Anda di halaman 1dari 1

CV.

CATUR EKA SETYA


ENGINEERING - DESIGN - SUPERVISOR – MANAGEMENT
INKINDO No. 14075/P/0931.JB NPWP No. 21.092.553.3-437.000
Jalan Raya Pekandangan Blok B No.1 Tlp (0234) 274561 Indramayu

PENAWARAN HARGA

KEGIATAN PENGELOLAAN CAGAR BUDAYA PERINGKAT KABUPATEN/KOTA


SUB KEGIATAN PERLINDUNGAN CAGAR BUDAYA
PEKERJAAN PERENCANAAN TEKNIS PEMAGARAN MASJID KUNO PAMAYAHAN, PERENCANAAN TEKNIS PEMAGARAN SITUS JAKA
DOLOG
PENDAPATAN ASLI DAERAH (PAD)

No Uraian Unit/Satuan Orang/Bulan Harga Satuan (Rp) Jumlah Harga (Rp)


I. BIAYA LANGSUNG PERSONIL `
A. Biaya Tenaga Ahli (Field Team)
1 Team Leader /Ahli Muda (S1 - 5 Thn) 1 Org x 0,5 Bln 4.100.000,00 2.050.000,00
2 Ahli Sipil ( S1 - 4 thn) 1 Org x 0,5 Bln 3.690.000,00 1.845.000,00
SUB TOAL I - A 3.895.000,00
B. Biaya Staf Pendukung
1 Operator CAD 1 Org x 0,5 Bln 1.960.000,00 980.000,00
2 Surveyor 1 Org x 0,2 Bln 1.760.000,00 352.000,00
3 Administrasi 1 Org x 0,5 Bln 1.760.000,00 880.000,00
SUB TOTAL I - B 2.212.000,00
JUMLAH BIAYA LANGSUNG PERSONIL I ( A + B ) 6.107.000,00
II. BIAYA LANGSUNG NON PERSONIL
A. Biaya Transportasi & Akomodasi Konsultan
1 Sewa Kendaraan Roda 4 1 Unit 3 Hr 300.000,00 900.000,00
SUB TOTAL II - A 900.000,00
B. Alat Tulis Kantor (ATK) dan Dokumentasi
1 Refill Tinta Epson Type 664 Black 5 Tube 110.000,00 550.000,00
2 Refill Tinta Epson Type 664 Warna 12 Tube 85.000,00 1.020.000,00
3 Kertas HVS ef 60 gram 8 Rim 46.000,00 368.000,00
4 Kertas HVS df 70 gram 7 Rim 55.000,00 385.000,00
5 Kertas HVS df 80 gram 7 Rim 75.000,00 525.000,00
SUB TOTAL II - B 2.848.000,00
C. Biaya Percetakan Laporan
1 Laporan Gambar Rencana dan RAB 5 Buku 94.000,00 470.000,00
2 Dokumen Kontrak 5 Buku 96.000,00 480.000,00
SUB TOTAL II - C 950.000,00
JUMLAH BIAYA LANGSUNG NON PERSONIL II ( A + B + C ) 4.698.000,00
REKAPITULASI
.......................................................................................
I. BIAYA LANGSUNG PERSONIL 6.107.000,00
.............
.......................................................................................
II. BIAYA LANGSUNG NON PERSONIL 4.698.000,00
.............
JUMLAH I + II 10.805.000,00
PPN 11% 1.188.550,00
JUMLAH TOTAL 11.993.550,00
DIBULATAN 11.993.000,00

Terbilang : Sebelah Juta Sembilan Ratus Sembilan Puluh Tiga Ribu Rupiah

Indramayu, 2022
CV. CATUR EKA SETYA

SARWIDI, ST
Direktur

Anda mungkin juga menyukai