Anda di halaman 1dari 51

REPUBLIK INDONESIA No. Paket : --- Digambar Oleh : Direncanakan Oleh : Diperiksa Oleh : Judul Gambar : No.

Digambar Oleh : Direncanakan Oleh : Diperiksa Oleh : Judul Gambar : No. Gambar :01
SATUAN
KERJA CORETEAM 2020
KEMENTER
AIN
PEKERA
JAN
UMUM
DAN
PERUMAHAN
RAKYAT PERENCANAAN DAN
PENGAWASAN
Nama Paket : Jemb. Gantung Akkotengeng PT. WIRANTA BHUANA RAYA Skala : H 1 : 1000
DIREKTORAT JENDERAL BINA MARGA JALAN
NASO
INAL Desa Akkotengeng, Kec. Sajoanging, JO. PLAN V 1 : 500
SATKER PERENCANAAN DAN PENGAWASAN
Nama Lokasi : Kab. Wajo PT. WIRAGUNA TANI
PROV
NISU
ILAWESE
ILATAN Hasdin, ST Zainuddin, ST Ir. H. Abd. Kamal Badaruddin, MT
JALAN NASIONAL PROVINSI SULAWESI SELATAN Provinsi : Sulawesi Selatan PT. ESKAPINDO MATRA Tanggal : Desember 2020
Drafter Bridge Engineer Team Leader

BM2

BM1

OU
TB
AKHIR PROYEK

OU
ND
IN BOUND
AWAL PROYEK

U
REPUBLIK INDONESIA No. Paket : --- Digambar Oleh : Direncanakan Oleh : Diperiksa Oleh : Judul Gambar : No. Gambar :2
SATUAN
KERJA CORETEAM 2020
KEMENTER
AIN
PEKERA
JAN
UMUM
DAN
PERUMAHAN
RAKYAT PERENCANAAN DAN
PENGAWASAN
Nama Paket : Jemb. Gantung Akkotengeng PT. WIRANTA BHUANA RAYA Skala : H 1 : 1000
DIREKTORAT JENDERAL BINA MARGA JALAN
NASO
INAL Desa Akkotengeng, Kec. Sajoanging, JO. PLAN V 1 : 500
Nama Lokasi : Kab. Wajo PT. WIRAGUNA TANI
SATKER PERENCANAAN DAN PENGAWASAN
JALAN NASIONAL PROVINSI SULAWESI SELATAN
PROV
NISU
ILAWESE
ILATAN
PT. ESKAPINDO MATRA Hasdin, ST Zainuddin, ST Ir. H. Abd. Kamal Badaruddin, MT AND PROFILE Tanggal : Desember 2020
Provinsi : Sulawesi Selatan Drafter Bridge Engineer Team Leader

BM2

BM1

OU
TB
AKHIR PROYEK

OU
ND
IN BOUND
AWAL PROYEK

U
80.00 HIGH PT STA: ??? HIGH PT STA: ??? 80.00
HIGH PT ELEV: ??? HIGH PT ELEV: ???
PVI STA:0+077.39 PVI STA:0+197.36
PVI ELEV:59.57 PVI ELEV:59.96
75.00 K:2.24 K:2.20 75.00
IN BOUND LVC:10.00 OUT BOUND LVC:10.00

BVCS: 0+192.36
BVCE: 60.26

EVCS: 0+202.36
EVCE: 59.88
BVCS: 0+072.39
BVCE: 59.59

EVCS: 0+082.39
EVCE: 59.77
70.00 70.00

65.00 65.00

0.00% -0.00%
8% -6.11%
12.4
4.08% MAB. +60.02 -1.56%
0.38% -0.38%
60.00 0.11%
60.00
MAN. +57.39

55.00 55.00

50.00 50.00

45.00 45.00

40.00 40.00

35.00 35.00
59.60
59.55

59.58

59.67

61.86

59.93
61.83

61.33
61.27

Elevasi Elevasi
Rencana Rencana

59.41
Elevasi Elevasi
57.49
59.55

59.38

59.46
59.33

54.23

59.23
59.47

Existing Existing

Sta. 0+000 0+025 0+050 0+075 0+100 0+125 0+150 0+175 0+200 Sta.