PERINCIAN PENAWARAN

PROGRAM : PENINGKATAN KINERJA PENGADILAN DAN LEMBAGA PENEGAK HUKUM LAINNYA


KEGIATAN : PEMBANGUNAN PRASARANA DAN SARANA LINGKUNGAN GEDUNG
PEKERJAAN : PERENCANAAN PEMBUATAN PAGAR RUMAH DINAS SEBANYAK 4 UNIT
LOKASI : KOTA PALANGKA RAYA
TAHUN ANGGARAN : 2009

I. LAYANAN KEAHLIAN
HARGA JUMLAH
NO KEAHLIAN PERSONIL SATUAN VOL ORANG-BULAN
SATUAN BIAYA

A TENAGA AHLI
1 Tenaga Prinsipal / Penanggung Jawab Org - Bln 1.00 x 1.00 3,000,000.00 3,000,000.00
2 Tenaga Perencana Org - Bln 1.00 x 1.00 2,500,000.00 2,500,000.00
3 Assisten Perencana/Tenaga Sipil/D3 Org - Bln 1.00 x 1.00 2,500,000.00 2,500,000.00

B TENAGA PENDUKUNG
1 Surveyor Org - Bln 2.00 x Err:522 1,500,000.00 Err:522
2 Drafter Org - Bln 2.00 x 1.00 1,800,000.00 3,600,000.00
3 Estimator Org - Bln 1.00 x Err:522 1,500,000.00 Err:522
4 Operator Komputer Org - Bln 1.00 x 1.00 850,000.00 850,000.00
5 Staf Administrasi Org - Bln 1.00 x 1.00 850,000.00 850,000.00
JUMLAH I Err:522

II. BIAYA SURVEY DAN KONSULTASI


HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA

A SURVEY LOKASI ;
1 Transport Lokal Org - Kali 2.00 x Err:522 50,000.00 Err:522
2 Akomodasi
- Lumpsum Surveyor Org - Hari 2.00 x 6.00 150,000.00 1,800,000.00

JUMLAH II.A Err:522

B KONSULTASI DAN PENJELASAN PEKERJAAN


1 Konsultasi
- Transport Lokal Org - Kali 1.00 x 1.00 50,000.00 50,000.00
- Lumpsum Tenaga Ahli Org - Hari 1.00 x 1.00 200,000.00 200,000.00
2 Penjelasan Pekerjaan
- Transport Lokal Org - Kali 1.00 x 1.00 50,000.00 50,000.00
- Lumpsum Tenaga Ahli Org - Hari 1.00 x 1.00 200,000.00 200,000.00
JUMLAH II.B 500,000.00
JUMLAH II Err:522

III. BIAYA FASILITAS, PERLENGKAPAN PENYUSUNAN


HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA

1 Komputer + Printer Unit - Bln 3.00 x 1.00 1,000,000.00 3,000,000.00


2 Meteran Unit - Bln 1.00 x Err:522 200,000.00 Err:522
3 Kamera Unit - Bln 1.00 x Err:522 150,000.00 Err:522
4 Mesin Hitung Unit - Bln 1.00 x Err:522 300,000.00 Err:522
5 Photo Film + Cuci Cetak Ls - Bln 1.00 300,000.00 300,000.00
6 Alat Tulis Kantor (ATK) Ls - Bln 1.00 800,000.00 800,000.00
7 Biaya Komunikasi dan Listrik Ls - Bln 1.00 400,000.00 400,000.00
8 Perlengkapan Bahan Habis Pakai Ls - Bln 1.00 500,000.00 500,000.00

JUMLAH III Err:522

IV. BIAYA PENGGANDAAN DOKUMEN


HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA

1 Rencana Kerja dan Syarat - Syarat (RKS) Buku - Pkt 5 x 1 35,000.00 175,000.00
2 Pembuatan Rencana Anggaran Biaya (RAB) Buku - Pkt 5 x 1 35,000.00 175,000.00
3 Gambar Bestek Buku - Pkt 5 x 1 35,000.00 175,000.00
4 Penggandaan Kontrak Buku - Pkt 10 x 1 50,500.00 505,000.00
JUMLAH IV 1,030,000.00
REKAPITULASI BIAYA :
I. LAYANAN KEAHLIAN Err:522
II. BIAYA SURVEY DAN KONSULTASI Err:522
III. BIAYA FASILITAS, PERLENGKAPAN PENYUSUNAN Err:522
IV. BIAYA PENGGANDAAN DOKUMEN 1,030,000.00
JUMLAH Err:522

Terbilang : /// Dua Puluh Empat Juta Empat Ratus Ribu Rupiah ///

Palangka Raya, 13 Mei 2009

P e n a w a r,

CV. PALANGKA WIDYAJASA KONSULTAN


Pusat Palangka Raya

ENARDO, ST
Direktur
LAMPIRAN BERITA ACARA KLARIFIKASI DAN NEGOSIASI
Nomor : W16-U1/008.a/Pan - PBJ/V/2009
Tanggal : 15 Mei 2009

PROGRAM : PENINGKATAN KINERJA PENGADILAN DAN LEMBAGA PENEGAK HUKUM LAINNYA


KEGIATAN : PEMBANGUNAN PRASARANA DAN SARANA LINGKUNGAN GEDUNG
PEKERJAAN : PERENCANAAN PEMBUATAN PAGAR RUMAH DINAS SEBANYAK 4 UNIT
LOKASI : KOTA PALANGKA RAYA
TAHUN ANGGARAN : 2009

I. LAYANAN KEAHLIAN HPS PENAWARAN NEGOSIASI


VOLUME HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
NO KEAHLIAN PERSONIL SATUAN
ORG - BLN SATUAN BIAYA SATUAN BIAYA SATUAN BIAYA

A TENAGA AHLI
1 Tenaga Prinsipal / Penanggung Jawab Org - Bln 1.00 x 1.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00 3,000,000.00
2 Tenaga Perencana Org - Bln 1.00 x 1.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00
3 Assisten Perencana/Tenaga Sipil/D3 Org - Bln 1.00 x 1.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00 2,500,000.00

B TENAGA PENDUKUNG
1 Surveyor Org - Bln 2.00 x Err:522 1,500,000.00 Err:522 1,500,000.00 Err:522 1,500,000.00 Err:522
2 Drafter Org - Bln 2.00 x 1.00 1,800,000.00 3,600,000.00 1,800,000.00 3,600,000.00 1,800,000.00 3,600,000.00
3 Estimator Org - Bln 1.00 x Err:522 1,500,000.00 Err:522 1,500,000.00 Err:522 1,500,000.00 Err:522
4 Operator Komputer Org - Bln 1.00 x 1.00 900,000.00 900,000.00 850,000.00 850,000.00 850,000.00 850,000.00
5 Staf Administrasi Org - Bln 1.00 x 1.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00 850,000.00
JUMLAH I Err:522 Err:522 Err:522

II. BIAYA SURVEY DAN KONSULTASI


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA SATUAN BIAYA SATUAN BIAYA
A SURVEY LOKASI ;
1 Transport Lokal Org - Kali 2.00 x Err:522 50,000.00 Err:522 50,000.00 Err:522 50,000.00 Err:522
2 Akomodasi
- Lumpsum Surveyor Org - Hari 2.00 x 6.00 150,000.00 1,800,000.00 150,000.00 1,800,000.00 150,000.00 1,800,000.00

JUMLAH II.A Err:522 Err:522 Err:522

B KONSULTASI DAN PENJELASAN PEKERJAAN


1 Konsultasi
- Transport Lokal Org - Kali 1.00 x 1.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
- Lumpsum Tenaga Ahli Org - Hari 1.00 x 1.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00 200,000.00
2 Penjelasan Pekerjaan
- Transport Lokal Org - Kali 1.00 x 1.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00 50,000.00
- Lumpsum Tenaga Ahli Org - Hari 1.00 x 1.00 200,000.00 200,000.00 200,000.00 200,000.00 150,000.00 150,000.00
JUMLAH II.B 500,000.00 500,000.00 500,000.00
JUMLAH II Err:522 Err:522 3,500,000.00
III. BIAYA FASILITAS, PERLENGKAPAN PENYUSUNAN
HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA SATUAN BIAYA SATUAN BIAYA
1 Komputer + Printer Unit - Bln 3.00 x 1.00 1,000,000.00 3,000,000.00 1,000,000.00 3,000,000.00 1,000,000.00 3,000,000.00
2 Meteran Unit - Bln 1.00 x Err:522 200,000.00 Err:522 200,000.00 Err:522 200,000.00 Err:522
3 Kamera Unit - Bln 1.00 x Err:522 150,000.00 Err:522 150,000.00 Err:522 150,000.00 Err:522
4 Mesin Hitung Unit - Bln 1.00 x Err:522 300,000.00 Err:522 300,000.00 Err:522 300,000.00 Err:522
5 Photo Film + Cuci Cetak Ls - Bln 1.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00 300,000.00
6 Alat Tulis Kantor (ATK) Ls - Bln 1.00 800,000.00 800,000.00 800,000.00 800,000.00 800,000.00 800,000.00
7 Biaya Komunikasi dan Listrik Ls - Bln 1.00 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00 400,000.00
8 Perlengkapan Bahan Habis Pakai Ls - Bln 1.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00 500,000.00
JUMLAH III Err:522 Err:522 Err:522

IV. BIAYA PENGGANDAAN DOKUMEN


HARGA JUMLAH HARGA JUMLAH HARGA JUMLAH
NO URAIAN SATUAN JUMLAH
SATUAN BIAYA SATUAN BIAYA SATUAN BIAYA
1 Rencana Kerja dan Syarat - Syarat (RKS) Buku - Pkt 5 x 1 35,000.00 175,000.00 35,000.00 175,000.00 35,000.00 175,000.00
2 Pembuatan Rencana Anggaran Biaya (RAB) Buku - Pkt 5 x 1 35,000.00 175,000.00 35,000.00 175,000.00 35,000.00 175,000.00
3 Gambar Bestek Buku - Pkt 5 x 1 35,000.00 175,000.00 35,000.00 175,000.00 35,000.00 175,000.00
4 Penggandaan Kontrak Buku - Pkt 10 x 1 50,500.00 505,000.00 50,500.00 505,000.00 50,500.00 505,000.00
JUMLAH IV 1,030,000.00 1,030,000.00 1,030,000.00

REKAPITULASI BIAYA :
I. LAYANAN KEAHLIAN Err:522 Err:522 Err:522
II. BIAYA SURVEY DAN KONSULTASI Err:522 Err:522 3,500,000.00
III. BIAYA FASILITAS, PERLENGKAPAN PENYUSUNAN Err:522 Err:522 Err:522
IV. BIAYA PENGGANDAAN DOKUMEN 1,030,000.00 1,030,000.00 1,030,000.00
JUMLAH Err:522 Err:522 24,400,000.00

Wakil Konsultan : Panitia Pengadaan Barang / Jasa


CV. PALANGKA WIDYAJASA KONSULTAN Ketua,
Pusat Palangka Raya

ENARDO, ST ROISUL EHWAN, SH


Direktur NIP. 19820928 200801 1 004
JADWAL RENCANA PEKERJAAN

PROGRAM : PENINGKATAN KINERJA PENGADILAN DAN LEMBAGA PENEGAK HUKUM LAINNYA


KEGIATAN : PEMBANGUNAN PRASARANA DAN SARANA LINGKUNGAN GEDUNG
PEKERJAAN : PERENCANAAN PEMBUATAN PAGAR RUMAH DINAS SEBANYAK 4 UNIT
LOKASI : KOTA PALANGKA RAYA
TAHUN ANGGARAN : 2009

JANGKA WAKTU PELAKSANAAN


NO URAIAN KEGIATAN KETERANGAN
1 2 3 4 5 6 7 8 9 10

1 PEKERJAAN PERSIAPAN 1 Kolom = 3 Hari


Jangka Waktu
2 PENYUSUNAN PERENCANAAN Perencanaan = 30 Hari

3 PENYUSUNAN RENCANA DETAIL

4 PELAKSANAAN PROSES LELANG

5 PENGAWASAN BERKALA

Palangka Raya, 13 Mei 2009

CV. PALANGKA WIDYAJASA KONSULTAN


Pusat Palangka Raya

ENARDO, ST
Direktur
DATA PERSONIL

NO URAIAN KEGIATAN NAMA KETERANGAN

1 Tenaga Prinsipal / Penanggung Jawab ENARDO ST

2 Tenaga Perencana MARYANI ST

3 Assisten Perencana/Tenaga Sipil/D3 MART SUPRIYADI A.Md

4 Surveyor WELLY

5 Drafter HERMON KAHARAP

6 Estimator SETIAWAN ST

7 Operator Komputer MINGGUS FERISANOVEL

8 Staf Administrasi KIKI FRANKI YOSUA

Palangka Raya, 13 Mei 2009

CV. PALANGKA WIDYAJASA KONSULTAN


Pusat Palangka Raya

ENARDO, ST
Direktur
JADWAL KERJA PERSONIL
PROGRAM : PENINGKATAN KINERJA PENGADILAN DAN LEMBAGA PENEGAK HUKUM LAINNYA
KEGIATAN : PEMBANGUNAN PRASARANA DAN SARANA LINGKUNGAN GEDUNG
PEKERJAAN : PERENCANAAN PEMBUATAN PAGAR RUMAH DINAS SEBANYAK 4 UNIT
LOKASI : KOTA PALANGKA RAYA
TAHUN ANGGARAN : 2009

JUMLAH DURASI JANGKA WAKTU PELAKSANAAN


NO URAIAN KEGIATAN KETERANGAN
ORANG (HARI) 1 2 3 4 5 6 7 8 9 10

1 Tenaga Prinsipal / Penanggung Jawab 1 30 1 Kolom = 3 Hari


Jangka Waktu
2 Tenaga Perencana 1 30 Perencanaan = 30 Hari

3 Assisten Perencana/Tenaga Sipil/D3 1 30

4 Surveyor 2 Err:522

5 Drafter 2 30

6 Estimator 1 Err:522

7 Operator Komputer 1 30

8 Staf Administrasi 1 30

Palangka Raya, 13 Mei 2009

CV. PALANGKA WIDYAJASA KONSULTAN


Pusat Palangka Raya

ENARDO, ST
Direktur