No URAIAN SATUAN
A UPAH KERJA
Pekerja Orang/Hari
Tukang Orang/Hari
Kepala Tukang Orang/Hari
Mandor Orang/Hari
B BAHAN BANGUNAN
BATU
Batu Karang / Gladag M3
Kerikil 3/5 cm M3
Kerikil 1/2 cm M3
Batu cetak/Batako bh
PEREKAT
Semen (Portland Cement) Zak
Bahan Addetive Beton Addetive Kilogram
KAYU
Kayu Meranti/Kayu Klas II
a. Balok / Usuk M3
b. Papan M3
c. Balok lokal Untuk Stut Work M3
d. Papan Untuk Bekesting M3
No URAIAN SATUAN
BESI
a. Besi Beton Ø 8mm s/d Ø 12 mm Kilogram
b. Kawat Ikat Beton Kilogram
PAKU
a. Biasa < 5Cm Kilogram
b. Biasa > 5Cm Kilogram
21,500.00
27,500.00
30,000.00
32,500.00
70,000.00
150,000.00
175,000.00
1,850.00
60,000.00
50,000.00
85,000.00
60,000.00
32,000.00
75,000.00
2,000,000.00
2,500,000.00
1,350,000.00
1,500,000.00
9,500.00
10,000.00
12,500.00
10,500.00
200,000.00
85,000.00
240,000.00
60,000.00
50,000.00
45,000.00
50,000.00
30,000.00
17,500.00
5,000.00
21,000.00
12,000.00
12,000.00
12,000.00
20,000.00
37,500.00
10,000.00
13,500.00
15,000.00
10,000.00
15,000.00
5,000.00
3,000.00
DAFTAR ANALISA PEKERJAAN PERSIAPAN SNI 03-2835-2002
KEGIATAN
S
HARGA SATUAN JUMLAH
KOOFISIE A
N
(Rp.) HARGA (Rp.)
T
KEGIATAN
S
HARGA SATUAN JUMLAH
URAIAN PEKERJAAN KOOFISI A
(Rp.) HARGA (Rp.)
EN T
Page 12 of 137
Pekerjaan Tanah SNI ....................
1 M3 Galian Tanah lumpur sedalam 1 meter
Tenaga kerja
- Pekerja 0.823 OH 21,500.00 17,694.50
- Tukang gali OH 27,500.00 0.00
- Kepala tukang OH 30,000.00 0.00
- Mandor 0.082 OH 32,500.00 2,674.75
Jumlah upah 20,369.25
1 M3 Pemadatan tanah
Tenaga kerja
- Pekerja 0.500 OH 21,500.00 10,750.00
- Tukang gali OH 27,500.00 0.00
- Kepala tukang OH 30,000.00 0.00
- Mandor 0.050 OH 32,500.00 1,625.00
Jumlah upah 12,375.00
1 M3 Urugan Pasir
Bahan Bangunan
- Pasir urug 1.200 M3 60,000.00 12,375.00
Jumlah bahan 12,375.00
Tenaga kerja
- Tukang kayu 0.300 OH 21,500.00 6,450.00
- Pekerja OH 27,500.00 0.00
- Kepala tukang OH 30,000.00 0.00
- Mandor 0.030 OH 32,500.00 975.00
Jumlah upah 7,425.00
Jumlah bahan & upah 19,800.00
Page 13 of 137
Pekerjaan Tanah SNI ....................
1 M3 Urugan Sirtu
Bahan Bangunan
-Sirtu 1.200 M3 50,000.00 19,800.00
Jumlah bahan 19,800.00
Tenaga kerja
- Tukang kayu 0.250 OH 21,500.00 5,375.00
- Pekerja OH 27,500.00 0.00
- Kepala tukang OH 30,000.00 0.00
- Mandor 0.025 OH 32,500.00 812.50
Jumlah upah 6,187.50
Jumlah bahan & upah 25,987.50
Page 14 of 137
Pekerjaan Pondasi SNI 03-2836-2002
DAFTAR ANALISA PEKERJAAN
Page 15 of 137
Pekerjaan Pondasi SNI 03-2836-2002
1 M3 Pasangan pondasi batu kali/karang 1PC : 3Psr
Bahan Bangunan
- Batu belah 15/20cm 1.100 M3 0.00 0.00
- Semen Porland 202.000 Kg 800.00 161,600.00
- Pasir pasang 0.485 M3 85,000.00 41,225.00
Jumlah bahan 202,825.00
Tenaga kerja
- Tukang kayu 1.500 OH 27,500.00 41,250.00
- Pekerja 0.600 OH 21,500.00 12,900.00
- Kepala tukang 0.060 OH 30,000.00 1,800.00
- Mandor 0.075 OH 32,500.00 2,437.50
Jumlah upah 58,387.50
Jumlah bahan & upah 261,212.50
Page 16 of 137
Pekerjaan Pondasi SNI 03-2836-2002
Jumlah bahan & upah 988,987.50
Page 17 of 137
Pekerjaan Pondasi SNI 03-2836-2002
1 M3 Pasangan pondasi batu kali/karang 1PC : 1/4 Kp :4Psr
Bahan Bangunan
- Batu belah 15/20cm 1.100 M3 0.00
- Semen Porland 156.000 Kg 0.00
- Kapur pasang 0.032 M3 0.00
- Pasir pasang 0.584 M3 0.00
Jumlah bahan 0.00
Tenaga kerja
- Tukang kayu 1.500 OH 21,500.00 32,250.00
- Pekerja 0.600 OH 27,500.00 16,500.00
- Kepala tukang 0.060 OH 30,000.00 1,800.00
- Mandor 0.075 OH 32,500.00 2,437.50
Jumlah upah 52,987.50
Jumlah bahan & upah 52,987.50
Page 18 of 137
Pekerjaan Pondasi SNI 03-2836-2002
1 M3 Pasangan pondasi batu kosong
Bahan Bangunan
- Batu belah 15/20cm 1.200 M3 0.00
- Pasir urug 0.300 M3 0.00
Jumlah bahan 0.00
Tenaga kerja
- Tukang kayu 0.780 OH 21,500.00 16,770.00
- Pekerja 0.390 OH 27,500.00 10,725.00
- Kepala tukang 0.039 OH 30,000.00 1,170.00
- Mandor 0.039 OH 32,500.00 1,267.50
Jumlah upah 29,932.50
Jumlah bahan & upah 29,932.50
Page 19 of 137
Pekerjaan Pondasi SNI 03-2836-2002
1 M' Pembuatan tiang pancang (35x35)cm, beton bertulang
Bahan Bangunan
- Pasir urug darat 0.016 M3 0.00
- Pasir beton 0.080 M3 0.00
- Koral beton 0.125 M3 0.00
- Semen Porland 49.000 Kg 0.00
- Besi beton 34.500 Kg 0.00
- Kawat beton 0.700 Kg 0.00
- Kayu kaso 5/7cm 0.027 M3 0.00
- Paku 0.120 Kg 0.00
- Minyak Bekisting 0.090 Ltr 0.00
- Plamur tembok 0.200 Kg
Jumlah bahan 0.00
Tenaga kerja
- Tukang kayu 0.800 OH 0.00
- Pekerja 0.500 OH 0.00
- Kepala tukang 0.050 OH 0.00
- Mandor 0.040 OH 0.00
Jumlah upah 0.00
Jumlah bahan & upah 0.00
Page 20 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 21 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 22 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 23 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 24 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 25 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 26 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 27 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 28 of 137
Pekerjaan Dinding SNI 03-2837-2002
Page 29 of 137
Pekerjaan Dinding SNI 03-2837-2002
ING
0.00
51,224.00
5,015.00
56,239.00
13,975.00
5,500.00
600.00
975.00
21,050.00
77,289.00
0.00
34,800.00
6,800.00
41,600.00
13,975.00
5,500.00
600.00
975.00
21,050.00
62,650.00
0.00
26,360.00
7,735.00
34,095.00
13,975.00
5,500.00
600.00
975.00
21,050.00
55,145.00
Page 30 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
21,240.00
7,735.00
28,975.00
13,975.00
5,500.00
600.00
975.00
21,050.00
50,025.00
0.00
17,760.00
7,735.00
25,495.00
13,975.00
5,500.00
600.00
975.00
21,050.00
46,545.00
0.00
17,760.00
7,735.00
25,495.00
13,975.00
5,500.00
600.00
975.00
21,050.00
46,545.00
Page 31 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
8,064.00
7,862.50
0.00
15,926.50
13,975.00
5,500.00
600.00
975.00
21,050.00
36,976.50
0.00
22,240.00
2,380.00
24,620.00
6,880.00
2,750.00
300.00
487.50
10,417.50
35,037.50
0.00
15,160.00
3,230.00
18,390.00
6,880.00
2,750.00
300.00
487.50
10,417.50
28,807.50
Page 32 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
11,496.00
3,400.00
14,896.00
6,880.00
2,750.00
300.00
487.50
10,417.50
25,313.50
0.00
9,200.00
3,655.00
12,855.00
6,880.00
2,750.00
300.00
487.50
10,417.50
23,272.50
0.00
7,744.00
3,825.00
11,569.00
6,880.00
2,750.00
300.00
487.50
10,417.50
21,986.50
Page 33 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
6,656.00
4,165.00
10,821.00
6,880.00
2,750.00
300.00
487.50
10,417.50
21,238.50
0.00
6,656.00
4,250.00
10,906.00
6,880.00
2,750.00
300.00
487.50
10,417.50
21,323.50
0.00
3,600.00
4,250.00
0.00
7,850.00
6,880.00
2,750.00
300.00
487.50
10,417.50
18,267.50
Page 34 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
6,000.00
57.38
0.00
6,057.38
6,880.00
2,750.00
300.00
487.50
10,417.50
16,474.88
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,955.00
4,317.50
192.50
492.00
601.25
5,603.25
5,603.25
Page 35 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,310.00
3,575.00
192.50
411.00
552.50
4,731.00
4,731.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
7,310.00
2,942.50
192.50
342.00
552.50
4,029.50
4,029.50
Page 36 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
0.00
0.00
0.00
0.00
0.00
2,150.00
825.00
825.00
180.00
162.50
1,992.50
1,992.50
0.00
0.00
0.00
0.00
6,450.00
2,750.00
300.00
487.50
3,537.50
3,537.50
0.00
0.00
0.00
0.00
6,880.00
4,125.00
450.00
487.50
5,062.50
5,062.50
Page 37 of 137
Pekerjaan Dinding SNI 03-2837-2002
0.00
0.00
0.00
0.00
0.00
2,150.00
1,375.00
150.00
65.00
1,590.00
1,590.00
Page 38 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 39 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 40 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 41 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 42 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 43 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 44 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 45 of 137
Pekerjaan Plesteran SNI 03-2837-2002
Page 46 of 137
SNI 03-3434-2002
Page 47 of 137
SNI 03-3434-2002
- Pekerja 0.350 OH
- Tukang kayu 1.050 OH
- Kepala tukang 0.105 OH
- Mandor 0.018 OH
Jumlah upah
Jumlah bahan & upah
Page 48 of 137
SNI 03-3434-2002
Page 49 of 137
SNI 03-3434-2002
Jumlah upah
Jumlah bahan & upah
Page 50 of 137
SNI 03-3434-2002
Page 51 of 137
SNI 03-3434-2002
Page 52 of 137
SNI 03-3434-2002
Page 53 of 137
SNI 03-3434-2002
Page 54 of 137
SNI 03-3434-2002
- Mandor 0.005 OH
Jumlah upah
Jumlah bahan & upah
Page 55 of 137
SNI 03-3434-2002
Page 56 of 137
SNI 03-3434-2002
Page 57 of 137
SNI 03-3434-2002
Bahan Bangunan
- Papan kayu kamper 0.007 M3
- Paku biasa 0.050 Kg
Jumlah bahan
Tenaga kerja
- Pekerja 0.100 OH
- Tukang kayu 0.200 OH
- Kepala tukang 0.250 OH
- Mandor 0.005 OH
Jumlah upah
Jumlah bahan & upah
Page 58 of 137
SNI 03-3434-2002
Page 59 of 137
SNI 03-3434-2002
Page 60 of 137
SNI 03-3434-2002
Page 61 of 137
Pekerjaan Beton SNI 03-........-2002
DAFTAR ANALISA PEKERJAAN BETON
1 M3 Membuat lantai kerja beton tumbuk, 1PC : 3Psr : 5Krl tebal 5cm
Bahan Bangunan
- Semen portland 10.000 Kg
- Pasir beton 0.026 M3
- Koral beton 0.044 M3
Jumlah bahan
Tenaga kerja
- Pekerja 1.150 OH
- Tukang batu 0.020 OH
- Kepala tukang 0.002 OH
- Mandor 0.006 OH
Page 62 of 137
Pekerjaan Beton Jumlah upah SNI 03-........-2002
Jumlah bahan & upah
Page 63 of 137
Pekerjaan Beton Jumlah upah SNI 03-........-2002
Jumlah bahan & upah
Page 64 of 137
Pekerjaan
1M Beton
3
Membuat beton bertulang, 1PC : 1,5Psr : 2,5Krl SNI 03-........-2002
Bahan Bangunan
- Semen portland 386.000 Kg
- Pasir beton 0.470 M3
- Koral beton 0.780 M3
Jumlah bahan
Tenaga kerja
- Pekerja 1.650 OH
- Tukang batu 0.250 OH
- Kepala tukang 0.025 OH
- Mandor 0.080 OH
Jumlah upah
Jumlah bahan & upah
Page 65 of 137
Pekerjaan Beton Jumlah bahan & upah SNI 03-........-2002
Page 66 of 137
Pekerjaan Beton Jumlah bahan & upah SNI 03-........-2002
Page 69 of 137
Pekerjaan Beton
- Balok
kayu borneo 0.015 M3 SNI 03-........-2002
- Plywood tebal 9mm 0.350 Lbr
- Dolken kayu galam Ø 8-10/4m 2.000 Btg
Jumlah bahan
Tenaga kerja
- Pekerja 0.300 OH
- Tukang batu 0.330 OH
- Kepala tukang 0.033 OH
- Mandor 0.006 OH
Jumlah upah
Jumlah bahan & upah
Page 73 of 137
Tenaga
Pekerjaan Beton kerja SNI 03-........-2002
- Pekerja 5.800 OH
- Tukang batu 0.350 OH
- Tukang kayu 2.800 OH
- Tukang besi 1.050 OH
- Kepala tukang 0.420 OH
- Mandor 0.185 OH
Jumlah upah
Jumlah bahan & upah
Page 74 of 137
SNI 03-3436-2002
Page 75 of 137
SNI 03-3436-2002
Page 76 of 137
SNI 03-3436-2002
Page 77 of 137
SNI 03-3436-2002
Page 78 of 137
SNI 03-3436-2002
Page 79 of 137
SNI 03-3436-2002
Page 80 of 137
SNI 03-3436-2002
Page 81 of 137
SNI 03-3436-2002
Page 82 of 137
Pekerjaan langit-langit SNI 03-2838-2002
Page 84 of 137
Pekerjaan langit-langit SNI 03-2838-2002
- Mandor 0.0035 OH
Jumlah upah
Jumlah bahan & upah
Page 85 of 137
Pekerjaan langit-langit SNI 03-2838-2002
Bahan Bangunan
- Papan kayu ramin 0.024 M3
- Paku 0.010 Kg
- Paku sekrup 0.050 Kg
Jumlah bahan
Tenaga kerja
- Pekerja 0.200 OH
- Tukang kayu 0.600 OH
- Kepala tukang 0.060 OH
- Mandor 0.010 OH
Jumlah upah
Jumlah bahan & upah
Page 88 of 137
Pekerjaan Sanitasi SNI ...............-2002
DAFTAR ANALISA PEKERJAAN SANITASI
Page 89 of 137
Pekerjaan Sanitasi Jumlah upah SNI ...............-2002
Jumlah bahan & upah
Memasang 1M' pipa penyalur air limbah jenis pipa tanah, Ø 15cm
Bahan Bangunan
- Pipa tanah 1.600 Bh
- Semen porland 0.680 Kg
- Pasir pasang 0.013 M3
- Pasir urug 0.011 M3
Jumlah bahan
Tenaga kerja
- Pekerja 0.060 OH
- Tukang batu 0.030 OH
- Kepala tukang 0.003 OH
- Mandor 0.0025 OH
Jumlah upah
Page 91 of 137
Pekerjaan Sanitasi Jumlah bahan & upah SNI ...............-2002
Memasang 1M' pipa penyalur air limbah jenis pipa tanah, Ø 20cm
Bahan Bangunan
- Pipa tanah 1.600 Bh
- Semen porland 0.870 Kg
- Pasir pasang 0.140 M3
- Pasir urug 0.140 M3
Jumlah bahan
Tenaga kerja
- Pekerja 0.080 OH
- Tukang batu 0.040 OH
- Kepala tukang 0.004 OH
- Mandor 0.007 OH
Jumlah upah
Jumlah bahan & upah
Memasang 1 buah bak kontrol pasangan batu bata ukuran 30x30cm tinggi 35cm
Bahan Bangunan
- Batu bata 0.145 M3
- Semen porland 44.000 Kg
- Pasir pasang 0.070 M3
- Batu kerikil 0.070 M3
- Besi beton 1.600 M3
- Pasir beton 0.060 M3
Page 92 of 137
Pekerjaan Sanitasi Jumlah bahan SNI ...............-2002
Tenaga kerja
- Pekerja 3.200 OH
- Tukang batu 1.015 OH
- Kepala tukang 0.0015 OH
- Mandor 0.015 OH
Jumlah upah
Jumlah bahan & upah
Memasang 1 buah bak kontrol pasangan batu bata ukuran 45x45cm tinggi 50cm
Bahan Bangunan
- Batu bata 0.250 M3
- Semen porland 77.000 Kg
- Pasir pasang 0.130 M3
- Batu kerikil 0.020 M3
- Besi beton 2.600 M3
- Pasir beton 0.090 M3
Jumlah bahan
Tenaga kerja
- Pekerja 1.420 OH
- Tukang batu 0.473 OH
- Kepala tukang 0.047 OH
- Mandor 0.071 OH
Jumlah upah
Jumlah bahan & upah
Memasang 1 buah bak kontrol pasangan batu bata ukuran 50x50cm tinggi 65cm
Bahan Bangunan
- Batu bata 0.371 M3
- Semen porland 114.000 Kg
- Pasir pasang 0.184 M3
- Batu kerikil 0.033 M3
- Besi beton 8.850 M3
- Pasir beton 0.120 M3
Jumlah bahan
Tenaga kerja
- Pekerja 2.160 OH
- Tukang batu 0.720 OH
- Kepala tukang 0.072 OH
- Mandor 0.108 OH
- Tukang gali 0.100 OH
Jumlah upah
Jumlah bahan & upah
Page 93 of 137
Memasang
Pekerjaan Sanitasi 1M' pipa galvanis, Ø ¾" SNI ...............-2002
Bahan Bangunan
- Pipa Galvanis 1.200 M'
- Perlengkapan (35% x harga) 0.350 Set
Jumlah bahan
Tenaga kerja
- Pekerja 0.054 OH
- Tukang pipa 0.900 OH
- Kepala tukang 0.009 OH
- Mandor 0.027 OH
Jumlah upah
Jumlah bahan & upah
Page 97 of 137
Pekerjaan besi alluminium
DAFTAR ANALISA PEKERJAAN BESI & ALLUMINIUM
1 M2 Pasang gymfloor
Bahan Bangunan
- Gymfloor 1.050 M2
- Lem vinyl 0.350 Kg
Jumlah bahan
Tenaga kerja
- Pekerja 0.650 OH
- Tukang batu 0.350 OH
- Kepala tukang 0.035 OH
- Mandor 0.0325 OH
Jumlah upah
Jumlah bahan & upah
1 M2 Plint kayu 2 x 10 cm
Bahan Bangunan
- Papan kayu jati 0.002 M3
- Paku skrup 3,5" 0.050 Kg
Jumlah bahan
Tenaga kerja
- Pekerja 0.120 OH
Page 129 of 137
- Tukang
Pekerjaan Penutup batu
Lantai Dinding 0.120 OH SNI .........................
- Kepala tukang 0.012 OH
- Mandor 0.006 OH
Jumlah upah
Jumlah bahan & upah
1 M2 Mengerok karat cat lama permukaan baja dengan pancar pasir (sanblasting)
dengan tingkat kebersihan Sa 2½
Bahan Bangunan
- Pasir silika 0.050 Kg
BBM 10.000 Ltr
Jumlah bahan
Peralatan
- Kompresor, blasting pot,
selang & nozzle Sewa Hr
Jumlah peralatan
Tenaga kerja
- Pekerja 1.600 OH
- Tukang cat 1.600 OH
- Kepala tukang 0.800 OH
- Mandor 0.500 OH
Jumlah upah
Jumlah bahan, alat & upah