Tunjungmuli, .. 2011
FK-P FK-T Mengetahui : Ketua TPK
PJOK
DESAIN
DAN
RENCANA ANGGARAN BIAYA
INTEGRASI
Jenis Kegiatan : Jembatan Lengkung
Volume : P= 24 m
Lokasi : Dusun Serang
Desa : Tunjungmuli
KECAMATAN KARANGMONCOL
KABUPATEN PURBALINGGA
PROVINSI JAWA TENGAH
PNPM - MANDIRI PERDESAAN INTEGRASI
PROVINSI
JAWA TENGAH
OPRIT
OPRIT
ACIAN RABAT BETON 1:3:5
KABUPATEN
PURBALINGGA
KECAMATAN
KARANGMONCOL
DE SA
20
20
RAJAWANA
JENIS PRASARANA
TAMPAK ATAS
PEMBANGUNAN
JEMBATAN
LOKASI
DusunSerang
JUDUL GAMBAR
10 10
2.25 FASTEKAB
2.70 2.70 2.80 1.3 2.80 2.70 2.70
0.55
Ir. Nur Suhartoyo
4.5
2.5
0.25
0.40
0.25
0.20
0.40
0.25
0.2
Diketahui Oleh :
PjOK
1.5
1.75
Parwoto
POT A
NIP. 19561231 198608 1002
Lembar..Dari..Lembar
TAMPAK SAMPING
PNPM - MANDIRI PERDESAAN INTEGRASI
PROVINSI
JAWA TENGAH
POT A KABUPATEN
PURBALINGGA
KECAMATAN
2.25
10 KARANGMONCOL
2.70 2.70 2.80 1.3 2.80 2.70 2.70 DE SA
RAJAWANA
JENIS PRASARANA
0.30
0.55
0.30 0.30
PEMBANGUNAN
JEMBATAN
LOKASI
DusunSerang
0.25 0.25 0.25
0.20 0.2
0.40 0.40
JUDUL GAMBAR
1.5
POT A
Suyatno Imam Setiyoko, ST
TAMPAK SAMPING
Diperiksa Oleh :
FASTEKAB
Parwoto
NIP. 19561231 198608 1002
Lembar..Dari..Lembar
PNPM - MANDIRI PERDESAAN INTEGRASI
PROVINSI
COR PENGAMAN J EMBATAN
JAWA TENGAH
KABUPATEN
LENENG J EMBATAN
PURBALINGGA
PENGAMAN J ALAN
KECAMATAN
KARANGMONCOL
DE SA
RAJAWANA
COR RABAT BETON JENIS PRASARANA
URUGAN SIRTU PEMBANGUNAN
COR LENGKUNG
JEMBATAN
LOKASI
COR ATAS PONDASI
DusunSerang
JUDUL GAMBAR
PONDASI
Dibuat Oleh : Diperiksa Oleh
Ketua TPK FT. Kec
POTONGAN A Parwoto
NIP. 19561231 198608 1002
POTONGAN A
Lembar..Dari..Lembar
5
30
PROVINSI
JAWA TENGAH
I 20 KABUPATEN
PURBALINGGA
70
II
KECAMATAN
KARANGMONCOL
20 DE SA
20
RAJAWANA
JENIS PRASARANA
PEMBANGUNAN
JEMBATAN
LOKASI
DusunSerang
JUDUL GAMBAR
PROVINSI
JAWA TENGAH
KABUPATEN
PURBALINGGA
KECAMATAN
KARANGMONCOL
0.30 DE SA
RAJAWANA
JENIS PRASARANA
PEMBANGUNAN
JEMBATAN
LOKASI
DusunSerang
JUDUL GAMBAR
Parwoto
NIP. 19561231 198608 1002
Lembar..Dari..Lembar
PROVINSI
JAWA TENGAH
KABUPATEN
PURBALINGGA
KECAMATAN
KARANGMONCOL
DE SA
RAJAWANA
JENIS PRASARANA
PEMBANGUNAN
JEMBATAN
LOKASI
DusunSerang
JUDUL GAMBAR
Parwoto
NIP. 19561231 198608 1002
Lembar..Dari..Lembar
PNPM - Mandiri Perdesaan Form.7.e.
URAIAN Dari Satuan Kategori Harga Satuan Rp. Swadaya PNPM - MD Jumlah Total Rp.
Total Dari Dana
Swadaya
Rp. Rp.
1. BAHAN
1.1 Batu Belah 212.00 21.00 191.00 m3 I-a 65,000 1,365,000 12,415,000 13,780,000
1.2 Batu pecah 2/3 ( split ) 73.00 - 73.00 m3 I-a 160,000 - 11,680,000 11,680,000
1.3 Sirtu/urugan 496.00 - 496.00 m3 I-a 50,000 - 24,800,000 24,800,000
1.4 Pasir Pasang kali sapi/serayu 152.00 15.00 137.00 m3 I-a 110,000 1,650,000 15,070,000 16,720,000
1.5 Portland Cement (PC) 1,118.00 - 1,118.00 zak I-b 57,500 - 64,285,000 64,285,000
1.6 Besi tulangan 12 mm 79 - 79 bt I-b 80,000 - 6,320,000 6,320,000
1.7 Besi tulangan 10 mm 7 7 bt I-b 55,500 - 388,500 388,500
1.8 Besi tulangan 8 mm 91 - 91 bt I-b 35,500 - 3,230,500 3,230,500
1.9 Kawat beton 21 - 21.00 kg I-b 15,000 - 315,000 315,000
1.10 Paku biasa 2" - 5" 83 - 83.00 kg I-b 12,000 - 996,000 996,000
1.11 Papan cor/begisting (0,02x0,2x3) 267 267.00 lbr I-b 22,000 - 5,874,000 5,874,000
1.12 Cat Tembok 145 - 145.00 kg I-b 15,000 - 2,175,000 2,175,000
1.13 Balok kasau (0,05x0,07x3)/begisting 124 - 124.00 btg I-b 18,000 - 2,232,000 2,232,000
1.14 Pipa Galvanis 3" 13 13.00 btg I-b 175,000 - 2,275,000 2,275,000
1.15 Bambu 200 100.00 100.00 btg I-b 8,000 800,000 800,000 1,600,000
1.16 Bekisting (0,06x0,15x3) untuk rabat 40 40.00 btg I-b 70,000 - 2,800,000 2,800,000
1.17 Papan sekat dilatasi rabat 56 - 56.00 lbr I-b 18,000 - 1,008,000 1,008,000
1.18
1.19 - - - - - -
Sub Total 1) 3,815,000 156,664,000 160,479,000
2. ALAT -
2.1 Cangkul 15.00 10.00 5.00 bh II-a 40,000 400,000 200,000 600,000
2.2 Bodem 5.00 3.00 2.00 bh II-a 50,000 150,000 100,000 250,000
2.3 Linggis 6.00 5.00 1.00 bh II-a 50,000 250,000 50,000 300,000
2.4 Cetok 5.00 - 5.00 bh II-a 20,500 - 102,500 102,500
2.5 Benang 10.00 10.00 bh II-a 2,000 - 20,000 20,000
2.6 Ember 54.00 - 54.00 bh II-a 5,000 - 270,000 270,000
2.7 Amplas 10.00 10.00 lbr II-a 2,000 - 20,000 20,000
2.8 Kuas 2" 4.00 4.00 bh II-a 6,000 - 24,000 24,000
2.9 Papan Nama 1.00 1.00 bh II-a 150,000 - 150,000 150,000
2.10 Prasasti 1.00 1.00 bh II-a 325,000 - 325,000 325,000
2.11 Sewa Molen 53.00 53.00 hr II-b 200,000 - 10,600,000 10,600,000
2.12 Sewa Pompa sedot air 20.00 20.00 hr II-b 125,000 - 2,500,000 2,500,000
2
1.b. Galian Talud 4 bh
20.50 0.40 0.50 8.20 16.40 m3
0.5
0.4
Total Galian ====>>>>> 70.40 m3
82.35 m3
II
2.00
2.a.1. Luas Siar pondasi =((((1,5*1,3)*2)+((4,5*1,3)*2))-(2*(4,5*1,3)*4) 15.60 m2
4.5 0.5
2.5
192.35 m3
0.40
0.30
No 0.40
Uraian Panjang Lebar Tinggi Luas Volume
3.c. Cor Sandaran Pengaman lebar 10 cm 8 bh 0.20 0.10 1.00 0.02 0.16 m3
3.d. Cor Sandaran Pengaman lebar 20 cm 8 bh 0.20 ### 1.00 0.04 0.32 m3
ACIAN RABAT BETON 1:3:5
4.b. Tepi Jembatan Kanan-Kiri 2 sisi 17.50 5.00 0.15 87.50 26.25 m3
4.c. Jalan Titik awal dari lapang ( lebar 1,3 m ) 2 sisi 35.00 1.30 0.15 45.50 13.65
Total Volume Pekerjaan Cor Rabat Beton 1:3:5 ==> 52.76 m3
5 Pekerjaan Urugan
5.a. Urugan untuk di bawah jalan lebar 3,5 m 19.50 3,5-0,8 47.80 129.06 m3
2.70
5.b. Urugan untuk di bawah jalan lebar 4,5 - 5 m 2 sisi 5.60 ((4,5+5)/2)-0,8 9.90 78.21 m3
3.95
No Uraian Panjang Lebar Tinggi Luas Volume
5.c. Urugan untuk di bawah jalan lebar 5 m 2 sisi 14.40 5-0,8 24.50 205.80 m3
4.20
Total Pekerjaan Urugan 413.07 m3
6 a. Pekerjaan Leneng Pasangan Batu (1:4) 4 bh 2.25 0.35 1.20 0.79 3.78 m3
I 20
II 0.20 0.30 0.50 0.06 1.08
1.35 m3
70
II
20
20
9 PEMBESIAN
8 1,087.33 m 1.05 450.97 kg
10 76.00 m 1.05 49.21 kg
12 943.25 m 1.05 883.12 kg
Jml Kg Tulangan 1,383.30 kg
kawat beton 0.0150 20.75 kg
Pekerja 0.0400 55.33 HOK
Tukang besi 0.0400 55.33 HOK
Kepala Kelompok 0.0020 2.77 HOK
4
,
6
1
m
'
No Uraian Panjang Lebar Tinggi Luas Volume
0
,
4
0
273.00 15
3 2.5
2 2.5
240
120.2
87.60
24
10 10
10 10
0.5
4.5
2.5
101.78 0.30
2.73175
0.40
0.40
13.65
14.40
14.4
1.08
23.3333333333
63.2
Batu Belah 211.59 212.00
Batu Blonos #REF! #REF!
Batu pecah 2/3 ( split ) 72.86 73.00
Batu bata -
Pasir Pasang 151.91 152.00
Portland Cement (PC) 1117.96 1,118.00
Semen putih 0.00 -
SIRTU 495.68 496.00
Pasir urug -
Keramik 30/30 cm 0.00 -
Besi tulangan 12 mm 78.60 79.00
Besi tulangan 10 mm 6.33 7.00
Besi tulangan 8 mm 90.61 91.00
Kawat beton 20.75 21.00
90.61
78.60
0.021 Oh Pekerja @ Rp.
#REF! 0.021 Oh Tukang ka @ Rp.
0.002 Oh Kepala tuk @ Rp.
0.001 Oh Mandor @ Rp.
Total harga
2.05
190.1481481481
123.22
- = Rp -
- = Rp -
- = Rp -
- = Rp -
= Rp -
= Rp #REF!