BILL OF QUANTITY
HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN JUMLAH BOBOT
SATUAN
1 PEKERJAAN TANAH ###
1 Galian Tanah Untuk Pondasi 29.8750 M3
81,875.00 2,446,015.63 1.50%
2 Mengurug Kembali Bekas Galian 7.4688 M3 58,750.00 438,789.06 0.27%
3 Urugan Pasir dibawah Pondasi 2.3125 M3 343,550.00 794,459.38 0.49%
4 Timbunan Tanah dibawah Lantai dipadatkan 6.6000 M3 58,750.00 387,750.00 0.24%
5 Urugan Pasir dibawah Lantai 2.7500 M3 343,550.00 944,762.50 0.58%
PINT
5,011,776.56 3.08%
2 PEKERJAAN PASANGAN / BETON ###
1 Pasang dinding bata 1:3 32.30 M3 902,440.00 29,148,812.00 17.91%
2 Pasang dinding bata 1:5 83.90 M2 133,464.00 11,197,629.60 6.88%
3 Plesteran 1 : 5 tebal 15 mm 168.00 M2 58,012.00 9,746,016.00 5.99%
4 Acian 168.00 M2 40,924.00 6,875,232.00 4.22%
5 Pek. Beton Bertulang :
- Sloof 15/15 1.0463 M' 3,151,172.00 3,296,913.71 2.03%
- Kolom Total 0.8320 M' 3,151,172.00 2,621,775.10 1.61%
- Plat Lisplank teras 4.4000 M3 3,151,172.00 13,865,156.80 8.52%
- Balok Total 1.3516 M' 3,151,172.00 4,259,124.08 2.62%
- beton profil keliling jendela 0.10 M3 3,151,172.00 321,419.54 0.20%
10 kolom teras 50 x 15 cm 0.39 M3 3,151,172.00 1,228,957.08 0.76%
82,561,035.91 50.73%
3 PEKERJAAN KAYU DAN PENUTUP ATAP
1 Kosen Pintu (P1), (PJ1) 12.5904 M3 3,361,500.00 42,322,629.60 26.00%
3 Kosen pintu (P2)(Lapis Plat Alumunium) 1.71 M' 112,534.00 192,208.07 0.12%
4 Jendel (J1),(J2),(j3) 13.98 M2 364,842.50 5,100,133.31 3.13%
Atap Genteng Nok 7 m1 30,000.00 210,000.00
Atap Genteng Nok Ujug 2 bh 30,000.00 60,000.00
Genteng Flashing 4 m1 72,000.00 288,000.00
Listplank 2 x 2.5 x 15 ( woodplank ) 10 m1 62,000.00 620,000.00
Beton Flashing Pinggir beton 24 m1 36,000.00 864,000.00
49,656,970.98 29.26%
4 Aksesoris Pintu dan Jendela
1 Kunci Set Pintu Utama 1 bh 170,000.00 170,000.00 0.10%
2 Engsel Pintu 4" 3 bh 12,000.00 36,000.00 0.02%
3 Kunci Pintu Kamar 1 bh 19,000.00 19,000.00 0.01%
4 Engsel Pintu 4" 12 bh 47,000.00 564,000.00 0.35%
5 Kunci Pintu KM/WC 1 bh 19,000.00 19,000.00 0.01%
6 Engsel Jendela 12 bh 142,000.00 1,704,000.00 1.05%
7 Rambucis 12 bh 50,000.00 600,000.00 0.37%
8 Tarikan Jendela 12 bh 50,000.00 600,000.00 0.37%
3,712,000.00 2.28%
5 PEKERJAAN CAT -
1 Cat Dinding 2x Termasuk 1x Plamir (Baru) 260.00 M2 60,179.00 15,646,540.00 9.61%
2 Cat Plafond 2x Termasuk 1x Plamir (Baru) 47.50 M2 60,179.00 2,858,502.50 1.76%
3 Cat Pintu, Jendela, Kosen 25.79 M2 45,482.50 1,172,766.26 0.72%
19,677,808.76 12.09%
6 PEKERJAAN INSTALASI LISTRIK
1 Titik Lampu + Instalasi 19.00 Bh 60,000.00 1,140,000.00 0.70%
2 Lampu Jari - jari 14 Watt 7.00 Bh 50,000.00 350,000.00 0.22%
3 Saklar Tunggal 1.00 Bh 20,000.00 20,000.00 0.01%
4 Saklar Ganda 2.00 Bh 32,100.00 64,200.00 0.04%
5 Saklar Tunggal Dobel Stop Kontak 4.00 Bh 35,000.00 140,000.00 0.09%
6 Box MCB 1.00 Bh 15,000.00 15,000.00 0.01%
7 MCB 6A 2.00 Bh 100,000.00 200,000.00 0.12%
8 Kabel NYM 2 x 2.25 mm 2.00 M1 7,000.00 14,000.00 0.01%
9 Kabel NYM 4 x 4 mm 8.00 M1 5,500.00 44,000.00 0.03%
10 Pipa Listrik 1/2'' 20.00 BTG 7,500.00 150,000.00 0.09%
2,137,200.00 1.31%
###
ADM
PERENCANAAN WAKTU PE
96.70% 96.95%
95.64% 95.64%
94.92%
93.16%
2.99%
4.22%
8.52%
2.62%
0.20%
0.00%
53.81%
0.76%
26.00% 53.81%
0.12%
3.13%
45.29% 0.10%
0.01% 0.01%
0.01%
0.35%
0.00%
34.50%
9.61%
1.76%
28.07% 0.72%
0.70%
23.01%
0.22%
0.01%
0.04%
0.09%
0.00%
0.01%
0.12%
0.01%
0.03%
0.09%
0.00%
0.00%
10.79% 8.52% 29.26% 0.00% 0.00% 0.00% 0.12% 0.01% 0.36% 9.61% 1.76% 0.72% 0.00% 1.06% 0.25%
45.29% 53.81% 83.06% 83.06% 83.06% 83.06% 83.18% 83.19% 83.55% 93.16% 94.92% 95.64% 95.64% 96.70% 96.95%
KET.
96.95%
PT. TUGAS ADKON
Manado,
ANALISA HARGA SATUAN
1. PEKERJAAN TANAH
A Tenaga
1 Pekerja oh 0.7500 105,000.00 78,750.00
2 Mandor oh 0.0250 125,000.00 3,125.00
Jumlah Harga Tenaga 81,875.00
B Bahan
-
-
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 81,875.00
E Overhead & Profit 15 %
F Total Harga 81,875.00
A Tenaga
1 Pekerja oh 0.5000 105,000.00 52,500.00
2 Mandor oh 0.0500 125,000.00 6,250.00
Jumlah Harga Tenaga 58,750.00
B Bahan
-
-
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 58,750.00
E Overhead & Profit 15 %
F Total Harga 58,750.00
A Tenaga
1 Pekerja oh 0.3000 105,000.00 31,500.00
2 Mandor oh 0.0100 125,000.00 1,250.00
Jumlah Harga Tenaga 32,750.00
B Bahan -
1 Pasir Pasang m3 1.2000 259,000.00 310,800.00
-
Jumlah Harga Bahan 310,800.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 343,550.00
E Overhead & Profit 15 %
F Total Harga 343,550.00
1.4. Pemadatan tanah 1 m3 tanah ( per 20 cm)
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.5000 105,000.00 52,500.00
2 Mandor oh 0.0500 125,000.00 6,250.00
Jumlah Harga Tenaga 58,750.00
B Bahan
-
-
Jumlah Harga Bahan -
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 58,750.00
E Overhead & Profit 15 %
F Total Harga 58,750.00
A Tenaga
1 Pekerja oh 1.5000 105,000.00 157,500.00
2 Tukang Batu oh 0.7500 130,000.00 97,500.00
3 Kepala tukang oh 0.0750 155,000.00 11,625.00
4 Mandor oh 0.0750 125,000.00 9,375.00
Jumlah Harga Tenaga 276,000.00
B Bahan
1 Batu Belah m3 1.2000 260,800.00 312,960.00
2 Semen kg 136.0000 1,269.00 172,584.00
3 Pasir Pasang m3 0.5440 259,000.00 140,896.00
Jumlah Harga Bahan 626,440.00
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 902,440.00
E Overhead & Profit 15 %
F Total Harga 902,440.00
A Tenaga
1 Pekerja oh 0.3200 105,000.00 33,600.00
2 Tukang Batu oh 0.1000 130,000.00 13,000.00
3 Kepala tukang oh 0.0100 155,000.00 1,550.00
4 Mandor oh 0.0150 125,000.00 1,875.00
Jumlah Harga Tenaga 50,025.00
B Bahan
1 Bata merah m3 70.0000 850.00 59,500.00
2 Semen kg 9.6800 1,269.00 12,283.92
3 Pasir Pasang m3 0.0450 259,000.00 11,655.00
A Tenaga
1 Pekerja oh 0.2000 105,000.00 21,000.00
2 Tukang batu oh 0.1500 130,000.00 19,500.00
3 Kepala tukang oh 0.0150 155,000.00 2,325.00
4 Mandor oh 0.0150 125,000.00 1,875.00
Jumlah Harga Tenaga 44,700.00
B Bahan
1 Semen kg 5.1840 1,269.00 6,578.50
2 Pasir Pasang m3 0.0260 259,000.00 6,734.00
A Tenaga
1 Pekerja oh 0.2000 105,000.00 21,000.00
2 Tukang Batu oh 0.1000 130,000.00 13,000.00
3 Kepala tukang oh 0.0100 155,000.00 1,550.00
4 Mandor oh 0.0100 125,000.00 1,250.00
Jumlah Harga Tenaga 36,800.00
B Bahan
1 Semen kg 3.2500 1,269.00 4,124.25
A Tenaga
1 Pekerja oh 0.2970 105,000.00 31,185.00
2 Tukang batu oh 0.0330 130,000.00 4,290.00
3 Tukang kayu oh 0.0330 130,000.00 4,290.00
4 Tukang besi oh 0.0330 130,000.00 4,290.00
5 Kepala tukang oh 0.0100 155,000.00 1,550.00
6 Mandor oh 0.0150 125,000.00 1,875.00
Jumlah Harga Tenaga 47,480.00
B Bahan
1 Kayu kls 3 m3 0.0030 4,500,000.00 13,500.00
2 Paku kg 0.0200 24,000.00 480.00
3 Besi beton kg 3.6000 6,355.14 22,878.50
4 Kawat beton kg 0.0500 24,000.00 1,200.00
5 Semen kg 5.5000 1,269.00 6,979.50
6 Pasir Pasang m3 0.0900 259,000.00 23,310.00
7 Kerikil m3 0.0150 485,145.42 7,277.18
Jumlah Harga Bahan 75,625.19
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 123,105.19
E Overhead & Profit 15 %
F Total Harga 123,105.00
A Tenaga
1 Pekerja oh 0.1800 105,000.00 18,900.00
2 Tukang batu oh 0.0200 130,000.00 2,600.00
Tukang kayu oh 0.0200 130,000.00 2,600.00
Tukang besi oh 0.0200 130,000.00 2,600.00
3 Kepala tukang oh 0.0060 155,000.00 930.00
4 Mandor oh 0.0080 125,000.00 1,000.00
Jumlah Harga Tenaga 28,630.00
B Bahan
1 Kayu kls 3 m3 0.0200 4,500,000.00 90,000.00
2 Paku kg 0.0100 24,000.00 240.00
3 Besi beton kg 3.0000 6,355.14 19,065.42
4 Kawat beton kg 0.4500 24,000.00 10,800.00
5 Semen kg 4.0000 1,269.00 5,076.00
6 Pasir Pasang m3 0.0060 259,000.00 1,554.00
7 Kerikil m3 0.0080 485,145.42 3,881.16
Jumlah Harga Bahan 126,735.42
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 155,365.42
E Overhead & Profit 15 %
F Total Harga 155,365.00
A Tenaga
1 Pekerja oh 2.8250 105,000.00 296,625.00
2 Tukang batu oh 0.2750 130,000.00 35,750.00
3 Tukang kayu oh 0.2750 130,000.00 35,750.00
4 Tukang besi oh 0.2750 130,000.00 35,750.00
5 Kepala tukang oh 0.2830 155,000.00 43,865.00
6 Mandor oh 0.2830 125,000.00 35,375.00
Jumlah Harga Tenaga 483,115.00
B Bahan
1 Kayu kls 3 m3 0.2700 4,500,000.00 1,215,000.00
2 Paku kg 0.2000 24,000.00 4,800.00
3 Besi beton kg 157.5000 6,355.14 1,000,934.58
4 Kawat beton kg 1.5000 24,000.00 36,000.00
5 Semen kg 218.0000 1,269.00 276,642.00
6 Pasir Pasang m3 0.5200 259,000.00 134,680.00
7 Kerikil m3 0.8700 485,145.42 422,076.52
Jumlah Harga Bahan 2,668,056.58
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 3,151,171.58
E Overhead & Profit 15 %
F Total Harga 3,151,172.00
2.8. Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.2970 105,000.00 31,185.00
2 Tukang batu oh 0.0330 130,000.00 4,290.00
3 Tukang kayu oh 0.0330 130,000.00 4,290.00
4 Tukang besi oh 0.0330 130,000.00 4,290.00
5 Kepala tukang oh 0.0100 155,000.00 1,550.00
6 Mandor oh 0.0150 125,000.00 1,875.00
Jumlah Harga Tenaga 47,480.00
B Bahan
1 Kayu kls 3 m3 0.0030 4,500,000.00 13,500.00
2 Paku kg 0.0200 24,000.00 480.00
3 Besi beton kg 3.6000 6,355.14 22,878.50
4 Kawat beton kg 0.0500 24,000.00 1,200.00
5 Semen kg 5.5000 1,269.00 6,979.50
6 Pasir Pasang m3 0.0900 259,000.00 23,310.00
7 Kerikil m3 0.0150 485,145.42 7,277.18
Jumlah Harga Bahan
C Peralatan
-
Jumlah Harga Peralatan -
D Jumlah (A+B+C) 47,480.00
E Overhead & Profit 15 %
F Total Harga 47,480.00
3.1. 1M2 Pasang konstruksi kuda-kuda baja ringan (utk type 70)
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Upah
1 Pekerja oh 0.1400 105,000.00 14,700.00
2 Tukang Kayu oh 0.0670 130,000.00 8,710.00
3 Kepala Tukang oh 0.0070 155,000.00 1,085.00
24,495.00
B Bahan
1 Profil pc 75 m' 3.2260 15,000.00 48,390.00
2 Reng GDC m' 3.1000 6,666.67 20,666.67
3 Screw Truss bh 2.2550 300.00 676.50
4 Screw reng bh 2.2550 250.00 563.75
5 Dynabolt bh 7.0000 1,500.00 10,500.00
Jumlah Harga Bahan 80,796.92
c Peralatan
1 Alat Bantu m2 -
Jumlah Harga Peralatan -
Total 105,291.92
Keuntungan max 10%
Total Harga 105,292.00
3.2. 1M2 Pasang Atap Genteng onduline 200 x 95 cm
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.1400 105,000.00 14,700.00
2 Tukang Kayu oh 0.0670 130,000.00 8,710.00
3 Kepala Tukang oh 0.0070 155,000.00 1,085.00
4 Mandor 0h 0.0070 125,000.00 875.00
Jumlah Harga Tenaga 25,370.00
B Bahan
1 genteng onduline m2 0.5789 157,000.00 90,887.30
2 Screw bh 25.0000 1,000.00 25,000.00
Jumlah Harga Bahan 115,887.30
c Peralatan
1 Alat Bantu ls -
Jumlah Harga Peralatan -
Total 141,257.30
Keuntungan max 10%
Total Harga 141,257.00
A Tenaga
1 Pekerja oh 0.1400 105,000.00 14,700.00
2 Tukang Kayu oh 0.0670 130,000.00 8,710.00
3 Kepala Tukang oh 0.0070 155,000.00 1,085.00
4 Mandor 0h 0.0070 125,000.00 875.00
Jumlah Harga Tenaga 25,370.00
B Bahan
1 Nok onduline m' 1.0200 95,000.00 96,900.00
2 screw bh 20.0000 1,000.00 20,000.00
Jumlah Harga Bahan 116,900.00
c Peralatan
1 Alat Bantu ls -
Jumlah Harga Peralatan -
Total 142,270.00
Keuntungan max 10%
Total Harga 142,270.00
A Tenaga
1 Pekerja oh 0.0900 105,000.00 9,450.00
2 Tukang Kayu oh 0.0600 130,000.00 7,800.00
3 Kepala Tukang oh 0.0200 155,000.00 3,100.00
4 Mandor 0h 0.0450 125,000.00 5,625.00
Jumlah Harga Tenaga 25,975.00
B Bahan
1 Papan Listplank GRC m' 1.0200 35,416.67 36,125.00
2 Paku screw GRC bh 4.0000 250.00 1,000.00
Jumlah Harga Bahan 37,125.00
c Peralatan
1 Alat Bantu ls 1 1,000.00 1,000.00
Jumlah Harga Peralatan 1,000.00
Total 64,100.00
Keuntungan max 10%
Total Harga 64,100.00
3.5. 1M2 Pasang Plafoon GRC + rangka
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.1000 105,000.00 10,500.00
2 Tukang Kayu oh 0.0500 130,000.00 6,500.00
3 Kepala Tukang oh 0.0050 155,000.00 775.00
4 Mandor oh 0.0050 125,000.00 625.00
Jumlah Harga Tenaga 18,400.00
B Bahan
1 GRC 3 mm lbr 0.3640 65,000.00 23,660.00
2 Baut GRC bh 16.0000 250.00 4,000.00
3 Dynabolt bh 4.0000 1,500.00 6,000.00
4 hollow 4/4 btg 0.4150 78,615.38 32,625.38
5 hollow 2/4 btg 0.1500 57,175.00 8,576.25
6 Cotton Plaster bh 0.0720 15,000.00 1,080.00
7 Compoun zak 0.1250 11,815.00 1,476.88
Jumlah Harga Bahan 77,418.51
c Peralatan
1 Alat Bantu ls 1.0000 1,000.00 1,000.00
Jumlah Harga Peralatan 1,000.00
Total 96,818.51
Keuntungan max 10%
Total Harga 96,818.51
3.6.Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 6.0000 105,000.00 630,000.00
2 Tukang Kayu oh 18.0000 130,000.00 2,340,000.00
3 Kepala Tukang oh 1.8000 155,000.00 279,000.00
4 Mandor oh 0.3000 125,000.00 37,500.00
Jumlah Harga Tenaga 3,286,500.00
B Bahan
1 Balok Kayu m3 1.1000 - -
2 Paku kg 1.2500 24,000.00 30,000.00
3 Lem kayu kg 1.0000 45,000.00 45,000.00
3.7. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm)
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.7000 105,000.00 73,500.00
2 Tukang Kayu oh 1.1000 130,000.00 143,000.00
3 Kepala Tukang oh 0.2100 155,000.00 32,550.00
4 Mandor oh 0.0350 125,000.00 4,375.00
Jumlah Harga Tenaga 253,425.00
B Bahan
1 Balok Kayu m3 0.0250 - -
2 Paku kg 0.0300 24,000.00 720.00
3 Lem kayu kg 0.0000 45,000.00 -
4 Plywood uk. 90 x 220 lbr 1.0000 78,000.00 78,000.00
Jumlah Harga Bahan 78,720.00
C Peralatan
1 Alat Bantu ls 1.0000 -
Jumlah Harga Peralatan -
Total 332,145.00
Keuntungan max 10%
Total Harga 332,145.00
A Tenaga
1 Pekerja oh 0.800 105,000.00 84,000.00
2 Tukang Kayu oh 1.000 130,000.00 130,000.00
3 Kepala Tukang oh 0.200 155,000.00 31,000.00
4 Mandor oh 0.040 125,000.00 5,000.00
Jumlah Harga Tenaga 250,000.00
B Bahan
1 Papan Kayu kls II m3 0.0350 7,000,000.00 245,000.00
2. TENAGA
Pekerja Oh 1.000 105,000.00 105,000.00
Tukang Kayu Oh 2.500 130,000.00 325,000.00
Kepala Tukang Oh 0.250 155,000.00 38,750.00
Mandor Oh 0.050 125,000.00 6,250.00
JUMLAH 475,000.00
JUMLAH (1) + (2) 7,488,500.00
3.10. 1 m2 Pasang Kaca, Tebal 3 mm
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.800 105,000.00 84,000.00
2 Tukang Kayu oh 1.000 130,000.00 130,000.00
3 Kepala Tukang oh 0.200 155,000.00 31,000.00
4 Mandor oh 0.040 125,000.00 5,000.00
Jumlah Harga Tenaga 250,000.00
B Bahan
1 Kaca Bening 5 mm m2 1.1000 179,025.00 196,927.50
2. TENAGA
Pekerja Oh 0.021 105,000.00 2,205.00
Tukang Kayu Oh 0.021 130,000.00 2,730.00
Kepala Tukang Oh 0.002 155,000.00 310.00
Mandor Oh 0.001 125,000.00 125.00
JUMLAH 5,370.00
JUMLAH (1) + (2) 8,703.33
4. PEKERJAAN LANTAI
A Tenaga
1 Pekerja oh 0.700 105,000.00 73,500.00
2 Tukang Batu oh 0.350 130,000.00 45,500.00
3 Kepala Tukang oh 0.035 155,000.00 5,425.00
4 Mandor oh 0.035 125,000.00 4,375.00
Jumlah Harga Tenaga 128,800.00
B Bahan
1 Ubin Keramik 40 x 40 KM bh 6.2500 13,700.00 85,625.00
2 Semen kg 10.0000 1,269.00 12,690.00
3 Pasir pasang m3 0.0450 259,000.00 11,655.00
4 Semen warna kg 1.5000 13,860.00 20,790.00
Jumlah Harga Bahan 130,760.00
C Peralatan
-
Jumlah Harga Peralatan -
Total 259,560.00
Keuntungan max 10%
Total Harga 259,560.00
4.2. Pemasangan 1 m2 dinding keramik 20cm x 20cm
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.900 105,000.00 94,500.00
2 Tukang Batu oh 0.450 130,000.00 58,500.00
3 Kepala Tukang oh 0.045 155,000.00 6,975.00
4 Mandor oh 0.045 125,000.00 5,625.00
Jumlah Harga Tenaga 165,600.00
B Bahan
1 Keramik 20 x 20 bh 25.0000 13,700.00 342,500.00
2 Semen kg 9.3000 1,269.00 11,801.70
3 Pasir pasang m3 0.0180 259,000.00 4,662.00
4 Semen warna kg 1.9400 13,860.00 26,888.40
Jumlah Harga Bahan 385,852.10
C Peralatan ls
-
Jumlah Harga Peralatan -
Total 551,452.10
Keuntungan max 10%
Total Harga 551,452.10
A Tenaga
1 Pekerja Jam 1.6500 105,000.00 173,250.00
4 Mandor Jam 0.4418 125,000.00 55,225.00
Jumlah Harga Tenaga 228,475.00
B Bahan
2 Semen kg 218.0000 1,269.00 276,642.00
3 Pasir beton m3 0.5125 259,000.00 132,737.50
4 Kerikil m3 0.7688 485,145.42 372,979.80
Jumlah Harga Bahan 782,359.30
C Peralatan
Conc Mixer jam 0.4418 - -
Water Tanker jam 0.0542 - -
Con Vibrator Jam 0.4418 - -
Alat bantu ls 0.1429 - -
5. Pekerjaan Pengecetan
5.1. 1 m2 Pengecatan Tembok (1 Lapis Plamir), Lapis Cat Dasar, 2 Lapis Cat
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.020 105,000.00 2,100.00
2 Tukang Cat oh 0.063 130,000.00 8,190.00
3 Kepala Tukang oh 0.006 155,000.00 976.50
4 Mandor oh 0.0025 125,000.00 312.50
Jumlah Harga Tenaga 11,579.00
B Bahan
1 Plamir kg 0.100 - -
2 Cat Dasar kg 0.100 135,000.00 13,500.00
3 Cat Penutup 2 Kali kg 0.260 135,000.00 35,100.00
5.2. 1 m2 Pengecatan Bidang Kayu (1 Lapis Plamir), Lapis Cat Dasar, 2 Lapis Cat
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.070 105,000.00 7,350.00
2 Tukang Cat oh 0.105 130,000.00 13,650.00
3 Kepala Tukang oh 0.004 155,000.00 620.00
4 Mandor oh 0.0025 125,000.00 312.50
Jumlah Harga Tenaga 21,932.50
B Bahan
1 Cat Meni kg 0.200 60,000.00 12,000.00
2 Plamir kg 0.150 50,000.00
3 Cat Besi kg 0.170 65,000.00 11,050.00
4 Cat Penutup 2 Kali 0.350 - -
Jumlah Harga Bahan 23,050.00
C Peralatan ls
1.0000 500.00 500.00
Jumlah Harga Peralatan 500.00
Total 45,482.50
Keuntungan max 10%
Total Harga 45,482.50
6. Pekerjaan Kunci
6.1. 1 Buah Pasang Kunci Tanam Baik
No Komponen Satuan Perkiran Kuantitas harga Satuan (Rp) Jumlah Harga(Rp)
A Tenaga
1 Pekerja oh 0.005 105,000.00 525.00
2 Tukang Kayu oh 0.500 130,000.00 65,000.00
3 Kepala Tukang oh 0.005 155,000.00 775.00
4 Mandor oh 0.0025 125,000.00 312.50
Jumlah Harga Tenaga 66,612.50
B Bahan
1 Kunci kualitas Baik kg 1.000 275,000.00 275,000.00
A Tenaga
1 Pekerja oh 0.015 105,000.00 1,575.00
2 Tukang Kayu oh 0.150 130,000.00 19,500.00
3 Kepala Tukang oh 0.015 155,000.00 2,325.00
4 Mandor oh 0.00075 125,000.00 93.75
Jumlah Harga Tenaga 23,493.75
B Bahan
1 Engsel Pintu kg 1.000 45,000.00 45,000.00
A Tenaga
1 Pekerja oh 0.010 105,000.00 1,050.00
2 Tukang Kayu oh 0.100 130,000.00 13,000.00
3 Kepala Tukang oh 0.010 155,000.00 1,550.00
4 Mandor oh 0.0005 125,000.00 62.50
Jumlah Harga Tenaga 15,662.50
B Bahan
1 Engsel Jendela kg 1.000 22,000.00 22,000.00
A Tenaga
1 Pekerja oh 0.020 105,000.00 2,100.00
2 Tukang Batu oh 0.200 130,000.00 26,000.00
3 Kepala Tukang oh 0.020 155,000.00 3,100.00
4 Mandor oh 0.001 125,000.00 125.00
Jumlah Harga Tenaga 31,325.00
B Bahan
1 Engsel Jendela kg 1.000 22,000.00 22,000.00
A Tenaga
1 Pekerja oh 1.100 105,000.00 115,500.00
2 Tukang Batu oh 1.500 130,000.00 195,000.00
3 Kepala Tukang oh 0.150 155,000.00 23,250.00
4 Mandor oh 0.110 125,000.00 13,750.00
Jumlah Harga Tenaga 347,500.00
B Bahan
1 Kloset Duduk Bh 1.000 1,000,000.00 1,000,000.00
Semen Portland Kg 6.000 1,269.00 7,614.00
Pasir Pasang Kg 0.010 259,000.00 2,590.00
A Tenaga
1 Pekerja oh 0.036 105,000.00 3,780.00
2 Tukang Pipa oh 0.060 130,000.00 7,800.00
3 Kepala Tukang oh 0.006 155,000.00 930.00
4 Mandor oh 0.0018 125,000.00 225.00
Jumlah Harga Tenaga 12,735.00
B Bahan
1 Pipa PVC 1/2 M' 1.200 16,575.00 19,890.00
Perlengkapan - 0.350 5,000.00 1,750.00
A Tenaga
1 Pekerja oh 0.081 105,000.00 8,505.00
2 Tukang Pipa oh 0.135 130,000.00 17,550.00
3 Kepala Tukang oh 0.0135 155,000.00 2,092.50
4 Mandor oh 0.0041 125,000.00 512.50
Jumlah Harga Tenaga 28,660.00
B Bahan
1 Pipa PVC3" M' 1.200 41,750.00 50,100.00
Perlengkapan - 0.350 5,000.00 1,750.00
A Tenaga
1 Pekerja oh 0.010 105,000.00 1,050.00
2 Tukang Batu oh 0.100 130,000.00 13,000.00
3 Kepala Tukang oh 0.010 155,000.00 1,550.00
4 Mandor oh 0.005 125,000.00 625.00
Jumlah Harga Tenaga 16,225.00
B Bahan
1 Kran Air Bh 1.000 40,000.00 40,000.00
Seal Tape Bh 0.025 2,000.00 50.00
A Tenaga
1 Pekerja oh 0.010 105,000.00 1,050.00
2 Tukang Batu oh 0.100 130,000.00 13,000.00
3 Kepala Tukang oh 0.010 155,000.00 1,550.00
4 Mandor oh 0.005 125,000.00 625.00
Jumlah Harga Tenaga 16,225.00
B Bahan
1 Floor Drain Bh 1.000 25,000.00 25,000.00
A Tenaga
1 Pekerja oh 0.900 105,000.00 94,500.00
2 Tukang Batu oh 0.450 130,000.00 58,500.00
3 Kepala Tukang oh 0.045 155,000.00 6,975.00
4 Mandor oh 0.045 125,000.00 5,625.00
Jumlah Harga Tenaga 165,600.00
B Bahan
1 Keramik artistik 10 x 20 bh 53.0000 8,270.00 438,310.00
2 Semen kg 9.3000 1,269.00 11,801.70
3 Pasir pasang m3 0.0180 259,000.00 4,662.00
4 Semen warna kg 2.7500 13,860.00 38,115.00
Jumlah Harga Bahan 492,888.70
C Peralatan ls
-
Jumlah Harga Peralatan -
Total 658,488.70
Keuntungan max 10%
Total Harga 658,488.70
A Tenaga
1 Pekerja oh 0.200 105,000.00 21,000.00
2 Tukang Kayu oh 0.400 130,000.00 52,000.00
3 Kepala Tukang oh 0.025 155,000.00 3,875.00
4 Mandor oh 0.010 125,000.00 1,250.00
Jumlah Harga Tenaga 78,125.00
B Bahan
1 talang onduline bh 1.1111 95,000.00 105,555.56
2 screw kg 20.0000 1,000.00 20,000.00
3 Papan Kayu kls II m3 0.0190 7,000,000.00 133,000.00
4 -
Jumlah Harga Bahan 258,555.56
C Peralatan ls
-
Jumlah Harga Peralatan -
Total 336,680.56
Keuntungan max 10%
Total Harga 336,680.56
HARGA SATUAN UPAH, BAHAN, ALAT
Tenaga
Mandor oh 125,000.00
Pekerja oh 105,000.00
Kepala Tukang oh 155,000.00
Tukang oh 130,000.00
Tukang Batu oh 130,000.00
Tukang Kayu oh 130,000.00
Tukang Besi oh 130,000.00
Tukang Cat oh 130,000.00
Tukang Pipa oh 130,000.00
Bahan
Balok Kayu m3 -
Batu Belah m3 260,800.00
Baut GRC bh 250.00
Besi angker dia 8 mm kg
Besi beton kg 6,355.14
Cat Besi kg 65,000.00
Cat Dasar kg 135,000.00
Cat Meni kg 60,000.00
Compoun kg 11,815.00
Bata Merah bh 850.00
Cotton Plaster bh 15,000.00
Dynabolt bh 1,500.00
Engsel Jendela bh 22,000.00
Engsel Pintu bh 45,000.00
Floor Drain bh 25,000.00
genteng onduline m2 157,000.00 onduline
GRC 3 mm 65,000.00
hollow 2/4 m 57,175.00
hollow 4/4 m 78,615.38
Kaca Bening 5 mm m2 179,025.00
Kawat beton 24,000.00
Kayu kls 3 m3 4,500,000.00
Keramik artistik 10 x 20 bh 8,270.00
Kerikil 485,145.42
Kloset Duduk bh 1,000,000.00
Kran Air bh 40,000.00
Kunci kualitas Baik 275,000.00
Lem kayu 45,000.00
Paku 24,000.00
Paku screw GRC bh 250.00
Papan Kayu kls II m3 7,000,000.00
Papan Listplank GRC m3 35,416.67
Pasir beton 259,000.00
Pasir Pasang 259,000.00
Pipa PVC 1/2 m 16,575.00
Pipa PVC3" m 41,750.00
Plamir Kg 50,000.00
Nok onduline 95,000.00
Plywood uk. 90 x 220 78,000.00
Profil pc 75 Ujg 15,000.00
Reng GDC 6,666.67
screw 1,000.00
Screw reng 250.00
Screw Truss 300.00
Seal Tape
Semen KG 1,269.00
Semen Portland KG 1,269.00
Semen warna KG 13,860.00
Ubin Keramik 40 x 40 km bh 13,700.00
Talang onduline 95,000.00
ALAT
Con Vibrator -
Conc Mixer -
Water Tanker
196,935,000.00
3,065,000.00
ANGKA MAX. 11 DIGIT ANGKA 196,935,000
MILYAR 0 0
100000000 100
JUTA 96000000 96
900000 900
RIBU 35000 35
0 0
RUPIAH 0 0
4 5
MILYAR SERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS MILYAR SERATUS SEMBIL
SERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS MILYAR SEMBILAN PULUH
SEMBILAN PULUH ENAM JU
SERATUS SEMBILAN PULUH
TERBILANG : SERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
0 0
SERATUS 100 SERATUS 1 SATU
SEMBILAN PULU 200 DUA RATUS 2 DUA
SEMBILAN RATU 300 TIGA RATUS 3 TIGA
TIGA PULUH LIM 400 EMPAT RATUS 4 EMPAT
500 LIMA RATUS 5 LIMA
600 ENAM RATUS 6 ENAM
700 TUJUH RATUS 7 TUJUH
800 DELAPAN RATUS 8 DELAPAN
900 SEMBILAN RATU 9 SEMBILAN
10 SEPULUH
11 SEBELAS
12 DUA BELAS
13 TIGA BELAS
14 EMPAT BELAS
15 LIMA BELAS
16 ENAM BELAS
17 TUJUH BELAS
18 DELAPAN BELAS
19 SEMBILAN BELAS
20 DUA PULUH
21 DUA PULUH SATU
22 DUA PULUH DUA
23 DUA PULUH TIGA
24 DUA PULUH EMPAT
25 DUA PULUH LIMA
26 DUA PULUH ENAM
27 DUA PULUH TUJUH
28 DUA PULUH DELAPAN
29 DUA PULUH SEMBILAN
30 TIGA PULUH
31 TIGA PULUH SATU
32 TIGA PULUH DUA
33 TIGA PULUH TIGA
34 TIGA PULUH EMPAT
35 TIGA PULUH LIMA
36 TIGA PULUH ENAM
37 TIGA PULUH TUJUH
38 TIGA PULUH DELAPAN
39 TIGA PULUH SEMBILAN
40 EMPAT PULUH
41 EMPAT PULUH SATU
42 EMPAT PULUH DUA
43 EMPAT PULUH TIGA
44 EMPAT PULUH EMPAT
45 EMPAT PULUH LIMA
46 EMPAT PULUH ENAM
47 EMPAT PULUH TUJUH
48 EMPAT PULUH DELAPAN
49 EMPAT PULUH SEMBILAN
50 LIMA PULUH
51 LIMA PULUH SATU
52 LIMA PULUH DUA
53 LIMA PULUH TIGA
54 LIMA PULUH EMPAT
55 LIMA PULUH LIMA
56 LIMA PULUH ENAM
57 LIMA PULUH TUJUH
58 LIMA PULUH DELAPAN
59 LIMA PULUH SEMBILAN
60 ENAM PULUH
61 ENAM PULUH SATU
62 ENAM PULUH DUA
63 ENAM PULUH TIGA
64 ENAM PULUH EMPAT
65 ENAM PULUH LIMA
66 ENAM PULUH ENAM
67 ENAM PULUH TUJUH
68 ENAM PULUH DELAPAN
69 ENAM PULUH SEMBILAN
70 TUJUH PULUH
71 TUJUH PULUH SATU
72 TUJUH PULUH DUA
73 TUJUH PULUH TIGA
74 TUJUH PULUH EMPAT
75 TUJUH PULUH LIMA
76 TUJUH PULUH ENAM
77 TUJUH PULUH TUJUH
78 TUJUH PULUH DELAPAN
79 TUJUH PULUH SEMBILAN
80 DELAPAN PULUH
81 DELAPAN PULUH SATU
82 DELAPAN PULUH DUA
83 DELAPAN PULUH TIGA
84 DELAPAN PULUH EMPAT
85 DELAPAN PULUH LIMA
86 DELAPAN PULUH ENAM
87 DELAPAN PULUH TUJUH
88 DELAPAN PULUH DELAPAN
89 DELAPAN PULUH SEMBILAN
90 SEMBILAN PULUH
91 SEMBILAN PULUH SATU
92 SEMBILAN PULUH DUA
93 SEMBILAN PULUH TIGA
94 SEMBILAN PULUH EMPAT
95 SEMBILAN PULUH LIMA
96 SEMBILAN PULUH ENAM
97 SEMBILAN PULUH TUJUH
98 SEMBILAN PULUH DELAPAN
99 SEMBILAN PULUH SEMBILAN
6 7 8 9 10
MILYAR SERATUMILYAR SERATUS MILYAR SERATU MILYAR S MILYAR S MILYAR SERATUS SEMBILAN PULUH ENA
MILYAR SERATUMILYAR SERATUS MILYAR SERATU MILYAR SERATUS SEMILYAR SERATUS SEMBILAN PULUH ENA
MILYAR SEMBIL MILYAR SERATUS MILYAR SERATU MILYAR SERATUS S MILYAR SERATUS SEMBILAN PULUH ENA
MILYAR SEMBIL MILYAR SERATUS MILYAR SERATU MILYAR SERATUS S MILYAR SERATUS SEMBILAN PULUH ENA
WAH PAYAH NICHMILYAR TIGA PULU MILYAR SERATU MILYAR SERATUS S MILYAR SERATUS SEMBILAN PULUH ENA
SEMBILAN PULUHMILYAR SEMBILAN MILYAR SERATU MILYAR SERATUS S MILYAR SERATUS SEMBILAN PULUH ENA
SERATUS JUTA SMILYAR SEMBILAN MILYAR SERATU MILYAR SERATUS SEMILYAR SERATUS SEMBILAN PULUH ENA
SERATUS SEMBI MILYAR SEMBILAN MILYAR SERATU MILYAR SERATUS SEMILYAR SERATUS SEMBILAN PULUH ENA
WAH PAYAH NICH ! MILYAR RUPIAH MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
WAH PAYAH NICH ! MILYAR TIGA P MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SEMBILAN PULUH EMILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SEMBILAN PULUH EMILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SERATUS JUTA TIG MILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SERATUS JUTA SEMMILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SERATUS SEMBILAN MILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
SERATUS SEMBILAN MILYAR SEMBIL MILYAR SERATUS JU MILYAR SERATUS SEMBILAN PULUH ENA
GOBLOK BANGETMILYAR RUPIAH MILYAR SERATUS JUTA RUPIAH
WAH PAYAH NICHMILYAR RUPIAH MILYAR SERATUS JUTA RUPIAH
WAH PAYAH NICHMILYAR TIGA PULUH MILYAR SERATUS JUTA RUPIAH
WAH PAYAH NICHMILYAR TIGA PULUH MILYAR SERATUS JUTA RUPIAH
SEMBILAN PULU MILYAR SEMBILAN R MILYAR SERATUS JUTA TIGA PULUH LIM
SEMBILAN PULUH MILYAR SEMBILAN R MILYAR SERATUS JUTA TIGA PULUH LIM
SEMBILAN PULU MILYAR SEMBILAN R MILYAR SERATUS JUTA TIGA PULUH LIM
SEMBILAN PULUH MILYAR SEMBILAN R MILYAR SERATUS JUTA TIGA PULUH LIM
SERATUS JUTA MILYAR SEMBILAN MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS JUTA TMILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS JUTA SMILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS JUTA SMILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS SEMBI MILYAR SEMBILAN MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS SEMBILMILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS SEMBI MILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
SERATUS SEMBILMILYAR SEMBILAN P MILYAR SERATUS JUTA SEMBILAN RATU
GOBLOK BANGET SIHMILYAR RUPIAH
GILE BENER !!! BUA MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR RUPIAH
WAH PAYAH NICH !! MILYAR TIGA PULUH LIMA RIBU RUPIAH
WAH PAYAH NICH !! MILYAR TIGA PULUH LIMA RIBU RUPIAH
WAH PAYAH NICH !! MILYAR TIGA PULUH LIMA RIBU RUPIAH
WAH PAYAH NICH !! MILYAR TIGA PULUH LIMA RIBU RUPIAH
SEMBILAN PULUH ENMILYAR SEMBILAN RATUS RIBU RUPIAH
SEMBILAN PULUH ENMILYAR SEMBILAN RATUS RIBU RUPIAH
SEMBILAN PULUH ENA MILYAR SEMBILAN RATUS RIBU RUPIAH
SEMBILAN PULUH ENA MILYAR SEMBILAN RATUS RIBU RUPIAH
SEMBILAN PULUH ENMILYAR SEMBILAN RATUS TIGA PULUH L
SEMBILAN PULUH ENMILYAR SEMBILAN RATUS TIGA PULUH L
SEMBILAN PULUH ENMILYAR SEMBILAN RATUS TIGA PULUH L
SEMBILAN PULUH ENA MILYAR SEMBILAN RATUS TIGA PULUH L
SERATUS JUTA RUPI MILYAR SEMBILAN PULUH ENAM JUTA R
SERATUS JUTA RUP MILYAR SEMBILAN PULUH ENAM JUTA R
SERATUS JUTA TIGA MILYAR SEMBILAN PULUH ENAM JUTA R
SERATUS JUTA TIGA MILYAR SEMBILAN PULUH ENAM JUTA
SERATUS JUTA SEMBMILYAR SEMBILAN PULUH ENAM JUTA T
SERATUS JUTA SEMBMILYAR SEMBILAN PULUH ENAM JUTA T
SERATUS JUTA SEMBIMILYAR SEMBILAN PULUH ENAM JUTA T
SERATUS JUTA SEMBIMILYAR SEMBILAN PULUH ENAM JUTA T
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN P MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
SERATUS SEMBILAN MILYAR SEMBILAN PULUH ENAM JUTA S
GOBLOK BANGET SIH, TAU BEKING RAB
BUSYETTT !!!!! LEBIH BAIK BUAT BELI KO
GILE BENER !!! BUAT APAAN TUH DUIT SE
LEBIH BAGUS TIDUR JOO !!! KALO MO U
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
WAH PAYAH NICH !! CUMA BEKING LELAH
SEMBILAN PULUH ENAM JUTA RUPIAH
SEMBILAN PULUH ENAM JUTA RUPIAH
SEMBILAN PULUH ENAM JUTA RUPIAH
SEMBILAN PULUH ENAM JUTA RUPIAH
SEMBILAN PULUH ENAM JUTA TIGA PULU
SEMBILAN PULUH ENAM JUTA TIGA PULU
SEMBILAN PULUH ENAM JUTA TIGA PULU
SEMBILAN PULUH ENAM JUTA TIGA PULU
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SEMBILAN PULUH ENAM JUTA SEMBILAN
SERATUS JUTA RUPIAH
SERATUS JUTA RUPIAH
SERATUS JUTA RUPIAH
SERATUS JUTA RUPIAH
SERATUS JUTA TIGA PULUH LIMA RIBU R
SERATUS JUTA TIGA PULUH LIMA RIBU R
SERATUS JUTA TIGA PULUH LIMA RIBU R
SERATUS JUTA TIGA PULUH LIMA RIBU
SERATUS JUTA SEMBILAN RATUS RIBU R
SERATUS JUTA SEMBILAN RATUS RIBU R
SERATUS JUTA SEMBILAN RATUS RIBU R
SERATUS JUTA SEMBILAN RATUS RIBU
SERATUS JUTA SEMBILAN RATUS TIGA P
SERATUS JUTA SEMBILAN RATUS TIGA P
SERATUS JUTA SEMBILAN RATUS TIGA P
SERATUS JUTA SEMBILAN RATUS TIGA P
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
SERATUS SEMBILAN PULUH ENAM JUTA
ULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS SEMBILAN PULUH ENAM JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA RUPIAH
ERATUS JUTA RUPIAH
ERATUS JUTA RUPIAH
ERATUS JUTA RUPIAH
ERATUS JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
ERATUS JUTA SEMBILAN RATUS TIGA PULUH LIMA RIBU RUPIAH
Bobot Tahap
Penyelesaian
NO URAIAN PEKERJAAN VOLUME SATUAN Tiap Pekerjaan
Pekerjaan (per jenis)
% %
A. PEMBANGUNAN RUMAH DINAS/JAGA
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan Tanah 88.00 M2 #REF! 100.00
2 Pengukuran/Pemasangan Bouwplank 54.50 M1 #REF! 100.00
3 Bangsal Kerja, Gudang, & Ruang Direksi 6.00 M2 #REF! 100.00
4 Papan Nama Proyek 1.00 Ls #REF! 100.00
5 Air Kerja 1.00 Ls #REF! 100.00
6 Dokumentasi dan Pelaporan 1.00 Ls #REF! 100.00
7 Pembersihan Akhir 1.00 Ls #REF! -
II PEKERJAAN TANAH
1 Galian Tanah Untuk Pondasi 35.55 M3 #REF! 100.00
2 Mengurug Kembali Bekas Galian 1/4 x 8.89 M3 #REF! 100.00
3 Urugan Pasir dibawah Pondasi 4.15 M3 #REF! 100.00
4 Timbunan Tanah dibawah Lantai dipadatkan 6.00 M3 #REF! 100.00
5 Urugan Pasir dibawah Lantai 6.00 M3 #REF! 100.00
V PEKERJAAN LANTAI
1 Lantai Rabat Beton Tebal 7 cm camo. 1 : 3 : 5 3.78 M3 #REF! 100.00
2 Lantai Rabat Keliling Beton Tebal 7 cm 1 : 3 : 5 2.66 M3 #REF! -
3 Lantai Rabat Saluran Beton Tebal 7 cm 1 : 3 : 6 0.84 M3 #REF! -
4 Spesi Lantai 1 : 4 60.00 M2 #REF! 100.00
5 Pek. Lantai Keramik 40 x 40 57.75 M2 #REF! -
6 Pek. Lantai Keramik WC/KM 2.25 M2 #REF! -
7 Pek Dinding WC/KM 8.48 M2 #REF! 50.00
VI PEKERJAAN CAT
1 Cat Dinding Dengan Matex 2x Termasuk 1x Plamir (Baru) 201.71 M2 #REF! 50.00
2 Cat Plafond Dng Matex 2x Termasuk 1x Plamir (Baru) 96.24 M2 #REF! 50.00
3 Cat Pintu, Jendela, Kosen, Ventilasi dan Lysplank 37.09 M2 #REF! 50.00
3x Dng Glotex/Platone (Baru)
4 Cat Atap Seng 116.34 M2 #REF! -
IX PEKERJAAN SANITASI
1 Kloset Jongkok 1.00 Bh #REF! -
2 Kran Air Bersih Kualitas Standard 2.00 Bh #REF! -
3 Saringan Pemb. Air Kotor/Avour Alumunium 1.00 Bh #REF! -
4 Bak Tampungan Air Besih 1.00 Bh #REF! 100.00
5 Pipa Paralon PVC dia. 3'' 5.00 M1 #REF! -
6 Pipa Paralon PVC dia. 1/2'' 20.00 M1 #REF! -
7 Penyambungan Air Bersih + Titik Air 1.00 Bh #REF! -
8 Septic Tank dan Perasapan Lengkap 1.00 Bh #REF! 35.00
II PEKERJAAN TANAH
1 Galian Tanah 178.05 M3 #REF! 100.00
2 Mengurug Kembali Bekas Galian 1/4 x 44.51 M3 #REF! 50.00
3 Timbunan Tanah Taman 98.51 M3 #REF! 50.00
IV PEKERJAAN PENGECATAN
1 Cat Tembok dan Trotoar 248.40 M2 #REF! -
TOTAL(%) #REF!
Terbilang :
JOHN T. MARAMBA, ST
Site Supervisor Site Manager
Bobot
Penyelesaian
Pekerjaan
(per jenis)
%
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
2007
ksana
MBA, ST
LAMPIRAN KEPUTUSAN KEPALA DINAS PEKERJAAN UMUM KOTA MANADO
Nomor :
Tanggal :
Tentang : Penetapan Standarisasi Harga Satuan Jadi
di Lingkungan Dinas Pekerjaan Umum Kota Manado T.A. 2014
44 Batu Palimanan 15 x 30 M2
45 Batu Palimanan 20 x 40 M2
46 Batu Palimanan 30 x 30 M2
47 Batu Sukabumi 10 x 20 M2
48 Batu Sukabumi 15 x 15 M2
49 Bensin / Premium (HET) Liter
50 Bensin / Premium (Industri) Liter
51 Bunker Oil Liter
52 Butonite Patch Kg
53 Cansteen Bh
54 Casing M2
55 Cerucuk M
56 Chipping Kg
57 Chipping Kg
58 Curing Compound Liter
59 Ducting (Kabel prestress) M1
60 Ducting (Strand prestress) M1
61 Elastomer buah
62 Elastomer Alam Kg
63 Elastomer Jenis 1 buah
64 Elastomer Jenis 2 buah
65 Elastomer Jenis 3 buah
66 Elastomer Sintesis Kg
67 Expansion Cap M2
68 Expansion Join Baja Siku M
69 Expansion Join Tipe Rubber M
70 Expansion Join Tipe Torma M1
71 Expansion Tipe Joint Asphaltic Plug M
72 Filler Kg
73 Filler Kg
74 Gravel M3
75 Gebalan Rumput M2
76 Geotextile M1
77 Hollow Brick Bh
78 Ijuk Kg
79 Joint Sealent Kg
80 Joint Socket Pile 16x16x16 Set
81 Joint Socket Pile 35x35 Set
82 Kapur M3
83 Kapur Padam M3
84 Kapur sirih Kg
85 Karet Elastomer Bh
86 Kerb Jenis 1 buah
87 Kerb Jenis 2 buah
88 Kerb Jenis 3 buah
89 Kerb Type A buah
90 Kerikil Beton M3
91 Kerikil Koral Uk. 1-3 cm M3
92 Koral Sikat 2-3 cm Kg
93 Koral Sikat Panca Warna Kg
94 Mikro Pile 16x16x16 M1
95 Mini Timber Pile buah
96 Minyak Bekisting Liter
97 Minyak Fluks Liter
DRAF SATUAN JADI 2014 up 5 %
BAHAN
Catatan :
- Sesuai harga yang berlaku di pasaran
- Harga satuan belum termasuk pajak yang berlaku
- harga sewaktu-waktu bisa berubah
333,930.00
266,220.00
285,940.00
289,790.00
289,790.00
643,130.00
511,880.00
459,380.00
538,130.00
130.00
26,250.00
1,398,600.00
52,500.00
33,600.00
6,238,050.00
62,380.00
12,000.00
5,780.00
1,365,000.00
240,980.00
1,050.00
5,250.00
1,260.00
71,470.00
57,180.00
11,390.00
12,600.00
790.00
2,100.00
120,750.00
6,300.00
630.00
1,580.00
235,200.00
198,450.00
198,450.00
210,000.00
131,250.00
147,000.00
162,750.00
194,250.00
194,250.00
152,250.00
173,250.00
178,500.00
178,500.00
136,500.00
120,750.00
4,730.00
10,390.00
2,390.00
25,460.00
47,250.00
26,250.00
15,750.00
1,260.00
1,260.00
40,430.00
157,500.00
52,500.00
682,500.00
47,250.00
445,250.00
750,750.00
967,890.00
47,250.00
6,350.00
288,750.00
1,260,000.00
1,260,000.00
1,080,000.00
1,260.00
1,260.00
282,660.00
31,500.00
6,830.00
3,680.00
13,130.00
35,810.00
70,880.00
637,880.00
42,000.00
78,750.00
950.00
682,500.00
47,250.00
52,500.00
57,750.00
47,250.00
289,790.00
289,790.00
10,500.00
7,880.00
633,790.00
28,350.00
11,030.00
2,390.00
HALAMAN 2 DARI 12 HALAMAN
28,880.00
36,750.00
73,500
31,500.00
47,250.00
31,500.00
5,250.00
36,750.00
24,150.00
18,380.00
10,500.00
28,880.00
23,630.00
52,500.00
36,750.00
35,700.00
35,700.00
115,500.00
57,750.00
78,750.00
50,400.00
58,800.00
39,900.00
52,500.00
60,380.00
68,250.00
39,380.00
54,600.00
61,430.00
44,100.00
54,600.00
5,250.00
315,000.00
3,150.00
3,410.00
2,625,000.00
2,100.00
4,880.00
9,890.00
2,360.00
5,250.00
8,750.00
73,500.00
31,500.00
-
63,000.00
105,000.00
119,700.00
52,500.00
76,130.00
85,050.00
105,000.00
157,500.00
296,630.00
8,400.00
4,200.00
26,250.00
4,730.00
44,100.00
472,500.00
11,550,000.00
288,750.00
1,575,000.00
1,026,380.00
2,625,000.00
3,675,000.00
78,750.00
36,750.00
162,910.00
63,000.00
5,512,500.00
4,200,000.00
1,439,550.00
580,100.00
36,750.00
37,410.00
49,220.00
60,380.00
131,250.00
367,500.00
7,880.00
1,680,000.00
2,100,000.00
3,045,000.00
6,300,000.00
6,825,000.00
945,000.00
7,880.00
8,930.00
63,000.00
31,500.00
34,130.00
8,400.00
5,250.00
6,300.00
7,880.00
47,250.00
78,750.00
91,880.00
2,890.00
21,000.00
26,250.00
15,750.00
26,250.00
15,750.00
52,500.00
68,250.00
84,000.00
173,250.00
28,880.00
126,000.00
28,880.00
89,250.00
84,000.00
189,000.00
178,500.00
28,880.00
13,130.00
18,380.00
105,000.00
120,750.00
787,500.00
945,000.00
315,000.00
183,750.00
168,000.00
210,000.00
315,000.00
105,000.00
162,750.00
168,000.00
168,000.00
157,500.00
HALAMAN 11 DARI 12 HALAMAN
HARGA (Rp.) KET
18,380.00
32,810.00
19,690.00
15,750.00
420,000.00
367,500.00
787,500.00
10,500.00
131,250.00
787,500.00
262,500.00
52,500.00
21,000.00
36,750.00
7,880.00
10,500.00
26,250.00
12,780.00
157,500.00
73,500.00
23,630.00
18,380.00
5,250.00
18,380.00
367,500.00
26,250.00
236,250.00
31,500.00
78,750.00
152,250.00
210,000.00
78,750.00
52,500.00
288,750.00
84,000.00
88,200.00
120,750.00
262,500.00
420,000.00
63,000.00
13,130.00
105,000.00
63,000.00
11,550.00
12,600.00
5,250.00
26,250.00
18,380.00
31,500.00
190,580.00
57,750.00
84,000.00
115,500.00
81,380.00