Anda di halaman 1dari 102

BUAT KWITANSI : => INDONESIA

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
Nominal Rp. 534,364.000

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal
Nominal U$D. 534,364.000

Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP

UNTUK PEMBAYARAN DOKUMEN PREQULIFICATION

Nominal U$D. 534,364.000


Nominal
No AMOUNTH
001 258,093,160.797
002 234,600,000.000
003 #REF!
004 #REF!
005 #REF!
006 #REF!
007
008
009
ISI KATA > INDONESIA atau FOREIGN

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 2-Dec-2023

SATTUANG SE.

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 2-Dec-2023

SATTUANG SE.

KWITANSI PEMBAYARAN/RECIVING OF PEYMENT


PATAR HUTAJULUK

EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUPIAH

PREQULIFICATION Yang Menerima


PT PLN PIKITRING SULAWESI
Makassar, 2-Dec-2023

SATTUANG SE.
TO SAYED
( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tujuh Ratus Sembi
( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KWITANSI No. 1 ( ( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tuju
258,093,160.797
258093161 0
258093160,797 0 0 0
0 MILYAR

KWITANSI No. 2 ( ( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )
234,600,000.000
234600000 0
234600000,000 0 0 0
0 MILYAR

KWITANSI No. 3 ( #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR

KWITANSI No. 4 ( #REF!


#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 5 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 6 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 1 ( #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! MILYAR
KWITANSI No. 1 ( ( Rupiah )
0.000
0 0
0.000 0 0 0
0 MILYAR
KWITANSI No. 1 ( (
0.000
0 0
mbilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tujuh Ratus Sembilan Puluh Tujuh Rupiah )
258 2 5 8 Dua Ratus Lima Puluh Delapan Juta
258093160,797 0
2 5 8 Dua Ratus Lima Puluh
BILLION AND 15 Juta Juta

m Ratus Ribu Rupiah )


234 2 3 4 Dua Ratus Tiga Puluh Empat Juta
234600000,000 0
2 3 4 Dua Ratus Tiga Puluh
BILLION AND 9 Juta Juta

#REF! ### #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! ### #REF! #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! ### #REF! #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! ### #REF! #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! ### #REF! #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

#REF! ### #REF! #REF! #REF!


#REF! #REF! #REF!
#REF! ### #REF! #REF! #REF! #REF!
BILLION AND #REF! #REF! Juta

0.000 0
0 0 0
BILLION AND 0 Juta

0
093 0 9 3 Sembilan Puluh Tiga Ribu
093160,797 0
Delapan 0 9 3 Sembilan Puluh
MILLION AND 12 Ribu Ribu

600 6 0 0 Enam Ratus Ribu


600000,000 0
Empat 6 0 0 Enam Ratus
MILLION AND 6 Ribu Ribu

#REF! #REF! ### #REF! #REF!


#REF! ### #REF!
#REF! #REF! ### #REF! #REF! #REF!
MILLION AND #REF! #REF! Ribu

#REF! #REF! ### #REF! #REF!


#REF! ### #REF!
#REF! #REF! ### #REF! #REF! #REF!
MILLION AND #REF! #REF! Ribu

#REF! #REF! ### #REF! #REF!


#REF! ### #REF!
#REF! #REF! ### #REF! #REF! #REF!
MILLION AND #REF! #REF! Ribu

#REF! #REF! ### #REF! #REF!


#REF! ### #REF!
#REF! #REF! ### #REF! #REF! #REF!
MILLION AND #REF! #REF! Ribu

#REF! #REF! ### #REF! #REF!


#REF! ### #REF!
#REF! #REF! ### #REF! #REF! #REF!
MILLION AND #REF! #REF! Ribu

0.000 0
0 0 0
MILLION AND 0 Ribu

0
160 1 6 0 Seratus Enam Puluh
160,797 0
Tiga 1 6 0 Seratus Enam Puluh
THOUSAND AND

000 0 0 0
000,000 0
0 0 0
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

#REF! ### ### ### #REF!


#REF! ### ###
#REF! ### ### ### #REF! #REF!
THOUSAND AND

0 0
0.000 0
0 0 0
THOUSAND AND

0
797 7 9 7 Koma Tujuh Ratus Sembilan Puluh Tujuh
0
7 9 7 Tujuh Ratus Sembilan Puluh Tujuh
7 23

000 0 0 0
0
0 0 0
0 0

#REF! ### #REF! #REF! #REF!


#REF! #REF!
#REF! ### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!

#REF! ### #REF! #REF! #REF!


#REF! #REF!
#REF! ### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!

#REF! ### #REF! #REF! #REF!


#REF! #REF!
#REF! ### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!

#REF! ### #REF! #REF! #REF!


#REF! #REF!
#REF! ### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!

#REF! ### #REF! #REF! #REF!


#REF! #REF!
#REF! ### #REF! #REF! #REF! #REF! #REF!
#REF! #REF!

000 0 0 0
0
0 0 0
0 0

0
SATUAN
ANGKA
1
2
3
4
5
6
7
8
9

PULUHAN
ANGKA
1
2
3
4
5
6
7
8
9

BELASAN
ANGKA
10
11
12
13
14
15
16
17
18
19

Koma Koma KOMMA


Rupiah Rupiah ) DOLAR
RATUSAN
ANGKA
1
2
Koma KOMMA 3
Rupiah Rupiah ) DOLAR 4
5
6
7
8
#REF! Koma KOMMA 9
Rupiah Rupiah ) DOLAR

#REF! Koma KOMMA


Rupiah Rupiah ) DOLAR

#REF! Koma KOMMA


Rupiah Rupiah ) DOLAR

#REF! Koma KOMMA


Rupiah Rupiah ) DOLAR

#REF! Koma KOMMA


Rupiah Rupiah ) DOLAR

Koma KOMMA
Rupiah Rupiah ) DOLAR
Satu Satu ONE
Dua Dua TWO
Tiga Tiga THREE
Empat Empat FOUR
Lima Lima FIVE
Enam Enam SIX
Tujuh Tujuh SEVEN
Delapan Delapan EIGHT
Sembilan Sembilan NINE

Sepuluh Sepuluh TEN


Dua Puluh Dua Puluh TWENTY
Tiga Puluh Tiga Puluh THIRTY
Empat Puluh Empat Puluh FOURTY
Lima Puluh Lima Puluh FIVETY
Enam Puluh Enam Puluh SIXTY
Tujuh Puluh Tujuh Puluh SEVENTY
Delapan Puluh Delapan Puluh EIGHTY
Sembilan Puluh Sembilan Puluh NINETY

Sepuluh Sepuluh TEN


Sebelas Sebelas ELEVEN
Dua Belas Dua Belas TWELVE
Tiga Belas Tiga Belas THIRTEEN
Empat Belas Empat Belas FOURTEEN
Lima Belas Lima Belas FIVETEEN
Enam Belas Enam Belas SIXTEEN
Tujuh Belas Tujuh Belas SEVENTEEN
Delapan Belas Delapan Belas EIGHTEEN
Sembilan Belas Sembilan Belas NINETEEN

Seratus Seratus HUNDRED AND


Dua Ratus Dua Ratus TWO HUNDRED AND
Tiga Ratus Tiga Ratus THREE HUNDRED AND
Empat Ratus Empat Ratus FOUR HUNDRED AND
Lima Ratus Lima Ratus FIVE HUNDRED AND
Enam Ratus Enam Ratus SIX HUNDRED AND
Tujuh Ratus Tujuh Ratus SEVEN HUNDRED AND
Delapan Ratus Delapan Ratus EIGHT HUNDRED AND
Sembilan Ratus Sembilan Ratus NINE HUNDRED AND
REKAPITULASI ENGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN

LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

NO. URAIAN PEKERJAAN HARGA PEKERJAAN

A PEKERJAAN PENDAHULUAN / PERSIAPAN Rp 100,000.00

B PEKERJAAN TANAH DAN PASIR Rp 2,822,383.33

C PEKERJAAN PASANGAN PONDASI BATU GUNUNG Rp 10,129,147.20

D PEKERJAAN BETON Rp 38,134,589.38

E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK Rp 18,579,645.92

F PEKERJAAN DINDING DAN PLESTERAN Rp 41,641,508.27

G PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND Rp 21,943,411.53

H PEKERJAAN KUSEN, PINTU, JENDELA, KACA, DAN ALAT PENGGANTUNG Rp 27,741,599.02

I PEKERJAAN RANGKA KAP DAN PENUTUP ATAP Rp 48,953,250.46

J PEKERJAAAN INSTALASI LISTRIK Rp 5,943,000.00

K PEKERJAAN SANITASI Rp 8,981,214.96

L PEKERJAAN RAILING BESI HOLLOW Rp -

M PEKERJAAN FINISHING DAN LAIN-LAIN Rp 9,660,396.10

REAL COST Rp 234,630,146.18

PPN 10% Rp 23,463,014.62

TOTAL COST Rp 258,093,160.80

DIBULATKAN Rp 258,093,160.80

TERBILANG : ( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tujuh Ratus Sembilan Puluh Tuj

Wanggudu, Mei 2015


REKAPITULASI ENGINEER ESTIMATE (EE)

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN

LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

NO. URAIAN PEKERJAAN HARGA PEKERJAAN

A PEKERJAAN PENDAHULUAN / PERSIAPAN Rp 100,000.00

B PEKERJAAN TANAH DAN PASIR Rp 2,822,383.33

C PEKERJAAN PASANGAN PONDASI BATU GUNUNG Rp 10,129,147.20

D PEKERJAAN BETON Rp 38,134,589.38

E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK Rp 18,579,645.92

F PEKERJAAN DINDING DAN PLESTERAN Rp 41,641,508.27

G PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND Rp 21,943,411.53

H PEKERJAAN KUSEN, PINTU, JENDELA, KACA, DAN ALAT PENGGANTUNG Rp 27,741,599.02

I PEKERJAAN RANGKA KAP DAN PENUTUP ATAP Rp 48,953,250.46

J PEKERJAAAN INSTALASI LISTRIK Rp 5,943,000.00

K PEKERJAAN SANITASI Rp 8,981,214.96

L PEKERJAAN FINISHING DAN LAIN-LAIN Rp 9,660,396.10

REAL COST Rp 234,630,146.18

DIBULATKAN Rp 234,600,000.00

TERBILANG : ( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )

Wanggudu, Mei 2015


ENGINEER ESTIMATE (EE)
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : BARUGA, KOTA KENDARI

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA

a b c d e f
A PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pembuatan Direksi keets / bangsal kerja Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
2 Pengukuran dan pemasangan bouwplank M1 80.00 Rp 29,400.00 Rp 2,352,000.00
3 Administrasi, dokumentasi dan pelaporan Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 4,852,000.00
B PEKERJAAN BETON
1 PEKERJAAN PONDASI
a. Pek. Bekisting M2 7.44 Rp 136,052.60 Rp 1,012,231.34
b. Pek. Pembesian U24 Kg 136.13 Rp 13,985.00 Rp 1,903,845.32
c. Pek. Pondasi poer plat, Beton K-250 M3 2.40 Rp 984,892.00 Rp 2,363,740.80
d. Pek. Lantai kerja t. 6cm M3 0.18 Rp 686,128.60 Rp 123,503.15
2 PEKERJAAN KOLOM
a. Pek. Bekisting M2 22.93 Rp 136,052.60 Rp 3,119,958.22
b. Pek. Pembesian U24 Kg 427.58 Rp 13,985.00 Rp 5,979,720.29
c. Pek. Kolom K1 uk. 25x25 cm, Beton K-250 M3 6.62 Rp 984,892.00 Rp 6,515,060.58
e. Pek. Kolom praktis M1 56.70 Rp 60,145.00 Rp 3,410,221.50
3 PEKERJAAN KOLOM TAMBAHAN (ATAS TERAS)
a. Pek. Bekisting M2 3.96 Rp 136,052.60 Rp 538,768.30
b. Pek. Pembesian U24 Kg 148.61 Rp 13,985.00 Rp 2,078,268.28
c. Pek. Kolom teras uk. 20x50 cm, Beton K-250 M3 0.91 Rp 984,892.00 Rp 894,281.94
d. Pek. Kolom praktis M1 5.60 Rp 60,145.00 Rp 336,812.00
4 PEKERJAAN BALOK TAMBAHAN DI ATAS TERAS
a. Pek. Bekisting M2 7.20 Rp 136,052.60 Rp 979,578.72
b. Pek. Pembesian U24 Kg 75.00 Rp 13,985.00 Rp 1,048,864.26
c. Pek. Balok uk. 20x30 cm, Beton K-250 M3 0.36 Rp 984,892.00 Rp 354,561.12
5 PEKERJAAN DAK BETON
a. Pek. Bekisting M2 21.45 Rp 152,052.60 Rp 3,261,528.27
b. Pek. Pembesian U24 Kg 316.29 Rp 13,985.00 Rp 4,423,292.57
c. Pek. Dak beton T = 10 cm, Beton K-250 M3 3.54 Rp 984,892.00 Rp 3,482,578.11
6 PEKERJAAN PLAT KANOPI BETON
a. Pek. Bekisting M2 2.25 Rp 152,052.60 Rp 341,966.30
b. Pek. Pembesian U24 Kg 181.25 Rp 13,985.00 Rp 2,534,753.28
c. Pek. Plat kanopi beton T = 5 cm, Beton K-250 M3 1.73 Rp 984,892.00 Rp 1,703,863.16
7 PEKERJAAN RINGBALOK DAN BALOK LATEI
a. Pek. Ring balok praktis uk; 10x15 cm M1 196.00 Rp 79,690.00 Rp 15,619,240.00
b. Pek. Ring balok atap uk; 10x15 cm M1 65.00 Rp 79,690.00 Rp 5,179,850.00
c. Pek. Balok latei uk. 10x15 cm M1 78.00 Rp 79,690.00 Rp 6,215,820.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 73,422,307.50
C PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK
1 Pas. Lantai granit, uk. 50x50 cm M2 91.00 Rp 120,052.00 Rp 10,924,732.00
2 Pas. Dinding keramik toilet, 30x60 cm M2 10.44 Rp 194,996.80 Rp 2,035,766.59
3 Pas. Lantai anti slip toilet, 30x30cm M2 2.50 Rp 175,266.40 Rp 438,166.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 13,398,664.59
D PEKERJAAN DINDING BATU BATA DAN PLESTERAN
1 Pek. Pasangan dinding bata ringan, 1Pc : 5Psr M2 383.03 Rp 73,677.60 Rp 28,220,362.74
2 Pek. Plesteran dinding, 1Pc : 5 Psr M2 755.61 Rp 45,915.36 Rp 34,694,105.17
3 Pek. Plesteran beton t = 15 mm, 1PC : 2 Psr M2 26.11 Rp 51,895.68 Rp 1,354,996.20
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 64,269,464.11
E PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND
1 Pek. Rangka plafond, hollow galvalum MB 2x4, 4x4 cm M2 91.00 Rp 128,250.00 Rp 11,670,750.00
2 Pek. Pasangan penutup plafond gypsumboard 9 mm M2 91.00 Rp 65,930.00 Rp 5,999,630.00
3 Pek. List plafond profil M1 86.60 Rp 25,500.00 Rp 2,208,300.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 19,878,680.00
F PEKERJAAN KUSEN, PINTU, JENDELA, KACA, DAN ALAT PENGGANTUNG
1 PEKERJAAN KUSEN DAN BINGKAI PINTU / JENDELA ALUMINIUM
a. Pek. Kusen pintu / jendela / ventilasi aluminium standart M1 242.30 Rp 77,510.00 Rp 18,780,673.00
b. Pek. Jendela aluminium standar M1 7.80 Rp 1,186,060.00 Rp 9,251,268.00
c. Pas. Kaca bening t = 5 mm (jendela/ventilasi) M2 157.20 Rp 153,550.00 Rp 24,138,060.00
3 PEKERJAAN PINTU
a. Pas. Pintu double multipleks 6 mm Lapis HPL ex. Taco M2 5.71 Rp 391,101.30 Rp 2,232,562.68
b. Pek. Lapis HPL pintu multipleks, ex. Taco M2 5.71 #NAME? #NAME?
c. Pas. Pintu + kusen Aluminium Toilet ex. Fortuna Bh 5.00 Rp 355,000.00 Rp 1,775,000.00
4 PASANGAN ENGSEL
a. Pasangan engsel kupu-kupu, pintu, Ex. Stainless Stell Bh 21.00 Rp 41,050.00 Rp 862,050.00
b. Pasangan engsel kupu-kupu, jendela, Ex. Stainless Stell Bh 6.00 Rp 28,700.00 Rp 172,200.00
5 PASANGAN KUNCI PINTU
a. Pasangan Kunci pintu stainless stell, ex. Gradino Bh 7.00 Rp 225,700.00 Rp 1,579,900.00
6 PASANGAN GRENDEL, HANDLE DAN HAK ANGIN
a. Pasangan Grendel pintu tanam Bh 2.00 Rp 33,400.00 Rp 66,800.00
b. Pasangan Grendel jendela Psg 6.00 Rp 33,400.00 Rp 200,400.00
d. Pasang Hak angin Psg 6.00 Rp 31,050.00 Rp 186,300.00
Sub Total (Dipindahkan Ke Rekapitulasi) #NAME?
G PEKERJAAN RANGKA KAP DAN PENUTUP ATAP
1 Pek. Konstruksi rangka baja ringan zincalume M2 422.32 Rp 97,490.00 Rp 41,171,976.80
2 Pas. Atap Spandek M2 422.32 Rp 63,850.00 Rp 26,965,132.00
3 Pek. Listplank papan semen, ex. Calsiplank, lebar = 30 cm M1 93.40 Rp 99,700.00 Rp 9,311,980.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 77,449,088.80
H PEKERJAAAN INSTALASI LISTRIK
1 Pas. Instalasi titik lampu Ttk 16.00 Rp 300,000.00 Rp 4,800,000.00
2 Pas. Lampu Downlight LED 20 watt Bh 15.00 Rp 58,000.00 Rp 870,000.00
3 Pas. Fitting down light Bh 15.00 Rp 32,500.00 Rp 487,500.00
4 Lampu TL LED 10 watt Bh 1.00 Rp 38,500.00 Rp 38,500.00
5 Saklar ganda ex. Panasonic Bh 7.00 Rp 32,500.00 Rp 227,500.00
6 Saklar tunggal ex. Panasonic Bh 2.00 Rp 27,000.00 Rp 54,000.00
7 Stop Kontak ex. Panasonic Bh 10.00 Rp 24,000.00 Rp 240,000.00
8 Kabel twestek 2 x 10 mm Roll 1.00 Rp 750,000.00 Rp 750,000.00
9 Kabel NYA 2.5 mm Roll 1.00 Rp 170,000.00 Rp 170,000.00
10 MCB 10 Ampere Bh 1.00 Rp 240,000.00 Rp 240,000.00
11 Pipa listrik 1/2 inchi, Ex Clipsal Btg 19.00 Rp 8,000.00 Rp 152,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 8,029,500.00
I PEKERJAAN SANITASI
1 Memasang pipa PVC 1/2 '' AW untuk air bersih M1 16.00 Rp 16,890.00 Rp 270,240.00
2 Memasang pipa PVC 2 " AW untuk air kotor M1 4.00 Rp 64,895.00 Rp 259,580.00
3 Memasang pipa PVC 4 '' AW untuk limbah padat M1 8.00 Rp 140,380.00 Rp 1,123,040.00
5 Pas. Kran air 1/2 " Bh 1.00 Rp 65,825.00 Rp 65,825.00
6 Pas. Kloset jongkok Set 1.00 Rp 379,120.00 Rp 379,120.00
7 Pas. Urinoir Set 2.00 Rp 764,120.00 Rp 1,528,240.00
8 Pas. Wastafel Set 2.00 Rp 630,120.00 Rp 1,260,240.00
9 Pas. Kran air wastafel 1/2" Set 2.00 Rp 115,825.00 Rp 231,650.00
10 Pas. Floor drain (FD) Bh 7.00 Rp 35,700.00 Rp 249,900.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 5,367,835.00
J PEKERJAAN RAILING BESI HOLLOW & TANGGA BESI
1 Pas. Railing besi hollow balkon lantai 2 M1 21.00 Rp 545,315.40 Rp 11,451,623.40
2 Pas. Railing besi hollow lantai 2 (tangga dalam) M1 4.00 Rp 545,315.40 Rp 2,181,261.60
3 Pas. Tangga besi M1 6.00 Rp 950,000.00 Rp 5,700,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 19,332,885.00
K PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pekerjaan Pengecatan
a. Cat dinding tembok, ex. Vinitex atau setara M2 781.72 Rp 11,818.38 Rp 9,238,664.01
b. Cat dinding / beton Weather Shield Exterior (anti lumut) M2 94.50 Rp 63,084.62 Rp 5,961,496.15
c. Cat langit-langit plafond, ex. Vinitex atau setara M3 91.00 Rp 16,816.08 Rp 1,530,263.28
d. Cat Kilap listplank (ex. Avian atau setara) M2 28.02 Rp 44,325.91 Rp 1,242,012.00
e. Cat Kilap besi railing (ex. Avian atau setara) M2 42.00 Rp 54,324.81 Rp 2,281,642.02
2 Pekerjaan Pembersihan akhir Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 21,254,077.47
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN RUMAH TINGGAL

NO. BAHAN MATERIAL VOL. SAT. VOLUME SATUAN

1 Batu kali 24.45 m3 8 ret

2 Pasir pasang 9.63 m3 3 ret

3 Semen @50 kg 35.31 zak 35 zak


RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN

LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

NO URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA


a b c d e f
A PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pengukuran dan pemasangan bouwplank Ls 1.00 Rp 100,000.00 Rp 100,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 100,000.00
B PEKERJAAN TANAH DAN PASIR
1 Pek. Galian pondasi M3 28.00 Rp 63,000.00 Rp 1,764,000.00
2 Pek. Urugan tanah bekas galian (1/4 dari total galian) M3 4.67 Rp 35,000.00 Rp 163,333.33
4 Pek. Urugan pasir bawah lantai tebal 7 cm M3 5.03 Rp 117,000.00 Rp 587,925.00
5 Pek. Urugan pasir bawah pondasi t = 5 cm M3 2.63 Rp 117,000.00 Rp 307,125.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 2,822,383.33
C PEKERJAAN PASANGAN PONDASI BATU GUNUNG
1 Pasangan batu kosong M3 7.40 Rp 308,160.00 Rp 2,278,843.20
2 Pasangan batu gunung 1Pc : 4 Psr M3 12.98 Rp 604,800.00 Rp 7,850,304.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 10,129,147.20
D PEKERJAAN BETON
1 PEKERJAAN KOLOM
a. Pek. Bekisting M2 11.70 Rp 136,052.60 Rp 1,591,815.42
b. Pek. Pembesian Kg 74.86 Rp 13,985.00 Rp 1,046,975.84
c. Pek. Kolom teras (KT) 15/30 cm M3 0.88 Rp 984,892.00 Rp 864,242.73
d. Pek. Kolom praktis M1 120.00 Rp 60,145.00 Rp 7,217,400.00
2 PEKERJAAN SLOEF BETON
a. Pek. Sloef beton 15/20 M3 2.28 Rp 3,536,150.38 Rp 8,044,742.12
3 PEKERJAAN RINGBALOK PRAKTIS & BALOK TENGAH
a. Pek. Ring balok & Ringbalok kuda-kuda bata uk; 10x15 cm M1 87.50 Rp 79,690.00 Rp 6,972,875.00
b. Pek. Balok tengah/latei uk. 10x15 cm M1 32.50 Rp 79,690.00 Rp 2,589,925.00
4 PEKERJAAN DAK BETON KANOPI TERAS + KANOPI JENDELA
a. Pek. Bekisting M2 26.52 Rp 152,052.60 Rp 4,032,434.95
b. Pek. Pembesian Kg 280.25 Rp 13,985.00 Rp 3,919,331.21
c. Pek. Plat kanopi teras T = 10 cm M3 1.66 Rp 984,892.00 Rp 1,634,920.72
d. Pek. Plat kanopi pintu jendela T = 7 cm M3 0.22 Rp 984,892.00 Rp 219,926.38
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 38,134,589.38
E PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK
1 Pas. Lantai Keramik, uk. 40x40 cm M2 94.50 Rp 120,052.00 Rp 11,344,914.00
2 Pas. Lantai anti slip toilet & tempat cuci, 20x20 cm M2 6.00 Rp 175,266.40 Rp 1,051,598.40
3 Pas. Dinding keramik toilet, 20x25 cm M2 25.65 Rp 194,996.80 Rp 5,001,667.92
4 Pas. Dinding keramik motif batu alam, 20x25 cm M2 11.20 Rp 105,488.00 Rp 1,181,465.60
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 18,579,645.92
F PEKERJAAN DINDING DAN PLESTERAN
1 Pek. Pasangan dinding bata, 1Pc : 5Psr M2 231.98 Rp 73,677.60 Rp 17,091,545.45
2 Pek. Pasangan dinding bata bawah 1Pc : 2Psr M2 19.94 Rp 85,074.00 Rp 1,695,950.19
3 Pek. Plesteran dinding, 1Pc : 5Psr M2 438.31 Rp 45,915.36 Rp 20,124,931.86
4 Pek. Plesteran dinding 1Pc : 2Psr M2 39.87 Rp 51,895.68 Rp 2,069,080.76
5 Pek. Pasangan roster 15x25 cm di atas kusen Bh 66.00 Rp 10,000.00 Rp 660,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 41,641,508.27
G PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND
1 Pek. Rangka plafond lantai 1, kayu balok 5/7 cm M2 182.72 Rp 64,500.00 Rp 11,785,401.30
2 Pek. Pasangan penutup plafond tripleks 3 cm untuk lantai 1 dan 2 M2 182.72 Rp 34,520.20 Rp 6,307,510.23
3 Pek. List plafond profil kayu 5x5 cm M1 151.00 Rp 25,500.00 Rp 3,850,500.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 21,943,411.53
H PEKERJAAN KUSEN, PINTU, JENDELA, KACA, DAN ALAT PENGGANTUNG
1 PEKERJAAN KUSEN, PINTU DAN BINGKAI JENDELA
a. Pek. Kusen pintu / jendela / ventilasi Kayu klas 2 M3 1.11 Rp 4,064,700.00 Rp 4,522,019.40
b. Pek. Panil pintu kayu klas 1 M2 17.93 Rp 479,850.00 Rp 8,603,710.50
b. Pek. Bingkai jendela kayu klas 1 M2 10.35 Rp 361,910.00 Rp 3,745,334.21
c. Pas. Kaca bening t = 5 mm (jendela/ventilasi) M2 12.69 Rp 153,550.00 Rp 1,948,134.92
2 PASANGAN ENGSEL
a. Pasangan engsel kupu-kupu, pintu Bh 34.00 Rp 41,050.00 Rp 1,395,700.00
b. Pasangan engsel kupu-kupu, jendela Bh 62.00 Rp 28,700.00 Rp 1,779,400.00
3 PASANGAN KUNCI PINTU
a. Pasangan Kunci pintu stainless stell Bh 10.00 Rp 225,700.00 Rp 2,257,000.00
4 PASANGAN GRENDEL, HANDLE DAN HAK ANGIN
a. Pasangan Grendel pintu 2 daun Bh 3.00 Rp 76,400.00 Rp 229,200.00
b. Pasangan Grendel pintu 1 daun Bh 9.00 Rp 33,400.00 Rp 300,600.00
c. Pasangan Grendel jendela Psg 31.00 Rp 33,400.00 Rp 1,035,400.00
d. Pasang Hak angin Psg 62.00 Rp 31,050.00 Rp 1,925,100.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 27,741,599.02
I PEKERJAAN RANGKA KAP DAN PENUTUP ATAP
1 Pek. Kuda-kuda kayu 8/12 M3 3.35 Rp 3,542,000.00 Rp 11,875,525.79
2 Pek. Balok gording 6/12 M3 1.82 Rp 4,489,000.00 Rp 8,189,964.67
3 Pas. Atap (seng gelombang 7 kaki) M2 265.10 Rp 63,850.00 Rp 16,926,635.00
4 Pas. Nok Atap M1 33.00 Rp 59,550.00 Rp 1,965,150.00
5 Pas. Talang seng plat M1 23.00 Rp 87,825.00 Rp 2,019,975.00
6 Pek. Listplank papan semen, ex. Calsiplank, lebar = 30 cm M1 80.00 Rp 99,700.00 Rp 7,976,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 48,953,250.46
J PEKERJAAAN INSTALASI LISTRIK
1 Pas. Pemasangan meteran 2300 watt Bh 1.00 Rp 1,500,000.00 Rp 1,500,000.00
2 Pas. Instalasi titik lampu Ttk 18.00 Rp 100,000.00 Rp 1,800,000.00
3 Pas. Lampu Downlight LED 20 watt Bh 16.00 Rp 58,000.00 Rp 928,000.00
4 Pas. Fitting down light Bh 16.00 Rp 32,500.00 Rp 520,000.00
5 Lampu TL LED 10 watt Bh 2.00 Rp 38,500.00 Rp 77,000.00
6 Saklar ganda ex. Panasonic Bh 8.00 Rp 32,500.00 Rp 260,000.00
8 Stop Kontak ex. Panasonic Bh 12.00 Rp 24,000.00 Rp 288,000.00
9 Kabel twestek 2 x 10 mm Roll 2.00 Rp 750,000.00 Rp 1,500,000.00
10 Kabel NYA 2.5 mm Roll 1.00 Rp 170,000.00 Rp 170,000.00
11 MCB 10 Ampere Bh 1.00 Rp 240,000.00 Rp 240,000.00
12 Pipa listrik 1/2 inchi, Ex Clipsal Btg 20.00 Rp 8,000.00 Rp 160,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 5,943,000.00
K PEKERJAAN SANITASI
1 Memasang pipa PVC 1/2 '' AW untuk air bersih M1 40.00 Rp 16,890.00 Rp 675,600.00
2 Memasang pipa PVC 2 " AW untuk air kotor M1 8.00 Rp 64,895.00 Rp 519,160.00
3 Memasang pipa PVC 4 '' AW untuk limbah padat M1 8.00 Rp 140,380.00 Rp 1,123,040.00
5 Pas. Kran air 1/2 " Bh 3.00 Rp 65,825.00 Rp 197,475.00
6 Pas. Kloset jongkok Set 2.00 Rp 379,120.00 Rp 758,240.00
7 Pas. Bak cuci piring / Kitchen sink Set 1.00 Rp 630,120.00 Rp 630,120.00
8 Pas. Kran air Bak Cuci Piring 1/2" Set 1.00 Rp 115,825.00 Rp 115,825.00
9 Pas. Floor drain (FD) Bh 3.00 Rp 35,700.00 Rp 107,100.00
10 Pek. Septictank dan peresapan Unit 1.00 Rp 4,854,654.96 Rp 4,854,654.96
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 8,981,214.96
L PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pekerjaan Pengecatan
a. Cat dinding tembok interior & Eksterior, ex. Propan atau setara M2 478.18 Rp 11,818.38 Rp 5,651,253.86
b. Cat langit-langit plafond, ex. Vinitex atau setara M3 182.72 Rp 16,816.08 Rp 3,072,624.05
c. Cat Kilap listplank (ex. Avian atau setara) M2 20.00 Rp 44,325.91 Rp 886,518.20
2 Pekerjaan Pembersihan akhir Ls 1.00 Rp 50,000.00 Rp 50,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 9,660,396.10

TOTAL
DIBULATKAN
Tanah Pasir Semen Pasir
timbunan
Batu kali Pasir urug
pasang
Besi 12
@50 kg kasar
M3 M3 M3 M3 zak M3 btg

90

0.38

117.04 6.03
0.61 3.15
###

0.00 8.87 4.0


0.00 15.58 5.61 35.31
10129147.2

Rp 10,720,433.99
0.90 3.00 23.40

5.25 0.50 7.00


9.60 1.08
Rp 8,044,742.12
87.50 17.47 1.05
Rp 9,562,800.00
87.50 9.63 1.31
32.5 3.58 0.49
Rp 9,586,686.88

21.12 10.72 1.29


3.19

lt.1 lt.2
2.03 38.25 4.25 18.52
50 0.27 1.248
17.1 1.5 50 0.46 4.77
16.05 20.4 6 7.05 50 0.47 2.55

0.968 1 10.44 44.91


16.5 1 0.76 7.56
11.40 45.13
lantai 1 lantai 2 0.80 8.15

120.735

152.16 38.04

16.2
169.8
169.8
184 84.6 63.70 0.04
241.1 0.03
223.75

66.5 27.70833
67.2 0.7

0.0 24.5 9.2 9.6 35.3 5.7 7.0


keramik balok
loster keramik keramik plint 10 x tegel tripleks 3 list kayu
Besi 10 Besi 8 Besi 6 Batu merah dinding kusen kaso 5/7
15/25 40x40 20x20 40 kuku mm 5x5
20x25 5/13
btg btg btg m3 bh bh bh bh m1 m3 btg lbr m1

8.65
40.00 20.03

29.17 20.46

29.17 14.62
10.83 5.45

53.75

567
150.00
513.00

16238.43
1395.45

2.92
66.51
158.55
98.3 64.6 69.2 17633.9
### 0.0 567.0 150.0 513.0 0.0 0.0 0.0 2.9 66.5 158.6
Floor
paku Atap Seng plat
balok balok paku listplank Kran air Klosed drain
campur paku 12 seng 7 lebar 30 Pipa 1/2" Pipa 2" Pipa 4"
8/12 6/12 seng papan 1/2" jongkok (saringan
5-7 kaki cm
kg btg btg kg lbr kg lbr m1 m1 m1 m1 m1 air m1
kotor)
89.55
64.97
235.939
33.00
23.00
20.51

0.0 89.6 65.0 0.0 235.9 56.0 0.0 20.5 0.0 0.0 0.0 0.0 0.0 0.0
cat
cincin Ø tembok cat plamir
Sock drat cat
80 cm, plat beton dasar tembok dinding
dalam tembok cat kilap
sambunga sambunga sambunga tinggi 60 tembok eksterior dalam ex.
1/2" (dari penutup interior ex. kayu ex. thiner (isi
n pipa L n pipa L n pipa L lem pipa seal tape cm dinding anti lumut TR 30 (isi
pipa ke (untuk cincin Ø Propan avian atau 1 liter)
1/2" 2" 4" luar warna ex. No 20 kg /
kran air septiktan 80 cm kgex.
putih dropkgatau kg
zak) atau
atau
kg setara
kg kg
1/2") k) setara
Aries atau setara setara
setara
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
cat meny
kayu
kg
0.0
ANALISA HARGA SATUAN

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN


LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

A. PEKERJAAN PENDAHULUAN/PERSIAPAN

1 Analisa SNI-2013 1 m' Pengukuran dan pemasangan bowplank


BAHAN
0.0120 M3 Kayu Kelas IV @ Rp 1,000,000.00 Rp 12,000.00
0.0200 Kg Paku biasa 2"-5" @ Rp 20,000.00 Rp 400.00
TENAGA
0.1000 Oh Tukang Kayu @ Rp 100,000.00 Rp 10,000.00
0.1000 Oh Pekerja @ Rp 70,000.00 Rp 7,000.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 29,400.00
Overhead + Profit 0 % Rp -
Total Rp 29,400.00

2 Analisa SNI-2013 1 m2 Pembuatan gudang semen dan alat-alat


BAHAN
1.7000 Btg Dolken kayu dia.8-10 / 400 Cm @ Rp 4,000.00 Rp 6,800.00
3.9900 kk Seng gelombang bjls 28 @ Rp 6,500.00 Rp 25,935.00
0.2000 M3 Kayu Balok Meranti (kayu Kls III) @ Rp 1,000,000.00 Rp 200,000.00
0.3000 Kg Paku biasa 2"-5" @ Rp 20,000.00 Rp 6,000.00
TENAGA
2.0000 Oh Tukang Kayu @ Rp 100,000.00 Rp 200,000.00
1.0000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
0.2000 Oh Kepala tukang @ Rp - Rp -
0.0500 Oh Mandor @ Rp - Rp -
Sub Total Rp 508,735.00
Overhead + Profit 0 % Rp -
Total Rp 508,735.00
ANALISA HARGA SATUAN

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN


LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

B. PEKERJAAN TANAH DAN PASIR

1 Analisa SNI-2013 1M3 Galian tanah biasa sedalam 2 meter


TENAGA
0.9000 Oh Pekerja @ Rp 70,000.00 Rp 63,000.00
0.0450 Oh Mandor @ Rp - Rp -
Sub Total Rp 63,000.00
Overhead + Profit 0 % Rp -
Total Rp 63,000.00

2 Analisa SNI-2013 1 m3 Urugan kembali


TENAGA
0.5000 Oh Pekerja @ Rp 70,000.00 Rp 35,000.00
0.0500 Oh Mandor @ Rp - Rp -
Sub Total Rp 35,000.00
Overhead + Profit 0 % Rp -
Total Rp 35,000.00

3 Analisa SNI-2013 1 m3 Urugan Pasir


BAHAN
1.2000 M3 Pasir urug @ Rp 80,000.00 Rp 96,000.00
TENAGA
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0100 Oh Mandor @ Rp - Rp -
Sub Total Rp 117,000.00
Overhead + Profit 0 % Rp -
Total Rp 117,000.00

4 Analisa SNI-2013 1 m3 Urugan tanah lantai/pemadatan tanah (didatangkan)


BAHAN
1.2000 M3 Tanah urug @ Rp 20,000.00 Rp 24,000.00
TENAGA
0.5000 Oh Pekerja @ Rp 70,000.00 Rp 35,000.00
0.0500 Oh Mandor @ Rp - Rp -
Sub Total Rp 59,000.00
Overhead + Profit 0 % Rp -
Total Rp 59,000.00
C. PEKERJAAN PASANGAN PONDASI BATU GUNUNG

1 Analisa SNI-2013 1 m3 Pasang pondasi batu gunung Ex. Moramo 1 Pc : 5 Ps


BAHAN
1.2000 M3 Batu gunung Ex.Moramo @ Rp 150,000.00 Rp 180,000.00
136.0000 Kg Sement portland @ Rp 1,320.00 Rp 179,520.00
0.5440 M3 Pasir pasang @ Rp 120,000.00 Rp 65,280.00
TENAGA
0.7500 Oh Tukang Batu @ Rp 100,000.00 Rp 75,000.00
1.5000 Oh Pekerja @ Rp 70,000.00 Rp 105,000.00
0.0750 Oh Kepala tukang @ Rp - Rp -
0.0750 Oh Mandor @ Rp - Rp -
Sub Total Rp 604,800.00
Overhead + Profit 0 % Rp -
Total Rp 604,800.00

2 Analisa SNI-2013 1 m3 Pasang pondasi batu kosong


BAHAN
1.2000 M3 Batu gunung Ex.Moramo @ Rp 150,000.00 Rp 180,000.00
0.4320 M3 Pasir urug @ Rp 80,000.00 Rp 34,560.00
TENAGA
0.3900 Oh Tukang Batu @ Rp 100,000.00 Rp 39,000.00
0.7800 Oh Pekerja @ Rp 70,000.00 Rp 54,600.00
0.0390 Oh Kepala tukang @ Rp - Rp -
0.0390 Oh Mandor @ Rp - Rp -
Sub Total Rp 308,160.00
Overhead + Profit 0 % Rp -
Total Rp 308,160.00
D. PEKERJAAN BETON DAN RABAT

1 Analisa SNI-2013 1 M3 Membuat rabat beton dan lantai kerja,1 Pc: 3 Ps: 5 Kr
BAHAN
184.0000 Kg Semen portland @ Rp 1,320.00 Rp 242,880.00
0.5422 M3 Pasir beton @ Rp 120,000.00 Rp 65,065.80
0.6466 M3 Koral beton (Split 2.3) @ Rp 240,000.00 Rp 155,182.80
170.0000 Ltr Air @ Rp 700.00 Rp 119,000.00
TENAGA
0.2000 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
1.2000 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
Sub Total Rp 686,128.60
Overhead + Profit 0 % Rp -
Total Rp 686,128.60

2 Analisa SNI-2013 1 M2 Pasang Bekisting Untuk Pondasi


BAHAN
0.0400 M3 Kayu Kelas-III (Papan) @ Rp 1,000,000.00 Rp 40,000.00
0.3000 Kg Paku Biasa 2"-5" @ Rp 20,000.00 Rp 6,000.00
0.1000 Lt Minyak Bekisting @ Rp 12,763.00 Rp 1,276.30
TENAGA
0.5200 Oh Pekerja @ Rp 70,000.00 Rp 36,400.00
0.2600 Oh Tukang Batu @ Rp 100,000.00 Rp 26,000.00
Sub Total Rp 109,676.30
Overhead + Profit 0 % Rp -
Total Rp 109,676.30

3 Analisa SNI-2013 1M2 Pasangan bekesting untuk sloof


BAHAN
0.0450 M3 Kayu/Papan Meranti (Kayu Kelas III) @ Rp 1,000,000.00 Rp 45,000.00
0.3000 Kg Paku 2" - 5" @ Rp 20,000.00 Rp 6,000.00
0.1000 Ltr Minyak bekisting @ Rp 12,763.00 Rp 1,276.30
TENAGA
0.5200 OH Pekerja @ Rp 70,000.00 Rp 36,400.00
0.2600 OH Tukang Besi @ Rp 100,000.00 Rp 26,000.00
Sub Total Rp 114,676.30
Overhead + Profit 0 % Rp -
Total Rp 114,676.30

4 Analisa SNI-2013 1M2 Pasangan bekesting untuk kolom


BAHAN
0.0400 M3 Kayu Kelas-III (Papan) @ Rp - Rp -
0.4000 Kg Paku Biasa 2"-5" @ Rp 20,000.00 Rp 8,000.00
0.2000 Lt Minyak Bekisting @ Rp 12,763.00 Rp 2,552.60
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 1,200,000.00 Rp 18,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 20,300.00
2.0000 Btg Kayu Dolken @ Rp 4,000.00 Rp 8,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.3300 Oh Tukang Batu @ Rp 100,000.00 Rp 33,000.00
Sub Total Rp 136,052.60
Overhead + Profit 0 % Rp -
Total Rp 136,052.60
5 Analisa SNI-2013 1M2 Pasangan bekesting untuk balok
BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp - Rp -
0.4000 Kg Paku Biasa 2"-5" @ Rp 20,000.00 Rp 8,000.00
0.2000 Lt Minyak Bekisting @ Rp 12,763.00 Rp 2,552.60
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 1,200,000.00 Rp 18,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 20,300.00
2.0000 Btg Kayu Dolken @ Rp 4,000.00 Rp 8,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.3300 Oh Tukang Batu @ Rp 100,000.00 Rp 33,000.00
Sub Total Rp 136,052.60
Overhead + Profit 0 % Rp -
Total Rp 136,052.60

6 Analisa SNI-2013 1M2 Pasangan bekesting untuk Ringbalk


BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp - Rp -
0.4000 Kg Paku Biasa 2"-5" @ Rp 20,000.00 Rp 8,000.00
0.2000 Lt Minyak Bekisting @ Rp 12,763.00 Rp 2,552.60
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 1,200,000.00 Rp 18,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 20,300.00
2.0000 Btg Kayu Dolken @ Rp 4,000.00 Rp 8,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.3300 Oh Tukang Batu @ Rp 100,000.00 Rp 33,000.00
Sub Total Rp 136,052.60
Overhead + Profit 0 % Rp -
Total Rp 136,052.60

7 Analisa SNI-2013 1M2 Pasangan bekesting untuk lantai


BAHAN
0.0400 M3 Kayu Kelas-II (Papan) @ Rp - Rp -
0.4000 Kg Paku Biasa 2"-5" @ Rp 20,000.00 Rp 8,000.00
0.2000 Lt Minyak Bekisting @ Rp 12,763.00 Rp 2,552.60
0.0150 M3 Kayu Kelas-III (Balok) @ Rp 1,200,000.00 Rp 18,000.00
0.3500 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 20,300.00
6.0000 Btg Kayu Dolken @ Rp 4,000.00 Rp 24,000.00
TENAGA
0.6600 Oh Pekerja @ Rp 70,000.00 Rp 46,200.00
0.3300 Oh Tukang Batu @ Rp 100,000.00 Rp 33,000.00
Sub Total Rp 152,052.60
Overhead + Profit 0 % Rp -
Total Rp 152,052.60

8 Analisa SNI-2013 1 M3 Membuat Beton Tak Bertulang 1 Pc : 2 Ps : 3 Kr


BAHAN
185.6000 Kg Semen Portland @ Rp 1,320.00 Rp 244,992.00
0.4160 M3 Pasir Beton @ Rp 120,000.00 Rp 49,920.00
0.6240 M3 Batu Pecah 2-3 Cm @ Rp 240,000.00 Rp 149,760.00
160.0000 Ltr Air @ Rp 700.00 Rp 112,000.00
TENAGA
1.6500 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.2500 Oh Tukang Batu @ Rp 100,000.00 Rp 25,000.00
Sub Total Rp 697,172.00
Overhead + Profit 0 % Rp -
Total Rp 697,172.00
9 Analisa SNI-2013 1M3 Membuat beton mutu, f'c=12,2 Mpa (K150) kedap air, slump (12±2) cm, w/c=0,72
BAHAN
299.0000 Kg Semen Portland @ Rp 1,320.00 Rp 394,680.00
0.5707 M3 Pasir Beton @ Rp 120,000.00 Rp 68,485.71
0.5650 M3 Batu Pecah 2-3 cm @ Rp 240,000.00 Rp 135,600.00
215.0000 Ltr Air @ Rp 700.00 Rp 150,500.00
TENAGA
1.6500 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.2750 Oh Tukang Batu @ Rp 100,000.00 Rp 27,500.00
Sub Total Rp 892,265.71
Overhead + Profit 0 % Rp -
Total Rp 892,265.71

10 Analisa SNI-2013 1M3 Membuat beton mutu, f'c=21,7 Mpa (K250) kedap air, slump (12±2) cm, w/c=0,56
BAHAN
384.0000 Kg Semen Portland @ Rp 1,320.00 Rp 506,880.00
0.6150 M3 Pasir Beton @ Rp 120,000.00 Rp 73,800.00
0.4613 M3 Batu Pecah 2-3 cm @ Rp 240,000.00 Rp 110,712.00
215.0000 Ltr Air @ Rp 700.00 Rp 150,500.00
TENAGA
1.6500 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.2750 Oh Tukang Batu @ Rp 100,000.00 Rp 27,500.00
Sub Total Rp 984,892.00
Overhead + Profit 0 % Rp -
Total Rp 984,892.00

11 Analisa SNI-2013 1 Kg Pembesian dengan Besi Polos U-24


BAHAN
1.0500 Kg Besi Beton Polos U24 @ Rp 12,000.00 Rp 12,600.00
0.0150 Kg Kawat Beton @ Rp 13,000.00 Rp 195.00
TENAGA
0.0070 Oh Pekerja @ Rp 70,000.00 Rp 490.00
0.0070 Oh Tukang Batu @ Rp 100,000.00 Rp 700.00
Sub Total Rp 13,985.00
Overhead + Profit 0 % Rp -
Total Rp 13,985.00
12 Analisa SNI-2013 1 M3 Pek. Sloef uk; 15 x 20 cm, K 150
1.0000 M3 Beton K-250 @ Rp 892,265.71 Rp 892,265.71
144.5644 Kg Pembesian @ Rp 13,000.00 Rp 1,879,337.78
6.6670 M2 Bekisting Sloef (2 X Pakai) 50 % @ Rp 114,676.30 Rp 764,546.89
Total Rp 3,536,150.38

13 Analisa SNI-2013 1 M1 Pek. Kolom Praktis 11 x 11 cm


BAHAN
0.0020 M3 Kayu terentang Kls III @ Rp 1,000,000.00 Rp 2,000.00
0.0100 Kg Paku 2" - 5" @ Rp 20,000.00 Rp 200.00
3.0000 Kg Besi beton polos @ Rp 13,000.00 Rp 39,000.00
0.0450 Kg Kawat beton @ Rp 13,000.00 Rp 585.00
4.0000 Kg Semen portland @ Rp 1,320.00 Rp 5,280.00
0.0060 M3 Pasir beton @ Rp 120,000.00 Rp 720.00
0.0090 M3 Koral beton @ Rp 240,000.00 Rp 2,160.00
TENAGA
0.0600 OH Pekerja @ Rp 70,000.00 Rp 4,200.00
0.0200 OH Tukang Batu @ Rp 100,000.00 Rp 2,000.00
0.0200 OH Tukang Kayu @ Rp 100,000.00 Rp 2,000.00
0.0200 OH Tukang Besi @ Rp 100,000.00 Rp 2,000.00
Sub Total Rp 60,145.00
Overhead + Profit 0 % Rp -
Total Rp 60,145.00
14 Analisa SNI-2013 1 M1 Pek. Ringbalk dan Balok Latei Praktis, uk. 10 x 15 cm
BAHAN
0.0030 M3 Kayu terentang Kls III @ Rp 1,000,000.00 Rp 3,000.00
0.0200 Kg Paku 2" - 5" @ Rp 20,000.00 Rp 400.00
3.6000 Kg Besi beton polos @ Rp 13,000.00 Rp 46,800.00
0.0500 Kg Kawat beton @ Rp 13,000.00 Rp 650.00
5.5000 Kg Semen portland @ Rp 1,320.00 Rp 7,260.00
0.0090 M3 Pasir beton @ Rp 120,000.00 Rp 1,080.00
0.0150 M3 Koral beton @ Rp 240,000.00 Rp 3,600.00
TENAGA
0.1000 OH Pekerja @ Rp 70,000.00 Rp 7,000.00
0.0330 OH Tukang Batu @ Rp 100,000.00 Rp 3,300.00
0.0330 OH Tukang Kayu @ Rp 100,000.00 Rp 3,300.00
0.0330 OH Tukang Besi @ Rp 100,000.00 Rp 3,300.00
Sub Total Rp 79,690.00
Overhead + Profit 0 % Rp -
Total Rp 79,690.00

15 Analisa SNI-2013 1M3 Membuat tangga beton bertulang (200 Kg besi + bekisting)
BAHAN
0.2500 M3 Kayu terentang Kls III @ Rp 1,000,000.00 Rp 250,000.00
3.0000 Kg Paku 2" - 5" @ Rp 20,000.00 Rp 60,000.00
1.2000 Ltr Minyak bekisting @ Rp 12,763.00 Rp 15,315.60
200.0000 Kg Besi beton polos @ Rp 12,000.00 Rp 2,400,000.00
3.0000 Kg Kawat beton @ Rp 13,000.00 Rp 39,000.00
323.0000 Kg Semen portland @ Rp 1,320.00 Rp 426,360.00
0.5200 M3 Pasir beton @ Rp 120,000.00 Rp 62,400.00
0.7800 M3 Koral beton @ Rp 240,000.00 Rp 187,200.00
0.1050 M3 Kayu borneo balok @ Rp 1,500,000.00 Rp 157,500.00
2.5000 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 145,000.00
14.0000 Btg Dolken dia 8 - 10 Cm/4 m @ Rp 4,000.00 Rp 56,000.00
TENAGA
5.6000 OH Pekerja @ Rp 70,000.00 Rp 392,000.00
0.3500 OH Tukang Batu @ Rp 100,000.00 Rp 35,000.00
2.3000 OH Tukang Kayu @ Rp 100,000.00 Rp 230,000.00
1.4000 OH Tukang Besi @ Rp 100,000.00 Rp 140,000.00
Sub Total Rp 4,595,775.60
Overhead + Profit 0 % Rp -
Total Rp 4,595,775.60
17 Analisa SNI-2013 1 M1 Pemancangan Kayu Besi dia 18 cm
BAHAN
1.0000 M1 Kayu Besi dia 16 cm @ Rp 45,500.00 Rp 45,500.00
1.0000 Ls Alat pancang @ Rp 10,000.00 Rp 10,000.00
TENAGA
0.7200 OH Pekerja @ Rp 70,000.00 Rp 50,400.00
0.1250 OH Tukang Pancang @ Rp 100,000.00 Rp 12,500.00
Sub Total Rp 118,400.00
Overhead + Profit 0 % Rp -
Total Rp 118,400.00
E. PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK

1 Analisa SNI-2013 1 m2 Pasang Dinding Keramik Warna 20/25 cm


BAHAN
20.0000 Bh Keramik 20 x 25 cm @ Rp 3,500.00 Rp 70,000.00
9.3000 Kg Semen portland @ Rp 1,320.00 Rp 12,276.00
1.9400 Kg Semen warna @ Rp 1,320.00 Rp 2,560.80
0.0180 M3 Pasir pasang @ Rp 120,000.00 Rp 2,160.00
TENAGA
0.4500 Oh Tukang batu @ Rp 100,000.00 Rp 45,000.00
0.9000 Oh Pekerja @ Rp 70,000.00 Rp 63,000.00
0.0450 Oh Kepala tukang @ Rp - Rp -
0.0450 Oh Mandor @ Rp - Rp -
Sub Total Rp 194,996.80
Overhead + Profit 0 % Rp -
Total Rp 194,996.80

2 Analisa SNI-2013 1 M2 Pasang Lantai Keramik Warna Anti Slip 20 x 20 cm


BAHAN
25.0000 Bh keramik 20 x 20 cm @ Rp 2,800.00 Rp 70,000.00
10.4000 Kg Semen portland @ Rp 1,320.00 Rp 13,728.00
1.6200 Kg Semen warna @ Rp 1,320.00 Rp 2,138.40
0.0450 M3 Pasir pasang @ Rp 120,000.00 Rp 5,400.00
TENAGA
0.3500 Oh Tukang batu @ Rp 100,000.00 Rp 35,000.00
0.7000 Oh Pekerja @ Rp 70,000.00 Rp 49,000.00
0.0350 Oh Kepala tukang @ Rp - Rp -
0.0300 Oh Mandor @ Rp - Rp -
Sub Total Rp 175,266.40
Overhead + Profit 0 % Rp -
Total Rp 175,266.40

3 Analisa SNI-2013 1 M2 Pasang Lantai Keramik 40 x 40 cm


BAHAN
6.0000 Bh Keramik @ Rp 11,666.67 Rp 70,000.00
9.8000 kg Semen portland @ Rp 1,320.00 Rp 12,936.00
1.3000 Kg Semen warna @ Rp 1,320.00 Rp 1,716.00
0.0450 m3 Pasir pasang @ Rp 120,000.00 Rp 5,400.00
TENAGA
0.1250 OH Tukang @ Rp 100,000.00 Rp 12,500.00
0.2500 OH Pekerja @ Rp 70,000.00 Rp 17,500.00
0.0130 OH Kepala Tukang @ Rp - Rp -
0.0130 OH Mandor @ Rp - Rp -
Sub Total Rp 120,052.00
Overhead + Profit 0 % Rp -
Total Rp 120,052.00
4 Analisa SNI-2013 1 M1 Pasang Plint Lantai 10 x 40 cm
BAHAN
2.6300 Bh Plint Keramik 10x40 cm @ Rp 2,916.67 Rp 7,670.83
1.1400 Kg Semen Portland @ Rp 1,320.00 Rp 1,504.80
0.0030 M3 Pasir Pasang @ Rp 120,000.00 Rp 360.00
0.1000 Kg Semen Warna @ Rp 1,320.00 Rp 132.00
TENAGA
0.0900 Oh Pekerja @ Rp 70,000.00 Rp 6,300.00
0.0900 Oh Tukang @ Rp 100,000.00 Rp 9,000.00
0.0090 Oh Kepala Tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 24,967.63
Overhead + Profit 0 % Rp -
Total Rp 24,967.63

5 Analisa SNI-2013 1 M1 Pasang Tegel Motif KM/WC (Plint border)


BAHAN
5.0000 Bh Tegel Motif @ Rp 4,100.00 Rp 20,500.00
1.6500 KG Semen Portland @ Rp 1,320.00 Rp 2,178.00
0.0030 M3 Pasir Pasang @ Rp 120,000.00 Rp 360.00
0.1900 KG Semen Warna @ Rp 1,320.00 Rp 250.80
TENAGA
0.0800 OH Pekerja @ Rp 70,000.00 Rp 5,600.00
0.0400 OH Tukang @ Rp 100,000.00 Rp 4,000.00
0.0040 OH Kepala Tukang @ Rp - Rp -
0.0040 OH Mandor @ Rp - Rp -
Sub Total Rp 32,888.80
Overhead + Profit 0 % Rp -
Total Rp 32,888.80

6 Analisa SNI-2013 1M2 Pasangan Dinding Keramik motif Batu Alam


BAHAN
1.2000 M2 Keramik motif Batu alam @ Rp 5,833.33 Rp 7,000.00
11.4000 Kg Semen portland @ Rp 1,320.00 Rp 15,048.00
0.0420 M3 Pasir pasang @ Rp 120,000.00 Rp 5,040.00
TENAGA
0.6200 OH Pekerja @ Rp 70,000.00 Rp 43,400.00
0.3500 OH Tukang Batu @ Rp 100,000.00 Rp 35,000.00
0.0350 OH Kepala Tukang @ Rp - Rp -
0.0300 OH Mandor @ Rp - Rp -
Sub Total Rp 105,488.00
Overhead + Profit 0 % Rp -
Total Rp 105,488.00
F. PEKERJAAN DINDING BATU BATA DAN PLESTERAN

1 Analisa SNI-2013 1 m2 Pasang bata merah 1/2 bata 1 Pc : 5 Ps


BAHAN
70.0000 Bh Batu merah @ Rp 350.00 Rp 24,500.00
9.6800 Kg Sement portland @ Rp 1,320.00 Rp 12,777.60
0.0450 M3 Pasir pasang @ Rp 120,000.00 Rp 5,400.00
TENAGA
0.1000 Oh Tukang Batu @ Rp 100,000.00 Rp 10,000.00
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0150 Oh Mandor @ Rp - Rp -
Sub Total Rp 73,677.60
Overhead + Profit 0 % Rp -
Total Rp 73,677.60

2 Analisa SNI-2013 1 m2 Pasang bata merah 1/2 bata 1 Pc : 2 Ps


BAHAN
70.0000 Bh Batu merah @ Rp 350.00 Rp 24,500.00
18.9500 Kg Sement portland @ Rp 1,320.00 Rp 25,014.00
0.0380 M3 Pasir pasang @ Rp 120,000.00 Rp 4,560.00
TENAGA
0.1000 Oh Tukang Batu @ Rp 100,000.00 Rp 10,000.00
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0150 Oh Mandor @ Rp - Rp -
Sub Total Rp 85,074.00
Overhead + Profit 0 % Rp -
Total Rp 85,074.00

3 Analisa SNI-2013 1M2 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Psr


BAHAN
140.0000 Bh Batu Bata Merah @ Rp 350.00 Rp 49,000.00
22.2000 Kg Semen portland @ Rp 1,320.00 Rp 29,304.00
0.1020 M3 Pasir pasangan @ Rp 120,000.00 Rp 12,240.00
TENAGA
0.6500 OH Pekerja @ Rp 70,000.00 Rp 45,500.00
0.2000 OH Tukang Batu @ Rp 100,000.00 Rp 20,000.00
0.0200 OH Kepala Tukang @ Rp - Rp -
0.0300 OH Mandor @ Rp - Rp -
Sub Total Rp 156,044.00
Overhead + Profit 0 % Rp -
Total Rp 156,044.00

4 Analisa SNI-2013 1 m2 Plasteran transraam 1 Pc : 2 Ps, tebal 15mm


BAHAN
10.2240 Kg Sement portland @ Rp 1,320.00 Rp 13,495.68
0.0200 M3 Pasir pasang @ Rp 120,000.00 Rp 2,400.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 100,000.00 Rp 15,000.00
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0150 Oh Kepala tukang @ Rp - Rp -
0.0150 Oh Mandor @ Rp - Rp -
Sub Total Rp 51,895.68
Overhead + Profit 0 % Rp -
Total Rp 51,895.68
5 Analisa SNI-2013 1 m2 Plasteran 1 Pc : 5 Ps, tebal 15mm
BAHAN
5.1480 Kg Sement portland @ Rp 1,320.00 Rp 6,795.36
0.0260 M3 Pasir pasang @ Rp 120,000.00 Rp 3,120.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 100,000.00 Rp 15,000.00
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0150 Oh Kepala tukang @ Rp - Rp -
0.0150 Oh Mandor @ Rp - Rp -
Sub Total Rp 45,915.36
Overhead + Profit 0 % Rp -
Total Rp 45,915.36

6 Analisa SNI-2013 1 m2 Plasteran beton 1 Pc : 2 Ps, tebal 15mm


BAHAN
10.2240 Kg Sement Portland @ Rp 1,320.00 Rp 13,495.68
0.0200 M3 Pasir pasang @ Rp 120,000.00 Rp 2,400.00
TENAGA
0.1500 Oh Tukang Batu @ Rp 100,000.00 Rp 15,000.00
0.3000 Oh Pekerja @ Rp 70,000.00 Rp 21,000.00
0.0150 Oh Kepala tukang @ Rp - Rp -
0.0150 Oh Mandor @ Rp - Rp -
Sub Total Rp 51,895.68
Overhead + Profit 0 % Rp -
Total Rp 51,895.68
G. PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND

1 Analisa SNI-2013 1 m2 Langit-Langit tripleks 3 mm (permukaan rata)


BAHAN
0.3640 Lbr Tripleks 240 x 120 cm, 3 mm @ Rp 45,000.00 Rp 16,380.00
0.1100 Kg Paku tripleks @ Rp 17,000.00 Rp 1,870.00
TENAGA
0.0500 Oh Tukang kayu @ Rp 240,000.00 Rp 12,000.00
0.1000 Oh Pekerja @ Rp 1,320.00 Rp 132.00
0.0050 Oh Kepala tukang @ Rp 120,000.00 Rp 600.00
0.0050 Oh Mandor @ Rp 80,000.00 Rp 400.00
Sub Total Rp 31,382.00
Overhead + Profit 10 % Rp 3,138.20
Total Rp 34,520.20

Analisa SNI-2013 1 M2 Rangka plafond (0,6 x 1,20 m)


BAHAN
0.2500 Kg Paku campur @ Rp 20,000.00 Rp 5,000.00
0.0160 M3 Kayu klas II @ Rp 1,500,000.00 Rp 24,000.00
Total A Rp 29,000.00

TENAGA
0.1500 Oh Pekerja @ Rp 70,000.00 Rp 10,500.00
0.2500 Oh Tukang @ Rp 100,000.00 Rp 25,000.00
0.0250 Oh Kepala Tukang @ Rp - Rp -
0.0750 Oh Mandor @ Rp - Rp -
Total B Rp 35,500.00
Sub Total Rp 64,500.00
Overhead + Profit 0 % Rp -
Total Rp 64,500.00
Jadi, 1 M2 Pek. Plafond Rangka kayu 5/7 = A + B Total Rp 64,500.00

3 Analisa SNI-2013 1 M' List Profil Kayu 5x5


BAHAN
1.0500 M' List Plafond @ Rp 16,000.00 Rp 16,800.00
0.0100 Kg Paku Campur @ Rp 20,000.00 Rp 200.00
TENAGA
0.0500 OH Pekerja @ Rp 70,000.00 Rp 3,500.00
0.0500 OH Tukang Kayu @ Rp 100,000.00 Rp 5,000.00
0.0050 OH Kepala Tukang @ Rp - Rp -
0.0030 OH Mandor @ Rp - Rp -
Sub Total Rp 25,500.00
Overhead + Profit 0 % Rp -
Total Rp 25,500.00
H. PEKERJAAN KUSEN, PINTU, JENDELA, PARTISI, KACA DAN ALAT PENGGANTUNG

1 Analisa SNI-2013 1 Bh pasang kunci tanam biasa, 2 Slag


BAHAN
1.0000 Bh Kunci tanam biasa @ Rp 175,000.00 Rp 175,000.00
TENAGA
0.5000 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0500 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 225,700.00
Overhead + Profit 0 % Rp -
Total Rp 225,700.00

2 Analisa SNI-2013 1 Bh pasang kunci tanam kamar mandi, 1 Slag


BAHAN
1.0000 Bh Kunci tanam kamar mandi @ Rp 185,130.00 Rp 185,130.00
TENAGA
0.5000 Oh Tukang kayu @ Rp 100,000.00 Rp 50,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0500 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 235,830.00
Overhead + Profit 0 % Rp -
Total Rp 235,830.00

3 Analisa SNI-2013 1 Bh pasang engsel pintu


BAHAN
1.0000 Bh Engsel pintu @ Rp 25,000.00 Rp 25,000.00
TENAGA
0.1500 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.0150 Oh Pekerja @ Rp 70,000.00 Rp 1,050.00
0.0150 Oh Kepala tukang @ Rp - Rp -
0.0008 Oh Mandor @ Rp - Rp -
Sub Total Rp 41,050.00
Overhead + Profit 0 % Rp -
Total Rp 41,050.00

4 Analisa SNI-2013 1 Bh pasang engsel jendela kupu-kupu


BAHAN
1.0000 Bh Engsel jendela @ Rp 18,000.00 Rp 18,000.00
TENAGA
0.1000 Oh Tukang kayu @ Rp 100,000.00 Rp 10,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0005 Oh Mandor @ Rp - Rp -
Sub Total Rp 28,700.00
Overhead + Profit 0 % Rp -
Total Rp 28,700.00

5 Analisa SNI-2013 1 Bh pasang Grendel pintu dan jendela Standart


BAHAN
1.0000 Bh Grendel @ Rp 12,000.00 Rp 12,000.00
TENAGA
0.2000 Oh Tukang kayu @ Rp 100,000.00 Rp 20,000.00
0.0200 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.0200 Oh Kepala tukang @ Rp - Rp -
0.0010 Oh Mandor @ Rp - Rp -
Sub Total Rp 33,400.00
Overhead + Profit 0 % Rp -
Total Rp 33,400.00
6 Analisa SNI-2013 1 Bh pasang Grendel pintu tanam 2 Daun
BAHAN
1.0000 Bh Grendel @ Rp 55,000.00 Rp 55,000.00
TENAGA
0.2000 Oh Tukang kayu @ Rp 100,000.00 Rp 20,000.00
0.0200 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.0200 Oh Kepala tukang @ Rp - Rp -
0.0010 Oh Mandor @ Rp - Rp -
Sub Total Rp 76,400.00
Overhead + Profit 0 % Rp -
Total Rp 76,400.00

7 Analisa SNI-2013 1 Buah Pasang Pegangan Pintu Stainless Steel


BAHAN
1.0000 Psg Handel Pintu Aluminium ex. Gradino @ Rp 585,000.00 Rp 585,000.00
TENAGA
0.0100 OH Pekerja @ Rp 70,000.00 Rp 700.00
0.5000 OH Tukang Kayu @ Rp 100,000.00 Rp 50,000.00
0.0100 OH Kepala Tukang @ Rp - Rp -
0.0050 OH Mandor @ Rp - Rp -
Sub Total Rp 635,700.00
Overhead + Profit 0 % Rp -
Total Rp 635,700.00

8 Analisa SNI-2013 1 Buah Pasang Hak Angin


BAHAN
1.0000 Psg Hak Angin @ Rp 15,000.00 Rp 15,000.00
TENAGA
0.0150 OH Pekerja @ Rp 70,000.00 Rp 1,050.00
0.1500 OH Tukang Kayu @ Rp 100,000.00 Rp 15,000.00
0.0150 OH Kepala Tukang @ Rp - Rp -
0.0080 OH Mandor @ Rp - Rp -
Sub Total Rp 31,050.00
Overhead + Profit 0 % Rp -
Total Rp 31,050.00

9 Analisa SNI-2013 1 Buah Pasang Door Closer


BAHAN
1.0000 Psg Door Closer @ Rp 481,950.00 Rp 481,950.00
TENAGA
0.0500 OH Pekerja @ Rp 70,000.00 Rp 3,500.00
0.5000 OH Tukang Kayu @ Rp 100,000.00 Rp 50,000.00
0.0500 OH Kepala Tukang @ Rp - Rp -
0.0030 OH Mandor @ Rp - Rp -
Sub Total Rp 535,450.00
Overhead + Profit 0 % Rp -
Total Rp 535,450.00

10 Analisa SNI-2013 Pekerjaan Kusen Kayu Kls II


BAHAN
1.2000 M3 Balok Kayu Kls II @ Rp 1,500,000.00 Rp 1,800,000.00
1.2500 Kg Paku 10 cm @ Rp 20,000.00 Rp 25,000.00
1.0000 Kg Lem Kayu @ Rp 19,700.00 Rp 19,700.00
TENAGA
6.0000 OH Pekerja @ Rp 70,000.00 Rp 420,000.00
18.0000 OH Tukang Kayu @ Rp 100,000.00 Rp 1,800,000.00
1.8000 OH Kepala Tukang @ Rp - Rp -
0.3000 OH Mandor @ Rp - Rp -
Sub Total Rp 4,064,700.00
Overhead + Profit 0 % Rp -
Total Rp 4,064,700.00
14 Analisa SNI-2013 1 M2 Pekerjaan Pintu Panel Kayu Kls I
BAHAN
0.0400 M3 Papan Kayu Kls I @ Rp 2,500,000.00 Rp 100,000.00
0.5000 Kg Lem Kayu @ Rp 19,700.00 Rp 9,850.00
TENAGA
1.0000 OH Pekerja @ Rp 70,000.00 Rp 70,000.00
3.0000 OH Tukang Kayu @ Rp 100,000.00 Rp 300,000.00
0.3000 OH Kepala Tukang @ Rp - Rp -
0.0500 OH Mandor @ Rp - Rp -
Sub Total Rp 479,850.00
Overhead + Profit 0 % Rp -
Total Rp 479,850.00

15 Analisa SNI-2013 1 M2 Pasang Bingkai Pintu dan Jendela


BAHAN
0.0240 M3 Papan Kayu Kls I @ Rp 2,500,000.00 Rp 60,000.00
0.3000 Kg Lem Kayu @ Rp 19,700.00 Rp 5,910.00
TENAGA
0.8000 OH Pekerja @ Rp 70,000.00 Rp 56,000.00
2.4000 OH Tukang Kayu @ Rp 100,000.00 Rp 240,000.00
0.2400 OH Kepala Tukang @ Rp - Rp -
0.0400 OH Mandor @ Rp - Rp -
Sub Total Rp 361,910.00
Overhead + Profit 0 % Rp -
Total Rp 361,910.00

16 Analisa SNI-2013 1 M2 Pasang Kaca 5 mm


BAHAN
1.1000 M3 Kaca Bening 5 mm @ Rp 125,000.00 Rp 137,500.00
TENAGA
0.0150 OH Pekerja @ Rp 70,000.00 Rp 1,050.00
0.1500 OH Tukang Kayu @ Rp 100,000.00 Rp 15,000.00
0.0150 OH Kepala Tukang @ Rp - Rp -
0.0008 OH Mandor @ Rp - Rp -
Sub Total Rp 153,550.00
Overhead + Profit 0 % Rp -
Total Rp 153,550.00

17 Analisa SNI-2013 1 M2 Pasang Rayban 5 mm (25%)


BAHAN
1.1000 M3 Kaca Rayben 5 mm @ Rp 185,250.00 Rp 203,775.00
TENAGA
0.0150 OH Pekerja @ Rp 70,000.00 Rp 1,050.00
0.1500 OH Tukang Kayu @ Rp 100,000.00 Rp 15,000.00
0.0150 OH Kepala Tukang @ Rp - Rp -
0.0008 OH Mandor @ Rp - Rp -
Sub Total Rp 219,825.00
Overhead + Profit 0 % Rp -
Total Rp 219,825.00

21 Analisa SNI-2013 1 M2 Partisi Rangka Besi Hollow 4x4 cm


BAHAN
3.5000 M1 Rangka hollow galvalum @ Rp 12,500.00 Rp 43,750.00
1.0000 Ls Assesoris (perkuatan, las. Dll) @ Rp 12,500.00 Rp 12,500.00
TENAGA
0.2500 OH Pekerja @ Rp 70,000.00 Rp 17,500.00
0.2500 OH Tukang Kayu @ Rp 100,000.00 Rp 25,000.00
0.0250 OH Kepala Tukang @ Rp - Rp -
0.0130 OH Mandor @ Rp - Rp -
Sub Total Rp 98,750.00
Overhead + Profit 0 % Rp -
Total Rp 98,750.00
I. PEKERJAAN RANGKA KAP DAN PENUTUP ATAP

1 Analisa SNI-2013 1M1 Pasang atap nok atap


BAHAN
1.1000 Lbr. Nok atap @ Rp 23,000.00 Rp 25,300.00
0.0500 Kg. Paku seng @ Rp 35,000.00 Rp 1,750.00
TENAGA
0.1500 Oh Tukang kayu @ Rp 100,000.00 Rp 15,000.00
0.2500 Oh Pekerja @ Rp 70,000.00 Rp 17,500.00
Sub Total Rp 59,550.00
Overhead + Profit 0 % Rp -
Total Rp 59,550.00

2 Analisa SNI-2013 1 m2 Pasangan Atap Seng panjang 7 kaki


BAHAN
0.8900 Lbr Atap seng 7 kaki @ Rp 55,000.00 Rp 48,950.00
0.0200 Kg. Paku seng @ Rp 25,000.00 Rp 500.00
TENAGA
0.0600 Oh Tukang kayu @ Rp 100,000.00 Rp 6,000.00
0.1200 Oh Pekerja @ Rp 70,000.00 Rp 8,400.00
Sub Total Rp 63,850.00
Overhead + Profit 0 % Rp -
Total Rp 63,850.00

3 Analisa SNI-2013 1M1 Pasang Lisplant ukuran (1 x 30) cm, Ex. Calsiplank
BAHAN
1.1000 M1 Calsiplank @ 65,000.00 Rp 71,500.00
0.0600 Kg Paku 2" - 5" @ 20,000.00 Rp 1,200.00
TENAGA
0.1000 OH Pekerja @ 70,000.00 Rp 7,000.00
0.2000 OH Tukang Kayu @ 100,000.00 Rp 20,000.00
Sub Total Rp 99,700.00
Overhead + Profit 0 % Rp -
Total Rp 99,700.00

4 Analisa SNI-2013 1 M2 Pek. Konstruksi Rangka Atap Baja Ringan Zincalume


BAHAN
1.1000 M1 Main Truss C-75, 0.75 @ Rp 14,900.00 Rp 16,390.00
2.2000 M1 Reng R 33-0,45 @ Rp 8,000.00 Rp 17,600.00
19.0000 Bh Baut (Screw Driver) @ Rp 500.00 Rp 9,500.00
1.6000 Bh Dynabolt @ Rp 2,500.00 Rp 4,000.00

TENAGA
0.3600 OH Tukang Besi @ Rp 100,000.00 Rp 36,000.00
0.2000 OH Pekerja @ Rp 70,000.00 Rp 14,000.00
Sub Total Rp 97,490.00
Overhead + Profit 0 % Rp -
Rp 97,490.00
6 Analisa SNI-2013 1 M3 Pek. Gording 6 x 12 cm Kayu Kelas II
BAHAN
1.1000 M3 Balok 6/12 cm @ Rp 1,500,000.00 Rp 1,650,000.00
15.0000 Kg Besi strip tebal 5 mm @ Rp 20,000.00 Rp 300,000.00
3.0000 Kg Paku 12 cm @ Rp 20,000.00 Rp 60,000.00
TENAGA
20.1000 Oh Tukang Kayu @ Rp 100,000.00 Rp 2,010,000.00
2.0100 Oh Kepala Tukang @ Rp - Rp -
6.7000 Oh Pekerja @ Rp 70,000.00 Rp 469,000.00
0.3350 Oh Mandor @ Rp - Rp -
Sub Total Rp 4,489,000.00
Overhead + Profit 0 % Rp -
Total Rp 4,489,000.00

1 M3 Pek. Kuda-Kuda Kayu K1

1.100 M3 Balok 8/12 cm Rp 1,500,000.00 Rp 1,650,000.00


15.000 Kg Besi strip tebal 5 mm Rp 20,000.00 Rp 300,000.00
5.600 Kg Paku 12 cm Rp 20,000.00 Rp 112,000.00

12.000 Oh Tukang Kayu Rp 100,000.00 Rp 1,200,000.00


1.200 Oh Kepala Tukang Rp - Rp -
4.000 Oh Pekerja Rp 70,000.00 Rp 280,000.00
0.200 Oh Mandor Rp - Rp -
Rp 3,542,000.00

Analisa SNI-2013 1 M2 Talang miring seng plat BJLS 30


BAHAN
1.000 m1 Seng plat bjls 30 Rp 16,000.00 Rp 16,000.00
0.015 Kg Paku seng Rp 35,000.00 Rp 525.00
0.019 M3 Papan klas II Rp 1,500,000.00 Rp 28,500.00

TENAGA
0.400 Oh Tukang Kayu Rp 100,000.00 Rp 40,000.00
0.025 Oh Kepala Tukang Rp - Rp -
0.040 Oh Pekerja Rp 70,000.00 Rp 2,800.00
0.001 Oh Mandor Rp - Rp -
Rp 87,825.00
J. PEKERJAAAN BESI HOLLOW

1 Analisa SNI-2013 1 M1 Railing Tangga


A. Bahan
2.1000 M1 Besi Hollow 4x4 cm @ Rp 55,000.00 Rp 115,500.00
4.8000 M1 Besi Hollow 2x4 cm @ Rp 50,000.00 Rp 240,000.00
1.0000 Ls Alat dan Bahan Las @ Rp 10,000.00 Rp 10,000.00
2.0000 Lbr Kertas Amplas @ Rp 6,757.00 Rp 13,514.00
Rp 379,014.00
Faktor Penyusutan 10% Rp 37,901.40
Total A Rp 416,915.40
B. Upah Kerja
0.1200 Oh Pekerja @ Rp 70,000.00 Rp 8,400.00
1.2000 Oh Tukang Las @ Rp 100,000.00 Rp 120,000.00
0.0120 Oh Kepala Tukang @ Rp - Rp -
0.0006 Oh Mandor @ Rp - Rp -
Total B Rp 128,400.00
Sub Total Rp 545,315.40
Overhead + Profit 0 % Rp -
Jadi, 1 M1 Pek. Railing Tangga = A + B Total Rp 545,315.40
K. PEKERJAAN SANITASI

1 Analisa SNI-2013 Memasang 1 bh kloset Jongkok


BAHAN
1.0000 Bh Kloset Jongkok @ Rp 150,000.00 Rp 150,000.00
6.0000 Kg Semen Portland @ Rp 1,320.00 Rp 7,920.00
0.0100 M3 Pasir pasang @ Rp 120,000.00 Rp 1,200.00
TENAGA
1.5000 Oh Tukang batu @ Rp 100,000.00 Rp 150,000.00
1.0000 Oh Pekerja @ Rp 70,000.00 Rp 70,000.00
0.1500 Oh Kepala tukang @ Rp - Rp -
0.1600 Oh Mandor @ Rp - Rp -
Sub Total Rp 379,120.00
Overhead + Profit 0 % Rp -
Total Rp 379,120.00

2 Analisa SNI-2013 Memasang 1 bh Wastafel


BAHAN
1.0000 Bh Wastafel @ Rp 350,000.00 Rp 350,000.00
0.1200 % Perlengkapan (harga wastafel) @ Rp 350,000.00 Rp 42,000.00
6.0000 Kg Semen portland @ Rp 1,320.00 Rp 7,920.00
0.0100 M3 Pasir pasang @ Rp 120,000.00 Rp 1,200.00
TENAGA
1.4500 Oh Tukang batu @ Rp 100,000.00 Rp 145,000.00
1.2000 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
0.1500 Oh Kepala tukang @ Rp - Rp -
0.1000 Oh Mandor @ Rp - Rp -
Sub Total Rp 630,120.00
Overhead + Profit 0 % Rp -
Total Rp 630,120.00
3 Analisa SNI-2013 Memasang 1 bh Kran dia.1/2"
BAHAN
1.0000 Bh Kran air 1/2" @ Rp 25,000.00 Rp 25,000.00
0.0250 Bh Seal tape @ Rp 5,000.00 Rp 125.00
TENAGA
0.4000 Oh Tukang batu @ Rp 100,000.00 Rp 40,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0400 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 65,825.00
Overhead + Profit 0 % Rp -
Total Rp 65,825.00

4 Analisa SNI-2013 Memasang 1 bh Kran


BAHAN
1.0000 Bh Kran air 1/2" @ Rp 75,000.00 Rp 75,000.00
0.0250 Bh Seal tape @ Rp 5,000.00 Rp 125.00
TENAGA
0.4000 Oh Tukang batu @ Rp 100,000.00 Rp 40,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0400 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 115,825.00
Overhead + Profit 0 % Rp -
Total Rp 115,825.00

5 Analisa SNI-2013 Memasang Floor Drain


BAHAN
1.0000 Bh Floor drain @ Rp 25,000.00 Rp 25,000.00
TENAGA
0.1000 Oh Tukang batu @ Rp 100,000.00 Rp 10,000.00
0.0100 Oh Pekerja @ Rp 70,000.00 Rp 700.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0050 Oh Mandor @ Rp - Rp -
Sub Total Rp 35,700.00
Overhead + Profit 0 % Rp -
Total Rp 35,700.00
6 Analisa SNI-2013 1 M' Memasang pipa PVC tipe AW dia 3/4"
BAHAN
1.2000 M' Pipa PVC type AW dia 3/4 " @ Rp 5,400.00 Rp 6,480.00
0.3500 % Perlengkapan (harga pipa) @ Rp 5,400.00 Rp 1,890.00
TENAGA
0.0600 Oh Tukang @ Rp 100,000.00 Rp 6,000.00
0.0360 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.0060 Oh Kepala tukang @ Rp - Rp -
0.0020 Oh Mandor @ Rp - Rp -
Sub Total Rp 16,890.00
Overhead + Profit 0 % Rp -
Total Rp 16,890.00

7 Analisa SNI-2013 1 M' Memasang pipa PVC type AW dia 1 "


BAHAN
1.2000 M' Pipa PVC type AW dia 1" @ Rp 12,300.00 Rp 14,760.00
0.3500 % Perlengkapan (harga pipa) @ Rp 12,300.00 Rp 4,305.00
TENAGA
0.0600 Oh Tukang @ Rp 100,000.00 Rp 6,000.00
0.0360 Oh Pekerja @ Rp 70,000.00 Rp 2,520.00
0.0060 Oh Kepala tukang @ Rp - Rp -
0.0020 Oh Mandor @ Rp - Rp -
Sub Total Rp 27,585.00
Overhead + Profit 0 % Rp -
Total Rp 27,585.00

8 Analisa SNI-2013 1 M' Memasang pipa PVC type AW dia 2"


BAHAN
1.2000 M' Pipa PVC type AW dia 2" @ Rp 29,500.00 Rp 35,400.00
0.3500 % Perlengkapan (harga pipa) @ Rp 29,500.00 Rp 10,325.00
TENAGA
0.1350 Oh Tukang @ Rp 100,000.00 Rp 13,500.00
0.0810 Oh Pekerja @ Rp 70,000.00 Rp 5,670.00
0.0135 Oh Kepala tukang @ Rp - Rp -
0.0040 Oh Mandor @ Rp - Rp -
Sub Total Rp 64,895.00
Overhead + Profit 0 % Rp -
Total Rp 64,895.00

9 Analisa SNI-2013 1 M' Memasang pipa PVC type AW dia 4"


BAHAN
1.2000 M' Pipa PVC type AW dia4" @ Rp 78,200.00 Rp 93,840.00
0.3500 % Perlengkapan (harga pipa) @ Rp 78,200.00 Rp 27,370.00
TENAGA
0.1350 Oh Tukang @ Rp 100,000.00 Rp 13,500.00
0.0810 Oh Pekerja @ Rp 70,000.00 Rp 5,670.00
0.0135 Oh Kepala tukang @ Rp - Rp -
0.0040 Oh Mandor @ Rp - Rp -
Sub Total Rp 140,380.00
Overhead + Profit 0 % Rp -
Total Rp 140,380.00

13 Analisa SNI-2013 1 Unit Septictank dan Peresapan


BAHAN
8.8070 M3 Galian Tanah Biasa @ Rp 63,000.00 Rp 554,841.00
1.8940 M2 Pas. Trasram 1/2 Bata 1 : 2 @ Rp 85,074.00 Rp 161,130.16
1.2810 M3 Urugan Pasir @ Rp 117,000.00 Rp 149,877.00
2.1690 M3 Urugan Tanah Kembali @ Rp 35,000.00 Rp 75,915.00
14.4400 M2 Plesteran Trasram 1 2 Tebal 15 mm @ Rp 51,895.68 Rp 749,373.62
1.3500 M2 Ijuk @ Rp 85,000.00 Rp 114,750.00
0.3810 M3 Plat Beton Bertulang 1:2:3 T=10 cm @ Rp 3,343,466.10 Rp 1,273,860.58
14.4400 M2 Acian Semen (Saus Semen) @ Rp 28,290.00 Rp 408,507.60
0.6000 M1 Pipa Hawa Galvanis Dia.1" @ Rp 29,500.00 Rp 17,700.00
0.9000 M3 Kerikil Beton @ Rp 240,000.00 Rp 216,000.00
9.0000 M1 PVC Dia.4"+ Dipasang+ ambungan @ Rp 78,200.00 Rp 703,800.00
TENAGA
2.0000 Oh Tukang Batu @ Rp 100,000.00 Rp 200,000.00
3.2700 Oh Pekerja @ Rp 70,000.00 Rp 228,900.00
0.1000 Oh Kepala tukang @ Rp - Rp -
0.1500 Oh Mandor @ Rp - Rp -
Sub Total Rp 4,854,654.96
Overhead + Profit 0 % Rp -
Total Rp 4,854,654.96
L. PEKERJAAN FINISHING

1 Analisa SNI-2013 1 m2 pengecatan bidang kayu baru


( 1 lapis meni, 1 lapis cat dasar,1 lapis cat penutup)

0.2000 Kg Cat meni kayu @ Rp 37,800.00 Rp 7,560.00


0.3500 Kg Cat penutup Ec. Avian/setara @ Rp 55,539.00 Rp 19,438.65
0.0100 Kg kuas @ Rp 6,006.00 Rp 60.06
0.0300 Kg Pengencer/Tenner @ Rp 22,200.00 Rp 666.00
0.2000 Kg Ampelas @ Rp 6,006.00 Rp 1,201.20
TENAGA
0.1050 Oh Tukang cat @ Rp 100,000.00 Rp 10,500.00
0.0700 Oh Pekerja @ Rp 70,000.00 Rp 4,900.00
0.0040 Oh Kepala tukang @ Rp - Rp -
0.0030 Oh Mandor @ Rp - Rp -
Sub Total Rp 44,325.91
Overhead + Profit 0 % Rp -
Total Rp 44,325.91

2 Analisa SNI-2013 1 m2 pengecatan tembok baru


( 1 lapis Plamir, 1 Lapis cat dasar,1 lapis cat penutup)
BAHAN
0.1000 Kg Plamir @ Rp 8,000.00 Rp 800.00
0.2600 Kg Cat penutup @ Rp 12,763.00 Rp 3,318.38
TENAGA
0.0630 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0200 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.0063 Oh Kepala tukang @ Rp - Rp -
0.0030 Oh Mandor @ Rp - Rp -
Sub Total Rp 11,818.38
Overhead + Profit 0 % Rp -
Total Rp 11,818.38

Analisa SNI-2013 1 m2 pengecatan tembok Weather Shield Exterior (anti lumut)


(1 Lapis cat dasar,1 lapis cat penutup)
BAHAN
0.1000 Kg Cat dasar @ Rp 153,846.15 Rp 15,384.62
0.2600 Kg Cat penutup @ Rp 153,846.15 Rp 40,000.00
TENAGA
0.0630 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0200 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.0063 Oh Kepala tukang @ Rp - Rp -
0.0030 Oh Mandor @ Rp - Rp -
Sub Total Rp 63,084.62
Overhead + Profit 0 % Rp -
Total Rp 63,084.62

3 Analisa SNI-2013 1 m2 pengecatan langit-langit plafond


( 1 lapis Plamir Compound, 1 Lapis cat dasar,1 lapis cat penutup)
BAHAN
0.1000 Kg Cat tembok (dasar) @ Rp 22,000.00 Rp 2,200.00
0.2600 Kg Cat tembok (penutup) @ Rp 12,763.00 Rp 3,318.38
0.1000 Lbr Amplas @ Rp 6,757.00 Rp 675.70
0.0500 Kg Plamir @ Rp 8,000.00 Rp 400.00
0.0160 Rol Isolasi Gypsum @ Rp 34,500.00 Rp 552.00
0.1000 Kg Lem fox @ Rp 19,700.00 Rp 1,970.00
TENAGA
0.0630 Oh Tukang cat @ Rp 100,000.00 Rp 6,300.00
0.0200 Oh Pekerja @ Rp 70,000.00 Rp 1,400.00
0.0063 Oh Kepala tukang @ Rp - Rp -
0.0025 Oh Mandor @ Rp - Rp -
Sub Total Rp 16,816.08
Overhead + Profit 0 % Rp -
Total Rp 16,816.08
4 Analisa SNI-2013 1 m2 Pekerjaan acian tembok
BAHAN
3.2500 Kg. PC untuk acian dasar @ Rp 1,320.00 Rp 4,290.00
TENAGA
0.1000 Oh Tukang Batu @ Rp 100,000.00 Rp 10,000.00
0.2000 Oh Pekerja @ Rp 70,000.00 Rp 14,000.00
0.0100 Oh Kepala tukang @ Rp - Rp -
0.0100 Oh Mandor @ Rp - Rp -
Sub Total Rp 28,290.00
Overhead + Profit 0 % Rp -
Total Rp 28,290.00

5 Analisa SNI-2013 1 m2 Pelaburan bidang kayu dengan vernis


BAHAN
0.1500 Lt Vernis @ Rp 35,000.00 Rp 5,250.00
0.0500 Kg Dempul @ Rp 17,000.00 Rp 850.00
0.1000 Lbr Ampelas @ Rp 6,006.00 Rp 600.60
0.0100 Bh Kuas @ Rp 24,684.00 Rp 246.84
TENAGA
0.1600 OH Pekerja @ Rp 70,000.00 Rp 11,200.00
0.1600 OH Tukang Cat @ Rp 100,000.00 Rp 16,000.00
0.0160 OH Kepala Tukang @ Rp - Rp -
0.0025 OH Mandor @ Rp - Rp -
Sub Total Rp 34,147.44
Overhead + Profit 0 % Rp -
Total Rp 34,147.44

6 Analisa SNI-2013 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
BAHAN
0.3500 Ltr Residu/Ter @ Rp 10,000.00 Rp 3,500.00
TENAGA
0.1000 OH Pekerja @ Rp 70,000.00 Rp 7,000.00
0.0060 OH Mandor @ Rp - Rp -
Sub Total Rp 10,500.00
Overhead + Profit 0 % Rp -
Total Rp 10,500.00

7 Analisa SNI-2013 1 m2 pengecatan bidang besi


( 1 lapis meni, 1 lapis cat dasar,1 lapis cat penutup)
BAHAN
0.1100 Kg Cat meni besi @ Rp 37,800.00 Rp 4,158.00
0.1700 Kg Cat dasar @ Rp 55,539.00 Rp 9,441.63
0.0800 Kg Cat penutup Ec. Avian/setara @ Rp 55,539.00 Rp 4,443.12
0.0100 Kg kuas @ Rp 6,006.00 Rp 60.06
0.0100 Kg Pengencer/Tenner @ Rp 22,200.00 Rp 222.00
TENAGA
0.0800 Oh Tukang cat @ Rp 100,000.00 Rp 8,000.00
0.4000 Oh Pekerja @ Rp 70,000.00 Rp 28,000.00
0.0800 Oh Kepala tukang @ Rp - Rp -
0.0200 Oh Mandor @ Rp - Rp -
Sub Total Rp 54,324.81
Overhead + Profit 0 % Rp -
Total Rp 54,324.81
DAFTAR HARGA BARANG DAN UPAH KERJA

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN


LOKASI : DESA BAITO, KEC. BAITO, KAB. KONSEL

NO TENAGA SAT UPAH/HARGA

1 2 3 4
1 Mandor OH Rp -
2 Kepala tukang OH Rp -
1 Tukang Listrik OH Rp 100,000.00
2 Tukang kayu OH Rp 100,000.00
3 Tukang batu OH Rp 100,000.00
4 Tukang besi OH Rp 100,000.00
5 Tukang Cat OH Rp 100,000.00
6 Tukang Plafond OH Rp 100,000.00
7 Tukang Partisi OH Rp 100,000.00
8 Tukang Aluminium OH Rp 100,000.00
9 Pekerja OH Rp 70,000.00
A. BAHAN DASAR
1 Tanah urug M3 Rp 20,000.00
2 Pasir urug M3 Rp 80,000.00
3 Pasir pasangan M3 Rp 120,000.00
4 Pasir beton M3 Rp 120,000.00
5 Batu belah gunung M3 Rp 150,000.00
6 Batu bata Bh Rp 350.00
7 Beton roster/kerawang 15 x 25 cm (abu-abu) Bh Rp 15,000.00
8 Koral beton/Split 2.3 cm M3 Rp 240,000.00
9 Koral beton/Split 1.2 cm M3 Rp 240,000.00
10 Semen Portland Kg Rp 1,320.00
11 Semen warna Kg Rp 1,320.00
12 Semen putih Kg Rp 1,500.00
B. BAHAN LANTAI
1 Tegel Keramik 40x40 cm, Bh Rp 11,666.67
3 Tegel keramik warna 20x25 cm Bh Rp 3,500.00
4 Tegel keramik warna 20x20 cm anti slip Bh Rp 2,800.00
5 Dinding keramik 20x40 cm motif batu alam M2 Rp 5,833.33
6 Kuku keramik M1 Rp 10,000.00
C. BAHAN KAYU
1 Dolken kayu dia 8 - 12 cm Btg. Rp 4,000.00
2 Papan Kayu kelas I M3 Rp 2,500,000.00
3 Balok Kayu Kelas I M3 Rp 2,500,000.00
4 Papan kayu Kelas II M3 Rp 1,500,000.00
5 Balok Kayu Kelas II M3 Rp 1,500,000.00
6 Papan kayu Kelas III M3 Rp 1,200,000.00
7 Balok Kayu Kelas III M3 Rp 1,200,000.00
8 Papan/balok kayu meranti kelas IV (bekisting) M3 Rp 1,000,000.00
D. BAHAN LANGIT-LANGIT
1 List profil kayu 5x5cm M1 Rp 16,000.00
2 List profil kayu 3x3cm M1 Rp 11,000.00
3 Tripleks 122 x 244 x 3 mm Lbr Rp 45,000.00
E. BAHAN ATAP
1 Atap Spandek P. 170 cm Lbr Rp 55,000.00
2 Seng gelombang bjls 28 kk Rp 6,500.00
3 Nok Metal spandek Lbr Rp 23,000.00

Page 58 HARGA
4 Papan Lisplank Semen, Ex. Calsiplank M1 Rp 65,000.00
5 Seng plat bjls 30 M1 Rp 16,000.00

Page 59 HARGA
F. BAHAN BESI
1 Kawat beton Kg Rp 13,000.00
2 Besi Beton polos Kg Rp 12,000.00
4 Paku biasa 2"-5" Kg Rp 20,000.00
5 Paku Genteng Metal Kg Rp 25,000.00
6 Paku tripleks Kg Rp 25,000.00
7 Paku Gypsumboard Kg Rp 27,000.00
8 Paku sekrup Kg Rp 25,000.00
9 Paku seng Kg Rp 35,000.00
10 Besi strip buah Rp 20,000.00
11 Besi Teralis Minimalis Dia. 12 mm M1 Rp 14,500.00
12 Besi Hollow 2 x 4 cm M1 Rp 23,000.00
13 Hollow aluminium 2,5x3,8 cm M1 Rp 26,000.00
14 Besi Hollow 4 x 4 cm M1 Rp 55,000.00
15 Besi Hollow 2 x 4 cm M1 Rp 50,000.00
16 Baut Angker Btg. Rp 8,000.00
17 Baut dia. 16 buah Rp 15,000.00
G. BAHAN CAT
1 Plamur tembok Kg. Rp 8,000.00
2 Plamir kayu Kg. Rp 15,000.00
3 Dempul Kayu Kg Rp 17,000.00
4 Cat kilap kayu setara glotex Kg Rp 37,800.00
Cat kilap kayu setara avian Kg Rp 42,000.00
5 Cat dasar/kayu/tembok Kg Rp 22,000.00
6 Cat Vernis Kayu Standart Kg Rp 35,000.00
7 Cat tembok ex. Vinitex atau setara Kg Rp 12,763.00
8 Cat Weather Shield Exterior (anti lumut) ex. SICA Kg Rp 153,846.15
9 Cat kayu kilap standart ex. Avian Kg Rp 55,539.00
10 Cat besi Kg Rp 55,539.00
11 Cat Politur Kg Rp 41,654.25
12 Residu/Ter Liter Rp 10,000.00
13 Minyak cat Ltr Rp 22,200.00
14 Kalsium Kg.
15 Lem fox/ lem kayu Kg. Rp 19,700.00
16 Kuas biasa 3 cm Bh. Rp 6,006.00
17 Kuas biasa 4" Bh. Rp 24,684.00
18 Kuas biasa 5 cm Bh. Rp 24,684.00
19 Kuas Roll Bh. Rp 43,197.00
20 Ampelas halus Lbr Rp 6,006.00
21 Ampelas kasar Lbr Rp 6,757.00
22 Meni besi Kg Rp 37,800.00
23 Meni kayu Kg Rp 18,000.00
24 Minyak bekisting ltr Rp 10,000.00
25 Isolasi Gypsum Roll Rp 34,500.00
26 Screws / Sekrup kalsiboard Bh. Rp 200.00
27 Minyak bekisting Ltr Rp 12,763.00
I BAHAN INSTALASI LISTRIK
1 Box Tanam type RM untuk TL 2 x 20 Watt Unit Rp 150,000.00
2 Down Light 3 Inchi ex.Philips Bh Rp 58,000.00
3 Lampu TL 18 watt Bh Rp 38,500.00
4 Saklar ganda Ex. Panasonic Bh Rp 32,500.00
5 Saklar tunggal Ex. Panasonic Bh Rp 27,000.00
6 Stop Kontak Ex. Panasonic Bh Rp 24,000.00
7 MCB 10 A 1 o Merlin Gering Bh Rp 240,000.00
8 Box MCB 10 A Bh Rp 15,000.00
9 Kabel NYA 2.5 mm (100m) roll Rp 170,000.00
10 Kabel Twestek 2 x 10 mm (100m) roll Rp 750,000.00

Page 60 HARGA
11 Pipa listrik 5/8 inchi, Ex Clipsal Btg Rp 8,000.00
12 Kee nee Bh Rp 3,500.00
13 Inbow Dos Bh Rp 6,000.00
14 Las DOP Bh Rp 3,000.00
15 Isolasi Listrik, Ex. Unibell Bh Rp 12,000.00
16 Klem kabel No 10 Bh Rp 150.00
17 Tee Doz 5/8 ex. Clipsal Bh Rp 7,500.00
18 Besi Penggantung Lampu Bh Rp 75,000.00
J BAHAN SANITER
1 Kloset Jongkok Bh. Rp 150,000.00
2 Wastafel ex. American standar Bh. Rp 350,000.00
3 Urinoir Bh. Rp 450,000.00
5 Floor drain Bh. Rp 25,000.00
6 Bak Mandi Fiberglass Bh. Rp 275,000.00
7 Kran air dia 1/2" Stainless Bh. Rp 25,000.00
8 Kran Air Wastafel 1/2 " Bh. Rp 75,000.00
9 Seal tape Bh. Rp 5,000.00
12 Pipa PVC Æ 3/4 '' AW M1 Rp 5,400.00
13 Pipa PVC Æ 1/2 ' AW' M1 Rp 12,300.00
14 Pipa PVC Æ 2 '' AW M1 Rp 29,500.00
15 Pipa PVC Æ 4 '' AW M1 Rp 78,200.00
K BAHAN PINTU DAN JENDELA
1 Pintu + kusen Aluminium Toilet ex. Fortuna BH Rp 355,000.00
2 Pintu Rooling door (one sheet) + assesoris lengkap, uk. 210x2,40 cm Unit Rp 66,752.00
3 Rangka Daun Pintu Aluminium M1 Rp 66,752.00
4 Bingkai Jendela Alumiium Architrave M1 Rp 1,100,000.00
5 Kaca bening 5 mm M2 Rp 125,000.00
6 Silicon Sealant kaca/Karet Kaca M1 Rp 7,500.00
7 Silicon Sielent Tembok BH Rp 9,000.00
8 Kusen Aluminium 3" M1 Rp 59,500.00
9 Jalusi aluminium M2 Rp 185,250.00
10 Door Stoper Kent 021 BH Rp 270,000.00
11 Handel Pintu Aluminium ex. Gradino Psg Rp 585,000.00
12 Skrup fixer BH Rp 2,000.00
13 Lem HPL / Wallpaper Kg Rp 42,500.00
14 List Profil Dinding M1 Rp 47,916.67
H. BAHAN PENGGANTUNG
1 Kunci tanam biasa Bh. Rp 175,000.00
2 Kunci tanam Putar Bulat KW1 ut kamar mandi Bh. Rp 185,130.00
3 Grendel Jendela biasa psg Rp 12,000.00
4 Grendel Pintu Tanam (Untuk pintu 2 Daun) psg Rp 55,000.00
5 Engsel Pintu Bh. Rp 25,000.00
6 Engsel jendela Standart Bh. Rp 18,000.00
7 Kait angin Bh. Rp 15,000.00
8 Door closer pintu ex. Gradino Bh. Rp 481,950.00

Page 61 HARGA
PERHITUNGAN VOLUME

PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN
TYPE Panjang Lebar Tinggi Kuantitas Luas Tebal Volume
1 2 3 4 5 6 7 8 9

I PEKERJAAN TANAH DAN PASIR


1 Pek. Galian Tanah Pondasi

1.1 Pek. Galian Tanah Pondasi menerus 87.50 0.80 0.40 28.00

28.00

1.2 Pek. Galian Tanah Pondasi talud 8.00 1.00 0.50 4.00
4.00
32.00

2 Pek. Urugan Tanah Alur Pondasi 0.00

3 Pek. Urugan Pasir Alas Pondasi


menerus 87.50 0.60 0.05 2.63

2.63

4 Pek. Urugan Tanah Alas Lantai 100.50 0.00


0.00

5 Pek. Urugan Pasir Alas Lantai 0.05 100.50 5.03


0.00
5.03

6 Pek. Urugan Pasir Alas Rabat Beton 0.00

II PEKERJAAN BATU, PASANGAN DAN PLESTERAN


1 Pek. Batu Kosong 75.50 0.60 0.15 6.79
12.00 0.50 0.10 0.60
7.40
2 Pek. Pasangan Pondasi Batu Gunung 1 : 5 pondasi 1 75.50 0.40 0.40 12.08
pondasi PT 12.00 0.25 0.30 0.90
12.98
3 Pek. Pasangan Bata Merah 1/2 Bata 1 : 5 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
dinding 75.50 3.00 226.50
kuda2 bata
24.30 24.30
250.80
24.92
275.72
Bukaan (kusen jendela, pintu dan lain-lain) …………….……………..(b)
PJ 1.30 2.05 1.00 2.67
0.55 1.50 1.00 0.83
P1 0.90 2.05 1.00 1.85
P2 0.85 2.05 5.00 8.71
P3 0.70 2.05 2.00 2.87
P4 1.20 2.05 1.00 2.46
J1 0.70 1.50 2.00 2.10
J2 0.85 1.30 2.00 2.21
J3 1.35 1.30 4.00 7.02
J4 1.15 1.30 1.00 1.49
J5 1.85 1.30 3.00 7.22
J6 1.85 1.00 2.00 3.70
V 1.55 0.40 1.00 0.62
43.74
Jumlah total (a - (b+c)) 231.98

5 Pek. Pas. Dinding Trasram (Tinggi 30 cm) 1:2 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
75.50 0.30 22.65
22.65
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
PJ 1.30 0.30 1.00 0.39
0.00
P1 0.90 0.30 1.00 0.27
P2 0.85 0.30 5.00 1.28
P3 0.70 0.30 2.00 0.42
P4 1.20 0.30 1.00 0.36
2.72

Jumlah total (a - b) 19.94

5 Pek. Pas. Dinding Trasram Toilet (Tinggi 160 cm) 1:2 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
1.20 0.00
0.00
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
0.00
0.00
Jumlah total (a - b) 0.00

7 Pek. Plesteran Beton 1 : 2 Lantai 1


K1 (30/30) 1 0.75 3.50 3.00 7.88
K1 (30/30) 2 1.05 3.50 1.00 3.68
K1 (30/30) 3 0.90 3.50 4.00 12.60
KT (20/30) 1.00 3.50 2.00 7.00
Lantai 2
K1 (30/30) 1 0.90 3.50 6.00 18.90
K1 (30/30) 2 0.75 3.50 2.00 5.25
55.30
8 Pek. Plesteran Pondasi 1 : 2 0.00

9 0.00
9.00
-9.00
-0.45
-9.45

III PEKERJAAN BETON

1 #NAME? 0.00
0.00
0.00

#NAME? 0.00
0.00
0.00

2 #NAME? 0.00
#NAME? 0.00

0.00

2 PEKERJAAN KOLOM
Pek. Kolom teras (KT) 15/30 cm 0.00
0.00
0.00

Pek. Kolom Praktis, 1 : 2 : 3 0.00


0.00
0.00
0.00

5 #NAME?
#NAME? 0.00
#NAME? 0.00
#NAME? 0.00
#NAME? 0.00
0.00

6 #NAME? 0.00
Pek. Plat kanopi teras T = 10 cm 0.00
0.00
0.00

7 PEKERJAAN TANGGA BETON 1.21


0.00
1.21

7 Pek. Lantai kerja Pondasi poor plat, Beton tumbuk, 1Pc:3Kr:5Psr 0.00
0.00

8 Pek. Rabat beton keliling bangunan , 1Pc :3Kr : 5Psr,tebal 7 cm 0.00


0.00

9 Pek. Ring balok praktis uk; 10.15 cm 0.00


0.00
0.00

10 Pek. Balok Latei, 1 : 2 : 3 0.00


0.00
0.00

11 #NAME? 0.00
0.00
12 #NAME? 0.00

IV PEKERJAAN KAP, KUDA-KUDA DAN ATAP


1 Pek. Kuda-kuda kayu 8/12 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2 Pas. Nok Atap 0.00


0.00
0.00
0.00

4 Pek. Papan Lisplank Kayu Silae 2x(3/20) 0.00

6 Pek. Nok Atap Sakura Roof 0.00


0.00

7 Pek. Talang Seng Plat BJLS 30 0.00


0.00

V PEKERJAAN KUSEN,DAUN PINTU/JENDELA/KACA


1 PEKERJAAN KUSEN, PINTU DAN BINGKAI JENDELA
a Pek. Kusen pintu / jendela / ventilasi Kayu klas 2 PJ 11.00 0.14 1.00 0.05 0.08

P1 5.00 0.14 1.00 0.05 0.04


P2 4.95 0.14 5.00 0.05 0.17
P3 4.80 0.14 2.00 0.05 0.07
P4 5.40 0.14 1.00 0.05 0.04
J1 4.60 0.14 2.00 0.05 0.06
J2 4.20 0.14 2.00 0.05 0.06
J3 7.20 0.14 4.00 0.05 0.20
J4 5.50 0.14 1.00 0.05 0.04
J5 9.20 0.14 3.00 0.05 0.19
J6 7.60 0.14 2.00 0.05 0.11
V 5.60 0.14 1.00 0.05 0.04
1.09
0.02
1.11

b Pek. Panil pintu kayu klas 1 PJ 1.20 2.00 1.00 2.40

P1 0.80 2.00 1.00 1.60


P2 0.75 2.00 5.00 7.50
P3 0.60 2.00 2.00 2.40
P4 1.20 2.00 1.00 2.40
10.00 16.30
1.63
17.93
c Pek. Bingkai jendela kayu klas 1 J1 5.20 0.07 2.00 0.73
J2 4.40 0.07 2.00 0.62
J3 9.00 0.07 4.00 2.52
J4 9.60 0.07 1.00 0.67
J5 12.60 0.07 3.00 2.65
J6 11.10 0.07 2.00 1.55
PJ 9.60 0.07 1.00 0.67
15.00 9.41
0.94
10.35

d Pas. Kaca bening t = 5 mm (jendela/ventilasi) J1 0.48 1.14 2.00 1.09


J2 0.38 0.97 2.00 0.74
J3 0.96 1.06 4.00 4.07
J4 0.52 1.26 1.00 0.66
J5 1.29 0.73 3.00 2.83
J6 1.29 0.73 2.00 1.88
V 1.45 0.32 1.00 0.46
PJ 1 1.26 1.00 0.96
12.69

Engsel Jendela J1 2.00 2.00 4.00


J2 2.00 2.00 4.00
J3 4.00 4.00 16.00
J4 4.00 1.00 4.00
J5 6.00 3.00 18.00
J6 6.00 2.00 12.00
PJ 4.00 1.00 4.00
15.00 62.00

g #NAME? 0.00
0.00
0.00
0.00

h #NAME? 0.00
0.00
0.00
0.00

i Pas. Kaca bening, 5 mm 0.00


0.00
0.00
0.00

j Pasangan engsel kupu-kupu, pintu 0.00


0.00
0.00
0.00
0.00
0.00
0.00

k Pasangan engsel kupu-kupu, jendela 0.00


0.00
0.00
0.00
0.00
0.00
0.00
0.00

l Pasangan Grendel jendela 0.00


0.00
0.00
0.00
0.00
0.00
0.00
0.00

b Pasangan Grendel pintu 2 daun 0.00


0.00
0.00
0.00
0.00
0.00
0.00

2 Pek. Daun Pintu Panil (Kayu Klas I) 0.00


0.00
0.00
0.00
0.00
0.00

3 Pek. Bingkai Jendela, Kayu Klas I 0.00


0.00
0.00
0.00

4 Pek. Pas. Kaca Bening 5 mm 0.00


0.00
0.00
0.00
0.00
0.00

4 Pek. Kusen jendela / rangka partisi aluminium standart 3" 0.00


0.00
0.00
0.00
0.00
0.00

4 Pek. Rangka daun pintu aluminium standar 0.00


0.00
0.00

4 Pas. Kaca rayben (25%) 5 mm 0.00


0.00
0.00
0.00
0.00
0.00

VI PEKERJAAN LANTAI & RABAT BETON


1 Pek. Pas.Tegel Keramik 40/40 cm 1:5 (Ex. Roman) 0.00
0.00
0.00
0.00
0.00
0.00
0.00

2 Pek. Pas.Tegel Dinding Keramik (Toilet) 20/25 cm, 1:5 0.00


0.00
0.00
0.00

4 #NAME? 0.00
0.00
0.00
0.00

5 Pek. Pas.Tegel Anti Slip (KM/WC/Tempat Cuci) 20/20 cm 1:3 0.00


0.000
0.00

6 #NAME? 0.00
0.00
0.00
IX PEKERJAAN PENGGANTUNG / PENGUNCI
3 Pas. Engsel Pintu 0.00
0.00
0.00
0.00

3 Pas. Engsel Jendela 0.00


0.00
0.00

3 Pasangan Kunci pintu stainless stell, 2 Slag 0.00


0.00
0.00
0.00
0.00

IX PEKERJAAN RANGKA PLAFOND & PLAFOND


1 Pek. Rangka Plafond Ruangan (Kayu Klas II) 0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

2 Pek. List Plafond (Profil Gypsum) 0.00


0.00
0.00
0.00
0.00
0.00
0.00
0.00

X PEKERJAAN PENGECETAN / FINISHING


1 Cat dinding tembok interior & Eksterior, ex. Propan atau setara Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
0.00
0.00
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
0.00
Jumlah total (a - (b+c)) 0.00

0.00

2 Cat Bidang Beton Ex. Mowilex atau setara 0.00


0.00
0.00
0.00
0.00
0.00
0.00

L PEKERJAAN RAILING BESI HOLLOW


KETERANGAN

10

Menerus

B. Utama

B. Utama
Carport

Pondasi Menerus

Lantai bawah

kuda2 bata

10 %

Utama

Toilet
Kurang
10%

10%

10%
PERHITUNGAN VOLUME

PERHITUNGAN VOLUME BESI

NO. URAIAN PEKERJAAN jarak beugel / Kuantitas titik


struktur Type besi Panjang Kuantitas Volume (m1) per batang
jarak besi dak besi

1 2 3 6 9 7

1 PEKERJAAN KOLOM
Pek. Kolom teras (KT) 15/30 cm besi 10 14.00 6.00 84.00 12.00
besi 6 (beugel) 1.1 94.33 103.77 12.00

Pek. Kolom praktis besi 10 120.00 4.00 480.00 12.00


besi 6 (beugel) 0.4 601.00 240.40 12.00

2 PEKERJAAN SLOEF BETON

Pek. Sloef beton 15/20 besi 10 87.50 4.00 350.00 12.00


besi 6 (beugel) 0.56 0.20 438.50 245.56 12.00

3 PEKERJAAN RINGBALOK PRAKTIS & BALOK TENGAH


a Pek. Ring balok & Ringbalok kuda-kuda bata uk; 10x15 cm besi 10 87.50 4.00 350.00 12.00
besi 6 (beugel) 0.4 438.50 175.40 12.00

b Pek. Balok tengah/latei uk. 10x15 cm besi 8 32.50 4.00 130.00 12.00
besi 6 (beugel) 0.4 163.50 65.40 12.00

4 PEKERJAAN DAK BETON & KANOPI JENDELA


Besi 8 42.00 0.15 4.33 2.00 364.00 12.00
0.50 0.15 281.00 2.00 281.00 12.00

REKAPITULASI
BESI 6
BESI 8
BESI 10
BESI 12
BESI 14
jumlah berat KETERANGAN
jumlah (batang) berat besi /m1
(kg)

8 10

7.00 0.617 51.83


8.65 0.222 23.04

40.00 0.617 296.16


20.03 0.222 53.37

74.86

29.17 0.617 215.95


20.46 0.222 54.51
270.46
270.46

29.17 0.617 215.95


14.62 0.222 38.94

10.83 0.395 51.35


5.45 0.222 14.52

254.89

30.33 0.395 143.78


23.42 0.395 111.00
53.75
254.78

REKAPITULASI
49.18 BATANG
64.58 BATANG
105.33 BATANG
0.00 BATANG
BATANG
SLOEF 15/20
1.00 0.20 0.40 12.50

10 mm besi utama 4.00 50.00 1.580 79.00

6 mm beugel 12.50 0.20 1.06 66.25 0.680 45.05

0.16 0.16 0.37 0.37 124.05

0.20 0.20 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi 136.455


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

SLOEF 15/30
1.00 0.15 0.30 22.22

12 mm besi utama 7.00 155.56 0.888 138.13

8 mm beugel 22.22 0.15 0.76 112.59 0.395 44.47

0.11 0.11 0.27 0.27 182.61

0.15 0.15 0.30 0.30 dimensi

0.04 0.04 0.03 0.03 over besi 200.868


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

SLOEF 15/40
1.00 0.15 0.40 16.67

12 mm besi utama 9.00 150.00 0.888 133.20

8 mm beugel 16.67 0.15 0.96 106.67 0.395 42.13

0.11 0.11 0.37 0.37 175.33

0.15 0.15 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi 192.867


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

SLOEF 20/25
1.00 0.20 0.25 20.00

12 mm besi utama 7.00 140.00 0.888 124.32

8 mm beugel 20.00 0.15 0.76 101.33 0.395 40.03

0.16 0.16 0.22 0.22 164.35

0.20 0.20 0.25 0.25 dimensi

0.04 0.04 0.03 0.03 over besi 180.781


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

SLOEF 20/40
1.00 0.20 0.40 12.50

14 mm besi utama 7.00 87.50 1.120 98.00

10 mm beugel 12.50 0.13 1.06 106.00 0.617 65.40

0.16 0.16 0.37 0.37 163.40

0.20 0.20 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi 179.742


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

SLOEF 25/50
1.00 0.15 0.20 33.33

14 mm besi utama 4.00 133.33 0.617 82.27

8 mm beugel 33.33 0.15 0.56 124.44 0.395 49.16

0.11 0.11 0.17 0.17 131.42

0.15 0.15 0.20 0.20 dimensi

0.04 0.04 0.03 0.03 over besi 144.564


0.222 0.395 0.617 0.888 1.120 1.580 2.223 2.985

6 8 10 12 14 16 19 22

PONDASI POOR PLAT


P1 3 7 21

2.3 8 18.4
39.4 2

P2 2.8 7 19.6

2.3 8 18.4

38 10

P3 2.4 7 16.8

2.4 7 16.8

33.6 10 336

P4 2.8 5 14

1.9 8 15.2

29.2 6

P5 2.4 5 12

1.9 7 13.3

25.3 0

336 1.120 376.320

1.120

13.44

9,831

1.580

18.96

15442.6688
NO

1 KOLOM 30/30

2 KOLOM PRAKTIS
BALOK 10/10
1.00 0.10 0.10 100.00

12 mm besi utama 4.00 400.00 0.617

6 mm beugel 100.00 0.15 0.26 173.33 0.222

0.06 0.06 0.07 0.07

0.10 0.10 0.10 0.10 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.580 2.223 2.985

25 6 8 10 12 16 19 22

BALOK 13/20
1.00 0.13 0.20 38.46

10 mm besi utama 5.00 192.31 0.617

6 mm beugel 38.46 0.15 0.52 133.33 0.222

0.09 0.09 0.17 0.17

0.13 0.13 0.20 0.20 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.580 2.223 2.985

25 6 8 10 12 16 19 22

BALOK 15/15
1.00 0.13 0.15 51.28

12 mm besi utama 4.00 205.13 0.888

8 mm beugel 51.28 0.15 0.42 143.59 0.222

0.09 0.09 0.12 0.12

0.13 0.13 0.15 0.15 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.580 2.223 2.985

25 6 8 10 12 16 19 22

BALOK 15/25
1.00 0.15 0.25 26.67

14 mm besi utama 7.00 186.67 0.888

8 mm beugel 26.67 0.15 0.66 117.33 0.395

0.11 0.11 0.22 0.22

0.15 0.15 0.25 0.25 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.120 1.580 2.223

25 6 8 10 12 14 16 19

BALOK 25/30
1.00 0.25 0.30 13.33

14 mm besi utama 7.00 93.33 1.120

8 mm beugel 13.33 0.15 0.96 85.33 0.395

0.21 0.21 0.27 0.27

0.25 0.25 0.30 0.30 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.120 1.580 2.223

25 6 8 10 12 14 16 19

BALOK 15/30
1.00 0.25 0.30 13.33

14 mm besi utama 7.00 93.33 0.888

8 mm beugel 13.33 0.15 0.96 85.33 0.395

0.21 0.21 0.27 0.27

0.25 0.25 0.30 0.30 dimensi

kg 0.04 0.04 0.03 0.03 over besi

3.853 0.222 0.395 0.617 0.888 1.120 1.580 2.223

25 6 8 10 12 14 16 19

BALOK 20/20
1.00 0.20 0.20 25.00

14 mm besi utama 7.00 175.00 0.888


8 mm beugel 25.00 0.15 0.66 110.00 0.395

0.16 0.16 0.17 0.17

0.20 0.20 0.20 0.20 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 20/25
1.00 0.20 0.25 20.00

14 mm besi utama 7.00 140.00 0.888

8 mm beugel 20.00 0.15 0.76 101.33 0.395

0.16 0.16 0.22 0.22

0.20 0.20 0.25 0.25 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 20/30
1.00 0.20 0.30 16.67

14 mm besi utama 7.00 116.67 0.888

8 mm beugel 16.67 0.15 0.86 95.56 0.395

0.16 0.16 0.27 0.27

0.20 0.20 0.30 0.30 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 20/40
1.00 0.20 0.40 12.50

14 mm besi utama 7.00 87.50 1.120

8 mm beugel 12.50 0.15 1.06 88.33 0.395

0.16 0.16 0.37 0.37


0.20 0.20 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 30/50
1.00 0.30 0.50 6.67

14 mm besi utama 12.00 80.00 1.120

8 mm beugel 6.67 0.15 1.46 64.89 0.395

0.26 0.26 0.47 0.47

0.30 0.30 0.50 0.50 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 30/60
1.00 0.30 0.60 5.56

14 mm besi utama 12.00 66.67 1.120

8 mm beugel 5.56 0.15 1.66 61.48 0.395

0.26 0.26 0.57 0.57

0.30 0.30 0.60 0.60 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 20/30
1.00 0.20 0.30 16.67

14 mm besi utama 7.00 116.67 0.888

8 mm beugel 16.67 0.15 0.86 95.56 0.395

0.16 0.16 0.27 0.27

0.20 0.20 0.30 0.30 dimensi

0.04 0.04 0.03 0.03 over besi


0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 25/45
1.00 0.25 0.45 8.89

16 mm besi utama 8.00 71.11 1.580

14 mm besi utama 8.00 71.11 1.120

10 mm beugel 8.89 0.13 1.26 89.60 0.617

0.21 0.21 0.42 0.42

0.25 0.25 0.45 0.45 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 25/40
1.00 0.25 0.40 10.00

16 mm besi utama 6.00 60.00 1.580

14 mm besi utama 6.00 60.00 1.120

10 mm beugel 10.00 0.13 1.16 92.80 0.617

0.21 0.21 0.37 0.37

0.25 0.25 0.40 0.40 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 20/25
1.00 0.20 0.25 20.00

16 mm besi utama 8.00 160.00 0.888

14 mm besi utama - 1.120

10 mm beugel 20.00 0.13 0.76 121.60 0.395

0.16 0.16 0.22 0.22

0.20 0.20 0.25 0.25 dimensi


0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19

BALOK 15/20
1.00 0.15 0.20 33.33

14 mm besi utama 4.00 133.33 0.888

14 mm besi utama - - 1.120

10 mm beugel 33.33 0.13 0.56 149.33 0.395

0.11 0.11 0.17 0.17

0.15 0.15 0.20 0.20 dimensi

0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580 2.223

6 8 10 12 14 16 19
KOLOM PRAKTS 13/13
1.00 0.13 0.13 59.17

246.80 12 mm besi utama 4.00 236.69

38.48 6 mm beugel 59.17 0.20 0.38 112.43

285.28 0.09 0.09 0.10 0.10

0.13 0.13 0.13 0.13 dimensi

313.808 kg 0.04 0.04 0.03 0.03 over besi

3.853 4.830 0.222 0.395 0.617 0.888 1.120 1.580

25 28 6 8 10 12 14 16

KOLOM 13/30
1.00 0.13 0.30 25.64

118.65 12 mm besi utama 6.00 153.85

29.60 6 mm beugel 25.64 0.15 0.72 123.08

148.25 0.09 0.09 0.27 0.27

0.13 0.13 0.30 0.30 dimensi

163.079 kg 0.04 0.04 0.03 0.03 over besi

3.853 4.830 0.222 0.395 0.617 0.888 1.120 1.580

25 28 6 8 10 12 14 16

KOLOM 20/30
1.00 0.20 0.30 16.67

182.15 12 mm besi utama 7.00 116.67

31.88 8 mm beugel 16.67 0.20 0.86 71.67

214.03 0.16 0.16 0.27 0.27

0.20 0.20 0.30 0.30 dimensi

235.434 kg 0.04 0.04 0.03 0.03 over besi

3.853 4.830 0.222 0.395 0.617 0.888 1.120 1.580

25 28 6 8 10 12 14 16

KOLOM 20/20
1.00 0.20 0.20 25.00

165.76 12 mm besi utama 8.00 200.00

46.35 8 mm beugel 25.00 0.20 0.66 82.50

212.11 0.16 0.16 0.17 0.17

0.20 0.20 0.20 0.20 dimensi

233.317 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 15/30
1.00 0.15 0.30 22.22

104.53 12 mm besi utama 7.00 155.56

33.71 8 mm beugel 22.22 0.20 0.76 84.44

138.24 0.11 0.11 0.27 0.27

0.15 0.15 0.30 0.30 dimensi

152.064 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 20/40
1.00 0.20 0.40 12.50

82.88 14 mm besi utama 9.00 112.50

33.71 8 mm beugel 12.50 0.20 1.06 66.25

116.59 0.16 0.16 0.37 0.37

0.20 0.20 0.40 0.40 dimensi

128.245 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 20/50
1.00 0.20 0.50 10.00

155.40 14 mm besi utama 10.00 100.00


43.45 8 mm beugel 10.00 0.20 1.26 63.00

198.85 0.16 0.16 0.47 0.47

0.20 0.20 0.50 0.50 dimensi

218.735 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 50/50
1.00 0.50 0.50 4.00

124.32 14 mm besi utama 12.00 48.00

40.03 8 mm beugel 4.00 0.20 1.86 37.20

164.35 0.46 0.46 0.47 0.47

0.50 0.50 0.50 0.50 dimensi

180.781 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 25/25
1.00 0.25 0.25 16.00

103.60 14 mm besi utama 8.00 128.00

37.74 8 mm beugel 16.00 0.20 0.86 68.80

141.34 0.21 0.21 0.22 0.22

0.25 0.25 0.25 0.25 dimensi

155.479 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 25/50
1.00 0.25 0.50 8.00

98.00 14 mm besi utama 12.00 96.00

34.89 10 mm beugel 8.00 0.20 1.36 54.40

132.89 0.21 0.21 0.47 0.47


0.25 0.25 0.50 0.50 dimensi

146.181 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 40/40
1.00 0.40 0.40 6.25

89.60 16 mm besi utama 16.00 100.00

25.63 10 mm beugel 6.25 0.20 1.46 45.62

115.23 0.36 0.36 0.37 0.37

0.40 0.40 0.40 0.40 dimensi

126.754 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 30/40
1.00 0.30 0.40 8.33

74.67 14 mm besi utama 14.00 116.67

24.29 10 mm beugel 8.33 0.20 1.26 52.50

98.95 0.26 0.26 0.37 0.37

0.30 0.30 0.40 0.40 dimensi

108.847 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 30/30
1.00 0.30 0.30 11.11

103.60 14 mm besi utama 8.00 88.89

37.74 10 mm beugel 11.11 0.20 1.06 58.89

141.34 0.26 0.26 0.27 0.27

0.30 0.30 0.30 0.30 dimensi

155.479 kg 0.04 0.04 0.03 0.03 over besi


2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 20/25
1.00 0.20 0.25 20.00

112.36 12 mm besi utama 10.00 200.00

79.64

55.28 8 mm beugel 20.00 0.20 0.76 76.00

247.28 0.16 0.16 0.22 0.22

0.20 0.20 0.25 0.25 dimensi

272.012 kg 0.04 0.04 0.03 0.03 over besi

2.985 3.853 0.222 0.395 0.617 0.888 1.120 1.580

22 25 6 8 10 12 14 16

KOLOM 15/30
1.00 0.15 0.30 22.22

94.80 10 mm besi utama 4.00 88.89

67.20 8 mm beugel 22.22 0.20 0.76 84.44

57.26 0.11 0.11 0.27 0.27

219.26 0.15 0.15 0.30 0.30 dimensi

0.04 0.04 0.03 0.03 over besi

241.183 kg 0.222 0.395 0.617 0.888 1.120 1.580

2.985 3.853 6 8 10 12 14 16

22 25

KOLOM 20/20
1.00 0.20 0.20 25.00

14 mm besi utama 4.00 100.00

142.08 8 mm beugel 25.00 0.20 0.66 82.50

- 0.16 0.16 0.17 0.17

48.03 0.20 0.20 0.20 0.20 dimensi

190.11 0.04 0.04 0.03 0.03 over besi

0.222 0.395 0.617 0.888 1.120 1.580


209.123 kg 6 8 10 12 14 16

2.985 3.853

22 25

118.40

58.99

177.39

195.125 kg
2.985 3.853

22 25
KTS 13/13 RING BALK 15/15
1.00 0.15 0.15

0.617 146.04 12 mm besi utama 4.00

0.222 24.96 8 mm beugel 44.44 0.15 0.46

170.99 0.11 0.11 0.12 0.12

0.15 0.15 0.15 0.15 dimensi

188.093 kg 0.04 0.04 0.03 0.03 over besi

2.223 2.985 3.853 0.222 0.395 0.617 0.888 1.580

19 22 25 6 8 10 12 16

13/30 RING BALK 13/15


1.00 0.13 0.15

0.617 94.92 12 mm besi utama 4.00

0.222 27.32 8 mm beugel 51.28 0.15 0.42

122.25 0.09 0.09 0.12 0.12

0.13 0.13 0.15 0.15 dimensi

134.471 kg 0.04 0.04 0.03 0.03 over besi

2.223 2.985 3.853 0.222 0.395 0.617 0.888 1.580

19 22 25 6 8 10 12 16

20/30 RING BALK 13/10


1.00 0.13 0.10

0.888 103.60 12 mm besi utama 4.00

0.395 28.31 8 mm beugel 76.92 0.15 0.32

131.91 0.09 0.09 0.07 0.07

0.13 0.13 0.10 0.10 dimensi

145.099 kg 0.04 0.04 0.03 0.03 over besi

2.223 2.985 3.853 0.222 0.395 0.617 0.888 1.580

19 22 25 6 8 10 12 16

20/20
0.888 177.60

0.395 32.59

210.19

231.206 kg
2.223 2.985 3.853

19 22 25

15/30

0.888 138.13

0.395 33.36

171.49

188.638 kg
2.223 2.985 3.853

19 22 25

20/40

1.120 126.00

0.395 26.17

152.17

167.386 kg
2.223 2.985 3.853

19 22 25

20/50

1.120 112.00
0.395 24.89

136.89

150.574 kg
2.223 2.985 3.853

19 22 25

50/50

1.120 53.76

0.395 14.69

68.45

75.299 kg
2.223 2.985 3.853

19 22 25

25/25 VOLUME PERTIANG KOLOM

0.617

1.120 143.36 besi 12 21 12.957

0.395 27.18 besi 8 12 7.404

170.54 20.361

187.590 kg
2.223 2.985 3.853

19 22 25

25/50

1.120 107.52

0.395 21.49

129.01
141.909 kg
2.223 2.985 3.853

19 22 25

40/40 #REF! #NAME?

1.580 158.00 #REF!

0.617 28.15

186.15

204.766 kg
2.223 2.985 3.853

19 22 25

30/40 #NAME?

1.580 184.33 #NAME?

0.617 32.39

216.73

238.398 kg
2.223 2.985 3.853

19 22 25

BESI 12 BESI 8 bera

30/30 TINGGI 3.50 18.92

TITIK 8

1.120 99.56

0.617 36.33 T. PJG 28.00

135.89 0

BERAT 24.86 28.59 BERAT 7.47 7.85

149.479 kg ttk 21 600.47 164.79


2.223 2.985 3.853 berat ttl 765.25

19 22 25

20/25

1.120 224.00

0.617 46.89

270.89

297.981 kg
2.223 2.985 3.853

19 22 25

15/30

0.617 54.84

0.395 33.36

88.20

97.020 kg
2.223 2.985 3.853

19 22 25

20/20

0.888 88.80

0.395 32.59

121.39

133.526 kg
2.223 2.985 3.853
19 22 25
G BALK 15/15 PLAT BETON 12 CM
44.44 1.00 1.00

177.78 0.888 157.87 8 mm bawah

136.30 0.395 53.84 8 mm bawah

211.70

232.874 kg
2.223 2.985 3.853 4.830 0.222 0.395 0.617 0.888

19 22 25 28 6 8 10 12

G BALK 13/15 PLAT BETON 10 CM (TANG


51.28 1.00 1.00

205.13 0.617 126.56 10 mm bawah

143.59 0.395 56.72 10 mm bawah

183.28

201.610 kg
2.223 2.985 3.853 4.830 0.222 0.395 0.617 0.888

19 22 25 28 6 8 10 12

G BALK 13/10
76.92 Tulangan Pokok
307.69 0.617 189.85 Luas Lebar Pjg Jarak
164.10 0.395 64.82 8.3333333 1.00 8.3333333 0.1
254.67

280.133 kg
2.223 2.985 3.853 4.830

19 22 25 28

Tulangan Pokok
Luas Lebar Pjg Jarak

8.3333333 1.00 8.3333333 0.1

39200

Tulangan Pokok

Luas Lebar Pjg Jarak

10 1.00 10 0.1
397.32 33.11 245.014
PLAT BETON 12 CM PONDASI PUUR P
0.12 8.33 1.00

7.00 58.33 0.617 35.99

10 mm bawah 3.57

35.99 0.76 0.76 0.32

2.00 0.80 0.80 0.35

79.182 kg 0.04 0.04 0.03

1.580 2.223 2.985 3.853 4.830 0.222 0.395 0.617

16 19 22 25 28 6 8 10

PLAT BETON 10 CM (TANGGA) PONDASI PUUR


0.10 10.00 1.00

7.67 76.67 0.617 47.30

10 mm bawah 4.17

47.30 0.76 0.76 0.27

2.00 0.80 0.80 0.30

104.067 kg 0.04 0.04 0.03

1.580 2.223 2.985 3.853 4.830 0.222 0.395 0.617

16 19 22 25 28 6 8 10

PLAT TANGGA
Tulangan Pokok Tulangan Bagi P. Total
Jarak Pokok
Pjg Jlh Diameter Pjg Jlh Diameter
1.00 84.333333 10 0.15 8.33 11 10 84.333333

PLAT TANGGA LANTAI


Tulangan Pokok Tulangan Bagi P. Total
Pokok
P. Total
Jarak Pokok
Pjg Jlh Diameter Pjg Jlh Diameter
1.00 84.333333 10 0.1 8.33 11 10 84.333333

1.00000 1.00000
30 20

83.3331 66.6666666

27.777 22.2222222

83.331 66.6666666

166.6641 133.3333332

333.3282 133.3333332

131.665 52.667

PLAT TANGGA
Tulangan Pokok Tulangan Bagi P. Total
Jarak Pokok
Pjg Jlh Diameter Pjg Jlh Diameter
1.00 101 10 0.15 10.00 11 10 101
PONDASI PUUR PLAT 100 X 130
0.80 0.35 3.57

0.10 2.16 77.14 0.617 47.60

0.32 47.60

0.35 dimensi 2.00

0.03 over besi 104.714 kg


0.888 1.580 2.223 2.985 3.853 4.830

12 16 19 22 25 28

PONDASI PUUR PLAT 80 X 80


0.80 0.30 4.17

0.10 2.06 85.83 0.617 52.96

0.27 52.96

0.30 dimensi 2.00

0.03 over besi 116.510 kg


0.888 1.580 2.223 2.985 3.853 4.830

12 16 19 22 25 28

P. Total Berat Total Berat Total


Bagi Pokok Bagi

91.666667 52.005556 56.527778

108.53333 217.06667
238.773333

P. Total Berat Total Berat Total


Bagi Pokok Bagi
P. Total Berat Total Berat Total
Bagi Pokok Bagi

91.666667 52.005556 56.527778

108.53333 217.06667
238.773333

P. Total Berat Total Berat Total


Bagi Pokok Bagi

110 62.283333 67.833333

130.11667 260.23333
286.256667

Anda mungkin juga menyukai