Anda di halaman 1dari 22

RINCIAN KEMAJUAN PEKERJAAN

Periode: 29 Mei 2019 S/D 27 Juni 2019


SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN JENEBERANG
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA
TAHUN ANGGARAN
:
:
APBN/SBSN
2019
B.01
SA KONTRAK KEMAJUAN PEKERJAAN SISA KONTRAK
TU VOLUME HARGA JUMLAH Bobot S/D PERIODE LALU PERIODE INI S/D PERIODE INI Volume Bobot
NO. URAIAN KEGIATAN
AN SATUAN HARGA Volume Bobot Volume Bobot Volume Bobot
( Rp. ) ( Rp. ) % % % % %

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00 119,000,000.00 0.67 0.00 - 0.33 0.22 0.33 0.22 0.67 0.45
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00 20,895,000.00 0.12 0.00 - 1,500.00 0.06 1,500.00 0.06 1,500.00 0.06
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00 22,481,280.00 0.13 0.00 - 64.00 0.06 64.00 0.06 64.00 0.06
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00 14,120,597.00 0.08 0.00 - - - - 529.00 0.08
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00 8,607,960.00 0.05 0.00 - - - - 120.00 0.05
1.6 Biaya SMK3 Ls 1.00 302,910,000.00 302,910,000.00 1.71 0.00 - 0.33 0.57 0.33 0.57 0.67 1.14
Sub Total I 488,014,837.00 2.75 - 0.91 0.91 1.84

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,530.00 5,200.00 304,356,000.00 1.72 0.00 - 37,000.00 1.08 37,000.00 1.08 21,530.00 0.63
2.2 Galian Tanah Biasa (Mekanis) m3 5,991.00 24,614.00 147,462,474.00 0.83 0.00 - 3,500.00 0.49 3,500.00 0.49 2,491.00 0.35
2.3 Galian Tanah Biasa (Manual) m3 338.00 46,475.00 15,708,550.00 0.09 0.00 - 50.00 0.01 50.00 0.01 288.00 0.08
2.4 Galian Tanah Keras (Semi Mekanis) m3 72.00 60,683.00 4,369,176.00 0.02 0.00 - 70.00 0.02 70.00 0.02 2.00 0.00
2.5 Galian Batu (Semi Mekanis) m3 28.00 89,100.00 2,494,800.00 0.01 0.00 - 20.00 0.01 20.00 0.01 8.00 0.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 106.00 60,271.00 6,388,726.00 0.04 0.00 - - - - 106.00 0.04
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 498.00 34,962.00 17,411,076.00 0.10 0.00 - - - - 498.00 0.10
2.8 Timbunan Tanah Kembali m3 76.00 28,551.00 2,169,876.00 0.01 0.00 - - - - 76.00 0.01
2.9 Buangan Hasil Galian, jarak 1 km m3 1,374.00 25,477.00 35,005,398.00 0.20 0.00 - - - - 1,374.00 0.20
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 7,305.00 131,416.00 959,993,880.00 5.41 0.00 - - - - 7,305.00 5.41
Sub Total II 1,495,359,956.00 8.43 - 1.62 1.62 6.81

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 9,581.00 801,180.00 7,676,105,580.00 43.26 0.00 - 299.50 1.35 299.50 1.35 9,281.50 41.91
3.2 Plesteran 1 : 3 m2 29,242.00 61,960.00 1,811,834,320.00 10.21 0.00 - - - - 29,242.00 10.21
3.3 Siaran 1: 2 m2 99.00 37,896.00 3,751,704.00 0.02 0.00 - - - - 99.00 0.02
921 Beton K.225 m3 138.00 1,173,860.00 161,992,680.00 0.91 0.00 - - - - 138.00 0.91
3.5 Beton K175 m3 1,117.00 782,092.00 873,596,764.00 4.92 0.00 - 50.49 0.22 50.49 0.22 1,066.51 4.70
3.6 Beton K100 (Lantai Kerja) m3 88.00 663,033.00 58,346,904.00 0.33 0.00 - - - - 88.00 0.33
3.7 Pembesian Beton kg 76,057.00 14,414.00 1,096,285,598.00 6.18 0.00 - 26,588.62 2.16 26,588.62 2.16 49,468.38 4.02
3.8 Bekesting m2 22,618.00 173,515.00 3,924,562,270.00 22.12 0.00 - 1,640.90 1.60 1,640.90 1.60 20,977.10 20.51
3.9 Bongkaran Pasangan Batu m3 5.00 139,385.00 696,925.00 0.00 0.00 - - - - 5.00 0.00
3.10 Bongkaran Beton (Semi Mekanis) m3 30.00 369,444.00 11,083,320.00 0.06 0.00 - - - - 30.00 0.06
Sub Total III 15,618,256,065.00 88.03 - 5.34 5.34 82.69

IV PEKERJAAN PINTU AIR 100,761,983.00


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 13,413,677.00 40,241,031.00 0.23 0.00 - - - - 3.00 0.23
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 12,094,735.00 12,094,735.00 0.07 0.00 - - - - 1.00 0.07
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 8,575,793.00 25,727,379.00 0.15 0.00 - - - - 3.00 0.15
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 6,156,851.00 18,470,553.00 0.10 0.00 - - - - 3.00 0.10

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 486,801.00 1,460,403.00 0.01 0.00 - - - - 3.00 0.01
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 443,974.00 443,974.00 0.00 0.00 - - - - 1.00 0.00
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 422,129.00 1,266,387.00 0.01 0.00 - - - - 3.00 0.01
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 352,507.00 1,057,521.00 0.01 0.00 - - - - 3.00 0.01
Sub Total IV 100,761,983.00 0.57 - - - 0.57

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00 5,750,000.00 0.03 0.00 - 0.14 0.00 0.14 0.00 0.86 0.03
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00 34,274,097.00 0.19 0.00 - 52.00 0.02 52.00 0.02 377.00 0.17
Sub Total V 40,024,097.00 0.23 - 0.03 0.03 0.20

A SUB TOTAL I S/D VII Rp 17,742,416,938.00 100.00 - 7.900 7.900 92.10


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp 1,774,241,693.80
C TOTAL Rp 19,516,658,631.80
D DIBULATKAN Rp 19,516,658,000.00
Laporan Cuaca
PERIODE : Bulan I
TANGGAL : 29 Mei - 27 Juni 2019
KONSULTAN : CV. Tengkonindo Teknik Geospasial
PEKERJAAN : Peningkatan Jaringan Irigasi D.I. Tallungura Kabupaten Enrekang

Periode Bulan I
No. Jam Sat Juni 2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 6.00 - 7.00
L
2 7.00 - 8.00 i
3 8.00 - 9.00 b
10.00 u
4 9.00 - r
5 10.00 - 11.00
6 11.00 - 12.00 L
e
7 12.00 - 13.00 b
8 13.00 - 14.00 a
9 14.00 - 15.00 r
a
10 15.00 - 16.00 n
11 16.00 - 17.00
12 17.00 - 18.00

Ket: = Hujan

= Mendung

= Cerah

Laporan Cuaca
PERIODE : Bulan II
TANGGAL : 28 Juni - 27 Juli 2019
KONSULTAN : CV. Tengkonindo Teknik Geospasial
PEKERJAAN : Peningkatan Jaringan Irigasi D.I. Tallungura Kabupaten Enrekang

Periode Bulan II
No. Jam Sat Juli 2019
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
1 6.00 - 7.00
2 7.00 - 8.00
3 8.00 - 9.00
4 9.00 - 10.00
5 10.00 - 11.00
6 11.00 - 12.00
7 12.00 - 13.00
8 13.00 - 14.00
9 14.00 - 15.00
10 15.00 - 16.00
11 16.00 - 17.00
12 17.00 - 18.00

Ket: = Hujan

= Mendung

= Cerah
ca

Periode Bulan I
Juni 2019
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

aca

Periode Bulan II
Juli 2019
16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
RINCIAN KEMAJUAN PEKERJAAN
Periode: 29 Mei 2019 S/D 27 Juni 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN JENEBERANG
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA
TAHUN ANGGARAN
:
:
APBN/SBSN
2019
B.01
B.02
KEMAJUAN PEKERJAAN SISA KONTRAK
Bobot PERIODE LALU PERIODE INI PERIODE INI Bobot
NO. URAIAN KEGIATAN
Bobot Bobot Bobot
% % % % %

I PEKERJAAN PERSIAPAN 2.74 0.00 0.46 0.46 2.28

II. PEKERJAAN TANAH 9.80 0.00 1.93 1.93 7.87

III. PEKERJAAN PASANGAN BATU DAN BETON 86.68 0.00 5.51 5.51 81.17

IV PEKERJAAN PINTU AIR 0.56 0.00 0.00 0.00 0.56

V PEKERJAAN LAIN-LAIN 0.22 0.00 0.00 0.00 0.22


A TOTAL 100.00 0.00 7.90 7.90 92.10
RINCIAN KEMAJUAN PE
Periode: 28 Juni 2019 S/D 2
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA : APBN/SBSN
TAHUN ANGGARAN : 2019

SA KONTRAK
TU VOLUME HARGA JUMLAH
NO. URAIAN KEGIATAN
AN SATUAN HARGA
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,530.00 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 5,991.00 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 338.00 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 72.00 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 28.00 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 106.00 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 498.00 34,962.00
2.8 Timbunan Tanah Kembali m3 76.00 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,374.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 7,305.00 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 9,581.00 801,180.00
3.2 Plesteran 1 : 3 m2 29,242.00 61,960.00
3.3 Siaran 1: 2 m2 99.00 37,896.00
921 Beton K.225 m3 138.00 1,173,860.00
3.5 Beton K175 m3 1,117.00 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 88.00 663,033.00
3.7 Pembesian Beton kg 76,057.00 14,414.00
3.8 Bekesting m2 22,618.00 173,515.00
3.9 Bongkaran Pasangan Batu m3 5.00 139,385.00
3.10 Bongkaran Beton (Semi Mekanis) m3 30.00 369,444.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 12,094,735.00
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 443,974.00
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00
Sub Total V

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juni 2019 S/D 27 Juli 2019
ANFAATAN AIR POMPENGAN JENEBERANG

ALLUNG URA KAB. ENREKANG

KONTRAK KEMAJUAN PEKERJAAN


JUMLAH Bobot S/D PERIODE LALU PERIODE INI S/D PERIODE INI
HARGA Volume Bobot Volume Bobot Volume Bobot
( Rp. ) % % % %

119,000,000.00 0.67 0.33 0.22 0.14 0.10 0.48 0.32


20,895,000.00 0.12 1,500.00 0.06 - - 1,500.00 0.06
22,481,280.00 0.13 64.00 0.06 - - 64.00 0.06
14,120,597.00 0.08 - - - - -
8,607,960.00 0.05 - - - - -
302,910,000.00 1.71 0.33 0.57 0.14 0.24 0.48 0.81
488,014,837.00 2.75 0.91 0.34 1.25

304,356,000.00 1.72 37,000.00 1.08 1,665.00 0.05 38,665.00 1.13


147,462,474.00 0.83 3,500.00 0.49 1,594.00 0.22 5,094.00 0.71
15,708,550.00 0.09 50.00 0.01 30.00 0.01 80.00 0.02
4,369,176.00 0.02 70.00 0.02 2.00 0.00 72.00 0.02
2,494,800.00 0.01 20.00 0.01 8.00 0.00 28.00 0.01
6,388,726.00 0.04 - - - -
17,411,076.00 0.10 - - - -
2,169,876.00 0.01 - - - -
35,005,398.00 0.20 - - - -
959,993,880.00 5.41 - - - -
1,495,359,956.00 8.43 1.62 0.28 1.90

7,676,105,580.00 43.26 299.50 1.35 690 3.12 989.50 4.47


1,811,834,320.00 10.21 - 227.55 0.08 227.55 0.08
3,751,704.00 0.02 - 99 0.02 99.00 0.02
161,992,680.00 0.91 - 138 0.91 138.00 0.91
873,596,764.00 4.92 50.49 0.22 - - 50.49 0.22
58,346,904.00 0.33 - - - -
1,096,285,598.00 6.18 26588.62 2.16 49468.38 4.02 76,057.00 6.18
3,924,562,270.00 22.12 1640.90 1.60 1881.31 1.84 3,522.21 3.44
696,925.00 0.00 - - - -
11,083,320.00 0.06 - - - - -
15,618,256,065.00 88.03 5.34 - 9.99 - 15.33

100,761,983.00

40,241,031.00 0.23 - - - -
12,094,735.00 0.07 - - - -
25,727,379.00 0.15 - - - -
18,470,553.00 0.10 - - - -

1,460,403.00 0.01 - - - -
443,974.00 0.00 - - - -
1,266,387.00 0.01 - - - -
1,057,521.00 0.01 - - - -
100,761,983.00 0.57 - - -

5,750,000.00 0.03 0.14 0.00 0.19 0.01 0.33 0.01


34,274,097.00 0.19 52.00 0.02 241.00 0.11 293.00 0.13
40,024,097.00 0.23 0.03 0.11 0.14

17,742,416,938.00 100.00 7.900 10.725 18.625


1,774,241,693.80
19,516,658,631.80
19,516,658,000.00
B.02
SISA KONTRAK
Volume Bobot

0.52 0.35
1,500.00 0.06
64.00 0.06
529.00 0.08
120.00 0.05
0.52 0.89
1.50

19,865.00 0.58
897.00 0.12
258.00 0.07
- -
- -
106.00 0.04
498.00 0.10
76.00 0.01
1,374.00 0.20
7,305.00 5.41
6.53

8,591.50 38.80
29,014.45 10.13
- - 838.814 31,787,695.34 0.18
- - 197.14 231,414,760.40 1.30
1,066.51 4.70
88.00 0.33
- -
19,095.79 18.68
5.00 0.00
30.00 0.06
72.70

3.00 0.23
1.00 0.07
3.00 0.15
3.00 0.10

3.00 0.01
1.00 0.00
3.00 0.01
3.00 0.01
0.57

0.67 0.02
136.00 0.06
0.08

81.375
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juni 2019 S/D 27 Juli 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA : APBN/SBSN
TAHUN ANGGARAN : 2019

KEMAJUAN PEK
Bobot PERIODE LALU
NO. URAIAN KEGIATAN
Bobot
% %

I PEKERJAAN PERSIAPAN 2.74 0.91

II. PEKERJAAN TANAH 9.80 1.62

III. PEKERJAAN PASANGAN BATU DAN BETON 86.68 5.34

IV PEKERJAAN PINTU AIR 0.56 0.00

V PEKERJAAN LAIN-LAIN 0.22 0.03


A TOTAL 100.00 7.900
PEKERJAAN
D 27 Juli 2019
TAN AIR POMPENGAN JENEBERANG

G URA KAB. ENREKANG

B.02
KEMAJUAN PEKERJAAN SISA KONTRAK
PERIODE INI PERIODE INI Bobot
Bobot Bobot
% % %

0.34 1.25 1.49

0.28 1.90 7.90

9.99 15.33 71.35

0.00 0.00 0.56

0.11 0.14 0.08


10.725 18.625 81.375
RINCIAN KEMAJUAN PE
Periode: 28 Juli 2019 S/D 26 A
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

SA KONTRAK
TU VOLUME HARGA JUMLAH
NO. URAIAN KEGIATAN
AN SATUAN HARGA
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,000,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,530.00 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 5,991.00 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 338.00 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 72.00 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 28.00 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 106.00 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 498.00 34,962.00
2.8 Timbunan Tanah Kembali m3 76.00 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,374.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 7,305.00 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 9,581.00 801,180.00
3.2 Plesteran 1 : 3 m2 29,242.00 61,960.00
3.3 Siaran 1: 2 m2 99.00 37,896.00
921 Beton K.225 m3 138.00 1,173,860.00
3.5 Beton K175 m3 1,117.00 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 88.00 663,033.00
3.7 Pembesian Beton kg 76,057.00 14,414.00
3.8 Bekesting m2 22,618.00 173,515.00
3.9 Bongkaran Pasangan Batu m3 5.00 139,385.00
3.10 Bongkaran Beton (Semi Mekanis) m3 30.00 369,444.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 12,094,735.00
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 3.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit 1.00 443,974.00
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 3.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 3.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 429.00 79,893.00
Sub Total V

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juli 2019 S/D 26 Agustus 2019
ANFAATAN AIR POMPENGAN JENEBERANG

ALLUNG URA KAB. ENREKANG

KONTRAK KEMAJUAN PEKERJAAN


JUMLAH Bobot S/D PERIODE LALU PERIODE INI S/D PERIODE INI
HARGA Volume Bobot Volume Bobot Volume Bobot
( Rp. ) % % % %

119,000,000.00 0.67 0.48 0.32 0.02 0.01 0.50 0.33


20,895,000.00 0.12 1,500.00 0.06 - - 1,500.00 0.06
22,481,280.00 0.13 64.00 0.06 - - 64.00 0.06
14,120,597.00 0.08 0.00 - - - - -
8,607,960.00 0.05 0.00 - - - - -
302,910,000.00 1.71 0.48 0.81 0.02 0.03 0.50 0.85
488,014,837.00 2.75 1.25 0.05 1.30

304,356,000.00 1.72 38,665.00 1.13 19,000.00 0.56 57,665.00 1.69


147,462,474.00 0.83 5,094.00 0.71 897.00 0.12 5,991.00 0.83
15,708,550.00 0.09 80.00 0.02 30.00 0.01 110.00 0.03
4,369,176.00 0.02 72.00 0.02 - - 72.00 0.02
2,494,800.00 0.01 28.00 0.01 - - 28.00 0.01
6,388,726.00 0.04 0.00 - - - -
17,411,076.00 0.10 0.00 - - - - -
2,169,876.00 0.01 0.00 - - - -
35,005,398.00 0.20 0.00 - 250.00 0.04 250.00 0.04
959,993,880.00 5.41 0.00 - - - -
1,495,359,956.00 8.43 1.90 0.73 2.62

7,676,105,580.00 43.26 989.50 4.47 320 1.44 1,309.50 5.91


1,811,834,320.00 10.21 227.55 0.08 427.55 0.15 792.28 0.28
3,751,704.00 0.02 99.00 0.02 0 - 99.00 0.02
161,992,680.00 0.91 138.00 0.91 0 - 138.00 0.91
873,596,764.00 4.92 50.49 0.22 - - 50.49 0.22
58,346,904.00 0.33 0.00 - 11.25 0.04 11.25 0.04
1,096,285,598.00 6.18 76057.00 6.18 0.00 - 76,057.00 6.18
3,924,562,270.00 22.12 3522.21 3.44 2338 2.29 5,860.21 5.73
696,925.00 0.00 0.00 - 5.00 0.00 5.00 0.00
11,083,320.00 0.06 0.00 - 30.00 0.06 30.00 0.06
15,618,256,065.00 88.03 15.33 - 3.99 - 19.37

100,761,983.00

40,241,031.00 0.23 - - - -
12,094,735.00 0.07 - - - -
25,727,379.00 0.15 - - - -
18,470,553.00 0.10 - - - -

1,460,403.00 0.01 - - - -
443,974.00 0.00 - - - -
1,266,387.00 0.01 - - - -
1,057,521.00 0.01 - - - -
100,761,983.00 0.57 - - -

5,750,000.00 0.03 0.33 0.01 0.19 0.01 0.52 0.02


34,274,097.00 0.19 293.00 0.13 113.00 0.05 406.00 0.18
40,024,097.00 0.23 0.14 0.06 0.20

17,742,416,938.00 100.00 18.625 4.819 23.492


1,774,241,693.80
19,516,658,631.80
19,516,658,000.00
B.03

SISA KONTRAK
Volume Bobot

0.50 0.34
1,500.00 0.06
64.00 0.06
529.00 0.08
120.00 0.05
0.50 0.86
1.45

865.00 0.03
- -
228.00 0.06
- -
- -
106.00 0.04
498.00 0.10
76.00 0.01
1,124.00 0.16
7,305.00 5.41
5.80

8,271.50 37.35
28,449.72 9.94
- - 937.814 35,539,399.34 0.20
- - 335.14 393,407,440.40 2.22
1,066.51 4.70
76.75 0.29
- -
16,757.79 16.39
- -
- -
68.66

3.00 0.23
1.00 0.07
3.00 0.15
3.00 0.10

3.00 0.01
1.00 0.00
3.00 0.01
3.00 0.01
0.57

0.48 0.02 0.333333


23.00 0.01 406
0.03

76.508
RINCIAN KEMAJUAN PEKERJAAN
Periode: 28 Juli 2019 S/D 26 Agustus 2019
SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN J
PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I
PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKANG
SUMBER DANA : APBN/SBSN
TAHUN ANGGARAN : 2019

KEMAJUAN PEK
Bobot PERIODE LALU
NO. URAIAN KEGIATAN
Bobot
% %

I PEKERJAAN PERSIAPAN 2.74 1.25

II. PEKERJAAN TANAH 9.80 1.90

III. PEKERJAAN PASANGAN BATU DAN BETON 86.68 15.33

IV PEKERJAAN PINTU AIR 0.56 0.00

V PEKERJAAN LAIN-LAIN 0.22 0.14


A TOTAL 100.00 18.625
PEKERJAAN
26 Agustus 2019
TAN AIR POMPENGAN JENEBERANG

G URA KAB. ENREKANG

B.03
KEMAJUAN PEKERJAAN SISA KONTRAK
PERIODE INI PERIODE INI Bobot
Bobot Bobot
% % %

0.05 1.30 1.44

0.73 2.62 7.18

3.99 19.37 67.31

0.00 0.00 0.56

0.06 0.20 0.02


4.819 23.492 76.508