Terbilang :
Baut Ø 12 Panjang 13 cm Bh 3
Paku 2" - 5" Kg 0.08
Pekerja OH 1
Tukang OH 0.5
Kayu 8/12 m3 0.10176
#NAME? #NAME? #NAME?
Besi Strip 4.40.0,2 Btg 8
Baut Ø 12 Panjang 13 cm Bh 16
Paku 2" - 5" Kg 0.2
Pekerja OH 0.4
Tukang OH 0.2
Kayu 8/12 m3 0.07008
#NAME? #NAME? #NAME?
Besi Strip 4.40.0,2 Btg 2
Baut Ø 12 Panjang 13 cm Bh 3
Paku 2" - 5" Kg 0.08
Pekerja OH 0.4
Tukang OH 0.2
Kayu 8/12 m3 0.06336
Pek. Kuda-kuda Kayu Tipe 3 6.00 Unit
Besi Strip 4.40.0,2 Btg 2
Baut Ø 12 Panjang 13 cm Bh 4
Paku 2" - 5" Kg 0.1
Pekerja OH 0.09
Tukang OH 0.045
Pek. Rangka Gording 5/10 99.50 m²
Kayu 5/10 m3 0.009
Paku 2" - 5" Kg 0.08
Pekerja OH 0.08
Tukang OH 0.04
Pek. Penutup Atap Soka Jempol 99.50 m²
Atap Soka Jempol 80 x 170 x 0,25 Lbr 0.8928571
Paku Payung 5 cm Kg 0.1
Pekerja OH 0.05
Tukang OH 0.025
Pek. Nok atap 21.00 m'
Nok Metal Panjang 91 cm Lbr 0.8
Paku 2" - 5" Kg 0.075
Pekerja OH 0.075
Pek. Listplank GRC tebal 10 mm Tukang OH 0.1
51.50 m'
lebar 30 cm Kalsiplank GRC 0,8 x 30 P= 4 m Lbr 0.25
Paku 2" - 5" Bh 0.1
Pekerja OH 0.3
Tukang OH 0.1
#NAME? #NAME? #NAME? Batu merah Buah 70
#NAME? #NAME? #NAME?
Semen Portland (50 Kg) kg 18.95
Pasir Pasang M3 0.038
Pekerja OH 0.3
Tukang OH 0.1
Pek. Pasangan 1/2 Dinding bata
103.79 m² Batu merah Buah 70
merah 1:5
Semen Portland (50 Kg) kg 9.68
Pasir Pasang M3 0.045
Pekerja OH 0.3
Tukang OH 0.15
#NAME? #NAME? #NAME?
Semen Portland (50 Kg) kg 10.224
Pasir Pasang M3 0.02
Pekerja OH 0.3
Tukang OH 0.1
Pek. Plesteran Dinding bata 1 : 5 228.20 m²
Semen Portland (50 Kg) kg 5.184
Pasir Pasang M3 0.026
Pekerja OH 0.2
Pek. Acian Dinding bata #NAME? m² Tukang OH 0.1
Semen Portland (50 Kg) kg 3.25
Pekerja OH 0.3
Tukang OH 0.1
Pek. Pasang Roster 20 x 20 3.00 m² Roster 20 x 20 Buah 25
Semen Portland (50 Kg) kg 3.9
Pasir Pasang M3 0.03
Pekerja OH 0.1
Tukang OH 0.15
#NAME? #NAME? #NAME?
Kusen Pintu Bh 1
Paku 2" - 5" kg 0.7142857
Pekerja OH 0.1
Tukang OH 0.15
#NAME? #NAME? #NAME?
Kusen Jendela 1 Lubang Lubang 3
Paku 2" - 5" kg 0.4285714
Pekerja OH 0.1
Tukang OH 0.15
#NAME? #NAME? #NAME? Kusen Pintu Bh 1
Kusen Jendela 1 Lubang Lubang 1
Paku 2" - 5" kg 0.6428571
Pekerja OH 0.1
Tukang OH 0.15
#NAME? #NAME? #NAME? Kusen Pintu Bh 1
Kusen Jendela 1 Lubang Lubang 2
Paku 2" - 5" kg 0.6428571
Pekerja OH 0.23
#NAME? #NAME? #NAME? Tukang OH 0.35
Daun Pintu Kecil Bh 1
Pekerja OH 0.23
#NAME? #NAME? #NAME? Tukang OH 0.35
Daun Pintu Besar Bh 1
Pekerja OH 0.15
#NAME? #NAME? #NAME? Tukang OH 0.25
Daun Jendela + Kaca 5mm Bh 1
Pekerja OH 0.05
Tukang OH 0.1
#NAME? #NAME? #NAME?
Ventilasi Kayu Bh 1
Paku 2" - 5" kg 0.2857143
Pekerja OH 0,015
#NAME? #NAME? #NAME? Tukang OH 0,150
Kaca Bening 5 mm M2 1,100
Pekerja OH 0.24
Tukang OH 0.12
Keramik 60 x 60 cm Bh 3.1
#NAME? #NAME? #NAME?
Semen Portland (50 Kg) Kg 9.6
Semen Warna Kg 1.5
Pasir Pasang M3 0.045
Pekerja OH 0.7
Tukang OH 0.35
Pek. Pasangan Keramik Lantai Keramik 20 x 20 cm (Unpolish) Bh 1.05
46.50 #NAME?
20 x 20 Semen Portland (50 Kg) Kg 10.4
Semen Warna Kg 0.5
Pasir Pasang M3 0.045
Pekerja OH 0.9
Tukang OH 0.45
Pek. Pasangan Keramik Dinding Keramik 20 x 25 cm (Unpolish) Doos 1.05
31.90 m²
20 x 25 Semen Portland (50 Kg) Kg 9.3
Semen Warna Kg 1.94
Pasir Pasang M3 0.018
Pekerja OH 0.2
Pek. Rangka Kayu Palfond 5 X 7 Tukang OH 0.3
72.00 m²
Cm Kayu 5/7 m' 0.01575
Paku 2" - 5" Bh 0.25
Pekerja OH 0.1
Pek. Pasangan Penutup Tripleks Tukang OH 0.1
72.00 m²
Tebal 3,5 mm Tripleks Ukuran 120 x 240 cm T= Lbr 0.375
Paku Tripleks Bh 0.03
Pekerja OH 0.02
Tukang OH 0.063
Pek. Pengecetan Dinding #NAME? m² Plamur Tembok Kg 0.1
Cat Tembok Kg 0.1
Cat Tembok Kg 0.26
Pekerja OH 0.07
Tukang OH 0.009
Cat Meni Kayu Kg 0.2
Plamur Kayu Kg 0.15
#NAME? #NAME? #NAME? Cat Kayu Kg 0.17
Cat Kayu Kg 0.26
#NAME? #NAME? #NAME?
Rp 11,500 #NAME?
Rp 21,000 #NAME?
Rp 5,000 #NAME?
Rp 80,000 Rp 20,000.00
Rp 120,000 Rp 90,000.00
Rp 284,000.00
Rp 125,000 Rp 125,000.00
Rp 49,000 Rp 49,000.00
Rp 80,000 #NAME?
Rp 120,000 #NAME?
#NAME?
Rp 30,000 #NAME?
Rp 6,500 #NAME?
Rp 80,000 Rp 24,000.00
Rp 120,000 Rp 126,000.00
Rp 253,500.00
Rp 28,000 Rp 84,000.00
Rp 6,500 Rp 19,500.00
Rp 80,000 Rp 16,000.00
Rp 120,000 Rp 84,000.00
Rp 189,000.00
Rp 38,000 Rp 76,000.00
Rp 6,500 Rp 13,000.00
Rp 80,000 #NAME?
Rp 120,000 #NAME?
#NAME?
Rp 12,000 #NAME?
Rp 76,000 #NAME?
Rp 80,000 Rp 96,000.00
Rp 120,000 Rp 504,000.00
Rp 1,416,000.00
Rp 12,000 Rp 144,000.00
Rp 56,000 Rp 672,000.00
Rp 80,000 Rp 64,000.00
Rp 120,000 Rp 288,000.00
Rp 19,000 Rp 1,520,000.00
Rp 2,152,000.00
Rp 9,000 Rp 180,000.00
Rp 2,000 Rp 40,000.00
Rp 3,000 Rp 60,000.00
#NAME?
Rp 27,384,433
Rp 203,306,062
#NAME?
RENCANA PENGGUNAAN DANA (RPD)
PEKERJAAN : PEMBANGUNAN TOILET KECAMATAN : TANAMBULAVA
LOKASI : SMA N 3 SIGI (KAB.SIGI) KABUPATEN : SIGI
TAHUN ANGGARAN : 2022
Volume
Jumlah Pengajuan
No Uraian Kebutuhan unit/ Harga Satuan
Analisa
Analisa Satuan
1 2 3 4 5
I. Bahan/Material
1 Err:509 Err:508 Err:509 Err:509 Err:509
2 Atap Soka Jempol 80 x 170 x 0,25 mm 89 Lbr Rp 66,000 Rp 5,863,392.86
3 Batu Kali / Batu Belah 29 M3 Rp 150,000 Rp 4,297,852.80
4 Batu merah #NAME? Buah Rp 1,000 #NAME?
5 Batu Pecah 1/4 #NAME? M3 Rp 410,000 #NAME?
6 Besi Strip 4.40.0,2 #NAME? Btg Rp 48,000 #NAME?
7 Err:509 Err:508 Err:509 Err:509 Err:509
8 Paku 2" - 5" 18 Bh Rp 21,000 Rp 378,000.00
9 Baut Ø 12 Panjang 13 cm #NAME? Bh Rp 7,500 #NAME?
10 Baut Ø 12 Panjang 30 cm 0 Bh Rp 9,000 Rp -
11 Besi Ø8 #NAME? Btg Rp 68,000 #NAME?
12 Besi Ø10 #NAME? Btg Rp 87,000 #NAME?
13 Besi Ø12 #NAME? Btg Rp 138,000 #NAME?
14 Box MCB 1 Bh Rp 49,000 Rp 49,000.00
15 Cat Tembok #NAME? Kg Rp 32,400 #NAME?
16 Err:509 Err:508 Err:509 Err:509 Err:509
17 Balok Kayu
Elbow 1/2" 5/7 #NAME? Btg Rp 19,000 #NAME?
18 Elbow 3" 5 Bh Rp 3,500 Rp 17,500.00
19 16 Bh Rp 27,000 Rp 432,000.00
20 FittingDrain
Floor Lampu #NAME? Bh Rp 12,000 #NAME?
21 7 Bh Rp 33,000 Rp 231,000.00
22 Ijuk 0 m³ Rp 280,000 Rp 100,800.00
23 Kabel NYM 3 x 2,5 mm / 100 Meter 80 m' Rp 19,000 Rp 1,520,000.00
24 Err:509 Err:509 Err:509 Err:509 Err:509
25 Kalsiplank GRC 0,8 x 30 P= 4 m 13 Lbr Rp 110,000 Rp 1,416,250.00
26 Kawat Ikat Beton / Bendrat #NAME? Kg Rp 26,000 #NAME?
27 Kayu Klas III #NAME? M3 Rp 2,500,000 #NAME?
28 Kayu 5/10 1 m3 Rp 2,500,000 Rp 2,238,750.00
29 Kayu 8/12 #NAME? m3 Rp 2,500,000 #NAME?
30 Keramik 20 x 20 cm (Unpolish) 49 Doos Rp 60,000 Rp 2,929,500.00
31 Keramik
Kloset 20 x 25 cm (Unpolish)
Duduk 33 Doos Rp 65,000 Rp 2,177,175.00
32 Kloset Jongkok 3 Bh Rp 1,450,000 Rp 4,350,000.00
33 2 Bh Rp 240,000 Rp 480,000.00
34 Kran 1/2 " 5 Bh Rp 27,000 Rp 135,000.00
35 L Bow Listrik 20 Bh Rp 2,000 Rp 40,000.00
36 Lampu Essential 18 Watt 12 Bh Rp 56,000 Rp 672,000.00
37 Mangkok Listril #NAME? Bh Rp 6,500 #NAME?
38 MCB 1phase 10A 1 Bh Rp 125,000 Rp 125,000.00
39 Kayu 5/7 0 Btg Rp 10,000,000 Rp 2,835,000.00
40 Media Filter Botol Air Mineral 1 m³ Rp 250,000 Rp 182,250.00
41 Minyak Bekisting #NAME? Liter Rp 9,000 #NAME?
42 Tripleks Ukuran 120 x 240 cm T=9 mm #NAME? Lbr Rp 120,000 #NAME?
43 Nok Metal Panjang 91 cm 17 Lbr Rp 26,000 Rp 436,800.00
44 Paku 2" - 5" #NAME? Kg Rp 21,000 #NAME?
45 Paku Payung 5 cm 10 Kg Rp 31,000 Rp 308,450.00
46 Err:509 Err:508 Err:509 Err:509 Err:509
47 Pasir Beton #NAME? M3 Rp 130,000 #NAME?
48 Pasir Pasang #NAME? M3 Rp 130,000 #NAME?
49 Pasir Urug #NAME? M3 Rp 130,000 #NAME?
50 Pintu Wc Aluminium 7 Bh Rp 1,600,000 Rp 11,200,000.00
51 Pipa Listrik 5/8" 20 Btg Rp 9,000 Rp 180,000.00
52 Pipa PVC AW 1/2" 6 Btg Rp 29,000 Rp 174,000.00
53 Pipa PVC AW 2" #NAME? Btg #NAME? #NAME?
54 Pipa PVC AW 3" 8 Btg Rp 205,000 Rp 1,537,500.00
55 Pipa Galvanish dia. 1" 1 Btg Rp 500,000 Rp 333,333.33
56 Plamur Tembok #NAME? Kg Rp 13,250 #NAME?
57 Roster 20 x 20 75 Buah Rp 10,000 Rp 750,000.00
58 Saklar Tunggal 3 Bh Rp 28,000 Rp 84,000.00
59 Saklar Ganda 2 Bh Rp 38,000 Rp 76,000.00
60 Semen Portland (50 Kg) #NAME? Zak Rp 78,000 #NAME?
61 SemenDrak
Sock Warna
kran 1/2" #NAME? Kg Rp 3,500 #NAME?
62 5 Bh Rp 4,000 Rp 20,000.00
63 Tanah Urug #NAME? M3 Rp 65,000 #NAME?
64 Tangki Air Fiberglas 1100 Liter 2 Bh Rp 1,700,000 Rp 3,400,000.00
65 Tee
T Dus1/2"
Pipa 20 Bh Rp 3,000 Rp 60,000.00
66 T Pipa 3" 5 Bh Rp 3,500 Rp 17,500.00
67 5 Bh Rp 30,000 Rp 150,000.00
68 Tempat Sabun 5 Bh Rp 45,000 Rp 225,000.00
69 Tutup Manhole Besi plat t = 2 mm 3 Bh Rp 450,000 Rp 1,350,000.00
70 Urinoir #NAME? #NAME? #NAME? #NAME?
71 Wastafel 5 Bh Rp 360,000 Rp 1,800,000.00
SM K3
72 Helm proyek 6 Bh Rp 43,000 Rp 258,000.00
73 Sarung tangan 4 Pack Rp 58,000 Rp 232,000.00
74 Sepatu keselamatan untuk pekerja 6 Bh Rp 42,000 Rp 252,000.00
75 Rompi keselamatan 6.000 Psg Rp 26,000 Rp 156,000.00
Sub Total I Err:509
II Alat
1 Rp -
Sub Total II Rp -
III Upah
1 Pekerja Err:508 OH Rp 80,000.00 Err:508
2 Tukang Err:508 OH Rp 120,000.00 Err:508
(.............
..............
....)
RENCANA PENGGUNAAN DANA 30% (RPD)
PEKERJAAN : PEMBANGUNAN TOILET KECAMATAN : TANAMBULAVA
LOKASI : SMA N 3 SIGI (KAB.SIGI) KABUPATEN : SIGI
TAHUN ANGGARAN : 2022
Volume
Jumlah Pengajuan
No Uraian unit/ Harga Satuan
Kebutuhan Analisa
Satuan
1 2 3 4 5
I. Bahan/Material
1 Batu Kali / Batu Belah 25.00 M3 Rp 150,000 Rp 3,750,000.00
2 Batu merah 3432.00 Buah Rp 1,000 Rp 3,432,000.00
3 Batu Pecah 1/4 8.00 M3 Rp 410,000 Rp 3,280,000.00
4 Besi Ø8 85.00 Btg Rp 68,000 Rp 5,780,000.00
5 Besi Ø10 21.00 Btg Rp 87,000 Rp 1,827,000.00
6 Besi Ø12 75.00 Btg Rp 138,000 Rp 10,350,000.00
7 Kawat Ikat Beton / Bendrat 10.00 Kg Rp 26,000 Rp 260,000.00
8 Kayu Klas III 1.00 M3 Rp 2,500,000 Rp 2,500,000.00
9 Minyak Bekisting 4.00 Liter Rp 9,000 Rp 36,000.00
10 Tripleks Ukuran 120 x 240 cm T=9 mm 6.00 Lbr Rp 120,000 Rp 720,000.00
11 Paku 2" - 5" 10.00 Kg Rp 21,000 Rp 210,000.00
12 Pasir Beton 4.00 M3 Rp 130,000 Rp 520,000.00
13 Pasir Pasang 12.00 M3 Rp 130,000 Rp 1,560,000.00
14 Pasir Urug 12.00 M3 Rp 130,000 Rp 1,560,000.00
15 Semen Portland (50 Kg) 90.00 Zak Rp 78,000 Rp 7,020,000.00
SM K3
16 Helm proyek 6 Bh Rp 43,000 Rp 258,000.00
17 Sarung tangan 4 Pack Rp 58,000 Rp 232,000.00
18 Sepatu keselamatan untuk pekerja 6 Bh Rp 42,000 Rp 252,000.00
19 Rompi keselamatan 6.000 Psg Rp 26,000 Rp 156,000.00
Sub Total I Err:509
II Alat
1 Rp -
Sub Total II Rp -
III Upah
1 Pekerja 120.000 OH Rp 80,000.00 Rp 9,600,000.00
2 Tukang 60.000 OH Rp 120,000.00 Rp 7,200,000.00
BAHAN
A Tanah dan Pasir
A.1 Pasir Urug M3 Rp. 130,000.00
A.2 Pasir Pasang M3 Rp. 130,000.00
A.3 Pasir Beton M3 Rp. 130,000.00 Rp. 92.86 /kg
A.4 Sirtu M3 Rp. 130,000.00
A.5 Tanah Urug M3 Rp. 65,000.00
B Batu Batuan
B.1 Batu Pecah 1/4 M3 Rp. 410,000.00 Rp. 303.70 /kg
B.2 Batu Kali / Batu Belah M3 Rp. 150,000.00
B.3 Batu Bata Ukuran Bh Rp. 1,000.00
C Bahan Kayu
C,1 Kayu Klas II M3 Rp. 3,500,000.00
C,2 Kayu Klas III M3 Rp. 2,500,000.00
C,3 Kayu 8/12 M3 Rp. 2,500,000.00
C,4 Kayu 5/10 M3 Rp. 2,500,000.00
C,5 Kayu 5/7 M4 Rp. 2,500,000.00
C,6 Balok Kayu 5/7 Btg Rp. 19,000.00
D Bahan Semen
D.1 Semen Portland (50 Kg) Zak Rp. 78,000.00 1,560.00 /kg
D.2 Semen Warna kg Rp. 3,500.00
E Bahan Besi
E.1 Besi D13 Btg Rp. 182,000.00 14,556.95 /kg
E.2 Besi Ø12 Btg Rp. 138,000.00 12,953.95 /kg
E.3 Besi Ø10 Btg Rp. 87,000.00 11,759.94 /kg
E.4 Besi Ø8 Btg Rp. 68,000.00 14,361.99 /kg
E.5 Besi Strip 4.40.0,2 Btg Rp. 48,000.00
E.6 Pipa Galvanish dia. 1" Btg Rp. 500,000.00 Rp 83,333 /m
E.7 Tutup Manhole Besi plat t = 2 mm Bh Rp. 450,000.00
E.8 Menara Tandon (Besi Siku 5.5) Set Rp. 8,000,000.00
F Bahan Kawat
F.1 Kawat Ikat Beton / Bendrat Kg Rp. 26,000.00
I Bahan Plafond
I.1 Tripleks Ukuran 120 x 240 cm T=5 mm Lbr Rp. 47,000.00
I.2 Tripleks Ukuran 120 x 240 cm T=9 mm Lbr Rp. 120,000.00
I.3 Gypsum Ukuran 120 x 240 cm T=9 mm Lbr Rp. 65,000.00
I.4 Kalsiboar Ukuran 120 x 240 cm T=3,5 mm Lbr Rp. 60,000.00
I.5 Metal hollow 40.40.2 mm Btg Rp. 40,000.00 10,000.00 /m
I.6 Coumpound Kg Rp. 4,000.00
I.7 Paper Tape (75m/roll) Roll Rp. 63,000.00
I.8 List Plafond Gypsum Polos L.10 Cm, Panjang 2 m Btg Rp. 35,000.00 Rp 17,500.00 /m
J Bahan Atap
J.1 Baja Ringan C 75.75 Btg Rp - - /m
J.2 Baja Ringan C 75.65 Btg Rp - - /m
J.3 Reng U T S 40 Btg Rp - - /m
J.4 Atap Soka Jempol 80 x 170 x 0,25 mm Lbr Rp. 66,000.00
J.5 Nok Metal Panjang 91 cm Lbr Rp. 26,000.00
J.6 Kalsiplank GRC 0,8 x 30 P= 4 m Lbr Rp. 110,000.00
K Bahan Listrik
K.1 MCB 1phase 10A Bh Rp. 125,000.00
K.2 Box MCB Bh Rp. 49,000.00
K.3 Stop Kontak Bh Rp. 30,000.00
K.4 Saklar Tunggal Bh Rp. 28,000.00
K.5 Saklar Ganda Bh Rp. 38,000.00
K.6 Fitting Lampu Bh Rp. 12,000.00
K.7 Lampu Essential 23 Watt Bh Rp. 76,000.00
K.8 Lampu Essential 18 Watt Bh Rp. 56,000.00
K.9 Pipa Listrik 5/8" Btg Rp. 9,000.00
K.10 L Bow Listrik Bh Rp. 2,000.00
K.11 Tee Dus Bh Rp. 3,000.00
K.12 Mangkok Listril Bh Rp. 6,500.00
K.13 Kabel NYM 3 x 2,5 mm / 100 Meter Roll Rp. 1,900,000.00 Rp 19,000.00 /m
O Bahan Kaca
O.1 Kaca Bening 5 mm M2 Rp. 105,000.00
P Bahan Sanitasi
P.1 Kran 1/2 " Bh Rp. 27,000.00
P.2 Floor Drain Stainless Stell Bh Rp. 33,000.00
P.3 Wastafel Unit Rp. 360,000.00
P.4 Wastafel Cuci Piring Unit x
P.5 Urinoir Bh Rp. 1,500,000.00
Kloset Duduk
P.6 Bh Rp. 1,450,000.00
Kloset Jongkok
P.7 Bh Rp. 240,000.00
P.8 Tempat Sabun Bh Rp. 45,000.00
Sock Drak kran 1/2"
P.9 Bh Rp. 4,000.00
Floor Drain
P.10 Bh Rp. 28,000.00
Elbow 1/2"
P.11 Bh Rp. 3,500.00
T Pipa 1/2"
P.12 Bh Rp. 3,500.00
Elbow 3"
P.13 Bh Rp. 27,000.00
T Pipa 3"
P.14 Bh Rp. 30,000.00
P.15 Media Filter Botol Air Mineral m3 Rp. 250,000.00
P.16 Ijuk m3 Rp. 280,000.00
P.17 Tangki Air Fiberglas 1100 Liter Bh Rp. 1,700,000.00
P.18 Pompa Air 250 Watt Bh Rp. 1,650,000.00
Q Bahan Pipa
Q.1 Pipa PVC AW 1/2" Rp. 29,000.00 Rp 7,250 /m
Q.2 Pipa PVC AW 2" Rp. 76,000.00 Rp 19,000 /m
Q.3 Pipa PVC AW 3" Rp. 205,000.00 Rp 51,250 /m
R SMK 3
R.1 Papan informasi Bh Rp. 250,000.00
R.2 Helm proyek Bh Rp. 43,000.00
R.3 Sarung tangan Pack Rp. 58,000.00
R.4 Sepatu keselamatan untuk pekerja Bh Rp. 42,000.00
R.5 Rompi keselamatan Psg Rp. 26,000.00
S MOBILER
S.1 Kursi Murid Bh Rp. 230,000.00
S.2 Meja Murid Kapasitas 1 orang Bh Rp. 285,000.00
S.3 Kursi guru Bh Rp. 310,000.00
S.4 Meja Guru Bh Rp. 450,000.00
S.5 Kursi Labolatorium Bh Rp. 270,000.00
S.6 Meja Labolatorium Bh Rp. 2,100,000.00
S.7 Meja Demonstran Bh Rp. 950,000.00
S.8 Ranjang Periksa/ Kasur Bed Bh Rp -
S.9 Papan Tulis Bh Rp. 1,450,000.00
S.10 Lemari Penyimpanan Bh Rp. 1,400,000.00
S.11 Tempat Sampah Bh Rp. 120,000.00
ANALISA HARGA SATUAN PEKERJAAN
JENIS PEKERJAAN : Pengurugan kembali 1m2 Galian tanah (Dhitung 1/3x koefisien galian)
SUMBER DANA : APBN A.2.3.1.9. (2016)
TAHUN ANGGARAN : 2022 hal. 583
No Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga
A TENAGA
Pekerja L.01 OH 0.5 Rp. 80,000.00 Rp. 40,000.00
Mandor L.04 OH 0.05 Rp - Rp -
JUMLAH TENAGA KERJA Rp. 40,000.00
B BAHAN
Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp. 40,000.00
E Overhead & Profit 15% x D Rp -
F Harga Satuan Pekerjaan (D+E) Rp. 40,000.00