I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00 119,000,000.00 0.67 0.00 - 0.33 0.22 0.33 0.22 0.67 0.45
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00 20,895,000.00 0.12 0.00 - 1,500.00 0.06 1,500.00 0.06 1,500.00 0.06
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00 22,481,280.00 0.13 0.00 - 64.00 0.06 64.00 0.06 64.00 0.06
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00 14,120,597.00 0.08 0.00 - - - - 529.00 0.08
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00 8,607,960.00 0.05 0.00 - - - - 120.00 0.05
1.6 Biaya SMK3 Ls 1.00 302,910,000.00 302,910,000.00 1.71 0.00 - 0.33 0.57 0.33 0.57 0.67 1.14
Sub Total I 488,014,837.00 2.75 - 0.91 0.91 1.84
V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00 5,750,000.00 0.03 0.00 - 0.14 0.00 0.14 0.00 0.86 0.03
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00 34,274,097.00 0.19 0.00 - 52.00 0.02 52.00 0.02 377.00 0.17
Sub Total V 40,024,097.00 0.23 - 0.03 0.03 0.20
Periode Bulan I
No. Jam Sat Juni 2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 6.00 - 7.00
L
2 7.00 - 8.00 i
3 8.00 - 9.00 b
10.00 u
4 9.00 - r
5 10.00 - 11.00
6 11.00 - 12.00 L
e
7 12.00 - 13.00 b
8 13.00 - 14.00 a
9 14.00 - 15.00 r
a
10 15.00 - 16.00 n
11 16.00 - 17.00
12 17.00 - 18.00
Ket: = Hujan
= Mendung
= Cerah
Laporan Cuaca
PERIODE : Bulan II
TANGGAL : 28 Juni - 27 Juli 2019
KONSULTAN : CV. Tengkonindo Teknik Geospasial
PEKERJAAN : Peningkatan Jaringan Irigasi D.I. Tallungura Kabupaten Enrekang
Periode Bulan II
No. Jam Sat Juli 2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 6.00 - 7.00
2 7.00 - 8.00
3 8.00 - 9.00
4 9.00 - 10.00
5 10.00 - 11.00
6 11.00 - 12.00
7 12.00 - 13.00
8 13.00 - 14.00
9 14.00 - 15.00
10 15.00 - 16.00
11 16.00 - 17.00
12 17.00 - 18.00
Ket: = Hujan
= Mendung
= Cerah
ca
Periode Bulan I
Juni 2019
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
aca
Periode Bulan II
Juli 2019
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
RINCIAN KEMAJUAN PEKERJAAN
Periode: 29 Mei 2019 S/D 27 Juni 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN JENEBERANG
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA
TAHUN ANGGARAN
:
:
APBN/SBSN
2019
B.01
B.02
KEMAJUAN PEKERJAAN SISA KONTRAK
Bobot PERIODE LALU PERIODE INI PERIODE INI Bobot
NO. URAIAN KEGIATAN
Bobot Bobot Bobot
% % % % %
III. PEKERJAAN PASANGAN BATU DAN BETON 86.68 0.00 5.51 5.51 81.17
SA KONTRAK
TU VOLUME HARGA JUMLAH
NO. URAIAN KEGIATAN
AN SATUAN HARGA
( Rp. ) ( Rp. )
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I
V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00
Sub Total V
100,761,983.00
40,241,031.00 0.23 - - - -
12,094,735.00 0.07 - - - -
25,727,379.00 0.15 - - - -
18,470,553.00 0.10 - - - -
1,460,403.00 0.01 - - - -
443,974.00 0.00 - - - -
1,266,387.00 0.01 - - - -
1,057,521.00 0.01 - - - -
100,761,983.00 0.57 - - -
0.52 0.35
1,500.00 0.06
64.00 0.06
529.00 0.08
120.00 0.05
0.52 0.89
1.50
19,865.00 0.58
897.00 0.12
258.00 0.07
- -
- -
106.00 0.04
498.00 0.10
76.00 0.01
1,374.00 0.20
7,305.00 5.41
6.53
8,591.50 38.80
29,014.45 10.13
- - 838.814 31,787,695.34 0.18
- - 197.14 231,414,760.40 1.30
1,066.51 4.70
88.00 0.33
- -
19,095.79 18.68
5.00 0.00
30.00 0.06
72.70
3.00 0.23
1.00 0.07
3.00 0.15
3.00 0.10
3.00 0.01
1.00 0.00
3.00 0.01
3.00 0.01
0.57
0.67 0.02
136.00 0.06
0.08
81.375
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juni 2019 S/D 27 Juli 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA : APBN/SBSN
TAHUN ANGGARAN : 2019
KEMAJUAN PEK
Bobot PERIODE LALU
NO. URAIAN KEGIATAN
Bobot
% %
B.02
KEMAJUAN PEKERJAAN SISA KONTRAK
PERIODE INI PERIODE INI Bobot
Bobot Bobot
% % %
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SA KONTRAK
TU VOLUME HARGA JUMLAH
NO. URAIAN KEGIATAN
AN SATUAN HARGA
( Rp. ) ( Rp. )
I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I
V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00
Sub Total V
100,761,983.00
40,241,031.00 0.23 - - - -
12,094,735.00 0.07 - - - -
25,727,379.00 0.15 - - - -
18,470,553.00 0.10 - - - -
1,460,403.00 0.01 - - - -
443,974.00 0.00 - - - -
1,266,387.00 0.01 - - - -
1,057,521.00 0.01 - - - -
100,761,983.00 0.57 - - -
SISA KONTRAK
Volume Bobot
0.50 0.34
1,500.00 0.06
64.00 0.06
529.00 0.08
120.00 0.05
0.50 0.86
1.45
865.00 0.03
- -
228.00 0.06
- -
- -
106.00 0.04
498.00 0.10
76.00 0.01
1,124.00 0.16
7,305.00 5.41
5.80
8,271.50 37.35
28,449.72 9.94
- - 937.814 35,539,399.34 0.20
- - 335.14 393,407,440.40 2.22
1,066.51 4.70
76.75 0.29
- -
16,757.79 16.39
- -
- -
68.66
3.00 0.23
1.00 0.07
3.00 0.15
3.00 0.10
3.00 0.01
1.00 0.00
3.00 0.01
3.00 0.01
0.57
76.508
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juli 2019 S/D 26 Agustus 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA : APBN/SBSN
TAHUN ANGGARAN : 2019
KEMAJUAN PEK
Bobot PERIODE LALU
NO. URAIAN KEGIATAN
Bobot
% %
B.03
KEMAJUAN PEKERJAAN SISA KONTRAK
PERIODE INI PERIODE INI Bobot
Bobot Bobot
% % %