Terbilang :
Dua Ratus Tiga Puluh Dua Juta Enam Ratus Enam Puluh Empat Ribu Rupiah
RENCANA ANGGARAN BIAYA ( RAB )
Kegiatan #REF!
Pekerjaan #REF!
Lokasi #REF!
Tahun Anggaran #REF!
I PEKERJAAN PENDAHULUAN
1 Uitset Lokasi dan Pembersihan Lokasi #REF! ls 2,000,000.00 - #REF! #REF! #REF!
Sub Total #REF! #REF! #REF!
II PEKERJAAN BETON
1 #REF! #REF! m3 #NAME? #NAME? #NAME? #NAME? #NAME?
2 #REF! #REF! m3 #NAME? #NAME? #NAME? #NAME? #NAME?
3 #REF! #REF! m3 #NAME? #NAME? #NAME? #NAME? #NAME?
4 #REF! #REF! m3 #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Total #NAME? #NAME? #NAME?
III PEKERJAAN PASANGAN, PLESTERAN
1 #REF! #REF! m2 60,918.00 #NAME? #REF! #NAME? #NAME?
2 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
3 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Total #REF! #NAME? #NAME?
IV PEKERJAAN ATAP DAN KERANGKANYA
1 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
2 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
3 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
4 #REF! #REF! m' #NAME? #NAME? #NAME? #NAME? #NAME?
5 #REF! #REF! m' #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Total #NAME? #NAME? #NAME?
V PEKERJAAN RANGKA DAN PENUTUP PLAFOND
1 #REF!
#REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
2 #REF! #REF! m' #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Total #NAME? #NAME? #NAME?
VI PEKERJAAN PENGECATAN
1 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
2 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
3 #REF! #REF! m2 #NAME? #NAME? #NAME? #NAME? #NAME?
Sub Total #NAME? #NAME? #NAME?
VII PEKERJAAN INSTALASI LISTRIK
1 #REF! #REF! bh Err:509 - Err:509 #REF! #REF!
2 #REF! #REF! bh Err:509 - Err:509 #REF! #REF!
3 #REF! #REF! bh Err:509 - Err:509 #REF! #REF!
4 #REF! #REF! ttk Err:509 - Err:509 #REF! #REF!
5 #REF! #REF! ttk Err:509 - Err:509 #REF! #REF!
Sub Total Err:509 #REF! #REF!
Jenis barang/jasa Satuan Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.) Keterangan
PEKERJAAN PERSIAPAN
Pengukuran \/ uitzet dan Pas. Bowplank Ls 1.00 50,000.00 11.00 5,500.00 55,500.00
Pembersian Lokasi Ls 1.00 50,000.00 11.00 5,500.00 55,500.00
Papan nama kegiatan Ls 1.00 50,000.00 11.00 5,500.00 55,500.00
Jembatan Akses Masuk Sementara Ls 1.00 50,000.00 11.00 5,500.00 55,500.00
Penyiapan RK3K terdiri atas
Pembuatan Kartu Identitas Pekerja (KIP) Org 8.00 5,000.00 11.00 4,400.00 44,400.00
Sosialisasi dan Promosi K3 terdiri atas
Pelatihan K3
Bekerja di Ketinggian org 4.00 20,000.00 11.00 8,800.00 88,800.00
Analysis Keselamatan Pekerjaan org 4.00 20,000.00 11.00 8,800.00 88,800.00
Perilaku Berbasis Keselamatan (Budaya K3) org 1.00 20,000.00 11.00 2,200.00 22,200.00
Simulasi K3 org 4.00 20,000.00 11.00 8,800.00 88,800.00
Spanduk (banner) bh 2.00 20,000.00 11.00 4,400.00 44,400.00
Alat Pelindung Kerja dan Alat Pelindung Diri terdiri atas
Jaring Pengaman (Safety Net) Ls 1.00 25,000.00 11.00 2,750.00 27,750.00
Pembatas Area (Restricted Area ). Ls 1.00 25,000.00 11.00 2,750.00 27,750.00
Topi Pelindung (Safety Helmet) Bh 8.00 25,000.00 11.00 22,000.00 222,000.00
Pelindung Mata (Goggles, Spectacles) Bh 8.00 25,000.00 11.00 22,000.00 222,000.00
Pelindung Pernafasan Dan Mulut (Masker) Bh 8.00 25,000.00 11.00 22,000.00 222,000.00
Sarung Tangan (Safety Gloves) Bh 8.00 25,000.00 11.00 22,000.00 222,000.00
Sepatu Keselamatan (Rubber Safety Shoesand toe cap) Bh 4.00 25,000.00 11.00 11,000.00 111,000.00
Rompi Keselamatan (Safety Vest) Bh 8.00 25,000.00 11.00 22,000.00 222,000.00
Body Harnes (Safety Harnes) bh 1.00 25,000.00 11.00 2,750.00 27,750.00
Asuransi Dan Perijinan terdiri atas Nilai Kontrak 5 M
Asuransi Bangunan Ls 1.00 100,000.00 11.00 11,000.00 111,000.00
Personil K3 terdiri atas
Petugas K3 Ok 1.00 19,930.92 11.00 2,192.40 22,123.32
Fasilitas sarana kesehatan
Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen,
Obat Luka, Perban,dll Ls 1.00 50,000.00 11.00 5,500.00 55,500.00
Rambu - Rambu terdiri atas
Rambu Petunjuk Bh 1.00 50,000.00 11.00 5,500.00 55,500.00
Rambu Larangan Bh 1.00 50,000.00 11.00 5,500.00 55,500.00
Rambu Peringatan Bh 1.00 50,000.00 11.00 5,500.00 55,500.00
Lain - Lain Terkait Pengendalian Risiko K3
Bendera K3 bh 1.00 20,000.00 11.00 2,200.00 22,200.00
PEKERJAAN TANAH
Galian Tanah m3 40.48 82,595.62 11.00 367,781.78 3,711,252.47
Galian Strous 30 cm m 45.00 70,000.00 11.00 346,500.00 3,496,500.00
Urugan Tanah Kembali m3 13.49 58,616.25 11.00 86,980.65 877,713.87
Urugan Tanah m3 32.70 114,102.30 11.00 410,425.97 4,141,571.18
Urugan Pasir m3 19.44 190,538.25 11.00 407,446.99 4,111,510.57
PEKERJAAN PONDASI
Pas. Pondasi Batu Kali 1pc4ps m3 24.42 728,769.60 11.00 1,957,620.90 19,754,174.53
Pas. Rolag 1 Bata 1pc4ps m2 5.35 250,000.00 11.00 147,125.00 1,484,625.00
PEKERJAAN BETON
Strous 30 -250 cm
Beton K-225 m3 3.18 944,265.12 11.00 330,303.94 3,333,067.02
Besi beton kg 230.83 12,902.03 11.00 327,599.31 3,305,774.90
Foodplate 80x80x20 cm 0.00
Beton K-225 m3 2.05 944,265.12 11.00 212,931.78 2,148,675.28
Besi beton kg 323.58 12,902.03 11.00 459,232.28 4,634,071.14
Begisting m2 10.24 73,866.80 11.00 83,203.56 839,599.60
Foodplate 60x60x20 cm 0.00
Beton K-225 m3 0.14 944,265.12 11.00 14,541.68 146,738.80
Besi beton kg 26.61 12,902.03 11.00 37,765.53 381,088.55
Begisting m2 0.96 73,866.80 11.00 7,800.33 78,712.46
Sloof 11x20 cm 0.00
Beton K-225 m3 1.38 944,265.12 11.00 143,339.45 1,446,425.31
Besi beton kg 316.24 12,902.03 11.00 448,815.18 4,528,953.14
Begisting m2 25.00 122,791.90 11.00 337,677.73 3,407,475.23
Kolom 20x20 cm 0.00
Beton K-225 m3 0.39 944,265.12 11.00 40,508.97 408,772.37
Besi beton kg 53.94 12,902.03 11.00 76,552.90 772,488.40
Begisting m2 7.86 119,641.90 11.00 103,442.39 1,043,827.72
Kolom 11x20 cm 0.00
Beton K-225 m3 1.99 944,265.12 11.00 206,699.63 2,085,787.22
Besi beton kg 458.62 12,902.03 11.00 650,884.19 6,568,013.19
Begisting m2 27.12 119,641.90 11.00 356,915.72 3,601,604.04
Kolom 11x11 cm 0.00
Beton K-225 m3 0.34 944,265.12 11.00 35,315.52 356,365.66
Besi beton kg 130.38 12,902.03 11.00 185,038.33 1,867,205.01
Begisting m2 6.16 119,641.90 11.00 81,069.35 818,063.46
Balok latay 11x11 0.00
Beton K-225 m3 0.41 944,265.12 11.00 42,586.36 429,735.06
Besi beton kg 119.42 12,902.03 11.00 169,483.65 1,710,244.07
Begisting m2 7.37 122,791.90 11.00 99,547.39 1,004,523.70
Balok 11x20 0.00
Beton K-225 m3 0.40 944,265.12 11.00 41,547.67 419,253.71
Besi beton kg 71.61 12,902.03 11.00 101,630.58 1,025,544.95
Begisting m2 7.20 122,791.90 11.00 97,251.18 981,352.86
Pas. Canopi Beton t 5cm 0.00
Beton K-225 m3 0.34 944,265.12 11.00 35,315.52 356,365.66
Besi beton kg 39.11 12,902.03 11.00 55,505.82 560,104.22
Begisting m2 6.82 122,791.90 11.00 92,118.48 929,559.24
Pas. Plat Beton t 7 cm 0.00
Beton K-225 m3 0.42 944,265.12 11.00 43,625.05 440,216.40
Besi beton kg 31.48 12,902.03 11.00 44,677.15 450,833.05
Begisting m2 6.00 122,791.90 11.00 81,042.65 817,794.05
Ring Balk 11x20 cm 0.00
Beton K-225 m3 1.22 944,265.12 11.00 126,720.38 1,278,723.83
Besi beton kg 280.82 12,902.03 11.00 398,546.29 4,021,694.35
Begisting m2 22.20 122,791.90 11.00 299,857.82 3,025,838.00
Rabat Beton t 5 cm K-100 m3 8.05 720,385.05 11.00 637,900.96 6,437,000.61
PEKERJAAN PASANGAN
Pas. Tembok 1\/2 bata 1pc3ps m2 23.56 222,571.65 11.00 576,816.69 5,820,604.76
Pas. Tembok 1\/2 bata 1pc5ps m2 160.74 109,258.27 11.00 1,931,839.18 19,494,013.49
Plesteran tembok 1pc5ps m2 282.13 62,053.32 11.00 1,925,781.35 19,432,884.52
Pas. Bata Tempel m2 30.81 200,000.00 11.00 677,820.00 6,839,820.00
PEKERJAAN ATAP
Pas. Rangka Atap galvalum m2 192.56 107,978.32 11.00 2,287,153.58 23,079,458.88
Pas. Genteng m2 233.84 126,898.96 11.00 3,264,145.81 32,938,198.62
Pas. Bubungan m 40.72 160,747.65 11.00 720,020.87 7,265,665.18
Pas. Woodplank L 30 cm m 59.00 71,334.37 11.00 462,960.06 4,671,687.89
PEKERJAAN KERAMIK
Pas. Keramik 40x40 cm m2 147.79 114,213.48 11.00 1,856,757.12 18,736,367.33
Pas. Keramik 20x20 cm m2 2.50 234,819.30 11.00 64,575.31 651,623.56
Pas. Keramik Dinding 20x25 cm m2 8.55 234,819.30 11.00 220,847.55 2,228,552.57
PEKERJAAN SANITASI
Pas. Closed Jongkok bh 1.00 250,000.00 11.00 27,500.00 277,500.00
Pas. Kran Air 3\/4 bh 2.00 25,000.00 11.00 5,500.00 55,500.00
Pas. Tempat Sabun bh 1.00 20,000.00 11.00 2,200.00 22,200.00
Pas. Timba Air bh 1.00 5,000.00 11.00 550.00 5,550.00
Pas. Pipa PVC 3\/4 bh 30.00 31,320.12 11.00 103,356.40 1,042,960.00
Pas. Pipa PVC 3 bh 15.00 61,999.68 11.00 102,299.47 1,032,294.67
Pas. Bio Septiktank Kap. 1m3 bh 1.00 1,000,000.00 11.00 110,000.00 1,110,000.00
Pas. Sumur Bor bh 1.00 500,000.00 11.00 55,000.00 555,000.00
Pas. Pompa Air bh 1.00 300,000.00 11.00 33,000.00 333,000.00
PEKERJAAN PLAFOND
Pas. Rangka Plafond hollo galvalum m2 184.02 107,550.97 11.00 2,177,068.24 21,968,597.74
Pas. Penutup Plafond Gypsum board 9 mm m2 137.12 52,111.80 11.00 786,012.70 7,931,582.72
Pas. Penutup Plafond Kalsiboard 4 mm m2 46.90 69,779.32 11.00 359,991.51 3,632,641.62
PEKERJAAN PENGECATAN
Pengecatan Tembok m2 282.16 19,107.58 11.00 593,053.43 5,984,448.20
Pengecatan Plafond, Canopi dan Plat Beton m2 196.84 19,107.58 11.00 413,724.97 4,174,861.01
Pengecatan Risplank m2 17.70 49,267.31 11.00 95,923.45 967,954.84
Coating Bata tempel m2 30.81 50,000.00 11.00 169,455.00 1,709,955.00
324,706,799.99
324,706,800.00
PDN
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
REKAPITULASI
RENCANA ANGGARAN BIAYA
PEKERJAAN JUMLAH
#NAME?
Pengukuran \/ uitzet dan Pas. Bowplank Rp 2,054,917.91
PEKERJAAN TANAH Rp 14,719,412.90
PEKERJAAN BETON Rp 59,154,502.80
PEKERJAAN PASANGAN Rp 46,475,066.37
PEKERJAAN ATAP Rp 61,220,732.67
PEKERJAAN KERAMIK Rp 19,474,363.47
PEKERJAAN INSTALASI LISTRIK Rp 983,319.75
Pas. Lampu 18 Watt Rp 939,603.60
Pas. Pipa PVC 3 Rp -
Pas. Rangka Plafond hollo galvalum Rp 3,761,137.03
Coating Bata tempel
- Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
#NAME? Rp #NAME?
Jumlah Rp #NAME?
PPN 11% Rp #NAME?
Jumlah total Rp #NAME?
Dibulatkan Rp #NAME?
HERY KYSWANTO
Direktur
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG LINGKUNGAN KELURAHAN GUNUNG GEDANGAN
LOKASI : Kota Mojokerto
TH. ANGGARAN : 2022
PEKERJAAN PERSIAPAN
Pengukuran \/ uitzet dan Pas. Bowplank Ls 1.00 50,000.00 50,000.00
Pembersian Lokasi Ls 1.00 50,000.00 50,000.00
Papan nama kegiatan Ls 1.00 50,000.00 50,000.00
Jembatan Akses Masuk Sementara Ls 1.00 50,000.00 50,000.00
Penyiapan RK3K terdiri atas -
Pembuatan Kartu Identitas Pekerja (KIP) Org 8.00 5,000.00 40,000.00
Sosialisasi dan Promosi K3 terdiri atas -
Pelatihan K3 -
Bekerja di Ketinggian org 4.00 20,000.00 80,000.00
Analysis Keselamatan Pekerjaan org 4.00 20,000.00 80,000.00
Perilaku Berbasis Keselamatan (Budaya K3) org 1.00 20,000.00 20,000.00
Simulasi K3 org 4.00 20,000.00 80,000.00
Spanduk (banner) bh 2.00 20,000.00 40,000.00
Alat Pelindung Kerja dan Alat Pelindung Diri terdiri atas -
Jaring Pengaman (Safety Net) Ls 1.00 25,000.00 25,000.00
Pembatas Area (Restricted Area ). Ls 1.00 25,000.00 25,000.00
Topi Pelindung (Safety Helmet) Bh 8.00 25,000.00 200,000.00
Pelindung Mata (Goggles, Spectacles) Bh 8.00 25,000.00 200,000.00
Pelindung Pernafasan Dan Mulut (Masker) Bh 8.00 25,000.00 200,000.00
Sarung Tangan (Safety Gloves) Bh 8.00 25,000.00 200,000.00
Sepatu Keselamatan (Rubber Safety Shoesand toe cap) Bh 4.00 25,000.00 100,000.00
Rompi Keselamatan (Safety Vest) Bh 8.00 25,000.00 200,000.00
Body Harnes (Safety Harnes) bh 1.00 25,000.00 25,000.00
Asuransi Dan Perijinan terdiri atas Nilai Kontrak 5 M -
Asuransi Bangunan Ls 1.00 100,000.00 100,000.00
Personil K3 terdiri atas -
Petugas K3 Ok 1.00 19,917.91 19,917.91
Fasilitas sarana kesehatan -
Peralatan P3K (Kotak P3K, Tandu,Tabung Oksigen, -
Obat Luka, Perban,dll Ls 1.00 50,000.00 50,000.00
Rambu - Rambu terdiri atas -
Rambu Petunjuk Bh 1.00 50,000.00 50,000.00
Rambu Larangan Bh 1.00 50,000.00 50,000.00
Rambu Peringatan Bh 1.00 50,000.00 50,000.00
Lain - Lain Terkait Pengendalian Risiko K3 -
Bendera K3 bh 1.00 20,000.00 20,000.00
Jumlah I 2,054,917.91
PEKERJAAN TANAH
Galian Tanah m3 40.48 82,595.63 3,343,470.90
Galian Strous 30 cm m 45.00 70,000.00 3,150,000.00
Urugan Tanah Kembali m3 13.49 58,616.25 790,733.21
Urugan Tanah m3 32.70 114,102.30 3,731,145.21
Urugan Pasir m3 19.44 190,538.25 3,704,063.58
Jumlah II 14,719,412.90
PEKERJAAN PONDASI
Pas. Pondasi Batu Kali 1pc4ps m3 24.42 728,769.60 17,796,553.63
Pas. Rolag 1 Bata 1pc4ps m2 5.35 250,000.00 1,337,500.00
Jumlah III 19,134,053.63
PEKERJAAN BETON
Strous 30 -250 cm
Jenis Pekerjaan Sat Volume Harga Satuan Jumlah Harga
A. 4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.600 101,500.00 60,900.00
Tukang batu L.02 Oh 0.200 101,500.00 20,300.00
Kepala tukang L.03 Oh 0.020 101,500.00 2,030.00
Mandor L.04 Oh 0.030 101,500.00 3,045.00
Jumlah Tenaga 86,275.00
B BAHAN
Bata merah 5 x 11 x 22 cm Buah 140.000 600.00 84,000.00
Semen portland Kg 26.550 1,350.00 35,842.50
Pasir pasang m3 0.093 130,000.00 12,090.00
Jumlah Bahan 131,932.50
Jumlah Tenaga + Bahan 218,207.50
Overhead & Profit 2% 4,364.15
Jumlah Total 222,571.65
ANALISA HARGA SATUAN
PERMEN.PUPR28 - 2016
A. A.4.1.1.5 Membuat 1 m3 beton mutu f'c=14,5 Mpa; slump (120 ± 20) mm; ( K-175 )
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 1.650 101,500.00 167,475.00
Tukang batu L.02 Oh 0.275 101,500.00 27,912.50
Kepala tukang L.03 Oh 0.028 101,500.00 2,791.25
Mandor L.04 Oh 0.083 101,500.00 8,373.75
Jumlah Tenaga 206,552.50
B BAHAN
PC ( Portland Cement ) Kg 326.000 1,350.00 440,100.00
Pasir Beton Kg 760.000 92.86 70,571.43
Koral Kg 1,029.000 111.11 114,333.33
Air Ltr 215.000 50.00 10,750.00
Jumlah Bahan 635,754.76
Jumlah Tenaga + Bahan 842,307.26
Overhead & Profit 5% 42,115.36
Jumlah Total 884,422.63
A. 4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 Pc : 5 Ps
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.300 101,500.00 30,450.00
Tukang batu L.02 Oh 0.100 101,500.00 10,150.00
Kepala tukang L.03 Oh 0.010 101,500.00 1,015.00
Mandor L.04 Oh 0.015 101,500.00 1,522.50
Jumlah Tenaga 43,137.50
B BAHAN
Bata merah 5 x 11 x 22 cm Buah 70.000 600.00 42,000.00
Semen portland Kg 9.680 1,350.00 13,068.00
Pasir pasang m3 0.045 130,000.00 5,850.00
Jumlah Bahan 60,918.00
Jumlah Tenaga + Bahan 104,055.50
Overhead & Profit 5% 5,202.78
Jumlah Total 109,258.28
A.4.2.1.21. Pemasangan 1 m' rangka besi hollow 1x40 .40.2mm, modul 60 x 60 cm, untuk plafon
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.350 101,500.00 35,525.00
Tukang kayu L.02 Oh 0.350 101,500.00 35,525.00
Kepala tukang L.03 Oh 0.035 101,500.00 3,552.50
Mandor L.04 Oh 0.018 101,500.00 1,827.00
Jumlah Tenaga 76,429.50
B BAHAN
Rangka hollow 40.40
m' 2.000 3,666.67 7,333.33
mm
Rangka hollow 20.40
m' 2.000 2,833.33 5,666.67
mm
Assesoris ( perkuatan ) Ls 100 % x rangka 13,000.00
Jumlah Bahan 26,000.00
Jumlah Tenaga + Bahan 102,429.50
Overhead & Profit 5% 5,121.48
Jumlah Total 107,550.98
A TENAGA
Pekerja L.01 Oh 0.081 101,500.00 8,221.50
Tukang batu L.02 Oh 0.135 101,500.00 13,702.50
Kepala tukang L.03 Oh 0.014 101,500.00 1,370.25
Mandor L.04 Oh 0.004 101,500.00 406.00
. Jumlah Tenaga 23,700.25
B BAHAN
Pipa PVC 4" M' 1.200 105,500.00 126,600.00
Perlengkapan % 35.000 126,600.00 44,310.00
Jumlah Bahan 170,910.00
Jumlah Tenaga + Bahan 194,610.25
Overhead & Profit 2% 3,892.21
Jumlah Total 198,502.46
ANALISA HARGA SATUAN
PERMEN.PUPR28 - 2016
A.4.7.1.4. 1 m2 Pengecetan bidang kayu baru (1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.070 101,500.00 7,105.00
Tukang cat L.02 Oh 0.009 101,500.00 913.50
Kepala tukang L.03 Oh 0.006 101,500.00 609.00
Mandor L.04 Oh 0.003 101,500.00 253.75
. Jumlah Tenaga 8,881.25
B BAHAN
Cat meni Kg 0.200 32,000.00 6,400.00
Plamir Kg 0.150 30,000.00 4,500.00
Cat dasar Kg 0.170 60,000.00 10,200.00
Cat penutup 2x Kg 0.260 60,000.00 15,600.00
Kuas bh 0.010 15,000.00 150.00
Pengencer Kg 0.030 13,000.00 390.00
Ampelas Lbr 0.200 4,000.00 800.00
Jumlah Bahan 38,040.00
Jumlah Tenaga + Bahan 46,921.25
Overhead & Profit 5% 2,346.06
Jumlah Total 49,267.31
A.4.7.1.10. Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.020 101,500.00 2,030.00
Tukang cat L.02 Oh 0.063 101,500.00 6,394.50
Kepala tukang L.03 Oh 0.006 101,500.00 639.45
Mandor L.04 Oh 0.003 101,500.00 253.75
. Jumlah Tenaga 9,317.70
B BAHAN
Plamir Kg 0.100 6,000.00 600.00
Cat dasar Kg 0.100 23,000.00 2,300.00
Cat penutup Kg 0.260 23,000.00 5,980.00
Jumlah Bahan 8,880.00
Jumlah Tenaga + Bahan 18,197.70
Overhead & Profit 5% 909.89
Jumlah Total 19,107.59
ANALISA HARGA SATUAN
PERMEN.PUPR28 - 2016
A.4.7.1.11. Pengecatan 1 m2 tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien
( Rp ) ( Rp )
A TENAGA
Pekerja L.01 Oh 0.028 101,500.00 2,842.00
Tukang cat L.02 Oh 0.042 101,500.00 4,263.00
Kepala tukang L.03 Oh 0.004 101,500.00 426.30
Mandor L.04 Oh 0.003 101,500.00 304.50
. Jumlah Tenaga 7,835.80
B BAHAN
Cat dasar Kg 0.120 23,000.00 2,760.00
Cat penutup Kg 0.180 23,000.00 4,140.00
Jumlah Bahan 6,900.00
Jumlah Tenaga + Bahan 14,735.80
Overhead & Profit 5% 736.79
Jumlah Total 15,472.59
ANALISA HARGA SATUAN
PERMEN.PUPR28 - 2016
Tenaga:
22.01.01.01.01 Mandor 0.0083 O.H 101,500.00 845.83
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.2500 O.H Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.01.02.20 1 m³ Pekerjaan Pengurugan Pasir Urug SNI 2835 : 2008 (6.11)
Tenaga:
22.01.01.01.01 Mandor 0.0100 O.H 101,500.00 1,015.00
22.01.01.03.01 Pekerja/Buruh Terampil 0.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.06.03 Pasir Urug 1.2000 m³ 125,000.00 150,000.00
Jumlah: 150,000.00
Nilai HSPK : Err:509
23.01.02.21 1 m³ Pengurugan Tanah urug Padat untuk SNI 2835 : 2008 (6.15)
Peninggian Lantai Bangunan
Tenaga:
22.01.01.01.01 Mandor 0.0250 O.H 101,500.00 2,537.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.2500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.07.01 Tanah urug 1.2000 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.02.01.05 1 m³ Pekerjaan Pasangan Pondasi Batu Belah SNI 2836 : 2008 (6.2)
15/20 cm, Campuran (1 Pc : 4 PP)
Tenaga:
22.01.01.01.01 Mandor 0.0750 O.H 101,500.00 7,612.50
22.01.01.01.05 Kepala Tukang Batu 0.0750 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.7500 O.H 101,500.00 76,125.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 1.5000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 163.0000 kg 1,350.00 220,050.00
20.01.01.06.02 Pasir Pasang 0.5200 m³ 130,000.00 67,600.00
20.01.01.08.01.06 Batu Kali Pecah 15/20 cm 1.1000 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.14 1 m³ Pekerjaan Pembuatan Beton Tumbuk 1 SNI 03-2836-2002 Analisa Biaya Konstruksi
PC : 2 Psr : 3 Kr Bangunan Gedung dan Perumahan Pek. Beton
Tenaga: (6.5)
22.01.01.01.01 Mandor 0.0800 O.H 101,500.00 8,120.00
22.01.01.01.05 Kepala Tukang Batu 0.0250 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.2500 O.H 101,500.00 25,375.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 1.6500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 232.0000 kg 1,350.00 313,200.00
20.01.01.06.01 Pasir Beton 0.5200 m³ 130,000.00 67,600.00
20.01.01.08.03.03 Koral Beton 0.7800 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.27 1 m³ Membuat Pondasi Beton Bertulang (150 SNI 7394 : 2008 (6.28)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.2650 O.H 101,500.00 26,897.50
22.01.01.01.05 Kepala Tukang Batu 0.2620 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 1.0500 O.H 101,500.00 106,575.00
22.01.01.02.02 Tukang Kayu 1.3000 O.H 101,500.00 131,950.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 5.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.16.01.08 Besi Beton Polos 157.5000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 2.2500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.28 1 m³ Membuat Sloof Beton Bertulang (150 SNI 7394 : 2008 (6.29)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.2830 O.H 101,500.00 28,724.50
22.01.01.01.05 Kepala Tukang Batu 0.3230 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 1.4000 O.H 101,500.00 142,100.00
22.01.01.02.02 Tukang Kayu 1.5600 O.H 101,500.00 158,340.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 5.6500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.2700 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 2.0000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 0.6000 liter 9,000.00 5,400.00
20.01.01.16.01.08 Besi Beton Polos 157.5000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 2.2500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.29 1 m³ Membuat Kolom Beton Bertulang (200 SNI 7394 : 2008 (6.30)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.3530 O.H 101,500.00 35,829.50
22.01.01.01.05 Kepala Tukang Batu 0.4030 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 2.1000 O.H 101,500.00 213,150.00
22.01.01.02.02 Tukang Kayu 1.6500 O.H 101,500.00 167,475.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 7.0500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.4000 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 4.0000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 2.0000 liter 9,000.00 18,000.00
20.01.01.16.01.08 Besi Beton Polos 210.0000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 3.0000 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
20.01.01.67.40 Kayu Sengon Balok 0.1500 m³ Err:509 Err:509
20.01.01.68.04.01 Multipleks 6 mm 3.5000 Lembar Err:509 Err:509
20.01.01.67.55 Dolken Kayu Gelam dia 8-10 cm, pjg 4 m 20.0000 Batang Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.29 1 m³ Membuat Kolom Beton Bertulang (150 SNI 7394 : 2008 (6.30)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.3530 O.H 101,500.00 35,829.50
22.01.01.01.05 Kepala Tukang Batu 0.4030 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 2.1000 O.H 101,500.00 213,150.00
22.01.01.02.02 Tukang Kayu 1.6500 O.H 101,500.00 167,475.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 7.0500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.4000 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 4.0000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 2.0000 liter 9,000.00 18,000.00
20.01.01.16.01.08 Besi Beton Polos 157.5000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 2.2500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
20.01.01.67.40 Kayu Sengon Balok 0.1500 m³ Err:509 Err:509
20.01.01.68.04.01 Multipleks 6 mm 3.5000 Lembar Err:509 Err:509
20.01.01.67.55 Dolken Kayu Gelam dia 8-10 cm, pjg 4 m 20.0000 Batang Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.30 1 m³ Membuat Balok Beton Bertulang (150 SNI 7394 : 2008 (6.31)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.3180 O.H 101,500.00 32,277.00
22.01.01.01.05 Kepala Tukang Batu 0.3330 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 1.4000 O.H 101,500.00 142,100.00
22.01.01.02.02 Tukang Kayu 1.6500 O.H 101,500.00 167,475.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 6.3500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.3200 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 3.2000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 1.6000 liter 9,000.00 14,400.00
20.01.01.16.01.08 Besi Beton Polos 157.5000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 2.2500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
20.01.01.67.40 Kayu Sengon Balok 0.1400 m³ Err:509 Err:509
20.01.01.68.04.01 Multipleks 6 mm 2.8000 Lembar Err:509 Err:509
20.01.01.67.55 Dolken Kayu Gelam dia 8-10 cm, pjg 4 m 16.0000 Batang Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.30 1 m³ Membuat Balok Beton Bertulang (200 SNI 7394 : 2008 (6.31)
Kg Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.3180 O.H 101,500.00 32,277.00
22.01.01.01.05 Kepala Tukang Batu 0.3330 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 1.4000 O.H 101,500.00 142,100.00
22.01.01.02.02 Tukang Kayu 1.6500 O.H 101,500.00 167,475.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 6.3500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.3200 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 3.2000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 1.6000 liter 9,000.00 14,400.00
20.01.01.16.01.08 Besi Beton Polos 210.0000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 3.0000 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
20.01.01.67.40 Kayu Sengon Balok 0.1400 m³ Err:509 Err:509
20.01.01.68.04.01 Multipleks 6 mm 2.8000 Lembar Err:509 Err:509
20.01.01.67.55 Dolken Kayu Gelam dia 8-10 cm, pjg 4 m 16.0000 Batang Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.31 1 m³ Membuat Plat Beton Bertulang (150 Kg SNI 7394 : 2008 (6.32)
Besi+Bekesting)
Tenaga:
22.01.01.01.01 Mandor 0.2650 O.H 101,500.00 26,897.50
22.01.01.01.05 Kepala Tukang Batu 0.2650 O.H Err:509 Err:509
22.01.01.02.07 Tukang Besi 1.0500 O.H 101,500.00 106,575.00
22.01.01.02.02 Tukang Kayu 1.3000 O.H 101,500.00 131,950.00
22.01.01.02.04 Tukang Batu 0.2750 O.H 101,500.00 27,912.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 5.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.3200 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 3.2000 Kg Err:509 Err:509
20.02.01.07.07 Minyak Bekesting (Solar) 1.6000 liter 9,000.00 14,400.00
20.01.01.16.01.08 Besi Beton Polos 157.5000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 2.2500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 336.0000 kg 1,350.00 453,600.00
20.01.01.06.01 Pasir Beton 0.5400 m³ 130,000.00 70,200.00
20.01.01.08.03.03 Kerikil 0.8100 m³ Err:509 Err:509
20.01.01.67.40 Kayu Sengon Balok 0.1200 m³ Err:509 Err:509
20.01.01.68.04.01 Multipleks 6 mm 2.8000 Lembar Err:509 Err:509
20.01.01.67.55 Dolken Kayu Gelam dia 8-10 cm, pjg 4 m 32.0000 Batang Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.01.36 1 m' Membuat Ring Balok Beton Bertulang (10 x 15) cm SNI 7394 : 2008 (6.36)
Tenaga:
22.01.01.01.01 Mandor 0.0150 O.H 101,500.00 1,522.50
22.01.01.01.05 Kepala Tukang Batu 0.0100 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0330 O.H 101,500.00 3,349.50
22.01.01.02.04 Tukang Batu 0.0330 O.H 101,500.00 3,349.50
22.01.01.02.07 Tukang Besi 0.0330 O.H 101,500.00 3,349.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.2970 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.51 Kayu Bekesting Sengon 0.0030 m³ Err:509 Err:509
20.01.01.40.22 Paku Biasa 2" - 5" 0.0200 Kg Err:509 Err:509
20.01.01.16.01.08 Besi Beton Polos 3.6000 Kg Err:509 Err:509
20.01.01.66.04.05 Kawat Beton 0.0500 Kg Err:509 Err:509
20.01.01.02.01 Semen Portland 5.5000 kg 1,350.00 7,425.00
20.01.01.06.01 Pasir Beton 0.0090 m³ 130,000.00 1,170.00
20.01.01.08.03.03 Kerikil 0.0150 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.04.01.04 1 m² Pekerjaan Pemasangan Batu Merah SNI 6897 : 2008 (6.10)
Tebal 1/2 Bata (1 Pc : 3 Ps)
Tenaga:
22.01.01.01.01 Mandor 0.0150 O.H 101,500.00 1,522.50
22.01.01.01.05 Kepala Tukang Batu 0.0100 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.1000 O.H 101,500.00 10,150.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 14.3700 kg 1,350.00 19,399.50
20.01.01.06.02 Pasir Pasang 0.0400 m³ 130,000.00 5,200.00
20.01.01.08.05.01 Bata Merah uk.5 x 11 x 22 70.0000 buah 600.00 42,000.00
Jumlah: 66,599.50
Nilai HSPK : Err:509
23.04.01.10 1 m² Pekerjaan Pemasangan Batu Merah SNI 6897 : 2008 (6.11)
Tebal 1/2 Bata (1 Pc : 6 Ps)
Tenaga:
22.01.01.01.01 Mandor 0.0150 O.H 101,500.00 1,522.50
22.01.01.01.05 Kepala Tukang Batu 0.0100 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.1000 O.H 101,500.00 10,150.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 8.3200 kg 1,350.00 11,232.00
20.01.01.06.02 Pasir Pasang 0.0490 m³ 130,000.00 6,370.00
20.01.01.08.05.01 Bata Merah uk.5 x 11 x 22 70.0000 buah 600.00 42,000.00
Jumlah: 59,602.00
Nilai HSPK : Err:509
23.04.02.03 1 m² Pekerjaan Plesteran 1 Pc : 3 Ps Tebal 15 mm SNI 2837 : 2008 (6.3)
Tenaga:
22.01.01.01.01 Mandor 0.0150 O.H 101,500.00 1,522.50
22.01.01.01.05 Kepala Tukang Batu 0.0150 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.1500 O.H 101,500.00 15,225.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 7.7760 kg 1,350.00 10,497.60
20.01.01.06.02 Pasir Pasang 0.0230 m³ 130,000.00 2,990.00
Jumlah: 13,487.60
Nilai HSPK : Err:509
23.04.02.06 1 m² Pekerjaan Plesteran 1 Pc : 6 Ps Tebal 15 mm SNI 2837 : 2008 (6.6)
Tenaga:
22.01.01.01.01 Mandor 0.0150 O.H 101,500.00 1,522.50
22.01.01.01.05 Kepala Tukang Batu 0.0150 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.1500 O.H 101,500.00 15,225.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.3000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland 4.4160 kg 1,350.00 5,961.60
20.01.01.06.02 Pasir Pasang 0.0270 m³ 130,000.00 3,510.00
Jumlah: 9,471.60
Nilai HSPK : Err:509
23.05.01.06 1 m² Pekerjaan Pasangan Lantai Keramik SNI 7395 : 2008
Motif Uk.40x40 cm
Tenaga:
22.01.01.01.01 Mandor 0.0350 O.H 101,500.00 3,552.50
22.01.01.01.05 Kepala Tukang Batu 0.0350 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.3500 O.H 101,500.00 35,525.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.7000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland (40 kg) 9.8000 kg 1,350.00 13,230.00
20.01.01.03.04 Semen Warna 1.3000 Kg 14,000.00 18,200.00
20.01.01.06.02 Pasir Pasang 0.0450 m³ 130,000.00 5,850.00
20.01.01.32.01.09 Keramik Motif 40x40 cm 1.0608 m2 Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.05.01.13 1 m² Pekerjaan Pasangan Dinding Keramik SNI 7395 : 2008
Motif Uk.20x25 cm
Tenaga:
22.01.01.01.01 Mandor 0.0450 O.H 101,500.00 4,567.50
22.01.01.01.05 Kepala Tukang Batu 0.0450 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.4500 O.H 101,500.00 45,675.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.9000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland (40 kg) 9.3000 kg 1,350.00 12,555.00
20.01.01.03.04 Semen Warna 1.9400 Kg 14,000.00 27,160.00
20.01.01.06.02 Pasir Pasang 0.0180 m³ 130,000.00 2,340.00
20.01.01.32.03.01 Dinding Keramik 20x25 cm (Motif) 1.0750 m2 Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.05.01.14 1 m² Pekerjaan Pasangan Dinding Keramik SNI 7395 : 2008 (6.54)
Motif Uk.20x20 cm
Tenaga:
22.01.01.01.01 Mandor 0.0450 O.H 101,500.00 4,567.50
22.01.01.01.05 Kepala Tukang Batu 0.0450 O.H Err:509 Err:509
22.01.01.02.04 Tukang Batu 0.4500 O.H 101,500.00 45,675.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.9000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland (40 kg) 9.3000 kg 1,350.00 12,555.00
20.01.01.03.04 Semen Warna 1.9400 Kg 14,000.00 27,160.00
20.01.01.06.02 Pasir Pasang 0.0180 m³ 130,000.00 2,340.00
20.01.01.32.01.07 Dinding Keramik 20x20 cm (Motif) 1.0600 m2 Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.01 1 kg Ongkos Kerja Pabrikasi dan an. HSPK PROP JATIM 2005 A III.16.001
Pemasangan Baja (Elektrode 20%)
Tenaga:
22.01.01.02.07 Tukang Besi 0.0600 O.H 101,500.00 6,090.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.0800 O.H Err:509 Err:509
Jumlah: Err:509
Peralatan:
21.02.01.01.05.83 Sewa Welding Set (min 5 jam) 0.0700 jam Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.02 1 kg Pekerjaan Besi Plat an. HSPK PROP JATIM 2005 A III.16.003
Bahan:
20.01.01.14.09 Besi Plat Bordes 1.1000 Kg Err:509 Err:509
20.01.01.22.02.02 Elektroda Baja (20%) 0.0200 Kg Err:509 Err:509
Jumlah: Err:509
Upah:
23.03.02.01 Ongkos Kerja Pabrikasi dan Pemasangan Baja 1.0000 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.05 1 kg Pekerjaan Besi Baja Profil WF an. HSPK PROP JATIM 2005 A III.16.006
Bahan:
20.01.01.16.03.08 Besi Profil WF < 200 mm 1.1000 Kg Err:509 Err:509
20.01.01.22.02.02 Elektroda Baja (20%) 0.0200 Kg Err:509 Err:509
Jumlah: Err:509
Upah:
23.03.02.01 Ongkos Kerja Pabrikasi dan Pemasangan Baja 1.0000 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.07 1 kg Pekerjaan Besi Baja an. HSPK PROP JATIM 2005 A III.16.008
Kanal C
Bahan:
20.01.01.16.11.01 Besi Profil C 100 mm s/d 150 mm 1.1000 Kg Err:509 Err:509
20.01.01.22.02.02 Elektroda Baja (20%) 0.0200 Kg Err:509 Err:509
Jumlah: Err:509
Upah:
23.03.02.01 Ongkos Kerja Pabrikasi dan Pemasangan Baja 1.0000 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.08 1 kg pekerjaan pas. Mur + baut kuda kuda an. HSPK PROP JATIM 2005 A III.16.008
Bahan:
20.01.01.14.07 Mur + baut 1.1000 Kg Err:509 Err:509
20.01.01.22.02.02 Meni besi 0.0800 Kg Err:509 Err:509
Jumlah: Err:509
Upah:
23.03.02.01 Ongkos Kerja Pabrikasi dan Pemasangan Baja 1.0000 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.03.02.08 1 kg pekerjaan pas. Ikatan kuda kuda an. HSPK PROP JATIM 2005 A III.16.008
Bahan:
23.03.02.08 Besi bulat 1.1000 Kg Err:509 Err:509
20.01.01.22.02.02 Meni besi 0.0800 Kg Err:509 Err:509
Jumlah: Err:509
Upah:
23.03.02.01 Ongkos Kerja Pabrikasi dan Pemasangan Baja 1.0000 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.30 1 m' Pekerjaan Pasang Listplank SNI 3434 : 2008 (6.21)
(Kalsiplank)
Tenaga:
22.01.01.01.01 Mandor 0.0050 O.H 101,500.00 507.50
22.01.01.01.03 Kepala Tukang Kayu 0.0200 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.2000 O.H 101,500.00 20,300.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.1000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.67.01 Kalsiplank 1/30 cm 1.0000 m' Err:509 Err:509
20.01.01.40.22 Paku Biasa 0.1000 Kg 19,000.00 1,900.00
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.02 1 m² Pekerjaan Pasang Atap Genteng Kodok SNI 03-3434-2002 Analisa Biaya Konstruksi
ex. Trenggalek Bangunan Gedung dan Perumahan Pek.
Tenaga: Penutup Atap (6.2)
22.01.01.01.01 Mandor 0.0080 O.H 101,500.00 812.00
22.01.01.01.03 Kepala Tukang Kayu 0.0080 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0750 O.H 101,500.00 7,612.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.1500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.17.06.03 Genteng Kodok ex. Trenggalek 25.0000 Buah Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.02 1 m² Pekerjaan Pasang Atap Genteng lama SNI 03-3434-2002 Analisa Biaya Konstruksi
Tenaga: Bangunan Gedung dan Perumahan Pek.
22.01.01.01.01 Mandor 0.0080 O.H 101,500.00 812.00
22.01.01.01.03 Kepala Tukang Kayu 0.0080 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0750 O.H 101,500.00 7,612.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.1500 O.H Err:509 Err:509
Jumlah: Err:509
23.06.02.22 1 m' Pekerjaan Pasang Genteng Wuwung SNI 03-3436-2002 Analisa Biaya Konstruksi
Palentong Lokal Bangunan Gedung dan Perumahan Pek.
Tenaga: Penutup Atap (6.4)
22.01.01.01.01 Mandor 0.0020 O.H 101,500.00 203.00
22.01.01.01.03 Kepala Tukang Kayu 0.0200 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.2000 O.H 101,500.00 20,300.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.4000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.02.01 Semen Portland (40 Kg) 8.0000 kg 1,350.00 10,800.00
20.01.01.06.02 Pasir Pasang 0.0320 m³ 220,000.00 7,040.00
20.01.01.17.01.04 Genteng Wuwung Palentong Lokal 5.0000 Buah Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.28 1 m' Pekerjaan Pasang Talang Miring Seng SNI 2002 Analisa Biaya Konstruksi Bangunan
BJLS 28 Gedung dan Perumahan Pek. Besi dan
Tenaga: Alluminium (6.19)
22.01.01.01.01 Mandor 0.0013 O.H 101,500.00 126.88
22.01.01.01.03 Kepala Tukang Kayu 0.0250 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.4000 O.H 101,500.00 40,600.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.1500 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.13.02.08 Seng Plat 3" x 6" BJLS 28 0.5000 Lembar Err:509 Err:509
20.01.01.40.22 Paku Biasa 0.0150 Kg 19,000.00 285.00
20.01.01.67.47 Kayu Borneo Papan 0.0096 m³ Err:509 Err:509
20.01.01.11.01.06 Meni Besi 0.2500 m³ Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.14 1 m² Pekerjaan Pasang Atap Asbes SNI 03-3436-2002 Analisa Biaya Konstruksi
Gelombang Tebal 4 mm (2,1 x 1,05) Bangunan Gedung dan Perumahan Pek.
Tenaga: Penutup Atap (6.15)
22.01.01.01.01 Mandor 0.0070 O.H 101,500.00 710.50
22.01.01.01.03 Kepala Tukang Kayu 0.0070 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0670 O.H 101,500.00 6,800.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.1400 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.21.02.04 Asbes Gelombang Tb.4 mm 0.5100 Lembar Err:509 Err:509
(2.10 x 1.05)
20.01.01.40.11 Paku Pancing 60x230 0.1200 kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.02.20 1 m' Pekerjaan Pasang Nok Asbes SNI 03-3436-2002 Analisa Biaya Konstruksi
Gelombang 4 m Bangunan Gedung dan Perumahan Pek.
Tenaga: Penutup Atap (6.23)
22.01.01.01.01 Mandor 0.0040 O.H 101,500.00 406.00
22.01.01.01.03 Kepala Tukang Kayu 0.0130 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.1250 O.H 101,500.00 12,687.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.0840 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.17.07.06 Nok Asbes Gelombang 2.1000 Stel Err:509 Err:509
20.01.01.40.16 Paku Skrup 6.0000 Buah Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
01.06.03.03 1 m² Pemasangan Plafon Gypsum board an. LPPM UNAIR
tebal 9 mm + Rangka Besi Hollow
Tenaga:
22.01.01.01.01 Mandor 0.0050 O.H 101,500.00 507.50
22.01.01.01.03 Kepala Tukang Kayu 0.0050 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0500 O.H 101,500.00 5,075.00
22.01.01.03.01 Pekerja Terampil 0.1000 O.H Err:509 Err:509
Jumlah: Err:509
Bahan:
20.01.01.15.04.01 Hollow 4/4 Zincromate 0.4150 btg Err:509 Err:509
20.01.01.15.04.02 Hollow 2/4 Zincromate 0.1500 btg Err:509 Err:509
20.01.01.57.03 Gypsumboard Uk.240 x 120 x 9 mm 0.3640 Lembar Err:509 Err:509
20.01.01.40.20 Paku gypsum 0.1100 kg Err:509 Err:509
20.01.01.39.01 Ramset / dina bolt 4.0000 bh Err:509 Err:509
20.08.01.28.04 Cotton plaster 0.0720 bh Err:509 Err:509
20.01.01.11.04.19 Coumpound 0.1250 Buah Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.06.03.20 1 m' Pekerjaan List Langit - Langit Gypsum SNI 2839 : 2008 (6.8)
Tenaga:
22.01.01.01.01 Mandor 0.0030 O.H 101,500.00 304.50
22.01.01.01.03 Kepala Tukang Kayu 0.0060 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0600 O.H 101,500.00 6,090.00
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.0600 O.H 45,000.00 2,700.00
Jumlah: Err:509
Bahan:
20.01.01.57.01 List Gypsum 1.0500 m' Err:509 Err:509
20.01.01.11.04.20 Tepung Gypsum 0.1500 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.07.01.03 1 m' Pekerjaan Kusen Pintu Alluminium SNI 7393 : 2008 (6.11)
Tenaga:
22.01.01.01.01 Mandor 0.0021 O.H 101,500.00 213.15
22.01.01.01.03 Kepala Tukang Kayu 0.0043 O.H Err:509 Err:509
22.01.01.02.02 Tukang Kayu 0.0430 O.H 101,500.00 4,364.50
22.01.01.03.03 Pekerja/Buruh Tak Terampil 0.0430 O.H 45,000.00 1,935.00
Jumlah: Err:509
Bahan:
20.01.01.19.04 Profil Alluminium (coklat) 1.1000 m Err:509 Err:509
20.01.01.40.16 Skrup Fixer 2.0000 Buah Err:509 Err:509
20.01.01.34.03 Sealant 0.0600 Tube Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.07.05.05 1 m² Pekerjaan Pengecatan Bidang Kayu SNI 2002 Analisa Biaya Konstruksi Bangunan
Baru (1 Lapis Plamir), 1 Lapis Cat Dasar 2 Gedung dan Perumahan Pek. Pengecatan (6.8)
Lapis Cat Penutup
Tenaga:
22.01.01.01.01 Mandor 0.0025 O.H 101,500.00 253.75
22.01.01.01.04 Kepala Tukang Cat 0.0060 O.H Err:509 Err:509
22.01.01.02.03 Tukang Cat 0.0090 O.H 101,500.00 913.50
22.01.01.03.01 Pekerja Terampil 0.0700 O.H 45,000.00 3,150.00
Jumlah: Err:509
Bahan:
20.01.01.11.01.06 Cat Meni Kayu 0.2000 Kg Err:509 Err:509
20.01.01.11.02.09 Plamur Kayu 0.1500 Kg Err:509 Err:509
20.01.01.11.02.11 Cat Kayu Dasar 0.1700 Kg Err:509 Err:509
20.01.01.11.02.11 Cat Kayu Penutup 2 Kali 0.2600 Kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
23.07.05.11 1 m² Pekerjaan Pengecatan Tembok Baru 2 PT. T.38-2000-C
Lapis Interior
Tenaga:
22.01.01.01.01 Mandor 0.0025 O.H 101,500.00 253.75
22.01.01.01.04 Kepala Tukang Cat 0.0063 O.H Err:509 Err:509
22.01.01.02.03 Tukang Cat 0.0630 O.H 101,500.00 6,394.50
22.01.01.03.01 Pekerja terampil 0.0200 O.H 45,000.00 900.00
Jumlah: Err:509
Bahan:
20.01.01.11.03.05 Plamur Tembok 0.1000 Kg Err:509 Err:509
20.01.01.11.03.07 Cat Tembok Dasar setara Ducholite 0.1000 Kg Err:509 Err:509
20.01.01.11.03.07 Cat Tembok Penutup setara Ducholite 0.2600 kg Err:509 Err:509
Jumlah: Err:509
Nilai HSPK : Err:509
No. Jenis Bahan Satuan Harga Satuan
A Bahan Pasir
1 Pasir Urug m3 125,000.00
2 Pasir Pasang m3 130,000.00
3 Pasir Beton m3 220,000.00
4 Tanah urug m3 67,000.00
B Bahan Batu
1 Kerikil Beton (batu 2/3 pecah mesin) m3 150,000.00
2 Batu Bata merah ( kelas I ) bj 600.00
C Bahan Semen
1 Semen PC 40 kg zak 54,000.00
2 Semen PC kg 1,350.00
3 Semen warna kg 14,000.00
D Bahan Kayu
1 Kayu Meranti Balok m3 3,000,000.00
2 Kayu sengon begesting m3 3,000,000.00
3 Plywood 122 x 244 x 9 mm lbr 115,000.00
4 Dolken kayu galam ¢ 8-10 / 400 cm bt 10,000.00
E Bahan Besi
1 Besi Beton Polos Kg 10,000.00
2 Besi WF , Chanal C Kg 14,000.00
3 Kawat beton kg 17,000.00
4 Paku reng kg 19,000.00
5 Paku eternit kg 19,000.00
6 Paku kait kg 19,000.00
7 C-80 1,00 mm btg 98,000.00
8 C-75 0,75 mm btg 83,000.00
9 Reng 0,45 mm btg 43,000.00
10 Dynabolt bh 1,400.00
11 Baut (Screw Driver) Bh 100.00
12 Angker baut Ø 16 (pjg 300 mm) bh 50,000.00
13 Baut HTB baja ∅ 16 x 8 cm btg 10,000.00
14 Hollow 4/4 Zincromate btg 22,000.00
15 Hollow 2/4 Zincromate btg 17,000.00
16 Seng plat 3" x 6" bjls 28 lbr 40,000.00
17 Kusen Almunium 4/10 ( Dark Brown ) m' 50,000.00
18 Frame aluminium lebar 8 cm ( Dark Brown ) m' 30,000.00
19 List U Aluminium Profil m' 5,000.00
20 Sekrup fixer bh 200.00
21 Sealant tube 40,000.00
22 Pintu Harmonika m2 500,000.00
F Bahan Penutup
1 Atap Genteng Kodok bh 3,500.00
2 Bubungan Tengah bh 15,000.00
3 Kalsiplank 1/30 m' 34,000.00
4 Gypsumboard 120/240/9mm lbr 90,000.00
5 Penutup Atap Spandex Lebar 72 cm, tbl. 0,3 mm m' 52,000.00
No. Jenis Bahan Satuan Harga Satuan
G Bahan Lantai
1 Keramik lantai 30 x 30 cm m2 35,000.00
2 Keramik lantai 40 x 40 cm m2 40,000.00
3 Granit Lantai Polos 60x60 m2 120,000.00
4 Keramik Dinding 20 x 25 cm m2 40,000.00
5 Plint/ List keramik 9,5x30cm bh 8,000.00
6 Plint Keramik 7 x 20 cm bh 4,000.00
7 Paving stone tbl 6 cm K-300 m2 42,000.00
8 Kanstin 10.20.40 cm K-300 m' 15,000.00
9 Uskup / stopper bh 6,000.00
J Bahan Cat
1 Plamur tembok kg 6,000.00
2 Plamur kayu kg 30,000.00
3 Cat kayu / besi EMCO/setara kg 60,000.00
4 Cat Tembok kg 23,000.00
5 Cat meni besi "PEDANG" kg 32,000.00
6 Kuas bh 15,000.00
7 Pengencer kg 13,000.00
8 Ampelas lbr 4,000.00
L Bahan Kaca
No. Jenis Bahan Satuan Harga Satuan
1 Kaca tbl. 5 mm m2 90,000.00
Kegiatan #REF!
Pekerjaan #REF!
Lokasi #REF!
I PEKERJAAN PENDAHULUAN
1 #REF! 1.00 ls
2 #REF! 1.00 ls
5 #REF!
#REF! ### 0.20 x 0.20 x 40.08 = 1.60 m3
#REF! ### 0.20 x 0.30 x 37.80 = 2.27 m3
#REF! ### 0.20 x 0.35 x 12.00 = 0.84 m3
#REF! ### 0.15 x 0.15 x 10.57 = 0.24 m3
#REF! ### 0.15 x 0.20 x 83.03 = 2.49 m3
#REF! ### 0.15 x 0.25 x 100.35 = 3.76 m3
7 #REF!
0.10 x 2.05 x 26.02 = 5.33
0.10 x 2.05 x 6.20 = 1.27
0.10 x 2.68 x 6.17 = 1.65
8.26 = 8.26 m3
8 #REF! 0.07 x 0.60 x 26.48 = 1.11 m3
9 #REF!
R. Pelayanan masyarakat 0.05 x 9.90 x 5.85 = 2.90
0.05 x 5.90 x 5.00 = 1.48
R. Pertemuan 0.05 x 10.85 x 10.85 = 5.89
R. Kerja lurah 0.05 x 4.85 x 3.85 = 0.93
R. Kerja staff 1 0.05 x 4.60 x 4.25 = 0.98
R. Kerja staff 2 0.05 x 2.85 x 5.88 = 0.84
R. Kerja staff 3 0.05 x 3.45 x 3.85 = 0.66
R. Kerja staff 4 0.05 x 2.40 x 3.85 = 0.46
R. Tamu 0.05 x 3.35 x 4.85 = 0.81
0.05 x 6.15 x 1.85 = 0.57
0.05 x 1.35 x 4.85 = 0.33
0.05 x 2.00 x 3.85 = 0.39
R. Tidur 1 0.05 x 2.85 x 2.85 = 0.41
R. Tidur 2 0.05 x 2.85 x 2.85 = 0.41
Teras depan 0.05 x 1.92 x 21.68 = 2.08
0.05 x 2.00 x 6.35 = 0.64
0.05 x 2.83 x 1.80 = 0.25
20.01 20.01 m3
VII #REF!
1 #REF! = 12.00 bh
2 #REF! = 1.00 set
3 #REF! = 24.00 bh
4 #REF! = 48.00 bh
5 #REF! = 12.00 bh
6 #REF! = 24.00 bh
7 #REF! = 48.00 bh
IX PEKERJAAN PLAFOND
1 #REF!
R. Pelayanan masyarakat 9.90 x 5.85 = 57.92
5.90 x 5.00 = 29.50
R. Pertemuan 10.85 x 10.85 = 117.72
R. Kerja lurah 4.85 x 3.85 = 18.67
R. Kerja staff 1 4.60 x 4.25 = 19.55
R. Kerja staff 2 2.85 x 5.88 = 16.76
R. Kerja staff 3 3.45 x 3.85 = 13.28
R. Kerja staff 4 2.40 x 3.85 = 9.24
R. Tamu 3.35 x 4.85 = 16.25
6.15 x 1.85 = 11.38
1.35 x 4.85 = 6.55
2.00 x 3.85 = 7.70
R. Tidur 1 2.85 x 2.85 = 8.12
R. Tidur 2 2.85 x 2.85 = 8.12
Teras depan 1.92 x 21.68 = 41.63
2.00 x 6.35 = 12.70
2.83 x 1.80 = 5.09
Teras Belakang 1.88 x 11.55 = 21.71
1.90 x 4.26 = 8.09
km/wc 1.85 x 1.85 = 3.42
induk samping kanan kiri 0.80 x 25.20 = 20.16
induk depan belakang 0.80 x 55.20 = 44.16
497.73 = 497.73 m2
3 Pas. List gypsum 20 cm
R. Pelayanan masyarakat 41.50 x 1.00 = 41.50
R. Pertemuan 43.40 x 1.00 = 43.40
R. Kerja lurah 17.40 x 1.00 = 17.40
R. Kerja staff 1 17.70 x 1.00 = 17.70
R. Kerja staff 2 17.44 x 1.00 = 17.44
137.44 = 137.44 m'
X PEKERJAAN PENGECATAN
1 Pengecatan dinding 104.00 x 3.50 = 364.00 x 2.00 = 728.00 = 347.93 m2
173.96 x 2.00 = 347.93
1,075.93 = 1,075.93 m2
2 Pengecatan plafond = 497.73 m2
3 Pengecatan kayu 80.40 x 0.60 = 48.24 m2
4 Pengecatan genteng = 441.60 m2
XI PEKERJAAN SANITASI
1 Pas. Instalasi air hujan pipa PVC Class D 2" 3.70 x 9.00 = 33.30
2.57 x 6.00 = 15.42
48.72 = 48.72 m'
SLOOF S1 15/20 cm
Lebar : 15 cm
Tinggi : 20 cm
Panjang : 33.3 m
Ø Tulangan utama : 10 mm
Jumlah tulangan utama : 6 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 33.3 m
Panjang = 33.3 x 6
= 200.0 m
= 123.3 kg
c. Besi beugel
= 3333.3 : 15
= 222 buah
= 0.6 m
= 122.2 m
= 122.2 x 0.39
= 48.2 kg
= 171.6 kg
BALOK LATEI 15/20 cm
Lebar : 15 cm
Tinggi : 20 cm
Panjang : 33.3 m
Ø Tulangan utama : 10 mm
Jumlah tulangan utama : 6 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 33.3 m
Panjang = 33.3 x 6
= 200.0 m
= 123.3 kg
c. Besi beugel
= 3333.3 : 15
= 222 buah
= 0.6 m
= 122.2 m
= 122.2 x 0.39
= 48.2 kg
= 171.6 kg
BALOK RING 15/25 cm
Lebar : 15 cm
Tinggi : 25 cm
Panjang : 26.7 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 6 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 26.7 m
Panjang = 26.7 x 6
= 160.0 m
= 142.1 kg
c. Besi beugel
= 2666.7 : 15
= 178 buah
= 0.7 m
= 115.6 m
= 115.6 x 0.39
= 45.6 kg
= 187.7 kg
BALOK B1 20/30 cm
Lebar : 20 cm
Tinggi : 30 cm
Panjang : 16.7 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 8 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 16.7 m
Panjang = 16.7 x 8
= 133.3 m
= 118.4 kg
c. Besi beugel
= 1666.7 : 15
= 111 buah
= 0.9 m
= 94.4 m
= 94.4 x 0.39
= 37.3 kg
= 155.7 kg
BALOK B2 20/40 cm
Lebar : 20 cm
Tinggi : 40 cm
Panjang : 12.5 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 10 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 12.5 m
Panjang = 12.5 x 10
= 125.0 m
= 111.0 kg
c. Besi beugel
= 1250.0 : 15
= 83 buah
= 1.1 m
= 87.5 m
= 87.5 x 0.39
= 34.5 kg
= 145.5 kg
BALOK B3 20/45 cm
Lebar : 20 cm
Tinggi : 45 cm
Panjang : 11.1 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 10 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 11.1 m
Panjang = 11.1 x 10
= 111.1 m
= 98.7 kg
c. Besi beugel
= 1111.1 : 15
= 74 buah
= 1.2 m
= 85.2 m
= 85.2 x 0.39
= 33.6 kg
= 132.3 kg
BALOK B4 15/25 cm
Lebar : 15 cm
Tinggi : 25 cm
Panjang : 26.7 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 6 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 26.7 m
Panjang = 26.7 x 6
= 160.0 m
= 142.1 kg
c. Besi beugel
= 2666.7 : 15
= 178 buah
= 0.7 m
= 115.6 m
= 115.6 x 0.39
= 45.6 kg
= 187.7 kg
KOLOM K1 20/20 cm
Lebar : 20 cm
Tinggi : 20 cm
Panjang : 25.0 m
Ø Tulangan utama : 12 mm
Jumlah tulangan utama : 8 buah
Ø Tulangan beugel : 8 mm
Jarak tulangan beugel : 15 cm
a. Besi Utama
= 25.0 m
Panjang = 25.0 x 8
= 200.0 m
= 177.6 kg
c. Besi beugel
= 2500.0 : 15
= 167 buah
= 0.7 m
= 108.3 m
= 108.3 x 0.39
= 42.8 kg
= 220.3 kg
PERHITUNGAN BESI
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
PERHITUNGAN ANALISA BETON
### #REF!
### #REF!
### #REF!
### #REF!
I KEBUTUHAN BEGESTING
1 Pek. Pondasi Sepatu 80.80.25 cm
Volume Pondasi = 0,80 x 0,80 x 0,25 = 0.16 m3
Jumlah Pondasi / m3 = 1,00 / 0,16 = 6.25 bh
Luas Begesting = ( 0,80 x 0,25 x 4 sisi ) x 6,25 bh = 4.00 m2
2 Pek. Sloof 20 x 25 cm
Volume Sloof = 0,20 x 0,25 x 1,00 = 0.05 m3
Panjang Sloof = 1,00 / 0,05 = 20.00 m'
Luas Begesting = 0,25 x 20,00 x 2 sisi = 10.00 m2
2 Pek. Sloof 15 x 20 cm
Volume Sloof = 0,15 x 0,20 x 1,00 = 0.03 m3
Panjang Sloof = 1,00 / 0,03 = 33.33 m'
Luas Begesting = 0,20 x 33,33 x 2 sisi = 13.33 m2
2 Pek. Kolom 25 x 25 cm
Volume Kolom = 0,25 x 0,25 x 1,00 = 0.06 m3
Panjang Kolom = 1,00 / 0,06 = 16.00 m'
Luas Begesting = .0,25 x 16,00 x 4 sisi = 16.00 m2
3 Pek. Kolom 20 x 20 cm
Volume Kolom = 0,20 x 0,20 x 1,00 = 0.04 m3
Panjang Kolom = 1,00 / 0,04 = 25.00 m'
Luas Begesting = 0,20 x 25,00 x 4 sisi = 20.00 m2
2 Pek. Kolom 15 x 20 cm
Volume Kolom = 0,15 x 0,20 x 1,00 = 0.03 m3
Panjang Kolom = 1,00 / 0,03 = 33.33 m'
Luas Begesting = ( 0,15 x 33,33 x 2 sisi ) + ( 0,05 x 33,33 x 2 sisi ) = 13.33 m2
3 Pek. Kolom 15 x 45 cm
Volume Kolom = 0,15 x 0,45 x 1,00 = 0.07 m3
Panjang Kolom = 1,00 / 0,07 = 14.81 m'
Luas Begesting = 0,45 x 14,81 x 2 sisi = 13.33 m2
4 Pek. Balok Gantung 15 x 25 cm
Volume Balok Gantung = 0,15 x 0,25 x 1,00 = 0.04 m3
Panjang Balok Gantung = 1,00 / 0,04 = 26.67 m'
Luas Begesting = ( 0,25 x 26,67 x 2 sisi ) + ( 0,15 x26,67 x 1 sisi ) = 17.34 m2
II KEBUTUHAN BESI
1 Pek. Pondasi Strouse 25 cm
Volume Pondasi = 3,14 x 0,125 x 0,125 x 1,00 = 0.05 m3
Jumlah Pondasi / m3 = 1,00 / 0,05 = 20.38 bh
Jumlah Besi Beugel = 20,38 / 0,15 = 135.88 bh
Panjang Besi Utama = 22,38 x 6 bh = 122.29 m'
Panjang Besi Beugel = ( 3,14 x 0,25 ) x 135,88 bh = 106.67 m'
Volume Besi Utama Ø 12 mm = 122,29 x 0,888 = 108.60 kg
Volume Besi Beugel Ø 8 mm = 106,67 x 0,395 = 42.13 kg
Jumlah Volume Besi = 108,60 + 42,13 = 150.73 kg
2 Pek. Kolom 25 x 25 cm
Volume Kolom = 0,25 x 0,25 x 1,00 = 0.06 m3
Panjang Kolom = 1,00 / 0,06 = 16.00 m'
Jumlah Besi Beugel = 16,00 / 0,15 = 106.67 bh
Panjang Besi Utama = 16,00 x 8 bh = 128.00 m'
Panjang Besi Beugel = ( 0,20 + 0,20 + 0,20 + 0,20 + 0,05 ) x 106,67 bh = 90.67 m'
Volume Besi Utama D 13 mm = 128,00 x 1,040 = 133.12 kg
Volume Besi Beugel Ø 8 mm = 90,67 x 0,395 = 35.81 kg
Jumlah Volume Besi = 133,12 + 35,81 = 168.93 kg
3 Pek. Kolom 20 x 20 cm
Volume Kolom = 0,20 x 0,20 x 1,00 = 0.04 m3
Panjang Kolom = 1,00 / 0,04 = 25.00 m'
Jumlah Besi Beugel = 25,00 / 0,15 = 166.67 bh
Panjang Besi Utama = 25,00 x 4 bh = 100.00 m'
Panjang Besi Beugel = ( 0,15 + 0,15 + 0,15 + 0,15 + 0,05 ) x 166,67 bh = 108.33 m'
Volume Besi Utama Ø 12 mm = 100,00 x 0,888 = 88.80 kg
Volume Besi Beugel Ø 8 mm = 108,33 x 0,395 = 42.79 kg
Jumlah Volume Besi = 88,80 + 42,79 = 131.59 kg
3 Pek. Kolom 15 x 20 cm
Volume Kolom = 0,15 x 0,20 x 1,00 = 0.02 m3
Panjang Kolom = 1,00 / 0,03 = 33.33 m'
Jumlah Besi Beugel = 33,33 / 0,15 = 222.22 bh
Panjang Besi Utama = 33,33 x 4 bh = 133.33 m'
Panjang Besi Beugel = ( 0,10 + 0,10 + 0,15 + 0,15 + 0,05 ) x 222,22 bh = 122.22 m'
Volume Besi Utama Ø 12 mm = 133,33 x 0,888 = 118.40 kg
Volume Besi Beugel Ø 8 mm = 122,22 x 0,395 = 48.28 kg
Jumlah Volume Besi = 118,40 + 48,28 = 166.68 kg
3 Pek. Kolom 15 x 45 cm
Volume Kolom = 0,15 x 0,45 x 1,00 = 0.07 m3
Panjang Kolom = 1,00 / 0,07 = 14.81 m'
Jumlah Besi Beugel = 14,81 / 0,15 = 98.77 bh
Panjang Besi Utama = 14,81 x 8 bh = 118.52 m'
Panjang Besi Beugel = ( 0,10 + 0,10 + 0,40 + 0,40 + 0,05 ) x 98,77 bh = 103.70 m'
Volume Besi Utama Ø 12 mm = 118,52 x 0,888 = 105.24 kg
Volume Besi Beugel Ø 8 mm = 103,70 x 0,395 = 40.96 kg
Jumlah Volume Besi = 105,24 + 40,96 = 146.20 kg