LOKASI 0
TAHUN : 2018
NO URAIAN
A PEKERJAAN PERSIAPAN
B PEKERJAAN PONDASI
C PEKERJAAN BETON
D PEKERJAAN DINDING + PLESTERAN
F PEKERJAAN AKHIR
JUMLAH
PPN 10%
JUMLAH
DIBULATKAN
FISIK
PERENCANAAN
PENGAWASAN
ADMINISTRASI PROYEK
TOTAL
TERBILANG :
Lima Ratus Enam Puluh Tujuh Juta Empat Ratus Ribu Ru
NER ESTIMATE
JUMLAH
Rp 14,324,945.42
Rp 56,425,434.43
Rp 121,489,885.59
Rp 113,855,117.94
Rp 148,687,000.00
Rp 454,782,383.38
Rp 45,478,238.34
Rp 500,260,621.71
Rp 500,200,000.00
Rp 500,200,000.00
Rp 24,000,000.00
Rp 19,200,000.00
Rp 24,000,000.00
Rp 567,400,000.00
A PEKERJAAN PERSIAPAN
1 Pemasangan Papan Nama Proyek 1.00 Ls
2 Pembersihan dan Perataan 71.25 M2
3 Pembuatan Gudang Bahan dan peralatan 6.00 M2
4 Pengukuran dan Pasangan Bouwplank 7.63 M'
5 Penyediaan Air Kerja 1.00 ls
B PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Belah camp. 1pc : 4pp 22.44 M3
2 Gaian Tanah Pondasi 25.65 M3
C PEKERJAAN BETON
1 Membuat Sloof Beton Bertulang - SL 30/20
a. Beton camp. 1pc : 2ps : 3kr 4.28 M3
b. Besi 360.10 Kg
c. Bekisting 28.50 M2
2 Membuat Ring Balok 30/30
a. Beton camp. 1pc : 2ps : 3kr 4.28 M3
b. Besi 448.03 Kg
c. Bekisting 49.88 M2
3 Membuat Kolom Beton Bertulang - K2 20/20
a. Beton camp. 1pc : 2ps : 3kr 0.68 M3
b. Besi 98.65 Kg
c. Bekisting 13.60 M2
4 Membuat Kolom Beton Bertulang - K1 30/30 Up + 1,50 m
a. Beton camp. 1pc : 2ps : 3kr 1.35 M3
b. Besi 151.08 Kg
c. Bekisting (2 kali pake) 18.00 M2
4 Membuat Kolom Beton Bertulang - K1 30/30 Up + 2,00 m
a. Beton camp. 1pc : 2ps : 3kr 2.70 M3
b. Besi 298.60 Kg
c. Bekisting 36.00 M2
D PEKERJAAN DINDING + PLESTERAN
1 Memasang Dinding Bata Ringan (10x20x60) cm camp. 1pc : 4 psr 111.68 M2
2 Memasang Plesteran 1 Pc : 4 Pp tebal=15 mm 367.08 M2
3 Memasang Acian 367.08 M2
4 Pengecatan Bidang Tembok dengan Roll ex. Paragon 367.08 M2
F PEKERJAAN AKHIR
1 Pasang Pagar Rangka Stainless 38.22 M2
3 Memasang ACP 41.60 M2
4 Pasang Akriliks 11.95 M2
ESTIMATE
LOKASI 0
TAHUN : 2018
NO URAIAN JUMLAH
JUMLAH Rp 637,315,642.06
TOTAL Rp 701,047,206.27
DIBULATKAN Rp 701,000,000.00
FISIK Rp 701,000,000.00
PERENCANAAN Rp 42,800,000.00
PENGAWASAN Rp 32,300,000.00
TOTAL Rp 797,100,000.00
TERBILANG :
Tujuh Ratus Sembilan Puluh Tujuh Juta SeRatus Ribu Rupiah
ESTIMATE
LOKASI
TAHUN : 2018
A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 ls
2 Pengukuran Dan Pemasangan Bouwplang 52.00 m1
3 Membuat Gudang Semen Dan Alat 12.00 m2
4 Pembersihan Dan Perataan 165.00 m2
5 Laporan Dan Dokumentasi 1.00 ls
6 Penyediaan Air Kerja 1.00 ls
C PEKERJAAN BETON
1 Membuat Sloof Beton Bertulang 15/20 cm
a. Beton camp. 1pc : 2ps : 3kr 5.76 m3
b. Besi 818.07 kg
c. Bekisting 76.80 m2
2 Membuat Kolom Praktis 11/11 cm 116.78 m1
3 Membuat Balok Praktis 11/11 cm 49.50 m1
4 Membuat Ring Balok Beton Bertulang 15/20 cm
a. Beton camp. 1pc : 2ps : 3kr 3.49 m3
b. Besi 496.11 kg
c. Bekisting 46.56 m2
5 Membuat Kolom Beton Bertulang 10/30 cm
a. Beton camp. 1pc : 2ps : 3kr 0.32 m3
NO JENIS PEKERJAAN VOL. SAT.
b. Besi 72.82 kg
c. Bekisting 6.30 m2
6 Membuat Plat Beton Bertulang 1.55 m3
E PEKERJAAN KAYU
1 Membuat Kusen Pintu, Jendela dan Pasangan Kayu Kelas I 0.56 m3
2 Membuat Daun Pintu Panel Kayu Kelas I 10.25 m2
3 Membuat Daun Jendela Panel Kaca Kayu Kelas I 10.64 m2
4 Memasang Rangka Langit-langit (60x60)cm, Kayu Kelas II 110.14 m2
5 Memasang Plafond Tripleks tebal = 4 mm 110.14 m2
6 List Langit-Langit kayu Profil 184.47 m1
7 Memasang Listplank (3x20)cm Kayu Kelas I 53.00 m1
H PEKERJAAN PENGECATAN
1 Pengecatan Bidang Tembok dengan Roll ex. Paragon 493.33 m2
Pengecatan Langit-langit 2 lapis dengan cat tembok menggunakan Roll ex.
2 159.87 m2
Paragon
3 Pengecatan Penutup Permukaan Kayu 2 Lapis Kuas ex. Polibest 60.47 m2
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
2 1 M3 URUGAN PASIR
1.2000 m3 Pasir Urug 893,389.00
0.3000 oh Pekerja 115,000.00 34,500.00
0.0100 oh Mandor 159,275.00 1,592.75
Total : 36,092.75
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
2 1 M2 PEKERJAAN ACIAN
3.2500 zak Semen Portland 50 Kg 2,853.08
0.2000 oh Pekerja 115,000.00 23,000.00
0.1000 oh Tukang Labur/Cat 148,350.00 14,835.00
0.0100 oh Kepala Tukang 154,100.00 1,541.00
0.0100 oh Mandor 159,275.00 1,592.75
Total : 40,968.75
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
1 1 M3 MEMBUAT BETON 1 PC : 3 PS : 5 KR
218.0000 kg Semen Portland 2,853.08
HARGA HARGA
NO URAIAN SATUAN UPAH
(Rp) (Rp)
0.5200 m3 Pasir Beton 893,389.00
0.8700 m3 Koral Beton 1,640,233.39
1.6500 oh Pekerja 115,000.00 189,750.00
0.2500 oh Tukang Batu 142,600.00 35,650.00
0.0250 oh Kepala Tukang 154,100.00 3,852.50
0.0800 oh Mandor 159,275.00 12,742.00
Total : 241,994.50
2 1 M3 MEMBUAT BETON 1 PC : 2 PS : 3 KR
280.0000 kg Semen Portland 2,853.08
0.4500 m3 Pasir Beton 893,389.00
0.9000 m3 Koral Beton 1,640,233.39
1.6500 oh Pekerja 115,000.00 189,750.00
0.2500 oh Tukang Batu 142,600.00 35,650.00
0.0250 oh Kepala Tukang 154,100.00 3,852.50
0.0800 oh Mandor 159,275.00 12,742.00
Total : 241,994.50
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
39,811.72
829.99
18,583.64
59,225.35 87,897.73
36,744.23
641,026.78
12,449.81
29,957.35
26,801.67
82,011.67
131,846.93
960,838.43 1,411,322.18
19,463.75
182,056.50
1,072,066.80
1,072,066.80 1,108,159.55
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
515,283.72
515,283.72 580,747.47
1,073,450.11
465,052.20
464,562.28
2,003,064.60 2,306,017.72
286,303.58
32,810.43
38,415.73
357,529.73 410,794.86
17,803.23
21,441.34
39,244.56 99,835.19
9,272.51
9,272.51 50,241.26
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
6,565,890.41
43,588.74
54,756.10
6,664,235.25 10,963,941.50
185,732.69
27,378.05
213,110.74 827,354.49
111,439.61
268,057.09
16,426.83
395,923.53 887,318.53
6,565,890.41
170,303.00
195,277.54
6,931,470.95 9,388,445.95
3,357,759.33
170,303.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
104,612.97
3,632,675.30 5,106,860.30
3,357,759.33
170,303.00
104,612.97
3,632,675.30 5,106,860.30
3,357,759.33
170,303.00
104,612.97
3,632,675.30 5,106,860.30
54,077.59
8,717.75
62,795.33 136,516.08
50,147.83
3,487.10
53,634.93 98,683.30
621,971.66
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
464,562.28
1,427,003.04
2,513,536.98 2,755,531.48
798,862.68
402,025.05
1,476,210.05
2,677,097.78 2,919,092.28
234,465.17
6,181.68
240,646.85 26,079.71
106,192.25
10,461.30
2,161.43
118,814.97 225,333.72
106,192.25
13,948.40
4,322.85
49,764.65
74,842.94
98,906.81
347,977.90 241,587.39
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
106,192.25
13,948.40
4,322.85
59,717.58
74,842.94
98,906.81
357,930.83 493,127.70
849,538.01
111,587.17
34,582.80
3,516,977.57
92,725.13
958,635.22
482,430.06
1,328,589.04
366,301.02
598,743.54
1,582,508.93
9,922,618.49 11,003,000.37
5,309.61
348.71
66,990.05
1,854.50
11,412.32
5,360.33
14,762.10
106,037.63 137,881.71
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
5,309.61
348.71
66,990.05
1,854.50
11,412.32
5,360.33
14,762.10
106,037.63 137,881.71
123,460.60
5,648.52
129,109.12 170,077.87
74,641.21
74,641.21 153,711.76
55,332.48
999.44
56,331.92 85,004.30
15,735.17
2,824.26
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
18,559.44 32,975.26
604,622.62
17,118.49
8,933.89
630,675.00 1,216,209.00
405,771.52
48,692.58
17,118.49
8,933.89
480,516.48 864,328.98
803,473.72
144,625.27
948,098.99 1,640,853.24
67,724.65
540.36
68,265.01 86,587.38
160,810.02
540.36
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
161,350.38 179,672.75
233,722.09
233,722.09 311,384.47
28,242.62
28,242.62 54,659.04
28,242.62
28,242.62 45,848.26
28,242.62
28,242.62 54,659.04
44,150.71
44,150.71 79,361.98
294,862.80
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
294,862.80 321,279.22
86,975.74
28,530.81
40,202.51
28,444.35
184,153.41 325,531.54
119,438.64
28,530.81
40,202.51
28,444.35
216,616.30 357,994.43
89,383.86
29,672.04
40,202.51
30,719.90
189,978.31 331,356.43
89,383.86
26,533.65
16,081.00
36,788.03
168,786.54 350,558.42
200,000.00
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
26,533.65
16,081.00
242,614.66 424,386.53
21,556.61
12,449.81
15,787.77
26,300.22
76,094.41 86,802.35
2,599.47
9,286.92
10,205.38
22,091.78 35,106.85
225,940.96
104,612.97
29,971.76
125,362.65
21,095.51
18,962.90
525,946.75 575,946.75
575,946.75
61,384.47
637,331.22 637,331.22
575,946.75
HARGA HARGA
BAHAN JUMLAH
(Rp) (Rp)
74,641.21
650,587.96 650,587.96
575,946.75
61,384.47
637,331.22 637,331.22
575,946.75
61,384.47
637,331.22 637,331.22
DAFTAR HARGA SATUAN BAHAN
HARGA
NO NAMA BARANG SATUAN
(Rp.)
###
1 Cat Meni Besi/dasar (Polibest) Kaleng 0,8 kg kg 92,869 Rp. ###
2275.00
2 Cat kayu+Besi/dasar (polibest) kaleng 0.8 kg kg 101,154 Rp. ###
6900.00
3 Cat menie kayu (Avian) 1kg kg 107,783 Rp. ###
0600.00
4 Cat tembok Paragon 5 Kg kg 39,251 Rp. ###
4780.00
5 Dempul kayu (Pedang) 0.8 kg kg 82,998 Rp. ###
7200.00
6 Plamir tembok 5 kg merk Paragon kg 25,994 Rp. ###
7380.00
7 Besi strip 1kg kg 11,353 Rp. ###
5332.40
8 Seng BJLS 0,20 gelombang lbr 87,897 Rp. ###
9500.00
9 Multiroof BJ 300 lbr 121,039 Rp. ###
8000.00
10 Bubungan multiroof Bh 74,641 Rp. ###
2100.00
11 Engsel jendela biasa ps 28,242 Rp. ###
6200.00
12 Engsel nylon ps 28,242 Rp. ###
6200.00
13 Kaca ryben 5 mm 153x122 cm m2 268,057 Rp. ###
0892.12
14 Kait angin biasa ps 28,242 Rp. ###
6200.00
15 Kunci slot sedang bh 44,150 Rp. ###
7080.00
16 Kunci tanam 2 slag Biasa bh 233,722 Rp. ###
0900.00
17 Bambu sedang Ukuran 4 m btg 21,614 Rp. ###
2500.00
18 Kayu Besi 5 x 10, panjang 4 m' m3 ###
###
19 Papan Kayu besi 2,5 x 25, panjang 4 m' m3 ###
###
20 Papan Cor/Papan Kayu Putih m3 ###
###
21 Kayu Matoa 5 x 10, panjang 4 m' m3 ###
###
22 Kayu Matoa 5 x 5, panjang 4 m' m3 ###
###
23 Kayu dolken (pekerjaan sementara) btg 49,453 Rp. ###
4040.00
24 Kayu profil m1 14,985 Rp. ###
8800.00
25 Lem Kayu (fox) kg 54,756 Rp. ###
1000.00
26 Minyak bekisting ltr 21,614 Rp. ###
2500.00
27 Tripleks 4 mm Lbr 147,553 Rp. ###
2800.00
28 Plywood 9 mm lbr 213,836 Rp. ###
9800.00
29 Keramik 20 x 20 kelas I warna muda m2 84,324 Rp. ###
3940.00
30 Keramik 30 x 30 kelas I warna muda m2 118,734 Rp. ###
2800.00
31 Keramik 40 x 40 kelas I warna muda m2 86,975 Rp. ###
7420.00
32 Bak mandi fibre glass 70x70x66 cm sudut bh 803,473 Rp. ###
7200.00
33 Kloset porselin jongkok Ina (standar) bh 604,622 Rp. ###
6200.00
34 Kran air 3/4 biasa dari besi bh 67,724 Rp. ###
6500.00
35 Kran cuci piring bh 160,810 Rp. ###
0200.00
HARGA
NO NAMA BARANG SATUAN
(Rp.)
36 Seal tape Besar bh 21,614 Rp. ###
2500.00
37 Washtafel cuci piring 1 lubang bh 405,771 Rp. ###
5200.00
38 Paku 5 biasa kg 41,499 Rp. ###
3600.00
39 Paku 10 biasa kg 34,870 Rp. ###
9900.00
40 Paku 12 biasa kg 34,870 Rp. ###
9900.00
41 Paku reng/usuk SQ kg 28,242 Rp. ###
6200.00
42 Paku tripleks kg 33,314 Rp. ###
7640.00
43 Bata Ringan/ Bataco 10 x 20 x 60 bj 34,357 Rp. ###
8034.70
44 Batu gunung/ belah m3 894,541 Rp. ###
7600.00
45 Batu Pecah 2-3 m3 ###
###
46 Pasir sedot / Lokal m3 ###
893,389 Rp. 0000.00
47 Tanah urug m3 ###
429,403 Rp. 1000.00
48 Batu Alam 20/20 m2 200,000 Rp. 0000.00
49 Semen Tonasa 40 kg kg 2,853 Rp. ###
0810.00
50 Semen warna/semen grouting kg ###
18,962 Rp. 9020.00
51 Besi beton kg ###
22,330 Rp. 0163.46
52 Kawat beton RRT 1 Kg kg ###
41,211 Rp. 1700.00
53 Saklar tunggal philip bh ###
74,641 Rp. 2100.00
54 Saklar ganda philip bh ###
61,384 Rp. 4700.00
55 Stop kontak philip bh ###
61,384 Rp. 4700.00
56 Kabel NYM 3 x 2.5 mm ex. Supreme m1 ###
28,242 Rp. 6200.00
57 Lampu 18 Watt (Philip) bh ###
61,384 Rp. 4700.00
58 Pipa clipsal 20 mm bt ###
34,870 Rp. 9900.00
59 Sock clipsal 20 mm bj 7,031 Rp. ###
8360.00
60 Tee dos clipsal 20 mm bh ###
14,985 Rp. 8800.00
61 Klem clipsal 0,5 " bj 8,357 Rp. ###
5100.00
62 Inbow dos plastik clipsal E 157 P bj ###
18,962 Rp. 9020.00
DAFTAR HARGA SATUAN UPAH
HARGA
NO NAMA BARANG SATUAN
(Rp.)