Anda di halaman 1dari 24

LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 47,150,000.00 1.263 - - -


1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 12,926,250.00 0.346 - - -

SUB TOTAL I 60,076,250.00 1.610 - -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 482,490,275.82 12.927 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 51,131,864.33 1.370 - - -

SUB TOTAL III 533,622,140.15 14.297 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - 912,468,486.93 24.447 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 912,848,263.97 24.458 - - - - -

SUB TOTAL V 1,825,316,750.90 48.905 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 102,619,304.42 2.749 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 1,118,259,431.00 29.961 - - - - -

SUB TOTAL VI 1,220,878,735.43 32.711 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16,245,981.28 0.435 - - - - -
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 14,481,778.65 0.388 - - - - -
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 61,744,080.75 1.654 - - - - -

SUB TOTAL V 92,471,840.68 2.478 - -


J U M L A H 3,732,365,717.14 100.000 0.000 0.000
P P N 10 % 373,236,571.71
GRAND TOTAL 4,105,602,288.86 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,105,602,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 4
Bulan Mei

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -
- - - -

- - -
0.000 - 0.000

0.000% DEVIASI = 0.000%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES BULANAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Bulan Lalu Bulan Ini s/d Bulan Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 47,150,000.00 1.263 - - -


1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 12,926,250.00 0.346 - - -

SUB TOTAL I 60,076,250.00 1.610 - -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 482,490,275.82 12.927 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 51,131,864.33 1.370 - - -

SUB TOTAL III 533,622,140.15 14.297 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - 912,468,486.93 24.447 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 912,848,263.97 24.458 - - - - -

SUB TOTAL V 1,825,316,750.90 48.905 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 102,619,304.42 2.749 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 1,118,259,431.00 29.961 - - - - -

SUB TOTAL VI 1,220,878,735.43 32.711 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16,245,981.28 0.435 - - - - -
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 14,481,778.65 0.388 - - - - -
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 61,744,080.75 1.654 - - - - -

SUB TOTAL V 92,471,840.68 2.478 - -


J U M L A H 3,732,365,717.14 100.000 0.000 0.000
P P N 10 % 373,236,571.71
GRAND TOTAL 4,105,602,288.86 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,105,602,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


PEJABAT PEMBUAT KOMITMEN KOORDINATOR PENGAWAS Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

ABDULLAH LARIJA, ST DARLIS RUITEN MANDAKE SAFRUDIN UMAR, ST


NIP. 19650618 200701 1 019 NIP. 19650518 200701 1 019 Inspector
S BULANAN FISIK PEKERJAAN

: Sampai dengan tanggal 28 Mei 2017

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Bulan Ini

Bobot Rp. Bobot


Volume
% (%)

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -
- - - -

- - -
0.000 - 0.000

0.000% DEVIASI = 0.000%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 47,150,000.00 1.263 - - -


1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 12,926,250.00 0.346 - - -

SUB TOTAL I 60,076,250.00 1.610 - -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 482,490,275.82 12.927 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 51,131,864.33 1.370 - - -

SUB TOTAL III 533,622,140.15 14.297 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 912,468,486.93 24.447 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 912,848,263.97 24.458 - - - - -

SUB TOTAL V 1,825,316,750.90 48.905 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 102,619,304.42 2.749 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 1,118,259,431.00 29.961 - - - - -

SUB TOTAL VI 1,220,878,735.43 32.711 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16,245,981.28 0.435 - - - - -
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 14,481,778.65 0.388 - - - -
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 61,744,080.75 1.654 - - - -

SUB TOTAL V 92,471,840.68 2.478 - -


J U M L A H 3,732,365,717.14 100.000 0.000 0.000
P P N 10 % 373,236,571.71
GRAND TOTAL 4,105,602,288.86 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,105,602,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 1
Bulan Juni

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -

- - -

- - - -
- - - -
- - - -

- - -
0.000 - 0.000

0.000% DEVIASI = 0.000%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 - - 0.50 0.613 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - -

SUB TOTAL I 60,076,250.00 1.561 - 0.613

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - -

SUB TOTAL III 484,372,382.76 12.589 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - - - -

SUB TOTAL V 1,537,129,657.40 39.950 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 - - - -
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 - - 923.53 1.104 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 - - 46.26 1.456 46.26

SUB TOTAL V 224,192,331.76 5.827 - 2.559


J U M L A H 3,847,636,718.03 100.000 0.000 3.172
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 2
Bulan Juni

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


- - 1.00 0.336

0.613 23,575,000.00 0.949

- - 1,270.55 11.150
- - 18,045.75 1.439

- - 12.589

- - - -
- - 2,406.10 39.950

- - 39.950

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

- - 16.20 0.814
1.104 42,471,813.14 - -
1.456 56,005,513.25 77.96 2.453

2.559 98,477,326.38 3.267


3.172 122,052,326.38 96.828

3.172% DEVIASI = 3.172%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - -

SUB TOTAL I 60,076,250.00 1.561 0.613 -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - - -

SUB TOTAL III 484,372,382.76 12.589 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - - -

SUB TOTAL V 1,537,129,657.40 39.950 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 - - 16.20 0.814 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 46.26 1.456 51.97 1.635 98.23

SUB TOTAL V 224,192,331.76 5.827 2.559 2.450


J U M L A H 3,847,636,718.03 100.000 3.172 2.450
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 3
Bulan Juni

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


- - 1.00 0.336

0.613 23,575,000.00 0.949

- - 1,270.55 11.150
- - 18,045.75 1.439

- - 12.589

- - - -
- - 2,406.10 39.950

- - 39.950

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.091 118,927,826.62 25.99 0.818

5.009 192,731,175.07 0.818


5.622 216,306,175.07 94.378

5.622% DEVIASI = 5.622%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - -

SUB TOTAL I 60,076,250.00 1.561 0.613 -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - - -

SUB TOTAL III 484,372,382.76 12.589 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - - -

SUB TOTAL V 1,537,129,657.40 39.950 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 98.23 3.091 25.99 0.818 124.22

SUB TOTAL V 224,192,331.76 5.827 5.009 0.818


J U M L A H 3,847,636,718.03 100.000 5.622 0.818
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 4
Bulan Juni

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


- - 1.00 0.336

0.613 23,575,000.00 0.949

- - 1,270.55 11.150
- - 18,045.75 1.439

- - 12.589

- - - -
- - 2,406.10 39.950

- - 39.950

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
6.439 247,767,331.76 93.561

6.439% DEVIASI = 6.439%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES BULANAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Bulan Lalu Bulan Ini s/d Bulan Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 - 0.50 0.613 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - - -

SUB TOTAL I 60,076,250.00 1.561 - 0.613

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - - -

SUB TOTAL III 484,372,382.76 12.589 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - - -

SUB TOTAL V 1,537,129,657.40 39.950 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 - - 16.20 0.814 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 - - 923.53 1.104 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 - - 124.22 3.909 124.22

SUB TOTAL V 224,192,331.76 5.827 - 5.827


J U M L A H 3,847,636,718.03 100.000 0.000 6.439
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


PEJABAT PEMBUAT KOMITMEN KOORDINATOR PENGAWAS Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

ABDULLAH LARIJA, ST DARLIS RUITEN MANDAKE SAFRUDIN UMAR, ST


NIP. 19650618 200701 1 019 NIP. 19650518 200701 1 019 Inspector
S BULANAN FISIK PEKERJAAN

: Sampai dengan tanggal 25 Juni 2017

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Bulan Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


- - 1.00 0.336

0.613 23,575,000.00 0.949

- - 1,270.55 11.150
- - 18,045.75 1.439

- - 12.589

- - - -
- - 2,406.10 39.950

- - 39.950

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
6.439 247,767,331.76 93.561

6.439% DEVIASI = 6.439%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - - -

SUB TOTAL I 60,076,250.00 1.561 0.613 -

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - - -

SUB TOTAL III 484,372,382.76 12.589 - -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - - -

SUB TOTAL V 1,537,129,657.40 39.950 - -

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 124.22 3.909 - - 124.22

SUB TOTAL V 224,192,331.76 5.827 5.827 -


J U M L A H 3,847,636,718.03 100.000 6.439 0.000
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 1
Bulan Juli

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


- - 1.00 0.336

0.613 23,575,000.00 0.949

- - 1,270.55 11.150
- - 18,045.75 1.439

- - 12.589

- - - -
- - 2,406.10 39.950

- - 39.950

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
6.439 247,767,331.76 93.561

6.439% DEVIASI = 6.439%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - 0.13 0.044 0.13

SUB TOTAL I 60,076,250.00 1.561 0.613 0.044

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - 18,045.75 1.439 18,045.75

SUB TOTAL III 484,372,382.76 12.589 - 1.439

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - 320.81 5.327 320.81

SUB TOTAL V 1,537,129,657.40 39.950 - 5.327

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 124.22 3.909 - - 124.22

SUB TOTAL V 224,192,331.76 5.827 5.827 -


J U M L A H 3,847,636,718.03 100.000 6.439 6.809
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 2
Bulan Juli

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


0.044 1,680,412.50 0.87 0.292

0.656 25,255,412.50 0.905

- - 1,270.55 11.150
1.439 55,351,377.12 - -

1.439 55,351,377.12 11.150

- - - -
5.327 204,950,620.99 2,085.29 34.623

5.327 204,950,620.99 34.623

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
13.248 509,749,742.37 86.752

13.248% DEVIASI = 13.248%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 0.13 0.044 0.18 0.060 0.31

SUB TOTAL I 60,076,250.00 1.561 0.656 0.060

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 18,045.75 1.439 - 18,045.75

SUB TOTAL III 484,372,382.76 12.589 1.439 -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 320.81 5.327 1,122.85 18.643 1,443.66

SUB TOTAL V 1,537,129,657.40 39.950 5.327 18.643

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - - -
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - - -

SUB TOTAL VI 1,541,866,096.10 40.073 - -

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 124.22 3.909 - - 124.22

SUB TOTAL V 224,192,331.76 5.827 5.827 -


J U M L A H 3,847,636,718.03 100.000 13.248 18.704
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 3
Bulan Juli

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


0.104 4,007,137.50 0.69 0.232

0.717 27,582,137.50 0.845

- - 1,270.55 11.150
1.439 55,351,377.12 - -

1.439 55,351,377.12 11.150

- - - -
23.970 922,277,794.44 962.44 15.980

23.970 922,277,794.44 15.980

- - 9,624.40 3.368
- - 601.53 36.705

- - 40.073

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
31.952 1,229,403,640.82 68.048

31.952% DEVIASI = 31.952%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES MINGGUAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Minggu Lalu Minggu Ini s/d Minggu Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 0.31 0.104 0.11 0.037 0.42

SUB TOTAL I 60,076,250.00 1.561 0.717 0.037

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 18,045.75 1.439 - 18,045.75

SUB TOTAL III 484,372,382.76 12.589 1.439 -

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 1,443.66 23.970 962.44 15.980 2,406.10

SUB TOTAL V 1,537,129,657.40 39.950 23.970 15.980

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - 534.69 0.187 534.69
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - 33.42 2.039 33.42

SUB TOTAL VI 1,541,866,096.10 40.073 - 2.226

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 124.22 3.909 - - 124.22

SUB TOTAL V 224,192,331.76 5.827 5.827 -


J U M L A H 3,847,636,718.03 100.000 31.952 18.243
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
MINGGUAN FISIK PEKERJAAN

: Minggu 4
Bulan Juli

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Minggu Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


0.141 5,429,025.00 0.58 0.195

0.754 29,004,025.00 0.808

- - 1,270.55 11.150
1.439 55,351,377.12 - -

1.439 55,351,377.12 11.150

- - - -
39.950 1,537,129,657.40 - -

39.950 1,537,129,657.40 -

0.187 7,200,143.14 9,089.71 3.181


2.039 78,459,084.42 568.11 34.666

2.226 85,659,227.56 37.847

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
50.195 1,931,336,618.85 49.805

50.195% DEVIASI = 50.195%

Dibuat Oleh
Kontraktor Pelaksana
PT. MANGGALA PRIMA KARYA

FREDRIK LAMBI
Direktur Utama
LAPORAN PROGRES BULANAN FISIK PEKERJAAN

KEGIATAN : PENINGKATAN JALAN


PEKERJAAN : PENINGKATAN JALAN SP3 JL. PROVINSI-TOMUI KARYA (DAK)
LOKASI : KEC. MORI ATAS Periode
THN ANGGARAN : 2017

KEMAJUAN FISIK PEKERJAAN


URAIAN SAT HARGA JUMLAH HARGA BOBOT
NO. MATA s/d Bulan Lalu Bulan Ini s/d Bulan Ini
SATUAN KUANTITAS ADDENDUM 01
PMBYRN
Bobot Bobot
( Rp. ) Volume Volume Volume
( Rp. ) (%) % %

I DIVISI 1 - UMUM

1.2 Mobilisasi LS 47,150,000.00 1.00 1.00 47,150,000.00 1.225 0.50 0.613 - - 0.50
1.8 (1) Manajemen dan Keselamatan Lalu Lintas LS 12,926,250.00 1.00 1.00 12,926,250.00 0.336 - - 0.42 0.141 0.42

SUB TOTAL I 60,076,250.00 1.561 0.613 0.141

III DIVISI 3 - PEKERJAAN TANAH

3.2(2a) Timbunan Pilihan dari sumber galian M3 337,665.53 1,428.90 1,270.55 429,021,005.64 11.150 - - - - -
3.3(1) Penyiapan Badan Jalan M2 3,067.28 16,670.10 18,045.75 55,351,377.12 1.439 - - 18,045.75 1.439 18,045.75

SUB TOTAL III 484,372,382.76 12.589 - 1.439

V DIVISI 5 - PERKERASAN BERBUTIR

5.1.(1) Lapis Pondasi Agregat Kelas A M3 798,240.30 1,143.10 - - 0.000 - - - - -


5.1.(2) Lapis Pondasi Agregat Kelas B M3 638,846.85 1,428.90 2,406.10 1,537,129,657.40 39.950 - - 2,406.10 39.950 2,406.10

SUB TOTAL V 1,537,129,657.40 39.950 - 39.950

VI DIVISI 6 - PERKERASAN ASPAL

6.1.(1)(a) Lapis Resap Pengikat Aspal Cair Liter 13,466.04 7,620.60 9,624.40 129,602,576.59 3.368 - - 534.69 0.187 534.69
6.6.(1) Lapis Permukaan Penetrasi Macadam M3 2,347,804.81 476.30 601.53 1,412,263,519.51 36.705 - - 33.42 2.039 33.42

SUB TOTAL VI 1,541,866,096.10 40.073 - 2.226

VII DIVISI 7 - STRUKTUR

7.1.(7)(a) Beton Mutu Sedang fc' 20 Mpa M3 1,934,045.39 8.40 16.20 31,331,535.32 0.814 16.20 0.814 - - 16.20
7.3.(1) Baja Tulangan U24 Polos Kg 45,988.50 314.90 923.53 42,471,813.14 1.104 923.53 1.104 - - 923.53
7.9.(1) Pasangan Batu M3 1,210,668.25 51.00 124.22 150,388,983.31 3.909 124.22 3.909 - - 124.22

SUB TOTAL V 224,192,331.76 5.827 5.827 -


J U M L A H 3,847,636,718.03 100.000 6.439 43.756
P P N 10 % 384,763,671.80
GRAND TOTAL 4,232,400,389.83 R. SHC. AWAL = 0.00% REALISASI =
DIBULATKAN 4,232,400,000.00

Mengetahui Oleh, Disetujui Oleh, Diperiksa Oleh,


Koordinator Lapangan Pengawas Lapangan Konsultan Supervisi
DINAS PU MOROWALI UTARA DINAS PU MOROWALI UTARA CV. ARYFA WARNA CONSULTANT,

DARLIS RUITEN MANDAKE YOHANIS ROBER SAFRUDIN UMAR, ST


NIP. 19650518 200701 1 019 NIP : 19821125 200701 1 005 Inspector
S BULANAN FISIK PEKERJAAN

: Sampai dengan tanggal 24 Juli 2017

KEMAJUAN FISIK PEKERJAAN


JUMLAH HARGA SISA PEKERJAAN
s/d Bulan Ini

Bobot Rp. Bobot


Volume
% (%)

0.613 23,575,000.00 0.50 0.613


0.141 5,429,025.00 0.58 0.195

0.754 29,004,025.00 0.808

- - 1,270.55 11.150
1.439 55,351,377.12 - -

1.439 55,351,377.12 11.150

- - - -
39.950 1,537,129,657.40 - -

39.950 1,537,129,657.40 -

0.187 7,200,143.14 9,089.71 3.181


2.039 78,459,084.42 568.11 34.666

2.226 85,659,227.56 37.847

0.814 31,331,535.32 - -
1.104 42,471,813.14 - -
3.909 150,388,983.31 - -

5.827 224,192,331.76 -
50.195 1,931,336,618.85 49.805

50.195% DEVIASI = 50.195%