Anda di halaman 1dari 102

DAFTAR ANALISA/SATUAN PEKERJAAN TA 2019

BERDASARKAN STANDAR NASI0NAL IND0NESIA (SNI)


HARGA WIL I HARGA WIL II HARGA WIL III HARGA WIL IV.a HARGA WIL IV.b HARGA WIL IV.c
Harga Jumlah Harga Harga Jumlah Harga Harga Jumlah Harga Harga Jumlah Harga Harga Jumlah Harga Harga Jumlah Harga
NO. URAIAN Satuan Bahan / Upah Satuan Bahan / Upah Satuan Bahan / Upah Satuan Bahan / Upah Satuan Bahan / Upah Satuan Bahan / Upah
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6 7 8 9 10 11 12 11 12

I PEKERJAAN PERSIAPAN
1 1 M' Pagar Sementara dari Kayu Tinggi 2 Meter #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.250 Btg Kayu Gelam dia 8-10 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2"-5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.005 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.009 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.072 M3 Kayu 5/7 ppn #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Ltr Residu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
b. Tenaga 57,740.00 57,740.00 57,740.00 57,740.00 57,740.00 57,740.00
0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.020 Oh Mandor 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M' Pagar Sementara dari Seng Gelombang Tinggi 2 Meter #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.250 Btg Kayu Gelam dia 8-10 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.200 Lbr Seng Gelombang BJLS 20 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.005 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.009 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.072 M3 Kayu 5/7 ppn #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2"-5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.450 Ltr Meni Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 64,240.00 64,240.00 64,240.00 64,240.00 64,240.00 64,240.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.020 Oh Mandor 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M' Pagar Sementara dari Kawat Duri Tinggi 1,8 Meter #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Btg Kayu Gelam dia 8-10 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
25.000 M' Kawat Duri roll 50m( dipasang jarak 25cm) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.005 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.009 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2"-5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,290.00 53,290.00 53,290.00 53,290.00 53,290.00 53,290.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00

SNI OKI 2019 Page 1


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.020 Oh Mandor 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00 131,500.00 2,630.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

0.0006 0.00

4 1 M' Pemasangan Bexisting untuk Jalan Setapak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.001 M3 Kayu balok 5/7 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.001 M3 Kayu Papan 3/25 kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M' Pemasangan Bouwplank #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.012 M3 Kayu balok 5/7 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.007 M3 Kayu Papan 3/20 kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M2 Pembuatan Direksikeet #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.250 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.180 M3 Kayu kls IV persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.850 Kg Paku Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Lbr Seng Gelombang BJLS 20 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Lbr Seng Plat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Bh Jendela Nako #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.080 M2 Kaca Polos 3mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Bh Kunci Tanam biasa 1 slagg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Lbr Plywood 3mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 525,225.00 525,225.00 525,225.00 525,225.00 525,225.00 525,225.00


2.000 Oh Tukang Kayu 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00
1.000 Oh Tukang Batu 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
2.000 Oh Pekerja 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 2
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M2 Pembuatan Gudang Semen dan Alat - Alat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.700 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.210 M3 Kayu kls IV persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 Kg Paku Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Lbr Seng Gelombang BJLS 20 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M' Seng Bubungan Plat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 326,675.00 326,675.00 326,675.00 326,675.00 326,675.00 326,675.00


2.000 Oh Tukang Kayu 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00
1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
0.200 Oh Kepala Tukang 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M2 Pembuatan Rumah Jaga/Konstruksi Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Btg Kayu Gelam dia 8-10 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.276 M3 Kayu kls IV persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.700 Kg Paku Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Lbr Seng Gelombang BJLS 20 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 265,900.00 265,900.00 265,900.00 265,900.00 265,900.00 265,900.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
1.500 Oh Tukang Kayu 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00
0.150 Oh Kepala Tukang 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M2 Membersihkan Lapangan 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00

a. Tenaga 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00 14,275.00
Overhead & Profit (Contoh 15 %) 2,141.25 2,141.25 2,141.25 2,141.25 2,141.25 2,141.25
Harga Satuan Pekerjaan 16,416.25 16,416.25 16,416.25 16,416.25 16,416.25 16,416.25

9 1 M2 Pembuatan Bak Adukan Ukuran (40 x 50 x 25) cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.036 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.080 Kg Paku Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.014 M3 Kayu 5/7 kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,795.00 36,795.00 36,795.00 36,795.00 36,795.00 36,795.00


0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 3


1 2 3 4 5 6 7 8 9 10 11 12 11 12
10 1 M2 Pembuatan Stegger dari Gelam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 23,062.00 23,062.00 23,062.00 23,062.00 23,062.00 23,062.00


0.017 Oh Tukang Kayu 109,500.00 1,861.50 109,500.00 1,861.50 109,500.00 1,861.50 109,500.00 1,861.50 109,500.00 1,861.50 109,500.00 1,861.50
0.002 Oh Kepala Tukang 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00
0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M2 Pembuatan Jalan Sementara #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.150 M3 Batu Pecah 10/15 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.090 M3 Batu Pecah 5/7 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 83,575.00 83,575.00 83,575.00 83,575.00 83,575.00 83,575.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M3 Bongkaran Beton Bertulang 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00

a. Tenaga 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00


13.334 Oh Pekerja 77,000.00 1,026,718.00 77,000.00 1,026,718.00 77,000.00 1,026,718.00 77,000.00 1,026,718.00 77,000.00 1,026,718.00 77,000.00 1,026,718.00
0.666 Oh Mandor 131,500.00 87,579.00 131,500.00 87,579.00 131,500.00 87,579.00 131,500.00 87,579.00 131,500.00 87,579.00 131,500.00 87,579.00
Jumlah (A+B) 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00 1,114,297.00
Overhead & Profit (Contoh 15 %) 167,144.55 167,144.55 167,144.55 167,144.55 167,144.55 167,144.55
Harga Satuan Pekerjaan 1,281,441.55 1,281,441.55 1,281,441.55 1,281,441.55 1,281,441.55 1,281,441.55

13 1 M3 Bongkaran Dinding Tembok Bata Merah 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50

a. Tenaga 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50


6.667 Oh Pekerja 77,000.00 513,359.00 77,000.00 513,359.00 77,000.00 513,359.00 77,000.00 513,359.00 77,000.00 513,359.00 77,000.00 513,359.00
0.033 Oh Mandor 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50
Jumlah (A+B) 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50 517,698.50
Overhead & Profit (Contoh 15 %) 77,654.78 77,654.78 77,654.78 77,654.78 77,654.78 77,654.78
Harga Satuan Pekerjaan 595,353.28 595,353.28 595,353.28 595,353.28 595,353.28 595,353.28

II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa Sedalam 1 Meter 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50

a. Tenaga 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50


0.750 Oh Pekerja 77,000.00 57,750.00 77,000.00 57,750.00 77,000.00 57,750.00 77,000.00 57,750.00 77,000.00 57,750.00 77,000.00 57,750.00
0.025 Oh Mandor 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50
Jumlah (A+B) 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50 61,037.50
Overhead & Profit (Contoh 15 %) 9,155.63 9,155.63 9,155.63 9,155.63 9,155.63 9,155.63
Harga Satuan Pekerjaan 70,193.13 70,193.13 70,193.13 70,193.13 70,193.13 70,193.13

2 1 M3 Galian Tanah Biasa Sedalam 2 Meter 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50

SNI OKI 2019 Page 4


1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Tenaga 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50


0.900 Oh Pekerja 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00
0.045 Oh Mandor 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50
Jumlah (A+B) 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50 75,217.50
Overhead & Profit (Contoh 15 %) 11,282.63 11,282.63 11,282.63 11,282.63 11,282.63 11,282.63
Harga Satuan Pekerjaan 86,500.13 86,500.13 86,500.13 86,500.13 86,500.13 86,500.13

3 1 M3 Galian Tanah Biasa Sedalam 3 Meter 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50

a. Tenaga 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50


1.050 Oh Pekerja 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00
0.067 Oh Mandor 131,500.00 8,810.50 131,500.00 8,810.50 131,500.00 8,810.50 131,500.00 8,810.50 131,500.00 8,810.50 131,500.00 8,810.50
Jumlah (A+B) 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50 89,660.50
Overhead & Profit (Contoh 15 %) 13,449.08 13,449.08 13,449.08 13,449.08 13,449.08 13,449.08
Harga Satuan Pekerjaan 103,109.58 103,109.58 103,109.58 103,109.58 103,109.58 103,109.58

4 1 M3 Galian Tanah Keras Sedalam 1 Meter 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00

a. Tenaga 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
0.032 Oh Mandor 131,500.00 4,208.00 131,500.00 4,208.00 131,500.00 4,208.00 131,500.00 4,208.00 131,500.00 4,208.00 131,500.00 4,208.00
Jumlah (A+B) 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00 81,208.00
Overhead & Profit (Contoh 15 %) 12,181.20 12,181.20 12,181.20 12,181.20 12,181.20 12,181.20
Harga Satuan Pekerjaan 93,389.20 93,389.20 93,389.20 93,389.20 93,389.20 93,389.20

5 1 M3 Galian Tanah Cadas Sedalam 1 Meter 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00

a. Tenaga 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.060 Oh Mandor 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00
Jumlah (A+B) 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00 123,390.00
Overhead & Profit (Contoh 15 %) 18,508.50 18,508.50 18,508.50 18,508.50 18,508.50 18,508.50
Harga Satuan Pekerjaan 141,898.50 141,898.50 141,898.50 141,898.50 141,898.50 141,898.50

6 1 M3 Galian Tanah Lumpur Sedalam 1 Meter 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50

a. Tenaga 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50


0.823 Oh Pekerja 77,000.00 63,371.00 77,000.00 63,371.00 77,000.00 63,371.00 77,000.00 63,371.00 77,000.00 63,371.00 77,000.00 63,371.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50 74,285.50
Overhead & Profit (Contoh 15 %) 11,142.83 11,142.83 11,142.83 11,142.83 11,142.83 11,142.83
Harga Satuan Pekerjaan 85,428.33 85,428.33 85,428.33 85,428.33 85,428.33 85,428.33

7 1 M2 Pekerjaan Stripping Setinggi 1 Meter 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50

a. Tenaga 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50


0.050 Oh Pekerja 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50 4,507.50
Overhead & Profit (Contoh 15 %) 676.13 676.13 676.13 676.13 676.13 676.13
Harga Satuan Pekerjaan 5,183.63 5,183.63 5,183.63 5,183.63 5,183.63 5,183.63

8 1 M3 Pembuangan Tanah Sejauh 30 meter 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00

a. Tenaga 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00


0.330 Oh Pekerja 77,000.00 25,410.00 77,000.00 25,410.00 77,000.00 25,410.00 77,000.00 25,410.00 77,000.00 25,410.00 77,000.00 25,410.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00 26,725.00
Overhead & Profit (Contoh 15 %) 4,008.75 4,008.75 4,008.75 4,008.75 4,008.75 4,008.75
Harga Satuan Pekerjaan 30,733.75 30,733.75 30,733.75 30,733.75 30,733.75 30,733.75

SNI OKI 2019 Page 5


1 2 3 4 5 6 7 8 9 10 11 12 11 12

9 1 M3 Urugan Kembali 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00

a. Tenaga 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00


0.500 Oh Pekerja 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00
Overhead & Profit (Contoh 15 %) 6,761.25 6,761.25 6,761.25 6,761.25 6,761.25 6,761.25
Harga Satuan Pekerjaan 51,836.25 51,836.25 51,836.25 51,836.25 51,836.25 51,836.25

10 1 M3 Pemadatan Tanah (per 20 cm) 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00

a. Tenaga 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00


0.500 Oh Pekerja 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00 45,075.00
Overhead & Profit (Contoh 15 %) 6,761.25 6,761.25 6,761.25 6,761.25 6,761.25 6,761.25
Harga Satuan Pekerjaan 51,836.25 51,836.25 51,836.25 51,836.25 51,836.25 51,836.25

11 1 M3 Urugan Tanah #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Tanah Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Mandor 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M3 Urugan Pasir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Mandor 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M3 Urugan Sirtu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Sirtu padat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 22,537.50 22,537.50 22,537.50 22,537.50 22,537.50 22,537.50


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.025 Oh Mandor 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50 131,500.00 3,287.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

III PEKERJAAN PONDASI


1 1 Btg Pasang Cerucuk gelam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 btg Kayu gelam #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 6


1 2 3 4 5 6 7 8 9 10 11 12 11 12

b. Tenaga 9,573.00 9,573.00 9,573.00 9,573.00 9,573.00 9,573.00


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.010 Oh tukang 109,500.00 1,095.00 109,500.00 1,095.00 109,500.00 1,095.00 109,500.00 1,095.00 109,500.00 1,095.00 109,500.00 1,095.00
0.001 Oh kepala tukang 120,500.00 120.50 120,500.00 120.50 120,500.00 120.50 120,500.00 120.50 120,500.00 120.50 120,500.00 120.50
0.005 Oh mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 1 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu kali/patu pecah 15/20 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
392.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.314 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 198,292.50 198,292.50 198,292.50 198,292.50 198,292.50 198,292.50


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.600 Oh Tukang Batu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 2 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu kali/Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
267.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.427 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 198,292.50 198,292.50 198,292.50 198,292.50 198,292.50 198,292.50


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.600 Oh Tukang Batu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 3 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu kali/ Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
202.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.485 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.750 Oh Tukang Batu 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00
0.075 Oh Kepala Tukang 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 7


1 2 3 4 5 6 7 8 9 10 11 12 11 12

5 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 4 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
163.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.750 Oh Tukang Batu 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00
0.075 Oh Kepala Tukang 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 5 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
136.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.544 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.750 Oh Tukang Batu 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00
0.075 Oh Kepala Tukang 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 6 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
117.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.561 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.750 Oh Tukang Batu 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00
0.075 Oh Kepala Tukang 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M3 Pasang Pondasi Batu Kali, 1 Pc : 8 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
91.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 8


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.584 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00 216,525.00


1.500 Oh Pekerja 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00 77,000.00 115,500.00
0.750 Oh Tukang Batu 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00 109,500.00 82,125.00
0.075 Oh Kepala Tukang 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50 120,500.00 9,037.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M3 Pasang Pondasi Batu Kosong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu kali/ Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.432 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 112,593.00 112,593.00 112,593.00 112,593.00 112,593.00 112,593.00


0.780 Oh Pekerja 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00
0.390 Oh Tukang Batu 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00
0.039 Oh Kepala Tukang 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50
0.039 Oh Mandor 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M3 Pasang Pondasi batu kali kawat bronjong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Batu kali/ Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.800 Kg Kawat bronjong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 112,593.00 112,593.00 112,593.00 112,593.00 112,593.00 112,593.00


0.780 Oh Pekerja 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00 77,000.00 60,060.00
0.390 Oh Tukang Batu 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00 109,500.00 42,705.00
0.039 Oh Kepala Tukang 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50 120,500.00 4,699.50
0.039 Oh Mandor 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50 131,500.00 5,128.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M3 Pasang Pondasi Sumuran & 100 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.450 M3 Batu kali/ Batu Belah 15/20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
194.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.312 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.468 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 297,688.50 297,688.50 297,688.50 297,688.50 297,688.50 297,688.50


2.400 Oh Pekerja 77,000.00 184,800.00 77,000.00 184,800.00 77,000.00 184,800.00 77,000.00 184,800.00 77,000.00 184,800.00 77,000.00 184,800.00
0.800 Oh Tukang Batu 109,500.00 87,600.00 109,500.00 87,600.00 109,500.00 87,600.00 109,500.00 87,600.00 109,500.00 87,600.00 109,500.00 87,600.00
0.080 Oh Kepala Tukang 120,500.00 9,640.00 120,500.00 9,640.00 120,500.00 9,640.00 120,500.00 9,640.00 120,500.00 9,640.00 120,500.00 9,640.00
0.119 Oh Mandor 131,500.00 15,648.50 131,500.00 15,648.50 131,500.00 15,648.50 131,500.00 15,648.50 131,500.00 15,648.50 131,500.00 15,648.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 9


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M' Pembuatan Tiang Pancang (40 x 40) cm, Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Bertulang

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.019 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.094 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
60.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
45.000 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.900 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Kayu Kasau 5/7 kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.120 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.090 Ltr Minyak Bekisting #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.240 Kg Plamir Tembok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 165,013.50 165,013.50 165,013.50 165,013.50 165,013.50 165,013.50


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
0.670 Oh Tukang Batu 109,500.00 73,365.00 109,500.00 73,365.00 109,500.00 73,365.00 109,500.00 73,365.00 109,500.00 73,365.00 109,500.00 73,365.00
0.067 Oh Kepala Tukang 120,500.00 8,073.50 120,500.00 8,073.50 120,500.00 8,073.50 120,500.00 8,073.50 120,500.00 8,073.50 120,500.00 8,073.50
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M' Pembuatan Tiang Pancang (35 x 35) cm, Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Bertulang

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.016 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.080 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.125 M3 Koral Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
49.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
34.500 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.700 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.027 M3 Kayu Kasau 5/7 kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.120 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.090 Ltr Minyak Bekisting #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Kg Plamir Tembok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 127,635.00 127,635.00 127,635.00 127,635.00 127,635.00 127,635.00


0.800 Oh Pekerja 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00
0.500 Oh Tukang Batu 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00
0.050 Oh Kepala Tukang 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00
0.040 Oh Mandor 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

IV PEKERJAAN DINDING

SNI OKI 2019 Page 10


1 2 3 4 5 6 7 8 9 10 11 12 11 12
1 1 M2 Pasangan Batu Bata (8x8x18) 1 Pc : 2 Ps tebal 1 batu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M3 Pasangan Batu Bata (8x8x18) , 1 Pc : 2 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


55.000 Bh Batu Bata bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
43.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.080 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 74,455.00 74,455.00 74,455.00 74,455.00 74,455.00 74,455.00


0.600 Oh Pekerja 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M2 Pasangan Batu Bata (8x8x18) tebal 1 batu, 1 Pc : 4 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M3 Pasangan Batu Bata (8x8x18) , 1 Pc : 4 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


55.000 Bh Batu Bata Bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
26.550 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.093 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 74,455.00 74,455.00 74,455.00 74,455.00 74,455.00 74,455.00


0.600 Oh Pekerja 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M2 Pasangan Batu Bata (8x8x18) Tebal 1/2 Bata, 1 Pc:2 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M3 Pasangan Batu Bata (8x8x18) Tebal 1/2 Bata, 1 Pc : 2 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


55.000 Bh Batu Bata Bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18.950 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.038 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M2 Pasangan Batu Bata (8x8x18) Tebal 1/2 Bata, 1 Pc : 4 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M3 Pasangan Batu Bata (8x8x18) Tebal 1/2 Bata, 1 Pc : 4 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 11


1 2 3 4 5 6 7 8 9 10 11 12 11 12
55.000 Bh Batu Bata Bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.043 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M2 Pasang Dinding Rooster / Terawang cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


30.000 Bh Rooster / Terawang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M2 Pasang Dinding Rooster warna/Terawang cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


30.000 Bh Rooster / Terawang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50 37,227.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M2 Pasang Lantai Selapis Bata #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


40.000 Bh Batu bata kecil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,370.00 37,370.00 37,370.00 37,370.00 37,370.00 37,370.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.060 Oh Tukang Batu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 12


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

V PEKERJAAN PLESTERAN
1 1 M2 Plesteran 1 Pc : 1 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


15.504 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.016 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.150 Oh Tukang Batu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


10.224 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.150 Oh Tukang Batu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


6.240 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.150 Oh Tukang Batu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M2 Pemasangan acian #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.250 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 13


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00
0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.184 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.026 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.150 Oh Tukang Batu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


4.416 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.027 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00 43,305.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.150 Oh Tukang Batu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 20 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


13.632 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.027 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.022 Oh Mandor 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 14


1 2 3 4 5 6 7 8 9 10 11 12 11 12

8 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 20 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


10.368 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.031 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 45,973.75 45,973.75 45,973.75 45,973.75 45,973.75 45,973.75


0.260 Oh Pekerja 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 20 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


8.320 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.320 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.022 Oh Mandor 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 20 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


6.912 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.022 Oh Mandor 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M2 Plesteran 1 Pc : 6 Ps, Tebal 20 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.888 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.036 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00 58,003.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00

SNI OKI 2019 Page 15


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.022 Oh Mandor 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00 131,500.00 2,893.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M2 Plesteran 1 Pc : 2 Ps, Tebal 25 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


15.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.013 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 25 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


11.750 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 M2 Plesteran 1 Pc : 4 Ps, Tebal 25 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


9.480 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.038 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 M2 Plesteran 1 Pc : 5 Ps, Tebal 25 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


7.940 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.039 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 16


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50 49,119.50
0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 1 M2 Berapen 1 Pc : 5 Ps, Tebal 15 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


4.320 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.022 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 21,110.50 21,110.50 21,110.50 21,110.50 21,110.50 21,110.50


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.070 Oh Tukang Batu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.007 Oh Kepala Tukang 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 M' Plesteran Profil 1 Pc : 3 Ps, + Acian #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M' Plesteran Profil 1 Pc : 3 Ps, + Acian Lt.II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


25.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 127,176.75 127,176.75 127,176.75 127,176.75 127,176.75 127,176.75


0.540 Oh Pekerja 77,000.00 41,580.00 77,000.00 41,580.00 77,000.00 41,580.00 77,000.00 41,580.00 77,000.00 41,580.00 77,000.00 41,580.00
0.675 Oh Tukang Batu 109,500.00 73,912.50 109,500.00 73,912.50 109,500.00 73,912.50 109,500.00 73,912.50 109,500.00 73,912.50 109,500.00 73,912.50
0.068 Oh Kepala Tukang 120,500.00 8,133.75 120,500.00 8,133.75 120,500.00 8,133.75 120,500.00 8,133.75 120,500.00 8,133.75 120,500.00 8,133.75
0.027 Oh Mandor 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm + acian #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M2 Plesteran Beton 1 Pc : 3 Ps, Tebal 15 mm + acian Lt.II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


15.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.021 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 46,039.50 46,039.50 46,039.50 46,039.50 46,039.50 46,039.50


0.260 Oh Pekerja 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00
0.200 Oh Tukang Batu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 17


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 M2 Plesteran Skoning 1 Pc : 3 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.013 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,306.00 55,306.00 55,306.00 55,306.00 55,306.00 55,306.00


0.080 Oh Pekerja 77,000.00 6,160.00 77,000.00 6,160.00 77,000.00 6,160.00 77,000.00 6,160.00 77,000.00 6,160.00 77,000.00 6,160.00
0.400 Oh Tukang Batu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.004 Oh Mandor 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 M2 Plesteran Ciprat 1 Pc : 2 Ps #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


4.320 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.016 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 33,377.50 33,377.50 33,377.50 33,377.50 33,377.50 33,377.50


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

VI PEKERJAAN KAYU
1 1 M3 Pasang Kusen Pintu dan Jendela Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Kayu Kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.250 Kg Paku 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00


6.000 Oh Pekerja 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00
18.000 Oh Tukang Kayu 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00
1.800 Oh Kepala Tukang 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00
0.300 Oh Mandor 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M3 Pasang Kusen Pintu dan Jendela Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! - #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M3 Kayu Kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.250 Kg Paku 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
-

SNI OKI 2019 Page 18


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00 2,689,350.00
6.000 Oh Pekerja 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00
18.000 Oh Tukang Kayu 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00 109,500.00 1,971,000.00
1.800 Oh Kepala Tukang 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00 120,500.00 216,900.00
0.300 Oh Mandor 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M2 Pasang Pintu Panel Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu Kls II, Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Paku 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 448,225.00 448,225.00 448,225.00 448,225.00 448,225.00 448,225.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
3.000 Oh Tukang Kayu 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M2 Pasang Pintu Panel Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Paku 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 448,225.00 448,225.00 448,225.00 448,225.00 448,225.00 448,225.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
3.000 Oh Tukang Kayu 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M2 Pasang Pintu dan Jendela Kaca Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.024 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.600 M2 Kaca bening 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 358,580.00 358,580.00 358,580.00 358,580.00 358,580.00 358,580.00


0.800 Oh Pekerja 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00
2.400 Oh Tukang Kayu 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00
0.240 Oh Kepala Tukang 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00
0.040 Oh Mandor 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M2 Pasang Pintu dan Jendela Kaca Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 19
1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.024 M3 Kayu kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.600 M2 Kaca bening 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 358,580.00 358,580.00 358,580.00 358,580.00 358,580.00 358,580.00


0.800 Oh Pekerja 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00 77,000.00 61,600.00
2.400 Oh Tukang Kayu 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00 109,500.00 262,800.00
0.240 Oh Kepala Tukang 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00 120,500.00 28,920.00
0.040 Oh Mandor 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00 131,500.00 5,260.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M2 Pasang Pintu dan Jendela Jalusi/ram Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.064 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 507,400.00 507,400.00 507,400.00 507,400.00 507,400.00 507,400.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
3.000 Oh Tukang Kayu 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.500 Oh Mandor 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M2 Pasang Pintu dan Jendela Jalusi/ram Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.064 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Lem kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 507,400.00 507,400.00 507,400.00 507,400.00 507,400.00 507,400.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
3.000 Oh Tukang Kayu 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.500 Oh Mandor 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00 131,500.00 65,750.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M2 Pasang Pintu Plywood 4mm Rangkap,Rangka Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.025 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku Biasa 1 cm - 2,5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Lem Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Lbr Plywood 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 313,757.50 313,757.50 313,757.50 313,757.50 313,757.50 313,757.50


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
2.100 Oh Tukang Kayu 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00
0.210 Oh Kepala Tukang 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00

SNI OKI 2019 Page 20


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M2 Pasang Pintu Plywood 4 mm Rangkap,Rangka Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.025 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku Biasa 1 cm - 2,5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Lem Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Lbr Plywood 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 313,757.50 313,757.50 313,757.50 313,757.50 313,757.50 313,757.50


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
2.100 Oh Tukang Kayu 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00
0.210 Oh Kepala Tukang 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00 120,500.00 25,305.00
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M2 Pasang Jalusi Mati Kusen Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.060 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Paku Biasa 1-2,5 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 338,742.50 338,742.50 338,742.50 338,742.50 338,742.50 338,742.50


0.670 Oh Pekerja 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00
2.000 Oh Tukang Kayu 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00
0.200 Oh Kepala Tukang 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00
0.335 Oh Mandor 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M2 Pasang Jalusi Mati Kusen Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.060 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Paku Biasa 1-2,5 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 338,742.50 338,742.50 338,742.50 338,742.50 338,742.50 338,742.50


0.670 Oh Pekerja 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00 77,000.00 51,590.00
2.000 Oh Tukang Kayu 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00 109,500.00 219,000.00
0.200 Oh Kepala Tukang 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00 120,500.00 24,100.00
0.335 Oh Mandor 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 21


1 2 3 4 5 6 7 8 9 10 11 12 11 12

13 1 M3 (Atap)Pasang Konstruksi Kuda-kuda / gording Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M3 Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15.000 Kg Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.800 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50


6.700 Oh Pekerja 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00
20.100 Oh Tukang Kayu 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00
2.010 Oh Kepala Tukang 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00
0.335 Oh Mandor 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 M3 (Atap) Pasang Konstruksi Kuda-kuda/gording Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M3 Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15.000 Kg Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.800 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50 3,003,107.50


6.700 Oh Pekerja 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00 77,000.00 515,900.00
20.100 Oh Tukang Kayu 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00 109,500.00 2,200,950.00
2.010 Oh Kepala Tukang 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00 120,500.00 242,205.00
0.335 Oh Mandor 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50 131,500.00 44,052.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 M2 Pasang Kasau + Reng Genteng Kodok Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 1 M2 Pasang Kasau + Reng Genteng Kodok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 22


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.014 M3 Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 M2 Pasang Kasau + Reng Genteng Keramik Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kaso-kaso 5x7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.036 M3 Reng 2 x3 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M2 Pasang Kasau + Reng Genteng Beton Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kaso-kaso 5x7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.057 M3 Reng 3 x4 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 M2 Pasang Kasau + Reng Genteng Beton Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kaso-kaso 5x7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.057 M3 Reng 3 x4 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku Biasa 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 23


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 M2 Pasang Kasau + Reng Atap Sirap Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.057 Kg Paku Biasa 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.120 Oh Tukang Kayu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

21 1 M2 Pasang Kasau + Reng Atap Sirap Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.014 M3 Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.057 Kg Paku Biasa 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.120 Oh Tukang Kayu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

22 1 M2 Pasang Rangka Langit-langit (50 x 100) m, Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0154 M3 Kaso-kaso 5x7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.2000 Kg Paku Biasa 7 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 57,877.50 57,877.50 57,877.50 57,877.50 57,877.50 57,877.50


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 M2 Pasang Rangka Langit-langit (50 x 100) cm, Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0154 M3 Kaso-kaso 5x7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.2000 Kg Paku Biasa 7 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 57,877.50 57,877.50 57,877.50 57,877.50 57,877.50 57,877.50

SNI OKI 2019 Page 24


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

24 1 M2 Pasang Rangka Langit-langit (60 x 60) cm, Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0163 M3 Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,180.00 53,180.00 53,180.00 53,180.00 53,180.00 53,180.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

25 1 M2 Pasang Rangka Langit-langit (60 x 60) m, Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0163 M3 Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,180.00 53,180.00 53,180.00 53,180.00 53,180.00 53,180.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

26 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0108 M3 Papan kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.1000 Kg Paku Biasa 5 cm - 7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

27 1 M' Pasang Lisplang Ukuran (3 x 20) cm, Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.007 M3 Papan kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 25


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.050 Kg Paku Biasa 5 cm - 7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 33,270.00 33,270.00 33,270.00 33,270.00 33,270.00 33,270.00


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.025 Oh Kepala Tukang 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

28 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.011 M3 Kayu kls II papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku Biasa 5 cm - 7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

29 1 M' Pasang Lisplang Ukuran (3 x 30) cm, Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.011 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku 5 cm - 7 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50 32,667.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

30 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.015 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 51,800.00 51,800.00 51,800.00 51,800.00 51,800.00 51,800.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.250 Oh Tukang Kayu 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00
0.025 Oh Kepala Tukang 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

31 1 M' Pasang Lisplang Ukuran 2 x (3 x 20) cm, Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 26
1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.015 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 51,800.00 51,800.00 51,800.00 51,800.00 51,800.00 51,800.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.250 Oh Tukang Kayu 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00
0.025 Oh Kepala Tukang 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

32 1 M2 Pasang Dinding Papan+ rangka Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls II Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Kayu Kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 76,110.00 76,110.00 76,110.00 76,110.00 76,110.00 76,110.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.450 Oh Tukang Kayu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

33 1 M2 Pasang Dinding Papan+ rangka Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls III Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.560 Kg Lem Kayu

b. Tenaga 76,110.00 76,110.00 76,110.00 76,110.00 76,110.00 76,110.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.450 Oh Tukang Kayu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.075 Oh Mandor 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50 131,500.00 9,862.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

34 1 M2 Pasang Dinding Plywood Rangkap, Rangka Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.028 M3 Kayu Kls II Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Paku 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.860 Kpg Plywood 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 27


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.560 Kg Lem Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

35 1 M2 Pasang Dinding Plywood Rangkap, Rangka Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls III Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kpg Plywood 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

36 1 M' Pasang List Plafond Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M' Kayu List #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 4,289.00 4,289.00 4,289.00 4,289.00 4,289.00 4,289.00


0.021 Oh Pekerja 77,000.00 1,617.00 77,000.00 1,617.00 77,000.00 1,617.00 77,000.00 1,617.00 77,000.00 1,617.00 77,000.00 1,617.00
0.021 Oh Tukang Kayu 109,500.00 2,299.50 109,500.00 2,299.50 109,500.00 2,299.50 109,500.00 2,299.50 109,500.00 2,299.50 109,500.00 2,299.50
0.002 Oh Kepala Tukang 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00 120,500.00 241.00
0.001 Oh Mandor 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

37 1 M3 Pasang Tiang Kayu, Belandar Kayu Kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M3 Kayu Kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 1,466,225.00 1,466,225.00 1,466,225.00 1,466,225.00 1,466,225.00 1,466,225.00


3.000 Oh Pekerja 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00
10.000 Oh Tukang Kayu 109,500.00 1,095,000.00 109,500.00 1,095,000.00 109,500.00 1,095,000.00 109,500.00 1,095,000.00 109,500.00 1,095,000.00 109,500.00 1,095,000.00
1.000 Oh Kepala Tukang 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00
0.150 Oh Mandor 131,500.00 19,725.00 131,500.00 19,725.00 131,500.00 19,725.00 131,500.00 19,725.00 131,500.00 19,725.00 131,500.00 19,725.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 28


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

38 1 M2 Pasang Dinding Papan Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 44,822.50 44,822.50 44,822.50 44,822.50 44,822.50 44,822.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

39 1 M2 Pasang Lantai Papan Kayu kls. III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.033 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

40 1 M2 Pasang Kasau + Reng Atap Seng Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.008 M3 Kayu Kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

41 1 M2 Pasang Daun Meja Papan Kayu kls. III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.024 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 29


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00
0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

42 1 M2 Pasang Daun Meja Papan Kayu kls III di Serut #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 67,233.75 67,233.75 67,233.75 67,233.75 67,233.75 67,233.75


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.450 Oh Tukang Kayu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.008 Oh Mandor 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

43 1 M2 Pasang Dinding Papan Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.020 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 44,822.50 44,822.50 44,822.50 44,822.50 44,822.50 44,822.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

44 1 M2 Pasang Dinding Papan Diserut Kayu Kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.024 M3 Kayu Kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 30


1 2 3 4 5 6 7 8 9 10 11 12 11 12
VII PEKERJAAN BETON
1 1 M3 Membuat Beton mutu fc = 7,4 Mpa (K-100) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


247.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
869.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
999.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
\
b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00
1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M3 Membuat Beton mutu fc = 9,8 Mpa (K-125) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


276.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
828.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,012.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,089.50 171,089.50 171,089.50 171,089.50 171,089.50 171,089.50


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.025 Oh Kepala Tukang 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50 120,500.00 3,012.50
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M3 Membuat Beton mutu fc = 12,2 Mpa (K-150) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


299.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
799.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,017.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M3 Membuat Beton mutu fc = 14,5 Mpa (K-175) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


326.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 31


1 2 3 4 5 6 7 8 9 10 11 12 11 12
760.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,029.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M3 Membuat Beton mutu fc = 16,9 Mpa (K-200) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


352.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
731.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,031.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M3 Membuat Beton mutu fc = 19,3 Mpa (K-225) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


371.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
698.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,047.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


384.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
692.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,039.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00

SNI OKI 2019 Page 32


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M3 Membuat Beton mutu fc = 24 Mpa (K-275) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


406.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
684.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,026.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M3 Membuat Beton mutu fc = 26,4 Mpa (K-300) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


413.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
681.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,021.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M3 Membuat Beton mutu fc = 28,8 Mpa (K-325) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


8 413.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
681.000 Kg Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1,021.000 Kg Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215.000 Ltr Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00 171,451.00


1.650 Oh Pekerja 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00 77,000.00 127,050.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.028 Oh Kepala Tukang 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00 120,500.00 3,374.00
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 33


1 2 3 4 5 6 7 8 9 10 11 12 11 12

11 1 M² Lapis Aspal Perekat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.800 ltr Aspal #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00 36,250.00


0.300 Oh Pekerja 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00 77,000.00 23,100.00
0.100 Oh Mandor 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 2 Ps : 4 Kr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


291.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.470 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.930 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50


2.000 Oh Pekerja 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 3 Kr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


367.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.440 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.880 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50


2.000 Oh Pekerja 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1,5 Ps : 2,5 Kr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


400.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.480 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.800 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50


2.000 Oh Pekerja 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50

SNI OKI 2019 Page 34


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 M3 Membuat Beton Tak Bertulang, 1 Pc : 1 Ps : 1 Kr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


615.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50 199,244.50


2.000 Oh Pekerja 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00 77,000.00 154,000.00
0.275 Oh Tukang Batu 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50 109,500.00 30,112.50
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.083 Oh Mandor 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50 131,500.00 10,914.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 1 Kg Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 Kg Besi Beton ( Polos / Ulir ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 1,442.45 1,442.45 1,442.45 1,442.45 1,442.45 1,442.45


0.0070 Oh Pekerja 77,000.00 539.00 77,000.00 539.00 77,000.00 539.00 77,000.00 539.00 77,000.00 539.00 77,000.00 539.00
0.0070 Oh Tukang Besi 109,500.00 766.50 109,500.00 766.50 109,500.00 766.50 109,500.00 766.50 109,500.00 766.50 109,500.00 766.50
0.0007 Oh Kepala Tukang 120,500.00 84.35 120,500.00 84.35 120,500.00 84.35 120,500.00 84.35 120,500.00 84.35 120,500.00 84.35
0.0004 Oh Mandor 131,500.00 52.60 131,500.00 52.60 131,500.00 52.60 131,500.00 52.60 131,500.00 52.60 131,500.00 52.60
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 M2 Pasang Bekisting Untuk Pondasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 Kg Paku 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Ltr Minyak Bekisting/solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 75,062.00 75,062.00 75,062.00 75,062.00 75,062.00 75,062.00


0.520 Oh Pekerja 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00
0.260 Oh Tukang Kayu 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00
0.026 Oh Kepala Tukang 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00
0.026 Oh Mandor 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M2 Pasang Bekisting Untuk Sloof #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.045 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Paku 5 cm - 10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 35


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.100 Ltr Minyak Bekisting/solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 75,062.00 75,062.00 75,062.00 75,062.00 75,062.00 75,062.00


0.520 Oh Pekerja 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00 77,000.00 40,040.00
0.260 Oh Tukang Kayu 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00 109,500.00 28,470.00
0.026 Oh Kepala Tukang 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00 120,500.00 3,133.00
0.026 Oh Mandor 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00 131,500.00 3,419.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 M2 Pasang Bekisting Untuk Kolom #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Kg Paku Biasa 5"- 12" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Ltr Minyak Bekisting/solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 M3 Balok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Lbr Plywood Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Btg Kayu Gelam dia 8-10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 95,271.00 95,271.00 95,271.00 95,271.00 95,271.00 95,271.00


0.660 Oh Pekerja 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00
0.330 Oh Tukang Kayu 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00
0.033 Oh Kepala Tukang 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50
0.033 Oh Mandor 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 M2 Pasang Bekisting Untuk Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Kg Paku Biasa 5"- 12" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Ltr Minyak Bekisting/solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Balok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Lbr Plywood Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Btg Kayu Gelam dia 8-10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50


0.320 Oh Pekerja 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00
0.330 Oh Tukang Kayu 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00
0.033 Oh Kepala Tukang 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

21 1 M2 Pasang Bekisting Untuk Lantai #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.040 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Kg Paku Biasa 5"- 12" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Ltr Minyak Bekisting #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 M3 Balok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Lbr Plywood Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 36


1 2 3 4 5 6 7 8 9 10 11 12 11 12
6.000 Btg Kayu Gelam dia 8-10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50


0.320 Oh Pekerja 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00
0.330 Oh Tukang Batu 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00
0.033 Oh Kepala Tukang 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

22 1 M2 Pasang Bekisting Untuk Dinding #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.030 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Kg Paku Biasa 5"- 12" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Ltr Minyak Bekisting #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Balok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Lbr Plywood Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Btg Kayu Gelam dia 8-10 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 95,271.00 95,271.00 95,271.00 95,271.00 95,271.00 95,271.00


0.660 Oh Pekerja 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00 77,000.00 50,820.00
0.330 Oh Tukang Kayu 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00
0.033 Oh Kepala Tukang 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50
0.033 Oh Mandor 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50 131,500.00 4,339.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

23 1 M2 Pasang Bekisting Untuk Tangga #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.030 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Kg Paku Biasa 5"- 12" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Ltr Minyak Bekisting #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 M3 Balok Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Lbr Plywood Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50 65,540.50


0.320 Oh Pekerja 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00 77,000.00 24,640.00
0.330 Oh Tukang Kayu 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00 109,500.00 36,135.00
0.033 Oh Kepala Tukang 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50 120,500.00 3,976.50
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

24 1 M2 Pasang bekisting Jembatan Cor #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.0264 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.6000 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.5000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 18,679.50 18,679.50 18,679.50 18,679.50 18,679.50 18,679.50

SNI OKI 2019 Page 37


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.050 Oh Tukang Kayu 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

25 1 M3 Membuat Pondasi Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.200 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.400 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.000 Kg Besi Beton Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.250 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 618,700.00 618,700.00 618,700.00 618,700.00 618,700.00 618,700.00


3.900 Oh Pekerja 77,000.00 300,300.00 77,000.00 300,300.00 77,000.00 300,300.00 77,000.00 300,300.00 77,000.00 300,300.00 77,000.00 300,300.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
1.040 Oh Tukang Kayu 109,500.00 113,880.00 109,500.00 113,880.00 109,500.00 113,880.00 109,500.00 113,880.00 109,500.00 113,880.00 109,500.00 113,880.00
1.050 Oh Tukang Besi 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00
0.245 Oh Kepala Tukang 120,500.00 29,522.50 120,500.00 29,522.50 120,500.00 29,522.50 120,500.00 29,522.50 120,500.00 29,522.50 120,500.00 29,522.50
0.165 Oh Mandor 131,500.00 21,697.50 131,500.00 21,697.50 131,500.00 21,697.50 131,500.00 21,697.50 131,500.00 21,697.50 131,500.00 21,697.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 M3 Membuat Pondasi Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.00 Kg 1 M3 Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 M3 Pasang Bekisting Untuk Pondasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 M3 Membuat Sloof Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.00 Kg 1 M3 Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 M3 Pasang Bekisting Untuk Sloof #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 M3 Membuat Kolom Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.00 Kg 1 M3 Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 M3 Pasang Bekisting Untuk Kolom #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 M3 Membuat Balok Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.00 Kg 1 M3 Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 M3 Pasang Bekisting Untuk Balok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1M3Membuat Beton Plat lantai Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 38


1 2 3 4 5 6 7 8 9 10 11 12 11 12
110.00 Kg 1 M3 Pembesian dengan Besi Polos atau Besi Ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 M3 Membuat Beton mutu fc = 21,7 Mpa (K-250) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.000 M3 Pasang Bekisting Untuk Plat lantai #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

26 1 M3 Membuat Sloof Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.270 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.600 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.000 Kg Besi Beton Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 798,135.50 798,135.50 798,135.50 798,135.50 798,135.50 798,135.50


4.850 Oh Pekerja 77,000.00 373,450.00 77,000.00 373,450.00 77,000.00 373,450.00 77,000.00 373,450.00 77,000.00 373,450.00 77,000.00 373,450.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
1.560 Oh Tukang Kayu 109,500.00 170,820.00 109,500.00 170,820.00 109,500.00 170,820.00 109,500.00 170,820.00 109,500.00 170,820.00 109,500.00 170,820.00
1.400 Oh Tukang Besi 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00
0.331 Oh Kepala Tukang 120,500.00 39,885.50 120,500.00 39,885.50 120,500.00 39,885.50 120,500.00 39,885.50 120,500.00 39,885.50 120,500.00 39,885.50
0.170 Oh Mandor 131,500.00 22,355.00 131,500.00 22,355.00 131,500.00 22,355.00 131,500.00 22,355.00 131,500.00 22,355.00 131,500.00 22,355.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

27 1 M3 Membuat Kolom Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.400 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4.000 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140.000 Kg Besi Beton Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 1,293,285.00 1,293,285.00 1,293,285.00 1,293,285.00 1,293,285.00 1,293,285.00


7.300 Oh Pekerja 77,000.00 562,100.00 77,000.00 562,100.00 77,000.00 562,100.00 77,000.00 562,100.00 77,000.00 562,100.00 77,000.00 562,100.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
3.300 Oh Tukang Kayu 109,500.00 361,350.00 109,500.00 361,350.00 109,500.00 361,350.00 109,500.00 361,350.00 109,500.00 361,350.00 109,500.00 361,350.00
2.100 Oh Tukang Besi 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00 109,500.00 229,950.00
0.570 Oh Kepala Tukang 120,500.00 68,685.00 120,500.00 68,685.00 120,500.00 68,685.00 120,500.00 68,685.00 120,500.00 68,685.00 120,500.00 68,685.00
0.250 Oh Mandor 131,500.00 32,875.00 131,500.00 32,875.00 131,500.00 32,875.00 131,500.00 32,875.00 131,500.00 32,875.00 131,500.00 32,875.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

28 1 M3 Membuat Balok Beton Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.320 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.200 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.600 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 39
1 2 3 4 5 6 7 8 9 10 11 12 11 12
140.000 Kg Besi Beton Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 1,039,324.50 1,039,324.50 1,039,324.50 1,039,324.50 1,039,324.50 1,039,324.50


5.960 Oh Pekerja 77,000.00 458,920.00 77,000.00 458,920.00 77,000.00 458,920.00 77,000.00 458,920.00 77,000.00 458,920.00 77,000.00 458,920.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
2.800 Oh Tukang Kayu 109,500.00 306,600.00 109,500.00 306,600.00 109,500.00 306,600.00 109,500.00 306,600.00 109,500.00 306,600.00 109,500.00 306,600.00
1.400 Oh Tukang Besi 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00
0.455 Oh Kepala Tukang 120,500.00 54,827.50 120,500.00 54,827.50 120,500.00 54,827.50 120,500.00 54,827.50 120,500.00 54,827.50 120,500.00 54,827.50
0.208 Oh Mandor 131,500.00 27,352.00 131,500.00 27,352.00 131,500.00 27,352.00 131,500.00 27,352.00 131,500.00 27,352.00 131,500.00 27,352.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

31 1M3Membuat Beton Plat lantai Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.240 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.200 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.600 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
110.000 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.160 M3 Balok Kayu kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.800 Lbr Plywood 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
24.000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 947,159.50 947,159.50 947,159.50 947,159.50 947,159.50 947,159.50


5.600 Oh Pekerja 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
2.640 Oh Tukang Kayu 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00
1.050 Oh Tukang Besi 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00
0.400 Oh Kepala Tukang 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00
0.193 Oh Mandor 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

32 1M3Membuat Beton Plat lantai Bertulang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.240 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.600 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
115.000 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.160 M3 Balok Kayu kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 40
1 2 3 4 5 6 7 8 9 10 11 12 11 12
2.800 Lbr Plywood 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
24.000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 947,159.50 947,159.50 947,159.50 947,159.50 947,159.50 947,159.50


5.600 Oh Pekerja 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
2.640 Oh Tukang Kayu 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00 109,500.00 289,080.00
1.050 Oh Tukang Besi 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00 109,500.00 114,975.00
0.400 Oh Kepala Tukang 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00 120,500.00 48,200.00
0.193 Oh Mandor 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50 131,500.00 25,379.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

33 1 M3 Membuat Tangga Beton Bertulang ( 200 Kg Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
+ Bekisting )

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.250 M3 Kayu kls IV papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.200 Ltr Minyak Bekisting/ solar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
200.000 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.520 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.780 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.105 M3 Balok Kayu kls IV #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.500 Lbr Plywood 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
14.000 Btg Kayu Gelam dia 10-12 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 950,040.50 950,040.50 950,040.50 950,040.50 950,040.50 950,040.50


5.600 Oh Pekerja 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00 77,000.00 431,200.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
2.300 Oh Tukang Kayu 109,500.00 251,850.00 109,500.00 251,850.00 109,500.00 251,850.00 109,500.00 251,850.00 109,500.00 251,850.00 109,500.00 251,850.00
1.400 Oh Tukang Besi 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00 109,500.00 153,300.00
0.405 Oh Kepala Tukang 120,500.00 48,802.50 120,500.00 48,802.50 120,500.00 48,802.50 120,500.00 48,802.50 120,500.00 48,802.50 120,500.00 48,802.50
0.202 Oh Mandor 131,500.00 26,563.00 131,500.00 26,563.00 131,500.00 26,563.00 131,500.00 26,563.00 131,500.00 26,563.00 131,500.00 26,563.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

34 1 M' Kolom Praktis Penguat Beton Bertulang ( 11 x 11 ) cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.002 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.000 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.450 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.006 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.009 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 22,336.50 22,336.50 22,336.50 22,336.50 22,336.50 22,336.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.020 Oh Tukang Batu 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00

SNI OKI 2019 Page 41


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.020 Oh Tukang Kayu 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00
0.020 Oh Tukang Besi 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00 109,500.00 2,190.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

35 1 M' Membuat Ring Balok Beton Bertulang ( 10 x 15 ) cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.003 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku Biasa 2"- 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.600 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Kawat Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5.500 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.009 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 M3 Batu Pecah 2-3 Cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,887.00 36,887.00 36,887.00 36,887.00 36,887.00 36,887.00


0.297 Oh Pekerja 77,000.00 22,869.00 77,000.00 22,869.00 77,000.00 22,869.00 77,000.00 22,869.00 77,000.00 22,869.00 77,000.00 22,869.00
0.033 Oh Tukang Batu 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50
0.033 Oh Tukang Kayu 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50
0.033 Oh Tukang Besi 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50 109,500.00 3,613.50
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.015 Oh Mandor 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50 131,500.00 1,972.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

VIII PEKERJAAN PENUTUP ATAP


1 1 M2 Pasang Atap Genteng kodok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


25.000 Bh Genteng kodok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 21,778.50 21,778.50 21,778.50 21,778.50 21,778.50 21,778.50


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.075 Oh Tukang Kayu 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50
0.008 Oh Kepala Tukang 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M2 Pasang Atap Genteng Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


25.000 Bh Genteng Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 21,778.50 21,778.50 21,778.50 21,778.50 21,778.50 21,778.50


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.075 Oh Tukang Kayu 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50
0.008 Oh Kepala Tukang 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 42
1 2 3 4 5 6 7 8 9 10 11 12 11 12

3 1 M2 Pasang Atap Genteng Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


11.000 Bh Genteng Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku biasa 2"-5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M2 Pasang Atap Genteng Keramik Natural 193,870.00 198,370.00 201,370.00 205,870.00 208,870.00 210,370.00

a. Bahan 165,000.00 169,500.00 172,500.00 177,000.00 180,000.00 181,500.00


15.000 Bh Genteng keramik natural 11,000.00 165,000.00 11,300.00 169,500.00 11,500.00 172,500.00 11,800.00 177,000.00 12,000.00 180,000.00 12,100.00 181,500.00

b. Tenaga 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) 193,870.00 198,370.00 201,370.00 205,870.00 208,870.00 210,370.00
Overhead & Profit (Contoh 15 %) 29,080.50 29,755.50 30,205.50 30,880.50 31,330.50 31,555.50
Harga Satuan Pekerjaan 222,950.50 228,125.50 231,575.50 236,750.50 240,200.50 241,925.50

5 1 M2 Pasang Atap Genteng Keramik Maroon 238,870.00 241,870.00 246,370.00 249,370.00 253,870.00 255,370.00

a. Bahan 210,000.00 213,000.00 217,500.00 220,500.00 225,000.00 226,500.00


15.000 Bh Genteng keramik maroon 14,000.00 210,000.00 14,200.00 213,000.00 14,500.00 217,500.00 14,700.00 220,500.00 15,000.00 225,000.00 15,100.00 226,500.00

b. Tenaga 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00 28,870.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) 238,870.00 241,870.00 246,370.00 249,370.00 253,870.00 255,370.00
Overhead & Profit (Contoh 15 %) 35,830.50 36,280.50 36,955.50 37,405.50 38,080.50 38,305.50
Harga Satuan Pekerjaan 274,700.50 278,150.50 283,325.50 286,775.50 291,950.50 293,675.50

6 1 m2 Atap Genteng Metal Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


kpg Genteng Multiroof Polos
1.300 48,000.00 62,400.00 48,500.00 63,050.00 49,000.00 63,700.00 49,500.00 64,350.00 50,500.00 65,650.00 51,000.00 66,300.00
0.200 kg Paku anti karat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 27,686.50 27,686.50 27,686.50 27,686.50 27,686.50 27,686.50


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.001 Oh Mandor 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 43


1 2 3 4 5 6 7 8 9 10 11 12 11 12

7 1 m' Bubungan Genteng Metal Polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 m' Bubungan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 kg Paku anti karat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,192.00 39,192.00 39,192.00 39,192.00 39,192.00 39,192.00


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.150 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 m2 Atap Genteng Metal multiroof #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.300 kpg Genteng metal multiroof insulasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 kg Paku anti karat genteng metal #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 27,686.50 27,686.50 27,686.50 27,686.50 27,686.50 27,686.50


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.100 Oh Tukang 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.001 Oh Mandor 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 m' Bubungan Genteng Metal multiroof #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.100 m' Bubungan metal multiroof insulasi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 kg Paku anti karat genteng metal #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,192.00 39,192.00 39,192.00 39,192.00 39,192.00 39,192.00


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.150 Oh Tukang 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 m2 Rangka Atap baja ringan Tipe C #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 m2 Rangka atap baja ringan tipe C #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 kg Sekrup khusus baja ringan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50 20,512.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.100 Oh Tukang 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 44
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M' Pasang Bubungan Genteng Kodok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.000 Bh Genteng Bubungan Kodok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.002 Oh Mandor 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M' Pasang Bubung Genteng Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.000 Bh Genteng Bubungan biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.002 Oh Mandor 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M' Pasang bubungan Genteng Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


3.500 Bh Bubungan Genteng Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku biasa 1/2"-1" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.800 Kg Semen Abu-abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.002 Oh Mandor 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 45


1 2 3 4 5 6 7 8 9 10 11 12 11 12

9 1 M' Pas. Bubungan Genteng keramik natural #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.000 Bh Genteng Bubungan Keramik natural #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.002 Oh Mandor 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M' Pas. Bubungan Genteng keramik maroon #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


5.000 Bh Genteng Bubungan keramik maroon #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.032 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00 55,373.00


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.002 Oh Mandor 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00 131,500.00 263.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M2 Pasang Atap Asbes Gelombang besar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Lbr Asbes Gelombang besar 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.120 Kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00


0.140 Oh Pekerja 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00
0.070 Oh Tukang Kayu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.007 Oh Kepala Tukang 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50
0.007 Oh Mandor 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M2 Pasang Atap Asbes Gelombang kecil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Lbr Asbes Gelombang kecil 6kk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.120 Kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00

SNI OKI 2019 Page 46


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.140 Oh Pekerja 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00
0.070 Oh Tukang Kayu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.007 Oh Kepala Tukang 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50
0.007 Oh Mandor 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M' Pasang Bubungan asbes Gelombang besar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


2.400 Lbr Bubungan asbes Gelombang besar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 22,248.00 22,248.00 22,248.00 22,248.00 22,248.00 22,248.00


0.084 Oh Pekerja 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00
0.125 Oh Tukang Kayu 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50
0.013 Oh Kepala Tukang 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50
0.004 Oh Mandor 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 M' Pasang Bubungan asbes Gelombang kecil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


2.400 Lbr Bubungan asbes Gelombang kecil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 22,248.00 22,248.00 22,248.00 22,248.00 22,248.00 22,248.00


0.084 Oh Pekerja 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00 77,000.00 6,468.00
0.125 Oh Tukang Kayu 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50
0.013 Oh Kepala Tukang 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50
0.004 Oh Mandor 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 M2 Pasang Atap Seng Gelombang BJLS 20 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Lbr Seng Gelombang 3" x 6" BJLS 20(6kk) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.060 Oh Tukang Kayu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 47


1 2 3 4 5 6 7 8 9 10 11 12 11 12
16 1 M2 Pasang Atap Seng Gelombang SWG 24 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Lbr Seng Gelombang 3" x 6" SWG 24 (6kk) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.060 Oh Tukang Kayu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 M2 Pasang Atap Seng Gelombang SWG 28 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Lbr Seng Gelombang 3" x 6" SWG 28(6kk) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.060 Oh Tukang Kayu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M1 Pasang Atap bubungan Seng BJLS 20 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M' Seng Plat BJLS 20 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.040 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.070 Oh Tukang Kayu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.008 Oh Kepala Tukang 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 M1 Pasang Atap bubungan Seng SWG 24 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M' Seng Plat SWG 24 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.040 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.070 Oh Tukang Kayu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.008 Oh Kepala Tukang 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
SNI OKI 2019 Page 48
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 M1 Pasang Atap bubungan Seng SWG 28 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M' Seng Plat SWG 28 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.040 Kg Paku seng #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00 20,968.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.070 Oh Tukang Kayu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.008 Oh Kepala Tukang 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00 120,500.00 964.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

21 1 M2 Pasang Alluminium Foil / Sisalation #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M2 Sisalation / Alluminium Foil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 18,679.50 18,679.50 18,679.50 18,679.50 18,679.50 18,679.50


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.050 Oh Tukang Kayu 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

22 1 M2 Pasang Atap Seng Maja Deck T. 0.35 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.428 m' Seng Maja Deck #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 bh Paku seng ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.060 Oh Tukang Kayu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

23 1 M2 Pasang Atap Seng Tunas Deck T. 0.25 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.428 m' Seng Tunas Deck T. 0.25 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 bh Paku seng ulir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00 17,322.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.060 Oh Tukang Kayu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00

SNI OKI 2019 Page 49


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

IX PEKERJAAN LANGIT-LANGIT

1 1 M2 Langit2 Asbes/eternit 1 x 1 m, 3,5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 Lbr Asbes 1,00 x 1,00 m 3,5mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku 0.5-1.5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.320 Oh Tukang Kayu 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00
0.032 Oh Kepala Tukang 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 M2 Langit2 Asbes/eternit 1 x 1m, 3,5 mm+rangka kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.012 M3 Kayu kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.100 Lbr Asbes 1,00 x 1,00 m 3,5mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 M2 Langit2 Asbes/eternit 1 x 1 m, 3.5 mm+rangka kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.012 M3 Kayu kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku asbes #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.100 Lbr Asbes 1,00 x 1,00 m #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25

SNI OKI 2019 Page 50


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 M2 Langit-langit Plywood Tebal 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.360 Lbr Plywood 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.320 Oh Tukang Kayu 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00
0.032 Oh Kepala Tukang 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 M2 Langit-langit Plywood Tebal 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.360 Lbr Plywood 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.320 Oh Tukang Kayu 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00
0.032 Oh Kepala Tukang 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 M2 Langit2 Plywood 3 mm + Rangka Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.023 M3 Kayu kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Plywood 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 M2 Langit2 Plywood 3 mm + Rangka Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 51


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.023 M3 Kayu kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Plywood 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 M2 Langit2 Plywood 5 mm + Rangka Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.023 M3 Kayu kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Plywood 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 M2 Langit2 Plywood 5 mm + Rangka Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.023 M3 Kayu kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku plywood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Plywood 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 M2 Langit-langit Teakwood Tebal 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.360 Lbr Teakwood 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Paku teakwood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 52


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 18,005.25 18,005.25 18,005.25 18,005.25 18,005.25 18,005.25
0.070 Oh Pekerja 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.004 Oh Mandor 131,500.00 460.25 131,500.00 460.25 131,500.00 460.25 131,500.00 460.25 131,500.00 460.25 131,500.00 460.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 M2 Langit2 Teakwood 4 mm + Rangka Kayu kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.023 M3 Kayu kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku teakwood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Teakwood 4mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 M2 Langit2 Teakwood 4 mm + Rangka Kayu kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.023 M3 Kayu kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku Biasa 2" - 5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 Kg Paku teakwood #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.390 Lbr Teakwood 4 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25 71,185.25


0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.400 Oh Tukang Kayu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.014 Oh Mandor 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25 131,500.00 1,775.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 M2 Langit-langit Kayu kls II /lamberizering #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.024 M3 Kayu kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.320 Oh Tukang Kayu 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00
0.032 Oh Kepala Tukang 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 M2 Langit-langit Kayu kls III / lamberizering #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 53


1 2 3 4 5 6 7 8 9 10 11 12 11 12
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Kayu kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50 53,939.50


0.180 Oh Pekerja 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00 77,000.00 13,860.00
0.320 Oh Tukang Kayu 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00 109,500.00 35,040.00
0.032 Oh Kepala Tukang 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00 120,500.00 3,856.00
0.009 Oh Mandor 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50 131,500.00 1,183.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 M2 Langit2 Kayu kls II /lamberizering +rangka ky kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.012 M3 Kayu kls II persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Kayu kls II Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 1 M2 Langit2 Kayu kls III /lamberizering+rangka ky kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.012 M3 Kayu kls III persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.250 Kg Paku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 M' List Langit-langit Kayu Profil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M' List Langit-langit Kayu Profil Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M' List Kayu Profil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00


0.050 Oh Pekerja 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00
0.050 Oh Tukang Kayu 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.003 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 54
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Pemasangan 1 m2 langit-langit PVC + rangka besi hollow

Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


3.00 bh Paku beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.50 Btg Besi Hollow P = 4 M 40/40 25,000.00 12,500.00 26,000.00 13,000.00 27,000.00 13,500.00 28,000.00 14,000.00 32,000.00 16,000.00 32,500.00 16,250.00
1.00 Btg Besi Hollow P = 4 M 20/40 23,000.00 23,000.00 24,000.00 24,000.00 25,000.00 25,000.00 25,000.00 25,000.00 29,000.00 29,000.00 29,500.00 29,500.00
18.00 Bh Screw 90.00 1,620.00 95.00 1,710.00 100.00 1,800.00 105.00 1,890.00 120.00 2,160.00 125.00 2,250.00
1.00 M2 Plafond PVC (setara Shunda Plafon, Flat Gloss Half Silver) 100,000.00 100,000.00 102,000.00 102,000.00 103,000.00 103,000.00 104,000.00 104,000.00 110,000.00 110,000.00 111,000.00 111,000.00

Tenaga 123,659.50 123,659.50 123,659.50 123,659.50 123,659.50 123,659.50


0.50 OH Pekerja 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00 77,000.00 38,500.00
0.60 OH Tukang 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.06 OH Kepala tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.09 OH Mandor 131,500.00 12,229.50 131,500.00 12,229.50 131,500.00 12,229.50 131,500.00 12,229.50 131,500.00 12,229.50 131,500.00 12,229.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Analisa diambil dari analisa pasangan PVC kab. Bogor (harga pasar)

Pemasangan 1 m' List Plafond PVC

Bahan 20,720.00 21,760.00 22,800.00 23,840.00 28,960.00 31,000.00


8.00 bh Screw 90.00 720.00 95.00 760.00 100.00 800.00 105.00 840.00 120.00 960.00 125.00 1,000.00
1.00 Btg List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) 20,000.00 20,000.00 21,000.00 21,000.00 22,000.00 22,000.00 23,000.00 23,000.00 28,000.00 28,000.00 30,000.00 30,000.00

Tenaga 14,435.00 14,435.00 14,435.00 14,435.00 14,435.00 17,632.50


0.10 OH Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 109,500.00 10,950.00
0.05 OH Tukang 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 120,500.00 6,025.00
0.01 OH Kepala tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 131,500.00 657.50
0.01 OH Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 - -
Jumlah (A+B) 35,155.00 36,195.00 37,235.00 38,275.00 43,395.00 48,632.50
Overhead & Profit (Contoh 15 %) 5,273.25 5,429.25 5,585.25 5,741.25 6,509.25 7,294.88
Harga Satuan Pekerjaan 40,428.25 41,624.25 42,820.25 44,016.25 49,904.25 55,927.38
Harga Satuan Pekerjaan Lantai II 41,922.27 43,118.27 44,314.27 45,510.27 51,398.27 57,752.34
Analisa diambil dari analisa pasangan PVC kab. Bogor (harga pasar)

18 1 M2 Langit-langit Gypsum Board, Tebal 9 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M2 Langit-langit Gypsum Board, Tebal 9 mm Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.364 Lbr Gypsum Board ( 120 x 240 x 9 ) mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.110 Kg Paku Sekrup #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 kg Cornice adhesive #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.500 M' textile tape #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 set rangka Metal Fooring #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 bh Paku beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang Kayu 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 55
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE!
19 1 M' List Gypsum ukuran besar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M' List Gypsum ukuran besar Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M' List Profil besar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 kg Cornice adhesive #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 M' textile tape #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00


0.050 Oh Pekerja 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00
0.050 Oh Tukang Kayu 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.003 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M2 Langit-langit Kalsiboard, Tebal 3,5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M2 Langit-langit Kalsiboard, Tebal 3,5 mm LT. 2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.364 Lbr Kaliboard ( 120 x 240 x4,5 ) mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.110 Kg Paku Sekrup #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 kg Cornice adhesive #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.500 M' textile tape #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 set rangka Metal Fooring #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.000 bh Paku beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00 89,645.00


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.600 Oh Tukang 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00 109,500.00 65,700.00
0.060 Oh Kepala Tukang 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00 120,500.00 7,230.00
0.010 Oh Mandor 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00 131,500.00 1,315.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 M' List Flank Kalsiboard Tebal 8 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M' List Flank Kalsiboard Tebal 8 mm LT.II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.310 Lbr Kaliboard ( 200 x3000 x8 ) mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.110 Kg Paku Sekrup #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 kg Cornice adhesive #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 M' textile tape #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,347.50 39,347.50 39,347.50 39,347.50 39,347.50 39,347.50


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.250 Oh Tukang 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00 109,500.00 27,375.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
SNI OKI 2019 Page 56
1 2 3 4 5 6 7 8 9 10 11 12 11 12
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 M' List Gypsum ukuran sedang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 M' List Gypsum ukuran sedang Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M' List Profil sedang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 kg Cornice adhesive #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 M' textile tape #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00 10,322.00


0.050 Oh Pekerja 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00 77,000.00 3,850.00
0.050 Oh Tukang Kayu 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00 109,500.00 5,475.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.003 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

X PEKERJAAN SANITASI
1 Memasang 1 Buah Kloset Duduk KIA #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kloset Duduk KIA putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 6 % Harga Kloset ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 396,795.00 396,795.00 396,795.00 396,795.00 396,795.00 396,795.00


3.300 Oh Pekerja 77,000.00 254,100.00 77,000.00 254,100.00 77,000.00 254,100.00 77,000.00 254,100.00 77,000.00 254,100.00 77,000.00 254,100.00
1.100 Oh Tukang Batu 109,500.00 120,450.00 109,500.00 120,450.00 109,500.00 120,450.00 109,500.00 120,450.00 109,500.00 120,450.00 109,500.00 120,450.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.160 Oh Mandor 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 Memasang 1 Buah Kloset Jongkok Lokal #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kloset Jongkok lokal #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 280,365.00 280,365.00 280,365.00 280,365.00 280,365.00 280,365.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
1.500 Oh Tukang Batu 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00
0.150 Oh Kepala Tukang 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00
0.160 Oh Mandor 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00 131,500.00 21,040.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 Memasang 1 Buah Kloset Jongkok KIA #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 57


1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kloset Jongkok KIA #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 211,700.00 211,700.00 211,700.00 211,700.00 211,700.00 211,700.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
1.000 Oh Tukang Batu 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
0.100 Oh Kepala Tukang 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00
0.100 Oh Mandor 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00 131,500.00 13,150.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 Memasang 1 Buah Urinoir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Urinoir #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 30 % Harga Urinoir ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 205,125.00 205,125.00 205,125.00 205,125.00 205,125.00 205,125.00


1.000 Oh Pekerja 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00
1.000 Oh Tukang Batu 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
0.100 Oh Kepala Tukang 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00 120,500.00 12,050.00
0.050 Oh Mandor 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00 131,500.00 6,575.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 Memasang 1 Buah Wastafel #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 Bh Wastafel #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 12 % Harga Wastafel ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 277,140.00 277,140.00 277,140.00 277,140.00 277,140.00 277,140.00


1.200 Oh Pekerja 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00
1.450 Oh Tukang Batu 109,500.00 158,775.00 109,500.00 158,775.00 109,500.00 158,775.00 109,500.00 158,775.00 109,500.00 158,775.00 109,500.00 158,775.00
0.150 Oh Kepala Tukang 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00 120,500.00 18,075.00
0.060 Oh Mandor 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00 131,500.00 7,890.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 Memasang 1 Buah Bak Mandi Fibreglass Volume 1 m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Bak Fibreglass #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 12 % Harga Bak Fibreglass ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 848,125.00 848,125.00 848,125.00 848,125.00 848,125.00 848,125.00

SNI OKI 2019 Page 58


1 2 3 4 5 6 7 8 9 10 11 12 11 12
3.000 Oh Pekerja 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00 77,000.00 231,000.00
4.500 Oh Tukang Batu 109,500.00 492,750.00 109,500.00 492,750.00 109,500.00 492,750.00 109,500.00 492,750.00 109,500.00 492,750.00 109,500.00 492,750.00
0.050 Oh Kepala Tukang 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00
0.900 Oh Mandor 131,500.00 118,350.00 131,500.00 118,350.00 131,500.00 118,350.00 131,500.00 118,350.00 131,500.00 118,350.00 131,500.00 118,350.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 Memasang 1 Buah Bak Mandi Batu Bata Volume 0,30 m3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


150.000 Bh Batu Bata bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
120.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.300 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 ktk Porselen 11x11 putih cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6.000 Kg Semen Nat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 866,100.00 866,100.00 866,100.00 866,100.00 866,100.00 866,100.00


6.000 Oh Pekerja 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00 77,000.00 462,000.00
3.000 Oh Tukang Batu 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00 109,500.00 328,500.00
0.300 Oh Kepala Tukang 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00 120,500.00 36,150.00
0.300 Oh Mandor 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00 131,500.00 39,450.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 Memasang 1 m' Pipa Beton, gorong2 & 60 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Pipa Beton/gorong2 60 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.027 M3 Batu Bata bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.920 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.056 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00


0.140 Oh Pekerja 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00
0.070 Oh Tukang Batu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.007 Oh Kepala Tukang 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50
0.007 Oh Mandor 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 Memasang 1 m' Pipa Beton, gorong2 & 80 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Pipa Beton/gorong2 80 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.027 M3 Batu Bata bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3.920 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.056 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.024 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00 20,209.00


0.140 Oh Pekerja 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00 77,000.00 10,780.00

SNI OKI 2019 Page 59


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.070 Oh Tukang Batu 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00 109,500.00 7,665.00
0.007 Oh Kepala Tukang 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50 120,500.00 843.50
0.007 Oh Mandor 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50 131,500.00 920.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 Memasang 1 m' Pipa Beton, gorng2 & 100 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Pipa Beton/gorong2 100cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.550 M3 Batu Bata Bolong #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.300 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.061 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.069 M3 Pasir Urug #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 54,853.00 54,853.00 54,853.00 54,853.00 54,853.00 54,853.00


0.380 Oh Pekerja 77,000.00 29,260.00 77,000.00 29,260.00 77,000.00 29,260.00 77,000.00 29,260.00 77,000.00 29,260.00 77,000.00 29,260.00
0.190 Oh Tukang Batu 109,500.00 20,805.00 109,500.00 20,805.00 109,500.00 20,805.00 109,500.00 20,805.00 109,500.00 20,805.00 109,500.00 20,805.00
0.019 Oh Kepala Tukang 120,500.00 2,289.50 120,500.00 2,289.50 120,500.00 2,289.50 120,500.00 2,289.50 120,500.00 2,289.50 120,500.00 2,289.50
0.019 Oh Mandor 131,500.00 2,498.50 131,500.00 2,498.50 131,500.00 2,498.50 131,500.00 2,498.50 131,500.00 2,498.50 131,500.00 2,498.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 Memasang 1 Buah Bak Kontrol Pasangan Batu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Bata Ukuran ( 30 x 30 ) cm Tinggi 35 cm

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.145 M3 Batu Bata #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
44.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.070 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.070 M3 Batu Kerikil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.600 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.060 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 176,133.50 176,133.50 176,133.50 176,133.50 176,133.50 176,133.50


1.420 Oh Pekerja 77,000.00 109,340.00 77,000.00 109,340.00 77,000.00 109,340.00 77,000.00 109,340.00 77,000.00 109,340.00 77,000.00 109,340.00
0.473 Oh Tukang Batu 109,500.00 51,793.50 109,500.00 51,793.50 109,500.00 51,793.50 109,500.00 51,793.50 109,500.00 51,793.50 109,500.00 51,793.50
0.047 Oh Kepala Tukang 120,500.00 5,663.50 120,500.00 5,663.50 120,500.00 5,663.50 120,500.00 5,663.50 120,500.00 5,663.50 120,500.00 5,663.50
0.071 Oh Mandor 131,500.00 9,336.50 131,500.00 9,336.50 131,500.00 9,336.50 131,500.00 9,336.50 131,500.00 9,336.50 131,500.00 9,336.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 Memasang 1 Buah Bak Kontrol Pasangan Batu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Bata Ukuran ( 45 x 45 ) cm Tinggi 50 cm

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.250 M3 Batu Bata #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
77.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.130 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 M3 Batu Kerikil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.600 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.090 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 359,827.25 359,827.25 359,827.25 359,827.25 359,827.25 359,827.25


3.200 Oh Pekerja 77,000.00 246,400.00 77,000.00 246,400.00 77,000.00 246,400.00 77,000.00 246,400.00 77,000.00 246,400.00 77,000.00 246,400.00
1.015 Oh Tukang Batu 109,500.00 111,142.50 109,500.00 111,142.50 109,500.00 111,142.50 109,500.00 111,142.50 109,500.00 111,142.50 109,500.00 111,142.50

SNI OKI 2019 Page 60


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.002 Oh Kepala Tukang 120,500.00 180.75 120,500.00 180.75 120,500.00 180.75 120,500.00 180.75 120,500.00 180.75 120,500.00 180.75
0.016 Oh Mandor 131,500.00 2,104.00 131,500.00 2,104.00 131,500.00 2,104.00 131,500.00 2,104.00 131,500.00 2,104.00 131,500.00 2,104.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 Memasang 1 Buah Bak Kontrol Pasangan Batu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Bata Ukuran ( 60 x 60 ) cm Tinggi 65 cm

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.371 M3 Batu Bata #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
114.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.184 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.033 M3 Batu Kerikil #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4.850 Kg Besi Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.120 M3 Pasir Beton #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 278,988.00 278,988.00 278,988.00 278,988.00 278,988.00 278,988.00


2.160 Oh Pekerja 77,000.00 166,320.00 77,000.00 166,320.00 77,000.00 166,320.00 77,000.00 166,320.00 77,000.00 166,320.00 77,000.00 166,320.00
0.720 Oh Tukang Batu 109,500.00 78,840.00 109,500.00 78,840.00 109,500.00 78,840.00 109,500.00 78,840.00 109,500.00 78,840.00 109,500.00 78,840.00
0.100 Oh Tukang Gali 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.072 Oh Kepala Tukang 120,500.00 8,676.00 120,500.00 8,676.00 120,500.00 8,676.00 120,500.00 8,676.00 120,500.00 8,676.00 120,500.00 8,676.00
0.108 Oh Mandor 131,500.00 14,202.00 131,500.00 14,202.00 131,500.00 14,202.00 131,500.00 14,202.00 131,500.00 14,202.00 131,500.00 14,202.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 Memasang 1 m' Pipa Galvanis & 3/4" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M' Pipa Galvanis 3/4" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 35 % Harga Pipa Galvanis ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 18,648.00 18,648.00 18,648.00 18,648.00 18,648.00 18,648.00


0.054 Oh Pekerja 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.009 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.027 Oh Mandor 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 Memasang 1 m' Pipa Galvanis & 1" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.200 M' Pipa Galvanis 1" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 35 % Harga Pipa Galvanis ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 18,648.00 18,648.00 18,648.00 18,648.00 18,648.00 18,648.00


0.054 Oh Pekerja 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.009 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.027 Oh Mandor 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50 131,500.00 3,550.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 Memasang 1 m' Pipa Galvanis & 11/2"

SNI OKI 2019 Page 61


1 2 3 4 5 6 7 8 9 10 11 12 11 12
a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.200 M' Pipa Galvanis #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Perlengkapan ( 35 % Harga Pipa Galvanis ) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 30,905.10 30,905.10 30,905.10 30,905.10 30,905.10 30,905.10


0.108 Oh Pekerja 77,000.00 8,316.00 77,000.00 8,316.00 77,000.00 8,316.00 77,000.00 8,316.00 77,000.00 8,316.00 77,000.00 8,316.00
0.180 Oh Tukang Batu 109,500.00 19,710.00 109,500.00 19,710.00 109,500.00 19,710.00 109,500.00 19,710.00 109,500.00 19,710.00 109,500.00 19,710.00
0.018 Oh Kepala Tukang 120,500.00 2,169.00 120,500.00 2,169.00 120,500.00 2,169.00 120,500.00 2,169.00 120,500.00 2,169.00 120,500.00 2,169.00
0.005 Oh Mandor 131,500.00 710.10 131,500.00 710.10 131,500.00 710.10 131,500.00 710.10 131,500.00 710.10 131,500.00 710.10
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 Memasang 1 m' Pipa PVC Tipe AW & 1/2" 19,989.20 20,570.45 21,539.20 22,120.45 23,282.95 23,932.01

a. Bahan 9,687.50 10,268.75 11,237.50 11,818.75 12,981.25 13,630.31


1.200 M' Pipa PVC 6,250.00 7,500.00 6,625.00 7,950.00 7,250.00 8,700.00 7,625.00 9,150.00 8,375.00 10,050.00 8,793.75 10,552.50
Perlengkapan ( 35 % Harga Pipa ) 2,187.50 2,318.75 2,537.50 2,668.75 2,931.25 3,077.81

b. Tenaga 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70


0.0360 Oh Pekerja 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00
0.0600 Oh Tukang Batu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.0060 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.0018 Oh Mandor 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70
Jumlah (A+B) 19,989.20 20,570.45 21,539.20 22,120.45 23,282.95 23,932.01
Overhead & Profit (Contoh 15 %) 2,998.38 3,085.57 3,230.88 3,318.07 3,492.44 3,589.80
Harga Satuan Pekerjaan 22,987.58 23,656.02 24,770.08 25,438.52 26,775.39 27,521.81

18 Memasang 1 m' Pipa PVC Tipe AW & 3/4" 21,926.70 22,507.95 23,089.20 23,670.45 24,832.95 25,559.51

a. Bahan 11,625.00 12,206.25 12,787.50 13,368.75 14,531.25 15,257.81


1.200 M' Pipa PVC 7,500.00 9,000.00 7,875.00 9,450.00 8,250.00 9,900.00 8,625.00 10,350.00 9,375.00 11,250.00 9,843.75 11,812.50
Perlengkapan ( 35 % Harga Pipa ) 2,625.00 2,756.25 2,887.50 3,018.75 3,281.25 3,445.31

b. Tenaga 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70


0.036 Oh Pekerja 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00
0.060 Oh Tukang Batu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.002 Oh Mandor 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70
Jumlah (A+B) 21,926.70 22,507.95 23,089.20 23,670.45 24,832.95 25,559.51
Overhead & Profit (Contoh 15 %) 3,289.01 3,376.19 3,463.38 3,550.57 3,724.94 3,833.93
Harga Satuan Pekerjaan 25,215.71 25,884.14 26,552.58 27,221.02 28,557.89 29,393.44

19 Memasang 1 m' Pipa PVC Tipe AW & 1" 26,576.70 26,964.20 27,351.70 27,739.20 28,901.70 29,831.70

a. Bahan 16,275.00 16,662.50 17,050.00 17,437.50 18,600.00 19,530.00


1.200 M' Pipa PVC 10,500.00 12,600.00 10,750.00 12,900.00 11,000.00 13,200.00 11,250.00 13,500.00 12,000.00 14,400.00 12,600.00 15,120.00
Perlengkapan ( 35 % Harga Pipa ) 3,675.00 3,762.50 3,850.00 3,937.50 4,200.00 4,410.00

b. Tenaga 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70 10,301.70


0.036 Oh Pekerja 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00 77,000.00 2,772.00
0.060 Oh Tukang Batu 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.002 Oh Mandor 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70 131,500.00 236.70
Jumlah (A+B) 26,576.70 26,964.20 27,351.70 27,739.20 28,901.70 29,831.70
Overhead & Profit (Contoh 15 %) 3,986.51 4,044.63 4,102.76 4,160.88 4,335.26 4,474.76
Harga Satuan Pekerjaan 30,563.21 31,008.83 31,454.46 31,900.08 33,236.96 34,306.46

SNI OKI 2019 Page 62


1 2 3 4 5 6 7 8 9 10 11 12 11 12

20 Memasang 1 m' Pipa PVC Tipe AW & 11/2" 42,617.00 43,198.25 43,779.50 44,360.75 45,523.25 47,024.81

a. Bahan 27,125.00 27,706.25 28,287.50 28,868.75 30,031.25 31,532.81


1.200 M' Pipa PVC 17,500.00 21,000.00 17,875.00 21,450.00 18,250.00 21,900.00 18,625.00 22,350.00 19,375.00 23,250.00 20,343.75 24,412.50
Perlengkapan ( 35 % Harga Pipa ) 6,125.00 6,256.25 6,387.50 6,518.75 6,781.25 7,120.31

b. Tenaga 15,492.00 15,492.00 15,492.00 15,492.00 15,492.00 15,492.00


0.0540 Oh Pekerja 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00
0.0900 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.0090 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.0030 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) 42,617.00 43,198.25 43,779.50 44,360.75 45,523.25 47,024.81
Overhead & Profit (Contoh 15 %) 6,392.55 6,479.74 6,566.93 6,654.11 6,828.49 7,053.72
Harga Satuan Pekerjaan 49,009.55 49,677.99 50,346.43 51,014.86 52,351.74 54,078.53

Memasang 1 m' Pipa PVC Tipe AW & 11/4" 38,742.00 39,323.25 39,904.50 40,485.75 41,648.25 42,956.06

a. Bahan 23,250.00 23,831.25 24,412.50 24,993.75 26,156.25 27,464.06


1.200 M' Pipa PVC 15,000.00 18,000.00 15,375.00 18,450.00 15,750.00 18,900.00 16,125.00 19,350.00 16,875.00 20,250.00 17,718.75 21,262.50
Perlengkapan ( 35 % Harga Pipa ) 5,250.00 5,381.25 5,512.50 5,643.75 5,906.25 6,201.56

b. Tenaga 15,492.00 15,492.00 15,492.00 15,492.00 15,492.00 15,492.00


0.0540 Oh Pekerja 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00
0.0900 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.0090 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.0030 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) 38,742.00 39,323.25 39,904.50 40,485.75 41,648.25 42,956.06
Overhead & Profit (Contoh 15 %) 5,811.30 5,898.49 5,985.68 6,072.86 6,247.24 6,443.41
Harga Satuan Pekerjaan 44,553.30 45,221.74 45,890.18 46,558.61 47,895.49 49,399.47

21 Memasang 1 m' Pipa PVC Tipe AW & 2" 48,390.05 48,971.30 49,552.55 50,133.80 51,296.30 53,088.49

a. Bahan 32,937.50 33,518.75 34,100.00 34,681.25 35,843.75 37,635.94


1.200 M' Pipa PVC 21,250.00 25,500.00 21,625.00 25,950.00 22,000.00 26,400.00 22,375.00 26,850.00 23,125.00 27,750.00 24,281.25 29,137.50
Perlengkapan ( 35 % Harga Pipa ) 7,437.50 7,568.75 7,700.00 7,831.25 8,093.75 8,498.44

b. Tenaga 15,452.55 15,452.55 15,452.55 15,452.55 15,452.55 15,452.55


0.054 Oh Pekerja 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00 77,000.00 4,158.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.009 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.003 Oh Mandor 131,500.00 355.05 131,500.00 355.05 131,500.00 355.05 131,500.00 355.05 131,500.00 355.05 131,500.00 355.05
Jumlah (A+B) 48,390.05 48,971.30 49,552.55 50,133.80 51,296.30 53,088.49
Overhead & Profit (Contoh 15 %) 7,258.51 7,345.70 7,432.88 7,520.07 7,694.45 7,963.27
Harga Satuan Pekerjaan 55,648.56 56,317.00 56,985.43 57,653.87 58,990.75 61,051.76

22 Memasang 1 m' Pipa PVC Tipe AW & 21/2" 67,734.75 68,316.00 68,897.25 69,478.50 70,641.00 73,014.44

a. Bahan 44,562.50 45,143.75 45,725.00 46,306.25 47,468.75 49,842.19


1.200 M' Pipa PVC 28,750.00 34,500.00 29,125.00 34,950.00 29,500.00 35,400.00 29,875.00 35,850.00 30,625.00 36,750.00 32,156.25 38,587.50
Perlengkapan ( 35 % Harga Pipa ) 10,062.50 10,193.75 10,325.00 10,456.25 10,718.75 11,254.69

b. Tenaga 23,172.25 23,172.25 23,172.25 23,172.25 23,172.25 23,172.25


0.0810 Oh Pekerja 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00
0.1350 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.0135 Oh Kepala Tukang 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75

SNI OKI 2019 Page 63


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.0040 Oh Mandor 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00
Jumlah (A+B) 67,734.75 68,316.00 68,897.25 69,478.50 70,641.00 73,014.44
Overhead & Profit (Contoh 15 %) 10,160.21 10,247.40 10,334.59 10,421.78 10,596.15 10,952.17
Harga Satuan Pekerjaan 77,894.96 78,563.40 79,231.84 79,900.28 81,237.15 83,966.60

23 Memasang 1 m' Pipa PVC Tipe AW & 3" 83,234.75 84,009.75 84,784.75 85,559.75 87,497.25 90,713.50

a. Bahan 60,062.50 60,837.50 61,612.50 62,387.50 64,325.00 67,541.25


1.200 M' Pipa PVC 38,750.00 46,500.00 39,250.00 47,100.00 39,750.00 47,700.00 40,250.00 48,300.00 41,500.00 49,800.00 43,575.00 52,290.00
Perlengkapan ( 35 % Harga Pipa ) 13,562.50 13,737.50 13,912.50 14,087.50 14,525.00 15,251.25

b. Tenaga 23,172.25 23,172.25 23,172.25 23,172.25 23,172.25 23,172.25


0.0810 Oh Pekerja 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00
0.1350 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.0135 Oh Kepala Tukang 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75
0.0040 Oh Mandor 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00 131,500.00 526.00
Jumlah (A+B) 83,234.75 84,009.75 84,784.75 85,559.75 87,497.25 90,713.50
Overhead & Profit (Contoh 15 %) 12,485.21 12,601.46 12,717.71 12,833.96 13,124.59 13,607.03
Harga Satuan Pekerjaan 95,719.96 96,611.21 97,502.46 98,393.71 100,621.84 104,320.53

24 Memasang 1 m' Pipa PVC Tipe AW & 4" 150,188.53 152,416.65 154,644.78 156,872.90 161,329.15 161,329.15

a. Bahan 127,003.13 129,231.25 131,459.38 133,687.50 138,143.75 138,143.75


1.200 M' Pipa PVC 81,937.50 98,325.00 83,375.00 100,050.00 84,812.50 101,775.00 86,250.00 103,500.00 89,125.00 106,950.00 89,125.00 106,950.00
Perlengkapan ( 35 % Harga Pipa ) 28,678.13 29,181.25 29,684.38 30,187.50 31,193.75 31,193.75

b. Tenaga 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40


0.081 Oh Pekerja 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00
0.135 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.014 Oh Kepala Tukang 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75
0.004 Oh Mandor 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15
Jumlah (A+B) 150,188.53 152,416.65 154,644.78 156,872.90 161,329.15 161,329.15
Overhead & Profit (Contoh 15 %) 22,528.28 22,862.50 23,196.72 23,530.94 24,199.37 24,199.37
Harga Satuan Pekerjaan 172,716.80 175,279.15 177,841.49 180,403.84 185,528.52 185,528.52

25 Memasang 1 m' Pipa PVC Tipe AW & 6" 313,810.40 316,135.40 317,685.40 319,235.40 325,435.40 326,210.40

a. Bahan 290,625.00 292,950.00 294,500.00 296,050.00 302,250.00 303,025.00


1.200 M' Pipa PVC (hargapasar) 187,500.00 225,000.00 189,000.00 226,800.00 190,000.00 228,000.00 191,000.00 229,200.00 195,000.00 234,000.00 195,500.00 234,600.00
Perlengkapan ( 35 % Harga Pipa ) 65,625.00 66,150.00 66,500.00 66,850.00 68,250.00 68,425.00

b. Tenaga 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40


0.081 Oh Pekerja 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00
0.135 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.014 Oh Kepala Tukang 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75
0.004 Oh Mandor 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15
Jumlah (A+B) 313,810.40 316,135.40 317,685.40 319,235.40 325,435.40 326,210.40
Overhead & Profit (Contoh 15 %) 47,071.56 47,420.31 47,652.81 47,885.31 48,815.31 48,931.56
Harga Satuan Pekerjaan 360,881.96 363,555.71 365,338.21 367,120.71 374,250.71 375,141.96

25 Memasang 1 m' Pipa PVC Tipe AW & 8" 474,622.90 475,785.40 477,335.40 478,035.40 479,785.40 486,785.40

a. Bahan 451,437.50 452,600.00 454,150.00 454,850.00 456,600.00 463,600.00


1.200 M' Pipa PVC 291,250.00 349,500.00 292,000.00 350,400.00 293,000.00 351,600.00 295,000.00 351,600.00 300,000.00 351,600.00 320,000.00 351,600.00
Perlengkapan ( 35 % Harga Pipa ) 101,937.50 102,200.00 102,550.00 103,250.00 105,000.00 112,000.00

b. Tenaga 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40 23,185.40


0.081 Oh Pekerja 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00 77,000.00 6,237.00

SNI OKI 2019 Page 64


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.135 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.014 Oh Kepala Tukang 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75 120,500.00 1,626.75
0.004 Oh Mandor 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15 131,500.00 539.15
Jumlah (A+B) 474,622.90 475,785.40 477,335.40 478,035.40 479,785.40 486,785.40
Overhead & Profit (Contoh 15 %) 71,193.44 71,367.81 71,600.31 71,705.31 71,967.81 73,017.81
Harga Satuan Pekerjaan 545,816.34 547,153.21 548,935.71 549,740.71 551,753.21 559,803.21

26 Memasang 1 Buah Bak Cuci Piring Aluminium #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Bak Cuci Aluminium #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.000 Bh

b. Tenaga 38,972.25 38,972.25 38,972.25 38,972.25 38,972.25 38,972.25


0.030 Oh Pekerja 77,000.00 2,310.00 77,000.00 2,310.00 77,000.00 2,310.00 77,000.00 2,310.00 77,000.00 2,310.00 77,000.00 2,310.00
0.300 Oh Tukang Batu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.002 Oh Mandor 131,500.00 197.25 131,500.00 197.25 131,500.00 197.25 131,500.00 197.25 131,500.00 197.25 131,500.00 197.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

27 Memasang 1 Buah Kran & 3/4" atau 1/2" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kran Air #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.025 Bh Seal Tape 5,000.00 125.00 5,000.00 125.00 5,000.00 125.00 5,000.00 125.00 5,000.00 125.00 5,000.00 125.00

b. Tenaga 50,047.50 50,047.50 50,047.50 50,047.50 50,047.50 50,047.50


0.010 Oh Pekerja 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00
0.400 Oh Tukang Batu 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00 109,500.00 43,800.00
0.040 Oh Kepala Tukang 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00 120,500.00 4,820.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

28 Memasang 1 Buah Floor Drain #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Floor Drain #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 13,582.50 13,582.50 13,582.50 13,582.50 13,582.50 13,582.50


0.010 Oh Pekerja 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00
0.100 Oh Tukang Batu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

XI PEKERJAAN BESI DAN ALLUMINIUM


1 1 Kg Pasang Rangka Kuda-kuda baja IWF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.150 Kg Besi baja IWF #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 65


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 1,419.45 1,419.45 1,419.45 1,419.45 1,419.45 1,419.45
0.0600 Oh Pekerja 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00
0.0060 Oh Tukang Besi 109,500.00 657.00 109,500.00 657.00 109,500.00 657.00 109,500.00 657.00 109,500.00 657.00 109,500.00 657.00
0.0060 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.0003 Oh Mandor 131,500.00 39.45 131,500.00 39.45 131,500.00 39.45 131,500.00 39.45 131,500.00 39.45 131,500.00 39.45
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 m2 Pasang Pintu Besi Plat baja tebal 2 mm rangkap, rangka baja siku #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


15.000 Kg Besi Siku L 30.30.3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
32.800 Kg Besi plat baja #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Kawas las 2,000.00 100.00

b. Tenaga 177,586.30 177,586.30 177,586.30 177,586.30 177,586.30 177,586.30


1.0500 Oh Pekerja 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00
1.5000 Oh Tukang Besi Konstruksi 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00
0.1050 Oh Kepala Tukang 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50
0.0052 Oh Mandor 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 m2 Pasang Rolling Door #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M2 Roll Door #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 146,649.00 146,649.00 146,649.00 146,649.00 146,649.00 146,649.00


1.200 Oh Pekerja 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00 77,000.00 92,400.00
1.200 Oh Tukang Besi Konstruksi 109,500.00 131,400.00 109,500.00 131,400.00 109,500.00 131,400.00 109,500.00 131,400.00 109,500.00 131,400.00 109,500.00 131,400.00
0.120 Oh Kepala Tukang 120,500.00 14,460.00 120,500.00 14,460.00 120,500.00 14,460.00 120,500.00 14,460.00 120,500.00 14,460.00 120,500.00 14,460.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 m2 Pasang Pintu Alluminium #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M2 Pintu Alluminium #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 258,436.30 258,436.30 258,436.30 258,436.30 258,436.30 258,436.30


1.500 Oh Tukang Besi Konstruksi 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00 109,500.00 164,250.00
1.050 Oh Pekerja 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00 77,000.00 80,850.00
0.105 Oh Kepala Tukang 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50 120,500.00 12,652.50
0.005 Oh Mandor 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80 131,500.00 683.80
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 m' Pasang pipa besi 3" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 M' Pipa Besi 3" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 66


1 2 3 4 5 6 7 8 9 10 11 12 11 12

b. Tenaga 69,722.63 69,722.63 69,722.63 69,722.63 69,722.63 69,722.63


0.350 Oh Tukang Las 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.350 Oh Pekerja 77,000.00 26,950.00 77,000.00 26,950.00 77,000.00 26,950.00 77,000.00 26,950.00 77,000.00 26,950.00 77,000.00 26,950.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.002 Oh Mandor 131,500.00 230.13 131,500.00 230.13 131,500.00 230.13 131,500.00 230.13 131,500.00 230.13 131,500.00 230.13
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 m2 Pasang Terali Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


11.500 kg Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 224,737.50 224,737.50 224,737.50 224,737.50 224,737.50 224,737.50


1.000 Oh Tukang Las 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
0.650 Oh Pekerja 77,000.00 50,050.00 77,000.00 50,050.00 77,000.00 50,050.00 77,000.00 50,050.00 77,000.00 50,050.00 77,000.00 50,050.00
0.350 Oh Kepala Tukang 120,500.00 42,175.00 120,500.00 42,175.00 120,500.00 42,175.00 120,500.00 42,175.00 120,500.00 42,175.00 120,500.00 42,175.00
0.175 Oh Mandor 131,500.00 23,012.50 131,500.00 23,012.50 131,500.00 23,012.50 131,500.00 23,012.50 131,500.00 23,012.50 131,500.00 23,012.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 m2 Pasang Kawat Harmonika #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M2 Kawat Harmonika #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku Biasa 1/2" - 1" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.002 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,920.75 19,920.75 19,920.75 19,920.75 19,920.75 19,920.75


0.100 Oh Pekerja 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.100 Oh Tukang Kayu 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.001 Oh Mandor 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 m2 Pasang Kawat Nyamuk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M2 Kawat Nyamuk #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.020 Kg Paku Biasa 1/2" - 1" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.002 M3 Kayu kls III papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,920.75 19,920.75 19,920.75 19,920.75 19,920.75 19,920.75


0.100 Oh Pekerja 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.100 Oh Tukang Kayu 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.001 Oh Mandor 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 m2 Pasang Jendela Nako dan Tralis #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 67
1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M2 Jendela Nako (rangka + kaca 5 mm) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.000 Bh Paku skrup (1 cm-2,5 cm) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
7.000 M Besi Strip #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,841.50 39,841.50 39,841.50 39,841.50 39,841.50 39,841.50


0.200 Oh Pekerja 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.200 Oh Tukang Kayu 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.001 Oh Mandor 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50 131,500.00 131.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 m' Pasang Talang Datar/miring, Seng BJLS #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M' Seng Plat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.015 Kg Paku Biasa 1 cm - 2,5 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.019 M3 Kayu kls III Papan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,874.38 39,874.38 39,874.38 39,874.38 39,874.38 39,874.38


0.200 Oh Pekerja 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00 77,000.00 15,400.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.001 Oh Mandor 131,500.00 164.38 131,500.00 164.38 131,500.00 164.38 131,500.00 164.38 131,500.00 164.38 131,500.00 164.38
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 m' Pasang Talang 1/2 Lingkaran & 10 cm, #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Seng BJLS 20

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M' Seng Plat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Kg Paku 1 cm - 2,5 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Besi Strip #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 49,067.00 49,067.00 49,067.00 49,067.00 49,067.00 49,067.00


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.300 Oh Tukang Kayu 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00 109,500.00 32,850.00
0.030 Oh Kepala Tukang 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00 120,500.00 3,615.00
0.008 Oh Mandor 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00 131,500.00 1,052.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

XII PEKERJAAN KUNCI DAN KACA


1 1 Buah Pasang Kunci Tanam Biasa 1 slaag #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kunci Tanam Biasa 1 slaag #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 62,202.50 62,202.50 62,202.50 62,202.50 62,202.50 62,202.50


0.010 Oh Pekerja 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00
0.500 Oh Tukang Kayu 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00

SNI OKI 2019 Page 68


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.050 Oh Kepala Tukang 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00 120,500.00 6,025.00
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 Buah Pasang Kunci Tanam Biasa 2 slaag #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kunci Tanam Biasa 2 slaag #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 56,066.25 56,066.25 56,066.25 56,066.25 56,066.25 56,066.25


0.005 Oh Pekerja 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00
0.500 Oh Tukang Kayu 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 Buah Pasang Kunci Tanam Biasa 2 slaag Italy #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kunci Tanam Biasa 2 slaag merk italy #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 56,066.25 56,066.25 56,066.25 56,066.25 56,066.25 56,066.25


0.005 Oh Pekerja 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00 77,000.00 385.00
0.500 Oh Tukang Kayu 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00 109,500.00 54,750.00
0.005 Oh Kepala Tukang 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50 120,500.00 602.50
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 Buah Pasang Engsel Pintu biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Engsel Pintu biasa #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,492.70 19,492.70 19,492.70 19,492.70 19,492.70 19,492.70


0.0150 Oh Pekerja 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00
0.1500 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.0150 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.0008 Oh Mandor 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 Buah Pasang Engsel Pintu Kuningan 4" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Engsel Pintu Kuningan 4" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13


0.015 Oh Pekerja 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00
0.150 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.001 Oh Mandor 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63

SNI OKI 2019 Page 69


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 Buah Pasang Engsel Jendela H #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Engsel Jendela H #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13


0.015 Oh Pekerja 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00
0.150 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.001 Oh Mandor 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 Buah Pasang Kait Angin #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kait Angin #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 19,492.70 19,492.70 19,492.70 19,492.70 19,492.70 19,492.70


0.0150 Oh Pekerja 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00
0.1500 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.0150 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.0008 Oh Mandor 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20 131,500.00 105.20
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 Buah Pasang Kunci Selot #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Kunci Selot #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 25,915.75 25,915.75 25,915.75 25,915.75 25,915.75 25,915.75


0.020 Oh Pekerja 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00
0.200 Oh Tukang Kayu 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.020 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.001 Oh Mandor 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 Buah Pasang Pegangan Pintu / Handel #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Bh Pegangan Pintu/ Handel #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 12,990.75 12,990.75 12,990.75 12,990.75 12,990.75 12,990.75


0.010 Oh Pekerja 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00 77,000.00 770.00
0.100 Oh Tukang Kayu 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00 109,500.00 10,950.00
0.010 Oh Kepala Tukang 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00 120,500.00 1,205.00
0.001 Oh Mandor 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75 131,500.00 65.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 70


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 m2 Pasang Kaca, Tebal 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M2 Kaca Tebal 3 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Sealant

b. Tenaga 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13 19,486.13


0.015 Oh Pekerja 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00 77,000.00 1,155.00
0.150 Oh Tukang Kayu 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00 109,500.00 16,425.00
0.015 Oh Kepala Tukang 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50 120,500.00 1,807.50
0.001 Oh Mandor 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63 131,500.00 98.63
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 m2 Pasang Kaca, Tebal 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.100 M2 Kaca Tebal 5 mm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.070 Kg Sealant

b. Tenaga 22,090.85 22,090.85 22,090.85 22,090.85 22,090.85 22,090.85


0.0170 Oh Pekerja 77,000.00 1,309.00 77,000.00 1,309.00 77,000.00 1,309.00 77,000.00 1,309.00 77,000.00 1,309.00 77,000.00 1,309.00
0.1700 Oh Tukang Kayu 109,500.00 18,615.00 109,500.00 18,615.00 109,500.00 18,615.00 109,500.00 18,615.00 109,500.00 18,615.00 109,500.00 18,615.00
0.0170 Oh Kepala Tukang 120,500.00 2,048.50 120,500.00 2,048.50 120,500.00 2,048.50 120,500.00 2,048.50 120,500.00 2,048.50 120,500.00 2,048.50
0.0009 Oh Mandor 131,500.00 118.35 131,500.00 118.35 131,500.00 118.35 131,500.00 118.35 131,500.00 118.35 131,500.00 118.35
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

XIII PEKERJAAN PENUTUP LANTAI DAN DINDING

1 1 m2 Pasang Lantai Tegel Abu-abu Ukuran 30 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


11.870 Bh Ubin Abu-abu 30 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 36,087.50 36,087.50 36,087.50 36,087.50 36,087.50 36,087.50


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.125 Oh Tukang Batu 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50 109,500.00 13,687.50
0.013 Oh Kepala Tukang 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 m2 Pasang Lantai tegel Abu-abu Ukuran 20 x 20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


26.500 Bh Ubin Abu-abu 20 x 20 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.400 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 71


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 39,100.50 39,100.50 39,100.50 39,100.50 39,100.50 39,100.50
0.270 Oh Pekerja 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00 77,000.00 20,790.00
0.135 Oh Tukang Batu 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50 109,500.00 14,782.50
0.014 Oh Kepala Tukang 120,500.00 1,687.00 120,500.00 1,687.00 120,500.00 1,687.00 120,500.00 1,687.00 120,500.00 1,687.00 120,500.00 1,687.00
0.014 Oh Mandor 131,500.00 1,841.00 131,500.00 1,841.00 131,500.00 1,841.00 131,500.00 1,841.00 131,500.00 1,841.00 131,500.00 1,841.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

3 1 m2 Pasang Lantai Teraso abu-abu Ukuran 30 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


11.870 Bh Ubin Teraso 30 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 Kg Semen Warna 1,300.00 58.50 1,300.00 58.50 1,300.00 58.50 1,300.00 58.50 1,300.00 58.50 1,300.00 58.50

b. Tenaga 37,470.75 37,470.75 37,470.75 37,470.75 37,470.75 37,470.75


0.260 Oh Pekerja 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00
0.130 Oh Tukang Batu 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00
0.013 Oh Kepala Tukang 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25 120,500.00 1,506.25
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 m2 Pasang Lantai conblock 6 cm polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


50.000 bh Conblock 6 cm polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 m2 Pasang Lantai conblock 6 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


50.000 bh Conblock 6 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 m2 Pasang Lantai conblock 8 cm polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
SNI OKI 2019 Page 72
1 2 3 4 5 6 7 8 9 10 11 12 11 12

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


50.000 bh Conblock 8 cm polos #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 m2 Pasang Lantai conblock 8 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


50.000 bh Conblock 8 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75 35,479.75


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.013 Oh Mandor 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75 131,500.00 1,643.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 m2 Pasang Lantai Keramik 10 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 10 x 20 cm putih Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 ktk Ubin Keramik 10 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.380 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.042 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 m2 Pasang Lantai Keramik 10 x 20 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 10 x 20 cm warna Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 ktk Ubin Keramik 10 x 20 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.380 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.042 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 73


1 2 3 4 5 6 7 8 9 10 11 12 11 12

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 m2 Pasang Lantai Keramik 20 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 20 x 20 cm putih Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 ktk Ubin Keramik 20 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.400 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 m2 Pasang Lantai Keramik 20 x 20 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 20 x 20 cm warnaLt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


Bh 1.050 ktk Ubin Keramik 20 x 20 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.400 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 m2 Pasang Lantai Keramik 40 x 40 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 40 x 40 cm putih Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 ktk Ubin Keramik 40 x 40 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.190 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 74


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

13 1 m2 Pasang Lantai Keramik 40 x 40 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 40 x 40 cm warna Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


Bh 1.050 ktk Ubin Keramik 40 x 40 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.190 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00


0.700 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

14 1 m2 Pasang Lantai Keramik 30 x 30 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 30 x 30 cm putih Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 ktk Ubin Keramik 30 x 30 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.380 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.042 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

15 1 m2 Pasang Lantai Keramik 30 x 30 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pasang Lantai Keramik 30 x 30 cm warna Lt. II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


Bh 11.870 ktk Ubin Keramik 30 x 30 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10.000 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 75


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.600 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 37,531.00 37,531.00 37,531.00 37,531.00 37,531.00 37,531.00


0.260 Oh Pekerja 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00 77,000.00 20,020.00
0.130 Oh Tukang Batu 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00 109,500.00 14,235.00
0.013 Oh Kepala Tukang 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50 120,500.00 1,566.50
0.013 Oh Mandor 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50 131,500.00 1,709.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

16 1 m2 Pasang Lantai Keramik 30 x 30 cm Anti Slip #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


10.000 Bh Ubin Keramik 30 x 30 cm Anti Slip #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.380 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.042 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

17 1 m2 Pasang Lantai Granit 60 x 60 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


2.800 Bh Lantai Granit 60 x 60 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8.190 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.045 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.130 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00 101,045.00


0.7 Oh Pekerja 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00 77,000.00 53,900.00
0.35 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.035 Oh Mandor 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50 131,500.00 4,602.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

18 1 m' Pasang Plint keramik Ukuran 10 x 30 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


3.330 Bh Plint keramik putih 10 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.650 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.003 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 8,661.00 8,661.00 8,661.00 8,661.00 8,661.00 8,661.00


0.060 Oh Pekerja 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00 77,000.00 4,620.00

SNI OKI 2019 Page 76


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.030 Oh Tukang Batu 109,500.00 3,285.00 109,500.00 3,285.00 109,500.00 3,285.00 109,500.00 3,285.00 109,500.00 3,285.00 109,500.00 3,285.00
0.003 Oh Kepala Tukang 120,500.00 361.50 120,500.00 361.50 120,500.00 361.50 120,500.00 361.50 120,500.00 361.50 120,500.00 361.50
0.003 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 m' Pasang Plint keramik Ukuran 10 x 30 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


3.530 Bh Plint keramik Warna 10 x 30 cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.140 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.003 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 18,527.00 18,527.00 18,527.00 18,527.00 18,527.00 18,527.00


0.090 Oh Pekerja 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.009 Oh Kepala Tukang 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50 120,500.00 1,084.50
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

19 1 m' Pasang Plint keramik Ukuran 10 x 40 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


2.650 Bh Plint keramik 10 x 40 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.140 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.003 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.025 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 21,660.00 21,660.00 21,660.00 21,660.00 21,660.00 21,660.00


0.090 Oh Pekerja 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

20 1 m' Pasang Plint keramik Ukuran 10 x 40 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


2.650 Bh Plint keramik 10 x 40 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.140 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.003 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 21,660.00 21,660.00 21,660.00 21,660.00 21,660.00 21,660.00


0.090 Oh Pekerja 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00 77,000.00 6,930.00
0.090 Oh Tukang Batu 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.005 Oh Mandor 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50 131,500.00 657.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 77


1 2 3 4 5 6 7 8 9 10 11 12 11 12
21 1 m2 Pasang Lantai koral #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.100 m3 koral #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.380 Kg Semen Portland #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.042 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 46,487.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 s 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

22 1 m2 Pasang Dinding keramik 10 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 Kg keramik 10 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50


0.600 Oh Pekerja 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

23 1 m2 Pasang Dinding keramik 10 x 20 cm, Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


Bh 1.000 Kg keramik 10 x 20 cm, Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.750 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00


0.900 Oh Pekerja 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.045 Oh Mandor 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

24 1 m2 Pasang Dinding keramik20 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 78


1 2 3 4 5 6 7 8 9 10 11 12 11 12
26.500 bh keramik 20 x 20 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.940 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00


0.900 Oh Pekerja 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.045 Oh Mandor 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

25 1 m2 Pasang Dinding keramik20 x 20 cm, Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


Bh 26.500 bh keramik 20 x 20 cm, Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.940 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00 129,915.00


0.900 Oh Pekerja 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00 77,000.00 69,300.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.045 Oh Mandor 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50 131,500.00 5,917.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

26 1 m2 Pasang Dinding Keramik 20 x 25 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 ktk Keramik 20 x 25 cm putih #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50


0.600 Oh Pekerja 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

27 1 m2 Pasang Dinding Keramik 20 x 25 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.000 ktk Keramik 20 x 25 cm warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9.300 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.018 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1.500 Kg Semen Warna #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 79


1 2 3 4 5 6 7 8 9 10 11 12 11 12
b. Tenaga 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50 104,842.50
0.600 Oh Pekerja 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00 77,000.00 46,200.00
0.450 Oh Tukang Batu 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00 109,500.00 49,275.00
0.045 Oh Kepala Tukang 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50 120,500.00 5,422.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

28 1 m2 Pasang batu pecah 3-5cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.100 M3 Batu pecah 3-5cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.750 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

29 1 m2 Pasang Dinding Batu Pualam Kuning/hijau #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


1.050 M2 Batu Pualam kuning/hijau #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11.750 Kg Semen Abu-Abu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.035 M3 Pasir Pasang #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50 94,227.50


0.620 Oh Pekerja 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00 77,000.00 47,740.00
0.350 Oh Tukang Batu 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00 109,500.00 38,325.00
0.035 Oh Kepala Tukang 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50 120,500.00 4,217.50
0.030 Oh Mandor 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00 131,500.00 3,945.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

30 1 m2 Plint Kayu 2 x 10 cm kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.003 M3 Kayu papan kls II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku skrup 3.5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 80


1 2 3 4 5 6 7 8 9 10 11 12 11 12
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

31 1 m2 Plint Kayu 2 x 10 cm kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.003 M3 Kayu papan kls III #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Paku skrup 3.5" #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00 24,615.00


0.120 Oh Pekerja 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00 77,000.00 9,240.00
0.120 Oh Tukang Batu 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00 109,500.00 13,140.00
0.012 Oh Kepala Tukang 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00 120,500.00 1,446.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

XIV PEKERJAAN PENGECATAN


1 1 m2 Pengecatan Bidang Kayu Lama #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.150 Kg Plamir/Dempul Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.170 Kg Cat meni #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.170 Kg Cat mengkilat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 14,835.00 14,835.00 14,835.00 14,835.00 14,835.00 14,835.00


0.070 Oh Pekerja 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00
0.075 Oh Tukang Cat 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50 109,500.00 8,212.50
0.008 Oh Kepala Tukang 120,500.00 903.75 120,500.00 903.75 120,500.00 903.75 120,500.00 903.75 120,500.00 903.75 120,500.00 903.75
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

2 1 m2 Pengecatan Bidang Kayu Baru(1 Lapis Plamir, 2 Lapis Cat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Penutup)

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.200 Kg Cat Meni #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Plamir/Dempul Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.170 Kg Cat dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.260 Kg Cat mengkilat 2 kali #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 ltr Pengencer #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Lbr Ampelas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 16,296.75 16,296.75 16,296.75 16,296.75 16,296.75 16,296.75


0.070 Oh Pekerja 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00
0.090 Oh Tukang Cat 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00 109,500.00 9,855.00
0.006 Oh Kepala Tukang 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00 120,500.00 723.00
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 81


1 2 3 4 5 6 7 8 9 10 11 12 11 12
3 1 m2 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir, 3 Lapis Cat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Penutup)

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.200 Kg Cat Meni #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.150 Kg Plamir/Dempul Kayu #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.170 Kg Cat dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.350 Kg Cat mengkilat 2 kali #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.030 Kg Pengencer #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Lbr Ampelas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 17,698.25 17,698.25 17,698.25 17,698.25 17,698.25 17,698.25


0.070 Oh Pekerja 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00 77,000.00 5,390.00
0.105 Oh Tukang Cat 109,500.00 11,497.50 109,500.00 11,497.50 109,500.00 11,497.50 109,500.00 11,497.50 109,500.00 11,497.50 109,500.00 11,497.50
0.004 Oh Kepala Tukang 120,500.00 482.00 120,500.00 482.00 120,500.00 482.00 120,500.00 482.00 120,500.00 482.00 120,500.00 482.00
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

4 1 m2 Pelaburan Bidang Kayu dengan Politur #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.522 Ltr Politur #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2.000 Lbr Ampelas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 39,626.75 39,626.75 39,626.75 39,626.75 39,626.75 39,626.75


0.400 Oh Pekerja 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00 77,000.00 30,800.00
0.060 Oh Tukang Cat 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00 109,500.00 6,570.00
0.016 Oh Kepala Tukang 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

5 1 m2 Pelaburan Bidang Kayu dengan Cat Residu dan Teer #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.350 Ltr Residu atau Ter #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 8,489.00 8,489.00 8,489.00 8,489.00 8,489.00 8,489.00


0.100 Oh Pekerja 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00 77,000.00 7,700.00
0.006 Oh Mandor 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00 131,500.00 789.00
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

6 1 m2 Pelaburan Bidang Kayu dengan Vernis #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.150 Ltr Vernis #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.050 Kg Dempul #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Lbr Ampelas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 32,096.75 32,096.75 32,096.75 32,096.75 32,096.75 32,096.75


0.160 Oh Pekerja 77,000.00 12,320.00 77,000.00 12,320.00 77,000.00 12,320.00 77,000.00 12,320.00 77,000.00 12,320.00 77,000.00 12,320.00
0.160 Oh Tukang Cat 109,500.00 17,520.00 109,500.00 17,520.00 109,500.00 17,520.00 109,500.00 17,520.00 109,500.00 17,520.00 109,500.00 17,520.00

SNI OKI 2019 Page 82


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.016 Oh Kepala Tukang 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00 120,500.00 1,928.00
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

7 1 m2 Pengecatan Tembok Baru (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pengecatan Tembok Baru (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
lapis dalam Lt. II Mutu C

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.100 Kg Plamir tembok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Kg Cat Dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 45,000.00 4,500.00 #VALUE! #VALUE!
0.260 Kg Cat Penutup 2 kali #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas roll 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00

b. Tenaga 9,592.15 9,592.15 9,592.15 9,592.15 9,592.15 9,592.15


0.0200 Oh Pekerja 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00
0.0630 Oh Tukang Cat 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50
0.0063 Oh Kepala Tukang 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15
0.0030 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

8 1 m2 Pengecatan Tembok Lama (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
1 m2 Pengecatan Tembok Lama (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
lapis dalam Lt. II

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.1200 Kg Cat Dasar 14,000.00 1,680.00 14,200.00 1,704.00 14,500.00 1,740.00 14,700.00 1,764.00 45,000.00 5,400.00 15,000.00 1,800.00
0.1800 Kg Cat Penutup 2 kali #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.01000 Bh Kuas roll 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00

b. Tenaga 7,655.60 7,655.60 7,655.60 7,655.60 7,655.60 7,655.60


0.0280 Oh Pekerja 77,000.00 2,156.00 77,000.00 2,156.00 77,000.00 2,156.00 77,000.00 2,156.00 77,000.00 2,156.00 77,000.00 2,156.00
0.0420 Oh Tukang Cat 109,500.00 4,599.00 109,500.00 4,599.00 109,500.00 4,599.00 109,500.00 4,599.00 109,500.00 4,599.00 109,500.00 4,599.00
0.0042 Oh Kepala Tukang 120,500.00 506.10 120,500.00 506.10 120,500.00 506.10 120,500.00 506.10 120,500.00 506.10 120,500.00 506.10
0.0030 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

9 1 m2 Pengecatan Tembok Baru Anti Lumut (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

1 m2 Pengecatan Tembok Baru Anti Lumut (1 Lapis Plamir,2 Lapis Cat Penutup) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
lapis dalam Lt. II

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.150 Kg Plamir tembok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.200 Kg Cat Dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! 45,000.00 9,000.00 #VALUE! #VALUE!
0.260 Kg Cat Penutup anti lumut 2 kali #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas roll 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00 18,000.00 180.00

b. Tenaga 9,592.15 9,592.15 9,592.15 9,592.15 9,592.15 9,592.15


0.0200 Oh Pekerja 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00

SNI OKI 2019 Page 83


1 2 3 4 5 6 7 8 9 10 11 12 11 12
0.0630 Oh Tukang Cat 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50 109,500.00 6,898.50
0.0063 Oh Kepala Tukang 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15 120,500.00 759.15
0.0030 Oh Mandor 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50 131,500.00 394.50
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan Lantai II #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

10 1 m Melabur Tembok dengan Kapur Sirih


2
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.150 Kg Kapur tembok #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.100 Lbr Ampelas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 12,000.30 12,000.30 12,000.30 12,000.30 12,000.30 12,000.30


0.150 Oh Pekerja 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00 77,000.00 11,550.00
0.001 Oh Tukang Cat 109,500.00 109.50 109,500.00 109.50 109,500.00 109.50 109,500.00 109.50 109,500.00 109.50 109,500.00 109.50
0.000 Oh Kepala Tukang 120,500.00 12.05 120,500.00 12.05 120,500.00 12.05 120,500.00 12.05 120,500.00 12.05 120,500.00 12.05
0.003 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

11 1 m2 Pengecatan Permukaan Baja dengan Meni Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.100 Kg Meni Besi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 26,178.75 26,178.75 26,178.75 26,178.75 26,178.75 26,178.75


0.0200 Oh Pekerja 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00 77,000.00 1,540.00
0.2000 Oh Tukang Cat 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00 109,500.00 21,900.00
0.0200 Oh Kepala Tukang 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00 120,500.00 2,410.00
0.0025 Oh Mandor 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75 131,500.00 328.75
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

12 1 m2 Pengecatan besi/baja/kayu 3 lapis #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.110 Kg Cat Dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.057 lt minyak cat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.330 Kg Cat Penutup/mengkilat #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 47,585.00 47,585.00 47,585.00 47,585.00 47,585.00 47,585.00


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.225 Oh Tukang Cat 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50
0.023 Oh Kepala Tukang 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25
0.008 Oh Mandor 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

SNI OKI 2019 Page 84


1 2 3 4 5 6 7 8 9 10 11 12 11 12

13 1 m2 Pengecatan Baja dg Meni Besi dan Perancah #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

a. Bahan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


0.100 Kg Meni Besi/cat dasar #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.010 Bh Kuas #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
0.002 M3 Perancah kayu kls IV persegi #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

b. Tenaga 47,585.00 47,585.00 47,585.00 47,585.00 47,585.00 47,585.00


0.250 Oh Pekerja 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00 77,000.00 19,250.00
0.225 Oh Tukang Cat 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50 109,500.00 24,637.50
0.023 Oh Kepala Tukang 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25 120,500.00 2,711.25

0.008 Oh Mandor 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25 131,500.00 986.25
Jumlah (A+B) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! -
Overhead & Profit (Contoh 15 %) #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! -
Harga Satuan Pekerjaan #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! -

Kayuagung, 2019
Mengetahui
Kepala Dinas Perumahan Rakyat dan Kabid. Tata Bangunan dan Lingkungan
Kawasan Permukiman Kab. OKI Dinas Perumahan Rakyat dan
Kawasan Permukiman Kab. OKI

Ir. MAN WINARDI, MT AHMAD SULAIMAN, ST. MM


NIP.19690220199403 1 004 NIP. 19760319 200701 1 002

SNI OKI 2019 Page 85


WILAYAH I WILAYAH II WILAYAH III WILAYAH IV.a WILAYAH IV.b WILAYAH IV.c
KEC. KAYUAGUNG PAMPANGAN MESUJI RAYA KEC. CENGAL KEC. CENGAL Desa Simpang Tiga Sakti
KEC. SP. PADANG LEMPUING MESUJI MAKMUR KEC. SUNGAI MENANG KEC. SUNGAI MENANG Desa Somor,
JEJAWI PEDAMARAN TIMUR MESUJI KEC. TLG. SELAPAN KEC. TLG. SELAPAN Desa Sungai Pasir,
TELUK GELAM LEMPUING JAYA KEC. AIR SUGIHAN KEC. AIR SUGIHAN Desa Sungai Batang
PEDAMARAN PKL. LAMPAM (daerah daratan) (daerah perairan) Desa Sungai Kong
TANJUNG LUBUK (daerah perairan)

DAFTAR SATUAN HARGA DAN BAHAN 2019


HARGA SAT HARGA SAT HARGA SAT HARGA SAT HARGA SAT HARGA SAT
NO URAIAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4.00 5.00 6.00 7.00 8.00 9.00

I UPAH SEHARI
1 Mandor Lapangan HARI 131,500.00 131,500.00 131,500.00 131,500.00 131,500.00 131,500.00
2 Tukang kepala HARI 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00
3 Tukang HARI 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
4 Buruh Lapangan Tak Terampil/pekerja HARI 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00

II BAHAN BANGUNAN
1 Batu Quary-Royalty M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2 Batu Gunung atau Quarry M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3 Batu dari Galian Bukit M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4 Batu Kali M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5 Kerikil Sungai (tidak disaring) M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6 Kerikil Sungai Ayak Tanpa Pasir (koral) M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
7 Batu Pecah 10-15 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
8 Batu Pecah 7-10Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9 Batu Pecah 5-7 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10 Batu Pecah 3-5 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11 Batu Pecah 2-3 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
12 Batu Pecah 1-2 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
13 Batu Pecah 0,5-1 Cm M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
14 Gorong-gorong dia. 60 Cm M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15 Gorong-gorong dia.80 Cm M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
16 Gorong-gorong dia.100 Cm M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
17 Pasir Urug M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
18 Pasir Beton/Pasangan M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
19 Sirtu(tak diayak) M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
20 Bahan Timbunan Pilihan/Tanah Puru M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
21 Batu Bata Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
22 Batu Bata Bolong Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
23 Batu Catur 40 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
24 Batu Catur 60 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
25 Batu Catur 70 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
26 Batu Catur 80 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
27 Batu Catur 100 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
28 Batu Catur 120 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
29 Conblok Berwarna 8cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
30 Conblok polos 8cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
31 Conblok berwarna 6cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
32 Conblok polos 6cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
33 Glassblock Duz #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Geotextile M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
34 Geotextile Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
35 Ijuk Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
36 Rumput Gabalan M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
37 Pohon Pinus Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
38 Pohon Palem Raja 3-4 M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
39 Pohon Palem Raja Besar Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
40 Pohon Mahoni Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
41
42 -
43 2 4 -
44 Pohon Dadap Biasa Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
45 Pohon Dadap Merah Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
46 Pohon Aknain Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
47 Pohon Lamtoro Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
48 Pohon Bunga Tanjung Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
49 Pohon Palem Botol Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
50 Lili Paris Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
51 Lipi Putih Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
52 Lantano Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
53 Maworo Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
54 Wali songo Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
55 Batapia Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
56 Asoka Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
57 Cemara lili Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
58 Palem Ponik Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
59 Astre Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
60 A Gapa Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
61 Palem Ekor Tupai Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
62 Manas Kerang Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Page 86
63 Pakis - pakisan Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
64 Rumput Gajah Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
65 Puring Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
66 Adam Hawa Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
67 Lamatang Kuning Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
68 Soka Jambon Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Page 87
1 2 4 5.00 6.00 7.00 8.00 8.00 9

69 Soka Merah Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!


70 Soka Orange Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
71 Soka Putih Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
72 Biola Cantik Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
73 Palem Putih Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
74 Palem Merah Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
75 Palem Jambe pinang Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
76 Pisang Kipas Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
77 Pisang - Pisangan Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
78 Bougenvile Ungu Pot Besar Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
79 Bougenvile Payang Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
80 Bougenvile Ungu Pot Kecil Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
81 Bougenvile Putih Pot Kecil Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
82 Bougenvile Lokal Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
83 Golden Kaye Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
84 Teratai Air (Pot) Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
85 Kemuning (Pengharum) Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
86 Krokot Bungan kuning Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
87 Paku ukuran 0" s/d 1" Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
88 Paku ukuran 1,5" s/d 6" Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
89 Besi Beton Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
90 Besi Kuda -kuda Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
91 Besi Wiremesh dia 6mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
92 Besi Wiremesh dia 8mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
93 Kawat Pengikat Beton Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
94 Kawat Bronjong Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
95 Besi Pipa dia.8"-6 M Ex.Pertamina Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
96 Besi Pipa dia.6"-6 M Ex.Pertamina Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
97 Besi Pipa dia.5"-6M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
98 Besi Pipa dia.4"-6 M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
99 Besi Pipa dia.3"-6M Ex.Pertamina Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
100 Besi Pipa dia.2"-6 M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
101 Besi Pipa dia.1"-6 M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
102 Besi Plat kembang Tebal 8 MM Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
103 Besi Plat Tebal 5,6 MM Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
104 Besi Plat Tebal 4,5 MM Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
105 Besi Plat Tebal 3,6 MM Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
106 Besi Plat Tebal 3 MM Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
107 Besi siku/Plat strip Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
108 Pipa PVC type D dia 5/8" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
109 Pipa PVC Type "D"dia.1/2" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
110 Pipa PVC Type "D"dia.3/4" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
111 Pipa PVC Type "D"dia.1" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
112 Pipa PVC Type "D"dia.1,5" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
113 Pipa PVC Type "D"dia.2" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
114 Pipa PVC Type "D"dia.3" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
115 Pipa PVC Type "D"dia.4" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
116 Pipa PVC Type "AW"dia.1/2" Btg 25,000.00 26,500.00 29,000.00 30,500.00 33,500.00 35,175.00
117 Pipa PVC Type "AW"dia.3/4" Btg 30,000.00 31,500.00 33,000.00 34,500.00 37,500.00 39,375.00
118 Pipa PVC Type "AW"dia.1" Btg 42,000.00 43,000.00 44,000.00 45,000.00 48,000.00 50,400.00
119 Pipa PVC Type "AW"dia.1 1/4" Btg 60,000.00 61,500.00 63,000.00 64,500.00 67,500.00 70,875.00
120 Pipa PVC Type "AW"dia 1 1/2" Btg 70,000.00 71,500.00 73,000.00 74,500.00 77,500.00 81,375.00
121 Pipa PVC Type "AW"dia.2" Btg 85,000.00 86,500.00 88,000.00 89,500.00 92,500.00 97,125.00
122 Pipa PVC Type "AW"dia.2 1/2" Btg 115,000.00 116,500.00 118,000.00 119,500.00 122,500.00 128,625.00
123 Pipa PVC Type "AW"dia.3" Btg 155,000.00 157,000.00 159,000.00 161,000.00 166,000.00 174,300.00
124 Pipa PVC Type "AW"dia.4" Btg 327,750.00 333,500.00 339,250.00 345,000.00 356,500.00 368,000.00
125 sok Elbow PVC Type "D"dia.3/4" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
126 sok Elbow PVC Type"D"dia.1" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
127 sok Elbow PVC Type"D"dia.1 1/2" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
128 sok Elbow PVC Type"D"dia.2" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
129 sok Elbow PVC Type"D"dia.3" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
130 sok Elbow PVC Type"D"dia.4" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
131 Pompa Distribusi 40 L/dtk Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
132 Pompa Distribusi 5 L/dtk Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
133 Pompa Distribusi 7,5 L/dtk Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
134 Pompa Distribusi 10 L/dtk Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
135 Kayu kelas IV Persegi M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
136 Kayu kelas IV Papan M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
137 Kayu kelas III Persegi M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
138 Kayu kelas III Papan M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
139 Kayu kelas II Persegi M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
140 Kayu kelas II Papan M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
141 Kayu Tembesu Persegi (ky kls. I) M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
142 Kayu Tembesu Papan (ky kls. I) M3 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Page 88
1 2 4 5.00 6.00 7.00 8.00 8.00 9

143 Kayu Gelam dia.8/12cm-4M Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
144 Plywood tebal 3 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
145 Plywood tebal 5 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
146 Plywood tebal 9 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
147 Plywood tebal 12 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
148 Plywood tebal 18 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
149 Teakwood tebal 3 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
150 Gypsum board (1200x2400x9)mm lbr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
151 Kalsiboard (1200x2400x3,5)mm lbr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
152 Kalsiflank (200x3000x8)mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
153 List profil Gypsum besar M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
154 List profil Gypsum sedang M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
155 Semen Batu Raja(50 Kg) Zak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
156 Teer Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
157 Cat mengkilat Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
158 Cat genteng Galon #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
159 Cat menie Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
160 Cat tembok Galon #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
161 Cat tembok anti lumut kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Cat Avitex 5 Kg kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Cat Spektrum 5 Kg kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
162 Kapur Tembok Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
163 Minyak Cat Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
164 Alat Bantu Set #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
165 Baut Baja 'U' Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
166 Paku sekrup Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
167 Paku beton BH #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
168 cornice adhesive kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
169 textile tape M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
170 rangka metal fooring M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
171 Plat Kelam relban tebal 5 mm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
172 Baut plat kelam relban Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
173 Paku Jepang/Paku Jembatan Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
174 Genteng Kodok Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
175 Genteng Buleleng Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
176 Genteng Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
177 Genteng Beton Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
178 Genteng Mirando natural Bh 11,000.00 11,300.00 11,500.00 11,800.00 12,000.00 12,100.00
179 Genteng keramik maroon Bh 14,000.00 14,200.00 14,500.00 14,700.00 15,000.00 15,100.00
182 Genteng Metal Tbl 2.5 mm Butiran Roof Kpg 65,000.00 66,000.00 67,000.00 68,000.00 69,000.00 70,000.00
183 Genteng Metal Ex.Multiroof Polos Kpg 48,000.00 48,500.00 49,000.00 49,500.00 50,500.00 51,000.00
184 Bubungan Genteng Metal Tbl 3.5 ButiranRoof Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
185 Paku Khusus Genteng Metal Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
186 Kuda2 dan RangkaAtap BahanZincalume Z M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
187 Atap Polivinyl Carbonate M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
188 Tutup Genteng Mirandu Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
189 Kuda2 dan RangkaAtap BahanZincalume C M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
190 Genteng Metal multiroof insulasi Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
191 Bubungan gentengMetal multiroof Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
192 Sekrup khusus baja ringan Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
193 Bubungan Genteng Kodok Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
194 Bubungan Genteng Buleleng Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
195 Bubungan Genteng Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
196 Bubungan Genteng Beton Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
197 Bubungan Gtg Mirando natural Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
198 Bubungan Genteng krmk maroon Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
199 Aluminium foil M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
200 Seng Gelombang BJLS 20 Kaki #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
201 Roster Beton Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
202 Roster Warna Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
203 Seng Asbes Gelombang kecil 6kk Keping #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
204 Seng Asbes Gelombang besar 6kk Keping #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
205 Seng Bumbungan plat BJLS 20 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
206 Seng Bumbungan Asbes(Karpus) Keping #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
207 Seng Alum. trapiziodal (SWG 24)6kk lbr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
208 Seng Alum.Trapiziodal(SWG 28)6kk lbr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
209 Seng tunas Deck T. 025 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
210 Seng Maja Deck T. 035 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
211 Tutup Bumbungan SWG 24 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
212 Tutup Bumbungan SWG 28 M' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
213 Kubah Masjid Almnium Model Timur Tgh 80 Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
214 Kubah Masjid Almnium Model Timur Tgh 100 Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
215 KubahMasjidAlmnium ModelTimurTgh125cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
216 KubahMasjidAlmnium ModelTimurTgh150cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
217 KubahMasjidAlmnium ModelTimurTgh200cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
218 KubahMasjidAlmnium ModelBiasa dia 80 cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
219 Pintu Km/Wc Aluminium Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
220 Pintu Km/Wc Fibreglass Standard Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
221 Pintu Km/Wc Fibreglass Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
222 Pintu Km/Wc Fibreglass motif kaca Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Page 89
223 Kloset Jongkok KIA Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Page 90
1 2 4 5.00 6.00 7.00 8.00 8.00 9

224 Kloset Jongkok Ex.Lokal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
225 Kloset duduk KIA Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
226 Urinoir KIA Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
227 Floor drain Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
228 Wastafel KIA Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
229 Bak Cuci Piring Aluminium Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
230 Pintu alluminium M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
231 Bak Cuci Piring Porselin Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
232 Bak Air Porselin Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
233 Bak Air Fiberglas(0,25 M3) Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
234 Bak Air Fiberglas(1 M3) Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
234 Bak Air Ex.Tedmon 2000 Ltr Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
235 Bak Air Ex.Tedmon 1100 Ltr Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
236 Bak Air Ex.Tedmon 550 Ltr Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
237 Bak Air Ex.Tedmon 250 Ltr Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
238 Bak Air Km/Wc Fibreglass 53x53 Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
239 Bak Air Km/Wc Fibreglass 69x69 Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
240 Bak Air Km/Wc Sudut Fibreglass Kecil Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
241 Bak Air Km/Wc Sudut Fibreglass Besar Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
242 Tegel Abu-abu 20x20 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
243 Tegel Abu-abu 10x20 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
244 Tegel Abu-abu 15x20 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
245 Tegel Abu-abu 15x30 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
246 Tegel Abu-abu 30x30 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
247 Tegel Teraso 30x30 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
248 Tegel Porselin 11x11 Cm KIA Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
249 Tegel Porselin 15x15 Cm KIA Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
250 Tegel Porselin 10x20 CmSUPER ITALI Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
251 Tegel Plin Traso 10x30 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
252 Tegel Wafel 20x20 Cm Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
253 Tegel Keramik 30 x 30 cm warna Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
254 Tegel Keramik 30 x 30 cm putih Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
255 Tegel Keramik 20 x 20 cm warna Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
256 Tegel Keramik 20 x 20 cm putih Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
257 Tegel Keramik 40 x 40 cm warna Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
258 Tegel Keramik 40 x 40 cm putih Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
259 Tegel Keramik 20 x 25 cm warna Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
260 Tegel Keramik 20 x 25 cm putih Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
261 Tegel Keramik 10 x 20 cm warna Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
262 Tegel Keramik 10 x 20 cm putih Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
263 LantaiGranit Non Homogenous/Granit Alam M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
264 Granitoo 60 x 60 M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
265 KarpetLantai (dust washable,fire resistant) M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
266 Keramik anti slip 30x30 bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
267 Batu alam kuning/hijau M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
268 Plin keramik 10x30 Cm putih Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
269 Plin keramik 10x30 Cm warna Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
270 Plin keramik 10x40 Cm putih Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
271 Plin keramik 10x40 Cm warna Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
272 Tegel Plin 11x11 Cm Kotak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
273 Kayu List Eternit 1x3 Cm Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
274 Bambu Betung Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
275 Bambu Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
276 Pompa Tangan Dragon Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
277 Pompa Air Sanyo Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
278 Kunci Tanam 1 selag Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
279 Kunci Tanam 2 selag Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
280 Kunci Tanam 2 slag ex. Italy Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
281 Kunci selot Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
282 Roll door M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
283 Pintu lipat besi M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Pintu lipat besi (Folding gate) M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
284 Engsel Kuningan 4" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
285 Engsel Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
286 Engsel H Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
287 Grendel Biasa Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
288 Kunci Gembok Sedang Kuningan Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
289 Kaitan Angin Sedang Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
290 Handel/Tarikan/Pegangan Pintu Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
291 Kawat Duri (50m) Rol #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
292 Kawat Harmonika dia.2,5 mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
293 Kawat nyamuk M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
294 Pipa Ledeng dia.3/4" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
295 Pipa Ledeng dia 1" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
296 Pipa Ledeng dia.1,5 " Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Page 91
1 2 3 4 5 6 7 8.00 9

285 Pipa Ledeng dia.2" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
286 Pipa ledeng dia.2,5" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
287 Pipa PVC dia.8" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
288 Pipa PVC dia. 10" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
289 Pipa PVC dia. 12" Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
290 Clame sadle dia. 3"X 3/4 HDPE Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
291 Clame sadle dia. 2"X 3/4 HDPE Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
292 Pipa HDPE dia. 3/4 m' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
293 Male Tread Elbow 90X dia. 3/4 Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
294 Gate Valve Angel Locable Dia. 3/4 x dia. 1/2 Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
295 Segel Coupling + Segel dia.1/2" Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
296 Coupling Meter + Segel dia.1/2" Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
297 Faucet Elbow (drat dalam) dia.1/2" Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
298 Water Meter Dry dia.Multi Jet dia.1/2" Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
299 Knee Galvanis dia.1/2" Unit #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
300 Pipa Galvanis dia.1/2" m' #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
301 Tee PVC dia.1/2" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
302 Kran Air dia.1/2" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
303 Dop Galvanis dia.1/2" Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
304 Box Water Meter (Fibre Glass) Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
305 Kran Air 1/2" Ex.lokal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
306 Kran Air 1/2"Ex.Import Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
307 Kran Air 3/4"Ex.lokal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
308 Kran Air 3/4"Ex.Import Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
309 Kran Air 1" Ex.lokal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
310 Kran Air 1" Ex.Import Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
311 Kran Air 11/2" Ex.lokal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
312 Kran Air 11/2" Ex.Import Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
313 List Profil Btg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
314 Kabel NYA 4 mm mtr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
315 isolator bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
316 inbow dos bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
317 trafo sinar bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
318 Stater sinar bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
319 isolasi kecil roll #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
320 MCB 4 Amper bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
321 Box Panel bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
322 Sakelar Engkel Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
323 sakelar Tunggal Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
324 Sakelar ganda Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
325 Stop Kontak Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
326 Stop kontak AC Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
327 Piting lampu Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
328 Lampu TL 10 Watt Komplit Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
329 Lampu TL 20 Watt Komplit Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
330 Lampu TL 2 x 20 Watt Komplit Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
331 Bola Lampu Pijar 10 Watt Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
332 Bola Lampu Pijar 20 Watt Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
333 Lampu Hemat Energi 18 Watt Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
334 Lampu Hemat Energi 11 Watt Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
335 Lampu Hemat Energi 45 Watt Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
336 Eternit/asbes media Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
337 Eternit/asbes lokal Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
338 Tegel Mozaik Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
339 Semen Putih Zak #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
340 Plamer Cat Tembok Galon #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
341 Dempul Kayu Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
342 Politur Btl #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
343 Pernis Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
344 Amplas lbr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
345 Kuas bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
346 Lem kayu kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
347 Paku seng biasa Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
348 Paku seng ulir Bh #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
349 Kaca Bening tebal 3 mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
350 Kaca Bening tebal 5 mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
351 Kaca Nako 5 mm M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
352 Star Deck Tebal 2,50 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
353 Tunggal 1.020 mm Kpg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
354 Kaca nako 5mm + bingkai M2 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
355 Spritus Btl #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
356 Cat Keramik Super Groud Bks #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
357 Pasangan Huruf Steenlis Steel cm #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
III BAHAN BAKAR
1 Minyak Solar Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
2 Minyak Premium Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
3 Minyak SAE 30 Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
4 Minyak Hidrolik Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
5 Minyak Rem Btl #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
6 Minyak Gemuk Kg #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
7 Air Hujan Btl #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Page 92
8 Air ACCU Btl #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Air Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
9 Minyak Bakar/Kerosine Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
10 Minyak Aspal Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
11 Minyak Tanah Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
12 Minyak Solar Industri Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
13 Solar Pertambangan Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
14 Aspal Bitumen Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
15 Minyak Tambang Ltr #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!

Kayuagung, 2018

Kabupaten Ogan Komering Ilir

Ir. MAN WINARDI, MT


NIP.19690220199403 1 004

Page 93
WILAYAH I WILAYAH II WILAYAH III WILAYAH IV.a WILAYAH IV.b WILAYAH IV.c
KEC. KAYUAGUNG PAMPANGAN MESUJI RAYA KEC. CENGAL KEC. CENGAL Desa Simpang Tiga Sakti
KEC. SP. PADANG LEMPUING MESUJI MAKMUR KEC. SUNGAI MENANG KEC. SUNGAI MENANG Desa Somor,
JEJAWI PEDAMARAN TIMUR MESUJI KEC. TLG. SELAPAN KEC. TLG. SELAPAN Desa Sungai Pasir,
TELUK GELAM LEMPUING JAYA KEC. AIR SUGIHAN KEC. AIR SUGIHAN Desa Sungai Batang
PEDAMARAN PKL. LAMPAM (daerah daratan) (daerah perairan) Desa Sungai Kong
TANJUNG LUBUK (daerah perairan)

DAFTAR SATUAN HARGA DAN BAHAN 2019


HARGA SAT HARGA SAT HARGA SAT HARGA SAT HARGA SAT HARGA SAT
NO URAIAN
( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. ) ( Rp. )
1 2 3 4.00 5.00 6.00 7.00 8.00 9.00

I UPAH SEHARI
1 Mandor Lapangan HARI 131,500.00 131,500.00 131,500.00 131,500.00 131,500.00 131,500.00
2 Tukang kepala HARI 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00 120,500.00
3 Tukang HARI 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00 109,500.00
4 Buruh Lapangan Tak Terampil/pekerja HARI 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00 77,000.00

II BAHAN BANGUNAN
1 Batu Quary-Royalty M3 473,000.00 511,900.00 551,900.00 591,300.00 650,000.00 700,000.00
2 Batu Gunung atau Quarry M3 325,000.00 365,000.00 450,000.00 511,770.00 614,250.00 645,750.00
3 Batu dari Galian Bukit M3 551,880.00 600,000.00 650,000.00 700,000.00 750,000.00 1,000,000.00
4 Batu Kali M3 600,000.00 650,000.00 700,000.00 750,000.00 850,000.00 1,050,000.00
5 Kerikil Sungai (tidak disaring) M3 368,000.00 400,000.00 500,000.00 550,000.00 800,000.00 950,000.00
6 Kerikil Sungai Ayak Tanpa Pasir (koral) M3 405,000.00 435,000.00 485,000.00 550,000.00 850,000.00 1,050,000.00
7 Batu Pecah 10-15 Cm M3 650,000.00 675,000.00 725,000.00 775,000.00 982,800.00 1,050,000.00
8 Batu Pecah 7-10Cm M3 660,000.00 685,000.00 735,000.00 785,000.00 982,800.00 1,060,000.00
9 Batu Pecah 5-7 Cm M3 670,000.00 695,000.00 745,000.00 795,000.00 1,010,100.00 1,070,000.00
10 Batu Pecah 3-5 Cm M3 670,500.00 695,500.00 745,500.00 795,500.00 1,037,400.00 1,070,500.00
11 Batu Pecah 2-3 Cm M3 671,000.00 696,000.00 746,000.00 796,000.00 1,064,700.00 1,071,000.00
12 Batu Pecah 1-2 Cm M3 671,500.00 696,500.00 746,500.00 796,500.00 1,078,350.00 1,071,500.00
13 Batu Pecah 0,5-1 Cm M3 672,000.00 701,610.00 747,000.00 797,000.00 1,092,000.00 1,092,000.00
14 Gorong-gorong dia. 60 Cm M' 887,250.00 900,900.00 914,550.00 928,200.00 1,365,000.00 1,365,000.00
15 Gorong-gorong dia.80 Cm M' 1,064,700.00 1,078,350.00 1,092,000.00 1,105,650.00 1,774,500.00 1,774,500.00
16 Gorong-gorong dia.100 Cm M' 1,597,050.00 1,610,700.00 1,624,350.00 1,638,000.00 2,047,500.00 2,047,500.00
17 Pasir Urug M3 110,000.00 135,000.00 150,000.00 200,000.00 486,200.00 550,000.00
18 Pasir Beton/Pasangan M3 123,750.00 175,000.00 185,000.00 210,000.00 550,000.00 650,000.00
19 Sirtu(tak diayak) M3 336,840.00 358,365.00 372,645.00 415,695.00 750,750.00 750,750.00
20 Bahan Timbunan Pilihan/Tanah Puru M3 75,000.00 75,000.00 75,000.00 75,000.00 188,500.00 188,500.00
21 Batu Bata Biasa Bh 700.00 700.00 750.00 850.00 1,100.00 1,155.00
22 Batu Bata Bolong Bh 1,000.00 1,050.00 1,100.00 1,150.00 1,400.00 1,470.00
23 Batu Catur 40 Cm Bh 7,700.00 8,900.00 10,100.00 11,300.00 11,500.00 12,075.00
24 Batu Catur 60 Cm Bh 8,580.00 8,800.00 9,100.00 9,400.00 12,000.00 12,600.00
25 Batu Catur 70 Cm Bh 10,300.00 10,600.00 10,900.00 11,200.00 12,500.00 13,125.00
26 Batu Catur 80 Cm Bh 11,100.00 11,400.00 11,700.00 12,000.00 13,000.00 13,650.00
27 Batu Catur 100 Cm Bh 12,200.00 12,500.00 12,800.00 13,100.00 14,000.00 14,700.00
28 Batu Catur 120 Cm Bh 12,800.00 13,100.00 13,400.00 13,700.00 15,000.00 15,750.00
29 Conblok Berwarna 8cm Bh 3,500.00 3,700.00 3,900.00 4,100.00 4,500.00 4,725.00
30 Conblok polos 8cm Bh 2,800.00 3,100.00 3,400.00 3,700.00 4,000.00 4,200.00
31 Conblok berwarna 6cm Bh 2,900.00 3,200.00 3,500.00 3,800.00 4,100.00 4,300.00
32 Conblok polos 6cm Bh 2,500.00 2,800.00 3,100.00 3,400.00 3,700.00 3,900.00
33 Glassblock Duz 125,800.00 130,800.00 135,800.00 140,500.00 260,400.00 273,420.00
Geotextile M2 25,000.00 28,000.00 32,000.00 35,000.00 40,000.00 40,000.00
34 Geotextile Kg 845,000.00 845,000.00 845,000.00 845,000.00 845,000.00 887,250.00
35 Ijuk Kg 4,750.00 4,750.00 4,750.00 4,750.00 4,750.00 4,987.50
36 Rumput Gabalan M2 13,000.00 13,000.00 13,000.00 13,000.00 13,000.00 13,650.00
37 Pohon Pinus Btg 69,300.00 69,300.00 69,300.00 69,300.00 69,300.00 72,765.00
38 Pohon Palem Raja 3-4 M Btg 479,200.00 479,200.00 479,200.00 479,200.00 479,200.00 503,160.00
39 Pohon Palem Raja Besar Btg 407,550.00 407,550.00 407,550.00 407,550.00 407,550.00 427,927.50
40 Pohon Mahoni Btg 18,150.00 18,150.00 18,150.00 18,150.00 18,150.00 19,057.50
41
42 -
43 2 4 -
44 Pohon Dadap Biasa Btg 10,725.00 10,725.00 10,725.00 10,725.00 10,725.00 11,261.25
45 Pohon Dadap Merah Btg 72,600.00 72,600.00 72,600.00 72,600.00 72,600.00 76,230.00
46 Pohon Aknain Btg 9,075.00 9,075.00 9,075.00 9,075.00 9,075.00 9,528.75
47 Pohon Lamtoro Btg 11,800.00 11,800.00 11,800.00 11,800.00 11,800.00 12,390.00
48 Pohon Bunga Tanjung Btg 18,150.00 18,150.00 18,150.00 18,150.00 18,150.00 19,057.50
49 Pohon Palem Botol Btg 635,250.00 635,250.00 635,250.00 635,250.00 635,250.00 667,012.50
50 Lili Paris Btg 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00 8,610.00
51 Lipi Putih Btg 18,150.00 18,150.00 18,150.00 18,150.00 18,150.00 19,057.50
52 Lantano Btg 6,400.00 6,400.00 6,400.00 6,400.00 6,400.00 6,720.00
53 Maworo Btg 9,075.00 9,075.00 9,075.00 9,075.00 9,075.00 9,528.75
54 Wali songo Btg 13,700.00 13,700.00 13,700.00 13,700.00 13,700.00 14,385.00
55 Batapia Btg 13,700.00 13,700.00 13,700.00 13,700.00 13,700.00 14,385.00
56 Asoka Btg 8,200.00 8,200.00 8,200.00 8,200.00 8,200.00 8,610.00
57 Cemara lili Btg 90,750.00 90,750.00 90,750.00 90,750.00 90,750.00 95,287.50
58 Palem Ponik Btg 72,600.00 72,600.00 72,600.00 72,600.00 72,600.00 76,230.00
59 Astre Btg 138,125.00 138,125.00 138,125.00 138,125.00 138,125.00 145,031.25
60 A Gapa Btg 138,125.00 138,125.00 138,125.00 138,125.00 138,125.00 145,031.25
61 Palem Ekor Tupai Btg 544,500.00 544,500.00 544,500.00 544,500.00 544,500.00 571,725.00
62 Manas Kerang Btg 2,800.00 2,800.00 2,800.00 2,800.00 2,800.00 2,940.00
63 Pakis - pakisan Btg 20,800.00 20,800.00 20,800.00 20,800.00 20,800.00 21,840.00

Page 94
64 Rumput Gajah Btg 27,225.00 27,225.00 27,225.00 27,225.00 27,225.00 28,586.25
65 Puring Btg 23,100.00 23,100.00 23,100.00 23,100.00 23,100.00 24,255.00
66 Adam Hawa Btg 90,750.00 90,750.00 90,750.00 90,750.00 90,750.00 95,287.50
67 Lamatang Kuning Btg 90,750.00 90,750.00 90,750.00 90,750.00 90,750.00 95,287.50
68 Soka Jambon Btg 25,740.00 25,740.00 25,740.00 25,740.00 25,740.00 27,027.00

Page 95
1 2 4 5.00 6.00 7.00 8.00 8.00 9

69 Soka Merah Btg 25,740.00 25,740.00 25,740.00 25,740.00 25,740.00 27,027.00


70 Soka Orange Btg 25,740.00 25,740.00 25,740.00 25,740.00 25,740.00 27,027.00
71 Soka Putih Btg 25,740.00 25,740.00 25,740.00 25,740.00 25,740.00 27,027.00
72 Biola Cantik Btg 345,550.00 345,550.00 345,550.00 345,550.00 345,550.00 362,827.50
73 Palem Putih Btg 499,125.00 499,125.00 499,125.00 499,125.00 499,125.00 524,081.25
74 Palem Merah Btg 363,000.00 363,000.00 363,000.00 363,000.00 363,000.00 381,150.00
75 Palem Jambe pinang Btg 317,625.00 317,625.00 317,625.00 317,625.00 317,625.00 333,506.25
76 Pisang Kipas Btg 499,455.00 499,455.00 499,455.00 499,455.00 499,455.00 524,427.75
77 Pisang - Pisangan Btg 27,225.00 27,225.00 27,225.00 27,225.00 27,225.00 28,586.25
78 Bougenvile Ungu Pot Besar Btg 1,130,250.00 1,130,250.00 1,130,250.00 1,130,250.00 1,130,250.00 1,186,762.50
79 Bougenvile Payang Btg 499,475.00 499,475.00 499,475.00 499,475.00 499,475.00 524,448.75
80 Bougenvile Ungu Pot Kecil Btg 81,675.00 81,675.00 81,675.00 81,675.00 81,675.00 85,758.75
81 Bougenvile Putih Pot Kecil Btg 81,675.00 81,675.00 81,675.00 81,675.00 81,675.00 85,758.75
82 Bougenvile Lokal Btg 81,675.00 81,675.00 81,675.00 81,675.00 81,675.00 85,758.75
83 Golden Kaye Btg 588,100.00 588,100.00 588,100.00 588,100.00 588,100.00 617,505.00
84 Teratai Air (Pot) Btg 54,450.00 54,450.00 54,450.00 54,450.00 54,450.00 57,172.50
85 Kemuning (Pengharum) Btg 25,750.00 25,750.00 25,750.00 25,750.00 25,750.00 27,037.50
86 Krokot Bungan kuning Btg 9,075.00 9,075.00 9,075.00 9,075.00 9,075.00 9,528.75
87 Paku ukuran 0" s/d 1" Kg 25,000.00 26,100.00 29,100.00 30,200.00 35,300.00 37,065.00
88 Paku ukuran 1,5" s/d 6" Kg 27,000.00 29,000.00 31,000.00 33,000.00 38,000.00 39,900.00
89 Besi Beton Kg 18,500.00 21,525.00 24,675.00 27,825.00 27,825.00 27,825.00
90 Besi Kuda -kuda Kg 27,500.00 29,500.00 31,500.00 33,500.00 38,500.00 40,425.00
91 Besi Wiremesh dia 6mm M2 85,000.00 86,000.00 87,000.00 88,000.00 98,000.00 102,900.00
92 Besi Wiremesh dia 8mm M2 100,000.00 102,000.00 104,000.00 106,000.00 116,000.00 1,218,000.00
93 Kawat Pengikat Beton Kg 25,000.00 26,000.00 27,000.00 28,000.00 30,000.00 31,500.00
94 Kawat Bronjong Kg 23,000.00 24,500.00 26,000.00 27,500.00 27,500.00 28,875.00
95 Besi Pipa dia.8"-6 M Ex.Pertamina Btg 3,570,000.00 3,727,500.00 3,885,000.00 4,042,500.00 4,200,000.00 4,200,000.00
96 Besi Pipa dia.6"-6 M Ex.Pertamina Btg 2,782,500.00 2,940,000.00 3,045,000.00 3,255,000.00 3,675,000.00 3,858,750.00
97 Besi Pipa dia.5"-6M Btg 2,310,000.00 2,415,000.00 2,520,000.00 2,625,000.00 2,887,500.00 3,031,875.00
98 Besi Pipa dia.4"-6 M Btg 2,100,000.00 2,205,000.00 2,310,000.00 2,415,000.00 2,730,000.00 2,866,500.00
99 Besi Pipa dia.3"-6M Ex.Pertamina Btg 1,785,000.00 1,890,000.00 1,995,000.00 2,100,000.00 2,520,000.00 2,646,000.00
100 Besi Pipa dia.2"-6 M Btg 1,470,000.00 1,575,000.00 1,680,000.00 1,785,000.00 1,942,500.00 2,039,625.00
101 Besi Pipa dia.1"-6 M Btg 1,155,000.00 1,260,000.00 1,365,000.00 1,470,000.00 1,575,000.00 1,575,000.00
102 Besi Plat kembang Tebal 8 MM Kpg 3,255,000.00 3,360,000.00 3,465,000.00 3,570,000.00 4,305,000.00 4,520,250.00
103 Besi Plat Tebal 5,6 MM Kpg 2,835,000.00 2,940,000.00 3,045,000.00 3,150,000.00 3,885,000.00 4,079,250.00
104 Besi Plat Tebal 4,5 MM Kpg 2,625,000.00 2,730,000.00 2,835,000.00 2,940,000.00 3,465,000.00 3,638,250.00
105 Besi Plat Tebal 3,6 MM Kpg 2,100,000.00 2,205,000.00 2,310,000.00 2,415,000.00 2,835,000.00 2,976,750.00
106 Besi Plat Tebal 3 MM Kpg 1,837,500.00 1,942,500.00 2,047,500.00 2,152,500.00 2,415,000.00 2,535,750.00
107 Besi siku/Plat strip Btg 630,000.00 682,500.00 787,500.00 892,500.00 997,500.00 1,047,375.00
108 Pipa PVC type D dia 5/8" Btg 9,000.00 10,500.00 13,000.00 14,500.00 16,500.00 17,325.00
109 Pipa PVC Type "D"dia.1/2" Btg 20,000.00 21,500.00 23,000.00 24,500.00 26,500.00 27,825.00
110 Pipa PVC Type "D"dia.3/4" Btg 25,000.00 26,500.00 28,000.00 29,500.00 32,500.00 34,125.00
111 Pipa PVC Type "D"dia.1" Btg 30,000.00 31,500.00 33,000.00 34,500.00 37,500.00 39,375.00
112 Pipa PVC Type "D"dia.1,5" Btg 35,000.00 36,500.00 38,000.00 39,500.00 45,000.00 47,250.00
113 Pipa PVC Type "D"dia.2" Btg 48,000.00 49,000.00 50,000.00 51,000.00 53,000.00 55,650.00
114 Pipa PVC Type "D"dia.3" Btg 66,000.00 67,000.00 68,000.00 69,000.00 72,000.00 75,600.00
115 Pipa PVC Type "D"dia.4" Btg 90,000.00 91,000.00 92,000.00 93,000.00 93,000.00 97,650.00
116 Pipa PVC Type "AW"dia.1/2" Btg 25,000.00 26,500.00 29,000.00 30,500.00 33,500.00 35,175.00
117 Pipa PVC Type "AW"dia.3/4" Btg 30,000.00 31,500.00 33,000.00 34,500.00 37,500.00 39,375.00
118 Pipa PVC Type "AW"dia.1" Btg 42,000.00 43,000.00 44,000.00 45,000.00 48,000.00 50,400.00
119 Pipa PVC Type "AW"dia.1 1/4" Btg 60,000.00 61,500.00 63,000.00 64,500.00 67,500.00 70,875.00
120 Pipa PVC Type "AW"dia 1 1/2" Btg 70,000.00 71,500.00 73,000.00 74,500.00 77,500.00 81,375.00
121 Pipa PVC Type "AW"dia.2" Btg 85,000.00 86,500.00 88,000.00 89,500.00 92,500.00 97,125.00
122 Pipa PVC Type "AW"dia.2 1/2" Btg 115,000.00 116,500.00 118,000.00 119,500.00 122,500.00 128,625.00
123 Pipa PVC Type "AW"dia.3" Btg 155,000.00 157,000.00 159,000.00 161,000.00 166,000.00 174,300.00
124 Pipa PVC Type "AW"dia.4" Btg 327,750.00 333,500.00 339,250.00 345,000.00 356,500.00 368,000.00
125 sok Elbow PVC Type "D"dia.3/4" Bh 3,000.00 3,200.00 3,400.00 3,600.00 4,000.00 4,200.00
126 sok Elbow PVC Type"D"dia.1" Bh 4,000.00 4,200.00 4,400.00 4,600.00 5,100.00 5,355.00
127 sok Elbow PVC Type"D"dia.1 1/2" Bh 6,000.00 6,200.00 6,400.00 6,600.00 7,100.00 7,455.00
128 sok Elbow PVC Type"D"dia.2" Bh 10,000.00 10,200.00 10,400.00 10,600.00 11,100.00 11,655.00
129 sok Elbow PVC Type"D"dia.3" Bh 15,000.00 15,200.00 15,400.00 15,600.00 16,100.00 16,905.00
130 sok Elbow PVC Type"D"dia.4" Bh 20,000.00 20,200.00 20,400.00 20,600.00 21,100.00 22,155.00
131 Pompa Distribusi 40 L/dtk Unit 105,820,000.00 105,820,000.00 105,820,000.00 105,820,000.00 105,820,000.00 111,111,000.00
132 Pompa Distribusi 5 L/dtk Unit 40,000,000.00 40,000,000.00 40,000,000.00 40,000,000.00 40,000,000.00 42,000,000.00
133 Pompa Distribusi 7,5 L/dtk Unit 63,350,000.00 63,350,000.00 63,350,000.00 63,350,000.00 63,350,000.00 66,517,500.00
134 Pompa Distribusi 10 L/dtk Unit 79,250,000.00 79,250,000.00 79,250,000.00 79,250,000.00 79,250,000.00 83,212,500.00
135 Kayu kelas IV Persegi M3 2,000,000.00 2,100,000.00 2,200,000.00 2,300,000.00 2,400,000.00 2,520,000.00
136 Kayu kelas IV Papan M3 2,100,000.00 2,205,000.00 2,310,000.00 2,415,000.00 2,520,000.00 2,646,000.00
137 Kayu kelas III Persegi M3 3,150,000.00 3,255,000.00 3,360,000.00 3,675,000.00 3,990,000.00 4,189,500.00
138 Kayu kelas III Papan M3 3,412,500.00 3,517,500.00 3,622,500.00 3,727,500.00 4,042,500.00 4,244,625.00
139 Kayu kelas II Persegi M3 4,200,000.00 4,305,000.00 4,410,000.00 4,515,000.00 4,830,000.00 5,071,500.00
140 Kayu kelas II Papan M3 4,462,500.00 4,567,500.00 4,672,500.00 4,777,500.00 5,092,500.00 5,347,125.00
141 Kayu Tembesu Persegi (ky kls. I) M3 5,300,000.00 5,400,000.00 5,500,000.00 5,600,000.00 5,700,000.00 5,985,000.00
142 Kayu Tembesu Papan (ky kls. I) M3 5,500,000.00 5,600,000.00 5,700,000.00 5,800,000.00 6,000,000.00 6,300,000.00

Page 96
1 2 4 5.00 6.00 7.00 8.00 8.00 9

143 Kayu Gelam dia.8/12cm-4M Btg 13,860.00 13,860.00 13,860.00 13,860.00 13,860.00 13,860.00
144 Plywood tebal 3 mm Kpg 50,400.00 51,450.00 52,500.00 54,600.00 57,750.00 57,750.00
145 Plywood tebal 5 mm Kpg 89,250.00 91,350.00 93,450.00 106,050.00 111,300.00 111,300.00
146 Plywood tebal 9 mm Kpg 147,000.00 149,100.00 150,675.00 152,775.00 152,775.00 152,775.00
147 Plywood tebal 12 mm Kpg 189,000.00 192,150.00 195,300.00 197,400.00 197,400.00 197,400.00
148 Plywood tebal 18 mm Kpg 254,100.00 254,100.00 254,100.00 254,100.00 254,100.00 254,100.00
149 Teakwood tebal 3 mm Kpg 78,750.00 79,800.00 80,850.00 82,950.00 82,950.00 82,950.00
150 Gypsum board (1200x2400x9)mm lbr 141,225.00 141,750.00 143,325.00 143,850.00 143,850.00 143,850.00
151 Kalsiboard (1200x2400x3,5)mm lbr 88,000.00 90,000.00 92,000.00 94,000.00 96,000.00 100,800.00
152 Kalsiflank (200x3000x8)mm Kpg 55,000.00 56,000.00 57,000.00 58,000.00 60,000.00 63,000.00
153 List profil Gypsum besar M' 20,150.00 20,650.00 21,400.00 23,400.00 23,400.00 24,570.00
154 List profil Gypsum sedang M' 15,500.00 16,000.00 16,750.00 18,750.00 18,750.00 19,687.50
155 Semen Batu Raja(50 Kg) Zak 85,600.00 86,600.00 87,600.00 90,000.00 95,600.00 100,380.00
156 Teer Kg 50,000.00 52,500.00 55,000.00 57,500.00 62,500.00 65,625.00
157 Cat mengkilat Kg 63,000.00 65,625.00 68,250.00 70,875.00 73,500.00 77,175.00
158 Cat genteng Galon 159,500.00 161,500.00 163,500.00 168,500.00 168,500.00 176,925.00
159 Cat menie Kg 52,500.00 53,550.00 55,650.00 60,900.00 60,900.00 63,945.00
160 Cat tembok Galon 65,000.00 66,500.00 74,000.00 86,000.00 86,000.00 90,300.00
161 Cat tembok anti lumut kg 70,000.00 72,000.00 74,000.00 76,000.00 86,000.00 90,300.00
Cat Avitex 5 Kg kg 127,000.00 133,000.00 138,000.00 144,000.00 150,000.00 161,000.00
Cat Spektrum 5 Kg kg 207,000.00 213,000.00 218,000.00 224,000.00 230,000.00 242,000.00

162 Kapur Tembok Kg 7,000.00 9,000.00 11,000.00 13,000.00 13,000.00 13,650.00


163 Minyak Cat Ltr 25,000.00 27,500.00 30,000.00 32,500.00 37,500.00 39,375.00
164 Alat Bantu Set
165 Baut Baja 'U' Bh 26,000.00 27,000.00 28,000.00 29,000.00 29,000.00 30,450.00
166 Paku sekrup Kg 20,000.00 21,000.00 22,000.00 23,000.00 25,000.00 26,250.00
167 Paku beton BH 1,000.00 1,100.00 1,200.00 1,400.00 1,600.00 1,680.00
168 cornice adhesive kg 5,000.00 5,250.00 5,450.00 5,700.00 5,950.00 6,247.50
169 textile tape M' 3,650.00 3,950.00 4,450.00 4,950.00 4,950.00 5,197.50
170 rangka metal fooring M2 90,900.00 91,800.00 92,800.00 92,800.00 92,800.00 97,440.00
171 Plat Kelam relban tebal 5 mm Bh 47,000.00 48,850.00 50,950.00 55,950.00 55,950.00 58,747.50
172 Baut plat kelam relban Bh 11,000.00 13,600.00 14,550.00 15,250.00 15,250.00 16,012.50
173 Paku Jepang/Paku Jembatan Kg 48,000.00 67,750.00 70,550.00 73,650.00 73,650.00 73,650.00
174 Genteng Kodok Bh 2,900.00 3,100.00 3,400.00 3,900.00 3,900.00 4,095.00
175 Genteng Buleleng Bh 2,900.00 3,100.00 3,400.00 3,900.00 3,900.00 4,095.00
176 Genteng Biasa Bh 2,900.00 3,100.00 3,400.00 3,900.00 3,900.00 4,095.00
177 Genteng Beton Bh 6,600.00 6,800.00 7,100.00 7,600.00 7,600.00 7,980.00
178 Genteng Mirando natural Bh 9,700.00 9,900.00 10,200.00 10,700.00 10,700.00 11,235.00
179 Genteng keramik maroon Bh 13,000.00 13,500.00 14,000.00 14,500.00 15,000.00 15,500.00
182 Genteng Metal Tbl 2.5 mm Butiran Roof Kpg 50,000.00 52,000.00 54,000.00 56,000.00 60,000.00 63,000.00
183 Genteng Metal Ex.Multiroof Polos Kpg 44,300.00 45,000.00 45,700.00 51,400.00 58,000.00 60,900.00
184 Bubungan Genteng Metal Tbl 3.5 ButiranRoof Bh 70,000.00 72,000.00 74,000.00 76,000.00 81,000.00 81,000.00
185 Paku Khusus Genteng Metal Kg 60,000.00 62,000.00 63,500.00 65,500.00 66,000.00 69,300.00
186 Kuda2 dan RangkaAtap BahanZincalume Z M2 253,500.00 254,000.00 254,500.00 255,000.00 275,000.00 288,750.00
187 Atap Polivinyl Carbonate M2 123,200.00 124,700.00 126,200.00 128,200.00 131,200.00 137,760.00
188 Tutup Genteng Mirandu Bh 7,000.00 9,000.00 10,750.00 14,000.00 16,500.00 17,325.00
189 Kuda2 dan RangkaAtap BahanZincalume C M2 208,000.00 209,300.00 210,600.00 211,900.00 214,500.00 214,500.00
190 Genteng Metal multiroof insulasi Kpg 58,500.00 59,800.00 61,100.00 62,400.00 65,000.00 68,250.00
191 Bubungan gentengMetal multiroof Bh 46,800.00 48,100.00 49,400.00 50,700.00 52,000.00 54,600.00
192 Sekrup khusus baja ringan Kg 80,000.00 82,000.00 84,000.00 86,000.00 91,000.00 95,550.00
193 Bubungan Genteng Kodok Bh 5,000.00 7,000.00 8,750.00 12,000.00 14,000.00 14,700.00
194 Bubungan Genteng Buleleng Bh 5,500.00 7,250.00 9,250.00 11,250.00 14,500.00 15,225.00
195 Bubungan Genteng Biasa Bh 4,000.00 6,000.00 7,750.00 11,000.00 13,000.00 13,650.00
196 Bubungan Genteng Beton Bh 9,420.00 10,820.00 12,570.00 15,820.00 17,850.00 18,742.50
197 Bubungan Gtg Mirando natural Bh 7,800.00 9,200.00 10,950.00 14,200.00 16,200.00 17,010.00
198 Bubungan Genteng krmk maroon Bh 15,000.00 16,000.00 17,000.00 19,050.00 20,500.00 21,525.00
199 Aluminium foil M2 8,500.00 9,000.00 9,500.00 10,000.00 12,000.00 12,600.00
200 Seng Gelombang BJLS 20 Kaki 9,000.00 9,500.00 10,000.00 10,500.00 11,500.00 12,075.00
201 Roster Beton Bh 14,500.00 15,000.00 15,500.00 16,000.00 18,000.00 18,900.00
202 Roster Warna Bh 18,150.00 18,650.00 19,150.00 19,650.00 21,150.00 22,207.50
203 Seng Asbes Gelombang kecil 6kk Keping 58,500.00 62,500.00 67,500.00 72,500.00 82,500.00 86,625.00
204 Seng Asbes Gelombang besar 6kk Keping 62,000.00 62,500.00 67,500.00 72,500.00 82,500.00 86,625.00
205 Seng Bumbungan plat BJLS 20 M' 35,650.00 37,250.00 40,000.00 43,000.00 44,000.00 46,200.00
206 Seng Bumbungan Asbes(Karpus) Keping 30,100.00 37,100.00 40,600.00 40,800.00 41,800.00 43,890.00
207 Seng Alum. trapiziodal (SWG 24)6kk lbr 179,400.00 182,400.00 185,400.00 189,000.00 192,000.00 201,600.00
208 Seng Alum.Trapiziodal(SWG 28)6kk lbr 135,700.00 138,700.00 142,000.00 145,000.00 147,000.00 154,350.00
209 Seng tunas Deck T. 025 M' 70,000.00 72,000.00 74,000.00 76,000.00 86,000.00 90,300.00
210 Seng Maja Deck T. 035 M' 100,000.00 103,000.00 106,000.00 109,500.00 110,500.00 116,025.00
211 Tutup Bumbungan SWG 24 M' 44,850.00 47,850.00 50,850.00 54,350.00 52,300.00 54,915.00
212 Tutup Bumbungan SWG 28 M' 49,350.00 52,350.00 55,350.00 58,850.00 58,850.00 61,792.50
213 Kubah Masjid Almnium Model Timur Tgh 80 Bh 1,716,000.00 1,721,000.00 1,741,000.00 1,766,000.00 1,768,000.00 1,856,400.00
214 Kubah Masjid Almnium Model Timur Tgh 100 Bh 2,922,000.00 2,927,000.00 2,947,000.00 2,972,000.00 2,975,000.00 3,123,750.00
215 KubahMasjidAlmnium ModelTimurTgh125cm Bh 4,290,000.00 4,295,000.00 4,315,000.00 4,340,000.00 4,340,000.00 4,557,000.00
216 KubahMasjidAlmnium ModelTimurTgh150cm Bh 6,000,000.00 6,005,000.00 6,025,000.00 6,050,000.00 6,050,000.00 6,352,500.00
217 KubahMasjidAlmnium ModelTimurTgh200cm Bh 8,580,000.00 8,585,000.00 8,605,000.00 8,630,000.00 8,630,000.00 9,061,500.00
218 KubahMasjidAlmnium ModelBiasa dia 80 cm Bh 1,500,000.00 1,505,000.00 1,525,000.00 1,550,000.00 1,550,000.00 1,627,500.00
219 Pintu Km/Wc Aluminium Unit 1,750,000.00 1,800,000.00 1,850,000.00 1,900,000.00 1,950,000.00 2,047,500.00
220 Pintu Km/Wc Fibreglass Standard Unit 475,000.00 475,000.00 485,000.00 495,000.00 495,000.00 519,750.00
221 Pintu Km/Wc Fibreglass Unit 485,000.00 485,000.00 485,000.00 485,000.00 485,000.00 485,000.00
222 Pintu Km/Wc Fibreglass motif kaca Unit 1,150,000.00 1,250,000.00 1,350,000.00 1,450,000.00 1,650,000.00 1,732,500.00
223 Kloset Jongkok KIA Bh 350,000.00 400,000.00 450,000.00 500,000.00 600,000.00 700,000.00

Page 97
1 2 4 5.00 6.00 7.00 8.00 8.00 9

224 Kloset Jongkok Ex.Lokal Bh 250,000.00 300,000.00 350,000.00 400,000.00 500,000.00 600,000.00
225 Kloset duduk KIA Bh 2,500,000.00 2,600,000.00 2,700,000.00 2,800,000.00 3,000,000.00 3,150,000.00
226 Urinoir KIA Bh 800,000.00 800,000.00 805,000.00 812,000.00 812,000.00 852,600.00
227 Floor drain Bh 24,200.00 26,200.00 28,950.00 31,700.00 31,700.00 33,285.00
228 Wastafel KIA Unit 1,800,000.00 1,900,000.00 2,000,000.00 2,100,000.00 2,300,000.00 2,415,000.00
229 Bak Cuci Piring Aluminium Bh 350,000.00 360,000.00 380,000.00 390,000.00 400,000.00 420,000.00
230 Pintu alluminium M2 1,750,000.00 1,800,000.00 1,850,000.00 1,900,000.00 1,950,000.00 2,047,500.00
231 Bak Cuci Piring Porselin Bh 718,750.00 720,750.00 724,000.00 729,000.00 729,000.00 765,450.00
232 Bak Air Porselin Bh 1,175,818.00 1,175,818.00 1,181,068.00 1,181,068.00 1,181,068.00 1,240,121.40
233 Bak Air Fiberglas(0,25 M3) Bh 220,000.00 225,250.00 236,000.00 236,000.00 236,000.00 247,800.00
234 Bak Air Fiberglas(1 M3) Bh 300,000.00 305,250.00 316,000.00 316,000.00 316,000.00 331,800.00
234 Bak Air Ex.Tedmon 2000 Ltr Bh 3,000,000.00 3,050,000.00 3,100,000.00 3,150,000.00 3,200,000.00 3,360,000.00
235 Bak Air Ex.Tedmon 1100 Ltr Bh 1,750,000.00 1,800,000.00 1,850,000.00 1,900,000.00 1,950,000.00 2,047,500.00
236 Bak Air Ex.Tedmon 550 Ltr Bh 1,200,000.00 1,250,000.00 1,300,000.00 1,350,000.00 1,450,000.00 1,522,500.00
237 Bak Air Ex.Tedmon 250 Ltr Bh 500,000.00 550,000.00 600,000.00 650,000.00 750,000.00 787,500.00
238 Bak Air Km/Wc Fibreglass 53x53 Bh 160,000.00 172,750.00 180,250.00 187,750.00 187,750.00 197,137.50
239 Bak Air Km/Wc Fibreglass 69x69 Bh 250,000.00 255,000.00 259,500.00 263,500.00 263,500.00 276,675.00
240 Bak Air Km/Wc Sudut Fibreglass Kecil Bh 350,000.00 355,000.00 359,500.00 363,500.00 363,500.00 381,675.00
241 Bak Air Km/Wc Sudut Fibreglass Besar Bh 390,000.00 395,000.00 399,500.00 403,500.00 403,500.00 423,675.00
242 Tegel Abu-abu 20x20 Cm Bh 1,250.00 1,300.00 1,400.00 1,500.00 1,500.00 1,575.00
243 Tegel Abu-abu 10x20 Cm Bh 1,000.00 1,500.00 2,000.00 3,000.00 3,000.00 3,150.00
244 Tegel Abu-abu 15x20 Cm Bh 1,300.00 1,800.00 2,300.00 3,300.00 3,300.00 3,465.00
245 Tegel Abu-abu 15x30 Cm Bh 1,400.00 1,900.00 2,400.00 3,400.00 3,400.00 3,570.00
246 Tegel Abu-abu 30x30 Cm Bh 3,600.00 4,750.00 5,550.00 6,350.00 6,350.00 6,667.50
247 Tegel Teraso 30x30 Cm Bh 8,000.00 8,700.00 9,400.00 10,600.00 10,600.00 11,130.00
248 Tegel Porselin 11x11 Cm KIA Kotak 68,000.00 75,000.00 87,000.00 92,000.00 92,000.00 96,600.00
249 Tegel Porselin 15x15 Cm KIA Kotak 76,000.00 77,000.00 80,250.00 87,700.00 87,700.00 92,085.00
250 Tegel Porselin 10x20 CmSUPER ITALI Kotak 40,000.00 43,000.00 45,500.00 47,000.00 47,000.00 49,350.00
251 Tegel Plin Traso 10x30 Cm Bh 6,250.00 7,250.00 10,250.00 12,800.00 12,800.00 13,440.00
252 Tegel Wafel 20x20 Cm Bh 2,250.00 2,500.00 3,000.00 3,800.00 3,800.00 3,990.00
253 Tegel Keramik 30 x 30 cm warna Kotak 70,000.00 72,000.00 74,000.00 79,000.00 89,000.00 93,450.00
254 Tegel Keramik 30 x 30 cm putih Kotak 60,000.00 62,000.00 64,000.00 69,000.00 79,000.00 82,950.00
255 Tegel Keramik 20 x 20 cm warna Kotak 60,000.00 63,000.00 66,000.00 69,000.00 74,000.00 77,700.00
256 Tegel Keramik 20 x 20 cm putih Kotak 49,500.00 52,500.00 54,500.00 59,500.00 63,500.00 66,675.00
257 Tegel Keramik 40 x 40 cm warna Kotak 75,000.00 77,000.00 79,000.00 85,000.00 95,000.00 99,750.00
258 Tegel Keramik 40 x 40 cm putih Kotak 60,000.00 62,000.00 64,000.00 70,000.00 80,000.00 84,000.00
259 Tegel Keramik 20 x 25 cm warna Kotak 60,000.00 63,000.00 66,000.00 69,000.00 64,000.00 67,200.00
260 Tegel Keramik 20 x 25 cm putih Kotak 55,000.00 58,000.00 61,000.00 64,000.00 69,000.00 72,450.00
261 Tegel Keramik 10 x 20 cm warna Kotak 44,000.00 47,000.00 49,500.00 51,000.00 62,000.00 65,100.00
262 Tegel Keramik 10 x 20 cm putih Kotak 52,800.00 55,800.00 58,300.00 59,800.00 62,000.00 65,100.00
263 LantaiGranit Non Homogenous/Granit Alam M2 1,150,000.00 1,180,250.00 1,187,750.00 1,203,000.00 1,203,000.00 1,263,150.00
264 Granitoo 60 x 60 M2 350,000.00 360,000.00 370,000.00 380,000.00 400,000.00 420,000.00
265 KarpetLantai (dust washable,fire resistant) M2 1,100,000.00 1,244,000.00 1,277,000.00 1,304,000.00 1,304,000.00 1,369,200.00
266 Keramik anti slip 30x30 bh 18,000.00 19,500.00 20,500.00 21,500.00 21,500.00 22,575.00
267 Batu alam kuning/hijau M2 225,000.00 235,000.00 250,000.00 275,000.00 275,000.00 288,750.00
268 Plin keramik 10x30 Cm putih Bh 2,600.00 2,950.00 3,275.00 3,550.00 3,550.00 3,727.50
269 Plin keramik 10x30 Cm warna Bh 2,650.00 3,000.00 4,775.00 5,450.00 5,450.00 5,722.50
270 Plin keramik 10x40 Cm putih Bh 3,200.00 3,550.00 3,900.00 4,250.00 4,250.00 4,462.50
271 Plin keramik 10x40 Cm warna Bh 3,500.00 3,850.00 4,200.00 4,550.00 4,550.00 4,777.50
272 Tegel Plin 11x11 Cm Kotak 60,000.00 66,000.00 70,750.00 78,650.00 78,650.00 82,582.50
273 Kayu List Eternit 1x3 Cm Btg 15,000.00 16,000.00 17,000.00 18,000.00 19,000.00 19,950.00
274 Bambu Betung Btg 36,000.00 37,500.00 49,500.00 60,500.00 60,500.00 63,525.00
275 Bambu Btg 41,000.00 42,500.00 54,500.00 65,500.00 65,500.00 68,775.00
276 Pompa Tangan Dragon Unit 350,000.00 375,000.00 400,000.00 425,000.00 450,000.00 472,500.00
277 Pompa Air Sanyo Unit 2,000,000.00 2,100,000.00 2,200,000.00 2,300,000.00 2,300,000.00 2,415,000.00
278 Kunci Tanam 1 selag Biasa Bh 100,000.00 110,000.00 120,000.00 130,000.00 140,000.00 147,000.00
279 Kunci Tanam 2 selag Biasa Bh 150,000.00 160,000.00 170,000.00 180,000.00 190,000.00 199,500.00
280 Kunci Tanam 2 slag ex. Italy Bh 250,000.00 260,000.00 270,000.00 280,000.00 290,000.00 304,500.00
281 Kunci selot Bh 10,000.00 11,000.00 12,000.00 13,000.00 14,000.00 14,700.00
282 Roll door M2 360,000.00 372,250.00 395,250.00 416,250.00 416,250.00 437,062.50
283 Pintu lipat besi M2 515,000.00 540,000.00 565,000.00 590,000.00 640,000.00 640,000.00
Pintu lipat besi (Folding gate) M2 950,000.00 1,050,000.00 1,100,000.00 1,200,000.00 1,500,000.00 1,575,000.00
284 Engsel Kuningan 4" Bh 30,000.00 31,500.00 33,000.00 35,000.00 35,000.00 36,750.00
285 Engsel Biasa Bh 15,000.00 17,500.00 20,000.00 23,000.00 23,000.00 24,150.00
286 Engsel H Bh 25,000.00 26,000.00 27,000.00 28,000.00 29,000.00 30,450.00
287 Grendel Biasa Bh 12,000.00 130,000.00 14,000.00 15,000.00 16,000.00 16,800.00
288 Kunci Gembok Sedang Kuningan Bh 15,000.00 17,000.00 18,500.00 20,000.00 20,000.00 21,000.00
289 Kaitan Angin Sedang Bh 15,000.00 16,000.00 17,000.00 18,000.00 19,000.00 19,950.00
290 Handel/Tarikan/Pegangan Pintu Bh 7,500.00 7,800.00 8,500.00 9,200.00 9,200.00 9,660.00
291 Kawat Duri (50m) Rol 160,000.00 170,000.00 175,000.00 185,000.00 190,000.00 199,500.00
292 Kawat Harmonika dia.2,5 mm M2 45,000.00 47,500.00 50,600.00 57,000.00 57,000.00 59,850.00
293 Kawat nyamuk M2 25,000.00 28,000.00 30,000.00 32,000.00 32,000.00 33,600.00
294 Pipa Ledeng dia.3/4" Btg 130,000.00 135,000.00 137,000.00 140,000.00 140,000.00 147,000.00
295 Pipa Ledeng dia 1" Btg 150,000.00 155,000.00 157,000.00 160,000.00 160,000.00 168,000.00
296 Pipa Ledeng dia.1,5 " Btg 146,200.00 149,300.00 156,300.00 164,400.00 164,400.00 172,620.00

Page 98
1 2 3 4 5 6 7 8.00 9

285 Pipa Ledeng dia.2" Btg 194,000.00 196,000.00 202,250.00 212,350.00 212,350.00 222,967.50
286 Pipa ledeng dia.2,5" Btg 275,300.00 283,000.00 293,250.00 299,350.00 299,350.00 314,317.50
287 Pipa PVC dia.8" Btg 252,560.00 257,560.00 262,560.00 267,560.00 277,560.00 288,560.00
288 Pipa PVC dia. 10" Btg 394,900.00 399,900.00 404,900.00 409,900.00 419,900.00 430,900.00
289 Pipa PVC dia. 12" Btg 630,520.00 635,520.00 640,520.00 645,520.00 655,520.00 666,520.00
290 Clame sadle dia. 3"X 3/4 HDPE Unit 58,300.00 63,300.00 68,300.00 73,300.00 83,300.00 94,300.00
291 Clame sadle dia. 2"X 3/4 HDPE Unit 47,300.00 52,300.00 57,300.00 62,300.00 72,300.00 83,300.00
292 Pipa HDPE dia. 3/4 m' 11,000.00 16,000.00 21,000.00 26,000.00 36,000.00 47,000.00
293 Male Tread Elbow 90X dia. 3/4 Unit 18,469.00 23,469.00 28,469.00 33,469.00 43,469.00 54,469.00
294 Gate Valve Angel Locable Dia. 3/4 x dia. 1/2 Unit 214,500.00 219,500.00 224,500.00 229,500.00 239,500.00 250,500.00
295 Segel Coupling + Segel dia.1/2" Unit 5,500.00 10,500.00 15,500.00 20,500.00 30,500.00 41,500.00
296 Coupling Meter + Segel dia.1/2" Unit 17,270.00 22,270.00 27,270.00 32,270.00 42,270.00 53,270.00
297 Faucet Elbow (drat dalam) dia.1/2" Unit 3,850.00 8,850.00 13,850.00 18,850.00 28,850.00 39,850.00
298 Water Meter Dry dia.Multi Jet dia.1/2" Unit 192,500.00 197,500.00 202,500.00 207,500.00 217,500.00 228,500.00
299 Knee Galvanis dia.1/2" Unit 22,550.00 27,550.00 32,550.00 37,550.00 47,550.00 58,550.00
300 Pipa Galvanis dia.1/2" m' 11,000.00 16,000.00 21,000.00 26,000.00 36,000.00 47,000.00
301 Tee PVC dia.1/2" Bh 16,500.00 21,500.00 26,500.00 31,500.00 41,500.00 52,500.00
302 Kran Air dia.1/2" Bh 27,500.00 32,500.00 37,500.00 42,500.00 52,500.00 63,500.00
303 Dop Galvanis dia.1/2" Bh 10,450.00 15,450.00 20,450.00 25,450.00 35,450.00 46,450.00
304 Box Water Meter (Fibre Glass) Bh 82,500.00 87,500.00 92,500.00 97,500.00 107,500.00 118,500.00
305 Kran Air 1/2" Ex.lokal Bh 15,000.00 15,500.00 16,000.00 16,500.00 17,000.00 17,850.00
306 Kran Air 1/2"Ex.Import Bh 60,000.00 62,000.00 64,000.00 66,000.00 69,000.00 72,450.00
307 Kran Air 3/4"Ex.lokal Bh 15,000.00 15,500.00 16,000.00 16,500.00 17,000.00 17,850.00
308 Kran Air 3/4"Ex.Import Bh 33,000.00 34,000.00 35,000.00 36,000.00 37,000.00 38,850.00
309 Kran Air 1" Ex.lokal Bh 28,600.00 35,750.00 42,900.00 50,050.00 50,050.00 52,552.50
310 Kran Air 1" Ex.Import Bh 114,400.00 121,550.00 128,700.00 135,850.00 135,850.00 142,642.50
311 Kran Air 11/2" Ex.lokal Bh 42,900.00 50,050.00 57,200.00 64,350.00 64,350.00 67,567.50
312 Kran Air 11/2" Ex.Import Bh 135,850.00 143,000.00 150,150.00 164,450.00 164,450.00 172,672.50
313 List Profil Btg 25,000.00 26,000.00 27,500.00 29,000.00 29,000.00 30,450.00
314 Kabel NYA 4 mm mtr 14,000.00 14,500.00 15,000.00 15,500.00 16,500.00 17,325.00
315 isolator bh 1,000.00 1,100.00 1,200.00 1,300.00 1,400.00 1,470.00
316 inbow dos bh 6,000.00 7,000.00 8,000.00 9,000.00 10,000.00 10,500.00
317 trafo sinar bh 25,000.00 26,000.00 27,000.00 28,000.00 29,000.00 30,450.00
318 Stater sinar bh 7,000.00 8,000.00 9,000.00 10,000.00 11,000.00 11,550.00
319 isolasi kecil roll 5,000.00 5,500.00 6,000.00 6,500.00 7,000.00 7,350.00
320 MCB 4 Amper bh 35,000.00 36,000.00 37,000.00 38,000.00 39,000.00 40,950.00
321 Box Panel bh 75,000.00 85,000.00 86,000.00 87,000.00 88,000.00 92,400.00
322 Sakelar Engkel Bh 55,000.00 56,000.00 57,000.00 58,000.00 59,000.00 61,950.00
323 sakelar Tunggal Bh 45,000.00 46,000.00 47,000.00 48,000.00 49,000.00 51,450.00
324 Sakelar ganda Bh 55,000.00 56,000.00 57,000.00 58,000.00 59,000.00 61,950.00
325 Stop Kontak Bh 65,000.00 66,000.00 67,000.00 68,000.00 69,000.00 72,450.00
326 Stop kontak AC Bh 75,000.00 76,000.00 77,000.00 78,000.00 79,000.00 82,950.00
327 Piting lampu Bh 20,000.00 21,000.00 22,000.00 23,000.00 24,000.00 25,200.00
328 Lampu TL 10 Watt Komplit Bh 75,000.00 80,000.00 85,000.00 90,000.00 95,000.00 99,750.00
329 Lampu TL 20 Watt Komplit Bh 95,000.00 100,000.00 105,000.00 110,000.00 115,000.00 120,750.00
330 Lampu TL 2 x 20 Watt Komplit Bh 145,000.00 146,000.00 147,000.00 148,000.00 158,000.00 165,900.00
331 Bola Lampu Pijar 10 Watt Bh 4,000.00 4,500.00 5,000.00 6,000.00 6,000.00 6,300.00
332 Bola Lampu Pijar 20 Watt Bh 5,000.00 5,500.00 6,000.00 7,000.00 7,000.00 7,350.00
333 Lampu Hemat Energi 18 Watt Bh 45,000.00 46,000.00 47,000.00 48,000.00 49,000.00 51,450.00
334 Lampu Hemat Energi 11 Watt Bh 32,000.00 33,000.00 34,000.00 35,000.00 35,000.00 36,750.00
335 Lampu Hemat Energi 45 Watt Bh 75,000.00 76,000.00 77,000.00 78,000.00 79,000.00 82,950.00
336 Eternit/asbes media Kpg 25,025.00 25,750.00 26,475.00 28,600.00 28,600.00 30,030.00
337 Eternit/asbes lokal Kpg 20,000.00 23,000.00 26,000.00 29,000.00 34,000.00 35,700.00
338 Tegel Mozaik Kpg 11,750.00 12,450.00 15,550.00 18,650.00 18,650.00 19,582.50
339 Semen Putih Zak 110,000.00 115,000.00 120,000.00 125,000.00 135,000.00 141,750.00
340 Plamer Cat Tembok Galon 137,500.00 139,500.00 141,500.00 146,500.00 146,500.00 153,825.00
341 Dempul Kayu Kg 40,000.00 42,000.00 44,000.00 46,000.00 61,000.00 64,050.00
342 Politur Btl 42,800.00 44,300.00 45,500.00 48,500.00 48,500.00 50,925.00
343 Pernis Kg 50,000.00 52,000.00 54,000.00 56,000.00 61,000.00 64,050.00
344 Amplas lbr 8,000.00 9,000.00 9,500.00 11,500.00 11,500.00 12,075.00
345 Kuas bh 10,000.00 10,500.00 11,000.00 11,500.00 12,500.00 13,125.00
346 Lem kayu kg 16,750.00 19,000.00 19,500.00 22,500.00 22,500.00 23,625.00
347 Paku seng biasa Kg 26,400.00 27,600.00 28,400.00 31,200.00 31,200.00 32,760.00
348 Paku seng ulir Bh 1,100.00 1,200.00 1,300.00 1,400.00 1,400.00 1,470.00
349 Kaca Bening tebal 3 mm M2 150,000.00 156,350.00 166,350.00 176,350.00 176,350.00 185,167.50
350 Kaca Bening tebal 5 mm M2 190,000.00 196,350.00 206,350.00 216,350.00 216,350.00 227,167.50
351 Kaca Nako 5 mm M2 50,000.00 56,350.00 66,350.00 76,350.00 76,350.00 80,167.50
352 Star Deck Tebal 2,50 mm Kpg 64,000.00 70,350.00 80,350.00 90,350.00 90,350.00 94,867.50
353 Tunggal 1.020 mm Kpg 110,000.00 116,350.00 126,350.00 136,350.00 136,350.00 143,167.50
354 Kaca nako 5mm + bingkai M2 110,000.00 116,350.00 126,350.00 136,350.00 136,350.00 143,167.50
355 Spritus Btl 10,000.00 10,500.00 11,000.00 12,500.00 12,500.00 13,125.00
356 Cat Keramik Super Groud Bks 10,500.00 11,500.00 12,500.00 14,000.00 14,000.00 14,700.00
357 Pasangan Huruf Steenlis Steel cm 15,000.00 17,000.00 19,000.00 21,000.00 23,000.00 24,150.00
III BAHAN BAKAR
1 Minyak Solar Ltr 6,000.00 8,000.00 8,500.00 9,000.00 10,450.00 10,450.00
2 Minyak Premium Ltr 7,000.00 8,200.00 9,900.00 10,150.00 11,000.00 11,000.00
3 Minyak SAE 30 Ltr 60,500.00 62,000.00 64,000.00 66,000.00 68,000.00 71,400.00
4 Minyak Hidrolik Ltr 82,500.00 83,600.00 84,700.00 85,800.00 85,800.00 85,800.00
5 Minyak Rem Btl 25,900.00 29,200.00 30,300.00 31,400.00 31,400.00 31,720.00
6 Minyak Gemuk Kg 55,000.00 57,200.00 59,400.00 61,600.00 61,600.00 62,700.00
7 Air Hujan Btl 3,850.00 4,180.00 4,730.00 5,280.00 5,280.00 5,500.00
8 Air ACCU Btl 7,865.00 8,195.00 8,360.00 8,910.00 8,910.00 9,350.00
Air Ltr 50.00 55.00 60.00 65.00 70.00 75.00
9 Minyak Bakar/Kerosine Ltr 11,660.00 12,200.00 12,700.00 13,000.00 13,000.00 13,000.00
10 Minyak Aspal Ltr 3,465.00 3,850.00 4,455.00 5,005.00 5,005.00 5,280.00
Page 99
11 Minyak Tanah Ltr 11,660.00 12,200.00 12,700.00 13,000.00 13,000.00 13,000.00
12 Minyak Solar Industri Ltr 9,460.00 9,680.00 9,900.00 10,450.00 10,450.00 10,450.00
13 Solar Pertambangan Ltr 9,790.00 10,230.00 11,000.00 12,100.00 12,100.00 12,650.00
14 Aspal Bitumen Ltr 12,870.00 13,650.00 15,600.00 17,550.00 18,200.00 19,110.00
15 Minyak Tambang Ltr 2,900.00 3,200.00 3,900.00 4,300.00 4,300.00 4,515.00

Kayuagung, 2018

Kepala Dinas Perumahan Rakyat dan


Kawasan Permukiman Kab. OKI

Ir. MAN WINARDI, MT


NIP.19690220199403 1 004

Page 100
kusen 0.04 #REF! #REF!
pintu 3.52 #REF! #REF!
engsel 6.00 #REF! #REF!
kunci 2 slag 1.00 #REF! #REF!
gendel 2.00 #REF! #REF!
cat minyak 8.54 #REF! #REF!
#REF!

kusen 0.04 #REF! #REF!


pintu 2.86 #REF! #REF!
engsel 6.00 #REF! #REF!
kunci 2 slag 1.00 #REF! #REF!
gendel 2.00 #REF! #REF!
cat minyak 7.15 #REF! #REF!
1.43 #REF!

kusen 0.04 #REF! #REF!


pintu 3.52 #REF! #REF!
engsel 6.00 #REF! #REF!
kunci 2 slag 1.00 #REF! #REF!
gendel 2.00 #REF! #REF!
cat minyak 8.54 #REF! #REF!