1 Rakhmat Hidayat Supervisi Engineer Tidak Tetap 3,990,385 1,197,115 1,995,192 7,182,692 399,038 718,269
2 Ramli, ST Inspector Tidak Tetap 2,884,615 865,385 1,442,308 5,192,308 288,462 519,231
3 Dedy Chandra, ST Quantitiy Surveyor Tidak Tetap 2,884,615 865,385 1,442,308 5,192,308 288,462 519,231
4 Anton Wijaya, ST Draftman Tetap 1,201,923 360,577 600,962 2,163,462 120,192 216,346
5 Sri Handayani, SE Administrasi Tetap 1,201,923 360,577 600,962 2,163,462 120,192 216,346
8,300,000
6,000,000
6,000,000
2,500,000
2,500,000
PERHITUNGAN BIAYA LANGSUNG PERSONIL
1 Dody Irwandi, ST Supervisi Engineer Tetap 2,884,615 865,385 1,442,308 5,192,308 288,462 519,231
2 Nopfirman Arif Rahman, SE Administrasi Tetap 1,201,923 360,577 600,962 2,163,462 120,192 216,346
6,000,000
2,500,000
RINCIAN BEBAN BIAYA PERSONIL
KEGIATAN : #REF!
PEKERJAAN : #REF!
BIDANG/ SUB BIDANG : #REF!
KUALIFIKASI : #REF!
LOKASI : #REF!
TAHUN ANGGARAN : #REF!
### #REF!
#REF! #REF! S1 Arsitektur #REF! #REF! #REF! #REF! #REF! #REF! #REF!
### #REF!
#REF! #REF! S1 Teknik Sipil #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!
PT. WAHANA KONSULTAN
YON HENDRI, ST