JADWAL PELAKSANAAN
PEMBANGUNAN JEMBATAN GELAGAR BESI (CLUSTER)
PROGRAM NASIONAL PEMBERDAYAAN MASAYARAKAT MANDIRI PERDESAAN (PNPM - MP)
KECAMATAN SUKAMAKMUR KABUPATENGARUT TAHUN ANGGARAN 2012
BOBOT TAH U N 2008
RENCANA
URAIAN PEKERJAAN BULAN I BULAN II BULAN III
BIAYA [E](=% ) %
[ C/ 1 2 3 4 5 6 7 8 9
[B] [C] ∑C ] x
100% #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Renc.
50 50
Pekerjaan Abutmen dan Sayap 27,209,443 #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Real.
#VALUE! #VALUE!
Rencana #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Realisasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Kumulatip Rencana #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Kumulatip Realisasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Selisih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
203,736,400
#VALUE!
1,242,658
Program Nasional Pemberdayaan Masyarakat
#VALUE!
#VALUE!
#VALUE!
Bobot %
90.79
0.57
3.64
95.00
2.00
3.00
100.00
HOK
Program Nasional Pemberdayaan Masyarakat mandiri Perdesaan FORM IV-8
Sub Total 3 -
TOTAL BIAYA
Dari PNPM-MP
Sumber Dana
Program Nasional Pemberdayaan Masyarakat mandiri Perdesaan FORM IV-8
Catatan :
1 Sumbangan dalam bentuk bahan dan alat tulis dalam kolom swadaya
2 Nilai RAB di dapat dari kolom volume dana dikalikan dengan harga satuan yang kemudian ditotalkan
3 Sumbangan dalam bentuk uang dimasukan pada baris terbawah (sumber dana dari swadaya)
4 Swadaya dalam bentuk lahan ditulis dalam format lain
Jumlah Total
PNPM-MP
(Rp)
52,796,000 52,796,000
6,097,000 6,097,000
12,274,400 12,274,400
2,599,600 2,599,600
7,182,400 7,182,400
1,710,000 1,710,000
2,200,000 2,200,000
9,200,000 9,200,000
9,210,000 9,210,000
9,210,000 9,210,000
570,000 570,000
2,250,000 2,250,000
3,600,000 3,600,000
120,000
6,750,000 6,750,000
210,000 210,000
20,228,000 20,148,000
450,000 115,299,400
700,000
12,500,000 181,875,400
20,148,000 20,148,000
120,000 137,197,400
1,750,000 1,750,000 142,197,400
6,600,000
5,000,000 147,757,400
193,475,400
100,000
-
-
-
-
-
4,500
100,000
700,000
300,000
10,000 147,757,400
-
-
1,214,500
5,000,000
2,765,000
7,765,000
202,454,900
Program Nasional Pemberdayaan Masyarakat mandiri Perdesaan FORM IV-8
332,500,000
203,736,400 (130,045,100)
r Kecamatan
aziz gagap
Pemberdayaan
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
A. GELAGAR DIAFRAGMA
Direncanakan pakai IWF 200.100
Berat (G) = 21.3 kg/m¹
Wx = 184 cm³
Ix = 1,840 cm4
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Momen yang terjadi :
Jarak antara Gelagar utama = 0.9 m
Momen Maximum = 21.3 x 0.81 = 215.663 kg.cm
(⅛.q.l²) 8
Kontrol Tegangan = Mmax = 215.66 = 1.17 kg/cm² ≤ σd = 1600 kg/cm²
Wx 184
B. GELAGAR UTAMA
Direncanakan pakai IWF 400.200
Berat (G) = 66.0 kg/m¹
Wx = 1,190 cm³
Ix = 23,700 cm4
Panjang = 12.0 m
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Pembebanan terdiri dari :
1. Akibat Beban Mati
Berat sendiri Lantai Kayu = 0.08 x 0.9 x 1200 = 86 kg/m¹
Berat sendiri jalur roda = 0.05 x 0.9 x 1200 = 54 kg/m¹
Berat sendiri IWF 400.300 = 66 kg/m¹
Total = 206 kg/m¹
Momen (M1) = ⅛.q.l² = 206.4 x 144 = 371520 kg.cm
8
q q 0.86
1.75
Momen Angin (M4) = ⅛.q.l² = 212.6 x 144 = 382629 kg.cm
8
Momen total = M1 + M2 + M3 + M4
= 371,520 + 11,502 + 934,944 + 382,629
= 1,700,595 kg.cm
C. CHEK LENDUTAN
Lendutan yang di izinkan = 1 x Bentang
250
= 1 x 12 = 4.80 cm
250
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20
2
20
18 1.2
GN
Ix netto 20,145
σ bekerja = 18.0 x 1,688 = 1,520 kg/cm²
20
Angka keamanan = σl = 2,400 = 1.6 ≥ 1.5 (ok !)
σ bekerja 1,520
E. PLAT INJAK
Panjang = 6.0 m
Lebar = 2.5 m
Tinggi = 0.1 m
Volume = 3.00 m³
analisa K719
Bahan :
Pasir Beton = 8.00 : 13 x 3.00 = 1.85 m3
Semen = 65.00 : 13 x 3.00 = 15.00 zak
Split = 9.00 : 13 x 3.00 = 2.08 m3
Kayu Bekisting = 0.26 : 13 x 3.00 = 0.06 m3
Upah :
Pekerja = 24 : 13 x 3.00 = 5.54 HOK
Tukang = 4 : 13 x 3.00 = 0.92 HOK
Jumlah = 2,243 +
f. Baud 1/2" x 4 cm = 143 x 1 = 172 buah
g. Baud 5/8" x 6 cm = 184 x 1 = 221 buah
g. Dexton 10/50 = 384 x 1 = 461 buah
h. Baud Dexton = 768 x 1 = 922 buah
i. Plat Klem Dexton = 768 x 1 = 922 buah
j. Karet Peredam Lantai = 48 x 1 = 58 m
k. Elastomer = 8 x 1 = 10 m
l. Pabrikasi Ereksion = 6,045 kg
m. Cat Finishing = 1 ls
n. Pasir Beton = 2 m³
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
o. Split = 2 m³
p. Semen = 15 zak
q. Kayu Bekisting = 0.06 m³
r. Pekerja = 6 hok
s. Tukang = 0.9 hok
A4 0.2
A5 0.6
`
"O"
2.5
A. GAYA VERTIKAL
1. Berat sendiri :
G1 = 0.22 x 2500 x 4.00 = 2,200 Kg
G2 = 0.28 x 2500 x 4.00 = 2,800 Kg
G3 = 3.24 x 2200 x 4.00 = 28,512 Kg
G4 = 2.16 x 2200 x 4.00 = 19,008 Kg
G5 = 1.50 x 2200 x 4.00 = 13,200 Kg
∑Gv1 = G1+G2+G3+G4+G5 = 65,720 Kg
B. GAYA HORIZONTAL
1. Gaya Rem dan Traksi
Untuk gaya rem dan traksi diambil dari besarnya muatan hidup D tanpa koefisien kejut, yaitu sebesar 5% muatan hidu
Muatan-muatan tersebut adalah beban merata "q" dan "p"
Titik tangkap gaya berada setinggi 1.20 m diatas lantai kendaraan
Dari titik "O" = 1.20 + 0.6 + 4.00 + 0.70 = 6.50 m
h1 = 5% x 206 + 1,122 = 66 kg
2. Gaya Akibat Tekanan Tanah
Akibat muatan lalu lintas yang senilai dengan muatan tanah setinggi 60 cm (PMUJJR), juga akibat tebal lapisan perker
qll = 0.6 x ∂ + 0.10 x 2.40 dimana : ∂ =
= 1.27 t/m² Ka =
Besar tekanan tanah untuk panjang abutmen B = 4.00 m
Ea1 = qll x Ka x
0.7 = 1.27 x 0.297 x
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 8,020 kg
Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
= 28,749 kg
E1
4.0 Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
E2
= 2,303 kg
1.5 ∑Ea = 34,467 kg
E3 0.6
"O"
F. SAYAP
Panjang = 5.3 m
Lebar atas = 0.3
Lebar bawah = 1.0
Volume = 3.45 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 3.45 = 1.79 m3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Tinggi = 1.0 m
Lebar = 0.5 m
Panjang = 5.3 m
Volume = 2.65 m³
Analisa K-224
Pekerja = 0.7500 x 2.65 = 1.99 HOK
G. ABUTMEN
Kiri Kanan
Panjang = 4.00 m Panjang = 4.00 m
Luas = 7.40 m² Luas = 7.40 m²
Volume = 29.60 m³ Volume = 29.60 m³
Total Volume = 59.20 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 59.20 = 30.78 m3
Semen = 3.26 x 59.20 = 192.99 zak
Batu Belah = 1.10 x 59.20 = 65.12 m3
Kayu Bekisting = 0.04 x 59.20 = 2.37 m3
Upah :
Pekerja = 1.50 x 59.20 = 88.80 HOK
Tukang = 0.60 x 59.20 = 35.52 HOK
Pekerjaan Galian
Luas = 5.0 m²
Panjang = 4.0 m
Volume = 20.00 m³
Analisa K-224
Pekerja = 0.7500 x 20.0 = 15.00 HOK
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 50.50 = 27.47 m3
Semen = 2.72 x 50.50 = 137.36 zak
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Luas = 0.75 m²
Panjang = 35.0 m
Volume = 26.25 m³
Analisa K-224
Pekerja = 0.7500 x 26.3 = 19.69 HOK
I. BETON TUMPUAN
Luas = 0.50 m²
Panjang = 4.00 m
Volume = 4.00 m³
analisa CK-17
Bahan :
Kayu Bekisting = 0.04 x 4.00 = 0.16 m3
Paku = 1.50 x 4.00 = 6.00 kg
Besi beton polos = 150 x 4.00 = 600.00 kg
Kawat beton = 3.00 x 4.00 = 12.00 kg
Semen = 6.46 x 4.00 = 25.84 zak
Pasir beton = 0.52 x 4.00 = 2.08 m3
Split = 0.78 x 4.00 = 3.12 m3
Upah :
Pekerja = 4.85 x 4.00 = 19.40 HOK
Tukang = 1.91 x 4.00 = 7.64 HOK
Pekerjaan Galian
Volume = 16.56 m³
Analisa K-224
Pekerja = 0.7500 x 16.6 = 12.42 HOK
K. LONENG
Luas = 0.24 m²
Panjang = 4.80 m
Volume = 1.15 m³
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 1.15 = 0.63 m3
Semen = 2.72 x 1.15 = 3.13 zak
Batu Belah = 1.10 x 1.15 = 1.27 m3
Kayu Bekisting = 0.04 x 1.15 = 0.05 m3
Upah :
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
UPAH
Pekerja = 245 HOK
Tukang = 79 HOK
UPAH
Pekerja = 250 HOK
Tukang = 79 HOK
hgg
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
0.81
P 3 3
Rb
g besarnya sbb :
kg.cm
kg.cm
kg/m¹
1,600 kg/cm²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
1,122 x 2E+09
2,100,000 x 23,700
ד izin
= 0.58 x 1,600
= 928 kg/cm²
(ok !) ( cukup aman)
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
PLAT INJAK
150,000 276,923
52,000 780,000
140,000 290,769
900,000 54,000
20,000 110,769
35,000 32,308
1,544,769
kg
10% = 455 kg
32
128 13
10% = 765 kg 141
10% = 139 kg
8
10% = 195 kg
10% = 537 kg
10% = 151 kg
2,243 kg STRUKTUR ATAS
3,802 = 6,045 kg 13,400 80,999,720
10,000 1,716,000
10,000 2,208,000 141
20,000 9,216,000 48 8
10,000 9,216,000 384
10,000 9,216,000
10,000 576,000
250,000 2,400,000
3,000 18,134,266
1,750,000 1,750,000
135,431,985
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 0.22 m²
= 0.28 m²
= 3.24 m²
0.5 = 2.16 m²
= 1.50 m²
= 7.40 m²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
11,520 kg
5,236 kg
7,200 kg
23,956 kg
r 5% muatan hidup
al lapisan perkerasan :
1.723 t/m³
0.297
B x H
4.00 x 5.3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
B x H² x ∂
4.00 x 28.1 x 1.72
B x H² x ∂
4.00 x 2.3 x 1.72
70,893 = 2.06 m
34,467
76,472
7,766
30,196
114,434
( ok )
SAYAP
120,000 214,968
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
52,000 583,996
100,000 378,950
900,000 124,020
20,000 103,350
35,000 72,345
20,000 39,750
1,517,379
ABUTMEN
120,000 3,694,080
52,000 10,035,584
100,000 6,512,000
900,000 2,131,200
20,000 1,776,000
35,000 1,243,200
20,000 300,000
25,692,064
TPT
120,000 3,296,640
52,000 7,142,720
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
100,000 5,555,000
900,000 1,818,000
- -
20,000 1,515,000
35,000 1,060,500
-
-
-
-
-
-
20,000 393,750
20,781,610
BETON TUMPUAN
900,000 144,000
15,000 90,000
10,000 6,000,000
15,000 180,000
52,000 1,343,680
150,000 312,000
140,000 436,800
-
20,000 388,000
35,000 267,400
3,000 1,800,000
3,000 #VALUE!
#REF! #REF!
#REF!
LONENG
120,000 75,203
52,000 162,939
100,000 126,720
900,000 41,472
- -
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20,000 34,560
35,000 24,192
465,085
TIANG PENGAMAN
900,000 22,680
15,000 37,800
10,000 756,000
15,000 42,525
52,000 211,630
150,000 49,140
140,000 68,796
- -
20,000 91,980
35,000 80,483
1,361,033
#VALUE!
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
A. GELAGAR DIAFRAGMA
Direncanakan pakai IWF 200.100
Berat (G) = 21.3 kg/m¹
Wx = 184 cm³
Ix = 1,840 cm4
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Momen yang terjadi :
Jarak antara Gelagar utama = 0.9 m
Momen Maximum = 21.3 x 0.81 = 215.663 kg.cm
(⅛.q.l²) 8
Kontrol Tegangan = Mmax = 215.66 = 1.17 kg/cm² ≤ σd = 1600 kg/cm²
Wx 184
B. GELAGAR UTAMA
Direncanakan pakai IWF 400.200 1190
Berat (G) = 66.0 kg/m¹
Wx = 1,190 cm³
Ix = 23,700 cm4
Panjang = 12.0 m
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Pembebanan terdiri dari :
1. Akibat Beban Mati
Berat sendiri Lantai Kayu = 0.08 x 0.9 x 1200 = 86 kg/m¹
Berat sendiri jalur roda = 0.05 x 0.9 x 1200 = 54 kg/m¹
Berat sendiri IWF 450.200 = 66 kg/m¹
Total = 206 kg/m¹
Momen (M1) = ⅛.q.l² = 206.4 x 144 = 371520 kg.cm
8
q q 0.86
1.75
Momen Angin (M4) = ⅛.q.l² = 212.6 x 144 = 382629 kg.cm
8
Momen total = M1 + M2 + M3 + M4
= 371,520 + 11,502 + 934,944 + 382,629
= 1,700,595 kg.cm
C. CHEK LENDUTAN
Lendutan yang di izinkan = 1 x Bentang
250
= 1 x 12 = 4.80 cm
250
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20
2
20
18 1.2
GN
Ix netto 20,145
σ bekerja = 18.0 x 1,688 = 1,520 kg/cm²
20
Angka keamanan = σl = 2,400 = 1.6 ≥ 1.5 (ok !)
σ bekerja 1,520
E. PLAT INJAK
Panjang = 6.0 m
Lebar = 2.5 m
Tinggi = 0.1 m
Volume = 3.00 m³
analisa K719
Bahan :
Pasir Beton = 8.00 : 13 x 3.00 = 1.85 m3
Semen = 65.00 : 13 x 3.00 = 15.00 zak
Split = 9.00 : 13 x 3.00 = 2.08 m3
Kayu Bekisting = 0.26 : 13 x 3.00 = 0.06 m3
Upah :
Pekerja = 24 : 13 x 3.00 = 5.54 HOK
Tukang = 4 : 13 x 3.00 = 0.92 HOK
Jumlah = 2,631 +
f. Baud 1/2" x 4 cm = 143 x 1 = 172 buah
g. Baud 5/8" x 6 cm = 184 x 1 = 221 buah
g. Dexton 10/50 = 512 x 1 = 614 buah
h. Baud Dexton = 1,024 x 1 = 1,229 buah
i. Plat Klem Dexton = 1,024 x 1 = 1,229 buah
j. Karet Peredam Lantai = 48 x 1 = 58 m
k. Elastomer = 8 x 1 = 10 m
l. Pabrikasi Ereksion = 6,432 kg
m. Cat Finishing = 1 ls
n. Pasir Beton = 2 m³
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
o. Split = 2 m³
p. Semen = 15 zak
q. Kayu Bekisting = 0.06 m³
r. Pekerja = 6 hok
s. Tukang = 0.9 hok
A4 0.2
A5 0.6
`
"O"
2.5
A. GAYA VERTIKAL
1. Berat sendiri :
G1 = 0.22 x 2500 x 4.00 = 2,200 Kg
G2 = 0.28 x 2500 x 4.00 = 2,800 Kg
G3 = 3.24 x 2200 x 4.00 = 28,512 Kg
G4 = 2.16 x 2200 x 4.00 = 19,008 Kg
G5 = 1.50 x 2200 x 4.00 = 13,200 Kg
∑Gv1 = G1+G2+G3+G4+G5 = 65,720 Kg
B. GAYA HORIZONTAL
1. Gaya Rem dan Traksi
Untuk gaya rem dan traksi diambil dari besarnya muatan hidup D tanpa koefisien kejut, yaitu sebesar 5% muatan hidu
Muatan-muatan tersebut adalah beban merata "q" dan "p"
Titik tangkap gaya berada setinggi 1.20 m diatas lantai kendaraan
Dari titik "O" = 1.20 + 0.6 + 4.00 + 0.70 = 6.50 m
h1 = 5% x 206 + 1,122 = 66 kg
2. Gaya Akibat Tekanan Tanah
Akibat muatan lalu lintas yang senilai dengan muatan tanah setinggi 60 cm (PMUJJR), juga akibat tebal lapisan perker
qll = 0.6 x ∂ + 0.10 x 2.40 dimana : ∂ =
= 1.27 t/m² Ka =
Besar tekanan tanah untuk panjang abutmen B = 4.00 m
Ea1 = qll x Ka x
0.7 = 1.27 x 0.297 x
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 8,020 kg
Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
= 28,749 kg
E1
4.0 Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
E2
= 2,303 kg
1.5 ∑Ea = 34,467 kg
E3 0.6
"O"
F. SAYAP
Panjang = 5.3 m
Lebar atas = 0.3
Lebar bawah = 1.0
Volume = 3.45 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 3.45 = 1.79 m3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Tinggi = 1.0 m
Lebar = 0.5 m
Panjang = 5.3 m
Volume = 2.65 m³
Analisa K-224
Pekerja = 0.7500 x 2.65 = 1.99 HOK
G. ABUTMEN
Kiri Kanan
Panjang = 4.00 m Panjang = 4.00 m
Luas = 7.40 m² Luas = 7.40 m²
Volume = 29.60 m³ Volume = 29.60 m³
Total Volume = 59.20 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 59.20 = 30.78 m3
Semen = 3.26 x 59.20 = 192.99 zak
Batu Belah = 1.10 x 59.20 = 65.12 m3
Kayu Bekisting = 0.04 x 59.20 = 2.37 m3
Upah :
Pekerja = 1.50 x 59.20 = 88.80 HOK
Tukang = 0.60 x 59.20 = 35.52 HOK
Pekerjaan Galian
Luas = 5.0 m²
Panjang = 4.0 m
Volume = 20.00 m³
Analisa K-224
Pekerja = 0.7500 x 20.0 = 15.00 HOK
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 50.50 = 27.47 m3
Semen = 2.72 x 50.50 = 137.36 zak
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Luas = 0.75 m²
Panjang = 35.0 m
Volume = 26.25 m³
Analisa K-224
Pekerja = 0.7500 x 26.3 = 19.69 HOK
I. BETON TUMPUAN
Luas = 0.50 m²
Panjang = 4.00 m
Volume = 4.00 m³
analisa CK-17
Bahan :
Kayu Bekisting = 0.04 x 4.00 = 0.16 m3
Paku = 1.50 x 4.00 = 6.00 kg
Besi beton polos = 150 x 4.00 = 600.00 kg
Kawat beton = 3.00 x 4.00 = 12.00 kg
Semen = 6.46 x 4.00 = 25.84 zak
Pasir beton = 0.52 x 4.00 = 2.08 m3
Split = 0.78 x 4.00 = 3.12 m3
Upah :
Pekerja = 4.85 x 4.00 = 19.40 HOK
Tukang = 1.91 x 4.00 = 7.64 HOK
Pekerjaan Galian
Volume = 16.56 m³
Analisa K-224
Pekerja = 0.7500 x 16.6 = 12.42 HOK
K. LONENG
Luas = 0.24 m²
Panjang = 4.80 m
Volume = 1.15 m³
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 1.15 = 0.63 m3
Semen = 2.72 x 1.15 = 3.13 zak
Batu Belah = 1.10 x 1.15 = 1.27 m3
Kayu Bekisting = 0.04 x 1.15 = 0.05 m3
Upah :
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
UPAH
Pekerja = 245 HOK
Tukang = 79 HOK
UPAH
Pekerja = 250 HOK
Tukang = 79 HOK
hgg
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
0.81
P 3 3
Rb
g besarnya sbb :
kg.cm
kg.cm
kg/m¹
1971
1,600 kg/cm²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
1,122 x 2E+09
2,100,000 x 23,700
ד izin
= 0.58 x 1,600
= 928 kg/cm²
(ok !) ( cukup aman)
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
PLAT INJAK
150,000 276,923
52,000 780,000
140,000 290,769
900,000 54,000
20,000 110,769
35,000 32,308
1,544,769
kg
10% = 455 kg
32
128 13
10% = 957 kg 141
10% = 139 kg
10% = 219 kg
10% = 708 kg
10% = 151 kg
2,631 kg STRUKTUR ATAS
3,802 = 6,432 kg 13,400 86,190,971
10,000 1,716,000
10,000 2,208,000 141
20,000 12,288,000 64 8
10,000 12,288,000 512
10,000 12,288,000
10,000 576,000
250,000 2,400,000
3,000 19,296,486
1,750,000 1,750,000
151,001,457
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 0.22 m²
= 0.28 m²
= 3.24 m²
0.5 = 2.16 m²
= 1.50 m²
= 7.40 m²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
11,520 kg
5,236 kg
7,200 kg
23,956 kg
r 5% muatan hidup
al lapisan perkerasan :
1.723 t/m³
0.297
B x H
4.00 x 5.3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
B x H² x ∂
4.00 x 28.1 x 1.72
B x H² x ∂
4.00 x 2.3 x 1.72
70,893 = 2.06 m
34,467
76,472
7,766
30,196
114,434
( ok )
SAYAP
120,000 214,968
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
52,000 583,996
100,000 378,950
900,000 124,020
20,000 103,350
35,000 72,345
20,000 39,750
1,517,379
ABUTMEN
120,000 3,694,080
52,000 10,035,584
100,000 6,512,000
900,000 2,131,200
20,000 1,776,000
35,000 1,243,200
20,000 300,000
25,692,064
TPT
120,000 3,296,640
52,000 7,142,720
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
100,000 5,555,000
900,000 1,818,000
- -
20,000 1,515,000
35,000 1,060,500
-
-
-
-
-
-
20,000 393,750
20,781,610
BETON TUMPUAN
900,000 144,000
15,000 90,000
10,000 6,000,000
15,000 180,000
52,000 1,343,680
150,000 312,000
140,000 436,800
-
20,000 388,000
35,000 267,400
3,000 1,800,000
3,000 #VALUE!
#REF! #REF!
#REF!
LONENG
120,000 75,203
52,000 162,939
100,000 126,720
900,000 41,472
- -
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20,000 34,560
35,000 24,192
465,085
TIANG PENGAMAN
900,000 22,680
15,000 37,800
10,000 756,000
15,000 42,525
52,000 211,630
150,000 49,140
140,000 68,796
- -
20,000 91,980
35,000 80,483
1,361,033
#VALUE!
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
A. GELAGAR DIAFRAGMA
Direncanakan pakai IWF 200.100
Berat (G) = 21.3 kg/m¹
Wx = 184 cm³
Ix = 1,840 cm4
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Momen yang terjadi :
Jarak antara Gelagar utama = 0.9 m
Momen Maximum = 21.3 x 0.81 = 215.663 kg.cm
(⅛.q.l²) 8
Kontrol Tegangan = Mmax = 215.66 = 1.17 kg/cm² ≤ σd = 1600 kg/cm²
Wx 184
B. GELAGAR UTAMA
Direncanakan pakai IWF 450.200
Berat (G) = 66.2 kg/m¹
Wx = 1,290 cm³
Ix = 28,700 cm4
Panjang = 12.0 m
Mutu besi st.37 : Tegangan leleh (σl) = 2400 kg/cm²
Tegangan dasar (σd) = 1600 kg/cm²
Pembebanan terdiri dari :
1. Akibat Beban Mati
Berat sendiri Lantai Kayu = 0.06 x 0.9 x 1200 = 65 kg/m¹
Berat sendiri jalur roda = 0.1 x 0.9 x 1200 = 108 kg/m¹
Berat sendiri IWF 450.200 = 66 kg/m¹
Total = 239 kg/m¹
Momen (M1) = ⅛.q.l² = 239.0 x 144 = 430200 kg.cm
8
q q 0.86
1.75
Momen Angin (M4) = ⅛.q.l² = 212.6 x 144 = 382629 kg.cm
8
Momen total = M1 + M2 + M3 + M4
= 430,200 + 11,502 + 1,522,002 + 382,629
= 2,346,333 kg.cm
C. CHEK LENDUTAN
Lendutan yang di izinkan = 1 x Bentang
250
= 1 x 12 = 4.80 cm
250
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20
1.2
22.3
21.1 0.8
GN
Ix netto 24,395
σ bekerja = 21.1 x 2,145 = 2,029 kg/cm²
22
Angka keamanan = σl = 2,400 = 1.2 ≥ 1.5 (ok !)
σ bekerja 2,029
E. PLAT INJAK
Panjang = 6.0 m
Lebar = 2.5 m
Tinggi = 0.1 m
Volume = 3.00 m³
analisa K719
Bahan :
Pasir Beton = 8.00 : 13 x 3.00 = 1.85 m3
Semen = 65.00 : 13 x 3.00 = 15.00 zak
Split = 9.00 : 13 x 3.00 = 2.08 m3
Kayu Bekisting = 0.26 : 13 x 3.00 = 0.06 m3
Upah :
Pekerja = 24 : 13 x 3.00 = 5.54 HOK
Tukang = 4 : 13 x 3.00 = 0.92 HOK
Jumlah = 2,192 +
f. Baud 1/2" x 4 cm = 143 x 1 = 143 buah
g. Baud 5/8" x 6 cm = 184 x 1 = 184 buah
g. Dexton 10/50 = 512 x 1 = 512 buah
h. Baud Dexton = 1,024 x 1 = 1,024 buah
i. Plat Klem Dexton = 1,024 x 1 = 1,024 buah
j. Karet Peredam Lantai = 48 x 1 = 48 m
k. Elastomer = 8 x 1 = 8 m
l. Pabrikasi Ereksion = 5,370 kg
m. Cat Finishing = 1 ls
n. Pasir Beton = 2 m³
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
o. Split = 2 m³
p. Semen = 15 zak
q. Kayu Bekisting = 0.06 m³
r. Pekerja = 6 hok
s. Tukang = 0.9 hok
A4 0.2
A5 0.6
`
"O"
2.5
A. GAYA VERTIKAL
1. Berat sendiri :
G1 = 0.22 x 2500 x 4.00 = 2,200 Kg
G2 = 0.28 x 2500 x 4.00 = 2,800 Kg
G3 = 3.24 x 2200 x 4.00 = 28,512 Kg
G4 = 2.16 x 2200 x 4.00 = 19,008 Kg
G5 = 1.50 x 2200 x 4.00 = 13,200 Kg
∑Gv1 = G1+G2+G3+G4+G5 = 65,720 Kg
B. GAYA HORIZONTAL
1. Gaya Rem dan Traksi
Untuk gaya rem dan traksi diambil dari besarnya muatan hidup D tanpa koefisien kejut, yaitu sebesar 5% muatan hidu
Muatan-muatan tersebut adalah beban merata "q" dan "p"
Titik tangkap gaya berada setinggi 1.20 m diatas lantai kendaraan
Dari titik "O" = 1.20 + 0.6 + 4.00 + 0.70 = 6.50 m
h1 = 5% x 335 + 1,827 = 108 kg
2. Gaya Akibat Tekanan Tanah
Akibat muatan lalu lintas yang senilai dengan muatan tanah setinggi 60 cm (PMUJJR), juga akibat tebal lapisan perker
qll = 0.6 x ∂ + 0.10 x 2.40 dimana : ∂ =
= 1.27 t/m² Ka =
Besar tekanan tanah untuk panjang abutmen B = 4.00 m
Ea1 = qll x Ka x
0.7 = 1.27 x 0.297 x
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 8,020 kg
Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
= 28,749 kg
E1
4.0 Ea2 = 0.5 x Ka x
= 0.50 x 0.297 x
E2
= 2,303 kg
1.5 ∑Ea = 34,467 kg
E3 0.6
"O"
F. SAYAP
Panjang = 5.3 m
Lebar atas = 0.3
Lebar bawah = 1.0
Volume = 3.45 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 3.45 = 1.79 m3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Tinggi = 1.0 m
Lebar = 0.5 m
Panjang = 5.3 m
Volume = 2.65 m³
Analisa K-224
Pekerja = 0.7500 x 2.65 = 1.99 HOK
G. ABUTMEN
Kiri Kanan
Panjang = 4.00 m Panjang = 4.00 m
Luas = 7.40 m² Luas = 7.40 m²
Volume = 29.60 m³ Volume = 29.60 m³
Total Volume = 59.20 m³
analisa CK-2(1:4)
Bahan :
Pasir Pasang = 0.52 x 59.20 = 30.78 m3
Semen = 3.26 x 59.20 = 192.99 zak
Batu Belah = 1.10 x 59.20 = 65.12 m3
Kayu Bekisting = 0.04 x 59.20 = 2.37 m3
Upah :
Pekerja = 1.50 x 59.20 = 88.80 HOK
Tukang = 0.60 x 59.20 = 35.52 HOK
Pekerjaan Galian
Luas = 5.0 m²
Panjang = 4.0 m
Volume = 20.00 m³
Analisa K-224
Pekerja = 0.7500 x 20.0 = 15.00 HOK
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 50.50 = 27.47 m3
Semen = 2.72 x 50.50 = 137.36 zak
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Pekerjaan Galian
Luas = 0.75 m²
Panjang = 35.0 m
Volume = 26.25 m³
Analisa K-224
Pekerja = 0.7500 x 26.3 = 19.69 HOK
I. BETON TUMPUAN
Luas = 0.50 m²
Panjang = 4.00 m
Volume = 4.00 m³
analisa CK-17
Bahan :
Kayu Bekisting = 0.04 x 4.00 = 0.16 m3
Paku = 1.50 x 4.00 = 6.00 kg
Besi beton polos = 150 x 4.00 = 600.00 kg
Kawat beton = 3.00 x 4.00 = 12.00 kg
Semen = 6.46 x 4.00 = 25.84 zak
Pasir beton = 0.52 x 4.00 = 2.08 m3
Split = 0.78 x 4.00 = 3.12 m3
Upah :
Pekerja = 4.85 x 4.00 = 19.40 HOK
Tukang = 1.91 x 4.00 = 7.64 HOK
Pekerjaan Galian
Volume = 16.56 m³
Analisa K-224
Pekerja = 0.7500 x 16.6 = 12.42 HOK
K. LONENG
Luas = 0.24 m²
Panjang = 4.80 m
Volume = 1.15 m³
analisa CK-3(1:5)
Bahan :
Pasir Pasang = 0.54 x 1.15 = 0.63 m3
Semen = 2.72 x 1.15 = 3.13 zak
Batu Belah = 1.10 x 1.15 = 1.27 m3
Kayu Bekisting = 0.04 x 1.15 = 0.05 m3
Upah :
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
UPAH
Pekerja = 245 HOK
Tukang = 79 HOK
UPAH
Pekerja = 250 HOK
Tukang = 79 HOK
hgg
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
0.81
P 3 3
Rb
g besarnya sbb :
kg.cm
kg.cm
kg/m¹
1,600 kg/cm²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
1,827 x 2E+09
2,100,000 x 28,700
ד izin
= 0.58 x 1,600
= 928 kg/cm²
(ok !) ( cukup aman)
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
PLAT INJAK
150,000 276,923
52,000 780,000
140,000 290,769
900,000 54,000
20,000 110,769
35,000 32,308
1,544,769
kg
10% = 380 kg
32
128 13
10% = 797 kg 141
10% = 117 kg
10% = 183 kg
10% = 590 kg
10% = 126 kg
2,192 kg STRUKTUR ATAS
3,178 = 5,370 kg 13,400 71,959,166
10,000 1,430,000
10,000 1,840,000 141
20,000 10,240,000 64 8
10,000 10,240,000 512
10,000 10,240,000
10,000 480,000
250,000 2,000,000
3,000 16,110,261
1,750,000 1,750,000
126,289,427
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
= 0.22 m²
= 0.28 m²
= 3.24 m²
0.5 = 2.16 m²
= 1.50 m²
= 7.40 m²
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
11,520 kg
5,236 kg
7,200 kg
23,956 kg
r 5% muatan hidup
al lapisan perkerasan :
1.723 t/m³
0.297
B x H
4.00 x 5.3
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
B x H² x ∂
4.00 x 28.1 x 1.72
B x H² x ∂
4.00 x 2.3 x 1.72
70,893 = 2.06 m
34,467
76,472
7,766
30,196
114,434
( ok )
SAYAP
120,000 214,968
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
52,000 583,996
100,000 378,950
900,000 124,020
20,000 103,350
35,000 72,345
20,000 39,750
1,517,379
ABUTMEN
120,000 3,694,080
52,000 10,035,584
100,000 6,512,000
900,000 2,131,200
20,000 1,776,000
35,000 1,243,200
20,000 300,000
25,692,064
TPT
120,000 3,296,640
52,000 7,142,720
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
100,000 5,555,000
900,000 1,818,000
- -
20,000 1,515,000
35,000 1,060,500
-
-
-
-
-
-
20,000 393,750
20,781,610
BETON TUMPUAN
900,000 144,000
15,000 90,000
10,000 6,000,000
15,000 180,000
52,000 1,343,680
150,000 312,000
140,000 436,800
-
20,000 388,000
35,000 267,400
3,000 1,800,000
3,000 #VALUE!
#REF! #REF!
#REF!
LONENG
120,000 75,203
52,000 162,939
100,000 126,720
900,000 41,472
- -
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
20,000 34,560
35,000 24,192
465,085
TIANG PENGAMAN
900,000 22,680
15,000 37,800
10,000 756,000
15,000 42,525
52,000 211,630
150,000 49,140
140,000 68,796
- -
20,000 91,980
35,000 80,483
1,361,033
#VALUE!
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19
Program Nasional Pemberdayaan Masyarakat Mandiri Perdesaan Form.19