Pasir
Batu Pecah
Perbandingan Semen Pasir Bt. Pecah
Volume 1 2 3
50 175.9 202.23
0.06 0.05
Semen Berat Isi (kg/m3) Ukuran Tong Pasir (M)
1 Zak (50 kg) Pasir Bt. Pecah Tinggi Lebar Panjang
50 1,400 1,350 0.2 0.4 0.79
0.2 0.4 0.67
0.2 0.4 0.60
0.2 0.4 0.52
0.2 0.4 0.46
0.2 0.4 0.42
0.2 0.4 0.40
0.2 0.4 0.38
0.2 0.4 0.37
0.2 0.4 0.34
0.2 0.4 0.33
RA MANUAL
Input Data Mix Design Semen Berat Isi ( Unit Weight)
302.00 50 1400 1350 1 x Campur =
828.00 1 M3
1,012.00 137.09 167.55
Proporsi Campuran Semen Pasir Bt. Pecah
Perbandingan Volume 1 3 4
1 x Campur Ukuran Tong (m)
0.166 Tinggi Lebar Panjang
Pasir 0.18 0.42 0.43
Kerikil 0.18 0.42 0.41
tulisan warna merah
GAN TRUCK MIXER
Input Data Mix Design Semen Berat Isi ( Unit Weight)
384.00 50 1400 1350
692.00
1,039.00 90.10 135.29
Proporsi Campuran
Perbandingan Volume
Ukuran Bucket (m3)
4 0.7
(Zak) 30.72
(M3) 1.98 2.82
(M3) 3.08 4.40
tulisan warna merah
Input Data Mix Design Semen Berat Isi ( Unit Weight) K. 250 Input Data Mix Design
410.00 50 1300 1400 Semen
670.00 Pasir
992.00 81.71 120.98 Batu Pecah
Proporsi Campuran Proporsi Campuran
Perbandingan Volume Perbandingan Volume
Ukuran Bucket (m3) Volume
1.000 0.7 (m3)
(Zak) 8.20 0.0314
0.166 M3
6.04 x Campur
el A : Input Volume Beton
el B : Input Jumlah Zak Semen
RA MANUAL