KEGIATAN
PEKERJAAN
LOKASI
TAHUN
:
:
:
:
NO
DIMENSI
JUMLAH BESI
1 40/40 (Kolom)
2 40/40 (Kolom)
3 40/40 (Kolom)
4 40/40 (Kolom)
7 25/60 (Sloof)
8 25/60 (Sloof)
9 25/30 (Sloof)
10 30/55 (Balok)
12 D 16
D 10 - 15
10 D 16
D 10 - 15
8 D 16
D 10 - 15
6 D 16
D 10 - 15
JUMLAH
BESI/
panjang
4
12
9.8
10
9.8
8
9.8
6
9.8
DIAM
BERAT
BESI
6
16
8
16
8
16
8
16
8
1.56
0.62
0.62
0.62
1.56
0.62
1.56
0.62
4 D 10
D 8 - 15
4
2.56
10
8
0.62
0.393
D 16 -15
D 16 -15
D 10 - 30
8
8
3
16
16
10
1.56
1.56
0.62
6 D 16
2 D 13
D 10 - 10
6 D 19
2 D 13
D 10 - 10
4 D 16
D 10 - 20
8 D 19
2 D 13
D 10 - 10
8
2
17.5
6
2
17.5
4
6.05
8
2
13.6
16
13
10
19
13
10
16
10
19
12
10
1.56
0.995
0.62
1.56
0.995
0.62
1.56
0.62
1.56
0.995
0.62
TOTAL
BERAT
BESI
7
BERAT
BESI/ M3
PAPAN
CETAK
18.72
6.076
24.796
154.975
12.5
6.2
6.076
12.276
76.725
12.5
12.48
6.076
18.556
115.975
12.5
9.36
6.076
15.436
96.475
12.5
2.48
1.00608
3.48608 288.10579 18.1818
12.48
12.48
1.86
26.82
134.1
10
12.48
1.99
10.85
25.32
168.8
9.36
1.99
10.85
22.2
148
6.24
3.751
9.991 166.51667
12.48
1.99
8.432
22.902
138.8 8.48485
11 30/40 (Balok)
8 D 19
D 10 - 10
8
11.2
19
10
1.56
0.62
12.48
6.944
19.424 161.86667 7.77778
12 25/30 (Balok)
5 D 16
D 10 - 10
5
8.8
16
10
1.56
0.62
7.8
5.456
13.256 176.74667
13 15/30 (Balok)
5 D 13
D 19 - 10
5
8.25
13
10
0.995
0.393
6.2963
4.975
3.24225
8.21725 182.60556 13.3333
14 POOR P1
D 16 -15
D 16 -15
40.7
40.7
16
16
1.56
1.56
15 POOR P2
D 16 -15
D 16 -15
27
27
16
16
1.56
1.56
16 POOR P3
17 POOR P4
18 Plat Lantai
D 16 -15
D 16 -15
D 16 -15
D 16 -15
D 10 -15
D 10 -15
18.2
18.2
71.5
45.5
8
8
16
16
16
16
10
10
1.56
1.56
1.56
1.56
0.56
0.56
63.492
63.492
126.984 141.09333 2.37037
42.12
42.12
84.24
134.784
28.392
28.392
56.784
141.96
111.54
70.98
182.52
108.16 1.33333
3.2
4.48
4.48
8.96 74.666667 16.6667
SATUAN
HARGA
(Rp)
1
2
3
4
5
6
7
8
9
10
A. UPAH / OH
Pekerja
Tukang
Kepala Tukang
Mandor
Penjaga Malam
Operator
Pembantu Operator
Sopir
Mekanik
Pembantu Mekanik
1
1
1
1
1
1
1
1
1
1
Oh
Oh
Oh
Oh
Oh
Jam
Jam
Jam
Jam
Jam
75,000
100,000
125,000
125,000
75,000
9,375
7,000
7,500
10,000
6,750
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
B. PERALATAN
Alat Bantu
Alat Bantu Beton
Alat Bantu Pancang
Bulldozer
Concrete Mixer
Concrete Vibrator
Crane
Dump Truck/ Trailler
Excavator Standard
Excavator Long Arm
Generator Set 250 KVA
Las Potong
Mesin Las
Mesin Potong Besi
Pile Driver Hammer
Scafolding
Stemper
Vibrator Roller
Water Pump 70 - 100 MM
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Ls
Ls
Ls
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Jam
Set
Jam
Jam
Jam
1,150
2,300
2,300
269,000
38,200
20,100
259,000
148,600
296,100
312,100
201,250
6,900
85,600
23,000
117,200
58,095
28,800
290,500
20,100
1
2
3
4
5
6
1
1
1
1
1
1
M3
M3
M3
M3
M3
M3
120,000
150,000
200,000
120,000
160,000
40,000
1
2
3
4
5
6
7
8
BAHAN BATU
Batu Bata
Batako Ukuran 10x15x30
Batako Ukuran 10x20x40
Batu Tempel
Batu Alam RTA 7 x15
Batu Pecah
Batu Pecah / Split Ukuran 2-3 cm
Batu Con Block tebal 8 cm Uk. 10x20
1
1
1
1
1
1
1
1
Bh
Bh
Bh
M2
M2
M3
M3
Bh
500
1,824
1,900
130,000
90,000
280,000
300,000
2,500
II
KETERANGA
N
1
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
2
BAHAN BATU ALAM
Andersit Ukuran 20x40
Andersit Ukuran 15x30
Andersit Ukuran 20x30
Batu Suka Bumi Ukuran 20x10
Batu Suka Bumi Ukuran 7x15
Batu RTA Ukuran 20x10
Batu RTA Ukuran 7x15
Batu Palemanan Ukuran 20x10
Batu Palemanan Ukuran 7x15
Batu Palemanan Ukuran 20x40
Batu Coral Sikat Panca Warna
Batu Coral Sikat Putih Itali
Batu Coral Sikat Hitam Bengkulu
Batu Gunung
Filler (Abu Batu)
Filler (Abu Batu)
Batu Kali / Batu Mangga
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Kg
Kg
Kg
M3
M3
M3
M3
220,000
210,000
210,000
130,000
130,000
130,000
130,000
130,000
130,000
220,000
6,000
8,000
6,000
100,000
290,000
375,000
200,000
1
2
3
M3
M3
M3
290,000
290,000
290,000
Pulau Padang
Pulau Padang
Pulau Padang
1
2
3
1
1
1
M3
M3
M3
290,000
290,000
290,000
Pulau Padang
Pulau Padang
Pulau Padang
1
2
M3
M3
285,000
285,000
Sitorajo Kari
Sitorajo Kari
VII
1
2
1
1
M3
M3
285,000
285,000
Pulau Padang
Pulau Padang
VIII
1
2
3
BAHAN SEMEN
Semen Type I 50 Kg/Zak
Semen Putih 40 Kg/Zak
Semen Warna
1
1
1
Kg
Kg
Kg
1,120
2,875
12,500
1
2
BAHAN ASPAL
Aspal
Aspal Atap (Water Proofing)
1
1
Kg
Kg
8,000
40,000
1
2
3
4
5
6
7
8
9
1
1
1
1
1
1
1
1
1
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
Ktk
IV
VI
IX
47,000
48,000
48,000
85,000
165,000
60,000
50,000
250,000
220,320
Sumbar
Pulau Padang
Sitorajo Kari
10
11
12
1
XI
Bon-bon Panjang 10 cm
Batu Terawang Keramik
Marmer Ukuran 100x100 cm
1
1
1
Bh
Bh
Bh
2
BAHAN SANITAIR
Kloset Jongkok Warna Terang Setara TOTO
Kloset Jongkok Warna Gelap Setara TOTO
Kloset Duduk Lengkap Setara INOVA
Westafel Komplit
Urinal Komplit
Bak Air Fiber Glass Besar
Bak Air Fiber Glass Kecil
Bak Air Fiber Glass Sudut Besar
Bak Air Fiber Glass Sudut Kecil
Tangki Fiber Glass Kavasitas 1 M3
Tempat Sabun Keramik
Kran Air Besi Stainless Steel 1"
Kran Air Besi Stainless Steel 3/4"
Kran Air Besi Stainless Steel 1/2"
Floor Drain Stainless Steel
Sower Kloset + Kran
Gantungan Handuk Stainless Steel
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
165,000
185,000
4,500,000
1,000,000
500,000
350,000
275,000
450,000
260,000
850,000
50,000
35,000
35,000
35,000
75,000
175,000
185,000
XII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
BAHAN KAYU
Balok Kayu Kelas I
Papan Kayu Kelas I
Balok Kayu Kelas II
Papan Kayu Kelas II
Balok Kayu Kelas III
Papan Kayu Kelas III
Kayu Bakar
Kayu Cerocok 10-15 cm
Kayu Dolken 8-10 cm
Kayu Profil Uk. 3x3 cm/ Btg Panjang 4 M
Kayu Profil Uk. 4x5 cm/ Btg Panjang 4 M
Kayu Les Kaca
Triplek Tebal 3 mm
Triplek Tebal 3,6 mm
Triplek Tebal 6 mm
Triplek Tebal 9 mm
Triplek Tebal 12 mm
Lisplank Lebah Bergayut
Lisplank Papan Ukir
Lambersering 4 M (Kayu)
Gipsum Tebal 9 MM
Les Gipsum
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
M3
M3
M3
M3
M3
M3
M3
Btg
Btg
M1
M1
M1
Lbr
Lbr
Lbr
Lbr
Lbr
M1
M1
Lbr
Lbr
M1
2,800,000
2,800,000
2,000,000
2,000,000
1,700,000
1,700,000
300,000
15,000
7,500
3,250
3,750
2,000
40,000
50,000
74,000
110,000
150,000
120,000
175,000
13,000
60,000
15,000
XIII
1
2
3
4
5
6
7
8
9
BAHAN ATAP
Seng Plat BJLS 20 K
Seng Plat Aluminium
Atap Plastik Gelombang
Talang Karpet
Seng Gelombang Bjls 20 K 11 Gelombng
Seng Gelombang Bjls 20 K 9 Gelombng
Seng Gelombang Warna Bjls 20 K
Perabung Seng Plat L 20 K
Perabung Seng Plat L 30 K
1
1
1
1
1
1
1
1
1
Lbr
Lbr
Lbr
M1
Lbr
Lbr
Lbr
Lbr
Lbr
40,000
65,000
70,000
15,000
42,500
40,000
45,000
20,000
20,000
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
7,500
35,000
150,000
10
11
12
13
14
1
1
1
1
1
2
Perabung Genteng Metal Motif Ratu Tebal 0,35 mm
Tutup Ujung Perabung Metal Tebal 0,35 mm
Atap Spandek Colorbond (Mono red) Tebal 0.4 mm
Flexalum Lineal Ceiling 84C ex Hunter Douglas, warn
Sisalation/ Aluminium Foil
Aluminium Composite Panel 0,30 MM
Atap Zincalume Tebal 0,40 MM
Atap Square Ribbet Roof - Alluminium Tebal 0,8 MM
XIV
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
XV
1
2
3
4
5
6
7
8
9
10
11
1
15
16
17
18
19
20
21
22
M2
M2
M2
M2
M1
65,000
55,000
55,000
45,000
35,000
1
1
1
1
1
1
1
1
M1
M1
M2
M2
M2
M2
M2
M2
4
27,000
15,000
162,800
550,000
35,000
300,000
175,000
1,100,000
BAHAN BESI
Besi Beton Polos
Besi Beton Ulir
Besi C (Kanal) Tebal 2 mm panjang 10 M'
Besi C (Kanal) Tebal 3 mm panjang 10 M'
Besi Hollow Ukuran 20x20 mm
Besi Hollow Ukuran 30x30 mm
Besi Hollow Ukuran 40x40 mm
Besi Hollow Ukuran 30x50 mm
Besi Hollow Ukuran 20x40 mm
Besi Plat Polos Tebal 3 mm
Besi Plat Polos Tebal 5 mm
Besi Plat Bunga Tebal 3 mm
Besi Plat Siku Ukuran 30.30.3 panjang 6 m
Besi Plat Siku Ukuran 40.40.3 panjang 6 m
Besi Plat Siku Ukuran 50.50.5 panjang 6 m
Besi Plat Siku Ukuran 30.30.5 panjang 6 m
Besi Plat Siku Ukuran 40.40.5 panjang 6 m
Besi Plat Siku Ukuran 60.60.5 panjang 6 m
Kawat Harmonika Gas
Kawat Beton
Kawat Bronjong 3,4 mm
Kawat Las
Besi Pipa (Hitam) 2" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 3" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 4" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 5" Tebal 2,8 mm Panjang 6 m
Besi Pipa (Hitam) 6" Tebal 2,8 mm Panjang 6 m
Besi Pipa Galvanis 2" Tebal 1,7 mm Panjang 6 m
Besi Pipa Galvanis 2" Tebal 3 mm Panjang 6 m
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Kg
Kg
Btg
Btg
M1
M1
M1
M1
M1
Lbr
Lbr
Lbr
Btg
Btg
Btg
Btg
Btg
Btg
M1
Kg
Kg
Kg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
9,000
10,000
155,000
250,000
7,500
9,500
11,250
18,750
8,750
565,000
565,000
870,000
35,000
48,000
68,000
35,000
95,000
193,000
20,000
16,000
20,000
16,000
155,000
235,000
385,000
810,000
950,000
225,000
410,000
1
1
1
1
1
1
1
1
1
1
1
Kg
Kg
Kg
Kg
Bh
Btg
Btg
Btg
Btg
Btg
Btg
35,000
25,000
18,000
16,000
7,500
4,000
6,000
8,000
10,000
6,000
9,000
12
13
14
15
16
17
18
1
1
1
1
1
1
1
Btg
Btg
M1
M1
M1
M2
M2
12,000
15,000
75,000
60,000
35,000
230,000
135,000
1
XVI
1
2
3
4
5
6
7
8
9
10
11
1
1
1
1
1
1
1
1
1
1
1
Btg
Btg
Btg
Btg
M1
M1
M1
M1
M1
M1
M1
XVII
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
BAHAN GANTUNGAN
Kunci 2 Slaag
Kunci 1 Slaag
Grendel 4"
Grendel 2"
Engsel Pintu
Engsel Jendela
Hak Angin
Gembok
Handel Pintu
Handel Jendela
Door Closer
Floor Hinges setara CISA
Bottom Patch Fitting Swing Door
Top Patch Fitting Swing Door
Top Pin Patch Fitting Swing Door
Kunci Cisa Cylinder
Handel Pintu Aluminium
Pintu Aluminium uk. 2x0,9 m
Pintu Aluminium
Pintu Falding Gate Besi
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ps
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Ps
Bh
M2
M2
82,000
80,000
40,000
10,000
10,000
12,000
8,000
20,000
75,000
30,000
250,000
900,000
125,000
125,000
125,000
150,000
135,000
1,500,000
850,000
600,000
XVIII
1
2
3
4
5
6
7
8
9
BAHAN KACA
Kaca Bening Tebal 3 mm
Kaca Bening Tebal 5 mm
Kaca Nako + Bingkai
Kaca Rayben Tebal 3 mm
Kaca Rayben Tebal 5 mm
Kaca Block Tebal 5 mm
Kaca Es/ Buram Tebal 3 mm
Kaca Es/ Buram Tebal 5 mm
Kaca Tempered Biru Tebal 5 mm yang transparan 50
1
1
1
1
1
1
1
1
1
M2
M2
M2
M2
M2
Bh
M2
M2
M2
75,000
85,000
83,000
90,000
92,000
19,000
60,000
90,000
175,000
140,000
180,000
212,000
415,000
4,000
5,000
12,000
13,000
15,200
27,500
40,000
Medan
Medan
Medan
Medan
Medan
Medan
Medan
10
11
12
13
14
15
16
17
1
1
1
1
1
1
1
1
M2
M2
M1
M1
M2
Tube
Bh
M1
250,000
350,000
95,000
65,000
2,500,000
12,500
250
25,000
1
XIX
1
2
3
4
5
6
7
8
8
9
10
11
12
13
14
15
16
17
18
2
BAHAN LISTRIK
Pemasangan Instalasi/ Titik Api
MCB Setara Braco
Panel Box Lengkap
Bola Lampu Pijar 25 Watt Setara Philips
Bola Lampu Pijar 40 Watt Setara Philips
Bola Lampu Pijar 60 Watt Setara Philips
Bola Lampu Pijar 75 Watt Setara Philips
Bola Lampu Pijar 100 Watt Setara Philips
Bola Lampu Lilin 23 Watt Setara Philips
Bola Lampu Energi Super 20 Watt Setara Philips
Bola Lampu TL 2x36 Watt
Bola Lampu Office Light 2x20 Watt
Fitting Gantung
Fitting Duduk
Saklar Tunggal Setara Braco
Saklar Seri Setara Braco
Stop Kontak Biasa Setara Braco
Stop Kontak AC Setara Braco
Stop Kontak Tutup (Panasonic)
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
172,500
75,000
2,500,000
10,000
10,000
10,000
10,000
80,000
30,000
105,000
175,000
125,000
4,000
4,000
25,000
25,000
25,000
40,000
15,000
XX
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
BAHAN FINISHING
Cat Minyak Dulux Brilo
Cat Perak Setara Brilo
Cat Dulux Exterior (Luar)
Cat Dulux Interior (Dalam)
Vernish/ Teak Oil
Cat Batu Alam
Minyak Cat
Residu
Minyak Bekisting
Dempul Kayu
Amplas Kayu
Amplas Besi
Plamir
Cat Meni Kayu
Menie Besi
Spirtus
Kuas Cat Biasa 3-4"
Kuas Cat Gulung
Ornamen Timbul GRC
Waterproofing
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Kg
Kg
Kg
Bh
Bh
Kg
Kg
Kg
Ltr
Bh
Bh
M2
Kg
40,000
60,000
100,000
54,000
45,000
95,000
20,000
20,000
20,000
15,000
2,500
3,000
9,000
15,000
20,000
5,000
10,000
40,000
450,000
40,000
XXI
1
2
3
BAHAN PONDASI
Mini Pile Ukuran 20x20 cm
Mini Pile Ukuran 25x25 cm
Corrugated Sheet Pile W-325 Kelas B
1
1
1
M1
M1
M1
165,000
285,000
830,000
XXII
1
2
BAHAN BBM
Solar
Minyak Pelumas
1
1
Ltr
Ltr
4,500
30,000
1
XXIII
1
2
3
4
5
6
7
8
9
10
11
12
2
BAHAN TAMAN
Rumput Gajah Mini
Tanah Hitam
Bunga Palm Ekor Tupai tinggi 1-2 m
Bunga Bougenville 3-6 warna
Bunga
Bunga
Bunga
Bunga
Bunga
Bunga
Bunga
Bunga
3
1
1
1
1
1
1
1
1
1
1
1
1
4
M2
M3
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
Btg
32,500
30,000
780,000
455,000
400,000
3,250
3,250
97,500
3,250
3,250
3,250
250,000
DAFTAR ANALISA
HARGA SATUAN (SNI DT 91-0006-2007)
:
PROGRAM
:
KEGIATAN
:
LOKASI
TAHUN ANGGARAN :
:
SUMBER DANA
#REF!
#REF!
#REF!
2010
APBD-P
ANALISA BIAYA KONSTRUKSI PEKERJAAN PERSIAPAN
NO.
1
1
URAIAN PEKERJAAN
1 M1
HARGA SATUAN
(Rp.)
4
VOLUME
2
PEK.PENGUKURAN DAN PEMASANGAN BOWPLANK
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu 5/7, Klas II
Paku Biasa 2'-5'
Kayu Papan 3/20
0.1000
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0120
0.0200
0.0070
M3
Kg
Kg
Rp.
Rp.
Rp.
2,000,000.00
16,000.00
2,000,000.00
UPAH
5
Rp.
Rp.
Rp.
Rp.
JUMLAH HARGA
BAHAN
6
7,500.00
10,000.00
1,250.00
625.00
Rp.
19,375.00
Rp.
Rp.
Rp.
7,500.00
6,250.00
13,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1 M2
0.1000
0.0500
OH
OH
Rp.
Rp.
75,000.00
125,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1M
OH
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
100,000.00
125,000.00
125,000.00
Btg
M3
Kg
Kg
Kg
M3
M3
M3
Bh
Lbr
Bh
M2
Bh
Lbr
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
2,000,000.00
16,000.00
3,000.00
1,120.00
150,000.00
150,000.00
160,000.00
500.00
40,000.00
150,000.00
75,000.00
80,000.00
50,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
268,750.00
Rp.
Rp.
22,500.00
187.50
JUMLAH TOTAL
4
1M
0.3000
0.0015
OH
OH
Rp.
Rp.
75,000.00
125,000.00
0.0360
0.0800
1.0000
M3
Kg
Btg
Rp.
Rp.
Rp.
2,000,000.00
16,000.00
2,000,000.00
Rp.
24,000.00
320.00
14,000.00
38,320.00
57,695.00
57,695.00
57,600.00
57,600.00
Rp.
Rp.
Rp.
Rp.
13,750.00
13,750.00
13,700.00
13,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,375.00
220,000.00
13,600.00
3,300.00
39,200.00
22,500.00
15,000.00
24,000.00
15,000.00
10,000.00
150,000.00
6,000.00
12,000.00
3,000.00
542,975.00
811,725.00
811,725.00
811,700.00
811,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
72,000.00
1,280.00
2,000,000.00
2,073,280.00
2,095,967.50
2,095,967.50
2,095,900.00
2,095,900.00
75,000.00
50,000.00
100,000.00
37,500.00
6,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
22,687.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1 M3
2
PEK.GALIAN TANAH BIASA SEDALAM 1 M
TENAGA
Pekerja
Mandor
0.7500
0.0250
OH
OH
Rp.
Rp.
75,000.00
125,000.00
Rp.
Rp.
Rp.
56,250.00
3,125.00
59,375.00
Rp.
Rp.
Rp.
90,000.00
5,625.00
95,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1 M3
1.2000
0.0450
OH
OH
Rp.
Rp.
75,000.00
125,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
59,375.00
59,375.00
59,375.00
59,300.00
59,300.00
Rp.
Rp.
Rp.
Rp.
95,625.00
95,625.00
95,625.00
95,600.00
JUMLAH TOTAL
1 M3
0.3300
0.0100
OH
OH
Rp.
Rp.
75,000.00
125,000.00
Rp.
Rp.
Rp.
24,750.00
1,250.00
26,000.00
Rp.
Rp.
Rp.
18,750.00
1,041.67
19,791.67
Rp.
Rp.
Rp.
37,500.00
6,250.00
43,750.00
Rp.
Rp.
18,750.00
3,125.00
Rp.
21,875.00
Rp.
Rp.
22,500.00
1,250.00
Rp.
23,750.00
Rp.
Rp.
22,500.00
1,250.00
Rp.
23,750.00
Rp.
Rp.
75,000.00
12,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M3
0.2500
0.0083
OH
OH
Rp.
Rp.
75,000.00
125,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 M3
0.5000
0.0500
OH
OH
Rp.
Rp.
75,000.00
125,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1M
0.2500
0.0250
OH
OH
Rp.
Rp.
75,000.00
125,000.00
1.2000
M3
Rp.
200,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1 M3
PEK.URUGAN PASIR
TENAGA
Pekerja
Mandor
BAHAN
Pasir Urug
0.3000
0.0100
OH
OH
Rp.
Rp.
75,000.00
125,000.00
1.2000
M3
Rp.
120,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
1 M3
PEK.URUGAN TANAH
TENAGA
Pekerja
Mandor
BAHAN
Tanah Urug
0.3000
0.0100
OH
OH
Rp.
Rp.
75,000.00
125,000.00
1.2000
M3
Rp.
40,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
1M
1.0000
0.1000
OH
OH
Rp.
Rp.
75,000.00
125,000.00
0.2750
0.0300
0.0500
M3
M3
M3
Rp.
Rp.
Rp.
280,000.00
160,000.00
150,000.00
Rp.
87,500.00
Rp.
Rp.
Rp.
Rp.
15,000.00
20,000.00
2,250.00
1,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10
1 M2
0.2000
0.2000
0.0180
0.0100
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
2.3400
0.0070
Kg
M3
Rp.
Rp.
1,120.00
150,000.00
Rp.
38,500.00
Rp.
Rp.
Rp.
86,250.00
2,000.00
250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11
1M
PEK.LANTAI KERJA 1 : 3 : 5
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
1.1500 OH
0.0200 OH
0.0020 OH
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
Rp.
95,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
26,000.00
26,000.00
26,000.00
26,000.00
26,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
19,791.67
19,791.67
19,791.67
19,700.00
19,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
43,750.00
43,750.00
43,750.00
43,700.00
43,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
240,000.00
240,000.00
261,875.00
261,875.00
261,800.00
261,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
144,000.00
144,000.00
167,750.00
167,750.00
167,700.00
167,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
48,000.00
48,000.00
71,750.00
71,750.00
71,700.00
71,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
77,000.00
4,800.00
7,500.00
89,300.00
176,800.00
176,800.00
176,800.00
176,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,620.80
1,050.00
3,670.80
42,170.80
42,170.80
42,100.00
42,100.00
Mandor
0.0060 OH
Rp.
125,000.00
Semen Portland
Pasir Beton
Kerikil Beton
0.2000 Zak
0.0260 M3
0.0440 M3
Rp.
Rp.
Rp.
1,120.00
150,000.00
160,000.00
Rp.
750.00
BAHAN
Rp.
89,250.00
Rp.
Rp.
Rp.
Rp.
123,750.00
25,000.00
3,125.00
10,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12
1 M3
PEK.MEMBUAT BETON 1 : 3 : 5
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Beton
Koral Beton
1.6500
0.2500
0.0250
0.0800
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
218.0000
0.5200
0.8700
Kg
M3
M3
Rp.
Rp.
Rp.
1,120.00
150,000.00
160,000.00
Rp.
161,875.00
Rp.
Rp.
Rp.
Rp.
525.00
700.00
87.50
37.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
1 KG
0.0070
0.0070
0.0007
0.0003
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0500
0.0150
Kg
Kg
Rp.
Rp.
9,000.00
16,000.00
Rp.
1,350.00
Rp.
Rp.
Rp.
Rp.
22,500.00
26,000.00
3,250.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14
1 M2
0.3000
0.2600
0.0260
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0400
0.3000
0.1000
M3
M3
Ltr
Rp.
Rp.
Rp.
2,000,000.00
16,000.00
20,000.00
Rp.
52,375.00
Rp.
Rp.
Rp.
Rp.
172,500.00
100,000.00
12,500.00
37,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15
1 M3
2.3000
1.0000
0.1000
0.3000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
388.0000
0.6500
0.6500
Kg
M3
M3
Rp.
Rp.
Rp.
1,120.00
150,000.00
160,000.00
Rp.
322,500.00
Rp.
Rp.
Rp.
Rp.
172,500.00
100,000.00
12,500.00
37,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
16
1 M3
2.3000
1.0000
0.1000
0.3000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
400.0000
0.4000
0.8200
Kg
M3
M3
Rp.
Rp.
Rp.
1,120.00
150,000.00
160,000.00
Rp.
322,500.00
Rp.
Rp.
Rp.
Rp.
525.00
700.00
875.00
375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
17
1 Kg
0.007
0.007
0.007
0.003
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.050 Kg
0.015 Kg
Rp.
Rp.
10,000.00
16,000.00
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
18
1M
2,475.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
224.00
3,900.00
7,040.00
11,164.00
100,414.00
100,414.00
100,400.00
100,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
244,160.00
78,000.00
139,200.00
461,360.00
623,235.00
623,235.00
623,200.00
623,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,450.00
240.00
9,690.00
11,040.00
11,040.00
11,000.00
11,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,000.00
4,800.00
2,000.00
86,800.00
139,175.00
139,175.00
139,100.00
139,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
434,560.00
97,500.00
104,000.00
636,060.00
958,560.00
958,560.00
958,500.00
958,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
448,000.00
60,000.00
131,200.00
639,200.00
961,700.00
961,700.00
961,700.00
961,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,500.00
240.00
10,740.00
13,215.00
13,215.00
13,200.00
13,200.00
TENAGA
Pekerja
Tukang
Kepala Tukang
Mandor
BAHAN
Kayu terentang / kayu klas III
Paku biasa 2" - 5"
Minyak bekisting
0.300
0.260
0.026
0.005
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.040 M3
0.300 Kg
0.100 Ltr
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
Rp.
Rp.
Rp.
Rp.
22,500.00
26,000.00
3,250.00
625.00
Rp.
52,375.00
Rp.
Rp.
Rp.
Rp.
22,500.00
26,000.00
3,250.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
19
1M
0.300
0.260
0.026
0.005
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.040 M3
0.300 Kg
0.100 Ltr
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
Rp.
52,375.00
Rp.
Rp.
Rp.
Rp.
22,500.00
26,000.00
3,250.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
20
1 M3
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
Rp.
52,375.00
Rp.
Rp.
Rp.
Rp.
22,500.00
33,000.00
4,125.00
750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
21
1 M3
0.300
0.330
0.033
0.006
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.040
0.400
0.200
0.015
0.350
2.000
M3
Kg
Ltr
M3
Lbr
Btg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.
60,375.00
Rp.
Rp.
Rp.
Rp.
22,500.00
33,000.00
4,125.00
750.00
SUB TOTAL
JUMLAH
DIBULATKAN
22
1 M3
JUMLAH TOTAL
PEK.MEMBUAT PASANG BEKISTING UNTUK BALOK LANTAI
TENAGA
0.300
Pekerja
0.330
Tukang
0.033
Kepala Tukang
0.006
Mandor
BAHAN
Kayu terentang/ kayu klas III
0.040
Paku biasa 2" - 5"
0.400
Minyak bekisting
0.200
Balok kayu meranti/ kayu klas II
0.018
Plywood tebal 3 mm
0.350
Dolken kayu galam 8 - 10/4 m
2.000
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
M3
Kg
Ltr
M3
Lbr
Btg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.
60,375.00
Rp.
Rp.
Rp.
Rp.
22,500.00
33,000.00
4,125.00
750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
23
1M
0.300
0.330
0.033
0.006
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.040
0.400
0.200
0.018
0.350
2.000
M3
Kg
Ltr
M3
Lbr
Btg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.
60,375.00
Rp.
24,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
24
1 M3
0.320 Oh
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,000.00
4,800.00
2,000.00
74,800.00
127,175.00
127,175.00
127,100.00
127,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,000.00
4,800.00
2,000.00
74,800.00
127,175.00
127,175.00
127,100.00
127,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
76,500.00
4,800.00
2,000.00
83,300.00
135,675.00
135,675.00
135,600.00
135,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
15,000.00
137,400.00
197,775.00
197,775.00
197,700.00
197,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,000.00
6,400.00
4,000.00
36,000.00
14,000.00
15,000.00
143,400.00
203,775.00
203,775.00
203,700.00
203,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
68,000.00
6,400.00
4,000.00
36,000.00
14,000.00
15,000.00
143,400.00
203,775.00
203,775.00
203,700.00
203,700.00
BAHAN
Tukang
Kepala Tukang
Mandor
0.330 Oh
0.033 Oh
0.006 Oh
Rp.
Rp.
Rp.
100,000.00
125,000.00
125,000.00
0.040
0.400
0.200
0.015
0.350
6.000
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
M3
Kg
Ltr
M3
Lbr
Btg
Rp.
Rp.
Rp.
33,000.00
4,125.00
750.00
Rp.
61,875.00
Rp.
Rp.
Rp.
Rp.
24,000.00
33,000.00
4,125.00
750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
25
1M
0.320
0.330
0.033
0.006
Oh
Oh
Oh
Oh
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.040
0.400
0.200
0.015
0.350
6.000
M3
Kg
Ltr
M3
Lbr
Btg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,700,000.00
16,000.00
20,000.00
2,000,000.00
40,000.00
7,500.00
Rp.
61,875.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
26
1M
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
141.09 Kg
Rp.
13,200.00
Papan cetakan kayu kls III
2.37 M2
Rp.
127,100.00
Rp.
Rp.
Rp.
Rp.
958,500.00
1,862,432.00
301,274.07
3,122,206.07
JUMLAH TOTAL
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
134.78 Kg
Rp.
13,200.00
2
Papan cetakan kayu kls III
3.20 M
Rp.
127,100.00
Rp.
Rp.
Rp.
Rp.
958,500.00
1,779,148.80
406,720.00
3,144,368.80
JUMLAH TOTAL
28
1M
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
141.96 Kg
Rp.
13,200.00
Papan cetakan kayu kls III
4.00 M2
Rp.
127,100.00
Rp.
Rp.
Rp.
Rp.
958,500.00
1,873,872.00
508,400.00
3,340,772.00
JUMLAH TOTAL
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PONDASI
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00
Besi Ulir
108.16 Kg
Rp.
13,200.00
2
Papan cetakan kayu kls III
1.33 M
Rp.
127,100.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
45,000.00
167,400.00
229,275.00
229,275.00
229,200.00
229,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
3,122,206.07
3,122,206.07
3,122,200.00
3,122,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
3,144,368.80
3,144,368.80
3,144,300.00
3,144,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
3,340,772.00
3,340,772.00
3,340,700.00
3,340,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
2,555,678.67
2,555,678.67
2,555,600.00
2,555,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
29
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
68,000.00
6,400.00
4,000.00
30,000.00
14,000.00
45,000.00
167,400.00
229,275.00
229,275.00
229,200.00
229,200.00
SUB TOTAL
JUMLAH
DIBULATKAN
27
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
958,500.00
1,427,712.00
169,466.67
2,555,678.67
30
1M
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S1 Uk. 25x60 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
168.80 Kg
Rp.
13,200.00 Rp.
2,228,160.00
Papan cetakan kayu kls III
4.00 M2
Rp.
203,700.00 Rp.
814,800.00
Rp. 4,001,460.00 Rp.
SUB TOTAL
Rp.
4,001,460.00
JUMLAH
Rp.
4,001,460.00
DIBULATKAN
Rp.
4,001,400.00
JUMLAH TOTAL
Rp.
4,001,400.00
31
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S2 Uk. 20x30 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
148.00 Kg
Rp.
13,200.00 Rp.
1,953,600.00
2
Papan cetakan kayu kls III
8.00 M
Rp.
203,700.00 Rp.
1,629,600.00
Rp. 4,541,700.00 Rp.
SUB TOTAL
Rp.
4,541,700.00
JUMLAH
Rp.
4,541,700.00
DIBULATKAN
Rp.
4,541,700.00
JUMLAH TOTAL
Rp.
4,541,700.00
32
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE S3 Uk. 25x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
166.52 Kg
Rp.
13,200.00 Rp.
2,198,020.00
2
Papan cetakan kayu kls III
8.00 M
Rp.
203,700.00 Rp.
1,629,600.00
Rp. 4,786,120.00 Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
4,786,120.00
4,786,120.00
4,786,100.00
4,786,100.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K1 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
161.87 Kg
Rp.
13,200.00 Rp.
2,136,640.00
Papan cetakan kayu kls III
6.25 M2
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 4,330,765.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
4,330,765.00
4,330,765.00
4,330,700.00
4,330,700.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K2 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
76.73 Kg
Rp.
13,200.00 Rp.
1,012,770.00
2
Papan cetakan kayu kls III
6.25 M
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 3,206,895.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
3,206,895.00
3,206,895.00
3,206,800.00
3,206,800.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K3 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
115.98 Kg
Rp.
13,200.00 Rp.
1,530,870.00
2
Papan cetakan kayu kls III
6.25 M
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 3,724,995.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
3,724,995.00
3,724,995.00
3,724,900.00
3,724,900.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM K4 Uk. 40x40 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
155.00 Kg
Rp.
13,200.00 Rp.
2,046,000.00
Papan cetakan kayu kls III
6.25 M2
Rp.
197,700.00 Rp.
1,235,625.00
Rp. 4,240,125.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
4,240,125.00
4,240,125.00
4,240,100.00
4,240,100.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (KOLOM PRAKTIS Uk. 11x11 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
288.11 Kg
Rp.
13,200.00 Rp.
3,802,996.36
2
Papan cetakan kayu kls III
18.18 M
Rp.
197,700.00 Rp.
3,594,545.45
Rp. 8,356,041.82 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.
JUMLAH TOTAL
Rp.
8,356,041.82
8,356,041.82
8,356,000.00
8,356,000.00
JUMLAH TOTAL
33
34
35
36
37
1 M3
1 M3
1 M3
1 M3
1 M3
38
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B1 Uk. 30x55 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
138.80 Kg
Rp.
13,200.00 Rp.
1,832,160.00
2
Papan cetakan kayu kls III
6.36 M
Rp.
203,700.00 Rp.
1,296,272.73
Rp. 4,086,932.73 Rp.
SUB TOTAL
Rp.
4,086,932.73
JUMLAH
Rp.
4,086,932.73
DIBULATKAN
Rp.
4,086,900.00
JUMLAH TOTAL
Rp.
4,086,900.00
39
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B2 Uk. 30x40 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
161.87 Kg
Rp.
13,200.00 Rp.
2,136,640.00
Papan cetakan kayu kls III
5.83 M2
Rp.
203,700.00 Rp.
1,188,250.00
Rp. 4,283,390.00 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.
JUMLAH TOTAL
Rp.
4,283,390.00
4,283,390.00
4,283,300.00
4,283,300.00
40
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B3 Uk. 25x35 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
176.75 Kg
Rp.
13,200.00 Rp.
2,333,056.00
Papan cetakan kayu kls III
4.72 M2
Rp.
203,700.00 Rp.
961,916.67
Rp. 4,253,472.67 Rp.
SUB TOTAL
Rp.
4,253,472.67
JUMLAH
Rp.
4,253,472.67
DIBULATKAN
Rp.
4,253,400.00
JUMLAH TOTAL
Rp.
4,253,400.00
41
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (BALOK LANTAI TYPE B4 Uk. 15x30 cm )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
182.61 Kg
Rp.
13,200.00 Rp.
2,410,393.33
2
Papan cetakan kayu kls III
6.67 M
Rp.
203,700.00 Rp.
1,358,000.00
Rp. 4,726,893.33 Rp.
SUB TOTAL
Rp.
JUMLAH
Rp.
DIBULATKAN
Rp.
4,726,893.33
4,726,893.33
4,726,800.00
JUMLAH TOTAL
42
43
44
1M
1 M3
1 M3
Rp.
4,726,800.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT LANTAI TEBAL 12 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
74.67 Kg
Rp.
13,200.00 Rp.
985,600.00
2
Papan cetakan kayu kls III
8.33 M
Rp.
229,200.00 Rp.
1,910,000.00
Rp. 3,854,100.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
3,854,100.00
3,854,100.00
3,854,100.00
3,854,100.00
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT DINDING TEBAL 15 cm)
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
134.10 Kg
Rp.
13,200.00 Rp.
1,770,120.00
2
Papan cetakan kayu kls III
10.00 M
Rp.
229,200.00 Rp.
2,292,000.00
Rp. 5,020,620.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
5,020,620.00
5,020,620.00
5,020,600.00
5,020,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,697,700.00
1,697,700.00
1,697,700.00
1,697,700.00
958,500.00
13,200.00
Rp.
Rp.
Rp.
958,500.00
739,200.00
1,697,700.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
45
1M
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT BORDES TEBAL 12 cm untuk TANGGA )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
306.00 Kg
Rp.
13,200.00 Rp.
4,039,200.00
2
Papan cetakan kayu kls III
4.17 M
Rp.
229,200.00 Rp.
955,764.00
Rp. 5,953,464.00 Rp.
SUB TOTAL
Rp.
5,953,464.00
JUMLAH
Rp.
5,953,464.00
DIBULATKAN
Rp.
5,953,400.00
JUMLAH TOTAL
Rp.
5,953,400.00
46
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (PLAT TANGGA TEBAL 12 cm untuk TANGGA )
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
444.00 Kg
Rp.
13,200.00 Rp.
5,860,800.00
2
Papan cetakan kayu kls III
4.17 M
Rp.
229,200.00 Rp.
955,764.00
Rp. 7,775,064.00 Rp.
SUB TOTAL
Rp.
7,775,064.00
JUMLAH
Rp.
7,775,064.00
DIBULATKAN
Rp.
7,775,000.00
JUMLAH TOTAL
Rp.
7,775,000.00
47
1 M3
PEK.MEMBUAT BETON BERTULANG STRUKTUR DENGAN PAPAN CETAKAN KLAS III (ANAK TANGGA untuk TANGGA
BAHAN + UPAH :
Beton mutu K-225
1.00 M3
Rp.
958,500.00 Rp.
958,500.00
Besi Ulir
263.00 Kg
Rp.
13,200.00 Rp.
3,471,600.00
Papan cetakan kayu kls III
3.33 M2
Rp.
229,200.00 Rp.
763,236.00
Rp. 5,193,336.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
5,193,336.00
5,193,336.00
5,193,300.00
5,193,300.00
1 M2
2
PEK.PASANG ATAP LONGSPAN ZINCKALUM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Atap Zincalume - Alluminium tebal 0,3 mm
Paku Atap Zincalume
0.2000
0.1000
0.0100
0.0010
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0200
0.2000
M2
Kg
Rp.
Rp.
85,000.00
25,000.00
Rp.
Rp.
Rp.
Rp.
15,000.00
10,000.00
1,250.00
125.00
Rp.
26,375.00
Rp.
Rp.
Rp.
Rp.
15,000.00
10,000.00
1,250.00
125.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
0.2000
0.1000
0.0100
0.0010
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0200
0.2000
M2
Kg
Rp.
Rp.
65,000.00
25,000.00
Rp.
26,375.00
Rp.
18,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 M1
0.2500
OH
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
86,700.00
5,000.00
91,700.00
118,075.00
118,075.00
118,000.00
118,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
66,300.00
5,000.00
71,300.00
97,675.00
97,675.00
97,600.00
97,600.00
Tukang Kayu
Kepala Tukang
Mandor
0.1500
0.0150
0.0130
OH
OH
OH
Rp.
Rp.
Rp.
100,000.00
125,000.00
125,000.00
1.0000
0.0500
Lbr
Kg
Rp.
Rp.
35,000.000
16,000.000
Rp.
Rp.
Rp.
15,000.00
1,875.00
1,625.00
BAHAN
Rp.
37,250.00
Rp.
Rp.
Rp.
Rp.
15,000.00
15,000.00
1,875.00
1,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M1
0.2000
0.1500
0.0150
0.0130
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.1500
1.0000
0.0500
M2
M1
Kg
Rp.
Rp.
Rp.
40,000.000
15,000.000
16,000.000
Rp.
33,500.00
Rp.
Rp.
Rp.
Rp.
15,000.00
15,000.00
1,875.00
1,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 M1
0.2000
0.1500
0.0150
0.0130
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.5000
0.0500
Lbr
Kg
Rp.
Rp.
15,000.000
16,000.000
Rp.
33,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,000.00
800.00
35,800.00
73,050.00
73,050.00
73,000.00
73,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,000.00
15,000.00
800.00
21,800.00
55,300.00
55,300.00
55,300.00
55,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,500.00
800.00
8,300.00
41,800.00
41,800.00
41,800.00
41,800.00
1 M1
2
PEK.MEMASANG KUSEN PINTU ALLUMINIUM
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Profil Alluminium 3"
Skrup Fixer
Sealant
0.0430
0.0430
0.0043
0.0021
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.
95,000.00
7,500.00
12,500.00
Rp.
Rp.
Rp.
Rp.
3,225.00
4,300.00
537.50
262.50
Rp.
8,325.00
Rp.
Rp.
Rp.
Rp.
6,375.00
8,500.00
1,125.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1 M2
0.0850
0.0850
0.0090
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
4.5000 M1 Rp.
4.5000 M1 Rp.
0.2700 Tube Rp.
95,000.00
85,000.00
12,500.00
Rp.
16,625.00
Rp.
Rp.
Rp.
Rp.
15,000.00
40,000.00
3,125.00
1,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 M2
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
Rp.
40,000.00
18,000.00
1,700,000.00
Rp.
59,375.00
Rp.
Rp.
Rp.
Rp.
11,250.00
30,000.00
3,750.00
1,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M2
PEK.MEMASANG TALANG 1/2 LINGKARAN D=15 CM, SENG PLAT BJLS 30 LEBAR
TENAGA
Pekerja
0.1500 OH Rp.
Tukang Besi
0.3000 OH Rp.
Kepala Tukang
0.0300 OH Rp.
Mandor
0.0080 OH Rp.
BAHAN
Seng Plat
1.0500 M1 Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,500.00
15,000.00
750.00
120,250.00
128,575.00
128,575.00
128,500.00
128,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
427,500.00
382,500.00
3,375.00
813,375.00
830,000.00
830,000.00
830,000.00
830,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
42,000.00
270.00
32,300.00
74,570.00
133,945.00
133,945.00
133,900.00
133,900.00
Rp.
42,000.00
45 CM
75,000.00
100,000.00
125,000.00
125,000.00
40,000.00
Paku 1 cm-2,5 cm
Besi Strip
0.0100
0.5000
Kg
Kg
Rp.
Rp.
18,000.00
3,000.00
Rp.
46,000.00
SUB TOTAL
OVERHEAD &PROFIT 10% X SUB JUMLAH
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
180.00
1,500.00
43,680.00
89,680.00
8,968.00
98,648.00
98,600.00
98,600.00
1 M2
2
3
PEK.MEMASANG LANTAI KERAMIK, UKURAN (60 X 60) CM
TENAGA
Pekerja
0.7000
Tukang Kayu
0.3500
Kepala Tukang
0.0350
Mandor
0.0350
BAHAN
Keramik 60 X 60 cm Homogenous
2.7778
Semen Type I/Portland Cement
10.0000
Semen Type I Warna
1.5000
Pasir Pasang
0.0450
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
90,000.25
1,120.00
12,500.00
150,000.00
Rp.
Rp.
Rp.
Rp.
52,500.00
35,000.00
4,375.00
4,375.00
Rp.
96,250.00
Rp.
Rp.
Rp.
Rp.
15,000.00
35,000.00
4,375.00
4,375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1 M2
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
M2
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
85,000.00
1,120.00
12,500.00
150,000.00
Rp.
58,750.00
Rp.
Rp.
Rp.
Rp.
6,750.00
9,000.00
1,125.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1M
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
3,400.00
1,120.00
12,500.00
150,000.00
Rp.
17,500.00
Rp.
Rp.
Rp.
Rp.
6,750.00
9,000.00
1,125.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
4
1 M1
JUMLAH TOTAL
PEK.MEMASANG PLINT LANTAI KERAMIK UKURAN (10 X 60) CM
TENAGA
Pekerja
0.0900
Tukang Kayu
0.0900
Kepala Tukang
0.0090
Mandor
0.0050
BAHAN
Plint Keramik 10 x 60
1.7000
Semen Type I/Portland Cement
1.1400
Semen Type I Warna
0.1000
Pasir Pasang
0.0030
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
15,000.04
1,120.00
12,500.00
150,000.00
Rp.
17,500.00
Rp.
Rp.
Rp.
Rp.
6,750.00
9,000.00
1,125.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1M
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
1,200.00
1,120.00
12,500.00
150,000.00
Rp.
17,500.00
Rp.
Rp.
52,500.00
35,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1M
OH
OH
Rp.
Rp.
75,000.00
100,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250,000.63
11,200.00
18,750.00
6,750.00
286,700.63
382,950.63
382,950.63
382,900.00
382,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
85,000.00
11,200.00
18,750.00
6,750.00
121,700.00
180,450.00
180,450.00
180,400.00
180,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,002.00
1,276.80
1,250.00
450.00
14,978.80
32,478.80
32,478.80
32,400.00
32,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,500.07
1,276.80
1,250.00
450.00
28,476.87
45,976.87
45,976.87
45,900.00
45,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,800.00
1,276.80
1,250.00
450.00
4,776.80
22,276.80
22,276.80
22,200.00
22,200.00
Kepala Tukang
Mandor
0.0350
0.0350
OH
OH
Rp.
Rp.
125,000.00
125,000.00
26.5000
10.4000
1.6200
0.0450
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
3,000.00
1,120.00
12,500.00
150,000.00
Rp.
Rp.
4,375.00
4,375.00
BAHAN
Keramik 25 X 25 cm
Semen Type I/Portland Cement
Semen Type I Warna
Pasir Pasang
Rp.
96,250.00
Rp.
Rp.
Rp.
Rp.
78,750.00
52,500.00
6,625.00
6,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1 M2
75,000.00
100,000.00
125,000.00
125,000.00
3,400.00
1,120.00
12,500.00
150,000.00
Rp.
144,500.00
Rp.
Rp.
Rp.
Rp.
52,500.00
35,000.00
4,375.00
4,375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
1 M2
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
150,000.00
1,120.00
12,500.00
150,000.00
Rp.
96,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1
9
1 M2
2
3
PEK.MEMASANG DINDING KERAMIK, UKURAN (11 X 11) CM
TENAGA
Pekerja
1.0000
Tukang Kayu
0.5000
Kepala Tukang
0.0500
Mandor
0.0500
BAHAN
Porselen
53.0000
Semen Type I/Portland Cement
9.3000
Semen Warna
1.5000
Pasir Pasang
0.0180
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
500.00
1,120.00
12,500.00
150,000.00
Rp.
Rp.
Rp.
Rp.
1M
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
940.00
1,120.00
12,500.00
150,000.00
Rp.
137,500.00
Rp.
Rp.
Rp.
Rp.
67,500.00
45,000.00
5,625.00
5,625.00
Rp.
123,750.00
Rp.
Rp.
Rp.
Rp.
67,500.00
45,000.00
5,625.00
5,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11
1M
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
2,400.00
1,120.00
12,500.00
150,000.00
Rp.
123,750.00
Rp.
22,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12
1M
OH
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
136,000.00
10,976.00
54,625.00
6,750.00
208,351.00
352,851.00
352,851.00
352,800.00
352,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
159,000.00
9,172.80
8,125.00
6,750.00
183,047.80
279,297.80
279,297.80
279,200.00
279,200.00
75,000.00
50,000.00
6,250.00
6,250.00
JUMLAH TOTAL
10
79,500.00
11,648.00
20,250.00
6,750.00
118,148.00
214,398.00
214,398.00
214,300.00
214,300.00
SUB TOTAL
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
26,500.00
10,416.00
18,750.00
2,700.00
58,366.00
195,866.00
195,866.00
195,800.00
195,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
49,820.00
10,416.00
34,375.00
2,700.00
97,311.00
221,061.00
221,061.00
221,000.00
221,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
62,400.00
10,416.00
24,250.00
2,700.00
99,766.00
223,516.00
223,516.00
223,500.00
223,500.00
Tukang Kayu
Kepala Tukang
Mandor
0.3500
0.0450
0.0450
OH
OH
OH
Rp.
Rp.
Rp.
100,000.00
125,000.00
125,000.00
25.0000
9.3000
1.9400
0.0180
Bh
Kg
Kg
M3
Rp.
Rp.
Rp.
Rp.
1,920.00
1,120.00
12,500.00
150,000.00
Rp.
Rp.
Rp.
35,000.00
5,625.00
5,625.00
BAHAN
Keramik 20 x 20
Semen Type I/Portland Cement
Semen Warna
Pasir Pasang
Rp.
68,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
48,000.00
10,416.00
24,250.00
2,700.00
85,366.00
154,116.00
154,116.00
154,100.00
154,100.00
1 M2
2
PEK.PASANGAN BATA MERAH TEBAL 1 BATA (1 : 2)
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Batu Bata
Semen Portland
Pasir Pasang
0.6500
0.2000
0.0200
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
175.0000
26.5500
0.0930
Bh
Kg
M3
Rp.
Rp.
Rp.
500.000
1,120.000
150,000.000
Rp.
Rp.
Rp.
Rp.
48,750.00
20,000.00
2,500.00
3,750.00
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
24,000.00
10,000.00
1,250.00
1,875.00
SUB TOTAL
JUMLAH
DIBULATKAN
2
1 M2
JUMLAH TOTAL
PEK.PASANGAN BATA MERAH TEBAL 1/2 BATA (1 : 2)
TENAGA
Pekerja
0.3200
Tukang Kayu
0.1000
Kepala Tukang
0.0100
Mandor
0.0150
BAHAN
Batu Bata
102.0000
Semen Portland
18.9500
Pasir Pasang
0.0380
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
M3
Rp.
Rp.
Rp.
500.000
1,120.000
150,000.000
Rp.
37,125.00
Rp.
Rp.
Rp.
Rp.
24,000.00
10,000.00
1,250.00
1,875.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 M2
0.3200
0.1000
0.0100
0.0150
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
102.0000
11.5000
0.0430
Bh
Kg
M3
Rp.
Rp.
Rp.
500.00
1,120.00
150,000.00
Rp.
37,125.00
Rp.
Rp.
Rp.
Rp.
48,750.00
20,000.00
2,500.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M2
0.6500
0.2000
0.0200
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
175.0000
11.5000
0.0430
Bh
Kg
M3
Rp.
Rp.
Rp.
500.00
1,120.00
150,000.00
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
112,500.00
60,000.00
7,500.00
9,375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 M3
1.5000
0.6000
0.0600
0.0750
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000
163.0000
0.5200
M3
Kg
M3
Rp.
Rp.
Rp.
200,000.00
1,120.00
150,000.00
Rp.
189,375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
87,500.00
29,736.00
13,950.00
131,186.00
206,186.00
206,186.00
206,100.00
206,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
51,000.00
21,224.00
5,700.00
77,924.00
115,049.00
115,049.00
115,000.00
115,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
51,000.00
12,880.00
6,450.00
70,330.00
107,455.00
107,455.00
107,400.00
107,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
87,500.00
12,880.00
6,450.00
106,830.00
181,830.00
181,830.00
181,800.00
181,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
220,000.00
182,560.00
78,000.00
480,560.00
669,935.00
669,935.00
669,900.00
669,900.00
1 M2
2
PEK.PLESTERAN 1 : 2, TEBAL 20 MM
TENAGA
Pekerja
Tukang Kayu
0.2500
0.2000
OH
OH
Rp.
Rp.
75,000.00
100,000.00
Rp.
Rp.
18,750.00
20,000.00
Kepala Tukang
Mandor
0.0200
0.0125
OH
OH
Rp.
Rp.
125,000.00
125,000.00
14.2800
0.0230
Kg
M3
Rp.
Rp.
1,120.000
150,000.000
Rp.
Rp.
2,500.00
1,562.50
Rp.
42,812.50
Rp.
Rp.
Rp.
Rp.
18,750.00
20,000.00
2,500.00
1,562.50
BAHAN
Semen Portland
Pasir Pasang
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
PEK.PLESTERAN 1 : 4, TEBAL 20 MM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang
0.2500
0.2000
0.0200
0.0125
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
8.6800
0.0280
Kg
M3
Rp.
Rp.
1,120.000
150,000.000
Rp.
42,812.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1
3
1 M2
2
PEK.PLESTERAN BERAPEN 1 : 3, TEBAL 30 MM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Semen Portland
Pasir Pasang
0.1500
0.0700
0.0070
0.0080
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
7.0700
0.0210
Kg
M3
Rp.
Rp.
1,120.000
150,000.000
1M
0.2000
0.2000
0.0180
0.0100
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
2.3400
0.0070
Kg
M3
Rp.
Rp.
1,120.000
150,000.000
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
9,721.60
4,200.00
13,921.60
56,734.10
56,734.10
56,700.00
56,700.00
Rp.
Rp.
Rp.
Rp.
11,250.00
7,000.00
875.00
1,000.00
Rp.
20,125.00
Rp.
Rp.
Rp.
Rp.
15,000.00
20,000.00
2,250.00
1,250.00
JUMLAH TOTAL
4
15,993.60
3,450.00
19,443.60
62,256.10
62,256.10
62,200.00
62,200.00
SUB TOTAL
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
38,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,918.40
3,150.00
11,068.40
31,193.40
31,193.40
31,100.00
31,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,620.80
1,050.00
3,670.80
42,170.80
42,170.80
42,100.00
42,100.00
1 M2
2
PEK.MEMASANG PINTU ROLLING DOOR ALUMINIUM
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Pintu Gulung Besi
1.0000
1.0000
0.1000
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
M2
Rp.
400,000.00
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
12,500.00
625.00
Rp.
188,125.00
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
12,500.00
625.00
Rp.
188,125.00
Rp.
Rp.
Rp.
Rp.
3,225.00
4,300.00
537.50
262.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
1.0000
1.0000
0.1000
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
M2
Rp.
600,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1M
0.0430
0.0430
0.0043
0.0021
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.
95,000.00
250.00
12,500.00
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
8,325.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
400,000.00
400,000.00
588,125.00
588,125.00
588,100.00
588,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
600,000.00
600,000.00
788,125.00
788,125.00
788,100.00
788,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
104,500.00
500.00
750.00
105,750.00
114,075.00
114,075.00
114,000.00
JUMLAH TOTAL
4
1M
0.0430
0.0430
0.0043
0.0021
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000 M1 Rp.
2.0000 Bh Rp.
0.0600 Tube Rp.
65,000.00
250.00
12,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
8,325.00
Rp.
Rp.
Rp.
Rp.
6,375.00
8,500.00
1,062.50
525.00
JUMLAH TOTAL
5
1M
0.0850
0.0850
0.0085
0.0042
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
4.4000
14.6000
M1
M1
Rp.
Rp.
95,000.00
25,000.00
Rp.
16,462.50
Rp.
Rp.
Rp.
Rp.
6,375.00
8,500.00
1,000.00
500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1M
0.0850
0.0850
0.0080
0.0040
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
4.4000 M1 Rp.
4.5000 M1 Rp.
0.2700 Tube Rp.
95,000.00
111,600.00
12,500.00
Rp.
16,375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1
7
2
1 UNIT PEK.PASANG KUZEN TYPE P-1
TENAGA + BAHAN :
Rangka Alluminium 4"
Pasang Pintu Kaca Tempered tebal 12mm
Pasang Kacabening 5 mm
Flour Hings
Pegangan Tangan Pintu
Kunci Pintu
10.0000
5.7600
0.7500
4.0000
4.0000
2.0000
M1
M2
M2
Bh
Ps
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
810,000.00
4,780,800.00
157,950.00
3,672,400.00
612,400.00
269,200.00
###
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
810,000.00
10,881,300.00
157,950.00
3,672,400.00
612,400.00
269,200.00
###
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
729,000.00
3,054,400.00
842,400.00
3,672,400.00
612,400.00
269,200.00
9,179,800.00
Rp.
Rp.
Rp.
729,000.00
3,245,300.00
775,008.00
JUMLAH TOTAL
10.0000
13.1100
0.7500
4.0000
4.0000
2.0000
M1
M2
M2
Bh
Ps
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
9.0000
3.6800
4.0000
4.0000
4.0000
2.0000
M1
M2
M2
Bh
Ps
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
81,000.00
830,000.00
210,600.00
918,100.00
153,100.00
134,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9.0000
3.9100
3.6800
M1
M2
M2
Rp.
Rp.
Rp.
81,000.00
830,000.00
210,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
71,500.00
500.00
750.00
72,750.00
81,075.00
81,075.00
81,000.00
81,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
418,000.00
365,000.00
783,000.00
799,462.50
799,462.50
799,400.00
799,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
418,000.00
502,200.00
3,375.00
923,575.00
939,950.00
939,950.00
939,900.00
939,900.00
SUB TOTAL
JUMLAH
DIBULATKAN
114,000.00
3,225.00
4,300.00
537.50
262.50
SUB TOTAL
JUMLAH
DIBULATKAN
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,302,750.00
10,302,750.00
10,302,700.00
10,302,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
16,403,250.00
16,403,250.00
16,403,200.00
16,403,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
9,179,800.00
9,179,800.00
9,179,800.00
9,179,800.00
Flour Hings
Pegangan Tangan Pintu
Kunci Pintu
4.0000
4.0000
2.0000
Bh
Ps
Bh
Rp.
Rp.
Rp.
918,100.00
153,100.00
134,600.00
Rp.
Rp.
Rp.
Rp.
3,672,400.00
612,400.00
269,200.00
9,303,308.00
Rp.
Rp.
Rp.
Rp.
Rp.
173,600.00
445,500.00
708,750.00
134,600.00
1,462,450.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
0.0620
4.0500
4.0500
1.0000
M3
M2
M2
Bh
Rp.
2,800,000.000
110,000.000
175,000.000
134,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
0.0620
3.4500
3.4500
1.0000
M3
M2
M2
Bh
Rp.
2,800,000.000
110,000.000
175,000.000
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
173,600.00
379,500.00
603,750.00
134,600.00
1,291,450.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
0.0620
2.7600
2.7600
1.0000
M3
M2
M2
Bh
Rp.
2,800,000.000
110,000.000
175,000.000
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
173,600.00
303,600.00
483,000.00
134,600.00
1,094,800.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
0.0620
2.4000
2.4000
1.0000
M3
M2
M2
Bh
Rp.
2,800,000.000
110,000.000
175,000.000
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
173,600.00
264,000.00
420,000.00
134,600.00
992,200.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
0.0620
1.8400
1.8400
1.0000
M3
M2
M2
Bh
Rp.
2,800,000.000
110,000.000
175,000.000
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
173,600.00
202,400.00
322,000.00
134,600.00
832,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14
15.0000
2.0000
M1
M2
Rp.
Rp.
81,000.00
250,000.00
Rp.
Rp.
Rp.
1,215,000.00
500,000.00
1,715,000.00
Rp.
Rp.
Rp.
1,944,000.00
925,000.00
2,869,000.00
Rp.
Rp.
2,835,000.00
1,063,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15
24.0000
3.7000
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
16
35.0000
4.2550
M1
M2
Rp.
Rp.
81,000.00
250,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
9,303,308.00
9,303,308.00
9,303,300.00
9,303,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,462,450.00
1,462,450.00
1,462,400.00
1,462,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,291,450.00
1,291,450.00
1,291,400.00
1,291,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,094,800.00
1,094,800.00
1,094,800.00
1,094,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
992,200.00
992,200.00
992,200.00
992,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
832,600.00
832,600.00
832,600.00
832,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,715,000.00
3,430,000.00
3,430,000.00
3,430,000.00
3,430,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
2,869,000.00
5,738,000.00
5,738,000.00
5,738,000.00
5,738,000.00
Rp.
3,898,750.00
Rp.
Rp.
Rp.
5,265,000.00
1,650,000.00
6,915,000.00
Rp.
Rp.
Rp.
1,944,000.00
1,035,000.00
2,979,000.00
Rp.
Rp.
Rp.
5,427,000.00
2,160,000.00
7,587,000.00
Rp.
Rp.
Rp.
324,000.00
500,000.00
824,000.00
Rp.
Rp.
Rp.
777,600.00
525,000.00
1,302,600.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
17
65.0000
6.6000
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
18
24.0000
4.1400
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
19
67.0000
8.6400
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
31
4.0000
2.0000
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
32
9.6000
2.1000
M1
M2
Rp.
Rp.
81,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
3,898,750.00
7,797,500.00
7,797,500.00
7,797,500.00
7,797,500.00
Rp.
Rp.
Rp.
Rp.
Rp.
6,915,000.00
13,830,000.00
13,830,000.00
13,830,000.00
13,830,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
2,979,000.00
5,958,000.00
5,958,000.00
5,958,000.00
5,958,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
7,587,000.00
15,174,000.00
15,174,000.00
15,174,000.00
15,174,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
824,000.00
1,648,000.00
1,648,000.00
1,648,000.00
1,648,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
1,302,600.00
2,605,200.00
2,605,200.00
2,605,200.00
2,605,200.00
1 M3
2
PEK.PASANG KUSEN PINTU DAN JENDELA KAYU KULIM
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Kayu Kulim
Paku Biasa
6.0000
18.0000
2.0000
0.3000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
0.1500
M3
Kg
Rp.
Rp.
2,800,000.00
16,000.00
Rp.
Rp.
Rp.
Rp.
450,000.00
1,800,000.00
250,000.00
37,500.00
Rp.
2,537,500.00
Rp.
Rp.
Rp.
Rp.
18,750.00
20,000.00
2,500.00
1,562.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
0.2500
0.2000
0.0200
0.0125
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0200
1.2000
0.1500
M3
M2
Kg
Rp.
Rp.
Rp.
2,000,000.000
85,000.000
16,000.000
Rp.
42,812.50
Rp.
Rp.
75,000.00
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 M2
1.0000
2.5000
OH
OH
Rp.
Rp.
75,000.00
100,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,360,000.00
2,400.00
3,362,400.00
5,899,900.00
5,899,900.00
5,899,900.00
5,899,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,000.00
102,000.00
2,400.00
144,400.00
187,212.50
187,212.50
187,200.00
187,200.00
Kepala Tukang
Mandor
0.2500
0.0500
OH
OH
Rp.
Rp.
125,000.00
125,000.00
Kayu Surian
Paku Biasa
0.0400
0.1500
M3
Kg
Rp.
Rp.
2,000,000.000
16,000.000
Rp.
Rp.
31,250.00
6,250.00
BAHAN
Rp.
362,500.00
Rp.
Rp.
Rp.
Rp.
75,000.00
250,000.00
31,250.00
6,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M2
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
M3
M2
Kg
Rp.
Rp.
Rp.
2,000,000.000
40,000.000
16,000.000
Rp.
362,500.00
Rp.
Rp.
Rp.
Rp.
37,500.00
200,000.00
25,000.00
3,125.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 M2
0.5000
2.0000
0.2000
0.0250
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0600
0.1500
M3
Kg
Rp.
Rp.
2,000,000.000
16,000.000
Rp.
265,625.00
Rp.
Rp.
Rp.
Rp.
11,250.00
25,000.00
3,125.00
937.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1 M2
0.1500
0.2500
0.0250
0.0075
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0120
0.1000
M3
Kg
Rp.
Rp.
2,000,000.00
16,000.00
Rp.
40,312.50
Rp.
Rp.
Rp.
Rp.
300,000.00
1,200,000.00
150,000.00
25,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1 M3
4.0000
12.0000
1.2000
0.2000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000
0.8000
M3
Kg
Rp.
Rp.
2,000,000.00
16,000.00
Rp.
1,675,000.00
Rp.
Rp.
Rp.
Rp.
7,500.00
20,000.00
3,125.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
1M
0.1000
0.2000
0.0250
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
0.0500
M1
Kg
Rp.
Rp.
175,000.000
16,000.000
Rp.
31,250.00
Rp.
Rp.
Rp.
Rp.
8,250.00
22,000.00
2,750.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
1M
0.1100
0.2200
0.0220
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
0.0500
M2
Kg
Rp.
Rp.
350,000.000
16,000.000
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10
1M
33,625.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,000.00
2,400.00
82,400.00
444,900.00
444,900.00
444,900.00
444,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
80,000.00
48,000.00
2,720.00
130,720.00
493,220.00
493,220.00
493,200.00
493,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
120,000.00
2,400.00
122,400.00
388,025.00
388,025.00
388,000.00
388,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
24,000.00
1,600.00
25,600.00
65,912.50
65,912.50
65,900.00
65,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,200,000.00
12,800.00
2,212,800.00
3,887,800.00
3,887,800.00
3,887,800.00
3,887,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
210,000.00
800.00
210,800.00
242,050.00
242,050.00
242,000.00
242,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
420,000.00
800.00
420,800.00
454,425.00
454,425.00
454,400.00
454,400.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.1000
0.1000
0.0100
0.0500
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Kayu Meranti
Paku Biasa
0.0080
0.0600
M3
Kg
Rp.
Rp.
2,000,000.000
16,000.000
Rp.
Rp.
Rp.
Rp.
7,500.00
10,000.00
1,250.00
6,250.00
BAHAN
Rp.
25,000.00
Rp.
Rp.
Rp.
Rp.
45,000.00
18,000.00
22,500.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11
1 M2
0.6000
0.1800
0.1800
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.0070
0.1000
M3
Kg
Rp.
Rp.
2,000,000.000
16,000.000
Rp.
89,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,000.00
960.00
16,960.00
41,960.00
41,960.00
41,900.00
41,900.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,000.00
1,600.00
15,600.00
104,850.00
104,850.00
104,800.00
104,800.00
1 M2
2
PEK.MEMASANG RANGKA PLAFOND FURRING
TENAGA
Pekerja
Tukang Besi
Kepala Tukang
Mandor
BAHAN
Rangka Furing
0.0800
0.0080
0.0800
0.0040
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
M1
Rp.
23,500.00
Rp.
Rp.
Rp.
Rp.
6,000.00
800.00
10,000.00
500.00
Rp.
17,300.00
Rp.
Rp.
Rp.
Rp.
1,200.00
1,600.00
875.00
1,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1 M2
0.0160
0.0160
0.0070
0.0080
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1500
1.0000
0.1000
0.0500
0.8000
Kg
Ltr
Ltr
Kg
Jam
Rp.
Rp.
Rp.
Rp.
Rp.
5,000.00
4,500.00
30,000.00
16,000.00
15,000.00
Rp.
4,675.00
Rp.
Rp.
Rp.
Rp.
7,500.00
5,000.00
625.00
625.00
Rp.
13,750.00
Rp.
Rp.
Rp.
Rp.
7,500.00
5,000.00
625.00
625.00
Rp.
13,750.00
Rp.
Rp.
Rp.
Rp.
7,500.00
10,000.00
1,250.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1M
0.1000
0.0500
0.0050
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.3640
0.1100
Lbr
Kg
Rp.
Rp.
70,000.00
18,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M2
0.1000
0.0500
0.0050
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
1.0000
Lbr
Ls
Rp.
Rp.
300,000.000
54,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 M2
PEK. MEMASANG LANGIT-LANGIT TRIPLEK, UKURAN (120 X 120) CM, TEBAL 3,6 MM
TENAGA
Pekerja
0.1000 OH Rp.
75,000.00
Tukang Kayu
0.1000 OH Rp.
100,000.00
Kepala Tukang
0.0100 OH Rp.
125,000.00
Mandor
0.0050 OH Rp.
125,000.00
BAHAN
Tripleks
0.3750 Lbr Rp.
50,000.00
Paku Triplek
0.0300 Kg Rp.
18,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
23,500.00
23,500.00
40,800.00
40,800.00
40,800.00
40,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
5,750.00
4,500.00
3,000.00
800.00
12,000.00
26,050.00
30,725.00
30,725.00
30,700.00
30,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
25,480.00
1,980.00
27,460.00
41,210.00
41,210.00
41,200.00
41,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
300,000.00
54,000.00
354,000.00
367,750.00
367,750.00
367,700.00
367,700.00
Rp.
Rp.
18,750.00
540.00
Rp.
19,375.00
Rp.
Rp.
Rp.
Rp.
60,000.00
80,000.00
10,000.00
5,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1M
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
2,000,000.00
18,000.00
Rp.
155,000.00
Rp.
Rp.
Rp.
Rp.
7,500.00
5,000.00
625.00
625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1M
Rp.
13,750.00
Rp.
Rp.
Rp.
Rp.
3,750.00
5,000.00
625.00
375.00
SUB TOTAL
JUMLAH
DIBULATKAN
8
1 M1
JUMLAH TOTAL
PEK. MEMASANG LIST LANGIT-LANGIT KAYU PROFIL, UKURAN (5 X 5) CM
TENAGA
Pekerja
0.0500 OH Rp.
Tukang Kayu
0.0500 OH Rp.
Kepala Tukang
0.0050 OH Rp.
Mandor
0.0030 OH Rp.
BAHAN
List Kayu Profil K2 ( 5 x 5) cm
1.0500 M1 Rp.
Paku
0.0100 Kg Rp.
75,000.00
100,000.00
125,000.00
125,000.00
3,750.00
16,000.00
Rp.
9,750.00
Rp.
Rp.
Rp.
Rp.
3,750.00
5,000.00
625.00
375.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
1M
0.0500
0.0500
0.0050
0.0030
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000
0.0100
Lbr
Kg
Rp.
Rp.
15,000.000
18,000.000
Rp.
9,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
19,290.00
38,665.00
38,665.00
38,600.00
38,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
30,000.00
180.00
30,180.00
185,180.00
185,180.00
185,100.00
185,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
21,840.00
2,200.00
24,040.00
37,790.00
37,790.00
37,700.00
37,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,937.50
160.00
4,097.50
13,847.50
13,847.50
13,800.00
13,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
16,500.00
180.00
16,680.00
26,430.00
26,430.00
26,400.00
26,400.00
2
1 SET PEK.PASANG 1 BUAH KLOSET JONGKOK STANDARD
TENAGA
Pekerja
Tukang Batu
Kepala Tukang
Mandor
BAHAN
Kloset Jongkok
Semen Portland
Pasir Pasang
0.5000
0.5000
0.0500
0.1000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
5.0000
0.0100
Bh
Kg
M3
Rp.
Rp.
Rp.
165,000.000
1,120.000
150,000.000
Rp.
Rp.
Rp.
Rp.
37,500.00
50,000.00
6,250.00
12,500.00
Rp.
106,250.00
Rp.
Rp.
Rp.
Rp.
37,500.00
50,000.00
6,250.00
12,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
0.5000
0.5000
0.0500
0.1000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
5.0000
0.0100
Bh
Kg
M3
Rp.
Rp.
Rp.
4,500,000.00
1,120.00
150,000.00
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
106,250.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
165,000.00
5,600.00
1,500.00
172,100.00
278,350.00
278,350.00
278,300.00
278,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,500,000.00
5,600.00
1,500.00
4,507,100.00
4,613,350.00
4,613,350.00
4,613,300.00
4,613,300.00
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
0.5000
0.5000
0.0500
0.1000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bak Fiberglass
Perlengkapan (18% dari harga bak fiberglass)
1.0000
1.0000
Bh
Ls
Rp.
Rp.
350,000.000
63,000.000
Rp.
Rp.
Rp.
Rp.
37,500.00
50,000.00
6,250.00
12,500.00
BAHAN
Rp.
106,250.00
Rp.
Rp.
Rp.
Rp.
37,500.00
50,000.00
6,250.00
12,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Ls
Rp.
Rp.
850,000.000
153,000.000
Rp.
106,250.00
Rp.
Rp.
Rp.
Rp.
106,500.00
47,300.00
5,875.00
8,875.00
SUB TOTAL
JUMLAH
DIBULATKAN
5
1 BH
JUMLAH TOTAL
PEK.PASANG 1 BUAH BAK KONTROL PAS.BATU BATA (45 x 45) TINGGI 50 CM
TENAGA
Pekerja
1.4200 OH Rp.
Tukang Kayu
0.4730 OH Rp.
Kepala Tukang
0.0470 OH Rp.
Mandor
0.0710 OH Rp.
BAHAN
Batu Bata
250.0000 Bh Rp.
Semen Portland
77.0000 Kg Rp.
Pasir Pasang
0.1300 M3 Rp.
Batu Kerikil
0.0200 M3 Rp.
Besi Beton
2.6000 Kg Rp.
Pasir Beton
0.0900 M3 Rp.
75,000.00
100,000.00
125,000.00
125,000.00
500.000
1,120.000
150,000.000
160,000.000
9,000.000
150,000.000
Rp.
168,550.00
Rp.
Rp.
Rp.
Rp.
2,700.00
6,000.00
750.00
225.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1 M1
0.0360
0.0600
0.0060
0.0018
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
4,000.000
1,400.000
Rp.
9,675.00
Rp.
Rp.
Rp.
Rp.
2,700.00
6,000.00
750.00
225.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1 M1
0.0360
0.0600
0.0060
0.0018
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
5,000.000
1,750.000
Rp.
9,675.00
Rp.
Rp.
Rp.
Rp.
2,700.00
6,000.00
750.00
225.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
1 M1
0.0360
0.0600
0.0060
0.0018
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
12,000.000
4,200.000
Rp.
9,675.00
Rp.
Rp.
Rp.
Rp.
2,700.00
6,000.00
750.00
225.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
1 M1
0.0360
0.0600
0.0060
0.0018
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
15,200.000
5,320.000
Rp.
SUB TOTAL
JUMLAH
9,675.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
350,000.00
63,000.00
413,000.00
519,250.00
519,250.00
519,200.00
519,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
850,000.00
153,000.00
1,003,000.00
1,109,250.00
1,109,250.00
1,109,200.00
1,109,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
125,000.00
86,240.00
19,500.00
3,200.00
23,400.00
13,500.00
270,840.00
439,390.00
439,390.00
439,300.00
439,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,800.00
1,400.00
6,200.00
15,875.00
15,875.00
15,800.00
15,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,000.00
1,750.00
7,750.00
17,425.00
17,425.00
17,400.00
17,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
14,400.00
4,200.00
18,600.00
28,275.00
28,275.00
28,200.00
28,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
18,240.00
5,320.00
23,560.00
33,235.00
33,235.00
DIBULATKAN
JUMLAH TOTAL
10
1 M1
0.0810
0.1350
0.0135
0.0041
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
27,500.000
9,625.000
Rp.
Rp.
Rp.
Rp.
Rp.
21,775.00
Rp.
Rp.
Rp.
Rp.
6,075.00
13,500.00
1,687.50
512.50
JUMLAH TOTAL
1 M1
0.0810
0.1350
0.0135
0.0041
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.2000
1.0000
M1
Ls
Rp.
Rp.
40,000.000
14,000.000
Rp.
21,775.00
Rp.
Rp.
Rp.
Rp.
750.00
10,000.00
1,250.00
625.00
Rp.
12,625.00
Rp.
Rp.
Rp.
Rp.
750.00
10,000.00
1,250.00
625.00
Rp.
12,625.00
Rp.
Rp.
Rp.
Rp.
90,000.00
145,000.00
18,750.00
12,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12
1 BH
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
0.0250
Bh
Bh
Rp.
Rp.
35,000.000
1,500.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
1 BH
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
75,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Kg
M3
Ls
Rp.
Rp.
Rp.
Rp.
1,000,000.00
1,120.00
150,000.00
120,000.00
Rp.
266,250.00
Rp.
Rp.
Rp.
Rp.
90,000.00
145,000.00
18,750.00
12,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15
1.2000
1.4500
0.1500
0.1000
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
6.0000
0.0100
1.0000
Bh
Kg
M3
Ls
Rp.
Rp.
Rp.
Rp.
500,000.00
1,120.00
120,000.00
60,000.00
Rp.
33,200.00
33,200.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
33,000.00
9,625.00
42,625.00
64,400.00
64,400.00
64,400.00
64,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
48,000.00
14,000.00
62,000.00
83,775.00
83,775.00
83,700.00
83,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
35,000.00
37.50
35,037.50
47,662.50
47,662.50
47,600.00
47,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
75,000.00
75,000.00
87,625.00
87,625.00
87,600.00
87,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
1,000,000.00
6,720.00
1,500.00
120,000.00
1,128,220.00
1,394,470.00
1,394,470.00
1,394,400.00
1,394,400.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
500,000.00
6,720.00
1,200.00
60,000.00
567,920.00
834,170.00
834,170.00
834,100.00
834,100.00
6,075.00
13,500.00
1,687.50
512.50
SUB TOTAL
JUMLAH
DIBULATKAN
11
Rp.
Rp.
266,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
1 BH
2
PEK.PASANG KUNCI TANAM BIASA
TENAGA
Pekerja
Tukang Batu
0.0100
0.5000
OH
OH
Rp.
Rp.
75,000.00
100,000.00
Rp.
Rp.
750.00
50,000.00
Kepala Tukang
Mandor
0.0100
0.0050
OH
OH
Rp.
Rp.
125,000.00
125,000.00
1.0000
Bh
Rp.
82,000.000
Rp.
Rp.
1,250.00
625.00
Rp.
52,625.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
750.00
10,000.00
1,250.00
625.00
Rp.
12,625.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
BAHAN
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1 BH
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
10,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 BH
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
12,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 BH
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
8,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1 BH
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
30,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
135,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
250,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
900,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
82,000.00
82,000.00
134,625.00
134,625.00
134,600.00
134,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,000.00
10,000.00
28,100.00
28,100.00
28,100.00
28,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
12,000.00
12,000.00
24,625.00
24,625.00
24,600.00
24,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
8,000.00
8,000.00
26,100.00
26,100.00
26,100.00
26,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
30,000.00
30,000.00
48,100.00
48,100.00
48,100.00
48,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
135,000.00
135,000.00
153,100.00
153,100.00
153,100.00
153,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250,000.00
250,000.00
268,100.00
268,100.00
268,100.00
268,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900,000.00
900,000.00
918,100.00
918,100.00
918,100.00
918,100.00
1 BH
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
10,000.000
Rp.
Rp.
Rp.
Rp.
750.00
10,000.00
1,250.00
625.00
Rp.
12,625.00
Rp.
Rp.
Rp.
Rp.
750.00
10,000.00
1,250.00
625.00
Rp.
12,625.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
1,125.00
15,000.00
1,875.00
100.00
Rp.
18,100.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
1 BH
0.0100
0.1000
0.0100
0.0050
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
Bh
Rp.
40,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10
1M
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Bh
Rp.
175,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11
1 M2
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000
Bh
Rp.
85,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12
1M
0.0150
0.1500
0.0150
0.0008
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.1000
Bh
Rp.
90,000.000
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0500
11.7500
0.0350
M2
Kg
M3
Rp.
Rp.
Rp.
150,000.000
1,120.000
150,000.000
Rp.
89,625.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
14
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
10,000.00
10,000.00
22,625.00
22,625.00
22,600.00
22,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
40,000.00
40,000.00
52,625.00
52,625.00
52,600.00
52,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
192,500.00
192,500.00
210,600.00
210,600.00
210,600.00
210,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
93,500.00
93,500.00
111,600.00
111,600.00
111,600.00
111,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
99,000.00
99,000.00
117,100.00
117,100.00
117,100.00
117,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
157,500.0
13,160.0
5,250.0
175,910.00
265,535.00
265,535.00
265,500.00
265,500.00
Batu Andersit
Semen Abu-abu
Pasir Pasang
1.0500
11.7500
0.0350
M2
Kg
M3
Rp.
Rp.
Rp.
220,000.00
1,120.00
150,000.00
Rp.
89,625.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
15
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0500
11.7500
0.0350
Bh
Kg
M3
Rp.
Rp.
Rp.
125,000.00
1,120.00
150,000.00
Rp.
89,625.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
231,000.0
13,160.0
5,250.0
249,410.00
339,035.00
339,035.00
339,000.00
339,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
131,250.0
13,160.0
5,250.0
149,660.00
239,285.00
239,285.00
239,200.00
239,200.00
1 M2
2
3
4
PEK. PENGECATAN BIDANG KAYU BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja
0.0700 OH Rp.
75,000.00
Tukang Batu
0.0090 OH Rp.
100,000.00
Kepala Tukang
0.0060 OH Rp.
125,000.00
Mandor
0.0025 OH Rp.
125,000.00
BAHAN
Cat Meni
0.2000 Kg Rp.
15,000.00
Plamir
0.1500 Kg Rp.
9,000.00
Cat Dasar
0.1700 Kg Rp.
40,000.00
Cat Penutup 2 x
0.2600 Kg Rp.
40,000.00
Rp.
Rp.
Rp.
Rp.
5,250.00
900.00
750.00
312.50
Rp.
7,212.50
Rp.
Rp.
Rp.
Rp.
12,000.00
16,000.00
2,000.00
312.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
0.1600
0.1600
0.0160
0.0025
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.1500
0.0500
0.1000
0.0100
Ltr
Kg
Lbr
Bh
Rp.
Rp.
Rp.
Rp.
45,000.00
15,000.00
2,500.00
10,000.00
Rp.
30,312.50
Rp.
Rp.
Rp.
Rp.
1,500.00
20,000.00
2,500.00
1,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1M
0.0200
0.2000
0.0200
0.0100
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
0.1000
0.0100
Kg
Bh
Rp.
Rp.
20,000.00
10,000.00
Rp.
25,250.00
Rp.
Rp.
Rp.
Rp.
1,500.00
6,300.00
787.50
312.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1M
PEK. PENGECATAN BIDANG TEMBOK BARU (1 PLAMIR : 1 CAT DASAR : 2 CAT PENUTUP)
TENAGA
Pekerja
0.0200 OH Rp.
75,000.00
Tukang Batu
0.0630 OH Rp.
100,000.00
Kepala Tukang
0.0063 OH Rp.
125,000.00
Mandor
0.0025 OH Rp.
125,000.00
BAHAN
Plamir
0.1000 Kg Rp.
9,000.00
Cat Dasar
0.1000 Kg Rp.
54,000.00
Cat Penutup 2 x
0.2600 Kg Rp.
54,000.00
Rp.
8,900.00
Rp.
7,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
5
1M
PEK. RESIDU
TENAGA
Pekerja
0.1000
OH
Rp.
75,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
3,000.0
1,350.0
6,800.0
10,400.0
21,550.00
28,762.50
28,762.50
28,700.00
28,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
6,750.0
750.0
250.0
100.0
7,850.00
38,162.50
38,162.50
38,100.00
38,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
2,000.0
100.0
2,100.00
27,350.00
27,350.00
27,300.00
27,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.0
5,400.0
14,040.0
20,340.00
29,240.00
29,240.00
29,200.00
29,200.00
Mandor
0.0060
OH
Rp.
125,000.00
Residu
0.3500
Ltr
Rp.
20,000.00
Rp.
750.00
Rp.
8,250.00
BAHAN
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,000.0
7,000.00
15,250.00
15,250.00
15,200.00
15,200.00
2
1 M2
1.0000
0.0500
OH
OH
Rp.
Rp.
75,000.00
125,000.00
50.0000
0.0070
Bh
M3
Rp.
Rp.
2,500.00
150,000.00
Rp.
Rp.
75,000.00
6,250.00
Rp.
81,250.00
Rp.
Rp.
Rp.
2,250.00
10,000.00
1,250.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
2
1M
0.0300
0.1000
0.0100
OH
OH
OH
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
1.0500
0.0500
M2
M3
Rp.
Rp.
32,500.00
30,000.00
Rp.
13,500.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
3
1 M1
0.1200
0.0200
0.0200
0.7000
1.4000
M3
M3
M3
M2
M2
Rp.
Rp.
Rp.
Rp.
Rp.
59,300.000
167,700.000
100,400.000
107,400.000
62,200.000
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
4
1 M3
2.7300
0.9100
0.0900
0.1360
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
630.0000
88.0000
0.4500
Bh
Kg
M3
Rp.
Rp.
Rp.
500.00
1,120.00
150,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
324,000.00
Rp.
Rp.
22,500.00
1,875.00
JUMLAH TOTAL
1 M2
0.3000
0.0150
OH
OH
Rp.
Rp.
75,000.00
125,000.00
0.0100
0.2900
0.0060
Kg
Kg
M3
Rp.
Rp.
Rp.
1,120.00
40,000.00
150,000.00
Rp.
24,375.00
Rp.
Rp.
Rp.
Rp.
60,000.00
50,000.00
6,250.00
5,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
6
1 M'
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
Rp.
285,000.00
5,000.00
15,000.00
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
7
1 M'
125,000.0
1,050.0
126,050.00
207,300.00
207,300.00
207,300.00
207,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
34,125.0
1,500.0
35,625.00
49,125.00
49,125.00
49,100.00
49,100.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
7,116.0
3,354.0
2,008.0
75,180.0
87,080.0
174,738.00
174,738.00
174,738.00
174,700.00
174,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
315,000.00
98,560.00
67,500.00
481,060.00
805,060.00
805,060.00
805,000.00
805,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11.20
11,600.00
900.00
12,511.20
36,886.20
36,886.20
36,800.00
36,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
285,000.00
5,000.00
15,000.00
305,000.00
426,250.00
426,250.00
426,200.00
426,200.00
204,750.00
91,000.00
11,250.00
17,000.00
SUB TOTAL
JUMLAH
DIBULATKAN
5
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
121,250.00
TENAGA
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
BAHAN
Tiang Pancang 25x25 cm K.400
Besi + Las
Alat Pancang
0.8000
0.5000
0.0500
0.0400
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
1.0000
1.0000
M'
Ls
Ls
Rp.
Rp.
Rp.
170,000.00
5,000.00
46,400.00
Rp.
Rp.
Rp.
Rp.
60,000.00
50,000.00
6,250.00
5,000.00
Rp.
121,250.00
Rp.
Rp.
Rp.
Rp.
7,500.00
1,000.00
18,725.00
1,250.00
Rp.
28,475.00
Rp.
Rp.
Rp.
Rp.
450.00
6,000.00
750.00
37.50
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
8
1 Btg PEK. PAS. TIANG PANCANG CERUCUK DIA 12- 15 CM, PANJANG 6 M
TENAGA
Pekerja
0.1000 OH
Tukang Kayu
0.0100 OH
Kepala Tukang
0.1498 OH
Mandor
0.0100 OH
BAHAN
Cerucuk Katu
1.0000 Btg
Alat Bantu
1.0000 Ls
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
15,000.00
2,300.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
9
0.006
0.060
0.006
0.000
OH
OH
OH
OH
1.100 Kg
0.080 Kg
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
Rp.
Rp.
10,000.00
1,150.00
Rp.
7,237.50
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
10
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
11.7500
0.0350
M2
Kg
M3
Rp.
Rp.
Rp.
220,000.000
1,120.000
150,000.000
Rp.
89,625.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
11
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
11.7500
0.0350
M2
Kg
M3
Rp.
Rp.
Rp.
150,000.000
1,120.000
150,000.000
Rp.
89,625.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
12
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
0.0350
M2
M3
Rp.
Rp.
65,000.000
150,000.000
Rp.
89,625.00
Rp.
Rp.
Rp.
Rp.
46,500.00
35,000.00
4,375.00
3,750.00
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
13
1 M2
0.6200
0.3500
0.0350
0.0300
OH
OH
OH
OH
Rp.
Rp.
Rp.
Rp.
75,000.00
100,000.00
125,000.00
125,000.00
1.0000
11.7500
0.0350
M2
Kg
M3
Rp.
Rp.
Rp.
250,000.000
1,120.000
150,000.000
Rp.
SUB TOTAL
JUMLAH
DIBULATKAN
JUMLAH TOTAL
89,625.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
170,000.00
5,000.00
46,400.00
221,400.00
342,650.00
342,650.00
342,600.00
342,600.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
15,000.00
2,300.00
17,300.00
45,775.00
45,775.00
45,700.00
45,700.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
11,000.00
92.00
11,092.00
18,329.50
18,329.50
18,300.00
18,300.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
220,000.0
13,160.0
5,250.0
238,410.00
328,035.00
328,035.00
328,000.00
328,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
150,000.0
13,160.0
5,250.0
168,410.00
258,035.00
258,035.00
258,000.00
258,000.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
65,000.0
5,250.0
70,250.00
159,875.00
159,875.00
159,800.00
159,800.00
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
250,000.0
13,160.0
5,250.0
268,410.00
358,035.00
358,035.00
358,000.00
358,000.00
PEKERJAAN
: PENDOPO
NO
URAIAN PEKERJAAN
VOLUME
1
2
3
4
5
6
1
2
3
4
5
6
1,041.50
149.16
5,485.04
84.78
96.00
52.08
95
25
32
58
4
35.2
HARGA SATUAN
(Rp)
4
Kg
Kg
Kg
Kg
Bh
Ls
M2
M'
M'
M'
Set
M2
18,300
18,300
18,300
18,300
35,000
18,300
Sub Jumlah
97,600
73,000
41,800
41,900
700,000
454,400
Sub Jumlah
JUMLAH HARGA
(Rp)
5
19,059,523.20
2,729,628.00
100,376,232.00
1,551,474.00
3,360,000.00
952,976.16
128,029,833.36
9,272,000.00
1,825,000.00
1,337,600.00
2,430,200.00
2,800,000.00
15,994,880.00
33,659,680.00
161,689,513.36
63
128,029,833.36
11.52
33,659,680.00
PEKERJAAN
: PANGGUNG TERBUKA
NO
URAIAN PEKERJAAN
VOLUME
1
2
3
4
5
6
7
1
2
3
4
5
6
2,819.39
969.54
1,003.20
8,525.66
84.78
96.00
140.97
570.9
54
110.5
110.5
10
50
HARGA SATUAN
(Rp)
4
Kg
Kg
Kg
Kg
Kg
Bh
Kg
M2
M'
M'
M'
Set
M2
18,300.00
18,300.00
18,300.00
18,300.00
18,300.00
35,000.00
18,300.00
Sub Jumlah
97,600
73,000
41,800
41,900
700,000
454,400
Sub Jumlah
JUMLAH HARGA
(Rp)
5
51,594,897.02
17,742,582.00
18,358,560.00
156,019,578.00
1,551,474.00
3,360,000.00
2,579,744.85
251,206,835.88
251,206,835.88
55,719,840.00
3,942,000.00
4,618,900.00
4,629,950.00
7,000,000.00
22,720,000.00
98,630,690.00
98,630,690.00
349,837,525.88