PEKERJAAN TANAH
1 m3 Galian tanah biasa sedalam 1 meter
Tenaga
Pekerja 0.750 Oh 80,500.00 Rp
Mandor 0.025 Oh 130,000.00 Rp
JUMLAH Rp
Rp
1 m3 Urugan kembali
Tenaga
Pekerja 0.2500 Oh 80,500.00 Rp
Mandor 0.0083 Oh 130,000.00 Rp
JUMLAH Rp
Rp
PEKERJAAN PONDASI
1 m3 Pasang pondasi batu kosong (aanstamping)
Bahan
Batu belah 15/20 cm 1.200 M3 200,000.00 Rp
Pasir urug 0.432 M3 195,000.00 Rp
JUMLAH Rp
Tenaga
Pekerja 0.780 Oh 80,500.00 Rp
Tukang batu 0.390 Oh 92,500.00 Rp
Kepala tukang 0.039 Oh 110,000.00 Rp
Mandor 0.039 Oh 130,000.00 Rp
JUMLAH Rp
Rp
1 m3 Urugan pasir
Bahan
Pasir Urug 1.200 M3 195,000.00 Rp
JUMLAH Rp
Tenaga
Pekerja 0.300 Oh 80,500.00 Rp
Mandor 0.010 Oh 130,000.00 Rp
JUMLAH Rp
Rp
PEKERJAAN BETON
1 m3 Membuat Sloof beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun ) 0.270 M3 4,500,000.00 Rp
Paku Biasa 2'' - 5'' 2.000 Kg 16,500.00 Rp
Minyak bekisting 0.600 Lt 15,000.00 Rp
Besi beton polos 157.500 Kg 25,000.00 Rp
Kawat beton 2.250 Kg 20,000.00 Rp
semen Portland 336.000 Kg 1,500.00 Rp
Pasir beton 0.540 M3 285,000.00 Rp
Koral beton 0.810 M3 290,000.00 Rp
Jumlah Rp
Tenaga
Pekerja 5.300 Oh 80,500.00 Rp
Tukang batu 0.275 Oh 95,000.00 Rp
Tukang kayu 1.560 Oh 92,500.00 Rp
Tukang Besi 1.050 Oh 92,500.00 Rp
Kepala tukang 0.262 Oh 110,000.00 Rp
Mandor 0.265 Oh 130,000.00 Rp
Jumlah Rp
Rp
PEKERJAAN ATAP
1 m3 Pasang konstruksi kuda - kuda kayu bangkirai
Bahan
Kayu bangkirai, balok 1.100 M3 13,550,000.00 Rp
Besi strip 15.000 Kg 16,000.00 Rp
Paku biasa 12 cm 5.600 Kg 20,000.00 Rp
JUMLAH Rp
Tenaga
Pekerja 4.000 Oh 80,500.00 Rp
Tukang kayu 12.000 Oh 92,500.00 Rp
Kepala tukang 1.200 Oh 110,000.00 Rp
Mandor 0.200 Oh 130,000.00 Rp
JUMLAH Rp
Rp
1 m' pasang nok stel gelombang 1,08 m
Bahan
Nok stel gelombang 2.050 Lbr 42,000.00 Rp
Paku sekrup 3,5 '' 6.000 Bh 2,000.00 Rp
JUMLAH Rp
Tenaga
Pekerja 0.084 Oh 80,500.00 Rp
Tukang kayu 0.125 Oh 92,500.00 Rp
Kepala tukang 0.013 Oh 110,000.00 Rp
Mandor 0.004 Oh 130,000.00 Rp
JUMLAH Rp
Rp
PEKERJAAN LANTAI
1 m2 Pasang Lantai ubin warna uk 30 x 30 cm
Bahan :
Ubin warna 30x30 cm 11.870 Bh 68,000.00 Rp
Semen portland 10.000 Kg 1,500.00 Rp
pasir pasang 0.045 M3 275,000.00 Rp
Semen warna 0.300 kg 12,500.00 Rp
JUMLAH Rp
Tenaga :
Pekerja 0.260 Oh 80,500.00 Rp
Tukang batu 0.130 Oh 92,500.00 Rp
Kepala Tukang 0.013 Oh 110,000.00 Rp
Mandor 0.013 Oh 130,000.00 Rp
JUMLAH Rp
Rp
1 m2 pengecatan bidang kayu baru ( 1 lapis plamir ), 1 lapis cat dasar, 2 lapis cat penutup
Bahan :
Cat meni kayu 0.200 Kg 80,500.00 Rp
Plamir kayu 0.150 Kg 92,500.00 Rp
Cat dasar 0.170 Kg 41,500.00 Rp
cat penutup 2 kali 0.260 Kg 330,000.00 Rp
JUMLAH Rp
Tenaga :
Pekerja 0.070 Oh 80,500.00 Rp
Tukang cat 0.009 Oh 92,500.00 Rp
Kepala Tukang 0.006 Oh 110,000.00 Rp
Mandor 0.003 Oh 130,000.00 Rp
JUMLAH Rp
Rp
PEKERJAAN ELEKTRKAL
Pemasangan 1 buah titik lampu
Bahan
Pipa listrik 5/8" 3.000 btg 10,000.00 Rp
Kabel 24.000 m 5,000.00 Rp
T Dus 3.000 bh 3,000.00 Rp
L Bow 4.000 bh 2,200.00 Rp
Las Dop 3.000 bh 20,000.00 Rp
Klem 24.000 bh 1,200.00 Rp
Mongkok 1.000 bh 3,000.00 Rp
Saklar 1.000 bh 38,000.00 Rp
Fitting 1.000 bh 15,000.00 Rp
JUMLAH Rp
Tenaga
Upah 100 % Rp
Rp
JUMLAH (Rp) JUMLAH HARGA (Rp)
480.00
330.00
9,100.00
9,910.00
9,250.00
8,050.00
1,100.00
650.000
19,050.00
28,960.00
60,375.00
3,250.00
63,625.00
63,625.00
20,125.00
1,083.33
21,208.33
21,208.33
240,000.00
84,240.00
324,240.00
62,790.00
36,075.00
4,290.00
5,070.00
108,225.00
432,465.00
240,000.00
204,000.00
149,600.00
593,600.00
120,750.00
69,375.00
8,250.00
9,750.00
208,125.00
801,725.00
234,000.000
234,000.000
24,150.00
1,300.00
25,450.00
259,450.00
1,215,000
33,000
9,000
3,937,500
45,000
504,000
153,900
234,900
6,132,300
426,650.00
26,125.00
144,300.00
97,125.00
28,820.00
34,450.00
757,470.00
6,889,770.00
1,440,000.00
52,800.00
24,000.00
3,937,500.00
45,000.00
504,000.00
153,900.00
202,500.00
792,000.00
476,000.00
1,196,800.00
8,824,500.00
426,650.00
25,437.50
120,250.00
97,125.00
28,820.00
34,450.00
732,732.50
9,557,232.50
360.00
400.00
90,000.00
1,000.00
8,250.00
2,565.00
4,350.00
106,925.00
23,908.50
3,052.50
3,052.50
3,052.50
1,100.00
1,950.00
36,116.00
143,041.00
327,000.00
148,200.00
252,300.00
727,500.00
132,825.00
23,125.00
2,750.00
10,400.00
169,100.00
896,600.00
455,000.00
4,955,000.00
2,250,000.00
7,660,000.00
214,693.50
80,937.50
31350
7,480.00
17,290.00
351,751.00
8,011,751.00
245,000.00
49,425.00
25,025.00
319,450.00
48,300.00
18,500.00
2,200.00
3,900.00
72,900.00
392,350.00
7,776.00
7,150.00
14,926.00
24,150.00
13,875.00
1,650.00
1,950.00
41,625.00
56,551.00
750.00
3,575.00
4,325.00
6,440.00
3,700.00
4,400.00
520.00
15,060.00
19,385.00
4,875.00
4,875.00
16,100.00
9,250.00
1,100.00
1,300.00
27,750.00
32,625.00
4,440,000.00
18,750.00
17,000.00
4,475,750.00
483,000.00
1,665,000.00
198,000.00
39,000.00
2,385,000.00
6,860,750.00
311,760.00
5,100.00
316,860.00
64,400.00
222,000.00
26,400.00
5,200.00
318,000.00
634,860.00
831,360.00
8,500.00
839,860.00
80,500.00
277,500.00
33,000.00
6,500.00
397,500.00
1,237,360.00
10,900.00
10,900.00
805.00
9,250.00
1,100.00
65.00
11,220.00
22,120.00
22,200.00
22,200.00
1,207.50
13,875.00
1,650.00
97.50
16,830.00
39,030.00
190,000.00
190,000.00
1,610.00
18,500.00
2,200.00
130.00
22,440.00
212,440.00
13,500.00
13,500.00
1,207.50
13,875.00
1,650.00
97.500
16,830.00
30,330.00
13,500.00
13,500.00
1,207.50
13,875.00
1,650.00
97.500
16,830.00
30,330.00
14,905,000.00
240,000.00
112,000.00
15,257,000.00
322,000.00
1,110,000.00
132,000.00
26,000.00
1,590,000.00
16,847,000.00
86,100.00
12,000.00
98,100.00
6,762.00
11,562.50
1,430.00
520.00
20,274.50
118,374.50
14,905,000.00
240,000.0
60,000.00
15,205,000.00
193,200.00
666,000.00
79,200.00
15,600.00
954,000.00
16,159,000.00
4,060.00
2,250.00
104,250.00
110,560.00
3,381.00
11,655.00
546.00
15,582.00
126,142.00
50,000.00
50,000.00
12,075.00
6,937.50
880.00
1,040.00
20,932.50
70,932.50
30,800.00
12,000.00
8,800.00
51,600.00
32,200.00
18,500.00
2,200.00
260.00
53,160.00
104,760.00
140,292.00
1,650.00
141,942.00
8,050.00
18,500.00
2,200.00
650.00
29,400.00
171,342.00
155,880.00
2,475.00
158,355.00
8,050.00
9,250.00
1,100.00
650.00
19,050.00
177,405.00
42,224.00
220.00
42,444.00
8,050.00
4,625.00
550.00
650.00
13,875.00
56,319.00
5,250.00
160.00
5,410.00
4,025.00
4,625.00
550.00
390.00
9,590.00
15,000.00
807,160.00
15,000.00
12,375.00
3,750.00
838,285.00
20,930.00
12,025.00
1,430.00
1,690.00
36,075.00
874,360.00
1,855,000.00
15,600.00
12,375.00
1,882,975.00
21,735.00
14,175.00
1,540.00
1,820.00
39,270.00
1,922,245.00
54,000.00
54,000.00
12,075.00
1,950.00
14,025.00
68,025.00
15,000.00
100.00
15,100.00
805.00
9,250.00
1,100.00
650.00
11,805.00
26,905.00
24,000.00
770,000.00
794,000.00
2,898.00
5,550.00
660.00
260.00
9,368.00
803,368.00
6,520.50
12,487.50
1,485.00
520.00
21,013.00
370,800.00
770,000.00
382,850.00
403,863.00
6,520.50
12,487.50
1,485.00
520.00
21,013.00
534,000.00
350,000.00
884,000.00
905,013.00
805.00
9,250.00
1,100.00
650.00
11,805.00
38,000.00
38,000.00
49,805.00
1,250,000.00
1,253,000.00
2,503,000.00
265,650.00
101,750.00
1,100.00
20,800.00
389,300.00
2,892,300.00
3,000.00
4,150.00
85,800.00
92,950.00
1,610.00
5,827.50
693.00
325.00
8,455.50
101,405.50
16,100.00
13,875.00
7,055.00
85,800.00
122,830.00
5,635.00
832.50
660.00
325.00
7,452.50
130,282.50
30,000.00
120,000.00
9,000.00
8,800.00
60,000.00
28,800.00
3,000.00
38,000.00
15,000.00
312,600.00
286,300.00
598,900.00
B PEKERJAAN PONDASI
Galian taah pondasi tepi M3 39 0.5 1.1
1
Galian tanah pondasi tengah M3 24 0.8 1.1
Urugan pasir pondasi tepi M3 39 0.5 0.1
2
Urugan pasir pondasi tengah M3 24 0.8 0.1
Pasangan batu kosong pondasi tepi M3 39 0.5 0.2
3
Pasangan batu kosong pondasi tengah M3 24 0.8 0.2
Pasangan batu belah pondasi tepi M3 39 0.65 0.8
4
Pasangan batu belah pondasi tengah M3 24 0.9 0.8
5 Urugan tanah kembali M3 1/4 x galian
G PEKERJAAN ATAP
1 Kontruksi kuda kuda kayu bangkirai M3 0.08 0.12 15
2 Kontruksi gordng kayu bingkarai M3 6 0.08 0.12
3 Atap nok seng M3 6 0.08 0.12
4 Atap genting soka M3 6 4.5
5 Genteng bubung sokka M3 6
6 Lisplank M3 6
I PEKERJAAN ELEKTRIKAL
1 Lampu BH
2 Stop kontak BH
3 Saklar tunggal BH
4 Saklar ganda BH
K PEKERJAAN PENGECATAN
Luas dinding interior M2 48 3.15
Luas dinding eksterior M2 24 3.15
Luas pagar depan M2 20 1.3
Luas pagar belakang M2 28 2.15
QTY JUMLAH JUMLAH TOTAL
136.000
18.000
1.000
2 50.000
205.000
1 21.450
1 21.120 42.570
1 1.950
1 1.920 3.870
1 3.900
1 3.840 7.740
1 10.140
1 8.640 18.780
2.160
72.960
1 2.190
5 0.146
3 0.145
4 0.243
10 0.709
2 0.284 1.527
3 0.405
1 0.750
1 1.800
1 0.150
1 0.300 3.405
1 0.840
1 0.476 1.316
6.248
1 8.940
1 4.770 13.710
113.400
0.567
0.290
3.600
6.000
2.250
139.817
4 0.910
1 0.227 1.137
1 0.313
2 0.448 0.760
4 6.400
1 1.400 7.800
2 2.132
4 2.964 5.096
1 0.054
1 0.300
14.793
5 15.000
3 6.000
6 9.000
6 12.000
3 3.000
4 0.142
1 0.057
45.198
1 0.144
2 0.115
0.058
2 21.000
1 6.000
2 12.000
39.317
45 157.500
1 42.000
199.500
7 7.000
4 4.000
3 3.000
2 2.000
16.000
1 1.000
2 2.000
1.000
4.000
151.200
75.600 226.800
26.000
60.200 86.200
TOTAL 1163.544
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGNAN TEMPAT TINGGAL TYPE 36
VOLUME
NO ITEM PEKERJAAN SAT
(a)
I PEKERJAAN PERSIAPAN
1 Pengukuran dan pemasangan bowplank M' 50.000
2 Direksi kit M2 18.000
3 Meratakan dan membersihkan lokasi M 136.000
4 Membuat sumur Units 1.000
II PEKERJAANN PONDASI
1 Galian tanah M3 42.570
2 Urugan pasir M3 3.870
3 Pasangan batu kosong M3 7.740
4 Pasangan batu belah M3 18.780
5 Urugan tanah kembali M3 2.160
IV PEKERJAAN DINDING
1 Pasangan batu bata merah 1/2 bata 1 pc : 3 pp M3 13.710
V PEKERJAAN PLESTERAN
1 Plesteran M2 0.567
2 Acian M2 0.290
3 Plesteran skoning M' 3.600
4 Pasang lantai ubin warna uk 30 x 30 cm M2 6.000
VI PEKERJAAN ATAP
1 Pasang kontruksi kuda kuda kayu bangkirai M3 0.144
2 Pasang kontruksi gording kayu bangkirai M3 0.115
3 Pasang atap nok M' 0.058
4 Pasang atap genting sokka M2 21.000
5 Pasang genteng bubung sokka M1 6.000
6 Pasang lisplank uk (3 x 20) cm, kayu kamper M1 12.000
IX PEKERJAAN ELEKTRIKAL
1 Pemasangan titik buah lampu BH 7.000
2 Stop kontak BH 4.000
3 Saklar tunggal BH 3.000
4 Saklar ganda BH 2.000
XI PEKERJAAN PENGECATAN
1 Pengecatan luas dinding interior dan eksterior M2 226.800
2 Pengecatan pagar belakang dan pagar depan M2 86.200
GGARAN BIAYA (RAB)
MPAT TINGGAL TYPE 36
28,960.00 1,448,000.00
1,000.00 18,000.00
1,000.00 136,000.00
1,000.00 1,000.00
1,603,000.00
63,625.00 2,708,516.25
21,208.33 82,076.25 3,351,004.50
432,465.00 3,347,279.10
801,725.00 15,056,395.50 18,403,674.60
259,450.00 560,412.00
21,754,679.10
6,889,770.00 15,088,596.30
9,557,232.50 14,590,310.07
143,041.00 487,054.61
143,041.00 57,931.60
30,223,892.58
392,350.00 5,379,118.50
5,379,118.50
56,551.00 32,064.42
32,625.00 9,461.25
19,385.00 69,786.00
874,360.00 5,246,160.00
5,357,471.67
16,847,000.00 2,425,968.00
16,159,000.00 1,861,516.80
118,374.50 6,818.37
70,932.50 1,489,582.50
104,760.00 628,560.00
171,342.00 2,056,104.00
8,468,549.67
6,860,750.00 7,800,672.75
22,120.00 132,720.00
212,440.00 1,911,960.00
30,330.00 363,960.00
30,330.00 90,990.00
10,300,302.75
56,319.00 8,870,242.50
15,000.00 630,000.00
9,500,242.50
598,900.00 4,192,300.00
38,000.00 152,000.00
38,000.00 114,000.00
38,000.00 76,000.00
4,534,300.00
2,892,300.00 5,784,600.00
26,905.00 26,905.00
49,805.00 49,805.00
5,861,310.00
101,405.50 22,998,767.40
130,282.50 11,230,351.50
34,229,118.90
Tenaga
Tukang kayu
Pekerja
Kepala tukang
Mandor
B Pekerjaan Tanah
1 1 m3 Galian tanah biasa sedalam 1 meter
Tenaga
Pekerja
Mandor
2 1 m3 Urugan kembali
Tenaga
Pekerja
Mandor
C Pekerjaan Pondasi
1 1 m3 Pasang pondasi batu kosong (aanstamping)
Bahan
Batu belah 15/20 cm
Pasir urug
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
3 1 m3 Urugan pasir
Bahan
Pasir Urug
Tenaga
Pekerja
Mandor
D Pekerjaan Beton
1 1 m3 Membuat Sloof beton bertulang ( 150 Kg besi + Bekisting )
Bahan
Kayu terentang ( kayu tahun )
Paku Biasa 2'' - 5''
Minyak bekisting
Besi beton polos
Kawat beton
semen Portland
Pasir beton
Koral beton
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang Besi
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang Besi
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu
Tukang kayu
Tukang Besi
Kepala tukang
Mandor
Tenaga
pekerja
Tukang batu
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang besi
Tukang kayu
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
2 1 m2 Plesteran 1 Pc : 5 Ps, tebal : 15 mm
Bahan
semen portland
Pasir pasang
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
4 1 m2 acian
Bahan
Semen Portland
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor
Koefisien Satuan Harga Satuan Rp Jumlah Harga Rp Rekapitulasi Rp
4 5 6 7 8