JUMLAH A + B Rp 16,216,216.22
PPN 11% Rp 1,783,783.78
TOTAL HARGA Rp 18,000,000.00
DIBULATKAN Rp 18,000,000.00
A TEAM LEADER
1 Gaji Dasar GD 2,000,000
2 Beban Biaya Sosial BBS 0.35 X GD 700,000
3 Beban Biaya Umum BBU 0.9 X GD 1,800,000
4 Tunjangan Penugasan TP 0.2 X GD 400,000
5 Keuntungan K 0.1 X (GD+BBS+BBU) 450,000
TOTAL 5,350,000
B ESTIMATOR
1 Gaji Dasar GD 1,400,000
2 Beban Biaya Sosial BBS 0.3 X GD 420,000
3 Beban Biaya Umum BBU 0.9 X GD 1,260,000
4 Tunjangan Penugasan TP 0.2 X GD 280,000
5 Keuntungan K 0.1 X (GD+BBS+BBU) 308,000
TOTAL 3,668,000
C DRAFTER
1 Gaji Dasar GD 1,400,000
2 Beban Biaya Sosial BBS 0.3 X GD 420,000
3 Beban Biaya Umum BBU 0.9 X GD 1,260,000
4 Tunjangan Penugasan TP 0.2 X GD 280,000
5 Keuntungan K 0.1 X (GD+BBS+BBU) 308,000
TOTAL 3,668,000
JADWAL PERENCANAAN
SATUAN KERJA : RUMAH SAKIT UMUM DAERAH LABUHA
PEKERJAAN : PERENCANAAN REHABILITASI IGD LANTAI I
LOKASI : DESA MARABOSE, KECAMATAN BACAN
JANGKA WAKTU : 20 (DUA PULUH) HARI KALENDER
TAHUN ANGGARAN : 2022
WAKTU PELAKSANAAN 20
NO URAIAN JUMLAH HARGA BOBOT
1 2 3 4 5 6 7 8
A BIAYA LANGSUNG PERSONIL Rp 12,686,000 78.23 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91
B BIAYA LANGSUNG NON PERSONIL Rp 3,530,216 21.77 1.09 1.09 2.18 1.09 1.09 2.18
9 10 11 12 13 14 15 16 17 18 19 20
3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91 3.91
3.91 6.09 3.91 5.00 5.00 6.09 3.91 5.00 5.00 5.00 5.00 6.09
43.91 50.00 53.91 58.91 63.91 70.00 73.91 78.91 83.91 88.91 93.91 100.00