Pekerjaan : Pembangunan Dan Peningkatan Jalan Damai RT. 28 Kec. Samarinda Ilir
Lokasi : Samarinda
I. PEK. UMUM -
V. PEK.PERKERASAN BERBUTIR -
Total Kontrak -
PPn 10 % -
Total Kontrak + PPn 10 % -
Dibulatkan -
Terbilang :
Samarinda 2018
PEJABAT PEMBUAT KOMITMEN
I. PEK. UMUM
1 Mobilisasi dan Demobilisasi 1.00 Ls - -
-
V. PEK.PERKERASAN BERBUTIR
5.3.1 Perkerasan Beton Semen (Fc 20 Mpa) 295.09 M3 - -
5.3.3 Beton Lc/ B0 147.55 M3 - -
5.3.4 Baja Tulangan 8,580.19 Kg - -
5.3.5 Joint Sealent 305.59 M' - -
5.3.6 Pasangan Batu Telford 252.59 M3 - -
-
TABEL PERHITUNGAN BESI PER SEGMEN DENGAN LEBAR JALAN 2.5 M'
a
e
d b
AA c
BESI SUSUT/POT CC
a
e
d b
CC c
12 0.15 0.10 0.15 0.10 0.10 0.60 16 9.6 0.892 8.560
a
e
BESI SUSUT/POT CC
a
e
d b
CC c
HARGA JUMLAH
No. URAIAN SATUAN VOL. SATUAN HARGA
(Rp.) (Rp.)
A. FASILITAS KONTRAKTOR
File : 527696559.xlsx
ITEM PEMBAYARAN NO. : 2.1 Analisa EI-21
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume bahan D 1.60 Ton/M3
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.30 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.23 -
Faktor Konversi (<40 %) Fv 0.3
Waktu siklus = T1 x Fv Ts1 0.90 menit
- Menggali, memuat dan berputar T1 3.0 menit
3. TENAGA
Produksi menentukan :Dump Truck Q1 5.24 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 36.71 M3
Kebutuhan tenaga :
- Pekerja P 6.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 1.1440 Jam
- Mandor = (Tk x M) : Qt (L03) 0.1907 Jam
Rp. 0.00 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Pasir & Semen : - Volume Semen Sm 20 % Kuat Tekan min.
: - Volume Pasir Ps 80 % 50 kg/cm2
7 Perbandingan Batu & Mortar :
- Batu Bt 60 %
- Mortar (campuran semen & pasir) Mr 40 %
8 Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar D1 2.40 ton/M3
- Batu D2 1.60 ton/M3
- Adukan (mortar) D3 1.80 ton/M3
- Pasir D4 1.67 ton/M3
- Semen Portland D5 1.43 ton/M3
1. BAHAN
1.a. Batu -----> {(Bt x D1 x 1 M3) : D2} x 1.20 (M02) 1.1 M3 Lepas
1.b. Semen ----> Sm x {(Mr x D1 x 1 M3} : D3} x 1.2 0.1280
x {D5 x (1000)} (M12) 183 Kg
1.c. Pasir -----> Ps x {(Mr x D1 x 1 M3) : D4} x 1.2 (M01) 0.5519 M3
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 Liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4)
- Memuat T1 4.92 menit
- Mengaduk T2 10.00 menit
- Menuang T3 3.00 menit
- Menunggu, dll. T4 3.00 menit
Ts1 20.92 menit
3. TENAGA
Produksi Pas. Batu yang menentukan ( Prod. C. Mixer ) Q1 1.19 M3/Jam
Produksi Pasangan Batu dalam 1 hari = Tk x Q1 Qt 8.33 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 1.6806 jam
- Tukang = (Tk x Tb) : Qt (L02) 3.3611 jam
- Pekerja = (Tk x P) : Qt (L01) 6.7222 jam
Rp. 0.00 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.1 PERKIRAAN VOL. PEK. : 287.53
JENIS PEKERJAAN : Galian Utk Drainase, Saluran dan Saluran Air TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 0 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 2.2 PERKIRAAN VOL. PEK. : 209.43
JENIS PEKERJAAN : Pasangan Batu Dengan Mortar untuk Saluran TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
2. ALAT
2.a. CONCRETE VIBRATOR
Kebutuhan Alat Penggetar Beton ini disesuaikan dengan
kapasitas produksi Alat Pencampur (Concrete Mixer)
Concrete Paver
Kebutuhan Alat Perata Beton ini disesuaikan dg. (E10)
kapasitas Alat Pencampur ( Mobil mixer )
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 31.13 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.4498 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.7992 jam
- Pekerja = (Tk x P) : Qt (L01) 4.7229 jam
Rp. 0.00 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.57
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.3655 jam
- Pekerja = (Tk x P) : Qt (L01) 2.0482 jam
Rp. 0.0 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.3.1 PERKIRAAN VOL. PEK. : 295.09
JENIS PEKERJAAN : Perkerasan Beton Semen TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1 Beton Ready Mix Fc 20 Mpa M3 1.1000 - -
2 Plastik Coor M2 5.0000 - -
3 Kayu Begesting M3 0.0167 - -
4 Paku Biasa Kg 0.1338 - -
5 Pipa Pvc M' 6.0000 - -
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.3.3 PERKIRAAN VOL. PEK. : 147.55
JENIS PEKERJAAN : Beton LC/B0 TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 150.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0467 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0933 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2800 jam
Rp. 0.00 / Kg
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.3.4 PERKIRAAN VOL. PEK. : 8,580.19
JENIS PEKERJAAN :Baja Tulangan BJ 24 Polos TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar Sealent (Aspal) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.0 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Aspal Fh 0.02 -
1. BAHAN
1.a. Sealent (Aspal) (M39a) 0.1500 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- tempat pembakaran aspal = 1 buah
- Penuang Aspal kedalam lubang beton = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 275.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Pekerja P 3.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0255 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.0764 jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.3.5 PERKIRAAN VOL. PEK. : 305.59
JENIS PEKERJAAN : Joint Sealent TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M' % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
1. Sealent Kg 0.1500 - -
C. PERALATAN
I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi
3 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Bahan pondasi cerucuk 10/10 @ 200 Cm (M52) 0.0200 M3/Titik
2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk Lumpsum
- 1 set palu tripot
- Alat pertukangan
3. TENAGA
Produksi Tiang dalam 1 hari Qt 70.00 Titik
PROYEK : ………………………………………………
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : ………………………………………………
………………………………………………………………….
PROP / KAB / KODYA : Samarinda
ITEM PEMBAYARAN NO. : 7.3.1(2) PERKIRAAN VOL. PEK. : 545.72
JENIS PEKERJAAN : Pondasi Cerucuk, Pengadaan dan Pemancangan P TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : Titik % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan cara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu dan pasir) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor kehilangan material Fh 1.10 -
1. BAHAN
1.a. Batu Belah (M06) 1.1000 M3
2. ALAT
2.a. ALAT BANTU
Diperlukan :
- Gerobak Dorong = 4 buah
- Palu Batu = 2 buah
3. TENAGA
Produksi pasangan batu kosong dalam 1 hari Qt 8.00 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.8750 jam
- Tukang = (Tk x Tb) : Qt (L02) 1.7500 jam
- Pekerja = (Tk x P) : Qt (L01) 5.2500 jam
Rp. 0.00 / M3
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.10 (2) PERKIRAAN VOL. PEK. : 252.59
JENIS PEKERJAAN : Pasangan Batu Telford TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.15 M
7 Berat volume bahan (lepas) D 1.60 Ton/M3
2. ALAT
2.a. EXCAVATOR (E15)
Kapasitas Bucket V 0.80 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi Alat Fa 0.83 -
Faktor Konversi Fv 0.90 Lihat panduan
Waktu sklus Ts1
- Muat T1 0.2 menit
Waktu Siklus = T1 x Fv Ts1 0.19 menit
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.2 (1) PERKIRAAN VOL. PEK. : 133.94
JENIS PEKERJAAN : Timbunan Biasa dari selain Sumber Galian TOTAL HARGA (Rp.) : 0.00
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : 0.00
A. TENAGA
B. BAHAN
C. PERALATAN
Pekerjaan : Pembangunan Dan Peningkatan Jalan Damai RT. 28 Kec. Samarinda Ilir
: Samarinda
Lokasi
1 2 3 4
A UPAH
B BAHAN
26 Semen 1.00 Kg -
1 2 3 4
1 2 3 4
C ALAT
1 Concrete Mixer Truck 1.00 Jam -
TENAGA KAPASITAS HARGA ALAT YANG DIPAKAI NILAI FAKTOR BIAYA PASTI PER JAM BIAYA OPERASI PER JAM KERJA TOTAL
ALAT ALAT ALAT JAM SISA PENGEM- BIAYA ASURANSI TOTAL BAHAN BAKAR & PELUMAS PERBAIKAN & PERAWATAN UPAH TOTAL BIAYA
UMUR KERJA HARGA ALAT BALIAN PENGEM- DAN BIAYA BAHAN MINYAK OPERATOR PEMBANTU BIAYA ALAT
ALAT 1 TAHUN ALAT MODAL BALIAN LAIN-LAIN PASTI / JAM BAKAR PELUMAS BIAYA KOEF. BIAYA / SOPIR OPERATOR OPERASI PER
MODAL / SOPIR / JAM JAM KERJA
(HP) - (Tahun) (Tahun) (Jam) (Rp.) (Rp.) - (Rp.) (Rp.) (Rp.) Lt/HP/Jam Ltr/HP/Jam (Rp.) - (Rp.) (Rp.) (Rp.) (Rp.) (Rp.) KET.
No. JENIS PERALATAN
KODE f1 x HP x 1 Orang 1 Orang
ALAT i(1+i)^A (B - C) x D 0.002 x B 0.125 0.01 Harga BBM 0.125 (g1 x B') Per Per
(10% X B) ----------- ----------- ----------- (e1 + e2) s/d s/d + s/d ----------- Jam Kerja Jam Kerja F+G+H+I E+J
(1+i)^A-1 W W 0.175 0.02 f2 x HP x 0.175 W = =
Harga Olie Rp0.0 Rp0.0
HP Cp B A W B C D e1 e2 E f1 f2 F g1 G H I J K L
1 2 2a 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
1 Concrete Mixer Truck 125.0 9.0 Ton 950,000,000 5.0 1,500.0 950,000,000 95,000,000 0.33438 190,596.43 1,266.67 191,863.10 0.1500 0.0150 0.00 0.1500 95,000.00 0.00 0.00 95,000.00 286,863.10 Alat Baru
2 Compressor 4000/6500 L/M 80.0 370.0 CFM 5,000,000 5.0 2,000.0 5,000,000 500,000 0.33438 752.35 5.00 757.35 0.1500 0.0150 0.00 0.1500 375.00 0.00 0.00 375.00 1,132.35 Alat Baru
3 Concrete Mixer 0.3 - 0.6 m3 15.0 500.0 Liter 8,000,000 2.0 1,500.0 8,000,000 800,000 0.65455 3,141.82 10.67 3,152.48 0.1500 0.0150 0.00 0.1500 800.00 0.00 0.00 800.00 3,952.48 Alat Baru
4 Concrete Vibrator 5.5 25.0 4,000,000 4.0 1,000.0 4,000,000 400,000 0.38629 1,390.64 8.00 1,398.64 0.1500 0.0150 0.00 0.1500 600.00 0.00 0.00 600.00 1,998.64 Alat Baru
5 Concrete Paver 15.0 1,000,000,000 4.0 2,000.0 1,000,000,000 100,000,000 0.38629 173,830.10 1,000.00 174,830.10 0.1500 0.0150 0.00 0.1500 75,000.00 0.00 0.00 75,000.00 249,830.10 Alat Baru
6 Dump Truck 3 - 4 M3 100.0 3.5 Ton 285,000,000 5.0 2,000.0 285,000,000 28,500,000 0.33438 42,884.20 285.00 43,169.20 0.1500 0.0150 0.00 0.1500 21,375.00 0.00 0.00 21,375.00 64,544.20 Alat Baru
7 Flat Bed Truck 3-4 M3 190.0 10.0 Ton 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.33438 52,664.80 350.00 53,014.80 0.1500 0.0150 0.00 0.1500 26,250.00 0.00 0.00 26,250.00 79,264.80 Alat Baru
8 Generator Set 180.0 125.0 KVA 207,000,000 5.0 2,000.0 207,000,000 20,700,000 0.33438 31,147.47 207.00 31,354.47 0.1500 0.0150 0.00 0.1500 15,525.00 0.00 0.00 15,525.00 46,879.47 Alat Baru
9 Motor Grader >100 HP 135.0 10,800.0 1,007,000,000 5.0 2,000.0 1,007,000,000 100,700,000 0.33438 151,524.16 1,007.00 152,531.16 0.1500 0.0150 0.00 0.1500 75,525.00 0.00 0.00 75,525.00 228,056.16 Alat Baru
10 Bulldozer 100-150 HP 155.0 - - 1,000,000,000 5.0 2,000.0 1,000,000,000 100,000,000 0.33438 150,470.87 1,000.00 151,470.87 0.1500 0.0150 0.00 0.1500 75,000.00 0.00 0.00 75,000.00 226,470.87 Alat Baru
11 Excavator 80-140 HP 133.0 0.9 M3 1,500,000,000 5.0 2,000.0 1,500,000,000 150,000,000 0.33438 225,706.30 1,500.00 227,206.30 0.1500 0.0150 0.00 0.1500 112,500.00 0.00 0.00 112,500.00 339,706.30 Alat Baru
12 Tandem Roller 6 - 8 T 82.0 8.1 Ton 755,000,000 5.0 2,000.0 755,000,000 75,500,000 0.33438 113,605.50 755.00 114,360.50 0.1500 0.0150 0.00 0.1500 56,625.00 0.00 0.00 56,625.00 170,985.50 Alat Baru
13 Vibratoty Roller 5-8 T. 82 7.1 Ton 720,000,000.0 5 2,000.0 720,000,000 72,000,000 0.33438 108,339.02 720.00 109,059.02 0.1500 0.0150 0.00 0.1500 54,000.00 0.00 0.00 54,000.00 163,059.02 Alat Baru
14 Concrete Cutter 15.0 10,000,000 5.0 1,500.0 10,000,000 1,000,000 0.33438 2,006.28 13.33 2,019.61 0.1500 0.0150 0.00 0.1500 1,000.00 0.00 0.00 1,000.00 3,019.61 Alat Baru
15 Baby Roller 10.0 0.7 Ton 270,000,000 5.0 2,000.0 270,000,000 27,000,000 0.33438 40,627.13 270.00 40,897.13 0.1500 0.0150 0.00 0.1500 20,250.00 0.00 0.00 20,250.00 61,147.13 Alat Baru
16 Water Tanker 3000 - 4500 L 100.0 4,000.0 Ltr 350,000,000 5.0 2,000.0 350,000,000 35,000,000 0.33438 52,664.80 350.00 53,014.80 0.1500 0.0150 0.00 0.1500 26,250.00 0.00 0.00 26,250.00 79,264.80 Alat Baru
KETERANGAN : 1. Tingkat Suku Bunga = 20.00 % per-tahun
2. Upah Operator / Sopir / Mekanik = 0 Rupiah per-orang/jam Samarinda, ………….........……2018
3. Upah Pembantu Operator/Sopir/Mekanik = 0 Rupiah per-orang/jam
4. Harga Bahan Bakar Bensin = 0 Rupiah per-liter
5. Harga Bahan Bakar Solar = 0 Rupiah per-liter
6. Minyak Pelumas = 0 Rupiah per-liter
7. Pajak Pertambahan Nilai (PPN) diperhitungkan pada Lembar Rekapitulasi Biaya Pekerjaan
8. Khusus AMP, biaya bahan bakar ditambah (untuk pemanasan material) sebesar : 12 Liter x (Kapasitas AMP Riil = 0.7 x Kapasitas AMP/Jam) x Harga BBM Solar , (kolom 16) ...............................
dan untuk biaya Upah (Pembantu Operator/sopir) menjadi 3 orang per jam kerja, (Kolom 20) .............
GANG SEDERHANA 2
TALUD
PANJANG 258 M
JALAN
Panjang 129 M
Beton Lc/ B0
1 Panjang Lebar Tinggi Volume
129 2.5 0.1 32.25 M3
Baja Tulangan
1 Panjang Besi Dowel Besi Susut
129 26.8 53.6 Bh
3 1 8 Titik
REKAP
Jenis Pekerjaan Total Volume Satuan
Galian untuk Selokan Drainase dan Saluran Air 287.52535 M3
Timbunan Biasa dari selain Sumber Galian 133.94 M3
Pasangan Batu dengan Mortar 209.42981 M3
Pancang Kayu 2 m ulin 10/10 545.723 ttk
DRAINASE
PANJANG 41 M
Gorong Gorong
PANJANG 4M
JALAN
Panjang 239 M
Beton Lc/ B0
1 Panjang Lebar Tinggi Volume
239 4 0.1 95.6 M3
Baja Tulangan
1 Panjang Besi Dowel Besi Susut
239 48.8 97.6 Bh
Joint Silent
239 195.2 M1
GANG MUSLIM ( BELOK KIRI)
TALUD
PANJANG 49.241 M
DRAINASE
PANJANG 49.241 M
JALAN
Panjang 49.241 M
Beton Lc/ B0
1 Panjang Lebar Tinggi Volume
49.241 4 0.1 19.70
Baja Tulangan
1 Panjang Besi Dowel Besi Susut
49.241 10.8482 21.6964 Bh
M3
Volume
41.85485 M3
M3
Volume
27.57 M3
M3
M3
M3
Volume
133.936
ITEM PEMBAYARAN NO. : 5.1.2 Analisa EI-512
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. B
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00 KM
5 Tebal lapis agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 jam
8 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
9 Berat volume agregat (lepas) Bil 1.51 ton/m3
Faktor kehilangan - Agregat Pecah Mesin 20 - 30 mm Fh1 1.05
Faktor kehilangan - Agregat Pecah Mesin 5 - 10 & 10 - 20 mm Fh2 1.05
Faktor kehilangan - Sirtu Fh3 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.83 - lepas
Faktor Efisiensi alat Fa 0.80 - kondisi sedang
Waktu Siklus : Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
Ts1 0.45 menit
3. TENAGA
Produksi menentukan : WHEEL LOADER Q1 110.79 M3/jam
Produksi agregat / hari = Tk x Q1 Qt 775.52 M3
Kebutuhan tenaga :
- Pekerja P 2.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt - 0.0181 jam
- Mandor = (Tk x M) : Qt - 0.0090 jam
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 5.1.2 PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Lps. Pond. Agg. Kls. B TOTAL HARGA : #NAME?
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan L 10.00 KM
5 Tebal lapis Agregat padat t 0.15 M
6 Berat isi padat Bip 1.81
7 Jam kerja efektif per-hari Tk 7.00 Jam
8 Lebar bahu jalan Lb 1.00 M
9 Proporsi Campuran : - Agregat Pecah Mesin 20 - 30 mm 20-30 18.00 % Gradasi harus
- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm 5-10&10-20 18.00 % memenuhi
- Sirtu St 64.00 % Spesifikasi
10 Berat volume agregat (lepas) Bil 1.51 ton/m3
- Agregat B Fh 1.05
2. ALAT
2.a. WHEEL LOADER (E15)
Kapasitas bucket V 1.50 M3
Faktor bucket Fb 0.83 - Pemuatan lepas
Faktor Efisiensi alat Fa 0.80 - sedang
Waktu siklus Ts1
- Memuat dan lain-lain T1 0.45 menit panduan
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 4.2 (2) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Lps. Pond. Ag. Kls. B, CBR Min 60% TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Berat volume tanah (lepas) D 1.60 ton/m3 1.40 - 1.80
1. BAHAN
Tidak ada bahan yang diperlukan
2. ALAT
2.a. EXCAVATOR (E10)
Kapasitas Bucket V 0.90 M3
Faktor Bucket Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman < 40 % Fv 0.90 lihat panduan
Waktu siklus Ts1 menit
- Menggali / memuat (standar) T1 2.500 menit
Waktu Siklus Ts
- Waktu gusur = (L x 60) : Vf T1 4.80 menit
- Waktu kembali = (L x 60) : Vr T2 3.43 menit
- Waktu lain-lain T3 0.05 menit
Ts 8.28 menit
3. TENAGA M3/Jam
Produksi menentukan : EXCAVATOR Q1 16.58 M3
Produksi Galian / hari = Tk x Q1 Qt 116.05
Kebutuhan tenaga : orang
- Pekerja P 2.00 orang
- Mandor M 1.00
Rp. 550.00 / M3
I. ASUMSI
1 Pekerjaan dilaksanakan hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi Jalan : jelek / belum padat
5 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. MOTOR GRADER (E13)
Panjang operasi grader sekali jalan Lh 15.00 M
Lebar Efektif kerja Blade b 2.50 M
Lebae overlap bo 0.30
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 2.00 Km / Jam
Jumlah lintasan n 8.00 lintasan
Waktu siklus Ts1
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.45 menit
- Lain-lain T2 2.00 menit
Ts1 2.45 menit
3. TENAGA
Produksi menentukan : MOTOR GRADER Q1 682.21 M2/Jam
Produksi Pekerjaan / hari = Tk x Q1 Qt 4,775.46 M2
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.0059 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0015 Jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.3 Analisa EI-33
JENIS PEKERJAAN : Penyiapan Badan Jalan
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
Lanjutan
Rp. 550.00 / M2
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1 (1) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Galian Biasa TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.3 PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Penyiapan Badan Jalan TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M2 0 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0015 0.00 0.00
2. Vibro Roller (E19) jam 0.0007 0.00 0.00
3 Alat Bantu Ls 1.0000 500.00 500.00
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Kadar Semen Minimum (Spesifikasi) Ks 365 Kg/M3
7 Ukuran Agregat Maksimum Ag 19 mm
8 Perbandingan Air/Semen Maksimum (Spesifikasi) Wcr 0.45 -
9 Perbandingan Camp. : Semen Sm 410.0 Kg/M3 Berdasarkan
: Pasir Ps 637.0 Kg/M3 JMF & sesuai
: Agregat Kasar Kr 992.0 Kg/M3 dgn Spesifikasi
10 Berat Isi :
- Beton D1 2.40 T/M3
- Semen D2 1.25 T/M3
- Pasir D3 1.30 T/M3
- Agregat Kasar D4 1.40 T/M3
1. BAHAN
2. ALAT
2.a. CONCRETE PAN MIXER (BATCHING PLANT) (E43)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 1.00 menit
- Mengaduk T2 3.00 menit
- Menuang T3 0.50 menit
- Tunggu, dll. T4 0.50 menit
Ts 5.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 15.20 M3
Rp. 1,100.00 / M3
I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
2. ALAT
2.a. CONCRETE MIXER (E06)
Kapasitas Alat V 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 8.00 menit
- Mengaduk T2 4.00 menit
- Menuang T3 2.00 menit
- Tunggu, dll. T4 3.00 menit
Ts 17.00 menit
3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 10.25 M3
Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.6827 jam
- Tukang = (Tk x Tb) : Qt (L02) 2.7309 jam
- Pekerja = (Tk x P) : Qt (L01) 4.0964 jam
Rp. 1,100.0 / M3
I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (besi dan kawat) diterima seluruhnya
di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 10.00 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Faktor Kehilangan Besi Tulangan Fh 1.10 -
1. BAHAN
1.a. Baja Tulangan (Polos) U24 (M39a) 1.1000 Kg
1.b. Kawat beton (M14) 0.0025 Kg
2. ALAT
2.a. ALAT BANTU Ls
Diperlukan :
- Gunting Potong Baja = 2 buah
- Kunci Pembengkok Tulangan = 2 buah
- Alat lainnya
3. TENAGA
Produksi kerja satu hari Qt 150.00 Kg
dibutuhkan tenaga : - Mandor M 1.00 orang
- Tukang Tb 2.00 orang
- Pekerja P 6.00 orang
Koefisien Tenaga / Kg :
- Mandor = ( M x Tk ) : Qt (L03) 0.0467 jam
- Tukang = ( Tb x Tk ) : Qt (L02) 0.0933 jam
- Pekerja = ( P x Tk ) : Qt (L01) 0.2800 jam
Rp. 550.00 / Kg
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (3) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Beton Fc 30 Mpa TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.1 (6) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Beton Fc 10 Mpa TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.3 (1) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Baja Tulangan 24 Polos TOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : Kg % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN
I. ASUMSI
1 Dilakukan secara manual
2 Bahan diterima di lokasi Jembatan
3 Jam kerja efektif per-hari Tk 7.00 jam
1. BAHAN
1.a. Bahan pondasi cerucuk (M52) 0.0100 M3
2. ALAT
2.e. ALAT BANTU
Diperlukan alat bantu untuk pek pondasi cerucuk Lumpsum
- 1 set palu tripot
- Alat pertukangan
3. TENAGA
Produksi Tiang dalam 1 hari Qt 28.00 M1
Rp. 1,100.00 / M1
PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 7.6 (1) PERKIRAAN VOL. PEK. : #NAME?
JENIS PEKERJAAN : Pondasi Cerucuk, Pengadaan dan PemancanTOTAL HARGA (Rp.) : #NAME?
SATUAN PEMBAYARAN : M1 % THD. BIAYA PROYEK : #NAME?
A. TENAGA
B. BAHAN
C. PERALATAN