Anda di halaman 1dari 67

RENCANA ANGGARAN BIAYA

PEKERJAAN :

PEMBANGUNAN PAGAR

LOKASI :

JL.Ndorem kai
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN PAGAR
LOKASI : Jl.NDOREM KAI
KAB. / PROVINSI : MERAUKE
TAHUN ANGGARAN : 2022

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. 500,000.00 Rp. 500,000.00
JUMLAH A Rp. 500,000.00
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 14.22 M3 Rp. 69,320.00 Rp. 985,383.80
2 Urugan Pasir Bawah Pondasi 1.94 M3 Rp. 737,730.00 Rp. 1,431,196.20
3 Urugan Pasir Bawah Lantai 3.50 M3 Rp. 737,730.00 Rp. 2,582,055.00
4 Urugan Tanah Kembali 8.19 M3 Rp. 23,106.00 Rp. 189,252.00
5 Pondasi Menerus Bata 30/60/60, 1 Pc : 4 Ps (Pasir Lokal) 8.76 M3 Rp. 1,424,884.00 Rp. 12,481,983.84
JUMLAH B Rp. 17,669,870.84
C PEKERJAAN BETON DAN STRUKTUR
1 Sloof, Uk. 20X20 cm
- Bekisting 2x Pakai 13.25 M2 Rp. 133,525.00 Rp. 1,769,206.25
- Besi Dia. 10 mm 96.67 Kg Rp. 7,756.00 Rp. 749,788.03
- Besi Dia. 13 mm 188.21 Kg Rp. 7,771.00 Rp. 1,462,541.99
- Cor Beton, 1 Pc : 2 Ps : 3 Kr 1.59 M3 Rp. 1,337,903.00 Rp. 2,127,265.77
2 Pondasi Poer Plat 60x60 cm
- Bekisting 2x Pakai 7.00 M2 Rp. 133,525.00 Rp. 934,675.00
- Besi Dia. 16mm 3,276.00 Kg Rp. 7,756.00 Rp. 25,408,656.00
- Cor Beton, 1 Pc : 2 Ps : 3 Kr 8.75 M3 Rp. 1,337,903.00 Rp. 11,706,651.25
6 Kolom, Uk. 20 x 20 cm
- Bekisting 2x Pakai 16.00 M2 Rp. 133,525.00 Rp. 2,136,400.00
- Besi Dia. 8 mm 97.28 Kg Rp. 7,756.00 Rp. 754,503.68
- Besi Dia. 10 mm 158.72 Kg Rp. 7,771.00 Rp. 1,233,413.12
- Cor Beton, 1 Pc : 2 Ps : 3 Kr 2.56 M3 Rp. 1,337,903.00 Rp. 3,425,031.68
JUMLAH C Rp. 51,708,132.77
D PEKERJAAN ARSITEKTUR
1 Pas. Dinding Bata, 1 Pc : 4 Ps (Pasir Lokal) 36.50 M2 Rp. 118,833.00 Rp. 4,337,404.50
2 Plesteran, 1 Pc : 3 Ps (Pasir Lokal) 73.00 M2 Rp. 78,425.00 Rp. 5,725,025.00
3 Acian dinding luar 45.28 M2 Rp. 57,304.00 Rp. 2,594,725.12
JUMLAH D Rp. 12,657,154.62
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pas.Pintu Pagar L=4m 8.00 m2 Rp. 600,000.00 Rp. 4,800,000.00
2 Pas.Tralis Pagar 10.00 Bh Rp. 600,000.00 Rp. 6,000,000.00
JUMLAH F Rp. 10,800,000.00

I PEKERJAAN PENGECATAN
1 Cat Dinding Pagar 35.00 M2 Rp. 23,331.00 Rp. 816,585.00
2 Cat besi tralis 21.00 M2 Rp. 61,377.00 Rp. 1,288,917.00
JUMLAH I Rp. 2,105,502.00
J PEKERJAAN AKHIR
1 Pembersihan Akhir 1.00 Ls Rp. 1,000,000.00 Rp. 1,000,000.00
JUMLAH J Rp. 1,000,000.00
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN PAGAR
LOKASI : Jl.NDOREM KAI
KAB. / PROVINSI : MERAUKE
TAHUN ANGGARAN : 2022

NO. NAMA PEKERJAAN JUMLAH HARGA


1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp. 500,000.00


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp. 17,669,870.84
C PEKERJAAN BETON DAN STRUKTUR ............................................................................ Rp. 51,708,132.77
D PEKERJAAN ARSITEKTUR ............................................................................ Rp. 12,657,154.62
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA ............................................................................ Rp. 10,800,000.00
I PEKERJAAN PENGECATAN ............................................................................ Rp. 2,105,502.00
J PEKERJAAN AKHIR ............................................................................ Rp. 1,000,000.00

REAL COST ( RC ) ............................................................................ Rp. 96,440,660.23


DIBULATKAN ............................................................................ Rp. 96,400,000.00

Terbilang : Sembilan Ratus Enam Puluh Juta Empat Ratus Ribu Rupiah

MERAUKE,……………….. 2022
ANALISA HARGA SATUAN
PEKERJAAN : PEMBANGUNAN PAGAR
LOKASI : Jl.NDOREM KAI
KAB. / PROVINSI : MERAUKE
TAHUN ANGGARAN : 2022

HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

A. PEKERJAAN PERSIAPAN

1 1 M' Pengukuran Dan Pasangan Bouwplank


Balok Kayu kls III (kotor) 0.0120 M3 Rp. 1,452,630.00 Rp. 17,431.56
Kayu Papan kls III (kotor) 0.0070 M3 Rp. 1,452,630.00 Rp. 10,168.41
Paku Biasa Campur 2" - 5" 0.0200 KG Rp. 29,000.00 Rp. 580.00
Pekerja kayu 0.1000 OH Rp. 152,000.00 Rp. 15,200.00
Tukang kayu 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
Kepala Tukang Kayu 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 65,864.00

B. PEKERJAAN TANAH DAN PASIR

1 1 M3 Galian Tanah Biasa Sedalam 1 M


Pekerja 0.4000 OH Rp. 152,000.00 Rp. 60,800.00
Mandor 0.0400 OH Rp. 213,000.00 Rp. 8,520.00
JUMLAH Rp. 69,320.00
2 1 M3 Urugan Pasir Bawah Pondasi/Lantai/Konstruksi
Pasir Pasang (Lokal) 1.2000 M3 Rp. 575,000.00 Rp. 690,000.00
Pekerja 0.3000 OH Rp. 152,000.00 Rp. 45,600.00
Mandor 0.0100 OH Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 737,730.00
3 1 M3 Urugan Kembali Tanah Biasa Sedalam 1 M
1/3 x Galian Tanah 0.3333 M3 Rp. 69,320.00 Rp. 23,106.67
JUMLAH Rp. 23,106.00
4 1 M3 Urugan Tanah Timbun Biasa
Tanah timbun biasa 1.2000 M3 Rp. 129,535.00 Rp. 155,442.00
Pekerja 0.2500 OH Rp. 152,000.00 Rp. 38,000.00
Mandor 0.0250 OH Rp. 213,000.00 Rp. 5,325.00
JUMLAH Rp. 198,767.00

C. PEKERJAAN PASANGAN DAN BETON

1 1 M3 Pasang Pondasi Bata Merah, 1 Pc : 4 Ps - Pasir Lokal


Batu bata 649.0000 Buah Rp. 675.00 Rp. 438,075.00
Semen Portland (PC) @ 50 Kg 3.4299 Zak Rp. 1,031.70 Rp. 3,538.63
Pasir semen (Lokal) 0.4900 M3 Rp. 372,575.00 Rp. 182,556.43
Mandor pasir/batu 0.1429 OH Rp. 213,000.00 Rp. 30,428.57
Kepala tukang pasir/batu 0.4286 OH Rp. 202,000.00 Rp. 86,571.43
Tukang pasir/batu 1.2857 OH Rp. 194,000.00 Rp. 249,428.57
Pekerja pasir/batu 2.8571 OH Rp. 152,000.00 Rp. 434,285.71
JUMLAH Rp. 1,424,884.00
2 1 M3 COR 1 Pc : 3 Ps, Manual- Pasir Lokal
Semen Portland (PC) @ 50 Kg 11.2500 Zak Rp. 166,750.00 Rp. 1,875,937.50
Pasir semen (lokal) 1.1250 M3 Rp. 372,575.00 Rp. 419,146.88
Mandor 0.3000 OH Rp. 213,000.00 Rp. 63,900.00
Kepala tukang 0.1000 OH Rp. 202,000.00 Rp. 20,200.00
Tukang pasir/batu 1.0000 OH Rp. 194,000.00 Rp. 194,000.00
Pekerja 6.0000 OH Rp. 152,000.00 Rp. 912,000.00
JUMLAH Rp. 3,485,184.00
3 1 M3 COR 1 Pc : 4 Ps, Manual- Pasir Lokal
Semen Portland (PC) @ 50 Kg 9.0000 Zak Rp. 51,585.00 Rp. 464,265.00
Pasir semen (lokal) 1.2000 M3 Rp. 372,575.00 Rp. 447,090.00
Mandor 0.3000 OH Rp. 213,000.00 Rp. 63,900.00
Kepala tukang 0.1000 OH Rp. 202,000.00 Rp. 20,200.00
Tukang pasir/batu 1.0000 OH Rp. 194,000.00 Rp. 194,000.00
Pekerja 6.0000 OH Rp. 152,000.00 Rp. 912,000.00
JUMLAH Rp. 2,101,455.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

4 1 M3 COR 1 Pc : 2 Ps : 3 Kr, Manual- Pasir lokal


Semen Portland (PC) @ 50 Kg 336.0000 KG Rp. 1,031.70 Rp. 346,651.20
Pasir semen 0.5400 M3 Rp. 372,575.00 Rp. 201,190.50
Kerikil/batu pecah (import) 0.8100 M3 Rp. 581,280.00 Rp. 470,836.80
Mandor 2.0000 OH Rp. 213,000.00 Rp. 426,000.00
Kepala tukang 0.3500 OH Rp. 202,000.00 Rp. 70,700.00
Tukang pasir/batu 0.0350 OH Rp. 194,000.00 Rp. 6,790.00
Pekerja 1.0000 OH Rp. 152,000.00 Rp. 152,000.00
JUMLAH Rp. 1,674,168.00
5 1 M2 Pas. Lantai Granit Uk. 60 x 60 cm
Granit Ukuran 60 x 60 4.0000 Buah Rp. 20,250.00 Rp. 81,000.00
Semen Portland (PC) @ 50 Kg 9.6000 KG Rp. 1,031.70 Rp. 9,904.32
Pasir Semen (Lokal) 0.0350 M3 Rp. 372,575.00 Rp. 13,040.13
Semen Warna 1.5000 KG Rp. 8,170.00 Rp. 12,255.00
Pekerja 0.2400 OH Rp. 152,000.00 Rp. 36,480.00
Tukang batu 0.1200 OH Rp. 194,000.00 Rp. 23,280.00
Kepala tukang 0.0120 OH Rp. 202,000.00 Rp. 2,424.00
Mandor 0.0120 OH Rp. 213,000.00 Rp. 2,556.00
JUMLAH Rp. 180,939.00
6 1 M2 Pas. Keramik Uk. 40 x 40 cm
Keramik Ukuran 40 x 40 6.0000 Buah Rp. 23,250.00 Rp. 139,500.00
Semen Portland (PC) @ 50 Kg 10.0000 KG Rp. 1,031.70 Rp. 10,317.00
Pasir Semen (Lokal) 0.0450 M3 Rp. 372,575.00 Rp. 16,765.88
Semen Warna 1.6200 KG Rp. 8,170.00 Rp. 13,235.40
Pekerja 0.7000 OH Rp. 152,000.00 Rp. 106,400.00
Tukang batu 0.3500 OH Rp. 194,000.00 Rp. 67,900.00
Kepala tukang 0.0350 OH Rp. 202,000.00 Rp. 7,070.00
Mandor 0.0350 OH Rp. 213,000.00 Rp. 7,455.00
JUMLAH Rp. 368,643.00
7 1 M2 Pas. Keramik Dinding Uk. 25 x 40 cm
Keramik Ukuran 25 x 40 10.0000 Buah Rp. 15,100.00 Rp. 151,000.00
Semen Portland (PC) @ 50 Kg 10.0000 KG Rp. 1,031.70 Rp. 10,317.00
Pasir Semen (Lokal) 0.0450 M3 Rp. 372,575.00 Rp. 16,765.88
Semen Warna 1.6200 KG Rp. 8,170.00 Rp. 13,235.40
Pekerja 0.7000 OH Rp. 152,000.00 Rp. 106,400.00
Tukang batu 0.3500 OH Rp. 194,000.00 Rp. 67,900.00
Kepala tukang 0.0350 OH Rp. 202,000.00 Rp. 7,070.00
Mandor 0.0350 OH Rp. 213,000.00 Rp. 7,455.00
JUMLAH Rp. 380,143.00
8 1 M2 Pas. Keramik Lantai Uk. 25 x 25 cm
Keramik Ukuran 25 x 25 16.0000 Buah Rp. 9,437.50 Rp. 151,000.00
Semen Portland (PC) @ 50 Kg 10.0000 KG Rp. 1,031.70 Rp. 10,317.00
Pasir Semen (Lokal) 0.0450 M3 Rp. 372,575.00 Rp. 16,765.88
Semen Warna 1.6200 KG Rp. 8,170.00 Rp. 13,235.40
Pekerja 0.7000 OH Rp. 152,000.00 Rp. 106,400.00
Tukang batu 0.3500 OH Rp. 194,000.00 Rp. 67,900.00
Kepala tukang 0.0350 OH Rp. 202,000.00 Rp. 7,070.00
Mandor 0.0350 OH Rp. 213,000.00 Rp. 7,455.00
JUMLAH Rp. 380,143.00
9 1 M Pas. Plin Keramik Uk. 25 x 10 cm
Plin Keramik Ukuran 25 x 10 (potongan) 5.3000 Buah Rp. 4,718.75 Rp. 25,009.38
Semen Portland (PC) @ 50 Kg 1.1400 KG Rp. 1,031.70 Rp. 1,176.14
Pasir Semen (Lokal) 0.0300 M3 Rp. 372,575.00 Rp. 11,177.25
Semen Warna 0.0250 KG Rp. 8,170.00 Rp. 204.25
Pekerja 0.0900 OH Rp. 152,000.00 Rp. 13,680.00
Tukang batu 0.0900 OH Rp. 194,000.00 Rp. 17,460.00
Kepala tukang 0.0090 OH Rp. 202,000.00 Rp. 1,818.00
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 71,590.00
10 1 M2 Pas. Lantai Batu Sikat
Batu alam (batu sikat) 1.0000 M2 Rp. 4,718.75 Rp. 4,718.75
Semen Portland (PC) @ 50 Kg 0.1575 Zak Rp. 51,585.00 Rp. 8,124.64
Pasir Semen (Lokal) 0.0300 M3 Rp. 372,575.00 Rp. 11,177.25
Pekerja 1.0000 OH Rp. 152,000.00 Rp. 152,000.00
Tukang batu 1.0000 OH Rp. 194,000.00 Rp. 194,000.00
JUMLAH Rp. 370,020.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
11 1 M2 Pas. Keramik Motif Batu Alam
Keramik Motif Batu Alam 1.0000 M2 Rp. 95,000.00 Rp. 95,000.00
Semen Portland (PC) @ 50 Kg 9.3000 KG Rp. 1,031.70 Rp. 9,594.81
Pasir Semen (Lokal) 0.0180 M3 Rp. 372,575.00 Rp. 6,706.35
Pekerja 0.9000 OH Rp. 152,000.00 Rp. 136,800.00
Tukang batu 0.4500 OH Rp. 194,000.00 Rp. 87,300.00
Kepala tukang 0.0450 OH Rp. 202,000.00 Rp. 9,090.00
Mandor 0.0450 OH Rp. 213,000.00 Rp. 9,585.00
JUMLAH Rp. 354,076.00
12 1 M2 Pas. Batu Alam Tempel
Keramik Motif Batu Alam 1.0000 M2 Rp. 225,000.00 Rp. 225,000.00
Semen Portland (PC) @ 50 Kg 9.3000 KG Rp. 1,031.70 Rp. 9,594.81
Pasir Semen (Lokal) 0.0180 M3 Rp. 372,575.00 Rp. 6,706.35
Pekerja 0.9000 OH Rp. 152,000.00 Rp. 136,800.00
Tukang batu 0.4500 OH Rp. 194,000.00 Rp. 87,300.00
Kepala tukang 0.0450 OH Rp. 202,000.00 Rp. 9,090.00
Mandor 0.0450 OH Rp. 213,000.00 Rp. 9,585.00
JUMLAH Rp. 484,076.00
13 1 M2 Pas. Paving Block
Paving blok (10 x 20 cm) 1.0000 M2 Rp. 7,500.00 Rp. 7,500.00
Pasir semen (lokal) 0.0800 M3 Rp. 372,575.00 Rp. 29,806.00
Pekerja 0.1500 OH Rp. 152,000.00 Rp. 22,800.00
Tukang batu 0.2000 OH Rp. 194,000.00 Rp. 38,800.00
Kepala tukang 0.0200 OH Rp. 202,000.00 Rp. 4,040.00
Mandor 0.0100 OH Rp. 213,000.00 Rp. 2,130.00
Peralatan 0.0500 Ls Rp. Rp. -
JUMLAH Rp. 105,076.00
14 1 Ls pemasangan Panel dinding GRC krawangan
GRC Krawangan Motif abstrak 1.0000 bh Rp. 850,000.00 Rp. 850,000.00
Ongkos pasang 1.0000 Ls Rp. 213,000.00 Rp. 213,000.00
JUMLAH Rp. 1,063,000.00

15 1 Kg Besi Beton Dia.6 SNI (P=12 m)


Besi Beton Dia.6 SNI (P=12 m) 1.0500 KG Rp. 6,511.00 Rp. 6,836.55
Kawat beton 0.0150 Kg Rp. 12,760.00 Rp. 191.40
Pekerja 0.0070 OH Rp. 152,000.00 Rp. 1,064.00
Tukang besi 0.0070 OH Rp. 194,000.00 Rp. 1,358.00
Kepala tukang 0.0007 OH Rp. 202,000.00 Rp. 141.40
Mandor 0.0004 OH Rp. 213,000.00 Rp. 85.20
JUMLAH Rp. 9,676.00
16 1 Kg Besi Beton Dia.8 SNI (P=12 m)
Besi Beton Dia.8 SNI (P=12 m) 1.0500 KG Rp. 5,945.00 Rp. 6,242.25
Kawat beton 0.0150 Kg Rp. 12,760.00 Rp. 191.40
Pekerja 0.0070 OH Rp. 152,000.00 Rp. 1,064.00
Tukang besi 0.0070 OH Rp. 194,000.00 Rp. 1,358.00
Kepala tukang 0.0007 OH Rp. 202,000.00 Rp. 141.40
Mandor 0.0004 OH Rp. 213,000.00 Rp. 85.20
JUMLAH Rp. 9,082.00
17 1 Kg Besi Beton Dia.10 SNI (P=12 m)
Besi Beton Dia.10 SNI (P=12 m) 1.0500 KG Rp. 5,960.00 Rp. 6,258.00
Kawat beton 0.0150 Kg Rp. 12,760.00 Rp. 191.40
Pekerja 0.0070 OH Rp. 152,000.00 Rp. 1,064.00
Tukang besi 0.0070 OH Rp. 194,000.00 Rp. 1,358.00
Kepala tukang 0.0007 OH Rp. 202,000.00 Rp. 141.40
Mandor 0.0004 OH Rp. 213,000.00 Rp. 85.20
JUMLAH Rp. 9,098.00
18 1 Kg Besi Beton Dia.12 SNI (P=12 m)
Besi Beton Dia.12 SNI (P=12 m) 1.0500 KG Rp. 6,084.00 Rp. 6,388.20
Kawat beton 0.0150 Kg Rp. 12,760.00 Rp. 191.40
Pekerja 0.0070 OH Rp. 152,000.00 Rp. 1,064.00
Tukang besi 0.0070 OH Rp. 194,000.00 Rp. 1,358.00
Kepala tukang 0.0007 OH Rp. 202,000.00 Rp. 141.40
Mandor 0.0004 OH Rp. 213,000.00 Rp. 85.20
JUMLAH Rp. 9,228.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
19 1 Kg Besi Beton Dia.16 SNI (P=16 m)
Besi Beton Dia.16 SNI (P=12 m) 1.0500 KG Rp. 7,136.50 Rp. 7,493.33
Kawat beton 0.0150 Kg Rp. 12,760.00 Rp. 191.40
Pekerja 0.0070 OH Rp. 152,000.00 Rp. 1,064.00
Tukang besi 0.0070 OH Rp. 194,000.00 Rp. 1,358.00
Kepala tukang 0.0007 OH Rp. 202,000.00 Rp. 141.40
Mandor 0.0004 OH Rp. 213,000.00 Rp. 85.20
JUMLAH Rp. 10,333.00
20 1 M2 Bekisting
Kayu Bekisting Kelas III (kotor) 0.0170 M3 Rp. 1,452,630.00 Rp. 24,694.71
Papan Kayu Kelas III (kotor) 0.0240 M3 Rp. 1,452,630.00 Rp. 34,863.12
Paku Campur Biasa 5 cm - 10 cm 0.4000 KG Rp. 10,488.00 Rp. 4,195.20
Pekerja Kayu 0.2000 OH Rp. 152,000.00 Rp. 30,400.00
Tukang Kayu 0.5000 OH Rp. 194,000.00 Rp. 97,000.00
Kepala Tukang Kayu 0.0500 OH Rp. 202,000.00 Rp. 10,100.00
Mandor 0.0100 OH Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 203,383.00
21 1 M2 Dinding Bata Merah tebal 1/4 bata, 1 Pc : 4 Ps - Pasir Lokal
Bata merah (5 x 10 x 20) cm 35.0000 Buah Rp. 675.00 Rp. 23,625.00
Semen Portland (PC) @ 50 Kg 5.7500 kg Rp. 1,031.70 Rp. 5,932.28
Pasir semen (Lokal) 0.0430 M3 Rp. 372,575.00 Rp. 16,020.73
Pekerja pasir/batu 0.3200 OH Rp. 152,000.00 Rp. 48,640.00
Tukang pasir/batu 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
Kepala tukang pasir/batu 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor pasir/batu 0.0150 OH Rp. 213,000.00 Rp. 3,195.00
JUMLAH Rp. 118,833.00
22 1 M2 Plesteran 1 Pc : 3 Ps, Tebal 1,5 cm - Pasir Lokal
Semen Portland (PC) @ 50 Kg 6.4800 KG Rp. 1,031.70 Rp. 6,685.42
Pasir semen (Lokal) 0.0190 M3 Rp. 372,575.00 Rp. 7,078.93
Pekerja pasir/batu 0.2000 OH Rp. 152,000.00 Rp. 30,400.00
Tukang pasir/batu 0.1500 OH Rp. 194,000.00 Rp. 29,100.00
Kepala tukang pasir/batu 0.0150 OH Rp. 202,000.00 Rp. 3,030.00
Mandor pasir/batu 0.0100 OH Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 78,425.00
23 1 M2 Profil Beton
Semen Portland (PC) @ 50 Kg 8.1600 KG Rp. 1,031.70 Rp. 8,418.67
Pasir semen (Lokal) 0.0194 M3 Rp. 372,575.00 Rp. 7,227.96
Pekerja pasir/batu 1.0000 OH Rp. 152,000.00 Rp. 152,000.00
Tukang pasir/batu 0.5000 OH Rp. 194,000.00 Rp. 97,000.00
Kepala tukang pasir/batu 0.2500 OH Rp. 202,000.00 Rp. 50,500.00
Mandor pasir/batu 0.2500 OH Rp. 213,000.00 Rp. 53,250.00
JUMLAH Rp. 368,397.00
24 1 M2 Acian
Semen Portland (PC) @ 50 Kg 3.2500 KG Rp. 1,031.70 Rp. 3,353.03
Pekerja pasir/batu 0.2000 OH Rp. 152,000.00 Rp. 30,400.00
Tukang pasir/batu 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
Kepala tukang pasir/batu 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor pasir/batu 0.0100 OH Rp. 213,000.00 Rp. 2,130.00
JUMLAH Rp. 57,304.00

D. PEKERJAAN PLAFOND

1 1 M2 Pasang Gypsum Board Ukuran (1200 x 2400 )4mm


Gypsum 0.3640 lbr Rp. 46,200.00 Rp. 16,816.80
Paku Skrup 0.1100 kg Rp. 4,181.00 Rp. 459.91
Hollow Galvalum 2/4 tebal 0,30 (baja ringan ) 0.5600 Btg Rp. 35,000.00 Rp. 19,600.00
Ramset /dinabolt 4.0000 Bh Rp. 4,600.00 Rp. 18,400.00
Cotton Plaster 0.0720 Bh Rp. 12,000.00 Rp. 864.00
Compound 0.1250 Zak Rp. 120,000.00 Rp. 15,000.00
Pekerja 0.1000 OH Rp. 152,000.00 Rp. 15,200.00
Tukang 0.0500 OH Rp. 194,000.00 Rp. 9,700.00
Kepala Tukang 0.0050 OH Rp. 202,000.00 Rp. 1,010.00
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 98,115.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

E. PEKERJAAN ATAP

1 1 M2 Pekerjaan Kuda-Kuda Kayu


Kayu 6x12 1.4880 M1 Rp. 20,751.86 Rp. 30,878.76
Paku Campur 1.6000 kg Rp. 4,025.00 6,440.00
Talang Jurai 0.1240 M1 Rp. 55,200.00 6,844.80
Pekerja 0.2000 OH Rp. 152,000.00 Rp. 30,400.00
Tukang besi 0.4500 OH Rp. 194,000.00 Rp. 87,300.00
Kepala Tukang 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0500 OH Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 174,533.00
2 1 M2 Penutup Atap Spandek Zincalume
Tap Spandek Zincalume 1.1000 m2 Rp. 63,250.00 Rp. 69,575.00
Screw Cteks 12-4x50 6.0000 bh Rp. 1,380.00 Rp. 8,280.00
Screw Cteks 10x16-16 2.0000 bh Rp. 862.50 Rp. 1,725.00
Pekerja 0.0200 OH Rp. 152,000.00 3,040.00
Tukang Kayu 0.0800 OH Rp. 194,000.00 Rp. 15,520.00
Kepala Tukang 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0060 OH Rp. 213,000.00 Rp. 1,278.00
JUMLAH Rp. 101,438.00
3 1 M1 Bubungan/Nok Atap Alumunium
Nok Atap Zincalume 1.1000 M Rp. 53,000.00 Rp. 58,300.00
Screw Cteks 10x16-16 6.0000 bh Rp. 862.50 Rp. 5,175.00
Pekerja 0.0200 OH Rp. 152,000.00 Rp. 3,040.00
Tukang Kayu 0.0800 OH Rp. 194,000.00 Rp. 15,520.00
Kepala Tukang 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0060 OH Rp. 213,000.00 Rp. 1,278.00
JUMLAH Rp. 85,333.00
4 1 M1 Lisplank Kalsiboard
Kalsiplank 20x240cm 0.1150 Lbr Rp. 116,000.00 Rp. 13,340.00
Screw Cteks 10x16-16 10.0000 Kg Rp. 862.50 Rp. 8,625.00
Tukang Kayu 0.2200 OH Rp. 194,000.00 Rp. 42,680.00
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 65,710.00

F. PEKERJAAN KAYU DAN PINTU

1 1 M3 Kusen Kayu Kelas II


Balok Kayu kelas II 1.2000 M3 Rp. 2,089,575.00 Rp. 2,507,490.00
Pekerja Kayu 6.0000 OH Rp. 152,000.00 Rp. 912,000.00
Tukang Kayu 18.0000 OH Rp. 194,000.00 Rp. 3,492,000.00
Kepala Tukang 2.0000 OH Rp. 202,000.00 Rp. 404,000.00
Mandor 0.3000 OH Rp. 213,000.00 Rp. 63,900.00
JUMLAH Rp. 7,379,390.00
2 1 M2 Pasangan Dinding Papan Kayu Besi
Papan Kayu kelas I 0.0070 M3 5,800,000.00 40,600.00
Paku 5cm 0.1000 Kg 29,000.00 2,900.00
Skrup 10cm 0.1500 Kg - -
Pekerja Kayu 0.6000 OH 152,000.00 91,200.00
Tukang Kayu 1.8000 OH 194,000.00 349,200.00
Kepala Tukang 0.1800 OH 202,000.00 36,360.00
Mandor 0.0300 OH 213,000.00 6,390.00
JUMLAH Rp. 526,650.00
3 1M2 Pasang dinding multipleks t=2cm lapis HPL
Pasang Multipleks 2cm Lapis HPL 1.0000 Ls Rp. 2,500,000.00 Rp. 2,500,000.00
JUMLAH Rp. 2,500,000.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
4 1 M2 Pasang Kaca, Tebal 5 mm
Kaca 5 mm 1.1000 M2 Rp. 82,929.00 Rp. 91,221.90
Pekerja 0.0150 Oh Rp. 152,000.00 Rp. 2,280.00
Tukang Kayu 0.1500 Oh Rp. 194,000.00 Rp. 29,100.00
Kepala Tukang 0.0150 Oh Rp. 202,000.00 Rp. 3,030.00
Mandor 0.0008 Oh Rp. 213,000.00 Rp. 159.75
JUMLAH Rp. 125,791.00
5 1 M pemasangan kusen allumunium
Kusen Profil allumunium 1.1000 M Rp. 150,000.00 Rp. 165,000.00
Skrup fixer 2.0000 bh Rp. 22.50 Rp. 45.00
Sealant 0.0600 tube Rp. 27,600.00 Rp. 1,656.00
Pekerja 0.0430 OH Rp. 152,000.00 Rp. 6,536.00
Tukang allumunium 0.0430 OH Rp. 194,000.00 Rp. 8,342.00
Kepala tukang 0.0430 OH Rp. 202,000.00 Rp. 8,686.00
Mandor 0.0021 OH Rp. 213,000.00 Rp. 447.30
JUMLAH Rp. 190,712.00

G. PEKERJAAN PENGECATAN

1 1 M2 Lapis Plamur
Plamur 0.1000 KG Rp. 74,795.00 Rp. 7,479.50
Kertas amplas (kayu) 0.5000 Lembar Rp. 2,717.00 Rp. 1,358.50
Kapek 0.0500 Buah Rp. 15,000.00 Rp. 750.00
Mandor cat 0.0010 OH Rp. 213,000.00 Rp. 213.00
Kepala tukang cat 0.0030 OH Rp. 202,000.00 Rp. 606.00
Tukang cat 0.0300 OH Rp. 194,000.00 Rp. 5,820.00
Pekerja cat 0.0200 OH Rp. 152,000.00 Rp. 3,040.00
JUMLAH Rp. 19,267.00
2 1 M2 Cat dasar Meny Kayu/Besi
Meni (besi/kayu) 0.0840 KG Rp. 30,581.50 Rp. 2,568.85
Minyak Cat 0.0440 Ltr Rp. 36,665.00 Rp. 1,613.26
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
Kepala tukang 0.0075 OH Rp. 202,000.00 Rp. 1,515.00
Pekerja 0.0300 OH Rp. 152,000.00 Rp. 4,560.00
Tukang 0.0750 OH Rp. 194,000.00 Rp. 14,550.00
JUMLAH Rp. 25,872.00
3 1 M2 Cat Ter/Residu (Kuda-Kuda dan Gording)
Residu/ter 0.3500 KG Rp. 12,229.00 Rp. 4,280.15
Minyak Tanah 0.0300 Liter Rp. 6,322.00 Rp. 189.66
Kuas 0.0200 Buah Rp. 11,045.00 Rp. 220.90
Kepala tukang cat 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Tukang cat 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
JUMLAH Rp. 26,110.00
4 1 M2 Cat Besi
Cat meny besi 0.1000 KG Rp. 40,000.00 Rp. 4,000.00
Minyak Cat 0.1000 Ltr Rp. 51,000.00 Rp. 5,100.00
Amplas besi 0.0500 Buah Rp. 9,000.00 Rp. 450.00
Kuas 0.0150 Buah Rp. 11,045.00 Rp. 165.68
Mandor cat 0.0040 OH Rp. 213,000.00 Rp. 852.00
Pekerja cat 0.0750 OH Rp. 152,000.00 Rp. 11,400.00
JUMLAH Rp. 21,967.00
5 1 M2 Cat Tembok
Cat dasar 0.1000 KG Rp. 17,400.00 Rp. 1,740.00
Cat penutup 2 kali 0.2600 KG Rp. 17,400.00 Rp. 4,524.00
Mandor cat 0.0025 OH Rp. 213,000.00 Rp. 532.50
Kepala tukang cat 0.0063 OH Rp. 202,000.00 Rp. 1,272.60
Tukang cat 0.0630 OH Rp. 194,000.00 Rp. 12,222.00
Pekerja cat 0.0200 OH Rp. 152,000.00 Rp. 3,040.00
JUMLAH Rp. 23,331.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
6 1 M2 Cat Kilat Kayu
Dempul Kayu 0.1500 KG Rp. 74,000.00 Rp. 11,100.00
Cat Dasar (1 Klg @ 5 Kg) 0.1700 KG Rp. 80,000.00 Rp. 13,600.00
Cat Kayu 0.2600 KG Rp. 80,000.00 Rp. 20,800.00
Kuas 0.0100 KG Rp. 11,045.00 Rp. 110.45
Minyak Cat / Thinner (Setara Lauguer) 0.0300 KG Rp. 51,000.00 Rp. 1,530.00
Pekerja cat 0.0700 OH Rp. 152,000.00 Rp. 10,640.00
Tukang cat 0.0090 OH Rp. 194,000.00 Rp. 1,746.00
Kepala tukang cat 0.0060 OH Rp. 202,000.00 Rp. 1,212.00
Mandor cat 0.0030 OH Rp. 213,000.00 Rp. 639.00
JUMLAH Rp. 61,377.00
7 1 M2 Cat Plafond Menggunakan Roll
Plamur 0.1000 KG Rp. 74,795.00 Rp. 7,479.50
Cat tembok 0.4700 KG Rp. 13,290.00 Rp. 6,246.30
Kertas amplas (kayu) 0.5000 Lembar Rp. 2,717.00 Rp. 1,358.50
Kuas roll 0.0100 Buah Rp. 16,795.00 Rp. 167.95
Mandor cat 0.0030 OH Rp. 213,000.00 Rp. 639.00
Kepala tukang cat 0.0040 OH Rp. 202,000.00 Rp. 808.00
Tukang cat 0.0400 OH Rp. 194,000.00 Rp. 7,760.00
Pekerja cat 0.0600 OH Rp. 152,000.00 Rp. 9,120.00
JUMLAH Rp. 33,579.00
8 1 M2 Waterprofing
Waterproofing sika top 4kg 0.4500 KG Rp. 72,500.00 Rp. 32,625.00
Kuas 0.0150 Buah Rp. 40,000.00 Rp. 600.00
Tukang cat 0.1600 OH Rp. 194,000.00 Rp. 31,040.00
Pekerja cat 0.0150 OH Rp. 152,000.00 Rp. 2,280.00
JUMLAH Rp. 66,545.00

IX. PEKERJAAN SANITAIR

1 1 M' Memasang Pipa PVC Dia. 3"


Pipa PVC Tipe AW Dia. 2" 1.2000 M Rp. 134,500.00 Rp. 161,400.00
Perlengkapan 1.0000 Set Rp. 40,000.00 Rp. 40,000.00
Pekerja 0.0810 OH Rp. 152,000.00 Rp. 12,312.00
Tukang pipa 0.1350 OH Rp. 194,000.00 Rp. 26,190.00
Kepala tukang 0.1350 OH Rp. 202,000.00 Rp. 27,270.00
Mandor 0.0041 OH Rp. 213,000.00 Rp. 873.30
JUMLAH Rp. 268,045.00
2 1 M' Memasang Pipa PVC Dia. 4"
Pipa PVC Tipe AW Dia. 4" 1.2000 M Rp. 317,666.67 Rp. 381,200.00
Perlengkapan 1.0000 Set Rp. 40,000.00 Rp. 40,000.00
Pekerja 0.0810 OH Rp. 152,000.00 Rp. 12,312.00
Tukang pipa 0.1350 OH Rp. 194,000.00 Rp. 26,190.00
Kepala tukang 0.1350 OH Rp. 202,000.00 Rp. 27,270.00
Mandor 0.0041 OH Rp. 213,000.00 Rp. 873.30
JUMLAH Rp. 487,845.00
3 1 Unit Septictank (2x1x1,5 m), Pas. Bata 1Pc : 4Ps, Pasir Lokal
Galian Tanah Biasa Sedalam 1 - 2 M 3.0000 M3 Rp. 69,320.00 Rp. 207,960.00
Semen Portland (PC) @ 50 Kg 5.5000 Zak Rp. 1,031.70 Rp. 5,674.35
Pasir semen (lokal) 2.5000 M3 Rp. 372,575.00 Rp. 931,437.50
Batu bata 1,216.0000 Buah Rp. 675.00 Rp. 820,800.00
Besi beton dia 10 mm 112.4000 KG Rp. 5,960.00 Rp. 669,904.00
Kawat ikat beton 0.5000 KG Rp. 12,760.00 Rp. 6,380.00
Papan begisting kayu bus 2.0000 M2 Rp. 76,385.58 Rp. 152,771.16
Pipa Dia 4" PVC 2.0000 M Rp. 117,000.00 Rp. 234,000.00
Paku Campur 0.1000 KG Rp. 20,750.00 Rp. 2,075.00
Mandor pasir/batu 0.2500 OH Rp. 213,000.00 Rp. 53,250.00
Kepala tukang pasir/batu 0.5000 OH Rp. 202,000.00 Rp. 101,000.00
Tukang pasir/batu 5.0000 OH Rp. 194,000.00 Rp. 970,000.00
Pekerja pasir/batu 2.5000 OH Rp. 152,000.00 Rp. 380,000.00
JUMLAH Rp. 4,535,252.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)
4 1 Unit Bak Peresapan Pasangan Bata Uk. 0.8x0.8x0.8 m
Kerikil/batu pecah (import) 0.0330 M3 Rp. 4,100,000.00 Rp. 135,300.00
Besi tulangan beton dia. 10 mm 4.8500 KG Rp. 5,960.00 Rp. 28,906.00
Pasir semen (lokal) 0.1200 M3 Rp. 372,575.00 Rp. 44,709.00
Pekerja pasir/batu 2.1600 OH Rp. 152,000.00 Rp. 328,320.00
Tukang gali 0.1000 OH Rp. 152,000.00 Rp. 15,200.00
Tukang pasir/batu 0.7200 OH Rp. 194,000.00 Rp. 139,680.00
Kepala tukang pasir/batu 0.0720 OH Rp. 202,000.00 Rp. 14,544.00
Mandor pasir/batu 0.1080 OH Rp. 213,000.00 Rp. 23,004.00
JUMLAH Rp. 729,663.00
5 1 BH Closet jongkok porselin
Closet jongkok porselin 1.0000 Buah Rp. 296,000.00 Rp. 296,000.00
Semen Portland (PC) @ 50 Kg 6.0000 KG Rp. 1,031.70 Rp. 6,190.20
Pasir semen (lokal) 0.0100 M3 Rp. 372,575.00 Rp. 3,725.75
Pekerja pasir/batu 1.0000 OH Rp. 152,000.00 Rp. 152,000.00
Tukang pasir/batu 1.5000 OH Rp. 194,000.00 Rp. 291,000.00
Kepala tukang pasir/batu 0.1500 OH Rp. 202,000.00 Rp. 30,300.00
Mandor pasir/batu 0.1600 OH Rp. 213,000.00 Rp. 34,080.00
JUMLAH Rp. 813,295.00
6 1 BH Closet duduk
Closet duduk toto ecowaser 1.0000 Buah Rp. 1,650,000.00 Rp. 1,650,000.00
Pekerja pasir/batu 3.3000 OH Rp. 152,000.00 Rp. 501,600.00
Tukang pasir/batu 1.1000 OH Rp. 194,000.00 Rp. 213,400.00
Kepala tukang pasir/batu 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor pasir/batu 0.1600 OH Rp. 213,000.00 Rp. 34,080.00
Perlengkapan 6% harga kloset 0.0600 ls Rp. 1,650,000.00 Rp. 99,000.00
JUMLAH Rp. 2,401,100.00
7 1 BH Floor Drain
Floor Drain 1.0000 Buah Rp. 40,000.00 Rp. 40,000.00
Pekerja 0.0100 OH Rp. 152,000.00 Rp. 1,520.00
Tukang pipa 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
Kepala tukang 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0050 OH Rp. 213,000.00 Rp. 1,065.00
JUMLAH Rp. 64,005.00
8 1 Bh Kran Air Dia. 3/4"
Kran air Dia. 3/4" 1.0000 Bh Rp. 34,000.00 Rp. 34,000.00
Seal Tape 0.0250 Set Rp. 9,000.00 Rp. 225.00
Pekerja 0.0100 OH Rp. 152,000.00 Rp. 1,520.00
Tukang pipa 0.1000 OH Rp. 194,000.00 Rp. 19,400.00
Kepala tukang 0.0100 OH Rp. 202,000.00 Rp. 2,020.00
Mandor 0.0500 OH Rp. 213,000.00 Rp. 10,650.00
JUMLAH Rp. 67,815.00
9 1 Bh Washtafel
Washtafel standard 1.0000 Bh Rp. 1,012,700.00 Rp. 1,012,700.00
Semen PC 6.0000 kg Rp. 9,000.00 Rp. 54,000.00
Pasir pasang 0.0100 m3 Rp. 372,575.00 3,725.75
Pekerja 1.2000 OH Rp. 152,000.00 Rp. 182,400.00
Tukang pipa 1.4500 OH Rp. 194,000.00 Rp. 281,300.00
Kepala tukang 0.1500 OH Rp. 202,000.00 Rp. 30,300.00
Mandor 0.1000 OH Rp. 213,000.00 Rp. 21,300.00
Perlengkapan 12% harga washtafel 0.1200 ls Rp. 1,012,700.00 121,524.00
JUMLAH Rp. 1,707,249.00
10 1 Bh Bak cuci stainless
Kitchen sink komplit keran 1.0000 Bh Rp. 1,475,000.00 Rp. 1,475,000.00
Pekerja 0.0300 OH Rp. 194,000.00 Rp. 5,820.00
Tukang 0.3000 OH Rp. 202,000.00 Rp. 60,600.00
Kepala tukang 0.0300 OH Rp. 213,000.00 Rp. 6,390.00
Mandor 0.0015 OH Rp. 213,000.00 Rp. 319.50
JUMLAH Rp. 1,548,129.00
HARGA JUMLAH
No. URAIAN PEKERJAAN ANALISA
SATUAN HARGA
1 2 3 4 5 = (3) x (4)

X. PEKERJAAN INSTALASI LISTRIK


1 1 Titik Instalasi Lampu LED Downlight 10.5 Watt
Kabel NYA 2x1,5 mm 7.0000 M Rp. 20,240.00 Rp. 141,680.00
Lampu LED Downlight 10.5 Watt 1.0000 Buah Rp. 104,075.00 Rp. 104,075.00
Klem Kabel 0.2000 Dos Rp. 29,000.00 Rp. 5,800.00
Isolasi 0.1000 Buah Rp. 17,000.00 Rp. 1,700.00
Sekrup 0.1000 Dos Rp. 15,500.00 Rp. 1,550.00
Upah Memasang 1.0000 LS Rp. 80,000.00 Rp. 80,000.00
JUMLAH Rp. 334,805.00
2 1 Titik Instalasi Lampu LED Downlight 5 Watt
Kabel NYA 2x1,5 mm 7.0000 M Rp. 20,240.00 Rp. 141,680.00
Lampu LED Downlight 5 Watt 1.0000 Buah Rp. 47,725.00 Rp. 47,725.00
Klem Kabel 0.2000 Dos Rp. 29,000.00 Rp. 5,800.00
Isolasi 0.1000 Buah Rp. 17,000.00 Rp. 1,700.00
Sekrup 0.1000 Dos Rp. 15,500.00 Rp. 1,550.00
Upah Memasang 1.0000 LS Rp. 80,000.00 Rp. 80,000.00
JUMLAH Rp. 278,455.00
3 1 Titik Instalasi Lampu LED Bulb 8 Watt
Kabel NYA 2x1,5 mm 7.0000 M Rp. 20,240.00 Rp. 141,680.00
Lampu LED BULB 8 Watt 1.0000 Buah Rp. 41,400.00 Rp. 41,400.00
Klem Kabel 0.2000 Dos Rp. 29,000.00 Rp. 5,800.00
Isolasi 0.1000 Buah Rp. 17,000.00 Rp. 1,700.00
Sekrup 0.1000 Dos Rp. 15,500.00 Rp. 1,550.00
Upah Memasang 1.0000 LS Rp. 80,000.00 Rp. 80,000.00
JUMLAH Rp. 272,130.00
4 1 Titik Lampu Dinding Sorot Minimalis Kotak Eksterior 2 arah 6
Kabel NYA 2x1,5 mm 7.0000 M Rp. 20,240.00 Rp. 141,680.00
Lampu Dinding Sorot Minimalis Kotak Eksterior 2 arah 6 watt 1.0000 Buah Rp. 174,900.00 Rp. 174,900.00
Isolasi 0.1000 Buah Rp. 17,000.00 Rp. 1,700.00
Sekrup 0.1000 Dos Rp. 15,500.00 Rp. 1,550.00
Upah Memasang 1.0000 LS Rp. 80,000.00 Rp. 80,000.00
JUMLAH Rp. 399,830.00
5 1 Titik Instalasi Stop Kontak
Stop Kontak 1.0000 Buah Rp. 52,000.00 Rp. 52,000.00
Kabel NYA 3x2.5 mm 3.0000 M Rp. 20,240.00 Rp. 60,720.00
Klem Kabel 0.2000 Dos Rp. 29,000.00 Rp. 5,800.00
Isolasi 0.1000 Buah Rp. 17,000.00 Rp. 1,700.00
Sekrup 0.1000 Dos Rp. 15,500.00 Rp. 1,550.00
Upah Memasang 1.0000 LS Rp. 80,000.00 Rp. 80,000.00
JUMLAH Rp. 201,770.00
6 1 Titik Saklar Tunggal
Saklar Tunggal 1.0000 Buah Rp. 35,000.00 Rp. 35,000.00
Upah Memasang 1.0000 OH Rp. 80,000.00 Rp. 80,000.00
Alat Bantu + Aksesoris 1.0000 LS Rp. 3,000.00 Rp. 3,000.00
JUMLAH Rp. 118,000.00
7 1 Titik Saklar Ganda
Saklar Ganda 1.0000 Buah Rp. 41,000.00 Rp. 41,000.00
Upah Memasang 1.0000 OH Rp. 80,000.00 Rp. 80,000.00
Alat Bantu + Aksesoris 1.0000 LS Rp. 3,000.00 Rp. 3,000.00
JUMLAH Rp. 124,000.00
8 1 Titik Exhaust fan
Exhaustfan Panasonic 4" 1.0000 Buah Rp. 435,000.00 Rp. 435,000.00
Upah Memasang 1.0000 OH Rp. 100,000.00 Rp. 100,000.00
JUMLAH Rp. 535,000.00
9 1 Titik Exhaust fan
Lampu Taman stand tiang tinggi 4220 A/2 + kabel dan aksesoris 1.0000 Buah Rp. 2,000,000.00 Rp. 2,000,000.00
Upah Memasang 1.0000 OH Rp. 200,000.00 Rp. 200,000.00
JUMLAH Rp. 2,200,000.00
MASTER BACK UP DATA VOLUME
PEMBANGUNAN RUMAH TINGGAL 2 LANTAI

A. PEKERJAAN PERSIAPAN
1 Pengukuran dan Bouwplank Horizontal = 40.20 m
Jumlah Total Vertikal = 27.00 m
= 67.2 m

B. PEKERJAAN TANAH & PONDASI


1 Galian Tanah Pondasi Menerus Panjang Pondasi 30/60/60 73.00 m vertikal 57.9
Vol galian Pondasi 30/50/60 = Luas Penampang x Panjang Pondasi Menerus Lebar Bwh 0.40 m horizontal 65.5
= (0,4 x 0,4) x 73 Dalam 0.40 m
= 11.68 m3 Lebar Atas 0.20 m

Vol galian Pondasi 30/60 = Luas Penampang x Panjang Pondasi Menerus Panjang Pondasi 12.00 m vertikal 6
= (0,4 x 0,5) x 12 Lebar Bwh 0.40 m horizontal 5
= 2.4 m3 Dalam 0.50 m

Vol galian pondasi 20/40 = Luas Penampang x Panjang rollag Panjang Pondasi m vertikal 12
= (x)x Lebar Bwh m horizontal 12
= 0 m3 Dalam m

Vol galian rollag = Luas Penampang x Panjang rollag Panjang Pondasi 9.00 m vertikal 17.9
= (0,1 x 0,15) x 9 Lebar Bwh 0.10 m horizontal 22.92
= 0.135 m3 Dalam 0.15 m

Total = 14.215 m3

2 Urugan Pasir Bawah Pondasi Menerus Panjang Pondasi menerus 73.00 m


Vol Urugan Pasir 30/50/60 = Lebar x Tebal x Panjang Pondasi Menerus Lebar 0.40 m
= (0,4 x 0,05) x 73 Tebal 0.05 m
= 1.46 m3

Vol urugan Pondasi 30/40/50 = Luas Penampang x Panjang Pondasi Menerus Panjang Pondasi 12.00 m vertikal 6
= (0,5 x 0,05) x 12 Lebar Bwh 0.50 m horizontal 5
= 0.3 m3 tebal 0.05 m

Vol urugan pondasi 20/40 = Luas Penampang x Panjang rollag Panjang Pondasi - m vertikal 12
= (0,4 x 0,05) x 0 Lebar Bwh 0.40 m horizontal 12
= 0 m3 tebal 0.05 m

Vol urugan rollag = Luas Penampang x Panjang rollag Panjang Pondasi 9.00 m vertikal 17.9
= (0,4 x 0,05) x 9 Lebar Bwh 0.40 m horizontal 22.92
= 0.18 m3 tebal 0.05 m

Total = 1.94 m3

3 Urugan Pasir Bawah Lantai Ruangan Luas Lantai Ruangan 70.00 m2


Vol Urugan lantai = Luas Penampang Lantai x Tebal Tebal Urugan 0.05 m
= 70 x 0,05
= 3.50 m3

Urugan Pasir Bawah lantai bag. Selasar Luas Lantai Selasar m2


Vol Urugan lantai = Luas Penampang Lantai x Tebal Tebal Urugan m
= x
= - m3

Vol. Urugan Pasir Total = 3.50 m3

4 Urugan tanah kembali


Vol urugan tanah kembali = Luas penampang x panjang pondasi luas penampang 0.11 m2
= 0,1122 x 73 panjang pondasi 73.00 m2
= 8.19

3 Urugan Tanah biasa - Stamper


Vol Urugan Tanah = Luas Penampang x Tebal
= (70 + 5) x 0,3 Luas Penampang Dalam 70.00 m2
= 22.50 m3 Luas Penampang Teras 5 m2
Luas Penampang Teras belakang m2
Tebal Timbunan 0.30 m

4 Urugan Tanah Biasa bagian Selasar - Stamper


Vol Urugan Tanah = Luas Penampang x Tebal
= (x) Luas Penampang m2
= - m3 Tebal Timbunan m

Total = 22.50

5 Cor Lantai Ruangan + Rabat/selasar


Luas Cor = 70.00 m2
Tebal Cor = 0.07 m
Volume = 4.90 m3

6 Pemasangan Keramik lantai Uk. 60 x 60 cm ruang dalam


Luas Lantai Ruangan = 70.00 m2
7 Pemasangan Keramik lantai Uk. 40 x 40 cm bermotif untuk teras
Luas Lantai Ruangan = m2
8 Pemasangan Keramik lantai Uk. 25 x 25 cm berglasir untuk kamar mandi
Luas Lantai Ruangan = 24.00 m2
9 Pemasangankeramik dinding Uk. 40 x 40 cm untuk kamar mandi
panjang permukaan dinding = 34.00 m
tinggi pasangan keramik = 2.00 m
Luas Lantai Ruangan = 68.00 m2
10 Pemasangan plin keramik dinding Uk. 25 x10 cm untuk kamar mandi
panjang permukaan dinding = 34.00 m

11 Pemasangan Granit dinding luar


luas penampang =
tinggi =
total = m2

12 Finishing lantai batu sikat teras depan


luas permukaan =

12 Pemasangan batu alam


luas penampang = m2

13 Pas. Pilar pilar kayu besi


luas penampang = m2
panjang kayu = m
total = m3

14 Pondasi Menerus 30/50/60


Panjang Pondasi 30/40/50 = 73.00 m
Lebar Atas Pondasi = 0.20 m
Lebar Bawah Pondasi = 0.40 m
Tinggi Pondasi = 0.40 m

Vol Pondasi Menerus 30/60/60 = Luas Penampang x Panjang


= (((0,2 + 0,4) / 2) x 0,4) x 73
= 8.76 m3
155
155
### Rollag bata
Panjang Pondasi = 9.00 m
Lebar Atas Pondasi = 0.10 m
Lebar Bawah Pondasi = 0.10 m
Tinggi Pondasi = 0.30 m

Vol Pondasi Menerus = Luas Penampang x Panjang


= 0.27 m3
155

### Cor Sloof 25X 40 cm


lebar 0.15 m
Tinggi 0.20 m
Luas 0.03 m2
u/ 1 m3 33.3 m

Panjang Sloof = 53.00 m Vertikal = 124 m


Horizontal = m
Vol Cor Sloof = Luas Penampang x Panjang
= (0,15 x 0,2) x 53
= m3
Vol Besi dia. 13 = Jml tul pokok = 8 slonjor
pjg tul pokok = 53.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 376.41024 kg
Vol Besi beugel dia. 10
pjg 1 buah beugel = 0.72 m
pjg sloof = 53.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 156.8376 kg
Vol Bekisting
pjg bekisting = 53.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting
= 26.5 m2 dua kali pemakaian = 13.25 m2

2 Cor Sloof 20X 30 cm


lebar 0.15 m
Tinggi 0.20 m
Luas 0.03 m2
u/ 1 m3 33.3 m

Panjang Sloof = 53.00 m Vertikal = 6 m


Horizontal = m
Vol Cor Sloof = Luas Penampang x Panjang
= (0,15 x 0,2) x 53
= 1.59 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 53.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 188.20512 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 53.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 96.672 kg
Vol Bekisting
pjg bekisting = 53.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting
= 26.5 m2 dua kali pemakaian = 13.25 m2

### Cor Pondasi Poer Plat 130x130cm


lebar 1.3 m
Tinggi 1.3 m
Luas 1.69 m2
u/ 1 m3 0.591716 m

Banyaknya = 35.00 m Vertikal = 0.25 m


Horizontal = m
Vol Poerplat = Luas Penampang x Panjang
= ( x ) x 35
= m3
Vol Besi dia. 16 = Jml tul pokok = 44 slonjor
pjg tul pokok = 3.10 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 0 kg
Vol Bekisting
pjg bekisting = 35.00 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting
= 14 m2 dua kali pemakaian = 7 m2

3 Cor Pondasi Poer Plat 100*100cm


lebar 1m
Tinggi 1m
Luas 1 m2
u/ 1 m3 1m

Banyaknya = 35.00 m Vertikal = 0.25 m


Horizontal = m
Vol Poerplat = Luas Penampang x Panjang
= ( x ) x 35
= 8.75 m3
Vol Besi dia. 13 = Jml tul pokok = 36 slonjor
pjg tul pokok = 2.50 m
berat jenis besi / m' = 1.04 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 3276 kg
Vol Bekisting
pjg bekisting = 35.00 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting
= 14 m2 dua kali pemakaian = 7 m2

### Cor Kolom 30x25 cm Tinggi Kolom = 4.00 m 271


lebar 0.20 m Jumlah Kolom = 2.00 bh
Panjang 0.20 m
Luas 0.04 m2
u/ 1 m3 25.0 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,2 x 0,2) x 4) x 2
= 0.32 m3
Vol Besi dia. 16 = Jml tul pokok = 8 slonjor
pjg tul pokok = 4.00 m
berat jenis besi / m' = 1.67 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 106.88 kg
Vol Besi beugel dia. 10
pjg 1 buah beugel = 1.1 m
pjg kolom = 4.00 m
jarak antar beugel = 0.20 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 27.28 kg
Vol Bekisting
pjg bekisting = 4.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 4 m2 dua kali pemakaian = 2 m2

2 Cor Kolom 30x15 cm Tinggi Kolom = 4.00 m 271


lebar 0.30 m Jumlah Kolom = 3.00 bh
Panjang 0.15 m
Luas 0.05 m2
u/ 1 m3 22.2 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,3 x 0,15) x 4) x 3
= m3
Vol Besi dia. 16 = Jml tul pokok = 6 slonjor
pjg tul pokok = 4.00 m
berat jenis besi / m' = 1.67 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 120.24 kg
Vol Besi beugel dia. 10
pjg 1 buah beugel = 0.9 m
pjg kolom = 4.00 m
jarak antar beugel = 0.20 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 33.48 kg
Vol Bekisting
pjg bekisting = 4.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 6 m2 dua kali pemakaian = 3 m2

3 Cor Kolom 15x15 cm Tinggi Kolom = 2.00 m 271


lebar 0.20 m Jumlah Kolom = 32.00 bh
Panjang 0.20 m
Luas 0.04 m2
u/ 1 m3 25.0 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,2 x 0,2) x 2) x 32
= 2.56 m3
Vol Besi dia. 10 = Jml tul pokok = 4 slonjor
pjg tul pokok = 2.00 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 158.72 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.6 m
pjg kolom = 2.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 97.28 kg
Vol Bekisting
pjg bekisting = 2.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 32 m2 dua kali pemakaian = 16 m2

3 Cor Kolom 15x40 cm Tinggi Kolom = 3.50 m 271


lebar 0.15 m Jumlah Kolom = 3.00 bh
Panjang 0.40 m
Luas 0.06 m2
u/ 1 m3 16.7 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,15 x 0,4) x 3,5) x 3
= m3
Vol Besi dia. 16 = Jml tul pokok = 12 slonjor
pjg tul pokok = 3.50 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.1 m
pjg kolom = 3.50 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 47.74 kg
Vol Bekisting
pjg bekisting = 3.50 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 5.25 m2 dua kali pemakaian = 2.625 m2
3 Cor Kolom 15x40 (L) cm Tinggi Kolom = 3.50 m 271
lebar 0.15 m Jumlah Kolom = 2.00 bh
Panjang 0.40 m
Luas 0.06 m2
u/ 1 m3 16.7 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,15 x 0,4) x 3,5) x 2
= m3
Vol Besi dia. 16 = Jml tul pokok = 12 slonjor
pjg tul pokok = 3.50 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.1 m
pjg kolom = 3.50 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= kg
Vol Bekisting
pjg bekisting = 3.50 m
lbr bekisting (v) = 0.15 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 2.1 m2 dua kali pemakaian = 1.05 m2

3 Cor Kolom 15x40 (I) cm Tinggi Kolom = 3.50 m 271


lebar 0.15 m Jumlah Kolom = 7.00 bh
Panjang 0.40 m
Luas 0.06 m2
u/ 1 m3 16.7 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,15 x 0,4) x 3,5) x 7
= m3
Vol Besi dia. 16 = Jml tul pokok = 8 slonjor
pjg tul pokok = 3.50 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.1 m
pjg kolom = 3.50 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= kg
Vol Bekisting
pjg bekisting = 3.50 m
lbr bekisting (v) = 0.15 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 7.35 m2 dua kali pemakaian = 3.675 m2

3 Cor Balok B1 Panjang balok = 53.00 m 271


lebar 0.13 m
Panjang 0.20 m
Luas 0.03 m2
u/ 1 m3 38.5 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,13 x 0,2) x 53) x
= 1.38 m3
Vol Besi dia. 16 = Jml tul pokok = 11 slonjor
pjg tul pokok = 53.00 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 915.31 kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.8 m
pjg kolom = 53.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 394.32 kg
Vol Bekisting
pjg bekisting = 53.00 m
lbr bekisting (v) = 0.3 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 31.8 m2 dua kali pemakaian = 15.9 m2

3 Cor Balok B2 Panjang balok = 33.00 m 271


lebar 0.20 m
Panjang 0.30 m
Luas 0.06 m2
u/ 1 m3 16.7 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,2 x 0,3) x 33) x
= 1.98 m3
Vol Besi dia. 16 = Jml tul pokok = 7 slonjor
pjg tul pokok = 33.00 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 362.67 kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.4 m
pjg kolom = 33.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 190.96 kg
Vol Bekisting
pjg bekisting = 33.00 m
lbr bekisting (v) = 0.25 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 16.5 m2 dua kali pemakaian = 8.25 m2

3 Cor Balok B3 Panjang balok = 15.00 m 271


lebar 0.15 m
Panjang 0.20 m
Luas 0.03 m2
u/ 1 m3 33.3 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,15 x 0,2) x 15) x
= 0.45 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 15.00 m
berat jenis besi / m' = 1.04 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 62.4 kg
Vol Besi beugel dia.8
pjg 1 buah beugel = 1 m
pjg kolom = 15.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 38 kg
Vol Bekisting
pjg bekisting = 15.00 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 6 m2 dua kali pemakaian = 3 m2

3 Cor Balok RB1 Panjang balok = 10.00 m 271


lebar 0.20 m
Panjang 0.30 m
Luas 0.06 m2
u/ 1 m3 16.7 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,2 x 0,3) x 10) x
= - m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 10.00 m
berat jenis besi / m' = 1.04 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 41.6 kg
Vol Besi beugel dia.8
pjg 1 buah beugel = 1 m
pjg kolom = 10.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 25.333333 kg
Vol Bekisting
pjg bekisting = 10.00 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 4 m2 dua kali pemakaian = 2 m2

3 Cor Balok RB2 Panjang balok = 39.60 m 271


lebar 0.25 m
Panjang 0.45 m
Luas 0.11 m2
u/ 1 m3 8.9 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,25 x 0,45) x 39,6) x
= m3
Vol Besi dia. 16 = Jml tul pokok = 4 slonjor
pjg tul pokok = 39.60 m
berat jenis besi / m' = 1.57 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 248.688 kg
Vol Besi beugel dia.10
pjg 1 buah beugel = 1.4 m
pjg kolom = 39.60 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 229.152 kg
Vol Bekisting
pjg bekisting = 39.60 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 15.84 m2 dua kali pemakaian = 7.92 m2

3 Cor Balok Lintel Panjang balok = 39.60 m 271


lebar 0.15 m
Panjang 0.20 m
Luas 0.03 m2
u/ 1 m3 33.3 m

Vol Cor Kolom = (Luas Penampang x Tinggi Kolom) x Jml. Kolom


= ((0,15 x 0,2) x 39,6) x
= m3
Vol Besi dia. 10 = Jml tul pokok = 4 slonjor
pjg tul pokok = 39.60 m
berat jenis besi / m' = 0.62 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m' x jml kolom
= 98.208 kg
Vol Besi beugel dia.8
pjg 1 buah beugel = 0.7 m
pjg kolom = 39.60 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 70.224 kg
Vol Bekisting
pjg bekisting = 39.60 m
lbr bekisting (v) = 0.2 m
lbr bekisting (h) =
Vol bekisting = pjg bekisting x lebar bekisting x jml kolom
= 15.84 m2 dua kali pemakaian = 7.92 m2

Pek.Dinding Pas.batu bata

4 Cor Kanopi
- Kanopi depan = 6 6 0.59
- Kanopi s. kanan = 1.7

- Kanopi s. kiri = 1.01

Total 8.71 m3
Vol besi dia. 8 v = 12.8 m
h = 33.333333 m berat jenis besi / m' = 0.3946 kg
Total 13.152 kg
Vol bekisting v = 12.8 m
h = 0.5 m
Total 6.4 m2 dua kali pemakai = 3.2 m2

5 Plat Dak Teras depan t=10 cm


Luas = 6.2 m2
Tebal = 0.1 m

Vol. Cor = 0.62 m3


Vol besi dia. 10 h 4.232 m berat jenis besi / m' = 0.6165 kg
v 2.0266692 m
6.2586692 m
Total 3.8584695 kg
bekisting = 6.2 m2 dua kali pemakaian = 3.1 m2

1 Plat Dak Talang beton t=10 cm


Luas Penampang = 0.878 m2 panjang besi 8 (h) = 115.5 m
Tebal = 0.1 m panjang besi 8 (v) = 23.333 m
Panjang talang = 3.5 m 138.83 m
Vol. Cor = 3.073 m3 berat jenis besi / m' = 1.57 kg
Vol besi dia 8 = 217.96833 kg
bekisting = 3.29 m2 dua kali pemakaian = 1.645 m2

2 Plat Dak beton samping t=10 cm


Luas Penampang = 1.693 m2 panjang besi 8 (h) = 105 m
Tebal = 0.1 m panjang besi 8 (v) = 13.44 m
Panjang talang = 2.1 m 118.44 m
Vol. Cor = 3.5553 m3 berat jenis besi / m' = 1.57 kg
Vol besi dia 8 = 185.9508 kg
bekisting = 1.974 m2 dua kali pemakaian = 0.987 m2

2 Plat Dak beton Belakang t=10 cm


Luas Penampang = 1.678 m2 panjang besi 8 (h) = 49.32 m
Tebal = 0.1 m panjang besi 8 (v) = 26.304 m
Panjang talang = 4.11 m 75.624 m
Vol. Cor = 6.89658 m3 berat jenis besi / m' = 1.57 kg
Vol besi dia 8 = 118.72968 kg
bekisting = 3.8634 m2 dua kali pemakaian = 1.9317 m2

Total Volume Dak


Vol.cor = 13.52488 m3
Vol.besi = 522.64881 kg
Vol.bekisting = 4.5637 m2
Cor Tangga
lebar 1.2 m
Tinggi 3.5 m
Luas 4.2 m2
u/ 1 m3 0.2380952 m

Banyaknya = 1.00 m Vertikal = 0.3 m


Horizontal = m
Vol tangga = Luas Penampang x Panjang
= (x)x1
= 1.26 m3
Vol Besi dia. 13 = Jml tul pokok = 72 slonjor
pjg tul pokok = 3.50 m
berat jenis besi / m' = 1.04 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 262.08 kg
Vol Bekisting
pjg bekisting = 1.00 m
lbr bekisting (v) = 1.2 m
lbr bekisting (h) = 3.5
Vol bekisting = pjg bekisting x lebar bekisting
= 8.4 m2 dua kali pemakaian = 4.2 m2

1 Pasangan dinding bata merah


Panjang dinding total = 73 h 75 m v 69 m
tinggi dinding = 0.5 m
luas dinding total = 36.5 m2
Pengurangan luas dinding
Bukaan Pintu = m2
Bukaan Jendela = m2 PG = 9.99 m2
Bukaan Jalusi = m2 PT = 1.47 m2
total volume dinding = 36.50 m2 PJ1 = 14.31 m2
PJ = 4.32 m2
P1 = 2.00 m2
PJ2 = 7.82 m2
PJ3 = 5.10 m2
P1 = 16.80 m2
PK = 2.70 m2
PT = 1.47 m2

RO = 5.40 m2
J4 = 8.97 m2
J5 = 20.10 m2
J1 = 2.60 m2
J2 = 4.93 m2
J3 = 5.98 m2

V1 = 3.04 m2
v1 = 1.52 m2
js = 5.43 m2

1 Penebalan didning
penampang1 m2 tinggi = m 0 m3
penampang2 m2 tinggi = m 0 m3
penampang3 m2 tinggi = m 0 m3
penampang4 m2 tinggi = m 0 m3
penampang5 m2 tinggi = m 0 m3
penampang6 m2 tinggi m 0 m3
penampang7 m2 tinggi m 0 m3
total = 0 m3 0 m2 dibagi 10cm tebal dinding

2 Luas Plesteran Dinding Ruangan = 36.50 m2


Jumlah Total Plesteran = 36.50 m2

3 Luas aCian Dinding luar = 36.50 m2


Luas acian Talang beton = 8.78 m2
Luas acian langit langit dag = m2
Jumlah Total Acian = 45.28 m2

4 Luas plamur Dinding dalam = 36.50 m2


Jumlah Total Plamur = 36.50 m2

5 Kusen Alumunium Pintu dan Jendela


Kusen PG = 21.750 m 1 Bh
Kusen PT = 5.600 m 1 Bh
Kusen PJ1 = 26.700 m 2 Bh
Kusen PJ = 12.900 m 1 Bh
Kusen P1 = 10.658 m 1 Bh
Kusen PJ2 = 19.750 m 1 Bh
Kusen PJ3 = 0.000 m 1 Bh
Kusen P1 = 7.800 m 1 Bh
Kusen PK = 8.000 m 1 Bh

Kusen RO =
Kusen J4 = 23.350
Kusen J5 = 35.100 2
Kusen J1 = 8.300
Kusen J2 = 13.650
Kusen J3 = 17.300
Kusen v2 = 12.450 3
Js = 16.210
Total 239.518 m
Penampang Kusen = 0.003 m2
Vol Kusen = Jumlah Panjang Kusen x Luas Penampang
= (239,5182) x (0,0032)
= 0.76645824 m3

6 Kusen kayu Pintu dan Jendela


Kusen P5 = 5.600 m 1 Bh
Kusen PG = m 1 Bh
5.600 m

7 Kusen Ventilasi
panjang = 6.050 m jumlah ventilasi = 3
penampang = 0.007 m2
Vol kusen ventilasi = 0.131 m3

5 Pasang lisplank papan


Panjang = 13 m2
Total Panjang = 26 m2

6 Rangka Plafond 12.61


Luas = 320 m2
Total Luas = 320 m2

7 Pemasangan Kuda-kuda baja ringan


kuda-kuda K1 = 302.64 m2 12 pjg = 25.22 m penampang = m2 3,22+2+1,89+0,9+4,6
total = 302.64 m2

8 Pemasangan Gording kayu 5/10


Panjang Gording = 195 m v 13 h 15
penampang = 0.0016 m2
total = 0.312 m3

9 Luas Atap
Luas Total Atap = 122.222 m2

10 Panjang Bubungan Atap


Bubungan Atas Lurus = 13 m
Jumlah Total = 13.000 m

11 Ca tembok
luasan tembok luar+talang beton = 36.500 m2
luasan tembok dalam = 36.500 m2
total = 73.000 m2

12 Cat plafond
Total luasan cat plafond = 320.000 m2

13 Cat kilat kayu kusen pintu dan jendela


panjang kusen = 239.518 m
penampang yang kena cat = 0.240 m
total = 57.484 m2
14 Cat kilat kayu daun pintu dan jendela
p1 = 2 m2
p2 = 1.76 m2
p3 = m2
j1 = m m2
j2 = m m2
j3 = - m2
j4 = - m2
j5 = - m2
total m2
m2

15 Cat residu kuda-kuda


panjang kuda-kuda = m
luas penampang terkena cat = m
total = m2

16 Cat residu gording


panjang gording = m
luas penampang terkena cat = m
total = m2

17 Lapisan waterproofing dak


luas lapisan dak = m2

MUSHOLA
A PENGUKURAN DAN PASANG BOUWPLANK

B PEKERJAAN TANAH DAN PONDASI


1 Galian tanah pondasi
luas penampang = panjang = 0.4 m
lebar = 0.45 m
tinggi = m
jmlh = 10.000 bh
vol galian = 1.8 m3

2 Urugan pasir pond = panjang = 0.4 m


lebar = 0.45 m
tinggi = 0.050 m
jmlh = 10.000 bh
vol. urugan pasir = 0.09 m3

3 Urugan tanah kembali


luas penampang = 0.005 m2
panjang = 1.2 m
jmlh = 10.000 bh
vol urugan kembali = 0.06 m3

4 Cor pondasi umpak beton


luas penampang = panjang = m
lebar = m
tinggi = m
jmlh = bh
vol cor umpak beton = 0 m3

5 Pas bata tangga depan


luas penampang = 0.5 m2
panjang tangga = 2.5 m
Vol pas bata = 1.25 m3

C PEKERJAAN BETON
1 Pas. Sloof 15x20 =
penampang sloof = 0.03 m2 4
panjang sloof = 10 m
total = 0.3 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 10.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 35.5104 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 10.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 18.24 kg
2 Ringbalk 13/13
penampang sloof = 0.0169 m2 2.6
panjang ringbalk = 10 m
total = 0.169 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 10.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 35.5104 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 10.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 18.24 kg
2 Kolom 15/15
penampang sloof = 0.0225 m2 2.6
panjang ringbalk = 10 m
total = 0.225 m3
Vol Besi dia. 10 = Jml tul pokok = 4 slonjor
pjg tul pokok = 10.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 35.5104 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 10.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 18.24 kg

8 Pas.dinding partisi Hollow =


luasan penampang = 2.82 m2
total = 2.82 m2

9 Ornamen GRC Mihrab =


penampang = 1.13 m2
pjg bingkai = 1m
total = 1.13 m3

10 Papan mihrab multipleks Lapis HPL


luas permukaan dinding = m2

11 Kaligrafi Allumunium = 1 Ls

D PEKERJAAN ATAP DAN PLAFOND


1 Pas kuad-kuda CNP. 0.75mm =
luas penampang balok = 0.2625 m2
panjang kuda-kuda = 10.2 m
total = 2.6775 m3

2 Pas. Reng =
luas penampang balok = 0.0016 m2
panjang gording = 20.4 m
total = 0.03264 m3

3 Atap allumunium =
total = 10.37 m2

4 bubungan atap = 9.54 m

5 lisplank papan 2/20 = 9.4 m


6 Pas plafond gypsum = 10.37 m2

landscape
I PEKERJAAN KOLAM DAN TAMAN BELAKANG
A PENGUKURAN DAN PASANG BOUWPLANK

B PEKERJAAN TANAH
1 Perapihan galian eksisting = 1 LS
2 Galian Tanah pondasi =
Penampang galian = 0.0598 m2
panjang galian = 24.52 m
total = 1.466296 m3
3 Urugan Pasir Bwaha pondasi =
penampang urugan = 0.013 m2
Panjang urugan = 24.52 m
total = 0.31876 m3
4 Urugan pasir bawah lantai =
Luas urugan = 5.98 m2
tebal urugan = 0.05 m
total = 0.299 m3
5 urugan tanah kembali = 0.4887653 m3
6 Pondasi menerus rolag =
penampang pondasi = 0.04 m2
panjang pondasi = 24.52 m
total = 0.9808 m3
7 Pas. Rolag bata pinggiran kolam
penampang rolag = 0.05 m2
panjang pasangan = 32 m
total = 1.6 m3
8 Box lampu hias taman /brg jadi = 4 bh
9 lampu LED bulb 8 watt = 4 bh

B PEKERJAAN COR DAN PASANGAN


1 Pas. Sloof =
penampang sloof = 0.0225 m2
panjang sloof = 24.52 m
total = 0.5517 m3
2 Ringbalk 13/13
penampang sloof = 0.0169 m2
panjang ringbalk = 24.52 m
total = 0.414388 m3
3 Pas. Dinding kolam
tinggi dinding = 0.72 m
panjang dinding = 24.52 m
total = 17.6544 m2
4 Plester dinding
tinggi dinding = 0.72 m
panjang dinding = 24.52 m
total = 17.6544 m2
5 cor lantai kolam =
luas lantai = 5.98 m2
timggi cor lantai = 0.07 m
total = 0.4186 m3
6 Cor lantai pinggiran kolam
penampang cor lantai = 0.0435
panjang cor lantai = 28
total = 1.218 m3
7 Cor lantai jalan taman
luas cor lantai = 21 m2
tebal cor = 0.05 m
total = 1.05 m3

8 pek seni waterfall batu alam = 1 ls


9 box pas bata tempat pompa =
panjang = 3.12 m
lebar = 0.4 m
tebal = 0.1 m
total = 0.1248 m3
10 pembuatan kursi beton taman
penampang bangku beton = 0.98
lebar = 0.4
total = 0.784 m3
11 cor pijakan taman =
luas penampang = 8.379 m2
tebal cor = 0.04 m
total = 0.33516 m3
12 pas dinding pot taman
pot1
luas penampang = 0.71182 m3
= 0.40063 m3
total = 11.1245 M2
13 plesteran dinding pot
luas permukaan plester = 7.2469 m2
= 3.505 m2
total = 10.7519 m2
14 urugan tanah timbun =
luas timbunan = 1.4985 m3
= 1.628 m3
3.1265 m3

II PEKERJAAN TEMPAT WUDHU


1 Urugan pasir t=5cm =
luas penampang = 1.903 m2
tebal urugan = 0.05 m
total = 0.09515 m3
2 Cor lantai
luas penampang = 1.903 m2
tebal cor = 0.05 m
total = 0.09515 m3
3 Pas sinsing tempat wudhu
ppenampang = 0.24 m2
tinggi = 1.1
total = 0.264 m3
4 plesteran dinding
luas penampang = 2.13 m2

III PEKERJAAN SELASAR CUCI JEMUR


1 URUGAN PASIR T=5CM
Luas = 8.82
tinggi urugan = 0.05
total = 0.441 m3
2 cor lantai t=5cm
luas = 8.82
tebal cor = 0.05
total = 0.441 m3
3 pas dinding pot taman
vol penampang = 1.54 M2
4 plesteran dinding = 1.62 m2
5 Pas. Bata saluran
panjang = 48 m2
penampang rolag = 0.03 m
total = 14.4 m3
6 Cor lantai saluran
penampang cor = 0.0075
panjang = 48
total = 0.36 m3

IV PEKERJAAN LANDSCAPE DEPAN


1 Urugan pasir t=3cm
luas = 115.65 m2
tebal urugan = 0.03 m
total = 3.4695 m3
2 pas pavinf block = 115.65 m2
3 pas bata pinggiran =
luas penampang = 4.86 m2
tinggi = 0.1 m
total = 0.486 m3
4 cor pijakan
luas penampang = 4.69 m2
tebal cor = 0.04 m
total = 0.1876 m3
5 pas bata pot taman
penampang = 1.113 m3
= 0.759 m3
= 0.378 m3
total = 2.25 m3
= 22.5 m2
6 urugan tanah pot
luasan = 6.5965 m3
7

PAGAR
I PEKERJAAN PAGAR RUMAH
A PENGUKURAN DAN PASANG BOUWPLANK

B PEKERJAAN TANAH
1 Galian Tanah pondasi =
Penampang galian = 0.16 m2
panjang galian = 28 m
total = 4.48 m3
2 Urugan Pasir Bwaha pondasi =
penampang urugan = 0.008 m2
Panjang urugan = 28 m
total = 0.224 m3
3 Urugan pasir bawah lantai =
Luas urugan = 14 m2
tebal urugan = 0.05 m
total = 0.7 m3
4 urugan tanah kembali = 1.4933333 m3
5 Pondasi menerus Pas Bata =
penampang pondasi = 0.08 m2
panjang pondasi = 28 m
total = 2.24 m3

B PEKERJAAN COR DAN PASANGAN


1 Pas. Sloof 15x20 =
penampang sloof = 0.03 m2 11.2
panjang sloof = 28 m
total = 0.84 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 28.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 99.42912 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 28.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 51.072 kg
2 Ringbalk 13/13
penampang sloof = 0.0169 m2 7.28
panjang ringbalk = 28 m
total = 0.4732 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 28.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 99.42912 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 28.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 51.072 kg
3 Pas. Dinding bata pagar
tinggi dinding = 1.6 m
panjang dinding = 20 m
total = 32 m2
4 Plester dinding
tinggi dinding = 1.6 m
panjang dinding = 20 m
total = 32 m2
5 Pas. Dinding Rouster =
tinggi dinding = 1 m2
Panjang dinding = 3m
total = 3 m3
6 Pas.batu alam
Tinggi batu alam = 1.5
panjang batu alam = 3.6
total = 5.4 m3
7 Kolom 20/20
penampang kolom = 0.04 m2 5.12
Tinggi kolom = 1.6 m
jumlah kolom = 4
total = 0.256 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 4.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 14.20416 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 4.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 7.296 kg
8 Kolom 15/20
penampang kolom = 0.03 m2 2.56
Tinggi kolom = 1.6 m
jumlah kolom = 4
total = 0.192 m3
Vol Besi dia. 13 = Jml tul pokok = 4 slonjor
pjg tul pokok = 4.00 m
berat jenis besi / m' = 0.89 kg
Vol berat besi total = (Jml tul pokok x pjg tul) x berat jenis besi / m'
= 14.20416 kg
Vol Besi beugel dia. 8
pjg 1 buah beugel = 0.72 m
pjg sloof = 4.00 m
jarak antar beugel = 0.15 m
berat jenis besi / m' = 0.38 kg
Vol berat besi total = ((pjg sloof / jarak beugel) x pjg 1 beugel) x berat jenis besi
= 7.296 kg
9 kolom pendek 20/20
penampang kolom = 0.03 m2 0.24
Tinggi kolom = 0.1 m
jumlah kolom = 6
total = 0.018 m3

8 Pek Pagar Tralis besi Type B = 7m


9 Pek Pintu Pagar Besi = 1 Ls
10 pembuatan kursi beton taman
13 plesteran penebalan kolom
luas permukaan plester = 3.84 m2
= m2
total = 3.84 m2
14 Cat Tembok Pagar =
Luas permukaan = 32 m2
= m2
32 m2
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN PAGAR
LOKASI : Jl.NDOREM KAI
KAB. / PROVINSI : MERAUKE
TAHUN ANGGARAN : 2021

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp. -


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp. -
C PEKERJAAN BETON DAN STRUKTUR ............................................................................ Rp. -
D PEKERJAAN ARSITEKTUR ............................................................................ Rp. -
E PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp. -
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA ............................................................................ Rp. -
G PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp. -
H PEKERJAAN SANITAIR ............................................................................ Rp. -
I PEKERJAAN PENGECATAN ............................................................................ Rp. -
J PEKERJAAN AKHIR ............................................................................ Rp. -

REAL COST ( RC ) ............................................................................ Rp. -

DIBULATKAN ............................................................................ Rp. -

Terbilang :

MERAUKE, 07 MARET 2021


BQ (BILL OF QUANTITY)
PEKERJAAN : PEMBANGUNAN PAGAR
LOKASI : Jl.NDOREM KAI
KAB. / PROVINSI : MERAUKE
TAHUN ANGGARAN : 2021

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. Rp. -
JUMLAH A Rp. -
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 14.22 M3 Rp. Rp. -
2 Urugan Pasir Bawah Pondasi 1.94 M3 Rp. Rp. -
3 Urugan Pasir Bawah Lantai 3.50 M3 Rp. Rp. -
4 Urugan Tanah Kembali 8.19 M3 Rp. Rp. -
5 Timbunan Tanah Biasa 22.50 M3 Rp. Rp. -
6 Pondasi Menerus Bata 30/60/60, 1 Pc : 4 Ps (Pasir Lokal) 8.76 M3 Rp. Rp. -
7 Rolag Bata Rabat 1 Pc : 4 Ps (Pasir Lokal) 0.27 M3 Rp. Rp. -
JUMLAH B Rp. -
C PEKERJAAN BETON DAN STRUKTUR
1 Sloof, Uk. 20X25 cm
- Bekisting 2x Pakai 13.25 M2 Rp. Rp. -
- Besi Dia. 8 mm 156.84 Kg Rp. Rp. -
- Besi Dia. 10 mm 376.41 Kg Rp. Rp. -
- Cor Beton, 1 Pc : 2 Ps : 3 Kr - M3 Rp. Rp. -
2 Pondasi Poer Plat 80x80 cm
- Bekisting 2x Pakai 7.00 M2 Rp. Rp. -
- Besi Dia. 10 mm - Kg Rp. Rp. -
- Cor Beton, 1 Pc : 2 Ps : 3 Kr - M3 Rp. Rp. -
3 Kolom KL1, Uk. 30 x 30 cm
- Bekisting 2x Pakai 2.00 M2 Rp. Rp. -
- Besi Dia. 8 mm 27.28 Kg Rp. Rp. -
- Besi Dia. 10 mm 106.88 Kg Rp. Rp. -
- Cor Beton, 1 Pc : 2 Ps : 3 Kr 0.32 M3 Rp. Rp. -
5 Pas. Kayu besi Tiang balok 10/10 0.68 M3 Rp. Rp. -
6 Pas. Rangka dinding regel kayu besi balok 5/10 3.60 M3 Rp. Rp. -
7 Pas. Kayu Besi balok meerplat 10/10 1.24 M3 Rp. Rp. -
JUMLAH C Rp. -

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe
D PEKERJAAN ARSITEKTUR
1 Cor Lantai, 1 Pc : 3 Ps (Pasir Lokal) 4.90 M3 Rp. Rp. -
2 Pas. Lantai Keramik Uk. 40 x 40 cm (Pasir Lokal) 70.00 M2 Rp. Rp. -
3 Pas. Keramik Berglasir Lantai KM/WC Uk. 25 x 25 cm (Pasir Lokal) 24.00 M2 Rp. Rp. -
4 Pas. Keramik Dinding KM/WC 25/40 (Pasir Lokal) 68.00 M2 Rp. Rp. -
5 Pas. Plin Keramik Dinding KM/WC 25/10 (Pasir Lokal) 34.00 M2 Rp. Rp. -
6 Pas. Dinding Bata, 1 Pc : 4 Ps (Pasir Lokal) - M2 Rp. Rp. -
7 Plesteran, 1 Pc : 3 Ps (Pasir Lokal) 36.50 M2 Rp. Rp. -
8 Acian dinding luar 45.28 M2 Rp. Rp. -
9 Plamur dinding dalam 36.50 M2 Rp. Rp. -
JUMLAH D Rp. -
E PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu 5/10 302.64 M3 Rp. Rp. -
2 Pemasangan Gording Kayu 5/10 0.31 M3 Rp. Rp. -
3 Pas. Atap Allumunium Gelombang 122.22 M2 Rp. Rp. -
4 Nok Atap Allumunium 13.00 M1 Rp. Rp. -
5 Pasang Lisplank Papan 2/20 26.00 M1 Rp. Rp. -
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) 320.00 M2 Rp. Rp. -
JUMLAH E Rp. -
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pas. Kusen Pintu dan Jendela, Kayu Kls II 6/12 cm 0.77 M3 Rp. Rp. -
2 Pas. Kusen Alumunium Pintu dan Jendela 5.60 M Rp. Rp. -
3 Pas. Pintu Panel Kayu 1.00 Bh Rp. Rp. -
4 Pas. Pintu Kamar Mandi 1.00 Bh Rp. Rp. -
5 Pas. Jendela kaca J1 1.00 Bh Rp. Rp. -
6 Pas. Jendela kaca J2 1.00 Bh Rp. Rp. -
7 Pas. Jendela kaca J3 1.00 Bh Rp. Rp. -
8 Pas. Jendela Kaca J4 1.00 Bh Rp. Rp. -
9 Pas. Jendela kaca J5 1.00 Bh Rp. Rp. -
10 Pas. Kusen Ventilasi 80x80 0.13 M3 Rp. Rp. -
JUMLAH F Rp. -
No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe
G PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED 5 Watt 1.00 Titik Rp. Rp. -
2 Instalasi Lampu LED Downlite 18 Watt 8.00 Titik Rp. Rp. -
3 Instalasi Lampu Gantung LED 18 Watt 7.00 Titik Rp. -
4 Instalasi Saklar Tunggal 2.00 Titik Rp. Rp. -
5 Instalasi Saklar Ganda 5.00 Titik Rp. Rp. -
6 Instalasi Stop Kontak 7.00 Titik Rp. Rp. -
JUMLAH G Rp. -
H PEKERJAAN SANITAIR
1 Instalasi Pipa Air bersih & Air Kotor 1.00 Ls Rp. Rp. -
2 Pas. Kran 3/4" 5.00 Bh Rp. Rp. -
3 Closet jongkok Porselin Merk TOTO 1.00 Bh Rp. Rp. -
4 Floor Drain 1.00 Bh Rp. Rp. -
5 Septictank Uk. 2x1x1,5 m 1.00 Unit Rp. Rp. -
6 Bak Peresapan Uk. 0.7x0.7x0.7 m 1.00 Unit Rp. Rp. -
JUMLAH H Rp. -
I PEKERJAAN PENGECATAN
1 Cat Tembok 36.50 M2 Rp. Rp. -
2 Cat Plafond 320.00 M2 Rp. Rp. -
3 Cat Kilat Kusen Pintu dan Jendela 57.48 M2 Rp. Rp. -
4 Cat Kilat Daun Pintu dan Jendela 0.00 M2 Rp. Rp. -
5 Cat Residu kuda-kuda 0.00 M2 Rp. Rp. -
6 Cat Residu Gording 0.00 M2 Rp. Rp. -
JUMLAH I Rp. -
J PEKERJAAN AKHIR
1 Pembersihan Akhir 1.00 Ls Rp. Rp. -
2 Pemasangan Hidrolik Carwash 1.00 Ls Rp. Rp. -
JUMLAH J Rp. -
DAFTAR HARGA SATUAN BAHAN

KEGIATAN :
PEKERJAAN :
LOKASI :
KABUPATEN / PROPINSI :
TAHUN ANGGARAN :
SUMBER DANA :

PERIODE : LOKASI :
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin (Non Subsidi) MA.1 Liter 14,619.00 0% 401.00 7,510.00
2 Solar (Non Subsidi) MA.2 Liter 13,723.00 0% 401.00 7,062.00
3 Minyak Tanah (Non Subsidi) MA.3 Liter 12,243.00 0% 401.00 6,322.00
4 Minyak Pelumas / Olie MA.4 Liter 35,000.00 0% 407.00 17,703.50
5 Minyak Bekisting / Oli Bekas MA.5 Liter 500.00 0% 407.00 453.50
6 Polimer MA.6 Liter 18,000.00 0% 567.00 9,283.50
7 Aspal MA.7 Kg 15,483.00 0% 429.00 7,956.00
8 Residu MA.8 Liter 23,600.00 0% 858.00 12,229.00

B. BAHAN PASIR, BATU DAN SEMEN


1 Pasir Semen (Import) MB.1 M3 1,125,000.00 0% 33,663.00 579,331.50
2 Pasir Pasang Lokal (kualitas baik) MB.2 M3 500,000.00 0% 245,150.00 372,575.00
3 Tanah Timbun biasa MB.3 M3 150,000.00 0% 109,070.00 129,535.00
4 Tanah Pilihan (Selmat) MB.4 M3 150,000.00 0% 109,070.00 129,535.00
5 Batu Kerikil/Koral beton (Import) MB.5 M3 1,125,000.00 0% 37,560.00 581,280.00
6 Batu Kali/Gunung (Import) MB.6 M3 1,218,000.00 0% 37,560.00 627,780.00
7 Batu Bata Merah MB.7 Buah 1,000.00 0% 350.00 675.00
8 Batu Cetak 10 x 20 x 30 Cm MB.8 Buah 2,000.00 0% 740.00 1,370.00
9 Paving Blok MB.9 Buah 6,500.00 0% 230.00 3,365.00
10 Semen Portland (PC) @ 50 Kg MB.10 Zak 95,000.00 0% 8,170.00 51,585.00
11 Semen PC Warna MB.11 Zak 127,500.00 0% 8,170.00 67,835.00
12 Tepung Gypsum MB.12 Zak 98,000.00 0% 11,140.00 54,570.00

C. BAHAN KAYU, TRIPLEKS DLL


1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 2,750,000.00 0% 155,260.00 1,452,630.00
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 4,000,000.00 0% 179,150.00 2,089,575.00
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 6,000,000.00 0% 203,030.00 3,101,515.00
4 Balok Kayu Kelas IV (Kayu Campur) MC.4 M3 2,500,000.00 0% 119,430.00 1,309,715.00
5 Papan Kayu Kelas III (Kayu Bus) t : 2-5 cm MC.5 M3 2,750,000.00 0% 155,260.00 1,452,630.00
6 Papan Kayu Kelas II (Kayu Rahay) t : 2 cm MC.6 M3 4,000,000.00 0% 179,150.00 2,089,575.00
7 Papan Kayu Kelas II (Kayu Rahay) t : 3 cm MC.7 M3 4,000,000.00 0% 179,150.00 2,089,575.00
8 Papan Kayu Kelas I (Kayu Besi) t : 2-3 cm MC.8 M3 6,000,000.00 0% 203,030.00 3,101,515.00
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 2,500,000.00 0% 119,430.00 1,309,715.00
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang 25,000.00 0% 370.00 12,685.00
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 64,500.00 0% 1,530.00 33,015.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 81,100.00 0% 2,040.00 41,570.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar 103,800.00 0% 3,060.00 53,430.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar 151,333.00 0% 4,600.00 77,966.50
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar 205,500.00 0% 6,130.00 105,815.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar 265,200.00 0% 7,660.00 136,430.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar 298,166.00 0% 9,710.00 153,938.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 300,000.00 0% 11,240.00 155,620.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar 125,000.00 0% 1,530.00 63,265.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar 100,833.00 0% 2,040.00 51,436.50
21 Plywood - Multiplex (9 mm) MC.21 Lembar 450,000.00 0% 3,770.00 226,885.00
22 Melamin MC.22 Lembar 142,166.00 0% 2,510.00 72,338.00
23 Formika Polos (122 x 244) Cm MC.23 Lembar 300,000.00 0% 3,060.00 151,530.00
24 Pelat Asbes Tebal 6 mm MC.24 Lembar 127,000.00 0% 3,190.00 65,095.00
25 Pelat Asbes Tebal 5 mm MC.25 Lembar 65,000.00 0% 2,660.00 33,830.00
26 Pelat Asbes Tebal 4 mm MC.26 Lembar 61,000.00 0% 2,130.00 31,565.00
27 Gypsum Board tebal 9 mm MC.27 Lembar 87,250.00 0% 5,150.00 46,200.00
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' 45,000.00 0% 325.00 22,662.50
29 Hard Board MC.29 Lembar 75,500.00 0% 9,150.00 42,325.00
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang 125,000.00 0% 24,390.00 74,695.00
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) MC.31 Batang 150,000.00 0% 92,230.00 121,115.00
32 Kayu dolken Ø 8-10, L=4 M MC.32 Batang 12,500.00 0% 4,520.00 8,510.00
33 Patok kayu (Dia = 3 cm, L= 1 m) MC.33 Batang 3,000.00 0% - 1,500.00
34 Patok kayu (Dia = 5 cm, L= 5 m) MC.34 Batang 5,000.00 0% - 2,500.00
35 Kayu Bakar (Campuran) MC.35 M3 400,000.00 0% - 200,000.00

D. BAHAN BESI, PAKU, ALUMUNIUM DAN KAWAT


1 Besi Beton Dia.6 mm (SNI) MD.1 Kg 12,762.00 0% 260.00 6,511.00
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg 11,590.00 0% 300.00 5,945.00
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg 11,610.00 0% 310.00 5,960.00
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg 11,728.00 0% 440.00 6,084.00
5 Besi Beton Dia.14 mm (SNI) MD.5 KG 12,327.00 0% 370.00 6,348.50
6 Besi Beton Dia.16 mm (SNI) MD.6 KG 13,713.00 0% 560.00 7,136.50
7 Besi Beton Dia.19 mm (SNI) MD.7 KG 12,331.00 0% 460.00 6,395.50
8 Besi Beton Dia.22 mm (SNI) MD.8 KG 12,583.00 0% 410.00 6,496.50
9 Kawat Beton MD.9 KG 25,200.00 0% 320.00 12,760.00
10 Kawat beton / bindrat 4 mm MD.10 KG 25,500.00 0% 320.00 12,910.00
11 Paku 1" (2,5 - 3 cm) MD.11 KG 23,000.00 0% 310.00 11,655.00
12 Paku 2" (5 cm) MD.12 KG 20,800.00 0% 310.00 10,555.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9
13 Paku 3" (7 cm) MD.13 KG 20,833.00 0% 310.00 10,571.50
14 Paku 4" (10 cm) MD.14 KG 20,666.00 0% 310.00 10,488.00
15 Paku 5" (12 - 15 cm) MD.15 KG 20,333.00 0% 310.00 10,321.50
16 Paku Campur MD.16 KG 20,666.00 0% 310.00 10,488.00
17 Paku Seng MD.17 KG 37,000.00 0% 350.00 18,675.00
18 Paku Ardex Ulir MD.18 KG 50,000.00 0% 310.00 25,155.00
19 Paku Sirap MD.19 Buah 15,000.00 0% 310.00 7,655.00
20 Paku Ondoline MD.20 KG 20,000.00 0% 310.00 10,155.00
21 Paku Tembok / Kecil 2/3 MD.21 Buah 316.00 0% 10.33 163.17
22 Paku/Skrup 5 cm MD.22 KG 8,052.00 0% 310.00 4,181.00
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M 24,400.00 0% 177.00 12,288.50
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 29,750.00 0% 196.00 14,973.00
25 Kawat Harmonika Has 40x40 mm MD.25 M 69,333.00 0% 994.00 35,163.50
26 Kawat burung MN.26 M² 25,000.00 0% 994.00 12,997.00
27 Kawat Duri Baja 20 M MD.27 KG 20,150.00 0% 280.00 10,215.00
28 Kawat Las 0.26 MD.28 Dos 159,500.00 0% 320.00 79,910.00
29 Timah Solder MD.29 KG 64,300.00 0% 100.00 32,200.00
30 Baut Jembatan Dia. <14 mm MD.30 KG 15,000.00 0% 310.00 7,655.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 8,450.00 0% 310.00 4,380.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 7,100.00 0% 310.00 3,705.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 7,250.00 0% 310.00 3,780.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 6,000.00 0% 310.00 3,155.00
35 Besi angkur dia. 8 mm MN.35 Buah 10,000.00 0% 310.00 5,155.00
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 26,833.00 0% 418.00 13,625.50
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 81,800.00 0% 2,890.00 42,345.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 261,200.00 0% 8,530.00 134,865.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 240,000.00 0% 8,920.00 124,460.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 142,250.00 0% 4,520.00 73,385.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 155,000.00 0% 8,150.00 81,575.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 110,000.00 0% 1,780.00 55,890.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 394,500.00 0% 8,450.00 201,475.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 461,666.00 0% 8,820.00 235,243.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 726,000.00 0% 13,530.00 369,765.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 1,136,666.00 0% 15,740.00 576,203.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 1,450,000.00 0% 50,000.00 750,000.00
48 Besi Strip 20.2 MD.48 Batang 61,250.00 0% 470.00 30,860.00
49 Besi Strip 30.3 MD.49 Batang 71,000.00 0% 1,110.00 36,055.00
50 Besi Strip 40.4 MD.50 Batang 102,750.00 0% 2,160.00 52,455.00
51 Besi Strip 50.5 MD.51 Batang 119,000.00 0% 2,980.00 60,990.00
52 Waltermur Dia 16 mm MD.52 Buah 20,000.00 0% 4,350.00 12,175.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 837,000.00 0% 4,350.00 420,675.00
54 Baja profil IWF MD.54 KG 21,000.00 0% 260.00 10,630.00
55 Besi gording canal MD.55 KG 22,549.00 0% 260.00 11,404.50
56 Water mur MD.56 KG 15,000.00 0% 260.00 7,630.00
57 Sealent MD.57 Tube 41,250.00 0% 260.00 20,755.00

E. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 0,30 ME.1 Lembar 82,500.00 0% 810.00 41,655.00
2 Seng Gelombang BJLS 0,22 ME.2 Lembar 59,333.00 0% 730.00 30,031.50
3 Seng Gelombang BJLS 0,20 ME.3 Lembar 52,800.00 0% 650.00 26,725.00
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar 82,562.00 0% 350.00 41,456.00
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 98,333.00 0% 1,470.00 49,901.50
6 Seng Plat BJLS 0.30 ME.6 Lembar 53,250.00 0% 810.00 27,030.00
7 Seng Plat BJLS 0.20 ME.7 Lembar 46,800.00 0% 650.00 23,725.00
8 Genteng Metal - Multiroof ME.8 Lembar 59,750.00 0% 1,450.00 30,600.00
9 Nok Genteng Metal - Multiroof ME.9 Bh 38,500.00 0% 1,450.00 19,975.00
10 Atap Allumunium Gelombang ME.10 M2 70,000.00 0% 1,450.00 35,725.00
11 Nok Atap Allumunium ME.11 M 25,000.00 0% 1,450.00 13,225.00
12 Karet Talang ME.12 M1 14,500.00 0% 320.00 7,410.00

F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 3,200.00 0% 140.00 1,670.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 7,272.00 0% 230.00 3,751.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,583.00 0% 400.00 7,491.50
4 Ubin Warna 20 x 20 Cm MF.4 Buah 3,200.00 0% 140.00 1,670.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 7,272.00 0% 230.00 3,751.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 14,583.00 0% 400.00 7,491.50
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,590.00 0% 230.00 3,410.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,083.00 0% 400.00 7,241.50
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 6,318.00 0% 230.00 3,274.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 12,166.00 0% 400.00 6,283.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 7,272.00 0% 230.00 3,751.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 14,250.00 0% 400.00 7,325.00
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 11,363.00 0% 230.00 5,796.50
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 22,083.00 0% 400.00 11,241.50
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 71,666.00 0% 1,570.00 36,618.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,250.00 0% 110.00 680.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0% 90.00 370.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 3,110.00 0% 140.00 1,625.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 4,062.00 0% 180.00 2,121.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 6,409.00 0% 230.00 3,319.50
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 7,272.00 0% 230.00 3,751.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 7,272.00 0% 230.00 3,751.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 12,208.00 0% 400.00 6,304.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 22,083.00 0% 790.00 11,436.50
25 Keramik Lantai 60 x 60 cm MF.25 Buah 82,111.00 0% 1,570.00 41,840.50
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,400.00 0% 110.00 755.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 2,880.00 0% 140.00 1,510.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0% 90.00 380.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 1,036.00 0% 110.00 573.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,900.00 0% 140.00 1,520.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0% 180.00 6,340.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0% 180.00 5,090.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 12,250.00 0% 180.00 6,215.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 4,500.00 0% 110.00 2,305.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 10,000.00 0% 180.00 5,090.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 12,000.00 0% 180.00 6,090.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 10,000.00 0% 180.00 5,090.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0% 180.00 6,340.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0% 180.00 6,340.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 8,000.00 0% 180.00 4,090.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 8,000.00 0% 180.00 4,090.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 8,000.00 0% 180.00 4,090.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 33,500.00 0% 190.00 16,845.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0% 180.00 5,090.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0% 180.00 3,840.00
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 5,000.00 0% 110.00 2,555.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0% 90.00 2,295.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 4,000.00 0% 90.00 2,045.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 7,500.00 0% 180.00 3,840.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0% 8,710.00 179,355.00
51 Wall paper (Lebar 50 cm) MF.51 M2 250,000.00 0% 373.00 125,186.50
52 Batu Paras MF.52 Buah 22,727.00 0% 230.00 11,478.50
53 Batu Tempel Hitam MF.53 Buah 28,181.00 0% 230.00 14,205.50

G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 115,182.00 0% 2,060.00 58,621.00
2 Kaca Polos 5 mm MG.2 M2 162,968.00 0% 2,890.00 82,929.00
3 Kaca Buram 3 mm MG.3 M2 107,698.00 0% 2,060.00 54,879.00
4 Kaca Buram 4 mm MG.4 M2 107,698.00 0% 2,480.00 55,089.00
5 Kaca Buram 5 mm MG.5 M2 173,849.00 0% 2,890.00 88,369.50
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 154,875.00 0% 3,140.00 79,007.50
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 149,500.00 0% 3,530.00 76,515.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 220,500.00 0% 3,930.00 112,215.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 247,500.00 0% 4,340.00 125,920.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 215,000.00 0% 2,890.00 108,945.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,400,000.00 0% 2,830.00 701,415.00

H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 97,750.00 0% 350.00 49,050.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 157,400.00 0% 350.00 78,875.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 142,500.00 0% 350.00 71,425.00
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 148,000.00 0% 350.00 74,175.00
5 Kunci Gembok 1" MH.5 Set 43,000.00 0% 170.00 21,585.00
6 Engsel 4" (Untuk Pintu) MH.6 Pasang 36,750.00 0% 170.00 18,460.00
7 Engsel 3" (Untuk Jendela) MH.7 Pasang 26,833.00 0% 170.00 13,501.50
8 Engsel Kupu-Kupu T MH.8 Pasang 18,300.00 0% 170.00 9,235.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 54,000.00 0% 170.00 27,085.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 15,600.00 0% 170.00 7,885.00
11 Hak Angin / Kait Angin MH.11 Buah 13,800.00 0% 170.00 6,985.00
12 Espagnolet MH.12 Set 65,000.00 0% 170.00 32,585.00
13 Grendel Tanam (Pintu) MH.13 Buah 90,000.00 0% 170.00 45,085.00
14 Grendel Besar / Kecil MH.14 Buah 69,250.00 0% 170.00 34,710.00
15 Tarikan Pintu MH.15 Buah 257,000.00 0% 170.00 128,585.00
16 Tarikan Jendela MH.16 Buah 16,400.00 0% 170.00 8,285.00

I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 5,416.00 0% 18.00 2,717.00
2 Amplas Besi MI.2 Lembar 6,100.00 0% 18.00 3,059.00
3 Dempul Kayu MI.3 Kg 60,833.00 0% 330.00 30,581.50
4 Cat Meny Kayu MI.4 Kg 68,333.00 0% 330.00 34,331.50
5 Cat Meny Besi MI.5 Kg 60,833.00 0% 330.00 30,581.50
6 Cat Kayu MI.6 Kg 64,500.00 0% 330.00 32,415.00
7 Cat Besi MI.7 Kg 63,500.00 0% 330.00 31,915.00
8 Cat Kilat LN MI.8 Kg 73,000.00 0% 330.00 36,665.00
9 Minyak Cat / Thinner MI.9 Kg 55,000.00 0% 330.00 27,665.00
10 Cat Tembok (Setara Dulux Weathershield) MI.10 Kg 26,250.00 0% 330.00 13,290.00
11 Plamur Tembok MI.11 Zak 140,600.00 0% 8,990.00 74,795.00
12 Cat Tembok Biasa (1 Klg @ 5 Kg) MI.12 Kaleng 93,416.00 0% 1,860.00 47,638.00
13 Cat Besi Crom MI.13 Kg 57,200.00 0% 330.00 28,765.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 77,000.00 0% 330.00 38,665.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 65,125.00 0% 330.00 32,727.50
16 Floor Hardener MI.16 KG 19,000.00 0% 330.00 9,665.00

J. BAHAN LISTRIK DAN ELEKTRONIKA


1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll 1,442,800.00 0% 25,150.00 733,975.00
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 839,000.00 0% 25,150.00 432,075.00
3 Pipa Listrik dia, 5/8 MJ.3 Batang 27,200.00 0% 130.00 13,665.00
4 Saklar Double - Tempel MJ.4 Buah 24,700.00 0% 540.00 12,620.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 18,500.00 0% 540.00 9,520.00
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 27,750.00 0% 540.00 14,145.00
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 35,750.00 0% 540.00 18,145.00
8 Home Saklar 1 Fase Komplit MJ.8 Buah 436,250.00 0% 870.00 218,560.00
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 150,500.00 0% 100.00 75,300.00
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 122,500.00 0% 100.00 61,300.00
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 12,166.00 0% 100.00 6,133.00
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 12,833.00 0% 100.00 6,466.50
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 13,833.00 0% 100.00 6,966.50
14 Vitting Lampu MJ.14 Buah 12,500.00 0% 100.00 6,300.00
15 Lampu XL 40 Watt MJ.15 Set 86,000.00 0% 100.00 43,050.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9
16 Lampu XL 20 Watt MJ.16 Set 58,500.00 0% 100.00 29,300.00
17 Lampu SL 23 Watt MJ.17 Set 54,625.00 0% 100.00 27,362.50
18 Lampu SL 14 Watt MJ.18 Set 43,125.00 0% 100.00 21,612.50
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 0.00 0% 320.00 160.00
20 Klem Kabel MJ.20 Dus 21,800.00 0% 170.00 10,985.00
21 Isolasi Listrik MJ.21 Buah 10,125.00 0% 170.00 5,147.50
22 Sekrup MJ.22 Dus 34,575.00 0% 170.00 17,372.50
23 Panil Distribusi MJ.23 Buah 12,500,000.00 0% 870.00 6,250,435.00

K. BAHAN PIPA DAN SANITAIR


1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang 130,666.00 0% 1,280.00 65,973.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang 160,250.00 0% 1,750.00 81,000.00
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang 207,750.00 0% 2,520.00 105,135.00
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang 305,666.00 0% 3,940.00 154,803.00
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang 351,666.00 0% 4,900.00 178,283.00
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang 466,666.00 0% 6,900.00 236,783.00
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang 808,666.00 0% 20,540.00 414,603.00
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang 1,064,333.00 0% 23,940.00 544,136.50
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang 635,000.00 0% 2,970.00 318,985.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang 337,625.00 0% 1,870.00 169,747.50
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang 185,300.00 0% 1,870.00 93,585.00
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang 131,200.00 0% 1,110.00 66,155.00
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang 65,900.00 0% 640.00 33,270.00
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang 47,625.00 0% 320.00 23,972.50
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang 28,700.00 0% 160.00 14,430.00
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang 34,700.00 0% 240.00 17,470.00
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang 112,600.00 0% 860.00 56,730.00
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang 80,250.00 0% 1,620.00 40,935.00
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang 107,000.00 0% 2,160.00 54,580.00
20 Talang PVC Kotak 4" - 4 Meter MK.20 Batang 134,200.00 0% 2,570.00 68,385.00
21 Talang PVC Kotak 8" - 4 Meter MK.21 Batang 395,000.00 0% 3,130.00 199,065.00
22 Closed Duduk Porselin Komplit MK.22 Buah 1,784,400.00 0% 4,720.00 894,560.00
23 Closet duduk (siram) MK.23 Buah 600,000.00 0% 3,760.00 301,880.00
24 Closed Jongkok Porselin (Standar) MK.24 Buah 197,000.00 0% 3,810.00 100,405.00
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 87,200.00 0% 1,880.00 44,540.00
26 Urinoir MK.26 Buah 1,547,500.00 0% 3,050.00 775,275.00
27 Wastafel Porselin MK.27 Buah 556,250.00 0% 3,050.00 279,650.00
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 378,666.00 0% 3,810.00 191,238.00
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 395,000.00 0% 3,050.00 199,025.00
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 295,000.00 0% 2,540.00 148,770.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah 1,970,000.00 0% 7,630.00 988,815.00
32 Kran Air 3/4" MK.32 Buah 33,000.00 0% 170.00 16,585.00
33 Kran Air 1/2" MK.33 Buah 30,300.00 0% 170.00 15,235.00
34 Kran Air 1" MK.34 Buah 22,166.00 0% 170.00 11,168.00
35 Stop Kran 1/2" MK.35 Buah 17,000.00 0% 170.00 8,585.00
36 Doble Neple GIP 1/2" MK.36 Buah 8,750.00 0% 170.00 4,460.00
37 Soccet 1/2" MK.37 Buah 12,333.00 0% 170.00 6,251.50
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 37,000.00 0% 170.00 18,585.00
39 Tee 1/2" x 1/2" MK.39 Buah 2,250.00 0% 170.00 1,210.00
40 Hand Kran 1/2" Besi MK.40 Buah 85,000.00 0% 170.00 42,585.00
41 Dop GIP 1/2" MK.41 Buah 6,500.00 0% 170.00 3,335.00
42 Water Meter 1/2" MK.42 Buah 375,000.00 0% 1,270.00 188,135.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 65,000.00 0% 1,270.00 33,135.00
44 Pengaman Box Meter MK.44 Buah 250,000.00 0% 1,270.00 125,635.00
45 Pipa HDPE Ø 150 mm MK.45 M 398,000.00 0% 2,210.00 200,105.00
46 Pipa HDPE Ø 100 mm MK.46 M 196,000.00 0% 850.00 98,425.00
47 Pipa HDPE Ø 75 mm MK.47 M 108,500.00 0% 390.00 54,445.00
48 Pipa HDPE Ø 50-63 mm MK.48 M 70,000.00 0% 150.00 35,075.00
49 Tee All Flange Ø 50 x 50 mm (HDPE) MK.49 Buah 450,000.00 0% 5,890.00 227,945.00
50 Tee All Flange Ø 75 x 50 mm (HDPE) MK.50 Buah 475,000.00 0% 5,990.00 240,495.00
51 Tee All Flange Ø 75 x 75 mm (HDPE) MK.51 Buah 500,000.00 0% 6,080.00 253,040.00
52 Tee All Flange Ø 100 x 75 mm (HDPE) MK.52 Buah 650,000.00 0% 6,180.00 328,090.00
53 Bend 90 All Flange Ø 50 mm (HDPE) MK.53 Buah 210,000.00 0% 1,610.00 105,805.00
54 Bend 90 All Flange Ø 75 mm (HDPE) MK.54 Buah 335,000.00 0% 5,310.00 170,155.00
55 Bend 90 All Flange Ø 100 mm (HDPE) MK.55 Buah 50,000.00 0% 5,460.00 27,730.00
56 Gate Valve Flange Ø 50 mm MK.56 Buah 1,850,000.00 0% 13,810.00 931,905.00
57 Gate Valve Flange Ø 75 mm MK.57 Buah 2,350,000.00 0% 14,520.00 1,182,260.00
58 Gate Valve Flange Ø 1/2" MK.58 Buah 200,000.00 0% 190.00 100,095.00
59 Stub Flange Ø 50 mm MK.59 Buah 200,000.00 0% 1,140.00 100,570.00
60 Stub Flange Ø 75 mm MK.60 Buah 600,000.00 0% 2,220.00 301,110.00
61 Stub Flange Ø 100 mm MK.61 Buah 840,000.00 0% 2,750.00 421,375.00
62 End Cap (Dop) Ø 50 mm (HDPE) MK.62 Buah 37,009.00 0% 280.00 18,644.50
63 End Cap (Dop) Ø 75 mm (HDPE) MK.63 Buah 86,873.00 0% 1,140.00 44,006.50
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah 950,000.00 0% 410.00 475,205.00
65 Reducer Ø 75 x 75 mm (HDPE) MK.65 Buah 525,000.00 0% 4,100.00 264,550.00
66 Reducer Ø 75 x 50 mm (HDPE) MK.66 Buah 500,000.00 0% 4,040.00 252,020.00
67 Quil Elbow HDPE (adaptor) Ø15 (1/2") MK.67 Buah 48,000.00 0% 1,610.00 24,805.00
68 Pipa Input HDPE Ø 1/2" MK.68 Buah 38,400.00 0% 1,610.00 20,005.00

M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 860,000.00 0% 45,780.00 452,890.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 760,000.00 0% 38,180.00 399,090.00
3 Dwiker/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 680,000.00 0% 40,290.00 360,145.00
4 Dwiker/Gorong2 Ø 0,45 m, H 80 cm MM.4 Buah 680,000.00 0% 30,680.00 355,340.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar +
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + Ket.
( Rp. ) ( %. ) (Rp) Ongkos angkut
1 2 3 4 5 6 7 8 9

N. BAHAN BANGUNAN LAIN


1 Lem Aica Aibon MN.1 KG 49,500.00 0% 330.00 24,915.00
2 Lem Fox MN.2 KG 53,166.00 0% 330.00 26,748.00
3 Lem Vinyl MN.3 KG 20,000.00 0% 330.00 10,165.00
4 Ijuk MN.4 KG 35,750.00 0% 410.00 18,080.00
5 Pipa Plastik dia, 3" (AW) MN.5 Batang 246,000.00 0% 310.00 123,155.00
7 Mata bor MN.7 Buah 18,000.00 0% 60.00 9,030.00
8 Mata gurinda MN.8 Buah 12,666.00 0% 90.00 6,378.00
9 Gas elpiji MN.9 KG #DIV/0! 0% 570.00 #DIV/0!
10 Oksigen (@50 kg/btl) MN.10 KG 350,000.00 0% 680.00 175,340.00
11 Kuas Cat Minyak MN.11 Buah 22,000.00 0% 90.00 11,045.00
12 Kuas Roll (Cat Tembok) MN.12 Buah 33,500.00 0% 90.00 16,795.00
13 Air Bersih MN.13 Liter 50.00 0% - 25.00

NB - Pemilihan Harga Satuan disesuaikan dengan Format Standar Analisa Harga Satuan Pekerjaan Masing-masing Bidang Pekerjaan Konstruksi
- Harga Sewaktu-waktu dapat berubah, penentuan nilai barang/material dalam penyusunan HPS disesuaikan dengan hasil survei dilapangan kembali.
DAFTAR HARGA SATUAN UPAH
Harga Dasar
No. Uraian Tenaga Kode Tenaga
(per hari) (per jam)
1 2 3 4 5

1 Mandor Bangunan / Lapangan 213,000.00 30,429.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) 202,000.00 28,858.00
3 Tukang (Batu, Pasir, Kayu, dsb) 194,000.00 27,715.00
4 Pekerja 152,000.00 21,715.00
5 Mandor Alat Berat (F. Equipment) (*) 116,500.00 16,643.00
6 Operator Alat Berat (*) 97,000.00 13,858.00
7 Pembantu Operator (*) 76,000.00 10,858.00
8 Sopir / Driver (*) 97,000.00 13,858.00
9 Pembantu Sopir / Driver (*) 76,000.00 10,858.00
10 Mekanik (*) 97,000.00 13,858.00
11 Pembantu Mekanik (*) 76,000.00 10,858.00
12 Surveyor 101,000.00 14,429.00
13 Pembantu Surveyor 76,000.00 10,858.00

Jam kerja efektif per hari = 7.00 Jam


Jumlah hari per bulan = 25.00 Hari
Overhead + profit = 15.00%
Keterangan

8
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN GAZEBO KELUARGA 3,5M X 3,5M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp. 1,000,000.00


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp. Err:509
C PEKERJAAN KAYU ............................................................................ Rp. Err:509
D PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp. Err:509
E PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp. 591,900.00
F PEKERJAAN PENGECATAN ............................................................................ Rp. Err:509
G PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp. 1,000,000.00

REAL COST ( RC ) ............................................................................ Rp. Err:509

DIBULATKAN ............................................................................ Rp. Err:509

Terbilang : EMPAT PULUH JUTA TUJUH RATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN GAZEBO KELUARGA 3,5M X 3,5M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. 1,000,000.00 Rp. 1,000,000.00
JUMLAH A Rp. 1,000,000.00
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Err:509 M3 Rp. 69,320.00 Rp. Err:509
2 Urugan Pasir Bawah Pondasi Err:509 M3 Rp. 737,730.00 Rp. Err:509
3 Urugan Tanah Kembali Err:509 M3 Rp. 23,106.00 Rp. Err:509
4 Pondasi Umpak Cor 30/30/50, 1 Pc : 2 Ps : 3Kr (Pasir Lokal) Err:509 M3 Rp. 1,674,168.00 Rp. Err:509
5 Rolag Bata Tangga 1 Pc : 4 Ps (Pasir Lokal) Err:509 M3 Rp. 1,424,884.00 Rp. Err:509
JUMLAH B Rp. Err:509
C PEKERJAAN KAYU
1 Pas. Balok Gelagar induk kayu besi 8/8 Err:509 M2 Rp. 174,533.00 Rp. Err:509
2 Pas. Balok Lantai kayu besi 4/8 Err:509 M3 Rp. 174,533.00 Rp. Err:509
3 Pas. Lantai Papan kayu besi 2/20 Err:509 M2 Rp. 526,650.00 Rp. Err:509
4 Pas. Rangka dinding Kayu besi Tiang balok 8/8 + meerplat 8/8 Err:509 M2 Rp. 174,533.00 Rp. Err:509
5 Pas. Rangka dinding regel kayu besi balok 4/8 Err:509 M2 Rp. 174,533.00 Rp. Err:509
6 Pas. Rangka Kayu Besi balok 4/4 Err:509 M2 Rp. 174,533.00 Rp. Err:509
7 Pas. Dinding Papan Kayu besi 2/20 Err:509 M2 Rp. 526,650.00 Rp. Err:509
JUMLAH C Rp. Err:509
D PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu Besi 4/8 Err:509 M3 Rp. 174,533.00 Rp. Err:509
2 Pemasangan Gording Kayu Besi 4/8 Err:509 M3 Rp. Err:509 Rp. Err:509
3 Pas. Atap Allumunium Gelombang Err:509 M2 Rp. 101,438.00 Rp. Err:509
4 Nok Atap Allumunium Err:509 M1 Rp. 85,333.00 Rp. Err:509
5 Pasang Lisplank Papan Kayu besi 2/20 Err:509 M1 Rp. 65,710.00 Rp. Err:509
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) Err:509 M2 Rp. 98,115.00 Rp. Err:509
7 Pas. Rangka kuda-kuda kanopi balok kayu besi 4/8 Err:509 M3 Rp. 174,533.00 Rp. Err:509
8 Pas. Gording Kayu besi kanopi balok 4/4 Err:509 M3 Rp. Err:509 Rp. Err:509
JUMLAH D Rp. Err:509
E PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED Bulb Philips 8 W 1.00 Titik Rp. 272,130.00 Rp. 272,130.00
2 Instalasi Saklar Tunggal 1.00 Titik Rp. 118,000.00 Rp. 118,000.00
3 Instalasi Stop Kontak 1.00 Titik Rp. 201,770.00 Rp. 201,770.00
JUMLAH E Rp. 591,900.00
F PEKERJAAN PENGECATAN
1 Cat Meny Kayu Err:509 M2 Rp. 25,872.00 Rp. Err:509
2 Cat Kilat Kayu Err:509 M2 Rp. 61,377.00 Rp. Err:509
3 Cat Residu kuda-kuda & balok gelagar+balok lantai Err:509 M2 Rp. 26,110.00 Rp. Err:509
JUMLAH F Rp. Err:509
G PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. 1,000,000.00 Rp. 1,000,000.00
JUMLAH G Rp. 1,000,000.00
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN 156,9m2
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp.


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp.
C PEKERJAAN BETON DAN STRUKTUR ............................................................................ Rp.
D PEKERJAAN ARSITEKTUR ............................................................................ Rp.
E PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp.
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA ............................................................................ Rp.
G PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp.
H PEKERJAAN SANITAIR ............................................................................ Rp.
I PEKERJAAN PENGECATAN ............................................................................ Rp.
J PEKERJAAN AKHIR ............................................................................ Rp.

REAL COST ( RC ) ............................................................................ Rp.

DIBULATKAN ............................................................................ Rp.

Terbilang : SEMBILAN RATUS LIMA PULUH ENAM JUTA LIMA RATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL PERMANEN 156,9m2
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. Rp.
JUMLAH A Rp.
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 14.22 M3 Rp. Rp.
2 Urugan Pasir Bawah Pondasi 1.94 M3 Rp. Rp.
3 Urugan Pasir Bawah Lantai 3.50 M3 Rp. Rp.
4 Urugan Tanah Kembali 8.19 M3 Rp. Rp.
5 Timbunan Tanah Biasa 22.50 M3 Rp. Rp.
6 Pondasi Menerus Bata 30/60/60, 1 Pc : 4 Ps (Pasir Lokal) 8.76 M3 Rp. Rp.
7 Pondasi Menerus Bata 30/60, 1 Pc : 4 Ps (Pasir Lokal) Err:509 M3 Rp. Rp.
8 Pondasi Menerus Bata 20/40, 1 Pc : 4 Ps (Pasir Lokal) Err:509 M3 Rp. Rp.
9 Rolag Bata Rabat 1 Pc : 4 Ps (Pasir Lokal) 0.27 M3 Rp. Rp.
JUMLAH B Rp.
C PEKERJAAN BETON DAN STRUKTUR
1 Sloof, Uk. 18X25 cm
- Bekisting 2x Pakai 13.25 M2 Rp. Rp.
- Besi Dia. 8 mm 156.84 Kg Rp. Rp.
- Besi Dia. 10 mm 376.41 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr - M3 Rp. Rp.
2 Sloof, Uk. 15X20 cm
- Bekisting 2x Pakai 7.00 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm - Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr - M3 Rp. Rp.
3 Kolom KL1, Uk. 13 x 13 cm
- Bekisting 2x Pakai 2.00 M2 Rp. Rp.
- Besi Dia. 8 mm 27.28 Kg Rp. Rp.
- Besi Dia. 12 mm 106.88 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr 0.32 M3 Rp. Rp.
4 Kolom KL2, Uk. 13 x 13 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
5 Kolom KL3, Uk. 13 x 20 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 12 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
6 Kolom KL4, Uk. 13 x 30 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 12 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
7 Kolom KL5, Uk. 13 x 40 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 12 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
8 Kolom KL6, Uk. 13 x 50 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Besi Dia. 12 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
9 Ringbalk, Uk. 13 x 20 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
10 Balok, Uk. 13 x 25 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe
11 Balok, Uk. 13 x 30 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
12 Balok, Uk. 13 x 50 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Besi Dia. 12 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
13 Balok Talang & Balok anak Dag teras Uk. 13 x 20 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
14 Kanopi-kanopi Beton
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
15 Plat Dak Beton Teras Depan, Tebal 10 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 10 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
16 Plat + Dek Talang beton samping , Tebal 10 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
17 Plat Talang beton belakang , Tebal 10 cm
- Bekisting 2x Pakai Err:509 M2 Rp. Rp.
- Besi Dia. 8 mm Err:509 Kg Rp. Rp.
- Cor Beton, 1 Pc : 2 Ps : 3 Kr Err:509 M3 Rp. Rp.
JUMLAH C Rp.
D PEKERJAAN ARSITEKTUR
1 Cor Lantai, 1 Pc : 3 Ps (Pasir Lokal) 4.90 M3 Rp. Rp.
2 Pas. Lantai Granit Uk. 60 x 60 cm (Pasir Lokal) 70.00 M2 Rp. Rp.
3 Pas. Lantai Granit Uk. 60 x 60 cm bermotif untuk teras(Pasir Lokal) - M2 Rp. Rp.
4 Pas. Keramik Berglasir Lantai KM/WC Uk. 25 x 25 cm (Pasir Lokal) 24.00 M2 Rp. Rp.
5 Pas. Keramik Dinding KM/WC 25/40 (Pasir Lokal) 68.00 M2 Rp. Rp.
6 Pas. Plin Keramik Dinding KM/WC 25/10 (Pasir Lokal) 34.00 M2 Rp. Rp.
7 Finishing Lantai Batu Sikat Teras Depan - M2 Rp. Rp.
8 Pas. Dinding Bata, 1 Pc : 4 Ps (Pasir Lokal) - M2 Rp. Rp.
9 Pas. Penebalan dinding bata, 1pc:4ps - M3 Rp. Rp.
10 Plesteran, 1 Pc : 3 Ps (Pasir Lokal) 36.50 M2 Rp. Rp.
11 Acian dinding luar 45.28 M2 Rp. Rp.
12 Plamur dinding dalam 36.50 M2 Rp. Rp.
13 Pas. Finishing Granit bermotif pada penebalan dinding luar - M2 Rp. Rp.
14 Pas. Finishing Batu Alam Tempel - M2 Rp. Rp.
15 Pas. GRC Krawangan 3.00 LS Rp. Rp.
16 Pas. Pilar pilar kayu besi teras depan - M3 Rp. Rp.
JUMLAH D Rp.
E PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu 5/10 302.64 M3 Rp. Rp.
2 Pemasangan Gording Kayu 5/10 0.31 M3 Rp. Rp.
3 Pas. Atap Allumunium Gelombang 122.22 M2 Rp. Rp.
4 Nok Atap Allumunium 13.00 M1 Rp. Rp.
5 Pasang Lisplank Papan 2/20 26.00 M1 Rp. Rp.
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) 320.00 M2 Rp. Rp.
JUMLAH E Rp.
F PEKERJAAN KUSEN, DAUN PINTU DAN JENDELA
1 Pas. Kusen Pintu dan Jendela, Kayu Kls II 6/12 cm 0.77 M3 Rp. Rp.
2 Pas. Kusen Alumunium Pintu dan Jendela 5.60 M Rp. Rp.
3 Pas. Pintu Panel Kayu L=90cm + L=40cm Tinggi=250cm (P1) 1.00 Bh Rp. Rp.
4 Pas. Pintu Panel Kayu L=80cm Tinggi= 220cm (P2) 1.00 Bh Rp. Rp.
5 Pas. Pintu Panel Kayu L=90cm Tinggi= 220cm (P3) 2.00 Bh Rp. Rp.
6 Pas. Pintu UPVC /Kamar Mandi L=70cm (P4) 1.00 Bh Rp. Rp.
7 Pas. Pintu Geser Kaca /Kamar Mandi L=70cm (P5) 1.00 Bh Rp. Rp.
8 Pas. Pintu Double Geser Kaca L=90cm (PG) 2.00 Bh Rp. Rp.
9 Pas. Pintu Harmonika Toko (PT) 1.00 LS Rp. Rp.
10 Pas. Jendela kaca J1 60x200 cm (3 Ruas) 3.00 Bh Rp. Rp.
11 Pas. Jendela kaca J2 60x150 cm (2 Ruas) 2.00 Bh Rp. Rp.
12 Pas. Jendela kaca J3 60x150 cm 1.00 Bh Rp. Rp.
13 Pas. Jendela Kaca J4 50x50 cm 1.00 Bh Rp. Rp.
14 Pas. Jendela kaca J5 60x180 cm (3 Ruas) 1.00 Bh Rp. Rp.
15 Pas. Ventilasi Kaca Zig zag Kamar Mandi 60x40 cm 1.00 Bh Rp. Rp.
16 Pas. Kusen Ventilasi 20x30 0.13 M3 Rp. Rp.
JUMLAH F Rp.
No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe
G PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED Downlite Philips 10.5 W 12.00 Titik Rp. Rp.
2 Instalasi Lampu LED Downlite Philips 5 W 6.00 Titik Rp. Rp.
3 Instalasi Lampu LED Bulb Philips 8 W 3.00 Titik Rp. Rp.
4 Lampu Dinding Sorot Minimalis Kotak Eksterior 2 arah 6 watt 3.00 Titik Rp. Rp.
5 Instalasi Saklar Tunggal 7.00 Titik Rp. Rp.
6 Instalasi Saklar Ganda 8.00 Titik Rp. Rp.
7 Instalasi Stop Kontak 11.00 Titik Rp. Rp.
8 Instalasi Exhaust Fan Kamar mandi 1.00 Titik Rp. Rp.
9 Penyambungan Listrik PLN 1300 KW 1.00 LS Rp. Rp.
JUMLAH G Rp.
H PEKERJAAN SANITAIR
1 Instalasi Pipa Air bersih & Air Kotor 1.00 Ls Rp. Rp.
2 Washtafel 1.00 Bh Rp. Rp.
3 Shower Kamar mandi shet tiang stainless 1.00 Bh Rp. Rp.
4 Kitchen Sink komplit kran 1.00 Bh Rp. Rp.
5 Pas. Kran 3/4" 5.00 Bh Rp. Rp.
6 Closet jongkok Porselin Merk TOTO 1.00 Bh Rp. Rp.
7 Closet Duduk Ecowasher Merk TOTO 2.00 Bh Rp. Rp.
8 Floor Drain 4.00 Bh Rp. Rp.
9 Septictank Uk. 2x1x1,5 m 2.00 Unit Rp. Rp.
10 Bak Peresapan Uk. 0.7x0.7x0.7 m 2.00 Unit Rp. Rp.
JUMLAH H Rp.
I PEKERJAAN PENGECATAN
1 Cat Tembok 73.00 M2 Rp. Rp.
2 Cat Plafond 320.00 M2 Rp. Rp.
3 Cat Kilat Kusen Pintu dan Jendela 57.48 M2 Rp. Rp.
4 Cat Kilat Daun Pintu dan Jendela 0.00 M2 Rp. Rp.
5 Cat Residu kuda-kuda 0.00 M2 Rp. Rp.
6 Cat Residu Gording 0.00 M2 Rp. Rp.
7 Lapisan waterprofing dak & talang beton 0.00 M2 Rp. Rp.
JUMLAH I Rp.
J PEKERJAAN AKHIR
1 Pembersihan Akhir 1.00 Ls Rp. Rp.
JUMLAH J Rp.
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN GAZEBO KELUARGA 3,5M X 3,5M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp.


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp.
C PEKERJAAN KAYU ............................................................................ Rp.
D PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp.
E PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp.
F PEKERJAAN PENGECATAN ............................................................................ Rp.
G PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp.

REAL COST ( RC ) ............................................................................ Rp.

DIBULATKAN ............................................................................ Rp.

Terbilang : EMPAT PULUH JUTA TUJUH RATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN GAZEBO KELUARGA 3,5M X 3,5M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. Rp.
JUMLAH A Rp.
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi Err:509 M3 Rp. Rp.
2 Urugan Pasir Bawah Pondasi Err:509 M3 Rp. Rp.
3 Urugan Tanah Kembali Err:509 M3 Rp. Rp.
4 Pondasi Umpak Cor 30/30/50, 1 Pc : 2 Ps : 3Kr (Pasir Lokal) Err:509 M3 Rp. Rp.
5 Rolag Bata Tangga 1 Pc : 4 Ps (Pasir Lokal) Err:509 M3 Rp. Rp.
JUMLAH B Rp.
C PEKERJAAN KAYU
1 Pas. Balok Gelagar induk kayu besi 8/8 Err:509 M2 Rp. Rp.
2 Pas. Balok Lantai kayu besi 4/8 Err:509 M3 Rp. Rp.
3 Pas. Lantai Papan kayu besi 2/20 Err:509 M2 Rp. Rp.
4 Pas. Rangka dinding Kayu besi Tiang balok 8/8 + meerplat 8/8 Err:509 M2 Rp. Rp.
5 Pas. Rangka dinding regel kayu besi balok 4/8 Err:509 M2 Rp. Rp.
6 Pas. Rangka Kayu Besi balok 4/4 Err:509 M2 Rp. Rp.
7 Pas. Dinding Papan Kayu besi 2/20 Err:509 M2 Rp. Rp.
JUMLAH C Rp.
D PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu Besi 4/8 Err:509 M3 Rp. Rp.
2 Pemasangan Gording Kayu Besi 4/8 Err:509 M3 Rp. Rp.
3 Pas. Atap Allumunium Gelombang Err:509 M2 Rp. Rp.
4 Nok Atap Allumunium Err:509 M1 Rp. Rp.
5 Pasang Lisplank Papan Kayu besi 2/20 Err:509 M1 Rp. Rp.
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) Err:509 M2 Rp. Rp.
7 Pas. Rangka kuda-kuda kanopi balok kayu besi 4/8 Err:509 M3 Rp. Rp.
8 Pas. Gording Kayu besi kanopi balok 4/4 Err:509 M3 Rp. Rp.
JUMLAH D Rp.
E PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED Bulb Philips 8 W 1.00 Titik Rp. Rp.
2 Instalasi Saklar Tunggal 1.00 Titik Rp. Rp.
3 Instalasi Stop Kontak 1.00 Titik Rp. Rp.
JUMLAH E Rp.
F PEKERJAAN PENGECATAN
1 Cat Meny Kayu Err:509 M2 Rp. Rp.
2 Cat Kilat Kayu Err:509 M2 Rp. Rp.
3 Cat Residu kuda-kuda & balok gelagar+balok lantai Err:509 M2 Rp. Rp.
JUMLAH F Rp.
G PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. Rp.
JUMLAH G Rp.
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN MUSHOLA KELUARGA 3M X 3M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp. 500,000.00


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp. 1,973,663.06
C PEKERJAAN KAYU ............................................................................ Rp. Err:509
D PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp. Err:509
E PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp. 591,900.00
F PEKERJAAN PENGECATAN ............................................................................ Rp. Err:509
G PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp. 500,000.00

REAL COST ( RC ) ............................................................................ Rp. Err:509

DIBULATKAN ............................................................................ Rp. Err:509

Terbilang : LIMA PULUH LIMA JUTA SERATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN MUSHOLA KELUARGA 3M X 3M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. 500,000.00 Rp. 500,000.00
JUMLAH A Rp. 500,000.00
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 1.80 M3 Rp. 69,320.00 Rp. 124,776.00
2 Urugan Pasir Bawah Pondasi 0.09 M3 Rp. 737,730.00 Rp. 66,395.70
3 Urugan Tanah Kembali 0.06 M3 Rp. 23,106.00 Rp. 1,386.36
4 Pondasi Umpak Cor 30/30/50, 1 Pc : 2 Ps : 3Kr (Pasir Lokal) - M3 Rp. 1,674,168.00 Rp. -
5 Rolag Bata Tangga 1 Pc : 4 Ps (Pasir Lokal) 1.25 M3 Rp. 1,424,884.00 Rp. 1,781,105.00
JUMLAH B Rp. 1,973,663.06
C PEKERJAAN KAYU
1 Pas. Balok Gelagar induk kayu besi 8/8 0.30 M3 Rp. 174,533.00 Rp. 52,359.90
2 Pas. Balok Lantai kayu besi 4/8 35.51 M3 Rp. 174,533.00 Rp. 6,197,736.64
3 Pas. Lantai Papan kayu besi 2/20 - M2 Rp. 526,650.00 Rp. 0.00
4 Pas. Rangka dinding Kayu besi Tiang balok 8/8 + meerplat 8/8 - M3 Rp. 174,533.00 Rp. 0.00
5 Pas. Rangka dinding regel kayu besi balok 4/8 - M3 Rp. 174,533.00 Rp. 0.00
6 Pas. Rangka Kayu Besi balok 4/4 - M3 Rp. 174,533.00 Rp. 0.00
7 Pas. Dinding Papan Kayu besi 2/20 Err:509 M2 Rp. 526,650.00 Rp. Err:509
8 Pas. Kaca Polos t=5mm 2.82 M2 Rp. 125,791.00 Rp. 354,730.62
9 Bingkai dinding mihrab balok 4/8 1.13 M3 Rp. 174,533.00 Rp. 197,222.29
10 Dinding Multipleks Mihrab lapis HPL Motif Kayu - M2 Rp. 2,500,000.00 Rp. 0.00
11 Kaligrafi Allumunium 1.00 Ls Rp. 400,000.00 Rp. 400,000.00
JUMLAH C Rp. Err:509
D PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu Besi 4/8 2.68 M3 Rp. 174,533.00 Rp. 467,312.11
2 Pemasangan Gording Kayu Besi 4/8 0.03 M3 Rp. Err:509 Rp. Err:509
3 Pas. Atap Allumunium Gelombang 10.37 M2 Rp. 101,438.00 Rp. 1,051,912.06
4 Nok Atap Allumunium 9.54 M1 Rp. 85,333.00 Rp. 814,076.82
5 Pasang Lisplank Papan Kayu besi 2/20 9.40 M1 Rp. 65,710.00 Rp. 617,674.00
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) 10.37 M2 Rp. 98,115.00 Rp. 1,017,452.55
JUMLAH D Rp. Err:509
E PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED Bulb Philips 8 W 1.00 Titik Rp. 272,130.00 Rp. 272,130.00
2 Instalasi Saklar Tunggal 1.00 Titik Rp. 118,000.00 Rp. 118,000.00
3 Instalasi Stop Kontak 1.00 Titik Rp. 201,770.00 Rp. 201,770.00
JUMLAH E Rp. 591,900.00
F PEKERJAAN PENGECATAN
1 Cat Meny Kayu Err:509 M2 Rp. 25,872.00 Rp. Err:509
2 Cat Kilat Kayu Err:509 M2 Rp. 61,377.00 Rp. Err:509
3 Cat Residu kuda-kuda & balok gelagar+balok lantai Err:509 M2 Rp. 26,110.00 Rp. Err:509
JUMLAH F Rp. Err:509
G PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. 500,000.00 Rp. 500,000.00
JUMLAH G Rp. 500,000.00
REKAPITULASI :
PEKERJAAN : PEMBANGUNAN MUSHOLA KELUARGA 3M X 3M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

A PEKERJAAN PERSIAPAN ............................................................................ Rp.


B PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp.
C PEKERJAAN KAYU ............................................................................ Rp.
D PEKERJAAN ATAP DAN PLAFOND ............................................................................ Rp.
E PEKERJAAN INSTALASI LISTRIK ............................................................................ Rp.
F PEKERJAAN PENGECATAN ............................................................................ Rp.
G PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp.

REAL COST ( RC ) ............................................................................ Rp.

DIBULATKAN ............................................................................ Rp.

Terbilang : LIMA PULUH LIMA JUTA SERATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN MUSHOLA KELUARGA 3M X 3M
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

A PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. Rp.
JUMLAH A Rp.
B PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi 1.80 M3 Rp. Rp.
2 Urugan Pasir Bawah Pondasi 0.09 M3 Rp. Rp.
3 Urugan Tanah Kembali 0.06 M3 Rp. Rp.
4 Pondasi Umpak Cor 30/30/50, 1 Pc : 2 Ps : 3Kr (Pasir Lokal) - M3 Rp. Rp.
5 Rolag Bata Tangga 1 Pc : 4 Ps (Pasir Lokal) 1.25 M3 Rp. Rp.
JUMLAH B Rp.
C PEKERJAAN KAYU
1 Pas. Balok Gelagar induk kayu besi 8/8 0.30 M3 Rp. Rp.
2 Pas. Balok Lantai kayu besi 4/8 35.51 M3 Rp. Rp.
3 Pas. Lantai Papan kayu besi 2/20 - M2 Rp. Rp.
4 Pas. Rangka dinding Kayu besi Tiang balok 8/8 + meerplat 8/8 - M3 Rp. Rp.
5 Pas. Rangka dinding regel kayu besi balok 4/8 - M3 Rp. Rp.
6 Pas. Rangka Kayu Besi balok 4/4 - M3 Rp. Rp.
7 Pas. Dinding Papan Kayu besi 2/20 Err:509 M2 Rp. Rp.
8 Pas. Kaca Polos t=5mm 2.82 M2 Rp. Rp.
9 Bingkai dinding mihrab balok 4/8 1.13 M3 Rp. Rp.
10 Dinding Multipleks Mihrab lapis HPL Motif Kayu - M2 Rp. Rp.
11 Kaligrafi Allumunium 1.00 Ls Rp. Rp.
JUMLAH C Rp.
D PEKERJAAN ATAP DAN PLAFOND
1 Pemasangan Kuda-kuda Kayu Besi 4/8 2.68 M3 Rp. Rp.
2 Pemasangan Gording Kayu Besi 4/8 0.03 M3 Rp. Rp.
3 Pas. Atap Allumunium Gelombang 10.37 M2 Rp. Rp.
4 Nok Atap Allumunium 9.54 M1 Rp. Rp.
5 Pasang Lisplank Papan Kayu besi 2/20 9.40 M1 Rp. Rp.
6 Pas. Plafon Gypsum t= 4 mm (rangka hollow baja ringan) 10.37 M2 Rp. Rp.
JUMLAH D Rp.
E PEKERJAAN INSTALASI LISTRIK
1 Instalasi Lampu LED Bulb Philips 8 W 1.00 Titik Rp. Rp.
2 Instalasi Saklar Tunggal 1.00 Titik Rp. Rp.
3 Instalasi Stop Kontak 1.00 Titik Rp. Rp.
JUMLAH E Rp.
F PEKERJAAN PENGECATAN
1 Cat Meny Kayu Err:509 M2 Rp. Rp.
2 Cat Kilat Kayu Err:509 M2 Rp. Rp.
3 Cat Residu kuda-kuda & balok gelagar+balok lantai Err:509 M2 Rp. Rp.
JUMLAH F Rp.
G PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. Rp.
JUMLAH G Rp.
REKAPITULASI :
PEKERJAAN : PEMBUATAN KOLAM IKAN DAN LANDSCAPE
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

I PEKERJAAN KOLAM IKAN & TAMAN BELAKANG


a PEKERJAAN PERSIAPAN ............................................................................ Rp. 500,000.00
b PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp. 4,496,017.76
c PEKERJAAN COR DAN PASANGAN ............................................................................ Rp. 25,939,471.64
II PEKERJAAN TEMPAT WUDHU ............................................................................ Rp. 468,565.61
III PEKERJAAN SELASAR TEMPAT CUCI JEMUR ............................................................................ Rp. 4,029,850.91
IV PEKERJAAN LANDSCAPE DEPAN ............................................................................ Rp. 21,348,488.45
V PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp. 500,000.00

REAL COST ( RC ) ............................................................................ Rp. 57,282,394.37

DIBULATKAN ............................................................................ Rp. 57,200,000.00

Terbilang : SEMBILAN PULUH TUJUH JUTA SERATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBUATAN KOLAM IKAN DAN LANDSCAPE
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

I PEKERJAAN KOLAM IKAN & TAMAN BELAKANG


a PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. 500,000.00 Rp. 500,000.00
JUMLAH A Rp. 500,000.00
b PEKERJAAN TANAH DAN PONDASI
1 Perapihan galian kolam eksisiting 1.00 Ls Rp. 250,000.00 Rp. 250,000.00
2 Galian Tanah Pondasi 1.47 M3 Rp. 69,320.00 Rp. 101,643.64
3 Urugan Pasir Bawah Pondasi 0.32 M3 Rp. 737,730.00 Rp. 235,158.81
4 Urugan Pasir Bawah Lantai kolam, pinggiran kolam dan jalan akses 0.30 M3 Rp. 737,730.00 Rp. 220,581.27
5 Urugan Tanah Kembali 0.49 M3 Rp. 23,106.00 Rp. 11,293.41
6 Pondasi Menerus Rolag bata, 1 Pc : 4 Ps (Pasir Lokal) 0.98 M3 Rp. 1,424,884.00 Rp. 1,397,526.23
7 Pas. Rolag Bata Pinggiran kolam, 1PC : 4PS (pasir Lokal) 1.60 M3 Rp. 1,424,884.00 Rp. 2,279,814.40
JUMLAH B Rp. 4,496,017.76
c PEKERJAAN COR DAN PASANGAN
1 Pas. Sloof 15/15 beton bertulang 0.55 M3 Rp. 1,674,168.00 Rp. 923,638.49
2 Pas. Ringbalk 13/13 beton bertulang 0.41 M3 Rp. 1,674,168.00 Rp. 693,755.13
3 Pas. Dinding kolam 17.65 M2 Rp. 118,833.00 Rp. 2,097,925.32
4 Plesteran dinding 17.65 M2 Rp. 78,425.00 Rp. 1,384,546.32
5 Cor lantai kolam t=7cm 0.42 M3 Rp. 2,101,455.00 Rp. 879,669.06
6 Cor lantai pinggiran kolam t=5cm 1.22 M3 Rp. 2,101,455.00 Rp. 2,559,572.19
7 Cor Lantai Jalan Taman t=5cm 1.05 M3 Rp. 2,101,455.00 Rp. 2,206,527.75
8 Pek. Seni Pembuatan Waterfall Batu Alam (Pancoran Air) + pempipaan 1.00 Ls Rp. 8,000,000.00 Rp. 8,000,000.00
9 Pek. Pas. Bata tempat Mesin pompa 0.12 M3 Rp. 1,424,884.00 Rp. 177,825.52
10 Box Lampu hias Taman dari beton + Kotak Lampu 4.00 Bh Rp. 250,000.00 Rp. 1,000,000.00
11 Lampu LED Philips Bulb 8 Watt 4.00 Titik Rp. 272,130.00 Rp. 1,088,520.00
12 Instalasi saklar Ganda 1.00 Titik Rp. 124,000.00 Rp. 124,000.00
13 Pembuatan Kursi Beton Taman 0.78 M3 Rp. 1,674,168.00 Rp. 1,312,547.71
14 Cor Piijakan-pijakan taman t=4cm 0.34 M3 Rp. 2,101,455.00 Rp. 704,323.66
15 Pembuatan Pasangan Bata dindng Pot taman 11.12 M2 Rp. 118,833.00 Rp. 1,321,957.71
16 Plesteran dinding pot taman 10.75 M2 Rp. 78,425.00 Rp. 843,217.76
17 Urugan Tanah Isian Pot Taman 3.13 M3 Rp. 198,767.00 Rp. 621,445.03
JUMLAH C Rp. 25,939,471.64
II PEKERJAAN TEMPAT WUDHU
1 Urugan Pasir Bawah lantai 0.10 M3 Rp. 737,730.00 Rp. 70,195.01
2 Cor Lantai tempat wudhu t=5cm 0.10 M3 Rp. 2,101,455.00 Rp. 199,953.44
3 Pas. bata dinding tempat wudhu 0.26 M2 Rp. 118,833.00 Rp. 31,371.91
4 Plesteran dinding tempat wudhu 2.13 M1 Rp. 78,425.00 Rp. 167,045.25
JUMLAH D Rp. 468,565.61
III PEKERJAAN SELASAR TEMPAT CUCI JEMUR
1 Urugan Pasir Lantai t=5cm 0.44 M3 Rp. 737,730.00 Rp. 325,338.93
2 Cor Lantai Selasar dan Tempat cuci jemur t=5cm 0.44 M3 Rp. 2,101,455.00 Rp. 926,741.66
3 Pas Bata Dinding Pot taman 1.54 M2 Rp. 118,833.00 Rp. 183,002.82
4 Plesteran dinding pot taman 1.62 M2 Rp. 78,425.00 Rp. 127,048.50
5 Pas, Rolag Saluran Pembuangan 14.40 M3 Rp. 118,833.00 Rp. 1,711,195.20
6 Cor lantai saluran t=5cm 0.36 M3 Rp. 2,101,455.00 Rp. 756,523.80
JUMLAH E Rp. 4,029,850.91
IV PEKERJAAN LANDSCAPE DEPAN
1 Urugan Pasir t=3cm 3.47 M3 Rp. 737,730.00 Rp. 2,559,554.24
2 Pas. Paving block Halaman 115.65 M2 Rp. 105,076.00 Rp. 12,152,039.40
3 Pas. Bata pinggiran Paving block 0.49 M3 Rp. 118,833.00 Rp. 57,752.84
4 Cor Piijakan-pijakan taman t=4cm 0.19 M3 Rp. 2,101,455.00 Rp. 394,232.96
5 Pembuatan Pasangan Bata dindng Pot taman 22.50 M2 Rp. 118,833.00 Rp. 2,673,742.50
6 Urugan Tanah Isian Pot Taman 6.60 M3 Rp. 198,767.00 Rp. 1,311,166.52
7 Lampu Taman Stand 1.00 Bh Rp. 2,200,000.00 Rp. 2,200,000.00
JUMLAH F Rp. 21,348,488.45
V PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. 500,000.00 Rp. 500,000.00
JUMLAH G Rp. 500,000.00
REKAPITULASI :
PEKERJAAN : PEMBUATAN KOLAM IKAN DAN LANDSCAPE
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

NO. NAMA PEKERJAAN JUMLAH HARGA

1 2 3

I PEKERJAAN KOLAM IKAN & TAMAN BELAKANG


a PEKERJAAN PERSIAPAN ............................................................................ Rp.
b PEKERJAAN TANAH DAN PONDASI ............................................................................ Rp.
c PEKERJAAN COR DAN PASANGAN ............................................................................ Rp.
II PEKERJAAN TEMPAT WUDHU ............................................................................ Rp.
III PEKERJAAN SELASAR TEMPAT CUCI JEMUR ............................................................................ Rp.
IV PEKERJAAN LANDSCAPE DEPAN ............................................................................ Rp.
V PEKERJAAN LAIN-LAIN DAN FINISHING ............................................................................ Rp.

REAL COST ( RC ) ............................................................................ Rp.

DIBULATKAN ............................................................................ Rp.

Terbilang : SEMBILAN PULUH TUJUH JUTA SERATUS RIBU RUPIAH

MERAUKE, 01 DESEMBER 2020


BILL OF QUANTITY
PEKERJAAN : PEMBUATAN KOLAM IKAN DAN LANDSCAPE
LOKASI : KEPI
KAB. / PROVINSI : MAPPI - PAPUA
TAHUN ANGGARAN : 2020

No. URAIAN PEKERJAAN VOLUME SAT. HARGA SATUAN JUMLAH HARGA

a b c d e f=cxe

I PEKERJAAN KOLAM IKAN & TAMAN BELAKANG


a PEKERJAAN PERSIAPAN
1 Pengukuran dan Pasangan Bouwplank 1.00 Ls Rp. Rp.
JUMLAH A Rp.
b PEKERJAAN TANAH DAN PONDASI
1 Perapihan galian kolam eksisiting 1.00 Ls Rp. Rp.
2 Galian Tanah Pondasi 1.47 M3 Rp. Rp.
3 Urugan Pasir Bawah Pondasi 0.32 M3 Rp. Rp.
4 Urugan Pasir Bawah Lantai kolam, pinggiran kolam dan jalan akses 0.30 M3 Rp. Rp.
5 Urugan Tanah Kembali 0.49 M3 Rp. Rp.
6 Pondasi Menerus Rolag bata, 1 Pc : 4 Ps (Pasir Lokal) 0.98 M3 Rp. Rp.
7 Pas. Rolag Bata Pinggiran kolam, 1PC : 4PS (pasir Lokal) 1.60 M3 Rp. Rp.
JUMLAH B Rp.
c PEKERJAAN COR DAN PASANGAN
1 Pas. Sloof 15/15 beton bertulang 0.55 M3 Rp. Rp.
2 Pas. Ringbalk 13/13 beton bertulang 0.41 M3 Rp. Rp.
3 Pas. Dinding kolam 17.65 M2 Rp. Rp.
4 Plesteran dinding 17.65 M2 Rp. Rp.
5 Cor lantai kolam t=7cm 0.42 M3 Rp. Rp.
6 Cor lantai pinggiran kolam t=5cm 1.22 M3 Rp. Rp.
7 Cor Lantai Jalan Taman t=5cm 1.05 M3 Rp. Rp.
8 Pek. Seni Pembuatan Waterfall Batu Alam (Pancoran Air) + pempipaan 1.00 Ls Rp. Rp.
9 Pek. Pas. Bata tempat Mesin pompa 0.12 M3 Rp. Rp.
10 Box Lampu hias Taman dari beton + Kotak Lampu 4.00 Bh Rp. Rp.
11 Lampu LED Philips Bulb 8 Watt 4.00 Titik Rp. Rp.
12 Instalasi saklar Ganda 1.00 Titik Rp. Rp.
13 Pembuatan Kursi Beton Taman 0.78 M3 Rp. Rp.
14 Cor Piijakan-pijakan taman t=4cm 0.34 M3 Rp. Rp.
15 Pembuatan Pasangan Bata dindng Pot taman 11.12 M2 Rp. Rp.
16 Plesteran dinding pot taman 10.75 M2 Rp. Rp.
17 Urugan Tanah Isian Pot Taman 3.13 M3 Rp. Rp.
JUMLAH C Rp.
II PEKERJAAN TEMPAT WUDHU
1 Urugan Pasir Bawah lantai 0.10 M3 Rp. Rp.
2 Cor Lantai tempat wudhu t=5cm 0.10 M3 Rp. Rp.
3 Pas. bata dinding tempat wudhu 0.26 M2 Rp. Rp.
4 Plesteran dinding tempat wudhu 2.13 M1 Rp. Rp.
JUMLAH D Rp.
III PEKERJAAN SELASAR TEMPAT CUCI JEMUR
1 Urugan Pasir Lantai t=5cm 0.44 M3 Rp. Rp.
2 Cor Lantai Selasar dan Tempat cuci jemur t=5cm 0.44 M3 Rp. Rp.
3 Pas Bata Dinding Pot taman 1.54 M2 Rp. Rp.
4 Plesteran dinding pot taman 1.62 M2 Rp. Rp.
5 Pas, Rolag Saluran Pembuangan 14.40 M3 Rp. Rp.
6 Cor lantai saluran t=5cm 0.36 M3 Rp. Rp.
JUMLAH E Rp.
IV PEKERJAAN LANDSCAPE DEPAN
1 Urugan Pasir t=3cm 3.47 M3 Rp. Rp.
2 Pas. Paving block Halaman 115.65 M2 Rp. Rp.
3 Pas. Bata pinggiran Paving block 0.49 M3 Rp. Rp.
4 Cor Piijakan-pijakan taman t=4cm 0.19 M3 Rp. Rp.
5 Pembuatan Pasangan Bata dindng Pot taman 22.50 M2 Rp. Rp.
6 Urugan Tanah Isian Pot Taman 6.60 M3 Rp. Rp.
7 Lampu Taman Stand 1.00 Bh Rp. Rp.
JUMLAH F Rp.
V PEKERJAAN LAIN-LAIN DAN FINISHING
1 Pembersihan Akhir 1.00 Ls Rp. Rp.
JUMLAH G Rp.
DAFTAR HARGA SATUAN BAHAN
LOKASI KEGIATAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : PENYUSUNAN NORMA, STANDAR, PEDOMAN DAN MANUAL (NSPM)


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN

IB
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2019

M
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2019 LOKASI : KOTA MERAUKE - DISTRIK MERAUKE


Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8

A. BAHAN BAKAR DAN PENCAMPUR


1 Bensin (Non Subsidi) MA.1 Liter 9,129.00 0% 369.00 9,498.00
2 Solar (Non Subsidi) MA.2 Liter 11,721.00 0% 369.00 12,090.00
3 Minyak Tanah (Non Subsidi) MA.3 Liter 10,478.00 0% 369.00 10,847.00
4 Minyak Pelumas / Olie MA.4 Liter 35,000.00 0% 375.00 35,375.00
5 Minyak Bekisting / Oli Bekas MA.5 Liter 500.00 0% 375.00 875.00
6 Polimer MA.6 Liter 18,000.00 0% 522.00 18,522.00
7 Aspal / Teer MA.7 Kg 15,483.00 0% 395.00 15,878.00
8 Residu MA.8 Liter 24,900.00 0% 790.00 25,690.00

B. BAHAN PASIR, BATU DAN SEMEN


1 Pasir Semen (Import) MB.1 M3 1,125,000.00 0% 31,017.00 1,156,017.00
2 Pasir Pasang Lokal (kualitas baik) MB.2 M3 600,000.00 0% 232,440.00 832,440.00
3 Tanah Timbun biasa MB.3 M3 200,000.00 0% 104,590.00 304,590.00
4 Tanah Pilihan (Selmat) MB.4 M3 200,000.00 0% 104,590.00 304,590.00
5 Batu Kerikil/Koral beton (Import) MB.5 M3 1,125,000.00 0% 34,610.00 1,159,610.00
6 Batu Kali/Gunung (Import) MB.6 M3 1,218,000.00 0% 34,610.00 1,252,610.00
7 Batu Bata Merah MB.7 Buah 1,000.00 0% 320.00 1,320.00
8 Batu Cetak 10 x 20 x 30 Cm MB.8 Buah 2,000.00 0% 680.00 2,680.00
9 Paving Blok MB.9 Buah 6,500.00 0% 210.00 6,710.00
10 Semen Portland (PC) @ 50 Kg MB.10 Zak 95,000.00 0% 7,530.00 102,530.00 2,051.00
11 Semen PC Warna MB.11 Zak 127,500.00 0% 7,530.00 135,030.00 2,701.00
12 Tepung Gypsum MB.12 Zak 99,000.00 0% 10,270.00 109,270.00 5,464.00

C. BAHAN KAYU, TRIPLEKS DLL


1 Balok Kayu Kelas III (Kayu Bus) MC.1 M3 2,750,000.00 0% 143,040.00 2,893,040.00
2 Balok Kayu Kelas II (Kayu Rahay) MC.2 M3 4,000,000.00 0% 165,050.00 4,165,050.00
3 Balok Kayu Kelas I (Kayu Besi) MC.3 M3 6,000,000.00 0% 187,060.00 6,187,060.00
4 Balok Kayu Kelas IV (Kayu Campur) MC.4 M3 2,500,000.00 0% 110,030.00 2,610,030.00
5 Papan Kayu Kelas III (Kayu Bus) t : 2-5 cm MC.5 M3 2,750,000.00 0% 143,040.00 2,893,040.00
6 Papan Kayu Kelas II (Kayu Rahay) t : 2 cm MC.6 M3 4,000,000.00 0% 165,050.00 4,165,050.00
7 Papan Kayu Kelas II (Kayu Rahay) t : 3 cm MC.7 M3 4,000,000.00 0% 165,050.00 4,165,050.00
8 Papan Kayu Kelas I (Kayu Besi) t : 2-3 cm MC.8 M3 6,000,000.00 0% 187,060.00 6,187,060.00
9 Papan Kayu Kelas IV (tebal = 2-5 cm) MC.9 M3 2,500,000.00 0% 110,030.00 2,610,030.00
10 Kayu Lat/Reng/List, Kayu Kelas II MC.10 Batang 25,000.00 0% 340.00 25,340.00 10,558,334.00
11 Tripleks (1,22 x 2,44) cm - tebal 3 mm MC.11 Lembar 64,375.00 0% 1,410.00 65,785.00 22,100.00
12 Tripleks (1,22 x 2,44) cm - tebal 4 mm MC.12 Lembar 79,500.00 0% 1,880.00 81,380.00 27,339.00
13 Tripleks (1,22 x 2,44) cm - tebal 6 mm MC.13 Lembar 102,000.00 0% 2,820.00 104,820.00 35,213.00
14 Tripleks (1,22 x 2,44) cm - tebal 9 mm MC.14 Lembar 145,000.00 0% 4,230.00 149,230.00 50,132.00
15 Tripleks (1,22 x 2,44) cm - tebal 12 mm MC.15 Lembar 201,500.00 0% 5,650.00 207,150.00 69,589.00
16 Tripleks (1,22 x 2,44) cm - tebal 15 mm MC.16 Lembar 259,625.00 0% 7,060.00 266,685.00 89,588.00
17 Tripleks (1,22 x 2,44) cm - tebal 18 mm MC.17 Lembar 292,750.00 0% 8,940.00 301,690.00 101,348.00
18 Tripleks (1,22 x 2,44) cm - tebal 22 mm MC.18 Lembar 300,000.00 0% 10,360.00 310,360.00 104,260.00
19 Teak - Wood (1.22 x 2.44 Cm) - 3 mm MC.19 Lembar 127,500.00 0% 1,410.00 128,910.00 43,305.00
20 Teak - Wood (0.92 x 2.44 Cm) - 4 mm MC.20 Lembar 120,000.00 0% 1,880.00 121,880.00 54,295.00
21 Plywood - Multiplex (9 mm) MC.21 Lembar 450,000.00 0% 3,470.00 453,470.00
22 Melamin MC.22 Lembar 126,500.00 0% 2,310.00 128,810.00
23 Formika Polos (122 x 244) Cm MC.23 Lembar 300,000.00 0% 2,820.00 302,820.00
24 Pelat Asbes Tebal 6 mm MC.24 Lembar 127,000.00 0% 2,940.00 129,940.00
25 Pelat Asbes Tebal 5 mm MC.25 Lembar 65,000.00 0% 2,450.00 67,450.00
26 Pelat Asbes Tebal 4 mm MC.26 Lembar 61,000.00 0% 1,960.00 62,960.00
27 Gypsum Board tebal 9 mm MC.27 Lembar 90,625.00 0% 4,740.00 95,365.00
28 List profil Gypsum Lebar Sampai 5 cm MC.28 M' 35,000.00 0% 300.00 35,300.00
29 Hard Board MC.29 Lembar 75,500.00 0% 8,430.00 83,930.00
30 Tiang Kayu Bulat (Dia 20 cm, L=4-6 m) MC.30 Batang 125,000.00 0% 22,800.00 147,800.00
31 Tiang Kayu Bulat (Dia 25-30 cm, L=4-6 m) MC.31 Batang 150,000.00 0% 86,220.00 236,220.00
32 Kayu dolken Ø 8-10, L=4 M MC.32 Batang 12,500.00 0% 4,230.00 16,730.00
33 Patok kayu (Dia = 3 cm, L= 1 m) MC.33 Batang 3,000.00 0% - 3,000.00
34 Patok kayu (Dia = 5 cm, L= 5 m) MC.34 Batang 5,000.00 0% - 5,000.00
35 Kayu Bakar (Campuran) MC.35 M3 400,000.00 0% - 400,000.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8

D. BAHAN BESI, PAKU DAN KAWAT


1 Besi Beton Dia.6 mm (SNI) MD.1 Kg 14,264.00 0% 240.00 14,504.00 38,000.00
2 Besi Beton Dia.8 mm (SNI) MD.2 Kg 13,697.00 0% 270.00 13,967.00 65,000.00
3 Besi Beton Dia.10 mm (SNI) MD.3 Kg 13,635.00 0% 290.00 13,925.00 101,000.00
4 Besi Beton Dia.12 mm (SNI) MD.4 Kg 13,698.00 0% 400.00 14,098.00 146,000.00
5 Besi Beton Dia.14 mm (SNI) MD.5 KG 13,636.00 0% 340.00 13,976.00 198,000.00
6 Besi Beton Dia.16 mm (SNI) MD.6 KG 13,660.00 0% 520.00 14,180.00 259,000.00
7 Besi Beton Dia.19 mm (SNI) MD.7 KG 14,312.00 0% 420.00 14,732.00 383,000.00
8 Besi Beton Dia.22 mm (SNI) MD.8 KG 11,884.00 0% 380.00 12,264.00 425,000.00
9 Kawat Beton MD.9 KG 25,666.00 0% 290.00 25,956.00
10 Kawat beton / bindrat 4 mm MD.10 KG 27,500.00 0% 290.00 27,790.00
11 Paku 1" (2,5 - 3 cm) MD.11 KG 24,833.00 0% 280.00 25,113.00
12 Paku 2" (5 cm) MD.12 KG 20,750.00 0% 280.00 21,030.00
13 Paku 3" (7 cm) MD.13 KG 20,750.00 0% 280.00 21,030.00
14 Paku 4" (10 cm) MD.14 KG 20,750.00 0% 280.00 21,030.00
15 Paku 5" (12 - 15 cm) MD.15 KG 21,000.00 0% 280.00 21,280.00
16 Paku Campur MD.16 KG 20,750.00 0% 280.00 21,030.00
17 Paku Seng MD.17 KG 41,750.00 0% 320.00 42,070.00
18 Paku Ardex Ulir MD.18 KG 85,000.00 0% 280.00 85,280.00
19 Paku Sirap MD.19 Buah 15,000.00 0% 280.00 15,280.00
20 Paku Ondoline MD.20 KG 20,000.00 0% 280.00 20,280.00
21 Paku Tembok / Kecil 2/3 MD.21 Buah 268.00 0% 9.33 277.33
22 Paku/Skrup 5 cm MD.22 KG 705.00 0% 280.00 985.00
23 Kawat Nyamuk (Plastik / Nylon) MD.23 M 25,500.00 0% 163.00 25,663.00
24 Kawat Has / Bankhas dia 12 mm MD.24 M2 29,500.00 0% 181.00 29,681.00
25 Kawat Harmonika Has 40x40 mm MD.25 M 80,500.00 0% 916.00 81,416.00
26 Kawat burung MN.26 M² 25,000.00 0% 916.00 25,916.00
27 Kawat Duri Baja 20 M MD.27 KG 20,500.00 0% 260.00 20,760.00
28 Kawat Las 0.26 MD.28 Dos 152,375.00 0% 290.00 152,665.00
29 Timah Solder MD.29 KG 35,333.00 0% 100.00 35,433.00
30 Baut Jembatan Dia. <14 mm MD.30 KG 15,000.00 0% 280.00 15,280.00
31 Baut Dia, 3/8" - 17.5 + Mur - Ring MD.31 Buah 4,200.00 0% 280.00 4,480.00
32 Baut Dia, 3/8" - 12.0/15.0 + Mur - Ring MD.32 Buah 3,250.00 0% 280.00 3,530.00
33 Baut Dia, 3/8" - 20.0 + Mur - Ring MD.33 Buah 5,550.00 0% 280.00 5,830.00
34 Baut Dia, 3/8" - 35.0 + Mur - Ring MD.34 Buah 6,000.00 0% 280.00 6,280.00
35 Besi angkur dia. 8 mm MN.35 Buah 10,000.00 0% 280.00 10,280.00
36 Kasa (Ram Ayam) Dia, 10 mm MD.36 M 25,250.00 0% 385.00 25,635.00
37 Besi Siku 30 . 30 . 3 - L = 6 Meter MD.37 Batang 78,500.00 0% 2,660.00 81,160.00 9,623.00
38 Besi Siku 50 . 50 . 5 - L = 6 Meter MD.38 Batang 247,000.00 0% 7,860.00 254,860.00 10,878.00
39 Besi Siku 50 . 50 . 6 - L = 6 Meter MD.39 Batang 240,000.00 0% 8,210.00 248,210.00 8,829.00
40 Besi Siku 40 . 40 . 4 - L = 6 Meter MD.40 Batang 170,000.00 0% 4,170.00 174,170.00 11,616.00
41 Besi Siku 40 . 40 . 5 - L = 6 Meter MD.41 Batang 145,000.00 0% 7,510.00 152,510.00 8,137.00
42 Besi Siku 20 . 20 . 3 - L = 6 Meter MD.42 Batang 110,000.00 0% 1,640.00 111,640.00 19,854.00
43 Besi Plat 1.0 mm - 120 x 240 Cm MD.43 Lembar 406,000.00 0% 7,780.00 413,780.00 18,397.00
44 Besi Plat 1.2 mm - 120 x 240 Cm MD.44 Lembar 492,000.00 0% 8,120.00 500,120.00 18,529.00
45 Besi Plat 2.0 mm - 120 x 240 Cm MD.45 Lembar 781,000.00 0% 12,460.00 793,460.00 17,639.00
46 Besi Plat 3.0 mm - 120 x 240 Cm MD.46 Lembar 1,157,000.00 0% 14,500.00 1,171,500.00 17,362.00
47 Besi Plat 12 mm -120 x 240 cm MD.47 Lembar 1,450,000.00 0% 46,060.00 1,496,060.00 5,543.00
48 Besi Strip 20.2 MD.48 Batang 39,250.00 0% 430.00 39,680.00 25,404.00
49 Besi Strip 30.3 MD.49 Batang 57,000.00 0% 1,020.00 58,020.00 16,509.00
50 Besi Strip 40.4 MD.50 Batang 76,250.00 0% 1,990.00 78,240.00 12,523.00
51 Besi Strip 50.5 MD.51 Batang 92,000.00 0% 2,740.00 94,740.00 9,705.00
52 Waltermur Dia 16 mm MD.52 Buah 20,000.00 0% 4,010.00 24,010.00
53 Gording lips chanel 150.65.20.2,3 ( 6 N ) MD.53 Batang 725,000.00 0% 4,010.00 729,010.00
54 Baja profil IWF MD.54 KG 21,000.00 0% 240.00 21,240.00
55 Besi gording canal MD.55 KG 22,549.00 0% 240.00 22,789.00
56 Water mur MD.56 KG 15,000.00 0% 240.00 15,240.00
57 Sealent MD.57 Tube 31,333.00 0% 240.00 31,573.00

E. BAHAN PENUTUP ATAP


1 Seng Gelombang BJLS 0,30 ME.1 Lembar 78,750.00 0% 740.00 79,490.00
2 Seng Gelombang BJLS 0,22 ME.2 Lembar 65,000.00 0% 680.00 65,680.00
3 Seng Gelombang BJLS 0,20 ME.3 Lembar 54,250.00 0% 590.00 54,840.00
4 Atap Seng Plastik Gelombang Kecil ME.4 Lembar 68,250.00 0% 320.00 68,570.00
5 Atap Seng Gelombang Besar Fiber Glass ME.5 Lembar 83,000.00 0% 1,360.00 84,360.00
6 Seng Plat BJLS 0.30 ME.6 Lembar 78,500.00 0% 740.00 79,240.00 6,604.00
7 Seng Plat BJLS 0.20 ME.7 Lembar 55,666.00 0% 590.00 56,256.00 4,688.00
8 Genteng Metal - Multiroof ME.8 Lembar 74,500.00 0% 1,340.00 75,840.00
9 Nok Genteng Metal - Multiroof ME.9 Bh 31,250.00 0% 1,340.00 32,590.00
10 Atap Allumunium Gelombang ME.10 M2 65,000.00 0% 1,340.00 66,340.00
11 Nok Atap Allumunium ME.11 M 21,000.00 0% 1,340.00 22,340.00
12 Karet Talang ME.12 M1 10,500.00 0% 300.00 10,800.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8
F. BAHAN KERAMIK
1 Ubin Abu-Abu 20 x 20 Cm MF.1 Buah 3,000.00 0% 130.00 3,130.00
2 Ubin Abu-Abu 30 x 30 Cm MF.2 Buah 6,818.00 0% 210.00 7,028.00
3 Ubin Abu-Abu 40 x 40 Cm MF.3 Buah 14,166.00 0% 370.00 14,536.00
4 Ubin Warna 20 x 20 Cm MF.4 Buah 2,780.00 0% 130.00 2,910.00
5 Ubin Warna 30 x 30 Cm MF.5 Buah 6,227.00 0% 210.00 6,437.00
6 Ubin Warna 40 x 40 Cm MF.6 Buah 10,833.00 0% 370.00 11,203.00
7 Ubin Teraso Ukuran 30 x 30 cm MF.7 Buah 6,590.00 0% 210.00 6,800.00
8 Ubin Teraso Ukuran 40 x 40 cm MF.8 Buah 14,083.00 0% 370.00 14,453.00
9 Ubin Granito Ukuran 30 x 30 cm MF.9 Buah 6,318.00 0% 210.00 6,528.00
10 Ubin Granito Ukuran 40 x 40 cm MF.10 Buah 12,166.00 0% 370.00 12,536.00
11 Ubin Teralux Kerang Ukuran 30 x 30 cm MF.11 Buah 7,272.00 0% 210.00 7,482.00
12 Ubin Teralux Kerang Ukuran 40 x 40 cm MF.12 Buah 14,250.00 0% 370.00 14,620.00
13 Ubin Teralux Marmer Ukuran 30 x 30 cm MF.13 Buah 11,363.00 0% 210.00 11,573.00
14 Ubin Teralux Marmer Ukuran 40 x 40 cm MF.14 Buah 22,083.00 0% 370.00 22,453.00
15 Ubin Teralux Marmer Ukuran 60 x 60 cm MF.15 Buah 71,666.00 0% 1,450.00 73,116.00
16 Keramik Artistik 10x20; 15x15 cm MF.16 Buah 1,250.00 0% 100.00 1,350.00
17 Keramik Artistik 10x10 atau 5x20 cm MF.17 Buah 650.00 0% 90.00 740.00
18 Keramik Lantai 20 x 20 cm MF.18 Buah 2,953.00 0% 130.00 3,083.00
19 Keramik Lantai 20 x 30 cm MF.19 Buah 4,062.00 0% 170.00 4,232.00
20 Keramik Lantai 30 x 30 cm MF.20 Buah 6,250.00 0% 210.00 6,460.00
21 Keramik Lantai 30 x 30 berglasir MF.21 Buah 7,272.00 0% 210.00 7,482.00
22 Keramik Lantai 30 x 30 berglasir (Mozaik) MF.22 Buah 7,272.00 0% 210.00 7,482.00
23 Keramik Lantai 40 x 40 cm MF.23 Buah 13,875.00 0% 370.00 14,245.00
24 Keramik Lantai 50 x 50 cm MF.24 Buah 24,041.00 0% 730.00 24,771.00
25 Keramik Lantai 60 x 60 cm MF.25 Buah 98,888.00 0% 1,450.00 100,338.00
26 Keramik Dinding 10 x 20 cm MF.26 Buah 1,400.00 0% 100.00 1,500.00
27 Keramik Dinding 20x20 atau 20x25 cm MF.27 Buah 3,010.00 0% 130.00 3,140.00
28 Ubin Dinding Porselin 11 x 11 MF.28 Buah 670.00 0% 90.00 760.00
29 Ubin Dinding Porselin 10 x 20 cm MF.29 Buah 1,036.00 0% 100.00 1,136.00
30 Ubin Dinding Porselin 20 x 20 MF.30 Buah 2,900.00 0% 130.00 3,030.00
31 Plint Ubin Abu-Abu 15 x 20 cm MF.31 Buah 12,500.00 0% 160.00 12,660.00
32 Plint Ubin Abu-Abu 10 x 30 cm MF.32 Buah 10,000.00 0% 170.00 10,170.00
33 Plint Ubin Abu-Abu 10 x 40 cm MF.33 Buah 12,250.00 0% 160.00 12,410.00
34 Plint Ubin Warna 10 x 20 cm MF.34 Buah 4,500.00 0% 100.00 4,600.00
35 Plint Ubin Warna 10 x 30 cm MF.35 Buah 10,000.00 0% 170.00 10,170.00
36 Plint Ubin Warna 10 x 40 cm MF.36 Buah 12,000.00 0% 160.00 12,160.00
37 Plint Ubin Teraso 10 x 30 cm MF.37 Buah 10,000.00 0% 170.00 10,170.00
38 Plint Ubin Teraso 10 x 40 cm MF.38 Buah 12,500.00 0% 160.00 12,660.00
39 Plint Ubin Granito 10 x 40 cm MF.39 Buah 12,500.00 0% 160.00 12,660.00
40 Plint Ubin Granito 10 x 30 cm MF.40 Buah 8,000.00 0% 170.00 8,170.00
41 Plint Ubin Teralux Kerang 10 x 40 cm MF.41 Buah 8,000.00 0% 160.00 8,160.00
42 Plint Ubin Teralux Kerang 10 x 30 cm MF.42 Buah 8,000.00 0% 170.00 8,170.00
43 Plint Ubin Teralux Marmer 10 x 60 cm MF.43 Buah 33,500.00 0% 180.00 33,680.00
44 Plint Ubin Teralux Marmer 10 x 40 cm MF.44 Buah 10,000.00 0% 160.00 10,160.00
45 Plint Ubin Teralux Marmer 10 x 30 cm MF.45 Buah 7,500.00 0% 170.00 7,670.00
46 Plint Keramik Artistik 10 x 20 cm MF.46 Buah 5,000.00 0% 100.00 5,100.00
47 Plint Keramik Artistik 10 x 10 cm MF.47 Buah 4,500.00 0% 90.00 4,590.00
48 Plint Keramik Artistik 5 x 20 cm MF.48 Buah 4,000.00 0% 90.00 4,090.00
49 Plint Keramik Artistik 10 x 30 cm MF.49 Buah 7,500.00 0% 170.00 7,670.00
50 Marmer Ukuran 100 x 100 cm MF.50 Buah 350,000.00 0% 8,020.00 358,020.00
51 Wall paper (Lebar 50 cm) MF.51 M2 250,000.00 0% 344.00 250,344.00
52 Batu Paras MF.52 Buah 22,727.00 0% 210.00 22,937.00 252,307.00
53 Batu Tempel Hitam MF.53 Buah 28,181.00 0% 210.00 28,391.00 312,301.00

G. BAHAN KACA
1 Kaca Polos 3 mm MG.1 M2 115,182.00 0% 1,900.00 117,082.00
2 Kaca Polos 5 mm MG.2 M2 169,895.00 0% 2,670.00 172,565.00
3 Kaca Buram 3 mm MG.3 M2 107,698.00 0% 1,900.00 109,598.00
4 Kaca Buram 4 mm MG.4 M2 107,698.00 0% 2,280.00 109,978.00
5 Kaca Buram 5 mm MG.5 M2 107,698.00 0% 2,670.00 110,368.00
6 Kaca Naco / Louver - 7 Clips (polos) MG.6 Buah 165,166.00 0% 2,890.00 168,056.00
7 Kaca Naco / Louver - 8 Clips (polos) MG.7 Buah 195,666.00 0% 3,260.00 198,926.00
8 Kaca Naco / Louver - 9 Clips (polos) MG.8 Buah 218,250.00 0% 3,620.00 221,870.00
9 Kaca Naco / Louver - 10 Clips (polos) MG.9 Buah 245,000.00 0% 4,000.00 249,000.00
10 Kaca Rayban 25 % - tebal 5 mm MG.10 M2 215,000.00 0% 2,670.00 217,670.00
11 Kaca Acrylic (Kaca Plastik) - 5 mm MG.11 Lembar 1,400,000.00 0% 2,600.00 1,402,600.00

H. BAHAN/ALAT PENGGANTUNG
1 Kunci Tanam (Setara Cap Kuda Terbang) MH.1 Set 94,333.00 0% 320.00 94,653.00
2 Kunci Tanam - 2 Slaagh MH.2 Set 123,500.00 0% 320.00 123,820.00
3 Kunci Tanam - 1 Slaagh MH.3 Set 110,000.00 0% 320.00 110,320.00
4 Kunci Tanam (Setara Cap Anchor / Yale) MH.4 Set 117,000.00 0% 320.00 117,320.00
5 Kunci Gembok 1" MH.5 Set 85,000.00 0% 160.00 85,160.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8
6 Engsel 4" (Untuk Pintu) MH.6 Pasang 22,833.00 0% 160.00 22,993.00
7 Engsel 3" (Untuk Jendela) MH.7 Pasang 16,666.00 0% 160.00 16,826.00
8 Engsel Kupu-Kupu T MH.8 Pasang 30,000.00 0% 160.00 30,160.00
9 Engsel Nylon Kuningan 4" MH.9 Pasang 20,000.00 0% 160.00 20,160.00
10 Engsel Biasa 3" (Untuk Jendela) MH.10 Pasang 17,000.00 0% 160.00 17,160.00
11 Hak Angin / Kait Angin MH.11 Buah 16,500.00 0% 160.00 16,660.00
12 Espagnolet MH.12 Set 65,000.00 0% 160.00 65,160.00
13 Grendel Tanam (Pintu) MH.13 Buah 127,500.00 0% 160.00 127,660.00
14 Grendel Besar / Kecil MH.14 Buah 34,666.00 0% 160.00 34,826.00
15 Tarikan Pintu MH.15 Buah 165,000.00 0% 160.00 165,160.00
16 Tarikan Jendela MH.16 Buah 14,000.00 0% 160.00 14,160.00

I. BAHAN CAT
1 Amplas Kertas (Amplas Kayu) MI.1 Lembar 5,166.00 0% 17.00 5,183.00
2 Amplas Besi MI.2 Lembar 4,666.00 0% 17.00 4,683.00
3 Dempul Kayu MI.3 Kg 34,666.00 0% 300.00 34,966.00
4 Cat Meny Kayu MI.4 Kg 36,166.00 0% 300.00 36,466.00
5 Cat Meny Besi MI.5 Kg 36,166.00 0% 300.00 36,466.00
6 Cat Kayu MI.6 Kg 63,750.00 0% 300.00 64,050.00
7 Cat Besi MI.7 Kg 71,500.00 0% 300.00 71,800.00
8 Cat Kilat LN MI.8 Kg 62,000.00 0% 300.00 62,300.00
9 Minyak Cat / Thinner MI.9 Kg 30,750.00 0% 300.00 31,050.00
10 Cat Tembok (Setara Dulux Weathershield) MI.10 Kg 26,250.00 0% 300.00 26,550.00
11 Plamur Tembok MI.11 Zak 134,250.00 0% 8,280.00 142,530.00 7,127.00
12 Cat Tembok Biasa (1 Klg @ 5 Kg) MI.12 Kaleng 105,000.00 0% 1,710.00 106,710.00 21,342.00
13 Cat Besi Crom MI.13 Kg 64,000.00 0% 300.00 64,300.00
14 Cat Besi (Setara Nippon Paint) MI.14 Kg 84,250.00 0% 300.00 84,550.00
15 Politur Kaleng (Setara Apache) MI.15 Kg 63,250.00 0% 300.00 63,550.00
16 Floor Hardener MI.16 KG 19,000.00 0% 300.00 19,300.00

J. BAHAN LISTRIK DAN ELEKTRONIKA


1 Kabel Listrik NYM/NYA 3x2.5 mm MJ.1 Roll 1,451,000.00 0% 23,170.00 1,474,170.00 14,742.00
2 Kabel Listrik NYM/NYA 2x1.5 mm MJ.2 Roll 835,000.00 0% 23,170.00 858,170.00 8,582.00
3 Pipa Listrik dia, 5/8 MJ.3 Batang 7,600.00 0% 110.00 7,710.00
4 Saklar Double - Tempel MJ.4 Buah 21,750.00 0% 500.00 22,250.00
5 Saklar Tunggal / Engkel - Tempel MJ.5 Buah 15,875.00 0% 500.00 16,375.00
6 Stop Kontak 500 Watt - Tempel MJ.6 Buah 15,250.00 0% 500.00 15,750.00
7 Stop Kontak 1000 Watt - Tempel MJ.7 Buah 23,250.00 0% 500.00 23,750.00
8 Home Saklar 1 Fase Komplit MJ.8 Buah 553,333.00 0% 800.00 554,133.00
9 Lampu TL 1 x 40 Watt Komplit MJ.9 Buah 183,750.00 0% 100.00 183,850.00
10 Lampu TL 1 x 20 Watt Komplit MJ.10 Buah 129,750.00 0% 100.00 129,850.00
11 Lampu Pijar 40 Watt Komplit MJ.11 Buah 11,000.00 0% 100.00 11,100.00
12 Lampu Pijar 60 Watt Komplit MJ.12 Buah 11,125.00 0% 100.00 11,225.00
13 Lampu Pijar 100 Watt Komplit MJ.13 Buah 10,166.00 0% 100.00 10,266.00
14 Vitting Lampu MJ.14 Buah 12,500.00 0% 100.00 12,600.00
15 Lampu XL 40 Watt MJ.15 Set 140,000.00 0% 100.00 140,100.00
16 Lampu XL 20 Watt MJ.16 Set 41,250.00 0% 100.00 41,350.00
17 Lampu SL 23 Watt MJ.17 Set 47,000.00 0% 100.00 47,100.00
18 Lampu SL 14 Watt MJ.18 Set 39,500.00 0% 100.00 39,600.00
19 Sekring Kas 1 Group (Biasa) MJ.19 Buah 0.00 0% 300.00 300.00
20 Klem Kabel MJ.20 Dus 33,625.00 0% 160.00 33,785.00
21 Isolasi Listrik MJ.21 Buah 8,700.00 0% 160.00 8,860.00
22 Sekrup MJ.22 Dus 15,500.00 0% 160.00 15,660.00
23 Panil Distribusi MJ.23 Buah 12,500,000.00 0% 800.00 12,500,800.00

K. BAHAN PIPA DAN SANITAIR


1 Pipa GIP (Leideng) Dia. 1/2" - 6 Meter MK.1 Batang 116,500.00 0% 1,180.00 117,680.00 19,614.00
2 Pipa GIP (Leideng) Dia. 3/4" - 6 Meter MK.2 Batang 154,500.00 0% 1,620.00 156,120.00 26,020.00
3 Pipa GIP (Leideng) Dia. 1" - 6 Meter MK.3 Batang 195,666.00 0% 2,330.00 197,996.00 33,000.00
4 Pipa GIP (Leideng) Dia. 1.25" - 6 Meter MK.4 Batang 249,333.00 0% 3,630.00 252,963.00 42,161.00
5 Pipa GIP (Leideng) Dia. 1.5" - 6 Meter MK.5 Batang 281,000.00 0% 4,510.00 285,510.00 47,585.00
6 Pipa GIP (Leideng) Dia. 2" - 6 Meter MK.6 Batang 313,000.00 0% 6,360.00 319,360.00 53,227.00
7 Pipa GIP (Leideng) Dia. 3" - 6 Meter MK.7 Batang 598,333.00 0% 18,920.00 617,253.00 102,876.00
8 Pipa GIP (Leideng) Dia. 4" - 6 Meter MK.8 Batang 742,000.00 0% 22,060.00 764,060.00 127,344.00
9 Pipa PVC Dia. 5" - 4 Meter (AW) MK.9 Batang 550,000.00 0% 2,730.00 552,730.00 138,183.00
10 Pipa PVC Dia. 4" - 4 Meter (AW) MK.10 Batang 329,833.00 0% 1,720.00 331,553.00 82,889.00
11 Pipa PVC Dia. 4" - 4 Meter (D) MK.11 Batang 236,875.00 0% 1,720.00 238,595.00 59,649.00
12 Pipa PVC Dia. 3" - 4 Meter (D) MK.12 Batang 147,375.00 0% 1,020.00 148,395.00 37,099.00
13 Pipa PVC Dia. 2" - 4 Meter (D) MK.13 Batang 77,125.00 0% 590.00 77,715.00 19,429.00
14 Pipa PVC Dia. 1" - 4 Meter (D) MK.14 Batang 43,625.00 0% 290.00 43,915.00 10,979.00
15 Pipa PVC Dia. 1/2" - 4 M MK.15 Batang 26,166.00 0% 140.00 26,306.00 6,577.00
16 Pipa PVC Dia. 3/4" - 4 M MK.16 Batang 34,625.00 0% 220.00 34,845.00 8,712.00
17 Pipa PVC Dia. 2,5" - 4 M MK.17 Batang 106,666.00 0% 790.00 107,456.00 26,864.00
18 Talang PVC Oval 6" - 4 Meter MK.18 Batang 80,000.00 0% 1,490.00 81,490.00
Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8
19 Talang PVC Oval 8" - 4 Meter MK.19 Batang 99,666.00 0% 1,990.00 101,656.00
20 Talang PVC Kotak 4" - 4 Meter MK.20 Batang 135,250.00 0% 2,370.00 137,620.00
21 Talang PVC Kotak 8" - 4 Meter MK.21 Batang 395,000.00 0% 2,880.00 397,880.00
22 Closed Duduk Porselin Komplit MK.22 Buah 2,311,000.00 0% 4,350.00 2,315,350.00
23 Closet duduk (siram) MK.23 Buah 580,000.00 0% 3,460.00 583,460.00
24 Closed Jongkok Porselin (Standar) MK.24 Buah 205,000.00 0% 3,510.00 208,510.00
25 Closed Jongkok Fiber Glass / Plastik MK.25 Buah 87,000.00 0% 1,730.00 88,730.00
26 Urinoir MK.26 Buah 1,495,000.00 0% 2,810.00 1,497,810.00
27 Wastafel Porselin MK.27 Buah 517,500.00 0% 2,810.00 520,310.00
28 Bak Air / Fiber Glass 1 M3 MK.28 Buah 427,500.00 0% 3,510.00 431,010.00
29 Bak Air / Fiber Glass 1/2 M3 MK.29 Buah 340,000.00 0% 2,810.00 342,810.00
30 Bak Air / Fiber Glass 1/4 M3 MK.30 Buah 295,000.00 0% 2,340.00 297,340.00
31 Tangki Air / Fiber Glass 1 M3 MK.31 Buah 1,970,000.00 0% 7,030.00 1,977,030.00
32 Kran Air 3/4" MK.32 Buah 29,125.00 0% 160.00 29,285.00
33 Kran Air 1/2" MK.33 Buah 22,875.00 0% 160.00 23,035.00
34 Kran Air 1" MK.34 Buah 30,000.00 0% 160.00 30,160.00
35 Stop Kran 1/2" MK.35 Buah 15,500.00 0% 160.00 15,660.00
36 Doble Neple GIP 1/2" MK.36 Buah 15,000.00 0% 160.00 15,160.00
37 Soccet 1/2" MK.37 Buah 2,000.00 0% 160.00 2,160.00
38 Elbow GIP 90º x 1/2" ( PE ) MK.38 Buah 50,000.00 0% 160.00 50,160.00
39 Tee 1/2" x 1/2" MK.39 Buah 2,250.00 0% 160.00 2,410.00
40 Hand Kran 1/2" Besi MK.40 Buah 30,000.00 0% 160.00 30,160.00
41 Dop GIP 1/2" MK.41 Buah 6,500.00 0% 160.00 6,660.00
42 Water Meter 1/2" MK.42 Buah 450,000.00 0% 1,170.00 451,170.00
43 Clamp Sadle 2" mm x 1/2" ( PE ) MK.43 Buah 80,000.00 0% 1,170.00 81,170.00
44 Pengaman Box Meter MK.44 Buah 250,000.00 0% 1,170.00 251,170.00
45 Pipa HDPE Ø 150 mm MK.45 M 398,000.00 0% 2,040.00 400,040.00
46 Pipa HDPE Ø 100 mm MK.46 M 196,000.00 0% 780.00 196,780.00
47 Pipa HDPE Ø 75 mm MK.47 M 107,000.00 0% 360.00 107,360.00
48 Pipa HDPE Ø 50-63 mm MK.48 M 60,000.00 0% 140.00 60,140.00
49 Tee All Flange Ø 50 x 50 mm (HDPE) MK.49 Buah 450,000.00 0% 5,420.00 455,420.00
50 Tee All Flange Ø 75 x 50 mm (HDPE) MK.50 Buah 475,000.00 0% 5,520.00 480,520.00
51 Tee All Flange Ø 75 x 75 mm (HDPE) MK.51 Buah 500,000.00 0% 5,600.00 505,600.00
52 Tee All Flange Ø 100 x 75 mm (HDPE) MK.52 Buah 650,000.00 0% 5,690.00 655,690.00
53 Bend 90 All Flange Ø 50 mm (HDPE) MK.53 Buah 210,000.00 0% 1,480.00 211,480.00
54 Bend 90 All Flange Ø 75 mm (HDPE) MK.54 Buah 335,000.00 0% 4,890.00 339,890.00
55 Bend 90 All Flange Ø 100 mm (HDPE) MK.55 Buah 50,000.00 0% 5,030.00 55,030.00
56 Gate Valve Flange Ø 50 mm MK.56 Buah 1,850,000.00 0% 12,720.00 1,862,720.00
57 Gate Valve Flange Ø 75 mm MK.57 Buah 2,350,000.00 0% 13,380.00 2,363,380.00
58 Gate Valve Flange Ø 1/2" MK.58 Buah 200,000.00 0% 170.00 200,170.00
59 Stub Flange Ø 50 mm MK.59 Buah 200,000.00 0% 1,050.00 201,050.00
60 Stub Flange Ø 75 mm MK.60 Buah 600,000.00 0% 2,040.00 602,040.00
61 Stub Flange Ø 100 mm MK.61 Buah 840,000.00 0% 2,540.00 842,540.00
62 End Cap (Dop) Ø 50 mm (HDPE) MK.62 Buah 37,009.00 0% 260.00 37,269.00
63 End Cap (Dop) Ø 75 mm (HDPE) MK.63 Buah 86,873.00 0% 1,050.00 87,923.00
64 Stop Cock (PIT Kran) 1/2" MK.64 Buah 950,000.00 0% 380.00 950,380.00
65 Reducer Ø 75 x 75 mm (HDPE) MK.65 Buah 525,000.00 0% 3,770.00 528,770.00
66 Reducer Ø 75 x 50 mm (HDPE) MK.66 Buah 500,000.00 0% 3,730.00 503,730.00
67 Quil Elbow HDPE (adaptor) Ø15 (1/2") MK.67 Buah 48,000.00 0% 1,480.00 49,480.00
68 Pipa Input HDPE Ø 1/2" MK.68 Buah 38,400.00 0% 1,480.00 39,880.00

M. BETON PRACETAK
1 Dwiker Sumur/Gorong2 Ø 1 m, H 60 cm MM.1 Buah 430,000.00 0% 42,180.00 472,180.00
2 Dwiker Sumur/Gorong2 Ø 0,8 m, H 60 cm MM.2 Buah 380,000.00 0% 35,180.00 415,180.00
3 Dwiker/Gorong2 Ø 0,6 m, H 80 cm MM.3 Buah 340,000.00 0% 37,120.00 377,120.00
4 Dwiker/Gorong2 Ø 0,45 m, H 80 cm MM.4 Buah 340,000.00 0% 28,270.00 368,270.00

N. BAHAN BANGUNAN LAIN


1 Lem Aica Aibon MN.1 KG 49,500.00 0% 300.00 49,800.00
2 Lem Fox MN.2 KG 31,250.00 0% 300.00 31,550.00
3 Lem Vinyl MN.3 KG 20,000.00 0% 300.00 20,300.00
4 Ijuk MN.4 KG 45,000.00 0% 380.00 45,380.00
5 Pipa Plastik dia, 3" (AW) MN.5 Batang 151,000.00 0% 290.00 151,290.00
7 Mata bor MN.7 Buah 18,000.00 0% 60.00 18,060.00
8 Mata gurinda MN.8 Buah 23,750.00 0% 80.00 23,830.00
9 Gas elpiji MN.9 KG 250,000.00 0% 520.00 250,520.00
10 Oksigen (@50 kg/btl) MN.10 KG 350,000.00 0% 630.00 350,630.00
11 Kuas Cat Minyak MN.11 Buah 22,000.00 0% 80.00 22,080.00
12 Kuas Roll (Cat Tembok) MN.12 Buah 33,500.00 0% 80.00 33,580.00
13 Air Bersih MN.13 Liter 50.00 0% - 50
14 Soft Board MN.14 Lembar #DIV/0! 0% #DIV/0! #DIV/0!
15 Aqustik 30 x 30 Cm MN.15 Lembar #DIV/0! 0% #DIV/0! #DIV/0!
16 Jabarwood Polos MN.16 Lembar #DIV/0! 0% #DIV/0! #DIV/0!
17 Jabarwood Bergaris MN.17 Lembar #DIV/0! 0% #DIV/0! #DIV/0!
Kode Harga Dasar Tingkat Ongkos Harga Dasar + Harga
No. Nama Bahan/Barang Barang Satuan (Distributor) Inflasi Angkut Inflasi + per satu
( Rp. ) ( %. ) (Rp) Ongkos angkut Satuan
1 2 3 4 5 6 7 8
18 Eternit Plafond MN.18 Lembar #DIV/0! 0% #DIV/0! #DIV/0!
19 Besi scuare tube MN.19 M' #DIV/0! 0% #DIV/0! #DIV/0!
20 Besi lis kaca (1 x 1) cm MN.20 M' 42,500.00 0% #DIV/0! #DIV/0!
21 Pintu besi baja MN.21 M² #DIV/0! 0% #DIV/0! #DIV/0!
22 Pintu Gulung Besi MN.22 M2 #DIV/0! 0% #DIV/0! #DIV/0!
23 Pintu Lipat Besi MN.23 M2 #DIV/0! 0% #DIV/0! #DIV/0!
24 Rolling door alumunium MN.24 M2 #DIV/0! 0% #DIV/0! #DIV/0!
25 Jendela besi MN.25 M² #DIV/0! 0% #DIV/0! #DIV/0!
26 Pintu alumunium MN.26 M' 500,000.00 0% 26,315.79 526,315.79
27 Sunscreen alumunium MN.27 M2 500,000.00 0% 26,315.79 526,315.79
28 Profil Kaca Alumunium MN.28 M' 200,000.00 0% 10,526.32 210,526.32
29 Profil alumunium MN.29 M' 200,000.00 0% 10,526.32 210,526.32
30 Alumunium strip MN.30 M' 250,000.00 0% 13,157.89 263,157.89
31 Skrup fixer MN.31 Buah 1,000.00 0% 52.63 1,052.63
32 Vienetions blinds dan vertikal blinds (tirai) MN.32 M2 #DIV/0! 0% #DIV/0! #DIV/0!
33 Kawat jaring galvanis/BRC MN.33 0 345,000.00 0% #DIV/0! #DIV/0!
34 Vinyl Karet MN.34 0 60,000.00 0% #DIV/0! #DIV/0!
35 Robotic Blender Cutter / Blender Manual MN.35 Jam #DIV/0! 0% #DIV/0! #DIV/0!

O. MOBILISASI DAN DEMOBILISASI ALAT BE MN.O. LS 7,000,000.00 0% 7,000,000.00


Alat Berat, Personil, Bahan dll
P. RETRIBUSI GALIAN C TANAH TIMBUN MN.P. M3 30,000.00 0% 30,000.00

NB - Pemilihan Harga Satuan disesuaikan dengan Format Standar Analisa Harga Satuan Pekerjaan Masing-masing Bidang Pekerjaan Konstruksi
- Harga Sewaktu-waktu dapat berubah, penentuan nilai barang/material dalam penyusunan HPS disesuaikan dengan hasil survei dilapangan kembali.

Merauke, Februari 2019


Diperiksa oleh :
Ketua Tim Penyusun NSPM Dihitung oleh :
Dinas Pekerjaan Umum dan Penataan Ruang Estimator Dinas

YEHERKANO TIROPADANG, ST VICTOR M. HATIGORAN, ST


NIP. 19730922 200801 1 007 NIP. 19800908 200909 1 001

Mengetahui / menyetujui :
Kepala Dinas Pekerjaan Umum dan Penataan Ruang
Kabupaten Merauke

Ir. H.B.L TOBING, M.Eng


Pembina Utama Muda
NIP. 19601216 199103 1 008
TA MERAUKE - DISTRIK MERAUKE

Ket.

1,900.00
2,550.00
Ket.

9
Ket.

9
Ket.

6,712.50
21,000.00

14,510.00
8,350.00

82,458.25
59,218.75
36,843.75
19,281.25
10,906.25
6,541.50
8,656.25
26,666.50
Ket.

9
Ket.

9
DAFTAR HARGA SATUAN UPAH
LOKASI KEGIATAN : KOTA MERAUKE - DISTRIK MERAUKE

KEGIATAN : PENYUSUNAN NORMA, STANDAR, PEDOMAN DAN MANUAL (NSPM)


PEKERJAAN : PERHITUNGAN HARGA SATUAN BAHAN, UPAH, PEKERJAAN DAN KEGIATAN
LOKASI : KOTA MERAUKE - DISTRIK MERAUKE
KABUPATEN / PROPINSI : MERAUKE - PAPUA
TAHUN ANGGARAN : 2019
SUMBER DANA : ---

PERIODE : JANUARI - JUNI 2019


Harga Dasar
No. Uraian Tenaga Kode Tenaga Keterangan
(per hari) (per jam)
1 2 3 4 5 8

1 Mandor Bangunan / Lapangan L-1 196,000.00 28,000.00


2 Kepala Tukang (Batu, Pasir, Kayu, dsb) L-2 186,000.00 26,572.00
3 Tukang (Batu, Pasir, Kayu, dsb) L-3 178,000.00 25,429.00
4 Pekerja L-4 140,000.00 20,000.00
5 Mandor Alat Berat (F. Equipment) (*) L-5 214,000.00 30,572.00
6 Operator Alat Berat (*) L-6 178,000.00 25,429.00
7 Pembantu Operator (*) L-7 140,000.00 20,000.00
8 Sopir / Driver (*) L-8 178,000.00 25,429.00
9 Pembantu Sopir / Driver (*) L-9 140,000.00 20,000.00
10 Mekanik (*) L - 10 178,000.00 25,429.00
11 Pembantu Mekanik (*) L - 11 140,000.00 20,000.00
12 Surveyor L - 12 186,000.00 26,572.00
13 Pembantu Surveyor L - 13 140,000.00 20,000.00

Jam kerja efektif per hari = 7.00 Jam


Jumlah hari per bulan = 25.00 Hari
Overhead + profit = 15.00%
PERKIRAAN KEBUTUHAN BAHAN

No Nama Bahan Volume Koef Jumlah Satuan


1 Semen Porland 50kg untuk Cor Err:509 3.43 Err:509 Zak
Semen Porland 50kg untuk Plesteran 73.00 0.13 9 Zak
2 Batu-Bata Err:509 649.00 Err:509 buah
3 Pasir Err:509 1.13 Err:509 M3
4 Besi Dia 16mm Err:509 18.96 Err:509 batang
5 Besi Dia 13mm Err:509 12.50 Err:509 batang
6 Besi Dia 10mm Err:509 7.40 Err:509 batang
7 Besi Dia 8mm Err:509 4.74 Err:509 batang
8 Kayu begisting/papan Err:509 0.02 Err:509 Kubik
Kayu begisting/balok Err:509 0.02 Err:509 Kubik
9 Baja Ringan Profil C Err:509 3.72 Err:509 batang
10 Reng Baja Ringan Err:509 5.40 Err:509 batang
11 Atap spandek (0.68x3m) 79.46 0.49 39 lembar
12 Lantai Granit 60x60 Err:509 1.44 Err:509 karton
13 Plafond Gypsum Err:509 0.36 Err:509 lembar
Rangka plafond besi hollow 2x4 Err:509 0.56 Err:509 batang