA BAJA


Pek. Kuda-kuda baja O 2,5"
Pek. Kuda-kuda baja O 3"
Pek. Gording C.125.50.20.2,3
Pek. Plat Baja tebal 25cmX25cmx10mm
Pek. Baut Dia 20 mm
Pek. Brancing

1
2
3
4
5
6

IV. PEKERJAAN ATAP GENTENG METAL


Pek. Pasang genteng metal
Pek. Pasang perabung atap
Pek. Pasang bola-bola atap
Pek. Pasangan Lisplank GRC
Pek. Selembayung
Pek. Singap Ukir
JUMLAH

1,041.50
149.16
5,485.04
84.78
96.00
52.08

95
25
32
58
4
35.2

HARGA SATUAN
(Rp)
4

Kg
Kg
Kg
Kg
Bh
Ls

M2
M'
M'
M'
Set
M2

18,300
18,300
18,300
18,300
35,000
18,300
Sub Jumlah
97,600
73,000
41,800
41,900
700,000
454,400
Sub Jumlah

JUMLAH HARGA
(Rp)
5

19,059,523.20
2,729,628.00
100,376,232.00
1,551,474.00
3,360,000.00
952,976.16
128,029,833.36
9,272,000.00
1,825,000.00
1,337,600.00
2,430,200.00
2,800,000.00
15,994,880.00
33,659,680.00
161,689,513.36

63
128,029,833.36
11.52

33,659,680.00

Engineer Estimate (EE)


PROGRAM

: PENGEMBANGAN DESTINASI WISATA

PEKERJAAN

: PANGGUNG TERBUKA

NO

URAIAN PEKERJAAN

VOLUME

1
2
3
4
5
6
7

I. PEKERJAAN KUDA-KUDA BAJA


Pek. Kuda-kuda baja O 2,5"
Pek. Kuda-kuda baja O 3"
Pek. Kuda-kuda baja O 4"
Pek. Gording C.125.50.20.2,3
Pek. Plat Baja tebal 25cmX25cmx10mm
Pek. Baut Dia 20 mm
Pek. Brancing

1
2
3
4
5
6

IV. PEKERJAAN ATAP GENTENG METAL


Pek. Pasang genteng metal
Pek. Pasang perabung atap
Pek. Pasang bola-bola atap
Pek. Pasangan Lisplank GRC
Pek. Selembayung
Pek. Singap Ukir
JUMLAH

2,819.39
969.54
1,003.20
8,525.66
84.78
96.00
140.97

570.9
54
110.5
110.5
10
50

HARGA SATUAN
(Rp)
4

Kg
Kg
Kg
Kg
Kg
Bh
Kg

M2
M'
M'
M'
Set
M2

18,300.00
18,300.00
18,300.00
18,300.00
18,300.00
35,000.00
18,300.00
Sub Jumlah
97,600
73,000
41,800
41,900
700,000
454,400
Sub Jumlah

JUMLAH HARGA
(Rp)
5

51,594,897.02
17,742,582.00
18,358,560.00
156,019,578.00
1,551,474.00
3,360,000.00
2,579,744.85
251,206,835.88

251,206,835.88

55,719,840.00
3,942,000.00
4,618,900.00
4,629,950.00
7,000,000.00
22,720,000.00
98,630,690.00

98,630,690.00

349,837,525.88