Anda di halaman 1dari 188

LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Rekapitulasi Volume Item Pekerjaan :0 - 14 - 20

II. PEKERJAAN TANAH


II.1 Pembersihan = m2
II.2 Galian Tanah Biasa (Mekanis) = m3
II.3 Galian Tanah Biasa (Manual) = m3
II.4 Galian Tanah Keras (Semi Mekanisl) = m3
II.5 Galian Batu (Semi Mekanisl) = m3
II.6 Timbunan dan Pemadatan Tanah Didatangkan = m3
II.7 Timbunan dan Pemadatan Tanah Hasil Galian = m3
II.8 TimbunanTanah Kembali = m3
II.9 Buangan Hasil Galian, jarak 1 km = m3
II.10 Lapisan Sirtu (Jalan Inspeksi = m3
III. PEKERJAAN PASANGAN BATU DAN BETON
III.1 Pasangan Batu 1 : 4 = m3
III.2 Plesteran 1 : 3 = m2
III.3 Siaran 1: 2 = m2
III.4 Beton K.225 = m3
III.5 Beton K175 = m3
III.6 Beton K100 (Lantai Kerja) = m3
III.7 Pembesian Beton = kg
III.8 Bekesting = m2
III.9 Bongkaran Pasangan Batu = m3
III.10 Bongkaran Beton (Semi Mekanis) = m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Rekapitulasi Volume Item Pekerjaan :0 - 14 - 20

II. PEKERJAAN TANAH


II.1 Pembersihan = m2
II.2 Galian Tanah Biasa (Mekanis) = m3
II.3 Galian Tanah Biasa (Manual) = m3
II.4 Galian Tanah Keras (Semi Mekanisl) = m3
II.5 Galian Batu (Semi Mekanisl) = m3
II.6 Timbunan dan Pemadatan Tanah Didatangkan = m3
II.7 Timbunan dan Pemadatan Tanah Hasil Galian = m3
II.8 TimbunanTanah Kembali = m3
II.9 Buangan Hasil Galian, jarak 1 km = m3
II.10 Lapisan Sirtu (Jalan Inspeksi = m3
III. PEKERJAAN PASANGAN BATU DAN BETON
III.1 Pasangan Batu 1 : 4 = m3
III.2 Plesteran 1 : 3 = m2
III.3 Siaran 1: 2 = m2
III.4 Beton K.225 = m3
III.5 Beton K175 = m3
III.6 Beton K100 (Lantai Kerja) = m3
III.7 Pembesian Beton = kg
III.8 Bekesting = m2
III.9 Bongkaran Pasangan Batu = m3
III.10 Bongkaran Beton (Semi Mekanis) = m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.1 Pembersihan Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.1 Pembersihan

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.1 Pembersihan Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.1 Pembersihan Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.2 Galian Tanah Biasa (Mekanis) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.2 Galian Tanah Biasa (Mekanis)


P.1/BKKA. 2a (Ambang Lebar) 1
1
1 0.30
1
B.Kka.1 - B.Kka.2

1.510.20
+31.57
1.5 1.5 1. Galian Dinding kiri Pas.Batu = 577.37 m3

1.70
1 11.00 1

B.Kka.7 - B.Kka.8
+30.06
0.80

0.54
1. Galian Dinding kiri Pas.Batu = 779.27 m3

Kumulatip = 1,356.64 m3

P2

0.30
+31.56
1.5 1.5
1 1.0
+30.05

1. Galian Dinding kiri Pas.Batu


a. = (1.57 + 1.08) / 2 x 67.50 = 89.20 m3
b. = (1.08 + 2.70) / 2 x 50.00 = 94.47 m3
c. = (2.70 + 5.72) / 2 x 50.00 = 210.40 m3
d. = (5.72 + 1.62) / 2 x 50.00 = 183.30 m3
Jumlah = 577.37 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.2 Galian Tanah Biasa (Mekanis) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

0.30 P133
1.5
1
+30.22

1.0
1.5 Daftar Pekerjaan : II.2 Galian Tanah Biasa (Mekanis)
B.Kka.7 - B.Kka.8
+28.70

1. Galian Dinding kiri Pas.Batu = 779.27 m3

P134
Kumulatip = 779.27 m3
0.30 0.30

+30.22
1.5 1.5
1.0 1.0
+28.70

P135
0.30 0.30
1. Galian Dinding kiri Pas.Batu
1.5
+30.21
1.5
a. = (1.15 + 5.61) / 2 x 50.00 = 169.00 m3
1.0 1.0
+28.69
b. = (5.61 + 5.14) / 2 x 50.00 = 268.57 m3
c. = (5.14 + 8.53) / 2 x 50.00 = 341.70 m3

Jumlah = 779.27 m3

P.136/BKKA. 8
1 0.30 0.30 1
1 1
1.52 0.20

+30.20
1.5 1.5
1.72

1.0 12.50 1.0


+28.68

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.4 Galian Tanah Keras (Semi Mekanisl) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.4 Galian Tanah Keras (Semi Mekanisl)

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.4 Galian Tanah Keras (Semi Mekanisl) Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.4 Galian Tanah Keras (Semi Mekanisl) Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.5 Galian Batu (Semi Mekanisl) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.5 Galian Batu (Semi Mekanisl)

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.5 Galian Batu (Semi Mekanisl) Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.5 Galian Batu (Semi Mekanisl) Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.6 Timbunan dan Pemadatan Tanah Didatangkan Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.6 Timbunan dan Pemadatan Tanah Didatangkan

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.6 Timbunan dan Pemadatan Tanah Didatangkan Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.6 Timbunan dan Pemadatan Tanah Didatangkan Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.7 Timbunan dan Pemadatan Tanah Hasil Galian Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.7 Timbunan dan Pemadatan Tanah Hasil Galian

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.7 Timbunan dan Pemadatan Tanah Hasil Galian Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.7 Timbunan dan Pemadatan Tanah Hasil Galian Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.8 TimbunanTanah Kembali Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : II.8 TimbunanTanah Kembali

1. Up Stream Gorong2 = 5.78 m3


2. Up Stream Gorong2 = 3.32 m3
3. Pondasi Plat = 16.80 m3
4. Down Stream Gorong2 = 6.14 m3
5. endapan Talang = 1.13 m3

Kumulatip = 33.17 m3

1. Up Stream Gorong2
a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.73) / 2 x 0.09 x 1.0 = 0.32 m2

= 3.60 m2

a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2


b. = 1.15 x 0.30 = 0.34 m2
c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
d. = 0.12 x 3.55 = 0.42 m2
e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2

= 4.03 m2
f. = 0.30 x 0.20 x 1.15 x 1.0 = 0.06 m3
= (3.60 + 4.03) / 2 x 1.50 = 5.72 m3
= 5.78 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.8 TimbunanTanah Kembali Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
1.85
3.95
0.15 0.15
3.55 0.20
2. Up Stream Gorong2
e
0.20 0.20
0.07 a. = (0.30 + 0.42) / 2 x 0.50 x 2.0 = 0.36 m2
d 0.12 b. = 1.15 x 0.30 = 0.34 m2
c 1 c 1.10 c. = (1.99 + 3.55) / 2 x 0.78 x 1.0 = 2.16 m2
1 0.78 b 1.47
d. = 0.12 x 3.55 = 0.42 m2
b e. = (3.55 + 3.95) / 2 x 0.20 x 1.0 = 0.75 m2
a a 0.30 0.50
f a a
0.20 = 4.03 m2
0.30 1.15 0.30 0.50 1.15 0.50
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
0.42 0.42 1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
= (4.03 + 3.36) / 2 x 0.90 = 3.32 m3

1.10 1.47 3. Pondasi Plat


b
a. = 0.20 x 0.50 x 2.00 x 5.0 = 1.00 m3
b. = 1.47 x 2.15 x 5.00 = 15.80 m3
0.50
a a
Jumlah = 16.80 m3
0.50 1.15 0.50 4. Down Stream Gorong2
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
1.85 b. = 1.47 x 2.15 x 1.00 = 3.16 m2
0.15 0.15
= 3.36 m2
0.20 0.20
0.07
0.20
a. = 0.20 x 0.50 x 2.00 = 0.20 m2
b. = 1.20 x 2.15 x 1.00 = 2.58 m2
1.10 1.47 0.90
b b 1.20
= 2.78 m2
0.50 0.50
a a
a a 0.20 = (3.36 + 2.78) / 2 x 2.00 = 6.14 m3

0.50 1.15 0.50 0.50 1.15 0.50

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : REHABILITASI JARINGAN IRIGASI D.I GUMBASA KABUPATEN SIGI (MYC) Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : II.8 TimbunanTanah Kembali Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. endapan Talang
b. = 0.90 x 1.15 x 1.00 = 1.03 m2

= 1.03 m2
a 0.90
= (1.03 + 0.00) / 2 x 2.20 = 1.13 m3

1.15

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana DIDIK


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : 1 Pasangan Batu 1 : 4

1. Proteksi Tebing p.38 - p.41 = 97.74 m3


2. Proteksi Tanggul Saluran P.59 - P.60 = 44.52 m3
3. Proteksi Sisi Kiri BTU. 2 = 9.90 m3
4. Proteksi Sisi Kiri BTU. 3 = 9.90 m3
5. Proteksi Sisi Kiri BTU. 4 = 9.90 m3
6. Proteksi Sisi Kanan BTU.5 = 29.17 m3
7. Proteksi Sisi Kiri BTU.5 = 9.90 m3
8. Proteksi Sisi Kiri BTU.6 = 19.00 m3
9. Proteksi Sisi Kiri BTU.7 = 185.44 m3
10. Proteksi Jalan Inspeksi 30m Sebelum P.221 = 15.19 m3
11. Proteksi Jalan Inspeksi 14m setelah p.221 = 37.97 m3
12. Proteksi Jalan Inspeksi 20m sebelum P.225 = 65.76 m3
13. Proteksi Sisi Kiri Jalan Inspeksi P.225 = 72.27 m3
14. Proteksi Sisi Kanan Jalan Inspeksi P.226 = 185.44 m3
15. Proteksi Sisi Kiri BTU.10 = 17.00 m3
16. Proteksi Sisi Kiri P.306 SEBELUM BTU.11A = 53.40 m3
17. Proteksi Sisi Kiri BTU.11 = 15.19 m3
18. Proteksi Sisi Kiri BTU.12 = 15.19 m3
19. Proteksi Sisi Kiri BTU.13 = 37.97 m3
20. Proteksi Sisi Kiri BTU.14 = 15.19 m3
21. Proteksi Sisi Kiri P. 339 = 68.35 m3
22. Proteksi Sisi Kiri P. 340 = 183.01 m3
23. Proteksi Sisi Kiri P. 345 = 80.30 m3
24. Proteksi Hulu Hilir Sungai Garigi sisi Kiri dan Kanan = 105.54 m3

Kumulatip = 1,383.24 m3 207.98

1. Proteksi Tebing p.38 - p.41 = 9.00 + 50.00 + 50.00 + 16.00

a. 0.782 x 9.000 x 1.000 = 7.03 m3

b. 0.782 x 50.000 x 1.000 = 39.10 m3

b. 0.782 x 50.000 x 1.000 = 39.10 m3

d 0.782 x 16.000 x 1.000 = 12.51 m3


Jumlah = 97.74 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

2. Proteksi Tanggul Saluran P.59 - P.60 = 15.00

a. 2.97 x 15.00 x 1.00 = 44.52 m3

3. Proteksi Sisi Kiri BTU. 2 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

4. Proteksi Sisi Kiri BTU. 3 = 10.00

a. 0.990 x 10.00 x 1.00 = 9.90 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. Proteksi Sisi Kiri BTU. 4 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

6. Proteksi Sisi Kanan BTU.5 = 10.00

a. 2.92 x 10.00 x 1.00 = 29.17 m3

7. Proteksi Sisi Kiri BTU.5 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

8. Proteksi Sisi Kiri BTU.6 = 10.00

a. 1.90 x 10.00 x 1.00 = 19.00 m3

9. Proteksi Sisi Kiri BTU.7 = 10.00

a. 1.90 x 10.00 x 1.00 = 19.00 m3

10. Proteksi Jalan Inspeksi 30m Sebelum P.221 = 30.00

a. 2.92 x 30.00 x 1.00 = 87.63 m3

11. Proteksi Jalan Inspeksi 14m setelah p.221 = 14.00

a. 1.90 x 14.00 x 1.00 = 26.60 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

12. Proteksi Jalan Inspeksi 20m sebelum P.225 = 40.00

a. 1.64 x 40.00 x 1.00 = 65.76 m3

13. Proteksi Sisi Kiri Jalan Inspeksi P.225 = 90.00

a. 0.803 x 90.00 x 1.00 = 72.27 m3

14. Proteksi Sisi Kanan Jalan Inspeksi P.226 = 95.00

a. 1.952 x 95.00 x 1.00 = 185.44 m3

15. Proteksi Sisi Kiri BTU.10 = 10.00

a. 1.700 x 10.00 x 1.00 = 17.00 m3

16. Proteksi Sisi Kiri P.306 SEBELUM BTU.11A = 40.00

a. 1.335 x 40.00 x 1.00 = 53.40 m3

17. Proteksi Sisi Kiri BTU.11 = 10.00

a. 1.519 x 10.00 x 1.00 = 15.19 m3

18. Proteksi Sisi Kiri BTU.12 = 10.00

a. 1.519 x 10.00 x 1.00 = 15.19 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

19. Proteksi Sisi Kiri BTU.13 = 25.00

a. 1.519 x 25.00 x 1.00 = 37.97 m3

20. Proteksi Sisi Kiri BTU.14 = 10.00

a. 1.519 x 10.00 x 1.00 = 15.19 m3

21. Proteksi Sisi Kiri P. 339 = 45.00

a. 1.519 x 45.00 x 1.00 = 68.35 m3

22. Proteksi Sisi Kiri P. 340 = 245.00

a. 0.747 x 245.00 x 1.00 = 183.01 m3

23. Proteksi Sisi Kiri P. 345 = 100.00

a. 0.803 x 100.00 x 1.00 = 80.30 m3

24. Proteksi Hulu Hilir Sungai Garigi sisi Kiri dan Kanan = 60.00

a. 1.759 x 60.00 x 1.00 = 105.54 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.2 Plesteran 1 : 3 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : III.2 Plesteran 1 : 3

1. Proteksi Kiri B.Tu.1- B.Tu.2 = 81.39 m2


2. Proteksi Kiri B.Tu.2- B.Tu.3 = 10.17 m2
3. Proteksi Kiri B.Tu.3- B.Tu.4 = 10.17 m2
4. Proteksi Kiri B.Tu.4- B.Tu.5 = 10.17 m2
5. Proteksi Kiri B.Tu.5- B.Tu.6 = 10.17 m2
6. Proteksi Kiri B.Tu.6- B.Tu.7 = 10.17 m2
7. Proteksi Kiri B.Tu.9- B.Tu.10 = 156.88 m2
8. Proteksi Kiri B.Tu.10- B.Tu.11 = 10.34 m2
9. Proteksi Kiri B.Tu.11- B.Tu.12 = 10.34 m2
10. Proteksi Kiri B.Tu.12- B.Tu.13 = 10.34 m2
11. Proteksi Kiri B.Tu.13- B.Tu.14 = 10.34 m2
12. Proteksi Kiri B.Tu.14- B.Tu.15 = 146.91 m2
13. Proteksi Kanan B.Tu.16- B.Tu.17 = 522.53 m2

Kumulatip = 999.92 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN
Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.2 Plesteran 1 : 3 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1. Proteksi Kiri B.Tu.1- B.Tu.2 = 81.39 m2


- Lokasi P.38 - P.40 = 9.00 m
a. = 0.45 x 9.00 x 1.00 = 4.05 m2
b. = 0.15 x 1.68 x 2.00 = 0.50 m2
c. = 0.50 x 9.00 x 1.00 = 4.50 m2
Jumlah = 9.05 m2
- Lokasi P.59 - P.60 = 50.00 m
a. = 0.45 x 50.00 x 1.00 = 22.50 m2
b. = 0.15 x 5.59 x 2.00 = 1.67 m2
Jumlah = 24.17 m2
- Lokasi B.Tu.2 / P.74 = 50.00 m
a. = 0.45 x 50.00 x 1.00 = 22.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 50.00 x 1.00 = 25.00 m2
Jumlah = 48.17 m2
2. Proteksi Kiri B.Tu.2- B.Tu.3 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2
3. Proteksi Kiri B.Tu.3- B.Tu.4 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2
4. Proteksi Kiri B.Tu.4- B.Tu.5 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2
5. Proteksi Kiri B.Tu.5- B.Tu.6 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PT. GARUDA MAS INDORAYA Lokasi : Saluran Induk


Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.2 Plesteran 1 : 3 Patok : -
Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

6. Proteksi Kiri B.Tu.6- B.Tu.7 = 10.00 m


a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2
7. Proteksi Kiri B.Tu.9- B.Tu.1 = 156.88 m2
- Lokasi P.221 = 30.00 m
a. = 0.45 x 30.00 x 1.00 = 13.50 m2
b. = 0.15 x 5.03 x 2.00 = 1.50 m2
Jumlah = 15.00 m2
- Lokasi P.221 = 30.00 m
a. = 0.45 x 30.00 x 1.00 = 13.50 m2
b. = 0.15 x 3.58 x 2.00 = 1.07 m2
Jumlah = 14.57 m2
- Lokasi P.225 = 30.00 m
a. = 0.45 x 30.00 x 1.00 = 13.50 m2
b. = 0.15 x 2.52 x 2.00 = 0.75 m2
Jumlah = 14.25 m2
- Lokasi P.226 = 95.00 m
a. = 0.45 x 95.00 x 1.00 = 42.75 m2
b. = 0.15 x 3.58 x 2.00 = 1.07 m2
Jumlah = 43.82 m2
- Lokasi B.Tu.10 = 72.00 m
a. = 0.45 x 72.00 x 1.00 = 32.40 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 72.00 x 1.00 = 36.00 m2
Jumlah = 69.24 m2
8. Proteksi Kiri B.Tu.10- B.Tu = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PT. GARUDA MAS INDORAYA Lokasi : Saluran Induk


Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.2 Plesteran 1 : 3 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket


Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

9. Proteksi Kiri B.Tu.11- B.Tu = 10.00 m


a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2
10. Proteksi Kiri B.Tu.12- B.T = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2
11. Proteksi Kiri B.Tu.13- B.T = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2
12. Proteksi Kiri B.Tu.14- B.Tu.15 = 146.91 m2
- Lokasi P.341 = 142.00 m
a. = 0.45 x 142.00 x 1.00 = 63.90 m2
b. = 0.15 x 5.59 x 2.00 = 1.67 m2
c. = 0.50 x 142.00 x 1.00 = 71.00 m2
Jumlah = 136.57 m2
- Lokasi B.Tu.15/P.342 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2
13. Proteksi Kanan B.Tu.16- B= 150.00 m
a. = 0.85 x 150.00 x 1.00 = 127.50 m2
b. = 0.15 x 5.59 x 6.00 = 5.03 m2
c. = 1.30 x 150.00 x 2.00 = 390.00 m2
Jumlah = 522.53 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PT. GARUDA MAS INDORAYA Lokasi : Saluran Induk


Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.2 Plesteran 1 : 3 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
b. = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2
- = 84.48 m2
- Lokasi P.221 = 0.00 m
a. = 0.45 x 0.00 x 1.00 = 0.00 m2
b. = 0.15 x 5.03 x 2.00 = 1.50 m2
Jumlah = 1.50 m2
- Lokasi P.221 = 30.00 m
a. = 0.45 x 30.00 x 1.00 = 13.50 m2
b. = 0.15 x 3.58 x 2.00 = 1.07 m2
Jumlah = 14.57 m2
- Lokasi P.221 = 30.00 m
a. = 0.45 x 30.00 x 1.00 = 13.50 m2
b. = 0.15 x 2.52 x 2.00 = 0.75 m2
Jumlah = 14.25 m2
- Lokasi P.221 = 95.00 m
a. = 0.45 x 95.00 x 1.00 = 42.75 m2
b. = 0.15 x 3.58 x 2.00 = 1.07 m2
Jumlah = 43.82 m2
- Lokasi P.221 = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.80 x 2.00 = 0.84 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.34 m2
- = 10.00 m
a. = 0.45 x 10.00 x 1.00 = 4.50 m2
b. = 0.15 x 2.24 x 2.00 = 0.67 m2
c. = 0.50 x 10.00 x 1.00 = 5.00 m2
Jumlah = 10.17 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.4 Beton K.225 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : III.4 Beton K.225

1. Plat Beton

V = 5.00 x 1.55 x 0.20 = 1.55 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : III.5 Beton K175

1. Ruas B.Tu.0- B.Tu.1 = 0.00 m3


2. Ruas B.Tu.1- B.Tu.2 = 15.81 m3
3. Ruas B.Tu.2- B.Tu.3 = 0.00 m3
4. Ruas B.Tu.3- B.Tu.4 = 0.00 m3
5. Ruas B.Tu.4- B.Tu.5 = 0.00 m3
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m3
7. Ruas B.Tu.6- B.Tu.7 = 0.00 m3
8. Ruas B.Tu.7- B.Tu.8 = 0.00 m3
9. Ruas B.Tu.8- B.Tu.9 = 0.00 m3
10. Ruas B.Tu.9- B.Tu.10 = 0.00 m3
11. Ruas B.Tu.10- B.Tu.11 = 0.00 m3
12. Ruas B.Tu.11- B.Tu.12 = m3
13. Ruas B.Tu.12- B.Tu.13 = m3
14. Ruas B.Tu.13- B.Tu.14 = 24.18 m3
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m3
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m3
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m3
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m3
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m3
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m3
21. ManHole Ruas B.Tu.1- B.Tu.2 = 0.00 m3
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m3
23. ManHole Ruas Syphon- B.Tu.14 = 0.00 m3
24. Proteksi Tongkonan = 5.85 m3
25. Proteksi Salu Garigi = 0.00 m3
Kumulatif = 45.84 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = m
a. 0.15 x 0.94 x 0.00 x 1.00 = 0.00 m3

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 85.00 m
a. 0.15 x 1.24 x 85.00 x 1.00 = 15.81 m3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

4. Ruas B.Tu.3- B.Tu.4


1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3
b. 0.12 x 1.24 x x 2.00 = 0.00 m3
c. 0.12 x 0.90 x x 2.00 = 0.00 m3
Jumlah = 0.00 m3
5. Ruas B.Tu.4- B.Tu.5
1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

6. Ruas B.Tu.5- B.Tu.6


1 Penutup = 0.00 m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

7. Ruas B.Tu.6- B.Tu.7


1 Penutup = m
a. 0.15 x x 0.00 x 1.00 = 0.00 m3
b. 0.12 x x x 2.00 = 0.00 m3
c. 0.12 x x x 2.00 = 0.00 m3
Jumlah = 0.00 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 150.00 m
a. 0.15 x 1.04 x 150.00 x 1.00 = 23.40 m3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 155.00 m
a. 0.15 x 1.04 x 155.00 x 1.00 = 24.18 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.54 15. Ruas B.Tu.14- B.Tu.15


0.15
1 Panjang = m

0.80
1.10

0.15
a. 1.00 x 0.15 x 0.00 = 0.00 m3
b. 0.80 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.70 c. 1.00 x 0.15 x 0.00 = 0.00 m3
AREA 0.474 Type S.I Tallungura R-15
Jumlah = - m3

16. Ruas B.Tu.15- B.Tu.16

1 Panjang = m
1.04

0.77
0.05 0.15

a. 0.90 x 0.15 x 0.00 = 0.00 m3


b. 0.77 x 0.15 x 0.00 x 2.0 = 0.00 m3

0.60 c. 0.90 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

17. Ruas B.Tu.16- B.Tu.17

Type S.I Tallungura R-16 1 Panjang = m


AREA 0.423
a. 0.80 x 0.15 x 0.00 = 0.00 m3
b. 0.69 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.80 x 0.15 x 0.00 = 0.00 m3
0.96

0.15

Jumlah = - m3
0.69

0.50 Lantai Kerja

Type S.I Tallungura R-17

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :
Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.378 18. Ruas B.Tu.17- B.Tu.18

0.81
1 Panjang = m

0.15
a. 0.80 x 0.15 x 0.00 = 0.00 m3

0.54
0.50 b. 0.54 x 0.15 x 0.00 x 2.0 = 0.00 m3

AREA 0.339 c. 0.80 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

19. Ruas B.Tu.18- B.Tu.19


Type S.I Tallungura R-18
0.77

0.15

0.50 1 Panjang = m

a. 0.70 x 0.15 x 0.00 = 0.00 m3


0.40
b. 0.50 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.70 x 0.15 x 0.00 = 0.00 m3
Type S.I Tallungura R-19 Jumlah = - m3

20. Ruas B.Tu.19- B.Tu.19 M


AREA 0.333
1 Panjang = m

a. 0.60 x 0.15 x 0.00 = 0.00 m3


b. 0.43 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.15 c. 0.60 x 0.15 x 0.00 = 0.00 m3

0.43
Jumlah = - m3
0.70

0.30 21. ManHole Ruas B.Tu.1- B.Tu.2 bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3

Type Sal. Muka TU. 20 ka 1 22. ManHole Ruas B.Tu.2- Syphon bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1.20 1 2 3
0.30
1.20
0.30

23. ManHole Ruas Syphon- B.Tu.14 bh


Pasangan batu 1 : 4

a. 1.05 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3


1
2 24. Proteksi Tongkonan m

Area 4.52 x Panjang 50.00 =


a. 1.00 x 1.00 x 0.00 x 1.00 = 0.00 m3
226.00 m3 b. 0.30 x 0.30 x 0.00 x 2.00 = 0.00 m3
Ø 8 - 25 c. 0.30 x 0.30 x 2.50 x 26.00 = 5.85 m3
16 Ø 12 Jumlah = 5.85 m3
0.50
1.00
25. Proteksi Salu Garigi m
PROTEKSI SALURAN P.59 ~ P.60
(STA 2+056,60 ~ 2+106.60 = 50 m a. 1.00 x 1.50 x 0.00 x 1.00 = 0.00 m3
Skala 1 : 100
1
2
b. 1.00 x 1.00 x 0.00 x 2.00 = 0.00 m3
c. 0.30 x 0.30 x 0.00 x 6.00 = 0.00 m3
1.00 d. 0.30 x 0.30 x 2.50 x 6.00 x 31.00 = 41.85 m3
Jumlah = - m3
Area .... x Panjang 150.00 =

0.50
1.00
..... m3

1.00

14.99
2

1.00

0.50
1.00
1.00
1
2

Ø 8 - 25

1.50
16 Ø 12

1.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : III.5 Beton K175

1. Ruas B.Tu.0- B.Tu.1 = 0.00 m3


2. Ruas B.Tu.1- B.Tu.2 = 15.81 m3
3. Ruas B.Tu.2- B.Tu.3 = 0.00 m3
4. Ruas B.Tu.3- B.Tu.4 = 0.00 m3
5. Ruas B.Tu.4- B.Tu.5 = 0.00 m3
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m3
7. Ruas B.Tu.6- B.Tu.7 = 0.00 m3
8. Ruas B.Tu.7- B.Tu.8 = 0.00 m3
9. Ruas B.Tu.8- B.Tu.9 = 0.00 m3
10. Ruas B.Tu.9- B.Tu.10 = 21.37 m3
11. Ruas B.Tu.10- B.Tu.11 = 23.40 m3
12. Ruas B.Tu.11- B.Tu.12 = 46.33 m3
13. Ruas B.Tu.12- B.Tu.13 = 36.50 m3
14. Ruas B.Tu.13- B.Tu.14 = 23.40 m3
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m3
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m3
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m3
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m3
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m3
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m3
21. ManHole Ruas B.Tu.1- B.Tu.2 = 0.00 m3
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m3
23. ManHole Ruas Syphon- B.Tu.14 = 0.00 m3
24. Proteksi Tongkonan = 5.85 m3
25. Proteksi Salu Garigi = 0.00 m3
Kumulatif = 172.66 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = m
a. 0.15 x 0.94 x 0.00 x 1.00 = 0.00 m3

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 85.00 m
a. 0.15 x 1.24 x 85.00 x 1.00 = 15.81 m3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

4. Ruas B.Tu.3- B.Tu.4


1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3
b. 0.12 x 1.24 x x 2.00 = 0.00 m3
c. 0.12 x 0.90 x x 2.00 = 0.00 m3
Jumlah = 0.00 m3
5. Ruas B.Tu.4- B.Tu.5
1 Penutup = m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

6. Ruas B.Tu.5- B.Tu.6


1 Penutup = 0.00 m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

7. Ruas B.Tu.6- B.Tu.7


1 Penutup = m
a. 0.15 x x 0.00 x 1.00 = 0.00 m3
b. 0.12 x x x 2.00 = 0.00 m3
c. 0.12 x x x 2.00 = 0.00 m3
Jumlah = 0.00 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = m
a. 0.15 x 1.04 x 0.00 x 1.00 = 0.00 m3

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = 137.00 m
a. 0.15 x 1.04 x 137.00 x 1.00 = 21.37 m3

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = 150.00 m
a. 0.15 x 1.04 x 150.00 x 1.00 = 23.40 m3

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 297.00 m
a. 0.15 x 1.04 x 297.00 x 1.00 = 46.33 m3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = 234.00 m
a. 0.15 x 1.04 x 234.00 x 1.00 = 36.50 m3

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 150.00 m
a. 0.15 x 1.04 x 150.00 x 1.00 = 23.40 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.54 15. Ruas B.Tu.14- B.Tu.15


0.15
1 Panjang = m

0.80
1.10

0.15
a. 1.00 x 0.15 x 0.00 = 0.00 m3
b. 0.80 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.70 c. 1.00 x 0.15 x 0.00 = 0.00 m3
AREA 0.474 Type S.I Tallungura R-15
Jumlah = - m3

16. Ruas B.Tu.15- B.Tu.16

1 Panjang = m
1.04

0.77
0.05 0.15

a. 0.90 x 0.15 x 0.00 = 0.00 m3


b. 0.77 x 0.15 x 0.00 x 2.0 = 0.00 m3

0.60 c. 0.90 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

17. Ruas B.Tu.16- B.Tu.17

Type S.I Tallungura R-16 1 Panjang = m


AREA 0.423
a. 0.80 x 0.15 x 0.00 = 0.00 m3
b. 0.69 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.80 x 0.15 x 0.00 = 0.00 m3
0.96

0.15

Jumlah = - m3
0.69

0.50 Lantai Kerja

Type S.I Tallungura R-17

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :
Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.378 18. Ruas B.Tu.17- B.Tu.18

0.81
1 Panjang = m

0.15
a. 0.80 x 0.15 x 0.00 = 0.00 m3

0.54
0.50 b. 0.54 x 0.15 x 0.00 x 2.0 = 0.00 m3

AREA 0.339 c. 0.80 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

19. Ruas B.Tu.18- B.Tu.19


Type S.I Tallungura R-18
0.77

0.15

0.50 1 Panjang = m

a. 0.70 x 0.15 x 0.00 = 0.00 m3


0.40
b. 0.50 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.70 x 0.15 x 0.00 = 0.00 m3
Type S.I Tallungura R-19 Jumlah = - m3

20. Ruas B.Tu.19- B.Tu.19 M


AREA 0.333
1 Panjang = m

a. 0.60 x 0.15 x 0.00 = 0.00 m3


b. 0.43 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.15 c. 0.60 x 0.15 x 0.00 = 0.00 m3

0.43
Jumlah = - m3
0.70

0.30 21. ManHole Ruas B.Tu.1- B.Tu.2 bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3

Type Sal. Muka TU. 20 ka 1 22. ManHole Ruas B.Tu.2- Syphon bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1.20 1 2 3
0.30
1.20
0.30

23. ManHole Ruas Syphon- B.Tu.14 bh


Pasangan batu 1 : 4

a. 1.05 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3


1
2 24. Proteksi Tongkonan m

Area 4.52 x Panjang 50.00 =


a. 1.00 x 1.00 x 0.00 x 1.00 = 0.00 m3
226.00 m3 b. 0.30 x 0.30 x 0.00 x 2.00 = 0.00 m3
Ø 8 - 25 c. 0.30 x 0.30 x 2.50 x 26.00 = 5.85 m3
16 Ø 12 Jumlah = 5.85 m3
0.50
1.00
25. Proteksi Salu Garigi m
PROTEKSI SALURAN P.59 ~ P.60
(STA 2+056,60 ~ 2+106.60 = 50 m a. 1.00 x 1.50 x 0.00 x 1.00 = 0.00 m3
Skala 1 : 100
1
2
b. 1.00 x 1.00 x 0.00 x 2.00 = 0.00 m3
c. 0.30 x 0.30 x 0.00 x 6.00 = 0.00 m3
1.00 d. 0.30 x 0.30 x 2.50 x 6.00 x 31.00 = 41.85 m3
Jumlah = - m3
Area .... x Panjang 150.00 =

0.50
1.00
..... m3

1.00

14.99
2

1.00

0.50
1.00
1.00
1
2

Ø 8 - 25

1.50
16 Ø 12

1.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.6 Beton K100 (Lantai Kerja) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
0.12 0.12 1.00
0.12 0.12 1.00 Perhitungan Vol. : III.6 Beton K100 (Lantai Kerja)
CL
CL

0.30
0.97 0.50
1.02 0.30
0.70 0.50

1. Ruas B.Tu.3- B.Tu.4 = 1.44 m3


2. Ruas B.Tu.6- B.Tu.7 = 7.20 m3

1.29
3. Ruas B.Tu.14- B.Tu.15 = 0.00 m3
4. Ruas B.Tu.15- B.Tu.16 = 0.00 m3
0.12

0.12 5. Ruas B.Tu.16- B.Tu.17 = 0.00 m3


1.00 6. Ruas B.Tu.17- B.Tu.18 = 0.00 m3
Lantai Kerja 1.00 Lantai Kerja
7. Ruas B.Tu.18- B.Tu.19 = 0.00 m3
8. Ruas B.Tu.19- B.Tu.19 M = 0.00 m3

Type S.I Tallungura R-4 Type S.I Tallungura R-7 9. Proteksi Tongkonan = 0.00 m3
10. Proteksi Salu Garigi = 0.00 m3
AREA 0.474
AREA 0.54 Komulatif = 8.64 m3
0.15
1. Ruas B.Tu.3- B.Tu.4
1.04

0.77
0.05 0.15
0.80
1.10

0.15

a. 1.44 x 0.05 x 20.00 x 1.00 = 1.44 m3

0.70
0.60 2. Ruas B.Tu.6- B.Tu.7

Type S.I Tallungura R-15 a. 1.44 x 0.05 x 100.00 x 1.00 = 7.20 m3

Type S.I Tallungura R-16 3. Ruas B.Tu.14- B.Tu.15

AREA 0.423 a. 1.20 x 0.05 x 0.00 x 1.00 = 0.00 m3

4. Ruas B.Tu.15- B.Tu.16


0.96

0.15

a. 1.10 x 0.05 x 0.00 x 1.00 = 0.00 m3


0.69

0.50 Lantai Kerja 5. Ruas B.Tu.16- B.Tu.17

a. 1.00 x 0.05 x 0.00 x 1.00 = 0.00 m3

Type S.I Tallungura R-17

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 14 - 19M
Item Pekerjaan : III.6 Beton K100 (Lantai Kerja) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3
AREA 0.378 AREA 0.339 6. Ruas B.Tu.17- B.Tu.18
0.81

a. 1.00 x 0.05 x 0.00 x 1.00 = 0.00 m3

0.77
0.15

0.15
0.54

7. Ruas B.Tu.18- B.Tu.19


0.50

0.50
a. 0.90 x 0.05 x 0.00 x 1.00 = 0.00 m3
0.40

Type S.I Tallungura R-18 Type S.I Tallungura R-19 8. Ruas B.Tu.19- B.Tu.19 M

a. 0.80 x 0.05 x 0.00 x 1.00 = 0.00 m3


AREA 0.333 9. Proteksi Tongkonan

a. 1.20 x 0.05 x x 1.00 = 0.00 m3

10. Proteksi Salu Garigi


0.15

0.43
0.70

a. 1.20 x 0.05 x x 3.00 = 0.00 m3


0.30

Type Sal. Muka TU. 20 ka 1

Ø 8 - 25
1.00

16 Ø 12
1.00
Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,
Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 14 - 19M
Item Pekerjaan : III.6 Beton K100 (Lantai Kerja) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 14 - 19M
Item Pekerjaan : III.6 Beton K100 (Lantai Kerja) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : III.8 Bekesting


1. Ruas B.Tu.0- B.Tu.1 = 0.00 m2
2. Ruas B.Tu.1- B.Tu.2 = 520.00 m2
3. Ruas B.Tu.2- B.Tu.3 = 0.00 m2
4. Ruas B.Tu.3- B.Tu.4 = 0.00 m2
5. Ruas B.Tu.4- B.Tu.5 = 0.00 m2
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m2
7. Ruas B.Tu.6- B.Tu.7 = 0.00 m2
8. Ruas B.Tu.7- B.Tu.8 = 0.00 m2
9. Ruas B.Tu.8- B.Tu.9 = 0.00 m2
10. Ruas B.Tu.9- B.Tu.10 = 0.00 m2
11. Ruas B.Tu.10- B.Tu.11 = 0.00 m2
12. Ruas B.Tu.11- B.Tu.12 = 386.10 m2
13. Ruas B.Tu.12- B.Tu.13 = 257.40 m2
14. Ruas B.Tu.13- B.Tu.14 = 477.40 m2
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m2
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m2
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m2
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m2
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m2
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m2
21. ManHole Ruas B.Tu.1- B.Tu.2 = 0.00 m2
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m2
23. ManHole Ruas Syphon- B.Tu.14 = 0.00 m2
24. Proteksi Tongkonan = 0.00 m2
25. Proteksi Salu Garigi = m2

Kumulatif = 1,640.90 m2

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.70 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 400.00 m
a. 0.15 x 400.00 x 2.00 = 120.00 m2
b. 1.00 x 400.00 x 1.00 = 400.00 m2
Jumlah = 520.00 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

2 Baru = m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = - m2

5. Ruas B.Tu.4- B.Tu.5

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

6. Ruas B.Tu.5- B.Tu.6

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

7. Ruas B.Tu.6- B.Tu.7

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1 Baru = 0.00 m
a. 1.44 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = - m2

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = 0.00 m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 297.00 m
a. 0.15 x 297.00 x 2.00 7.00 = 89.10 m2
b. 1.00 x 297.00 x 1.00 = 297.00 m2
Jumlah = 386.10 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = 234.00 m
a. 0.15 x 234.00 x 2.00 = 70.20 m2
b. 0.80 x 234.00 x 1.00 = 187.20 m2
Jumlah = 257.40 m2

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 155.00 m
a. 1.14 x 155.00 x 2.00 = 353.40 m2
b. 0.80 x 155.00 x 1.00 = 124.00 m2
Jumlah = 477.40 m2

15. Ruas B.Tu.14- B.Tu.15

1 Penutup = 0.00 m
a. 1.10 x 0.00 x 2.00 = 0.00 m2
b. 0.70 x 0.00 x 1.00 = 0.00 m2
c. 0.80 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

16. Ruas B.Tu.15- B.Tu.16

1 Penutup = 0.00 m
a. 1.07 x 0.00 x 2.00 = 0.00 m2
b. 0.60 x 0.00 x 1.00 = 0.00 m2
c. 0.77 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

17. Ruas B.Tu.16- B.Tu.17

1 Penutup = 0.00 m
a. 0.99 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.69 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

18. Ruas B.Tu.17- B.Tu.18

1 Penutup = 0.00 m
a. 0.84 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.54 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

19. Ruas B.Tu.18- B.Tu.19

1 Penutup = 0.00 m
a. 0.80 x 0.00 x 2.00 = 0.00 m2
b. 0.40 x 0.00 x 1.00 = 0.00 m2
c. 0.50 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

20. Ruas B.Tu.19- B.Tu.19 M

1 Penutup = 0.00 m
a. 0.73 x 0.00 x 2.00 = 0.00 m2
b. 0.30 x 0.00 x 1.00 = 0.00 m2
c. 0.43 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2
21. ManHole Ruas B.Tu.1- B.Tu.2

1 Penutup = 0.00 m
a. 1.25 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.25 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 0.00 m
a. 1.25 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.25 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

23. ManHole Ruas Syphon- B.Tu.14

1 Penutup = 0.00 m
a. 1.05 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.05 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

24. Proteksi Tongkonan

1 Dinding = 50.00 m
a. 1.00 x x 1.00 = 0.00 m2
b. 0.30 x x 13.00 = 0.00 m2
c. 0.30 x x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : III.8 Bekesting


1. Ruas B.Tu.0- B.Tu.1 = 0.00 m2
2. Ruas B.Tu.1- B.Tu.2 = 520.00 m2
3. Ruas B.Tu.2- B.Tu.3 = 0.00 m2
4. Ruas B.Tu.3- B.Tu.4 = 0.00 m2
5. Ruas B.Tu.4- B.Tu.5 = 0.00 m2
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m2
7. Ruas B.Tu.6- B.Tu.7 = 0.00 m2
8. Ruas B.Tu.7- B.Tu.8 = 0.00 m2
9. Ruas B.Tu.8- B.Tu.9 = 0.00 m2
10. Ruas B.Tu.9- B.Tu.10 = 150.70 m2
11. Ruas B.Tu.10- B.Tu.11 = 165.00 m2
12. Ruas B.Tu.11- B.Tu.12 = 386.10 m2
13. Ruas B.Tu.12- B.Tu.13 = 257.40 m2
14. Ruas B.Tu.13- B.Tu.14 = 868.56 m2
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m2
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m2
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m2
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m2
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m2
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m2
21. ManHole Ruas B.Tu.1- B.Tu.2 = 0.00 m2
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m2
23. ManHole Ruas Syphon- B.Tu.14 = 0.00 m2
24. Proteksi Tongkonan = 0.00 m2
25. Proteksi Salu Garigi = m2

Kumulatif = 2,347.76 m2 2,347.76

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.70 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 400.00 m
a. 0.15 x 400.00 x 2.00 = 120.00 m2
b. 1.00 x 400.00 x 1.00 = 400.00 m2
Jumlah = 520.00 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

2 Baru = m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = - m2

5. Ruas B.Tu.4- B.Tu.5

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

6. Ruas B.Tu.5- B.Tu.6

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

7. Ruas B.Tu.6- B.Tu.7

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1 Baru = 0.00 m
a. 1.44 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = - m2

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = 0.00 m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = 137.00 m
a. 0.15 x 137.00 x 2.00 = 41.10 m2
b. 0.80 x 137.00 x 1.00 = 109.60 m2
Jumlah = 150.70 m2

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = 150.00 m
a. 0.15 x 150.00 x 2.00 = 45.00 m2
b. 0.80 x 150.00 x 1.00 = 120.00 m2
Jumlah = 165.00 m2

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 297.00 m
a. 0.15 x 297.00 x 2.00 7.00 = 89.10 m2
b. 1.00 x 297.00 x 1.00 = 297.00 m2
Jumlah = 386.10 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = 234.00 m
a. 0.15 x 234.00 x 2.00 = 70.20 m2
b. 0.80 x 234.00 x 1.00 = 187.20 m2
Jumlah = 257.40 m2

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 282.00 m
a. 1.14 x 282.00 x 2.00 = 642.96 m2
b. 0.80 x 282.00 x 1.00 = 225.60 m2
Jumlah = 868.56 m2

15. Ruas B.Tu.14- B.Tu.15

1 Penutup = 0.00 m
a. 1.10 x 0.00 x 2.00 = 0.00 m2
b. 0.70 x 0.00 x 1.00 = 0.00 m2
c. 0.80 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

16. Ruas B.Tu.15- B.Tu.16

1 Penutup = 0.00 m
a. 1.07 x 0.00 x 2.00 = 0.00 m2
b. 0.60 x 0.00 x 1.00 = 0.00 m2
c. 0.77 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

17. Ruas B.Tu.16- B.Tu.17

1 Penutup = 0.00 m
a. 0.99 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.69 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

18. Ruas B.Tu.17- B.Tu.18

1 Penutup = 0.00 m
a. 0.84 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.54 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

19. Ruas B.Tu.18- B.Tu.19

1 Penutup = 0.00 m
a. 0.80 x 0.00 x 2.00 = 0.00 m2
b. 0.40 x 0.00 x 1.00 = 0.00 m2
c. 0.50 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

20. Ruas B.Tu.19- B.Tu.19 M

1 Penutup = 0.00 m
a. 0.73 x 0.00 x 2.00 = 0.00 m2
b. 0.30 x 0.00 x 1.00 = 0.00 m2
c. 0.43 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2
21. ManHole Ruas B.Tu.1- B.Tu.2

1 Penutup = 0.00 m
a. 1.25 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.25 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 0.00 m
a. 1.25 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.25 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

23. ManHole Ruas Syphon- B.Tu.14

1 Penutup = 0.00 m
a. 1.05 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.05 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

24. Proteksi Tongkonan

1 Dinding = 50.00 m
a. 1.00 x x 1.00 = 0.00 m2
b. 0.30 x x 13.00 = 0.00 m2
c. 0.30 x x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.10 Bongkaran Beton (Semi Mekanis) Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

0.12 0.12 1.00 Perhitungan Vol. : III.10 Bongkaran Beton (Semi Mekanis)

I Lokasi = 102.67 m3
CL

1.02 0.30
1. Ruas B.Tu.3 - B.Tu.4 = 16.03 m3
0.70 0.50
2. Ruas B.Tu.6 - B.Tu.7 = 86.64 m3

Jumlah = 102.67 m3
0.12

1. Ruas B.Tu.3 - B.Tu.4 = 20.00 m'


1.00 Lantai Kerja
a. 1.24 x 0.12 x 2.00 x 20.00 = 5.95 m3

b. 0.90 x 0.12 x 2.00 x 20.00 = 4.32 m3

Type S.I Tallungura R-4 c. 1.44 x 0.10 x 2.00 x 20.00 = 5.76 m3

Jumlah = 16.03 m3

0.12 0.12 1.00


CL 2. Ruas B.Tu.6 - B.Tu.7 = 100.00 m'
0.30
0.97 0.50

a. 1.24 x 0.12 x 2.00 x 100 = 29.76 m3

b. 1.17 x 0.12 x 2.00 x 100 = 28.08 m3


1.29

c. 1.44 x 0.10 x 2.00 x 100 = 28.80 m3


0.12

Jumlah = 86.64 m3

1.00 Lantai Kerja

Type S.I Tallungura R-7

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Daftar Pekerjaan : 1 Pasangan Batu 1 : 4

1. Proteksi Tebing p.38 - p.41 = 85.23 m3


2. Proteksi Tanggul Saluran P.59 - P.60 = 35.61 m3
3. Proteksi Sisi Kiri BTU. 2 = m3
4. Proteksi Sisi Kiri BTU. 3 = m3
5. Proteksi Sisi Kiri BTU. 4 = 9.90 m3
6. Proteksi Sisi Kanan BTU.5 = m3
7. Proteksi Sisi Kiri BTU.5 = m3
8. Proteksi Sisi Kiri BTU.6 = m3
9. Proteksi Sisi Kiri BTU.7 = 19.00 m3
10. Proteksi Jalan Inspeksi 30m Sebelum P.221 = 31.82 m3
11. Proteksi Jalan Inspeksi 14m setelah p.221 = 37.97 m3
12. Proteksi Jalan Inspeksi 20m sebelum P.225 = 65.76 m3
13. Proteksi Sisi Kiri Saluran P.225 = 72.89 m3
14. Proteksi Sisi Kanan Jalan Inspeksi P.226 = 175.68 m3
15. Proteksi Sisi Kiri BTU.10 = m3
16. Proteksi Sisi Kiri P.306 SEBELUM BTU.11A = 50.25 m3
17. Proteksi Sisi Kiri BTU.11 = 31.82 m3
18. Proteksi Sisi Kiri BTU.12 = 24.30 m3
19. Proteksi Sisi Kiri BTU.13 = 37.97 m3
20. Proteksi Sisi Kiri BTU.14 = m3
21. Proteksi Sisi Kiri P. 339 = m3
22. Proteksi Sisi Kiri P. 340 = m3
23. Proteksi Sisi Kiri P. 345 = m3
24. Proteksi Hulu Hilir Sungai Garigi sisi Kiri dan Kanan = m3
25. Manhole = m3

Kumulatip = 678.20 m3 653.90

1. Proteksi Tebing p.38 - p.41 = 9.00 + 50.00 + 50.00 + 16.00

a. 0.782 x 9.000 x 1.000 = 7.03 m3

b. 0.782 x 50.000 x 1.000 = 39.10 m3

b. 0.782 x 50.000 x 1.000 = 39.10 m3

d 0.782 x x 1.000 = 0.00 m3


Jumlah = 85.23 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

2. Proteksi Tanggul Saluran P.59 - P.60 = 12.00

a. 2.97 x 12.00 x 1.00 = 35.61 m3

3. Proteksi Sisi Kiri BTU. 2 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

4. Proteksi Sisi Kiri BTU. 3 = 10.00

a. 0.990 x 10.00 x 1.00 = 9.90 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

5. Proteksi Sisi Kiri BTU. 4 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

6. Proteksi Sisi Kanan BTU.5 = 10.00

a. 2.92 x 10.00 x 1.00 = 29.17 m3

7. Proteksi Sisi Kiri BTU.5 = 10.00

a. 0.99 x 10.00 x 1.00 = 9.90 m3

8. Proteksi Sisi Kiri BTU.6 = 10.00

a. 1.90 x 10.00 x 1.00 = 19.00 m3

9. Proteksi Sisi Kiri BTU.7 = 10.00

a. 1.90 x 10.00 x 1.00 = 19.00 m3

10. Proteksi Jalan Inspeksi 30m Sebelum P.221 = 30.00

a. 2.92 x 30.00 x 1.00 = 87.63 m3

11. Proteksi Jalan Inspeksi 14m setelah p.221 = 36.00

a. 1.90 x 36.00 x 1.00 = 68.40 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

12. Proteksi Jalan Inspeksi 20m sebelum P.225 = 40.00

a. 1.64 x 40.00 x 1.00 = 65.76 m3

13. Proteksi Sisi Kiri Saluran P.225 = 74.00

a. 0.985 x 74.00 x 1.00 = 72.89 m3

14. Proteksi Sisi Kanan Jalan Inspeksi P.226 = 90.00

a. 1.952 x 90.00 x 1.00 = 175.68 m3

15. Proteksi Sisi Kiri BTU.10 = 10.00

a. 1.700 x 10.00 x 1.00 = 17.00 m3

16. Proteksi Sisi Kiri P.306 SEBELUM BTU.11A = 30.00

a. 1.675 x 30.00 x 1.00 = 50.25 m3

17. Proteksi Sisi Kiri BTU.11 = 19.00

a. 1.675 x 19.00 x 1.00 = 31.82 m3

18. Proteksi Sisi Kiri BTU.12 = 16.00

a. 1.519 x 16.00 x 1.00 = 24.30 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : 1 Pasangan Batu 1 : 4 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

19. Proteksi Sisi Kiri BTU.13 = 25.00

a. 1.519 x 25.00 x 1.00 = 37.97 m3

20. Proteksi Sisi Kiri BTU.14 = 10.00

a. 1.519 x 10.00 x 1.00 = 15.19 m3

21. Proteksi Sisi Kiri P. 339 = 45.00

a. 1.519 x 45.00 x 1.00 = 68.35 m3

22. Proteksi Sisi Kiri P. 340 = 245.00

a. 0.747 x 245.00 x 1.00 = 183.01 m3

23. Proteksi Sisi Kiri P. 345 = 100.00

a. 0.803 x 100.00 x 1.00 = 80.30 m3

24. Proteksi Hulu Hilir Sungai Garigi sisi Kiri dan Kanan = 60.00

a. 1.759 x 60.00 x 1.00 = 105.54 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : BETON

1. Ruas B.Tu.0- B.Tu.1 = 56.54 m3


2. Ruas B.Tu.1- B.Tu.2 = 49.10 m3
3. Ruas B.Tu.2- B.Tu.3 = 16.55 m3
4. Ruas B.Tu.3- B.Tu.4 = 14.69 m3
5. Ruas B.Tu.4- B.Tu.5 = 10.23 m3
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m3
7. Ruas B.Tu.6- B.Tu.7 = 5.58 m3
8. Ruas B.Tu.7- B.Tu.8 = 2.18 m3
9. Ruas B.Tu.8- B.Tu.9 = 4.52 m3
10. Ruas B.Tu.9- B.Tu.10 = 21.37 m3
11. Ruas B.Tu.10- B.Tu.11 = 23.40 m3
12. Ruas B.Tu.11- B.Tu.12 = 38.84 m3
13. Ruas B.Tu.12- B.Tu.13 = 36.50 m3
14. Ruas B.Tu.13- B.Tu.14 = 43.99 m3
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m3
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m3
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m3
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m3
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m3
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m3
21. ManHole Ruas B.Tu.1- B.Tu.2 = m3
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m3
23. ManHole Ruas Syphon- B.Tu.14 = m3
24. Proteksi Tongkonan = 2.70 m3
25. Proteksi Salu Garigi = 0.00 m3
Kumulatif = 326.19 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = 401.00 m
a. 0.15 x 0.94 x 401.00 x 1.00 = 56.54 m3

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 264.00 m
a. 0.15 x 1.24 x 264.00 x 1.00 = 49.10 m3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = 89.00 m
a. 0.15 x 1.24 x 89.00 x 1.00 = 16.55 m3

4. Ruas B.Tu.3- B.Tu.4


1 Penutup = 79.00 m
a. 0.15 x 1.24 x 79.00 x 1.00 = 14.69 m3
b. 0.12 x 1.24 x x 2.00 = 0.00 m3
c. 0.12 x 0.90 x x 2.00 = 0.00 m3
Jumlah = 14.69 m3
5. Ruas B.Tu.4- B.Tu.5
1 Penutup = 55.00 m
a. 0.15 x 1.24 x 55.00 x 1.00 = 10.23 m3

6. Ruas B.Tu.5- B.Tu.6


1 Penutup = 0.00 m
a. 0.15 x 1.24 x 0.00 x 1.00 = 0.00 m3

7. Ruas B.Tu.6- B.Tu.7


1 Penutup = 30.00 m
a. 0.15 x 1.24 x 30.00 x 1.00 = 5.58 m3
b. 0.12 x x x 2.00 = 0.00 m3
c. 0.12 x x x 2.00 = 0.00 m3
Jumlah = 5.58 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = 14.00 m
a. 0.15 x 1.04 x 14.00 x 1.00 = 2.18 m3

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = 29.00 m
a. 0.15 x 1.04 x 29.00 x 1.00 = 4.52 m3

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = 137.00 m
a. 0.15 x 1.04 x 137.00 x 1.00 = 21.37 m3

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = 150.00 m
a. 0.15 x 1.04 x 150.00 x 1.00 = 23.40 m3

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 249.00 m
a. 0.15 x 1.04 x 249.00 x 1.00 = 38.84 m3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = 234.00 m
a. 0.15 x 1.04 x 234.00 x 1.00 = 36.50 m3

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 282.00 m
a. 0.15 x 1.04 x 282.00 x 1.00 = 43.99 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.54 15. Ruas B.Tu.14- B.Tu.15


0.15
1 Panjang = m

0.80
1.10

0.15
a. 1.00 x 0.15 x 0.00 = 0.00 m3
b. 0.80 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.70 c. 1.00 x 0.15 x 0.00 = 0.00 m3
AREA 0.474 Type S.I Tallungura R-15
Jumlah = - m3

16. Ruas B.Tu.15- B.Tu.16

1 Panjang = m
1.04

0.77
0.05 0.15

a. 0.90 x 0.15 x 0.00 = 0.00 m3


b. 0.77 x 0.15 x 0.00 x 2.0 = 0.00 m3

0.60 c. 0.90 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

17. Ruas B.Tu.16- B.Tu.17

Type S.I Tallungura R-16 1 Panjang = m


AREA 0.423
a. 0.80 x 0.15 x 0.00 = 0.00 m3
b. 0.69 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.80 x 0.15 x 0.00 = 0.00 m3
0.96

0.15

Jumlah = - m3
0.69

0.50 Lantai Kerja

Type S.I Tallungura R-17

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :
Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

AREA 0.378 18. Ruas B.Tu.17- B.Tu.18

0.81
1 Panjang = m

0.15
a. 0.80 x 0.15 x 0.00 = 0.00 m3

0.54
0.50 b. 0.54 x 0.15 x 0.00 x 2.0 = 0.00 m3

AREA 0.339 c. 0.80 x 0.15 x 0.00


Jumlah
=
=
0.00
-
m3
m3

19. Ruas B.Tu.18- B.Tu.19


Type S.I Tallungura R-18
0.77

0.15

0.50 1 Panjang = m

a. 0.70 x 0.15 x 0.00 = 0.00 m3


0.40
b. 0.50 x 0.15 x 0.00 x 2.0 = 0.00 m3
c. 0.70 x 0.15 x 0.00 = 0.00 m3
Type S.I Tallungura R-19 Jumlah = - m3

20. Ruas B.Tu.19- B.Tu.19 M


AREA 0.333
1 Panjang = m

a. 0.60 x 0.15 x 0.00 = 0.00 m3


b. 0.43 x 0.15 x 0.00 x 2.0 = 0.00 m3
0.15 c. 0.60 x 0.15 x 0.00 = 0.00 m3

0.43
Jumlah = - m3
0.70

0.30 21. ManHole Ruas B.Tu.1- B.Tu.2 31.00 bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 31.00 = 6.98 m3

Type Sal. Muka TU. 20 ka 1 22. ManHole Ruas B.Tu.2- Syphon bh

a. 1.25 x 0.60 x 0.15 x 2.00 x 0.00 = 0.00 m3

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.5 Beton K175 Patok :

Sketsa / Uraian Pekerjaan Perhitungan Ket

1.20 1 2 3
0.30
1.20
0.30

23. ManHole Ruas Syphon- B.Tu.14 42.00 bh


Pasangan batu 1 : 4

a. 1.05 x 0.60 x 0.15 x 2.00 x 42.00 = 7.94 m3


1
2 24. Proteksi Tongkonan m

Area 4.52 x Panjang 50.00 =


a. 1.00 x 1.00 x 0.00 x 1.00 = 0.00 m3
226.00 m3 b. 0.30 x 0.30 x 0.00 x 2.00 = 0.00 m3
Ø 8 - 25 c. 0.30 x 0.30 x 2.50 x 12.00 = 2.70 m3
16 Ø 12 Jumlah = 2.70 m3
0.50
1.00
25. Proteksi Salu Garigi m
PROTEKSI SALURAN P.59 ~ P.60
(STA 2+056,60 ~ 2+106.60 = 50 m a. 1.00 x 1.50 x 0.00 x 1.00 = 0.00 m3
Skala 1 : 100
1
2
b. 1.00 x 1.00 x 0.00 x 2.00 = 0.00 m3
c. 0.30 x 0.30 x 0.00 x 6.00 = 0.00 m3
1.00 d. 0.30 x 0.30 x 2.50 x 6.00 x 31.00 = 41.85 m3
Jumlah = - m3
Area .... x Panjang 150.00 =

0.50
1.00
..... m3

1.00

14.99
2

1.00

0.50
1.00
1.00
1
2

Ø 8 - 25

1.50
16 Ø 12

1.00

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

Perhitungan Vol. : III.8 Bekesting


1. Ruas B.Tu.0- B.Tu.1 = 401.00 m2
2. Ruas B.Tu.1- B.Tu.2 = 692.90 m2
3. Ruas B.Tu.2- B.Tu.3 = 115.70 m2
4. Ruas B.Tu.3- B.Tu.4 = 102.70 m2
5. Ruas B.Tu.4- B.Tu.5 = 71.50 m2
6. Ruas B.Tu.5- B.Tu.6 = 0.00 m2
7. Ruas B.Tu.6- B.Tu.7 = 0.00 m2
8. Ruas B.Tu.7- B.Tu.8 = 0.00 m2
9. Ruas B.Tu.8- B.Tu.9 = 0.00 m2
10. Ruas B.Tu.9- B.Tu.10 = 75.35 m2
11. Ruas B.Tu.10- B.Tu.11 = 165.00 m2
12. Ruas B.Tu.11- B.Tu.12 = 386.10 m2
13. Ruas B.Tu.12- B.Tu.13 = 257.40 m2
14. Ruas B.Tu.13- B.Tu.14 = 868.56 m2
15. Ruas B.Tu.14- B.Tu.15 = 0.00 m2
16. Ruas B.Tu.15- B.Tu.16 = 0.00 m2
17. Ruas B.Tu.16- B.Tu.17 = 0.00 m2
18. Ruas B.Tu.17- B.Tu.18 = 0.00 m2
19. Ruas B.Tu.18- B.Tu.19 = 0.00 m2
20. Ruas B.Tu.19- B.Tu.19 M = 0.00 m2
21. ManHole Ruas B.Tu.1- B.Tu.2 = m2
22. ManHole Ruas B.Tu.2- Syphon = 0.00 m2
23. ManHole Ruas Syphon- B.Tu.14 = m2
24. Proteksi Tongkonan = 0.00 m2
25. Proteksi Salu Garigi = m2

Kumulatif = 3,136.21 m2

1. Ruas B.Tu.0- B.Tu.1

1 Penutup = 401.00 m
a. 0.15 x 401.00 x 2.00 = 120.30 m2
b. 0.70 x 401.00 x 1.00 = 280.70 m2
Jumlah = 401.00 m2

2. Ruas B.Tu.1- B.Tu.2

1 Penutup = 533.00 m
a. 0.15 x 533.00 x 2.00 = 159.90 m2
b. 1.00 x 533.00 x 1.00 = 533.00 m2
Jumlah = 692.90 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

3. Ruas B.Tu.2- B.Tu.3

1 Penutup = 89.00 m
a. 0.15 x 89.00 x 2.00 = 26.70 m2
b. 1.00 x 89.00 x 1.00 = 89.00 m2
Jumlah = 115.70 m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 79.00 m
a. 0.15 x 79.00 x 2.00 = 23.70 m2
b. 1.00 x 79.00 x 1.00 = 79.00 m2
Jumlah = 102.70 m2

2 Baru = m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = 102.70 m2

5. Ruas B.Tu.4- B.Tu.5

1 Penutup = 55.00 m
a. 0.15 x 55.00 x 2.00 = 16.50 m2
b. 1.00 x 55.00 x 1.00 = 55.00 m2
Jumlah = 71.50 m2

6. Ruas B.Tu.5- B.Tu.6

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

7. Ruas B.Tu.6- B.Tu.7

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

1 Baru = 0.00 m
a. 1.44 x 0.00 x 2.00 = 0.00 m2
b. 1.00 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2
Total = - m2

8. Ruas B.Tu.7- B.Tu.8

1 Penutup = 0.00 m
a. 0.15 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

9. Ruas B.Tu.8- B.Tu.9

1 Penutup = 0.00 m
a. 1.14 x 0.00 x 2.00 = 0.00 m2
b. 0.80 x 0.00 x 1.00 = 0.00 m2
Jumlah = - m2

10. Ruas B.Tu.9- B.Tu.10

1 Penutup = 68.50 m
a. 0.15 x 68.50 x 2.00 = 20.55 m2
b. 0.80 x 68.50 x 1.00 = 54.80 m2
Jumlah = 75.35 m2

11. Ruas B.Tu.10- B.Tu.11

1 Penutup = 150.00 m
a. 0.15 x 150.00 x 2.00 = 45.00 m2
b. 0.80 x 150.00 x 1.00 = 120.00 m2
Jumlah = 165.00 m2

12. Ruas B.Tu.11- B.Tu.12

1 Penutup = 297.00 m
a. 0.15 x 297.00 x 2.00 7.00 = 89.10 m2
b. 1.00 x 297.00 x 1.00 = 297.00 m2
Jumlah = 386.10 m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

13. Ruas B.Tu.12- B.Tu.13

1 Penutup = 234.00 m
a. 0.15 x 234.00 x 2.00 = 70.20 m2
b. 0.80 x 234.00 x 1.00 = 187.20 m2
Jumlah = 257.40 m2

14. Ruas B.Tu.13- B.Tu.14

1 Penutup = 282.00 m
a. 1.14 x 282.00 x 2.00 = 642.96 m2
b. 0.80 x 282.00 x 1.00 = 225.60 m2
Jumlah = 868.56 m2

15. Ruas B.Tu.14- B.Tu.15

1 Penutup = 0.00 m
a. 1.10 x 0.00 x 2.00 = 0.00 m2
b. 0.70 x 0.00 x 1.00 = 0.00 m2
c. 0.80 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

16. Ruas B.Tu.15- B.Tu.16

1 Penutup = 0.00 m
a. 1.07 x 0.00 x 2.00 = 0.00 m2
b. 0.60 x 0.00 x 1.00 = 0.00 m2
c. 0.77 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

17. Ruas B.Tu.16- B.Tu.17

1 Penutup = 0.00 m
a. 0.99 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.69 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

18. Ruas B.Tu.17- B.Tu.18

1 Penutup = 0.00 m
a. 0.84 x 0.00 x 2.00 = 0.00 m2
b. 0.50 x 0.00 x 1.00 = 0.00 m2
c. 0.54 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

19. Ruas B.Tu.18- B.Tu.19

1 Penutup = 0.00 m
a. 0.80 x 0.00 x 2.00 = 0.00 m2
b. 0.40 x 0.00 x 1.00 = 0.00 m2
c. 0.50 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2

20. Ruas B.Tu.19- B.Tu.19 M

1 Penutup = 0.00 m
a. 0.73 x 0.00 x 2.00 = 0.00 m2
b. 0.30 x 0.00 x 1.00 = 0.00 m2
c. 0.43 x 0.00 x 2.00 = 0.00 m2
Jumlah = - m2
21. ManHole Ruas B.Tu.1- B.Tu.2

1 Penutup = 31.00 m
a. 1.25 x 0.60 x 2.00 x 31.00 = 46.50 m2
b. 0.15 x 1.25 x 2.00 x 31.00 = 11.62 m2
c. 0.15 x 0.60 x 2.00 x 31.00 = 5.58 m2
Jumlah = 63.70 m2

4. Ruas B.Tu.3- B.Tu.4

1 Penutup = 0.00 m
a. 1.25 x 0.60 x 2.00 x 0.00 = 0.00 m2
b. 0.15 x 1.25 x 2.00 x 0.00 = 0.00 m2
c. 0.15 x 0.60 x 2.00 x 0.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
LEMBAR PERHITUNGAN

Pekerjaan : PENINGKATAN JARINGAN IRIGASI D.I TALLUNGURA KABUPATEN ENREKANG Lokasi : Saluran Induk
Kontaraktor : PT. GARUDA MAS INDORAYA Ruas : 0 - 14 - 20
Item Pekerjaan : III.8 Bekesting Patok : -

Sketsa / Uraian Pekerjaan Perhitungan Ket

1 2 3

23. ManHole Ruas Syphon- B.Tu.14

1 Penutup = 42.00 m
a. 1.05 x 0.60 x 2.00 x 42.00 = 52.92 m2
b. 0.15 x 1.05 x 2.00 x 42.00 = 13.23 m2
c. 0.15 x 0.60 x 2.00 x 42.00 = 7.56 m2
Jumlah = 73.71 m2

24. Proteksi Tongkonan

1 Dinding = 50.00 m
a. 1.00 x x 1.00 = 0.00 m2
b. 0.30 x x 13.00 = 0.00 m2
c. 0.30 x x 2.00 = 0.00 m2
Jumlah = - m2

Disetujui Oleh, Diperiksa Oleh, Diajukan Oleh,


Pengawas Utama KONSULTAN KONTRAKTOR
Irigasi dan Rawa I CV. TENGKONINDO TEKNIK GEOSPASIAL PT. GARUDA MAS INDORAYA

QUR'AN Junuana Erdiansyah Haedar A.P


NIP. Team Leader Kepala Proyek
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu IV 30 Sep 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u IV 30 Sep 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN S


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000 0.00
8,607,960.00 0.049 0.00 0.00 0.000 0.00
302,910,000.00 1.707 0.54 163,571,400.00 0.922 0.00
488,214,837.00 2.752 249,426,050.00 1.406 0.00
0.00
0.00
306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00
636,165,813.66 3.586 17,850.47 439,371,468.58 2.476 1,250.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000 0.00
585,798,974.00 3.302 0.00 0.00 0.000 0.00
17,411,076.00 0.00 0.00
568,387,898.00 0.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000 0.00
2,386,863.60 0.013 0.00 0.00
1,880,939.88 0.011 0.00 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,070,452,737.73 6.033

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 892.27 1,047,400,062.20 5.903 39.70
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 88,132.45 1,270,341,134.30 7.160 211.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 3,968.21 688,543,958.15 3.881 21.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,651,699,528.1 26.217 0.00
0.00
0.00
0.00
53,654,708.00 0.302 0.00 0.00 0.000 0.00
0.000 0.00 0.00 0.000 0.00
17,151,586.00 0.097 0.00 0.00 0.000 0.00
6,156,851.00 0.035 0.00 0.00 0.000 0.00
0.00
0.00
1,947,204.00 0.011 0.00 0.00 0.000 0.00
0.000 0.00 0.00 0.000 0.00
844,258.00 0.005 0.00 0.00 0.000 0.00
352,507.00 0.002 0.00 0.00 0.000 0.00
80,107,114.00 0.451 0.00 0.000 0.00
0.00
0.00
5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.00
41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219 0.00
0.00
0.00
7,903,463,252.00 44.545 1,594.00 3,951,731,626.00 22.273 271.00
1,252,797,924.00 7.061 360.00 141,470,280.00 0.797 182.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000 0.00
2,012,120.00 0.011 0.00 0.00 0.000 0.00
9,643,364,472.00 54.351 4,309,062,368.00 24.287 0.00
0.00
0.00
17,751,456.00 0.100 0.00 0.00 0.000 0.00
13,800,000.00 0.078 0.00 0.00 0.000 0.00
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 10,319,428,817.81 58.162 Rp


1,774,261,689.69 1,031,942,881.78 Rp
19,516,878,586.61 11,351,371,699.59 Rp
19,516,878,000.00 11,351,371,000.00 Rp

-
19,516,878,000.00
Makassar, 30 September 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.54 163,571,400.00 0.922
0.00 0.000 249,426,050.00 1.406

0.00 0.000 58,902.81 306,294,612.00 1.726


30,767,500.00 0.173 19,100.47 470,138,968.58 2.650 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
30,767,500.00 0.173 1,101,220,237.73 6.207

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
46,602,242.00 0.263 931.97 1,094,002,304.20 6.166 344.65
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
3,041,354.00 0.017 88,343.45 1,273,382,488.30 7.177 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
3,643,815.00 0.021 3,989.21 692,187,773.15 3.901
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
53,287,411.0 0.300 4,704,986,939.1 26.518

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

0.00 0.000 0.66 3,795,000.00 0.021


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
0.00 0.000 38,788,134.00 0.219

671,843,959.00 3.787 1,865.00 4,623,575,585.00 26.059


71,521,086.00 0.403 542.00 212,991,366.00 1.200
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
743,365,045.00 4.190 5,052,427,413.00 28.476

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

827,419,956.00 4.663 Rp 11,146,848,773.81 62.825


82,741,995.60 Rp 1,114,684,877.38 62.825 4,078.91
910,161,951.60 Rp 12,261,533,651.19 27.18
910,161,000.00 Rp 12,261,533,000.00
27.441
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu I 5 Okt 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 22.5 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 22.5 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
gu I 5 Okt 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPTEMB


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000
8,607,960.00 0.049 0.00 0.00 0.000
302,910,000.00 1.707 0.54 163,571,400.00 0.922 0.04
488,214,837.00 2.752 249,426,050.00 1.406

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 19,100.47 470,138,968.58 2.650 505.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,101,220,237.73 6.207

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 931.97 1,094,002,304.20 6.166 40.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 88,343.45 1,273,382,488.30 7.177 295.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 3,989.21 692,187,773.15 3.901 17.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,704,986,939.1 26.518

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.00


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219

7,903,463,252.00 44.545 1,865.00 4,623,575,585.00 26.059 229.00


1,252,797,924.00 7.061 542.00 212,991,366.00 1.200 458.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 5,052,427,413.00 28.476

17,751,456.00 0.100 0.00 0.00 0.000


13,800,000.00 0.078 0.00 0.00 0.000
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 11,146,848,773.81 62.825 Rp


1,774,261,689.69 1,114,684,877.38 Rp
19,516,878,586.61 12,261,533,651.19 Rp
19,516,878,000.00 12,261,533,000.00 Rp

-
19,516,878,000.00
Makassar, 30 September 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
10,813,887.00 0.061 0.58 174,385,287.00 0.983
10,813,887.00 0.061 260,239,937.00 1.467

0.00 0.000 58,902.81 306,294,612.00 1.726


12,430,070.00 0.070 19,605.47 482,569,038.58 2.720 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
12,430,070.00 0.070 1,113,650,307.73 6.277

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
46,954,400.00 0.265 971.97 1,140,956,704.20 6.431 344.65
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
4,252,130.00 0.024 88,638.45 1,277,634,618.30 7.201 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
2,949,755.00 0.017 4,006.21 695,137,528.15 3.918
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
54,156,285.0 0.305 4,759,143,224.1 26.823

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

0.00 0.000 0.66 3,795,000.00 0.021


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
0.00 0.000 38,788,134.00 0.219

567,720,541.00 3.200 2,094.00 5,191,296,126.00 29.259


179,981,634.00 1.014 1,000.00 392,973,000.00 2.215
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160 11.00
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
747,702,175.00 4.214 5,800,129,588.00 32.690

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

825,102,417.00 4.650 Rp 11,971,951,190.81 67.475


82,510,241.70 Rp 1,197,195,119.08 67.475 4,089.91
907,612,658.70 Rp 13,169,146,309.89 27.18
907,612,000.00 Rp 13,169,146,000.00
27.441
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu II 10 Okt 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u II 10 Okt 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000
8,607,960.00 0.049 0.00 0.00 0.000
302,910,000.00 1.707 0.58 174,385,287.00 0.983 0.00
488,214,837.00 2.752 260,239,937.00 1.467

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 19,605.47 482,569,038.58 2.720 405.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,113,650,307.73 6.277

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 971.97 1,140,956,704.20 6.431 15.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 88,638.45 1,277,634,618.30 7.201 1,200.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,006.21 695,137,528.15 3.918 24.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,759,143,224.1 26.823

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.00


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219

7,903,463,252.00 44.545 2,094.00 5,191,296,126.00 29.259 135.00


1,252,797,924.00 7.061 1,000.00 392,973,000.00 2.215 270.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 5,800,129,588.00 32.690

17,751,456.00 0.100 0.00 0.00 0.000


13,800,000.00 0.078 0.00 0.00 0.000
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 11,971,951,190.81 67.475 Rp


1,774,261,689.69 1,197,195,119.08 Rp
19,516,878,586.61 13,169,146,309.89 Rp
19,516,878,000.00 13,169,146,000.00 Rp

-
19,516,878,000.00
Makassar, 30 September 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.58 174,385,287.00 0.983
0.00 0.000 260,239,937.00 1.467

0.00 0.000 58,902.81 306,294,612.00 1.726


9,968,670.00 0.056 20,010.47 492,537,708.58 2.776 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
9,968,670.00 0.056 1,123,618,977.73 6.333

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
17,607,900.00 0.099 986.97 1,158,564,604.20 6.530 344.65
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
17,296,800.00 0.097 89,838.45 1,294,931,418.30 7.298 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
4,164,360.00 0.023 4,030.21 699,301,888.15 3.941
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
39,069,060.0 0.220 4,798,212,284.1 27.043

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

0.00 0.000 0.66 3,795,000.00 0.021


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
0.00 0.000 38,788,134.00 0.219

334,682,415.00 1.886 2,229.00 5,525,978,541.00 31.145


106,102,710.00 0.598 1,270.00 499,075,710.00 2.813
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
440,785,125.00 2.484 6,240,914,713.00 35.175

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

489,822,855.00 2.760 Rp 12,461,774,045.81 70.236 67.476


48,982,285.50 Rp 1,246,177,404.58 70.236 4,078.91
538,805,140.50 Rp 13,707,951,450.39 27.18
538,805,000.00 Rp 13,707,951,000.00
27.441
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu IV 25 Sep 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u IV 25 Sep 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000 20.00
8,607,960.00 0.049 0.00 0.00 0.000 20.00
302,910,000.00 1.707 0.58 174,385,287.00 0.983 0.10
488,214,837.00 2.752 260,239,937.00 1.467

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 20,010.47 492,537,708.58 2.776 573.00
162,208,721.40 1,190.10 29,293,121.40 0.165 1,000.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,123,618,977.73 6.333

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 986.97 1,158,564,604.20 6.530 5.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 89,838.45 1,294,931,418.30 7.298 400.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,030.21 699,301,888.15 3.941 3.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,798,212,284.1 27.043

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.00


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219

7,903,463,252.00 44.545 2,229.00 5,525,978,541.00 31.145 259.00


1,252,797,924.00 7.061 1,270.00 499,075,710.00 2.813 518.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 6,240,914,713.00 35.175

17,751,456.00 0.100 0.00 0.00 0.000


13,800,000.00 0.078 0.00 0.00 0.000
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 12,461,774,045.81 70.236 Rp


1,774,261,689.69 1,246,177,404.58 Rp
19,516,878,586.61 13,707,951,450.39 Rp
19,516,878,000.00 13,707,951,000.00 Rp

-
19,516,878,000.00
Makassar, 30 September 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
533,860.00 0.003 20.00 533,860.00 0.003
1,434,660.00 0.008 20.00 1,434,660.00 0.008
29,857,838.70 0.168 0.67 204,243,125.70 1.151
31,826,358.70 0.179 292,066,295.70 1.646

0.00 0.000 58,902.81 306,294,612.00 1.726


14,103,822.00 0.079 20,583.47 506,641,530.58 2.856 1.11
24,614,000.00 0.139 2,190.10 53,907,121.40 0.304
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
14,103,822.00 0.079 1,137,722,799.73 6.412

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
5,869,300.00 0.033 991.97 1,164,433,904.20 6.563 344.65
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
5,765,600.00 0.032 90,238.45 1,300,697,018.30 7.331 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
520,545.00 0.003 4,033.21 699,822,433.15 3.944
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
12,155,445.0 0.068 4,810,367,729.1 27.112

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

0.00 0.000 0.66 3,795,000.00 0.021


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
0.00 0.000 38,788,134.00 0.219

642,094,411.00 3.619 2,488.00 6,168,072,952.00 34.764


203,560,014.00 1.147 1,788.00 702,635,724.00 3.960
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
845,654,425.00 4.766 7,086,569,138.00 39.941

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

903,740,050.70 5.093 Rp 13,365,514,096.51 75.330 70.236


90,374,005.07 Rp 1,336,551,409.65 4,078.91
994,114,055.77 Rp 14,702,065,506.16 27.18
994,114,000.00 Rp 14,702,065,000.00
27.441
0.5
1500
90
20
20
0.714286

58902.81
20310.47
1190.1
10760.37
429.49
72.75
39.74
2405.44
34.9
2300.54
1214.56
21.1
1173.46
0
0
0
0
0
0
0
1311
131.18

1752.45
917.28
2622
108.9
2513.1
991.97
151.8
512.47
30.75
46.75
90188.45
38658.19
2969.75
4054.21
30
5
22
70.27
5
40.27

0
0
0
0

0
0
0
0

0.714286
438
260
18

2322
1456
0
0
4.5
0.5
3
15
3
8
3
6.5
0.5
6
10
0
0

12
12
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu IV 25 Sep 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u IV 25 Sep 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000 20.00
8,607,960.00 0.049 0.00 0.00 0.000 20.00
302,910,000.00 1.707 0.58 174,385,287.00 0.983 0.10
488,214,837.00 2.752 260,239,937.00 1.467

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 20,010.47 492,537,708.58 2.776 573.00
162,208,721.40 1,190.10 29,293,121.40 0.165 1,000.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,123,618,977.73 6.333

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 986.97 1,158,564,604.20 6.530 5.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 89,838.45 1,294,931,418.30 7.298 400.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,030.21 699,301,888.15 3.941 3.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,798,212,284.1 27.043

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.00


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219

7,903,463,252.00 44.545 2,229.00 5,525,978,541.00 31.145 259.00


1,252,797,924.00 7.061 1,270.00 499,075,710.00 2.813 518.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 6,240,914,713.00 35.175

17,751,456.00 0.100 0.00 0.00 0.000


13,800,000.00 0.078 0.00 0.00 0.000
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 12,461,774,045.81 70.236 Rp


1,774,261,689.69 1,246,177,404.58 Rp
19,516,878,586.61 13,707,951,450.39 Rp
19,516,878,000.00 13,707,951,000.00 Rp

-
19,516,878,000.00
Makassar, 30 September 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
533,860.00 0.003 20.00 533,860.00 0.003
1,434,660.00 0.008 20.00 1,434,660.00 0.008
29,857,838.70 0.168 0.67 204,243,125.70 1.151
31,826,358.70 0.179 292,066,295.70 1.646

0.00 0.000 58,902.81 306,294,612.00 1.726


14,103,822.00 0.079 20,583.47 506,641,530.58 2.856 1.11
24,614,000.00 0.139 2,190.10 53,907,121.40 0.304
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
14,103,822.00 0.079 1,137,722,799.73 6.412

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
5,869,300.00 0.033 991.97 1,164,433,904.20 6.563 344.65
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
5,765,600.00 0.032 90,238.45 1,300,697,018.30 7.331 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
520,545.00 0.003 4,033.21 699,822,433.15 3.944
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
12,155,445.0 0.068 4,810,367,729.1 27.112

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

0.00 0.000 0.66 3,795,000.00 0.021


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
0.00 0.000 38,788,134.00 0.219

642,094,411.00 3.619 2,488.00 6,168,072,952.00 34.764


203,560,014.00 1.147 1,788.00 702,635,724.00 3.960
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
845,654,425.00 4.766 7,086,569,138.00 39.941

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

903,740,050.70 5.093 Rp 13,365,514,096.51 75.330 70.236


90,374,005.07 Rp 1,336,551,409.65 4,078.91
994,114,055.77 Rp 14,702,065,506.16 27.18
994,114,000.00 Rp 14,702,065,000.00
27.441
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu III 15 Okt 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u III 15 Okt 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 0.00 0.00 0.000 20.00
8,607,960.00 0.049 0.00 0.00 0.000 20.00
302,910,000.00 1.707 0.58 174,385,287.00 0.983 0.14
488,214,837.00 2.752 260,239,937.00 1.467

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 20,010.47 492,537,708.58 2.776 300.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,123,618,977.73 6.333

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 986.97 1,158,564,604.20 6.530 5.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 89,838.45 1,294,931,418.30 7.298 350.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,030.21 699,301,888.15 3.941 24.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,798,212,284.1 27.043

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.66 3,795,000.00 0.021 0.05


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 38,788,134.00 0.219

7,903,463,252.00 44.545 2,229.00 5,525,978,541.00 31.145 93.00


1,252,797,924.00 7.061 1,270.00 499,075,710.00 2.813 186.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 6,240,914,713.00 35.175

17,751,456.00 0.100 0.00 0.00 0.000 12.00


13,800,000.00 0.078 0.00 0.00 0.000 12.00
31,551,456.00 0.178 0.00 0.000

17,742,616,896.92 100.000 12,461,774,045.81 70.236 Rp


1,774,261,689.69 1,246,177,404.58 70.236 Rp
19,516,878,586.61 13,707,951,450.39 Rp
19,516,878,000.00 13,707,951,000.00 Rp

-
19,516,878,000.00
Makassar, 15 Oktober 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
533,860.00 0.003 20.00 533,860.00 0.003
1,434,660.00 0.008 20.00 1,434,660.00 0.008
41,978,998.71 0.237 0.71 216,364,285.71 1.219
43,947,518.71 0.248 304,187,455.71 1.714

0.00 0.000 58,902.81 306,294,612.00 1.726


7,384,200.00 0.042 20,310.47 499,921,908.58 2.818 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
7,384,200.00 0.042 1,131,003,177.73 6.375

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
5,869,300.00 0.033 991.97 1,164,433,904.20 6.563 344.65 991.97
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
5,044,900.00 0.028 90,188.45 1,299,976,318.30 7.327 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
4,164,360.00 0.023 4,054.21 703,466,248.15 3.965
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
15,078,560.0 0.085 4,813,290,844.1 27.128

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

312,142.86 0.002 0.71 4,107,142.86 0.023


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
312,142.86 0.002 39,100,276.86 0.220

230,558,997.00 1.299 2,322.00 5,756,537,538.00 32.445


73,092,978.00 0.412 1,456.00 572,168,688.00 3.225
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
303,651,975.00 1.711 6,544,566,688.00 36.886

17,751,456.00 0.100 12.00 17,751,456.00 0.100


13,800,000.00 0.078 12.00 13,800,000.00 0.078
31,551,456.00 0.178 31,551,456.00 0.178

401,925,852.57 2.265 Rp 12,863,699,898.38 72.501 70.236


40,192,585.26 Rp 1,286,369,989.84 70.236 4,078.91
442,118,437.83 Rp 14,150,069,888.22 27.18
442,118,000.00 Rp 14,150,069,000.00
27.441
5.00
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu III 20 Okt 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u III 20 Okt 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 20.00 533,860.00 0.003 0.00
8,607,960.00 0.049 20.00 1,434,660.00 0.008 0.00
302,910,000.00 1.707 0.71 216,364,285.71 1.219 0.00
488,214,837.00 2.752 304,187,455.71 1.714

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 20,310.47 499,921,908.58 2.818 490.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,131,003,177.73 6.375

1,742,077,780.20 9.819 1,752.45 1,404,027,891.00 7.913 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 991.97 1,164,433,904.20 6.563 0.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 90,188.45 1,299,976,318.30 7.327 0.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,054.21 703,466,248.15 3.965 0.00
16,667,993.00 0.094 30.00 4,181,550.00 0.024 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 4,813,290,844.1 27.128

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.71 4,107,142.86 0.023 0.05


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 39,100,276.86 0.220

7,903,463,252.00 44.545 2,322.00 5,756,537,538.00 32.445 196.00


1,252,797,924.00 7.061 1,456.00 572,168,688.00 3.225 392.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 6,544,566,688.00 36.886

17,751,456.00 0.100 12.00 17,751,456.00 0.100 0.00


13,800,000.00 0.078 12.00 13,800,000.00 0.078 0.00
31,551,456.00 0.178 31,551,456.00 0.178

17,742,616,896.92 100.000 12,863,699,898.38 72.501 Rp


1,774,261,689.69 1,286,369,989.84 Rp
19,516,878,586.61 14,150,069,888.22 Rp
19,516,878,000.00 14,150,069,000.00 Rp

-
19,516,878,000.00
Makassar, 15 Oktober 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
0.00 0.000 20.00 533,860.00 0.003
0.00 0.000 20.00 1,434,660.00 0.008
0.00 0.000 0.71 216,364,285.71 1.219
0.00 0.000 304,187,455.71 1.714

0.00 0.000 58,902.81 306,294,612.00 1.726


12,060,860.00 0.068 20,800.47 511,982,768.58 2.886 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165 490
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
12,060,860.00 0.068 1,143,064,037.73 6.442

0.00 0.000 1,752.45 1,404,027,891.00 7.913 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
0.00 0.000 991.97 1,164,433,904.20 6.563 344.65 991.97
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
0.00 0.000 90,188.45 1,299,976,318.30 7.327 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
0.00 0.000 4,054.21 703,466,248.15 3.965
0.00 0.000 30.00 4,181,550.00 0.024
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
(0.0) (0.000) 4,813,290,844.1 27.128

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

312,142.86 0.002 0.77 4,419,285.71 0.025


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
312,142.86 0.002 39,412,419.71 0.222

485,909,284.00 2.739 2,518.00 6,242,446,822.00 35.183


154,045,416.00 0.868 1,848.00 726,214,104.00 4.093
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
639,954,700.00 3.607 7,184,521,388.00 40.493

0.00 0.000 12.00 17,751,456.00 0.100


0.00 0.000 12.00 13,800,000.00 0.078
0.00 0.000 31,551,456.00 0.178

652,327,702.86 3.676 Rp 13,516,027,601.24 76.178 72.502


65,232,770.29 Rp 1,351,602,760.12 4,078.91
717,560,473.14 Rp 14,867,630,361.36 27.18
717,560,000.00 Rp 14,867,630,000.00
27.441
0.00
REKAPITULASI DAFTAR KUANTITAS DAN H

SATUAN KERJA : SNVT PELAKSANAAAN JARINGAN PEMANFAATAN AIR POMPENGAN


PROVINSI SULAWESI SELATAN
SATUAN KEGIATAN ; IRIGASI DAN RAWA I

PAKET PEKERJAAN : PENINGKATAN JARINGAN IRIGASI D.I TALLUNG URA KAB. ENREKAN

SUMBER DANA : APBN/SBSN

TAHUN ANGGARAN : 2019

LAPORAN KEMAJUAN FISIK BULANAN


Periode : Minggu IV 25 Okt 2019

SA HARGA JUMLAH
TU VOLUME SATUAN HARGA
NO. URAIAN KEGIATAN
AN ADD.1
( Rp. ) ( Rp. )

I PEKERJAAN PERSIAPAN
1.1 Mobilisasi dan Demobilisasi Ls 1.00 119,200,000.00
1.2 Pengukuran (MC0% - MC100%) m' 3,000.00 6,965.00
1.3 Penggambaran (MC0% - MC100%) Lbr 128.00 175,635.00
1.4 Kistdam pasir/Tanah Bh 529.00 26,693.00
1.5 Pengoperasian Pompa Air Jam 120.00 71,733.00
1.6 Biaya SMK3 Ls 1.00 302,910,000.00
Sub Total I

II. PEKERJAAN TANAH


2.1 Pembersihan m2 58,902.81 5,200.00
2.2 Galian Tanah Biasa (Mekanis) m3 25,845.69 24,614.00
Galian Tanah Biasa (Mekanis) 6,590.10 24,614.00
Galian Tanah Biasa (Mekanis) 19,255.59 24,614.00
2.3 Galian Tanah Biasa (Manual) m3 1,026.79 46,475.00
Galian Tanah Biasa (Manual) 371.80 46,475.00
Galian Tanah Biasa (Manual) 654.99 46,475.00
2.4 Galian Tanah Keras (Semi Mekanis) m3 2,482.13 60,683.00
Galian Tanah Keras (Semi Mekanis) 79.20 60,683.00
Galian Tanah Keras (Semi Mekanis) 2,402.93 60,683.00
2.5 Galian Batu (Semi Mekanis) m3 1,557.70 89,100.00
Galian Batu (Semi Mekanis) 30.80 89,100.00
Galian Batu (Semi Mekanis) 1,526.90 89,100.00
2.6 Timbunan dan Pemadatan Tanah Didatangkan m3 82.77 60,271.00
2.7 Timbunan dan Pemadatan Tanah Hasil Galian m3 17,314.21 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 498.00 34,962.00
Timbunan dan Pemadatan Tanah Hasil Galian 16,816.21 33,800.00
2.8 Timbunan Tanah Kembali m3 149.48 28,551.00
Timbunan Tanah Kembali 83.60 28,551.00
Timbunan Tanah Kembali 65.88 28,551.00
2.9 Buangan Hasil Galian, jarak 1 km m3 1,311.00 25,477.00
2.10 Lapisan Sirtu (Jalan Inspeksi) m3 457.69 131,416.00
Sub Total II

III. PEKERJAAN PASANGAN BATU DAN BETON


3.1 Pasangan Batu 1 : 4 m3 2,174.39 801,180.00
3.2 Plesteran 1 : 3 m2 1,102.03 61,960.00
3.3 Siaran 1: 2 m2 2,824.94 37,896.00
Siaran 1: 2 108.90 37,896.00
Siaran 1:2 2,716.04 37,896.00
921 Beton K.225 m3 1,121.60 1,173,860.00
Beton K.225 151.80 1,173,860.00
Beton K.225 969.80 1,173,860.00
3.5 Beton K175 m3 30.75 782,092.00
3.6 Beton K100 (Lantai Kerja) m3 59.40 663,033.00
3.7 Pembesian Beton kg 96,605.71 14,414.00
Pembesian Beton 83,662.70 14,414.00
Pembesian Beton 12,943.01 14,414.00
3.8 Bekesting m2 4,359.51 173,515.00
3.9 Bongkaran Pasangan Batu m3 153.43 139,385.00
Bongkaran Pasangan Batu 5.00 139,385.00
Bongkaran Pasangan Batu 148.43 107,600.00
3.10 Bongkaran Beton (Semi Mekanis) m3 76.32 369,444.00
Bongkaran Beton (Semi Mekanis) 30.00 369,444.00
Bongkaran Beton (Semi Mekanis) 46.32 211,800.00
Sub Total III

IV PEKERJAAN PINTU AIR


4.1 Pengadaan Pintu Sorong Baja
4.1.1 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 13,413,677.00
4.1.2 Pengadaan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.1.3 Pengadaan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 8,575,793.00
4.1.4 Pengadaan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 6,156,851.00

4.2 Pemasangan Pintu Sorong Baja


4.2.1 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.60m unit 4.00 486,801.00
4.2.2 Pemasangan Pintu Sorong Baja, B=0.60m, H=0.50m unit
4.2.3 Pemasangan Pintu Sorong Baja, B=0.50m, H=0.50m unit 2.00 422,129.00
4.2.4 Pemasangan Pintu Sorong Baja, B=0.40m, H=0.40m unit 1.00 352,507.00
Sub Total IV

V PEKERJAAN LAIN-LAIN
5.1 Dokumentasi Ls 1.00 5,750,000.00
5.2 Filter Wheep Hole( PVC 2") Bh 638.00 79,893.00
429.00 79,893.00
209.00 34,600.00
Sub Total V

VI PEKERJAAN PIPA DAN ASSESORIS


VI.1 Pengadaan Pipa Gip Dia. 400 m' 3,188.00 2,479,129.00
VI.2 Pemasangan Pipa Gip Dia. 400 m' 3,188.00 392,973.00
VI.3 Pengadaan Pipa Gip Dia 160 m' 56.00 723,000.00
VI.4 Pemasangan Pipa Gip Dia. 160 m' 56.00 173,567.00
VI.5 Pengadaan & Pemasangan Gate Valve dia 160 bh 9.00 6,647,679.00
VI.6 Pengadaan & Pemasangan Gate Valve dia 400 bh 1.00 34,065,869.00
VI.7 Pengadaan & Pemasangan Bend GIP 45 Dia 160 mm bh 6.00 948,554.00
VI.8 Pengadaan & Pemasangan Bend GIP 45 Dia 400 mm bh 30.00 4,246,475.00
VI.9 Pengadaan & Pemasangan Bend GIP 90 Dia 160 mm bh 6.00 1,077,869.00
VI.10 Pengadaan & Pemasangan Bend GIP 90 Dia 400 mm bh 16.00 6,207,273.00
VI.11 Pengadaan & Pemasangan Bend GIP 225 Dia 160 mm bh 6.00 771,549.00
VI.12 Pengadaan & Pemasangan Bend GIP 225 Dia 400 mm bh 13.00 4,364,175.00
VI.13 Tee Joint Dia 400 x 160 mm bh 1.00 8,638,227.00
VI.14 Pengadaan & Pemasangan Flanges Steel Dia 400 mm bh 12.00 1,084,886.00
VI.15 Pengadaan & Pemasangan Flanges Steel Dia 160 mm bh 20.00 796,818.00
VI.16 Pengadaan dan Pemasangan Air Valve Dia. 1.5" Unit 4.00 790,625.00
VI.17 Pengadaan dan Pemasangan Air Valve Dia. 2" Unit 2.00 1,006,060.00
Sub Total VI

VII PEKERJAAN PLAT BAJA PENGAMAN SIPON


VII,1 Pengadaan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,479,288.00
VII,2 Pemasangan Plat Baja T=10 mm Pengaman Sipon m2 12.00 1,150,000.00
Sub Total VII

A SUB TOTAL I S/D VII Rp


B PAJAK PERTAMBAHAN NILAI (PPN) APBN 10% Rp
C TOTAL Rp
D DIBULATKAN Rp

Terbilang : Sembilan Belas Milyar Lima Ratus Enam Belas Juta Delapan Ratus Tujuh Puluh Delapan Ribu RupiahSISA
NEG
MENYETUJUI : DIPERIKSA :
PEJABAT PEMBUAT KOMITMEN CV. TENGKONINDO TEKNIK GEOSPASIAL
IRIGASI DAN RAWA I

HAMNAH MADDANRENG, ST.,MT AFDHALIA, ST.


NIP: 196511262008122001 DIREKTRIS
KUANTITAS DAN HARGA

ATAN AIR POMPENGAN JENEBERANG

NG URA KAB. ENREKANG

AN FISIK BULANAN
u IV 25 Okt 2019

JUMLAH PROGRESS VOLUME REALISASI BULAN SEPT


HARGA BOBOT S/D Periode Lalu Periode Ini
VOLUME JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA
( Rp. ) % ( Rp. ) % ( Rp. )

119,200,000.00 0.672 0.50 59,600,000.00 0.336 0.00


20,895,000.00 0.118 1,500.00 10,447,500.00 0.059 0.00
22,481,280.00 0.127 90.00 15,807,150.00 0.089 0.00
14,120,597.00 0.080 20.00 533,860.00 0.003 0.00
8,607,960.00 0.049 20.00 1,434,660.00 0.008 0.00
302,910,000.00 1.707 0.71 216,364,285.71 1.219 0.00
488,214,837.00 2.752 304,187,455.71 1.714

306,294,612.00 1.726 58,902.81 306,294,612.00 1.726 0.00


636,165,813.66 3.586 20,800.47 511,982,768.58 2.886 642.00
162,208,721.40 1,190.10 29,293,121.40 0.165 0.00
473,957,092.26 10,760.37 264,855,747.18 1.493 0.00
47,720,065.25 0.269 429.49 19,960,547.75 0.113 0.00
17,279,405.00 72.75 3,381,056.25 0.019 0.00
30,440,660.25 39.74 1,846,916.50 0.010 0.00
150,623,094.79 0.849 2,405.44 145,969,315.52 0.823 0.00
4,806,093.60 34.90 2,117,836.70 0.012 0.00
145,817,001.19 2,300.54 139,603,668.82 0.787 0.00
138,791,070.00 0.782 1,214.56 108,217,296.00 0.610 0.00
2,744,280.00 21.10 1,880,010.00 0.011 0.00
136,046,790.00 1,173.46 104,555,286.00 0.589 0.00
4,988,630.67 0.028 0.00 0.00 0.000
585,798,974.00 3.302 0.00 0.00 0.000
17,411,076.00 0.00
568,387,898.00 0.00
4,267,803.48 0.024 0.00 0.00 0.000
2,386,863.60 0.013 0.00
1,880,939.88 0.011 0.00
33,400,347.00 0.188 1,311.00 33,400,347.00 0.188 0.00
60,147,789.04 0.339 131.18 17,239,150.88 0.097 0.00
1,968,198,199.89 11.093 1,143,064,037.73 6.442

1,742,077,780.20 9.819 1,978.64 1,585,246,795.20 8.935 0.00


68,281,778.80 0.385 917.28 56,834,668.80 0.320 0.00
107,053,926.24 0.603 2,622.00 99,363,312.00 0.560 0.00
4,126,874.40 108.90 4,126,874.40 0.023 0.00
102,927,051.84 2,513.10 95,236,437.60 0.537 0.00
1,316,601,376.00 7.421 1,065.00 1,250,160,900.00 7.046 0.00
178,191,948.00 151.80 178,191,948.00 1.004 0.00
1,138,409,428.00 512.47 601,568,034.20 3.391 0.00
24,049,329.00 0.136 30.75 24,049,329.00 0.136 0.00
39,384,160.20 0.222 46.75 30,996,792.75 0.175 0.00
1,392,474,703.94 7.848 92,123.00 1,327,860,922.00 7.484 0.00
1,205,914,157.80 38,658.19 557,219,150.66 3.141 0.00
186,560,546.14 2,969.75 42,805,976.50 0.241 0.00
756,440,377.65 4.263 4,054.21 703,466,248.15 3.965 0.00
16,667,993.00 0.094 100.00 13,938,500.00 0.079 0.00
696,925.00 5.00 696,925.00 0.004 0.00
15,971,068.00 22.00 2,367,200.00 0.013 0.00
20,893,896.00 0.118 70.27 25,960,829.88 0.146 0.00
11,083,320.00 5.00 1,847,220.00 0.010 0.00
9,810,576.00 40.27 8,529,186.00 0.048 0.00
5,483,925,321.03 30.908 5,117,878,297.8 28.845

53,654,708.00 0.302 0.00 0.00 0.000


0.000 0.00 0.00 0.000
17,151,586.00 0.097 0.00 0.00 0.000
6,156,851.00 0.035 0.00 0.00 0.000

1,947,204.00 0.011 0.00 0.00 0.000


0.000 0.00 0.00 0.000
844,258.00 0.005 0.00 0.00 0.000
352,507.00 0.002 0.00 0.00 0.000
80,107,114.00 0.451 0.00 0.000

5,750,000.00 0.032 0.77 4,419,285.71 0.025 0.05


41,505,497.00 0.234 438.00 34,993,134.00 0.197 0.00
34,274,097.00 260.00 20,772,180.00 0.117 0.00
7,231,400.00 18.00 0.00
47,255,497.00 0.266 39,412,419.71 0.222

7,903,463,252.00 44.545 3,188.00 7,903,463,252.00 44.545 279.00


1,252,797,924.00 7.061 3,188.00 1,252,797,924.00 7.061 558.00
40,488,000.00 0.228 0.00 0.00 0.000 0.00
9,719,752.00 0.055 0.00 0.00 0.000 0.00
59,829,111.00 0.337 4.50 29,914,555.50 0.169 0.00
34,065,869.00 0.192 0.50 17,032,934.50 0.096 0.00
5,691,324.00 0.032 3.00 2,845,662.00 0.016 0.00
127,394,250.00 0.718 15.00 63,697,125.00 0.359 0.00
6,467,214.00 0.036 3.00 3,233,607.00 0.018 0.00
99,316,368.00 0.560 8.00 49,658,184.00 0.280 0.00
4,629,294.00 0.026 3.00 2,314,647.00 0.013 0.00
56,734,275.00 0.320 6.50 28,367,137.50 0.160 0.00
8,638,227.00 0.049 0.50 4,319,113.50 0.024 0.00
13,018,632.00 0.073 6.00 6,509,316.00 0.037 0.00
15,936,360.00 0.090 10.00 7,968,180.00 0.045 0.00
3,162,500.00 0.018 0.00 0.00 0.000
2,012,120.00 0.011 0.00 0.00 0.000
9,643,364,472.00 54.351 9,372,121,638.00 52.823

17,751,456.00 0.100 12.00 17,751,456.00 0.100 0.00


13,800,000.00 0.078 12.00 13,800,000.00 0.078 0.00
31,551,456.00 0.178 31,551,456.00 0.178

17,742,616,896.92 100.000 16,008,215,304.94 90.224 Rp


1,774,261,689.69 1,600,821,530.49 Rp
19,516,878,586.61 17,609,036,835.43 Rp
19,516,878,000.00 17,609,036,000.00 Rp

-
19,516,878,000.00
Makassar, 15 Oktober 2019

DIAJUKAN :
PT. GARUDA MAS INDORAYA

H. SARIF NURJAMAN, SE
Direktur Utama
ESS VOLUME REALISASI BULAN SEPTEMBER
Periode Ini S/D Periode Ini
JUMLAH HARGA BOBOT VOLUME JUMLAH HARGA BOBOT
( Rp. ) % ( Rp. ) %

0.00 0.000 0.50 59,600,000.00 0.336


0.00 0.000 1,500.00 10,447,500.00 0.059
0.00 0.000 90.00 15,807,150.00 0.089
0.00 0.000 20.00 533,860.00 0.003
0.00 0.000 20.00 1,434,660.00 0.008
0.00 0.000 0.71 216,364,285.71 1.219
0.00 0.000 304,187,455.71 1.714

0.00 0.000 58,902.81 306,294,612.00 1.726


15,802,188.00 0.089 21,442.47 527,784,956.58 2.975 1.11
0.00 0.000 1,190.10 29,293,121.40 0.165 490
0.00 0.000 10,760.37 264,855,747.18 1.493
0.00 0.000 429.49 19,960,547.75 0.113
0.00 0.000 72.75 3,381,056.25 0.019
0.00 0.000 39.74 1,846,916.50 0.010
0.00 0.000 2,405.44 145,969,315.52 0.823
0.00 0.000 34.90 2,117,836.70 0.012
0.00 0.000 2,300.54 139,603,668.82 0.787
0.00 0.000 1,214.56 108,217,296.00 0.610
0.00 0.000 21.10 1,880,010.00 0.011
0.00 0.000 1,173.46 104,555,286.00 0.589
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 0.00 0.00 0.000
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.000 1,311.00 33,400,347.00 0.188
0.00 0.000 131.18 17,239,150.88 0.097
15,802,188.00 0.089 1,158,866,225.73 6.532

0.00 0.000 1,978.64 1,585,246,795.20 8.935 20.77


0.00 0.000 917.28 56,834,668.80 0.320
0.00 0.000 2,622.00 99,363,312.00 0.560 3,712.12
0.00 0.000 108.90 4,126,874.40 0.023
0.00 0.000 2,513.10 95,236,437.60 0.537
0.00 0.000 1,065.00 1,250,160,900.00 7.046 344.65 991.97
0.00 0.000 151.80 178,191,948.00 1.004
0.00 0.000 512.47 601,568,034.20 3.391
0.00 0.000 30.75 24,049,329.00 0.136
0.00 0.000 46.75 30,996,792.75 0.175
0.00 0.000 92,123.00 1,327,860,922.00 7.484 0.26
0.00 0.000 38,658.19 557,219,150.66 3.141
0.00 0.000 2,969.75 42,805,976.50 0.241
0.00 0.000 4,054.21 703,466,248.15 3.965
0.00 0.000 100.00 13,938,500.00 0.079
0.00 0.000 5.00 696,925.00 0.004
0.00 0.000 22.00 2,367,200.00 0.013
0.00 0.000 70.27 25,960,829.88 0.146
0.00 0.000 5.00 1,847,220.00 0.010
0.00 0.000 40.27 8,529,186.00 0.048
(0.0) (0.000) 5,117,878,297.8 28.845

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000

0.00 0.000 0.00 0.00 0.000


0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.000

312,142.86 0.002 0.82 4,731,428.57 0.027


0.00 0.000 438.00 34,993,134.00 0.197
0.00 0.000 260.00 20,772,180.00 0.117
0.00 18.00 0.00
312,142.86 0.002 39,724,562.57 0.224

691,676,991.00 3.898 3,467.00 8,595,140,243.00 48.443


219,278,934.00 1.236 3,746.00 1,472,076,858.00 8.297
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
0.00 0.000 4.50 29,914,555.50 0.169
0.00 0.000 0.50 17,032,934.50 0.096
0.00 0.000 3.00 2,845,662.00 0.016
0.00 0.000 15.00 63,697,125.00 0.359
0.00 0.000 3.00 3,233,607.00 0.018
0.00 0.000 8.00 49,658,184.00 0.280
0.00 0.000 3.00 2,314,647.00 0.013
0.00 0.000 6.50 28,367,137.50 0.160
0.00 0.000 0.50 4,319,113.50 0.024
0.00 0.000 6.00 6,509,316.00 0.037
0.00 0.000 10.00 7,968,180.00 0.045
0.00 0.000 0.00 0.00 0.000
0.00 0.000 0.00 0.00 0.000
910,955,925.00 5.134 10,283,077,563.00 57.957

0.00 0.000 12.00 17,751,456.00 0.100


0.00 0.000 12.00 13,800,000.00 0.078
0.00 0.000 31,551,456.00 0.178

927,070,255.86 5.225 Rp 16,935,285,560.80 95.449 90.225


92,707,025.59 Rp 1,693,528,556.08 4,078.91
1,019,777,281.44 Rp 18,628,814,116.88 27.18
1,019,777,000.00 Rp 18,628,814,000.00
27.441
-73.03

Anda mungkin juga menyukai