HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 0.750 184,140.00 138,105.00
Mandor Oh 0.250 194,700.00 48,675.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Mandor Oh 0.045 194,700.00 8,761.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 1.050 184,140.00 193,347.00
Mandor Oh 0.067 194,700.00 13,044.90
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Mandor Oh 0.032 194,700.00 6,230.40
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Mandor Oh 0.060 194,700.00 11,682.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 1.200 184,140.00 220,968.00
Mandor Oh 0.045 194,700.00 8,761.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 0.050 184,140.00 9,207.00
Mandor Oh 0.005 194,700.00 973.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
B TENAGA
Pekerja Oh 0.330 184,140.00 60,766.20
Mandor Oh 0.010 194,700.00 1,947.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
Halaman 2 dari 132
( Rp )
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
SNI 2008
HARGA SATUAN 62,260.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
TU M3 1.200 373,750.00 448,500.00
B TENAGA
Pekerja Oh 0.500 184,140.00 92,070.00
Mandor Oh 0.050 194,700.00 9,735.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PU M3 1.200 444,475.00 533,370.00
B TENAGA 533,370.00
Pekerja Oh 0.300 184,140.00 55,242.00
Mandor Oh 0.010 194,700.00 1,947.00
57,189.00
C JUMLAH (A+B) 590,559.00
D HARGA SATUAN 590,559.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
KP M3 0.135 292,100.00 39,433.50
PP M3 0.400 455,400.00 182,160.00
TL M3 0.948 143,750.00 136,275.00
B TENAGA
Pekerja OH 0.800 184,140.00 147,312.00
Tukang Batu OH 0.400 202,910.40 81,164.16
Kepala Tukang OH 0.040 246,272.40 9,850.90
Mandor OH 0.080 194,700.00 15,576.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
KP M3 0.248 292,100.00 72,440.80
TL M3 1.400 143,750.00 201,250.00
B TENAGA
Pekerja OH 0.800 184,140.00 147,312.00
Tukang Batu OH 0.400 202,910.40 81,164.16
Kepala Tukang OH 0.040 246,272.40 9,850.90
Mandor OH 0.080 194,700.00 15,576.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ijuk Kg 6.000 12,880.00 77,280.00
B TENAGA
Pekerja OH 0.150 184,140.00 27,621.00
Mandor OH 0.015 194,700.00 2,920.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Sirtu M3 1.200 297,275.00 356,730.00
B TENAGA
Pekerja OH 0.250 184,140.00 46,035.00
Mandor OH 0.025 194,700.00 4,867.50
50,902.50
C JUMLAH (A+B) 407,632.50
D HARGA SATUAN 407,632.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bulat M3 1.200 436,800.00 524,160.00
PU M3 0.432 444,475.00 192,013.20
716,173.20
B TENAGA
Pekerja Oh 0.780 184,140.00 143,629.20
Tukang Batu Oh 0.390 202,910.40 79,135.06
Kepala Tukang Oh 0.039 246,272.40 9,604.62
Mandor Oh 0.039 194,700.00 7,593.30
239,962.18
C JUMLAH (A+B) 956,135.38
D HARGA SATUAN 956,135.38
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 202.000 1,856.10 374,932.20
PP M3 0.485 455,400.00 220,869.00
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Halaman 5 dari 132
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 163.000 1,856.10 302,544.30
PP M3 0.520 455,400.00 236,808.00
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bulat M3 1.200 436,800.00 524,160.00
PC Kg 136.000 1,856.10 252,429.60
PP M3 0.544 455,400.00 247,737.60
1,024,327.20
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) 1,485,792.93
D HARGA SATUAN 1,485,792.93
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 117.000 1,856.10 217,163.70
PP M3 0.561 455,400.00 255,479.40
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 117.000 1,856.10 217,163.70
PP M3 0.561 455,400.00 255,479.40
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 91.000 1,856.10 168,905.10
PP M3 0.584 455,400.00 265,953.60
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
Halaman 7 dari 132
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 61.000 1,856.10 113,222.10
KP M3 0.147 292,100.00 42,938.70
PP M3 0.492 455,400.00 224,056.80
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 1.200 #N/A #N/A
PC Kg 41.000 1,856.10 76,100.10
KP M3 0.131 292,100.00 38,265.10
PP M3 0.523 455,400.00 238,174.20
#N/A
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 / 20 cm M3 0.480 #N/A #N/A
PC Kg 194.000 1,856.10 360,083.40
PP M3 0.312 455,400.00 142,084.80
KR M3 0.468 872,850.00 408,493.80
Besi Beton' Kg 126.000 22,727.27 2,863,636.36
Kawat Beton Kg 1.800 40,250.00 72,450.00
#N/A
B TENAGA
Pekerja Oh 3.400 184,140.00 626,076.00
Tukang Batu Oh 0.850 202,910.40 172,473.84
Kepala Tukang Oh 0.085 246,272.40 20,933.15
Mandor Oh 0.170 194,700.00 33,099.00
852,581.99
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Halaman 8 dari 132
Batu Belah 15 / 20 cm M3 0.450 #N/A #N/A
PC Kg 194.000 1,856.10 360,083.40
PP M3 0.312 455,400.00 142,084.80
KR M3 0.468 872,850.00 408,493.80
#N/A
B TENAGA
Pekerja Oh 2.400 184,140.00 441,936.00
Tukang Batu Oh 0.800 202,910.40 162,328.32
Kepala Tukang Oh 0.080 246,272.40 19,701.79
Mandor Oh 0.119 194,700.00 23,169.30
647,135.41
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
1 1.85
ANALISA SNI BETON
2 1.10
ANALISA HARGA SATUAN
Uraian Pekerjaan : Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
Kuantitas Pekerjaan : 1 M3
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 247.000 1,856.10 458,456.70
PB' Kg 869.000 325.29 282,673.29
KR' Kg 999.000 646.56 645,909.00
1,387,038.99
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 276.000 1,856.10 512,283.60
PB' Kg 828.000 325.29 269,336.57
KR' Kg 1,012.000 646.56 654,314.22
1,435,934.39
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 299.000 1,856.10 554,973.90
PB' Kg 799.000 325.29 259,903.29
KR' Kg 1,017.000 646.56 657,547.00
1,472,424.19
B TENAGA
Halaman 9 dari 132
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 230.000 1,856.10 426,903.00
PB' Kg 893.000 325.29 290,480.14
KR' Kg 1,027.000 646.56 664,012.56
1,381,395.70
B TENAGA
Pekerja Oh 1.200 184,140.00 220,968.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.060 194,700.00 11,682.00
278,157.53
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 326.000 1,856.10 605,088.60
PB' Kg 760.000 325.29 247,217.14
KR' Kg 1,029.000 646.56 665,305.67
1,517,611.41
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 352.000 1,856.10 653,347.20
PB' Kg 731.000 325.29 237,783.86
KR' Kg 1,031.000 646.56 666,598.78
1,557,729.83
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Halaman 10 dari 132
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 371.000 1,856.10 688,613.10
PB' Kg 698.000 325.29 227,049.43
KR' Kg 1,047.000 646.56 676,943.67
1,592,606.20
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 384.000 1,856.10 712,742.40
PB' Kg 692.000 325.29 225,097.71
KR' Kg 1,039.000 646.56 671,771.22
1,609,611.34
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 406.000 1,856.10 753,576.60
PB' Kg 684.000 325.29 222,495.43
KR' Kg 1,026.000 646.56 663,366.00
1,639,438.03
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 413.000 1,856.10 766,569.30
PB' Kg 681.000 325.29 221,519.57
KR' Kg 1,021.000 646.56 660,133.22
1,648,222.09
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Kepala Tukang Oh 0.028 246,272.40 6,895.63
Mandor Oh 0.083 194,700.00 16,160.10
382,687.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 439.000 1,856.10 814,827.90
PB' Kg 670.000 325.29 217,941.43
KR' Kg 1,006.000 646.56 650,434.89
1,683,204.22
B TENAGA
Pekerja Oh 2.100 184,140.00 386,694.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.105 194,700.00 20,443.50
486,775.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 448 1,856.10 831,532.80
PB' Kg 667 325.29 216,965.57
KR' Kg 1,000 646.56 646,555.56
1,695,053.93
B TENAGA
Pekerja Oh 2.100 184,140.00 386,694.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.105 194,700.00 20,443.50
486,775.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 400.000 1,856.10 742,440.00
PB M3 0.480 455,400.00 218,592.00
KR M3 0.800 872,850.00 698,280.00
Stororox - 100 Kg 1.200
1,659,312.00
B TENAGA
Pekerja Oh 2.100 184,140.00 386,694.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.105 194,700.00 20,443.50
486,775.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 400.000 1,856.10 742,440.00
PB M3 0.480 455,400.00 218,592.00
KR M3 0.800 872,850.00 698,280.00
Stororox - 100 Kg 1.200
1,659,312.00
B TENAGA
Pekerja Oh 2.100 184,140.00 386,694.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.105 194,700.00 20,443.50
486,775.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Waterstop lebar 150 mm M1 1.050 -
-
B TENAGA
Pekerja Oh 0.060 184,140.00 11,048.40
Tukang Batu Oh 0.030 202,910.40 6,087.31
Kepala Tukang Oh 0.003 246,272.40 738.82
Mandor Oh 0.003 194,700.00 584.10
18,458.63
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
Halaman 13 dari 132
( Rp )
A BAHAN
Waterstop lebar 150 mm M1 1.050 -
-
B TENAGA
Pekerja Oh 0.070 184,140.00 12,889.80
Tukang Batu Oh 0.035 202,910.40 7,101.86
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.004 194,700.00 778.80
21,755.55
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Waterstop lebar 150 mm M1 1.050 -
-
B TENAGA
Pekerja Oh 0.080 184,140.00 14,731.20
Tukang Batu Oh 0.040 202,910.40 8,116.42
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.004 194,700.00 778.80
24,611.51
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Besi Beton' Kg 10.500 22,727.27 238,636.36
Kawat Beton Kg 0.150 40,250.00 6,037.50
244,673.86
B TENAGA
Pekerja Oh 0.080 184,140.00 14,731.20
Tukang Batu Oh 0.040 202,910.40 8,116.42
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.004 194,700.00 778.80
24,611.51
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Besi Beton' Kg 10.500 22,727.27 238,636.36
Kawat Beton Kg 0.100 40,250.00 4,025.00
242,661.36
Halaman 14 dari 132
B TENAGA
Pekerja Oh 0.050 184,140.00 9,207.00
Tukang Batu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.003 194,700.00 584.10
21,167.98
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Jaring kawat baja dilas Kg 1.020 -
Kawat Beton Kg 0.050 40,250.00 2,012.50
2,012.50
B TENAGA
Pekerja Oh 0.025 184,140.00 4,603.50
Tukang Batu Oh 0.025 202,910.40 5,072.76
Kepala Tukang Oh 0.002 246,272.40 492.54
Mandor Oh 0.001 194,700.00 194.70
10,363.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.300 32,200.00 9,660.00
Minyak Bikisting Liter 0.100 8,423.75 842.38
157,702.38
B TENAGA
Pekerja Oh 0.520 184,140.00 95,752.80
Tukang Batu Oh 0.260 202,910.40 52,756.70
Kepala Tukang Oh 0.026 246,272.40 6,403.08
Mandor Oh 0.026 194,700.00 5,062.20
159,974.79
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.045 3,680,000.00 165,600.00
Paku Campuran Kg 0.300 32,200.00 9,660.00
Minyak Bikisting Liter 0.100 8,423.75 842.38
176,102.38
B TENAGA
Pekerja Oh 0.520 184,140.00 95,752.80
Tukang Batu Oh 0.260 202,910.40 52,756.70
Halaman 15 dari 132
Kepala Tukang Oh 0.026 246,272.40 6,403.08
Mandor Oh 0.026 194,700.00 5,062.20
159,974.79
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.400 32,200.00 12,880.00
Minyak bikisting Liter 0.200 8,423.75 1,684.75
Balok kayu kelas II M3 0.015 3,680,000.00 55,200.00
Tripleks 8 mm Lbr 0.350 160,301.38 56,105.48
Dolken kayu galam, φ (8–10) cm, panjang
Batang 2.000 11,500.00 23,000.00
4m
296,070.23
B TENAGA
Pekerja Oh 0.660 184,140.00 121,532.40
Tukang Batu Oh 0.330 202,910.40 66,960.43
Kepala Tukang Oh 0.033 246,272.40 8,126.99
Mandor Oh 0.033 194,700.00 6,425.10
203,044.92
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.400 32,200.00 12,880.00
Minyak bikisting Liter 0.200 8,423.75 1,684.75
Balok kayu kelas II M3 0.018 3,680,000.00 66,240.00
Tripleks 8 mm Lbr 0.350 160,301.38 56,105.48
Dolken kayu galam, φ (8–10) cm, panjang
Batang 2.000 11,500.00 23,000.00
4m
307,110.23
B TENAGA
Pekerja Oh 0.660 184,140.00 121,532.40
Tukang Batu Oh 0.330 202,910.40 66,960.43
Kepala Tukang Oh 0.033 246,272.40 8,126.99
Mandor Oh 0.033 194,700.00 6,425.10
203,044.92
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.400 32,200.00 12,880.00
Minyak bikisting Liter 0.200 8,423.75 1,684.75
Balok kayu kelas II M3 0.015 3,680,000.00 55,200.00
Tripleks 8 mm Lbr 0.350 160,301.38 56,105.48
Halaman 16 dari 132
Dolken kayu galam, φ (8–10) cm, panjang
Batang 6.000 11,500.00 69,000.00
4m
342,070.23
B TENAGA
Pekerja Oh 0.660 184,140.00 121,532.40
Tukang Batu Oh 0.330 202,910.40 66,960.43
Kepala Tukang Oh 0.033 246,272.40 8,126.99
Mandor Oh 0.033 194,700.00 6,425.10
203,044.92
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.030 3,680,000.00 110,400.00
Paku Campuran Kg 0.400 32,200.00 12,880.00
Minyak bikisting Liter 0.200 8,423.75 1,684.75
Balok kayu kelas II M3 0.020 3,680,000.00 73,600.00
Tripleks 8 mm Lbr 0.350 160,301.38 56,105.48
Dolken kayu galam, φ (8–10) cm, panjang
Batang 3.000 11,500.00 34,500.00
4m
289,170.23
B TENAGA
Pekerja Oh 0.660 184,140.00 121,532.40
Tukang Batu Oh 0.330 202,910.40 66,960.43
Kepala Tukang Oh 0.033 246,272.40 8,126.99
Mandor Oh 0.033 194,700.00 6,425.10
203,044.92
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.030 3,680,000.00 110,400.00
Paku Campuran Kg 0.400 32,200.00 12,880.00
Minyak bikisting Liter 0.150 8,423.75 1,263.56
Balok kayu kelas II M3 0.015 3,680,000.00 55,200.00
Tripleks 8 mm Lbr 0.350 160,301.38 56,105.48
Dolken kayu galam, φ (8–10) cm, panjang
Batang 2.000 11,500.00 23,000.00
4m
258,849.04
B TENAGA
Pekerja Oh 0.660 184,140.00 121,532.40
Tukang Batu Oh 0.330 202,910.40 66,960.43
Kepala Tukang Oh 0.033 246,272.40 8,126.99
Mandor Oh 0.033 194,700.00 6,425.10
203,044.92
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
Penyiraman Beton & Bongkaran bekisting
TENAGA
Pekerja Oh 0.400 57,850.00 23,140.00
JUMLAH 23,140.00
Halaman 17 dari 132
ANALISA SNI BETON BERTULANG +
BIKISTING
ANALISA HARGA SATUAN
Uraian Pekerjaan : Membuat 1 m3 pondasi beton bertulang (150 kg besi + bekisting)
Kuantitas Pekerjaan : M3
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.200 3,680,000.00 736,000.00
Paku Campuran Kg 1.500 32,200.00 48,300.00
Minyak bikisting Liter 0.400 8,423.75 3,369.50
Besi Beton' Kg 157.500 22,727.27 3,579,545.45
Kawat Beton Kg 2.250 40,250.00 90,562.50
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
6,034,351.55
B TENAGA
Pekerja Oh 5.300 184,140.00 975,942.00
Tukang Batu Oh 0.270 202,910.40 54,785.81
Tukang Kayu Oh 1.300 202,910.40 263,783.52
Tukang Besi Oh 1.050 202,910.40 213,055.92
Kepala Tukang Oh 0.262 246,272.40 64,523.37
Mandor Oh 0.265 194,700.00 51,595.50
1,623,686.12
C JUMLAH (A+B) 7,658,037.67
D HARGA SATUAN 7,658,037.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.270 3,680,000.00 993,600.00
Paku Campuran Kg 2.000 32,200.00 64,400.00
Minyak bikisting Liter 0.600 8,423.75 5,054.25
Besi Beton' Kg 105.000 22,727.27 2,386,363.64
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
5,146,741.99
B TENAGA
Pekerja Oh 5.650 184,140.00 1,040,391.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.560 202,910.40 316,540.22
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.323 246,272.40 79,545.99
Mandor Oh 0.283 194,700.00 55,100.10
1,831,452.23
C JUMLAH (A+B) 6,978,194.22
D HARGA SATUAN 6,978,194.22
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.270 3,680,000.00 993,600.00
Paku Campuran Kg 2.000 32,200.00 64,400.00
Minyak bikisting Liter 0.600 8,423.75 5,054.25
Besi Beton' Kg 131.250 22,727.27 2,982,954.55
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
5,743,332.90
B TENAGA
Pekerja Oh 5.650 184,140.00 1,040,391.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.560 202,910.40 316,540.22
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.323 246,272.40 79,545.99
Mandor Oh 0.283 194,700.00 55,100.10
1,831,452.23
C JUMLAH (A+B) 7,574,785.12
D HARGA SATUAN 7,574,785.12
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.270 3,680,000.00 993,600.00
Paku Campuran Kg 2.000 32,200.00 64,400.00
Minyak bikisting Liter 0.600 8,423.75 5,054.25
Besi Beton' Kg 157.500 22,727.27 3,579,545.45
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
6,339,923.80
B TENAGA
Pekerja Oh 5.650 184,140.00 1,040,391.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.560 202,910.40 316,540.22
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.323 246,272.40 79,545.99
Mandor Oh 0.283 194,700.00 55,100.10
1,831,452.23
C JUMLAH (A+B) 8,171,376.03
Halaman 19 dari 132
D HARGA SATUAN 8,171,376.03
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.270 3,680,000.00 993,600.00
Paku Campuran Kg 2.000 32,200.00 64,400.00
Minyak bikisting Liter 0.600 8,423.75 5,054.25
Besi Beton' Kg 210.000 22,727.27 4,772,727.27
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 336.000 1,856.10 623,649.60
PB M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
7,533,105.62
B TENAGA
Pekerja Oh 5.650 184,140.00 1,040,391.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.560 202,910.40 316,540.22
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.323 246,272.40 79,545.99
Mandor Oh 0.283 194,700.00 55,100.10
1,831,452.23
C JUMLAH (A+B) 9,364,557.85
D HARGA SATUAN 9,364,557.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.400 3,680,000.00 1,472,000.00
Paku Campuran Kg 4.000 32,200.00 128,800.00
Minyak bikisting Liter 2.000 8,423.75 16,847.50
Besi Beton' Kg 315.000 22,727.27 7,159,090.91
Kawat Beton Kg 4.500 40,250.00 181,125.00
PC Kg 336.000 1,856.10 623,649.60
PB M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Balok Kayu kelas II M3 0.150 3,680,000.00 552,000.00
Tripleks 8 mm Lbr 3.500 160,301.38 561,054.81
Dolken kayu galam, φ (8–10) cm, panjang
Batang 20.000 11,500.00 230,000.00
4m
11,877,492.32
B TENAGA
Pekerja Oh 7.050 184,140.00 1,298,187.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.650 202,910.40 334,802.16
Tukang Besi Oh 2.100 202,910.40 426,111.84
Kepala Tukang Oh 0.403 246,272.40 99,247.78
Mandor Oh 0.353 194,700.00 68,729.10
2,282,878.24
C JUMLAH (A+B) 14,160,370.56
D HARGA SATUAN 14,160,370.56
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.400 3,680,000.00 1,472,000.00
Paku Campuran Kg 4.000 32,200.00 128,800.00
Minyak bikisting Liter 2.000 8,423.75 16,847.50
Besi Beton' Kg 157.500 22,727.27 3,579,545.45
Kawat Beton Kg 4.500 40,250.00 181,125.00
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Balok Kayu kelas II M3 0.150 3,680,000.00 552,000.00
Tripleks 8 mm Lbr 3.500 160,301.38 561,054.81
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.320 3,680,000.00 1,177,600.00
Paku Campuran Kg 3.200 32,200.00 103,040.00
Minyak bikisting Liter 1.600 8,423.75 13,478.00
Besi Beton'' Kg 210.000 #N/A #N/A
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 336.000 1,856.10 623,649.60
PB M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Balok Kayu kelas II M3 0.140 3,680,000.00 515,200.00
Tripleks 8 mm Lbr 2.800 160,301.38 448,843.85
Dolken kayu galam, φ (8–10) cm, panjang
Batang 16.000 11,500.00 184,000.00
4m
#N/A
B TENAGA
Pekerja Oh 6.350 184,140.00 1,169,289.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.650 202,910.40 334,802.16
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.333 246,272.40 82,008.71
Mandor Oh 0.318 194,700.00 61,914.60
1,987,889.39
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.320 3,680,000.00 1,177,600.00
Paku Campuran Kg 3.200 32,200.00 103,040.00
Minyak bikisting Liter 1.600 8,423.75 13,478.00
Besi Beton' Kg 200.000 22,727.27 4,545,454.55
Kawat Beton Kg 3.000 40,250.00 120,750.00
PC Kg 413.000 1,856.10 766,569.30
PB M3 0.619 455,400.00 281,892.60
KR M3 0.552 872,850.00 481,813.20
Balok Kayu kelas II M3 0.140 3,680,000.00 515,200.00
Tripleks 8 mm Lbr 2.800 160,301.38 448,843.85
Dolken kayu galam, φ (8–10) cm, panjang
Batang 16.000 11,500.00 184,000.00
4m
8,638,641.50
B TENAGA
Pekerja Oh 6.350 184,140.00 1,169,289.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.650 202,910.40 334,802.16
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.333 246,272.40 82,008.71
Mandor Oh 0.318 194,700.00 61,914.60
1,987,889.39
C JUMLAH (A+B) 10,626,530.88
D HARGA SATUAN 10,626,530.88
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.320 3,680,000.00 1,177,600.00
Paku Campuran Kg 3.200 32,200.00 103,040.00
Minyak bikisting Liter 1.600 8,423.75 13,478.00
Besi Beton' Kg 157.000 22,727.27 3,568,181.82
Kawat Beton Kg 2.250 40,250.00 90,562.50
PC Kg 336.000 1,856.10 623,649.60
PB M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Balok Kayu kelas II M3 0.120 3,680,000.00 441,600.00
Tripleks 8 mm Lbr 2.800 160,301.38 448,843.85
Dolken kayu galam, φ (8–10) cm, panjang
Batang 32.000 11,500.00 368,000.00
4m
7,787,880.27
B TENAGA
Pekerja Oh 5.300 184,140.00 975,942.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.300 202,910.40 263,783.52
Tukang Besi Oh 1.050 202,910.40 213,055.92
Kepala Tukang Oh 0.265 246,272.40 65,262.19
Mandor Oh 0.265 194,700.00 51,595.50
1,625,439.49
C JUMLAH (A+B) 9,413,319.75
D HARGA SATUAN 9,413,319.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.240 3,680,000.00 883,200.00
Paku Campuran Kg 3.200 32,200.00 103,040.00
Minyak bikisting Liter 1.600 8,423.75 13,478.00
Besi Beton' Kg 1,115.000 22,727.27 25,340,909.09
Kawat Beton Kg 2.250 40,250.00 90,562.50
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Balok Kayu kelas II M3 0.120 3,680,000.00 441,600.00
Tripleks 8 mm Lbr 2.800 160,301.38 448,843.85
Dolken kayu galam, φ (8–10) cm, panjang
Batang 24.000 11,500.00 276,000.00
4m
29,174,207.54
B TENAGA
Pekerja Oh 5.300 184,140.00 975,942.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.300 202,910.40 263,783.52
Tukang Besi Oh 1.050 202,910.40 213,055.92
Kepala Tukang Oh 0.265 246,272.40 65,262.19
Mandor Oh 0.265 194,700.00 51,595.50
1,625,439.49
C JUMLAH (A+B) 30,799,647.03
D HARGA SATUAN 30,799,647.03
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.250 3,680,000.00 920,000.00
Paku Campuran Kg 3.000 32,200.00 96,600.00
Minyak bikisting Liter 1.200 8,423.75 10,108.50
Besi Beton' Kg 210.000 22,727.27 4,772,727.27
Kawat Beton Kg 0.540 40,250.00 21,735.00
PC Kg 336.000 1,856.10 623,649.60
PP M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
Halaman 23 dari 132
Balok Kayu kelas II M3 0.105 3,680,000.00 386,400.00
Tripleks 8 mm Lbr 2.500 160,301.38 400,753.44
Dolken kayu galam, φ (8–10) cm, panjang
Batang 14.000 11,500.00 161,000.00
4m
8,345,898.31
B TENAGA
Pekerja Oh 5.650 184,140.00 1,040,391.00
Tukang Batu Oh 0.275 202,910.40 55,800.36
Tukang Kayu Oh 1.560 202,910.40 316,540.22
Tukang Besi Oh 1.400 202,910.40 284,074.56
Kepala Tukang Oh 0.323 246,272.40 79,545.99
Mandor Oh 0.283 194,700.00 55,100.10
1,831,452.23
C JUMLAH (A+B) 10,177,350.54
D HARGA SATUAN 10,177,350.54
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.002 3,680,000.00 7,360.00
Paku Campuran Kg 0.010 32,200.00 322.00
Besi Beton' Kg 3.000 22,727.27 68,181.82
Kawat Beton Kg 0.045 40,250.00 1,811.25
PC Kg 4.000 1,856.10 7,424.40
PP M3 0.006 455,400.00 2,732.40
KR M3 0.009 872,850.00 7,855.65
95,687.52
B TENAGA
Pekerja Oh 0.180 184,140.00 33,145.20
Tukang Batu Oh 0.020 202,910.40 4,058.21
Tukang Kayu Oh 0.020 202,910.40 4,058.21
Tukang Besi Oh 0.020 202,910.40 4,058.21
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.009 194,700.00 1,752.30
48,549.76
C JUMLAH (A+B) 144,237.28
D HARGA SATUAN 144,237.28
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
PC Kg 43.500 1,856.10 80,740.35
PP M3 0.080 455,400.00 36,432.00
398,922.35
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 560,754.88
D HARGA SATUAN 560,754.88
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
PC Kg 32.950 1,856.10 61,158.50
PP M3 0.091 455,400.00 41,441.40
384,349.90
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Halaman 24 dari 132
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 546,182.42
D HARGA SATUAN 546,182.42
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
PC Kg 26.550 1,856.10 49,279.46
PP M3 0.093 455,400.00 42,352.20
373,381.66
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 535,214.18
D HARGA SATUAN 535,214.18
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
PC Kg 22.200 1,856.10 41,205.42
PP M3 0.102 455,400.00 46,450.80
369,406.22
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 531,238.75
D HARGA SATUAN 531,238.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
PC Kg 18.500 1,856.10 34,337.85
PP M3 0.122 455,400.00 55,558.80
371,646.65
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 533,479.18
D HARGA SATUAN 533,479.18
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 140.000 2,012.50 281,750.00
Halaman 25 dari 132
PC Kg 10.080 1,856.10 18,709.49
PP M3 0.093 455,400.00 42,124.50
342,583.99
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.030 194,700.00 5,841.00
161,832.53
C JUMLAH (A+B) 504,416.52
D HARGA SATUAN 504,416.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 18.950 1,856.10 35,173.10
PP M3 0.028 455,400.00 12,751.20
188,799.30
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 269,715.56
D HARGA SATUAN 269,715.56
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 14.270 1,856.10 26,486.55
PP M3 0.040 455,400.00 18,216.00
185,577.55
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 266,493.81
D HARGA SATUAN 266,493.81
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 11.500 1,856.10 21,345.15
PP M3 0.043 455,400.00 19,582.20
181,802.35
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 262,718.61
D HARGA SATUAN 262,718.61
Kuantitas Pekerjaan : M3
Halaman 26 dari 132
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 218.000 1,856.10 404,629.80
PB M3 0.520 455,400.00 236,808.00
KR M3 0.870 872,850.00 759,379.50
1,400,817.30
B TENAGA
Pekerja Oh 1.650 184,140.00 303,831.00
Tukang Batu Oh 0.250 202,910.40 50,727.60
Kepala Tukang Oh 0.025 246,272.40 6,156.81
Mandor Oh 0.080 194,700.00 15,576.00
376,291.41
C JUMLAH (A+B) 1,777,108.71
D HARGA SATUAN 1,777,108.71
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Press Buah 30.000 2,760.00 82,800.00
PC Kg 9.680 1,856.10 17,967.05
PP M3 0.045 455,400.00 20,493.00
121,260.05
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 202,176.31
D HARGA SATUAN 202,176.31
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 8.320 1,856.10 15,442.75
PP M3 0.049 455,400.00 22,314.60
178,632.35
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 259,548.62
D HARGA SATUAN 259,548.62
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 6.500 1,856.10 12,064.65
PP M3 0.050 455,400.00 22,770.00
175,709.65
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 4.500 1,856.10 8,352.45
PP M3 0.050 455,400.00 22,770.00
KP M3 0.015 292,100.00 4,381.50
176,378.95
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 257,295.21
D HARGA SATUAN 257,295.21
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
PC Kg 0.018 1,856.10 33.41
PP M3 0.018 455,400.00 8,197.20
KP M3 0.018 292,100.00 5,257.80
154,363.41
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 235,279.67
D HARGA SATUAN 235,279.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Merah Buah 70.000 2,012.50 140,875.00
Semen Warna Kg 0.014 23,000.00 322.00
PP M3 0.028 455,400.00 12,751.20
KP M3 0.014 292,100.00 4,089.40
158,037.60
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 238,953.86
D HARGA SATUAN 238,953.86
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
Halaman 28 dari 132
A BAHAN
HB 20 Buah 12.500 #N/A #N/A
PC Kg 30.320 1,856.10 56,276.95
PP M3 0.728 455,400.00 331,531.20
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.350 184,140.00 64,449.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.018 194,700.00 3,504.60
102,084.25
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
HB 20 Buah 12.500 #N/A #N/A
PC Kg 24.260 1,856.10 45,028.99
PP M3 0.772 455,400.00 351,568.80
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.350 184,140.00 64,449.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.018 194,700.00 3,504.60
102,084.25
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
HB 15 Buah 12.500 #N/A #N/A
PC Kg 22.740 1,856.10 42,207.71
PP M3 0.550 455,400.00 250,470.00
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.016 194,700.00 3,115.20
89,344.52
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
HB 15 Buah 12.500 #N/A #N/A
PC Kg 18.200 1,856.10 33,781.02
PP M3 0.582 455,400.00 265,042.80
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.016 194,700.00 3,115.20
89,344.52
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
HB 10 Buah 12.500 #N/A #N/A
PC Kg 15.160 1,856.10 28,138.48
PP M3 0.364 455,400.00 165,765.60
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
HB 10 Buah 12.500 #N/A #N/A
PC Kg 12.130 1,856.10 22,514.49
PP M3 0.388 455,400.00 176,695.20
Besi Angkur Ø 8 mm Kg 0.280 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Terawang (Roster) Buah 30.000 #N/A #N/A
PC Kg 14.000 1,856.10 25,985.40
PP M3 0.032 455,400.00 14,572.80
#N/A
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Terawang (Roster) Buah 30.000 #N/A #N/A
PC Kg 11.000 1,856.10 20,417.10
PP M3 0.035 455,400.00 15,939.00
#N/A
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Halaman 30 dari 132
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bata Berongga Ekspose Buah 70.000 #N/A #N/A
PC Kg 14.000 1,856.10 25,985.40
PP M3 0.032 455,400.00 14,572.80
#N/A
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 15.504 1,856.10 28,776.97
PH M3 0.016 506,000.00 8,096.00
36,872.97
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 129,166.12
D HARGA SATUAN 129,166.12
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 10.224 1,856.10 18,976.77
PH M3 0.020 506,000.00 10,120.00
29,096.77
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 121,389.91
D HARGA SATUAN 121,389.91
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 7.776 1,856.10 14,433.03
PH M3 0.023 506,000.00 11,638.00
26,071.03
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Halaman 31 dari 132
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 118,364.18
D HARGA SATUAN 118,364.18
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 6.240 1,856.10 11,582.06
PH M3 0.023 506,000.00 11,638.00
23,220.06
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 115,513.21
D HARGA SATUAN 115,513.21
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 5.184 1,856.10 9,622.02
PH M3 0.026 506,000.00 13,156.00
22,778.02
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 115,071.17
D HARGA SATUAN 115,071.17
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 4.416 1,856.10 8,196.54
PH M3 0.027 506,000.00 13,662.00
21,858.54
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 114,151.68
D HARGA SATUAN 114,151.68
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 3.936 1,856.10 7,305.61
PH M3 0.028 506,000.00 14,168.00
21,473.61
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 113,766.76
D HARGA SATUAN 113,766.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 3.456 1,856.10 6,414.68
PH M3 0.028 506,000.00 14,168.00
20,582.68
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 112,875.83
D HARGA SATUAN 112,875.83
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
semen Warna M3 0.009 23,000.00 207.00
KP M3 0.009 292,100.00 2,628.90
PH M3 0.009 506,000.00 4,554.00
7,389.90
B TENAGA
Pekerja Oh 3.600 184,140.00 662,904.00
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.018 194,700.00 3,504.60
693,713.12
C JUMLAH (A+B) 701,103.02
D HARGA SATUAN 701,103.02
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Semen Warna M3 0.007 23,000.00 161.00
KP M3 0.009 292,100.00 2,628.90
PH M3 0.009 506,000.00 4,554.00
7,343.90
B TENAGA
Pekerja Oh 3.600 184,140.00 662,904.00
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.018 194,700.00 3,504.60
693,713.12
C JUMLAH (A+B) 701,057.02
D HARGA SATUAN 701,057.02
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 13.632 1,856.10 25,302.36
PH M3 0.027 506,000.00 13,662.00
38,964.36
B TENAGA
Pekerja Oh 0.400 184,140.00 73,656.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.022 194,700.00 4,283.40
123,446.93
C JUMLAH (A+B) 162,411.28
D HARGA SATUAN 162,411.28
Halaman 34 dari 132
ANALISA HARGA SATUAN
Uraian Pekerjaan : Membuat 1 m2 plesteran 1 PC : 3 PP, tebal 20 mm
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 10.368 1,856.10 19,244.04
PH M3 0.031 506,000.00 15,686.00
34,930.04
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.013 194,700.00 2,531.10
95,915.03
C JUMLAH (A+B) 130,845.07
D HARGA SATUAN 130,845.07
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 8.320 1,856.10 15,442.75
PH M3 0.032 506,000.00 16,192.00
31,634.75
B TENAGA
Pekerja Oh 0.400 184,140.00 73,656.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.022 194,700.00 4,283.40
123,446.93
C JUMLAH (A+B) 155,081.68
D HARGA SATUAN 155,081.68
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 6.912 1,856.10 12,829.36
PH M3 0.035 506,000.00 17,710.00
30,539.36
B TENAGA
Pekerja Oh 0.400 184,140.00 73,656.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.022 194,700.00 4,283.40
123,446.93
C JUMLAH (A+B) 153,986.29
D HARGA SATUAN 153,986.29
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 5.888 1,856.10 10,928.72
PH M3 0.038 506,000.00 19,228.00
30,156.72
B TENAGA
Pekerja Oh 0.400 184,140.00 73,656.00
Tukang Batu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.022 194,700.00 4,283.40
123,446.93
C JUMLAH (A+B) 153,603.64
D HARGA SATUAN 153,603.64
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Semen Warna M3 0.009 23,000.00 207.00
KP M3 0.009 292,100.00 2,628.90
PH M3 0.018 506,000.00 9,108.00
11,943.90
B TENAGA
Pekerja Oh 0.440 184,140.00 81,021.60
Tukang Batu Oh 0.220 202,910.40 44,640.29
Kepala Tukang Oh 0.022 246,272.40 5,417.99
Mandor Oh 0.022 194,700.00 4,283.40
135,363.28
C JUMLAH (A+B) 147,307.18
D HARGA SATUAN 147,307.18
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 5.184 1,856.10 9,622.02
PH M3 0.026 506,000.00 13,156.00
22,778.02
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Batu Oh 0.075 202,910.40 15,218.28
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.008 194,700.00 1,557.60
46,367.06
C JUMLAH (A+B) 69,145.08
D HARGA SATUAN 69,145.08
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 0.500 1,856.10 928.05
PH M3 0.013 506,000.00 6,578.00
7,506.05
B TENAGA
Pekerja Oh 0.080 184,140.00 14,731.20
Tukang Batu Oh 0.400 202,910.40 81,164.16
Kepala Tukang Oh 0.040 246,272.40 9,850.90
Mandor Oh 0.004 194,700.00 778.80
106,525.06
C JUMLAH (A+B) 114,031.11
D HARGA SATUAN 114,031.11
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 10.000 1,856.10 18,561.00
Batu Granit Kg 15.000 53,400.00 801,000.00
819,561.00
B TENAGA
Pekerja Oh 0.450 184,140.00 82,863.00
Tukang Batu Oh 0.225 202,910.40 45,654.84
Kepala Tukang Oh 0.023 246,272.40 5,664.27
Mandor Oh 0.023 194,700.00 4,478.10
138,660.21
C JUMLAH (A+B) 958,221.21
D HARGA SATUAN 958,221.21
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 10.000 1,856.10 18,561.00
Batu Teraso Kg 15.000 43,200.00 648,000.00
666,561.00
B TENAGA
Pekerja Oh 0.450 184,140.00 82,863.00
Tukang Batu Oh 0.225 202,910.40 45,654.84
Kepala Tukang Oh 0.023 246,272.40 5,664.27
Mandor Oh 0.023 194,700.00 4,478.10
138,660.21
C JUMLAH (A+B) 805,221.21
D HARGA SATUAN 805,221.21
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 4.320 1,856.10 8,018.35
PH Kg 0.006 506,000.00 3,036.00
11,054.35
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
80,916.26
C JUMLAH (A+B) 91,970.62
D HARGA SATUAN 91,970.62
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 3.108 1,856.10 5,768.76
5,768.76
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Batu Oh 0.075 202,910.40 15,218.28
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.008 194,700.00 1,557.60
46,367.06
C JUMLAH (A+B) 52,135.82
D HARGA SATUAN 52,135.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 1.600 1,856.10 2,969.76
2,969.76
B TENAGA
Pekerja Oh 0.070 184,140.00 12,889.80
Tukang Batu Oh 0.035 202,910.40 7,101.86
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.004 194,700.00 778.80
21,755.55
C JUMLAH (A+B) 24,725.31
D HARGA SATUAN 24,725.31
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
Halaman 37 dari 132
( Rp )
A BAHAN
PC Kg 6.340 1,856.10 11,767.67
PH M3 0.012 506,000.00 6,072.00
17,839.67
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 110,132.82
D HARGA SATUAN 110,132.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 3.250 1,856.10 6,032.33
6,032.33
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.010 194,700.00 1,947.00
61,528.76
C JUMLAH (A+B) 67,561.09
D HARGA SATUAN 67,561.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin abu-abu Buah 6.630 #N/A #N/A
PC Kg 9.800 1,856.10 18,189.78
PP M3 0.045 455,400.00 20,493.00
#N/A
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.125 202,910.40 25,363.80
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
77,131.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin abu-abu Buah 11.870 #N/A #N/A
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
#N/A
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.130 202,910.40 26,378.35
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
79,987.39
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin abu-abu Buah 26.500 #N/A #N/A
PC Kg 10.400 1,856.10 19,303.44
PP M3 0.045 455,400.00 20,493.00
#N/A
B TENAGA
Pekerja Oh 0.270 184,140.00 49,717.80
Tukang Batu Oh 0.135 202,910.40 27,392.90
Kepala Tukang Oh 0.014 246,272.40 3,447.81
Mandor Oh 0.014 194,700.00 2,725.80
83,284.32
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin warna Buah 6.630 #N/A #N/A
PC Kg 10.400 1,856.10 19,303.44
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
#N/A
B TENAGA
Pekerja Oh 0.270 184,140.00 49,717.80
Tukang Batu Oh 0.135 202,910.40 27,392.90
Kepala Tukang Oh 0.014 246,272.40 3,447.81
Mandor Oh 0.014 194,700.00 2,725.80
83,284.32
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin warna Buah 11.870 #N/A #N/A
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.130 202,910.40 26,378.35
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
79,987.39
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin warna Buah 26.500 #N/A #N/A
PC Kg 10.400 1,856.10 19,303.44
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.620 23,000.00 37,260.00
#N/A
B TENAGA
Halaman 39 dari 132
Pekerja Oh 0.270 184,140.00 49,717.80
Tukang Batu Oh 0.135 202,910.40 27,392.90
Kepala Tukang Oh 0.014 246,272.40 3,447.81
Mandor Oh 0.014 194,700.00 2,725.80
83,284.32
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teraso Buah 6.630 #N/A #N/A
PC Kg 9.800 1,856.10 18,189.78
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
#N/A
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.125 202,910.40 25,363.80
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
77,131.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teraso Buah 11.870 #N/A #N/A
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.130 202,910.40 26,378.35
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
79,987.39
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin Granit Buah 6.630 #N/A #N/A
PC Kg 9.800 1,856.10 18,189.78
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
#N/A
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.125 202,910.40 25,363.80
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
77,131.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teralux kerang Buah 6.630 #N/A #N/A
PC Kg 9.800 1,856.10 18,189.78
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
#N/A
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.125 202,910.40 25,363.80
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
77,131.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teralux kerang Buah 11.870 #N/A #N/A
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.130 202,910.40 26,378.35
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
79,987.39
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teralux marmer Buah 3.100 #N/A #N/A
PC Kg 9.600 1,856.10 17,818.56
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 0.240 184,140.00 44,193.60
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Halaman 41 dari 132
Mandor Oh 0.012 194,700.00 2,336.40
73,834.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teralux marmer Buah 6.630 #N/A #N/A
PC Kg 9.600 1,856.10 17,818.56
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
#N/A
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.125 202,910.40 25,363.80
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
77,131.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin teralux marmer Buah 11.870 #N/A #N/A
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 0.260 184,140.00 47,876.40
Tukang Batu Oh 0.130 202,910.40 26,378.35
Kepala Tukang Oh 0.013 246,272.40 3,201.54
Mandor Oh 0.013 194,700.00 2,531.10
79,987.39
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint Ubin Buah 5.300 #N/A #N/A
PC Kg 1.650 1,856.10 3,062.57
PP M3 0.004 455,400.00 1,821.60
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
Halaman 42 dari 132
A BAHAN
Plint Ubin Buah 3.530 #N/A #N/A
PC Kg 1.200 1,856.10 2,227.32
PP M3 0.003 455,400.00 1,366.20
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint Ubin Buah 2.650 #N/A #N/A
PC Kg 1.240 1,856.10 2,301.56
PP M3 0.003 455,400.00 1,366.20
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin PC warna Buah 5.300 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin PC warna Buah 3.530 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin PC warna Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teraso Buah 3.530 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teraso Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin granit Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
Halaman 44 dari 132
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin granit Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin granit Buah 3.530 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teralux kerang Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teralux kerang Buah 3.530 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teralux kerang Buah 1.700 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teralux kerang Buah 2.650 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint ubin teralux kerang Buah 3.530 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Halaman 46 dari 132
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bahan Terasso Cor M3 0.036 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.360 184,140.00 66,290.40
Tukang Batu Oh 0.180 202,910.40 36,523.87
Kepala Tukang Oh 0.018 246,272.40 4,432.90
Mandor Oh 0.018 194,700.00 3,504.60
110,751.78
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin keramik artistik Buah 53.000 #N/A #N/A
PC Kg 8.190 1,856.10 15,201.46
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 2.750 23,000.00 63,250.00
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin keramik artistik Buah 106.000 #N/A #N/A
PC Kg 8.190 1,856.10 15,201.46
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 3.200 23,000.00 73,600.00
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Halaman 47 dari 132
Tegel Keramik Buah 11.110 7,183.62 79,810.00
PC Kg 10.400 1,856.10 19,303.44
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.300 23,000.00 29,900.00
149,506.44
B TENAGA
Pekerja Oh 0.270 184,140.00 49,717.80
Tukang Batu Oh 0.135 202,910.40 27,392.90
Kepala Tukang Oh 0.014 246,272.40 3,447.81
Mandor Oh 0.014 194,700.00 2,725.80
83,284.32
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin keramik Buah 10.000 #N/A #N/A
PC Kg 8.190 1,856.10 15,201.46
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.620 23,000.00 37,260.00
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
keramik Buah 11.870 6,172.80 73,271.10
PC Kg 10.000 1,856.10 18,561.00
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.500 23,000.00 34,500.00
146,825.10
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Tegel Keramik Kasar 20 x 20 cm Buah 26.500 3,069.62 81,344.81
PC Kg 10.400 1,856.10 19,303.44
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 1.620 23,000.00 37,260.00
158,401.25
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Ubin keramik Buah 33.000 #N/A #N/A
PC Kg 9.800 1,856.10 18,189.78
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 4.370 23,000.00 100,510.00
#N/A
B TENAGA
Pekerja Oh 1.050 184,140.00 193,347.00
Tukang Batu Oh 0.525 202,910.40 106,527.96
Kepala Tukang Oh 0.053 246,272.40 13,052.44
Mandor Oh 0.053 194,700.00 10,319.10
323,246.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Mosaik Buah 11.870 #N/A #N/A
PC Kg 14.150 1,856.10 26,263.82
PP M3 0.039 455,400.00 17,760.60
Semen Warna Kg 2.000 23,000.00 46,000.00
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint keramik artistik Buah 5.300 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
Halaman 49 dari 132
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.025 23,000.00 575.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint keramik artistik Buah 10.600 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.050 23,000.00 1,150.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plint keramik artistik Buah 5.300 #N/A #N/A
PC Kg 0.570 1,856.10 1,057.98
PP M3 0.002 455,400.00 683.10
Semen Warna Kg 0.013 23,000.00 299.00
#N/A
B TENAGA
Pekerja Oh 0.090 184,140.00 16,572.60
Tukang Batu Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
38,024.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Internal cove Buah 5.300 #N/A #N/A
PC Kg 1.140 1,856.10 2,115.95
PP M3 0.003 455,400.00 1,366.20
Semen Warna Kg 0.100 23,000.00 2,300.00
#N/A
B TENAGA
Pekerja Oh 0.750 184,140.00 138,105.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.038 194,700.00 7,398.60
316,156.83
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Marmer Buah 1.060 #N/A #N/A
PC Kg 8.190 1,856.10 15,201.46
PP M3 0.045 455,400.00 20,493.00
Semen Warna Kg 0.650 23,000.00 14,950.00
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Karpet Buah 1.050 #N/A #N/A
Lem Kg 0.350 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.170 184,140.00 31,303.80
Tukang Batu Oh 0.170 202,910.40 34,494.77
Kepala Tukang Oh 0.017 246,272.40 4,186.63
Mandor Oh 0.009 194,700.00 1,752.30
71,737.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Underlayer / rubber corrugated Buah 1.050 #N/A #N/A
Lem Kg 0.350 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.006 194,700.00 1,168.20
50,569.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Parquet Buah 1.050 #N/A #N/A
Lem Kg 0.600 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
Halaman 51 dari 132
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Gymfloor M2 1.050 #N/A #N/A
Lem Kg 0.600 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Porselen Buah 86.000 #N/A #N/A
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 1.500 23,000.00 34,500.00
#N/A
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.050 246,272.40 12,313.62
Mandor Oh 0.050 194,700.00 9,735.00
307,643.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Porselen Buah 53.000 #N/A #N/A
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 2.750 23,000.00 63,250.00
#N/A
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Tegel Keramik 20 x 25 cm Buah 26.500 3,657.88 96,933.94
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Halaman 52 dari 132
Semen Warna Kg 1.940 23,000.00 44,620.00
167,012.87
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Keramik artistik Buah 53.000 #N/A #N/A
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 2.750 23,000.00 63,250.00
#N/A
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Keramik artistik Buah 106.000 #N/A #N/A
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 2.900 23,000.00 66,700.00
#N/A
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Keramik artistik Buah 53.000 #N/A #N/A
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 2.750 23,000.00 63,250.00
#N/A
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Tegel Keramik 20 x 25 cm Buah 20.000 4,755.25 95,105.00
PC Kg 9.300 1,856.10 17,261.73
PP M3 0.018 455,400.00 8,197.20
Semen Warna Kg 1.940 23,000.00 44,620.00
165,183.93
B TENAGA
Pekerja Oh 0.900 184,140.00 165,726.00
Tukang Batu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.045 194,700.00 8,761.50
276,879.44
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Marmer Buah 1.060 #N/A #N/A
Paku 12 Cm Kg 0.012 #N/A
PC Kg 12.440 1,856.10 23,089.88
PP M3 0.025 455,400.00 11,385.00
Semen Warna Kg 0.650 23,000.00 14,950.00
#N/A
B TENAGA
Pekerja Oh 1.300 184,140.00 239,382.00
Tukang Batu Oh 0.650 202,910.40 131,891.76
Kepala Tukang Oh 0.065 246,272.40 16,007.71
Mandor Oh 0.065 194,700.00 12,655.50
399,936.97
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bata pelapis dinding Buah 63.000 #N/A #N/A
PC Kg 12.440 1,856.10 23,089.88
PP M3 0.025 455,400.00 11,385.00
Semen Warna Kg 2.750 23,000.00 63,250.00
#N/A
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.050 246,272.40 12,313.62
Mandor Oh 0.050 194,700.00 9,735.00
307,643.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu paras M2 1.100 #N/A #N/A
PC Kg 11.750 1,856.10 21,809.18
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu tempel hitam M2 1.100 62,000.00 68,200.00
PC Kg 11.750 1,856.10 21,809.18
PP M3 0.035 455,400.00 15,939.00
105,948.18
B TENAGA
Pekerja Oh 0.700 184,140.00 128,898.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
215,350.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Vinyl M2 11.870 #N/A #N/A
Lem vinyl Kg 0.350 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.008 194,700.00 1,557.60
63,309.25
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Wall paper M' 2.200 301,012.50 662,227.50
Lem Kg 0.250 57,155.00 14,288.75
676,516.25
B TENAGA
Pekerja Oh 0.350 184,140.00 64,449.00
Tukang Batu Oh 0.175 202,910.40 35,509.32
Kepala Tukang Oh 0.017 246,272.40 4,186.63
Mandor Oh 0.002 194,700.00 389.40
104,534.35
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
Halaman 55 dari 132
( Rp )
A BAHAN
Floor hardener Kg 5.000 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.006 194,700.00 1,168.20
50,569.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Vinyl karet Buah 1.700 #N/A #N/A
Lem vinyl Kg 0.080 #N/A
#N/A
B TENAGA
Pekerja Oh 0.080 184,140.00 14,731.20
Tukang Batu Oh 0.080 202,910.40 16,232.83
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.004 194,700.00 778.80
33,713.01
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu kelas II Buah 0.003 3,680,000.00 11,040.00
Paku Campuran Kg 0.050 32,200.00 1,610.00
12,650.00
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Tukang Batu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.006 194,700.00 1,168.20
50,569.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium M3 1.100 125,925.00 138,517.50
Bingkai jendela aluminium Kg 1.250 118,450.00 148,062.50
Kaca buram Kg 1.000 #N/A #N/A
Daun pintu panil Aluminium Type A #N/A
Handle pintu
Kunci pintu
Engsel pintu
Espanyolet
Windows hinger
Karet dan silent
Angker/fisher
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 1.200 3,680,000.00 4,416,000.00
Paku 10 Cm Kg 1.250 - -
Lem Kayu Kg 1.000 48,875.00 48,875.00
4,464,875.00
B TENAGA
Pekerja Oh 6.000 57,850.00 347,100.00
Tukang Kayu Oh 18.000 68,400.00 1,231,200.00
Kepala Tukang Oh 1.800 83,150.00 149,670.00
Mandor Oh 0.300 74,950.00 22,485.00
1,750,455.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.050 32,200.00 1,610.00
148,810.00
B TENAGA
Pekerja Oh 0.350 57,850.00 20,247.50
Tukang Kayu Oh 1.050 68,400.00 71,820.00
Kepala Tukang Oh 0.105 83,150.00 8,730.75
Mandor Oh 0.018 74,950.00 1,349.10
102,147.35
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Paku Campuran Kg 0.050 32,200.00 1,610.00
148,810.00
B TENAGA
Pekerja Oh 0.350 57,850.00 20,247.50
Tukang Kayu Oh 1.050 68,400.00 71,820.00
Kepala Tukang Oh 0.105 83,150.00 8,730.75
Mandor Oh 0.018 74,950.00 1,349.10
102,147.35
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 0.040 4,830,000.00 193,200.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
217,637.50
B TENAGA
Pekerja Oh 1.000 57,850.00 57,850.00
Tukang Kayu Oh 3.000 68,400.00 205,200.00
Halaman 58 dari 132
Kepala Tukang Oh 0.300 83,150.00 24,945.00
Mandor Oh 0.050 74,950.00 3,747.50
291,742.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.040 3,680,000.00 147,200.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
171,637.50
B TENAGA
Pekerja Oh 1.000 57,850.00 57,850.00
Tukang Kayu Oh 3.000 68,400.00 205,200.00
Kepala Tukang Oh 0.300 83,150.00 24,945.00
Mandor Oh 0.050 74,950.00 3,747.50
291,742.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 0.024 4,830,000.00 115,920.00
Lem Kayu Kg 0.300 48,875.00 14,662.50
130,582.50
B TENAGA
Pekerja Oh 0.800 57,850.00 46,280.00
Tukang Kayu Oh 2.400 68,400.00 164,160.00
Kepala Tukang Oh 0.240 83,150.00 19,956.00
Mandor Oh 0.040 74,950.00 2,998.00
233,394.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.024 3,680,000.00 88,320.00
Lem Kayu Kg 0.300 48,875.00 14,662.50
102,982.50
B TENAGA
Pekerja Oh 0.800 57,850.00 46,280.00
Tukang Kayu Oh 2.400 68,400.00 164,160.00
Kepala Tukang Oh 0.240 83,150.00 19,956.00
Mandor Oh 0.040 74,950.00 2,998.00
233,394.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas I M3 0.064 4,830,000.00 309,120.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
333,557.50
B TENAGA
Halaman 59 dari 132
Pekerja Oh 1.000 57,850.00 57,850.00
Tukang Kayu Oh 3.000 68,400.00 205,200.00
Kepala Tukang Oh 0.300 83,150.00 24,945.00
Mandor Oh 0.050 74,950.00 3,747.50
291,742.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 0.026 4,830,000.00 123,648.00
Paku 1 Cm - 2.5 Cm Kg 0.030 43,700.00 1,311.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
Teakwood 4 mm Lembar 1.000 174,915.00 174,915.00
324,311.50
B TENAGA
Pekerja Oh 0.700 57,850.00 40,495.00
Tukang Kayu Oh 2.100 68,400.00 143,640.00
Kepala Tukang Oh 0.210 83,150.00 17,461.50
Mandor Oh 0.035 74,950.00 2,623.25
204,219.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 0.026 4,830,000.00 123,648.00
Paku 1 Cm - 2.5 Cm Kg 0.030 43,700.00 1,311.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
Teakwood 4 mm Lembar 1.000 174,915.00 174,915.00
324,311.50
B TENAGA
Pekerja Oh 0.800 57,850.00 46,280.00
Tukang Kayu Oh 2.400 68,400.00 164,160.00
Kepala Tukang Oh 0.240 83,150.00 19,956.00
Mandor Oh 0.040 74,950.00 2,998.00
233,394.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.026 3,680,000.00 94,208.00
Paku 1 Cm - 2.5 Cm Kg 0.030 43,700.00 1,311.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
Teakwood 4 mm Lembar 1.000 174,915.00 174,915.00
294,871.50
B TENAGA
Pekerja Oh 0.800 57,850.00 46,280.00
Tukang Kayu Oh 2.400 68,400.00 164,160.00
Kepala Tukang Oh 0.240 83,150.00 19,956.00
Mandor Oh 0.040 74,950.00 2,998.00
233,394.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.060 3,680,000.00 220,800.00
Paku 1 Cm - 2.5 Cm Kg 0.150 43,700.00 6,555.00
227,355.00
B TENAGA
Pekerja Oh 0.670 184,140.00 123,373.80
Tukang Kayu Oh 2.000 202,910.40 405,820.80
Kepala Tukang Oh 0.200 246,272.40 49,254.48
Mandor Oh 0.335 194,700.00 65,224.50
643,673.58
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 0.025 4,830,000.00 120,750.00
Paku 1 Cm - 2.5 Cm Kg 0.030 43,700.00 1,311.00
Lem Kayu Kg 0.300 48,875.00 14,662.50
Teakwood 4 mm Lembar 1.000 174,915.00 174,915.00
311,638.50
B TENAGA
Pekerja Oh 0.800 184,140.00 147,312.00
Tukang Kayu Oh 2.400 202,910.40 486,984.96
Kepala Tukang Oh 0.240 246,272.40 59,105.38
Mandor Oh 0.040 194,700.00 7,788.00
701,190.34
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 1.100 4,830,000.00 5,313,000.00
Besi Strp Tebal 5 mm Kg 15.000 14,375.00 215,625.00
Paku Campuran Kg 5.600 32,200.00 180,320.00
5,708,945.00
B TENAGA
Pekerja Oh 4.000 184,140.00 736,560.00
Tukang Kayu Oh 12.000 202,910.40 2,434,924.80
Kepala Tukang Oh 1.200 246,272.40 295,526.88
Mandor Oh 0.200 194,700.00 38,940.00
3,505,951.68
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas I M3 1.200 4,830,000.00 5,796,000.00
Besi Strp Tebal 5 mm Kg 15.000 14,375.00 215,625.00
Paku Campuran Kg 5.600 32,200.00 180,320.00
6,191,945.00
B TENAGA
Pekerja Oh 6.700 184,140.00 1,233,738.00
Tukang Kayu Oh 20.100 202,910.40 4,078,499.04
Kepala Tukang Oh 2.010 246,272.40 495,007.52
Mandor Oh 0.335 194,700.00 65,224.50
5,872,469.06
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 1.100 3,680,000.00 4,048,000.00
Besi Strp Tebal 5 mm Kg 15.000 14,375.00 215,625.00
Paku Campuran Kg 3.000 32,200.00 96,600.00
4,360,225.00
B TENAGA
Pekerja Oh 2.400 184,140.00 441,936.00
Tukang Kayu Oh 7.200 202,910.40 1,460,954.88
Kepala Tukang Oh 0.720 246,272.40 177,316.13
Mandor Oh 0.120 194,700.00 23,364.00
2,103,571.01
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kaso-kaso (5 x 7) cm M3 0.014 2,300,000.00 32,200.00
Reng (2 x 3) cm M3 0.004 2,300,000.00 8,280.00
Paku Campuran Kg 0.250 32,200.00 8,050.00
48,530.00
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
42,141.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kaso-kaso (5 x 7) cm M3 0.014 2,300,000.00 32,200.00
Reng (2 x 3) cm M3 0.007 2,300,000.00 16,560.00
Paku Campuran Kg 0.250 32,200.00 8,050.00
56,810.00
B TENAGA
Halaman 62 dari 132
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
42,141.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.165 3,680,000.00 607,200.00
Paku Campuran Kg 0.200 32,200.00 6,440.00
613,640.00
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Tukang Kayu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.006 194,700.00 1,168.20
50,569.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kaso-kaso (5 x 7) cm M3 0.015 2,300,000.00 35,420.00
Paku Campuran Kg 0.200 32,200.00 6,440.00
41,860.00
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.300 202,910.40 60,873.12
Kepala Tukang Oh 0.030 246,272.40 7,388.17
Mandor Oh 0.075 194,700.00 14,602.50
110,484.79
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kaso-kaso (5 x 7) cm M3 0.016 2,300,000.00 37,490.00
Paku Campuran Kg 0.250 32,200.00 8,050.00
45,540.00
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.300 202,910.40 60,873.12
Kepala Tukang Oh 0.030 246,272.40 7,388.17
Mandor Oh 0.010 194,700.00 1,947.00
107,036.29
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas I M3 0.011 4,830,000.00 52,164.00
Paku Campuran Kg 0.100 32,200.00 3,220.00
Halaman 63 dari 132
55,384.00
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.005 194,700.00 973.50
64,895.03
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas I M3 0.011 4,830,000.00 52,164.00
Paku Campuran Kg 0.050 32,200.00 1,610.00
53,774.00
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.005 194,700.00 973.50
64,895.03
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.028 3,680,000.00 103,040.00
Paku Campuran Kg 0.150 32,200.00 4,830.00
107,870.00
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.008 194,700.00 1,557.60
131,570.54
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.028 3,680,000.00 103,040.00
Paku Campuran Kg 0.150 32,200.00 4,830.00
Lem Kayu Kg 0.560 48,875.00 27,370.00
Teakwood 4 mm Lembar 0.860 174,915.00 150,426.90
285,666.90
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.450 202,910.40 91,309.68
Kepala Tukang Oh 0.045 246,272.40 11,082.26
Mandor Oh 0.008 194,700.00 1,557.60
131,570.54
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
Halaman 64 dari 132
( Rp )
A BAHAN
kayu Kelas II M3 0.028 3,680,000.00 103,040.00
Paku Campuran Kg 0.150 32,200.00 4,830.00
Lem Kayu Kg 0.560 48,875.00 27,370.00
Teakwood 4 mm Lembar 0.860 174,915.00 150,426.90
285,666.90
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.600 202,910.40 121,746.24
Kepala Tukang Oh 0.060 246,272.40 14,776.34
Mandor Oh 0.010 194,700.00 1,947.00
175,297.58
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
kayu Kelas II M3 0.007 3,680,000.00 25,760.00
Paku Campuran Kg 0.100 32,200.00 3,220.00
Paku Skrup 10 Cm Kg 0.150 25,530.00 3,829.50
32,809.50
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Kayu Oh 1.800 202,910.40 365,238.72
Kepala Tukang Oh 0.180 246,272.40 44,329.03
Mandor Oh 0.030 194,700.00 5,841.00
525,892.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Teakwood 4 mm Lmb 0.400 174,915.00 69,966.00
Paku 1 Cm - 2.5 Cm Kg 0.050 43,700.00 2,185.00
72,151.00
B TENAGA
Pekerja Oh 0.025 184,140.00 4,603.50
Tukang Kayu Oh 0.075 202,910.40 15,218.28
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.001 194,700.00 194.70
21,986.66
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bilik bambu Lmb 1.500 26,565.00 39,847.50
Kaso-kaso (5 x 7) cm M3 0.014 2,300,000.00 32,200.00
Paku Campuran Kg 0.012 32,200.00 386.40
List kayu 2/4 M3 0.003 17,250.00 51.75
72,485.65
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.005 194,700.00 973.50
30,764.38
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Profil Alminium 4" m 1.100 97,980.00 107,778.00
Sealant Tube 0.060 32,430.00 1,945.80
Skrup fixer Buah 2.000 23,000.00 46,000.00
155,723.80
B TENAGA
Pekerja Oh 0.043 184,140.00 7,918.02
Tukang Alluminium Oh 0.043 202,910.40 8,725.15
Kepala Tukang Oh 0.004 246,272.40 1,058.97
Mandor Oh 0.002 194,700.00 408.87
18,111.01
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Profil Alminium 4" M' 4.400 97,980.00 431,112.00
Kaca Bening 5 mm M2 1.000 210,910.00 210,910.00
Sealant M' 4.500 32,430.00 145,935.00
787,957.00
B TENAGA
Pekerja Oh 0.085 184,140.00 15,651.90
Tukang Alluminium Oh 0.085 202,910.40 17,247.38
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
36,089.24
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bubungan Genteng Metal M1 1.100 86,135.00 94,748.50
Paku Campuran Kg 0.050 32,200.00 1,610.00
96,358.50
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Kayu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.013 194,700.00 2,531.10
82,696.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Genteng Metal m2 1.020 105,225.00 107,329.50
Paku Campuran Kg 0.200 32,200.00 6,440.00
113,769.50
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.001 194,700.00 194.70
59,776.46
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Seng Pelat Bubungan M1 0.300 53,590.00 16,077.00
Paku Campuran Kg 0.040 32,200.00 1,288.00
17,365.00
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.070 202,910.40 14,203.73
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.006 194,700.00 1,168.20
44,963.11
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Seng gelombang BJLS 25 m2 0.700 75,555.00 52,888.50
Paku Seng Kg 0.020 46,000.00 920.00
53,808.50
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Tukang Kayu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.006 194,700.00 1,168.20
36,917.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Papan Klas I M3 0.040 4,830,000.00 193,200.00
Lem Kayu Kg 0.500 48,875.00 24,437.50
217,637.50
B TENAGA
Pekerja Oh 1.000 56,000.00 56,000.00
Tukang Kayu Terampil Oh 3.000 79,000.00 237,000.00
Halaman 67 dari 132
Kepala Tukang Oh 0.300 88,000.00 26,400.00
Mandor Oh 0.050 93,000.00 4,650.00
324,050.00
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Engsel Pintu Kuningan bh 1.000 64,170.00 64,170.00
64,170.00
B TENAGA
Pekerja Oh 0.015 184,140.00 2,762.10
Tukang Kayu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.001 194,700.00 155.76
37,048.51
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kunci Pintu 1 Slaag Kualitas baik bh 1.000 278,300.00 278,300.00
278,300.00
B TENAGA
Pekerja Oh 0.010 184,140.00 1,841.40
Tukang Kayu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
106,732.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu kelas I m3 0.020 2,228,900.00 43,686.44
Paku Tripleks Kg 0.050 25,000.00 1,250.00
Teakwood 3 mm m2 1.000 122,100.00 122,100.00
Teakwood Lapis Almunium m2 0.500 99,470.00 49,735.00
216,771.44
B TENAGA
Pekerja Oh 0.600 56,000.00 33,600.00
Tukang Kayu Terampil Oh 2.000 79,000.00 158,000.00
Kepala Tukang Oh 0.200 88,000.00 17,600.00
Mandor Oh 0.030 93,000.00 2,790.00
211,990.00
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Asbes semen m2 1.100 #N/A #N/A
Paku tripleks Kg 0.010 43,700.00 437.00
#N/A
B TENAGA
Pekerja Oh 0.030 184,140.00 5,524.20
Tukang Kayu Oh 0.070 202,910.40 14,203.73
Kepala Tukang Oh 0.007 246,272.40 1,723.91
Mandor Oh 0.004 194,700.00 778.80
22,230.63
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Akustik Lembar 12.000 #N/A #N/A
Paku tripleks Kg 0.050 43,700.00 2,185.00
#N/A
B TENAGA
Pekerja Oh 0.120 184,140.00 22,096.80
Halaman 69 dari 132
Tukang Kayu Oh 0.120 202,910.40 24,349.25
Kepala Tukang Oh 0.012 246,272.40 2,955.27
Mandor Oh 0.006 194,700.00 1,168.20
50,569.52
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Akustik Lembar 5.800 #N/A #N/A
Paku tripleks Kg 0.050 43,700.00 2,185.00
#N/A
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
42,141.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Akustik Lembar 1.500 #N/A #N/A
Paku tripleks Kg 0.050 43,700.00 2,185.00
#N/A
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
42,141.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Tripleks 5 mm Lembar 0.375 101,200.00 37,950.00
Paku tripleks Kg 0.030 43,700.00 1,311.00
39,261.00
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
42,141.26
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu papan Kelas II M3 0.015 50.00 0.75
Paku tripleks Kg 0.010 43,700.00 437.00
Halaman 70 dari 132
437.75
B TENAGA
Pekerja Oh 0.800 184,140.00 147,312.00
Tukang Kayu Oh 0.800 202,910.40 162,328.32
Kepala Tukang Oh 0.080 246,272.40 19,701.79
Mandor Oh 0.040 194,700.00 7,788.00
337,130.11
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Gypsum board Lembar 0.364 #N/A #N/A
Paku tripleks Kg 0.110 43,700.00 4,807.00
#N/A
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.005 194,700.00 973.50
30,764.38
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
List Profil Gypsum M' 1.050 31,855.00 33,447.75
Tepung Gypsum Kg 0.150 47,380.00 7,107.00
40,554.75
B TENAGA
Pekerja Oh 0.060 184,140.00 11,048.40
Tukang Kayu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.003 194,700.00 584.10
25,284.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
list profil Gipsum M' 1.050 #REF! #REF!
Tepung Kalsium Kg 0.150 #REF! #REF!
#REF!
B TENAGA
Pekerja Oh 0.060 56,000.00 3,360.00
Tukang Kayu Terampil Oh 0.060 79,000.00 4,740.00
Kepala Tukang Oh 0.006 88,000.00 528.00
Mandor Oh 0.003 93,000.00 279.00
8,907.00
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Profil Alluminium "T" M' 3.600 #N/A #N/A
Kawat diameter 4 mm Kg 0.150 #N/A #N/A
Ramset Buah 1.050 #N/A #N/A
Akustik 60 cm x 120 cm Lembar 1.500 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.500 184,140.00 92,070.00
Tukang Kayu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.050 246,272.40 12,313.62
Mandor Oh 0.025 194,700.00 4,867.50
210,706.32
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
List kayu profil M' 1.050 20,815.00 21,855.75
Paku Campuran Kg 0.010 32,200.00 322.00
22,177.75
B TENAGA
Pekerja Oh 0.050 184,140.00 9,207.00
Tukang Kayu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.003 194,700.00 584.10
21,167.98
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Besi Hollow M1 1.100 44,275.00 48,702.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas II M3 0.016 3,680,000.00 59,984.00
Paku Campuran Kg 0.250 32,200.00 8,050.00
68,034.00
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.300 202,910.40 60,873.12
Kepala Tukang Oh 0.030 246,272.40 7,388.17
Mandor Oh 0.010 194,700.00 1,947.00
107,036.29
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Paving Blok m2 1.100 3,421.25 3,763.38
3,763.38
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.400 202,910.40 81,164.16
Kepala Tukang Oh 0.080 246,272.40 19,701.79
Mandor Oh 0.060 194,700.00 11,682.00
223,031.95
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Paving Blok Bh 33.000 3,421.25 112,901.25
PP M3 0.100 455,400.00 45,540.00
158,441.25
B TENAGA
Pekerja Oh 0.600 184,140.00 110,484.00
Tukang Batu Oh 0.400 202,910.40 81,164.16
Kepala Tukang Oh 0.080 246,272.40 19,701.79
Mandor Oh 0.060 194,700.00 11,682.00
223,031.95
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Fitting lengkap Bh 1.000 90,000.00 90,000.00
90,000.00
B TENAGA
Pekerja Oh 1.200 184,140.00 220,968.00
Kepala Tukang Oh 0.650 246,272.40 160,077.06
Mandor Oh 0.120 194,700.00 23,364.00
404,409.06
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Lampu Down Light (DL) PL 25 watt Set 1.000 90,000.00 90,000.00
Trafo dan aksesories Harga 0.200
Upah Pemasangan Ls 0.150
90,000.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Lampu Down Light (DL) PL 25 watt Set 1.000 90,000.00 90,000.00
Trafo dan aksesories Harga 0.200
Upah Pemasangan Ls 0.150
90,000.00
Kuantitas Pekerjaan : 1 M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Meni Kayu Kg 0.200 31,855.00 6,371.00
Dempul Kayu Kg 0.150 47,150.00 7,072.50
Cat Kayu / Besi Kg 0.350 51,290.00 17,951.50
31,395.00
B TENAGA
Pekerja Oh 0.070 184,140.00 12,889.80
Tukang Cat Oh 0.105 202,910.40 21,305.59
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.003 194,700.00 486.75
35,667.23
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Vernis Kg 0.200 75,670.00 15,134.00
15,134.00
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Cat Oh 0.020 202,910.40 4,058.21
Kepala Tukang Oh 0.120 246,272.40 29,552.69
Mandor Oh 0.010 194,700.00 1,947.00
72,385.90
C ALAT
Kuantitas Pekerjaan : 1 M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Dasar Dulux emultion Kg 0.100 127,995.00 12,799.50
Cat Tembok Dulux Kg 0.260 117,070.00 30,438.20
43,237.70
B TENAGA
Pekerja Oh 0.020 184,140.00 3,682.80
Tukang Cat Oh 0.063 202,910.40 12,783.36
Kepala Tukang Oh 0.006 246,272.40 1,551.52
Mandor Oh 0.003 194,700.00 486.75
18,504.42
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Meni Kg 0.100 #N/A #N/A
Kuas Cat Bh 0.010 #N/A #N/A
#N/A
B TENAGA
Pekerja Oh 0.020 56,000.00 1,120.00
Tukang Cat Oh 0.200 79,000.00 15,800.00
Kepala Tukang Oh 0.020 88,000.00 1,760.00
Mandor Oh 0.010 93,000.00 930.00
19,610.00
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plamir Tembok Kg 0.100 12,880.00 1,288.00
Cat Dasar Dulux emultion Kg 0.100 127,995.00 12,799.50
Cat Tembok Dulux Kg 0.260 117,070.00 30,438.20
44,525.70
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kansteen Bh 3.000 15,000.00 45,000.00
Semen Kg 0.030 92,805.00 2,784.15
Pasir Kg 0.010 455,400.00 4,554.00
52,338.15
B TENAGA
Pekerja Oh 0.020 184,140.00 3,682.80
Tukang Cat Oh 0.063 202,910.40 12,783.36
Kepala Tukang Oh 0.006 246,272.40 1,551.52
Mandor Oh 0.003 194,700.00 486.75
18,504.42
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium M' 45.690 125,925.00 5,753,513.25
Bingkai jendela aluminium M' 16.640 118,450.00 1,971,008.00
Kaca Rayban 5 mm M2 2.712 215,740.00 585,173.18
Daun pintu panil Aluminium Type A Unit 1.000 2,300,000.00 2,300,000.00
Handle + kunci stainless pintu aluminium Psg 1.000 517,500.00 517,500.00
Kunci pintu Bh 1.000 276,000.00 276,000.00
Engsel pintu Bh 2.000 50,600.00 101,200.00
Expanyolet Set 2.000 20,700.00 41,400.00
Windows hinger Set 2.000 57,500.00 115,000.00
Karet dan silent M' 1.000 4,025.00 4,025.00
Angker/fisher Btg 8.000 9,200.00 73,600.00
11,738,419.43
B TENAGA
Pekerja Oh 7.717 184,140.00 1,421,045.21
Tukang Alluminium Oh 9.483 202,910.40 1,924,199.32
Kepala Tukang Oh 1.243 246,272.40 306,018.08
Mandor Oh 0.296 194,700.00 57,554.88
3,708,817.49
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium m' 6.840 125,925.00 861,327.00
Bingkai jendela aluminium m' 2.320 118,450.00 274,804.00
Kaca Rayban 5 mm m2 0.158 215,740.00 34,173.22
Daun pintu panil Aluminium Type B unit 1.000 2,012,500.00 2,012,500.00
Handle + kunci stainless pintu aluminium psg 1.000 517,500.00 517,500.00
Kunci pintu bh 1.000 276,000.00 276,000.00
Engsel pintu bh 4.000 50,600.00 202,400.00
Expanyolet set 1.000 20,700.00 20,700.00
Karet dan silent m' 2.000 4,025.00 8,050.00
Angker/fisher btg 4.000 9,200.00 36,800.00
4,244,254.22
B TENAGA
Pekerja Oh 8.331 184,140.00 1,534,033.51
Tukang Alluminium Oh 11.649 202,910.40 2,363,703.25
Kepala Tukang Oh 1.341 246,272.40 330,349.80
Mandor Oh 0.319 194,700.00 62,131.11
4,290,217.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium m' 4.940 125,925.00 622,069.50
Kaca Rayban 5 mm m2 - 215,740.00 -
Daun pintu panil Aluminium Type B unit 1.000 2,012,500.00 2,012,500.00
Handle + kunci stainless pintu aluminium psg 1.000 517,500.00 517,500.00
Kunci pintu bh 1.000 276,000.00 276,000.00
Engsel pintu bh 4.000 50,600.00 202,400.00
Expanyolet set 1.000 20,700.00 20,700.00
Angker/fisher btg 2.000 9,200.00 18,400.00
3,669,569.50
B TENAGA
Pekerja Oh 8.331 184,140.00 1,534,033.51
Tukang Alluminium Oh 11.649 202,910.40 2,363,703.25
Kepala Tukang Oh 1.341 246,272.40 330,349.80
Mandor Oh 0.319 194,700.00 62,131.11
4,290,217.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium m' 6.560 125,925.00 826,068.00
Bingkai jendela aluminium m' 3.120 118,450.00 369,564.00
Kaca Rayban 5 mm m2 0.360 215,740.00 77,666.40
Daun pintu panil Aluminium Type A unit 1.000 2,300,000.00 2,300,000.00
Handle + kunci stainless pintu aluminium psg 1.000 517,500.00 517,500.00
Kunci pintu bh 1.000 276,000.00 276,000.00
Engsel pintu bh 4.000 50,600.00 202,400.00
Expanyolet set 1.000 20,700.00 20,700.00
Karet dan silent m' 2.760 4,025.00 11,109.00
Angker/fisher btg 6.000 9,200.00 55,200.00
4,656,207.40
B TENAGA
Pekerja Oh 8.331 184,140.00 1,534,033.51
Tukang Alluminium Oh 11.649 202,910.40 2,363,703.25
Kepala Tukang Oh 1.341 246,272.40 330,349.80
Mandor Oh 0.319 194,700.00 62,131.11
4,290,217.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium m' 9.460 125,925.00 1,191,250.50
Bingkai jendela aluminium m' 10.800 118,450.00 1,279,260.00
Kaca Rayban 5 mm m2 1.450 215,740.00 312,823.00
Windows hinger set 2.000 57,500.00 115,000.00
Grendel jendela set 2.000 20,700.00 41,400.00
Engsel jendela bh 4.000 39,675.00 158,700.00
Karet dan silent m' 10.480 4,025.00 42,182.00
Angker/fisher btg 6.000 9,200.00 55,200.00
3,195,815.50
B TENAGA
Pekerja Oh 8.331 184,140.00 1,534,033.51
Tukang Alluminium Oh 11.649 202,910.40 2,363,703.25
Kepala Tukang Oh 1.341 246,272.40 330,349.80
Mandor Oh 0.319 194,700.00 62,131.11
4,290,217.67
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium m' 2.840 125,925.00 357,627.00
Bingkai jendela aluminium m' 2.320 118,450.00 274,804.00
Kaca Rayban 5 mm m2 0.220 215,740.00 47,462.80
Karet dan silent m' 2.220 4,025.00 8,935.50
Angker/fisher btg 4.000 9,200.00 36,800.00
725,629.30
B TENAGA
Pekerja Oh 1.573 184,140.00 289,652.22
Tukang Alluminium Oh 2.299 202,910.40 466,491.01
Kepala Tukang Oh 0.460 246,272.40 113,236.05
Mandor Oh 0.109 194,700.00 21,297.06
890,676.34
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Main Trus M1 3.000 15,000.00 45,000.00
Reng U tipe 41-33 M1 5.000 88,665.00 443,325.00
Screw 12-14x20 PC 9.000 51,290.00 461,610.00
Screw 10-16x16 PC 11.000 949,935.00
Baut dinabot PC 0.600
B TENAGA
Pekerja Oh 8.331 184,140.00 1,534,033.51
Tukang Besi Oh 11.649 202,910.40 2,363,703.25
Kepala Tukang Oh 1.341 246,272.40 330,349.80
Mandor Oh 0.319 194,700.00 62,131.11
4,290,217.67
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Atap Spandek Zincalume 0,30 Lbr 1.600 15,000.00 24,000.00
Paku atap (skrup) Kg 0.250 276,000.00 69,000.00
93,000.00
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Kayu Oh 0.250 202,910.40 50,727.60
Kepala Tukang Oh 0.028 246,272.40 6,772.49
Mandor Oh 0.028 194,700.00 5,354.25
108,889.34
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Nok datar Zincalume Lbr 1.100 15,000.00 16,500.00
Paku atap (skrup) Kg 0.250 19,205.00 4,801.25
21,301.25
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Kayu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.013 194,700.00 2,531.10
82,696.75
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Sisalation /Aluminium Foil M2 1.050 15,000.00 15,750.00
15,750.00
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.008 194,700.00 1,557.60
40,555.48
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Hollow 20 x 40 x 0,7 mm btg 0.450 40,250.00 18,112.50
Hollow 40 x 40 x 0,7 mm btg 0.225 #N/A #N/A
Wall Angel btg 0.240 25,760.00 6,182.40
Suspention Road (pjg = 3,6 m') unit 1.000 18,400.00 18,400.00
Paku Riffet bj 8.000 2,300.00 18,400.00
#N/A
B TENAGA
Pekerja Oh 0.246 184,140.00 45,298.44
Tukang Alluminium Oh 0.256 202,910.40 51,945.06
Mandor Oh 0.035 194,700.00 6,814.50
104,058.00
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Gypsum board Lbr 0.364 #N/A #N/A
Paku skrup Kg 0.110 39,818.75 4,380.06
#N/A
B TENAGA
Pekerja Oh 0.128 184,140.00 23,569.92
Tukang Kayu Oh 0.142 202,910.40 28,813.28
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 0.035 194,700.00 6,814.50
67,817.23
Kuantitas Pekerjaan : M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
List Profil Gypsum M' 1.100 31,855.00 35,040.50
Tepung Gypsum Zak 0.250 47,380.00 11,845.00
Paku skrup Kg 0.020 39,818.75 796.38
47,681.88
B TENAGA
Pekerja Oh 0.128 184,140.00 23,569.92
Tukang Kayu Oh 0.142 202,910.40 28,813.28
Kepala Tukang Oh 0.035 246,272.40
Mandor Oh 0.035 194,700.00 6,814.50
59,197.70
Kuantitas Pekerjaan : Bh
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kloset Jongkok Buah 1.000 356,500.00 356,500.00
Semen (PC) Zak 0.120 92,805.00 11,136.60
PP M³ 0.160 455,400.00 72,864.00
440,500.60
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 1.500 202,910.40 304,365.60
Kepala Tukang Oh 1.500 246,272.40 369,408.60
Mandor Oh 0.160 194,700.00 31,152.00
889,066.20
Kuantitas Pekerjaan : Bh
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kloset Duduk / Lengkap Warna Buah 1.000 3,717,145.00 3,717,145.00
Semen (PC) Zak 0.120 92,805.00 11,136.60
PP M³ 0.160 455,400.00 72,864.00
3,801,145.60
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 1.500 202,910.40 304,365.60
Kepala Tukang Oh 1.500 246,272.40 369,408.60
Mandor Oh 0.160 194,700.00 31,152.00
889,066.20
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 0.5" M' 1.200 26,910.00 32,292.00
Perlengkapan Harga 0.350 26,910.00 9,418.50
pipa 41,710.50
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 3/4" M' 1.200 36,340.00 43,608.00
Perlengkapan Harga 0.350 36,340.00 12,719.00
pipa 56,327.00
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 4" AW M' 1.200 351,095.00 421,314.00
Perlengkapan Harga 0.350 #N/A
pipa 421,314.00
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 2" M' 1.200 110,860.00 133,032.00
Perlengkapan Harga 0.350 110,860.00 38,801.00
pipa 171,833.00
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Wastafel Warna Kualitas Baik M' 1.000 2,348,645.00 2,348,645.00
Kaca Cermin M2 1.000 287,500.00 287,500.00
Perlengkapan Harga 0.350 2,348,645.00 822,025.75
Semen (PC) Zak 0.120 92,805.00 11,136.60
PP M³ 0.010 455,400.00 4,554.00
3,473,861.35
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 1.450 202,910.40 294,220.08
Kepala Tukang Oh 0.150 246,272.40 36,940.86
Mandor Oh 0.100 194,700.00 19,470.00
534,770.94
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Floor Drain Bh 1.000 46,000.00 46,000.00
Upah Memasang Oh 0.100 46,000.00 4,600.00
50,600.00
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kran (Kualitas Baik) dari Stainless uk 1/2" Bh 1.000 88,665.00 88,665.00
Upah Memasang Oh 0.100 88,665.00 8,866.50
97,531.50
SPESIFIKASI HARGA
NO JENIS BAHAN MERK / MOFDEL SATUAN SATUAN KET
UKURAN (Rp)
1 2 3 4 11
1 Semen (PC) 50 kg Zak 87,700.00
Kg 1,600.00
2 Semen warna Kg 12,800.00
-
3 Kawat Beton Kg 16,700.00
4 Kawat Bronjong Kg 14,000.00
5 Kawat Duri Kg 16,700.00
BESI BETON -
Besi Strip -
6 Besi Beton Dia. 6 mm Staf 1,400.00
7 Besi Beton Dia. 8 mm Staf 12,600.00
8 Besi Beton Dia. 10 mm Staf 28,300.00
9 Besi Beton Dia. 12 mm Staf 50,700.00 4,225.00
10 Besi Beton Dia. 14 mm Staf 72,200.00
11 Besi Beton Dia. 16 mm Staf 108,100.00 9,008.33
12 Besi Beton Dia. 19 mm Staf 161,700.00
13 Besi Beton Dia. 20 mm Staf 219,700.00
14 Besi Beton Dia. 25 mm Staf 365,500.00
15 Besi Beton Dia. 32 mm Staf 478,900.00
PAKU -
16 Paku Campuran Kg 20,400.00
17 Paku Tripleks Kg 25,900.00
18 Paku Seng Kg 25,900.00
19 Paku Beton Kg 25,900.00
TRIPLEKS -
Gypsum 9 mm -
-
20 Teakwood 3 mm Uk. 122 x 244 cm Lbr 121,300.00
20 Teakwood 4 mm Uk. 122 x 244 cm Lbr 121,300.00
20 Teakwood 9 mm Uk. 122 x 244 cm Lbr 152,100.00
21 Tripleks 3 mm Uk. 122 x 244 cm Lbr 116,900.00
Tripleks 4 mm Uk. 122 x 244 cm Lbr 94,300.00
22 Tripleks 5 mm Uk. 122 x 244 cm Lbr 97,100.00
23 Tripleks 8 mm Uk. 122 x 244 cm Lbr 122,500.00
24 Tripleks 10 mm Uk. 122 x 244 cm Lbr 140,600.00
25 Tripleks 20 mm Uk. 122 x 244 cm Lbr 310,000.00
PIPA -
26 Pipa Galvanis Medium B Uk. 1/2 " M1 139,500.00
27 Pipa Galvanis Medium B Uk. 3/4 " M1 185,700.00
28 Pipa Galvanis Medium B Uk. 1 " M1 214,800.00
29 Pipa Galvanis Medium B Uk. 11/4 " M1 179,800.00
-
30 Pipa GIP Medium A Uk. 1/2 " M1 526,600.00
31 Pipa GIP Medium A Uk. 3/4 " M1 232,200.00
-
32 Pipa PVC Uk. 1/2 " M1 5,800.00
33 Pipa PVC Uk. 3/4 " M1 7,100.00
34 Pipa PVC Uk. 1 " M1 8,800.00
35 Pipa PVC Uk. 11/4 " M1 10,200.00
36 Pipa PVC Uk. 11/2 " M1 11,900.00
37 Pipa PVC Uk. 2 " M1 13,000.00
38 Pipa PVC Uk. 3 " M1 21,400.00
39 Pipa PVC Uk. 4 " M1 35,000.00
-
40 Knee PVC Uk. 1/2 " Bh 1,800.00
41 Knee PVC Uk. 3/4 " Bh 1,800.00
42 Knee PVC Uk. 1 " Bh 2,400.00
43 Knee PVC Uk. 11/4 " Bh 4,000.00
44 Knee PVC Uk. 11/2 " Bh 5,700.00
45 Knee PVC Uk. 2 " Bh 7,300.00
46 Knee PVC Uk. 3 " Bh 13,400.00
47 Knee PVC Uk. 4 " Bh 16,700.00
BATA DAN PAVING -
48 Batu Bata Bh 3,100.00
49 Paving Stone Bh 3,600.00
50 Bowling Bh 23,500.00
BESI SIKU -
51 Besi Siku Uk. 30.30.3 M' 76,500.00
52 Besi Siku Uk. 40.40.4 M' 142,300.00
53 Besi Siku Uk. 50.50.5 M' 187,700.00
Besi Plat 1"x 1/8'x6m Bh -
ATAP DAN TEGEL -
54 Seng Gelombang BJLS 0.20 mm Lbr 52,800.00
55 Seng Gelombang BJLS 0.25 mm Lbr 66,600.00
56 Seng Gelombang BJLS 0.30 mm Lbr 77,000.00
57 Seng Pelat Bubungan BJLS 0.25 mm Lbr 75,700.00
58 Atap Asbes Gelombang Lbr 72,000.00
59 Genteng Semen (Beton) Bh 49,700.00
Genteng Metal Tbl 2 mm Lmbr 60,900.00
Tbl 3 mm Lmbr 60,900.00
-
60 Tegel Semen 30 x 30 cm M2 69,300.00
61 Tegel Semen 20 x 20 cm M2 63,200.00
62 Tegel Porselin 10 x 20 cm M2 50,100.00
63 Tegel Porselin 10 x 10 cm M2 50,100.00
64 Tegel Keramik 10 x 20 cm M2 55,600.00
65 Tegel Keramik 20 x 20 cm M2 55,600.00
66 Tegel Keramik 20 x 25 cm M2 61,100.00
67 Tegel Keramik 30 x 30 cm M2 72,100.00
68 Tegel Keramik 40 x 40 cm M2 83,100.00
CAT -
69 Cat Kayu / Besi Glotex Kg 40,100.00
70 Cat Kayu / Besi Platone Kg 37,000.00
71 Cat Tembok Metrolite 1 Kg 22,700.00
72 Cat Tembok Catilac 5 Kg 98,200.00
-
73 Cat Meni Kayu Altex Kg 22,000.00
74 Cat Meni Besi Altex Kg 29,300.00
75 Minyak Cat Thinner Liter 23,800.00
76 Minyak Cat Afduner Liter 9,900.00
77 Pelumas / Olie Liter 43,100.00
78 Dempul Kayu Altex Kg 32,200.00
79 Plamir Tembok Buyo 5 Kg 37,700.00
80 Kuas Cat 4 " Bh 12,300.00
Kuas Cat 21/2 " Bh -
Ampelas Bh 6,800.00
Residu Liter 17,200.00
KACA -
81 Kaca Rayban 3 mm M2 214,500.00
82 Kaca Rayban 5 mm M2 214,500.00
83 Kaca Bening 2 mm M2 53,100.00
84 Kaca Bening 3 mm M2 155,900.00
85 Kaca Bening 5 mm M2 210,400.00
85 Kaca Bening 8 mm M2 -
85 Kaca Bening 12 mm M2 -
85 Gasket Kaca M' 7,400.00
Jendela Nako 5 mm Bh 42,900.00
RAngka Nako Lengap Terali Set 92,200.00
SANITAIR -
86 Kran (Kualitas Baik) dari Stainless uk 1/2" Bh 60,900.00
87 Avour / Saringan Air Kotor bahan Stainless Bh 73,000.00
88 Avour / Saringan Air Kotor bahan Plastik Halus Bh 30,100.00
89 Kloset Jongkok INA Bh 276,900.00
90 Kloset Jongkok TOTO Bh 276,900.00
91 Kloset Duduk / Lengkap Polos INA Bh 2,003,800.00
92 Kloset Duduk / Lengkap Warna TOTO Bh 3,032,300.00
93 Wastafel Warna Kualitas Baik Tanpa Kaki INA / TOTO Bh 551,800.00
92 Urinoir TOTO Bh 501,600.00
Kran (Kualitas Baik) dari Stainless uk 3/4" Bh 30,600.00
Kran (Kualitas Baik) bahan Kuningan uk 3/4" Bh 66,900.00
Kran (Kualitas Baik) bahan Kuningan uk 1/2" Bh 30,600.00
Kran Bathub Bh 91,100.00
Kran Wastafel Bh 103,200.00
Stop kran 1/2 " Bh 54,800.00
Hand shower Kualitas Baik Bh 151,600.00
Bak Cuci Piring Stainless 1 Bak Bh 371,000.00
Bak Cuci Piring Stainless 2 Bak Bh 673,500.00
Bak Kamar Mandi Fiber Bh 624,200.00
Profil Tank 1000 Ltr Bh 2,178,000.00
IJUK Kg 11,200.00
KUNCI DAN PENGGANTUNG -
94 Kunci Pintu 1 Slaag Kualitas baik Cap Kuda Terbang Bh 151,400.00
95 Kunci Pintu 2 Slaag Cap SES Bh 182,800.00
Grendel pintu 19,400.00
Grendel pintu (Espanyolet) 51,300.00
96 Grendel Jendela Bh 9,000.00
97 Kait Angin Kuningan Bh 18,300.00
98 Engsel Jendela Kuningan Bh 30,400.00
99 Engsel Pintu Kuningan Bh 54,600.00
Gembok Kunci Slot Besar Bh 37,800.00
LIST PROFIL DAN MUR -
100 Lis Profil 5 cm M' 18,100.00
101 Kertas Ampelas Lbr 4,900.00
102 Mur / Baut / Beugel / Angker Kg 22,200.00
LISITRIK -
103 Box Sekring 1 Group Bh 165,200.00
104 Box Sekring 2 Group Bh 220,200.00
-
105 MCB 2 Ampere Bh 16,700.00
106 MCB 4 Ampere Bh 16,700.00
107 MCB 6 Ampere Bh 16,700.00
108 MCB 10 Ampere Bh 16,700.00
-
109 Saklar Tunggal Tanam Bh 33,200.00
110 Saklar Ganda Tanam Bh 55,200.00
111 Saklar Tunggal Timbul Bh 33,200.00
112 Saklar Ganda Timbul Bh 55,200.00
113 Stop Kontak Tanam Bh 33,200.00
114 Stop Kontak Timbul Bh 33,200.00
115 Titik Lampu Bh 55,200.00
-
-
116 Lampu TL 1X20 Watt Bh 18,500.00
117 Lampu TL 2X20 Watt Bh 18,500.00
118 Lampu TL 2X40 Watt Bh 18,500.00
119 Lampu Pijar 25 Watt Bh 5,200.00
120 Lampu Pijar 40 Watt Bh 5,200.00
121 Lampu Pijar 60 Watt Bh 5,200.00
122 Lampu Pijar 75 Watt Bh 5,200.00
123 Lampu Pijar 100 Watt Bh 7,700.00
124 Lampu Jari-jari 14 Watt Philips Bh 33,700.00
125 Lampu Jari-jari 25 Watt Philips Bh 49,900.00
126 Lampu SL 25 Watt Bh 82,700.00
127 Lampu Neon 2x20 Watt dan Armaturnya 2x20 Watt Bh 145,700.00
128 Panel Lengkap dengan Aksesori Bh 2,750,500.00
129 Kabel Listrik NYY 2x 11/2mm M1 8,500.00
130 Kabel Listrik NYM 4x4 mm M1 17,600.00
131 Boks Saklar M1 2,900.00
132 Pipa Listrik PVC 3/4" Bh 32,800.00
133 T Dos Bh 2,900.00
134 Knee Bh 1,800.00
135 Klam Bh 13,400.00
136 Solasi Ban Dos 9,000.00
137 MCB dan Boks -
138 10 Ampere Bh 71,700.00
139 40 Ampere Bh 154,200.00
140 50 Ampere Bh 176,200.00
141 130 Ampere Bh 352,200.00
142 260 Ampere Bh 563,400.00
143 Saklar AC Bh 24,900.00
144 Saklar Ganda Bh 28,800.00
145 Saklar Tunggal Bh 17,800.00
146 Saklar Dobel Ganda Bh 57,400.00
147 Lampu Down Light lengkap dengan Armaturnya Bh 132,500.00
148 Kabel Penangkal Petir M1 102,300.00
149 Besi Plat/ Elektroda 2,5 mm Lempeng 24,400.00
150 Pengait Kabel Penangkap Petir dan Kelengkapannya M1 132,200.00
ANALISA SNI BONGKARAN DAN PEMBERSIHAN
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A TENAGA
Pekerja Oh 0.015 184,140.00 2,762.10
Mandor Oh 0.003 194,700.00 584.10
Amplas lbr 0.500 9,545.00 4,772.50
Alat Bantu % 1.000 10,000.00 10,000.00
18,118.70
C JUMLAH 18,118.70
D HARGA SATUAN 18,118.70
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Mandor Oh 0.010 194,700.00 1,947.00
20,361.00
C JUMLAH 20,361.00
D HARGA SATUAN 20,361.00
ANALISA TANAH
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PU M3 1.200 444,475.00 533,370.00
B TENAGA 533,370.00
Pekerja Oh 0.300 184,140.00 55,242.00
Mandor Oh 0.010 194,700.00 1,947.00
57,189.00
C JUMLAH (A+B) 590,559.00
D HARGA SATUAN 590,559.00
ANALISA SNI PASANGAN PONDASI
ANALISA HARGA SATUAN
Uraian Pekerjaan : Memasang 1 m3 batu kosong (anstamping)
Kuantitas Pekerjaan : 1 M3
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 - 20 cm M3 1.200 459,200.00 551,040.00
PU M3 0.432 444,475.00 192,013.20
743,053.20
B TENAGA
Pekerja Oh 0.780 184,140.00 143,629.20
Tukang Batu Oh 0.390 202,910.40 79,135.06
Kepala Tukang Oh 0.039 246,272.40 9,604.62
Mandor Oh 0.039 194,700.00 7,593.30
239,962.18
C JUMLAH (A+B) 983,015.38
D HARGA SATUAN 983,015.38
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Belah 15 - 20 cm M3 1.200 459,200.00 551,040.00
PC Kg 136.000 1,856.10 252,429.60
PP M3 0.544 455,400.00 247,737.60
1,051,207.20
B TENAGA
Pekerja Oh 1.500 184,140.00 276,210.00
Tukang Batu Oh 0.750 202,910.40 152,182.80
Kepala Tukang Oh 0.075 246,272.40 18,470.43
Mandor Oh 0.075 194,700.00 14,602.50
461,465.73
C JUMLAH (A+B) 1,512,672.93
D HARGA SATUAN 1,512,672.93
ANALISA SNI BETON
ANALISA HARGA SATUAN
Uraian Pekerjaan : Membuat 1 m3 Beton Bertulang 1 : 2 : 3
Kuantitas Pekerjaan : M3
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 336.000 1,856.10 623,649.60
PB M3 0.540 455,400.00 245,916.00
KR M3 0.810 872,850.00 707,008.50
1,576,574.10
B TENAGA
Pekerja Oh 2.000 184,140.00 368,280.00
Tukang Batu Oh 0.350 202,910.40 71,018.64
Kepala Tukang Oh 0.035 246,272.40 8,619.53
Mandor Oh 1.000 194,700.00 194,700.00
642,618.17
C JUMLAH (A+B) 2,219,192.27
D HARGA SATUAN 2,219,192.27
ANALISA HARGA SATUAN
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 5.184 1,856.10 9,622.02
PH M3 0.026 506,000.00 13,156.00
22,778.02
B TENAGA
Pekerja Oh 0.300 184,140.00 55,242.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.015 194,700.00 2,920.50
92,293.15
C JUMLAH (A+B) 115,071.17
D HARGA SATUAN 115,071.17
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
PC Kg 3.250 1,856.10 6,032.33
6,032.33
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.010 194,700.00 1,947.00
61,528.76
C JUMLAH (A+B) 67,561.09
D HARGA SATUAN 67,561.09
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Batu Bata Press Buah 70.000 2,760.00 193,200.00
PC Kg 9.680 1,856.10 17,967.05
PP M3 0.045 455,400.00 20,493.00
231,660.05
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
84,599.06
C JUMLAH (A+B) 316,259.11
D HARGA SATUAN 316,259.11
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Hollow 20 x 40 x 0,7 mm Buah 0.545 40,250.00 21,936.25
Metal Stud M' 1.455 53,475.00 77,806.13
Rangka U runner M' 0.750 44,275.00 33,206.25
Paku Riffet Buah 8.000 2,300.00 18,400.00
151,348.63
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
84,599.06
C JUMLAH (A+B) 235,947.69
D HARGA SATUAN 235,947.69
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Gypsum Board Buah 0.545 #N/A #N/A
Paku Gypsum M' 1.455 43,700.00 63,583.50
Kompon Gypsum kg 0.500 75,000.00 37,500.00
#N/A
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
84,599.06
C JUMLAH (A+B) #N/A
D HARGA SATUAN #N/A
ANALISA SNI ALMINIUM
ANALISA HARGA SATUAN
Uraian Pekerjaan : Memasang 1 m2 Rangka Dinding Besi holow galavnis 4/6
Kuantitas Pekerjaan : 1 M2
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Hollow 40 x 60 x 1,3 mm m 4.100 58,412.07 239,489.48
Aksesoris perkuatan dll Ls 1.000 47,897.90 47,897.90
287,387.38
B TENAGA
Pekerja Oh 0.500 184,140.00 92,070.00
Tukang Besi Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.025 246,272.40 6,156.81
Mandor Oh 0.013 194,700.00 2,433.75
110,806.08
C ALAT Ls 1.000 28,738.74 28,738.74
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
SolarTuff/SolarFlat 3 mm M' 1.000 501,975.00 501,975.00
Paku skrup M' 4.500 39,818.75 179,184.38
681,159.38
B TENAGA
Pekerja Oh 0.085 184,140.00 15,651.90
Tukang Alluminium Oh 0.085 202,910.40 17,247.38
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.005 194,700.00 973.50
36,089.24
C ALAT 1.000 68,115.94 56,526.57
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kusen aluminium M' 5.500 125,925.00 692,587.50
SolarTuff/SolarFlat 3 mm M2 2.100 501,975.00 1,054,147.50
Engsel pintu Bh 3.000 50,600.00 151,800.00
Expanyolet Set 1.000 20,700.00 20,700.00
Karet dan silent M' 5.500 4,025.00 22,137.50
Angker/fisher Btg 1.000 9,200.00 9,200.00
1,950,572.50
B TENAGA
Pekerja Oh 1.050 184,140.00 193,347.00
Tukang Alluminium Oh 1.050 202,910.40 213,055.92
Kepala Tukang Oh 0.105 246,272.40 25,858.60
Mandor Oh 0.005 194,700.00 1,012.44
433,273.96
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
GRC 4 mm Lembar 0.417 109,940.00 45,844.98
Paku Gypsum Kg 0.110 43,700.00 4,807.00
50,651.98
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.050 202,910.40 10,145.52
Kepala Tukang Oh 0.005 246,272.40 1,231.36
Mandor Oh 0.005 194,700.00 973.50
30,764.38
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
List Profil Gypsum M' 1.050 31,855.00 33,447.75
Tepung Gypsum Kg 0.150 47,380.00 7,107.00
Paku Gypsum Kg 0.010 43,700.00 437.00
40,991.75
B TENAGA
Pekerja Oh 0.060 184,140.00 11,048.40
Tukang Kayu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.003 194,700.00 584.10
25,284.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Besi Hollow 40 x 40 x 0,7 mm M' 1.650 58,412.07 96,379.91
Besi Hollow 20 x 40 x 0,7 mm M' 2.300 40,250.00 92,575.00
Skrup bh 30.000 750.00 22,500.00
211,454.91
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.300 202,910.40 60,873.12
Kepala Tukang Oh 0.030 246,272.40 7,388.17
Mandor Oh 0.010 194,700.00 1,947.00
107,036.29
C ALAT
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Paving Blok Buah 48.000 3,421.25 164,220.00
PC Kg 0.050 1,856.10 92.81
164,312.81
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Batu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.050 246,272.40 12,313.62
Mandor Oh 0.001 194,700.00 253.11
160,056.93
C JUMLAH (A+B) 324,369.74
D HARGA SATUAN 324,369.74
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Hollow 20 x 40 x 0,7 mm Buah 0.545 40,250.00 21,936.25
Metal Stud M' 1.455 53,475.00 77,806.13
Rangka U runner M' 0.750 44,275.00 33,206.25
Paku Riffet Buah 8.000 2,300.00 18,400.00
151,348.63
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
84,599.06
C JUMLAH (A+B) 235,947.69
D HARGA SATUAN 235,947.69
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
GRC 4 mm Buah 0.545 109,940.00 59,917.30
Paku Gypsum M' 1.455 43,700.00 63,583.50
Kompon Gypsum kg 0.500 75,000.00 37,500.00
161,000.80
B TENAGA
Pekerja Oh 0.320 184,140.00 58,924.80
Tukang Batu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.015 194,700.00 2,920.50
84,599.06
C JUMLAH (A+B) 245,599.86
D HARGA SATUAN 245,599.86
ANALISA SNI PINTU DAN ENGSEL
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kunci Pintu 1 Slaag Kualitas baik bh 1.000 278,300.00 278,300.00
278,300.00
B TENAGA
Pekerja Oh 0.010 184,140.00 1,841.40
Tukang Kayu Oh 0.500 202,910.40 101,455.20
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.005 194,700.00 973.50
106,732.82
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Vinyl M2 1.100 137,340.76 151,074.84
Lem vinyl Kg 0.350 18,000.00 6,300.00
157,374.84
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Batu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.008 194,700.00 1,557.60
63,309.25
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Paving Kg 0.200 32,200.00 6,440.00
Cat Paving Kg 0.350 32,200.00 11,270.00
17,710.00
B TENAGA
Pekerja Oh 0.070 184,140.00 12,889.80
Tukang Cat Oh 0.105 202,910.40 21,305.59
Kepala Tukang Oh 0.004 246,272.40 985.09
Mandor Oh 0.003 194,700.00 486.75
35,667.23
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Cat Dasar Dulux emultion Kg 0.100 127,995.00 12,799.50
Cat Tembok Dulux Kg 0.260 117,070.00 30,438.20
43,237.70
B TENAGA
Pekerja Oh 0.020 184,140.00 3,682.80
Tukang Cat Oh 0.063 202,910.40 12,783.36
Kepala Tukang Oh 0.006 246,272.40 1,551.52
Mandor Oh 0.003 194,700.00 486.75
18,504.42
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plamir Tembok Kg 0.100 12,880.00 1,288.00
Cat Dasar Dulux emultion Kg 0.100 127,995.00 12,799.50
Cat Tembok Dulux Kg 0.260 117,070.00 30,438.20
44,525.70
B TENAGA
Pekerja Oh 0.020 184,140.00 3,682.80
Tukang Cat Oh 0.063 202,910.40 12,783.36
Kepala Tukang Oh 0.006 246,272.40 1,551.52
Mandor Oh 0.003 194,700.00 486.75
18,504.42
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Plamir Tembok Kg 0.100 12,880.00 1,288.00
Cat Dasar Dulux emultion Kg 0.100 127,995.00 12,799.50
Cat Tembok Dulux Kg 0.260 117,070.00 30,438.20
44,525.70
B TENAGA
Pekerja Oh 0.040 184,140.00 7,365.60
Tukang Cat Oh 0.126 202,910.40 25,566.71
Kepala Tukang Oh 0.013 246,272.40 3,103.03
Mandor Oh 0.005 194,700.00 973.50
37,008.84
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Aluminium Composit Panel Polos M2 0.694 1,437,500.00 997,625.00
paku skrup Buah 0.060 39,818.75 2,389.13
Hollow 40 x 60 x 1,3 mm M' 2.000 58,412.07 116,824.14
Sealent M' 1.200 43,010.00 51,612.00
1,116,838.26
B TENAGA
Pekerja Oh 0.043 184,140.00 7,918.02
Tukang Alluminium Oh 0.043 202,910.40 8,725.15
Kepala Tukang Oh 0.004 246,272.40 1,058.97
Mandor Oh 0.002 194,700.00 408.87
18,111.01
C ALAT % 1.000 111,683.83 111,683.83
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Inst. NYM 3X2,5 mm2 m' 10.000 14,300.00 143,000.00
Pipa PVC 20 mm2 m' 4.000 12,000.00 48,000.00
T. Dos + L Bow unit 1.000 8,000.00 8,000.00
199,000.00
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
MCB 3 Phase Bh 1.000 299,000.00 299,000.00
Perlegkapan Ls 0.350 104,650.00 36,627.50
335,627.50
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Stop Kontak Bh 1.000 38,180.00 38,180.00
Perlengkapan 0.350 13,363.00 4,677.05
42,857.05
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Saklar Ganda Bh 1.000 63,480.00 63,480.00
Perlengkapan Ls 0.350 22,218.00 7,776.30
71,256.30
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Downlight Dan Armature Bh 1.000 81,477.50 81,477.50
Lampu Philips 18 Watt Bh 1.000 66,125.00 66,125.00
147,602.50
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Downlight Dan Armature Bh 1.000 97,922.50 97,922.50
Lampu Philips 25 Watt Bh 1.000 149,500.00 149,500.00
247,422.50
B TENAGA
Pekerja Oh 0.054 184,140.00 9,943.56
Tukang Listrik Oh 0.090 202,910.40 18,261.94
Kepala Tukang Oh 0.009 246,272.40 2,216.45
Mandor Oh 0.027 194,700.00 5,256.90
35,678.85
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 3/4" M' 1.200 36,340.00 43,608.00
Perlengkapan Harga 0.350 36,340.00 12,719.00
pipa 56,327.00
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC Ø 4" AW M' 1.200 351,095.00 421,314.00
Perlengkapan Harga 0.350 351,095.00 122,883.25
pipa 544,197.25
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.002 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kran (Kualitas Baik) dari Stainless uk 1/2" Bh 1.000 88,665.00 88,665.00
Upah Memasang Oh 0.100 88,665.00 8,866.50
97,531.50
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kloset Duduk / Lengkap Warna Buah 1.000 3,717,145.00 3,717,145.00
Semen (PC) Zak 0.120 92,805.00 11,136.60
Perlengkapan Ls 0.350 3,749,626.75 1,312,369.36
5,040,650.96
B TENAGA
Pekerja Oh 1.000 184,140.00 184,140.00
Tukang Batu Oh 1.500 202,910.40 304,365.60
Kepala Tukang Oh 1.500 246,272.40 369,408.60
Mandor Oh 0.160 194,700.00 31,152.00
889,066.20
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Pipa PVC diameter 1/2" AW M' 1.200 11,037.41 13,244.90
Perlengkapan Ls 0.350 3,863.09 1,352.08
14,596.98
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.0018 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kran (Kualitas Baik) dari Stainless uk 1/2" M' 1.000 88,665.00 88,665.00
Perlengkapan Ls 0.350 31,032.75 10,861.46
99,526.46
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.0018 194,700.00 350.46
20,631.76
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Wastafel Warna Kualitas Baik M' 1.000 2,348,645.00 2,348,645.00
Kran Wastafel Buah 1.000 118,680.00 118,680.00
Perlengkapan Ls 0.350 822,025.75 287,709.01
2,755,034.01
B TENAGA
Pekerja Oh 0.036 184,140.00 6,629.04
Tukang Batu Oh 0.060 202,910.40 12,174.62
Kepala Tukang Oh 0.006 246,272.40 1,477.63
Mandor Oh 0.0018 194,700.00 350.46
20,631.76
JUMLAH Rp 167,493,363.47
PPN 10% Rp 16,749,336.35
JUMLAH TOTAL Rp 184,242,699.81
PEMBULATAN Rp 184,243,000.00
Terbilang : Seratus Delapan Puluh Empat juta Dua Ratus Empat Puluh Tiga Ribu Rupiah
Herlina Al Idrus
Direktris
RINCIAN ANGGARAN BIAYA
Jumlah Harga
Harga Satuan ( Total
No Uraian Jenis Pekerjaan Satuan Volume
Rp ) ( Rp )
I PERSIAPAN 13,132,000
1 Pek. Pengecatan Paving (1 kali Cat Dasar 1 Kali Penutup) M² 232.00 53,377 12,383,518
2 Pek. Pengecatan papan Nama dan Prasasti (Cat Eksterior) M² 23.28 63,030 1,467,341
3 Pek. Cat Plafond M² - 81,535 -
RINCIAN ANGGARAN BIAYA
Jumlah Harga
Harga Satuan ( Total
No Uraian Jenis Pekerjaan Satuan Volume
Rp ) ( Rp )
I PERSIAPAN 13,132,000
1 Pek. Pengecatan Paving (1 kali Cat Dasar 1 Kali Penutup) M² 232.00 53,377 12,383,518
2 Pek. Pengecatan papan Nama dan Prasasti (Cat Eksterior) M² 23.28 63,030 1,467,341
3 Pek. Cat Plafond M² - 81,535 -
ANALISA SNI ATAP
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Bubungan Genteng Metal M1 1.100 86,135.00 94,748.50
Paku Campuran Kg 0.050 32,200.00 1,610.00
96,358.50
B TENAGA
Pekerja Oh 0.250 184,140.00 46,035.00
Tukang Kayu Oh 0.150 202,910.40 30,436.56
Kepala Tukang Oh 0.015 246,272.40 3,694.09
Mandor Oh 0.013 194,700.00 2,531.10
82,696.75
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Genteng Metal m2 1.020 105,225.00 107,329.50
Paku Campuran Kg 0.200 32,200.00 6,440.00
113,769.50
B TENAGA
Pekerja Oh 0.200 184,140.00 36,828.00
Tukang Kayu Oh 0.100 202,910.40 20,291.04
Kepala Tukang Oh 0.010 246,272.40 2,462.72
Mandor Oh 0.001 194,700.00 194.70
59,776.46
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Seng Plat Lbr 0.30 53,590.00 16,077.00
Papan kls II M3 0.01 3,680,000.00 32,384.00
Paku Seng Kg 0.0108 46,000.00 496.80
48,461.00
B TENAGA
Pekerja Oh 0.150 184,140.00 27,621.00
Tukang Kayu Oh 0.070 202,910.40 14,203.73
Kepala Tukang Oh 0.008 246,272.40 1,970.18
Mandor Oh 0.006 194,700.00 1,168.20
44,963.11
HARGA SATUAN
No URAIAN SATUAN KUANTITAS DASAR JUMLAH Rp
( Rp )
A BAHAN
Kayu Kelas I M3 0.011 4,830,000.00 52,164.00
Paku Campuran Kg 0.050 32,200.00 1,610.00
53,774.00
B TENAGA
Pekerja Oh 0.100 184,140.00 18,414.00
Tukang Kayu Oh 0.200 202,910.40 40,582.08
Kepala Tukang Oh 0.020 246,272.40 4,925.45
Mandor Oh 0.005 194,700.00 973.50
64,895.03
Pekerjaan Kanstin
No Keterangan Ukuran Satuan
1 Panjang 56.40 M'
2 Lebar 0.20 M'
3 Tinggi 0.25 M'
Volume 2.82 M3
Luas B 2.94 M2
Luas C 0.00 M2
Pek. Buat + Pas Panel Ventilasi Kaca Mati Kayu kls I (M2)
No Keterangan Ukuran Satuan
1 Luas 0.09 M'
2 Jlh 29.00 Bh
Luas D 2.61
Jlh. Luas Total (A+B+C+D) 27.17 M2
Pek. Keramik 40 x 40
No Keterangan Ukuran Satuan
1 Luas 76.66 M2
2 M'
Luas 76.66 M2
Pek. Keramik 20 x 20
No Keterangan Ukuran Satuan
1 Luas 10.08 M2
2 M'
Luas 10.08 M2
Pekerjaan Plafond
Pek. Rangka Plafond 4/5 Kayu kls II
No Keterangan Ukuran Satuan
1 Luas 0.00 M2
Luas 0.00 M2
A UPAH KERJA
KET:
Daftar Upah Kerja Kota ternate 2021
SK Walikota Ternate tentang Standar Satuan Harga
Harga Suda termasuk Profit Pihak ketiga 10%