A UMUM
1 Manajemen Dan Keselamatan Lalu lintas Ls 1.00 Rp 50,184,865.45 50,184,865.45 0.37 - - 1.00 0.37 1.00 0.37
Sub Total 50,184,865.45 0.37 - 0.37 0.37
B DRAINASE
1 Galian Untuk Selokan Drainase & Saluran Air M³ 500.00 Rp 51,312.73 25,656,363.64 0.19 - - - - - -
2 Pasangan Batu dengan Mortar M³ 238.00 Rp 1,773,298.18 422,044,967.27 3.10 - - - - - -
Sub Total 447,701,330.91 3.29 - - -
C PEKERJAAN GORONG - GORONG PIPA BAJA BERGELOMBANG
1 Galian Biasa M³ 2,765.00 Rp 51,312.73 141,879,690.91 1.04 - - - - - -
2 Timbunan Biasa M³ 3,342.00 Rp 222,313.64 742,972,172.73 5.46 - - - - - -
3 Timbunan Berbutir M³ 201.00 Rp 340,770.91 68,494,952.73 0.50 - - - - - -
4 Pasangan Batu M³ 282.00 Rp 1,773,298.18 500,070,087.27 3.68 - - - - - -
5 Fondasi Cerucuk, Pengadaan Dan Pemamcangan M¹ 1,152.00 Rp 76,000.00 87,552,000.00 0.64 - - - - - -
6 Gorong - Gorong Pipa Baja Bergelombang Ton 9.00 Rp 5,174,188.18 46,567,693.64 0.34 - - - - - -
Sub Total 1,587,536,597.27 11.67 - - -
D PEKERJAAN PENANGANAN LONGSORAN
1 Galian Tanah M³ 2,714.00 Rp 51,312.73 139,262,741.82 1.02 - - - - - -
2 Timbunan Tanah Biasa M³ 4,319.00 Rp 222,313.64 960,172,595.45 7.06 - - - - - -
3 Bronjong ( Upah ) M³ 1,020.00 Rp 167,100.00 170,442,000.00 1.25 - - - - - -
4 Material Batu Gunung M³ 1,020.00 Rp 650,000.00 663,000,000.00 4.87 - - - - - -
5 Geotekstil ( Upah ) M² 6,573.00 Rp 35,000.00 230,055,000.00 1.69 - - - - - -
6 Pengadaan Geotextile M² 6,573.00 Rp 26,000.00 170,898,000.00 1.26 - - - - - -
7 Penyediaan dan Pemancangan Tiang Pancang Kayu M¹ 480.00 Rp 76,000.00 36,480,000.00 0.27 - - - - - -
8 Pengadaan Kawat Bronjong Set 510.00 Rp 530,000.00 270,300,000.00 1.99 - - - - - -
9 Stabilisasi dengan Tanaman Vetifer Buah 1,400.00 Rp 53,000.00 74,200,000.00 0.55 - - - - - -
10 Pohon Buah 28.00 Rp 107,000.00 2,996,000.00 0.02 - - - - - -
11 Patok Pengarah Kayu Buah 48.00 Rp 126,500.00 6,072,000.00 0.04 - - - - - -
12 Pemancangan & Breacing ( Upah ) M¹ 720.00 Rp 450,000.00 324,000,000.00 2.38 - - - - - -
13 Pasir Urug Pipa Pancang M³ 17.00 Rp 1,350,000.00 22,950,000.00 0.17 - - - - - -
14 Pasir Urug File Cap M³ 26.00 Rp 1,350,000.00 35,100,000.00 0.26 - - - - - -
15 Lantai Kerja Pile Cap K-125 M³ 27.00 Rp 1,724,750.00 46,568,250.00 0.34 - - - - - -
16 Cor Beton Pile Cap K-250 M³ 117.00 Rp 2,206,800.00 258,195,600.00 1.90 - - - - - -
17 Pembesian Pile Cap Kg 7,587.00 Rp 13,500.00 102,424,500.00 0.75 - - - - - -
18 Pengadaan Pipa Pancang Baja Ø 8" Btng 120.00 Rp 4,757,500.00 570,900,000.00 4.20 - - - - - -
19 timbunan Berbutir m3 24.00 Rp 340,770.91 8,178,501.82 0.06 - - - - - -
20 Pengadaan Profil Kanal C Btng 46.00 Rp 1,680,000.00 77,280,000.00 0.57 - - - - - -
Sub Total 4,169,475,189.09 30.65 - - -
PEMERINTAH PROVINSI KALIMANTAN TIMUR
DINAS PEKERJAAAN UMUM
LAPORAN MINGGUAN PENATAAN RUANG DAN PERMUKIMAN RAKYAT
UPTD PEMELIHARAAN INFRASTRUKTUR PU WILAYAH III KABUPATEN KUTIM
PEMELIHARAAN JALAN
Nomor : 01 (SATU)
Periode : 01 s/d 07 Februari 2019
RUAS JALAN SP. KALIORANG - SP. GM ( KAUBUN ) & SP. 46 - SP. LENGGOQ ( BATU PUTIH )
TAHUN ANGGARAN 2019
KONTRAK AWAL REALISASI PEKERJAAN
S/D MINGGU S/D
No. URAIAN PEKERJAAN SAT. Harga Satuan Jumlah Harga Bobot MINGGU LALU INI MINGGU INI
Kuantitas
Kuantitas Bobot (%) Kuantitas Bobot (%) Kuantitas Bobot (%)
(Rp) (Rp) (%)
E PELEBARAN, PERKERASAN DAN BAHU JALAN
1 Timbunan Berbutir M³ 900.00 Rp 340,770.91 306,693,818.18 2.255 - - - - - -
2 Lapis Pondasi Kelas Agregat S M³ 425.00 Rp 650,000.00 276,250,000.00 2.031 - - - - - -
3 Lapis Pondasi Kelas Agregat S (Bahan) M³ 425.00 Rp 450,000.00 - - - - - -
Sub Total 582,943,818.18 4.29 - - -
F PEKERJAAN PATCHING DAN PERKERASAN ASPAL
1 Lapis Pondasi Kelas Agregat A M³ 2,476.00 Rp 687,306.36 1,701,770,556.36 12.511 - - - - - -
2 Lapis AC - BC Ton 1,625.00 Rp 2,255,300.00 3,664,862,500.00 26.943 - - - - - -
3 Lapis Resap Pengikat ( prime coat ) Ltr 8,190.00 Rp 20,000.00 163,800,000.00 1.204 - - - - - -
4 Timbunan Berbutir ( Stabilisasi ) M³ 1,620.00 Rp 340,770.91 552,048,872.73 4.059 - - - - - -
Sub Total 6,082,481,929.09 44.72 - - -
G PEKERJAAN PEMELIHARAAN RUTIN JALAN
1 Pemotongan Rumput M² 670,950.00 Rp 800.00 536,760,000.00 3.946 - - - - - -
2 Pembersihan Selokan Samping Diperkeras M¹ 13,200.00 Rp 11,000.00 145,200,000.00 1.067 - - - - - -
Sub Total 681,960,000.00 5.01 - - -
A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 13,602,283,730.00 100.00 - 0.37 0.37
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 1,360,228,373.00
C JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 14,962,512,103.00 50,184,000.00
D PEMBULATAN 14,962,512,100.00
A UMUM
1 Manajemen Dan Keselamatan Lalu lintas Ls 1.00 Rp 50,184,865.45 50,184,865.45 0.37 1.00 0.37 - - 1.00 0.37
Sub Total 50,184,865.45 0.37 0.37 - 0.37
B DRAINASE
1 Galian Untuk Selokan Drainase & Saluran Air M³ 500.00 Rp 51,312.73 25,656,363.64 0.19 - - - - - -
2 Pasangan Batu dengan Mortar M³ 238.00 Rp 1,773,298.18 422,044,967.27 3.10 - - - - - -
Sub Total 447,701,330.91 3.29 - - -
C PEKERJAAN GORONG - GORONG PIPA BAJA BERGELOMBANG
1 Galian Biasa M³ 2,765.00 Rp 51,312.73 141,879,690.91 1.04 - - - - - -
2 Timbunan Biasa M³ 3,342.00 Rp 222,313.64 742,972,172.73 5.46 - - - - - -
3 Timbunan Berbutir M³ 201.00 Rp 340,770.91 68,494,952.73 0.50 - - - - - -
4 Pasangan Batu M³ 282.00 Rp 1,773,298.18 500,070,087.27 3.68 - - - - - -
5 Fondasi Cerucuk, Pengadaan Dan Pemamcangan M¹ 1,152.00 Rp 76,000.00 87,552,000.00 0.64 - - - - - -
6 Gorong - Gorong Pipa Baja Bergelombang Ton 9.00 Rp 5,174,188.18 46,567,693.64 0.34 - - - - - -
Sub Total 1,587,536,597.27 11.67 - - -
D PEKERJAAN PENANGANAN LONGSORAN
1 Galian Tanah M³ 2,714.00 Rp 51,312.73 139,262,741.82 1.02 - - - - - -
2 Timbunan Tanah Biasa M³ 4,319.00 Rp 222,313.64 960,172,595.45 7.06 - - - - - -
3 Bronjong ( Upah ) M³ 1,020.00 Rp 167,100.00 170,442,000.00 1.25 - - - - - -
4 Material Batu Gunung M³ 1,020.00 Rp 650,000.00 663,000,000.00 4.87 - - - - - -
5 Geotekstil ( Upah ) M² 6,573.00 Rp 35,000.00 230,055,000.00 1.69 - - - - - -
6 Pengadaan Geotextile M² 6,573.00 Rp 26,000.00 170,898,000.00 1.26 - - - - - -
7 Penyediaan dan Pemancangan Tiang Pancang Kayu M¹ 480.00 Rp 76,000.00 36,480,000.00 0.27 - - - - - -
8 Pengadaan Kawat Bronjong Set 510.00 Rp 530,000.00 270,300,000.00 1.99 - - - - - -
9 Stabilisasi dengan Tanaman Vetifer Buah 1,400.00 Rp 53,000.00 74,200,000.00 0.55 - - - - - -
10 Pohon Buah 28.00 Rp 107,000.00 2,996,000.00 0.02 - - - - - -
11 Patok Pengarah Kayu Buah 48.00 Rp 126,500.00 6,072,000.00 0.04 - - - - - -
12 Pemancangan & Breacing ( Upah ) M¹ 720.00 Rp 450,000.00 324,000,000.00 2.38 - - - - - -
13 Pasir Urug Pipa Pancang M³ 17.00 Rp 1,350,000.00 22,950,000.00 0.17 - - - - - -
14 Pasir Urug File Cap M³ 26.00 Rp 1,350,000.00 35,100,000.00 0.26 - - - - - -
15 Lantai Kerja Pile Cap K-125 M³ 27.00 Rp 1,724,750.00 46,568,250.00 0.34 - - - - - -
16 Cor Beton Pile Cap K-250 M³ 117.00 Rp 2,206,800.00 258,195,600.00 1.90 - - - - - -
17 Pembesian Pile Cap Kg 7,587.00 Rp 13,500.00 102,424,500.00 0.75 - - - - - -
18 Pengadaan Pipa Pancang Baja Ø 8" Btng 120.00 Rp 4,757,500.00 570,900,000.00 4.20 - - - - - -
19 timbunan Berbutir m3 24.00 Rp 340,770.91 8,178,501.82 0.06 - - - - - -
20 Pengadaan Profil Kanal C Btng 46.00 Rp 1,680,000.00 77,280,000.00 0.57 - - - - - -
Sub Total 4,169,475,189.09 30.65 - - -
PEMERINTAH PROVINSI KALIMANTAN TIMUR
DINAS PEKERJAAAN UMUM
LAPORAN MINGGUAN PENATAAN RUANG DAN PERMUKIMAN RAKYAT
UPTD PEMELIHARAAN INFRASTRUKTUR PU WILAYAH III KABUPATEN KUTIM
PEMELIHARAAN JALAN
Nomor : 02 (DUA)
Periode : 08 s/d 14 Februari 2019
RUAS JALAN SP. KALIORANG - SP. GM ( KAUBUN ) & SP. 46 - SP. LENGGOQ ( BATU PUTIH )
TAHUN ANGGARAN 2019
KONTRAK AWAL REALISASI PEKERJAAN
S/D MINGGU S/D
No. URAIAN PEKERJAAN SAT. Harga Satuan Jumlah Harga Bobot MINGGU LALU INI MINGGU INI
Kuantitas
Kuantitas Bobot (%) Kuantitas Bobot (%) Kuantitas Bobot (%)
(Rp) (Rp) (%)
E PELEBARAN, PERKERASAN DAN BAHU JALAN
1 Timbunan Berbutir M³ 900.00 Rp 340,770.91 306,693,818.18 2.255 - - 86.67 0.22 86.67 0.22
2 Lapis Pondasi Kelas Agregat S M³ 425.00 Rp 650,000.00 276,250,000.00 2.031 - - - - - -
3 Lapis Pondasi Kelas Agregat S (Bahan) M³ 425.00 Rp 450,000.00 - - -
Sub Total 582,943,818.18 4.29 - 0.22 0.22
F PEKERJAAN PATCHING DAN PERKERASAN ASPAL
1 Lapis Pondasi Kelas Agregat A M³ 2,476.00 Rp 687,306.36 1,701,770,556.36 12.511 - - 96.67 0.49 96.67 0.49
2 Lapis AC - BC Ton 1,625.00 Rp 2,255,300.00 3,664,862,500.00 26.943 - - - - - -
3 Lapis Resap Pengikat ( prime coat ) Ltr 8,190.00 Rp 20,000.00 163,800,000.00 1.204 - - - - - -
4 Timbunan Berbutir ( Stabilisasi ) M³ 1,620.00 Rp 340,770.91 552,048,872.73 4.059 - - - - - -
Sub Total 6,082,481,929.09 44.72 - 0.49 0.49
G PEKERJAAN PEMELIHARAAN RUTIN JALAN
1 Pemotongan Rumput M² 670,950.00 Rp 800.00 536,760,000.00 3.946 - - 17,550.00 0.10 17,550.00 0.10
2 Pembersihan Selokan Samping Diperkeras M¹ 13,200.00 Rp 11,000.00 145,200,000.00 1.067 - - 1,020.00 0.08 1,020.00 0.08
Sub Total 681,960,000.00 5.01 - 0.19 0.19
A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 13,602,283,730.00 100.00 0.37 0.89 1.26
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 1,360,228,373.00
C JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 14,962,512,103.00 171,417,000.00
D PEMBULATAN 14,962,512,100.00
A UMUM
1 Manajemen Dan Keselamatan Lalu lintas Ls 1.00 Rp 50,184,865.45 50,184,865.45 0.37 1.00 0.37 - - 1.00 0.37
Sub Total 50,184,865.45 0.37 0.37 - 0.37
B DRAINASE
1 Galian Untuk Selokan Drainase & Saluran Air M³ 500.00 Rp 51,312.73 25,656,363.64 0.19 - - - - - -
2 Pasangan Batu dengan Mortar M³ 238.00 Rp 1,773,298.18 422,044,967.27 3.10 - - - - - -
Sub Total 447,701,330.91 3.29 - - -
C PEKERJAAN GORONG - GORONG PIPA BAJA BERGELOMBANG
1 Galian Biasa M³ 2,765.00 Rp 51,312.73 141,879,690.91 1.04 - - - - - -
2 Timbunan Biasa M³ 3,342.00 Rp 222,313.64 742,972,172.73 5.46 - - - - - -
3 Timbunan Berbutir M³ 201.00 Rp 340,770.91 68,494,952.73 0.50 - - - - - -
4 Pasangan Batu M³ 282.00 Rp 1,773,298.18 500,070,087.27 3.68 - - - - - -
5 Fondasi Cerucuk, Pengadaan Dan Pemamcangan M¹ 1,152.00 Rp 76,000.00 87,552,000.00 0.64 - - - - - -
6 Gorong - Gorong Pipa Baja Bergelombang Ton 9.00 Rp 5,174,188.18 46,567,693.64 0.34 - - - - - -
Sub Total 1,587,536,597.27 11.67 - - -
D PEKERJAAN PENANGANAN LONGSORAN
1 Galian Tanah M³ 2,714.00 Rp 51,312.73 139,262,741.82 1.02 - - - - - -
2 Timbunan Tanah Biasa M³ 4,319.00 Rp 222,313.64 960,172,595.45 7.06 - - - - - -
3 Bronjong ( Upah ) M³ 1,020.00 Rp 167,100.00 170,442,000.00 1.25 - - - - - -
4 Material Batu Gunung M³ 1,020.00 Rp 650,000.00 663,000,000.00 4.87 - - - - - -
5 Geotekstil ( Upah ) M² 6,573.00 Rp 35,000.00 230,055,000.00 1.69 - - - - - -
6 Pengadaan Geotextile M² 6,573.00 Rp 26,000.00 170,898,000.00 1.26 - - - - - -
7 Penyediaan dan Pemancangan Tiang Pancang Kayu M¹ 480.00 Rp 76,000.00 36,480,000.00 0.27 - - - - - -
8 Pengadaan Kawat Bronjong Set 510.00 Rp 530,000.00 270,300,000.00 1.99 - - - - - -
9 Stabilisasi dengan Tanaman Vetifer Buah 1,400.00 Rp 53,000.00 74,200,000.00 0.55 - - - - - -
10 Pohon Buah 28.00 Rp 107,000.00 2,996,000.00 0.02 - - - - - -
11 Patok Pengarah Kayu Buah 48.00 Rp 126,500.00 6,072,000.00 0.04 - - - - - -
12 Pemancangan & Breacing ( Upah ) M¹ 720.00 Rp 450,000.00 324,000,000.00 2.38 - - - - - -
13 Pasir Urug Pipa Pancang M³ 17.00 Rp 1,350,000.00 22,950,000.00 0.17 - - - - - -
14 Pasir Urug File Cap M³ 26.00 Rp 1,350,000.00 35,100,000.00 0.26 - - - - - -
15 Lantai Kerja Pile Cap K-125 M³ 27.00 Rp 1,724,750.00 46,568,250.00 0.34 - - - - - -
16 Cor Beton Pile Cap K-250 M³ 117.00 Rp 2,206,800.00 258,195,600.00 1.90 - - - - - -
17 Pembesian Pile Cap Kg 7,587.00 Rp 13,500.00 102,424,500.00 0.75 - - - - - -
18 Pengadaan Pipa Pancang Baja Ø 8" Btng 120.00 Rp 4,757,500.00 570,900,000.00 4.20 - - - - - -
19 timbunan Berbutir m3 24.00 Rp 340,770.91 8,178,501.82 0.06 - - - - - -
20 Pengadaan Profil Kanal C Btng 46.00 Rp 1,680,000.00 77,280,000.00 0.57 - - - - - -
Sub Total 4,169,475,189.09 30.65 - - -
PEMERINTAH PROVINSI KALIMANTAN TIMUR
DINAS PEKERJAAAN UMUM
LAPORAN MINGGUAN PENATAAN RUANG DAN PERMUKIMAN RAKYAT
UPTD PEMELIHARAAN INFRASTRUKTUR PU WILAYAH III KABUPATEN KUTIM
PEMELIHARAAN JALAN
Nomor : 03 (TIGA)
Periode : 15 s/d 21 Februari 2019
RUAS JALAN SP. KALIORANG - SP. GM ( KAUBUN ) & SP. 46 - SP. LENGGOQ ( BATU PUTIH )
TAHUN ANGGARAN 2019
KONTRAK AWAL REALISASI PEKERJAAN
S/D MINGGU S/D
No. URAIAN PEKERJAAN SAT. Harga Satuan Jumlah Harga Bobot MINGGU LALU INI MINGGU INI
Kuantitas
Kuantitas Bobot (%) Kuantitas Bobot (%) Kuantitas Bobot (%)
(Rp) (Rp) (%)
E PELEBARAN, PERKERASAN DAN BAHU JALAN
1 Timbunan Berbutir M³ 900.00 Rp 340,770.91 306,693,818.18 2.255 86.67 0.22 216.67 0.54 303.33 0.76
2 Lapis Pondasi Kelas Agregat S M³ 425.00 Rp 650,000.00 276,250,000.00 2.031 - - - - - -
3 Lapis Pondasi Kelas Agregat S (Bahan) M³ 425.00 Rp 450,000.00 - - -
Sub Total 582,943,818.18 4.29 0.22 0.54 0.76
F PEKERJAAN PATCHING DAN PERKERASAN ASPAL
1 Lapis Pondasi Kelas Agregat A M³ 2,476.00 Rp 687,306.36 1,701,770,556.36 12.511 96.67 0.49 98.81 0.50 195.48 0.99
2 Lapis AC - BC Ton 1,625.00 Rp 2,255,300.00 3,664,862,500.00 26.943 - - - - - -
3 Lapis Resap Pengikat ( prime coat ) Ltr 8,190.00 Rp 20,000.00 163,800,000.00 1.204 - - - - - -
4 Timbunan Berbutir ( Stabilisasi ) M³ 1,620.00 Rp 340,770.91 552,048,872.73 4.059 - - - - - -
Sub Total 6,082,481,929.09 44.72 0.49 0.50 0.99
G PEKERJAAN PEMELIHARAAN RUTIN JALAN
1 Pemotongan Rumput M² 670,950.00 Rp 800.00 536,760,000.00 3.946 17,550.00 0.10 45,000.00 0.26 62,550.00 0.37
2 Pembersihan Selokan Samping Diperkeras M¹ 13,200.00 Rp 11,000.00 145,200,000.00 1.067 1,020.00 0.08 2,130.00 0.17 3,150.00 0.25
Sub Total 681,960,000.00 5.01 0.19 0.44 0.62
A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 13,602,283,730.00 100.00 1.26 1.48 2.74
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 1,360,228,373.00
C JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 14,962,512,103.00 372,593,000.00
D PEMBULATAN 14,962,512,100.00
A UMUM
1 Manajemen Dan Keselamatan Lalu lintas Ls 1.00 Rp 50,184,865.45 50,184,865.45 0.37 1.00 0.37 - - 1.00 0.37
Sub Total 50,184,865.45 0.37 0.37 - 0.37
B DRAINASE
1 Galian Untuk Selokan Drainase & Saluran Air M³ 500.00 Rp 51,312.73 25,656,363.64 0.19 - - - - - -
2 Pasangan Batu dengan Mortar M³ 238.00 Rp 1,773,298.18 422,044,967.27 3.10 - - - - - -
Sub Total 447,701,330.91 3.29 - - -
C PEKERJAAN GORONG - GORONG PIPA BAJA BERGELOMBANG
1 Galian Biasa M³ 2,765.00 Rp 51,312.73 141,879,690.91 1.04 - - - - - -
2 Timbunan Biasa M³ 3,342.00 Rp 222,313.64 742,972,172.73 5.46 - - - - - -
3 Timbunan Berbutir M³ 201.00 Rp 340,770.91 68,494,952.73 0.50 - - - - - -
4 Pasangan Batu M³ 282.00 Rp 1,773,298.18 500,070,087.27 3.68 - - - - - -
5 Fondasi Cerucuk, Pengadaan Dan Pemamcangan M¹ 1,152.00 Rp 76,000.00 87,552,000.00 0.64 - - - - - -
6 Gorong - Gorong Pipa Baja Bergelombang Ton 9.00 Rp 5,174,188.18 46,567,693.64 0.34 - - - - - -
Sub Total 1,587,536,597.27 11.67 - - -
D PEKERJAAN PENANGANAN LONGSORAN
1 Galian Tanah M³ 2,714.00 Rp 51,312.73 139,262,741.82 1.02 - - - - - -
2 Timbunan Tanah Biasa M³ 4,319.00 Rp 222,313.64 960,172,595.45 7.06 - - - - - -
3 Bronjong ( Upah ) M³ 1,020.00 Rp 167,100.00 170,442,000.00 1.25 - - - - - -
4 Material Batu Gunung M³ 1,020.00 Rp 650,000.00 663,000,000.00 4.87 - - - - - -
5 Geotekstil ( Upah ) M² 6,573.00 Rp 35,000.00 230,055,000.00 1.69 - - - - - -
6 Pengadaan Geotextile M² 6,573.00 Rp 26,000.00 170,898,000.00 1.26 - - - - - -
7 Penyediaan dan Pemancangan Tiang Pancang Kayu M¹ 480.00 Rp 76,000.00 36,480,000.00 0.27 - - - - - -
8 Pengadaan Kawat Bronjong Set 510.00 Rp 530,000.00 270,300,000.00 1.99 - - - - - -
9 Stabilisasi dengan Tanaman Vetifer Buah 1,400.00 Rp 53,000.00 74,200,000.00 0.55 - - - - - -
10 Pohon Buah 28.00 Rp 107,000.00 2,996,000.00 0.02 - - - - - -
11 Patok Pengarah Kayu Buah 48.00 Rp 126,500.00 6,072,000.00 0.04 - - - - - -
12 Pemancangan & Breacing ( Upah ) M¹ 720.00 Rp 450,000.00 324,000,000.00 2.38 - - - - - -
13 Pasir Urug Pipa Pancang M³ 17.00 Rp 1,350,000.00 22,950,000.00 0.17 - - - - - -
14 Pasir Urug File Cap M³ 26.00 Rp 1,350,000.00 35,100,000.00 0.26 - - - - - -
15 Lantai Kerja Pile Cap K-125 M³ 27.00 Rp 1,724,750.00 46,568,250.00 0.34 - - - - - -
16 Cor Beton Pile Cap K-250 M³ 117.00 Rp 2,206,800.00 258,195,600.00 1.90 - - - - - -
17 Pembesian Pile Cap Kg 7,587.00 Rp 13,500.00 102,424,500.00 0.75 - - - - - -
18 Pengadaan Pipa Pancang Baja Ø 8" Btng 120.00 Rp 4,757,500.00 570,900,000.00 4.20 - - - - - -
19 timbunan Berbutir m3 24.00 Rp 340,770.91 8,178,501.82 0.06 - - - - - -
20 Pengadaan Profil Kanal C Btng 46.00 Rp 1,680,000.00 77,280,000.00 0.57 - - - - - -
Sub Total 4,169,475,189.09 30.65 - - -
PEMERINTAH PROVINSI KALIMANTAN TIMUR
DINAS PEKERJAAAN UMUM
LAPORAN MINGGUAN PENATAAN RUANG DAN PERMUKIMAN RAKYAT
UPTD PEMELIHARAAN INFRASTRUKTUR PU WILAYAH III KABUPATEN KUTIM
PEMELIHARAAN JALAN
Nomor : 04 (EMPAT)
Periode : 22 s/d 28 Februari 2019
RUAS JALAN SP. KALIORANG - SP. GM ( KAUBUN ) & SP. 46 - SP. LENGGOQ ( BATU PUTIH )
TAHUN ANGGARAN 2019
KONTRAK AWAL REALISASI PEKERJAAN
S/D MINGGU S/D
No. URAIAN PEKERJAAN SAT. Harga Satuan Jumlah Harga Bobot MINGGU LALU INI MINGGU INI
Kuantitas
Kuantitas Bobot (%) Kuantitas Bobot (%) Kuantitas Bobot (%)
(Rp) (Rp) (%)
E PELEBARAN, PERKERASAN DAN BAHU JALAN
1 Timbunan Berbutir M³ 900.00 Rp 340,770.91 306,693,818.18 2.255 303.33 0.76 125.42 0.31 428.75 1.07
2 Lapis Pondasi Kelas Agregat S M³ 425.00 Rp 650,000.00 276,250,000.00 2.031 - - - - - -
3 Lapis Pondasi Kelas Agregat S (Bahan) M³ 425.00 Rp 450,000.00 - - -
Sub Total 582,943,818.18 4.29 0.76 0.31 1.07
F PEKERJAAN PATCHING DAN PERKERASAN ASPAL
1 Lapis Pondasi Kelas Agregat A M³ 2,476.00 Rp 687,306.36 1,701,770,556.36 12.511 195.48 0.99 - - 195.48 0.99
2 Lapis AC - BC Ton 1,625.00 Rp 2,255,300.00 3,664,862,500.00 26.943 - - - - - -
3 Lapis Resap Pengikat ( prime coat ) Ltr 8,190.00 Rp 20,000.00 163,800,000.00 1.204 - - - - - -
4 Timbunan Berbutir ( Stabilisasi ) M³ 1,620.00 Rp 340,770.91 552,048,872.73 4.059 - - - - - -
Sub Total 6,082,481,929.09 44.72 0.99 - 0.99
G PEKERJAAN PEMELIHARAAN RUTIN JALAN
1 Pemotongan Rumput M² 670,950.00 Rp 800.00 536,760,000.00 3.946 62,550.00 0.37 40,050.00 0.24 102,600.00 0.60
2 Pembersihan Selokan Samping Diperkeras M¹ 13,200.00 Rp 11,000.00 145,200,000.00 1.067 3,150.00 0.25 1,997.00 0.16 5,147.00 0.42
Sub Total 681,960,000.00 5.01 0.62 0.40 1.02
A Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) 13,602,283,730.00 100.00 2.74 0.71 3.45
B Pajak Pertambahan Nilai ( PPN ) = 10% x (A) 1,360,228,373.00
C JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B) 14,962,512,103.00 469,338,000.00
D PEMBULATAN 14,962,512,100.00