Data Input - 2
A MATERIAL
1 Agregat Kasar M01 1.40 ton/m3
2 Agregat Halus M02 1.40 ton/m3
3 Filler M03 1.19 ton/m3
4 Agregat Burtu M04 ton/m3
5 Agregat Base Kelas A M04 1.40 ton/m3
6 Agregat Base Kelas B M05 1.40 ton/m3
7 Agregat Base Kelas C M07 1.40 ton/m3
8 Material Pilihan M06 ton/m3
9 Material Tanah Timbunan M07 1.35 ton/m3
10 Pasir M09 1.60 ton/m3
11 Pasir Urug M10 1.35 ton/m3
12 Batu Pecah ½/1 M11 1.40 ton/m3
13 Batu Pecah 1/2 M12 1.40 ton/m3
14 Batu Pecah 2/3 M13 1.40 ton/m3
15 Batu Pecah 3/5 M14 1.40 ton/m3
16 Batu Belah M15 1.50 ton/m3
17 Aspal Curah M16 1.03 kg/ltr
18 Aspal Drum M17 1.03 kg/ltr
19 #REF! #REF! kg/ltr
20 #REF! #REF! 1.00 kg/ltr
21 #REF! #REF! 0.99 ton/m3
22 #REF! #REF! 0.95 kg/ltr
23 Minyak Aspal M18 0.95 kg/ltr
24 Bensin M19 kg/ltr
25 Solar M20 kg/ltr
26 Semen ( PC ) M22 1.23 ton/m3
27 #REF! #REF! ton/m3
28 Cat Besi M38 kg/ltr
29 Cat Dasar / Menie M39 kg/ltr
30 Thinner M40 kg/ltr
31 Thermoplastic M50 0.85 kg/ltr
32 Glass Bead M51 kg/ltr
B CAMPURAN SEMEN
1 Adukan / Mortar 1.90 ton/m3
2 Beton 2.40 ton/m3
3 Pasangan Bata 1.70 ton/m3
4 Pasangan Batu 2.20 ton/m3
5 CTSB / CTB 2.20 ton/m3
6 CBC / LPB B0 2.20 ton/m3
C CAMPURAN ASPAL
1 HRS 2.25 ton/m3
2 ATB 2.25 ton/m3
3 AC 2.30 ton/m3
4 Cold Mixed 2.25 ton/m3
URAIAN ANALISA ALAT
A URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT E01
2 Tenaga Pw 220.0 HP
3 Kapasitas Cp 55.0 Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 10.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,500.0 Jam
c. Harga Alat B 3,200,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 3.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 2,880,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 320,000,000 Rupiah
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
URAIAN ANALISA ALAT
A URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER E02
2 Tenaga Pw 47.0 HP
3 Kapasitas Cp 6.0 Ton
4 Alat Baru : a. Umur Ekonomis A 6.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 1,060,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 954,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 106,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER E03
2 Tenaga Pw 15.0 HP
3 Kapasitas Cp 800.0 Liter
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 110,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.5 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 99,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 11,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000-6500 L\M E06
2 Tenaga Pw 80.0 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 188,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 169,200,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 18,800,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3-0.6 m3 E07
2 Tenaga Pw 15.0 HP
3 Kapasitas Cp 500.0 Liter
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan CRANE 10-15 TON E08
2 Tenaga Pw 150.0 HP
3 Kapasitas Cp 15.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 E09
2 Tenaga Pw 100.0 HP
3 Kapasitas Cp 6.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 175,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 157,500,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 17,500,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 8 - 10 M3 E10
2 Tenaga Pw 125.0 HP
3 Kapasitas Cp 15.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 420,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 378,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 42,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR PC 125 E11
2 Tenaga Pw 105.0 HP
3 Kapasitas Cp 0.8 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 590,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 531,000,000 Rupiah Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 59,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3-4 M3 E12
2 Tenaga Pw 100.0 HP
3 Kapasitas Cp 4.0 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER GD-500R E13
2 Tenaga Pw 125.0 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 770,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 693,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 77,000,000 Rupiah
2 Faktor Angsuran Modal = i x (1 + i)^A' D 0.33438 -
(1 + i)^A' - 1
3 Biaya Pasti per Jam :
a. Biaya Pengembalian Modal = ( B' - C ) x D E 102,988.95 Rupiah
W'
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75-100 HP E14
2 Tenaga Pw 90.0 HP
3 Kapasitas Cp 1.6 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 782,500,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 704,250,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 78,250,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER W-70 E15
2 Tenaga Pw 105.0 HP
3 Kapasitas Cp 1.7 M3
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 840,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 756,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 84,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6-8 T. E17
2 Tenaga Pw 50.0 HP
3 Kapasitas Cp 8.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 440,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 396,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 44,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TIRE ROLLER 8-10 T. E18
2 Tenaga Pw 60.0 HP
3 Kapasitas Cp 10.0 Ton
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,800.0 Jam
c. Harga Alat B 1,060,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 954,000,000 Rupiah Alat Baru
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5-8 T. E19
2 Tenaga Pw 75.0 HP
3 Kapasitas Cp 7.0 Ton
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 360,000,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 324,000,000 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 36,000,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR E20
2 Tenaga Pw 10.0 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan #REF! #REF!
2 Tenaga Pw #REF! HP
3 Kapasitas Cp #REF! Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B #REF! Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' #REF! Tahun #REF!
b. Jam Kerja Dalam 1 Tahun W' #REF! Jam #REF!
c. Harga Alat (*) B' #REF! Rupiah #REF!
#REF!
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C #REF! Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70-100 mm E21
2 Tenaga Pw 6.0 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
URAIAN ANALISA ALAT
A URAIAN PERALATAN
1 Jenis Peralatan WATER TANKER 3000-4500 L. E22
2 Tenaga Pw 100.0 HP
3 Kapasitas Cp 4,000.0 Liter
4 Alat Baru : a. Umur Ekonomis A 5.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan DOUBLE VIBRATORY ROLLER E23
2 Tenaga Pw 11.0 HP
3 Kapasitas Cp 0.980 Ton
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 2,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan STAMPER E24
2 Tenaga Pw 5.0 HP
3 Kapasitas Cp 0.170 Ton
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER E25
2 Tenaga Pw 3.0 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 0 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.0 Tahun Alat Baru
b. Jam Kerja Dalam 1 Tahun W' 2,000.0 Jam Alat Baru
c. Harga Alat (*) B' 0 Rupiah Alat Baru
Alat Baru
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 0 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
A URAIAN PERALATAN
1 Jenis Peralatan KUNCI MOMEN ( E49 )
2 Tenaga Pw - HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.0 Tahun
b. Jam Kerja Dalam 1 Tahun W 1,000.0 Jam
c. Harga Alat B 3,500,000 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.0 Tahun Usia 0 th.
b. Jam Kerja Dalam 1 Tahun W' 1,000.0 Jam Usia 0 th.
c. Harga Alat (*) B' 3,500,000 Rupiah Usia 0 th.
Usia 0 th.
B BIAYA PASTI PER JAM KERJA
1 Nilai Sisa Alat = 10 % x B C 350,000 Rupiah
E LAIN - LAIN
1 Tingkat Suku Bunga i 20.00 % / Tahun
2 Upah Operator / Sopir U1 11,681.43 Rp./Jam
3 Upah Pembantu Operator / Pmb.Sopir U2 7,585.71 Rp./Jam
4 Bahan Bakar Bensin Mb 5,800.00 Liter
5 Bahan Bakar Solar Ms 8,400.00 Liter
6 Minyak Pelumas Mp 46,000.00 Liter
7 PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan
Note : (*) = Bila bukan alat baru, diperhitungkan setelah mengalami depresiasi (dengan declining methode).
ANALISA BIAYA PERALATAN PER JAM KERJA
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BI
ALAT ALAT ALAT UMUR JAM HARGA SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS
ALAT KERJA ALAT ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK
( BARU ) 1 TAHUN MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS
MODAL
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam
No. JENIS PERALATAN KODE
ALAT i(1+i)^A' (B' - C) x D 0.20 x C 0.125 0.01
(10% X B) (e1 + e2) s/d s/d
(1+i)^A' - 1 W' W' 0.175 0.02
1 ASPHALT MIXING PLANT E01 220.0 55.0 Ton/Jam 3,200,000,000 5.0 2,000.0 2,880,000,000 320,000,000 0.33438 428,006.02 32,000.00 460,006.02 0.1250 0.0100
2 ASPHALT FINISHER E02 47.0 6.0 Ton 1,060,000,000 5.0 2,000.0 954,000,000 106,000,000 0.33438 141,776.99 10,600.00 152,376.99 0.1250 0.0100
3 ASPHALT SPRAYER E03 15.0 800.0 Liter 110,000,000 5.2 2,000.0 99,000,000 11,000,000 0.32652 14,367.05 1,100.00 15,467.05 0.1250 0.0100
4 BATCHING PLANT E04 150.0 50.0 Ton/Jam 400,000,000 5.0 2,000.0 360,000,000 40,000,000 0.33438 53,500.75 4,000.00 57,500.75 0.1250 0.0100
5 BULLDOZER D-65 E05 165.0 - - 775,000,000 5.0 2,000.0 697,500,000 77,500,000 0.33438 103,657.71 7,750.00 111,407.71 0.1250 0.0100
6 COMPRESSOR 4000-6500 L\M E06 80.0 - - 188,000,000 5.0 2,000.0 169,200,000 18,800,000 0.33438 25,145.35 1,880.00 27,025.35 0.1250 0.0100
7 CONCRETE MIXER 0.3-0.6 m3 E07 15.0 500.0 Liter 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
8 CRANE 10-15 TON E08 150.0 15.0 Ton 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
9 DUMP TRUCK 3 - 4 M3 E09 100.0 6.0 Ton 175,000,000 5.0 2,000.0 157,500,000 17,500,000 0.33438 23,406.58 1,750.00 25,156.58 0.1250 0.0100
10 DUMP TRUCK 8 - 10 M3 E10 125.0 15.0 Ton 420,000,000 5.0 2,000.0 378,000,000 42,000,000 0.33438 56,175.79 4,200.00 60,375.79 0.1250 0.0100
11 EXCAVATOR PC 125 E11 105.0 0.8 M3 590,000,000 5.0 2,000.0 531,000,000 59,000,000 0.33438 78,913.61 5,900.00 84,813.61 0.1250 0.0100
12 FLAT BED TRUCK 3-4 M3 E12 100.0 4.0 M3 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
13 MOTOR GRADER GD-500R E13 125.0 - - 770,000,000 5.0 2,000.0 693,000,000 77,000,000 0.33438 102,988.95 7,700.00 110,688.95 0.1250 0.0100
14 TRACK LOADER 75-100 HP E14 90.0 1.6 M3 782,500,000 5.0 2,000.0 704,250,000 78,250,000 0.33438 104,660.85 7,825.00 112,485.85 0.1250 0.0100
15 WHEEL LOADER W-70 E15 105.0 1.7 M3 840,000,000 5.0 2,000.0 756,000,000 84,000,000 0.33438 112,351.58 8,400.00 120,751.58 0.1250 0.0100
16 THREE WHEEL ROLLER 6-8 T E16 55.0 8.0 Ton 400,000,000 5.0 2,000.0 360,000,000 40,000,000 0.33438 53,500.75 4,000.00 57,500.75 0.1250 0.0100
17 TANDEM ROLLER 6-8 T. E17 50.0 8.0 Ton 440,000,000 5.0 2,000.0 396,000,000 44,000,000 0.33438 58,850.83 4,400.00 63,250.83 0.1250 0.0100
18 PNEUMATIC TIRE ROLLER 8-10 T E18 60.0 10.0 Ton 1,060,000,000 5.0 2,000.0 954,000,000 106,000,000 0.33438 141,776.99 10,600.00 152,376.99 0.1250 0.0100
19 VIBRATORY ROLLER 5-8 T. E19 75.0 7.0 Ton 360,000,000 5.0 2,000.0 324,000,000 36,000,000 0.33438 48,150.68 3,600.00 51,750.68 0.1250 0.0100
20 CONCRETE VIBRATOR E20 10.0 - - 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
21 WATER PUMP 70-100 mm E21 6.0 - - 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
22 WATER TANKER 3000-4500 L. E22 100.0 4,000.0 Liter 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
23 DOUBLE VIBRATORY ROLLER E23 11.0 1.0 Ton 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
24 STAMPER E24 5.0 0.2 Ton 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
25 JACK HAMMER E25 3.0 - - 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
26 GENSET ( Penerangan ) E26 7.0 5.0 KVA 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
27 PICK UP TRUCK, 1 Ton. E27 50.0 1.0 Ton 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
28 PILE DRIVER E28 60.0 2.5 Ton 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
29 CRANE ON TRACK E29 255.0 - - 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
30 CONCRETE/ASPHALT CUTTER E30 10.0 60.0 Cm/Min 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
31 MESIN LAS E31 15.0 - - 0 5.0 2,000.0 0 0 0.33438 0.00 0.00 0.00 0.1250 0.0100
KETERANGAN :
1. Tingkat Suku Bunga = 20.0 % per-tahun
2. Upah Operator / Sopir / Mekanik = 11,681 Rupiah per-orang/jam
3. Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik = 7,586 Rupiah per-orang/jam
4. Harga Bahan Bakar Residu = 5,800 Rupiah per-liter
5. Harga Bahan Bakar Solar = 8,400 Rupiah per-liter
6. Minyak Pelumas = 46,000 Rupiah per-liter
7. Nilai Tukar Uang 1 US $ = 12,000.00 Rupiah
8. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
9. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 15)
1260
.
BIAYA OPERASI PER JAM KERJA TOTAL
BAHAN BAKAR & PELUMAS WORKSHOP SPAREPART UPAH TOTAL BIAYA
OPERATOR PEMBANTU BIAYA ALAT
BIAYA KOEF. BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
/ SOPIR / JAM JAM KERJA
(Rp.) - (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
f1 x HP x
Harga BBM 0.0625 (g1 x B') 0.125 (h1 x B') 1 Orang 1 Orang
+ s/d ----- s/d ----- Per Per F+G+H+I+J E+K
f2 x HP x 0.0875 W' 0.175 W' Jam Kerja Jam Kerja
Harga Olie
F g1 G h1 H I J K L M
16 17 18 19 20 21 22 23 24 25
4,213,000.00 0.0625 90,000.00 0.1250 180,000.00 11,681.43 22,757.14 4,517,438.57 4,977,444.59 4,977,400.00 Alat Baru
70,970.00 0.0625 29,812.50 0.1250 59,625.00 11,681.43 7,585.71 179,674.64 332,051.64 332,000.00 Alat Baru
22,650.00 0.0625 3,093.75 0.1250 6,187.50 11,681.43 7,585.71 51,198.39 66,665.44 66,600.00 Alat Baru
226,500.00 0.0625 11,250.00 0.1250 22,500.00 11,681.43 7,585.71 279,517.14 337,017.90 337,000.00 Alat Baru
249,150.00 0.0625 21,796.88 0.1250 43,593.75 11,681.43 7,585.71 333,807.77 445,215.48 445,200.00 Alat Baru
120,800.00 0.0625 5,287.50 0.1250 10,575.00 11,681.43 7,585.71 155,929.64 182,955.00 84,400.00 Alat Baru
22,650.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 41,917.14 41,917.14 41,900.00 Alat Baru
226,500.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 245,767.14 245,767.14 245,700.00 Alat Baru
151,000.00 0.0625 4,921.88 0.1250 9,843.75 11,681.43 7,585.71 185,032.77 210,189.35 210,100.00 Alat Baru
188,750.00 0.0625 11,812.50 0.1250 23,625.00 11,681.43 7,585.71 243,454.64 303,830.43 303,800.00 Alat Baru
158,550.00 0.0625 16,593.75 0.1250 33,187.50 11,681.43 7,585.71 227,598.39 312,412.00 312,400.00 Alat Baru
151,000.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 170,267.14 170,267.14 170,200.00 Alat Baru
188,750.00 0.0625 21,656.25 0.1250 43,312.50 11,681.43 7,585.71 272,985.89 383,674.84 383,600.00 Alat Baru
135,900.00 0.0625 22,007.81 0.1250 44,015.63 11,681.43 7,585.71 221,190.58 333,676.43 333,600.00 Alat Baru
158,550.00 0.0625 23,625.00 0.1250 47,250.00 11,681.43 7,585.71 248,692.14 369,443.72 369,400.00 Alat Baru
83,050.00 0.0625 11,250.00 0.1250 22,500.00 11,681.43 7,585.71 136,067.14 193,567.90 193,500.00 Alat Baru
75,500.00 0.0625 12,375.00 0.1250 24,750.00 11,681.43 7,585.71 131,892.14 195,142.97 195,100.00 Alat Baru
90,600.00 0.0625 29,812.50 0.1250 59,625.00 11,681.43 7,585.71 199,304.64 351,681.64 351,600.00 Alat Baru
113,250.00 0.0625 10,125.00 0.1250 20,250.00 11,681.43 7,585.71 162,892.14 214,642.82 214,600.00 Alat Baru
15,100.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 34,367.14 34,367.14 34,300.00 Alat Baru
9,060.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 28,327.14 28,327.14 28,300.00 Alat Baru
151,000.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 170,267.14 170,267.14 170,200.00 Alat Baru
16,610.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 35,877.14 35,877.14 Alat Baru
7,550.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 26,817.14 26,817.14 26,800.00 Alat Baru
4,530.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 23,797.14 23,797.14 23,700.00 Alat Baru
10,570.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 29,837.14 29,837.14 29,800.00 Alat Baru
75,500.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 94,767.14 94,767.14 94,700.00 Alat Baru
90,600.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 109,867.14 109,867.14 109,800.00 Alat Baru
385,050.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 404,317.14 404,317.14 404,300.00 Alat Baru
15,100.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 34,367.14 34,367.14 34,300.00 Alat Baru
22,650.00 0.0625 0.00 0.1250 0.00 11,681.43 7,585.71 41,917.14 41,917.14 41,900.00 Alat Baru
DAFTAR HARGA ALAT BARU
HARGA ALAT
HARGA
KO ALAT
No. JENIS PERALATAN HP KAPASITAS
DE YANG
DITENTUKAN
US $ RUPIAH
1 2 3 4 5 6 7 8
HARGA HARGA
NO. URAIAN KODE PER JAM PER HARI
( Rp.) ( Rp.)
1 2 3 4 5
4 Mandor L03 - -
Ir. MUDJIANTO, MM
Pembina Tk I
NIP. 19581127 199303 1 002
HARGA SATUAN BAHAN
KABUPATEN BONDOWOSO TAHUN 2016
Ir. MUDJIANTO, MM
Pembina Tk I
NIP. 19581127 199303 1 002
ARGA SATUAN BAHAN
EN BONDOWOSO TAHUN 2016
KETERANGAN
6
KETERANGAN
6
KETERANGAN
6
KODE ANALISA : 6.9
JENIS PEKERJAAN : AC ( LASTON ) Levelling Manual
SATUAN PEMBAYARAN : Ton
3 TENAGA
Produksi menentukan : ASPHALT MIXING PLANT ( AMP ) Q2 35.75 Ton / jam
Produksi AC / Hari = Tk x Q2 Qt 250.25 Ton
Kebutuhan Tenaga :
- Pekerja P 15.00 Orang
- Mandor M 1.00 Orang
Koefisien Tenaga / M2 :
- Pekerja = (Tk x P) / Qt 0 0.4196 Jam
- Mandor = (Tk x M) / Qt 0 0.0280 Jam
Lanjutan
KETERANGAN
Lump Sum
HARGA SATUAN SEWA ALAT
KABUPATEN BONDOWOSO TAHUN 2016
BIAYA
NO. JENIS ALAT KODE ALAT / JAM
(Rp.)
1 2 3 4
MARGA
1 Asphalt Mixing Plant E01 4,977,400.00
2 Asphalt Finisher E02 332,000.00
3 Asphalt Sprayer E03 66,600.00
4 Batching Plant E04 337,000.00
5 Bulldozer D-65 E05 445,200.00
6 Compressor 4000-6500 L\M E06 84,400.00
7 Concrete Mixer 0.3-0.6 M3 E07 34,700.00
8 Crane 10-15 Ton E08 280,000.00
9 Dump Truck 3 - 4 M3 E09 210,100.00
10 Dump Truck 8 - 10 M3 E10 303,800.00
11 Excavator Pc 125 E11 312,400.00
12 Flat Bed Truck 3-4 M3 E12 170,200.00
13 Motor Grader Gd-500R E13 383,600.00
14 Track Loader 75-100 Hp E14 333,600.00
15 Wheel Loader W-70 E15 369,400.00
16 Three Wheel Roller 6-8 T E16 193,500.00
17 Tandem Roller 6-8 T. E17 195,100.00
18 Pneumatic Tire Roller 8-10 T. E18 351,600.00
19 Vibratory Roller 5-8 T. E19 214,600.00
20 Concrete Vibrator E20 30,000.00
21 Water Pump 70-100 Mm E21 21,000.00
22 Water Tanker 3000-4500 L. E22 170,200.00
23 Stamper E24 19,500.00
24 Jack Hammer E25 17,500.00
25 Genset ( Penerangan ) E26 25,000.00
26 Pick Up Truck, 1 Ton. E27 82,000.00
27 Pile Driver E28 109,800.00
28 Crane On Track E29 404,300.00
29 Mesin Las E31 36,000.00
30 Trailler E33 300,000.00
Ir. MUDJIANTO, MM
Pembina Tk I
NIP. 19581127 199303 1 002
Analisa EI-3.2 (1a)
HARGA JUMLAH
PERKIRAAN
NO. KOMPONEN KODE SATUAN SATUAN HARGA
KUANTITAS
(Rp.) (Rp.)
1 2 3 4 5 6 7
A TENAGA
B BAHAN
C PERALATAN
Note : 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
REKAPITULASI HARGA SATUAN PEKERJAAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN BONDOWOSO
TAHUN ANGGARAN 2016
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 -
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1a) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 33,600.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 33,600.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
NO URAIAN HARGA
( Rp )
1 2 3
I PEKERJAAN PERSIAPAN -
II PEKERJAAN TANAH -
TERBILANG ;
----------------------------------- --------------------
NIP, ------------------- Direktur
Mengetahui / Disetujui
Pj. KEPALA DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN BONDOWOSO
Ir. MUDJIANTO, MM
Pembina
NIP, 19581127 199703 1 002
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 -
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1a) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 33,600.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 33,600.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pekerjaan Harian Unit - 1.2 1,000,000.00
2 Mobilisasi Unit - 1.9 1,000,000.00
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 - 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 - 3.2 (2) 59,500.00
3 Urugan Tanah Biasa m3 - 3.3 (1) 139,300.00
4 Urugan Pasir m3 - 3.3 (3) 144,400.00
5 Urugan Pilihan m3 - 3.3 (2) 175,000.00
1.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
RENCANA ANGGARAN BIAYA
KEGIATAN :
PEKERJAAN :
LOKASI :
VOLUME :
DINAS : BINA MARGA DAN CIPTA KARYA KABUPATEN BONDOWOSO
TAHUN ANGGARAN : 2012
HARGA
PERKIRAAN KODE
NO URAIAN PEKERJAAN SAT SATUAN
KUANTITAS ANALIS
( Rp )
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Direksi keet Unit
2 Uji Bahan Material Paket
3 Pengukuran Unit
4 Mobilisasi Unit
5 Papan Nama Kegiatan Unit
6 Pembersihan Sisa Material Unit
SUB TOTAL
II PEKERJAAN TANAH
1 Galian Tanah Kedalaman 0 S/D 1 M m3 3.2 (1) 44,900.00
2 Galian Tanah Kedalaman 1 S/D 2 M m3 3.2 (2) 59,500.00
3 Galian Tanah Kedalaman 2 S/D 4 M m3 3.2 (3) 66,100.00
4 Galian Tanah Keras Mekanis m3 3.2 (5) 69,000.00
5 Urugan Tanah Biasa ( Manual ) m3 3.3 (1a) 33,600.00
6 Urugan Tanah Biasa ( Mendatangkan ) m3 3.3 (1b) 167,500.00
8 Urugan Pilihan ( Sirtu ) m3 3.3 (2) 175,000.00
SUB TOTAL
SUB TOTAL
SUB TOTAL
RENCANA ANGGARAN BIAYA
JUMLAH
HARGA
( Rp )
7
-
-
-
-
-
-
-
-
-
-
-
-
-
-