Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
Nominal Rp. 534,364.000
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
Nominal
Nominal U$D. 534,364.000
Number.: 009
Sudah Terima Uang Dari :
Sudah Terima Uang Dari :
Terbilang/
Terbilang
Terbilang/
To say
Terbilang
To say LIMA RATUS TIGA PULUH EMPAT RIBU TIGA RATUS ENAM PULUH EMPAT RUP
SATTUANG SE.
SATTUANG SE.
SATTUANG SE.
TO SAYED
( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tujuh Ratus Sembi
( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
KWITANSI No. 1 ( ( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tuju
258,093,160.797
258093161 0
258093160,797 0 0 0
0 MILYAR
KWITANSI No. 2 ( ( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )
234,600,000.000
234600000 0
234600000,000 0 0 0
0 MILYAR
0.000 0
0 0 0
BILLION AND 0 Juta
0
093 0 9 3 Sembilan Puluh Tiga Ribu
093160,797 0
Delapan 0 9 3 Sembilan Puluh
MILLION AND 12 Ribu Ribu
0.000 0
0 0 0
MILLION AND 0 Ribu
0
160 1 6 0 Seratus Enam Puluh
160,797 0
Tiga 1 6 0 Seratus Enam Puluh
THOUSAND AND
000 0 0 0
000,000 0
0 0 0
THOUSAND AND
0 0
0.000 0
0 0 0
THOUSAND AND
0
797 7 9 7 Koma Tujuh Ratus Sembilan Puluh Tujuh
0
7 9 7 Tujuh Ratus Sembilan Puluh Tujuh
7 23
000 0 0 0
0
0 0 0
0 0
000 0 0 0
0
0 0 0
0 0
0
SATUAN
ANGKA
1
2
3
4
5
6
7
8
9
PULUHAN
ANGKA
1
2
3
4
5
6
7
8
9
BELASAN
ANGKA
10
11
12
13
14
15
16
17
18
19
Koma KOMMA
Rupiah Rupiah ) DOLAR
Satu Satu ONE
Dua Dua TWO
Tiga Tiga THREE
Empat Empat FOUR
Lima Lima FIVE
Enam Enam SIX
Tujuh Tujuh SEVEN
Delapan Delapan EIGHT
Sembilan Sembilan NINE
DIBULATKAN Rp 258,093,160.80
TERBILANG : ( Dua Ratus Lima Puluh Delapan Juta Sembilan Puluh Tiga Ribu Seratus Enam Puluh Koma Tujuh Ratus Sembilan Puluh Tuj
DIBULATKAN Rp 234,600,000.00
TERBILANG : ( Dua Ratus Tiga Puluh Empat Juta Enam Ratus Ribu Rupiah )
a b c d e f
A PEKERJAAN PENDAHULUAN / PERSIAPAN
1 Pembuatan Direksi keets / bangsal kerja Ls 1.00 Rp 1,500,000.00 Rp 1,500,000.00
2 Pengukuran dan pemasangan bouwplank M1 80.00 Rp 29,400.00 Rp 2,352,000.00
3 Administrasi, dokumentasi dan pelaporan Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 4,852,000.00
B PEKERJAAN BETON
1 PEKERJAAN PONDASI
a. Pek. Bekisting M2 7.44 Rp 136,052.60 Rp 1,012,231.34
b. Pek. Pembesian U24 Kg 136.13 Rp 13,985.00 Rp 1,903,845.32
c. Pek. Pondasi poer plat, Beton K-250 M3 2.40 Rp 984,892.00 Rp 2,363,740.80
d. Pek. Lantai kerja t. 6cm M3 0.18 Rp 686,128.60 Rp 123,503.15
2 PEKERJAAN KOLOM
a. Pek. Bekisting M2 22.93 Rp 136,052.60 Rp 3,119,958.22
b. Pek. Pembesian U24 Kg 427.58 Rp 13,985.00 Rp 5,979,720.29
c. Pek. Kolom K1 uk. 25x25 cm, Beton K-250 M3 6.62 Rp 984,892.00 Rp 6,515,060.58
e. Pek. Kolom praktis M1 56.70 Rp 60,145.00 Rp 3,410,221.50
3 PEKERJAAN KOLOM TAMBAHAN (ATAS TERAS)
a. Pek. Bekisting M2 3.96 Rp 136,052.60 Rp 538,768.30
b. Pek. Pembesian U24 Kg 148.61 Rp 13,985.00 Rp 2,078,268.28
c. Pek. Kolom teras uk. 20x50 cm, Beton K-250 M3 0.91 Rp 984,892.00 Rp 894,281.94
d. Pek. Kolom praktis M1 5.60 Rp 60,145.00 Rp 336,812.00
4 PEKERJAAN BALOK TAMBAHAN DI ATAS TERAS
a. Pek. Bekisting M2 7.20 Rp 136,052.60 Rp 979,578.72
b. Pek. Pembesian U24 Kg 75.00 Rp 13,985.00 Rp 1,048,864.26
c. Pek. Balok uk. 20x30 cm, Beton K-250 M3 0.36 Rp 984,892.00 Rp 354,561.12
5 PEKERJAAN DAK BETON
a. Pek. Bekisting M2 21.45 Rp 152,052.60 Rp 3,261,528.27
b. Pek. Pembesian U24 Kg 316.29 Rp 13,985.00 Rp 4,423,292.57
c. Pek. Dak beton T = 10 cm, Beton K-250 M3 3.54 Rp 984,892.00 Rp 3,482,578.11
6 PEKERJAAN PLAT KANOPI BETON
a. Pek. Bekisting M2 2.25 Rp 152,052.60 Rp 341,966.30
b. Pek. Pembesian U24 Kg 181.25 Rp 13,985.00 Rp 2,534,753.28
c. Pek. Plat kanopi beton T = 5 cm, Beton K-250 M3 1.73 Rp 984,892.00 Rp 1,703,863.16
7 PEKERJAAN RINGBALOK DAN BALOK LATEI
a. Pek. Ring balok praktis uk; 10x15 cm M1 196.00 Rp 79,690.00 Rp 15,619,240.00
b. Pek. Ring balok atap uk; 10x15 cm M1 65.00 Rp 79,690.00 Rp 5,179,850.00
c. Pek. Balok latei uk. 10x15 cm M1 78.00 Rp 79,690.00 Rp 6,215,820.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 73,422,307.50
C PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK
1 Pas. Lantai granit, uk. 50x50 cm M2 91.00 Rp 120,052.00 Rp 10,924,732.00
2 Pas. Dinding keramik toilet, 30x60 cm M2 10.44 Rp 194,996.80 Rp 2,035,766.59
3 Pas. Lantai anti slip toilet, 30x30cm M2 2.50 Rp 175,266.40 Rp 438,166.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 13,398,664.59
D PEKERJAAN DINDING BATU BATA DAN PLESTERAN
1 Pek. Pasangan dinding bata ringan, 1Pc : 5Psr M2 383.03 Rp 73,677.60 Rp 28,220,362.74
2 Pek. Plesteran dinding, 1Pc : 5 Psr M2 755.61 Rp 45,915.36 Rp 34,694,105.17
3 Pek. Plesteran beton t = 15 mm, 1PC : 2 Psr M2 26.11 Rp 51,895.68 Rp 1,354,996.20
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 64,269,464.11
E PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND
1 Pek. Rangka plafond, hollow galvalum MB 2x4, 4x4 cm M2 91.00 Rp 128,250.00 Rp 11,670,750.00
2 Pek. Pasangan penutup plafond gypsumboard 9 mm M2 91.00 Rp 65,930.00 Rp 5,999,630.00
3 Pek. List plafond profil M1 86.60 Rp 25,500.00 Rp 2,208,300.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 19,878,680.00
F PEKERJAAN KUSEN, PINTU, JENDELA, KACA, DAN ALAT PENGGANTUNG
1 PEKERJAAN KUSEN DAN BINGKAI PINTU / JENDELA ALUMINIUM
a. Pek. Kusen pintu / jendela / ventilasi aluminium standart M1 242.30 Rp 77,510.00 Rp 18,780,673.00
b. Pek. Jendela aluminium standar M1 7.80 Rp 1,186,060.00 Rp 9,251,268.00
c. Pas. Kaca bening t = 5 mm (jendela/ventilasi) M2 157.20 Rp 153,550.00 Rp 24,138,060.00
3 PEKERJAAN PINTU
a. Pas. Pintu double multipleks 6 mm Lapis HPL ex. Taco M2 5.71 Rp 391,101.30 Rp 2,232,562.68
b. Pek. Lapis HPL pintu multipleks, ex. Taco M2 5.71 #NAME? #NAME?
c. Pas. Pintu + kusen Aluminium Toilet ex. Fortuna Bh 5.00 Rp 355,000.00 Rp 1,775,000.00
4 PASANGAN ENGSEL
a. Pasangan engsel kupu-kupu, pintu, Ex. Stainless Stell Bh 21.00 Rp 41,050.00 Rp 862,050.00
b. Pasangan engsel kupu-kupu, jendela, Ex. Stainless Stell Bh 6.00 Rp 28,700.00 Rp 172,200.00
5 PASANGAN KUNCI PINTU
a. Pasangan Kunci pintu stainless stell, ex. Gradino Bh 7.00 Rp 225,700.00 Rp 1,579,900.00
6 PASANGAN GRENDEL, HANDLE DAN HAK ANGIN
a. Pasangan Grendel pintu tanam Bh 2.00 Rp 33,400.00 Rp 66,800.00
b. Pasangan Grendel jendela Psg 6.00 Rp 33,400.00 Rp 200,400.00
d. Pasang Hak angin Psg 6.00 Rp 31,050.00 Rp 186,300.00
Sub Total (Dipindahkan Ke Rekapitulasi) #NAME?
G PEKERJAAN RANGKA KAP DAN PENUTUP ATAP
1 Pek. Konstruksi rangka baja ringan zincalume M2 422.32 Rp 97,490.00 Rp 41,171,976.80
2 Pas. Atap Spandek M2 422.32 Rp 63,850.00 Rp 26,965,132.00
3 Pek. Listplank papan semen, ex. Calsiplank, lebar = 30 cm M1 93.40 Rp 99,700.00 Rp 9,311,980.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 77,449,088.80
H PEKERJAAAN INSTALASI LISTRIK
1 Pas. Instalasi titik lampu Ttk 16.00 Rp 300,000.00 Rp 4,800,000.00
2 Pas. Lampu Downlight LED 20 watt Bh 15.00 Rp 58,000.00 Rp 870,000.00
3 Pas. Fitting down light Bh 15.00 Rp 32,500.00 Rp 487,500.00
4 Lampu TL LED 10 watt Bh 1.00 Rp 38,500.00 Rp 38,500.00
5 Saklar ganda ex. Panasonic Bh 7.00 Rp 32,500.00 Rp 227,500.00
6 Saklar tunggal ex. Panasonic Bh 2.00 Rp 27,000.00 Rp 54,000.00
7 Stop Kontak ex. Panasonic Bh 10.00 Rp 24,000.00 Rp 240,000.00
8 Kabel twestek 2 x 10 mm Roll 1.00 Rp 750,000.00 Rp 750,000.00
9 Kabel NYA 2.5 mm Roll 1.00 Rp 170,000.00 Rp 170,000.00
10 MCB 10 Ampere Bh 1.00 Rp 240,000.00 Rp 240,000.00
11 Pipa listrik 1/2 inchi, Ex Clipsal Btg 19.00 Rp 8,000.00 Rp 152,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 8,029,500.00
I PEKERJAAN SANITASI
1 Memasang pipa PVC 1/2 '' AW untuk air bersih M1 16.00 Rp 16,890.00 Rp 270,240.00
2 Memasang pipa PVC 2 " AW untuk air kotor M1 4.00 Rp 64,895.00 Rp 259,580.00
3 Memasang pipa PVC 4 '' AW untuk limbah padat M1 8.00 Rp 140,380.00 Rp 1,123,040.00
5 Pas. Kran air 1/2 " Bh 1.00 Rp 65,825.00 Rp 65,825.00
6 Pas. Kloset jongkok Set 1.00 Rp 379,120.00 Rp 379,120.00
7 Pas. Urinoir Set 2.00 Rp 764,120.00 Rp 1,528,240.00
8 Pas. Wastafel Set 2.00 Rp 630,120.00 Rp 1,260,240.00
9 Pas. Kran air wastafel 1/2" Set 2.00 Rp 115,825.00 Rp 231,650.00
10 Pas. Floor drain (FD) Bh 7.00 Rp 35,700.00 Rp 249,900.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 5,367,835.00
J PEKERJAAN RAILING BESI HOLLOW & TANGGA BESI
1 Pas. Railing besi hollow balkon lantai 2 M1 21.00 Rp 545,315.40 Rp 11,451,623.40
2 Pas. Railing besi hollow lantai 2 (tangga dalam) M1 4.00 Rp 545,315.40 Rp 2,181,261.60
3 Pas. Tangga besi M1 6.00 Rp 950,000.00 Rp 5,700,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 19,332,885.00
K PEKERJAAN FINISHING DAN LAIN-LAIN
1 Pekerjaan Pengecatan
a. Cat dinding tembok, ex. Vinitex atau setara M2 781.72 Rp 11,818.38 Rp 9,238,664.01
b. Cat dinding / beton Weather Shield Exterior (anti lumut) M2 94.50 Rp 63,084.62 Rp 5,961,496.15
c. Cat langit-langit plafond, ex. Vinitex atau setara M3 91.00 Rp 16,816.08 Rp 1,530,263.28
d. Cat Kilap listplank (ex. Avian atau setara) M2 28.02 Rp 44,325.91 Rp 1,242,012.00
e. Cat Kilap besi railing (ex. Avian atau setara) M2 42.00 Rp 54,324.81 Rp 2,281,642.02
2 Pekerjaan Pembersihan akhir Ls 1.00 Rp 1,000,000.00 Rp 1,000,000.00
Sub Total (Dipindahkan Ke Rekapitulasi) Rp 21,254,077.47
RENCANA ANGGARAN BIAYA
TOTAL
DIBULATKAN
Tanah Pasir Semen Pasir
timbunan
Batu kali Pasir urug
pasang
Besi 12
@50 kg kasar
M3 M3 M3 M3 zak M3 btg
90
0.38
117.04 6.03
0.61 3.15
###
Rp 10,720,433.99
0.90 3.00 23.40
lt.1 lt.2
2.03 38.25 4.25 18.52
50 0.27 1.248
17.1 1.5 50 0.46 4.77
16.05 20.4 6 7.05 50 0.47 2.55
120.735
152.16 38.04
16.2
169.8
169.8
184 84.6 63.70 0.04
241.1 0.03
223.75
66.5 27.70833
67.2 0.7
8.65
40.00 20.03
29.17 20.46
29.17 14.62
10.83 5.45
53.75
567
150.00
513.00
16238.43
1395.45
2.92
66.51
158.55
98.3 64.6 69.2 17633.9
### 0.0 567.0 150.0 513.0 0.0 0.0 0.0 2.9 66.5 158.6
Floor
paku Atap Seng plat
balok balok paku listplank Kran air Klosed drain
campur paku 12 seng 7 lebar 30 Pipa 1/2" Pipa 2" Pipa 4"
8/12 6/12 seng papan 1/2" jongkok (saringan
5-7 kaki cm
kg btg btg kg lbr kg lbr m1 m1 m1 m1 m1 air m1
kotor)
89.55
64.97
235.939
33.00
23.00
20.51
0.0 89.6 65.0 0.0 235.9 56.0 0.0 20.5 0.0 0.0 0.0 0.0 0.0 0.0
cat
cincin Ø tembok cat plamir
Sock drat cat
80 cm, plat beton dasar tembok dinding
dalam tembok cat kilap
sambunga sambunga sambunga tinggi 60 tembok eksterior dalam ex.
1/2" (dari penutup interior ex. kayu ex. thiner (isi
n pipa L n pipa L n pipa L lem pipa seal tape cm dinding anti lumut TR 30 (isi
pipa ke (untuk cincin Ø Propan avian atau 1 liter)
1/2" 2" 4" luar warna ex. No 20 kg /
kran air septiktan 80 cm kgex.
putih dropkgatau kg
zak) atau
atau
kg setara
kg kg
1/2") k) setara
Aries atau setara setara
setara
0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
cat meny
kayu
kg
0.0
ANALISA HARGA SATUAN
A. PEKERJAAN PENDAHULUAN/PERSIAPAN
1 Analisa SNI-2013 1 M3 Membuat rabat beton dan lantai kerja,1 Pc: 3 Ps: 5 Kr
BAHAN
184.0000 Kg Semen portland @ Rp 1,320.00 Rp 242,880.00
0.5422 M3 Pasir beton @ Rp 120,000.00 Rp 65,065.80
0.6466 M3 Koral beton (Split 2.3) @ Rp 240,000.00 Rp 155,182.80
170.0000 Ltr Air @ Rp 700.00 Rp 119,000.00
TENAGA
0.2000 Oh Tukang batu @ Rp 100,000.00 Rp 20,000.00
1.2000 Oh Pekerja @ Rp 70,000.00 Rp 84,000.00
Sub Total Rp 686,128.60
Overhead + Profit 0 % Rp -
Total Rp 686,128.60
10 Analisa SNI-2013 1M3 Membuat beton mutu, f'c=21,7 Mpa (K250) kedap air, slump (12±2) cm, w/c=0,56
BAHAN
384.0000 Kg Semen Portland @ Rp 1,320.00 Rp 506,880.00
0.6150 M3 Pasir Beton @ Rp 120,000.00 Rp 73,800.00
0.4613 M3 Batu Pecah 2-3 cm @ Rp 240,000.00 Rp 110,712.00
215.0000 Ltr Air @ Rp 700.00 Rp 150,500.00
TENAGA
1.6500 Oh Pekerja @ Rp 70,000.00 Rp 115,500.00
0.2750 Oh Tukang Batu @ Rp 100,000.00 Rp 27,500.00
Sub Total Rp 984,892.00
Overhead + Profit 0 % Rp -
Total Rp 984,892.00
15 Analisa SNI-2013 1M3 Membuat tangga beton bertulang (200 Kg besi + bekisting)
BAHAN
0.2500 M3 Kayu terentang Kls III @ Rp 1,000,000.00 Rp 250,000.00
3.0000 Kg Paku 2" - 5" @ Rp 20,000.00 Rp 60,000.00
1.2000 Ltr Minyak bekisting @ Rp 12,763.00 Rp 15,315.60
200.0000 Kg Besi beton polos @ Rp 12,000.00 Rp 2,400,000.00
3.0000 Kg Kawat beton @ Rp 13,000.00 Rp 39,000.00
323.0000 Kg Semen portland @ Rp 1,320.00 Rp 426,360.00
0.5200 M3 Pasir beton @ Rp 120,000.00 Rp 62,400.00
0.7800 M3 Koral beton @ Rp 240,000.00 Rp 187,200.00
0.1050 M3 Kayu borneo balok @ Rp 1,500,000.00 Rp 157,500.00
2.5000 Lbr Multipleks 6 mm @ Rp 58,000.00 Rp 145,000.00
14.0000 Btg Dolken dia 8 - 10 Cm/4 m @ Rp 4,000.00 Rp 56,000.00
TENAGA
5.6000 OH Pekerja @ Rp 70,000.00 Rp 392,000.00
0.3500 OH Tukang Batu @ Rp 100,000.00 Rp 35,000.00
2.3000 OH Tukang Kayu @ Rp 100,000.00 Rp 230,000.00
1.4000 OH Tukang Besi @ Rp 100,000.00 Rp 140,000.00
Sub Total Rp 4,595,775.60
Overhead + Profit 0 % Rp -
Total Rp 4,595,775.60
17 Analisa SNI-2013 1 M1 Pemancangan Kayu Besi dia 18 cm
BAHAN
1.0000 M1 Kayu Besi dia 16 cm @ Rp 45,500.00 Rp 45,500.00
1.0000 Ls Alat pancang @ Rp 10,000.00 Rp 10,000.00
TENAGA
0.7200 OH Pekerja @ Rp 70,000.00 Rp 50,400.00
0.1250 OH Tukang Pancang @ Rp 100,000.00 Rp 12,500.00
Sub Total Rp 118,400.00
Overhead + Profit 0 % Rp -
Total Rp 118,400.00
E. PEKERJAAN PENUTUP LANTAI DAN DINDING KERAMIK
TENAGA
0.1500 Oh Pekerja @ Rp 70,000.00 Rp 10,500.00
0.2500 Oh Tukang @ Rp 100,000.00 Rp 25,000.00
0.0250 Oh Kepala Tukang @ Rp - Rp -
0.0750 Oh Mandor @ Rp - Rp -
Total B Rp 35,500.00
Sub Total Rp 64,500.00
Overhead + Profit 0 % Rp -
Total Rp 64,500.00
Jadi, 1 M2 Pek. Plafond Rangka kayu 5/7 = A + B Total Rp 64,500.00
3 Analisa SNI-2013 1M1 Pasang Lisplant ukuran (1 x 30) cm, Ex. Calsiplank
BAHAN
1.1000 M1 Calsiplank @ 65,000.00 Rp 71,500.00
0.0600 Kg Paku 2" - 5" @ 20,000.00 Rp 1,200.00
TENAGA
0.1000 OH Pekerja @ 70,000.00 Rp 7,000.00
0.2000 OH Tukang Kayu @ 100,000.00 Rp 20,000.00
Sub Total Rp 99,700.00
Overhead + Profit 0 % Rp -
Total Rp 99,700.00
TENAGA
0.3600 OH Tukang Besi @ Rp 100,000.00 Rp 36,000.00
0.2000 OH Pekerja @ Rp 70,000.00 Rp 14,000.00
Sub Total Rp 97,490.00
Overhead + Profit 0 % Rp -
Rp 97,490.00
6 Analisa SNI-2013 1 M3 Pek. Gording 6 x 12 cm Kayu Kelas II
BAHAN
1.1000 M3 Balok 6/12 cm @ Rp 1,500,000.00 Rp 1,650,000.00
15.0000 Kg Besi strip tebal 5 mm @ Rp 20,000.00 Rp 300,000.00
3.0000 Kg Paku 12 cm @ Rp 20,000.00 Rp 60,000.00
TENAGA
20.1000 Oh Tukang Kayu @ Rp 100,000.00 Rp 2,010,000.00
2.0100 Oh Kepala Tukang @ Rp - Rp -
6.7000 Oh Pekerja @ Rp 70,000.00 Rp 469,000.00
0.3350 Oh Mandor @ Rp - Rp -
Sub Total Rp 4,489,000.00
Overhead + Profit 0 % Rp -
Total Rp 4,489,000.00
TENAGA
0.400 Oh Tukang Kayu Rp 100,000.00 Rp 40,000.00
0.025 Oh Kepala Tukang Rp - Rp -
0.040 Oh Pekerja Rp 70,000.00 Rp 2,800.00
0.001 Oh Mandor Rp - Rp -
Rp 87,825.00
J. PEKERJAAAN BESI HOLLOW
6 Analisa SNI-2013 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
BAHAN
0.3500 Ltr Residu/Ter @ Rp 10,000.00 Rp 3,500.00
TENAGA
0.1000 OH Pekerja @ Rp 70,000.00 Rp 7,000.00
0.0060 OH Mandor @ Rp - Rp -
Sub Total Rp 10,500.00
Overhead + Profit 0 % Rp -
Total Rp 10,500.00
1 2 3 4
1 Mandor OH Rp -
2 Kepala tukang OH Rp -
1 Tukang Listrik OH Rp 100,000.00
2 Tukang kayu OH Rp 100,000.00
3 Tukang batu OH Rp 100,000.00
4 Tukang besi OH Rp 100,000.00
5 Tukang Cat OH Rp 100,000.00
6 Tukang Plafond OH Rp 100,000.00
7 Tukang Partisi OH Rp 100,000.00
8 Tukang Aluminium OH Rp 100,000.00
9 Pekerja OH Rp 70,000.00
A. BAHAN DASAR
1 Tanah urug M3 Rp 20,000.00
2 Pasir urug M3 Rp 80,000.00
3 Pasir pasangan M3 Rp 120,000.00
4 Pasir beton M3 Rp 120,000.00
5 Batu belah gunung M3 Rp 150,000.00
6 Batu bata Bh Rp 350.00
7 Beton roster/kerawang 15 x 25 cm (abu-abu) Bh Rp 15,000.00
8 Koral beton/Split 2.3 cm M3 Rp 240,000.00
9 Koral beton/Split 1.2 cm M3 Rp 240,000.00
10 Semen Portland Kg Rp 1,320.00
11 Semen warna Kg Rp 1,320.00
12 Semen putih Kg Rp 1,500.00
B. BAHAN LANTAI
1 Tegel Keramik 40x40 cm, Bh Rp 11,666.67
3 Tegel keramik warna 20x25 cm Bh Rp 3,500.00
4 Tegel keramik warna 20x20 cm anti slip Bh Rp 2,800.00
5 Dinding keramik 20x40 cm motif batu alam M2 Rp 5,833.33
6 Kuku keramik M1 Rp 10,000.00
C. BAHAN KAYU
1 Dolken kayu dia 8 - 12 cm Btg. Rp 4,000.00
2 Papan Kayu kelas I M3 Rp 2,500,000.00
3 Balok Kayu Kelas I M3 Rp 2,500,000.00
4 Papan kayu Kelas II M3 Rp 1,500,000.00
5 Balok Kayu Kelas II M3 Rp 1,500,000.00
6 Papan kayu Kelas III M3 Rp 1,200,000.00
7 Balok Kayu Kelas III M3 Rp 1,200,000.00
8 Papan/balok kayu meranti kelas IV (bekisting) M3 Rp 1,000,000.00
D. BAHAN LANGIT-LANGIT
1 List profil kayu 5x5cm M1 Rp 16,000.00
2 List profil kayu 3x3cm M1 Rp 11,000.00
3 Tripleks 122 x 244 x 3 mm Lbr Rp 45,000.00
E. BAHAN ATAP
1 Atap Spandek P. 170 cm Lbr Rp 55,000.00
2 Seng gelombang bjls 28 kk Rp 6,500.00
3 Nok Metal spandek Lbr Rp 23,000.00
Page 58 HARGA
4 Papan Lisplank Semen, Ex. Calsiplank M1 Rp 65,000.00
5 Seng plat bjls 30 M1 Rp 16,000.00
Page 59 HARGA
F. BAHAN BESI
1 Kawat beton Kg Rp 13,000.00
2 Besi Beton polos Kg Rp 12,000.00
4 Paku biasa 2"-5" Kg Rp 20,000.00
5 Paku Genteng Metal Kg Rp 25,000.00
6 Paku tripleks Kg Rp 25,000.00
7 Paku Gypsumboard Kg Rp 27,000.00
8 Paku sekrup Kg Rp 25,000.00
9 Paku seng Kg Rp 35,000.00
10 Besi strip buah Rp 20,000.00
11 Besi Teralis Minimalis Dia. 12 mm M1 Rp 14,500.00
12 Besi Hollow 2 x 4 cm M1 Rp 23,000.00
13 Hollow aluminium 2,5x3,8 cm M1 Rp 26,000.00
14 Besi Hollow 4 x 4 cm M1 Rp 55,000.00
15 Besi Hollow 2 x 4 cm M1 Rp 50,000.00
16 Baut Angker Btg. Rp 8,000.00
17 Baut dia. 16 buah Rp 15,000.00
G. BAHAN CAT
1 Plamur tembok Kg. Rp 8,000.00
2 Plamir kayu Kg. Rp 15,000.00
3 Dempul Kayu Kg Rp 17,000.00
4 Cat kilap kayu setara glotex Kg Rp 37,800.00
Cat kilap kayu setara avian Kg Rp 42,000.00
5 Cat dasar/kayu/tembok Kg Rp 22,000.00
6 Cat Vernis Kayu Standart Kg Rp 35,000.00
7 Cat tembok ex. Vinitex atau setara Kg Rp 12,763.00
8 Cat Weather Shield Exterior (anti lumut) ex. SICA Kg Rp 153,846.15
9 Cat kayu kilap standart ex. Avian Kg Rp 55,539.00
10 Cat besi Kg Rp 55,539.00
11 Cat Politur Kg Rp 41,654.25
12 Residu/Ter Liter Rp 10,000.00
13 Minyak cat Ltr Rp 22,200.00
14 Kalsium Kg.
15 Lem fox/ lem kayu Kg. Rp 19,700.00
16 Kuas biasa 3 cm Bh. Rp 6,006.00
17 Kuas biasa 4" Bh. Rp 24,684.00
18 Kuas biasa 5 cm Bh. Rp 24,684.00
19 Kuas Roll Bh. Rp 43,197.00
20 Ampelas halus Lbr Rp 6,006.00
21 Ampelas kasar Lbr Rp 6,757.00
22 Meni besi Kg Rp 37,800.00
23 Meni kayu Kg Rp 18,000.00
24 Minyak bekisting ltr Rp 10,000.00
25 Isolasi Gypsum Roll Rp 34,500.00
26 Screws / Sekrup kalsiboard Bh. Rp 200.00
27 Minyak bekisting Ltr Rp 12,763.00
I BAHAN INSTALASI LISTRIK
1 Box Tanam type RM untuk TL 2 x 20 Watt Unit Rp 150,000.00
2 Down Light 3 Inchi ex.Philips Bh Rp 58,000.00
3 Lampu TL 18 watt Bh Rp 38,500.00
4 Saklar ganda Ex. Panasonic Bh Rp 32,500.00
5 Saklar tunggal Ex. Panasonic Bh Rp 27,000.00
6 Stop Kontak Ex. Panasonic Bh Rp 24,000.00
7 MCB 10 A 1 o Merlin Gering Bh Rp 240,000.00
8 Box MCB 10 A Bh Rp 15,000.00
9 Kabel NYA 2.5 mm (100m) roll Rp 170,000.00
10 Kabel Twestek 2 x 10 mm (100m) roll Rp 750,000.00
Page 60 HARGA
11 Pipa listrik 5/8 inchi, Ex Clipsal Btg Rp 8,000.00
12 Kee nee Bh Rp 3,500.00
13 Inbow Dos Bh Rp 6,000.00
14 Las DOP Bh Rp 3,000.00
15 Isolasi Listrik, Ex. Unibell Bh Rp 12,000.00
16 Klem kabel No 10 Bh Rp 150.00
17 Tee Doz 5/8 ex. Clipsal Bh Rp 7,500.00
18 Besi Penggantung Lampu Bh Rp 75,000.00
J BAHAN SANITER
1 Kloset Jongkok Bh. Rp 150,000.00
2 Wastafel ex. American standar Bh. Rp 350,000.00
3 Urinoir Bh. Rp 450,000.00
5 Floor drain Bh. Rp 25,000.00
6 Bak Mandi Fiberglass Bh. Rp 275,000.00
7 Kran air dia 1/2" Stainless Bh. Rp 25,000.00
8 Kran Air Wastafel 1/2 " Bh. Rp 75,000.00
9 Seal tape Bh. Rp 5,000.00
12 Pipa PVC Æ 3/4 '' AW M1 Rp 5,400.00
13 Pipa PVC Æ 1/2 ' AW' M1 Rp 12,300.00
14 Pipa PVC Æ 2 '' AW M1 Rp 29,500.00
15 Pipa PVC Æ 4 '' AW M1 Rp 78,200.00
K BAHAN PINTU DAN JENDELA
1 Pintu + kusen Aluminium Toilet ex. Fortuna BH Rp 355,000.00
2 Pintu Rooling door (one sheet) + assesoris lengkap, uk. 210x2,40 cm Unit Rp 66,752.00
3 Rangka Daun Pintu Aluminium M1 Rp 66,752.00
4 Bingkai Jendela Alumiium Architrave M1 Rp 1,100,000.00
5 Kaca bening 5 mm M2 Rp 125,000.00
6 Silicon Sealant kaca/Karet Kaca M1 Rp 7,500.00
7 Silicon Sielent Tembok BH Rp 9,000.00
8 Kusen Aluminium 3" M1 Rp 59,500.00
9 Jalusi aluminium M2 Rp 185,250.00
10 Door Stoper Kent 021 BH Rp 270,000.00
11 Handel Pintu Aluminium ex. Gradino Psg Rp 585,000.00
12 Skrup fixer BH Rp 2,000.00
13 Lem HPL / Wallpaper Kg Rp 42,500.00
14 List Profil Dinding M1 Rp 47,916.67
H. BAHAN PENGGANTUNG
1 Kunci tanam biasa Bh. Rp 175,000.00
2 Kunci tanam Putar Bulat KW1 ut kamar mandi Bh. Rp 185,130.00
3 Grendel Jendela biasa psg Rp 12,000.00
4 Grendel Pintu Tanam (Untuk pintu 2 Daun) psg Rp 55,000.00
5 Engsel Pintu Bh. Rp 25,000.00
6 Engsel jendela Standart Bh. Rp 18,000.00
7 Kait angin Bh. Rp 15,000.00
8 Door closer pintu ex. Gradino Bh. Rp 481,950.00
Page 61 HARGA
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
NO. URAIAN PEKERJAAN
TYPE Panjang Lebar Tinggi Kuantitas Luas Tebal Volume
1 2 3 4 5 6 7 8 9
1.1 Pek. Galian Tanah Pondasi menerus 87.50 0.80 0.40 28.00
28.00
1.2 Pek. Galian Tanah Pondasi talud 8.00 1.00 0.50 4.00
4.00
32.00
2.63
5 Pek. Pas. Dinding Trasram (Tinggi 30 cm) 1:2 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
75.50 0.30 22.65
22.65
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
PJ 1.30 0.30 1.00 0.39
0.00
P1 0.90 0.30 1.00 0.27
P2 0.85 0.30 5.00 1.28
P3 0.70 0.30 2.00 0.42
P4 1.20 0.30 1.00 0.36
2.72
5 Pek. Pas. Dinding Trasram Toilet (Tinggi 160 cm) 1:2 Volume keseluruhan (sebelum dikurangi bukaan) …………………….(a)
1.20 0.00
0.00
Bukaan (kusen jendela, pintu dan lain-lain) ……………………………..(b)
0.00
0.00
Jumlah total (a - b) 0.00
9 0.00
9.00
-9.00
-0.45
-9.45
1 #NAME? 0.00
0.00
0.00
#NAME? 0.00
0.00
0.00
2 #NAME? 0.00
#NAME? 0.00
0.00
2 PEKERJAAN KOLOM
Pek. Kolom teras (KT) 15/30 cm 0.00
0.00
0.00
5 #NAME?
#NAME? 0.00
#NAME? 0.00
#NAME? 0.00
#NAME? 0.00
0.00
6 #NAME? 0.00
Pek. Plat kanopi teras T = 10 cm 0.00
0.00
0.00
7 Pek. Lantai kerja Pondasi poor plat, Beton tumbuk, 1Pc:3Kr:5Psr 0.00
0.00
11 #NAME? 0.00
0.00
12 #NAME? 0.00
g #NAME? 0.00
0.00
0.00
0.00
h #NAME? 0.00
0.00
0.00
0.00
4 #NAME? 0.00
0.00
0.00
0.00
6 #NAME? 0.00
0.00
0.00
IX PEKERJAAN PENGGANTUNG / PENGUNCI
3 Pas. Engsel Pintu 0.00
0.00
0.00
0.00
0.00
10
Menerus
B. Utama
B. Utama
Carport
Pondasi Menerus
Lantai bawah
kuda2 bata
10 %
Utama
Toilet
Kurang
10%
10%
10%
PERHITUNGAN VOLUME
1 2 3 6 9 7
1 PEKERJAAN KOLOM
Pek. Kolom teras (KT) 15/30 cm besi 10 14.00 6.00 84.00 12.00
besi 6 (beugel) 1.1 94.33 103.77 12.00
b Pek. Balok tengah/latei uk. 10x15 cm besi 8 32.50 4.00 130.00 12.00
besi 6 (beugel) 0.4 163.50 65.40 12.00
REKAPITULASI
BESI 6
BESI 8
BESI 10
BESI 12
BESI 14
jumlah berat KETERANGAN
jumlah (batang) berat besi /m1
(kg)
8 10
74.86
254.89
REKAPITULASI
49.18 BATANG
64.58 BATANG
105.33 BATANG
0.00 BATANG
BATANG
SLOEF 15/20
1.00 0.20 0.40 12.50
6 8 10 12 14 16 19 22
SLOEF 15/30
1.00 0.15 0.30 22.22
6 8 10 12 14 16 19 22
SLOEF 15/40
1.00 0.15 0.40 16.67
6 8 10 12 14 16 19 22
SLOEF 20/25
1.00 0.20 0.25 20.00
6 8 10 12 14 16 19 22
SLOEF 20/40
1.00 0.20 0.40 12.50
6 8 10 12 14 16 19 22
SLOEF 25/50
1.00 0.15 0.20 33.33
6 8 10 12 14 16 19 22
2.3 8 18.4
39.4 2
P2 2.8 7 19.6
2.3 8 18.4
38 10
P3 2.4 7 16.8
2.4 7 16.8
33.6 10 336
P4 2.8 5 14
1.9 8 15.2
29.2 6
P5 2.4 5 12
1.9 7 13.3
25.3 0
1.120
13.44
9,831
1.580
18.96
15442.6688
NO
1 KOLOM 30/30
2 KOLOM PRAKTIS
BALOK 10/10
1.00 0.10 0.10 100.00
25 6 8 10 12 16 19 22
BALOK 13/20
1.00 0.13 0.20 38.46
25 6 8 10 12 16 19 22
BALOK 15/15
1.00 0.13 0.15 51.28
25 6 8 10 12 16 19 22
BALOK 15/25
1.00 0.15 0.25 26.67
25 6 8 10 12 14 16 19
BALOK 25/30
1.00 0.25 0.30 13.33
25 6 8 10 12 14 16 19
BALOK 15/30
1.00 0.25 0.30 13.33
25 6 8 10 12 14 16 19
BALOK 20/20
1.00 0.20 0.20 25.00
6 8 10 12 14 16 19
BALOK 20/25
1.00 0.20 0.25 20.00
6 8 10 12 14 16 19
BALOK 20/30
1.00 0.20 0.30 16.67
6 8 10 12 14 16 19
BALOK 20/40
1.00 0.20 0.40 12.50
6 8 10 12 14 16 19
BALOK 30/50
1.00 0.30 0.50 6.67
6 8 10 12 14 16 19
BALOK 30/60
1.00 0.30 0.60 5.56
6 8 10 12 14 16 19
BALOK 20/30
1.00 0.20 0.30 16.67
6 8 10 12 14 16 19
BALOK 25/45
1.00 0.25 0.45 8.89
6 8 10 12 14 16 19
BALOK 25/40
1.00 0.25 0.40 10.00
6 8 10 12 14 16 19
BALOK 20/25
1.00 0.20 0.25 20.00
6 8 10 12 14 16 19
BALOK 15/20
1.00 0.15 0.20 33.33
6 8 10 12 14 16 19
KOLOM PRAKTS 13/13
1.00 0.13 0.13 59.17
25 28 6 8 10 12 14 16
KOLOM 13/30
1.00 0.13 0.30 25.64
25 28 6 8 10 12 14 16
KOLOM 20/30
1.00 0.20 0.30 16.67
25 28 6 8 10 12 14 16
KOLOM 20/20
1.00 0.20 0.20 25.00
22 25 6 8 10 12 14 16
KOLOM 15/30
1.00 0.15 0.30 22.22
22 25 6 8 10 12 14 16
KOLOM 20/40
1.00 0.20 0.40 12.50
22 25 6 8 10 12 14 16
KOLOM 20/50
1.00 0.20 0.50 10.00
22 25 6 8 10 12 14 16
KOLOM 50/50
1.00 0.50 0.50 4.00
22 25 6 8 10 12 14 16
KOLOM 25/25
1.00 0.25 0.25 16.00
22 25 6 8 10 12 14 16
KOLOM 25/50
1.00 0.25 0.50 8.00
22 25 6 8 10 12 14 16
KOLOM 40/40
1.00 0.40 0.40 6.25
22 25 6 8 10 12 14 16
KOLOM 30/40
1.00 0.30 0.40 8.33
22 25 6 8 10 12 14 16
KOLOM 30/30
1.00 0.30 0.30 11.11
22 25 6 8 10 12 14 16
KOLOM 20/25
1.00 0.20 0.25 20.00
79.64
22 25 6 8 10 12 14 16
KOLOM 15/30
1.00 0.15 0.30 22.22
2.985 3.853 6 8 10 12 14 16
22 25
KOLOM 20/20
1.00 0.20 0.20 25.00
2.985 3.853
22 25
118.40
58.99
177.39
195.125 kg
2.985 3.853
22 25
KTS 13/13 RING BALK 15/15
1.00 0.15 0.15
19 22 25 6 8 10 12 16
19 22 25 6 8 10 12 16
19 22 25 6 8 10 12 16
20/20
0.888 177.60
0.395 32.59
210.19
231.206 kg
2.223 2.985 3.853
19 22 25
15/30
0.888 138.13
0.395 33.36
171.49
188.638 kg
2.223 2.985 3.853
19 22 25
20/40
1.120 126.00
0.395 26.17
152.17
167.386 kg
2.223 2.985 3.853
19 22 25
20/50
1.120 112.00
0.395 24.89
136.89
150.574 kg
2.223 2.985 3.853
19 22 25
50/50
1.120 53.76
0.395 14.69
68.45
75.299 kg
2.223 2.985 3.853
19 22 25
0.617
170.54 20.361
187.590 kg
2.223 2.985 3.853
19 22 25
25/50
1.120 107.52
0.395 21.49
129.01
141.909 kg
2.223 2.985 3.853
19 22 25
0.617 28.15
186.15
204.766 kg
2.223 2.985 3.853
19 22 25
30/40 #NAME?
0.617 32.39
216.73
238.398 kg
2.223 2.985 3.853
19 22 25
TITIK 8
1.120 99.56
135.89 0
19 22 25
20/25
1.120 224.00
0.617 46.89
270.89
297.981 kg
2.223 2.985 3.853
19 22 25
15/30
0.617 54.84
0.395 33.36
88.20
97.020 kg
2.223 2.985 3.853
19 22 25
20/20
0.888 88.80
0.395 32.59
121.39
133.526 kg
2.223 2.985 3.853
19 22 25
G BALK 15/15 PLAT BETON 12 CM
44.44 1.00 1.00
211.70
232.874 kg
2.223 2.985 3.853 4.830 0.222 0.395 0.617 0.888
19 22 25 28 6 8 10 12
183.28
201.610 kg
2.223 2.985 3.853 4.830 0.222 0.395 0.617 0.888
19 22 25 28 6 8 10 12
G BALK 13/10
76.92 Tulangan Pokok
307.69 0.617 189.85 Luas Lebar Pjg Jarak
164.10 0.395 64.82 8.3333333 1.00 8.3333333 0.1
254.67
280.133 kg
2.223 2.985 3.853 4.830
19 22 25 28
Tulangan Pokok
Luas Lebar Pjg Jarak
39200
Tulangan Pokok
10 1.00 10 0.1
397.32 33.11 245.014
PLAT BETON 12 CM PONDASI PUUR P
0.12 8.33 1.00
10 mm bawah 3.57
16 19 22 25 28 6 8 10
10 mm bawah 4.17
16 19 22 25 28 6 8 10
PLAT TANGGA
Tulangan Pokok Tulangan Bagi P. Total
Jarak Pokok
Pjg Jlh Diameter Pjg Jlh Diameter
1.00 84.333333 10 0.15 8.33 11 10 84.333333
1.00000 1.00000
30 20
83.3331 66.6666666
27.777 22.2222222
83.331 66.6666666
166.6641 133.3333332
333.3282 133.3333332
131.665 52.667
PLAT TANGGA
Tulangan Pokok Tulangan Bagi P. Total
Jarak Pokok
Pjg Jlh Diameter Pjg Jlh Diameter
1.00 101 10 0.15 10.00 11 10 101
PONDASI PUUR PLAT 100 X 130
0.80 0.35 3.57
0.32 47.60
12 16 19 22 25 28
0.27 52.96
12 16 19 22 25 28
108.53333 217.06667
238.773333
108.53333 217.06667
238.773333
130.11667 260.23333
286.256667