2. 00 % 2. 0 0 %
4. 0 0 % 4. 00 %
E XI STIN G TIMB UN AN P IL IH AN
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+000 0.000
2.20 25 55.00 tambahan
6+025 4.400
4.40 25 110.00
6+050 4.400
4.40 25 110.00
6+075 4.400
4.40 25 110.00
6+100 4.400
4.40 10 44.00
6+110 4.400
4.40 15 66.00
6+125 4.400
4.40 25 110.00
6+150 4.400
4.40 25 110.00
6+175 4.400
4.40 25 110.00
6+200 4.400
4.40 22 96.80
6+222 4.400
6+224 4.400
4.40 26 114.40
6+250 4.400
4.40 25 110.00
6+275 4.400
4.40 25 110.00
6+300 4.400
4.40 25 110.00
6+325 4.400
4.40 25 110.00
6+350 4.400
4.40 20 88.00
6+370 4.400
4.40 5 22.00
6+375 4.400
4.40 25 110.00
6+400 4.400
5.01 25 125.13
6+425 5.610
2.81 25 70.13
6+450 0.000
SUB TOTAL I 448 1,891.450
TOTAL ( I ) - 1,891.450
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
2. 00 % 2. 0 0 %
4. 0 0 % 4. 00 %
E XI STIN G TIMB UN AN P IL IH AN
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
plat dekker 2 x 2
6+224 4.400
4.40 26 114.40
6+250 4.400
4.40 25 110.00
6+275 4.400
4.40 25 110.00
6+300 4.400
4.40 25 110.00
6+325 4.400
4.40 25 110.00
6+350 4.400
4.40 20 88.00
6+370 4.400
4.40 5 22.00
6+375 4.400
4.40 25 110.00
6+400 4.400
5.01 25 125.13
6+425 5.610
2.81 25 70.13
6+450 0.000
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+100 L 11.99
9.37 25 234.22
0+125 L 6.748
6.12 25 152.91
0+150 L 5.485
3.80 25 95.02
0+175 L 2.117
15.72 25 392.95
0+200 L 29.319
66.83 25 1,670.68
0+225 L 104.336
94.93 25 2,373.14
0+250 L 85.515
79.90 25 1,997.39
0+275 L 74.276
71.94 25 1,798.45
0+300 L 69.600
83.53 25 2,088.19
0+325 L 97.455
106.56 25 2,663.89
0+350 L 115.656
80.54 25 2,013.50
0+375 L 45.424
55.10 25 1,377.42
0+400 L 64.770
94.40 25 2,359.89
0+425 L 124.021
85.79 25 2,144.65
0+450 L 47.550
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+450 L 47.550
57.53 25 1,438.35
0+475 L 67.518
62.37 25 1,559.34
0+500 L 57.230
41.45 25 1,036.31
0+525 L 25.675
22.70 25 567.44
0+550 L 19.720
17.36 25 434.00
0+575 L 15.000
12.50 25 312.53
0+600 L 10.003
7.62 25 190.57
0+625 L 5.243
7.08 25 177.01
0+650 L 8.918
5.71 25 142.72
0+675 L 2.500
3.91 25 97.77
0+700 L 5.322
24.10 25 602.46
0+725 L 42.875
33.02 25 825.56
0+750 L 23.170
24.75 25 618.69
0+775 L 26.325
27.87 25 696.81
0+800 L 29.420
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+800 L 29.420
27.39 25 684.69
0+825 L 25.355
17.77 25 444.37
0+850 L 10.195
22.69 25 567.20
0+875 L 35.181
25.67 25 641.64
0+900 L 16.150
0+950 L 31.557
21.05 25 526.31
0+975 L 10.548
15.34 25 383.48
1+000 L 20.130
16.20 25 405.06
1+025 L 12.275
13.29 25 332.26
1+050 L 14.306
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+250 R 42.000
39.38 25 984.38
0+275 R 36.750
1+025 R 124.289
116.23 25 2,905.87
1+050 R 108.180
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00
TITIK A B C D A
X 0.00 4.43 4.93 3.43 2.50 1.50 0.00
Y 8.74 8.74 4.89 4.89 6.31 6.31 8.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 96.26 - 120.24
LUAS = + = + = 11.989 m² -11.99
2.00 2.00
STA 0+125
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E A
X 0.00 3.60 3.80 3.91 2.21 1.71 0.00
Y 9.20 9.20 5.79 4.79 7.49 7.49 9.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 100.49 - 113.98
LUAS = + = + = 6.748 m² -6.75
2.00 2.00
STA 0+150
7.00
6.00
5.00
4.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
TITIK A B C D E A
X 0.00 3.29 3.79 2.29 1.65 0.65 0.00
Y 6.99 6.99 4.70 4.70 5.84 5.84 6.99
S(Xn x Yn+1) - S(Xn+1 x Yn) 60.73 - 71.70
LUAS = + = + = 5.485 m² -5.48
2.00 2.00
STA 0+175
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F A
X 0.00 3.62 4.62 3.62 2.56 2.06 0.00
Y 8.84 5.84 4.69 4.69 6.52 6.52 8.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 97.15 - 101.39
LUAS = + = + = 2.117 m² -2.12
2.00 2.00
STA 0+200
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D A
X 0.00 6.89 7.99 8.99 6.99 5.66 5.16 2.83 2.33 0.00
Y 11.80 11.80 7.80 4.68 4.68 7.01 7.01 9.34 9.34 11.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 323.89 - 382.53
LUAS = + = + = 29.319 m² -29.32
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E A
X 0.00 11.04 15.04 15.04 13.04 10.91 10.41 7.27 6.77 3.64 3.14 0.00
Y 17.22 17.22 4.72 4.68 4.68 7.80 7.80 10.93 10.93 14.05 14.05 17.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 718.74 - 927.41
LUAS = + = + = 104.336 m² -104.34
2.00 2.00
STA 0+250
16.00
14.00
12.00
10.00
8.00
6.00
4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F A
X 0.00 10.40 11.50 9.50 6.33 5.83 2.66 2.16 0.00
Y 16.33 16.33 4.83 4.83 6.99 6.99 11.16 11.16 16.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 346.32 - 517.35
LUAS = + = + = 85.515 m² -85.52
2.00 2.00
STA 0+275
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00
TITIK A B C D E F A
X 0.00 8.27 10.77 8.77 6.85 6.35 3.43 2.93 0.00
Y 15.68 15.68 2.91 2.91 5.83 5.83 8.75 8.75 15.68
S(Xn x Yn+1) - S(Xn+1 x Yn) 277.72 - 426.27
LUAS = + = + = 74.276 m² -74.28
2.00 2.00
STA 0+300
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E A
X 0.00 8.30 10.00 8.00 6.40 5.90 3.30 2.80 0.00
Y 14.80 14.80 2.80 2.80 5.40 5.40 8.00 8.00 14.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 244.08 - 383.28
LUAS = + = + = 69.600 m² -69.60
2.00 2.00
STA 0+325
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00 13.00
TITIK A B C D E F A
X 0.00 10.20 12.50 10.50 9.00 8.50 6.00 5.50 3.00 2.56 0.00
Y 16.80 16.80 2.80 2.80 5.30 5.30 7.80 7.80 10.30 10.30 16.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 410.70 - 605.61
LUAS = + = + = 97.455 m² -97.46
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G A
X 0.00 11.13 14.00 12.00 10.13 9.63 6.75 6.25 3.38 2.88 0.00
Y 18.25 18.25 2.75 2.75 5.62 5.62 8.50 8.50 11.37 11.37 18.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 494.31 - 725.62
LUAS = + = + = 115.656 m² -115.66
2.00 2.00
STA 0+375
13.00
11.00
9.00
7.00
5.00
3.00
1.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 5.70 7.80 5.80 3.65 3.15 0.00
Y 13.13 13.13 1.83 1.83 5.97 5.97 13.13
S(Xn x Yn+1) - S(Xn+1 x Yn) 122.49 - 213.34
LUAS = + = + = 45.424 m² -45.42
2.00 2.00
STA 0+400
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 8.20 10.00 8.00 6.34 5.84 3.18 2.68 0.00
Y 14.83 14.83 1.83 1.83 5.49 5.49 10.15 10.15 14.83
S(Xn x Yn+1) - S(Xn+1 x Yn) 243.15 - 372.69
LUAS = + = + = 64.770 m² -64.77
2.00 2.00
STA 0+425
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
3.00
1.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00 13.00 15.00
TITIK A B C D E A
X 0.00 11.20 14.80 12.80 10.73 10.23 7.15 6.65 3.58 3.08 0.00
Y 19.04 19.04 1.04 1.04 4.82 4.82 8.89 8.89 12.97 12.97 19.04
S(Xn x Yn+1) - S(Xn+1 x Yn) 485.89 - 733.93
LUAS = + = + = 124.021 m² -124.02
2.00 2.00
STA 0+450
15.00
13.00
11.00
9.00
7.00
5.00
3.00
1.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 5.40 7.40 9.50 7.50 6.00 5.50 3.00 2.50 0.00
Y 14.33 14.33 11.83 1.28 1.28 6.33 6.33 10.83 10.83 14.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 298.77 - 393.87
LUAS = + = + = 47.550 m² -47.55
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G A
X 0.00 6.40 8.40 10.50 8.50 6.67 6.17 3.33 2.83 0.00
Y 16.22 16.22 12.72 1.02 1.02 5.56 5.56 11.39 11.39 16.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 339.15 - 474.19
LUAS = + = + = 67.518 m² -67.52
2.00 2.00
STA 0+500
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F A
X 0.00 5.10 7.10 9.20 7.20 5.80 5.30 2.90 2.40 0.00
Y 16.01 16.01 11.41 0.81 0.81 5.21 5.21 10.61 10.61 16.01
S(Xn x Yn+1) - S(Xn+1 x Yn) 264.46 - 378.92
LUAS = + = + = 57.230 m² -57.23
2.00 2.00
STA 0+525
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 5.90 8.00 6.00 3.75 2.25 0.00
Y 11.22 11.22 4.72 4.72 7.97 7.97 11.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 168.61 - 219.96
LUAS = + = + = 25.675 m² -25.68
2.00 2.00
STA 0+550
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.80 8.30 6.30 3.90 2.40 0.00
Y 11.58 11.58 4.78 4.78 8.18 8.18 11.58
S(Xn x Yn+1) - S(Xn+1 x Yn) 168.94 - 208.38
LUAS = + = + = 19.720 m² -19.72
2.00 2.00
STA 0+575
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F A
X 0.00 3.00 7.50 5.50 3.50 2.00 0.00
Y 10.69 10.69 4.69 4.69 7.69 7.69 10.69
S(Xn x Yn+1) - S(Xn+1 x Yn) 139.84 - 169.84
LUAS = + = + = 15.000 m² -15.00
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F A
X 0.00 3.00 5.50 3.50 2.50 1.00 0.00
Y 8.95 8.95 4.95 4.95 6.95 6.95 8.95
S(Xn x Yn+1) - S(Xn+1 x Yn) 92.74 - 112.74
LUAS = + = + = 10.003 m² -10.00
2.00 2.00
STA 0+625
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G H I J A
X 0.00 1.50 4.00 2.00 0.00
Y 7.86 7.86 4.87 4.87 7.86
S(Xn x Yn+1) - S(Xn+1 x Yn) 42.49 - 52.98
LUAS = + = + = 5.243 m² -5.24
2.00 2.00
STA 0+650
15.00
13.00
11.00
9.00
7.00
5.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G H I J A
X 0.00 3.60 4.60 3.10 2.55 2.05 0.00
Y 8.89 8.89 4.79 4.79 6.84 6.84 8.89
S(Xn x Yn+1) - S(Xn+1 x Yn) 96.21 - 114.05
LUAS = + = + = 8.918 m² -8.92
2.00 2.00
STA 0+675
13.00
11.00
9.00
7.00
5.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G H I J A
X 0.00 3.20 1.20 0.00
Y 7.25 4.75 4.75 7.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 23.88 - 28.88
LUAS = + = + = 2.500 m² -2.50
2.00 2.00
STA 0+700
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H I A
X 0.00 0.85 2.35 3.55 1.76 0.00
Y 8.30 8.30 6.80 4.75 4.75 8.30
S(Xn x Yn+1) - S(Xn+1 x Yn) 48.45 - 59.09
LUAS = + = + = 5.322 m² -5.32
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G A
X 0.00 2.00 4.00 10.50 7.65 7.15 4.33 3.83 1.00 0.00
Y 4.71 11.71 15.21 15.21 11.36 11.36 8.54 8.54 4.71 4.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 418.31 - 504.06
LUAS = + = + = 42.875 m² -42.88
2.00 2.00
STA 0+750
14.00
12.00
10.00
8.00
6.00
4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G H A
X 0.00 2.00 4.00 7.30 4.40 3.90 1.00 0.00
Y 4.81 11.91 12.61 12.61 8.71 8.71 4.81 4.81
S(Xn x Yn+1) - S(Xn+1 x Yn) 201.02 - 247.36
LUAS = + = + = 23.170 m² -23.17
2.00 2.00
STA 0+775
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 2.10 7.60 4.55 4.05 1.00 0.00
Y 4.75 12.85 12.85 8.80 8.80 4.75 4.75
S(Xn x Yn+1) - S(Xn+1 x Yn) 157.97 - 210.62
LUAS = + = + = 26.325 m² -26.33
2.00 2.00
STA 0+800
14.00
12.00
10.00
8.00
6.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 2.00 3.70 8.10 4.80 4.30 1.00 0.00
Y 5.08 13.08 13.68 13.68 9.38 9.38 5.08 5.08
S(Xn x Yn+1) - S(Xn+1 x Yn) 225.83 - 284.67
LUAS = + = + = 29.420 m² -29.42
2.00 2.00
STA 0+825
14.00
12.00
10.00
8.00
6.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 2.00 5.50 7.60 4.55 4.05 1.00 0.00
Y 5.09 12.69 13.19 13.19 9.14 9.14 5.09 5.09
S(Xn x Yn+1) - S(Xn+1 x Yn) 235.68 - 286.39
LUAS = + = + = 25.355 m² -25.36
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G H I A
X 0.00 1.50 3.50 4.52 1.00 0.00
Y 4.80 9.80 10.32 10.32 4.80 4.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 78.06 - 98.45
LUAS = + = + = 10.195 m² -10.19
2.00 2.00
STA 0+875
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 1.50 3.50 3.92 1.00 0.00
Y 4.80 8.32 8.72 8.72 4.80 4.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 8.85 - 79.21
LUAS = + = + = 35.181 m² -35.18
2.00 2.00
STA 0+900
13.00
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H I J A
X 0.00 1.20 3.40 6.30 3.90 3.40 1.00 0.00
Y 4.37 8.47 11.17 11.17 7.77 7.77 4.37 4.37
S(Xn x Yn+1) - S(Xn+1 x Yn) 149.77 - 182.07
LUAS = + = + = 16.150 m² -16.15
2.00 2.00
STA 0+925
13.00
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H I A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+950
13.00
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H I J A
X 0.00 1.50 3.00 9.00 6.67 6.17 3.84 3.34 1.00 0.00
Y 4.37 8.87 13.37 13.37 10.03 10.03 7.70 7.70 4.37 4.37
S(Xn x Yn+1) - S(Xn+1 x Yn) 313.21 - 376.32
LUAS = + = + = 31.557 m² -31.56
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G A
X 0.00 2.00 3.70 5.85 3.67 3.17 1.00 0.00
Y 4.27 8.31 9.61 9.61 6.94 6.94 4.27 4.27
S(Xn x Yn+1) - S(Xn+1 x Yn) 138.66 - 159.76
LUAS = + = + = 10.548 m² -10.55
2.00 2.00
STA 1+000
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.50 3.50 6.90 4.20 3.70 1.00 0.00
Y 4.78 10.98 11.18 11.18 7.98 7.98 4.78 4.78
S(Xn x Yn+1) - S(Xn+1 x Yn) 166.96 - 207.22
LUAS = + = + = 20.130 m² -20.13
2.00 2.00
STA 1+025
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.30 4.30 6.00 5.00 2.75 2.25 0.00
Y 10.25 10.25 9.75 4.75 4.75 8.00 8.00 10.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 156.41 - 180.96
LUAS = + = + = 12.275 m² -12.28
2.00 2.00
STA 1+050
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 6.38 7.38 6.38 0.00
Y 8.74 8.74 4.86 4.86 8.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 122.67 - 151.28
LUAS = + = + = 14.306 m² -14.31
2.00 2.00
14.00
3
2
2
4
3
3.0
4.0
3.0
2
3.
..
4.
4.
2 .
2.
4.
5.
3.
4.0
6
3
4
0
0
3 .0
0
0
. 0
0 0.0
0
.0
00
0
. 5
0
0.0
0
0
0.
0
0
0
0
0.
.
.
.
.0
.
0.0
0 .
.
0 .0
0
0
0
.0
0
0
0
0
0
. 0
2
2
2
2
2
2
2.0
2.0
2.
2
2.
2.
.
.
.
2.0
2
.
.
.
2 .0
0
0
0
0
.0
. 0
0
0
0
0
4
4.0
4.0
4
4
4.
4
4
4
4
4.
4.
.
.
4.0
4.0
4
.
.
. 0
0
.0
.00
.0
0
0
0
0
STA 0+250 ( R )6
6.0
6.
6
6
6.
6
6
6
6.
6.
6.
.
.
6.0
6.0
6
.
.
. 0
0
.0
00
.0
0
0
0
0
0
8
8.0
8.
8
8
8.
8
8
8
8
..
.
8.0
8.
8.
8.0
8
.
.
0
. 0
.0
0
0
.0
0
0
0
0
0
1
10 .
1
1
100
0.
0..
0
.
. 1
12 .
12
12.
12.
1 2.
2
.
.
12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F A
X 0.00 1.00 8.00 4.75 4.25 1.00 0.00
Y 2.90 13.40 13.40 8.15 8.15 2.90 2.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 132.54 - 216.54
LUAS = + = + = 42.000 m² -42.00
2.00 2.00
14.00
STA 0+275 ( R )
12.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
t.1
t.1
TALUD TA LUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
a EXISTING a
c c
t.2
t.2
t.1
t.1
d MORTAR MORTAR d
b b
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 t.2 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
- - -
- - -
- - -
file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quantity Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
a EXISTING a
c c
t.2
t.2
t.1
t.1
d MORTAR MORTAR d
b b
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 t.2 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
JUMLAH
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG
file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quantity Quantity
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
3.00 3.00
t t
EXISTING
b b
DIMENSI
VOLUME
NO. STATION (STA) L/R p a b t KETERANGAN
(m) (m) (m) (m) (m³)
10
11
12
JUMLAH 748.000
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TIMBUNAN PILIHAN
UNTUK BAHU JAL AN
4. 00 % 2.00 % 2. 00 % 4.0 0 %
EXISTING
JUMLAH 1,260.000
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
DAFTAR KUANTITAS DAN HARGA
PPK
Paket
: 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
: Pelebaran Jalan Kalukku - Salubatu 1 DAFTAR KUANTITAS DAN HARGA
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
PEMBAYARAN
REKAYASA LAPANGAN-01 REKAYASA LAPANGAN-02 SELISIH
NO. MATA
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS JUMLAH HARGA BOBOT KUANTITAS JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS (RP.) KUANTITAS (RP.)
BAB I - UMUM
1.2 Mobilisasi 332,500,000.00 1.00 332,500,000.00 1.6900 1.00 332,500,000.00 1.5505 Tetap
SUB TOTAL I 332,500,000.00 332,500,000.00 - -
BAB II - DRAINASE - -
2.1 Galian untuk Drainase Selokan dan Saluran Air 18,948.27 8,845.40 167,605,027.46 0.8519 9,593.40 181,778,333.42 0.8477 748.00 14,173,305.96 Tambah
2.2 Pekerjaan Pasangan Batu dengan Mortar 413,982.91 1,207.04 499,693,931.69 2.5398 1,443.87 597,739,160.19 2.7873 236.83 98,045,228.51 Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang Diameter dalam 75 - 95 Cm 995,087.46 121.00 120,405,582.66 0.6120 121.00 120,405,582.66 0.5615 Tetap
SUB TOTAL II 787,704,541.80 899,923,076.27 - 112,218,534.47
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa 15,831.53 62,312.33 986,499,521.76 5.0142 100,249.44 1,587,101,966.78 7.4008 37,937.11 600,602,445.01 Tambah
3.1 (2) Galian Batu 137,851.01 1,587.87 218,889,483.25 1.1126 1,587.87 218,889,483.25 1.0207 Tetap
3.1 (8) Galian Perk. Beraspal tanpa CMM 26,574.13 1,329.30 35,324,991.01 0.1795 1,329.30 35,324,991.01 0.1647 Tetap
3.2 (1) Timbunan Biasa 44,367.84 13,785.40 611,628,421.54 3.1088 13,785.40 611,628,421.54 2.8521 Tetap
3.2 (2) Timbunan Pilihan 67,462.67 21,548.13 1,453,694,383.31 7.3888 23,439.58 1,581,296,650.48 7.3737 1,891.45 127,602,267.17 Tambah
3.3 Penyiapan Badan Jalan 3,166.18 13,008.00 41,185,669.44 0.2093 13,008.00 41,185,669.44 0.1921 Tetap
SUB TOTAL III 3,347,222,470.31 4,075,427,182.49 - 728,204,712.18
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (2) Lapis Pondasi Agregate Klass B 174,638.20 6,405.00 1,118,557,671.00 5.6854 6,405.00 1,118,557,671.00 5.2159 Tetap
SUB TOTAL - IV 1,118,557,671.00 1,118,557,671.00 - -
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A 220,899.80 9,607.50 2,122,294,828.50 10.7872 9,607.50 2,122,294,828.50 9.8965 Tetap
5.1 (2) Lapis Pondasi Agregate Kelas B 174,638.20 12,792.60 2,234,076,637.32 11.3553 13,107.60 2,289,087,670.32 10.6743 315.00 55,011,033.00 Tambah
SUB TOTAL V 4,356,371,465.82 4,411,382,498.82 - 55,011,033.00
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat 7,143.31 44,835.00 320,270,303.85 1.6279 44,835.00 320,270,303.85 1.4935 Tetap
6.1 (2) Lapis Perekat 7,956.41 9,607.50 76,441,209.08 0.3885 9,607.50 76,441,209.08 0.3565 Tetap
6.3 (5a) Laston - Lapis Aus (AC-WC) 55,640.02 64,050.00 3,563,743,281.00 18.1137 64,050.00 3,563,743,281.00 16.6181 Tetap
6.3 (5b) Laston - Lapis Antara (AC-BC) 1,328,517.31 3,202.50 4,254,576,685.28 21.6251 3,202.50 4,254,576,685.28 19.8395 Tetap
SUB TOTAL VI 8,215,031,479.20 8,215,031,479.20 - -
BAB VII PEKERJAAN STRUKTUR - -
7.1 (5) Beton Struktur K250 789,186.09 87.65 69,172,160.79 0.3516 87.65 69,172,160.79 0.3226 Tetap
7.1 (6) Beton K175 757,787.22 2.55 1,932,357.41 0.0098 2.55 1,932,357.41 0.0090 Tetap
7.3 (1) Baja Tulangan U24 11,104.50 8,064.74 89,554,905.33 0.4552 8,064.74 89,554,905.33 0.4176 Tetap
7.9 Pasangan Batu 383,844.89 3,042.19 1,167,729,085.91 5.9353 5,433.27 2,085,532,925.49 9.7251 2,391.08 917,803,839.58 Tambah
SUB TOTAL VII 1,328,388,509.44 2,246,192,349.02 - 917,803,839.58
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR -
8.4 (2) Marka Jalan Thermoplastik 155,485.00 789.75 122,794,278.75 0.6241 789.75 122,794,278.75 0.5726 Tetap
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG 461,102.95 16.00 7,377,647.20 0.0375 16.00 7,377,647.20 0.0344 Tetap
8.4 (5) Patok Pengarah 114,066.94 100.00 11,406,694.00 0.0580 100.00 11,406,694.00 0.0532 Tetap
8.4 (6) Patok Kilometer 395,903.82 11.00 4,354,942.02 0.0221 11.00 4,354,942.02 0.0203 Tetap
8.4 (10) Rel Pengaman 425,542.77 100.00 42,554,277.00 0.2163 - - - 100.00 42,554,277.00 Kurang
SUB TOTAL VIII 188,487,838.97 100.0000 145,933,561.97 100.0000 42,554,277.00 - -
JUMLAH 19,674,263,976.54 21,444,947,818.77 42,554,277.00 1,813,238,119.23
PPN 10 % 1,967,426,397.65 2,144,494,781.88 4,255,427.70 181,323,811.92 SELISIH
GRAND TOTAL 21,641,690,374.19 23,589,442,600.65 46,809,704.70 1,994,561,931.15 Rp (1,770,683,664.01)
DIBULATKAN 21,641,690,000.00 23,589,442,000.00 46,809,000.00 1,994,561,000.00
23,589,442,000.00 1,770,683,842.23
Ka. SNVT PEMBANGUNAN Konsultan Konsultan - 21,818,758,157.77 Kontraktor
PEMB. JALAN TOPOYO - KAROSSA PT. WIRANTA BHUANA RAYA
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
Ir. H. Iskandar Arsyad Ir. Muh. Idris Razak Ir. Muh. Idris Razak Ir. Hamsijar Ilham
NIP. 110 054 074 Site Engineer Site Engineer General Superintendent
BAB. V. REKAPITULASI VOLUME DAN
PPK
Paket BAB. V. REKAPITULASI
: 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
: Pelebaran Jalan Kalukku - Salubatu 1
HARGA VOLUME DAN
Kab. / Prop.
Tahun Anggaran
: Mamuju / Sulawesi Barat
: 2011 HARGA
PEMBAYARAN
NO. MATA KONTRAK ASLI REKAYASA LAPANGAN SELISIH
SATUAN
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS
JUMLAH HARGA BOBOT
KUANTITAS
JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS
(RP.) (RP.)
BAB I - UMUM
1.2 Mobilisasi Ls 332,500,000.00 1.00 332,500,000.00 1.6900 1.00 332,500,000.00 #NAME? Tetap
SUB TOTAL I 332,500,000.00 332,500,000.00 - -
BAB II - DRAINASE -
2.1 Galian untuk Drainase Selokan dan Saluran Air m³ 18,948.27 1,080.00 20,464,131.60 0.1040 748.00 14,173,305.96 #NAME? 332.00 6,290,825.64 Kurang
2.2 Pekerjaan Pasangan Batu dengan Mortar m³ 413,982.91 960.00 397,423,593.60 2.0200 960.00 397,423,593.60 #NAME? Tetap
354,299.50 247.04 87,526,148.48 #NAME? Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang Diameter dalam 75 - 95 Cm m' 995,087.46 66.00 65,675,772.36 0.3338 66.00 65,675,772.36 #NAME? Tetap
700,290.95 55.00 38,516,002.25 #NAME? Tambah
SUB TOTAL II 483,563,497.56 603,314,822.65 6,290,825.64 -
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa m³ 15,831.53 57,452.63 909,563,035.42 4.6231 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3.1 (2) Galian Batu m³ 137,851.01 5,745.26 791,989,893.71 4.0255 ### ### #NAME? ### ### Tambah
3.1 (8) Galian Perk. Beraspal tanpa CMM m³ 26,574.13 2,587.50 68,760,561.38 0.3495 1,329.30 35,324,991.01 #NAME? 1,258.20 33,435,570.37 Kurang
3.2 (1) Timbunan Biasa m³ 44,367.84 18,000.00 798,621,120.00 4.0592 13,785.40 611,628,421.54 #NAME? 4,214.60 186,992,698.46 Kurang
3.2 (2) Timbunan Pilihan m³ 67,462.67 6,000.00 404,776,020.00 2.0574 10,466.89 706,124,346.00 #NAME? 4,466.89 301,348,326.00 Tambah
3.3 Penyiapan Badan Jalan m² 3,166.18 69,000.00 218,466,420.00 1.1104 13,008.00 41,185,669.44 #NAME? 55,992.00 177,280,750.56 Kurang
SUB TOTAL III 3,192,177,050.51 #NAME? #NAME? #NAME?
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (2) Lapis Pondasi Agregate Klass B m³ 174,638.20 3,450.00 602,501,790.00 3.0624 6,405.00 1,118,557,671.00 #NAME? 2,955.00 516,055,881.00 Tambah
SUB TOTAL - IV 602,501,790.00 1,118,557,671.00 - 516,055,881.00
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A m³ 220,899.80 10,350.00 2,286,312,930.00 11.6208 9,607.50 2,122,294,828.50 #NAME? 742.50 164,018,101.50 Kurang
5.1 (2) Lapis Pondasi Agregate Kelas B m³ 174,638.20 13,800.00 2,410,007,160.00 12.2495 315.00 55,011,033.00 #NAME? 13,485.00 2,354,996,127.00 Kurang
SUB TOTAL V 4,696,320,090.00 2,177,305,861.50 2,519,014,228.50 -
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat Ltr 7,143.31 48,300.00 345,021,873.00 1.7537 44,835.00 320,270,303.85 #NAME? 3,465.00 24,751,569.15 Kurang
6.1 (2) Lapis Perekat Ltr 7,956.41 13,800.00 109,798,458.00 0.5581 9,607.50 76,441,209.08 #NAME? 4,192.50 33,357,248.93 Kurang
6.3 (5a) Laston - Lapis Aus (AC-WC) m² 55,640.02 69,000.00 3,839,161,380.00 19.5136 45,000.00 2,503,800,900.00 #NAME? 24,000.00 1,335,360,480.00 Kurang
6.3 (5b) Laston - Lapis Antara (AC-BC) m³ 1,328,517.31 3,450.00 4,583,384,719.50 23.2963 3,202.50 4,254,576,685.28 #NAME? 247.50 328,808,034.23 Kurang
SUB TOTAL VI 8,877,366,430.50 7,155,089,098.20 1,722,277,332.30 -
BAB VII PEKERJAAN STRUKTUR - -
7.1 (5) Beton Struktur K250 m³ 789,186.09 87.65 69,172,160.79 #NAME? 87.65 69,172,160.79 Tambah
7.1 (6) Beton K175 m³ 757,787.22 2.55 1,932,357.41 #NAME? 2.55 1,932,357.41 Tambah
7.3 (1) Baja Tulangan U24 kg 11,104.50 8,064.74 89,554,905.33 #NAME? 8,064.74 89,554,905.33 Tambah
7.9 Pasangan Batu m³ 383,844.89 3,375.00 1,295,476,503.75 6.5846 3,033.13 1,164,251,451.21 #NAME? 341.87 131,225,052.54 Kurang
SUB TOTAL VII 1,295,476,503.75 1,324,910,874.74 131,225,052.54 160,659,423.53
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR - -
8.4 (2) Marka Jalan Thermoplastik m² 155,485.00 575.00 89,403,875.00 0.4544 575.00 89,403,875.00 #NAME? Tetap
107,818.33 214.75 23,153,986.37 #NAME? Tambah
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG Bh 461,102.95 8.00 3,688,823.60 0.0187 8.00 3,688,823.60 #NAME? Tetap
326,321.48 8.00 2,610,571.84 #NAME? Tambah
8.4 (5) Patok Pengarah Bh 114,066.94 100.00 11,406,694.00 0.0580 100.00 11,406,694.00 #NAME? Tetap
8.4 (6) Patok Kilometer Bh 395,903.82 12.00 4,750,845.84 0.0241 11.00 4,354,942.02 #NAME? 1.00 395,903.82 Kurang
8.4 (10) Rel Pengaman m' 425,542.77 200.00 85,108,554.00 0.4326 100.00 42,554,277.00 #NAME? 100.00 42,554,277.00 Kurang
SUB TOTAL VIII 194,358,792.44 100.0000 177,173,169.83 #NAME? 42,950,180.82 - #NAME?
JUMLAH 19,674,264,154.76 #NAME? #NAME? #NAME?
PPN 10 % 1,967,426,415.48 #NAME? #NAME? #NAME? SELISIH
GRAND TOTAL 21,641,690,570.24 #NAME? #NAME? #NAME? #NAME?
DIBULATKAN 21,641,690,000.00 #NAME? #NAME? #NAME?
#NAME? #NAME?
Ka. SNVT PEMBANGUNAN Konsultan #NAME? Kontraktor
PEM. JALAN TOPOYO - KAROSSA PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
Ir. H. Iskandar Arsyad Ir. Muh. Idris Razak Ir. Hamsijar Ilham
NIP. 110 054 074 Site Engineer General Superintendent
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
AC - WC (0.04 m)
EXISTING
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LAPIS PEREKAT
EXISTING
APLIKAS
LEBAR PANJANG LUAS VOLUME
STATION (STA) I KETERANGAN
m m ltr/m2 m2 Ltr
JUMLAH 9,607.500
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
AC - BC (0.05 m)
EXISTING
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
2 . 50 3 . 00 3 .0 0 2. 50
4 . 00 % 2 .0 0 % 2. 00 % 4 . 00 %
EXI STI NG
APLIKAS
LEBAR PANJANG LUAS VOLUME
STATION (STA) I KETERANGAN
m m ltr/m2 m2 Ltr
JUMLAH 44,835.000
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 . 00 % 2. 00 % 2. 00 % 4.00 %
TE BAL
EX I STI NG
DIMENSI VOLUME
NO. STATION (STA) L/R LEBAR TEBAL PANJANG KETERANGAN
m m m m³
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
3.00 3.00
EXISTING
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
SKETSA
10 cm
Dia. 1,00 m
JUMLAH
STA SATUAN RENCANA KETERANGAN
(m')
4+250 M' 10 10
7+200 M' 1 1 tambahan ( R )
7+443 M' 12 12 Bak kontrol
7+607 M' 11 11 Bak kontrol
7+950 M' 12 12 Penggantian
8+075 M' 11 11 Bak kontrol
8+285 M' 2 2
8+850 M' 11 11 Bak kontrol
9+045 M' 2 2
9+140 M' 11 11 Bak kontrol
9+550 M' 11 11 Bak kontrol
9+680 M' 11 11 Bak kontrol
10+126 M' 11 11 Bak kontrol
10+225 M' 2 2 Bak kontrol
10+350 M' 3 3
TOTAL 121
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
7+930 3.630
3.63 270 980.10
8+200 3.630
8+550 3.630
3.63 1,050 3,811.50
9+600 3.630
10+100 3.630
3.63 100 363.00
10+200 3.630
10+250 3.630
3.63 175 635.25
10+425 3.630
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+450 0.000
1.38 25 34.38
0+475 2.750
2.75 25 68.75
0+500 2.750
2.75 25 68.75
0+525 2.750
2.75 25 68.75
0+550 2.750
2.75 25 68.75
0+575 2.750
2.75 25 68.75
0+600 2.750
Plat dekker 2 x 1.5
0+602 2.750
2.75 23 63.25
0+625 2.750
2.75 25 68.75
0+650 2.750
2.75 25 68.75
0+675 2.750
2.75 25 68.75
0+700 2.750
2.75 25 68.75
0+725 2.750
2.75 25 68.75
0+750 2.750
2.75 35 96.25
0+785 2.750
1.38 15 20.63
0+800 0.000
SUB TOTAL III 348 902.000
TOTAL (I+II+III) 1,943 7,951.850
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
9+600 3.300
5.50 25 137.50
9+625 7.700
7.70 25 192.50
9+650 7.700
7.70 25 192.50
9+675 7.700
7.70 25 192.50
9+700 7.700
7.70 25 192.50
9+725 7.700
7.70 25 192.50
9+750 7.700
7.70 15 115.50
9+765 7.700
3.85 35 134.75
9+800 0.000
6+000 0.000
1.58 25 39.60
6+025 3.168
3.65 25 91.30
6+050 4.136
4.26 25 106.56
6+075 4.389
4.52 25 112.89
6+100 4.642
5.07 10 50.71
6+110 5.500
5.50 15 82.50
6+125 5.500
5.50 25 137.50
6+150 5.500
5.50 25 137.50
6+175 5.500
SUB TOTAL IV 375 2,108.810
TOTAL (I s/d IV) 2,318 10,060.660
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+175 5.500
5.50 25 137.50
6+200 5.500
5.50 22 121.00
6+222 5.500
plat dekker 2 x 2
6+224 5.500
5.50 26 143.00
6+250 5.500
5.50 25 137.50
6+275 5.500
5.50 25 137.50
6+300 5.500
5.50 25 137.50
6+325 5.500
5.50 25 137.50
6+350 5.500
6.01 20 120.12
6+370 6.512
6.51 5 32.56
6+375 6.512
5.24 25 130.90
6+400 3.960
3.63 25 90.75
6+425 3.300
1.65 25 41.25
6+450 0.000
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
7+930 3.630
3.63 270 980.10
8+200 3.630
8+550 3.630
3.63 1,050 3,811.50
9+600 3.630
10+100 3.630
3.63 100 363.00
10+200 3.630
10+250 3.630
3.63 175 635.25
10+425 3.630
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+450 0.000
1.38 25 34.38
0+475 2.750
2.75 25 68.75
0+500 2.750
2.75 25 68.75
0+525 2.750
2.75 25 68.75
0+550 2.750
2.75 25 68.75
0+575 2.750
2.75 25 68.75
0+600 2.750
Plat dekker 2 x 1.5
0+602 2.750
2.75 23 63.25
0+625 2.750
2.75 25 68.75
0+650 2.750
2.75 25 68.75
0+675 2.750
2.75 25 68.75
0+700 2.750
2.75 25 68.75
0+725 2.750
2.75 25 68.75
0+750 2.750
2.75 35 96.25
0+785 2.750
1.38 15 20.63
0+800 0.000
SUB TOTAL III 348 902.000
TOTAL (I+II+III) 1,943 7,951.850
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
9+600 3.300
5.50 25 137.50
9+625 7.700
7.70 25 192.50
9+650 7.700
7.70 25 192.50
9+675 7.700
7.70 25 192.50
9+700 7.700
7.70 25 192.50
9+725 7.700
7.70 25 192.50
9+750 7.700
7.70 15 115.50
9+765 7.700
3.85 35 134.75
9+800 0.000
6+000 0.000
0.48 25 12.10
6+025 0.968
1.45 25 36.30
6+050 1.936
2.06 25 51.56
6+075 2.189
2.32 25 57.89
6+100 2.442
2.87 10 28.71
6+110 3.300
3.30 15 49.50
6+125 3.300
3.30 25 82.50
6+150 3.300
3.30 25 82.50
6+175 3.300
SUB TOTAL IV 375 1,751.310
TOTAL (I s/d IV) 2,318 9,703.160
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+175 3.300
3.30 25 82.50
6+200 3.300
3.30 22 72.60
6+222 3.300
plat dekker 2 x 2
6+224 3.300
3.30 26 85.80
6+250 3.300
3.30 25 82.50
6+275 3.300
3.30 25 82.50
6+300 3.300
3.30 25 82.50
6+325 3.300
3.30 25 82.50
6+350 3.300
3.26 20 65.12
6+370 3.212
3.21 5 16.06
6+375 3.212
2.49 25 62.15
6+400 1.760
1.43 25 35.75
6+425 1.100
0.55 25 13.75
6+450 0.000
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
PEMBAYARAN
KONTRAK ASLI REKAYASA LAPANGAN SELISIH
NO. MATA
SATUAN
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS
JUMLAH HARGA BOBOT
KUANTITAS
JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS
(RP.) (RP.)
BAB I - UMUM
1.2 Mobilisasi dan Demobilisasi Ls 296,150,000.00 1.00 296,150,000.00 1.3304 1.00 296,150,000.00 0.0045 Tetap
1.8 Manajemen dan Keselamatan Lalu Lintas Ls 18,000,000.00 1.00 18,000,000.00 0.0809 1.00 18,000,000.00 0.0003 Tetap
1.18.(2) Relokasi Utilitas dan Pelayanan PDAM yang Ada Ls 35,000,000.00 1.00 35,000,000.00 0.1572 1.00 35,000,000.00 0.0005 Tetap
1.18.(3) Relokasi Utilitas dan Pelayanan PLN yang Ada Ls 60,000,000.00 1.00 60,000,000.00 0.2695 1.00 60,000,000.00 0.0009 Tetap
1.21 Manajemen Mutu Ls 19,000,000.00 1.00 19,000,000.00 0.0854 1.00 19,000,000.00 0.0003 Tetap
SUB TOTAL I 428,150,000.00 428,150,000.00 - -
BAB II - DRAINASE -
2.1 Galian untuk Drainase Selokan dan Saluran Air m³ 31,224.56 3,255.00 101,635,942.80 0.4566 748.00 23,355,970.88 0.0004 2,507.00 78,279,971.92 Kurang
2.2 Pekerjaan Pasangan Batu dengan Mortar m³ 508,878.29 569.63 289,872,340.33 1.3022 236.83 120,517,645.42 0.0018 332.80 169,354,694.91 Kurang
2.3 (3) Gorong-gorong Pipa Beton Bertulang 70-100 cm m' 1,469,360.99 28.00 41,142,107.72 0.1848 121.00 177,792,679.79 0.0027 93.00 136,650,572.07 Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang 100-130 cm m' 1,939,363.63 10.00 19,393,636.30 0.0871
SUB TOTAL II 452,044,027.15 321,666,296.09 247,634,666.83 136,650,572.07
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa m³ 33,834.80 107,511.40 3,637,626,716.72 16.3418 21,062.65 712,650,507.93 0.0000 #REF! #REF! #REF! #REF! #REF!
3.1 (2) Galian Batu m³ 155,777.34 17,095.60 2,663,107,093.70 11.9639 ### ### 0.0006 #REF! #REF! #REF! #REF! #REF!
3.1 (8) Galian Perk. Beraspal tanpa CMM m³ - - - - 1,329.30 - - 1,329.30 Tetap
3.2 (1) Timbunan Biasa m³ 80,085.01 2,499.56 200,177,287.59 0.8993 13,785.40 1,104,003,896.85 0.0169 11,285.84 903,826,609.26 Tambah
3.2 (2) Timbunan Pilihan m³ 130,284.52 2,043.05 266,177,788.58 1.1958 10,466.89 1,363,673,739.54 0.0209 8,423.84 1,097,495,950.96 Tambah
3.3 Penyiapan Badan Jalan m² 3,735.43 37,500.00 140,078,625.00 0.6293 13,008.00 48,590,473.44 0.0007 24,492.00 91,488,151.56 Kurang
SUB TOTAL III 6,907,167,511.59 ### #REF! #REF!
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (1) Lapis Pondasi Agregate Kelas A m³ 394,155.48 2,250.00 886,849,830.00 3.9841 - - - 2,250.00 886,849,830.00 Kurang
4.2 (2) Lapis Pondasi Agregate Klass B m³ 301,634.17 8,625.00 2,601,594,716.25 11.6875 6,405.00 1,931,966,858.85 0.0296 2,220.00 669,627,857.40 Kurang
SUB TOTAL - IV 3,488,444,546.25 1,931,966,858.85 669,627,857.40 -
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A m³ 394,155.48 3,051.00 1,202,568,369.48 5.4025 9,607.50 3,786,848,774.10 0.0580 6,556.50 2,584,280,404.62 Tambah
5.1 (2) Lapis Pondasi Agregate Kelas B m³ 301,634.17 748.00 225,622,359.16 1.0136 315.00 95,014,763.55 0.0015 433.00 130,607,595.61 Kurang
SUB TOTAL V 1,428,190,728.64 3,881,863,537.65 130,607,595.61 2,584,280,404.62
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat Ltr 11,782.33 28,272.00 333,110,033.76 1.4965 44,835.00 528,260,765.55 0.0081 16,563.00 195,150,731.79 Tambah
6.1 (2) Lapis Perekat Ltr 12,312.81 19,131.00 235,556,368.11 1.0582 9,607.50 118,295,322.08 0.0018 9,523.50 117,261,046.04 Kurang
6.3 (5a) Laston - Lapis Aus (AC-WC) Ton 382,673.95 3,917.09 1,498,968,302.80 6.7340 45,000.00 17,220,327,750.00 0.2635 41,082.91 15,721,359,447.19 Tambah
6.3 (5b) Laston - Lapis Antara (AC-BC) Ton 353,304.59 4,932.90 1,742,816,212.01 7.8295 3,202.50 1,131,457,949.48 0.0173 1,730.40 611,358,262.54 Kurang
6.3.8 Aspal Ton 8,965,000.00 546.01 4,894,979,650.00 21.9904
6.3.9 Aditif anti pengelupasan Kilogram - -
6.3.10 Bahan Pengisi (Filler) Tambahan Kilogram 1,320.00 176,557.30 233,055,636.00 1.0470
SUB TOTAL VI 8,938,486,202.68 18,998,341,787.10 728,619,308.57 15,916,510,178.98
BAB VII PEKERJAAN STRUKTUR -
7.1 (5) Beton mutu sedang dengan fc'=25 Mpa (K-300) m³ 1,664,536.71 13.15 21,888,657.73 0.0983 87.65 145,896,642.63 0.0022 74.50 124,007,984.90 Tambah
7.3 (1) Baja Tulangan BJ 24 Polos kg 16,109.17 2,216.21 35,701,303.64 0.1604 8,064.74 129,916,267.66 0.0020 5,848.53 94,214,964.02 Tambah
7.9 Pasangan Batu m³ 504,443.71 510.35 257,442,847.39 1.1565 3,042.19 1,534,613,610.12 0.0235 2,531.84 1,277,170,762.73 Tambah
7.10(3) Bronjong (Gabions) m³ 506,758.89 160.00 81,081,422.40 0.3643
SUB TOTAL VII 396,114,231.16 1,810,426,520.41 - 1,495,393,711.64
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR
8.4 (2) Marka Jalan Thermoplastik m³ 198,199.92 1,050.00 208,109,916.00 0.9349 1,050.00 208,109,916.00 0.0032 Tetap
SUB TOTAL VIII 208,109,916.00 208,109,916.00 - 1,495,393,711.64
BAB IX - PEKERJAAN HARIAN -
9.1 Mandor Jam 11,000.00 7.00 77,000.00 0.0003 7.00 77,000.00 0.0000 Tetap
9.2 Pekerja Biasa Jam 6,600.00 14.00 92,400.00 0.0004 14.00 92,400.00 0.0000 Tetap
9.3 Tukang Kayu, Tukang Batu, dsb. Jam 9,900.00 7.00 69,300.00 0.0003 7.00 69,300.00 0.0000
9.4 Dump Truck 3-4 m3 Jam 211,002.00 7.00 1,477,014.00 0.0066 7.00 1,477,014.00 0.0000
9.7 Bulldozer 100 - 150 PK Jam 394,966.00 7.00 2,764,762.00 0.0124 7.00 2,764,762.00 0.0000
9.8 Motor Grader Min 100 PK Jam 381,315.00 7.00 2,669,205.00 0.0120 7.00 2,669,205.00 0.0000 Tetap
9.9 Loader Roda Karet 1.0 - 1.6 m3 Jam 397,705.00 7.00 2,783,935.00 0.0125 7.00 2,783,935.00 0.0000 Tetap
9.11 Alat Penggali (Excavator) 80 - 140 KP Jam 423,016.00 7.00 2,961,112.00 0.0133 7.00 2,961,112.00 0.0000 Tetap
SUB TOTAL IX 12,894,728.00 100.0000 12,894,728.00 0.4614 - - #REF!
JUMLAH 22,259,601,891.47 ### #REF! #REF!
PPN 10 % 2,225,960,189.15 653,458,434,662.88 #REF! #REF! SELISIH
GRAND TOTAL 24,485,562,080.62 ### #REF! #REF! ###
DIBULATKAN 24,485,562,000.00 ### #REF! #REF!
### #REF!
Disetujui oleh, Konsultan #REF! Kontraktor
PEJABAT PEMBUAT KOMITMEN 06 PT. ESKAPINDO MATRA PT. PASSOKORANG
TOPOYO - BARAKKANG - KALUKKU - SALUBATU
file:///conversion/tmp/scratch/509046377.xlsx
8.4(3) RAMBU JALAN DG PERMUKAAN PEMANTUL EG
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
file:///conversion/tmp/scratch/509046377.xlsx
MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN
Kordinator Lapangan Quatity Engineer Quantity Surveyor
file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG
:
1.58
1.2
file:///conversion/tmp/scratch/509046377.xlsx
:
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor
file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG
:
1.58
1.2
file:///conversion/tmp/scratch/509046377.xlsx
:
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
Dimensi
Volume
STA Jumlah Ket.
(buah) (buah)
TOTAL 100.000
file:///conversion/tmp/scratch/509046377.xlsx
8.4(5) PATOK PENGARAH
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor
file:///conversion/tmp/scratch/509046377.xlsx
8.4 (6) Patok Kilometer
:
1.58
1.2
file:///conversion/tmp/scratch/509046377.xlsx
:
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
Dimensi
Volume
STA Jumlah Ket.
(buah) (buah)
0+000
11.00 11.00
10+675
TOTAL 11.000
file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quality Eng/CI Quantity
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
file:///conversion/tmp/scratch/509046377.xlsx
MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN
Kordinator Lapangan Quatity Engineer Quantity Surveyor
file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG
:
1.58
1.2
0.65
1.70
0.50
0.95
0.40
file:///conversion/tmp/scratch/509046377.xlsx
0.80
1.70
0.50
0.95
0.40
0.80
file:///conversion/tmp/scratch/509046377.xlsx
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
file:///conversion/tmp/scratch/509046377.xlsx
0.80
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
10675
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+450 0.000
2.32 25 58.03
0+475 4.642
5.96 25 148.91
0+500 7.271
7.38 25 184.39
0+525 7.480
8.13 25 203.23
0+550 8.778
8.62 25 215.46
0+575 8.459
8.86 25 221.38
0+600 9.251
Plat dekker 2 x 1.5
0+602 9.053
9.03 23 207.59
0+625 8.998
9.03 25 225.78
0+650 9.064
9.00 25 225.09
0+675 8.943
8.72 25 218.08
0+700 8.503
8.78 25 219.45
0+725 9.053
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
0+725 9.053
9.05 25 226.33
0+750 9.053
6.74 25 168.44
0+775 4.422
2.21 10 22.11
0+785 0.000
1+810 0.700
0.70 272 190.40 (R)
2+082 0.700
2+082 2.250
2.25 68 153.00 (L)
2+150 2.250
2+650 0.800
0.80 100 80.00 (L)
2+750 0.800
2+800 0.660
0.66 50 33.00 (R)
2+850 0.660
3+131 1.440
1.44 69 99.36 (L)
3+200 1.440
0+000 0.520
0.52 1,810 941.20 (R)
1+810 0.520
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
3+500 0.810
0.81 3,375 5,467.50 ( L/R )
6+875 0.810
9+250 0.000
0.38 10 3.75 (R)
9+260 0.750
1.88 10 18.75 (R)
9+270 3.000
4.88 10 48.75 (R)
9+280 6.750
9.38 10 93.75 (R)
9+290 12.000
15.38 10 153.75 (R)
9+300 18.750
22.88 10 228.75 (R)
9+310 27.000
31.88 10 318.75 (R)
9+320 36.750
42.38 10 423.75 (R)
9+330 48.000
54.38 10 543.75 (R)
9+340 60.750
67.88 10 678.75 (R)
9+350 75.000
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+110 0.000
0.96 15 14.36
6+125 1.914
3.30 25 82.50
6+150 4.686
6.06 25 151.39
6+175 7.425
8.51 25 212.85
6+200 9.603
9.60 22 211.27
6+222 9.603
plat dekker 2 x 2
6+224 10.791
10.79 1 10.79
6+225 10.791
11.05 25 276.24
6+250 11.308
11.31 25 282.70
6+275 11.308
10.52 25 263.04
6+300 9.735
7.00 25 175.04
6+325 4.268
2.82 25 70.40
6+350 1.364
0.68 20 13.64
6+370 0.000
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m2 m m³
4+625 16.469
22.50 25 562.56
4+650 28.536
5+325 9.289
6.47 25 161.74
5+350 3.650
2.84 50 142.16
5+400 2.036
1.70 25 42.42
5+425 1.358
6+000 12.405
18.47 25 461.77
6+025 24.536
14.98 50 748.84
6+075 5.417
6+475 6.309
3.84 25 95.88
6+500 1.362
1.84 50 91.83
6+550 2.311
1.99 25 49.85
6+575 1.677
5.98 25 149.46
6+600 10.280
7.61 25 190.28
6+625 4.943
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
6+625 4.943
10.69 75 801.74
6+700 16.437
12.96 50 648.12
6+750 9.487
6.95 25 173.66
6+775 4.405
6.87 25 171.80
6+800 9.339
40.29 50 2,014.41
6+850 71.238
48.33 50 2,416.69
6+900 25.430
7+050 48.948
60.24 25 1,505.91
7+075 71.525
41.61 25 1,040.23
7+100 11.694
8.51 25 212.77
7+125 5.327
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
7+600 12.395
9.90 25 247.44
7+625 7.400
9.36 25 233.94
7+650 11.315
7.99 50 399.25
7+700 4.655
7+975 6.795
6.70 25 167.59
8+000 6.612
4.51 50 225.31
8+050 2.400
2.83 25 70.78
8+075 3.263
8+150 9.555
8.22 25 205.38
8+175 6.875
8+350 7.725
4.33 50 216.31
8+400 0.927
0.93 50 46.37
8+450 0.927
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
8+450 3.691
3.78 50 188.97
8+500 3.868
3.87 25 96.69
8+525 3.868
3.04 25 76.00
8+550 2.212
8.57 50 428.44
8+600 14.925
7.74 50 386.88
8+650 0.550
1.42 75 106.41
8+725 2.287
3.48 25 87.03
8+750 4.675
2.68 50 133.75
8+800 0.675
4.33 25 108.31
8+825 7.990
5.20 25 129.88
8+850 2.400
RIDWAN
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
GALIAN BIASA
2.00 3.00 3.00 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
10+775 4.565
3.58 75 268.87
10+850 2.605
5.45 25 136.38
10+875 8.305
12.07 25 301.63
10+900 15.825
24.49 50 1,224.63
10+950 33.160
45.43 25 1,135.75
10+975 57.700
53.94 25 1,348.38
11+000 50.170
39.97 25 999.25
11+025 29.770
16.44 25 410.94
11+050 3.105
GALIAN BIASA
2.00 3.00 3.0 0 2.00
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
11+550 6.425
17.44 25 435.91
11+575 28.448
21.83 25 545.72
11+600 15.210
15.15 25 378.79
11+625 15.093
11+675 10.026
12.80 15 191.97
11+690 15.570
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D A
X 0.00 1.20 3.70 0.70 0.00
Y 73.20 73.70 72.00 72.00 73.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 404.04 - 410.93
LUAS = + = + = 3.445 m² -3.44
2.00 2.00
STA 10+750
71.50
71.00
SISI : L
70.50
70.00
69.50
69.00
68.50
68.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00
TITIK A B C D A
X 0.00 2.00 3.60 1.00 0.00
Y 71.00 71.00 69.00 69.00 71.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 457.40 - 466.60
LUAS = + = + = 4.600 m² -4.60
2.00 2.00
STA 10+775
71.00 SISI : L
70.00
69.00
68.00
67.00
66.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00
TITIK A B C D A
X 0.00 2.45 2.70 1.00 0.00
Y 70.20 70.20 68.00 68.00 70.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 420.40 - 429.53
LUAS = + = + = 4.565 m² -4.57
2.00 2.00
STA 10+850
60.00 SISI : R
59.50
59.00
58.50
58.00
57.50
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50
TITIK A B C D A
X 5.40 5.60 8.00 7.50 5.40
Y 58.40 59.60 59.50 58.40 58.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 1560.24 - 1565.45
LUAS = + = + = 2.605 m² -2.60
2.00 2.00
STA 10+875
59.00
58.00
SISI : R
57.00
56.00
55.00
54.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D A
X 4.50 5.50 9.20 7.50 4.50
Y 55.70 58.00 58.60 55.70 55.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 1513.49 - 1530.10
LUAS = + = + = 8.305 m² -8.31
2.00 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D A
X 4.50 4.70 10.20 7.50 4.50
Y 52.80 55.70 58.20 52.80 52.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 1458.75 - 1490.40
LUAS = + = + = 15.825 m² -15.83
2.00 2.00
STA 10+950
59.00
57.00
55.00
SISI : R
53.00
51.00
49.00
47.00
45.00
4.00 6.00 8.00 10.00 12.00 14.00 16.00
TITIK A B C D E F A
X 6.40 6.60 14.60 11.00 10.00 7.50 6.40
Y 45.60 52.00 57.95 50.60 50.60 45.60 45.60
S(Xn x Yn+1) - S(Xn+1 x Yn) 2808.63 - 2874.95
LUAS = + = + = 33.160 m² -33.16
2.00 2.00
STA 10+975
63.00
58.00 SISI : R
53.00
48.00
43.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
TITIK A B C D E F G A
X 4.40 4.60 14.10 15.50 11.00 10.00 7.50 4.40
Y 43.80 49.40 57.40 57.40 48.80 48.80 43.80 43.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3350.44 - 3465.84
LUAS = + = + = 57.700 m² -57.70
2.00 2.00
STA 11+000
57.00 SISI : R
52.00
47.00
42.00
4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00
TITIK A B C D E F A
X 5.40 5.60 16.00 11.00 10.00 7.50 5.40
Y 42.40 48.40 58.00 47.40 47.40 42.40 42.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 2607.96 - 2708.30
LUAS = + = + = 50.170 m² -50.17
2.00 2.00
STA 11+025
56.00
54.00
52.00
SISI : R
50.00
48.00
46.00
44.00
42.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00
TITIK A B C D E F A
X 6.30 6.60 14.50 11.00 10.00 7.50 6.30
Y 42.20 47.90 54.20 47.20 47.20 42.20 42.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 2601.59 - 2661.13
LUAS = + = + = 29.770 m² -29.77
2.00 2.00
STA 11+050
45.00
SISI : R
44.00
43.00
42.00
41.00
6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00
TITIK A B C D A
X 6.40 6.60 8.75 7.50 6.40
Y 42.40 44.20 44.60 42.40 42.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 1266.24 - 1272.45
LUAS = + = + = 3.105 m² -3.10
2.00 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D A
X 5.40 5.60 8.30 7.50 5.40
Y 44.00 44.70 45.60 44.00 44.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 1191.94 - 1197.01
LUAS = + = + = 2.535 m² -2.54
2.00 2.00
STA 11+200
54.00 SISI : R
52.00
50.00
48.00
46.00
44.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00
TITIK A B C D A
X 4.40 4.60 10.20 7.50 4.40
Y 47.50 50.70 53.00 47.50 47.50
S(Xn x Yn+1) - S(Xn+1 x Yn) 1307.63 - 1342.14
LUAS = + = + = 17.255 m² -17.26
2.00 2.00
STA 11+225
53.00
52.50 SISI : R
52.00
51.50
51.00
50.50
50.00
5.50 6.00 6.50 7.00 7.50 8.00 8.50
TITIK A B C D A
X 5.70 5.80 8.20 7.50 5.70
Y 51.00 51.50 52.40 51.00 51.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 1398.17 - 1401.80
LUAS = + = + = 1.815 m² -1.81
2.00 2.00
STA 11+250
58.00
57.00 SISI : R
56.00
55.00
54.00
53.00
52.00
4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50
TITIK A B C D A
X 5.00 7.80 9.00 7.50 5.00
Y 54.10 56.80 57.15 54.10 54.10
S(Xn x Yn+1) - S(Xn+1 x Yn) 1622.42 - 1632.31
LUAS = + = + = 4.943 m² -4.94
2.00 2.00
STA 11+350
70.00
68.00
SISI : R
66.00
64.00
62.00
60.00
5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00
TITIK A B C A
X 6.00 9.70 7.50 6.00
Y 63.85 67.80 63.85 63.85
S(Xn x Yn+1) - S(Xn+1 x Yn) 1505.02 - 1510.95
LUAS = + = + = 2.962 m² -2.96
2.00 2.00
STA 11+375
80.00
SISI : R
75.00
70.00
65.00
60.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
TITIK A B C D E F A
X 4.00 7.40 13.60 11.00 10.00 7.50 4.00
Y 65.80 71.10 76.20 70.90 70.90 65.80 65.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3743.92 - 3796.03
LUAS = + = + = 26.055 m² -26.05
2.00 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D A
X 5.00 7.30 9.70 7.50 5.00
Y 67.00 70.85 71.40 67.00 67.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 2027.87 - 2046.85
LUAS = + = + = 9.487 m² -9.49
2.00 2.00
STA 11+425
72.00 SISI : L
71.00
70.00
69.00
68.00
67.00
66.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50
TITIK A B C D A
X 5.50 7.30 9.10 7.50 5.50
Y 68.20 70.80 71.50 68.20 68.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 2043.47 - 2053.49
LUAS = + = + = 5.010 m² -5.01
2.00 2.00
STA 11+450
78.00 SISI : R
74.00
70.00
66.00
62.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
TITIK A B C D E F A
X 4.50 7.30 13.50 11.00 10.00 7.50 4.50
Y 68.90 73.60 79.00 73.90 73.90 68.90 68.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 3924.20 - 3968.87
LUAS = + = + = 22.335 m² -22.34
2.00 2.00
STA 11+475
85.00 SISI : R
80.00
75.00
70.00
65.00
60.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00
TITIK A B C D E F A
X 3.00 6.80 13.80 11.00 10.00 7.50 3.00
Y 68.80 74.60 79.50 73.80 73.80 68.80 68.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3798.64 - 3869.72
LUAS = + = + = 35.540 m² -35.54
2.00 2.00
STA 11+500
80.00 SISI : R
75.00
70.00
65.00
60.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
TITIK A B C D E F A
X 4.70 8.80 13.50 11.00 10.00 7.50 4.70
Y 67.10 72.95 76.90 72.10 72.10 67.10 67.10
S(Xn x Yn+1) - S(Xn+1 x Yn) 3960.29 - 3998.33
LUAS = + = + = 19.020 m² -19.02
2.00 2.00
STA 11+550
68.00 SISI : R
67.00
66.00
65.00
64.00
63.00
62.00
61.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00
TITIK A B C D A
X 5.50 7.30 9.40 7.50 5.50
Y 63.70 66.80 67.50 63.70 63.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 1936.68 - 1949.53
LUAS = + = + = 6.425 m² -6.42
2.00 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D E F A
X 3.20 6.00 12.75 11.00 10.00 7.50 3.20
Y 62.60 67.00 71.20 67.10 67.10 62.60 62.60
S(Xn x Yn+1) - S(Xn+1 x Yn) 3330.73 - 3387.62
LUAS = + = + = 28.448 m² -28.45
2.00 2.00
STA 11+600
70.00
68.00
SISI : R
66.00
64.00
62.00
60.00
58.00
56.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
TITIK A B C D A
X 4.70 7.30 11.00 7.50 4.70
Y 60.80 65.40 68.00 60.80 60.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 1928.58 - 1959.00
LUAS = + = + = 15.210 m² -15.21
2.00 2.00
STA 11+625
62.00
60.00
SISI : R
58.00
56.00
54.00
52.00
50.00
48.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00
TITIK A B C D A
X 4.90 7.00 11.50 8.25 4.90
Y 52.71 56.00 59.50 52.71 52.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 1731.96 - 1762.15
LUAS = + = + = 15.093 m² -15.09
2.00 2.00
STA 11+675
62.00
60.00
SISI : R
58.00
56.00
54.00
52.00
50.00
48.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
TITIK A B C D E F A
X 5.50 8.30 12.00 11.00 10.00 7.50 5.50
Y 53.12 57.60 59.60 57.95 57.95 53.12 53.12
S(Xn x Yn+1) - S(Xn+1 x Yn) 3073.93 - 3093.98
LUAS = + = + = 10.026 m² -10.03
2.00 2.00
STA 11+690
60.00
58.00
SISI : R
56.00
54.00
52.00
50.00
48.00
46.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00
TITIK A B C D E F A
X 5.60 8.30 12.00 11.00 10.00 7.50 5.60
Y 51.30 57.60 58.90 56.70 56.70 51.30 51.30
S(Xn x Yn+1) - S(Xn+1 x Yn) 3013.28 - 3044.42
LUAS = + = + = 15.570 m² -15.57
2.00 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
40
35
30
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00
40
30
20
10
0
0.80 1.00 1.20 1.40 1.60 1.80 2.00
9
6
3
0
1
45
40
35
30
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00
9
6
3
0
1
9
6
3
0
1
15
104.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00
5
0
2
1
0
0
0.80 1.00 1.20 1.40 1.60 1.80 2.00
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
0
1
0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
1.5
1
0.5
0
1.5
1
0.5
0
1
1.5
1
0.5
0
1
55
50
1
110
90
70
50
0.80 1.00 1.20 1.40 1.60 1.80 2.00
0
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
0
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 86.40 266.40 51.24 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 87.84 272.69 50.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.44
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 138.00 248.40 71.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 142.00 255.60 69.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.60
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 166.60 183.60 70.20 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 171.99 189.54 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.57
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 321.84 333.20 467.20 438.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 327.04 476.80 446.25 315.36 0.00 0.00 0.00 0.00 0.00 0.00
2.60
9.00
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 261.00 322.30 512.44 417.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 306.35 533.60 439.50 250.65 0.00 0.00 0.00 0.00 0.00 0.00
8.31
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 250.65 273.54 538.56 396.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 248.16 568.14 436.50 237.60 0.00 0.00 0.00 0.00 0.00 0.00
15.83
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 332.80 382.47 738.76 556.60 456.00 342.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 300.96 759.20 637.45 506.00 379.50 291.84 0.00 0.00 0.00 0.00
33.16
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 217.36 264.04 809.34 756.40 536.80 438.00 328.50 0.00 0.00 0.00
Xn+1 x Yn 201.48 696.54 889.70 631.40 488.00 366.00 192.72 0.00 0.00 0.00
57.70
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 261.36 324.80 758.40 521.40 424.00 318.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 237.44 774.40 638.00 474.00 355.50 228.96 0.00 0.00 0.00 0.00
50.17
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 301.77 357.72 684.40 519.20 422.00 316.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 278.52 694.55 596.20 472.00 354.00 265.86 0.00 0.00 0.00 0.00
29.77
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 282.88 294.36 371.00 318.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 279.84 386.75 334.50 271.36 0.00 0.00 0.00 0.00 0.00 0.00
3.10
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 241.38 255.36 365.20 330.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 246.40 371.01 342.00 237.60 0.00 0.00 0.00 0.00 0.00 0.00
2.54
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 223.08 243.80 484.50 356.25 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 218.50 517.14 397.50 209.00 0.00 0.00 0.00 0.00 0.00 0.00
17.26
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 293.55 303.92 418.20 382.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 295.80 422.30 393.00 290.70 0.00 0.00 0.00 0.00 0.00 0.00
1.81
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 284.00 445.77 486.90 405.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 421.98 511.20 428.63 270.50 0.00 0.00 0.00 0.00 0.00 0.00
4.94
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 406.80 619.35 478.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 619.35 508.50 383.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.96
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 284.40 563.88 964.24 779.90 658.00 493.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 486.92 966.96 838.20 709.00 531.75 263.20 0.00 0.00 0.00 0.00
26.05
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 354.25 521.22 649.90 502.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 489.10 687.25 535.50 335.00 0.00 0.00 0.00 0.00 0.00 0.00
9.49
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 389.40 521.95 620.62 511.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 497.86 644.28 536.25 375.10 0.00 0.00 0.00 0.00 0.00 0.00
5.01
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 331.20 576.70 997.65 812.90 689.00 516.75 0.00 0.00 0.00 0.00
Xn+1 x Yn 502.97 993.60 869.00 739.00 554.25 310.05 0.00 0.00 0.00 0.00
22.34
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 223.80 540.60 1018.44 811.80 688.00 516.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 467.84 1029.48 874.50 738.00 553.50 206.40 0.00 0.00 0.00 0.00
35.54
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 342.87 676.72 973.35 793.10 671.00 503.25 0.00 0.00 0.00 0.00
Xn+1 x Yn 590.48 984.83 845.90 721.00 540.75 315.37 0.00 0.00 0.00 0.00
19.02
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 367.40 492.75 598.78 477.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 465.01 627.92 506.25 350.35 0.00 0.00 0.00 0.00 0.00 0.00
6.42
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 214.40 427.20 855.53 738.10 626.00 469.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 375.60 854.25 783.20 671.00 503.25 200.32 0.00 0.00 0.00 0.00
28.45
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 307.38 496.40 668.80 456.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 443.84 719.40 510.00 285.76 0.00 0.00 0.00 0.00 0.00 0.00
15.21
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 274.40 416.50 606.19 434.87 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 368.98 644.00 490.88 258.29 0.00 0.00 0.00 0.00 0.00 0.00
15.09
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 316.80 494.68 695.40 637.45 531.20 398.40 0.00 0.00 0.00 0.00
Xn+1 x Yn 440.90 691.20 655.60 579.50 434.63 292.16 0.00 0.00 0.00 0.00
10.03
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 322.56 488.87 680.40 623.70 513.00 384.75 0.00 0.00 0.00 0.00
Xn+1 x Yn 425.79 691.20 647.90 567.00 425.25 287.28 0.00 0.00 0.00 0.00
15.57
P
P
P
P
P
P
P
P
P
P
BACK UP DATA QUANTITY
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E A
X 0.00 1.68 3.18 5.30 0.58 0.00
Y 8.71 8.73 8.44 6.03 5.97 8.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 70.06 - 90.61
LUAS = + = + = 10.276 m² -10.28
2.00 2.00
STA 5+500
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.23 4.23 5.86 1.63 0.93 0.43 0.00
Y 9.67 9.01 8.78 6.03 5.97 8.93 8.93 9.67
S(Xn x Yn+1) - S(Xn+1 x Yn) 115.87 - 139.98
LUAS = + = + = 12.055 m² -12.05
2.00 2.00
STA 5+520
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.21 4.21 5.83 1.61 0.90 0.40 0.00
Y 9.62 8.84 8.17 6.03 5.97 8.93 8.93 9.62
S(Xn x Yn+1) - S(Xn+1 x Yn) 112.68 - 134.34
LUAS = + = + = 10.83 m² -10.83
2.00 2.00
STA 0+000
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+000
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
BACK UP DATA QUANTITY
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E A
X 0.00 1.87 3.17 4.40 0.37 0.00
Y 6.78 6.62 6.04 4.96 4.92 6.78
S(Xn x Yn+1) - S(Xn+1 x Yn) 51.17 - 62.08
LUAS = + = + = 5.454 m² -5.45
2.00 2.00
STA 4+950
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.92 5.22 6.45 0.92 0.52 0.42 0.00
Y 9.46 9.02 7.05 4.96 4.92 7.08 7.60 9.46
S(Xn x Yn+1) - S(Xn+1 x Yn) 99.70 - 139.76
LUAS = + = + = 20.028 m² -20.03
2.00 2.00
STA 4+960
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E A
X 0.00 1.74 3.04 5.76 0.44 0.00
Y 7.41 7.21 6.91 4.96 4.92 7.41
S(Xn x Yn+1) - S(Xn+1 x Yn) 58.69 - 76.79
LUAS = + = + = 9.048 m² -9.05
2.00 2.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
BACK UP DATA QUANTITY
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 2.39 4.19 6.99 8.49 7.94 7.44 5.73 0.00
Y 4.42 6.74 7.65 8.22 8.22 7.26 7.26 4.30 4.42
S(Xn x Yn+1) - S(Xn+1 x Yn) 286.83 - 322.98
LUAS = + = + = 18.077 m² -18.08
2.00 2.00
STA 8+275
14.00
12.00
10.00
8.00
6.00
4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G A
X 0.00 2.43 4.23 7.03 11.50 9.57 9.07 7.43 6.93 5.22 0.00
Y 4.41 7.81 11.45 13.25 13.45 10.09 10.09 7.26 7.26 4.30 4.41
S(Xn x Yn+1) - S(Xn+1 x Yn) 563.71 - 660.01
LUAS = + = + = 48.148 m² -48.15
2.00 2.00
STA 8+300
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.80 2.20 4.90 7.63 6.81 6.31 4.60 0.00 0.00
Y 5.72 5.89 6.90 8.71 9.52 8.10 8.10 5.14 5.24 5.72
S(Xn x Yn+1) - S(Xn+1 x Yn) 244.89 - 271.07
LUAS = + = + = 13.093 m² -13.09
2.00 2.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
BACK UP DATA QUANTITY
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+100
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+150
11.00
10.00
9.00
8.00
7.00
6.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+200
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+250
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
BACK UP DATA QUANTITY
STA 0+300
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+350
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+400
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+425
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+450
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
BACK UP DATA QUANTITY
STA 0+475
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+525
19.00 Chart Title
18.00
17.00
16.00
15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+575
19.00 Chart Title
18.00
17.00
16.00
15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+625
19.00 Chart Title
18.00
17.00
16.00
15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 0+675
19.00 Chart Title
18.00
17.00
16.00
15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X
BACK UP DATA QUANTITY
STA 8+400
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
STA 8+450
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.70 4.30 7.40 6.51 6.01 4.30 0.00
Y 4.74 8.20 8.78 9.01 7.62 7.62 4.66 4.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 216.79 - 250.21
LUAS = + = + = 16.712 m² -16.71
2.00 2.00
STA 8+500
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.50 4.19 7.19 6.39 5.89 4.19 0.00
Y 4.68 5.88 8.69 9.43 7.56 7.56 4.60 4.68
S(Xn x Yn+1) - S(Xn+1 x Yn) 210.56 - 235.25
LUAS = + = + = 12.343 m² -12.34
2.00 2.00
STA 8+550
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X 0.00 2.83 4.94 3.23 0.00
Y 5.45 7.52 8.35 5.39 5.45
S(Xn x Yn+1) - S(Xn+1 x Yn) 67.85 - 79.53
LUAS = + = + = 5.841 m² -5.84
2.00 2.00
STA 8+600
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
BACK UP DATA QUANTITY
STA 8+700
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.30 4.80 7.27 5.81 5.31 3.60 0.00
Y 2.28 5.79 7.44 7.72 5.16 5.16 2.20 2.28
S(Xn x Yn+1) - S(Xn+1 x Yn) 141.58 - 177.94
LUAS = + = + = 18.182 m² -18.18
2.00 2.00
STA 8+750
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.50 2.20 5.04 3.81 3.31 1.60 0.00
Y 3.22 4.64 7.43 8.28 6.14 6.14 3.18 3.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 91.98 - 110.96
LUAS = + = + = 9.494 m² -9.49
2.00 2.00
STA 8+800
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.11 3.51 6.32 4.92 4.42 2.71 0.00
Y 3.84 5.13 8.50 9.18 6.75 6.75 3.79 3.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 144.65 - 169.23
LUAS = + = + = 12.288 m² -12.29
2.00 2.00
STA 8+850
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F A
X 0.00 1.92 3.66 3.22 2.72 1.02 0.00
Y 3.73 6.70 7.43 6.67 6.67 3.71 3.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 74.00 - 80.53
LUAS = + = + = 3.268 m² -3.27
2.00 2.00
STA 8+900
9.00
8.00
7.00
6.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
BACK UP DATA QUANTITY
STA 8+950
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.92 2.92 5.27 4.23 3.73 2.02 0.00
Y 3.77 5.09 7.87 8.50 6.69 6.69 3.73 3.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 117.12 - 134.25
LUAS = + = + = 8.566 m² -8.57
2.00 2.00
STA 9+000
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F A
X 0.00 1.74 4.84 4.05 3.55 1.84 0.00
Y 4.44 7.22 8.73 7.36 7.36 4.40 4.44
S(Xn x Yn+1) - S(Xn+1 x Yn) 104.46 - 117.73
LUAS = + = + = 6.633 m² -6.63
2.00 2.00
STA 9+050
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D A
X 0.00 0.93 2.20 1.03 0.00
Y 4.75 6.08 6.76 4.73 4.75
S(Xn x Yn+1) - S(Xn+1 x Yn) 21.59 - 24.75
LUAS = + = + = 1.580 m² -1.58
2.00 2.00
STA 9+100
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.58 3.58 5.69 4.99 4.49 2.78 0.00
Y 3.49 5.58 6.97 7.62 6.40 6.40 3.44 3.49
S(Xn x Yn+1) - S(Xn+1 x Yn) 131.73 - 149.67
LUAS = + = + = 8.968 m² -8.97
2.00 2.00
STA 9+200
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
BACK UP DATA QUANTITY
TITIK A B C D A
X 0.00 1.90 3.13 1.60 0.00
Y 5.14 7.04 7.73 5.08 5.14
S(Xn x Yn+1) - S(Xn+1 x Yn) 38.80 - 44.14
LUAS = + = + = 2.670 m² -2.67
2.00 2.00
STA 9+250
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.58 2.88 5.58 4.59 4.09 2.38 0.00
Y 5.03 6.28 8.99 9.66 7.95 7.95 4.99 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 146.22 - 166.91
LUAS = + = + = 10.348 m² -10.35
2.00 2.00
STA 9+400
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 1.27 3.77 6.17 9.22 7.58 7.08 5.37 0.00
Y 4.73 5.03 9.03 9.96 10.42 7.58 7.58 4.63 4.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 298.86 - 345.94
LUAS = + = + = 23.538 m² -23.54
2.00 2.00
STA 9+450
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.00 3.00 4.25 3.31 2.81 1.10 0.00
Y 5.00 7.77 9.25 9.57 7.93 7.93 4.98 5.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 117.41 - 130.32
LUAS = + = + = 6.456 m² -6.46
2.00 2.00
STA 9+500
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.49 3.29 6.69 5.49 4.99 3.29 0.00
Y 3.18 3.73 6.39 8.13 6.07 6.07 3.11 3.18
S(Xn x Yn+1) - S(Xn+1 x Yn) 129.76 - 151.49
LUAS = + = + = 10.866 m² -10.87
2.00 2.00
STA 9+550
7.00
6.00
5.00
BACK UP DATA QUANTITY
5.00
3.1 (1) GALIAN BIASA
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D A
X 0.00 0.84 2.08 0.95 0.00
Y 4.25 5.46 6.21 4.25 4.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 18.09 - 20.82
LUAS = + = + = 1.365 m² -1.37
2.00 2.00
STA 9+600
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 2.19 3.99 6.19 7.14 6.00 5.50 3.79 0.00
Y 5.03 6.71 8.68 9.62 9.89 7.91 7.91 4.95 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 268.83 - 292.98
LUAS = + = + = 12.071 m² -12.07
2.00 2.00
STA 9+650
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.60 3.20 4.09 3.41 2.91 1.20 0.00
Y 3.48 6.24 7.34 7.60 6.42 6.42 3.46 3.48
S(Xn x Yn+1) - S(Xn+1 x Yn) 98.43 - 107.85
LUAS = + = + = 4.708 m² -4.71
2.00 2.00
STA 9+700
19.00
18.00
17.00
16.00
15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G H A
X 0.00 3.05 4.65 6.65 7.93 6.86 6.36 4.65 0.00
Y 3.19 4.72 6.24 7.49 7.91 6.06 6.06 3.10 3.19
S(Xn x Yn+1) - S(Xn+1 x Yn) 230.55 - 253.54
LUAS = + = + = 11.491 m² -11.49
2.00 2.00
STA 9+750
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H A
X 0.00 1.77 3.47 5.07 6.87 5.58 5.07 3.37 0.00
Y 4.18 4.59 6.67 8.22 9.31 7.07 7.07 4.11 4.18
S(Xn x Yn+1) - S(Xn+1 x Yn) 210.47 - 225.26
LUAS = + = + = 7.393 m² -7.39
2.00 2.00
STA 9+800
9.00
8.00
7.00
6.00
BACK UP DATA QUANTITY
7.00
3.1 (1) GALIAN BIASA
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.41 3.01 4.22 3.62 3.12 1.41 0.00
Y 4.21 6.10 7.80 8.19 7.14 7.14 4.19 4.21
S(Xn x Yn+1) - S(Xn+1 x Yn) 110.65 - 119.20
LUAS = + = + = 4.277 m² -4.28
2.00 2.00
STA 9+850
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.42 3.52 5.92 5.53 5.03 3.32 0.00
Y 4.71 6.06 7.58 8.28 7.61 7.61 4.65 4.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 166.00 - 182.16
LUAS = + = + = 8.080 m² -8.08
2.00 2.00
STA 9+900
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X 0.00 1.90 2.11 0.72 0.00
Y 5.94 8.25 8.33 5.93 5.94
S(Xn x Yn+1) - S(Xn+1 x Yn) 32.60 - 34.69
LUAS = + = + = 1.042 m² -1.04
2.00 2.00
STA 9+950
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.12 3.22 6.22 5.63 5.13 3.42 0.00
Y 5.16 6.13 7.79 9.08 8.05 8.05 5.09 5.16
S(Xn x Yn+1) - S(Xn+1 x Yn) 177.12 - 193.91
LUAS = + = + = 8.394 m² -8.39
2.00 2.00
STA 10+000
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X 0.00 1.19 2.99 4.49 3.40 2.90 1.19 0.00
Y 5.86 8.15 9.87 10.68 8.79 5.83 5.83 5.86
S(Xn x Yn+1) - S(Xn+1 x Yn) 126.90 - 144.45
LUAS = + = + = 8.776 m² -8.78
2.00 2.00
STA 10+050
11.00
10.00
9.00
BACK UP DATA QUANTITY
11.00
3.1 (1) GALIAN BIASA
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.55 4.25 5.75 8.85 7.76 7.26 5.55 0.00
Y 5.40 8.01 9.09 9.91 10.14 8.25 8.25 5.29 5.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 328.96 - 372.10
LUAS = + = + = 21.571 m² -21.57
2.00 2.00
STA 10+100
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.36 5.86 7.76 7.17 6.67 4.96 0.00
Y 4.84 7.31 8.43 8.72 7.70 7.70 4.74 4.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 250.02 - 276.64
LUAS = + = + = 13.309 m² -13.31
2.00 2.00
STA 10+150
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.58 2.18 4.28 7.48 6.38 5.88 4.18 0.00
Y 4.96 5.25 6.63 8.13 9.72 7.83 7.83 4.87 4.96
S(Xn x Yn+1) - S(Xn+1 x Yn) 221.13 - 244.33
LUAS = + = + = 11.603 m² -11.60
2.00 2.00
STA 10+200
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 1.28 2.88 4.58 6.88 8.10 6.44 6.19 4.48 0.00
Y 4.19 4.35 5.88 6.67 8.84 9.51 7.06 7.06 4.10 4.19
S(Xn x Yn+1) - S(Xn+1 x Yn) 279.48 - 298.88
LUAS = + = + = 9.701 m² -9.70
2.00 2.00
STA 10+250
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.30 3.40 5.70 8.40 7.21 6.71 5.00 0.00
Y 4.70 5.40 6.91 7.70 9.62 7.55 7.55 4.60 4.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 255.31 - 281.67
LUAS = + = + = 13.183 m² -13.18
2.00 2.00
STA 10+300
BACK UP DATA QUANTITY
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X 0.00 1.65 3.95 5.84 5.36 4.86 3.15 0.00
Y 4.91 6.14 7.80 8.65 7.81 7.81 4.85 4.91
S(Xn x Yn+1) - S(Xn+1 x Yn) 173.53 - 186.82
LUAS = + = + = 6.642 m² -6.64
2.00 2.00
STA 10+350
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 2.80 4.30 5.80 6.96 6.31 5.81 4.10 0.00
Y 2.90 3.67 5.72 6.67 6.90 5.77 5.77 2.81 2.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 189.53 - 204.20
LUAS = + = + = 7.336 m² -7.34
2.00 2.00
STA 10+400
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
TITIK A B C D E F G A
X 0.00 1.82 4.92 4.13 3.63 1.92 0.00
Y 3.88 5.89 8.17 6.80 6.80 3.84 3.88
S(Xn x Yn+1) - S(Xn+1 x Yn) 97.77 - 107.48
LUAS = + = + = 4.854 m² -4.85
2.00 2.00
STA 10+450
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 0.36 2.36 4.86 7.16 5.67 5.17 3.46 0.00
Y 4.48 4.63 6.58 8.13 9.03 7.37 7.37 4.41 4.48
S(Xn x Yn+1) - S(Xn+1 x Yn) 198.37 - 217.52
LUAS = + = + = 9.577 m² -9.58
2.00 2.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³
4+550 2.046
834,511.55 25 20,862,788.69
4+575 ###
834,518.76 25 20,862,968.98
4+600 16.469
4+700 3.728
3.73 17 63.38
4+717 3.728
4+740 5.409
4.62 60 277.21
4+800 3.831
4.78 50 238.98
4+850 5.728
5.73 25 143.20
4+875 5.728
6.69 25 167.20
4+900 7.648
6.26 50 313.11
4+950 4.876
6.00 50 300.24
5+000 7.133
5.22 50 260.82
5+050 3.299
SUJI PRAYITNO, ST
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
Bagian Pelak. Kegiatan : Pembangunan Jalan Barakang - Topoyo - Karossa
Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m 2
m m m³
5+500 1.407
0.94 50 47.18
5+550 0.480
3.58 25 89.43
5+575 6.675
4.71 25 117.87
5+600 2.755
7.19 50 359.32
5+650 11.618
12.30 25 307.47
5+675 12.980
14.04 25 350.91
5+700 15.093
12.56 50 627.96
5+750 10.026
10.03 50 501.27
5+800 10.026
23.49 25 587.25
5+825 36.954
22.02 25 550.60
5+850 7.094
7.09 25 177.34
5+875 7.094
4.98 25 124.39
5+900 2.858
SUJI PRAYITNO, ST
Koordinator Lapangan Quantity Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³
5+900 2.858
2.54 25 63.44
5+925 2.218
1.70 25 42.39
5+950 1.174
6+975 27.278
42.21 25 1,055.14
7+000 57.134
7+200 4.500
4.50 50 225.00
7+250 4.500
7+350 5.220
5.63 50 281.50
7+400 6.040
24.95 25 623.63
7+425 43.850
30.60 25 764.91
7+450 17.343
18.85 50 942.31
7+500 20.350
13.12 25 327.94
7+525 5.885
4.86 25 121.59
7+550 3.843
SUB TOTAL 325 4,447.852
KOMULATIF 650 41,735,810.664
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³
7+750 2.700
3.68 50 184.01
7+800 4.660
6.72 50 336.01
7+850 8.780
9.64 25 241.06
7+875 10.505
7.71 25 192.75
7+900 4.915
4.53 50 226.56
7+950 4.148
4.32 150 648.56
8+100 4.500
4.31 20 86.10
8+120 4.110
6.37 80 509.60
8+200 8.630
13.98 25 349.44
8+225 19.325
10.58 25 264.61
8+250 1.844
3.44 25 85.95
8+275 5.032
6.20 25 154.97
8+300 7.365
6.04 25 151.00
8+325 4.715
SUB TOTAL 575 3,430.631
KOMULATIF 1,150 41,739,241.296
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³
8+850 2.400
15.42 125 1,927.97
8+975 28.448
25.90 25 647.59
9+000 23.360
19.08 50 953.88
9+050 14.795
19.71 50 985.31
9+100 24.617
16.11 25 402.75
9+125 7.602
9.91 25 247.84
9+150 12.225
10.43 25 260.75
9+175 8.635
9.98 25 249.44
9+200 11.320
7.21 25 180.22
9+225 3.098
2.80 25 70.03
9+250 2.505
4.94 25 123.38
9+275 7.365
11.56 25 288.94
9+300 15.750
SUB TOTAL 450 6,338.094
KOMULATIF 450 41,745,579.389
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
TITIK A B C D E F G A
X 0.00 0.78 2.18 3.86 3.59 3.09 2.08 0.00
Y 6.33 7.54 9.38 10.25 9.27 9.27 6.31 6.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 131.39 - 142.31
LUAS = + = + = 5.461 m² -5.46
2.00 2.00
STA 7+560
10.00
9.00
8.00
7.00
6.00
5.00
TITIK 4.00 A B C D E F G A
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
X 0.00 1.30 6.30 5.45 5.10 4.50 1.60 0.00
Y 5.74 9.40 15.10 9.25 9.25 5.20 5.66 5.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 189.47 - 246.10
LUAS = + = + = 28.314 m² -28.31
2.00 2.00
STA 7+602
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G A
X 0.00 3.29 5.09 7.52 7.09 6.59 5.89 0.00
Y 5.03 7.39 8.49 9.58 7.89 7.89 4.94 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 254.21 - 284.47
LUAS = + = + = 15.132 m² -15.13
2.00 2.00
TYPE D2/2 (TUNGGAL)
1/2
BERAT
Ø Ukuran (cm) Panjang Berat
Bangunan Bentuk SATUAN Jumlah
(mm) (cm) (kg)
a b c d (kg/m)
a a a
d d b (tekuk)
c
b b
B
A
d d
a
D a
a
E
C BOX CULVERT
b
a a
A
variable A A
d b b
B B
c
variable
B
b
a a
DINDING SAYAP
KERB DINDING PENAHAN BAWAH
kg/m
5097 10194
10 16 144 22
654.24 55 654 600 65,424 148943.00 115218.00 724 608
1,178.24 98 1,178 1,080 117824 56
396 363 39600 448 3,584 46
146 133 14560 24
0 vertikal horizontal
178 72 32 448.30
35.16 3 57 52 54 88.6 32 304.00
34.11 3 39 36 104.6 32 304.00
81.00 7 250
19 165 120.8 32 304.00
63 58 6,327 709 136.9 32 304.00
52 48 5208 153 32 297.20
169.1 32 281.30
31 28 3072 185.2 32 265.40
20 18 1952 201.3 32 249.50
4324.229 217.4 32 233.60
12 1,728 4637.185 233.5 32 217.80
16 688 249.6 32 201.90
2,012 265.8 32 186.00
a
1,539 281.9 32 170.00
589 298 32 154.20
314 32 138.30
330.2 32 122.40
346.3 32 106.50
362.4 32 90.60
74.70
58.80
42.90
27.00
4130.6 608 4582.4
8869.2 9785.8
1178 45.1
47.12 15.1
1182
574 28.9
28.7 920
vertikal horizontal
16 362 32 160 16
17 330 32 160 16
18 398 32 160 16
19 266 32 160 16
20 234 32 157 16
21 202 32 149 16
22 170 32 141 16
23 138 32 133 16
24 106 32 125 16
25 117 16
26 109 16
27 110 16
28 93 16
29 85 16
30 77 16
31 69 16
32 61 16
33 53 16
34 45 16
35 37 16
36 29 16
37 21 16
38 2206 288 2251 352
621 2494 2603
9785.8 5097
578
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008
250
25
25 150 25
5
2
5
2
1
0
5
5
1
2
5
2
5
2
25 150 25
25 25
Section of Box
A = Ø 12 - 15
B = Ø 12 - 15 30
30
St r u k t u r Tu m pu a n
20 P er m u k a a n P la t
B e t on K - 250
2035
A n g k er Ø 12 m m Ja r a k 500 m m
50 D a la m 2 J a ja r P a n ja n g 500 m m
Total Total
DIAMTE Length (m) Space Total Leght Weigth per
sketsa W (kg/m) Number of Weigth
R (MM) (cm) length (m) bar (kg)
a b c d e (kg)
A 12 2.53 0.28 2.53 0.28 0.06 15.00 5.74 0.888 74 427 5.097 378.877
TOTAL 738.241
Volume
PEKERJAAN jml Baja Tulangan Ket.
(buah) (Kg) (Kg)
TOTAL 8,064.74
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
35.556 36
32.536 33
A = Ø 12 - 15
B = Ø 12 - 15 30
30
St r u k t u r Tu m p ua n
2 0 Pe r m u k a a n P la t
Be t o n K - 250
20 35
A n g k er Ø 12 m m J a r a k 50 0 m m
1.188 2
50 D a la m 2 J a ja r P a n ja n g 50 0 m m
71
284
133 12
531
369.12
73.82
2,555.89
255.59
:
30
St r u k t u r Tu m p u a n
m u ka a n Pla t
B e ton K - 250
A n g k er Ø 12 m m J a r a k 50 0 m m
D a la m 2 Ja ja r P a n ja n g 50 0 m m
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
BACK UP DATA QUANTITY
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008
250
10
Volume
PEKERJAAN jml Beton Ket.
(buah) (m3) (m3)
Lantai kerja
Box Culvert 2.00 x 2.00 m 1.00 2.55 2.55
TOTAL 2.550
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
1 0
200
25.5
1 0
200
:
200
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
MUTUAL CHECK
SUB PROJECT : ROAD BETTERMENT BARAKANG - TOPOYO - KAROSSA
PACKAGE NAME : ROAD BETTERMENT TOPOYO - KAROSSA -BARAS &
S. LOMBANG - LOMBANG BRIDGE, CS. (EIB-101)
CONTRAC NUMBER : 01-053/EIB-101/RB/A/IBRD 4744-IND/0206
CONTRAC DATE : FEBRUARY, 15 2006
7.10.(3) GABIONS
SECTION I
7+500
7.4 10 74
7+510
8+700
5.7 10 57
8+710
TOTAL 131
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
250
25
25 150 25
5
2
5
2
1
0
5
5
1
2
5
2
5
2
25 150 25
25 25
Section of Box
Volume
PEKERJAAN jml Beton Ket.
(buah) (m3) (m3)
TOTAL 87.650
file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quality Eng/CI Quantity
0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl
file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor
file:///conversion/tmp/scratch/509046377.xlsx
8.4 (6) Patok Kilometer
25 150 25
5
2
25
0
1
5
5
2
1
5
2
5
2
25 150 25
25 25
Section of Box
10.01 250
0
1
13.75
11.00
1.375 26.125
8.8
34.925
13.75 6.875
13.75
110
13.75 55.00
385
3080
20.06
10.03125
32.65 12.59
6.29375
32.65 701.2
file:///conversion/tmp/scratch/509046377.xlsx
:
file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20
0.65
1.85
CL BRG
1.70
0.50
0.50 0.50
0.95
0.40
0.80
4.50
SECTION - 1 (L = 11 m)
SCALE 1 : 50
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
V OLUME
SKETSA DIMENSION REMARKS
( M3 )
BOX CULVERT STA 09+350 DINDING & LANTAI
I 15.000
50
26
250
SAYAP
I 1.335
KERB
26 I 0.453
DINDING PENAHAN
I 0.894
150 26 250 26
20
Err:509
GALIAN BATU
0+023 171.3221
0+020 148.3065
0+040 271.665
0+010 69.49248
-8+250 -273053
8+300 254138.5
0
-18253.59
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G H I J K L M A
X 0.00 3.00 5.62 5.89 3.50 2.25 0.00 -2.50 -4.20 -4.50 -5.97 -5.62 -3.00 0.00
Y 4.48 4.42 4.31 3.85 4.29 4.41 4.48 4.37 4.30 4.21 3.70 4.31 4.42 4.48
S(Xn x Yn+1) - S(Xn+1 x Yn) -23.75 - -20.97
LUAS = + = + = 1.388 m² -1.39
2.00 2.00
STA 0+050
6.00
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G A
X 0.00 -2.78 -4.50 -5.92 -5.62 -3.00 -2.78 0.00
Y 4.46 4.40 4.23 3.77 4.29 4.40 4.40 4.46
S(Xn x Yn+1) - S(Xn+1 x Yn) -104.41 - -103.51
LUAS = + = + = 0.450 m² -0.45
2.00 2.00
STA 0+100
6.00
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G H I J K L M N O P Q R S T
X 0.00 -2.73 -4.50 -5.30 -5.92 -5.62 -3.00 -2.73 0.00
Y 4.568 4.508 4.371 4.143 3.878 4.403 4.508 4.508 4.568
S(Xn x Yn+1) - S(Xn+1 x Yn) -128.53 - -127.76
LUAS = + = + = 0.383 m² -0.38
2.00 2.00
STA 0+150
6.00
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G H I J K L M N O P A
X 0.00 1.50 3.00 5.62 5.87 5.69 2.25 1.50 0.00 -3.00 -4.97 -5.80 -5.90 -5.62 -4.97 -3.00 0.00
Y 4.504 4.474 4.444 4.339 3.906 3.906 4.444 4.474 4.504 4.444 4.365 3.844 3.854 4.339 4.365 4.444 4.504
S(Xn x Yn+1) - S(Xn+1 x Yn) -33.61 - -31.61
LUAS = + = + = 1.000 m² -1.00
2.00 2.00
STA 0+200
6.00
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G H I J K L M N O P Q R S T
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
5.00
4.00
3.00
2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00
TITIK A B C D E F G H I J K L M N O P Q R S T
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
3.00 3.00
t t
EXISTING
b b
DIMENSI
VOLUME
NO. STATION (STA) L/R p a b t KETERANGAN
(m) (m) (m) (m) (m³)
JUMLAH 7,690.600
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+000 0.000
1.65 50 82.50
0+050 3.300
3.30 450 1,485.00
0+500 3.300
3.30 250 825.00
0+750 3.300
1.65 50 82.50
0+800 0.000
2+277 0.000
1.65 25 41.25
2+302 3.300
1.65 25 41.25
2+327 0.000
6+000
0.98 50 48.86
6+050 1.954
2.21 50 110.64
6+100 2.471
5.38 50 269.23
6+150 8.298
10.99 50 549.45
6+200 13.680
14.67 50 733.28
6+250 15.651
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+250 15.651
14.53 50 726.60
6+300 13.413
9.09 50 454.58
6+350 4.771
3.27 50 163.65
6+400 1.775
0.89 50 44.38
6+450
TOTAL
a a
d d b (te kuk)
c
b b
B
d
A d
D a
a
E
C BOX CULVERT
a a
A variable
A A
d b b
B
c
variable
B B
b
a a
a a
DINDING SAYAP
KERB DINDING PENAHAN BAWAH
Berat kg/m
Jumlah
(kg)
5097 10194
10 16 144
75.00 207.775 23,400 39486.00 54330.00 724
75 174.478 19650
18 184.121 20736 46
18 176.130 19836
0 vertikal
178 72 32
54 88.6 32
104.6 32
120.8 32
- 136.9 32
0 153 32
169.1 32
0 185.2 32
0 201.3 32
TOTAL 742.504 217.4 32
233.5 32
b
249.6 32
a 265.8 32
281.9 32
298 32
314 32
330.2 32
a
346.3 32
362.4 32
4130.6 608
a 8869.2
1178
47.12
a
a
574
PENAHAN BAWAH 28.7
Dibuat Oleh :
ONTRAKTOR
A - PASSOKORANG -
TA GRAHA,JO
ARIFUDDIN
TOT
5,656,948.260000000
1,605,512.605800000
7,262,460.865800000
10,980,000.000000000
18,242,460.865800000
22
608
45.1
15.1
1182 578
28.9
920
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
5+477 6.223
7.45 23 171.32
5+500 8.674
7.42 20 148.31
5+520 6.156
4+910 3.059
6.79 40 271.65
4+950 10.523
6.95 10 69.49
4+960 3.375
8+250 18.077
33.11 25 827.81
8+275 48.148
30.62 25 765.52
8+300 13.093
6+000 0
0.97724 0+050 48.862
6+050 0.176 195.448
2.2128785 0+050 110.6439
6+100 0.222 247.1277
5.384634 0+050 269.2317
6+150 0.726 829.7991
10.9889255 0+050 549.4463
6+200 1.173 1367.986
14.665542 0+050 733.2771
6+250 1.328 1565.122
14.5319275 0+050 726.5964
6+300 1.185 1341.263
9.0916095 0+050 454.5805
6+350 0.424 477.0588
3.272913 0+050 163.6457
6+400 0.16 177.5238
0.887619 0+050 44.38095
6+450 0
3100.664
7.9 hal.195
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.196
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.197
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.198
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.199
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
SUB TOTAL I - -
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.200
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.201
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
SUB TOTAL II - -
TOTAL (I+II) - -
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.202
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011
EXISTING
a a
t.1
t.1
TALUD TALUD
d
b b
c c
DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)
file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.203
file:///conversion/tmp/scratch/509046377.xlsx