Anda di halaman 1dari 203

MUTUAL CHECK

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3. 00 2.50

2. 00 % 2. 0 0 %
4. 0 0 % 4. 00 %

E XI STIN G TIMB UN AN P IL IH AN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+000 0.000
2.20 25 55.00 tambahan
6+025 4.400
4.40 25 110.00
6+050 4.400
4.40 25 110.00
6+075 4.400
4.40 25 110.00
6+100 4.400
4.40 10 44.00
6+110 4.400
4.40 15 66.00
6+125 4.400
4.40 25 110.00
6+150 4.400
4.40 25 110.00
6+175 4.400
4.40 25 110.00
6+200 4.400
4.40 22 96.80
6+222 4.400
6+224 4.400
4.40 26 114.40
6+250 4.400
4.40 25 110.00
6+275 4.400
4.40 25 110.00
6+300 4.400
4.40 25 110.00
6+325 4.400
4.40 25 110.00
6+350 4.400
4.40 20 88.00
6+370 4.400
4.40 5 22.00
6+375 4.400
4.40 25 110.00
6+400 4.400
5.01 25 125.13
6+425 5.610
2.81 25 70.13
6+450 0.000
SUB TOTAL I 448 1,891.450
TOTAL ( I ) - 1,891.450
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3. 00 2.50

2. 00 % 2. 0 0 %
4. 0 0 % 4. 00 %

E XI STIN G TIMB UN AN P IL IH AN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

plat dekker 2 x 2
6+224 4.400
4.40 26 114.40
6+250 4.400
4.40 25 110.00
6+275 4.400
4.40 25 110.00
6+300 4.400
4.40 25 110.00
6+325 4.400
4.40 25 110.00
6+350 4.400
4.40 20 88.00
6+370 4.400
4.40 5 22.00
6+375 4.400
4.40 25 110.00
6+400 4.400
5.01 25 125.13
6+425 5.610
2.81 25 70.13
6+450 0.000

SUB TOTAL II 226 969.650

TOTAL (I s/d II) 674.000 2,861.100

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


TOPOYO II

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4.00 %

LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+100 L 11.99
9.37 25 234.22
0+125 L 6.748
6.12 25 152.91
0+150 L 5.485
3.80 25 95.02
0+175 L 2.117
15.72 25 392.95
0+200 L 29.319
66.83 25 1,670.68
0+225 L 104.336
94.93 25 2,373.14
0+250 L 85.515
79.90 25 1,997.39
0+275 L 74.276
71.94 25 1,798.45
0+300 L 69.600
83.53 25 2,088.19
0+325 L 97.455
106.56 25 2,663.89
0+350 L 115.656
80.54 25 2,013.50
0+375 L 45.424
55.10 25 1,377.42
0+400 L 64.770
94.40 25 2,359.89
0+425 L 124.021
85.79 25 2,144.65
0+450 L 47.550

SUB TOTAL I 350 21,362.293

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


TOPOYO II

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4.00 %

LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+450 L 47.550
57.53 25 1,438.35
0+475 L 67.518
62.37 25 1,559.34
0+500 L 57.230
41.45 25 1,036.31
0+525 L 25.675
22.70 25 567.44
0+550 L 19.720
17.36 25 434.00
0+575 L 15.000
12.50 25 312.53
0+600 L 10.003
7.62 25 190.57
0+625 L 5.243
7.08 25 177.01
0+650 L 8.918
5.71 25 142.72
0+675 L 2.500
3.91 25 97.77
0+700 L 5.322
24.10 25 602.46
0+725 L 42.875
33.02 25 825.56
0+750 L 23.170
24.75 25 618.69
0+775 L 26.325
27.87 25 696.81
0+800 L 29.420

SUB TOTAL II 350 8,699.563

TOTAL (I+II) 700 30,061.856

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


TOPOYO II

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4.00 %

LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+800 L 29.420
27.39 25 684.69
0+825 L 25.355
17.77 25 444.37
0+850 L 10.195
22.69 25 567.20
0+875 L 35.181
25.67 25 641.64
0+900 L 16.150

0+950 L 31.557
21.05 25 526.31
0+975 L 10.548
15.34 25 383.48
1+000 L 20.130
16.20 25 405.06
1+025 L 12.275
13.29 25 332.26
1+050 L 14.306

SUB TOTAL III 200 3,985.01

TOTAL (I+II+III) 900 34,046.87

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


TOPOYO II

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4.00 %

LUAS
L/R LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+250 R 42.000
39.38 25 984.38
0+275 R 36.750

1+025 R 124.289
116.23 25 2,905.87
1+050 R 108.180

SUB TOTAL IV 50 3,890.241

TOTAL (I - IV) 950 37,937.11

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+100
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00

TITIK A B C D A
X 0.00 4.43 4.93 3.43 2.50 1.50 0.00
Y 8.74 8.74 4.89 4.89 6.31 6.31 8.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 96.26 - 120.24
LUAS = + = + = 11.989 m² -11.99
2.00 2.00

STA 0+125
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E A
X 0.00 3.60 3.80 3.91 2.21 1.71 0.00
Y 9.20 9.20 5.79 4.79 7.49 7.49 9.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 100.49 - 113.98
LUAS = + = + = 6.748 m² -6.75
2.00 2.00

STA 0+150
7.00

6.00

5.00

4.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

TITIK A B C D E A
X 0.00 3.29 3.79 2.29 1.65 0.65 0.00
Y 6.99 6.99 4.70 4.70 5.84 5.84 6.99
S(Xn x Yn+1) - S(Xn+1 x Yn) 60.73 - 71.70
LUAS = + = + = 5.485 m² -5.48
2.00 2.00

STA 0+175
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F A
X 0.00 3.62 4.62 3.62 2.56 2.06 0.00
Y 8.84 5.84 4.69 4.69 6.52 6.52 8.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 97.15 - 101.39
LUAS = + = + = 2.117 m² -2.12
2.00 2.00

STA 0+200
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D A
X 0.00 6.89 7.99 8.99 6.99 5.66 5.16 2.83 2.33 0.00
Y 11.80 11.80 7.80 4.68 4.68 7.01 7.01 9.34 9.34 11.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 323.89 - 382.53
LUAS = + = + = 29.319 m² -29.32
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+225
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00

TITIK A B C D E A
X 0.00 11.04 15.04 15.04 13.04 10.91 10.41 7.27 6.77 3.64 3.14 0.00
Y 17.22 17.22 4.72 4.68 4.68 7.80 7.80 10.93 10.93 14.05 14.05 17.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 718.74 - 927.41
LUAS = + = + = 104.336 m² -104.34
2.00 2.00

STA 0+250
16.00
14.00
12.00
10.00
8.00
6.00
4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F A
X 0.00 10.40 11.50 9.50 6.33 5.83 2.66 2.16 0.00
Y 16.33 16.33 4.83 4.83 6.99 6.99 11.16 11.16 16.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 346.32 - 517.35
LUAS = + = + = 85.515 m² -85.52
2.00 2.00

STA 0+275
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00

TITIK A B C D E F A
X 0.00 8.27 10.77 8.77 6.85 6.35 3.43 2.93 0.00
Y 15.68 15.68 2.91 2.91 5.83 5.83 8.75 8.75 15.68
S(Xn x Yn+1) - S(Xn+1 x Yn) 277.72 - 426.27
LUAS = + = + = 74.276 m² -74.28
2.00 2.00

STA 0+300
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E A
X 0.00 8.30 10.00 8.00 6.40 5.90 3.30 2.80 0.00
Y 14.80 14.80 2.80 2.80 5.40 5.40 8.00 8.00 14.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 244.08 - 383.28
LUAS = + = + = 69.600 m² -69.60
2.00 2.00

STA 0+325
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00 13.00

TITIK A B C D E F A
X 0.00 10.20 12.50 10.50 9.00 8.50 6.00 5.50 3.00 2.56 0.00
Y 16.80 16.80 2.80 2.80 5.30 5.30 7.80 7.80 10.30 10.30 16.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 410.70 - 605.61
LUAS = + = + = 97.455 m² -97.46
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+350
18.00
15.00
12.00
9.00
6.00
3.00
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00

TITIK A B C D E F G A
X 0.00 11.13 14.00 12.00 10.13 9.63 6.75 6.25 3.38 2.88 0.00
Y 18.25 18.25 2.75 2.75 5.62 5.62 8.50 8.50 11.37 11.37 18.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 494.31 - 725.62
LUAS = + = + = 115.656 m² -115.66
2.00 2.00

STA 0+375
13.00
11.00
9.00
7.00
5.00
3.00
1.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 5.70 7.80 5.80 3.65 3.15 0.00
Y 13.13 13.13 1.83 1.83 5.97 5.97 13.13
S(Xn x Yn+1) - S(Xn+1 x Yn) 122.49 - 213.34
LUAS = + = + = 45.424 m² -45.42
2.00 2.00

STA 0+400
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 8.20 10.00 8.00 6.34 5.84 3.18 2.68 0.00
Y 14.83 14.83 1.83 1.83 5.49 5.49 10.15 10.15 14.83
S(Xn x Yn+1) - S(Xn+1 x Yn) 243.15 - 372.69
LUAS = + = + = 64.770 m² -64.77
2.00 2.00

STA 0+425
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
3.00
1.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00 13.00 15.00

TITIK A B C D E A
X 0.00 11.20 14.80 12.80 10.73 10.23 7.15 6.65 3.58 3.08 0.00
Y 19.04 19.04 1.04 1.04 4.82 4.82 8.89 8.89 12.97 12.97 19.04
S(Xn x Yn+1) - S(Xn+1 x Yn) 485.89 - 733.93
LUAS = + = + = 124.021 m² -124.02
2.00 2.00

STA 0+450
15.00
13.00
11.00
9.00
7.00
5.00
3.00
1.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 5.40 7.40 9.50 7.50 6.00 5.50 3.00 2.50 0.00
Y 14.33 14.33 11.83 1.28 1.28 6.33 6.33 10.83 10.83 14.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 298.77 - 393.87
LUAS = + = + = 47.550 m² -47.55
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+475
17.00
15.00
13.00
11.00
9.00
7.00
5.00
3.00
1.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00

TITIK A B C D E F G A
X 0.00 6.40 8.40 10.50 8.50 6.67 6.17 3.33 2.83 0.00
Y 16.22 16.22 12.72 1.02 1.02 5.56 5.56 11.39 11.39 16.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 339.15 - 474.19
LUAS = + = + = 67.518 m² -67.52
2.00 2.00

STA 0+500
16.00
14.00
12.00
10.00
8.00
6.00
4.00
2.00
0.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 5.10 7.10 9.20 7.20 5.80 5.30 2.90 2.40 0.00
Y 16.01 16.01 11.41 0.81 0.81 5.21 5.21 10.61 10.61 16.01
S(Xn x Yn+1) - S(Xn+1 x Yn) 264.46 - 378.92
LUAS = + = + = 57.230 m² -57.23
2.00 2.00

STA 0+525
11.00

9.00

7.00

5.00

3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 5.90 8.00 6.00 3.75 2.25 0.00
Y 11.22 11.22 4.72 4.72 7.97 7.97 11.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 168.61 - 219.96
LUAS = + = + = 25.675 m² -25.68
2.00 2.00

STA 0+550
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.80 8.30 6.30 3.90 2.40 0.00
Y 11.58 11.58 4.78 4.78 8.18 8.18 11.58
S(Xn x Yn+1) - S(Xn+1 x Yn) 168.94 - 208.38
LUAS = + = + = 19.720 m² -19.72
2.00 2.00

STA 0+575
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 3.00 7.50 5.50 3.50 2.00 0.00
Y 10.69 10.69 4.69 4.69 7.69 7.69 10.69
S(Xn x Yn+1) - S(Xn+1 x Yn) 139.84 - 169.84
LUAS = + = + = 15.000 m² -15.00
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+600
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 3.00 5.50 3.50 2.50 1.00 0.00
Y 8.95 8.95 4.95 4.95 6.95 6.95 8.95
S(Xn x Yn+1) - S(Xn+1 x Yn) 92.74 - 112.74
LUAS = + = + = 10.003 m² -10.00
2.00 2.00

STA 0+625
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G H I J A
X 0.00 1.50 4.00 2.00 0.00
Y 7.86 7.86 4.87 4.87 7.86
S(Xn x Yn+1) - S(Xn+1 x Yn) 42.49 - 52.98
LUAS = + = + = 5.243 m² -5.24
2.00 2.00

STA 0+650

15.00
13.00
11.00
9.00
7.00
5.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G H I J A
X 0.00 3.60 4.60 3.10 2.55 2.05 0.00
Y 8.89 8.89 4.79 4.79 6.84 6.84 8.89
S(Xn x Yn+1) - S(Xn+1 x Yn) 96.21 - 114.05
LUAS = + = + = 8.918 m² -8.92
2.00 2.00

STA 0+675
13.00

11.00

9.00

7.00

5.00

3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G H I J A
X 0.00 3.20 1.20 0.00
Y 7.25 4.75 4.75 7.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 23.88 - 28.88
LUAS = + = + = 2.500 m² -2.50
2.00 2.00

STA 0+700
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
TITIK A B C D E F G H I A
X 0.00 0.85 2.35 3.55 1.76 0.00
Y 8.30 8.30 6.80 4.75 4.75 8.30
S(Xn x Yn+1) - S(Xn+1 x Yn) 48.45 - 59.09
LUAS = + = + = 5.322 m² -5.32
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+725
16.00
14.00
12.00
10.00
8.00
6.00
4.00
-1.00 1.00 3.00 5.00 7.00 9.00 11.00

TITIK A B C D E F G A
X 0.00 2.00 4.00 10.50 7.65 7.15 4.33 3.83 1.00 0.00
Y 4.71 11.71 15.21 15.21 11.36 11.36 8.54 8.54 4.71 4.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 418.31 - 504.06
LUAS = + = + = 42.875 m² -42.88
2.00 2.00

STA 0+750
14.00

12.00

10.00

8.00

6.00

4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G H A
X 0.00 2.00 4.00 7.30 4.40 3.90 1.00 0.00
Y 4.81 11.91 12.61 12.61 8.71 8.71 4.81 4.81
S(Xn x Yn+1) - S(Xn+1 x Yn) 201.02 - 247.36
LUAS = + = + = 23.170 m² -23.17
2.00 2.00

STA 0+775
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 2.10 7.60 4.55 4.05 1.00 0.00
Y 4.75 12.85 12.85 8.80 8.80 4.75 4.75
S(Xn x Yn+1) - S(Xn+1 x Yn) 157.97 - 210.62
LUAS = + = + = 26.325 m² -26.33
2.00 2.00

STA 0+800
14.00

12.00

10.00

8.00

6.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 2.00 3.70 8.10 4.80 4.30 1.00 0.00
Y 5.08 13.08 13.68 13.68 9.38 9.38 5.08 5.08
S(Xn x Yn+1) - S(Xn+1 x Yn) 225.83 - 284.67
LUAS = + = + = 29.420 m² -29.42
2.00 2.00

STA 0+825
14.00

12.00

10.00

8.00

6.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 2.00 5.50 7.60 4.55 4.05 1.00 0.00
Y 5.09 12.69 13.19 13.19 9.14 9.14 5.09 5.09
S(Xn x Yn+1) - S(Xn+1 x Yn) 235.68 - 286.39
LUAS = + = + = 25.355 m² -25.36
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+850
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H I A
X 0.00 1.50 3.50 4.52 1.00 0.00
Y 4.80 9.80 10.32 10.32 4.80 4.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 78.06 - 98.45
LUAS = + = + = 10.195 m² -10.19
2.00 2.00

STA 0+875
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 1.50 3.50 3.92 1.00 0.00
Y 4.80 8.32 8.72 8.72 4.80 4.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 8.85 - 79.21
LUAS = + = + = 35.181 m² -35.18
2.00 2.00

STA 0+900
13.00

11.00

9.00

7.00

5.00

3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H I J A
X 0.00 1.20 3.40 6.30 3.90 3.40 1.00 0.00
Y 4.37 8.47 11.17 11.17 7.77 7.77 4.37 4.37
S(Xn x Yn+1) - S(Xn+1 x Yn) 149.77 - 182.07
LUAS = + = + = 16.150 m² -16.15
2.00 2.00

STA 0+925
13.00
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H I A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+950
13.00
11.00
9.00
7.00
5.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H I J A
X 0.00 1.50 3.00 9.00 6.67 6.17 3.84 3.34 1.00 0.00
Y 4.37 8.87 13.37 13.37 10.03 10.03 7.70 7.70 4.37 4.37
S(Xn x Yn+1) - S(Xn+1 x Yn) 313.21 - 376.32
LUAS = + = + = 31.557 m² -31.56
2.00 2.00
BACK UP DATA QUANTITY

SATKER : Pelaksanaan Jalan Nasional Wilayah II Prov SulBar


PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 0+975
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.00 3.70 5.85 3.67 3.17 1.00 0.00
Y 4.27 8.31 9.61 9.61 6.94 6.94 4.27 4.27
S(Xn x Yn+1) - S(Xn+1 x Yn) 138.66 - 159.76
LUAS = + = + = 10.548 m² -10.55
2.00 2.00

STA 1+000
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.50 3.50 6.90 4.20 3.70 1.00 0.00
Y 4.78 10.98 11.18 11.18 7.98 7.98 4.78 4.78
S(Xn x Yn+1) - S(Xn+1 x Yn) 166.96 - 207.22
LUAS = + = + = 20.130 m² -20.13
2.00 2.00

STA 1+025
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.30 4.30 6.00 5.00 2.75 2.25 0.00
Y 10.25 10.25 9.75 4.75 4.75 8.00 8.00 10.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 156.41 - 180.96
LUAS = + = + = 12.275 m² -12.28
2.00 2.00

STA 1+050
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 6.38 7.38 6.38 0.00
Y 8.74 8.74 4.86 4.86 8.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 122.67 - 151.28
LUAS = + = + = 14.306 m² -14.31
2.00 2.00

14.00
3
2
2
4
3
3.0
4.0
3.0
2

3.
..
4.
4.
2 .
2.
4.
5.
3.
4.0
6
3
4
0
0
3 .0
0
0
. 0

0 0.0
0
.0
00
0
. 5
0
0.0
0
0
0.
0
0
0

0
0.
.
.
.
.0
.
0.0
0 .
.
0 .0
0
0
0

.0
0

0
0
0

0
. 0

2
2
2
2
2
2

2.0
2.0
2.
2
2.
2.
.
.
.
2.0
2
.
.
.
2 .0
0
0
0
0

.0
. 0

0
0
0

0
4

4.0
4.0
4
4
4.
4
4
4
4

4.
4.
.
.
4.0
4.0
4
.
.
. 0

0
.0
.00

.0
0
0
0

0
STA 0+250 ( R )6

6.0
6.
6
6
6.
6
6
6
6.
6.
6.
.
.
6.0
6.0
6
.
.
. 0

0
.0
00

.0
0
0
0
0

0
8

8.0
8.
8
8
8.
8
8
8
8
..
.
8.0
8.
8.
8.0
8
.
.
0
. 0

.0
0
0

.0
0
0
0
0

0
1

10 .
1
1
100
0.
0..
0

.
. 1

12 .
12
12.
12.
1 2.
2

.
.

12.00
10.00
8.00
6.00
4.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 1.00 8.00 4.75 4.25 1.00 0.00
Y 2.90 13.40 13.40 8.15 8.15 2.90 2.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 132.54 - 216.54
LUAS = + = + = 42.000 m² -42.00
2.00 2.00

14.00
STA 0+275 ( R )
12.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

3+500 R 0.30 0.40 0.50 0.40 1.10 0.59


1 0.59 200.00 117.00
3+700 R 0.30 0.40 0.50 0.40 1.10 0.59

0+000 L 0.30 0.40 0.50 0.40 0.90 0.52


2 0.52 450.00 231.75
0+450 L 0.30 0.40 0.50 0.40 0.90 0.52

1+770 L 0.30 0.40 0.50 0.40 1.45 0.71


3 0.71 355.00 251.16
2+125 L 0.30 0.40 0.50 0.40 1.45 0.71

2+135 L 0.30 0.40 0.50 0.40 1.40 0.69


4 0.69 130.00 89.70
2+265 L 0.30 0.40 0.50 0.40 1.40 0.69

2+270 L 0.30 0.40 0.50 0.40 1.15 0.60


5 0.60 185.00 111.46
2+455 L 0.30 0.40 0.50 0.40 1.15 0.60

SUB TOTAL I 1,320.00 801.08

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

2+460 L 0.30 0.40 0.50 0.40 1.10 0.59


6 0.59 80.00 46.80
2+540 L 0.30 0.40 0.50 0.40 1.10 0.59

2+560 L 0.30 0.40 0.50 0.40 1.30 0.66


7 0.66 165.00 108.08
2+725 L 0.30 0.40 0.50 0.40 1.30 0.66

2+730 L 0.30 0.40 0.50 0.40 1.20 0.62


8 0.62 170.00 105.40
2+900 L 0.30 0.40 0.50 0.40 1.20 0.62

2+900 L 0.30 0.40 0.50 0.40 1.35 0.67


9 0.66 140.00 92.93
3+040 L 0.30 0.40 0.50 0.40 1.30 0.66

3+050 L 0.30 0.40 0.50 0.40 1.10 0.59


10 0.64 90.00 57.38
3+140 L 0.30 0.40 0.50 0.40 1.40 0.69

SUB TOTAL II 645.00 410.58


TOTAL (I+II) 1,965.00 1,211.65
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

3+155 L 0.30 0.40 0.50 0.40 1.30 0.66


11 0.66 99.00 64.85
3+254 L 0.30 0.40 0.50 0.40 1.30 0.66

3+265 L 0.30 0.40 0.50 0.40 1.25 0.64


12 0.64 10.00 6.38
3+275 L 0.30 0.40 0.50 0.40 1.25 0.64

3+350 L 0.30 0.40 0.50 0.40 1.20 0.62


13 0.62 50.00 31.00
3+400 L 0.30 0.40 0.50 0.40 1.20 0.62

3+415 L 0.30 0.40 0.50 0.40 1.10 0.59


14 0.59 660.00 386.10
4+075 L 0.30 0.40 0.50 0.40 1.10 0.59

6+350 L 0.30 0.40 0.50 0.40 1.00 0.55


15 0.55 400.00 220.00
6+750 L 0.30 0.40 0.50 0.40 1.00 0.55

SUB TOTAL III 1,219.00 708.32


TOTAL (I+II+III) 3,184.00 1,919.97
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)


E XIS TING
a a

t.1

t.1
TALUD TA LUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

0+865 L 0.30 0.40 0.50 0.40 0.90 0.52


1 0.52 110.00 56.65
0+975 L 0.30 0.40 0.50 0.40 0.90 0.52

0+980 L 0.30 0.40 0.50 0.40 0.94 0.53


2 0.51 20.00 10.25
1+000 L 0.30 0.40 0.50 0.40 0.85 0.50

1+005 L 0.30 0.40 0.50 0.40 0.95 0.53


3 0.53 345.00 183.71
1+350 L 0.30 0.40 0.50 0.40 0.95 0.53

1+475 L 0.30 0.40 0.50 0.40 0.90 0.52


4 0.52 225.00 115.88
1+700 L 0.30 0.40 0.50 0.40 0.90 0.52

5+950 L 0.30 0.40 0.50 0.40 0.90 0.52


5 0.51 206.67 104.63
6+157 L 0.30 0.40 0.50 0.40 0.85 0.50

SUB TOTAL II 906.67 471.11


TOTAL (I+II) 4,090.67 2,391.08
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

2.2 PEKERJAAN PASANGAN BATU DENGAN MORTAR

a EXISTING a
c c

t.2

t.2
t.1

t.1
d MORTAR MORTAR d
b b

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 t.2 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

5+700 R 1.40 0.80 1.00 0.40 0.80 0.60 0.46


1 0.46 300.00 138.00
6+000 R 1.40 0.80 1.00 0.40 0.80 0.60 0.46

5+600 L 1.40 0.80 1.00 0.40 0.80 0.60 0.46


2 0.46 214.85 98.83
5+815 L 1.40 0.80 1.00 0.40 0.80 0.60 0.46

- - -

- - -

- - -

JUMLAH 514.85 236.83


Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN

file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quantity Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

2.2 PEKERJAAN PASANGAN BATU DENGAN MORTAR

a EXISTING a
c c

t.2

t.2
t.1

t.1
d MORTAR MORTAR d
b b

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 t.2 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

JUMLAH
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

5.1 (2) LAPIS PONDASI AGREGATE KELAS B

2.50 3.00 3.00 2.50

4.00 % 2.00 % 2.00 % 4.00 %

EXISTING AGG. CLASS B

LEBAR TEBAL PANJANG VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 - 1+050 1.50 0.20 1,050 315.00 topoyo II

JUMLAH 1,050 315.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

2.1 GALIAN UNTUK DRAINASE SELOKAN DAN SALURAN AIR

3.00 3.00

GALIAN PARIT GALIAN PARIT


a a

t t
EXISTING
b b

DIMENSI
VOLUME
NO. STATION (STA) L/R p a b t KETERANGAN
(m) (m) (m) (m) (m³)

1 0+000 - 0+250 L 250.00 1.20 0.50 0.80 170.00 topoyo II

2 0+250 - 0+275 L/R 25.00 1.20 0.50 0.80 34.00 topoyo II

3 0+275 - 0+700 L 425.00 1.20 0.50 0.80 289.00 topoyo II

4 0+700 - 1+025 R 325.00 1.20 0.50 0.80 221.00 topoyo II

5 1-025 - 1+050 L/R 25.00 1.20 0.50 0.80 34.00 topoyo II

10

11

12

JUMLAH 748.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (BAHU)

2.00 3.00 3.00 2. 00

TIMBUNAN PILIHAN
UNTUK BAHU JAL AN
4. 00 % 2.00 % 2. 00 % 4.0 0 %

EXISTING

LEBAR PANJANG TEBAL VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 - 1+050 4.00 1,050 0.30 1,260.00

JUMLAH 1,260.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
DAFTAR KUANTITAS DAN HARGA
PPK
Paket
: 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
: Pelebaran Jalan Kalukku - Salubatu 1 DAFTAR KUANTITAS DAN HARGA
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

PEMBAYARAN
REKAYASA LAPANGAN-01 REKAYASA LAPANGAN-02 SELISIH
NO. MATA
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS JUMLAH HARGA BOBOT KUANTITAS JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS (RP.) KUANTITAS (RP.)

BAB I - UMUM
1.2 Mobilisasi 332,500,000.00 1.00 332,500,000.00 1.6900 1.00 332,500,000.00 1.5505 Tetap
SUB TOTAL I 332,500,000.00 332,500,000.00 - -
BAB II - DRAINASE - -
2.1 Galian untuk Drainase Selokan dan Saluran Air 18,948.27 8,845.40 167,605,027.46 0.8519 9,593.40 181,778,333.42 0.8477 748.00 14,173,305.96 Tambah
2.2 Pekerjaan Pasangan Batu dengan Mortar 413,982.91 1,207.04 499,693,931.69 2.5398 1,443.87 597,739,160.19 2.7873 236.83 98,045,228.51 Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang Diameter dalam 75 - 95 Cm 995,087.46 121.00 120,405,582.66 0.6120 121.00 120,405,582.66 0.5615 Tetap
SUB TOTAL II 787,704,541.80 899,923,076.27 - 112,218,534.47
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa 15,831.53 62,312.33 986,499,521.76 5.0142 100,249.44 1,587,101,966.78 7.4008 37,937.11 600,602,445.01 Tambah
3.1 (2) Galian Batu 137,851.01 1,587.87 218,889,483.25 1.1126 1,587.87 218,889,483.25 1.0207 Tetap
3.1 (8) Galian Perk. Beraspal tanpa CMM 26,574.13 1,329.30 35,324,991.01 0.1795 1,329.30 35,324,991.01 0.1647 Tetap
3.2 (1) Timbunan Biasa 44,367.84 13,785.40 611,628,421.54 3.1088 13,785.40 611,628,421.54 2.8521 Tetap
3.2 (2) Timbunan Pilihan 67,462.67 21,548.13 1,453,694,383.31 7.3888 23,439.58 1,581,296,650.48 7.3737 1,891.45 127,602,267.17 Tambah
3.3 Penyiapan Badan Jalan 3,166.18 13,008.00 41,185,669.44 0.2093 13,008.00 41,185,669.44 0.1921 Tetap
SUB TOTAL III 3,347,222,470.31 4,075,427,182.49 - 728,204,712.18
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (2) Lapis Pondasi Agregate Klass B 174,638.20 6,405.00 1,118,557,671.00 5.6854 6,405.00 1,118,557,671.00 5.2159 Tetap
SUB TOTAL - IV 1,118,557,671.00 1,118,557,671.00 - -
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A 220,899.80 9,607.50 2,122,294,828.50 10.7872 9,607.50 2,122,294,828.50 9.8965 Tetap
5.1 (2) Lapis Pondasi Agregate Kelas B 174,638.20 12,792.60 2,234,076,637.32 11.3553 13,107.60 2,289,087,670.32 10.6743 315.00 55,011,033.00 Tambah
SUB TOTAL V 4,356,371,465.82 4,411,382,498.82 - 55,011,033.00
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat 7,143.31 44,835.00 320,270,303.85 1.6279 44,835.00 320,270,303.85 1.4935 Tetap
6.1 (2) Lapis Perekat 7,956.41 9,607.50 76,441,209.08 0.3885 9,607.50 76,441,209.08 0.3565 Tetap
6.3 (5a) Laston - Lapis Aus (AC-WC) 55,640.02 64,050.00 3,563,743,281.00 18.1137 64,050.00 3,563,743,281.00 16.6181 Tetap
6.3 (5b) Laston - Lapis Antara (AC-BC) 1,328,517.31 3,202.50 4,254,576,685.28 21.6251 3,202.50 4,254,576,685.28 19.8395 Tetap
SUB TOTAL VI 8,215,031,479.20 8,215,031,479.20 - -
BAB VII PEKERJAAN STRUKTUR - -
7.1 (5) Beton Struktur K250 789,186.09 87.65 69,172,160.79 0.3516 87.65 69,172,160.79 0.3226 Tetap
7.1 (6) Beton K175 757,787.22 2.55 1,932,357.41 0.0098 2.55 1,932,357.41 0.0090 Tetap
7.3 (1) Baja Tulangan U24 11,104.50 8,064.74 89,554,905.33 0.4552 8,064.74 89,554,905.33 0.4176 Tetap
7.9 Pasangan Batu 383,844.89 3,042.19 1,167,729,085.91 5.9353 5,433.27 2,085,532,925.49 9.7251 2,391.08 917,803,839.58 Tambah
SUB TOTAL VII 1,328,388,509.44 2,246,192,349.02 - 917,803,839.58
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR -
8.4 (2) Marka Jalan Thermoplastik 155,485.00 789.75 122,794,278.75 0.6241 789.75 122,794,278.75 0.5726 Tetap
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG 461,102.95 16.00 7,377,647.20 0.0375 16.00 7,377,647.20 0.0344 Tetap
8.4 (5) Patok Pengarah 114,066.94 100.00 11,406,694.00 0.0580 100.00 11,406,694.00 0.0532 Tetap
8.4 (6) Patok Kilometer 395,903.82 11.00 4,354,942.02 0.0221 11.00 4,354,942.02 0.0203 Tetap
8.4 (10) Rel Pengaman 425,542.77 100.00 42,554,277.00 0.2163 - - - 100.00 42,554,277.00 Kurang
SUB TOTAL VIII 188,487,838.97 100.0000 145,933,561.97 100.0000 42,554,277.00 - -
JUMLAH 19,674,263,976.54 21,444,947,818.77 42,554,277.00 1,813,238,119.23
PPN 10 % 1,967,426,397.65 2,144,494,781.88 4,255,427.70 181,323,811.92 SELISIH
GRAND TOTAL 21,641,690,374.19 23,589,442,600.65 46,809,704.70 1,994,561,931.15 Rp (1,770,683,664.01)
DIBULATKAN 21,641,690,000.00 23,589,442,000.00 46,809,000.00 1,994,561,000.00
23,589,442,000.00 1,770,683,842.23
Ka. SNVT PEMBANGUNAN Konsultan Konsultan - 21,818,758,157.77 Kontraktor
PEMB. JALAN TOPOYO - KAROSSA PT. WIRANTA BHUANA RAYA
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

Ir. H. Iskandar Arsyad Ir. Muh. Idris Razak Ir. Muh. Idris Razak Ir. Hamsijar Ilham
NIP. 110 054 074 Site Engineer Site Engineer General Superintendent
BAB. V. REKAPITULASI VOLUME DAN
PPK
Paket BAB. V. REKAPITULASI
: 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
: Pelebaran Jalan Kalukku - Salubatu 1
HARGA VOLUME DAN
Kab. / Prop.
Tahun Anggaran
: Mamuju / Sulawesi Barat
: 2011 HARGA
PEMBAYARAN
NO. MATA KONTRAK ASLI REKAYASA LAPANGAN SELISIH

SATUAN
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS
JUMLAH HARGA BOBOT
KUANTITAS
JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS
(RP.) (RP.)

BAB I - UMUM
1.2 Mobilisasi Ls 332,500,000.00 1.00 332,500,000.00 1.6900 1.00 332,500,000.00 #NAME? Tetap
SUB TOTAL I 332,500,000.00 332,500,000.00 - -
BAB II - DRAINASE -
2.1 Galian untuk Drainase Selokan dan Saluran Air m³ 18,948.27 1,080.00 20,464,131.60 0.1040 748.00 14,173,305.96 #NAME? 332.00 6,290,825.64 Kurang
2.2 Pekerjaan Pasangan Batu dengan Mortar m³ 413,982.91 960.00 397,423,593.60 2.0200 960.00 397,423,593.60 #NAME? Tetap
354,299.50 247.04 87,526,148.48 #NAME? Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang Diameter dalam 75 - 95 Cm m' 995,087.46 66.00 65,675,772.36 0.3338 66.00 65,675,772.36 #NAME? Tetap
700,290.95 55.00 38,516,002.25 #NAME? Tambah
SUB TOTAL II 483,563,497.56 603,314,822.65 6,290,825.64 -
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa m³ 15,831.53 57,452.63 909,563,035.42 4.6231 #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?
3.1 (2) Galian Batu m³ 137,851.01 5,745.26 791,989,893.71 4.0255 ### ### #NAME? ### ### Tambah
3.1 (8) Galian Perk. Beraspal tanpa CMM m³ 26,574.13 2,587.50 68,760,561.38 0.3495 1,329.30 35,324,991.01 #NAME? 1,258.20 33,435,570.37 Kurang
3.2 (1) Timbunan Biasa m³ 44,367.84 18,000.00 798,621,120.00 4.0592 13,785.40 611,628,421.54 #NAME? 4,214.60 186,992,698.46 Kurang
3.2 (2) Timbunan Pilihan m³ 67,462.67 6,000.00 404,776,020.00 2.0574 10,466.89 706,124,346.00 #NAME? 4,466.89 301,348,326.00 Tambah
3.3 Penyiapan Badan Jalan m² 3,166.18 69,000.00 218,466,420.00 1.1104 13,008.00 41,185,669.44 #NAME? 55,992.00 177,280,750.56 Kurang
SUB TOTAL III 3,192,177,050.51 #NAME? #NAME? #NAME?
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (2) Lapis Pondasi Agregate Klass B m³ 174,638.20 3,450.00 602,501,790.00 3.0624 6,405.00 1,118,557,671.00 #NAME? 2,955.00 516,055,881.00 Tambah
SUB TOTAL - IV 602,501,790.00 1,118,557,671.00 - 516,055,881.00
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A m³ 220,899.80 10,350.00 2,286,312,930.00 11.6208 9,607.50 2,122,294,828.50 #NAME? 742.50 164,018,101.50 Kurang
5.1 (2) Lapis Pondasi Agregate Kelas B m³ 174,638.20 13,800.00 2,410,007,160.00 12.2495 315.00 55,011,033.00 #NAME? 13,485.00 2,354,996,127.00 Kurang
SUB TOTAL V 4,696,320,090.00 2,177,305,861.50 2,519,014,228.50 -
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat Ltr 7,143.31 48,300.00 345,021,873.00 1.7537 44,835.00 320,270,303.85 #NAME? 3,465.00 24,751,569.15 Kurang
6.1 (2) Lapis Perekat Ltr 7,956.41 13,800.00 109,798,458.00 0.5581 9,607.50 76,441,209.08 #NAME? 4,192.50 33,357,248.93 Kurang
6.3 (5a) Laston - Lapis Aus (AC-WC) m² 55,640.02 69,000.00 3,839,161,380.00 19.5136 45,000.00 2,503,800,900.00 #NAME? 24,000.00 1,335,360,480.00 Kurang
6.3 (5b) Laston - Lapis Antara (AC-BC) m³ 1,328,517.31 3,450.00 4,583,384,719.50 23.2963 3,202.50 4,254,576,685.28 #NAME? 247.50 328,808,034.23 Kurang
SUB TOTAL VI 8,877,366,430.50 7,155,089,098.20 1,722,277,332.30 -
BAB VII PEKERJAAN STRUKTUR - -
7.1 (5) Beton Struktur K250 m³ 789,186.09 87.65 69,172,160.79 #NAME? 87.65 69,172,160.79 Tambah
7.1 (6) Beton K175 m³ 757,787.22 2.55 1,932,357.41 #NAME? 2.55 1,932,357.41 Tambah
7.3 (1) Baja Tulangan U24 kg 11,104.50 8,064.74 89,554,905.33 #NAME? 8,064.74 89,554,905.33 Tambah
7.9 Pasangan Batu m³ 383,844.89 3,375.00 1,295,476,503.75 6.5846 3,033.13 1,164,251,451.21 #NAME? 341.87 131,225,052.54 Kurang
SUB TOTAL VII 1,295,476,503.75 1,324,910,874.74 131,225,052.54 160,659,423.53
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR - -
8.4 (2) Marka Jalan Thermoplastik m² 155,485.00 575.00 89,403,875.00 0.4544 575.00 89,403,875.00 #NAME? Tetap
107,818.33 214.75 23,153,986.37 #NAME? Tambah
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG Bh 461,102.95 8.00 3,688,823.60 0.0187 8.00 3,688,823.60 #NAME? Tetap
326,321.48 8.00 2,610,571.84 #NAME? Tambah
8.4 (5) Patok Pengarah Bh 114,066.94 100.00 11,406,694.00 0.0580 100.00 11,406,694.00 #NAME? Tetap
8.4 (6) Patok Kilometer Bh 395,903.82 12.00 4,750,845.84 0.0241 11.00 4,354,942.02 #NAME? 1.00 395,903.82 Kurang
8.4 (10) Rel Pengaman m' 425,542.77 200.00 85,108,554.00 0.4326 100.00 42,554,277.00 #NAME? 100.00 42,554,277.00 Kurang
SUB TOTAL VIII 194,358,792.44 100.0000 177,173,169.83 #NAME? 42,950,180.82 - #NAME?
JUMLAH 19,674,264,154.76 #NAME? #NAME? #NAME?
PPN 10 % 1,967,426,415.48 #NAME? #NAME? #NAME? SELISIH
GRAND TOTAL 21,641,690,570.24 #NAME? #NAME? #NAME? #NAME?
DIBULATKAN 21,641,690,000.00 #NAME? #NAME? #NAME?
#NAME? #NAME?
Ka. SNVT PEMBANGUNAN Konsultan #NAME? Kontraktor
PEM. JALAN TOPOYO - KAROSSA PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

Ir. H. Iskandar Arsyad Ir. Muh. Idris Razak Ir. Hamsijar Ilham
NIP. 110 054 074 Site Engineer General Superintendent
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

6.3 (5a) LASTON - LAPIS AUS (AC-WC)

2.50 3.00 3.00 2.50

AC - WC (0.04 m)

4.00 % 2.00 % 2.00 % 4.0 0 %

EXISTING

LEBAR TEBAL PANJANG VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 7+500 6.00 0.04 7,500 45,000.00

TOTAL 7,500 45,000.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

6.1 (2) LAPIS PEREKAT (TACK COAT)

2.50 3.00 3.00 2.50

LAPIS PEREKAT

4.00 % 2.00 % 2.00 % 4.00 %

EXISTING

APLIKAS
LEBAR PANJANG LUAS VOLUME
STATION (STA) I KETERANGAN
m m ltr/m2 m2 Ltr

0+000 - 10+675 6.00 10,675 0.15 64,050 9,607.50

JUMLAH 9,607.500

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

6.3 (6a) LASTON - LAPIS ANTARA (AC-BC)

2.50 3.00 3.00 2.50

AC - BC (0.05 m)

4.00 % 2.00 % 2.00 % 4.00 %

EXISTING

LEBAR TEBAL PANJANG VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 - 10+675 6.00 0.05 10,675 3,202.50

JUMLAH 10,675 3,202.500

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

6.1 (1) LAPIS RESAP PENGIKAT (PRIME COAT)

2 . 50 3 . 00 3 .0 0 2. 50

LAPI S R ESAP PEN GIKA T

4 . 00 % 2 .0 0 % 2. 00 % 4 . 00 %

EXI STI NG

APLIKAS
LEBAR PANJANG LUAS VOLUME
STATION (STA) I KETERANGAN
m m ltr/m2 m2 Ltr

0+000 - 10+675 6.00 10,675 0.70 64,050 44,835.00

JUMLAH 44,835.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

4.2 (2) LAPIS PONDASI AGREGATE KELAS B (BAHU JALAN)

2.00 3.00 3.0 0 2.00


AG G . C LA SS B

4 . 00 % 2. 00 % 2. 00 % 4.00 %
TE BAL

EX I STI NG

DIMENSI VOLUME
NO. STATION (STA) L/R LEBAR TEBAL PANJANG KETERANGAN
m m m m³

1 0+000 - 0+600 L/R 4.00 0.15 600.00 360.00


2 0+600 0+603 L/R 4.00 0.15 3.00 1.80 DEKKER 2 X 1,5
3 0+603 0+975 L/R 4.00 0.15 372.00 223.20
4 0+975 0+978 L/R 4.00 0.15 3.00 1.80 DEKKER 2 X 1,5
5 0+978 1+225 L/R 4.00 0.15 247.00 148.20
6 1+225 1+228 L/R 4.00 0.15 3.00 1.80 DEKKER 2 X 1,5
7 1+228 6+222 L/R 4.00 0.15 4,994.00 2,996.40
8 6+222 6+225 L/R 4.00 0.15 3.00 1.80 DEKKER 2 X 2
9 6+225 9+355 L/R 4.00 0.15 3,130.00 1,878.00
10 9+355 9+358 L/R 4.00 0.15 2.50 1.50 BOX CULVERT 2 X 2
11 9+358 10+675 L/R 4.00 0.15 1,317.50 790.50

JUMLAH 10,675 6,405.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

5.1 (1) LAPIS PONDASI AGREGATE KELAS A

2.50 3.00 3.00 2.50

4.00 % 2.00 % 2.00 % 4.00 %

EXISTING AGG. CLASS A

LEBAR TEBAL PANJANG VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 - 0+600 6.00 0.15 600 540.00


dekker 2 x 1,5
0+600 - 0+975 6.00 0.15 375 337.50
dekker 2 x 1,5
0+975 - 1+225 6.00 0.15 250 225.00
dekker 2 x1,5
1+225 - 6+222 6.00 0.15 4,997 4,497.30
dekker 2 x 2
6+222 - 9+335 6.00 0.15 3,113 2,801.70
box culvert 2 x 2
9+335 - 10+675 6.00 0.15 1,340 1,206.00

JUMLAH 10,675 9,607.500

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (8) GALIAN PERKERASAN BERASPAL TANPA CMM

1.00 2.25 2.25 1.00

GAL. PERKERASAN BERASPAL

4.00 % 2.00 % 2.00 % 4.00 %

EXISTING

LEBAR TEBAL PANJANG VOLUME


STATION (STA) KETERANGAN
m m m m³

0+000 - 0+450 4.50 0.05 450 101.25


recing
0+800 - 0+975 4.50 0.05 175 39.38
plat dekker 2 x 1,5
0+977 1+225 4.50 0.05 248 55.80
plat dekker 2 x 1,5
1+227 - 5+277 4.50 0.05 4,050 911.25

5+277 6+000 4.50 0.05 723 162.68


recing
6+600 6+810 4.50 0.05 210 47.25
p.b j
10+623 10+675 4.50 0.05 52 11.70

JUMLAH 5,908 1,329.300

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.3 PENYIAPAN BADAN JALAN

3.00 3.00

PENYIAPAN BADAN JALAN

EXISTING

LEBAR PANJANG LUAS


STATION (STA) KETERANGAN
m m m²
LAPEN & RESING
6+450 - 6+600 6.00 150 900.00
LAPEN
6+810 - 7+930 6.00 1,120 6,720.00
TIMBUNAN PILIHAN
8+200 - 8+550 6.00 350 2,100.00
TIMBUNAN PILIHAN
9+800 - 10+100 6.00 300 1,800.00
TIMBUNAN PILIHAN
10+200 10+250 6.00 50 300.00
TIMBUNAN PILIHAN
10+425 10+623 6.00 198 1,188.00

JUMLAH 2,168 13,008.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

2.3 (3) GORONG-GORONG PIPA BETON BERTULANG DIA. DLM 75 - 95 CM

SKETSA

10 cm

Dia. 1,00 m

JUMLAH
STA SATUAN RENCANA KETERANGAN
(m')

4+250 M' 10 10
7+200 M' 1 1 tambahan ( R )
7+443 M' 12 12 Bak kontrol
7+607 M' 11 11 Bak kontrol
7+950 M' 12 12 Penggantian
8+075 M' 11 11 Bak kontrol
8+285 M' 2 2
8+850 M' 11 11 Bak kontrol
9+045 M' 2 2
9+140 M' 11 11 Bak kontrol
9+550 M' 11 11 Bak kontrol
9+680 M' 11 11 Bak kontrol
10+126 M' 11 11 Bak kontrol
10+225 M' 2 2 Bak kontrol
10+350 M' 3 3

TOTAL 121

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
7+930 3.630
3.63 270 980.10
8+200 3.630

8+550 3.630
3.63 1,050 3,811.50
9+600 3.630

10+100 3.630
3.63 100 363.00
10+200 3.630

10+250 3.630
3.63 175 635.25
10+425 3.630

SUB TOTAL II 1,595 5,789.850

TOTAL (I+II) 3,190 7,049.850

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

0+450 0.000
1.38 25 34.38
0+475 2.750
2.75 25 68.75
0+500 2.750
2.75 25 68.75
0+525 2.750
2.75 25 68.75
0+550 2.750
2.75 25 68.75
0+575 2.750
2.75 25 68.75
0+600 2.750
Plat dekker 2 x 1.5
0+602 2.750
2.75 23 63.25
0+625 2.750
2.75 25 68.75
0+650 2.750
2.75 25 68.75
0+675 2.750
2.75 25 68.75
0+700 2.750
2.75 25 68.75
0+725 2.750
2.75 25 68.75
0+750 2.750
2.75 35 96.25
0+785 2.750
1.38 15 20.63
0+800 0.000
SUB TOTAL III 348 902.000
TOTAL (I+II+III) 1,943 7,951.850
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity

9+600 3.300
5.50 25 137.50
9+625 7.700
7.70 25 192.50
9+650 7.700
7.70 25 192.50
9+675 7.700
7.70 25 192.50
9+700 7.700
7.70 25 192.50
9+725 7.700
7.70 25 192.50
9+750 7.700
7.70 15 115.50
9+765 7.700
3.85 35 134.75
9+800 0.000

6+000 0.000
1.58 25 39.60
6+025 3.168
3.65 25 91.30
6+050 4.136
4.26 25 106.56
6+075 4.389
4.52 25 112.89
6+100 4.642
5.07 10 50.71
6+110 5.500
5.50 15 82.50
6+125 5.500
5.50 25 137.50
6+150 5.500
5.50 25 137.50
6+175 5.500
SUB TOTAL IV 375 2,108.810
TOTAL (I s/d IV) 2,318 10,060.660
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

6+175 5.500
5.50 25 137.50
6+200 5.500
5.50 22 121.00
6+222 5.500
plat dekker 2 x 2
6+224 5.500
5.50 26 143.00
6+250 5.500
5.50 25 137.50
6+275 5.500
5.50 25 137.50
6+300 5.500
5.50 25 137.50
6+325 5.500
5.50 25 137.50
6+350 5.500
6.01 20 120.12
6+370 6.512
6.51 5 32.56
6+375 6.512
5.24 25 130.90
6+400 3.960
3.63 25 90.75
6+425 3.300
1.65 25 41.25
6+450 0.000

SUB TOTAL V 273 1,367.080

TOTAL (I s/d V) 2,591 11,427.740

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
7+930 3.630
3.63 270 980.10
8+200 3.630

8+550 3.630
3.63 1,050 3,811.50
9+600 3.630

10+100 3.630
3.63 100 363.00
10+200 3.630

10+250 3.630
3.63 175 635.25
10+425 3.630

SUB TOTAL II 1,595 5,789.850

TOTAL (I+II) 3,190 7,049.850

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

0+450 0.000
1.38 25 34.38
0+475 2.750
2.75 25 68.75
0+500 2.750
2.75 25 68.75
0+525 2.750
2.75 25 68.75
0+550 2.750
2.75 25 68.75
0+575 2.750
2.75 25 68.75
0+600 2.750
Plat dekker 2 x 1.5
0+602 2.750
2.75 23 63.25
0+625 2.750
2.75 25 68.75
0+650 2.750
2.75 25 68.75
0+675 2.750
2.75 25 68.75
0+700 2.750
2.75 25 68.75
0+725 2.750
2.75 25 68.75
0+750 2.750
2.75 35 96.25
0+785 2.750
1.38 15 20.63
0+800 0.000
SUB TOTAL III 348 902.000
TOTAL (I+II+III) 1,943 7,951.850
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity

9+600 3.300
5.50 25 137.50
9+625 7.700
7.70 25 192.50
9+650 7.700
7.70 25 192.50
9+675 7.700
7.70 25 192.50
9+700 7.700
7.70 25 192.50
9+725 7.700
7.70 25 192.50
9+750 7.700
7.70 15 115.50
9+765 7.700
3.85 35 134.75
9+800 0.000

6+000 0.000
0.48 25 12.10
6+025 0.968
1.45 25 36.30
6+050 1.936
2.06 25 51.56
6+075 2.189
2.32 25 57.89
6+100 2.442
2.87 10 28.71
6+110 3.300
3.30 15 49.50
6+125 3.300
3.30 25 82.50
6+150 3.300
3.30 25 82.50
6+175 3.300
SUB TOTAL IV 375 1,751.310
TOTAL (I s/d IV) 2,318 9,703.160
Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

6+175 3.300
3.30 25 82.50
6+200 3.300
3.30 22 72.60
6+222 3.300
plat dekker 2 x 2
6+224 3.300
3.30 26 85.80
6+250 3.300
3.30 25 82.50
6+275 3.300
3.30 25 82.50
6+300 3.300
3.30 25 82.50
6+325 3.300
3.30 25 82.50
6+350 3.300
3.26 20 65.12
6+370 3.212
3.21 5 16.06
6+375 3.212
2.49 25 62.15
6+400 1.760
1.43 25 35.75
6+425 1.100
0.55 25 13.75
6+450 0.000

SUB TOTAL V 273 763.730

TOTAL (I s/d V) 2,591 10,466.890

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

2.50 3.00 3.00 2.50

4 .0 0 % 2. 00 % 2 .0 0 % 4 .0 0 %

E XIS TING T IMB UNA N PILIHA N

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
DAFTAR KUANTITAS DAN HARGA
NAMA SATKER
NAMA PAKET
DAFTAR KUANTITAS DAN HARGA
: PELAKSANAAN JALAN NASIONAL WILAYAH 2 PROPINSI SULBAR
: PELEBARAN JALAN KALUKKU - SALUBATU 1
PROPINSI : SULAWESI BARAT

PEMBAYARAN
KONTRAK ASLI REKAYASA LAPANGAN SELISIH

NO. MATA

SATUAN
HARGA
URAIAN SATUAN
(Rp.) KUANTITAS
JUMLAH HARGA BOBOT
KUANTITAS
JUMLAH HARGA BOBOT
PEK. KURANG PEK. TAMBAH KETERANGAN
(RP.) (%) (RP.) (%) JUMLAH HARGA JUMLAH HARGA
KUANTITAS KUANTITAS
(RP.) (RP.)

BAB I - UMUM
1.2 Mobilisasi dan Demobilisasi Ls 296,150,000.00 1.00 296,150,000.00 1.3304 1.00 296,150,000.00 0.0045 Tetap
1.8 Manajemen dan Keselamatan Lalu Lintas Ls 18,000,000.00 1.00 18,000,000.00 0.0809 1.00 18,000,000.00 0.0003 Tetap
1.18.(2) Relokasi Utilitas dan Pelayanan PDAM yang Ada Ls 35,000,000.00 1.00 35,000,000.00 0.1572 1.00 35,000,000.00 0.0005 Tetap
1.18.(3) Relokasi Utilitas dan Pelayanan PLN yang Ada Ls 60,000,000.00 1.00 60,000,000.00 0.2695 1.00 60,000,000.00 0.0009 Tetap
1.21 Manajemen Mutu Ls 19,000,000.00 1.00 19,000,000.00 0.0854 1.00 19,000,000.00 0.0003 Tetap
SUB TOTAL I 428,150,000.00 428,150,000.00 - -
BAB II - DRAINASE -
2.1 Galian untuk Drainase Selokan dan Saluran Air m³ 31,224.56 3,255.00 101,635,942.80 0.4566 748.00 23,355,970.88 0.0004 2,507.00 78,279,971.92 Kurang
2.2 Pekerjaan Pasangan Batu dengan Mortar m³ 508,878.29 569.63 289,872,340.33 1.3022 236.83 120,517,645.42 0.0018 332.80 169,354,694.91 Kurang
2.3 (3) Gorong-gorong Pipa Beton Bertulang 70-100 cm m' 1,469,360.99 28.00 41,142,107.72 0.1848 121.00 177,792,679.79 0.0027 93.00 136,650,572.07 Tambah
2.3 (3) Gorong-gorong Pipa Beton Bertulang 100-130 cm m' 1,939,363.63 10.00 19,393,636.30 0.0871
SUB TOTAL II 452,044,027.15 321,666,296.09 247,634,666.83 136,650,572.07
BAB III - PEKERJAAN TANAH - -
3.1 (1) Galian Biasa m³ 33,834.80 107,511.40 3,637,626,716.72 16.3418 21,062.65 712,650,507.93 0.0000 #REF! #REF! #REF! #REF! #REF!
3.1 (2) Galian Batu m³ 155,777.34 17,095.60 2,663,107,093.70 11.9639 ### ### 0.0006 #REF! #REF! #REF! #REF! #REF!
3.1 (8) Galian Perk. Beraspal tanpa CMM m³ - - - - 1,329.30 - - 1,329.30 Tetap
3.2 (1) Timbunan Biasa m³ 80,085.01 2,499.56 200,177,287.59 0.8993 13,785.40 1,104,003,896.85 0.0169 11,285.84 903,826,609.26 Tambah
3.2 (2) Timbunan Pilihan m³ 130,284.52 2,043.05 266,177,788.58 1.1958 10,466.89 1,363,673,739.54 0.0209 8,423.84 1,097,495,950.96 Tambah
3.3 Penyiapan Badan Jalan m² 3,735.43 37,500.00 140,078,625.00 0.6293 13,008.00 48,590,473.44 0.0007 24,492.00 91,488,151.56 Kurang
SUB TOTAL III 6,907,167,511.59 ### #REF! #REF!
BAB IV - PELEBARAN PERKERASAN DAN BAHU JALAN - -
4.2 (1) Lapis Pondasi Agregate Kelas A m³ 394,155.48 2,250.00 886,849,830.00 3.9841 - - - 2,250.00 886,849,830.00 Kurang
4.2 (2) Lapis Pondasi Agregate Klass B m³ 301,634.17 8,625.00 2,601,594,716.25 11.6875 6,405.00 1,931,966,858.85 0.0296 2,220.00 669,627,857.40 Kurang
SUB TOTAL - IV 3,488,444,546.25 1,931,966,858.85 669,627,857.40 -
BAB V - PERKERASAN BERBUTIR - -
5.1 (1) Lapis Pondasi Agregate Kelas A m³ 394,155.48 3,051.00 1,202,568,369.48 5.4025 9,607.50 3,786,848,774.10 0.0580 6,556.50 2,584,280,404.62 Tambah
5.1 (2) Lapis Pondasi Agregate Kelas B m³ 301,634.17 748.00 225,622,359.16 1.0136 315.00 95,014,763.55 0.0015 433.00 130,607,595.61 Kurang
SUB TOTAL V 1,428,190,728.64 3,881,863,537.65 130,607,595.61 2,584,280,404.62
BAB VI - PERKERASAN ASPAL - -
6.1 (1) Lapis Resap Pengikat Ltr 11,782.33 28,272.00 333,110,033.76 1.4965 44,835.00 528,260,765.55 0.0081 16,563.00 195,150,731.79 Tambah
6.1 (2) Lapis Perekat Ltr 12,312.81 19,131.00 235,556,368.11 1.0582 9,607.50 118,295,322.08 0.0018 9,523.50 117,261,046.04 Kurang
6.3 (5a) Laston - Lapis Aus (AC-WC) Ton 382,673.95 3,917.09 1,498,968,302.80 6.7340 45,000.00 17,220,327,750.00 0.2635 41,082.91 15,721,359,447.19 Tambah
6.3 (5b) Laston - Lapis Antara (AC-BC) Ton 353,304.59 4,932.90 1,742,816,212.01 7.8295 3,202.50 1,131,457,949.48 0.0173 1,730.40 611,358,262.54 Kurang
6.3.8 Aspal Ton 8,965,000.00 546.01 4,894,979,650.00 21.9904
6.3.9 Aditif anti pengelupasan Kilogram - -
6.3.10 Bahan Pengisi (Filler) Tambahan Kilogram 1,320.00 176,557.30 233,055,636.00 1.0470
SUB TOTAL VI 8,938,486,202.68 18,998,341,787.10 728,619,308.57 15,916,510,178.98
BAB VII PEKERJAAN STRUKTUR -
7.1 (5) Beton mutu sedang dengan fc'=25 Mpa (K-300) m³ 1,664,536.71 13.15 21,888,657.73 0.0983 87.65 145,896,642.63 0.0022 74.50 124,007,984.90 Tambah
7.3 (1) Baja Tulangan BJ 24 Polos kg 16,109.17 2,216.21 35,701,303.64 0.1604 8,064.74 129,916,267.66 0.0020 5,848.53 94,214,964.02 Tambah
7.9 Pasangan Batu m³ 504,443.71 510.35 257,442,847.39 1.1565 3,042.19 1,534,613,610.12 0.0235 2,531.84 1,277,170,762.73 Tambah
7.10(3) Bronjong (Gabions) m³ 506,758.89 160.00 81,081,422.40 0.3643
SUB TOTAL VII 396,114,231.16 1,810,426,520.41 - 1,495,393,711.64
BAB VIII - PENGEMBALIAN KONISI DAN PEKERJAAN MINOR
8.4 (2) Marka Jalan Thermoplastik m³ 198,199.92 1,050.00 208,109,916.00 0.9349 1,050.00 208,109,916.00 0.0032 Tetap
SUB TOTAL VIII 208,109,916.00 208,109,916.00 - 1,495,393,711.64
BAB IX - PEKERJAAN HARIAN -
9.1 Mandor Jam 11,000.00 7.00 77,000.00 0.0003 7.00 77,000.00 0.0000 Tetap
9.2 Pekerja Biasa Jam 6,600.00 14.00 92,400.00 0.0004 14.00 92,400.00 0.0000 Tetap
9.3 Tukang Kayu, Tukang Batu, dsb. Jam 9,900.00 7.00 69,300.00 0.0003 7.00 69,300.00 0.0000
9.4 Dump Truck 3-4 m3 Jam 211,002.00 7.00 1,477,014.00 0.0066 7.00 1,477,014.00 0.0000
9.7 Bulldozer 100 - 150 PK Jam 394,966.00 7.00 2,764,762.00 0.0124 7.00 2,764,762.00 0.0000
9.8 Motor Grader Min 100 PK Jam 381,315.00 7.00 2,669,205.00 0.0120 7.00 2,669,205.00 0.0000 Tetap
9.9 Loader Roda Karet 1.0 - 1.6 m3 Jam 397,705.00 7.00 2,783,935.00 0.0125 7.00 2,783,935.00 0.0000 Tetap
9.11 Alat Penggali (Excavator) 80 - 140 KP Jam 423,016.00 7.00 2,961,112.00 0.0133 7.00 2,961,112.00 0.0000 Tetap
SUB TOTAL IX 12,894,728.00 100.0000 12,894,728.00 0.4614 - - #REF!
JUMLAH 22,259,601,891.47 ### #REF! #REF!
PPN 10 % 2,225,960,189.15 653,458,434,662.88 #REF! #REF! SELISIH
GRAND TOTAL 24,485,562,080.62 ### #REF! #REF! ###
DIBULATKAN 24,485,562,000.00 ### #REF! #REF!
### #REF!
Disetujui oleh, Konsultan #REF! Kontraktor
PEJABAT PEMBUAT KOMITMEN 06 PT. ESKAPINDO MATRA PT. PASSOKORANG
TOPOYO - BARAKKANG - KALUKKU - SALUBATU

MUHAMMAD. IDRIS DJAFAR, ST, MT Ir. Samuel Rapi Hidayat Rachmat, ST


NIP. 1973 0528 200112 1 003 Site Engineer General Superintendent
MUTUAL CHECK

SNVT : Pembangunan Jalan Provinsi Sulawesi Barat


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008

8.4(3) RAMBU JALAN DG PERMUKAAN PEMANTUL EG

Uraian Jml Ket


Tikungan Kanan (R2) 1.00 buah
Tikungan Kiri (R1) 1.00 buah
Simpangan (R16) 1.00 buah
Simpangan (R17) 1.00 buah
Tanjakan (R10) 2.00 buah
Turunan (R9) 2.00 buah
Banyak Tikungan (R8) 2.00 buah
Hati - hati (R34) 2.00 buah
Mesjid 4.00 buah

jumlah rambu jalan yang dibutuhkan = 16.00 buah

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
8.4(3) RAMBU JALAN DG PERMUKAAN PEMANTUL EG

1. LAST MONTH ( MC 22 ) = -Buah

2. REMAIND LAST MONTH ( MC 22 ) = Buah

3. THIS MONTH ( MC 23 ) = #REF! Buah

4. TOTAL THIS MONTH ( MC 23 ) = #REF! Buah

5. UP TO THIS MONTH ( MC 23 ) = #REF! Buah

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

file:///conversion/tmp/scratch/509046377.xlsx
MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN
Kordinator Lapangan Quatity Engineer Quantity Surveyor

file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG

:
1.58
1.2

file:///conversion/tmp/scratch/509046377.xlsx
:

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

SNVT : Pembangunan Jalan dan Jembatan Provinsi Sulawesi Barat


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008

8.4(10) REL PENGAMAN

STA JML VOL SAT

7+900 s/d 8+000 100.00 100.00 m'

TOTAL 100.00 m'

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quality Eng/CI Quantity

8.4(10) REL PENGAMAN

1. LAST MONTH ( MC 22 ) = -Buah

2. REMAIND LAST MONTH ( MC 22 = Buah

3. THIS MONTH ( MC 23 ) = #REF! Buah

4. TOTAL THIS MONTH ( MC 23 ) = #REF! Buah

5. UP TO THIS MONTH ( MC 23 ) = #REF! Buah

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN

file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor

file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG

:
1.58
1.2

file:///conversion/tmp/scratch/509046377.xlsx
:

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

SNVT : Pembangunan Jalan Provinsi Sulawesi Barat


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008

8.4(5) PATOK PENGARAH

Dimensi
Volume
STA Jumlah Ket.
(buah) (buah)

7+500 - 10+500 100.00 100.00

TOTAL 100.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
8.4(5) PATOK PENGARAH

1. LAST MONTH ( MC 22 ) = - Buah

2. REMAIND LAST MONTH ( MC 22 = Buah

3. THIS MONTH ( MC 23 ) = 100.000 Buah

4. TOTAL THIS MONTH ( MC 23 ) = 100.000 Buah

5. UP TO THIS MONTH ( MC 23 ) = 100.000 Buah

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN

file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor

file:///conversion/tmp/scratch/509046377.xlsx
8.4 (6) Patok Kilometer

:
1.58
1.2

file:///conversion/tmp/scratch/509046377.xlsx
:

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

SNVT : Pembangunan Jalan Provinsi Sulawesi Barat


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008

8.4(6) PATOK KILOMETER

Dimensi
Volume
STA Jumlah Ket.
(buah) (buah)
0+000
11.00 11.00
10+675
TOTAL 11.000

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN

file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quality Eng/CI Quantity

8.4(6) PATOK KILOMETER

1. LAST MONTH ( MC 22 ) = -Buah

2. REMAIND LAST MONTH ( MC 22 = Buah

3. THIS MONTH ( MC 23 ) = 11.000Buah

4. TOTAL THIS MONTH ( MC 23 ) = 11.000Buah

5. UP TO THIS MONTH ( MC 23 ) = 11.000Buah

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

file:///conversion/tmp/scratch/509046377.xlsx
MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN
Kordinator Lapangan Quatity Engineer Quantity Surveyor

file:///conversion/tmp/scratch/509046377.xlsx
8.4 (3) Rambu Jalan dgn Permukaan Pemantul EG

:
1.58
1.2

0.65

1.70

0.50

0.95

0.40

file:///conversion/tmp/scratch/509046377.xlsx
0.80
1.70

0.50

0.95

0.40

0.80

file:///conversion/tmp/scratch/509046377.xlsx
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

file:///conversion/tmp/scratch/509046377.xlsx
0.80
1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

8.4(2) MARKA JALAN TERMOPLASTIK


LEBAR PANJANG LUAS
STA KETERANGAN
(m) (m) ( m2 )

0+000 s/d 0+550 0.38 0.12 550 24.75 CENTER LINE


0+550 s/d 0+650 0.12 100 12.00 SOLID
0+650 s/d 0+750 0.38 0.12 100 4.50 CENTER LINE
0+750 s/d 0+900 0.12 150 18.00 SOLID
0+900 s/d 1+500 0.38 0.12 600 27.00 CENTER LINE
1+500 s/d 1+600 0.12 100 12.00 SOLID
1+600 s/d 5+500 0.38 0.12 3900 175.50 CENTER LINE
5+500 s/d 5+600 0.12 100 12.00 SOLID
5+600 s/d 7+000 0.38 0.12 1400 63.00 CENTER LINE
7+000 s/d 10+675 0.12 3675 441.00 SOLID

10675

SUB TOTAL I 789.75

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (1) TIMBUNAN BIASA (REISING)

2.00 3.00 3.00 2. 00

4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %

EXISTI NG TI MBUNAN PILIHAN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

0+450 0.000
2.32 25 58.03
0+475 4.642
5.96 25 148.91
0+500 7.271
7.38 25 184.39
0+525 7.480
8.13 25 203.23
0+550 8.778
8.62 25 215.46
0+575 8.459
8.86 25 221.38
0+600 9.251
Plat dekker 2 x 1.5
0+602 9.053
9.03 23 207.59
0+625 8.998
9.03 25 225.78
0+650 9.064
9.00 25 225.09
0+675 8.943
8.72 25 218.08
0+700 8.503
8.78 25 219.45
0+725 9.053

SUB TOTAL I 273 2,127.362

TOTAL (I) 273 2,127.362

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (1) TIMBUNAN BIASA (REISING)

2.00 3.00 3.00 2. 00

4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %

EXISTI NG TI MBUNAN PILIHAN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Koordinator Lapangan Quality Eng/CI Quantity

0+725 9.053
9.05 25 226.33
0+750 9.053
6.74 25 168.44
0+775 4.422
2.21 10 22.11
0+785 0.000

1+810 0.700
0.70 272 190.40 (R)
2+082 0.700
2+082 2.250
2.25 68 153.00 (L)
2+150 2.250
2+650 0.800
0.80 100 80.00 (L)
2+750 0.800
2+800 0.660
0.66 50 33.00 (R)
2+850 0.660
3+131 1.440
1.44 69 99.36 (L)
3+200 1.440
0+000 0.520
0.52 1,810 941.20 (R)
1+810 0.520

SUB TOTAL II 2,429 1,913.833

TOTAL (I s/d II) 2,702 4,041.194

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (1) TIMBUNAN BIASA (REISING)

2.00 3.00 3.00 2. 00

4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %

EXISTI NG TI MBUNAN PILIHAN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

3+500 0.810
0.81 3,375 5,467.50 ( L/R )
6+875 0.810

9+250 0.000
0.38 10 3.75 (R)
9+260 0.750
1.88 10 18.75 (R)
9+270 3.000
4.88 10 48.75 (R)
9+280 6.750
9.38 10 93.75 (R)
9+290 12.000
15.38 10 153.75 (R)
9+300 18.750
22.88 10 228.75 (R)
9+310 27.000
31.88 10 318.75 (R)
9+320 36.750
42.38 10 423.75 (R)
9+330 48.000
54.38 10 543.75 (R)
9+340 60.750
67.88 10 678.75 (R)
9+350 75.000

SUB TOTAL III 3,475 7,980.000

TOTAL (I s/d III) 6,177 12,021.194

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (1) TIMBUNAN BIASA (REISING)

2.00 3.00 3.00 2. 00

4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %

EXISTI NG TI MBUNAN PILIHAN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

6+110 0.000
0.96 15 14.36
6+125 1.914
3.30 25 82.50
6+150 4.686
6.06 25 151.39
6+175 7.425
8.51 25 212.85
6+200 9.603
9.60 22 211.27
6+222 9.603
plat dekker 2 x 2
6+224 10.791
10.79 1 10.79
6+225 10.791
11.05 25 276.24
6+250 11.308
11.31 25 282.70
6+275 11.308
10.52 25 263.04
6+300 9.735
7.00 25 175.04
6+325 4.268
2.82 25 70.40
6+350 1.364
0.68 20 13.64
6+370 0.000

SUB TOTAL IV 258 1,764.202

TOTAL (I s/d IV) 6,435 13,785.40

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (1) TIMBUNAN BIASA (REISING)

2.00 3.00 3.00 2. 00

4 .00 % 2 .0 0 % 2. 00 % 4.0 0 %

EXISTI NG TI MBUNAN PILIHAN

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4. 00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN

m2 m2 m m³
4+625 16.469
22.50 25 562.56
4+650 28.536
5+325 9.289
6.47 25 161.74
5+350 3.650
2.84 50 142.16
5+400 2.036
1.70 25 42.42
5+425 1.358
6+000 12.405
18.47 25 461.77
6+025 24.536
14.98 50 748.84
6+075 5.417
6+475 6.309
3.84 25 95.88
6+500 1.362
1.84 50 91.83
6+550 2.311
1.99 25 49.85
6+575 1.677
5.98 25 149.46
6+600 10.280
7.61 25 190.28
6+625 4.943

SUB TOTAL I 350 2,696.794

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4. 00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
6+625 4.943
10.69 75 801.74
6+700 16.437
12.96 50 648.12
6+750 9.487
6.95 25 173.66
6+775 4.405
6.87 25 171.80
6+800 9.339
40.29 50 2,014.41
6+850 71.238
48.33 50 2,416.69
6+900 25.430
7+050 48.948
60.24 25 1,505.91
7+075 71.525
41.61 25 1,040.23
7+100 11.694
8.51 25 212.77
7+125 5.327

SUB TOTAL 350 8,985.323

KOMULATIF 700 11,682.118

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

Koordinator Lapangan Quality Eng/CI Quantity


MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4. 00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
7+600 12.395
9.90 25 247.44
7+625 7.400
9.36 25 233.94
7+650 11.315
7.99 50 399.25
7+700 4.655
7+975 6.795
6.70 25 167.59
8+000 6.612
4.51 50 225.31
8+050 2.400
2.83 25 70.78
8+075 3.263
8+150 9.555
8.22 25 205.38
8+175 6.875
8+350 7.725
4.33 50 216.31
8+400 0.927
0.93 50 46.37
8+450 0.927

SUB TOTAL 325 1,812.38

KOMULATIF 1,025 13,494.49

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

Koordinator Lapangan Quality Eng/CI Quantity


MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4. 00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
8+450 3.691
3.78 50 188.97
8+500 3.868
3.87 25 96.69
8+525 3.868
3.04 25 76.00
8+550 2.212
8.57 50 428.44
8+600 14.925
7.74 50 386.88
8+650 0.550
1.42 75 106.41
8+725 2.287
3.48 25 87.03
8+750 4.675
2.68 50 133.75
8+800 0.675
4.33 25 108.31
8+825 7.990
5.20 25 129.88
8+850 2.400

SUB TOTAL 400 1,742.344

KOMULATIF 1,425 15,236.84

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

RIDWAN
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.00 2.00

4.00 % 2.00 % 2.00 % 4. 00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
10+775 4.565
3.58 75 268.87
10+850 2.605
5.45 25 136.38
10+875 8.305
12.07 25 301.63
10+900 15.825
24.49 50 1,224.63
10+950 33.160
45.43 25 1,135.75
10+975 57.700
53.94 25 1,348.38
11+000 50.170
39.97 25 999.25
11+025 29.770
16.44 25 410.94
11+050 3.105

SUB TOTAL 275 5,825.812

KOMULATIF 1,700 21,062.649

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

Koordinator Lapangan Quality Eng/CI Quantity


MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

GALIAN BIASA
2.00 3.00 3.0 0 2.00

4.00 % 2.00 % 2.00 % 4.00 %

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2
m 2
m m³
11+550 6.425
17.44 25 435.91
11+575 28.448
21.83 25 545.72
11+600 15.210
15.15 25 378.79
11+625 15.093
11+675 10.026
12.80 15 191.97
11+690 15.570

SUB TOTAL VI 90 1,552.38

TOTAL (I - VI) 1,790 22,615.03

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

Koordinator Lapangan Quality Eng/CI Quantity


BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 10+700 SISI : L
74.00
73.50
73.00
72.50
72.00
71.50
71.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

TITIK A B C D A
X 0.00 1.20 3.70 0.70 0.00
Y 73.20 73.70 72.00 72.00 73.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 404.04 - 410.93
LUAS = + = + = 3.445 m² -3.44
2.00 2.00

STA 10+750
71.50
71.00
SISI : L
70.50
70.00
69.50
69.00
68.50
68.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00

TITIK A B C D A
X 0.00 2.00 3.60 1.00 0.00
Y 71.00 71.00 69.00 69.00 71.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 457.40 - 466.60
LUAS = + = + = 4.600 m² -4.60
2.00 2.00

STA 10+775
71.00 SISI : L
70.00
69.00
68.00
67.00
66.00
0.00 0.50 1.00 1.50 2.00 2.50 3.00

TITIK A B C D A
X 0.00 2.45 2.70 1.00 0.00
Y 70.20 70.20 68.00 68.00 70.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 420.40 - 429.53
LUAS = + = + = 4.565 m² -4.57
2.00 2.00

STA 10+850
60.00 SISI : R
59.50
59.00
58.50
58.00
57.50
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50

TITIK A B C D A
X 5.40 5.60 8.00 7.50 5.40
Y 58.40 59.60 59.50 58.40 58.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 1560.24 - 1565.45
LUAS = + = + = 2.605 m² -2.60
2.00 2.00

STA 10+875
59.00
58.00
SISI : R
57.00
56.00
55.00
54.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D A
X 4.50 5.50 9.20 7.50 4.50
Y 55.70 58.00 58.60 55.70 55.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 1513.49 - 1530.10
LUAS = + = + = 8.305 m² -8.31
2.00 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 10+900
60.00
58.00
SISI : R
56.00
54.00
52.00
50.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00

TITIK A B C D A
X 4.50 4.70 10.20 7.50 4.50
Y 52.80 55.70 58.20 52.80 52.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 1458.75 - 1490.40
LUAS = + = + = 15.825 m² -15.83
2.00 2.00

STA 10+950
59.00
57.00
55.00
SISI : R
53.00
51.00
49.00
47.00
45.00
4.00 6.00 8.00 10.00 12.00 14.00 16.00

TITIK A B C D E F A
X 6.40 6.60 14.60 11.00 10.00 7.50 6.40
Y 45.60 52.00 57.95 50.60 50.60 45.60 45.60
S(Xn x Yn+1) - S(Xn+1 x Yn) 2808.63 - 2874.95
LUAS = + = + = 33.160 m² -33.16
2.00 2.00

STA 10+975
63.00
58.00 SISI : R
53.00
48.00
43.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

TITIK A B C D E F G A
X 4.40 4.60 14.10 15.50 11.00 10.00 7.50 4.40
Y 43.80 49.40 57.40 57.40 48.80 48.80 43.80 43.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3350.44 - 3465.84
LUAS = + = + = 57.700 m² -57.70
2.00 2.00

STA 11+000
57.00 SISI : R
52.00

47.00

42.00
4.00 6.00 8.00 10.00 12.00 14.00 16.00 18.00

TITIK A B C D E F A
X 5.40 5.60 16.00 11.00 10.00 7.50 5.40
Y 42.40 48.40 58.00 47.40 47.40 42.40 42.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 2607.96 - 2708.30
LUAS = + = + = 50.170 m² -50.17
2.00 2.00

STA 11+025
56.00
54.00
52.00
SISI : R
50.00
48.00
46.00
44.00
42.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00

TITIK A B C D E F A
X 6.30 6.60 14.50 11.00 10.00 7.50 6.30
Y 42.20 47.90 54.20 47.20 47.20 42.20 42.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 2601.59 - 2661.13
LUAS = + = + = 29.770 m² -29.77
2.00 2.00

STA 11+050
45.00
SISI : R
44.00

43.00

42.00

41.00
6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00

TITIK A B C D A
X 6.40 6.60 8.75 7.50 6.40
Y 42.40 44.20 44.60 42.40 42.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 1266.24 - 1272.45
LUAS = + = + = 3.105 m² -3.10
2.00 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 11+150
46.00
45.50
SISI : R
45.00
44.50
44.00
43.50
43.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00

TITIK A B C D A
X 5.40 5.60 8.30 7.50 5.40
Y 44.00 44.70 45.60 44.00 44.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 1191.94 - 1197.01
LUAS = + = + = 2.535 m² -2.54
2.00 2.00

STA 11+200
54.00 SISI : R
52.00
50.00
48.00
46.00
44.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00

TITIK A B C D A
X 4.40 4.60 10.20 7.50 4.40
Y 47.50 50.70 53.00 47.50 47.50
S(Xn x Yn+1) - S(Xn+1 x Yn) 1307.63 - 1342.14
LUAS = + = + = 17.255 m² -17.26
2.00 2.00

STA 11+225
53.00
52.50 SISI : R
52.00
51.50
51.00
50.50
50.00
5.50 6.00 6.50 7.00 7.50 8.00 8.50

TITIK A B C D A
X 5.70 5.80 8.20 7.50 5.70
Y 51.00 51.50 52.40 51.00 51.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 1398.17 - 1401.80
LUAS = + = + = 1.815 m² -1.81
2.00 2.00

STA 11+250
58.00
57.00 SISI : R
56.00
55.00
54.00
53.00
52.00
4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50

TITIK A B C D A
X 5.00 7.80 9.00 7.50 5.00
Y 54.10 56.80 57.15 54.10 54.10
S(Xn x Yn+1) - S(Xn+1 x Yn) 1622.42 - 1632.31
LUAS = + = + = 4.943 m² -4.94
2.00 2.00

STA 11+350
70.00
68.00
SISI : R
66.00
64.00
62.00
60.00
5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00

TITIK A B C A
X 6.00 9.70 7.50 6.00
Y 63.85 67.80 63.85 63.85
S(Xn x Yn+1) - S(Xn+1 x Yn) 1505.02 - 1510.95
LUAS = + = + = 2.962 m² -2.96
2.00 2.00

STA 11+375
80.00
SISI : R
75.00
70.00
65.00
60.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

TITIK A B C D E F A
X 4.00 7.40 13.60 11.00 10.00 7.50 4.00
Y 65.80 71.10 76.20 70.90 70.90 65.80 65.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3743.92 - 3796.03
LUAS = + = + = 26.055 m² -26.05
2.00 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 11+400
72.00
SISI : R
70.00
68.00
66.00
64.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D A
X 5.00 7.30 9.70 7.50 5.00
Y 67.00 70.85 71.40 67.00 67.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 2027.87 - 2046.85
LUAS = + = + = 9.487 m² -9.49
2.00 2.00

STA 11+425
72.00 SISI : L
71.00
70.00
69.00
68.00
67.00
66.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50

TITIK A B C D A
X 5.50 7.30 9.10 7.50 5.50
Y 68.20 70.80 71.50 68.20 68.20
S(Xn x Yn+1) - S(Xn+1 x Yn) 2043.47 - 2053.49
LUAS = + = + = 5.010 m² -5.01
2.00 2.00

STA 11+450
78.00 SISI : R
74.00
70.00
66.00
62.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00

TITIK A B C D E F A
X 4.50 7.30 13.50 11.00 10.00 7.50 4.50
Y 68.90 73.60 79.00 73.90 73.90 68.90 68.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 3924.20 - 3968.87
LUAS = + = + = 22.335 m² -22.34
2.00 2.00

STA 11+475
85.00 SISI : R
80.00
75.00
70.00
65.00
60.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00 16.00

TITIK A B C D E F A
X 3.00 6.80 13.80 11.00 10.00 7.50 3.00
Y 68.80 74.60 79.50 73.80 73.80 68.80 68.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 3798.64 - 3869.72
LUAS = + = + = 35.540 m² -35.54
2.00 2.00

STA 11+500
80.00 SISI : R
75.00
70.00
65.00
60.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00

TITIK A B C D E F A
X 4.70 8.80 13.50 11.00 10.00 7.50 4.70
Y 67.10 72.95 76.90 72.10 72.10 67.10 67.10
S(Xn x Yn+1) - S(Xn+1 x Yn) 3960.29 - 3998.33
LUAS = + = + = 19.020 m² -19.02
2.00 2.00

STA 11+550
68.00 SISI : R
67.00
66.00
65.00
64.00
63.00
62.00
61.00
5.00 5.50 6.00 6.50 7.00 7.50 8.00 8.50 9.00 9.50 10.00

TITIK A B C D A
X 5.50 7.30 9.40 7.50 5.50
Y 63.70 66.80 67.50 63.70 63.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 1936.68 - 1949.53
LUAS = + = + = 6.425 m² -6.42
2.00 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA


STA 11+575
72.00
70.00 SISI : R
68.00
66.00
64.00
62.00
60.00
58.00
2.00 4.00 6.00 8.00 10.00 12.00 14.00

TITIK A B C D E F A
X 3.20 6.00 12.75 11.00 10.00 7.50 3.20
Y 62.60 67.00 71.20 67.10 67.10 62.60 62.60
S(Xn x Yn+1) - S(Xn+1 x Yn) 3330.73 - 3387.62
LUAS = + = + = 28.448 m² -28.45
2.00 2.00

STA 11+600
70.00
68.00
SISI : R
66.00
64.00
62.00
60.00
58.00
56.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00

TITIK A B C D A
X 4.70 7.30 11.00 7.50 4.70
Y 60.80 65.40 68.00 60.80 60.80
S(Xn x Yn+1) - S(Xn+1 x Yn) 1928.58 - 1959.00
LUAS = + = + = 15.210 m² -15.21
2.00 2.00

STA 11+625
62.00
60.00
SISI : R
58.00
56.00
54.00
52.00
50.00
48.00
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00

TITIK A B C D A
X 4.90 7.00 11.50 8.25 4.90
Y 52.71 56.00 59.50 52.71 52.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 1731.96 - 1762.15
LUAS = + = + = 15.093 m² -15.09
2.00 2.00

STA 11+675
62.00
60.00
SISI : R
58.00
56.00
54.00
52.00
50.00
48.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00

TITIK A B C D E F A
X 5.50 8.30 12.00 11.00 10.00 7.50 5.50
Y 53.12 57.60 59.60 57.95 57.95 53.12 53.12
S(Xn x Yn+1) - S(Xn+1 x Yn) 3073.93 - 3093.98
LUAS = + = + = 10.026 m² -10.03
2.00 2.00

STA 11+690
60.00
58.00
SISI : R
56.00
54.00
52.00
50.00
48.00
46.00
5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00

TITIK A B C D E F A
X 5.60 8.30 12.00 11.00 10.00 7.50 5.60
Y 51.30 57.60 58.90 56.70 56.70 51.30 51.30
S(Xn x Yn+1) - S(Xn+1 x Yn) 3013.28 - 3044.42
LUAS = + = + = 15.570 m² -15.57
2.00 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

40

35

30
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

40
30
20
10
0
0.80 1.00 1.20 1.40 1.60 1.80 2.00

9
6
3
0
1

45
40
35
30
4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00

9
6
3
0
1

9
6
3
0
1

15
104.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 8.00
5
0

2
1
0

0
0.80 1.00 1.20 1.40 1.60 1.80 2.00
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

0
1

0
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

1.5
1
0.5
0

1.5
1
0.5
0
1

1.5
1
0.5
0
1

55

50
1

110
90
70
50
0.80 1.00 1.20 1.40 1.60 1.80 2.00

0
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (1) GALIAN BIASA

0
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 86.40 266.40 51.24 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 87.84 272.69 50.40 0.00 0.00 0.00 0.00 0.00 0.00 0.00

3.44

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 138.00 248.40 71.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 142.00 255.60 69.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.60

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 0.00 166.60 183.60 70.20 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 171.99 189.54 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

4.57

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 321.84 333.20 467.20 438.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 327.04 476.80 446.25 315.36 0.00 0.00 0.00 0.00 0.00 0.00

2.60

9.00

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 261.00 322.30 512.44 417.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 306.35 533.60 439.50 250.65 0.00 0.00 0.00 0.00 0.00 0.00

8.31
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 250.65 273.54 538.56 396.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 248.16 568.14 436.50 237.60 0.00 0.00 0.00 0.00 0.00 0.00

15.83

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 332.80 382.47 738.76 556.60 456.00 342.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 300.96 759.20 637.45 506.00 379.50 291.84 0.00 0.00 0.00 0.00

33.16

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 217.36 264.04 809.34 756.40 536.80 438.00 328.50 0.00 0.00 0.00
Xn+1 x Yn 201.48 696.54 889.70 631.40 488.00 366.00 192.72 0.00 0.00 0.00

57.70

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 261.36 324.80 758.40 521.40 424.00 318.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 237.44 774.40 638.00 474.00 355.50 228.96 0.00 0.00 0.00 0.00

50.17

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 301.77 357.72 684.40 519.20 422.00 316.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 278.52 694.55 596.20 472.00 354.00 265.86 0.00 0.00 0.00 0.00

29.77

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 282.88 294.36 371.00 318.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 279.84 386.75 334.50 271.36 0.00 0.00 0.00 0.00 0.00 0.00

3.10
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 241.38 255.36 365.20 330.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 246.40 371.01 342.00 237.60 0.00 0.00 0.00 0.00 0.00 0.00

2.54

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 223.08 243.80 484.50 356.25 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 218.50 517.14 397.50 209.00 0.00 0.00 0.00 0.00 0.00 0.00

17.26

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 293.55 303.92 418.20 382.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 295.80 422.30 393.00 290.70 0.00 0.00 0.00 0.00 0.00 0.00

1.81

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 284.00 445.77 486.90 405.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 421.98 511.20 428.63 270.50 0.00 0.00 0.00 0.00 0.00 0.00

4.94

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 406.80 619.35 478.88 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 619.35 508.50 383.10 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2.96

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 284.40 563.88 964.24 779.90 658.00 493.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 486.92 966.96 838.20 709.00 531.75 263.20 0.00 0.00 0.00 0.00

26.05
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 354.25 521.22 649.90 502.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 489.10 687.25 535.50 335.00 0.00 0.00 0.00 0.00 0.00 0.00

9.49

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 389.40 521.95 620.62 511.50 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 497.86 644.28 536.25 375.10 0.00 0.00 0.00 0.00 0.00 0.00

5.01

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 331.20 576.70 997.65 812.90 689.00 516.75 0.00 0.00 0.00 0.00
Xn+1 x Yn 502.97 993.60 869.00 739.00 554.25 310.05 0.00 0.00 0.00 0.00

22.34

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 223.80 540.60 1018.44 811.80 688.00 516.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 467.84 1029.48 874.50 738.00 553.50 206.40 0.00 0.00 0.00 0.00

35.54

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 342.87 676.72 973.35 793.10 671.00 503.25 0.00 0.00 0.00 0.00
Xn+1 x Yn 590.48 984.83 845.90 721.00 540.75 315.37 0.00 0.00 0.00 0.00

19.02

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 367.40 492.75 598.78 477.75 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 465.01 627.92 506.25 350.35 0.00 0.00 0.00 0.00 0.00 0.00

6.42
TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 214.40 427.20 855.53 738.10 626.00 469.50 0.00 0.00 0.00 0.00
Xn+1 x Yn 375.60 854.25 783.20 671.00 503.25 200.32 0.00 0.00 0.00 0.00

28.45

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 307.38 496.40 668.80 456.00 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 443.84 719.40 510.00 285.76 0.00 0.00 0.00 0.00 0.00 0.00

15.21

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 274.40 416.50 606.19 434.87 0.00 0.00 0.00 0.00 0.00 0.00
Xn+1 x Yn 368.98 644.00 490.88 258.29 0.00 0.00 0.00 0.00 0.00 0.00

15.09

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 316.80 494.68 695.40 637.45 531.20 398.40 0.00 0.00 0.00 0.00
Xn+1 x Yn 440.90 691.20 655.60 579.50 434.63 292.16 0.00 0.00 0.00 0.00

10.03

TITIK A B C D E F G H I J K L M N O
Xn x Yn+1 322.56 488.87 680.40 623.70 513.00 384.75 0.00 0.00 0.00 0.00
Xn+1 x Yn 425.79 691.20 647.90 567.00 425.25 287.28 0.00 0.00 0.00 0.00

15.57
P

P
P

P
P

P
P

P
P

P
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


STA 5+477
9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E A
X 0.00 1.68 3.18 5.30 0.58 0.00
Y 8.71 8.73 8.44 6.03 5.97 8.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 70.06 - 90.61
LUAS = + = + = 10.276 m² -10.28
2.00 2.00

STA 5+500
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.23 4.23 5.86 1.63 0.93 0.43 0.00
Y 9.67 9.01 8.78 6.03 5.97 8.93 8.93 9.67
S(Xn x Yn+1) - S(Xn+1 x Yn) 115.87 - 139.98
LUAS = + = + = 12.055 m² -12.05
2.00 2.00

STA 5+520
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.21 4.21 5.83 1.61 0.90 0.40 0.00
Y 9.62 8.84 8.17 6.03 5.97 8.93 8.93 9.62
S(Xn x Yn+1) - S(Xn+1 x Yn) 112.68 - 134.34
LUAS = + = + = 10.83 m² -10.83
2.00 2.00

STA 0+000

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+000

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


LUAS = + = + = 0.000 m² 0.00
2.00 2.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


STA 4+910
7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E A
X 0.00 1.87 3.17 4.40 0.37 0.00
Y 6.78 6.62 6.04 4.96 4.92 6.78
S(Xn x Yn+1) - S(Xn+1 x Yn) 51.17 - 62.08
LUAS = + = + = 5.454 m² -5.45
2.00 2.00

STA 4+950
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.92 5.22 6.45 0.92 0.52 0.42 0.00
Y 9.46 9.02 7.05 4.96 4.92 7.08 7.60 9.46
S(Xn x Yn+1) - S(Xn+1 x Yn) 99.70 - 139.76
LUAS = + = + = 20.028 m² -20.03
2.00 2.00

STA 4+960
8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E A
X 0.00 1.74 3.04 5.76 0.44 0.00
Y 7.41 7.21 6.91 4.96 4.92 7.41
S(Xn x Yn+1) - S(Xn+1 x Yn) 58.69 - 76.79
LUAS = + = + = 9.048 m² -9.05
2.00 2.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


STA 8+250
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 2.39 4.19 6.99 8.49 7.94 7.44 5.73 0.00
Y 4.42 6.74 7.65 8.22 8.22 7.26 7.26 4.30 4.42
S(Xn x Yn+1) - S(Xn+1 x Yn) 286.83 - 322.98
LUAS = + = + = 18.077 m² -18.08
2.00 2.00

STA 8+275
14.00

12.00

10.00

8.00

6.00

4.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G A
X 0.00 2.43 4.23 7.03 11.50 9.57 9.07 7.43 6.93 5.22 0.00
Y 4.41 7.81 11.45 13.25 13.45 10.09 10.09 7.26 7.26 4.30 4.41
S(Xn x Yn+1) - S(Xn+1 x Yn) 563.71 - 660.01
LUAS = + = + = 48.148 m² -48.15
2.00 2.00

STA 8+300
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.80 2.20 4.90 7.63 6.81 6.31 4.60 0.00 0.00
Y 5.72 5.89 6.90 8.71 9.52 8.10 8.10 5.14 5.24 5.72
S(Xn x Yn+1) - S(Xn+1 x Yn) 244.89 - 271.07
LUAS = + = + = 13.093 m² -13.09
2.00 2.00

11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


STA 0+050
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+100
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+150
11.00

10.00

9.00

8.00

7.00

6.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+200
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+250
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+300
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+350
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+400
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+425
14.00
13.00
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 2.00 4.00 6.00 8.00 10.00 12.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+450
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+475
18.00
16.00
14.00
12.00
10.00
8.00
6.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+525
19.00 Chart Title

18.00

17.00

16.00

15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+575
19.00 Chart Title
18.00

17.00

16.00

15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+625
19.00 Chart Title
18.00

17.00

16.00

15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 0+675
19.00 Chart Title
18.00

17.00

16.00

15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 8+400
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00

STA 8+450
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.70 4.30 7.40 6.51 6.01 4.30 0.00
Y 4.74 8.20 8.78 9.01 7.62 7.62 4.66 4.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 216.79 - 250.21
LUAS = + = + = 16.712 m² -16.71
2.00 2.00

STA 8+500
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.50 4.19 7.19 6.39 5.89 4.19 0.00
Y 4.68 5.88 8.69 9.43 7.56 7.56 4.60 4.68
S(Xn x Yn+1) - S(Xn+1 x Yn) 210.56 - 235.25
LUAS = + = + = 12.343 m² -12.34
2.00 2.00

STA 8+550
9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X 0.00 2.83 4.94 3.23 0.00
Y 5.45 7.52 8.35 5.39 5.45
S(Xn x Yn+1) - S(Xn+1 x Yn) 67.85 - 79.53
LUAS = + = + = 5.841 m² -5.84
2.00 2.00

STA 8+600
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


X 0.00 2.37 4.77 6.37 5.17 4.67 2.97 0.00
Y 5.56 9.03 10.26 10.53 8.46 8.46 5.50 5.56
S(Xn x Yn+1) - S(Xn+1 x Yn) 214.38 - 240.69
LUAS = + = + = 13.154 m² -13.15
2.00 2.00

STA 8+700
8.00
7.00
6.00
5.00
4.00
3.00
2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.30 4.80 7.27 5.81 5.31 3.60 0.00
Y 2.28 5.79 7.44 7.72 5.16 5.16 2.20 2.28
S(Xn x Yn+1) - S(Xn+1 x Yn) 141.58 - 177.94
LUAS = + = + = 18.182 m² -18.18
2.00 2.00

STA 8+750
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.50 2.20 5.04 3.81 3.31 1.60 0.00
Y 3.22 4.64 7.43 8.28 6.14 6.14 3.18 3.22
S(Xn x Yn+1) - S(Xn+1 x Yn) 91.98 - 110.96
LUAS = + = + = 9.494 m² -9.49
2.00 2.00

STA 8+800
10.00
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.11 3.51 6.32 4.92 4.42 2.71 0.00
Y 3.84 5.13 8.50 9.18 6.75 6.75 3.79 3.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 144.65 - 169.23
LUAS = + = + = 12.288 m² -12.29
2.00 2.00

STA 8+850
8.00

7.00

6.00

5.00

4.00

3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 1.92 3.66 3.22 2.72 1.02 0.00
Y 3.73 6.70 7.43 6.67 6.67 3.71 3.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 74.00 - 80.53
LUAS = + = + = 3.268 m² -3.27
2.00 2.00

STA 8+900
9.00

8.00

7.00

6.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


TITIK A B C D E A
X 0.00 1.00 2.60 3.60 2.10 0.00
Y 6.33 6.67 8.60 8.88 6.29 6.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 67.64 - 73.29
LUAS = + = + = 2.821 m² -2.82
2.00 2.00

STA 8+950
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.92 2.92 5.27 4.23 3.73 2.02 0.00
Y 3.77 5.09 7.87 8.50 6.69 6.69 3.73 3.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 117.12 - 134.25
LUAS = + = + = 8.566 m² -8.57
2.00 2.00

STA 9+000
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F A
X 0.00 1.74 4.84 4.05 3.55 1.84 0.00
Y 4.44 7.22 8.73 7.36 7.36 4.40 4.44
S(Xn x Yn+1) - S(Xn+1 x Yn) 104.46 - 117.73
LUAS = + = + = 6.633 m² -6.63
2.00 2.00

STA 9+050
7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D A
X 0.00 0.93 2.20 1.03 0.00
Y 4.75 6.08 6.76 4.73 4.75
S(Xn x Yn+1) - S(Xn+1 x Yn) 21.59 - 24.75
LUAS = + = + = 1.580 m² -1.58
2.00 2.00

STA 9+100
8.00

7.00

6.00

5.00

4.00

3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.58 3.58 5.69 4.99 4.49 2.78 0.00
Y 3.49 5.58 6.97 7.62 6.40 6.40 3.44 3.49
S(Xn x Yn+1) - S(Xn+1 x Yn) 131.73 - 149.67
LUAS = + = + = 8.968 m² -8.97
2.00 2.00

STA 9+200
8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00
BACK UP DATA QUANTITY

SNVT 8.00 : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. 7.00 : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08
6.00

3.1 (1) GALIAN BIASA


5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D A
X 0.00 1.90 3.13 1.60 0.00
Y 5.14 7.04 7.73 5.08 5.14
S(Xn x Yn+1) - S(Xn+1 x Yn) 38.80 - 44.14
LUAS = + = + = 2.670 m² -2.67
2.00 2.00

STA 9+250
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.58 2.88 5.58 4.59 4.09 2.38 0.00
Y 5.03 6.28 8.99 9.66 7.95 7.95 4.99 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 146.22 - 166.91
LUAS = + = + = 10.348 m² -10.35
2.00 2.00

STA 9+400
11.00
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 1.27 3.77 6.17 9.22 7.58 7.08 5.37 0.00
Y 4.73 5.03 9.03 9.96 10.42 7.58 7.58 4.63 4.73
S(Xn x Yn+1) - S(Xn+1 x Yn) 298.86 - 345.94
LUAS = + = + = 23.538 m² -23.54
2.00 2.00

STA 9+450
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.00 3.00 4.25 3.31 2.81 1.10 0.00
Y 5.00 7.77 9.25 9.57 7.93 7.93 4.98 5.00
S(Xn x Yn+1) - S(Xn+1 x Yn) 117.41 - 130.32
LUAS = + = + = 6.456 m² -6.46
2.00 2.00

STA 9+500
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.49 3.29 6.69 5.49 4.99 3.29 0.00
Y 3.18 3.73 6.39 8.13 6.07 6.07 3.11 3.18
S(Xn x Yn+1) - S(Xn+1 x Yn) 129.76 - 151.49
LUAS = + = + = 10.866 m² -10.87
2.00 2.00

STA 9+550
7.00

6.00

5.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
7.00
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran
6.00
: 2008 BULAN : Mei '08

5.00
3.1 (1) GALIAN BIASA

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D A
X 0.00 0.84 2.08 0.95 0.00
Y 4.25 5.46 6.21 4.25 4.25
S(Xn x Yn+1) - S(Xn+1 x Yn) 18.09 - 20.82
LUAS = + = + = 1.365 m² -1.37
2.00 2.00

STA 9+600
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 2.19 3.99 6.19 7.14 6.00 5.50 3.79 0.00
Y 5.03 6.71 8.68 9.62 9.89 7.91 7.91 4.95 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 268.83 - 292.98
LUAS = + = + = 12.071 m² -12.07
2.00 2.00

STA 9+650
8.00

7.00

6.00

5.00

4.00

3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.60 3.20 4.09 3.41 2.91 1.20 0.00
Y 3.48 6.24 7.34 7.60 6.42 6.42 3.46 3.48
S(Xn x Yn+1) - S(Xn+1 x Yn) 98.43 - 107.85
LUAS = + = + = 4.708 m² -4.71
2.00 2.00

STA 9+700
19.00

18.00

17.00

16.00

15.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G H A
X 0.00 3.05 4.65 6.65 7.93 6.86 6.36 4.65 0.00
Y 3.19 4.72 6.24 7.49 7.91 6.06 6.06 3.10 3.19
S(Xn x Yn+1) - S(Xn+1 x Yn) 230.55 - 253.54
LUAS = + = + = 11.491 m² -11.49
2.00 2.00

STA 9+750
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G H A
X 0.00 1.77 3.47 5.07 6.87 5.58 5.07 3.37 0.00
Y 4.18 4.59 6.67 8.22 9.31 7.07 7.07 4.11 4.18
S(Xn x Yn+1) - S(Xn+1 x Yn) 210.47 - 225.26
LUAS = + = + = 7.393 m² -7.39
2.00 2.00

STA 9+800
9.00

8.00

7.00

6.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran
9.00 : 2008 BULAN : Mei '08
8.00

7.00
3.1 (1) GALIAN BIASA
6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.41 3.01 4.22 3.62 3.12 1.41 0.00
Y 4.21 6.10 7.80 8.19 7.14 7.14 4.19 4.21
S(Xn x Yn+1) - S(Xn+1 x Yn) 110.65 - 119.20
LUAS = + = + = 4.277 m² -4.28
2.00 2.00

STA 9+850
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.42 3.52 5.92 5.53 5.03 3.32 0.00
Y 4.71 6.06 7.58 8.28 7.61 7.61 4.65 4.71
S(Xn x Yn+1) - S(Xn+1 x Yn) 166.00 - 182.16
LUAS = + = + = 8.080 m² -8.08
2.00 2.00

STA 9+900
9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X 0.00 1.90 2.11 0.72 0.00
Y 5.94 8.25 8.33 5.93 5.94
S(Xn x Yn+1) - S(Xn+1 x Yn) 32.60 - 34.69
LUAS = + = + = 1.042 m² -1.04
2.00 2.00

STA 9+950
10.00

9.00

8.00

7.00

6.00

5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.12 3.22 6.22 5.63 5.13 3.42 0.00
Y 5.16 6.13 7.79 9.08 8.05 8.05 5.09 5.16
S(Xn x Yn+1) - S(Xn+1 x Yn) 177.12 - 193.91
LUAS = + = + = 8.394 m² -8.39
2.00 2.00

STA 10+000
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X 0.00 1.19 2.99 4.49 3.40 2.90 1.19 0.00
Y 5.86 8.15 9.87 10.68 8.79 5.83 5.83 5.86
S(Xn x Yn+1) - S(Xn+1 x Yn) 126.90 - 144.45
LUAS = + = + = 8.776 m² -8.78
2.00 2.00

STA 10+050
11.00
10.00
9.00
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

11.00
3.1 (1) GALIAN BIASA
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.55 4.25 5.75 8.85 7.76 7.26 5.55 0.00
Y 5.40 8.01 9.09 9.91 10.14 8.25 8.25 5.29 5.40
S(Xn x Yn+1) - S(Xn+1 x Yn) 328.96 - 372.10
LUAS = + = + = 21.571 m² -21.57
2.00 2.00

STA 10+100
9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.36 5.86 7.76 7.17 6.67 4.96 0.00
Y 4.84 7.31 8.43 8.72 7.70 7.70 4.74 4.84
S(Xn x Yn+1) - S(Xn+1 x Yn) 250.02 - 276.64
LUAS = + = + = 13.309 m² -13.31
2.00 2.00

STA 10+150
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.58 2.18 4.28 7.48 6.38 5.88 4.18 0.00
Y 4.96 5.25 6.63 8.13 9.72 7.83 7.83 4.87 4.96
S(Xn x Yn+1) - S(Xn+1 x Yn) 221.13 - 244.33
LUAS = + = + = 11.603 m² -11.60
2.00 2.00

STA 10+200
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 1.28 2.88 4.58 6.88 8.10 6.44 6.19 4.48 0.00
Y 4.19 4.35 5.88 6.67 8.84 9.51 7.06 7.06 4.10 4.19
S(Xn x Yn+1) - S(Xn+1 x Yn) 279.48 - 298.88
LUAS = + = + = 9.701 m² -9.70
2.00 2.00

STA 10+250
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.30 3.40 5.70 8.40 7.21 6.71 5.00 0.00
Y 4.70 5.40 6.91 7.70 9.62 7.55 7.55 4.60 4.70
S(Xn x Yn+1) - S(Xn+1 x Yn) 255.31 - 281.67
LUAS = + = + = 13.183 m² -13.18
2.00 2.00

STA 10+300
BACK UP DATA QUANTITY

SNVT : Pembangunan Jalan dan Jembatan Prov. Sulbar


Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 03
Tahun Anggaran : 2008 BULAN : Mei '08

3.1 (1) GALIAN BIASA


9.00

8.00

7.00

6.00

5.00

4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X 0.00 1.65 3.95 5.84 5.36 4.86 3.15 0.00
Y 4.91 6.14 7.80 8.65 7.81 7.81 4.85 4.91
S(Xn x Yn+1) - S(Xn+1 x Yn) 173.53 - 186.82
LUAS = + = + = 6.642 m² -6.64
2.00 2.00

STA 10+350
7.00

6.00

5.00

4.00

3.00

2.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 2.80 4.30 5.80 6.96 6.31 5.81 4.10 0.00
Y 2.90 3.67 5.72 6.67 6.90 5.77 5.77 2.81 2.90
S(Xn x Yn+1) - S(Xn+1 x Yn) 189.53 - 204.20
LUAS = + = + = 7.336 m² -7.34
2.00 2.00

STA 10+400
9.00
8.00
7.00
6.00
5.00
4.00
3.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00

TITIK A B C D E F G A
X 0.00 1.82 4.92 4.13 3.63 1.92 0.00
Y 3.88 5.89 8.17 6.80 6.80 3.84 3.88
S(Xn x Yn+1) - S(Xn+1 x Yn) 97.77 - 107.48
LUAS = + = + = 4.854 m² -4.85
2.00 2.00

STA 10+450
10.00
9.00
8.00
7.00
6.00
5.00
4.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.36 2.36 4.86 7.16 5.67 5.17 3.46 0.00
Y 4.48 4.63 6.58 8.13 9.03 7.37 7.37 4.41 4.48
S(Xn x Yn+1) - S(Xn+1 x Yn) 198.37 - 217.52
LUAS = + = + = 9.577 m² -9.58
2.00 2.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³

4+550 2.046
834,511.55 25 20,862,788.69
4+575 ###
834,518.76 25 20,862,968.98
4+600 16.469

4+700 3.728
3.73 17 63.38
4+717 3.728

4+740 5.409
4.62 60 277.21
4+800 3.831
4.78 50 238.98
4+850 5.728
5.73 25 143.20
4+875 5.728
6.69 25 167.20
4+900 7.648
6.26 50 313.11
4+950 4.876
6.00 50 300.24
5+000 7.133
5.22 50 260.82
5+050 3.299

SUB TOTAL 377 41,727,521.805

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

SUJI PRAYITNO, ST
Koordinator Lapangan Quality Eng/CI Quantity
MUTUAL CHECK
Bagian Pelak. Kegiatan : Pembangunan Jalan Barakang - Topoyo - Karossa
Paket : Pembangunan Jalan Topoyo - Karossa
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2008

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m 2
m m m³
5+500 1.407
0.94 50 47.18
5+550 0.480
3.58 25 89.43
5+575 6.675
4.71 25 117.87
5+600 2.755
7.19 50 359.32
5+650 11.618
12.30 25 307.47
5+675 12.980
14.04 25 350.91
5+700 15.093
12.56 50 627.96
5+750 10.026
10.03 50 501.27
5+800 10.026
23.49 25 587.25
5+825 36.954
22.02 25 550.60
5+850 7.094
7.09 25 177.34
5+875 7.094
4.98 25 124.39
5+900 2.858

SUB TOTAL 400 3,841.007


KOMULATIF 777 41,731,362.812

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG

SUJI PRAYITNO, ST
Koordinator Lapangan Quantity Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³

5+900 2.858
2.54 25 63.44
5+925 2.218
1.70 25 42.39
5+950 1.174

6+975 27.278
42.21 25 1,055.14
7+000 57.134

7+200 4.500
4.50 50 225.00
7+250 4.500

7+350 5.220
5.63 50 281.50
7+400 6.040
24.95 25 623.63
7+425 43.850
30.60 25 764.91
7+450 17.343
18.85 50 942.31
7+500 20.350
13.12 25 327.94
7+525 5.885
4.86 25 121.59
7+550 3.843
SUB TOTAL 325 4,447.852
KOMULATIF 650 41,735,810.664

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG
0
Koordinator Lapangan 0 Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³

7+750 2.700
3.68 50 184.01
7+800 4.660
6.72 50 336.01
7+850 8.780
9.64 25 241.06
7+875 10.505
7.71 25 192.75
7+900 4.915
4.53 50 226.56
7+950 4.148
4.32 150 648.56
8+100 4.500
4.31 20 86.10
8+120 4.110
6.37 80 509.60
8+200 8.630
13.98 25 349.44
8+225 19.325
10.58 25 264.61
8+250 1.844
3.44 25 85.95
8+275 5.032
6.20 25 154.97
8+300 7.365
6.04 25 151.00
8+325 4.715
SUB TOTAL 575 3,430.631
KOMULATIF 1,150 41,739,241.296

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG
0 0
Koordinator Lapangan 0 Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m2 m m m³

8+850 2.400
15.42 125 1,927.97
8+975 28.448
25.90 25 647.59
9+000 23.360
19.08 50 953.88
9+050 14.795
19.71 50 985.31
9+100 24.617
16.11 25 402.75
9+125 7.602
9.91 25 247.84
9+150 12.225
10.43 25 260.75
9+175 8.635
9.98 25 249.44
9+200 11.320
7.21 25 180.22
9+225 3.098
2.80 25 70.03
9+250 2.505
4.94 25 123.38
9+275 7.365
11.56 25 288.94
9+300 15.750
SUB TOTAL 450 6,338.094
KOMULATIF 450 41,745,579.389

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. ESKAPINDO MATRA PT. PASSOKORANG
0 0
Koordinator Lapangan 0 Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU


STA 7+520
12.00
11.00
10.00
9.00
8.00
7.00
6.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 0.78 2.18 3.86 3.59 3.09 2.08 0.00
Y 6.33 7.54 9.38 10.25 9.27 9.27 6.31 6.33
S(Xn x Yn+1) - S(Xn+1 x Yn) 131.39 - 142.31
LUAS = + = + = 5.461 m² -5.46
2.00 2.00

STA 7+560

10.00
9.00
8.00
7.00
6.00
5.00

TITIK 4.00 A B C D E F G A
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00
X 0.00 1.30 6.30 5.45 5.10 4.50 1.60 0.00
Y 5.74 9.40 15.10 9.25 9.25 5.20 5.66 5.74
S(Xn x Yn+1) - S(Xn+1 x Yn) 189.47 - 246.10
LUAS = + = + = 28.314 m² -28.31
2.00 2.00

STA 7+602
19.00
17.00
15.00
13.00
11.00
9.00
7.00
5.00
0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00

TITIK A B C D E F G A
X 0.00 3.29 5.09 7.52 7.09 6.59 5.89 0.00
Y 5.03 7.39 8.49 9.58 7.89 7.89 4.94 5.03
S(Xn x Yn+1) - S(Xn+1 x Yn) 254.21 - 284.47
LUAS = + = + = 15.132 m² -15.13
2.00 2.00
TYPE D2/2 (TUNGGAL)
1/2
BERAT
Ø Ukuran (cm) Panjang Berat
Bangunan Bentuk SATUAN Jumlah
(mm) (cm) (kg)
a b c d (kg/m)

Box Culvert A 16 48 48 132 27 282 1.579 232 1,032.827


panjang 11 m B 16 244 19 526 1.579 224 1,860.048
C 12 1,100 1,100 0.888 36 351.648
D 12 65 65 0.888 224 129.293

Dinding Sayap A 16 70 s.d 305 172 s.d 642 1.579 14 668.000


(4 buah) B 16 0 s.d 269 0 s.d 554 1.579 15 648.000
C 16 250 75 350 675 1.579 12 127.872

Kerb A 12 15 59 33 33 171 0.888 37 112.368


(2 buah) B 12 744 744 0.888 7 92.494

Dinding Penahan A 12 36 92 256 0.888 12 54.559


Bawah (2 buah) B 12 244 244 0.888 8 34.668
TOTAL 5,111.776

a a a

d d b (tekuk)

c
b b
B
A
d d
a

D a
a
E

C BOX CULVERT

b
a a

A
variable A A
d b b

B B
c
variable
B
b

a a

DINDING SAYAP
KERB DINDING PENAHAN BAWAH

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
SUJI PRAYITNO, ST SYAFRUDDIN SAIN RIDWAN
Koordinator Lapangan Inspektor Quantity

TOT PANJANG SAT KG HARGA TOT


16 1152.18 1.58 1820.4444 6590 11,996,728.596000000
10 1489.43 0.617 918.97831 6590 6,056,067.062900000
2739.42271 BESI 18,052,795.658900000
(2,372.353) BETON 10,980,000.000000000
(1,186.177) 29,032,795.658900000
BERAT
SATUAN

kg/m
5097 10194
10 16 144 22
654.24 55 654 600 65,424 148943.00 115218.00 724 608
1,178.24 98 1,178 1,080 117824 56
396 363 39600 448 3,584 46
146 133 14560 24
0 vertikal horizontal
178 72 32 448.30
35.16 3 57 52 54 88.6 32 304.00
34.11 3 39 36 104.6 32 304.00
81.00 7 250
19 165 120.8 32 304.00
63 58 6,327 709 136.9 32 304.00
52 48 5208 153 32 297.20
169.1 32 281.30
31 28 3072 185.2 32 265.40
20 18 1952 201.3 32 249.50
4324.229 217.4 32 233.60
12 1,728 4637.185 233.5 32 217.80
16 688 249.6 32 201.90
2,012 265.8 32 186.00
a
1,539 281.9 32 170.00
589 298 32 154.20
314 32 138.30
330.2 32 122.40
346.3 32 106.50
362.4 32 90.60
74.70
58.80
42.90
27.00
4130.6 608 4582.4
8869.2 9785.8

1178 45.1
47.12 15.1
1182

574 28.9
28.7 920
vertikal horizontal
16 362 32 160 16
17 330 32 160 16
18 398 32 160 16

19 266 32 160 16
20 234 32 157 16
21 202 32 149 16
22 170 32 141 16
23 138 32 133 16
24 106 32 125 16
25 117 16
26 109 16
27 110 16
28 93 16
29 85 16
30 77 16
31 69 16
32 61 16
33 53 16
34 45 16
35 37 16
36 29 16
37 21 16
38 2206 288 2251 352
621 2494 2603
9785.8 5097

578
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008

7.3(1) BAJA TULANGAN U24

250
25
25 150 25

5
2
5
2
1

0
5

5
1

2
5
2
5
2
25 150 25
25 25

Section of Box

A = Ø 12 - 15
B = Ø 12 - 15 30
30

St r u k t u r Tu m pu a n
20 P er m u k a a n P la t
B e t on K - 250
2035

A n g k er Ø 12 m m Ja r a k 500 m m
50 D a la m 2 J a ja r P a n ja n g 500 m m

Total Total
DIAMTE Length (m) Space Total Leght Weigth per
sketsa W (kg/m) Number of Weigth
R (MM) (cm) length (m) bar (kg)
a b c d e (kg)

A 12 2.53 0.28 2.53 0.28 0.06 15.00 5.74 0.888 74 427 5.097 378.877

B 12 10.93 0.06 15.00 11.05 0.888 35 390 9.812 346.691

C 12 0.50 0.06 50.00 0.62 0.888 23 14 0.551 12.673

TOTAL 738.241

Volume
PEKERJAAN jml Baja Tulangan Ket.
(buah) (Kg) (Kg)

Plat Dekker 2.00 x 1.50 m 3.00 738.24 2,214.72

Plat Dekker 2.00 x 2.00 m 1.00 738.24 738.24

Box Culvert 2.00 x 2.00 m 1.00 5111.78 5,111.78

TOTAL 8,064.74

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008

SUJI PRAYITNO, ST SYAFRUDDIN SAIN RIDWAN


Koordinator Lapangan Inspektor Quantity

7.3(1) BAJA TULANGAN U24

1. Volume Bulan Lalu = - Buah

2. Volume Bulan ini = 8,064.738 Buah

3. Volume S/d Bulan ini = 8,064.738 Buah

4. Volume yang dibayarkan = 8,064.738 Buah

5. Sisa Volume bulan lalu (MC 06) = 8,064.738 Buah

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE :September 2008

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN


Kordinator Lapangan Quatity Engineer Quantity Surveyor
8.4 (6) Patok Kilometer

35.556 36

32.536 33
A = Ø 12 - 15
B = Ø 12 - 15 30
30

St r u k t u r Tu m p ua n
2 0 Pe r m u k a a n P la t
Be t o n K - 250

20 35
A n g k er Ø 12 m m J a r a k 50 0 m m

1.188 2
50 D a la m 2 J a ja r P a n ja n g 50 0 m m

71
284

133 12
531

369.12
73.82
2,555.89
255.59
:
30

St r u k t u r Tu m p u a n
m u ka a n Pla t
B e ton K - 250

A n g k er Ø 12 m m J a r a k 50 0 m m
D a la m 2 Ja ja r P a n ja n g 50 0 m m
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008

7.16) BETON K175

250
10

Volume
PEKERJAAN jml Beton Ket.
(buah) (m3) (m3)

Lantai kerja
Box Culvert 2.00 x 2.00 m 1.00 2.55 2.55

TOTAL 2.550

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST SYAFRUDDIN SAIN RIDWAN


BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008

Koordinator Lapangan Inspektor Quantity

7.16) BETON K175

1. Volume Bulan Lalu = - m3

2. Volume Bulan ini = m3

3. Volume S/d Bulan ini = 2.550 m3

4. Volume yang dibayarkan = 2.550 m3

5. Sisa Volume bulan lalu (MC 06) = - m3

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG
BACK UP DATA QUANTITY

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat MC : 07
Tahun Anggaran : 2011 PRIODE : September 2008

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN


Kordinator Lapangan Quatity Engineer Quantity Surveyor
8.4 (6) Patok Kilometer

1 0
200

25.5
1 0
200

:
200
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50
MUTUAL CHECK
SUB PROJECT : ROAD BETTERMENT BARAKANG - TOPOYO - KAROSSA
PACKAGE NAME : ROAD BETTERMENT TOPOYO - KAROSSA -BARAS &
S. LOMBANG - LOMBANG BRIDGE, CS. (EIB-101)
CONTRAC NUMBER : 01-053/EIB-101/RB/A/IBRD 4744-IND/0206
CONTRAC DATE : FEBRUARY, 15 2006

7.10.(3) GABIONS
SECTION I

STA HIGHT LENGTH VOLUME


(m) (m) ( m3 )

7+500
7.4 10 74
7+510
8+700
5.7 10 57
8+710
TOTAL 131

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


BAG. PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR
PEMBANGUNAN JALAN WSP INTERNATIONAL IN ASS. WASKITA - PASSOKORANG -
BARAKANG - TOPOYO - KAROSSA DUTA GRAHA,JO

RUSJDY HARFA, BE MARTHEN L HARIFUDDIN


Koordinator lapangan Surveyor Surveyor
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.1(5) BETON STRUKTUR K250

250
25
25 150 25

5
2
5
2
1

0
5

5
1

2
5
2
5
2
25 150 25
25 25

Section of Box

Volume
PEKERJAAN jml Beton Ket.
(buah) (m3) (m3)

Plat Dekker 2.00 x 1.50 m 3.00 10.01 30.03 Pelat


3.00 3.74 11.22 Balok Tumpuan
Plat Dekker 2.00 x 2.00 m 1.00 10.01 10.01 Pelat
1.00 3.74 3.74 Balok Tumpuan
Box Culvert 2.00 x 2.00 m 2.00 6.88 13.75 Dinding pelat
2.00 5.50 11.00 Dinding tegak
4.00 0.34 1.38 Siku-siku
4.00 0.75 3.00 Sayap
2.00 0.75 1.50 Dinding bawah
2.00 1.01 2.03 Kerb

TOTAL 87.650

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN

file:///conversion/tmp/scratch/509046377.xlsx
Koordinator Lapangan Quality Eng/CI Quantity

7.1(5) BETON STRUKTUR K250

1. LAST MONTH ( MC 22 ) = - Buah

2. REMAIND LAST MONTH ( MC = Buah

3. THIS MONTH ( MC 23 ) = 87.650 Buah

4. TOTAL THIS MONTH ( MC 23 = 87.650 Buah

5. UP TO THIS MONTH ( MC 23 ) = 87.650 Buah

0 0 0
0 0 WASKITA-PASSOKORANG-DUTA GRAHA, JO
Tgl Tgl Tgl

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN

file:///conversion/tmp/scratch/509046377.xlsx
Kordinator Lapangan Quatity Engineer Quantity Surveyor

file:///conversion/tmp/scratch/509046377.xlsx
8.4 (6) Patok Kilometer
25 150 25

5
2
25

0
1

5
5

2
1

5
2
5
2
25 150 25
25 25

Section of Box

10.01 250
0
1

13.75
11.00
1.375 26.125
8.8

34.925
13.75 6.875
13.75
110
13.75 55.00
385
3080

20.06
10.03125
32.65 12.59
6.29375

32.65 701.2

file:///conversion/tmp/scratch/509046377.xlsx
:

file:///conversion/tmp/scratch/509046377.xlsx
file:///conversion/tmp/scratch/509046377.xlsx
0.20

0.20 0.45 0.73

0.65

1.85

CL BRG
1.70

0.50

0.50 0.50

0.95

0.40

0.80

1.95 0.60 1.95

4.50

SECTION - 1 (L = 11 m)
SCALE 1 : 50

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

V OLUME
SKETSA DIMENSION REMARKS
( M3 )
BOX CULVERT STA 09+350 DINDING & LANTAI
I 15.000

50

26

250
SAYAP
I 1.335

KERB
26 I 0.453

DINDING PENAHAN
I 0.894

150 26 250 26
20

TOTAL BETON K 250 17.682

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


BAG. PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR
PEMBANGUNAN JALAN WSP INTERNATIONAL IN ASS. WASKITA - PASSOKORANG -
BARAKANG - TOPOYO - KAROSSA DUTA GRAHA,JO

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN


Koordinator lapangan Quantity Engineer Surveyor
sta
6+900 344.5000
4.0225 0+050 201.125
6+950 460.0000
4.5825 0+050 229.125
7+000 456.5000
3.585 0+050 179.25
7+050 260.5000
5.455 0+050 272.75
7+100 830.5000
12.065 0+050 603.25
7+150 ###
24.4925 0+050 1224.625
7+200 ###
41.665 0+050 2083.25
7+250 ###
39.97 0+050 1998.5
7+300 ###
16.4375 0+050 821.875
7+350 310.5000
2.82 0+050 141
7+400 253.5000
9.895 0+050 494.75
7+450 1725.5
Err:509 0+050 Err:509
7+500 Err:509
Err:509
Err:509
7+600 Err:509
Err:509 0+050 Err:509
7+650 2605.5
17.77125 0+050 888.5625
7+700 948.75
7.24875 0+050 362.4375
7+750 501 5+477 622.3339
13.6725 0+050 683.625 7.448786
7+800 2233.5 5+500 867.4233
28.9375 0+050 1446.875 7.415323
7+850 3554 5+520 615.6413
27.28 0+050 1364
7+900 1902
17.115 0+050 855.75
7+950 1521
15.15145 0+050 757.5725
8+000 1509.29
12.5592 0+025 313.98
8+025 1002.55 4+910 305.9852
Err:509 0+025 Err:509 6.791624
8+050 Err:509 4+950 1052.34
Err:509 0+025 Err:509 6.949248
8+075 Err:509 4+960 337.5099
Err:509 0+025 Err:509
8+100 1054.136
12.269914 0+050 613.4957
8+150 1399.846 Err:509
16.642032 0+050 832.1016
8+200 1928.56
18.67265 0+050 933.6325
8+250 1805.97 8+250 1805.97
8+250 1805.97 8+250 1805.97
33.09732
0+000 4813.494
30.6191
8+300 1310.326 8+300 1310.326
16.576674 0+050 828.833675
8+350 2005.009
Err:509 0+050 Err:509
8+400 Err:509
Err:509 0+050 Err:509
8+450 Err:509
Err:509 0+050 Err:509
8+500 Err:509
Err:509 0+050 Err:509
8+550 Err:509
Err:509 0+050 Err:509
8+600 Err:509
Err:509 0+050 Err:509 Err:509
8+650
Err:509 0+050 Err:509
8+700 Err:509
Err:509 0+050 Err:509
8+750 Err:509
Err:509 0+050 Err:509
8+800 Err:509
Err:509 0+050 Err:509
8+850 Err:509
Err:509 0+050 Err:509
8+900 Err:509
Err:509 0+050 Err:509
8+950 Err:509
Err:509 0+050 Err:509
9+000 Err:509
Err:509 0+050 Err:509
9+050 Err:509
Err:509 0+050 Err:509
9+100 Err:509
Err:509 0+050 Err:509
9+150
Err:509 0+050 Err:509
9+200 Err:509
Err:509 0+050 Err:509
9+250 Err:509
Err:509 0+050 Err:509 Err:509
9+300 0
9+350 0
Err:509 0+050 Err:509
9+400 Err:509
Err:509 0+050 Err:509
9+450 Err:509
Err:509 0+050 Err:509
9+500 Err:509
Err:509 0+050 Err:509
9+550 Err:509
Err:509 0+050 Err:509
9+600 Err:509
Err:509 0+050 Err:509
9+650 Err:509
Err:509 0+050 Err:509
9+700 Err:509
Err:509 0+050 Err:509
9+750 Err:509
Err:509 0+050 Err:509
9+800 Err:509
Err:509 0+050 Err:509
Err:509 0+050 Err:509
9+850 Err:509
Err:509 0+050 Err:509
9+900 Err:509
Err:509 0+050 Err:509
9+950 Err:509
Err:509 0+050 Err:509 Err:509
10+000 Err:509
Err:509 0+050 Err:509
10+050 Err:509
Err:509 0+050 Err:509
10+100 Err:509
Err:509 0+050 Err:509
10+150 Err:509
Err:509 0+050 Err:509
10+200 Err:509
Err:509 0+050 Err:509
10+250 Err:509
Err:509 0+050 Err:509
10+300 Err:509
Err:509 0+050 Err:509
10+350 Err:509
Err:509 0+050 Err:509
10+400 Err:509
Err:509 0+050 Err:509 Err:509
10+450 Err:509

Err:509
GALIAN BATU

0+023 171.3221
0+020 148.3065

0+040 271.665
0+010 69.49248
-8+250 -273053
8+300 254138.5
0
-18253.59
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) TIMBUNAN BIASA


STA 0+000
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G H I J K L M A
X 0.00 3.00 5.62 5.89 3.50 2.25 0.00 -2.50 -4.20 -4.50 -5.97 -5.62 -3.00 0.00
Y 4.48 4.42 4.31 3.85 4.29 4.41 4.48 4.37 4.30 4.21 3.70 4.31 4.42 4.48
S(Xn x Yn+1) - S(Xn+1 x Yn) -23.75 - -20.97
LUAS = + = + = 1.388 m² -1.39
2.00 2.00

STA 0+050
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G A
X 0.00 -2.78 -4.50 -5.92 -5.62 -3.00 -2.78 0.00
Y 4.46 4.40 4.23 3.77 4.29 4.40 4.40 4.46
S(Xn x Yn+1) - S(Xn+1 x Yn) -104.41 - -103.51
LUAS = + = + = 0.450 m² -0.45
2.00 2.00

STA 0+100
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G H I J K L M N O P Q R S T
X 0.00 -2.73 -4.50 -5.30 -5.92 -5.62 -3.00 -2.73 0.00
Y 4.568 4.508 4.371 4.143 3.878 4.403 4.508 4.508 4.568
S(Xn x Yn+1) - S(Xn+1 x Yn) -128.53 - -127.76
LUAS = + = + = 0.383 m² -0.38
2.00 2.00

STA 0+150
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G H I J K L M N O P A
X 0.00 1.50 3.00 5.62 5.87 5.69 2.25 1.50 0.00 -3.00 -4.97 -5.80 -5.90 -5.62 -4.97 -3.00 0.00
Y 4.504 4.474 4.444 4.339 3.906 3.906 4.444 4.474 4.504 4.444 4.365 3.844 3.854 4.339 4.365 4.444 4.504
S(Xn x Yn+1) - S(Xn+1 x Yn) -33.61 - -31.61
LUAS = + = + = 1.000 m² -1.00
2.00 2.00

STA 0+200
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G H I J K L M N O P Q R S T
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) TIMBUNAN BIASA


STA 0+250
6.00

5.00

4.00

3.00

2.00
-10.00 -8.00 -6.00 -4.00 -2.00 0.00 2.00 4.00 6.00 8.00 10.00

TITIK A B C D E F G H I J K L M N O P Q R S T
X
Y
S(Xn x Yn+1) - S(Xn+1 x Yn) 0.00 - 0.00
LUAS = + = + = 0.000 m² 0.00
2.00 2.00
MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

2.1 GALIAN UNTUK DRAINASE SELOKAN DAN SALURAN AIR

3.00 3.00

GALIAN PARIT GALIAN PARIT


a a

t t
EXISTING
b b

DIMENSI
VOLUME
NO. STATION (STA) L/R p a b t KETERANGAN
(m) (m) (m) (m) (m³)

1 0+350 - 1+600 L 1,250.00 1.20 0.50 0.80 850.00

2 3+500 - 4+025 L/R 525.00 1.40 0.80 0.80 924.00 MORTAR

3 4+025 - 4+800 L/R 775.00 1.20 0.50 0.80 1,054.00

4 4+900 - 5+100 L 200.00 1.20 0.50 0.80 136.00

5 5+250 - 5+350 L/R 100.00 1.20 0.50 0.80 136.00

6 5+600 - 6+860 L/R 1,260.00 1.20 0.50 0.80 1,713.60

7 6+875 - 7+225 R 350.00 1.40 0.80 0.80 308.00 MORTAR

8 7+225 - 7+600 R 375.00 1.20 0.50 0.80 255.00

9 7+600 - 9+140 R 1,540.00 1.40 0.80 0.80 1,355.20 MORTAR

10 9+140 - 10+550 R 1,410.00 1.20 0.50 0.80 958.80

JUMLAH 7,690.600

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity

file:///conversion/tmp/scratch/509046377.xlsx
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
0+000 0.000
1.65 50 82.50
0+050 3.300
3.30 450 1,485.00
0+500 3.300
3.30 250 825.00
0+750 3.300
1.65 50 82.50
0+800 0.000

2+277 0.000
1.65 25 41.25
2+302 3.300
1.65 25 41.25
2+327 0.000

6+000
0.98 50 48.86
6+050 1.954
2.21 50 110.64
6+100 2.471
5.38 50 269.23
6+150 8.298
10.99 50 549.45
6+200 13.680
14.67 50 733.28
6+250 15.651

SUB TOTAL I 1,100 4,268.961

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quantity Quantity
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.2 (2) TIMBUNAN PILIHAN (REISING)

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³
6+250 15.651
14.53 50 726.60
6+300 13.413
9.09 50 454.58
6+350 4.771
3.27 50 163.65
6+400 1.775
0.89 50 44.38
6+450

SUB TOTAL II 200 1,389.203

TOTAL (I+II) 1,300 5,658.164

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN AGUSTINUS


Koordinator Lapangan Quantity Quantity
TYPE D2.5/2.5 (TUNGGAL)
BERAT
Ø Ukuran (cm) Panjang
Bangunan Bentuk SATUAN
(mm) (cm)
a b c d (kg/m)

PLAT A 12 250 6 25 312 0.888


B 12 250 6 262 0.888
C 12 1,090 6 25 1,152 0.888
D 12 1,090 6 1,102 0.888

TOTAL

a a
d d b (te kuk)

c
b b

B
d
A d

D a
a
E

C BOX CULVERT

a a

A variable
A A
d b b

B
c
variable

B B
b

a a
a a

DINDING SAYAP
KERB DINDING PENAHAN BAWAH

Disetujui Oleh : Diperiksa Oleh : Dibuat Oleh :


BAG. PELAKSANA KEGIATAN KONSULTAN KONTRAKTOR
PEMBANGUNAN JALAN WSP INTERNATIONAL IN ASS. WASKITA - PASSOKORANG -
BARAKANG - TOPOYO - KAROSSA DUTA GRAHA,JO

MUKANI Ir. LAPAKKANNA WEDDA HARIFUDDIN


Koordinator lapangan Quantity Engineer Surveyor

TOT PANJANG SAT KG HARGA


16 543.30 1.58 858.414 6590
10 394.86 0.617 243.62862 6590
1102.04262 BESI
359.538 BETON
179.769
BERAT
1/2 SATUAN

Berat kg/m
Jumlah
(kg)
5097 10194
10 16 144
75.00 207.775 23,400 39486.00 54330.00 724
75 174.478 19650
18 184.121 20736 46
18 176.130 19836
0 vertikal
178 72 32
54 88.6 32
104.6 32
120.8 32
- 136.9 32
0 153 32
169.1 32
0 185.2 32
0 201.3 32
TOTAL 742.504 217.4 32
233.5 32
b
249.6 32
a 265.8 32
281.9 32
298 32
314 32
330.2 32
a
346.3 32
362.4 32

4130.6 608
a 8869.2

1178
47.12

a
a

574
PENAHAN BAWAH 28.7

Dibuat Oleh :
ONTRAKTOR
A - PASSOKORANG -
TA GRAHA,JO

ARIFUDDIN

TOT
5,656,948.260000000
1,605,512.605800000
7,262,460.865800000
10,980,000.000000000
18,242,460.865800000
22
608

horizontal vertikal horizontal


448.30 16 362 32 160 16
304.00 17 330 32 160 16
304.00 18 398 32 160 16
304.00 19 266 32 160 16
304.00 20 234 32 157 16
297.20 21 202 32 149 16
281.30 22 170 32 141 16
265.40 23 138 32 133 16
249.50 24 106 32 125 16
233.60 25 117 16
217.80 26 109 16
201.90 27 110 16
186.00 28 93 16
170.00 29 85 16
154.20 30 77 16
138.30 31 69 16
122.40 32 61 16
106.50 33 53 16
90.60 34 45 16
74.70 35 37 16
58.80 36 29 16
42.90 37 21 16
27.00 38 2206 288 2251 352
4582.4 621 2494 2603
9785.8 5097

45.1
15.1
1182 578
28.9
920
MUTUAL CHECK

PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

3.1 (2) GALIAN BATU

LUAS
LUAS PANJANG VOLUME
STATION (STA) RATA-RATA KETERANGAN
m m m m³

5+477 6.223
7.45 23 171.32
5+500 8.674
7.42 20 148.31
5+520 6.156

4+910 3.059
6.79 40 271.65
4+950 10.523
6.95 10 69.49
4+960 3.375

8+250 18.077
33.11 25 827.81
8+275 48.148
30.62 25 765.52
8+300 13.093

SUB TOTAL I 143 2,254.099

Diketahui Oleh : Diperiksa Oleh: Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. WIRANTA BHUANA RAYA PT. PASSOKORANG

SUJI PRAYITNO, ST IR. RUSLAN RIDWAN


Koordinator Lapangan Quality Eng/CI Quantity
STA TINGGI LUAS LUAS PANJANG VOLUME
RATA-RATA

6+000 0
0.97724 0+050 48.862
6+050 0.176 195.448
2.2128785 0+050 110.6439
6+100 0.222 247.1277
5.384634 0+050 269.2317
6+150 0.726 829.7991
10.9889255 0+050 549.4463
6+200 1.173 1367.986
14.665542 0+050 733.2771
6+250 1.328 1565.122
14.5319275 0+050 726.5964
6+300 1.185 1341.263
9.0916095 0+050 454.5805
6+350 0.424 477.0588
3.272913 0+050 163.6457
6+400 0.16 177.5238
0.887619 0+050 44.38095
6+450 0
3100.664
7.9 hal.195

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

0+585 R 0.25 0.35 0.45 0.45 1.50 0.65


1 0.65 30.00 19.58
0+615 R 0.25 0.35 0.45 0.45 1.50 0.65

0+575 L 0.25 0.35 0.45 0.45 1.50 0.65


2 0.65 75.00 48.94
0+650 L 0.25 0.35 0.45 0.45 1.50 0.65

5+090 L 0.25 0.35 0.45 0.45 2.20 0.86


3 0.86 60.00 51.75
5+150 L 0.25 0.35 0.45 0.45 2.20 0.86

5+400 L 0.25 0.35 0.45 0.45 2.80 1.04


4 1.04 60.00 62.55
5+460 L 0.25 0.35 0.45 0.45 2.80 1.04

5+400 R 0.25 0.35 0.45 0.45 2.80 1.04


5 1.04 60.00 62.55
5+460 R 0.25 0.35 0.45 0.45 2.80 1.04

SUB TOTAL I 285.00 245.36

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.196

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

6+100 L 0.25 0.35 0.45 0.45 1.20 0.56


6 0.56 300.00 168.75
6+400 L 0.25 0.35 0.45 0.45 1.20 0.56

6+100 R 0.25 0.35 0.45 0.45 1.20 0.56


7 0.56 300.00 168.75
6+400 R 0.25 0.35 0.45 0.45 1.20 0.56

9+250 L 0.25 0.35 0.45 0.45 2.80 1.04


8 1.04 130.00 135.53
9+380 L 0.25 0.35 0.45 0.45 2.80 1.04

9+285 R 0.25 0.35 0.45 0.45 2.80 1.04


9 1.04 80.00 83.40
9+365 R 0.25 0.35 0.45 0.45 2.80 1.04

0+635 R 0.25 0.35 0.45 0.45 1.80 0.74


10 0.74 2,865.00 2,127.26
3+500 R 0.25 0.35 0.45 0.45 1.80 0.74

SUB TOTAL II 3,675.00 2,683.69


TOTAL (I+II) 3,960.00 2,929.05
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.197

Koordinator Lapangan Quantity Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
STATION LUAS PANJANG VOLUME
NO. L/R a b c d t.1 RATA-RATA KETERANGAN
(STA)
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

0+700 L 0.25 0.35 0.45 0.45 1.80 0.74


11 0.74 900.00 668.25
1+600 L 0.25 0.35 0.45 0.45 1.80 0.74

SUB TOTAL III 900.00 668.25


TOTAL (I+II+III) 4,860.00 3,597.30
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.198

Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.199

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

SUB TOTAL I - -

Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :


Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.200

Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.201

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

0.25 0.35 0.45 0.45 0.20


1 0.20 - -
0.25 0.35 0.45 0.45 0.20

0.25 0.35 0.45 0.45 0.20


2 0.20 - -
0.25 0.35 0.45 0.45 0.20

0.25 0.35 0.45 0.45 0.20


3 0.20 - -
0.25 0.35 0.45 0.45 0.20

0.25 0.35 0.45 0.45 0.20


4 0.20 - -
0.25 0.35 0.45 0.45 0.20

0.25 0.35 0.45 0.45 0.20


5 0.20 - -
0.25 0.35 0.45 0.45 0.20

SUB TOTAL II - -
TOTAL (I+II) - -
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.202

Koordinator Lapangan Quantity Quantity

MUTUAL CHECK
PPK : 06 (TOPOYO-BARAKKANG-KALUKKU-SALUBATU)
Paket : Pelebaran Jalan Kalukku - Salubatu 1
Kab. / Prop. : Mamuju / Sulawesi Barat
Tahun Anggaran : 2011

7.9 PASANGAN BATU (TALUD)

EXISTING
a a

t.1

t.1
TALUD TALUD

d
b b
c c

DIMENSI LUAS
LUAS PANJANG VOLUME
NO. STATION (STA) L/R a b c d t.1 RATA-RATA KETERANGAN
(m) (m) (m) (m) (m) (m²) (m²) (m) (m³)

0.25 0.35 0.45 0.45 0.20


6 0.20 - -
0.25 0.35 0.45 0.45 0.20

SUB TOTAL III - -


TOTAL (I+II+III) - -
Diketahui Oleh : Diperiksa Oleh : Dibuat Oleh :
Direksi Konsultan Pengawas Kontraktor Pelaksana
PT. PASSOKORANG

file:///conversion/tmp/scratch/509046377.xlsx
7.9 hal.203

Koordinator Lapangan Quantity Quantity

file:///conversion/tmp/scratch/509046377.xlsx

Anda mungkin juga menyukai