JUMLAH
NO. URAIAN PEKERJAAN
(Rp)
A. PEK. PENDAHULUAN 4.300.000,00
B PEK. GALIAN DAN PAS. BATU 434.432.384,00
C PEK. PENGECATAN DAN FINISHING 15.871.425,00
FISIK 454.603.809,00
PPN 10 % 45.460.380,90
JUMLAH TOTAL 500.064.189,90
DIBULATKAN 500.000.000,00
TERBILANG = Lima Ratus Juta Rupiah =
Rumbia, .. 2014
Menyetujui Oleh
Kepala Dinas Perhubungan Dan Informatika
Kab. Bombana
1
SYAFIUDDIN KUBE,SH,M.Si
Nip. 19680612 199703 1 009