A PEKERJAAN PERSIAPAN
1 Pek. Pengukuran 1.00 Ls 5,000,000.00 5,000,000.00 0.25% - Ls - 0.00% - Ls - 0.00% 1.00 Ls 5,000,000.00 0.25%
2 SMK3 (Keselamatan Kerja) 1.00 Ls 11,000,000.00 11,000,000.00 0.56% - Ls - 0.00% - Ls - 0.00% 1.00 Ls 11,000,000.00 0.56%
3 Pek. Pembongkaran Existing 1.00 Ls 35,000,000.00 35,000,000.00 1.77% - Ls - 0.00% - Ls - 0.00% 1.00 Ls 35,000,000.00 1.77%
Pembongkaran Atap
Pembongkaran Dinding
Pembongkaran Plafond
B PEKERJAAN ARSITEKTUR
GEDUNG WISMA TAMU
1 Pek. Plafond Dan Instalasi Listrik
Pek. Rangka Plafond Besi Hollow, Modul Uk. 60 x 80 Cm 98.17 M2 162,899.00 15,991,794.83 0.81% - M2 - 0.00% 49.17 M2 8,009,743.83 0.41% 49.00 M2 7,982,051.00 0.40%
(Hollow Galvanize, Uk. 4/4 Dan Uk. 2/4 Cm)
Pek. Plafond Gypsum, Tbl. 9 mm 219.92 M2 54,018.80 11,879,814.50 0.60% 89.36 M2 4,827,125.37 0.24% - M2 - 0.00% 309.28 M2 16,706,939.87 0.85%
Pek. Plafond PVC, Ex. Shunda Plafond + Rangka Hollow 74.60 M2 368,192.00 27,467,123.20 1.39% 65.73 M2 24,200,008.31 1.23% - M2 - 0.00% 140.33 M2 51,667,131.51 2.62%
Pas. List Plafon Gypsum 8 cm 292.90 M' 35,862.75 10,504,199.48 0.53% 70.71 M' 2,535,855.05 0.13% - M' - 0.00% 363.61 M' 13,040,054.53 0.66%
Pek. Pas. Down Light 6 Watt (Philips) 41.00 Ttk 102,030.50 4,183,250.50 0.21% 2.00 Ttk 204,061.00 0.01% - Ttk - 0.00% 43.00 Ttk 4,387,311.50 0.22%
Pek. Pas. Down Light 10 Watt (Philips) 12.00 Ttk 108,960.50 1,307,526.00 0.07% - Ttk - 0.00% - Ttk - 0.00% 12.00 Ttk 1,307,526.00 0.07%
Pek. Pas. Down Light 15 Watt (Philips) 8.00 Ttk 155,160.50 1,241,284.00 0.06% 6.00 Ttk 930,963.00 0.05% - Ttk - 0.00% 14.00 Ttk 2,172,247.00 0.11%
Pek. Pas. Down Light 15 Watt (Philips) Outbow 2.00 Ttk 218,685.50 437,371.00 0.02% - Ttk - 0.00% - Ttk - 0.00% 2.00 Ttk 437,371.00 0.02%
Pek. Pas. Lampu LED Strip 91.00 M' 30,000.00 2,730,000.00 0.14% 4.53 M' 135,900.00 0.01% - M' - 0.00% 95.53 M' 2,865,900.00 0.15%
Pek. Pas. Lampu Gantung 0.00 Bh 2,800,000.00 0.00 0.00% 1.00 Bh 2,800,000.00 0.14% - Bh - 0.00% 1.00 Bh 2,800,000.00 0.14%
2 Pek. Interior
Pek. Wallpaper motif (bahan vinyl) 80.00 M2 198,517.00 15,881,360.00 0.81% 280.26 M2 55,635,977.39 2.82% - M2 - 0.00% 360.26 M2 71,517,337.39 3.63%
3 Pek. Penggantung
Pek. Pas. Kunci Pintu ( Ex.Dekson) 0.00 Bh 764,148.00 0.00 0.00% 12.00 Bh 9,169,776.00 0.46% - Bh - 0.00% 12.00 Bh 9,169,776.00 0.46%
Pek. Pas. Tarikan Pintu ( Ex. Dekson/Stainless) 0.00 Bh 1,131,867.00 0.00 0.00% 6.00 Bh 6,791,202.00 0.34% - Bh - 0.00% 6.00 Bh 6,791,202.00 0.34%
2 Pek. Interior
Dinding Kaca Tempered 12 mm 32.74 M2 2,283,442.70 74,759,914.00 3.79% - M2 - 0.00% - M2 - 0.00% 32.74 M2 74,759,914.00 3.79%
Pek. Backdroff Dinding 37.91 M2 1,976,150.00 74,915,846.50 3.80% - M2 - 0.00% 26.91 M2 53,178,196.50 2.70% 11.00 M2 21,737,650.00 1.10%
Pek. Lantai Karpet Polos tebal 5,5 mm 91.00 M2 273,746.00 24,910,886.00 1.26% - M2 - 0.00% 91.00 M2 24,910,886.00 1.26% - M2 0.00 0.00%
Pek. Penebalan Dinding Lapis HPL 0.00 0.00 750,750.00 0.00 0.00% 15.21 0.00 11,418,907.50 0.58% - 0.00 - 0.00% 15.21 0.00 11,418,907.50 0.58%
3 Pek. Penggantung
Pek. Pas. Kunci Pintu ( Ex.Dekson) 0.00 Bh 764,148.00 0.00 0.00% 7.00 Bh 5,349,036.00 0.27% - Bh - 0.00% 7.00 Bh 5,349,036.00 0.27%
Pek. Pas. Tarikan Pintu ( Ex. Dekson/Stainless) 0.00 Bh 1,131,867.00 0.00 0.00% 14.00 Bh 15,846,138.00 0.80% - Bh - 0.00% 14.00 Bh 15,846,138.00 0.80%
SUB JUMLAH 290,506,157.53 14.73% 138,909,040.02 7.04% 124,760,383.86 6.33% 304,654,813.69 15.45%
D Pek. Lantai
1 Pek. Pas Lantai Granit 60 x 60 (Unpolyshed/artistik) 0.00 m2 309,317.66 0.00 0.00% 6.85 m2 2,117,279.40 0.11% - m2 - 0.00% 6.85 m2 2,117,279.40 0.11%
SUB JUMLAH 185,912,551.32 9.43% 116,441,427.09 5.90% 105,756,571.60 5.36% 196,597,406.80 9.97%
PLAFOND OVERSTEK/LUAR
1 Pek. Plafond Dan Instalasi Listrik
Pek. Rangka Plafond Besi Hollow, Modul Uk. 60 x 80 Cm 175.69 M2 162,899.00 28,619,725.31 1.45% - M2 - 0.00% 87.85 M2 14,309,862.66 0.73% 87.85 M2 14,309,862.66 0.73%
(Hollow Galvanize, Uk. 4/4 Dan Uk. 2/4 Cm)
2 Pek. Plafond Calsiboard, Tbl. 3.5 mm 351.38 M2 69,244.01 24,330,960.23 1.23% - M2 - 0.00% 38.38 M2 2,657,585.10 0.13% 313.00 M2 21,673,375.13 1.10%
3 Pas. List Plafon Gypsum 8 cm 270.00 M' 35,862.75 9,682,942.50 0.49% 39.40 M' 1,412,992.35 0.07% - M' - 0.00% 309.40 M' 11,095,934.85 0.56%
SUB JUMLAH 62,633,628.04 3.18% 1,412,992.35 0.07% 16,967,447.76 0.86% 47,079,172.64 2.39%
C PEKERJAAN FINISHING
1 Cat Dinding Ex. Mowilex 2,066.00 M2 44,575.85 92,093,706.10 4.67% 3,650.09 M2 162,706,018.06 8.25% - M2 - 0.00% 5,716.09 M2 254,799,724.16 12.92%
2 Cat Plafond Ex. Mowilex 1,047.61 M2 20,841.70 21,833,973.34 1.11% 485.54 M2 10,119,374.81 0.51% - M2 - 0.00% 1,533.15 M2 31,953,348.15 1.62%
3 Cat Kayu 252.00 M2 42,042.00 10,594,584.00 0.54% 201.45 M2 8,469,360.90 0.43% - M2 - 0.00% 453.45 M2 19,063,944.90 0.97%
4 Pek. Waterproofing Dak Beton (membran bakar) 337.88 M2 205,000.00 69,265,400.00 3.51% - M2 - 0.00% - M2 - 0.00% 337.88 M2 69,265,400.00 3.51%
SUB JUMLAH 193,787,663.44 9.83% 181,294,753.77 9.19% 0.00 0.00% 375,082,417.21 19.02%
SUB JUMLAH 58,477,035.38 2.97% 35,749,947.09 1.81% 0.00 0.00% 94,226,982.47 4.78%
3 Pek. Lantai
Pek. Cor Beton K-225 0.00 M3 1,241,360.87 0.00 0.00% 0.50 M3 620,680.43 0.03% - M3 - 0.00% 0.50 M3 620,680.43 0.03%
Pek. Pas Lantai keramik 40 X 40 0.00 M2 285,791.96 0.00 0.00% 5.70 M2 1,629,014.19 0.08% - M2 - 0.00% 5.70 M2 1,629,014.19 0.08%
6 Pek. Finishing
Cat Dinding Ex. Mowilex 82.21 M2 44,575.85 3,664,580.63 0.19% 30.26 M2 1,348,914.25 0.07% - M2 - 0.00% 112.47 M2 5,013,494.88 0.25%
Pek. Waterproofing Dak Beton (membran bakar) 7.20 M2 165,000.00 1,188,000.00 0.06% 0.97 M2 160,050.00 0.01% - M2 - 0.00% 8.17 M2 1,348,050.00 0.07%
6 Pek. Finishing
- Cat Dinding Ex. Mowilex 119.03 M2 44,575.85 5,305,863.43 0.27% 49.22 M2 2,194,157.06 0.11% - M2 - 0.00% 168.25 M2 7,500,020.49 0.38%
- Cat Plafond Ex. Mowilex 22.66 M2 20,841.70 472,272.92 0.02% - M2 - 0.00% 9.72 M2 202,664.69 0.01% 12.94 M2 269,608.23 0.01%
- Cat Kayu 5.13 M2 60,500.00 310,365.00 0.02% - M2 - 0.00% - M2 - 0.00% 5.13 M2 310,365.00 0.02%
6 Pek. Pengecatan
- Cat Dinding Ex. Mowilex 40.80 M2 44,575.85 1,818,694.68 0.09% 43.38 M2 1,933,486.41 0.10% - M2 - 0.00% 84.18 M2 3,752,181.09 0.19%
PEKERJAAN KOLAM
1 Pekerjaan Tanah dan Pondasi
- Pek. Galian Tanah Pondasi 11.32 M3 107,800.00 1,220,296.00 0.06% 4.78 M3 514,947.13 0.03% - M3 - 0.00% 16.10 M3 1,735,243.13 0.09%
- Pek. Urugan Pasir bawah Lantai 0.93 M3 241,120.00 224,241.60 0.01% 0.96 M3 232,379.40 0.01% - M3 - 0.00% 1.89 M3 456,621.00 0.02%
C GARASI
1 Pek. Struktur Beton
Pek. Sloef 15x15
- Cor Beton K.225 0.25 M3 1,241,360.87 310,340.22 0.02% - M3 - 0.00% 0.10 M3 123,205.07 0.01% 0.15 M3 187,135.15 0.01%
- Pembesian 57.99 Kg 17,571.95 1,018,997.38 0.05% - Kg - 0.00% 25.37 Kg 445,799.20 0.02% 32.62 Kg 573,198.18 0.03%
- Bekisting 3.39 M2 124,839.00 423,204.21 0.02% - M2 - 0.00% 1.38 M2 172,277.82 0.01% 2.01 M2 250,926.39 0.01%
Pek. Kolom 20x20
- Cor Beton K.225 0.22 M3 1,241,360.87 273,099.39 0.01% - M3 - 0.00% 0.22 M3 273,099.39 0.01% - M3 0.00 0.00%
- Pembesian 28.15 Kg 17,571.95 494,650.39 0.03% - Kg - 0.00% 28.15 Kg 494,650.39 0.03% - Kg 0.00 0.00%
- Bekisting 4.48 M2 205,759.81 921,803.96 0.05% - M2 - 0.00% 4.48 M2 921,803.96 0.05% - M2 0.00 0.00%
Pek. Kolom Praktis 13x13 8.40 M1 91,660.92 769,951.70 0.04% - M1 - 0.00% - M1 - 0.00% 8.40 M1 769,951.70 0.04%
Pek. Balok 20x35
- Cor Beton K.225 0.32 M3 1,241,360.87 397,235.48 0.02% - M3 - 0.00% 0.32 M3 397,235.48 0.02% - M3 0.00 0.00%
- Pembesian 52.96 Kg 17,571.95 930,610.47 0.05% - Kg - 0.00% 52.96 Kg 930,610.47 0.05% - Kg 0.00 0.00%
- Bekisting 4.14 M2 211,534.81 875,754.12 0.04% - M2 - 0.00% 4.14 M2 875,754.12 0.04% - M2 0.00 0.00%
6 Pek. Pengecetan
- Cat Dinding Ex. Mowilex 34.73 M2 44,575.85 1,548,119.27 0.08% 24.73 M2 1,102,449.92 0.06% - M2 - 0.00% 59.46 M2 2,650,569.19 0.13%
- Cat Kayu 3.20 M2 60,500.00 193,600.00 0.01% - M2 - 0.00% - M2 - 0.00% 3.20 M2 193,600.00 0.01%
3 Pek. Pengecetan
- Cat Dinding Ex. Mowilex 156.80 M2 44,575.85 6,989,493.28 0.35% - M2 - 0.00% 156.80 M2 6,989,493.28 0.35% - M2 0.00 0.00%
- Cat Plafond Ex. Mowilex 436.52 M2 20,841.70 9,097,818.88 0.46% - M2 - 0.00% 436.52 M2 9,097,818.88 0.46% - M2 0.00 0.00%
- Pek. Waterproofing Dak Beton (membran bakar) 40.80 M2 185,000.00 7,548,000.00 0.38% - M2 - 0.00% 40.80 M2 7,548,000.00 0.38% - M2 0.00 0.00%
IV PEKERJAAN AKHIR
Pek. Pembersihan Lokasi Sisa Material/Bahan 1.00 Ls 3,000,000.00 3,000,000.00 0.15% - Ls - 0.00% - Ls - 0.00% 1.00 Ls 3,000,000.00 0.15%
KONTRAK AWAL PEKERJAAN TAMBAH PEKERJAAN KURANG KONTRAK AKHIR
URAIAN PEKERJAAN HARGA JUMLAH BOBOT JUMLAH BOBOT JUMLAH BOBOT JUMLAH BOBOT
VOL. SAT. VOLUME SAT. VOLUME SAT VOL. SAT
SATUAN HARGA ( Rp. ) % HARGA ( Rp. ) % HARGA ( Rp. ) % HARGA ( Rp. ) %
Dimensi
Uraian Pekerjaan Kode Panjang
(m)
1. PEKERJAAN FINSIN
DINDING INTERIOR WISMA GUBERNUR/BARUGA TAMU/WISMA A
BUPATI
C
D
I
J
O
P
T
U
X
Y
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
AK
AL
AM
AN
AO
OP
AQ
AR
AS
AT
AU
AV
DINDING DEPAN
PAGAR DEPAN
PEKERJAAN ARSITEKTUR
GEDUNG WISMA TAMU
1. Pek. Plafond Dan Instalasi Listrik
Pek. Rangka Plafond Besi Hollow, Modul Uk. 60 x 80 Cm A 8.55
6.35
8.55
9.61
12.70
12.70
26.15
B 11.70
10.30
20.32
19.60
C 3.85
1.40
1.60
4.63
4.84
6.65
21.40
20.60
D 2.85
E 1.84
4.85
F 3.85
G
H 1.85
3.85
I 4.84
J 1.59
5.25
6.15
5.84
5.90
22.32
21.60
K 4.60
L 1.72
M 1.72
N 1.34
2.34
3.65
O 1.73
P 1.72
Q 4.60
R 4.59
S 4.75
6.10
3.35
1.35
T 3.35
U 1.60
V 1.60
W 1.85
X 3.50
A1 4.60
A2 4.30
JUMLAH TOTAL LUASAN RANGKA PLAFON WISMA TAMU
Pek. Plafond Gypsum, Tbl. 9 mm A 8.55
6.35
8.55
9.61
12.70
12.70
26.15
B 11.70
10.30
20.32
19.60
C 3.85
1.40
1.60
4.63
4.84
6.65
21.40
20.60
D 2.85
E 1.84
4.85
F 3.85
G
H 1.85
3.85
I 4.84
J 1.59
5.25
6.15
5.84
5.90
22.32
21.60
K 4.60
L 1.72
M 1.72
N 1.34
2.34
3.65
O 1.73
P 1.72
Q 4.60
R 4.59
S 4.75
6.10
3.35
1.35
T 3.35
U 1.60
V 1.60
W 1.85
X 3.50
A1 4.60
A2 4.30
JUMLAH TOTAL LUASAN GYPSUM 9MM PLAFON WISMA TAMU
Pek. Plafond PVC, Ex. Shunda Plafond + Rangka Hollow A 6.75
B 5.91
C 4.05
3.05
G 1.85
J 6.50
JUMLAH TOTAL LUASAN PLAFON PVC WISMA TAMU
Pas. List Plafon Gypsum 8 cm A 5.22
0.12
0.40
0.23
0.72
6.05
0.72
0.23
0.40
0.13
5.23
5.85
B 0.13
7.60
0.13
0.12
3.72
2.00
1.00
7.00
0.13
0.13
3.00
1.23
0.13
0.13
4.60
0.13
0.12
2.38
2.88
0.13
4.90
3.20
C 2.72
0.13
0.13
2.60
0.13
0.13
2.72
2.85
D 3.72
0.13
0.12
2.73
3.85
0.13
0.13
2.85
E 7.32
5.85
6.50
0.12
0.13
1.00
0.85
6.82
F 1.35
1.85
1.35
1.85
G 0.13
3.23
1.85
0.50
2.00
2.73
0.13
0.13
3.60
0.12
H 3.43
4.85
3.23
0.20
0.13
2.30
0.13
0.12
4.60
0.18
4.75
I 3.35
4.60
3.22
0.13
0.13
4.47
J 3.35
4.60
3.35
4.60
3.35
K 1.85
4.00
2.00
2.00
2.00
1.35
4.00
3.50
1.85
4.75
4.75
L 3.35
1.75
1.50
1.60
4.85
3.35
M 1.85
1.00
2.00
3.75
0.13
0.13
2.73
3.50
1.00
1.35
N 0.13
3.23
4.60
3.35
4.48
0.13
O 0.40
0.40
0.40
0.40
1.50
1.35
1.50
1.35
2.00
2.00
1.00
1.35
1.00
3.65
3.65
1.00
1.35
1.00
P 1.35
1.73
1.35
1.73
Q 1.35
1.73
1.35
1.73
R 3.35
4.60
3.35
4.60
S 4.30
1.85
2.20
0.95
AT 1.35
1.72
1.35
1.72
AU 1.35
1.72
1.35
1.73
AV 1.35
1.60
1.35
1.60
JUMLAH TOTAL PANJANG LIST PLAFON WISMA TAMU
Pek. Pas. Down Light 6 Watt (Philips)
Pek. Pas. Down Light 10 Watt (Philips)
Pek. Pas. Down Light 15 Watt (Philips)
Pek. Pas. Down Light 15 Watt (Philips) Outbow
Pek. Pas. Lampu LED Strip
2. Pek. Interior
Pek. Wallpaper motif (bahan vinyl) A.1
A.2
A.3
A.4
A
TOTAL LUASAN PLAFON PVC/EX SUNDA PLAFON WISMA BUPATI
Pas. List Plafon Gypsum 8 cm W 2.50
6.00
1.00
1.85
0.85
0.60
1.47
3.72
10.27
X 0.72
2.85
1.00
1.17
3.00
Y 2.85
5.85
2.85
5.85
Z 5.85
1.50
4.00
13.95
1.85
1.18
13.15
AA 5.35
3.85
5.35
3.85
AB 1.85
1.85
1.85
1.85
AC 3.85
3.35
3.85
3.35
AD 1.85
1.85
1.85
1.85
AE 3.73
0.12
0.13
3.72
1.85
1.00
2.00
2.85
AF 7.51
0.22
0.13
5.60
0.23
0.72
6.13
5.85
AG 1.35
5.59
0.50
4.35
0.50
8.90
2.55
AH 0.80
14.85
4.15
4.15
1.00
AI 2.85
3.85
2.85
3.85
AJ 1.35
2.00
1.35
0.39
3.85
AK 2.95
3.00
4.00
2.00
AL 0.85
6.00
0.85
6.00
AM 0.12
5.60
0.13
0.13
3.73
5.85
3.72
0.13
AN 0.13
4.10
0.13
0.13
2.60
0.40
1.45
AO 0.40
3.72
2.00
3.00
2.13
OP 1.18
2.85
2.80
2.70
0.74
AQ 4.36
1.67
1.38
1.11
6.62
3.07
2.66
1.25
0.89
3.00
3.60
10.44
AR 4.76
3.25
2.15
1.54
AS 3.37
1.73
1.73
3.26
1.02
JUMLAH TOTAL PANJANG LIST PLAFON WISMA BUPATI
Pek. Pas. Down Light 6 Watt (Philips)
Pek. Pas. Down Light 10 Watt (Philips)
Pek. Pas. Down Light 15 Watt (Philips)
Pek. Pas. Lampu LED Strip
GEDUNG BARUGA TAMU
Pek. Plafond Dan Instalasi Listrik
Pek. Pas. Down Light 6 Watt (Philips)
Pek. Pas. Down Light 15 Watt (Philips)
Pek. Pas. Lampu LED Strip 31.10
118.40
34.22
22.48
21.56
72.72
7.64
Pek. Pas. Exhaust Fan Ceiling
Pek. Pas. Lampu Halogen 5 watt
Pek. Plafond Gypsum, Tbl. 9 mm A.1 33.92
33.92
30.16
30.70
31.10
28.28
26.38
26.86
27.34
24.50
22.62
23.10
23.56
20.74
18.84
19.32
19.80
13.50
6.28
5.22
5.34
4.40
6.60
7.20
7.80
2.20
A. JUMLAH LUAS PLAFON LINGKARAN R. POLA
10.25
2.82
14.90
3.84
B. JUMLAH LUAS PLAFON DATAR R. POLA
JUMLAH TOTAL LUAS PLAFON RUANG POLA A
Pek. Rangka Plafond Besi Hollow, Modul Uk. 60 x 80 Cm A.2 0.10
453.54
1.62 13.85
1.20 7.62
1.62 13.85
1.20 11.53
0.10 1.27
0.10 1.27
0.21 5.49
0.10 1.17
0.10 1.03
0.18 3.66
0.15 2.94
0.60 2.31
0.60 0.84
0.60 0.96
0.60 2.78
0.60 2.90
0.60 3.99
0.20 4.28
0.15 3.09
2.85 8.12
1.15 2.12
1.35 6.55
2.85 10.97
0.00
0.50 0.93
2.85 10.97
3.43 16.60
0.84 1.34
0.60 3.15
0.60 3.69
0.60 3.50
0.60 3.54
0.18 4.02
0.15 3.24
3.35 15.41
1.35 2.32
1.35 2.32
1.00 1.34
1.34 3.14
1.35 4.93
1.35 2.34
1.35 2.32
3.35 15.41
3.35 15.38
1.85 8.79
1.85 11.29
2.00 6.70
2.00 2.70
3.35 11.22
1.35 2.16
1.35 2.16
1.35 2.50
2.85 9.98
3.35 15.41
1.84 7.91
309.28
1.62 13.85
1.20 7.62
1.62 13.85
1.20 11.53
0.10 1.27
0.10 1.27
0.21 5.49
0.10 1.17
0.10 1.03
0.18 3.66
0.15 2.94
0.60 2.31
0.60 0.84
0.60 0.96
0.60 2.78
0.60 2.90
0.60 3.99
0.20 4.28
0.15 3.09
2.85 8.12
1.15 2.12
1.35 6.55
2.85 10.97
0.00
0.50 0.93
2.85 10.97
3.43 16.60
0.84 1.34
0.60 3.15
0.60 3.69
0.60 3.50
0.60 3.54
0.18 4.02
0.15 3.24
3.35 15.41
1.35 2.32
1.35 2.32
1.00 1.34
1.34 3.14
1.35 4.93
1.35 2.34
1.35 2.32
3.35 15.41
3.35 15.38
1.85 8.79
1.85 11.29
2.00 6.70
2.00 2.70
3.35 11.22
1.35 2.16
1.35 2.16
1.35 2.50
2.85 9.98
3.35 15.41
1.84 7.91
309.28
6.75 45.56
5.51 32.56
5.05 20.45
2.00 6.10
1.35 2.50
5.10 33.15
140.33
1.00 5.22
1.00 0.12
1.00 0.40
1.00 0.23
1.00 0.72
1.00 6.05
1.00 0.72
1.00 0.23
1.00 0.40
1.00 0.13
1.00 5.23
1.00 5.85
1.00 0.13
1.00 7.60
1.00 0.13
1.00 0.12
1.00 3.72
1.00 2.00
1.00 1.00
1.00 7.00
1.00 0.13
1.00 0.13
1.00 3.00
1.00 1.23
1.00 0.13
1.00 0.13
1.00 4.60
1.00 0.13
1.00 0.12
1.00 2.38
1.00 2.88
1.00 0.13
1.00 4.90
1.00 3.20
1.00 2.72
1.00 0.13
1.00 0.13
1.00 2.60
1.00 0.13
1.00 0.13
1.00 2.72
1.00 2.85
1.00 3.72
1.00 0.13
1.00 0.12
1.00 2.73
1.00 3.85
1.00 0.13
1.00 0.13
1.00 2.85
1.00 7.32
1.00 5.85
1.00 6.50
1.00 0.12
1.00 0.13
1.00 1.00
1.00 0.85
1.00 6.82
1.00 1.35
1.00 1.85
1.00 1.35
1.00 1.85
1.00 0.13
1.00 3.23
1.00 1.85
1.00 0.50
1.00 2.00
1.00 2.73
1.00 0.13
1.00 0.13
1.00 3.60
1.00 0.12
1.00 3.43
1.00 4.85
1.00 3.23
1.00 0.20
1.00 0.13
1.00 2.30
1.00 0.13
1.00 0.12
1.00 4.60
1.00 0.18
1.00 4.75
1.00 3.35
1.00 4.60
1.00 3.22
1.00 0.13
1.00 0.13
1.00 4.47
1.00 3.35
1.00 4.60
1.00 3.35
1.00 4.60
1.00 3.35
1.00 1.85
1.00 4.00
1.00 2.00
1.00 2.00
1.00 2.00
1.00 1.35
1.00 4.00
1.00 3.50
1.00 1.85
1.00 4.75
1.00 4.75
1.00 3.35
1.00 1.75
1.00 1.50
1.00 1.60
1.00 4.85
1.00 3.35
1.00 1.85
1.00 1.00
1.00 2.00
1.00 3.75
1.00 0.13
1.00 0.13
1.00 2.73
1.00 3.50
1.00 1.00
1.00 1.35
1.00 0.13
1.00 3.23
1.00 4.60
1.00 3.35
1.00 4.48
1.00 0.13
1.00 0.40
1.00 0.40
1.00 0.40
1.00 0.40
1.00 1.50
1.00 1.35
1.00 1.50
1.00 1.35
1.00 2.00
1.00 2.00
1.00 1.00
1.00 1.35
1.00 1.00
1.00 3.65
1.00 3.65
1.00 1.00
1.00 1.35
1.00 1.00
1.00 1.35
1.00 1.73
1.00 1.35
1.00 1.73
1.00 1.35
1.00 1.73
1.00 1.35
1.00 1.73
1.00 3.35
1.00 4.60
1.00 3.35
1.00 4.60
1.00 4.30
1.00 1.85
1.00 2.20
1.00 0.95
1.00 1.35
1.00 1.72
1.00 1.35
1.00 1.72
1.00 1.35
1.00 1.72
1.00 1.35
1.00 1.73
1.00 1.35
1.00 1.60
1.00 1.35
1.00 1.60
366.46
43.00
12.00
14.00
2.00
95.53
50.50
7.47 72.61
0.80 4.97
155.15
7.47 72.61
0.80 4.97
77.58
0.17
4.88
0.95
3.85
1.00
6.00
1.97
1.00
2.88
1.00
10.25
1.00
2.90
1.00
1.90
6.00
1.00
3.85
0.95
4.95
0.10
4.67
0.13
16.00 105.60
16.00 105.60
273.60
3.72
0.08
0.18
4.60
0.13
0.08
3.38
0.54
4.65
17.36
3.73 14.92
0.67 1.53
2.00 2.00 3.20
32.13
PLAFON WISMA TAMU 309.28
PLAFON BARU TAMU/ASPIRASI 582.57
PLAFON WISMA BUPATI 315.78
1.00 313.04
1533.16
1.60 0.60 6.00 5.76
1.00 1.00 1.00
0.60 0.80 0.48
1.00 2.00 2.00
1.20 0.20 0.24
21.96
11.03
/ Kemiringan
/ 0.89 1735.82
buah
43.00
12.00
14.00
2.00
95.53
51.00
6.00
17.00
209.28
7.00
84.00
308.12
4.00
62.00
582.57
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
PLAFON LIST
309.28 778.50
315.78 18.70
313.04 23.90
288.75 259
22.66 1,080.10
22.66
1272.18
549
0.04
Nama Kegiatan : Peningkatan/Rehab. Bangunan dan Lingkungan Gedung
Pekerjaan : Rehabilitasi Interior Rujab Bupati
Lokasi : Kecamatan Pangkajene
Nomor Kontrak :
Nomor Kontrak ADD I :
Tanggal Kontrak :
Tanggal Kontrak ADD I :
Tahun Anggaran : 2022
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
I PEKERJAAN PERSIAPAN
1 Pek. Pengukuran Volume Kontrak = 1.00 LS
Volume MC = 1.00 LS
1248
1248
30 0
428
27 4
632
1248
1248
30 0
428
428
27 4
BACK UP DATA
632
4 75
1160
1160
1160
1160
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
1500
6 Pek. Penggantian Lesplank Woodplank, Uk. 2 x 30 Cm Volume Kontrak = 317.00 M1 KODE P (1) + P (2) VOLUME 1315
877
877
5 20
1400
640
D.6 8.77 = 8.77 520
KODE P VOLUME
E.1 14.49 = 14.49
E.2 14.49 = 14.49
E.3 11.32 = 11.32
E.4 13.31 = 13.31
E.5 12.22 = 12.22
E.6 12.22 = 12.22
E.7 10.97 = 10.97
E.8 10.97 = 10.97
E.9 10.68 = 10.68
E.10 10.78 = 10.78
E.11 20.00 = 20.00
E.12 20.00 = 20.00
E.13 8.11 = 8.11
E.14 5.68 = 5.68
E.15 2.87 = 2.87
E.16 2.79 = 2.79
E.17 5.42 = 5.42
E.18 6.89 = 6.89
E.19 15.00 = 15.00
E.20 15.00 = 15.00
E.21 9.49 = 9.49
E.22 9.49 = 9.49
E.23 7.31 = 7.31
SUB TOTAL VOLUME PEMASANGAN LESPLANK = 249.50 M1
B PEKERJAAN ARSITEKTUR
GEDUNG WISMA TAMU
1 Pek. Rangka Plafond Besi Hollow, Modul Uk. 60 x 80 Cm Volume Kontrak = 98.17 M2
Volume MC = 49.00 M2 B
KODE P x L = VOLUME A
A 6.72 x 6.72 = 45.16
1.00 x 1.34 = 1.34
B 1.35 x 1.85 = 2.50
SUB TOTAL VOLUME PEMASANGAN RANGKA PLAFON = 49.00 M2
KODE P x L VOLUME
A 8.55 x 1.62 = 13.85
6.35 x 1.20 = 7.62
8.55 x 1.62 = 13.85
9.61 x 1.20 = 11.53
12.70 x 0.10 = 1.27
12.70 x 0.10 = 1.27
26.15 x 0.21 = 5.49
B 11.70 x 0.10 = 1.17
10.30 x 0.10 = 1.03
20.32 x 0.18 = 3.66
19.60 x 0.15 = 2.94
C 3.85 x 0.60 = 2.31
1.40 x 0.60 = 0.84
1.60 x 0.60 = 0.96
4.63 x 0.60 = 2.78
4.84 x 0.60 = 2.90
6.65 x 0.60 = 3.99
21.40 x 0.20 = 4.28
20.60 x 0.15 = 3.09
D 2.85 x 2.85 = 8.12
E 1.84 x 1.15 = 2.12
4.85 x 1.35 = 6.55
F 3.85 x 2.85 = 10.97
G 0.00 x 0.00 = 0.00
H 1.85 x 0.50 = 0.93
3.85 x 2.85 = 10.97
I 4.84 x 3.43 = 16.60
J 1.59 x 0.84 = 1.34
5.25 x 0.60 = 3.15
6.15 x 0.60 = 3.69
5.84 x 0.60 = 3.50
5.90 x 0.60 = 3.54
22.32 x 0.18 = 4.02
21.60 x 0.15 = 3.24
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
KODE P x L = VOLUME
A 6.75 x 6.75 = 45.56
B 5.91 x 5.51 = 32.56
C 4.05 x 5.05 = 20.45
3.05 x 2.00 = 6.10
G 1.85 x 1.35 = 2.50
J6.50 x 5.10 = 33.15
SUB TOTAL VOLUME PEMASANGAN RANGKA PLAFON = 140.33 M2
8 Pek. Pas. Down Light 15 Watt (Philips) Outbow VOLUME KONTRA = 2.00 BH
VOLUME MC = 2.00 BH
KODE P x L VOLUME
A.1 6.34 x 4.00 = 25.36
0.12 x 4.00 = 0.48
0.22 x 4.00 = 0.88
6.04 x 4.00 = 24.16
0.23 x 4.00 = 0.92
0.13 x 4.00 = 0.52
6.34 x 4.00 = 25.36
5.85 x 4.00 = 23.40
A.2 7.85 x 4.00 = 31.40
3.85 x 4.00 = 15.40
2.00 x 4.00 = 8.00
1.00 x 4.00 = 4.00
6.99 x 4.00 = 27.96
3.00 x 4.00 = 12.00
1.34 x 4.00 = 5.36
4.85 x 4.00 = 19.40
2.50 x 4.00 = 10.00
3.00 x 4.00 = 12.00
A.3 3.85 x 4.00 = 15.40
2.84 x 4.00 = 11.36
3.84 x 4.00 = 15.36
0.13 x 4.00 = 0.52
0.12 x 4.00 = 0.48
2.85 x 4.00 = 11.40
A.4 7.35 x 4.00 = 29.40
5.84 x 4.00 = 23.36
6.50 x 4.00 = 26.00
0.12 x 4.00 = 0.48
0.13 x 4.00 = 0.52
1.00 x 4.00 = 4.00
0.84 x 4.00 = 3.36
6.85 x 4.00 = 27.40
JUMLAH LUSASAN WALLPAPER = 415.64 M2
- Luasan Kusen Pintu Jendela KODE L x T x BUAH
P1 1.90 x 2.45 x 4.00 = 18.62
J1 0.86 x 2.70 x 4.00 = 9.29
J2 2.00 x 2.65 x 2.00 = 10.60
J3 1.85 x 2.20 x 1.00 = 4.07
P2 0.92 x 2.50 x 4.00 = 9.20
P3 0.85 x 2.12 x 2.00 = 3.60
JUMLAH LUSASAN KUSEN = 55.38 M2
SUB TOTAL VOLUME PEMASANGAN WALLPAPER = 360.26 M2
KODE = VOLUEM
P1 = 4.00
P2 = 8.00
KODE = VOLUEM
P1 = 3.00
P2 = -
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
505
28.28 x 0.60 = 16.97
26.38 x 0.20 = 5.28
26.86 x 0.15 = 4.03
27.34 x 0.20 = 5.47 TR TR
VOLUME MC = 582.57 M2
505
28.28 x 0.60 = 16.97
26.38 x 0.20 = 5.28
26.86 x 0.15 = 4.03
27.34 x 0.20 = 5.47 TR TR
- Pek. Plafond PVC, Ex. Shunda Plafond + Rangka Hollow VOLUME KONTR = 107.20 M2
VOLUME MC = 18.62 M2
KODE P x L = VOLUME
A.1 4.90 3.80 = 18.62
SUB TOTAL VOLUME PEMASANGAN PLAFON PVC = 18.62 M2
490
376
KODE P = VOLUME
A.2 3.72 = 3.72
0.08 = 0.08
0.18 = 0.18
4.60 = 4.60
0.13 = 0.13 490
0.08 = 0.08
3.38 = 3.38
376
0.58 = 0.58
4.65 = 4.65
SUB TOTAL VOLUME PEMASANGAN LIST PLAFON PVC = 17.40 M
3.85 = 3.85
1.00 = 1.00
6.00 = 6.00
1.97 = 1.97
1.00 = 1.00
2.88 = 2.88
1.00 = 1.00
10.25 = 10.25
1.00 = 1.00
2.90 = 2.90
1.00 = 1.00
1.90 = 1.90
6.00 = 6.00
1.00 = 1.00
3.85 = 3.85
0.95 = 0.95
4.95 = 4.95
0.10 = 0.10
4.67 = 4.67
0.13 = 0.13
6.60 x 16.00 = 105.60
6.60 x 16.00 = 105.60
SUB TOTAL VOLUME PEMASANGAN LIST PLAFON GYPSUM = 273.60 M
-
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR
BACK UP DATA
QUANTITY MHUTUAL CHECK (MC 0) RUMAH JABATAN BUPATI
No URAIAN KEGIATAN PERHITUNGAN GAMBAR