B1 Peralatan Utama
1 Septic Tank, Kap : 3 M3 unit 1,00 10.725.000 10.725.000 2,274%
2 Sumur Resapan unit 1,00 2.726.035 2.726.035 0,578%
3 Bak Kontrol ( 300 x 300 x 400 mm ) unit 1,00 1.822.106 1.822.106 0,386%
HARGA
JUMLAH HARGA BOBOT
NO URAIAN PEKERJAAN SAT VOLUME SATUAN
(%)
Rp.
Rp
2 Fiting-fiting, klem, support dan gantungan serta finishing lot 1,00 715.000 715.000 0,152%
3 Roof Drain Φ 4" lot 2,00 145.574 291.148 0,062%
Sub Total 27.493.406 5,829%
V PEKERJAAN PAGAR DEPAN
1 Galian Tanah Pondasi Batu Kali m3 3,85 111.540 429.429 0,091%
2 Pas.Anstamping m3 1,10 373.230 410.553 0,087%
3 Pas.Pondasi Batukali m3 3,85 1.215.500 4.679.675 0,992%
4 Pek.Lantai Kerja m3 0,65 1.930.500 1.254.825 0,266%
5 Pondasi Cakar Ayam m3 0,63 8.294.000 5.225.220 1,108%
6 Pas.Sloof m1 0,50 8.294.000 4.105.530 0,870%
7 Pas.Kolom Uk.40 x 40cm m3 1,80 8.294.000 14.929.200 3,165%
8 Pas.Dinding Hebel m2 33,00 193.050 6.370.650 1,351%
9 Plester + Acian m2 66,00 122.980 8.116.680 1,721%
10 Finishing Kolom m1 20,00 307.450 6.149.000 1,304%
11 Urugan Kembali m3 2,73 64.350 175.354 0,037%
12 Pek.Balok Uk.15 x 30cm m3 0,50 8.294.000 4.105.530 0,870%
13 Ban - banan Pagar m1 132,00 45.760 6.040.320 1,281%
14 Pas.Dindng Batu Andesit m2 45,00 679.250 30.566.250 6,481%
15 Pot Bunga + Ornamen lot 1,00 14.300.000 14.300.000 3,032%
16 Pengecatan Dnding Pagar Bagian dalam m2 33,00 74.360 2.453.880 0,520%
Sub Total 109.312.096 23,178%
471.629.741 100,000%