SATUAN KERJA :

PEKERJAAN/PROYEK : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1


LOKASI :

TAHUN ANGGARAN :

R-E-N-C-A-N-A A-N-G-G-A-R-A-N B-I-A-Y-A {-RAB-}

NO URAIAN PEKERJAAN JUMLAH HARGA


a b c

I DIVISI 1 : DESIGN DEVELOPMENT Rp. 12,000,000.00

II DIVISI 2 : SITE WORK Rp. 279,221,387.00

III DIVISI 3 : PEKERJAAN STRUKTURAL Rp. 4,425,692,985.22

IV DIVISI 4 : PEKERJAAN ARSITEKTURAL Rp. 1,925,689,017.30

V DIVISI 5 : PEKERJAAN MEKANIKAL Rp. 1,729,503,055.36

VI DIVISI 6 : PEKERJAAN ELEKTRIKAL Rp. 625,586,797.36

VII DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN Rp. 1,554,782.00

REAL COST ( I+II+III+IV+V+VI+VII ) Rp. 8,999,248,024.23

PPN 10 % Rp. 899,924,802.42

IZIN MENDIRIKAN BANGUNAN (IMB) Rp. 3,500,000.00

TOTAL KESELURUHAN Rp. 9,902,672,826.66

DIBULATKAN Rp. 9,902,672,000.00


Terbilang :

Err:511

Palu
Dibuat,
PEJABAT PEMBUAT KOMITMEN
RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

I DIVISI 1 : DESIGN DEVELOPMENT

1 1.3 Pek. Pelaporan dan Asbuilt Drawing Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

2 1.4 Biaya Manajemen K3 Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

Biaya Manajemen K3 terdiri penyiapan Safety Equipment, Baik Untuk Direksi maupun Tukang/Pekerja,
Peralatan Pengobatan, Safety Sign serta Biaya Lain Yang Berkaitan Dengan Penanganan K3
3 1.5 Pek. Dokumentasi Proyek Ls 1.00 Rp 2,000,000 Rp 2,000,000.00

TOTAL ITEM DIVISI 1 : DESIGN DEVELOPMENT Rp 12,000,000.00

II DIVISI 2 : SITE WORK

II.1 PEKERJAAN PERSIAPAN


1 An.Prak Pek. Pagar Seng Gelombang Ls 1.00 Rp 7,000,000 Rp 7,000,000.00

2 An.Prak Pek. Pengukuran dan Pemasangan Bow Plank Ls 1.00 Rp 2,500,000 Rp 2,500,000.00

3 An.Prak Pek. Direksi Keet Ls 1.00 Rp 7,000,000 Rp 7,000,000.00

4 An.Prak Pek. Pembongkaran Bangunan Eksisting Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

5 An.Prak Pek. Mobilisasi Alat Diesel Hammer Ls 1.00 Rp 10,000,000 Rp 10,000,000.00

6 An.Prak Pek. Mobilisasi Alat Crane Ls 1.00 Rp 5,000,000 Rp 5,000,000.00

7 An.Prak Pek. Mobilisasi Alat Excavator Ls 1.00 Rp 10,000,000 Rp 10,000,000.00

8 An.Prak Pek. Demobilisasi Alat Ls 1.00 Rp 15,000,000 Rp 15,000,000.00

9 An.Prak Pek. Papan Nama Proyek Ls 1.00 Rp 1,000,000 Rp 1,000,000.00

TOTAL PEKERJAAN PERSIAPAN Rp 62,500,000.00

II.2 PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL


1 An.Prak Pek. Pembersihan Awal Lokasi Ls 1.00 Rp 3,000,000 Rp 3,000,000.00

2 An.Prak Pek. Pembersihan Akhir Lokasi Ls 1.00 Rp 2,500,000 Rp 2,500,000.00

3 An.Prak Pek. Mobilisasi Bongkaran Ls 1.00 Rp 6,000,000 Rp 6,000,000.00

TOTAL PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL Rp 11,500,000.00

II.3 PEKERJAAN TANAH


A Pekerjaan Tanah Area Pondasi Batu
1 2.3.1.1 Pek. Galian Tanah M3 231.00 Rp 72,450 Rp 16,735,950.00

2 2.3.1.8 Pek. Buangan Bekas Galian M3 190.00 Rp 31,740 Rp 6,030,600.00

3 2.3.1.9 Pek. Urugan Kembali Bekas Galian M3 201.00 Rp 29,670 Rp 5,963,670.00

4 2.3.1.11 Pek. Urugan Pasir M3 31.00 Rp 168,360 Rp 5,219,160.00

B Pekerjaan Tanah Area Pondasi Poer Plat


1 2.3.1.1 Pek. Galian Tanah M3 151.00 Rp 72,450 Rp 10,939,950.00

2 2.3.1.8 Pek. Buangan Bekas Galian M3 220.00 Rp 31,740 Rp 6,982,800.00

3 2.3.1.9 Pek. Urugan Kembali Bekas Galian M3 175.00 Rp 29,670 Rp 5,192,250.00

4 2.3.1.11 Pek. Urugan Pasir M3 41.00 Rp 168,360 Rp 6,902,760.00

C Pekerjaan Tanah Area Basement


1 2.3.1.1 Pek. Galian Tanah M3 300.00 Rp 72,450 Rp 21,735,000.00

2 2.3.1.8 Pek. Buangan Bekas Galian M3 270.00 Rp 31,740 Rp 8,569,800.00

3 2.3.1.9 Pek. Urugan Kembali Bekas Galian M3 453.00 Rp 29,670 Rp 13,440,510.00

D Pekerjaan Peninggian Lantai


1 2.5 Pek. Timbunan Biasa M3 411.00 Rp 154,422 Rp 63,467,442.00

2 2.3.1.10 Pek. Pemadatan Tanah Dengan Stamper Kuda M3 411.00 Rp 61,525 Rp 25,286,775.00

3 2.3.1.11 Pek. Urugan Pasir M3 52.00 Rp 168,360 Rp 8,754,720.00

TOTAL PEKERJAAN TANAH Rp 205,221,387.00

TOTAL ITEM DIVISI 2 : SITE WORK Rp 279,221,387.00


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

III DIVISI 3 : PEKERJAAN STRUKTURAL

III.1 PEKERJAAN STRUKTURAL DI ATAS TANAH


III.1.1 PEKERJAAN STRUKTURAL LANTAI 1
A Pekerjaan Sloof 25x40
1 4.1.1.6 Pek. Beton M3 21.50 Rp 1,315,020 Rp 28,272,937.63

2 4.1.1.17 Pek. Pembesian Kg 2,900.00 Rp 15,367 Rp 44,565,549.42

3 4.1.1.21 Pek. Bekisting M2 565.00 Rp 210,674 Rp 119,030,951.25

B Pekerjaan Sloof 20x30


1 4.1.1.6 Pek. Beton M3 15.00 Rp 1,315,020 Rp 19,725,305.32

2 4.1.1.17 Pek. Pembesian Kg 870.00 Rp 15,367 Rp 13,369,664.83

3 4.1.1.21 Pek. Bekisting M2 542.00 Rp 210,674 Rp 114,185,443.50

C Pekerjaan Cor Lantai


1 4.1.1.2 Pek. Beton M3 43.00 Rp 1,315,020 Rp 56,545,875.26

D Pekerjaan Kolom 50x50


1 4.1.1.6 Pek. Beton M3 32.00 Rp 1,315,020 Rp 42,080,651.36

2 4.1.1.17 Pek. Pembesian Kg 2,455.00 Rp 15,367 Rp 37,727,042.70

3 4.1.1.22 Pek. Bekisting M2 533.00 Rp 389,516 Rp 207,611,783.71

E Pekerjaan Kolom Praktis


1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 111.00 Rp 96,765 Rp 10,740,877.35

F Pekerjaan Balok 30x50


3 4.1.1.6 Pek. Beton M3 31.50 Rp 1,315,020 Rp 41,423,141.18

2 4.1.1.17 Pek. Pembesian Kg 3,200.00 Rp 15,367 Rp 49,175,778.67

1 4.1.1.23 Pek. Bekisting M2 565.00 Rp 399,621 Rp 225,785,634.29

G Pekerjaan Balok 20x40


3 4.1.1.6 Pek. Beton M3 17.00 Rp 1,315,020 Rp 22,355,346.03

2 4.1.1.17 Pek. Pembesian Kg 976.00 Rp 15,367 Rp 14,998,612.49

1 4.1.1.23 Pek. Bekisting M2 202.00 Rp 399,621 Rp 80,723,359.52

H Pekerjaan Core Lift


3 4.1.1.6 Pek. Beton M3 12.10 Rp 1,315,020 Rp 15,911,746.30

2 4.1.1.17 Pek. Pembesian Kg 1,100.00 Rp 15,367 Rp 16,904,173.92

1 4.1.1.23 Pek. Bekisting M2 333.00 Rp 399,621 Rp 133,073,657.03

I Pekerjaan Tangga
3 4.1.1.6 Pek. Beton M3 15.10 Rp 1,315,020 Rp 19,856,807.36

2 4.1.1.17 Pek. Pembesian Kg 988.00 Rp 15,367 Rp 15,183,021.66

1 4.1.1.23 Pek. Bekisting M2 89.00 Rp 399,621 Rp 35,566,232.66

J Pekerjaan Balok Latai


1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 153.00 Rp 116,101 Rp 17,763,477.01

III.1.2 PEKERJAAN STRUKTURAL LANTAI 2


A Pekerjaan Plat Lantai
1 4.1.1.6 Pek. Beton M3 53.00 Rp 1,315,020 Rp 69,696,078.81

2 4.1.1.17 Pek. Pembesian Kg 4,111.20 Rp 15,367 Rp 63,178,581.64

3 4.1.1.24 Pek. Bekisting M2 650.00 Rp 505,666 Rp 328,682,602.08

B Pekerjaan Kolom 50x50


1 4.1.1.6 Pek. Beton M3 42.00 Rp 1,315,020 Rp 55,230,854.91

2 4.1.1.17 Pek. Pembesian Kg 3,455.00 Rp 15,367 Rp 53,094,473.53

3 4.1.1.22 Pek. Bekisting M2 290.00 Rp 389,516 Rp 112,959,507.08

C Pekerjaan Kolom Praktis


1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 121.00 Rp 96,765 Rp 11,708,523.96

D Pekerjaan Balok 30x50


3 4.1.1.6 Pek. Beton M3 31.50 Rp 1,315,020 Rp 41,423,141.18

2 4.1.1.17 Pek. Pembesian Kg 3,100.00 Rp 15,367 Rp 47,639,035.58

1 4.1.1.23 Pek. Bekisting M2 141.47 Rp 399,621 Rp 56,534,325.10


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

E Pekerjaan Balok 20x40


3 4.1.1.6 Pek. Beton M3 17.00 Rp 1,315,020 Rp 22,355,346.03

2 4.1.1.17 Pek. Pembesian Kg 1,276.00 Rp 15,367 Rp 19,608,841.74

1 4.1.1.23 Pek. Bekisting M2 152.00 Rp 399,621 Rp 60,742,329.93

F Pekerjaan Core Lift


3 4.1.1.6 Pek. Beton M3 12.10 Rp 1,315,020 Rp 15,911,746.30

2 4.1.1.17 Pek. Pembesian Kg 1,100.00 Rp 15,367 Rp 16,904,173.92

1 4.1.1.23 Pek. Bekisting M2 73.00 Rp 399,621 Rp 29,172,303.19

G Pekerjaan Tangga
3 4.1.1.6 Pek. Beton M3 15.10 Rp 1,315,020 Rp 19,856,807.36

2 4.1.1.17 Pek. Pembesian Kg 988.00 Rp 15,367 Rp 15,183,021.66

1 4.1.1.23 Pek. Bekisting M2 80.00 Rp 399,621 Rp 31,969,647.33

H Pekerjaan Balok Latai


1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 73.00 Rp 116,101 Rp 8,475,384.46

III.1.3 PEKERJAAN STRUKTURAL LANTAI 3


A Pekerjaan Plat Lantai
1 4.1.1.6 Pek. Beton M3 53.00 Rp 1,315,020 Rp 69,696,078.81

2 4.1.1.17 Pek. Pembesian Kg 2,111.20 Rp 15,367 Rp 32,443,719.98

3 4.1.1.24 Pek. Bekisting M2 430.00 Rp 505,666 Rp 217,436,182.92

B Pekerjaan Kolom 50x50


1 4.1.1.6 Pek. Beton M3 42.00 Rp 1,315,020 Rp 55,230,854.91

2 4.1.1.17 Pek. Pembesian Kg 2,455.00 Rp 15,367 Rp 37,727,042.70

3 4.1.1.22 Pek. Bekisting M2 203.00 Rp 389,516 Rp 79,071,654.96

C Pekerjaan Kolom Praktis


1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian) M' 121.00 Rp 96,765 Rp 11,708,523.96

D Pekerjaan Balok 30x50


3 4.1.1.6 Pek. Beton M3 31.50 Rp 1,315,020 Rp 41,423,141.18

2 4.1.1.17 Pek. Pembesian Kg 3,200.00 Rp 15,367 Rp 49,175,778.67

1 4.1.1.23 Pek. Bekisting M2 165.00 Rp 399,621 Rp 65,937,397.63

E Pekerjaan Balok 20x40


3 4.1.1.6 Pek. Beton M3 17.00 Rp 1,315,020 Rp 22,355,346.03

2 4.1.1.17 Pek. Pembesian Kg 576.00 Rp 15,367 Rp 8,851,640.16

1 4.1.1.23 Pek. Bekisting M2 92.00 Rp 399,621 Rp 36,765,094.43

F Pekerjaan Core Lift


3 4.1.1.6 Pek. Beton M3 12.10 Rp 1,315,020 Rp 15,911,746.30

2 4.1.1.17 Pek. Pembesian Kg 750.00 Rp 15,367 Rp 11,525,573.13

1 4.1.1.23 Pek. Bekisting M2 83.00 Rp 399,621 Rp 33,168,509.11

G Pekerjaan Tangga
3 4.1.1.6 Pek. Beton M3 15.10 Rp 1,315,020 Rp 19,856,807.36

2 4.1.1.17 Pek. Pembesian Kg 388.00 Rp 15,367 Rp 5,962,563.16

1 4.1.1.23 Pek. Bekisting M2 89.00 Rp 399,621 Rp 35,566,232.66

H Pekerjaan Balok Latai


1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian) M' 95.00 Rp 116,101 Rp 11,029,609.91

TOTAL PEKERJAAN STRUKTURAL DI ATAS TANAH Rp 3,323,747,294.21

III.2 PEKERJAAN STRUKTURAL DI BAWAH TANAH


A Pekerjaan Pondasi Batu
1 3.2.1.3 Pek. Pasangan Pondasi Batu Kali M3 135.00 Rp 734,624 Rp 99,174,258.90

2 3.2.1.9 Pek. Pasangan Batu Kosong M3 75.00 Rp 457,656 Rp 34,324,222.50

3 4.4.1.4 Pek. Pasangan Pondasi Bata M2 21.00 Rp 140,275 Rp 2,945,778.36

B Pekerjaan Plat Lantai


1 4.1.1.6 Pek. Beton M3 53.00 Rp 1,315,020 Rp 69,696,078.81

2 4.1.1.17 Pek. Pembesian Kg 1,911.20 Rp 15,367 Rp 29,370,233.81

3 4.1.1.20 Pek. Bekisting M2 300.00 Rp 197,898 Rp 59,369,325.00

C Pekerjaan Dinding Penahan Tanah


1 4.1.1.6 Pek. Beton M3 33.00 Rp 1,315,020 Rp 43,395,671.71

2 4.1.1.17 Pek. Pembesian Kg 1,011.20 Rp 15,367 Rp 15,539,546.06

3 4.1.1.20 Pek. Bekisting M2 150.00 Rp 197,898 Rp 29,684,662.50


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

D Pekerjaan Pondasi Pancang


1 4.1.1.6 Pek. Beton M3 125.00 Rp 1,315,020 Rp 164,377,544.37

2 4.1.1.17 Pek. Pembesian Kg 1,150.00 Rp 15,367 Rp 17,672,545.46

3 4.1.1.20 Pek. Bekisting M2 105.00 Rp 197,898 Rp 20,779,263.75

E Pekerjaan Poer Plat


1 4.1.1.1 Pek. Lantai Kerja M3 54.00 Rp 991,827 Rp 53,558,663.09

2 4.1.1.6 Pek. Beton M3 110.00 Rp 1,315,020 Rp 144,652,239.05

3 4.1.1.17 Pek. Pembesian Kg 950.00 Rp 15,367 Rp 14,599,059.29

4 4.1.1.20 Pek. Bekisting M2 180.00 Rp 197,898 Rp 35,621,595.00

F Pekerjaan Kolom 50x50


1 4.1.1.6 Pek. Beton M3 42.00 Rp 1,315,020 Rp 55,230,854.91

2 4.1.1.17 Pek. Pembesian Kg 1,955.00 Rp 15,367 Rp 30,043,327.28

3 4.1.1.22 Pek. Bekisting M2 233.00 Rp 389,516 Rp 90,757,121.21

G Pekerjaan Pit Lift


3 4.1.1.6 Pek. Beton M3 12.10 Rp 1,315,020 Rp 15,911,746.30

2 4.1.1.17 Pek. Pembesian Kg 356.00 Rp 15,367 Rp 5,470,805.38

1 4.1.1.23 Pek. Bekisting M2 53.00 Rp 399,621 Rp 21,179,891.36

H Pekerjaan Ground Water Tank


3 4.1.1.6 Pek. Beton M3 17.00 Rp 1,315,020 Rp 22,355,346.03

2 4.1.1.17 Pek. Pembesian Kg 277.00 Rp 15,367 Rp 4,256,778.34

1 4.1.1.23 Pek. Bekisting M2 55.00 Rp 399,621 Rp 21,979,132.54

TOTAL PEKERJAAN STRUKTURAL DI BAWAH TANAH Rp 1,101,945,691.01

TOTAL ITEM DIVISI 3 : PEKERJAAN STRUKTURAL Rp 4,425,692,985.22

IV DIVISI 4 : PEKERJAAN ARSITEKTURAL

IV.1 PEKERJAAN FINISHING DINDING


IV.1.1 PEKERJAAN FINISHING DINDING LANTAI 1
1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps M2 856.75 Rp 144,718 Rp 123,986,975.43

2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm M2 1,713.50 Rp 60,716 Rp 104,037,397.96

3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm M2 514.05 Rp 60,716 Rp 31,211,219.39

4 4.4.2.27 Pek. Acian Dinding M2 1,713.50 Rp 38,139 Rp 65,350,946.23

5 4.4.2.27 Pek. Acian Beton M2 514.05 Rp 38,139 Rp 19,605,283.87

6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air) M2 18.29 Rp 372,718 Rp 6,815,151.81

7 An.Ter Pek. Roster Beton Bh 144.00 Rp 45,108 Rp 6,495,488.88

IV.1.2 PEKERJAAN FINISHING DINDING LANTAI 2


1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps M2 646.75 Rp 151,545 Rp 98,012,126.02

2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm M2 1,293.50 Rp 64,462 Rp 83,381,998.47

3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm M2 388.05 Rp 64,462 Rp 25,014,599.54

4 4.4.2.27 Pek. Acian Dinding M2 1,293.50 Rp 38,139 Rp 49,332,637.63

5 4.4.2.27 Pek. Acian Beton M2 388.05 Rp 38,139 Rp 14,799,791.29

6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air) M2 18.29 Rp 372,718 Rp 6,815,151.81

7 An.Ter Pek. Roster Beton Bh 144.00 Rp 45,108 Rp 6,495,488.88

IV.1.3 PEKERJAAN FINISHING DINDING LANTAI 3


1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps M2 916.75 Rp 151,545 Rp 138,929,391.26

2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm M2 1,833.50 Rp 64,462 Rp 118,191,603.02

3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm M2 550.05 Rp 64,462 Rp 35,457,480.91

4 4.4.2.27 Pek. Acian Dinding M2 1,833.50 Rp 38,139 Rp 69,927,605.83

5 4.4.2.27 Pek. Acian Beton M2 550.05 Rp 38,139 Rp 20,978,281.75

6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air) M2 18.29 Rp 372,718 Rp 6,815,151.81

7 An.Ter Pek. Roster Beton Bh 144.00 Rp 45,108 Rp 6,495,488.88


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

IV.1.4 PEKERJAAN FINISHING DINDING LANTAI BASEMENT


1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps M2 346.75 Rp 151,545 Rp 52,548,497.98

2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm M2 693.50 Rp 64,462 Rp 44,704,660.09

3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm M2 208.05 Rp 64,462 Rp 13,411,398.03

4 4.4.2.27 Pek. Acian Dinding M2 693.50 Rp 38,139 Rp 26,449,339.63

5 4.4.2.27 Pek. Acian Beton M2 208.05 Rp 38,139 Rp 7,934,801.89

6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air) M2 18.29 Rp 372,718 Rp 6,815,151.81

7 An.Ter Pek. Water Proofing Membrant Asphalt Ground Water Tank M2 18.29 Rp 336,917 Rp 6,160,522.63

IV.1.5 PEKERJAAN FINISHING FASADE


1 4.4.1.4 Pek. Aluminium Composite Panel M2 76.75 Rp 1,698,953 Rp 130,395,994.37

2 4.4.2.5 Pek. Batu Alam M2 110.00 Rp 457,556 Rp 50,331,162.20

3 4.4.2.27 Pek. Dinding Granit Ukuran 80x80 M2 95.00 Rp 626,493 Rp 59,516,820.73

TOTAL PEKERJAAN FINISHING DINDING Rp 1,436,417,610.01

IV.2 PEKERJAAN FINISHING LANTAI


IV.2.1 PEKERJAAN FINISHING LANTAI AREA LANTAI 1
1 An.Ter Pek. Homogenous Tile Ukuran 60x60 M2 146.85 Rp 455,007

2 An.Ter Pek. Tegel Keramik 50x50 M2 23.11 Rp 255,710

3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 50 X 50 cm (Teras Dan WC/Kamar Mandi) M2 28.29 Rp 255,710

4 An.Ter Pek. Waterproofing Couting Lantai KM/WC + Grouting M2 28.29 Rp 71,642

TOTAL PEKERJAAN FINISHING LANTAI Rp 112,020,647.16

IV.3 PEKERJAAN PINTU DAN JENDELA


IV.3.1 PEKERJAAN PINTU DAN JENDELA LANTAI 1
1 An.Ter Pek. Pintu (P1) + Aksesoris Set 6.00 Rp 2,555,596 Rp 15,333,578.32

2 An.Ter Pek. Pintu (P2) + Aksesoris Set 3.00 Rp 1,527,539 Rp 4,582,615.64

3 An.Ter Pek. Jendela (J1) + Aksesoris Set 12.00 Rp 1,006,332 Rp 12,075,982.24

4 An.Ter Pek. Ventilasi (V1) + Aksesoris Set 3.00 Rp 203,675 Rp 611,023.98

TOTAL PEKERJAAN PINTU DAN JENDELA Rp 32,603,200.19

IV.4 PEKERJAAN ATAP DAN LANGIT-LANGIT


IV.4.1 PEKERJAAN ATAP
1 An.Ter Pek. Atap Genteng Metal + Rangka Baja Ringan M2 229.07 Rp 258,215 Rp 59,148,853.82

2 4.5.2.36 Pek. Nok Genteng Metal M' 73.80 Rp 87,317 Rp 6,443,966.93

3 An.Ter Pek. Profil Listplank M' 118.50 Rp 75,831 Rp 8,985,973.50

4 An.Ter Pek. Waterproofing Couting Dak Atap M2 230.00 Rp 71,642 Rp 16,477,771.41

5 An.Ter Pek. Screed Dak Atap M2 230.00 Rp 60,716 Rp 13,964,738.36

6 An.Ter Pek. Water Proofing Membrant Asphalt Dak Atap M2 230.00 Rp 209,737 Rp 48,239,510.00

IV.4.2 PEKERJAAN LANGIT-LANGIT LANTAI 1


1 An.Ter Pek. Langit-Langit Gypsum + Rangka Metal Hollow M2 584.00 Rp 187,250 Rp 109,354,637.29

2 An.Ter Pek. Expose Plat Beton M2 700.81 Rp 38,139 Rp 26,727,902.59

3 An.Ter Pek. Langit-Langit Nusaboard + Rangka Metal Hollow (KM/WC, Teras Dan Talang) M2 40.77 Rp 169,371 Rp 6,905,240.48

4 An.Ter Pek. Profil List Gypsum M' 45.90 Rp 65,062 Rp 2,986,350.96

5 An.Ter Pek. Manhole Uk. 50x50 Bh 10.00 Rp 21,790 Rp 217,896.25

TOTAL PEKERJAAN ATAP DAN LANGIT-LANGIT Rp 299,452,841.58

IV.5 PEKERJAAN PENGECATAN


IV.5.1 PEKERJAAN PENGECATAN LANTAI 1
1 An.Ter Pek. Cat Dinding Ex. Jotun (Acrylic Emultion + Weather Shield) M2 648.70 Rp 45,671 Rp 29,627,241.95

2 An.Ter Pek. Cat Langit-Langit Ex. Jotun (Acrylic Emultion) M2 231.00 Rp 48,058 Rp 11,101,336.40

3 An.Ter Pek. Cat Batu Alam M2 112.00 Rp 39,876 Rp 4,466,140.00

TOTAL PEKERJAAN PENGECATAN Rp 45,194,718.35

TOTAL ITEM DIVISI 4 : PEKERJAAN ARSITEKTURAL Rp 1,925,689,017.30


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

V DIVISI 5 : PEKERJAAN MEKANIKAL

V.1 PEKERJAAN SANITARY


V.1.1 PEKERJAAN SANITARY LANTAI 1
1 5.1.1.1 Pek. Pemasangan Kloset Jongkok Set 8.00 Rp 2,453,469 Rp 19,627,754.72

2 5.1.1.35 Pek. Pemasangan Kran Air Bh 8.00 Rp 154,217 Rp 1,233,738.40


3 5.1.1.36 Pek. Pemasangan Floor Drain Bh 8.00 Rp 154,217 Rp 1,233,738.40
4 An.Ter Pek. Soap Holder Bh 8.00 Rp 135,010 Rp 1,080,080.00

TOTAL PEKERJAAN SANITARY Rp 23,175,311.52

V.2 PEKERJAAN INSTALASI AIR BERSIH


V.2.1 PEKERJAAN INSTALASI AIR BERSIH LANTAI BASEMENT
1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (ke Outlet) M' 284.70 Rp 25,396 Rp 7,230,241.11

2 An.Ter Gate Valve Dimensi 1/2" Bh 5.00 Rp 162,380 Rp 811,900.00


3 An.Ter Fitting Pipa PVC Ls 1.00 Rp 1,459,063 Rp 1,459,062.66

V.2.2 PEKERJAAN INSTALASI AIR BERSIH LANTAI 1


1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (ke Outlet) M' 164.70 Rp 25,396 Rp 4,182,721.15

2 An.Ter Gate Valve Dimensi 1/2" Bh 3.00 Rp 162,380 Rp 487,140.00


3 An.Ter Fitting Pipa PVC Ls 1.00 Rp 844,073 Rp 844,073.13

V.2.3 PEKERJAAN INSTALASI AIR BERSIH LANTAI 2


1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (ke Outlet) M' 164.70 Rp 25,396 Rp 4,182,721.15

2 An.Ter Gate Valve Dimensi 1/2" Bh 3.00 Rp 162,380 Rp 487,140.00


3 An.Ter Fitting Pipa PVC Ls 1.00 Rp 844,073 Rp 844,073.13

V.2.4 PEKERJAAN INSTALASI AIR BERSIH LANTAI 3


1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (ke Outlet) M' 164.70 Rp 25,396 Rp 4,182,721.15

2 An.Ter Gate Valve Dimensi 1/2" Bh 3.00 Rp 162,380 Rp 487,140.00

3 An.Ter Fitting Pipa PVC Ls 1.00 Rp 844,073 Rp 844,073.13

TOTAL PEKERJAAN INSTALASI AIR BERSIH Rp 26,043,006.61

V.3 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER)


V.3.1 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) LANTAI BASEMENT
1 5.1.1.31 Pipa PVC Type AW Diameter 3" M' 61.80 Rp 47,375 Rp 2,927,799.72

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 585,560 Rp 585,559.94

V.3.2 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 1


1 5.1.1.31 Pipa PVC Type AW Diameter 3" M' 61.80 Rp 47,375 Rp 2,927,799.72

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 585,560 Rp 585,559.94

V.3.3 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 2


1 5.1.1.31 Pipa PVC Type AW Diameter 3" M' 61.80 Rp 47,375 Rp 2,927,799.72

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 585,560 Rp 585,559.94

V.3.4 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 3


1 5.1.1.31 Pipa PVC Type AW Diameter 3" M' 61.80 Rp 47,375 Rp 2,927,799.72

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 585,560 Rp 585,559.94

TOTAL PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) Rp 14,053,438.66

V.4 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER)


V.4.1 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI BASEMENT
1 5.1.1.32 Pipa PVC Type AW Diameter 4" M' 90.00 Rp 50,963 Rp 4,586,706.00

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 917,341 Rp 917,341.20

3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali (Civil Work) M3 6.00 Rp 72,450 Rp 434,700.00

V.4.2 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 1


1 5.1.1.32 Pipa PVC Type AW Diameter 4" M' 90.00 Rp 50,963 Rp 4,586,706.00

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 917,341 Rp 917,341.20


3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali (Civil Work) M3 6.00 Rp 72,450 Rp 434,700.00

V.4.3 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 2


1 5.1.1.32 Pipa PVC Type AW Diameter 4" M' 90.00 Rp 50,963 Rp 4,586,706.00

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 917,341 Rp 917,341.20


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g
3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali (Civil Work) M3 6.00 Rp 72,450 Rp 434,700.00
RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

V.4.4 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 3


1 5.1.1.32 Pipa PVC Type AW Diameter 4" M' 90.00 Rp 50,963 Rp 4,586,706.00

2 An.Ter Fitting Pipa PVC Ls 1.00 Rp 917,341 Rp 917,341.20


3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali (Civil Work) M3 6.00 Rp 72,450 Rp 434,700.00

TOTAL PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) Rp 23,754,988.80

V.5 PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH


1 An.Ter Pek. Septiktank Fiberglass + Peresapan Unit 1.00 Rp 150,000,000 Rp 150,000,000.00

2 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali (Civil Work) M3 13.80 Rp 72,450 Rp 999,810.00

TOTAL PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH Rp 150,999,810.00

V.6 PEKERJAAN SUMBER AIR BERSIH


1 An.Ter Pek. Sumur Dalam Unit 1.00 Rp 200,000,000 Rp 200,000,000.00

Pengadaan dan pemasangan Pompa Sumur Dalam


Type : Submersible Pump
Daya : 3 HP
Lengkap Dengan Screen, proteksi, instalasi kabel daya/pemipaan (casing), dll
Kabel jenis waterproof, lengkap Panel Kontrol, dll
Pemipaan sampai ke Reservoir
Peralatan penunjang, Gate Valve, Check Valve, Meter air, Bak Kontrol, dan accessories lainnya.
Pengeboran dalam sampai mendapatkan Kapasitas air Min. 2liter/Detik (Jernih)
Pekerjaan harus mengikuti/memenuhi Standard DepKes-RI
2 An.Ter Pek. Pemasangan Mesin Pompa (Dari Sumber Air Ke Roof Water Tank) Unit 1.00 Rp 13,230,750 Rp 13,230,750.00

3 An.Ter Pek. Pemasangan Mesin Pompa (Dari Roof Water Tank Ke KM/WC) Unit 2.00 Rp 1,476,313 Rp 2,952,625.00

4 An.Ter Pek. Pemasangan Water Tank Unit 2.00 Rp 2,428,417 Rp 4,856,833.33


5 An.Ter Pek. Pemasangan Menara Air Set 1.00 Rp 10,000,000 Rp 10,000,000.00

6 An.Ter Pek. Pemasangan Floating Valve Bh 2.00 Rp 1,541,000 Rp 3,082,000.00

7 An.Ter Pek. Pemasangan Gate Valve Bh 5.00 Rp 266,915 Rp 1,334,575.00


8 An.Ter Pek. Pemasangan Pemipaan Utama M' 30.00 Rp 63,299 Rp 1,898,962.94
9 An.Ter Pek. Pemasangan Fitting Pipa Ls 1.00 Rp 379,793 Rp 379,792.59

10 An.Ter Pek. Tes Dan Komisioning Ls 1.00 Rp 2,000,000 Rp 2,000,000.00

TOTAL PEKERJAAN SUMBER AIR BERSIH Rp 239,735,538.86

V.6 PEKERJAAN PROTEKSI KEBAKARAN


V.6.1 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI BASEMENT
1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm M' 30.00 Rp 288,650 Rp 8,659,500.00

3 An.Ter - Diameter 50 mm M' 32.00 Rp 146,165 Rp 4,677,280.00

4 An.Ter - Diameter 40 mm M' 43.00 Rp 114,494 Rp 4,923,242.00

5 An.Ter - Diameter 25 mm M' 12.00 Rp 73,255 Rp 879,060.00


6 An.Ter Head Sprinkler Unit 13.00 Rp 410,550 Rp 5,337,150.00

7 An.Ter Gate Valve diameter 80 mm Unit 3.00 Rp 1,817,000 Rp 5,451,000.00


8 An.Ter Test Valve diameter 25 mm Unit 3.00 Rp 465,750 Rp 1,397,250.00

9 An.Ter Drain Valve diameter 25 mm Unit 3.00 Rp 465,750 Rp 1,397,250.00


10 An.Ter Water Flow Switch Unit 3.00 Rp 2,735,850 Rp 8,207,550.00
11 An.Ter Plat Orifice diameter 25 mm Unit 3.00 Rp 313,375 Rp 940,125.00

12 An.Ter Sight Gass 25mm Unit 3.00 Rp 2,305,750 Rp 6,917,250.00

13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP Ls 1.00 Rp 3,827,816 Rp 3,827,816.40


14 An.Ter Pek. Bobok Dinding + Perapian Ls 1.00 Rp 500,000 Rp 500,000.00
15 An.Ter Hydrant Pillar (HP), Two way type Unit 2.00 Rp 5,298,050 Rp 10,596,100.00

16 An.Ter Hose Rell Cabinet (HRC) type C Unit 2.00 Rp 3,751,683 Rp 7,503,366.67

17 An.Ter Fire Extinguisher 3Kg Unit 3.00 Rp 1,606,167 Rp 4,818,500.00

V.6.2 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI 1


1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm M' 30.00 Rp 288,650 Rp 8,659,500.00
3 An.Ter - Diameter 50 mm M' 32.00 Rp 146,165 Rp 4,677,280.00

4 An.Ter - Diameter 40 mm M' 43.00 Rp 114,494 Rp 4,923,242.00

5 An.Ter - Diameter 25 mm M' 12.00 Rp 73,255 Rp 879,060.00


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g
6 An.Ter Head Sprinkler Unit 13.00 Rp 410,550 Rp 5,337,150.00
7 An.Ter Gate Valve diameter 80 mm Unit 3.00 Rp 1,817,000 Rp 5,451,000.00
8 An.Ter Test Valve diameter 25 mm Unit 3.00 Rp 465,750 Rp 1,397,250.00

9 An.Ter Drain Valve diameter 25 mm Unit 3.00 Rp 465,750 Rp 1,397,250.00


10 An.Ter Water Flow Switch Unit 3.00 Rp 2,735,850 Rp 8,207,550.00
11 An.Ter Plat Orifice diameter 25 mm Unit 3.00 Rp 313,375 Rp 940,125.00
12 An.Ter Sight Gass 25mm Unit 3.00 Rp 2,305,750 Rp 6,917,250.00
13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP Ls 1.00 Rp 3,827,816 Rp 3,827,816.40

14 An.Ter Pek. Bobok Dinding + Perapian Ls 1.00 Rp 500,000 Rp 500,000.00


15 An.Ter Hydrant Pillar (HP), Two way type Unit 2.00 Rp 5,298,050 Rp 10,596,100.00

16 An.Ter Hose Rell Cabinet (HRC) type C Unit 2.00 Rp 3,751,683 Rp 7,503,366.67

17 An.Ter Fire Extinguisher 3Kg Unit 3.00 Rp 1,606,167 Rp 4,818,500.00

TOTAL PEKERJAAN PROTEKSI KEBAKARAN Rp 152,064,880.13

V.6 PEKERJAAN SISTEM TATA UDARA


V.6.1 PEKERJAAN SISTEM TATA UDARA LANTAI BASEMENT
1 Pek. Instalasi HVAC Ruang Unit 1.00 Rp 300,000,000 Rp 300,000,000.00

-Main Equipment
-Ducting
-Pipe Work
-Electrical Work
-Controls for AHU
-Civil & Construction Work
-Preliminary & Documentation
2 Pekerjaan Unit Air Conditioning VRV System
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type Unit 7.00 Rp 26,410,331 Rp 184,872,315.25

An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type Unit 5.00 Rp 5,180,980 Rp 25,904,900.00

3 An.Ter Pemipaan Refrigrant berisolasi M' 3.00 Rp 451,134 Rp 1,353,400.50


4 An.Ter Pemipaan Drain / PVC AW berisolasi M' 1.00 Rp 136,737 Rp 136,736.73
5 An.Ter Fitting-Fitting Ls 1.00 Rp 27,347 Rp 27,347.35

6 An.Ter Titik Instalasi daya AC Unit Titik 12.00 Rp 242,593 Rp 2,911,110.00

7 Ducting AC dengan isolasi


An.Ter - 55" x 25 " M' 30.00 Rp 4,000,000 Rp 120,000,000.00

An.Ter - 40" x 25 " M' 30.00 Rp 3,000,000 Rp 90,000,000.00

An.Ter - Fresh Air Grille ( FAG 25"x25") Bh 45.00 Rp 900,000 Rp 40,500,000.00

An.Ter - Intake Air Grille ( EAG 55"x25") Bh 45.00 Rp 1,200,000 Rp 54,000,000.00

V.6.2 PEKERJAAN SISTEM TATA UDARA LANTAI 1


1 Pekerjaan Unit Air Conditioning VRV System Include Outdoor
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type Unit 7.00 Rp 26,410,331 Rp 184,872,315.25

An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type Unit 5.00 Rp 5,180,980 Rp 25,904,900.00

2 An.Ter Pemipaan Refrigrant berisolasi M' 3.00 Rp 451,134 Rp 1,353,400.50

3 An.Ter Pemipaan Drain / PVC AW berisolasi M' 1.00 Rp 136,737 Rp 136,736.73

4 An.Ter Fitting-Fitting Ls 1.00 Rp 27,347 Rp 27,347.35

5 An.Ter Titik Instalasi daya AC Unit Titik 12.00 Rp 242,593 Rp 2,911,110.00


6 Ducting AC dengan isolasi
An.Ter - 55" x 25 " M' 30.00 Rp 4,000,000 Rp 120,000,000.00

An.Ter - 40" x 25 " M' 30.00 Rp 3,000,000 Rp 90,000,000.00

An.Ter - Fresh Air Grille ( FAG 25"x25") Bh 45.00 Rp 900,000 Rp 40,500,000.00


An.Ter - Intake Air Grille ( EAG 55"x25") Bh 45.00 Rp 1,200,000 Rp 54,000,000.00

TOTAL PEKERJAAN SISTEM TATA UDARA Rp 1,339,411,619.64

TOTAL ITEM DIVISI 5 : PEKERJAAN MEKANIKAL Rp 1,729,503,055.36

VI DIVISI 6 : PEKERJAAN ELEKTRIKAL

VI.1 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL


VI.1.1 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI BASEMENT
RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g
1 SDP Unit 1.00 Rp 18,893,302 Rp 18,893,301.70

2 LP-B Unit 1.00 Rp 4,020,515 Rp 4,020,515.00


3 PP-B Unit 1.00 Rp 4,190,370 Rp 4,190,370.00
4 PP-ARUS LEMAH B Unit 1.00 Rp 4,495,465 Rp 4,495,465.00

5 Pek. Instalasi Kabel Feeder


6 Dari SDP ke LP-B, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41
7 Dari SDP ke PP-B, NYY 4 x 16 mm3 M' 10.00 Rp 47,605 Rp 476,054.41
8 Dari SDP- ke PP - Arus Lemah B, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41
9 Pek. Rak Kabel Uk. 40cm M' 50.00 Rp 649,745 Rp 32,487,270.00

VI.1.2 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 1
1 LP-1 Unit 1.00 Rp 4,020,515 Rp 4,020,515.00

2 PP-1 Unit 1.00 Rp 4,190,370 Rp 4,190,370.00

3 PP-ARUS LEMAH 1 Unit 1.00 Rp 4,495,465 Rp 4,495,465.00

4 Pek. Instalasi Kabel Feeder


5 Dari SDP ke LP-1, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41

6 Dari SDP ke PP-1, NYY 4 x 16 mm3 M' 10.00 Rp 47,605 Rp 476,054.41

7 Dari SDP- ke PP - Arus Lemah 1, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41
8 Pek. Rak Kabel Uk. 40cm M' 50.00 Rp 649,745 Rp 32,487,270.00

VI.1.3 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 2
1 LP-2 Unit 1.00 Rp 4,020,515 Rp 4,020,515.00

2 PP-2 Unit 1.00 Rp 4,190,370 Rp 4,190,370.00


3 PP-ARUS LEMAH 2 Unit 1.00 Rp 4,495,465 Rp 4,495,465.00
4 Pek. Instalasi Kabel Feeder
5 Dari SDP ke LP-2, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41

6 Dari SDP ke PP-2, NYY 4 x 16 mm3 M' 10.00 Rp 47,605 Rp 476,054.41

7 Dari SDP- ke PP - Arus Lemah 2, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41
8 Pek. Rak Kabel Uk. 40cm M' 50.00 Rp 649,745 Rp 32,487,270.00

VI.1.4 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 3
1 LP-3 Unit 1.00 Rp 4,020,515 Rp 4,020,515.00

2 PP-3 Unit 1.00 Rp 4,190,370 Rp 4,190,370.00


3 PP-ARUS LEMAH 3 Unit 1.00 Rp 4,495,465 Rp 4,495,465.00
4 Pek. Instalasi Kabel Feeder
5 Dari SDP ke LP-3, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41
6 Dari SDP ke PP-3, NYY 4 x 16 mm3 M' 10.00 Rp 47,605 Rp 476,054.41
7 Dari SDP- ke PP - Arus Lemah 3, NYY 4 x 4 mm2 M' 10.00 Rp 37,485 Rp 374,854.41

8 Pek. Rak Kabel Uk. 40cm M' 50.00 Rp 649,745 Rp 32,487,270.00

TOTAL PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL Rp 204,570,834.67

VI.2 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN


VI.2.1 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1
1 Saklar Tunggal Bh 14.00 Rp 71,507 Rp 1,001,098.00

2 Saklar Ganda Bh 8.00 Rp 78,407 Rp 627,256.00

3 Stop Kontak Bh 21.00 Rp 77,142 Rp 1,619,982.00

4 Instalasi penerangan, NYM 3 x 2,5 mm2 Titik 74.00 Rp 176,942 Rp 13,093,741.30


5 Instalasi stop kontak, NYM 3 x 2,5 mm2 Titik 21.00 Rp 176,942 Rp 3,715,791.45

6 Downlight 4" Type Outbow + Lampu SL 18 Watt Bh 12.00 Rp 205,850 Rp 2,470,200.00

7 Lampu Spot Bh 3.00 Rp 502,931 Rp 1,508,792.30

8 Downlight 4" + Lampu SL 18 Watt Bh 38.00 Rp 194,156 Rp 7,377,919.07


9 Downlight 4" + Lampu SL 11 Watt Bh 21.00 Rp 186,106 Rp 3,908,221.07

VI.2.2 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1


1 Saklar Tunggal Bh 14.00 Rp 71,507 Rp 1,001,098.00

2 Saklar Ganda Bh 8.00 Rp 78,407 Rp 627,256.00

3 Stop Kontak Bh 21.00 Rp 77,142 Rp 1,619,982.00


4 Instalasi penerangan, NYM 3 x 2,5 mm2 Titik 74.00 Rp 176,942 Rp 13,093,741.30
5 Instalasi stop kontak, NYM 3 x 2,5 mm2 Titik 21.00 Rp 176,942 Rp 3,715,791.45

6 Downlight 4" Type Outbow + Lampu SL 18 Watt Bh 12.00 Rp 205,850 Rp 2,470,200.00

7 Lampu Spot Bh 3.00 Rp 502,931 Rp 1,508,792.30

8 Downlight 4" + Lampu SL 18 Watt Bh 38.00 Rp 194,156 Rp 7,377,919.07


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g
9 Downlight 4" + Lampu SL 11 Watt Bh 21.00 Rp 186,106 Rp 3,908,221.07

TOTAL PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN Rp 70,646,002.36


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

VI.3 PEKERJAAN SISTEM TATA SUARA


VI.3.1 PEKERJAAN SISTEM TATA SUARA LANTAI BASEMENT
A Pek. Sentral
1 An.Ter Pek. Pemasangan 2x700 W Power Amplifier Unit 1.00 Rp 6,451,500 Rp 6,451,500.14
2 An.Ter Instalasi Daya Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC M' 50.00 Rp 31,142 Rp 1,557,100.00
3 An.Ter Pek. Pemasangan CD / DVD/MP3 - Player Unit 1.00 Rp 1,439,685 Rp 1,439,685.00
4 An.Ter Pek. Pemasangan Mixer Unit 1.00 Rp 14,531,435 Rp 14,531,434.96
5 An.Ter Pek. Pemasangan Selector Speaker Unit 1.00 Rp 253,000 Rp 253,000.46
6 An.Ter Pek. Pemasangan MDF-S Unit 1.00 Rp 4,492,038 Rp 4,492,038.00
7 An.Ter Pek. Pemasangan Equalizer Unit 1.00 Rp 3,312,529 Rp 3,312,529.46
9 An.Ter Pek. Pemasangan Mic Paging Unit 1.00 Rp 1,063,751 Rp 1,063,750.69
10 An.Ter Pek. Pemasangan Cabinet Rack Type Standing Unit 1.00 Rp 5,984,083 Rp 5,984,082.96
B Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-B Set 1.00 Rp 707,641 Rp 707,641.46
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 ) M' 100.00 Rp 23,150 Rp 2,314,950.00
3 An.Ter Pek. Pemasangan Ceiling Speaker Bh 10.00 Rp 276,920 Rp 2,769,199.54
4 An.Ter Pek. Pemasangan Horn Speaker Bh 5.00 Rp 1,440,536 Rp 7,202,680.84
5 An.Ter Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 15.00 Rp 334,641 Rp 5,019,612.00

VI.3.2 PEKERJAAN SISTEM TATA SUARA LANTAI 1


A Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-1 Set 1.00 Rp 707,641 Rp 707,641.46
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 ) M' 100.00 Rp 23,150 Rp 2,314,950.00
3 An.Ter Pek. Pemasangan Ceiling Speaker Bh 10.00 Rp 276,920 Rp 2,769,199.54

4 An.Ter Pek. Pemasangan Horn Speaker Bh 5.00 Rp 1,440,536 Rp 7,202,680.84

5 An.Ter Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit Titik 15.00 Rp 334,641 Rp 5,019,612.00

TOTAL PEKERJAAN SISTEM TATA SUARA Rp 75,113,289.35

VI.4 PEKERJAAN SISTEM MATV


VI.4.1 PEKERJAAN SISTEM MATV LANTAI BASEMENT
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way Bh 3.00 Rp 501,515 Rp 1,504,545.69
2 An.Ter Pek. Pemasangan Spliter 2 way Bh 2.00 Rp 411,700 Rp 823,400.46
3 An.Ter Pek. Pemasangan Outlet TV Bh 5.00 Rp 214,115 Rp 1,070,572.95
4 An.Ter Pek. Pemasangan LED TV 32" Bh 5.00 Rp 5,452,725 Rp 27,263,626.15
5 An.Ter Pek. Titik instalasi, Coaxial Cable RG6 (dalam conduit) Titik 5.00 Rp 237,897 Rp 1,189,485.48

VI.4.2 PEKERJAAN SISTEM MATV LANTAI 1


A Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way Bh 3.00 Rp 501,515 Rp 1,504,545.69
2 An.Ter Pek. Pemasangan Spliter 2 way Bh 2.00 Rp 411,700 Rp 823,400.46

3 An.Ter Pek. Pemasangan Outlet TV Bh 5.00 Rp 214,115 Rp 1,070,572.95

4 An.Ter Pek. Pemasangan LED TV 32" Bh 5.00 Rp 5,452,725 Rp 27,263,626.15

5 An.Ter Pek. Titik instalasi, Coaxial Cable RG6 (dalam conduit) Titik 5.00 Rp 237,897 Rp 1,189,485.48

TOTAL PEKERJAAN SISTEM MATV Rp 63,703,261.46

VI.5 PEKERJAAN SISTEM CCTV


VI.5.1 PEKERJAAN SISTEM CCTV LANTAI BASEMENT
A Pek. Sentral
1 An.Ter Pek. Pemasangan Power Suply Bh 1.00 Rp 5,248,083 Rp 5,248,082.50

2 An.Ter Instalasi Daya Dari Panel Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC M' 50.00 Rp 31,142 Rp 1,557,100.00
3 An.Ter Pek. Pemasangan UPS 1 Kva Bh 1.00 Rp 5,202,600 Rp 5,202,600.00
4 An.Ter Pek. Pemasangan 32" LCD Monitor Bh 1.00 Rp 5,017,853 Rp 5,017,852.50
5 An.Ter Pek. Pemasangan Digital Disc Recorder 8 Channel, Video real time 2 Slot HDD Bh 1.00 Rp 11,811,305 Rp 11,811,305.46
6 An.Ter Pek. Pemasangan Rack CCTV Bh 1.00 Rp 2,445,475 Rp 2,445,475.00

B Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera Bh 7.00 Rp 3,003,340 Rp 21,023,380.00
2 An.Ter Pek. Pemasangan Instalasi Camera M' 90.00 Rp 23,150 Rp 2,083,455.00
RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

VI.5.2 PEKERJAAN SISTEM CCTV LANTAI 1


A Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera Bh 7.00 Rp 3,003,340 Rp 21,023,380.00
2 An.Ter Pek. Pemasangan Instalasi Camera M' 90.00 Rp 23,150 Rp 2,083,455.00

TOTAL PEKERJAAN SISTEM CCTV Rp 77,496,085.46

VI.5 PEKERJAAN SISTEM FIRE ALARM


VI.5.1 PEKERJAAN SISTEM FIRE ALARM LANTAI BASEMENT
A Pek. Sentral
1 An.Ter MCFA, Kap.5 Zone (Sistem Konvensional) Unit 1.00 Rp 10,345,400 Rp 10,345,400.00
2 An.Ter Instalasi Daya Dari Panel, NYM 3 x 2,5 mm2 dalam conduit PVC M' 50.00 Rp 31,142 Rp 1,557,100.00
3 An.Ter MDF-FA Set 1.00 Rp 4,932,350 Rp 4,932,350.00
4 An.Ter Kabel dari MCFA ke MDF-FA (Kabel NYA 1x1,5 mm2) M' 20.00 Rp 26,053 Rp 521,065.00

5 An.Ter Instalasi AC Shut Down Dari MCFA PP AC2, NYA 2 (1x 1,5 mm2) dalam conduit PVC M' 50.00 Rp 26,053 Rp 1,302,662.50

B Pek. Instalasi
1 An.Ter TBFA - B Set 1.00 Rp 707,641 Rp 707,641.46

2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2) M' 100.00 Rp 26,053 Rp 2,605,325.00
3 An.Ter ROR Bh 10.00 Rp 765,191 Rp 7,651,908.33
4 An.Ter Smoke Detector Bh 10.00 Rp 1,398,400 Rp 13,984,002.30

5 An.Ter Manual Breack Glass Bh 3.00 Rp 437,176 Rp 1,311,529.00

6 An.Ter Bell Alarm Bh 3.00 Rp 610,228 Rp 1,830,685.00


7 An.Ter Indicator Lamp Bh 3.00 Rp 328,670 Rp 986,010.00

8 An.Ter Jack Telephone Bh 3.00 Rp 682,333 Rp 2,047,000.00

9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75
10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75
11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC M' 75.00 Rp 26,053 Rp 1,953,993.75

VI.5.2 PEKERJAAN SISTEM FIRE ALARM LANTAI 1


A Pek. Instalasi
1 An.Ter TBFA - 1 Set 1.00 Rp 707,641 Rp 707,641.46
2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2) M' 100.00 Rp 26,053 Rp 2,605,325.00
3 An.Ter ROR Bh 10.00 Rp 765,191 Rp 7,651,908.33
4 An.Ter Smoke Detector Bh 10.00 Rp 1,398,400 Rp 13,984,002.30
5 An.Ter Manual Breack Glass Bh 3.00 Rp 437,176 Rp 1,311,529.00
6 An.Ter Bell Alarm Bh 3.00 Rp 610,228 Rp 1,830,685.00
7 An.Ter Indicator Lamp Bh 3.00 Rp 328,670 Rp 986,010.00

8 An.Ter Jack Telephone Bh 3.00 Rp 682,333 Rp 2,047,000.00

9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2 M' 75.00 Rp 26,053 Rp 1,953,993.75

13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC M' 75.00 Rp 26,053 Rp 1,953,993.75

TOTAL PEKERJAAN SISTEM FIRE ALARM Rp 100,446,717.19

VI.6 PEKERJAAN SISTEM PENTANAHAN (GROUNDING)


A PEKERJAAN SISTEM PENANGKAL PETIR
1 An.Ter Pek. Arester Lighting Protection Radius 50 Meter Unit 1.00 Rp 21,505,000 Rp 21,505,000.00

2 An.Ter Pek. Tiang Pipa + Aksesoris Ls 1.00 Rp 750,000 Rp 750,000.00


3 An.Ter Pek. Down Conductor BC 50 mm + Aksesoris M' 100.00 Rp 62,728 Rp 6,272,790.00

4 An.Ter Pek. Grounding System Max. 1 Ohm Ls 1.00 Rp 500,000 Rp 500,000.00

Copper Rod, Clamp Rod, BAR CU, Kontrol Box


5 An.Ter Bak Kontrol Unit 1.00 Rp 137,273 Rp 137,272.63

6 An.Ter Material Bantu Ls 1.00 Rp 500,000 Rp 500,000.00


RENCANA ANGGARAN BIAYA

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGARAN : 0

Kode
No URAIAN PEKERJAAN SATUAN VOLUME HARGA SATUAN JUMLAH HARGA
ANALISA

a b c d e f g

B PEKERJAAN GROUNDING ARUS KUAT


1 An.Ter Pek. Kabel BC 4 mm + Aksesoris M' 30.00 Rp 19,517 Rp 585,499.50

2 An.Ter Pek. Grounding System Max. 1 Ohm Ls 1.00 Rp 750,000 Rp 750,000.00

Copper Rod, Clamp Rod, BAR CU, Kontrol Box


4 An.Ter Bak Kontrol Ls 1.00 Rp 137,273 Rp 137,272.63

Material Bantu
C PEKERJAAN GROUNDING ARUS LEMAH
1 An.Ter Pek. Kabel BC 4 mm + Aksesoris M' 30.00 Rp 19,517 Rp 585,499.50

2 An.Ter Pek. Grounding System Max. 1 Ohm Ls 1.00 Rp 750,000 Rp 750,000.00


3 An.Ter Copper Rod, Clamp Rod, BAR CU, Kontrol Box
4 An.Ter Bak Kontrol Ls 1.00 Rp 137,273 Rp 137,272.63

Material Bantu
5 An.Ter Pek. Testing & Commisioning Ls 1.00 Rp 1,000,000 Rp 1,000,000.00

TOTAL PEKERJAAN SISTEM PENTANAHAN (GROUNDING) Rp 33,610,606.88

TOTAL ITEM DIVISI 6 : PEKERJAAN ELEKTRIKAL Rp 625,586,797.36

VII DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN

1 An.Ter Pek. Taman


- Pasangan Dinding M2 3.00 Rp 144,718 Rp 434,153.00

- Tanah Subur M3 3.00 Rp 203,205 Rp 609,615.00

- Rumput Gajah Mini M2 3.00 Rp 170,338 Rp 511,014.00

TOTAL ITEM DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN Rp 1,554,782.00


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

DIVISI 2 : SITE WORK


ANALISA PEKERJAAN TANAH
2.3.1.1 PerMen No 11-PRT-M-2013
Menggali 1 m3 tanah biasa sedalam 1 meter
A BAHAN

B TENAGA
0.750 Org/Hr. Pekerja Rp 80,000.00 Rp 60,000.00
0.025 Org/Hr. Mandor Rp 120,000.00 Rp 3,000.00
C ALAT

D JUMLAH (A+B+C) Rp 63,000.00


E 15 % Over Head + Profit (15% x D) Rp 9,450.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 72,450.00

2.3.1.10 PerMen No 11-PRT-M-2013


memadatkan 1 m3 tanah (per 20 cm)
A BAHAN

B TENAGA
0.500 Org/Hr. Pekerja Rp 80,000.00 Rp 40,000.00
0.050 Org/Hr. Mandor Rp 120,000.00 Rp 6,000.00
C ALAT
0.050 Alat/hari Sewa Stamper Rp 150,000.00 Rp 7,500.00
D JUMLAH (A+B+C) Rp 53,500.00
E 15 % Over Head + Profit (15% x D) Rp 8,025.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 61,525.00

2.3.1.8 PerMen No 11-PRT-M-2013


Membuang 1 m3 tanah sejauh 30 meter
A BAHAN

B TENAGA
0.330 Org/Hr. Pekerja Rp 80,000.00 Rp 26,400.00
0.010 Org/Hr. Mandor Rp 120,000.00 Rp 1,200.00
C ALAT

D JUMLAH (A+B+C) Rp 27,600.00

E 15 % Over Head + Profit (15% x D) Rp 4,140.00


F HARGA SATUAN PEKERJAAN (D+E) Rp 31,740.00

2.3.1.11 PerMen No 11-PRT-M-2013


Mengurug 1 m3 pasir urug
A BAHAN
1.200 M3 Pasir Urug Rp 101,000.00 Rp 121,200.00
B TENAGA
0.300 Org/Hr. Pekerja Rp 80,000.00 Rp 24,000.00
0.010 Org/Hr. Mandor Rp 120,000.00 Rp 1,200.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

C ALAT

D JUMLAH (A+B+C) Rp 146,400.00

E 15 % Over Head + Profit (15% x D) Rp 21,960.00


F HARGA SATUAN PEKERJAAN (D+E) Rp 168,360.00

PerMen No 11-PRT-M-2013
Mengurug 1 m3 tanah
A BAHAN
1.200 M3 Tanah Urug Rp 90,900.00 Rp 109,080.00
B TENAGA
0.300 Org/Hr. Pekerja Rp 80,000.00 Rp 24,000.00
0.010 Org/Hr. Mandor Rp 120,000.00 Rp 1,200.00
C ALAT

D JUMLAH (A+B+C) Rp 134,280.00


E 15 % Over Head + Profit (15% x D) Rp 20,142.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 154,422.00

DIVISI 3 : PEKERJAAN STRUKTURAL


ANALISA PEKERJAAN PONDASI
3.2.1.3 PerMen No 11-PRT-M-2013
Memasang 1 m3 pondasi batu belah, campuran 1 PC : 5 PP
A BAHAN
1.200 M3 Batu Kali Rp 151,500.00 Rp 181,800.00
136.000 Kg Portland Cement Rp 1,373.60 Rp 186,809.60
0.544 M3 Pasir pasang Rp 101,000.00 Rp 54,944.00
B TENAGA
1.500 Org/Hr. Pekerja Rp 80,000.00 Rp 120,000.00
0.750 Org/Hr. Tukang Batu Rp 100,000.00 Rp 75,000.00
0.075 Org/Hr. Kepala Tukang Rp 150,000.00 Rp 11,250.00
0.075 Org/Hr. Mandor Rp 120,000.00 Rp 9,000.00
C ALAT

D JUMLAH (A+B+C) Rp 638,803.60


E 15 % Over Head + Profit (15% x D) Rp 95,820.54
F HARGA SATUAN PEKERJAAN (D+E) Rp 734,624.14

3.2.1.9 PerMen No 11-PRT-M-2013


Memasang 1 m3 batu kosong (aanstamping)
A BAHAN

1.200 m 3
Batu belah 15 cm/20 cm Rp 202,000.00 Rp 242,400.00

0.432 m 3
Pasir urug Rp 101,000.00 Rp 43,632.00

B TENAGA
0.780 Org/Hr. Pekerja Rp 80,000.00 Rp 62,400.00
0.390 Org/Hr. Tukang batu Rp 100,000.00 Rp 39,000.00
0.039 Org/Hr. Kepala tukang Rp 150,000.00 Rp 5,850.00
0.039 Org/Hr. Mandor Rp 120,000.00 Rp 4,680.00
C ALAT
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

D JUMLAH (A+B+C) Rp 397,962.00


E 15 % Over Head + Profit (15% x D) Rp 59,694.30
F HARGA SATUAN PEKERJAAN (D+E) Rp 457,656.30
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

ANALISA PEKERJAAN BETON


4.1.1.1 PerMen No 11-PRT-M-2013
Membuat 1 m3 beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
A BAHAN
247.00 kg Portland Cement Rp 1,373.60 Rp 339,279.20
869.000 kg Pasir beton (Kg) Rp 72.14 Rp 62,692.14
999.00 kg Koral Beton (Kg) Rp 265.59 Rp 265,327.00
215.00 Liter Air Rp 100.00 Rp 21,500.00
B TENAGA
1.650 Org/Hr. Pekerja Rp 80,000.00 Rp 132,000.00
0.275 Org/Hr. Tukang batu Rp 100,000.00 Rp 27,500.00
0.028 Org/Hr. Kepala tukang Rp 150,000.00 Rp 4,200.00
0.083 Org/Hr. Mandor Rp 120,000.00 Rp 9,960.00
C ALAT

D JUMLAH (A+B+C) Rp 862,458.34


E 15 % Over Head + Profit (15% x D) Rp 129,368.75
F HARGA SATUAN PEKERJAAN (D+E) Rp 991,827.09

4.1.1.8 PerMen No 11-PRT-M-2013


Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
A BAHAN
384.000 Kg Portland Cement Rp 1,373.60 Rp 527,462.40
692.000 Kg Pasir beton (kg) Rp 72.14 Rp 49,922.86
1039.000 Kg Koral beton (kg) Rp 265.59 Rp 275,950.70
215.000 Liter Air Rp 100.00 Rp 21,500.00
B TENAGA
1.650 Org/Hr. Pekerja Rp 80,000.00 Rp 132,000.00
0.275 Org/Hr. Tukang batu Rp 100,000.00 Rp 27,500.00
0.028 Org/Hr. Kepala tukang Rp 150,000.00 Rp 4,200.00
0.083 Org/Hr. Mandor Rp 120,000.00 Rp 9,960.00
C ALAT
0.100 Alat/Hr. Sewa Vibrator Rp 250,000.00 Rp 25,000.00
0.200 Alat/Hr. Sewa Molen Rp 350,000.00 Rp 70,000.00
D JUMLAH (A+B+C) Rp 1,143,495.96
E 15 % Over Head + Profit (15% x D) Rp 171,524.39
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,315,020.35

Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
A BAHAN
448 Kg Portland Cement Rp 1,373.60 Rp 615,372.80
667 Kg Pasir beton (kg) Rp 72.14 Rp 48,119.29
1000 Kg Koral beton (kg) Rp 265.59 Rp 265,592.59
215 Liter Air Rp 100.00 Rp 21,500.00
B TENAGA
2.1 Org/Hr. Pekerja Rp 80,000.00 Rp 168,000.00
0.35 Org/Hr. Tukang batu Rp 100,000.00 Rp 35,000.00
0.034 Org/Hr. Kepala tukang Rp 150,000.00 Rp 5,100.00
0.105 Org/Hr. Mandor Rp 120,000.00 Rp 12,600.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

C ALAT
0.1 Alat/Hr. Sewa Vibrator Rp 250,000.00 Rp 25,000.00
0.2 Alat/Hr. Sewa Molen Rp 350,000.00 Rp 70,000.00
D JUMLAH (A+B+C) Rp 1,266,284.68
E 15 % Over Head + Profit (15% x D) Rp 189,942.70
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,456,227.38

4.1.1.17 PerMen No 11-PRT-M-2013-6.17


Pembesian 1 kg dengan besi polos atau besi ulir
A BAHAN
1.050 Kg Besi Beton (Polos/Ulir) Rp 10,975.33 Rp 11,524.10
0.015 Kg Kawat Beton Rp 28,392.22 Rp 425.88
B TENAGA
0.007 Org/Hr. Pekerja Rp 80,000.00 Rp 560.00
0.007 Org/Hr. Tukang Besi Rp 100,000.00 Rp 700.00
0.001 Org/Hr. Kepala Tukang Rp 150,000.00 Rp 105.00
0.000 Org/Hr. Mandor Rp 120,000.00 Rp 48.00
C ALAT

D JUMLAH (A+B+C) Rp 13,362.98


E 15 % Over Head + Profit (15% x D) Rp 2,004.45
F HARGA SATUAN PEKERJAAN (D+E) Rp 15,367.43
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

4.1.1.20 PerMen No 11-PRT-M-2013


Memasang 1 m2 bekisting untuk pondasi
A BAHAN

0.040 m3 Kayu kelas III Rp 2,222,000.00 Rp 88,880.00

0.300 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 8,080.00


0.100 Liter Minyak bekisting Rp 5,050.00 Rp 505.00
B TENAGA
0.520 OH Pekerja Rp 80,000.00 Rp 41,600.00
0.260 OH Tukang kayu Rp 100,000.00 Rp 26,000.00
0.026 OH Kepala tukang Rp 150,000.00 Rp 3,900.00
0.026 OH Mandor Rp 120,000.00 Rp 3,120.00
C ALAT

D JUMLAH (A+B+C) Rp 172,085.00


E 15 % Over Head + Profit (15% x D) Rp 25,812.75
F HARGA SATUAN PEKERJAAN (D+E) Rp 197,897.75

4.1.1.21 PerMen No 11-PRT-M-2013


Memasang 1 m2 bekisting untuk sloof
A BAHAN

0.045 m 3
Kayu kelas III Rp 2,222,000.00 Rp 99,990.00

0.300 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 8,080.00


0.100 Liter Minyak bekisting Rp 5,050.00 Rp 505.00
B TENAGA
0.520 OH Pekerja Rp 80,000.00 Rp 41,600.00
0.260 OH Tukang kayu Rp 100,000.00 Rp 26,000.00
0.026 OH Kepala tukang Rp 150,000.00 Rp 3,900.00
0.026 OH Mandor Rp 120,000.00 Rp 3,120.00
C ALAT

D JUMLAH (A+B+C) Rp 183,195.00


E 15.000 % Over Head + Profit (15% x D) Rp 27,479.25
F HARGA SATUAN PEKERJAAN (D+E) Rp 210,674.25

4.1.1.22 PerMen No 11-PRT-M-2013


Memasang 1 m2 bekisting untuk kolom
A BAHAN

0.040 m 3
Kayu kelas III Rp 2,222,000.00 Rp 88,880.00

0.400 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 10,773.33


0.200 Liter Minyak bekisting Rp 5,050.00 Rp 1,010.00

0.015 m 3
Balok Kayu kelas II Rp 2,929,000.00 Rp 43,935.00

0.350 Lbr Plywood 9 mm Rp 139,716.67 Rp 48,900.83


2.000 Batang Dolken kayu galam, φ (8–10) cm, panjang 4 m Rp 25,250.00 Rp 50,500.00
B TENAGA
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang kayu Rp 100,000.00 Rp 33,000.00
0.033 OH Kepala tukang Rp 150,000.00 Rp 4,950.00
0.033 OH Mandor Rp 120,000.00 Rp 3,960.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

C ALAT

D JUMLAH (A+B+C) Rp 338,709.17


E 15 % Over Head + Profit (15% x D) Rp 50,806.38
F HARGA SATUAN PEKERJAAN (D+E) Rp 389,515.54
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

4.1.1.23 PerMen No 11-PRT-M-2013


Memasang 1 m2 bekisting untuk balok
A BAHAN

0.040 m3 Kayu kelas III Rp 2,222,000.00 Rp 88,880.00

0.400 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 10,773.33


0.200 Liter Minyak bekisting Rp 5,050.00 Rp 1,010.00

0.018 m 3
Balok Kayu kelas II Rp 2,929,000.00 Rp 52,722.00

0.350 Lbr Plywood 9 mm Rp 139,716.67 Rp 48,900.83


2.000 Batang Dolken kayu galam, φ (8–10) cm, panjang 4 m Rp 25,250.00 Rp 50,500.00
B TENAGA
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang kayu Rp 100,000.00 Rp 33,000.00
0.033 OH Kepala tukang Rp 150,000.00 Rp 4,950.00
0.033 OH Mandor Rp 120,000.00 Rp 3,960.00
C ALAT

D JUMLAH (A+B+C) Rp 347,496.17


E 15 % Over Head + Profit (15% x D) Rp 52,124.43
F HARGA SATUAN PEKERJAAN (D+E) Rp 399,620.59

4.1.1.24 PerMen No 11-PRT-M-2013


Memasang 1 m2 bekisting untuk lantai
A BAHAN

0.040 m3 Kayu kelas III Rp 2,222,000.00 Rp 88,880.00

0.400 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 10,773.33


0.200 Liter Minyak bekisting Rp 5,050.00 Rp 1,010.00

0.015 m 3
Balok Kayu kelas II Rp 2,929,000.00 Rp 43,935.00

0.350 Lbr Plywood 9 mm Rp 139,716.67 Rp 48,900.83


6.000 Batang Dolken kayu galam, φ (8–10) cm, panjang 4 m Rp 25,250.00 Rp 151,500.00
B TENAGA
0.660 OH Pekerja Rp 80,000.00 Rp 52,800.00
0.330 OH Tukang kayu Rp 100,000.00 Rp 33,000.00
0.033 OH Kepala tukang Rp 150,000.00 Rp 4,950.00
0.033 OH Mandor Rp 120,000.00 Rp 3,960.00
C ALAT

D JUMLAH (A+B+C) Rp 439,709.17


E 15.000 % Over Head + Profit (15% x D) Rp 65,956.38
F HARGA SATUAN PEKERJAAN (D+E) Rp 505,665.54
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

4.1.1.35 PerMen No 11-PRT-M-2013


Membuat 1 m’ kolom praktis beton bertulang (11 x 11) cm
A BAHAN
0.002 m3 Kayu kelas III Rp 2,222,000.00 Rp 4,444.00
0.010 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 269.33
0.400 Liter Minyak bekisting Rp 5,050.00 Rp 2,020.00
3.000 kg Besi Beton (Polos/Ulir) Rp 10,975.33 Rp 32,926.00
0.450 kg Kawat beton Rp 28,392.22 Rp 12,776.50
4.000 kg Portland Cement Rp 1,373.60 Rp 5,494.40
0.006 m 3
Pasir beton Rp 101,000.00 Rp 606.00
0.009 m3 Koral Beton Rp 358,550.00 Rp 3,226.95
B TENAGA
0.180 Org/Hr. Pekerja Rp 80,000.00 Rp 14,400.00
0.020 Org/Hr. Tukang batu Rp 100,000.00 Rp 2,000.00
0.020 Org/Hr. Tukang kayu Rp 100,000.00 Rp 2,000.00
0.020 Org/Hr. Tukang besi Rp 100,000.00 Rp 2,000.00
0.006 Org/Hr. Kepala tukang Rp 150,000.00 Rp 900.00
0.009 Org/Hr. Mandor Rp 120,000.00 Rp 1,080.00
C ALAT

D JUMLAH (A+B+C) Rp 84,143.18


E 15 % Over Head + Profit (15% x D) Rp 12,621.48
F HARGA SATUAN PEKERJAAN (D+E) Rp 96,764.66

4.1.1.36 PerMen No 11-PRT-M-2013


Membuat 1 m’ ring balok beton bertulang (10 x 15) cm
A BAHAN

0.003 m3 Kayu kelas III Rp 2,222,000.00 Rp 6,666.00

0.020 kg Paku 5 cm – 12 cm Rp 26,933.33 Rp 538.67


0.400 Liter Minyak bekisting Rp 5,050.00 Rp 2,020.00
3.600 kg Besi Beton (Polos/Ulir) Rp 10,975.33 Rp 39,511.20
0.050 kg Kawat beton Rp 28,392.22 Rp 1,419.61
5.500 kg Portland Cement Rp 1,373.60 Rp 7,554.80

0.009 m 3
Pasir beton Rp 101,000.00 Rp 909.00

0.015 m 3
Koral Beton Rp 358,550.00 Rp 5,378.25

B TENAGA
0.297 Org/Hr. Pekerja Rp 80,000.00 Rp 23,760.00
0.033 Org/Hr. Tukang batu Rp 100,000.00 Rp 3,300.00
0.033 Org/Hr. Tukang kayu Rp 100,000.00 Rp 3,300.00
0.033 Org/Hr. Tukang besi Rp 100,000.00 Rp 3,300.00
0.010 Org/Hr. Kepala tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/Hr. Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 100,957.53


E 15 % Over Head + Profit (15% x D) Rp 15,143.63
F HARGA SATUAN PEKERJAAN (D+E) Rp 116,101.16
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

DIVISI 4 : PEKERJAAN ARSITEKTURAL


ANALISA PEKERJAAN DINDING
4.4.1.8 PerMen No 11-PRT-M-2013
Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 3 PP
A BAHAN
70.000 Buah Bata merah Rp 1,010.00 Rp 70,700.00
14.370 kg Portland Cement Rp 1,373.60 Rp 19,738.63

0.040 m 3
Pasir Pasang Rp 101,000.00 Rp 4,040.00

B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 131,778.63


E 15 % Over Head + Profit (15% x D) Rp 19,766.79
F HARGA SATUAN PEKERJAAN (D+E) Rp 151,545.43

4.4.1.10 PerMen No 11-PRT-M-2013


Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 5 PP
A BAHAN
70.000 Buah Bata merah Rp 1,010.00 Rp 70,700.00
9.680 kg Portland Cement Rp 1,373.60 Rp 13,296.45

0.045 m3 Pasir Pasang Rp 101,000.00 Rp 4,545.00

B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 125,841.45


E 15 % Over Head + Profit (15% x D) Rp 18,876.22
F HARGA SATUAN PEKERJAAN (D+E) Rp 144,717.67

4.4.1.12 PerMen No 11-PRT-M-2013


Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC : 8 PP
A BAHAN
70.000 Buah Bata merah Rp 1,010.00 Rp 70,700.00
6.500 kg Portland Cement Rp 1,373.60 Rp 8,928.40

0.050 m 3
Pasir Pasang Rp 101,000.00 Rp 5,050.00
B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

D JUMLAH (A+B+C) Rp 121,978.40


E 15 % Over Head + Profit (15% x D) Rp 18,296.76
F HARGA SATUAN PEKERJAAN (D+E) Rp 140,275.16
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

ANALISA PEKERJAAN PLESTERAN


4.4.2.3 PerMen No 11-PRT-M-2013
Memasang 1 m2 plesteran 1 PC : 3 PP, tebal 15 mm
A BAHAN
7.776 kg Portland Cement Rp 1,373.60 Rp 10,681.11

0.023 m3 Pasir Pasang Rp 101,000.00 Rp 2,323.00

B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.150 Org/ Hr Tukang batu Rp 100,000.00 Rp 15,000.00
0.015 Org/ Hr Kepala tukang Rp 150,000.00 Rp 2,250.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 56,054.11


E 15 % Over Head + Profit (15% x D) Rp 8,408.12
F HARGA SATUAN PEKERJAAN (D+E) Rp 64,462.23

4.4.2.5 PerMen No 11-PRT-M-2013


Memasang 1 m2 plesteran 1 PC : 5 PP, tebal 15 mm
A BAHAN
5.184 kg Portland Cement Rp 1,373.60 Rp 7,120.74

0.026 m 3
Pasir Pasang Rp 101,000.00 Rp 2,626.00

B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.150 Org/ Hr Tukang batu Rp 100,000.00 Rp 15,000.00
0.015 Org/ Hr Kepala tukang Rp 150,000.00 Rp 2,250.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 52,796.74


E 15 % Over Head + Profit (15% x D) Rp 7,919.51
F HARGA SATUAN PEKERJAAN (D+E) Rp 60,716.25

4.4.2.5 PerMen No 11-PRT-M-2013


Memasang 1 m2 acian
A BAHAN
3.250 kg Portland Cement Rp 1,373.60 Rp 4,464.20
B TENAGA
0.200 Org/ Hr Pekerja Rp 80,000.00 Rp 16,000.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.010 Org/ Hr Mandor Rp 120,000.00 Rp 1,200.00
C ALAT

D JUMLAH (A+B+C) Rp 33,164.20


E 15 % Over Head + Profit (15% x D) Rp 4,974.63
F HARGA SATUAN PEKERJAAN (D+E) Rp 38,138.83
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

ANALISA PEKERJAAN UBIN/TEGEL


Analisa Terapan
Memasang 1 m2 lantai keramik ukuran (50 x 50) cm
A BAHAN
4.000 Buah keramik 50x50 cm Rp 35,350.00 Rp 141,400.00
9.600 kg Portland Cement Rp 1,373.60 Rp 13,186.56

0.045 m 3
Pasir Pasang Rp 101,000.00 Rp 4,545.00

1.500 kg Semen warna Rp 19,190.00 Rp 28,785.00


B TENAGA
0.240 Org/ Hr Pekerja Rp 80,000.00 Rp 19,200.00
0.120 Org/ Hr Tukang batu Rp 100,000.00 Rp 12,000.00
0.012 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,800.00
0.012 Org/ Hr Mandor Rp 120,000.00 Rp 1,440.00
C ALAT

D JUMLAH (A+B+C) Rp 222,356.56


E 15 % Over Head + Profit (15% x D) Rp 33,353.48
F HARGA SATUAN PEKERJAAN (D+E) Rp 255,710.04

Analisa Terapan
Memasang 1 m2 lantai Granit ukuran (60 x 60) cm
A BAHAN
3.000 Buah Homogenous Tile 60x60 cm Rp 104,366.67 Rp 313,100.00
9.700 kg Portland Cement Rp 1,373.60 Rp 13,323.92

0.050 m3 Pasir Pasang Rp 101,000.00 Rp 5,050.00

1.550 kg Semen warna Rp 19,190.00 Rp 29,744.50


B TENAGA
0.240 Org/ Hr Pekerja Rp 80,000.00 Rp 19,200.00
0.120 Org/ Hr Tukang batu Rp 100,000.00 Rp 12,000.00
0.012 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,800.00
0.012 Org/ Hr Mandor Rp 120,000.00 Rp 1,440.00
C ALAT

D JUMLAH (A+B+C) Rp 395,658.42


E 15 % Over Head + Profit (15% x D) Rp 59,348.76
F HARGA SATUAN PEKERJAAN (D+E) Rp 455,007.18

Analisa Terapan
Memasang 1 m2 lantai Granit ukuran (80 x 80) cm
A BAHAN
2.000 Buah Tegel Granit 80x80 cm Rp 230,055.56 Rp 460,111.11
9.800 kg Portland Cement Rp 1,373.60 Rp 13,461.28

0.060 m 3
Pasir Pasang Rp 101,000.00 Rp 6,060.00

1.600 kg Semen warna Rp 19,190.00 Rp 30,704.00


B TENAGA
0.240 Org/ Hr Pekerja Rp 80,000.00 Rp 19,200.00
0.120 Org/ Hr Tukang batu Rp 100,000.00 Rp 12,000.00
0.012 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,800.00
0.012 Org/ Hr Mandor Rp 120,000.00 Rp 1,440.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
C ALAT

D JUMLAH (A+B+C) Rp 544,776.39


E 15 % Over Head + Profit (15% x D) Rp 81,716.46
F HARGA SATUAN PEKERJAAN (D+E) Rp 626,492.85

Analisa Terapan
Memasang 1 m2 dinding keramik ukuran (25 x 40) cm
A BAHAN
10.000 Buah Keramik 25x40 cm Rp 11,200.00 Rp 112,000.00
9.300 kg Portland Cement Rp 1,373.60 Rp 12,774.48

0.018 m 3
Pasir Pasang Rp 101,000.00 Rp 1,818.00

1.940 kg Semen warna Rp 19,190.00 Rp 37,228.60


B TENAGA
0.900 Org/ Hr Pekerja Rp 80,000.00 Rp 72,000.00
0.450 Org/ Hr Tukang batu Rp 100,000.00 Rp 45,000.00
0.045 Org/ Hr Kepala tukang Rp 150,000.00 Rp 6,750.00
0.045 Org/ Hr Mandor Rp 120,000.00 Rp 5,400.00
C ALAT

D JUMLAH (A+B+C) Rp 292,971.08


E 15 % Over Head + Profit (15% x D) Rp 43,945.66
F HARGA SATUAN PEKERJAAN (D+E) Rp 336,916.74

Analisa Praktis
Memasang 1 m2 dinding keramik ukuran (25 x 50) cm
A BAHAN
8.000 Buah Keramik 25x50 cm Rp 17,718.75 Rp 141,750.00
9.600 kg Portland Cement Rp 1,373.60 Rp 13,186.56

0.020 m3 Pasir Pasang Rp 101,000.00 Rp 2,020.00

1.980 kg Semen warna Rp 19,190.00 Rp 37,996.20


B TENAGA
0.900 Org/ Hr Pekerja Rp 80,000.00 Rp 72,000.00
0.450 Org/ Hr Tukang batu Rp 100,000.00 Rp 45,000.00
0.045 Org/ Hr Kepala tukang Rp 150,000.00 Rp 6,750.00
0.045 Org/ Hr Mandor Rp 120,000.00 Rp 5,400.00
C ALAT

D JUMLAH (A+B+C) Rp 324,102.76


E 15 % Over Head + Profit (15% x D) Rp 48,615.41
F HARGA SATUAN PEKERJAAN (D+E) Rp 372,718.17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

ANALISA PEKERJAAN PINTU, JENDELA DAN VENTILASI


Analisa Praktis
Memasang 1 Set Pintu P1 + Aksesoris
A BAHAN

2.420 M' Profil alluminium "M" Rp 45,848.31 Rp 110,952.91

2.420 M' Profil alluminium "Tutup Polos" Rp 24,713.33 Rp 59,806.27

5.390 M' Profil alluminium "Profil C" Rp 39,206.62 Rp 211,323.69

5.390 M' Profil alluminium "Tutup Jeep" Rp 21,138.33 Rp 113,935.62

0.944 M' Profil alluminium "Ambang Datar Atas" Rp 50,427.56 Rp 47,593.53

0.944 M' Profil alluminium "Ambang Datar Bawah" Rp 74,803.21 Rp 70,599.27

4.400 M' Profil alluminium "Ambang Datar Tegak" Rp 44,876.28 Rp 197,455.62

15.000 M' Profil Alluminium Strip Rp 12,375.00 Rp 185,625.00

B Aksesoris

3.000 Bh Engsel Pintu Kupu-kupu Rp 22,725.00 Rp 68,175.00

1.000 Bh Kunci Tanam Pintu 2 Slaag Rp 555,500.00 Rp 555,500.00

1.000 Bh Spring Knip & Rambuncis Rp 22,050.00 Rp 22,050.00

C UPAH

1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 750,000.00 Rp 750,000.00

D JUMLAH (A+B+C) Rp 2,222,257.73

E 15 % Over Head + Profit (15% x D) Rp 333,338.66

F HARGA SATUAN PEKERJAAN (D+E) Rp 2,555,596.39

Analisa Praktis
Memasang 1 Set Pintu P2 + Aksesoris
A BAHAN

2.420 M' Profil alluminium "M" Rp 45,848.31 Rp 110,952.91

2.420 M' Profil alluminium "Tutup Polos" Rp 24,713.33 Rp 59,806.27

4.730 M' Profil alluminium "Profil C" Rp 39,206.62 Rp 185,447.32

4.730 M' Profil alluminium "Tutup Jeep" Rp 21,138.33 Rp 99,984.32

0.770 M' Profil alluminium "Ambang Datar Atas" Rp 50,427.56 Rp 38,829.22

0.770 M' Profil alluminium "Ambang Datar Bawah" Rp 74,803.21 Rp 57,598.47

3.96 M' Profil alluminium "Ambang Datar Tegak" Rp 44,876.28 Rp 177,710.06

12.000 M' Profil Alluminium Strip Rp 12,375.00 Rp 148,500.00

B Aksesoris

3.000 Bh Engsel Pintu Kupu-kupu Rp 22,725.00 Rp 68,175.00

2.000 Bh Handle Pintu Aluminium Rp 15,000.00 Rp 30,000.00

1.000 Bh Spring Knip & Rambuncis Rp 22,050.00 Rp 22,050.00

C UPAH

1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 500,000.00 Rp 500,000.00

D JUMLAH (A+B+C) Rp 1,328,294.39

E 15 % Over Head + Profit (15% x D) Rp 199,244.16

F HARGA SATUAN PEKERJAAN (D+E) Rp 1,527,538.55


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Praktis
Memasang 1 Set Jendela J1 + Aksesoris
A BAHAN

2.420 M' Profil alluminium "M" Rp 45,848.31 Rp 110,952.91

2.420 M' Profil alluminium "Tutup Polos" Rp 24,713.33 Rp 59,806.27

4.180 M' Profil alluminium "Profil C" Rp 39,206.62 Rp 163,883.68

4.180 M' Profil alluminium "Tutup Jeep" Rp 21,138.33 Rp 88,358.23

4.180 M' Profil alluminium "Daun Jendela" Rp 23,504.25 Rp 98,247.77

0.495 M2 Kaca Bening 5 mm Rp 205,366.67 Rp 101,656.50

B Aksesoris

3.000 Bh Engsel Jendela Kupu-kupu Rp 23,625.00 Rp 70,875.00

2.000 Bh Kait Angin Jendela Rp 15,000.00 Rp 30,000.00

1.000 Bh Spring Knip & Rambuncis Rp 22,050.00 Rp 22,050.00

C UPAH

1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 300,000.00 Rp 300,000.00

D JUMLAH (A+B+C) Rp 875,071.18

E 15 % Over Head + Profit (15% x D) Rp 131,260.68

F HARGA SATUAN PEKERJAAN (D+E) Rp 1,006,331.85

Analisa Praktis
Memasang 1 Set Ventilasi V1 + Aksesoris
A BAHAN

2.420 M' Profil alluminium "M" Rp 45,848.31 Rp 110,952.91

2.420 M' Profil alluminium "Tutup Polos" Rp 24,713.33 Rp 59,806.27

0.132 M2 Kaca Bening 5 mm Rp 205,366.67 Rp 27,108.40

B Aksesoris

C UPAH

1.000 Ls Perakitan, Pemasangan Dan Perapian Rp 150,000.00 Rp 150,000.00

D JUMLAH (A+B+C) Rp 177,108.40

E 15 % Over Head + Profit (15% x D) Rp 26,566.26

F HARGA SATUAN PEKERJAAN (D+E) Rp 203,674.66

ANALISA PEKERJAAN PENUTUP ATAP


Analisa Terapan
1 m2 Pasang Rangka kuda-kuda baja Ringan + Genteng Metal
A BAHAN
2.800 M' Smartruss C 75.65 Rp 15,711.11 Rp 43,991.11
5.100 M' Reng R 33-0,45 Rp 7,855.56 Rp 40,063.33
20.000 Bh Self Drilling Screw dia-6x20mm (truss screw) Rp 757.50 Rp 15,150.00
30.000 Bh Self Drilling Screw dia-4x16mm (Roof Button Rp 757.50 Rp 22,725.00
1.000 m2 Genteng Metal Rp 46,291.67 Rp 46,291.67
B TENAGA
0.247 Org/ Hr Pekerja Rp 80,000.00 Rp 19,760.00
0.176 Org/ Hr Tukang Besi Rp 100,000.00 Rp 17,600.00
0.117 Org/ Hr Kepala tukang Rp 150,000.00 Rp 17,550.00
0.012 Org/ Hr Mandor Rp 120,000.00 Rp 1,404.00
C ALAT
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
D JUMLAH (A+B+C) Rp 224,535.11
E 15 % Over Head + Profit (15% x D) Rp 33,680.27
F HARGA SATUAN PEKERJAAN (D+E) Rp 258,215.38
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

4.5.2.36 PerMen No 11-PRT-M-2013


1 m2 Pasang nok genteng metal
A BAHAN
1.100 m' Nok Genteng Metal Rp 30,300.00 Rp 33,330.00
5.000 Bh Self Drilling Screw dia-4x16mm (Roof Button Rp 757.50 Rp 3,787.50
B TENAGA
0.250 Org/ Hr Pekerja Rp 80,000.00 Rp 20,000.00
0.150 Org/ Hr Tukang kayu Rp 100,000.00 Rp 15,000.00
0.015 Org/ Hr Kepala tukang Rp 150,000.00 Rp 2,250.00
0.013 Org/ Hr Mandor Rp 120,000.00 Rp 1,560.00
C ALAT

D JUMLAH (A+B+C) Rp 75,927.50


E 15 % Over Head + Profit (15% x D) Rp 11,389.13
F HARGA SATUAN PEKERJAAN (D+E) Rp 87,316.63

Analisa Terapan
1 m Pasang kalsiplank 2 X 25 cm
A BAHAN
2.200 m’ Kalsiplank 20x3 Rp 13,887.50 Rp 30,552.50
5.000 Bh Self Drilling Screw dia-6x20mm (truss screw) Rp 757.50 Rp 3,787.50
B TENAGA
0.100 Org/ Hr Pekerja Rp 80,000.00 Rp 8,000.00
0.200 Org/ Hr Tukang besi Rp 100,000.00 Rp 20,000.00
0.020 Org/ Hr Kepala tukang Rp 150,000.00 Rp 3,000.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 65,940.00


E 15 % Over Head + Profit (15% x D) Rp 9,891.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 75,831.00

ANALISA PEKERJAAN LANGIT-LANGIT


Analisa Terapan
Memasang 1 Bh Manhole
A BAHAN
1.050 m’ Allumunium Siku Rp 8,416.67 Rp 8,837.50
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.050 Org/ Hr Tukang Kayu Rp 100,000.00 Rp 5,000.00
0.005 Org/ Hr Kepala tukang Rp 150,000.00 Rp 750.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 360.00
C ALAT

D JUMLAH (A+B+C) Rp 18,947.50


E 15 % Over Head + Profit (15% x D) Rp 2,842.13
F HARGA SATUAN PEKERJAAN (D+E) Rp 21,789.63
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m2 langit-langit gypsum + rangka metal hollow
A BAHAN
2.100 m’ Rangka Metal Hollow 2x4 Rp 5,386.67 Rp 11,312.00
1.600 m’ Rangka Metal Hollow 4x4 Rp 5,891.67 Rp 9,426.67
0.150 Kg Kawat Diameter 4 mm Rp 16,833.33 Rp 2,525.00
1.050 Bh Ramset Rp 5,050.00 Rp 5,302.50
0.364 Lembar Gypsum board 120x240 cm, tebal 9mm Rp 92,583.33 Rp 33,700.33
0.110 kg Screw Bremick Rp 538.67 Rp 59.25
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang besi Rp 100,000.00 Rp 50,000.00
0.050 Org/ Hr Kepala tukang Rp 150,000.00 Rp 7,500.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
C ALAT

D JUMLAH (A+B+C) Rp 162,825.75


E 15 % Over Head + Profit (15% x D) Rp 24,423.86
F HARGA SATUAN PEKERJAAN (D+E) Rp 187,249.62

Analisa Terapan
Memasang 1 m2 langit-langit kalsiboard + rangka metal hollow
A BAHAN
2.100 m’ Rangka Metal Hollow 2x4 Rp 5,386.67 Rp 11,312.00
1.600 m’ Rangka Metal Hollow 4x4 Rp 5,891.67 Rp 9,426.67
0.150 Kg Kawat Diameter 4 mm Rp 16,833.33 Rp 2,525.00
1.050 Bh Ramset Rp 5,050.00 Rp 5,302.50
0.364 Lembar Kalsiboard 3,5 mm Rp 27,143.24 Rp 9,880.14
11.000 Bh Self Drilling Screw dia-6x20mm (truss screw) Rp 757.50 Rp 8,332.50
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang besi Rp 100,000.00 Rp 50,000.00
0.050 Org/ Hr Kepala tukang Rp 150,000.00 Rp 7,500.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
C ALAT

D JUMLAH (A+B+C) Rp 147,278.81


E 15 % Over Head + Profit (15% x D) Rp 22,091.82
F HARGA SATUAN PEKERJAAN (D+E) Rp 169,370.63

4.5.1.8 PerMen No 11-PRT-M-2013


Memasang 1 m pasang list gypsum langit-langit
A BAHAN
1.050 m’ List Profil Gypsum Rp 41,746.67 Rp 43,834.00
0.150 kg Tepung Gypsum Rp 4,545.00 Rp 681.75
B TENAGA
0.060 Org/ Hr Pekerja Rp 80,000.00 Rp 4,800.00
0.060 Org/ Hr Tukang kayu Rp 100,000.00 Rp 6,000.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 900.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.003 Org/ Hr Mandor Rp 120,000.00 Rp 360.00


C ALAT

D JUMLAH (A+B+C) Rp 56,575.75


E 15 % Over Head + Profit (15% x D) Rp 8,486.36
F HARGA SATUAN PEKERJAAN (D+E) Rp 65,062.11

ANALISA PEKERJAAN PENGECATAN


Analisa Terapan
1 m2 Coating Batu Alam
A BAHAN
0.250 Liter Cat Batu Alam Rp 70,700.00 Rp 17,675.00
B TENAGA
0.070 Org/ Hr Pekerja Rp 80,000.00 Rp 5,600.00
0.105 Org/ Hr Tukang Cat Rp 100,000.00 Rp 10,500.00
0.004 Org/ Hr Kepala tukang Rp 150,000.00 Rp 600.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 300.00
C ALAT

D JUMLAH (A+B+C) Rp 34,675.00


E 15 % Over Head + Profit (15% x D) Rp 5,201.25
F HARGA SATUAN PEKERJAAN (D+E) Rp 39,876.25

Analisa Terapan
1 m² Pengecatan Tembok Baru Eksterior (1 Lapis Cat Dasar Weathershield, 3 Lapis Cat Penutup )
A BAHAN
0.100 Kg Cat Dasar Rp 51,173.33 Rp 5,117.33
0.360 Kg Cat Tembok Rp 70,700.00 Rp 25,452.00
B TENAGA
0.020 Org/ Hr Pekerja Rp 80,000.00 Rp 1,600.00
0.063 Org/ Hr Tukang Cat Rp 100,000.00 Rp 6,300.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 945.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 300.00
C ALAT

D JUMLAH (A+B+C) Rp 39,714.33


E 15 % Over Head + Profit (15% x D) Rp 5,957.15
F HARGA SATUAN PEKERJAAN (D+E) Rp 45,671.48

Analisa Terapan
1 m² Pengecatan Langit-Langit ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
A BAHAN
0.100 Kg Cat Dasar Rp 51,173.33 Rp 5,117.33
0.260 Kg Cat Tembok Rp 70,700.00 Rp 18,382.00
B TENAGA
0.020 Org/ Hr Pekerja Rp 80,000.00 Rp 1,600.00
0.063 Org/ Hr Tukang Cat Rp 100,000.00 Rp 6,300.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 945.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 300.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

C ALAT Rp 9,145.00

D JUMLAH (A+B+C) Rp 41,789.33


E 15 % Over Head + Profit (15% x D) Rp 6,268.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 48,057.73
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

DIVISI 5 : PEKERJAAN MEKANIKAL


Analisa Terapan
Memasang 1 Unit AC, kapasitas : 1 Pk - Wall Mounted type
A BAHAN
1.000 Unit AC Unit, kapasitas : 1 Pk - Wall Mounted type Rp 4,400,000.00 Rp 4,400,000.00
1.000 Ls Alat Bantu Rp 44,000.00 Rp 44,000.00
B TENAGA
0.333 Org/ Hr Pekerja Rp 80,000.00 Rp 26,666.67
0.333 Org/ Hr Tukang AC Rp 100,000.00 Rp 33,333.33
0.010 Org/ Hr Mandor Rp 120,000.00 Rp 1,200.00
C ALAT

D JUMLAH (A+B+C) Rp 4,505,200.00


E 15 % Over Head + Profit (15% x D) Rp 675,780.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,180,980.00

Analisa Praktis
Memasang 1 Unit AC, kapasitas : 2 Pk - Cassette type
BAHAN
1.000 Unit AC Unit, kapasitas : 2 Pk - Cassette type Rp 22,500,500.00 Rp 22,500,500.00
1.000 Ls Alat Bantu Rp 225,005.00 Rp 225,005.00
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang AC Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00
15.000 % Over Head + Profit Rp 3,444,825.75
Rp 26,410,330.75
Analisai Terapan
Mengerjakan 1 m Pemipaan Refrigrant berisolasi
A BAHAN
1.000 M' Pipa Refrigerant + Isolasi 1,25" Rp 349,800.00 Rp 349,800.00
1.000 Ls Material bantu Rp 17,490.00 Rp 17,490.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang AC Rp 100,000.00 Rp 8,333.33
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 392,290.00


E 15 % Over Head + Profit (15% x D) Rp 58,843.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 451,133.50
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisai Terapan
Mengerjakan 1 m Pemipaan Drain / PVC AW berisolasi
A BAHAN
1.000 M' Pipa Drain PVC + Isolasi 1,25" Rp 89,430.00 Rp 89,430.00
1.000 Ls Material bantu Rp 4,471.50 Rp 4,471.50
B TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang AC Rp 100,000.00 Rp 8,333.33
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 118,901.50


E 15 % Over Head + Profit (15% x D) Rp 17,835.23
F HARGA SATUAN PEKERJAAN (D+E) Rp 136,736.73

Analisa Praktis
Memasang 1 Buah Sprinkler
BAHAN
1.000 bh Head Sprinkler Rp 165,000.00 Rp 165,000.00
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 100,000.00
0.100 Org/ Hr Mandor Rp 120,000.00 Rp 12,000.00
15.000 % Over Head + Profit Rp 53,550.00
Rp 410,550.00
Analisa Praktis
Memasang 1 Buah Flow Switch
BAHAN
1.000 bh Flow Switch Rp 2,299,000.00 Rp 2,299,000.00
TENAGA
0.333 Org/ Hr Pekerja Rp 80,000.00 Rp 26,666.67
0.333 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 33,333.33
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.00
15.000 % Over Head + Profit Rp 356,850.00
Rp 2,735,850.00
Analisa Praktis
Memasang 1 Buah Plat Orifice 25mm
BAHAN
1.000 bh Plat Orifice 25mm Rp 192,500.00 Rp 192,500.00
TENAGA
0.333 Org/ Hr Pekerja Rp 80,000.00 Rp 26,666.67
0.333 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 33,333.33
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.00
15.000 % Over Head + Profit Rp 40,875.00
Rp 313,375.00
Analisa Praktis
Memasang 1 Buah Sight Gass
BAHAN
1.000 bh Sight Gass Rp 1,925,000.00 Rp 1,925,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

TENAGA
0.333 Org/ Hr Pekerja Rp 80,000.00 Rp 26,666.67
0.333 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 33,333.33
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.00
15.000 % Over Head + Profit Rp 300,750.00
Rp 2,305,750.00
Analisa Praktis
Memasang 1 Buah Hydrant Pillar Two Way
BAHAN
1.000 bh Box Hydrant Pilar Rp 4,400,000.00 Rp 4,400,000.00
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang kayu Rp 100,000.00 Rp 100,000.00
0.100 Org/ Hr Kepala tukang Rp 150,000.00 Rp 15,000.00
0.100 Org/ Hr Mandor Rp 120,000.00 Rp 12,000.00
15.000 % Over Head + Profit Rp 691,050.00
Rp 5,298,050.00
Analisa Praktis
Memasang 1 Set Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm
BAHAN
1.000 Set Fire Hose Cabinet ( FHC ), 125 x 75 x 18 cm (Indoor) Rp 3,142,333.33 Rp 3,142,333.33
TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang batu Rp 100,000.00 Rp 50,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
15.000 % Over Head + Profit Rp 489,350.00
Rp 3,751,683.33
Analisa Praktis
Memasang 1 Buah Fire Protection Portable (Tabung Pemadam 3 Kg)
BAHAN
1.000 Bh Fire Protection (Tabung Pemadam Kebakaran) 3 kg Rp 1,136,666.67 Rp 1,136,666.67
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
0.750 Org/ Hr Tukang batu Rp 100,000.00 Rp 75,000.00
0.500 Org/ Hr Kepala tukang Rp 150,000.00 Rp 75,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
15.000 % Over Head + Profit Rp 209,500.00
Rp 1,606,166.67
ANALISA PEKERJAAN AIR BERSIH DAN SANITASI
PerMen No 11-PRT-M-2013
Memasang 1 buah Kloset Jongkok Porselen
BAHAN
1.000 bh Kloset Jongkok Rp 1,650,000.00 Rp 1,650,000.00
6.000 Kg Portland Cement Rp 1,373.60 Rp 8,241.60
0.010 m3 Pasir pasang Rp 101,000.00 Rp 1,010.00
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.500 Org/ Hr Tukang kayu Rp 100,000.00 Rp 150,000.00
1.500 Org/ Hr Kepala tukang Rp 150,000.00 Rp 225,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.160 Org/ Hr Mandor Rp 120,000.00 Rp 19,200.00


15.000 % Over Head + Profit Rp 320,017.74
Rp 2,453,469.34
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

5.1.1.16 PerMen No 11-PRT-M-2013


Memasang 1 buah Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35cm
A BAHAN
0.150 m3 Bata merah Rp 1,010.00 Rp 151.50
60.000 Kg Portland Cement Rp 1,373.60 Rp 82,416.00
0.100 m3 Pasir Pasang Rp 101,000.00 Rp 10,100.00
B TENAGA
0.100 Org/ Hr Pekerja Rp 80,000.00 Rp 8,000.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.050 Org/ Hr Kepala tukang Rp 150,000.00 Rp 7,500.00
0.010 Org/ Hr Mandor Rp 120,000.00 Rp 1,200.00
C ALAT

D JUMLAH (A+B+C) Rp 119,367.50


E 15 % Over Head + Profit (15% x D) Rp 17,905.13
F HARGA SATUAN PEKERJAAN (D+E) Rp 137,272.63

5.1.1.35 PerMen No 11-PRT-M-2013


Memasang 1 bh Kran Ø ¾" atau ½"
A BAHAN
1.000 Bh Kran Air Rp 121,000.00 Rp 121,000.00
0.025 bh Seal Tape Rp 8,080.00 Rp 202.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 134,102.00


E 15 % Over Head + Profit (15% x D) Rp 20,115.30
F HARGA SATUAN PEKERJAAN (D+E) Rp 154,217.30

5.1.1.36 PerMen No 11-PRT-M-2013


Memasang 1 bh Floor Drain
A BAHAN
1.000 Bh Floor drain Rp 121,000.00 Rp 121,000.00
0.025 bh Seal Tape Rp 8,080.00 Rp 202.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 134,102.00


E 15 % Over Head + Profit (15% x D) Rp 20,115.30
F HARGA SATUAN PEKERJAAN (D+E) Rp 154,217.30
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 bh Soap Holder
A BAHAN
1.000 Bh Soap Holder Rp 104,500.00 Rp 104,500.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 117,400.00


E 15 % Over Head + Profit (15% x D) Rp 17,610.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 135,010.00

Analisa Terapan
Memasang Mesin Pompa + Acessories
A BAHAN
1.000 Bh Mesin Pompa Listrik + Acessories Rp 825,000.00 Rp 825,000.00
0.15 Ls Aksesories Plumbing (15% Harga Bahan) Rp 825,000.00 Rp 123,750.00
B TENAGA
2.000 Org/ Hr Pekerja Rp 80,000.00 Rp 160,000.00
1.000 Org/ Hr Tukang batu Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Kepala tukang Rp 150,000.00 Rp 75,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,283,750.00


E 15 % Over Head + Profit (15% x D) Rp 192,562.50
D HARGA SATUAN PEKERJAAN (D+E) Rp 1,476,312.50

Analisa Terapan
Memasang Mesin Pompa Booster Kap. 5m3/h, Head 25m
A BAHAN
1.000 Bh Mesin Pompa Booster Kap. 5m3/h, Head 25m Rp 11,000,000.00 Rp 11,000,000.00
1.000 Ls Alat Bantu Rp 220,000.00 Rp 220,000.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Kepala tukang Rp 150,000.00 Rp 75,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
C ALAT

D JUMLAH (A+B+C) Rp 11,505,000.00


E 15 % Over Head + Profit (15% x D) Rp 1,725,750.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 13,230,750.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 bh Floating Valve Dia. 50mm
A BAHAN
1.000 Bh Floating Valve Dia. 50mm Rp 1,320,000.00 Rp 1,320,000.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 8,333.33
0.042 Org/ Hr Mandor Rp 120,000.00 Rp 5,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,340,000.00


E 15 % Over Head + Profit (15% x D) Rp 201,000.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,541,000.00

Analisa Praktis
Memasang 1 Bh Gate Valve Diameter 80mm / 10 Kg
BAHAN
1.000 Bh Gate Valve Ø 80mm / 10 Kg Rp 1,540,000.00 Rp 1,540,000.00
TENAGA
0.167 Org/ Hr Pekerja Rp 80,000.00 Rp 13,333.33
0.167 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 16,666.67
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 10,000.00
15.000 % Over Head + Profit Rp 237,000.00
Rp 1,817,000.00
Analisa Praktis
Memasang 1 Bh Gate Valve Diameter 25mm / 10 Kg
BAHAN
1.000 Bh Gate Valve Ø 25mm / 10 Kg Rp 385,000.00 Rp 385,000.00
TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 8,333.33
0.042 Org/ Hr Mandor Rp 120,000.00 Rp 5,000.00
15.000 % Over Head + Profit Rp 60,750.00
Rp 465,750.00
Analisa Terapan
Memasang 1 Bh Valve Dia. 2"
A BAHAN
1.000 Bh Valve Ø 2" Rp 212,100.00 Rp 212,100.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 8,333.33
0.042 Org/ Hr Mandor Rp 120,000.00 Rp 5,000.00
C ALAT

D JUMLAH (A+B+C) Rp 232,100.00


E 15 % Over Head + Profit (15% x D) Rp 34,815.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 266,915.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Bh Valve Dia. 1/2"
A BAHAN
1.000 Bh Valve Ø 1/2" Rp 121,200.00 Rp 121,200.00
B TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 8,333.33
0.042 Org/ Hr Mandor Rp 120,000.00 Rp 5,000.00
C ALAT

D JUMLAH (A+B+C) Rp 141,200.00


E 15 % Over Head + Profit (15% x D) Rp 21,180.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 162,380.00

5.1.1.25 PerMen No 11-PRT-M-2013


Memasang 1 m' Pipa PVC tipe AW Ø ½"
A BAHAN
1.200 m' Pipa PVC Type AW 1/2" Rp 7,748.38 Rp 9,298.06
0.300 Ls Accessories (30% Material) Rp 9,298.06 Rp 2,789.42
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang batu Rp 100,000.00 Rp 6,000.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 900.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT

D JUMLAH (A+B+C) Rp 22,083.48


E 15 % Over Head + Profit (15% x D) Rp 3,312.52
F HARGA SATUAN PEKERJAAN (D+E) Rp 25,396.00

5.1.1.29 PerMen No 11-PRT-M-2013


Memasang 1 m' Pipa PVC tipe AW Ø 2"
A BAHAN
1.200 m' Pipa PVC Type AW 2" Rp 28,875.90 Rp 34,651.08
0.300 Ls Accessories (30% Material) Rp 34,651.08 Rp 10,395.32
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang batu Rp 100,000.00 Rp 6,000.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 900.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT

D JUMLAH (A+B+C) Rp 55,042.40


E 15 % Over Head + Profit (15% x D) Rp 8,256.36
F HARGA SATUAN PEKERJAAN (D+E) Rp 63,298.76
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

5.1.1.31 PerMen No 11-PRT-M-2013


Memasang 1 m' Pipa PVC tipe AW Ø 3"
A BAHAN
1.200 m' Pipa PVC Type AW 3" Rp 20,000.00 Rp 24,000.00
0.300 Ls Accessories (30% Material) Rp 24,000.00 Rp 7,200.00
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang batu Rp 100,000.00 Rp 6,000.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 900.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT

D JUMLAH (A+B+C) Rp 41,196.00


E 15 % Over Head + Profit (15% x D) Rp 6,179.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 47,375.40

5.1.1.32 PerMen No 11-PRT-M-2013


Memasang 1 m' Pipa PVC tipe AW Ø 4"
A BAHAN
1.200 m' Pipa PVC Type AW 4" Rp 22,000.00 Rp 26,400.00
0.300 Ls Accessories (30% Material) Rp 26,400.00 Rp 7,920.00
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang batu Rp 100,000.00 Rp 6,000.00
0.006 Org/ Hr Kepala tukang Rp 150,000.00 Rp 900.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT

D JUMLAH (A+B+C) Rp 44,316.00


E 15 % Over Head + Profit (15% x D) Rp 6,647.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 50,963.40

Analisa Praktis
Memasang 1 m' Pipa BSP Dia. 80mm
BAHAN
1.200 m' Pipa BSP Dia. 80mm Rp 192,500.00 Rp 231,000.00
TENAGA
0.083 Org/ Hr Pekerja Rp 80,000.00 Rp 6,666.67
0.083 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 8,333.33
0.042 Org/ Hr Mandor Rp 120,000.00 Rp 5,000.00
15.000 % Over Head + Profit Rp 37,650.00
Rp 288,650.00
Analisa Praktis
Memasang 1 m' Pipa BSP Dia. 50mm
BAHAN
1.200 m' Pipa BSP Dia. 50mm Rp 92,583.33 Rp 111,100.00
TENAGA
0.067 Org/ Hr Pekerja Rp 80,000.00 Rp 5,333.33
0.067 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 6,666.67
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.033 Org/ Hr Mandor Rp 120,000.00 Rp 4,000.00


15.000 % Over Head + Profit Rp 19,065.00
Rp 146,165.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Praktis
Memasang 1 m' Pipa BSP Dia. 40mm
BAHAN
1.200 m' Pipa BSP Dia. 40mm Rp 72,966.67 Rp 87,560.00
TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.050 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 5,000.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
15.000 % Over Head + Profit Rp 14,934.00
Rp 114,494.00
Analisa Praktis
Memasang 1 m' Pipa BSP Dia. 25mm
BAHAN
1.200 m' Pipa BSP Dia. 25mm Rp 43,083.33 Rp 51,700.00
TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.050 Org/ Hr Tukang Pipa Rp 100,000.00 Rp 5,000.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
15.000 % Over Head + Profit Rp 9,555.00
Rp 73,255.00
DIVISI 6 : PEKERJAAN ELEKTRIKAL
Analisa Terapan
Memasang 1 Titik Instalasi Daya AC - 1 Phase
A BAHAN
13.000 M' Kabel NYM 3 x 2,5 mm Rp 12,650.00 Rp 164,450.00
1.000 Bh Isolasi Ban Rp 13,500.00 Rp 13,500.00
B TENAGA
0.150 Org/ Hr Pekerja Rp 80,000.00 Rp 12,000.00
0.150 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 15,000.00
0.050 Org/ Hr Mandor Rp 120,000.00 Rp 6,000.00
C ALAT

D JUMLAH (A+B+C) Rp 210,950.00


E 15 % Over Head + Profit (15% x D) Rp 31,642.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 242,592.50

Analisa Terapan
Memasang 1 Titik Instalasi Penerangan
A BAHAN
2.000 Bh T Dos 3 way 20 mm Rp 1,500.00 Rp 3,000.00
2.000 Bh Las Dop Rp 656.50 Rp 1,313.00
9.000 M' Kabel NYM 3 x 2,5 mm Rp 12,650.00 Rp 113,850.00
0.200 Bh Isolasi Ban Rp 13,500.00 Rp 2,700.00
B TENAGA
0.150 Org/ Hr Pekerja Rp 80,000.00 Rp 12,000.00
0.150 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 15,000.00
0.050 Org/ Hr Mandor Rp 120,000.00 Rp 6,000.00
C ALAT
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

D JUMLAH (A+B+C) Rp 153,863.00


E 15 % Over Head + Profit (15% x D) Rp 23,079.45
F HARGA SATUAN PEKERJAAN (D+E) Rp 176,942.45
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Titik Instalasi Speaker
A BAHAN
13.000 M' Pipa Conduit 20mm Rp 3,030.00 Rp 39,390.00
1.000 Bh Socket Pipa Rp 1,100.00 Rp 1,100.00
2.000 Bh T Dos 3 way 20 mm Rp 1,500.00 Rp 3,000.00
3.000 Bh Klem Pipa Conduit 20 mm Rp 808.00 Rp 2,424.00
6.000 Bh Fisher Rp 440.00 Rp 2,640.00
2.000 Bh Las Dop Rp 656.50 Rp 1,313.00
13.000 M' Kabel NYMHY 3 x 1,5 mm Rp 15,750.00 Rp 204,750.00
0.250 Bh Isolasi Ban Rp 13,500.00 Rp 3,375.00
B TENAGA
0.150 Org/ Hr Pekerja Rp 80,000.00 Rp 12,000.00
0.150 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 15,000.00
0.050 Org/ Hr Mandor Rp 120,000.00 Rp 6,000.00
C ALAT

D JUMLAH (A+B+C) Rp 290,992.00


E 15 % Over Head + Profit (15% x D) Rp 43,648.80
F HARGA SATUAN PEKERJAAN (D+E) Rp 334,640.80

Analisa Terapan
Memasang 1 Titik Instalasi MATV
A BAHAN
13.000 M' Pipa Conduit 20mm Rp 3,030.00 Rp 39,390.00
1.000 Bh Socket Pipa Rp 1,100.00 Rp 1,100.00
2.000 Bh T Dos 3 way 20 mm Rp 1,500.00 Rp 3,000.00
13.000 M' Kabel Coaxial 5C-2V 75 Ohm Rp 6,125.00 Rp 79,625.00
0.250 Bh Isolasi Ban Rp 13,500.00 Rp 3,375.00
6.000 Bh Fisher Rp 440.00 Rp 2,640.00
3.000 Bh Klem Pipa Conduit 20 mm Rp 808.00 Rp 2,424.00
2.000 Bh Las Dop Rp 656.50 Rp 1,313.00
B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.300 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 30,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.04
C ALAT

D JUMLAH (A+B+C) Rp 206,867.04


E 15 % Over Head + Profit (15% x D) Rp 31,030.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 237,897.10
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Panel SDP
A BAHAN
1.000 Bh MCCB 200-350 A/3 Phasa Rp 5,618,340.00 Rp 5,618,340.00
1.000 Bh MCB 16 A/3 Phasa Rp 609,000.00 Rp 609,000.00
1.000 Bh Volt Meter 0-500 V EC 96 Rp 175,890.00 Rp 175,890.00
3.000 Bh Ampere Meter 800/5A EC 96 Rp 175,230.00 Rp 525,690.00
3.000 Bh Pilot Lamp Rp 25,000.00 Rp 75,000.00
1.000 Bh Switch Voltmeter Rp 110,000.00 Rp 110,000.00
1.000 Bh Current Transformer Rp 220,000.00 Rp 220,000.00
3.000 Set Fuse Kubur Rp 22,000.00 Rp 66,000.00
1.000 Unit Box Panel ( 80 x 60 x 25 ) cm Rp 2,405,370.00 Rp 2,405,370.00
1.000 Ls Material Bantu Rp 1,123,668.00 Rp 1,123,668.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 5,500,000.00 Rp 5,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 16,428,958.00


E 15 % Over Head + Profit (15% x D) Rp 2,464,343.70
F HARGA SATUAN PEKERJAAN (D+E) Rp 18,893,301.70

Analisa Terapan
Memasang 1 Unit Panel LP-1
A BAHAN
2.000 Bh MCB 16 A/1 Phasa Rp 99,750.00 Rp 199,500.00
10.000 Bh MCB 10 A/1 Phasa Rp 78,750.00 Rp 787,500.00
3.000 Bh Pilot Lamp Rp 25,000.00 Rp 75,000.00
3.000 Set Fuse Kubur Rp 22,000.00 Rp 66,000.00
1.000 Unit Box Panel ( 40x60x20 ) cm Rp 572,000.00 Rp 572,000.00
1.000 Ls Material Bantu Rp 296,100.00 Rp 296,100.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 3,496,100.00


E 15 % Over Head + Profit (15% x D) Rp 524,415.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 4,020,515.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Panel PP-1
A BAHAN
1.000 Bh MCB 10 A/1 Phasa Rp 78,750.00 Rp 78,750.00
1.000 Bh MCB 6 A/1 Phasa Rp 68,250.00 Rp 68,250.00
3.000 Bh Pilot Lamp Rp 25,000.00 Rp 75,000.00
3.000 Set Fuse Kubur Rp 22,000.00 Rp 66,000.00
1.000 Unit Box Panel ( 40x60x20 ) cm Rp 572,000.00 Rp 572,000.00
1.000 Ls Grounding Bc 35 mm2 Rp 1,239,700.00 Rp 1,239,700.00
1.000 Ls Material Bantu Rp 44,100.00 Rp 44,100.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 3,643,800.00


E 15 % Over Head + Profit (15% x D) Rp 546,570.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 4,190,370.00

Analisa Terapan
Memasang 1 Unit Panel PP-Arus Lemah
A BAHAN
1.000 Bh MCCB 15 A/3 Phasa Rp 1,102,500.00 Rp 1,102,500.00
6.000 Bh MCB 6 A/1 Phasa Rp 68,250.00 Rp 409,500.00
3.000 Bh Pilot Lamp Rp 25,000.00 Rp 75,000.00
3.000 Set Fuse Kubur Rp 22,000.00 Rp 66,000.00
1.000 Unit Box Panel ( 30x40x20 ) cm Rp 302,500.00 Rp 302,500.00
1.000 Ls Material Bantu Rp 453,600.00 Rp 453,600.00
1.000 Set - CU Bars
1.000 Set - Sepatu Kabel
1.000 Set - Roll Isolator
1.000 Set - Spiral Duck Kabel
1.000 Set - Duck Kabel
1.000 Set - Mur Baut
B UPAH
1.000 Ls Perakitan, Pemasangan Dan Terminasi Rp 1,500,000.00 Rp 1,500,000.00
C ALAT

D JUMLAH (A+B+C) Rp 3,909,100.00


E 15 % Over Head + Profit (15% x D) Rp 586,365.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 4,495,465.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Antena UHF 17 Element lengkap tiang/ dudukan
A BAHAN
1.000 Unit Antena Yagi UHF 17 Element Rp 1,390,840.00 Rp 1,390,840.00
1.000 Ls Tiang Dudukan MATV Rp 721,600.00 Rp 721,600.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 2,272,440.20


E 15 % Over Head + Profit (15% x D) Rp 340,866.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,613,306.23

Analisa Terapan
Memasang 1 Unit Parabola 9 Feet Lengkap Tiang/Dudukan
A BAHAN
1.000 Unit Parabola 9 Feet Rp 1,045,000.00 Rp 1,045,000.00
1.000 Ls Tiang Dudukan MATV Rp 721,600.00 Rp 721,600.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 1,926,600.20


E 15 % Over Head + Profit (15% x D) Rp 288,990.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,215,590.23

Analisa Terapan
Memasang 1 Buah Smoke Detector
A BAHAN
1.000 Unit Satelite Receiver Rp 1,056,000.00 Rp 1,056,000.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 1,216,000.20


E 15 % Over Head + Profit (15% x D) Rp 182,400.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,398,400.23
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Satelite Receiver
A BAHAN
1.000 Unit Satelite Receiver Rp 1,056,000.00 Rp 1,056,000.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 1,216,000.20


E 15 % Over Head + Profit (15% x D) Rp 182,400.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,398,400.23

Analisa Terapan
Memasang 1 Unit Modulator
A BAHAN
1.000 Unit Modulator Rp 1,925,000.00 Rp 1,925,000.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 2,085,000.20


E 15 % Over Head + Profit (15% x D) Rp 312,750.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,397,750.23

Analisa Terapan
Memasang 1 Unit Active Combiner
A BAHAN
1.000 Unit Active Combiner Rp 4,499,660.00 Rp 4,499,660.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 4,659,660.20


E 15 % Over Head + Profit (15% x D) Rp 698,949.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,358,609.23

Analisa Terapan
Memasang 1 Unit Booster sinyal & P.supply

A BAHAN
1.000 Unit Terminal Box Dan Booster Rp 3,027,090.00 Rp 3,027,090.00

B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60

C ALAT

D JUMLAH (A+B+C) Rp 3,187,090.20

E 15 % Over Head + Profit (15% x D) Rp 478,063.53


F HARGA SATUAN PEKERJAAN (D+E) Rp 3,665,153.73

Analisa Terapan
Memasang 1 Unit Spliter 4 way
A BAHAN
1.000 Unit Spliter 4 way Rp 276,100.00 Rp 276,100.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 436,100.20


E 15 % Over Head + Profit (15% x D) Rp 65,415.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 501,515.23

Analisa Terapan
Memasang 1 Unit Spliter 2 way
A BAHAN
1.000 Unit Spliter 2 way Rp 198,000.00 Rp 198,000.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 358,000.20


E 15 % Over Head + Profit (15% x D) Rp 53,700.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 411,700.23

Analisa Terapan
Memasang 1 Unit Head And Amplifier ( Booster )
A BAHAN
1.000 Unit Head And Amplifier ( Booster ) Rp 5,399,680.00 Rp 5,399,680.00
B TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
C ALAT

D JUMLAH (A+B+C) Rp 5,559,680.20


E 15 % Over Head + Profit (15% x D) Rp 833,952.03
F HARGA SATUAN PEKERJAAN (D+E) Rp 6,393,632.23
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Praktis
Memasang 1 Unit LED TV 32"
BAHAN
1.000 Unit LED TV 32" Rp 4,581,500.00 Rp 4,581,500.00
TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
15.000 % Over Head + Profit Rp 711,225.03
Rp 5,452,725.23
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Praktis
Memasang 1 Unit Cabinet Rack 19 “
BAHAN
1.000 Unit Cabinet Rack 19 “ (Standing) Rp 18,700,000.00 Rp 18,700,000.00
TENAGA
0.667 Org/ Hr Pekerja Rp 80,000.00 Rp 53,333.60
0.667 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 66,667.00
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 39,999.60
15.000 % Over Head + Profit Rp 2,829,000.03
Rp 21,689,000.23
Analisa Terapan
Memasang 1 Bh Socket TV
A BAHAN
1.000 Bh Socket TV Rp 146,190.00 Rp 146,190.00
B TENAGA
0.167 Org/ Hr Pekerja Rp 80,000.00 Rp 13,333.60
0.167 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 16,667.00
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 9,996.00
C ALAT

D JUMLAH (A+B+C) Rp 186,186.60


E 15 % Over Head + Profit (15% x D) Rp 27,927.99
F HARGA SATUAN PEKERJAAN (D+E) Rp 214,114.59

Analisa Praktis
Memasang 1 Unit UPS 1 Kva
BAHAN
1.000 Bh UPS 1 Kva Rp 4,400,000.00 Rp 4,400,000.00
TENAGA
0.200 Org/ Hr Pekerja Rp 80,000.00 Rp 16,000.00
1.050 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 105,000.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
15.000 % Over Head + Profit Rp 678,600.00
Rp 5,202,600.00
Analisa Terapan
Memasang 1 Buah Saklar Tunggal
A BAHAN
1.000 Bh Saklar Tunggal Tanam Rp 27,000.00 Rp 27,000.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,650.00 Rp 12,650.00
1.000 m Inbow Dus Rp 5,500.00 Rp 5,500.00
1.000 Bh Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 62,180.00


E 15 % Over Head + Profit (15% x D) Rp 9,327.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 71,507.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Buah Saklar Ganda
A BAHAN
1.000 Bh Saklar Double Tanam Rp 33,000.00 Rp 33,000.00
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,650.00 Rp 12,650.00
1.000 m Inbow Dus Rp 5,500.00 Rp 5,500.00
1.000 Bh Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 68,180.00


E 15 % Over Head + Profit (15% x D) Rp 10,227.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 78,407.00

Analisa Terapan
Memasang 1 Buah Stop Kontak Tanam
A BAHAN
1.000 Bh Stop Kontak Tanam 1 lubang Rp 33,000.00 Rp 33,000.00
1.000 Bh Kabel NYM 2 x 2,5 mm Rp 11,550.00 Rp 11,550.00
1.000 Bh Inbow Dus Rp 5,500.00 Rp 5,500.00
1.000 m' Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 67,080.00


E 15 % Over Head + Profit (15% x D) Rp 10,062.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 77,142.00

Analisa Terapan
Memasang 1 Buah Lampu Spotlight 30 Watt
A BAHAN
1.000 Bh Lampu Spotlight 30 Watt Rp 420,000.00 Rp 420,000.00
B TENAGA
0.033 Org/ Hr Pekerja Rp 80,000.00 Rp 2,664.00
0.067 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 6,666.70
0.067 Org/ Hr Mandor Rp 120,000.00 Rp 8,000.40
C ALAT

D JUMLAH (A+B+C) Rp 437,331.10


E 15 % Over Head + Profit (15% x D) Rp 65,599.67
F HARGA SATUAN PEKERJAAN (D+E) Rp 502,930.77
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Buah Downlight 4 Inch + Lampu SL 18 Watt
A BAHAN
1.000 Bh Downlight 4 Inch (frame cool white) Rp 104,500.00 Rp 104,500.00
1.000 Bh Lampu SL 18 watt Rp 47,000.00 Rp 47,000.00
B TENAGA
0.033 Org/ Hr Pekerja Rp 80,000.00 Rp 2,664.00
0.067 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 6,666.70
0.067 Org/ Hr Mandor Rp 120,000.00 Rp 8,000.40
C ALAT

D JUMLAH (A+B+C) Rp 168,831.10


E 15 % Over Head + Profit (15% x D) Rp 25,324.67
F HARGA SATUAN PEKERJAAN (D+E) Rp 194,155.77

Analisa terapan
Memasang 1 Buah Downlight 4 Inch + Lampu SL 11 Watt
A BAHAN
1.000 Bh Downlight 4 Inch (frame cool white) Rp 104,500.00 Rp 104,500.00
1.000 Bh Lampu SL 11 watt Rp 40,000.00 Rp 40,000.00
B TENAGA
0.033 Org/ Hr Pekerja Rp 80,000.00 Rp 2,664.00
0.067 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 6,666.70
0.067 Org/ Hr Mandor Rp 120,000.00 Rp 8,000.40
C ALAT

D JUMLAH (A+B+C) Rp 161,831.10


E 15 % Over Head + Profit (15% x D) Rp 24,274.67
F HARGA SATUAN PEKERJAAN (D+E) Rp 186,105.77

Analisa Terapan
Memasang 1 Buah Downlight 4 Inch Outbow
A BAHAN
1.000 Bh Downlight 4 Inch Outbow+ Lampu SL 18 Watt Rp 165,000.00 Rp 165,000.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 179,000.00


E 15 % Over Head + Profit (15% x D) Rp 26,850.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 205,850.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m Kabel NYA 2 x 1,5 mm2
A BAHAN
1.000 m Kabel NYA 2 x 1,5 mm Rp 2,625.00 Rp 2,625.00
1.000 m Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.050 Org/ Hr Pekerja Rp 80,000.00 Rp 4,000.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
0.025 Org/ Hr Mandor Rp 120,000.00 Rp 3,000.00
C ALAT

D JUMLAH (A+B+C) Rp 22,655.00


E 15 % Over Head + Profit (15% x D) Rp 3,398.25
F HARGA SATUAN PEKERJAAN (D+E) Rp 26,053.25

Analisa Terapan
Memasang 1 m Kabel NYY 4 x 6 mm
A BAHAN
1.000 m Kabel NYY 4 x 6 mm Rp 37,400.00 Rp 37,400.00
B TENAGA
0.017 Org/ Hr Pekerja Rp 80,000.00 Rp 1,333.34
0.017 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 1,666.70
0.008 Org/ Hr Mandor Rp 120,000.00 Rp 996.00
C ALAT

D JUMLAH (A+B+C) Rp 41,396.04


E 15 % Over Head + Profit (15% x D) Rp 6,209.41
F HARGA SATUAN PEKERJAAN (D+E) Rp 47,605.44

Analisa Terapan
Memasang 1 m Kabel NYY 4 x 4 mm2
A BAHAN
1.000 m Kabel NYY 4 x 4 mm Rp 28,600.00 Rp 28,600.00
B TENAGA
0.017 Org/ Hr Pekerja Rp 80,000.00 Rp 1,333.34
0.017 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 1,666.70
0.008 Org/ Hr Mandor Rp 120,000.00 Rp 996.00
C ALAT

D JUMLAH (A+B+C) Rp 32,596.04


E 15 % Over Head + Profit (15% x D) Rp 4,889.41
F HARGA SATUAN PEKERJAAN (D+E) Rp 37,485.44
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m Kable Tray Uk 40x10
A BAHAN
1.000 m Kable Tray Uk 40x10 Rp 535,500.00 Rp 535,500.00
B TENAGA
0.125 Org/ Hr Pekerja Rp 80,000.00 Rp 10,000.00
0.125 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 12,500.00
0.058 Org/ Hr Mandor Rp 120,000.00 Rp 6,996.00
C ALAT

D JUMLAH (A+B+C) Rp 564,996.00


E 15 % Over Head + Profit (15% x D) Rp 84,749.40
F HARGA SATUAN PEKERJAAN (D+E) Rp 649,745.40

Analisa Terapan
Memasang 1 m Kabel NYM 3 x 2,5 mm
A BAHAN
1.000 m Kabel NYM 3 x 2,5 mm Rp 12,650.00 Rp 12,650.00
1.000 m Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 27,080.00


E 15 % Over Head + Profit (15% x D) Rp 4,062.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 31,142.00

Analisa Terapan
Memasang 1 m Kabel Coaxial 5C-2V 75 Ohm
A BAHAN
1.000 m Kabel Coaxial 5C-2V 75 Ohm Rp 6,125.00 Rp 6,125.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 16,925.00


E 15 % Over Head + Profit (15% x D) Rp 2,538.75
F HARGA SATUAN PEKERJAAN (D+E) Rp 19,463.75
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m Kabel NYMHY 2 x 1,5 mm
A BAHAN
1.000 m Kabel NYMHY 2 x 1,5 mm Rp 6,300.00 Rp 6,300.00
1.000 m Pipa Conduit 20mm Rp 3,030.00 Rp 3,030.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 20,130.00


E 15 % Over Head + Profit (15% x D) Rp 3,019.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 23,149.50

Analisa Terapan
Memasang 1 Buah Ceiling Speaker
A BAHAN
1.000 Bh Ceiling Speaker Rp 220,000.00 Rp 220,000.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 9,999.96
C ALAT

D JUMLAH (A+B+C) Rp 240,799.96


E 15 % Over Head + Profit (15% x D) Rp 36,119.99
F HARGA SATUAN PEKERJAAN (D+E) Rp 276,919.95

Analisa Praktis
Memasang 1 Buah Horn Speaker
A BAHAN
1.000 Bh Horn Speaker Rp 1,212,640.00 Rp 1,212,640.00
B TENAGA
0.167 Org/ Hr Pekerja Rp 80,000.00 Rp 13,333.42
0.167 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 16,666.77
0.083 Org/ Hr Mandor Rp 120,000.00 Rp 9,999.96
C ALAT

D JUMLAH (A+B+C) Rp 1,252,640.15


E 15 % Over Head + Profit (15% x D) Rp 187,896.02
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,440,536.17

Analisa Praktis
Memasang 1 Buah Main Distribution Frame (MDF)
BAHAN
1.000 Bh Main Distribution Frame (MDF) Rp 3,895,320.00 Rp 3,895,320.00
TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

15.000 % Over Head + Profit Rp 585,918.00


Rp 4,492,038.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Power Amplifier 2x300 W
A BAHAN
1.000 Bh Power Amplifier 300 Watt Rp 5,500,000.00 Rp 5,500,000.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.12
C ALAT

D JUMLAH (A+B+C) Rp 5,610,000.12


E 15 % Over Head + Profit (15% x D) Rp 841,500.02
F HARGA SATUAN PEKERJAAN (D+E) Rp 6,451,500.14

Analisa Terapan
Memasang 1 Unit CD/DVD/MP3 Player
A BAHAN
1.000 Bh CD / DVD / MP3 Player Rp 1,131,900.00 Rp 1,131,900.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,251,900.00


E 15 % Over Head + Profit (15% x D) Rp 187,785.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,439,685.00

Analisa Terapan
Memasang 1 Unit Mic Paging
A BAHAN
1.000 Bh Mic Paging Rp 880,000.00 Rp 880,000.00
B TENAGA
0.167 Org/ Hr Pekerja Rp 80,000.00 Rp 13,333.60
0.167 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 16,667.00
0.125 Org/ Hr Mandor Rp 120,000.00 Rp 15,000.00
C ALAT

D JUMLAH (A+B+C) Rp 925,000.60


E 15 % Over Head + Profit (15% x D) Rp 138,750.09
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,063,750.69
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Unit Equalizer
A BAHAN
1.000 Bh Equalizer Card (VX-200) Rp 2,770,460.00 Rp 2,770,460.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
C ALAT

D JUMLAH (A+B+C) Rp 2,880,460.40


E 15 % Over Head + Profit (15% x D) Rp 432,069.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,312,529.46

Analisa Terapan
Memasang 1 Unit Selector Switch
A BAHAN
1.000 Bh Selector Switch M-O-A 2P Rp 110,000.00 Rp 110,000.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
C ALAT

D JUMLAH (A+B+C) Rp 220,000.40


E 15 % Over Head + Profit (15% x D) Rp 33,000.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 253,000.46

Analisa Praktis
Memasang 1 Unit Mixer Frame w/ Module
BAHAN
1.000 Bh Mixer Frame w/ Module Rp 12,526,030.00 Rp 12,526,030.00
TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
15.000 % Over Head + Profit Rp 1,895,404.56
Rp 14,531,434.96
Analisa Terapan
Memasang 1 Unit Cabinet Rack
A BAHAN
1.000 Bh Cabinet rack Rp 5,093,550.00 Rp 5,093,550.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
C ALAT

D JUMLAH (A+B+C) Rp 5,203,550.40


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

E 15 % Over Head + Profit (15% x D) Rp 780,532.56


F HARGA SATUAN PEKERJAAN (D+E) Rp 5,984,082.96
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA
Analisa Terapan
Memasang 1 Unit Terminal Box
A BAHAN
1.000 Bh Terminal Box Rp 505,340.00 Rp 505,340.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
C ALAT

D JUMLAH (A+B+C) Rp 615,340.40


E 15 % Over Head + Profit (15% x D) Rp 92,301.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 707,641.46

Analisa Terapan
Memasang 1 Unit Digital Disc Recorder 8 Channel, Video real time (2 Slot HDD)
A BAHAN
1.000 Bh Digital Disc Recorder 8 Channel, Video real ti Rp 10,160,700.00 Rp 10,160,700.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.167 Org/ Hr Mandor Rp 120,000.00 Rp 20,000.40
C ALAT

D JUMLAH (A+B+C) Rp 10,270,700.40


E 15 % Over Head + Profit (15% x D) Rp 1,540,605.06
F HARGA SATUAN PEKERJAAN (D+E) Rp 11,811,305.46

Analisa Terapan
Memasang 1 Set Bivar + Power Suply
A BAHAN
1.000 Bh Bivar + Power Suply Rp 4,323,550.00 Rp 4,323,550.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00
C ALAT

D JUMLAH (A+B+C) Rp 4,563,550.00


E 15 % Over Head + Profit (15% x D) Rp 684,532.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,248,082.50

Analisa Terapan
Memasang 1 Unit 32" LCD Monitor
A BAHAN
1.000 Bh 32" LCD Monitor Rp 4,123,350.00 Rp 4,123,350.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00


C ALAT

D JUMLAH (A+B+C) Rp 4,363,350.00


E 15 % Over Head + Profit (15% x D) Rp 654,502.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 5,017,852.50

Analisa Terapan
Memasang 1 Bh Rack CCTV
A BAHAN
1.000 Bh Rack CCTV Rp 1,886,500.00 Rp 1,886,500.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00
C ALAT

D JUMLAH (A+B+C) Rp 2,126,500.00


E 15 % Over Head + Profit (15% x D) Rp 318,975.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 2,445,475.00

Analisa Terapan
Memasang 1 Bh Fixed Camera
A BAHAN
1.000 Bh Fixed Camera Rp 2,371,600.00 Rp 2,371,600.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00
C ALAT

D JUMLAH (A+B+C) Rp 2,611,600.00


E 15 % Over Head + Profit (15% x D) Rp 391,740.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 3,003,340.00

Analisa Terapan
Memasang 1 Buah Indicating Lamp
A BAHAN
1.000 Bh Indicating Lamp Rp 275,000.00 Rp 275,000.00
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 10,000.00
C ALAT

D JUMLAH (A+B+C) Rp 285,800.00


E 15 % Over Head + Profit (15% x D) Rp 42,870.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 328,670.00
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Buah Smoke Detector
A BAHAN
1.000 bh Smoke Detector Rp 880,000.00 Rp 880,000.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang kayu Rp 100,000.00 Rp 100,000.00
0.100 Org/ Hr Kepala tukang Rp 150,000.00 Rp 15,000.00
0.100 Org/ Hr Mandor Rp 120,000.00 Rp 12,000.00
C ALAT

D JUMLAH (A+B+C) Rp 1,087,000.00


E 15 % Over Head + Profit (15% x D) Rp 163,050.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,250,050.00

Analisa Praktis
Memasang 1 Buah MCFA, 5 Zone (Konvensional)
BAHAN
1.000 bh MCFA Kap. 5 Zone (Konvensional) Rp 8,756,000.00 Rp 8,756,000.00
TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
1.000 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 100,000.00
0.500 Org/ Hr Mandor Rp 120,000.00 Rp 60,000.00
15.000 % Over Head + Profit Rp 1,349,400.00
Rp 10,345,400.00
Analisa Terapan
Memasang 1 Buah MDF-F
A BAHAN
1.000 bh MDF-F Rp 4,169,000.00 Rp 4,169,000.00
B TENAGA
0.500 Org/ Hr Pekerja Rp 80,000.00 Rp 40,000.00
0.500 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 50,000.00
0.250 Org/ Hr Mandor Rp 120,000.00 Rp 30,000.00
C ALAT

D JUMLAH (A+B+C) Rp 4,289,000.00


E 15 % Over Head + Profit (15% x D) Rp 643,350.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 4,932,350.00

Analisa Terapan
Memasang 1 m Down Conductor BC 50 mm
A BAHAN
1.000 m' Kabel BC 50 mm Rp 45,450.00 Rp 45,450.00
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 6,000.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

D JUMLAH (A+B+C) Rp 54,546.00


E 15 % Over Head + Profit (15% x D) Rp 8,181.90
F HARGA SATUAN PEKERJAAN (D+E) Rp 62,727.90
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m Down Conductor BC 4 mm
A BAHAN
1.000 m' Kabel BC 4 mm Rp 7,875.00 Rp 7,875.00
B TENAGA
0.036 Org/ Hr Pekerja Rp 80,000.00 Rp 2,880.00
0.060 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 6,000.00
0.002 Org/ Hr Mandor Rp 120,000.00 Rp 216.00
C ALAT

D JUMLAH (A+B+C) Rp 16,971.00


E 15 % Over Head + Profit (15% x D) Rp 2,545.65
F HARGA SATUAN PEKERJAAN (D+E) Rp 19,516.65

Analisa Terapan
Memasang 1 Buah ROR
A BAHAN
1.000 Bh ROR Rp 512,050.00 Rp 512,050.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
0.333 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 33,333.33
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 40,000.00
C ALAT

D JUMLAH (A+B+C) Rp 665,383.33


E 15 % Over Head + Profit (15% x D) Rp 99,807.50
F HARGA SATUAN PEKERJAAN (D+E) Rp 765,190.83

Analisa Terapan
Memasang 1 Buah Manual Break Glass
A BAHAN
1.000 Bh Manual Break Glass Rp 226,820.00 Rp 226,820.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
0.333 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 33,333.33
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 40,000.00
C ALAT

D JUMLAH (A+B+C) Rp 380,153.33


E 15 % Over Head + Profit (15% x D) Rp 57,023.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 437,176.33

Analisa Terapan
Memasang 1 Buah Audible Bell
A BAHAN
1.000 Bh Audible Bell Rp 377,300.00 Rp 377,300.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
0.333 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 33,333.33
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

0.333 Org/ Hr Mandor Rp 120,000.00 Rp 40,000.00


C ALAT

D JUMLAH (A+B+C) Rp 530,633.33


E 15 % Over Head + Profit (15% x D) Rp 79,595.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 610,228.33
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 Buah Jack Telephone
A BAHAN
1.000 Bh Jack Telephone Rp 440,000.00 Rp 440,000.00
B TENAGA
1.000 Org/ Hr Pekerja Rp 80,000.00 Rp 80,000.00
0.333 Org/ Hr Tukang Listrik Rp 100,000.00 Rp 33,333.33
0.333 Org/ Hr Mandor Rp 120,000.00 Rp 40,000.00
C ALAT

D JUMLAH (A+B+C) Rp 593,333.33


E 15 % Over Head + Profit (15% x D) Rp 89,000.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 682,333.33

Analisa Praktis
Memasang 1 Unit Arrester Lightning Protection Radius 50 Meter
BAHAN
1.000 Unit Arrester Lightning Protection Radius 50 Meter Rp 18,700,000.00 Rp 18,700,000.00
15.000 % Over Head + Profit Rp 2,805,000.00
Rp 21,505,000.00
DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN
Analisa Terapan
Memasang 1 m2 dinding batu alam
A BAHAN
50.000 Bh Batu Alam Andesit Rp 5,555.00 Rp 277,750.00
11.750 kg Portland Cement Rp 1,373.60 Rp 16,139.80

0.035 m3 Pasir Pasang Rp 101,000.00 Rp 3,535.00


B TENAGA
0.700 Org/ Hr Pekerja Rp 80,000.00 Rp 56,000.00
0.350 Org/ Hr Tukang batu Rp 100,000.00 Rp 35,000.00
0.035 Org/ Hr Kepala tukang Rp 150,000.00 Rp 5,250.00
0.035 Org/ Hr Mandor Rp 120,000.00 Rp 4,200.00
C ALAT

D JUMLAH (A+B+C) Rp 397,874.80


E 15 % Over Head + Profit (15% x D) Rp 59,681.22
F HARGA SATUAN PEKERJAAN (D+E) Rp 457,556.02
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Memasang 1 m2 Allumunium Composit + Rangka Besi Hollow
A BAHAN
1.100 m2 Allumunium Composit Rp 229,273.04 Rp 252,200.35
8.400 m' Besi Hollow 4x4 cm Rp 26,091.67 Rp 219,170.00
168.00 cm' Pengelasan (20 % Panjang Rangka) Rp 5,218.33 Rp 876,680.00
0.15 Kg Paku Skrup Rp 60,600.00 Rp 9,090.00
1.000 Ls Alat Bantu (Mesin Bor Listrik) Rp 4,500.00 Rp 4,500.00
B TENAGA
0.045 Org/ Hr Pekerja Rp 80,000.00 Rp 3,600.00
1.050 Org/ Hr Tukang Besi Rp 100,000.00 Rp 105,000.00
0.045 Org/ Hr Kepala tukang Rp 150,000.00 Rp 6,750.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 360.00
C ALAT

D JUMLAH (A+B+C) Rp 1,477,350.35


E 15 % Over Head + Profit (15% x D) Rp 221,602.55
F HARGA SATUAN PEKERJAAN (D+E) Rp 1,698,952.90

Analisa Terapan
1 m2 Pekerjaan Screed 1Pc:5PP
A BAHAN
5.184 kg Portland Cement Rp 1,373.60 Rp 7,120.74

0.026 m 3
Pasir Pasang Rp 101,000.00 Rp 2,626.00

B TENAGA
0.300 Org/ Hr Pekerja Rp 80,000.00 Rp 24,000.00
0.150 Org/ Hr Tukang batu Rp 100,000.00 Rp 15,000.00
0.015 Org/ Hr Kepala tukang Rp 150,000.00 Rp 2,250.00
0.015 Org/ Hr Mandor Rp 120,000.00 Rp 1,800.00
C ALAT

D JUMLAH (A+B+C) Rp 52,796.74


E 15 % Over Head + Profit (15% x D) Rp 7,919.51
F HARGA SATUAN PEKERJAAN (D+E) Rp 60,716.25

Analisa Terapan
Mengerjakan 1m2 Waterproofing Coating
A BAHAN
1.050 kg Waterproofing Rp 51,131.25 Rp 53,687.81
B TENAGA
0.060 Org/ Hr Pekerja Rp 80,000.00 Rp 4,800.00
0.030 Org/ Hr Tukang batu Rp 100,000.00 Rp 3,000.00
0.003 Org/ Hr Kepala tukang Rp 150,000.00 Rp 450.00
0.003 Org/ Hr Mandor Rp 120,000.00 Rp 360.00
C ALAT

D JUMLAH (A+B+C) Rp 62,297.81


E 15 % Over Head + Profit (15% x D) Rp 9,344.67
DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

F HARGA SATUAN PEKERJAAN (D+E) Rp 71,642.48


DAFTAR ANALISA HARGA SATUAN PEKERJAAN

SATUAN KERJA : 0
PEKERJAAN : PEMBANGUNAN GEDUNG ASRAMA II TAHAP 1
LOKASI : 0
TAHUN ANGGA : 0

NO. KOEF. SATUAN URAIAN ANALISA PEKERJAAN HARGA SATUAN JUMLAH HARGA

Analisa Terapan
Mengerjakan 1m2 Waterproofing Membran Asphalt
A BAHAN
1.000 m2 Membran Asphalt Bithuthene Sheet 3000 Rp 156,550.00 Rp 156,550.00
B TENAGA
0.180 Org/ Hr Pekerja Rp 80,000.00 Rp 14,400.00
0.090 Org/ Hr Tukang batu Rp 100,000.00 Rp 9,000.00
0.009 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,350.00
0.009 Org/ Hr Mandor Rp 120,000.00 Rp 1,080.00
C ALAT

D JUMLAH (A+B+C) Rp 182,380.00


E 15 % Over Head + Profit (15% x D) Rp 27,357.00
F HARGA SATUAN PEKERJAAN (D+E) Rp 209,737.00

Analisa Terapan
Memasang 1 buah Rooster beton
A BAHAN
1.000 set Terawang (Roster) Rp 26,323.97 Rp 26,323.97
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Batu Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
C ALAT

D JUMLAH (A+B+C) Rp 39,223.97


E 15 % Over Head + Profit (15% x D) Rp 5,883.60
F HARGA SATUAN PEKERJAAN (D+E) Rp 45,107.56

4.2.1.5 PerMen No 11-PRT-M-2013


Mengerjakan 1 cm pengelasan dengan las listrik
A BAHAN
0.040 kg Kawat Las Rp 774.33 Rp 30.97
0.030 Liter Solar Rp 12,221.00 Rp 366.63
0.004 Liter Minyak Pelumas Rp 15,150.00 Rp 60.60
B TENAGA
0.010 Org/ Hr Pekerja Rp 80,000.00 Rp 800.00
0.100 Org/ Hr Tukang Las Rp 100,000.00 Rp 10,000.00
0.010 Org/ Hr Kepala tukang Rp 150,000.00 Rp 1,500.00
0.005 Org/ Hr Mandor Rp 120,000.00 Rp 600.00
0.017 Jam Sewa Alat Las Rp 12,283.33 Rp 208.82
C ALAT

D JUMLAH (A+B+C) Rp 13,567.02


E 15 % Over Head + Profit (15% x D) Rp 2,035.05
F HARGA SATUAN PEKERJAAN (D+E) Rp 15,602.07
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
A. AGREGAT & KAYU
1 Balok Kayu Kelas II m3 Rp 2,929,000

2 Batu Kali m3 Rp 151,500

3 Batu belah 15 cm/20 cm m3 Rp 202,000


4 Dolken kayu galam, φ (8–10) cm, panjang 4 m Btg Rp 25,250
5 Kayu kelas III m3 Rp 2,222,000

6 Koral Beton m3 Rp 358,550


7 Koral Beton (Kg) Kg Rp 266
8 Pasir beton m3 Rp 101,000
9 Pasir beton (Kg) kg Rp 72
10 Pasir pasang m3 Rp 101,000

11 Pasir urug m3 Rp 101,000

12 Tanah Urug m3 Rp 90,900

B. BAHAN BANGUNAN
1 Air Ltr Rp 100
2 Batu Alam Andesit Bh Rp 5,555
3 Bata merah Bh Rp 1,010
4 Besi Beton (Polos/ulir) Kg Rp 10,975
5 Besi Hollow 4x4 cm m Rp 26,092
6 Cat Batu Alam Liter Rp 70,700
7 Cat Dasar Kg Rp 51,173
8 Cat Tembok Kg Rp 70,700
9 Genteng Metal m2 Rp 46,292
10 Gypsum board 120x240 cm, tebal 9mm Lbr Rp 92,583
11 Homogenous Tile 60x60 cm Bh Rp 104,367
12 Kalsiboard 3,5 mm Lbr Rp 27,143
13 Kawat beton kg Rp 28,392
14 Kawat Diameter 4 mm kg Rp 16,833
15 Kawat Las Btg Rp 774
16 keramik 50x50 cm Bh Rp 35,350
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
17 Keramik 25x40 cm Bh Rp 11,200
18 Keramik 25x50 cm Bh Rp 17,719
19 List profil Gypsum m’ Rp 41,747
20 Kalsiplank 20x3 m' Rp 13,888
21 Minyak bekisting Ltr Rp 5,050
22 Minyak Pelumas Ltr Rp 15,150
23 Membran Asphalt Bithuthene Sheet 3000 m2 Rp 156,550
24 Nok Genteng Metal Bh Rp 30,300
25 Paku 5 cm – 12 cm Kg Rp 26,933
26 Paku Skrup Kg Rp 60,600
27 Plywood 9 mm Lbr Rp 139,717
28 Portland Cement Kg Rp 1,374
29 Semen warna Kg Rp 19,190
30 Solar Ltr Rp 12,221
31 Tegel Granit 80x80 cm Bh Rp 230,056
32 Terawang (Roster) Bh Rp 26,324
33 Tepung Gypsum Kg Rp 4,545
34 Waterproofing Kg Rp 51,131
35
C. BAHAN ALLUMUNIUM & KACA
1 Allumunium Composit m2 Rp 229,273
2 Allumunium Siku m' Rp 8,417
3 Engsel Jendela Kupu-kupu Bh Rp 23,625
4 Engsel Pintu Kupu-kupu Bh Rp 22,725
5 Kaca Bening 5 mm m2 Rp 205,367
6 Kait Angin Jendela Bh Rp 25,250
7 Kunci Tanam Pintu 2 Slaag Bh Rp 555,500
8 Profil alluminium "Profil C" m’ Rp 39,207
9 Profil alluminium "M" m’ Rp 45,848
10 Profil alluminium "Ambang Datar Atas" m’ Rp 50,428
11 Profil alluminium "Ambang Datar Bawah" m’ Rp 74,803
12 Profil alluminium "Ambang Datar Tegak" m’ Rp 44,876
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
13 Profil alluminium "Daun Jendela" m’ Rp 23,504
14 Profil alluminium "Tutup Polos" m’ Rp 24,713
15 Profil alluminium "Tutup Jeep" m’ Rp 21,138
16 Profil Alluminium Strip m' Rp 12,375
17 Ramset bh Rp 5,050
18 Rangka Metal Hollow 2x4 m’ Rp 5,387
19 Rangka Metal Hollow 4x4 m’ Rp 5,892
20 Reng R 33-0,45 m' Rp 7,856
21 Screw Bremick bh Rp 539
22 Self Drilling Screw dia-6x20mm (truss screw) Bh Rp 758
23 Self Drilling Screw dia-4x16mm (Roof Button Screw) Bh Rp 758
24 Smartruss C 75.65 m Rp 15,711
25 Seal Tape Roll Rp 8,080
26 Spring Knip & Rambuncis Bh Rp 22,050

D. KOMPONEN ELEKTRIKAL
1 32" LCD Monitor Unit Rp 4,123,350
2 Active Combiner Unit Rp 4,499,660
3 Antena Yagi UHF 17 Element Unit Rp 1,390,840
4 Ampere Meter 800/5A EC 96 Unit Rp 175,230
5 Bivar + Power Suply Set Rp 4,323,550
6 Box Panel ( 30x40x20 ) cm Unit Rp 302,500
7 Box Panel ( 40x60x20 ) cm Unit Rp 572,000
8 Box Panel ( 80 x 60 x 25 ) cm Unit Rp 2,405,370
9 Cabinet rack btg Rp 5,093,550
10 Ceiling Speaker bh Rp 220,000
11 CD / DVD / MP3 Player Unit Rp 1,131,900
12 Current Transformer Bh Rp 220,000
13 Downlight 4 Inch (frame cool white) Set Rp 104,500
14 Downlight 4 Inch Outbow+ Lampu SL 18 Watt Set Rp 165,000
15 Digital Disc Recorder 8 Channel, Video real time 2 Slot HDD Unit Rp 10,160,700
16 Equalizer Card (VX-200) Bh Rp 2,770,460
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
17 Fisher Unit Rp 440
18 Fixed Camera Unit Rp 2,371,600
19 Fuse Kubur Unit Rp 22,000
20 Grounding Bc 35 mm2 Bh Rp 1,239,700
21 Head And Amplifier ( Booster ) Unit Rp 5,399,680
22 Horn Speaker Bh Rp 1,212,640
23 Inbow Dus Bh Rp 5,500
24 Indicating Lamp Bh Rp 275,000
25 Isolasi Ban Bh Rp 13,500
26 Jack Telephone Unit Rp 440,000
27 Kabel NYA 2 x 1,5 mm m Rp 2,625
28 Kabel NYY 4 x 6 mm m Rp 37,400
29 Kabel NYY 4 x 4 mm m Rp 28,600
30 Kabel NYM 2 x 2,5 mm m Rp 11,550
31 Kabel NYM 3 x 2,5 mm m Rp 12,650
32 Kabel NYMHY 3 x 1,5 mm m' Rp 15,750
33 Kabel NYMHY 2 x 1,5 mm m' Rp 6,300
34 Kabel BC 4 mm m' Rp 7,875
35 Kabel BC 50 mm m' Rp 45,450
36 Kabel Coaxial 5C-2V 75 Ohm m' Rp 6,125
37 Kable Tray Uk 40x10 m' Rp 535,500
38 Klem Pipa Conduit 20 mm Bh Rp 808
39 Lampu SL 18 watt Bh Rp 47,000
40 Lampu SL 11 watt Bh Rp 40,000
41 Lampu Spotlight 30 Watt Bh Rp 420,000
42 Las Dop Bh Rp 657
43 MCCB 200-350 A/3 Phasa Bh Rp 5,618,340
44 MCCB 15 A/3 Phasa Bh Rp 1,102,500
45 MCB 16 A/3 Phasa Bh Rp 609,000
46 MCB 16 A/1 Phasa Bh Rp 99,750
47 MCB 10 A/1 Phasa Bh Rp 78,750
48 MCB 6 A/1 Phasa Bh Rp 68,250
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
49 Manual Break Glass Unit Rp 226,820
50 MDF-F Unit Rp 4,169,000
51 Mic Paging Bh Rp 880,000
52 Modulator Unit Rp 1,925,000
53 Parabola 9 Feet Unit Rp 1,045,000
54 Power Amplifier 300 Watt Bh Rp 5,500,000
55 Pilot Lamp Bh Rp 25,000
56 Pipa Conduit 20mm m Rp 3,030
57 Rack CCTV bh Rp 1,886,500
58 Satelite Receiver Unit Rp 1,056,000
59 Saklar Double Tanam bh Rp 33,000
60 Saklar Tunggal Tanam bh Rp 27,000
61 Selector Switch M-O-A 2P bh Rp 110,000
62 Smoke Detector bh Rp 880,000
63 Socket Pipa bh Rp 1,100
64 Socket TV bh Rp 146,190
65 Spliter 2 way Unit Rp 198,000
66 Spliter 4 way Unit Rp 276,100
67 Stop Kontak Tanam 1 lubang bh Rp 33,000
68 Switch Voltmeter bh Rp 110,000
69 T Dos 3 way 20 mm bh Rp 1,500
70 Tiang Dudukan MATV Set Rp 721,600
71 Terminal Box Dan Booster bh Rp 3,027,090
72 Terminal Box bh Rp 505,340
73 Volt Meter 0-500 V EC 96 bh Rp 175,890

E. KOMPONEN MEKANIKAL
1 AC Unit, kapasitas : 1 Pk - Wall Mounted type Unit Rp 4,400,000
2 Audible Bell Unit Rp 377,300
3 Pipa Refrigerant + Isolasi 1,25" m' Rp 349,800
4 Pipa Drain PVC + Isolasi 1,25" m' Rp 89,430
5 ROR Bh Rp 512,050
DAFTAR HARGA SATUAN MATERIAL

Harga Satuan
NO Uraian Satuan
Rp
E. KOMPONEN PLUMBING
1 Floor drain Bh Rp 121,000
2 Floating Valve Dia. 50mm Bh Rp 1,320,000
3 Kran Air Bh Rp 121,000
4 Mesin Pompa Listrik + Acessories Bh Rp 825,000
5 Mesin Pompa Booster Kap. 5m3/h, Head 25m Unit Rp 11,000,000
6 Pipa PVC Type AW 1/2" m' Rp 7,748
7 Pipa PVC Type AW 2" m' Rp 28,876
8 Pipa PVC Type AW 3" m' Rp 20,000
9 Pipa PVC Type AW 4" m' Rp 22,000
10 Soap Holder Bh Rp 104,500
11 Tandon PVC Kap. 1200 Liter Bh Rp 1,683,333
12 Valve Ø 2" Bh Rp 212,100
13 Valve Ø 1/2" Bh Rp 121,200
Total Bahan Rp 5,069,025,898.88

74.19 Rp 217,300,928.34

162.00 Rp 24,543,000.00

90.00 Rp 18,180,000.00

13342.94 Rp 336,909,235.00

261.34 Rp 580,703,701.60

7.99 Rp 2,865,531.60

1010553.30 Rp 268,395,470.90

5.01 Rp 505,707.00

684050.40 Rp 49,349,350.29

421.75 Rp 42,596,562.45

181.20 Rp 18,301,200.00

493.20 Rp 44,831,880.00

Rekap Rp 1,604,482,567.18

209560.50 Rp 20,956,050.00

5500.00 Rp 30,552,500.00

195160.67 Rp 197,112,280.74

48004.89 Rp 526,869,669.38

644.71 Rp 16,821,472.84

116.50 Rp 8,236,550.00

659.64 Rp 33,756,058.25

2263.11 Rp 160,001,853.92

229.07 Rp 10,603,934.78

850.31 Rp 78,724,598.75

1996.26 Rp 208,342,976.95

59.36 Rp 1,611,253.19

829.05 Rp 23,538,486.66

374.86 Rp 6,310,223.46

6.43 Rp 4,975.25

822.39 Rp 29,071,486.50
Total Bahan Rp 5,069,025,898.88

182.85 Rp 2,047,920.00

585.12 Rp 10,367,595.00

192.78 Rp 8,047,922.40

260.70 Rp 3,620,471.25

1356.09 Rp 6,848,274.70

0.64 Rp 9,734.18

230.00 Rp 36,006,500.00

81.18 Rp 2,459,754.00

2367.14 Rp 63,754,916.80

11.51 Rp 697,664.77

1579.01 Rp 220,614,642.56

519860.80 Rp 714,080,789.61

1672.09 Rp 32,087,353.87

4.82 Rp 58,891.81

190.00 Rp 43,710,555.56

432.00 Rp 11,371,953.60

27.54 Rp 125,169.30

360.32 Rp 18,423,509.74

Rekap Rp 2,526,847,989.81

84.43 Rp 19,356,578.57

42.00 Rp 353,500.00

144.00 Rp 3,402,000.00

108.00 Rp 2,454,300.00

30.10 Rp 6,180,715.20

96.00 Rp 2,424,000.00

24.00 Rp 13,332,000.00

386.76 Rp 15,163,553.00

319.44 Rp 14,645,784.68

31.89 Rp 1,608,195.30

31.89 Rp 2,385,564.08

114.84 Rp 5,153,591.80
Total Bahan Rp 5,069,025,898.88

200.64 Rp 4,715,892.72

319.44 Rp 7,894,427.20

386.76 Rp 8,175,461.80

504.00 Rp 6,237,000.00

2624.05 Rp 13,251,469.27

5248.11 Rp 28,269,801.10

3998.56 Rp 23,558,167.58

1168.25 Rp 9,177,223.55

256.96 Rp 138,416.88

6967.74 Rp 5,278,061.50

7241.04 Rp 5,485,085.48

641.39 Rp 10,076,951.35

1.60 Rp 12,928.00

84.00 Rp 1,852,200.00

Rekap Rp 210,582,869.07

1.00 Rp 4,123,350.00

1.00 Rp 4,499,660.00

1.00 Rp 1,390,840.00

3.00 Rp 525,690.00

1.00 Rp 4,323,550.00

12.00 Rp 3,630,000.00

8.00 Rp 4,576,000.00

1.00 Rp 2,405,370.00

1.00 Rp 5,093,550.00

40.00 Rp 8,800,000.00

2.00 Rp 2,263,800.00

1.00 Rp 220,000.00

236.00 Rp 24,662,000.00

48.00 Rp 7,920,000.00

1.00 Rp 10,160,700.00

1.00 Rp 2,770,460.00
Total Bahan Rp 5,069,025,898.88

468.00 Rp 205,920.00

28.00 Rp 66,404,800.00

27.00 Rp 594,000.00

4.00 Rp 4,958,800.00

1.00 Rp 5,399,680.00

20.00 Rp 24,252,800.00

172.00 Rp 946,000.00

12.00 Rp 3,300,000.00

143.50 Rp 1,937,250.00

12.00 Rp 5,280,000.00

1970.00 Rp 5,171,250.00

40.00 Rp 1,496,000.00

80.00 Rp 2,288,000.00

84.00 Rp 970,200.00

4332.00 Rp 54,799,800.00

780.00 Rp 12,285,000.00

760.00 Rp 4,788,000.00

60.00 Rp 472,500.00

100.00 Rp 4,545,000.00

284.00 Rp 1,739,500.00

200.00 Rp 107,100,000.00

234.00 Rp 189,072.00

152.00 Rp 7,144,000.00

84.00 Rp 3,360,000.00

12.00 Rp 5,040,000.00

916.00 Rp 601,354.00

1.00 Rp 5,618,340.00

4.00 Rp 4,410,000.00

1.00 Rp 609,000.00

8.00 Rp 798,000.00

44.00 Rp 3,465,000.00

4.00 Rp 273,000.00
Total Bahan Rp 5,069,025,898.88

12.00 Rp 2,721,840.00

1.00 Rp 4,169,000.00

1.00 Rp 880,000.00

10.00 Rp 19,250,000.00

1.00 Rp 1,045,000.00

1.00 Rp 5,500,000.00

39.00 Rp 975,000.00

4116.00 Rp 12,471,480.00

1.00 Rp 1,886,500.00

20.00 Rp 21,120,000.00

32.00 Rp 1,056,000.00

56.00 Rp 1,512,000.00

1.00 Rp 110,000.00

40.00 Rp 35,200,000.00

78.00 Rp 85,800.00

18.00 Rp 2,631,420.00

7.00 Rp 1,386,000.00

13.00 Rp 3,589,300.00

84.00 Rp 2,772,000.00

1.00 Rp 110,000.00

916.00 Rp 1,374,000.00

2.00 Rp 1,443,200.00

1.00 Rp 3,027,090.00

8.00 Rp 4,042,720.00

1.00 Rp 175,890.00

Rekap Rp 533,382,726.00

20.00 Rp 88,000,000.00

12.00 Rp 4,527,600.00

12.00 Rp 4,197,600.00

4.00 Rp 357,720.00

40.00 Rp 20,482,000.00
Total Bahan Rp 5,069,025,898.88

32.00 Rp 3,872,000.00

2.00 Rp 2,640,000.00

32.00 Rp 3,872,000.00

2.00 Rp 1,650,000.00

1.00 Rp 11,000,000.00

934.56 Rp 7,241,329.13

36.00 Rp 1,039,532.40

296.64 Rp 5,932,800.00

432.00 Rp 9,504,000.00

32.00 Rp 3,344,000.00

2.00 Rp 3,366,666.67

5.00 Rp 1,060,500.00

14.00 Rp 1,696,800.00

Rekap Rp 56,219,628.19
DAFTAR HARGA SATUAN UPAH KERJA
I II III IV

NO Uraian Satuan Harga Satuan ( Rp )

1 Pekerja OH Rp 80,000
2 Tukang Batu OH Rp 100,000
3 Tukang Kayu OH Rp 100,000
4 Tukang Besi OH Rp 100,000
5 Tukang Listrik OH Rp 100,000
7 Tukang AC OH Rp 100,000
8 Tukang Pipa OH Rp 100,000
9 Tukang Cat OH Rp 100,000
10 Tukang Las OH Rp 100,000
11 Kepala tukang OH Rp 150,000
12 Mandor OH Rp 120,000
Kode
No ANALIS URAIAN PEKERJAAN
A
a b c
I DIVISI 1 : DESIGN DEVELOPMENT
1 1.3 Pek. Pelaporan dan Asbuilt Drawing
2 1.4 Biaya Manajemen K3
Biaya Manajemen K3 terdiri penyiapan
Peralatan Pengobatan, Safety Sign serta Biaya Lain Yang Berkaitan Dengan Penanganan K3
3 1.5 Pek. Dokumentasi Proyek
TOTAL ITEM DIVISI 1 : DESIGN DEVELOPMENT

II DIVISI 2 : SITE WORK


II.1 PEKERJAAN PERSIAPAN
1 An.Prak Pek. Pagar Seng Gelombang
2 An.Prak Pek. Pengukuran dan Pemasangan Bow Plank
3 An.Prak Pek. Direksi Keet
4 An.Prak Pek. Pembongkaran Bangunan Eksisting
5 An.Prak Pek. Mobilisasi Alat Diesel Hammer
6 An.Prak Pek. Mobilisasi Alat Crane
7 An.Prak Pek. Mobilisasi Alat Excavator
8 An.Prak Pek. Demobilisasi Alat
9 An.Prak Pek. Papan Nama Proyek
TOTAL PEKERJAAN PERSIAPAN
II.2 PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL
1 An.Prak Pek. Pembersihan Awal Lokasi
2 An.Prak Pek. Pembersihan Akhir Lokasi
3 An.Prak Pek. Mobilisasi Bongkaran
TOTAL PEKERJAAN PEMBERSIHAN LAHAN DAN REMOVAL
II.3 PEKERJAAN TANAH
A Pekerjaan Tanah Area Pondasi Batu
1 2.3.1.1 Pek. Galian Tanah
2 2.3.1.8 Pek. Buangan Bekas Galian
3 2.3.1.9 Pek. Urugan Kembali Bekas Galian
4 2.3.1.11 Pek. Urugan Pasir
B Pekerjaan Tanah Area Pondasi Poer Plat
1 2.3.1.1 Pek. Galian Tanah
2 2.3.1.8 Pek. Buangan Bekas Galian
3 2.3.1.9 Pek. Urugan Kembali Bekas Galian
4 2.3.1.11 Pek. Urugan Pasir
C Pekerjaan Tanah Area Basement
1 2.3.1.1 Pek. Galian Tanah
2 2.3.1.8 Pek. Buangan Bekas Galian
3 2.3.1.9 Pek. Urugan Kembali Bekas Galian
D Pekerjaan Peninggian Lantai
1 2.5 Pek. Timbunan Biasa
2 2.3.1.10 Pek. Pemadatan Tanah Dengan Stamper Kuda
3 2.3.1.11 Pek. Urugan Pasir
TOTAL PEKERJAAN TANAH
TOTAL ITEM DIVISI 2 : SITE WORK

III DIVISI 3 : PEKERJAAN STRUKTURAL


III.1 PEKERJAAN STRUKTURAL DI ATAS TANAH
III.1.1 PEKERJAAN STRUKTURAL LANTAI 1
A Pekerjaan Sloof 25x40
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.21 Pek. Bekisting
B Pekerjaan Sloof 20x30
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.21 Pek. Bekisting
C Pekerjaan Cor Lantai
1 4.1.1.2 Pek. Beton
D Pekerjaan Kolom 50x50
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.22 Pek. Bekisting
E Pekerjaan Kolom Praktis
1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian)
F Pekerjaan Balok 30x50
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
G Pekerjaan Balok 20x40
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
H Pekerjaan Core Lift
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
I Pekerjaan Tangga
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
J Pekerjaan Balok Latai
1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian)
III.1.2 PEKERJAAN STRUKTURAL LANTAI 2
A Pekerjaan Plat Lantai
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.24 Pek. Bekisting
B Pekerjaan Kolom 50x50
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.22 Pek. Bekisting
C Pekerjaan Kolom Praktis
1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian)
D Pekerjaan Balok 30x50
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
E Pekerjaan Balok 20x40
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
F Pekerjaan Core Lift
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
G Pekerjaan Tangga
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
H Pekerjaan Balok Latai
1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian)
III.1.3 PEKERJAAN STRUKTURAL LANTAI 3
A Pekerjaan Plat Lantai
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.24 Pek. Bekisting
B Pekerjaan Kolom 50x50
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.22 Pek. Bekisting
C Pekerjaan Kolom Praktis
1 4.1.1.35 Pek. Kolom (Termasuk Bekisting Dan Pembesian)
D Pekerjaan Balok 30x50
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
E Pekerjaan Balok 20x40
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
F Pekerjaan Core Lift
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
G Pekerjaan Tangga
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
H Pekerjaan Balok Latai
1 4.1.1.35 Pek. Balok (Termasuk Bekisting Dan Pembesian)
TOTAL PEKERJAAN STRUKTURAL DI ATAS TANAH
III.2 PEKERJAAN STRUKTURAL DI BAWAH TANAH
A Pekerjaan Pondasi Batu
1 3.2.1.3 Pek. Pasangan Pondasi Batu Kali
2 3.2.1.9 Pek. Pasangan Batu Kosong
3 4.4.1.4 Pek. Pasangan Pondasi Bata
B Pekerjaan Plat Lantai
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.20 Pek. Bekisting
C Pekerjaan Dinding Penahan Tanah
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.20 Pek. Bekisting
D Pekerjaan Pondasi Pancang
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.20 Pek. Bekisting
E Pekerjaan Poer Plat
1 4.1.1.1 Pek. Lantai Kerja
2 4.1.1.6 Pek. Beton
3 4.1.1.17 Pek. Pembesian
4 4.1.1.20 Pek. Bekisting
F Pekerjaan Kolom 50x50
1 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
3 4.1.1.22 Pek. Bekisting
G Pekerjaan Pit Lift
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
H Pekerjaan Ground Water Tank
3 4.1.1.6 Pek. Beton
2 4.1.1.17 Pek. Pembesian
1 4.1.1.23 Pek. Bekisting
TOTAL PEKERJAAN STRUKTURAL DI BAWAH TANAH
TOTAL ITEM DIVISI 3 : PEKERJAAN STRUKTURAL

IV DIVISI 4 : PEKERJAAN ARSITEKTURAL


IV.1 PEKERJAAN FINISHING DINDING
IV.1.1 PEKERJAAN FINISHING DINDING LANTAI 1
1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm
4 4.4.2.27 Pek. Acian Dinding
5 4.4.2.27 Pek. Acian Beton
6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC
7 An.Ter Pek. Roster Beton
IV.1.2 PEKERJAAN FINISHING DINDING LANTAI 2
1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm
4 4.4.2.27 Pek. Acian Dinding
5 4.4.2.27 Pek. Acian Beton
6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC
7 An.Ter Pek. Roster Beton
IV.1.3 PEKERJAAN FINISHING DINDING LANTAI 3
1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm
4 4.4.2.27 Pek. Acian Dinding
5 4.4.2.27 Pek. Acian Beton
6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC
7 An.Ter Pek. Roster Beton
IV.1.4 PEKERJAAN FINISHING DINDING LANTAI BASEMENT
1 4.4.1.4 Pek. Pasangan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
2 4.4.2.5 Pek. Plesteran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
3 4.4.2.5 Pek. Plesteran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm
4 4.4.2.27 Pek. Acian Dinding
5 4.4.2.27 Pek. Acian Beton
6 An.Ter Pek. Dinding Keramik Ukuran 25 X 50 cm Area KM/WC
7 An.Ter Pek. Water Proofing Membrant Asphalt Ground Water Tank
IV.1.5 PEKERJAAN FINISHING FASADE
1 4.4.1.4Pek. Aluminium Composite Panel
2 4.4.2.5Pek. Curtain Wall
2 4.4.2.5Pek. Batu Alam
3 Pek. Dinding Granit Ukuran 80x80
4.4.2.27
TOTAL PEKERJAAN FINISHING DINDING
IV.2 PEKERJAAN FINISHING LANTAI
IV.2.1 PEKERJAAN FINISHING LANTAI AREA LANTAI BASEMENT
1 An.Ter Pek. Homogenous Tile Ukuran 60x60
2 An.Ter Pek. Tegel Keramik 50x50
3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 50 X 50 cm
4 An.Ter Pek. Waterproofing Couting Lantai KM/WC + Grouting
IV.2.1 PEKERJAAN FINISHING LANTAI AREA LANTAI 1
1 An.Ter Pek. Homogenous Tile Ukuran 60x60
2 An.Ter Pek. Tegel Keramik 50x50
3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 50 X 50 cm
4 An.Ter Pek. Waterproofing Couting Lantai KM/WC + Grouting
IV.2.3 PEKERJAAN FINISHING LANTAI AREA LANTAI 2
1 An.Ter Pek. Homogenous Tile Ukuran 60x60
2 An.Ter Pek. Tegel Keramik 50x50
3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 50 X 50 cm
4 An.Ter Pek. Waterproofing Couting Lantai KM/WC + Grouting
IV.2.4 PEKERJAAN FINISHING LANTAI AREA LANTAI 3
1 An.Ter Pek. Homogenous Tile Ukuran 60x60
2 An.Ter Pek. Tegel Keramik 50x50
3 An.Ter Pek. Tegel Keramik Type Unpolished Ukuran 50 X 50 cm
4 An.Ter Pek. Waterproofing Couting Lantai KM/WC + Grouting
TOTAL PEKERJAAN FINISHING LANTAI
IV.3 PEKERJAAN PINTU DAN JENDELA
IV.3.1 PEKERJAAN PINTU DAN JENDELA LANTAI BASEMENT
1 An.Ter Pek. Pintu (P1) + Aksesoris
2 An.Ter Pek. Pintu (P2) + Aksesoris
3 An.Ter Pek. Jendela (J1) + Aksesoris
4 An.Ter Pek. Ventilasi (V1) + Aksesoris
IV.3.1 PEKERJAAN PINTU DAN JENDELA LANTAI 1
1 An.Ter Pek. Pintu (P1) + Aksesoris
2 An.Ter Pek. Pintu (P2) + Aksesoris
3 An.Ter Pek. Jendela (J1) + Aksesoris
4 An.Ter Pek. Ventilasi (V1) + Aksesoris
IV.3.3 PEKERJAAN PINTU DAN JENDELA LANTAI 2
1 An.Ter Pek. Pintu (P1) + Aksesoris
2 An.Ter Pek. Pintu (P2) + Aksesoris
3 An.Ter Pek. Jendela (J1) + Aksesoris
4 An.Ter Pek. Ventilasi (V1) + Aksesoris
IV.3.4 PEKERJAAN PINTU DAN JENDELA LANTAI 3
1 An.Ter Pek. Pintu (P1) + Aksesoris
2 An.Ter Pek. Pintu (P2) + Aksesoris
3 An.Ter Pek. Jendela (J1) + Aksesoris
4 An.Ter Pek. Ventilasi (V1) + Aksesoris
TOTAL PEKERJAAN PINTU DAN JENDELA
IV.4 PEKERJAAN ATAP DAN LANGIT-LANGIT
IV.4.1 PEKERJAAN ATAP
1 An.Ter Pek. Atap Genteng Metal + Rangka Baja Ringan
2 4.5.2.36 Pek. Nok Genteng Metal
3 An.Ter Pek. Profil Listplank
4 An.Ter Pek. Waterproofing Couting Dak Atap
5 An.Ter Pek. Screed Dak Atap
6 An.Ter Pek. Water Proofing Membrant Asphalt Dak Atap
IV.4.2 PEKERJAAN LANGIT-LANGIT LANTAI BASEMENT
1 An.Ter Pek. Langit-Langit Gypsum + Rangka Metal Hollow
2 An.Ter Pek. Expose Plat Beton
3 An.Ter Pek. Langit-Langit Nusaboard + Rangka Metal Hollow
4 An.Ter Pek. Profil List Gypsum
5 An.Ter Pek. Manhole Uk. 50x50
IV.4.2 PEKERJAAN LANGIT-LANGIT LANTAI 1
1 An.Ter Pek. Langit-Langit Gypsum + Rangka Metal Hollow
2 An.Ter Pek. Expose Plat Beton
3 An.Ter Pek. Langit-Langit Nusaboard + Rangka Metal Hollow
4 An.Ter Pek. Profil List Gypsum
5 An.Ter Pek. Manhole Uk. 50x50
IV.4.4 PEKERJAAN LANGIT-LANGIT LANTAI 2
1 An.Ter Pek. Langit-Langit Gypsum + Rangka Metal Hollow
2 An.Ter Pek. Expose Plat Beton
3 An.Ter Pek. Langit-Langit Nusaboard + Rangka Metal Hollow
4 An.Ter Pek. Profil List Gypsum
5 An.Ter Pek. Manhole Uk. 50x50
IV.4.5 PEKERJAAN LANGIT-LANGIT LANTAI 3
1 An.Ter Pek. Langit-Langit Gypsum + Rangka Metal Hollow
2 An.Ter Pek. Expose Plat Beton
3 An.Ter Pek. Langit-Langit Nusaboard + Rangka Metal Hollow
4 An.Ter Pek. Profil List Gypsum
5 An.Ter Pek. Manhole Uk. 50x50
TOTAL PEKERJAAN ATAP DAN LANGIT-LANGIT
IV.5 PEKERJAAN PENGECATAN
IV.5.1 PEKERJAAN PENGECATAN LANTAI BASEMENT
1 An.Ter Pek. Cat Dinding Ex. Jotun
2 An.Ter Pek. Cat Langit-Langit Ex. Jotun (
3 An.TerPek. Cat Batu Alam
IV.5.1 PEKERJAAN PENGECATAN LANTAI 1
1 An.Ter Pek. Cat Dinding Ex. Jotun
2 An.Ter Pek. Cat Langit-Langit Ex. Jotun (
3 An.Ter Pek. Cat Batu Alam
IV.5.2 PEKERJAAN PENGECATAN LANTAI 2
1 An.Ter Pek. Cat Dinding Ex. Jotun
2 An.Ter Pek. Cat Langit-Langit Ex. Jotun (
3 An.Ter Pek. Cat Batu Alam
IV.5.3 PEKERJAAN PENGECATAN LANTAI 3
1 An.Ter Pek. Cat Dinding Ex. Jotun
2 An.Ter Pek. Cat Langit-Langit Ex. Jotun (
3 An.Ter Pek. Cat Batu Alam
TOTAL PEKERJAAN PENGECATAN
TOTAL ITEM DIVISI 4 : PEKERJAAN ARSITEKTURAL

V DIVISI 5 : PEKERJAAN MEKANIKAL


V.1 PEKERJAAN SANITARY
V.1.1 PEKERJAAN SANITARY LANTAI BASEMENT
1 5.1.1.1 Pek. Pemasangan Kloset Jongkok
2 5.1.1.35 Pek. Pemasangan Kran Air
3 5.1.1.36 Pek. Pemasangan Floor Drain
4 An.Ter Pek. Soap Holder
V.1.1 PEKERJAAN SANITARY LANTAI 1
1 5.1.1.1 Pek. Pemasangan Kloset Jongkok
2 5.1.1.35 Pek. Pemasangan Kran Air
3 5.1.1.36 Pek. Pemasangan Floor Drain
4 An.Ter Pek. Soap Holder
V.1.3 PEKERJAAN SANITARY LANTAI 2
1 5.1.1.1 Pek. Pemasangan Kloset Jongkok
2 5.1.1.35 Pek. Pemasangan Kran Air
3 5.1.1.36 Pek. Pemasangan Floor Drain
4 An.Ter Pek. Soap Holder
V.1.4 PEKERJAAN SANITARY LANTAI 3
1 5.1.1.1 Pek. Pemasangan Kloset Jongkok
2 5.1.1.35 Pek. Pemasangan Kran Air
3 5.1.1.36 Pek. Pemasangan Floor Drain
4 An.Ter Pek. Soap Holder
TOTAL PEKERJAAN SANITARY
V.2 PEKERJAAN INSTALASI AIR BERSIH
V.2.1 PEKERJAAN INSTALASI AIR BERSIH LANTAI BASEMENT
1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (
2 An.Ter Gate Valve Dimensi 1/2"
3 An.Ter Fitting Pipa PVC
V.2.2 PEKERJAAN INSTALASI AIR BERSIH LANTAI 1
1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (
2 An.Ter Gate Valve Dimensi 1/2"
3 An.Ter Fitting Pipa PVC
V.2.3 PEKERJAAN INSTALASI AIR BERSIH LANTAI 2
1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (
2 An.Ter Gate Valve Dimensi 1/2"
3 An.Ter Fitting Pipa PVC
V.2.4 PEKERJAAN INSTALASI AIR BERSIH LANTAI 3
1 5.1.1.25 Pipa PVC Type AW Diameter 1/2" (
2 An.Ter Gate Valve Dimensi 1/2"
3 An.Ter Fitting Pipa PVC
TOTAL PEKERJAAN INSTALASI AIR BERSIH
V.3 PEKERJAAN INSTALASI AIR BEKAS
V.3.1 PEKERJAAN INSTALASI AIR BEKAS (GREY WATER) LANTAI BASEMENT
1 5.1.1.31 Pipa PVC Type AW Diameter 3"
2 An.Ter Fitting Pipa PVC
V.3.2 PEKERJAAN INSTALASI AIR BEKAS
1 5.1.1.31 Pipa PVC Type AW Diameter 3"
2 An.Ter Fitting Pipa PVC
V.3.3 PEKERJAAN INSTALASI AIR BEKAS
1 5.1.1.31 Pipa PVC Type AW Diameter 3"
2 An.Ter Fitting Pipa PVC
V.3.4 PEKERJAAN INSTALASI AIR BEKAS
1 5.1.1.31 Pipa PVC Type AW Diameter 3"
2 An.Ter Fitting Pipa PVC
TOTAL PEKERJAAN INSTALASI AIR BEKAS
V.4 PEKERJAAN INSTALASI AIR KOTOR
V.4.1 PEKERJAAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI BASEMENT
1 5.1.1.32 Pipa PVC Type AW Diameter 4"
2 An.Ter Fitting Pipa PVC
3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali
V.4.2 PEKERJAAN INSTALASI AIR KOTOR
1 5.1.1.32 Pipa PVC Type AW Diameter 4"
2 An.Ter Fitting Pipa PVC
3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali
V.4.3 PEKERJAAN INSTALASI AIR KOTOR
1 5.1.1.32 Pipa PVC Type AW Diameter 4"
2 An.Ter Fitting Pipa PVC
3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali
V.4.4 PEKERJAAN INSTALASI AIR KOTOR
1 5.1.1.32 Pipa PVC Type AW Diameter 4"
2 Fitting Pipa PVC
An.Ter
3 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali
TOTAL PEKERJAAN INSTALASI AIR KOTOR
V.5 PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH
1 An.Ter Pek. Septiktank Fiberglass + Peresapan
2 2.3.1.1 Pek. Galian Tanah + Menimbun Kembali
TOTAL PEKERJAAN INSTALASI PENGOLAHAN AIR LIMBAH
V.6 PEKERJAAN SUMBER AIR BERSIH
1 An.Ter Pek. Sumur Dalam
Pengadaan dan pemasangan Pompa Sumur Dalam
Type : Submersible Pump
Daya : 3 HP
Lengkap Dengan Screen, proteksi, instalasi kabel daya/pemipaan (casing), dll
Kabel jenis waterproof, lengkap Panel Kontrol, dll
Pemipaan sampai ke Reservoir
Peralatan penunjang, Gate Valve, Check Valve, Meter air, Bak Kontrol, dan accessories lainny
Pengeboran dalam sampai mendapatkan Kapasitas air Min. 2liter/Detik (Jernih)
Pekerjaan harus mengikuti/memenuhi Standard DepKes-RI
2 An.Ter Pek. Pemasangan Mesin Pompa (Dari Sumber Air Ke Roof Water Tank)
3 An.Ter Pek. Pemasangan Mesin Pompa (Dari Roof Water Tank Ke KM/WC)
4 An.Ter Pek. Pemasangan Water Tank
5 An.Ter Pek. Pemasangan Menara Air
6 An.Ter Pek. Pemasangan Floating Valve
7 An.Ter Pek. Pemasangan Gate Valve
8 An.Ter Pek. Pemasangan Pemipaan Utama
9 An.Ter Pek. Pemasangan Fitting Pipa
10 An.Ter Pek. Tes Dan Komisioning
TOTAL PEKERJAAN SUMBER AIR BERSIH
V.6 PEKERJAAN PROTEKSI KEBAKARAN
V.6.1 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI BASEMENT
1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm
3 An.Ter - Diameter 50 mm
4 An.Ter - Diameter 40 mm
5 An.Ter - Diameter 25 mm
6 An.Ter Head Sprinkler
7 An.Ter Gate Valve diameter 80 mm
8 An.Ter Test Valve diameter 25 mm
9 An.Ter Drain Valve diameter 25 mm
10 An.Ter Water Flow Switch
11 An.Ter Plat Orifice diameter 25 mm
12 An.Ter Sight Gass 25mm
13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP
14 An.Ter Pek. Bobok Dinding + Perapian
15 An.Ter Hydrant Pillar (HP), Two way type
16 An.Ter Hose Rell Cabinet (HRC) type C
17 An.Ter Fire Extinguisher 3Kg
V.6.2 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI 1
1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm
3 An.Ter - Diameter 50 mm
4 An.Ter - Diameter 40 mm
5 An.Ter - Diameter 25 mm
6 An.Ter Head Sprinkler
7 An.Ter Gate Valve diameter 80 mm
8 An.Ter Test Valve diameter 25 mm
9 An.Ter Drain Valve diameter 25 mm
10 An.Ter Water Flow Switch
11 An.Ter Plat Orifice diameter 25 mm
12 An.Ter Sight Gass 25mm
13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP
14 An.Ter Pek. Bobok Dinding + Perapian
15 An.Ter Hydrant Pillar (HP), Two way type
16 An.Ter Hose Rell Cabinet (HRC) type C
17 An.Ter Fire Extinguisher 3Kg
V.6.3 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI 2
1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm
3 An.Ter - Diameter 50 mm
4 An.Ter - Diameter 40 mm
5 An.Ter - Diameter 25 mm
6 An.Ter Head Sprinkler
7 An.Ter Gate Valve diameter 80 mm
8 An.Ter Test Valve diameter 25 mm
9 An.Ter Drain Valve diameter 25 mm
10 An.Ter Water Flow Switch
11 An.Ter Plat Orifice diameter 25 mm
12 An.Ter Sight Gass 25mm
13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP
14 An.Ter Pek. Bobok Dinding + Perapian
15 An.Ter Hydrant Pillar (HP), Two way type
16 An.Ter Hose Rell Cabinet (HRC) type C
17 An.Ter Fire Extinguisher 3Kg
V.6.4 PEKERJAAN SISTEM PEMADAM KEBAKARAN LANTAI 3
1 Pek. Pemipaan BSP Sch. 40
2 An.Ter - Diameter 80 mm
3 An.Ter - Diameter 50 mm
4 An.Ter - Diameter 40 mm
5 An.Ter - Diameter 25 mm
6 Head Sprinkler
An.Ter
7 Gate Valve diameter 80 mm
An.Ter
8 Test Valve diameter 25 mm
An.Ter
9 An.Ter Drain Valve diameter 25 mm
10 An.Ter Water Flow Switch
11 An.Ter Plat Orifice diameter 25 mm
12 An.Ter Sight Gass 25mm
13 An.Ter Pek. Pemasangan Fitting Pemipaan BSP
14 An.Ter Pek. Bobok Dinding + Perapian
15 An.Ter Hydrant Pillar (HP), Two way type
16 An.Ter Hose Rell Cabinet (HRC) type C
17 An.Ter Fire Extinguisher 3Kg
TOTAL PEKERJAAN PROTEKSI KEBAKARAN
V.6 PEKERJAAN SISTEM TATA UDARA
V.6.1 PEKERJAAN SISTEM TATA UDARA LANTAI BASEMENT
1 Pek. Instalasi HVAC Ruang
-Main Equipment
-Ducting
-Pipe Work
-Electrical Work
-Controls for AHU
-Civil & Construction Work
-Preliminary & Documentation
2 Pekerjaan Unit Air Conditioning VRV System
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type
3 An.Ter Pemipaan Refrigrant berisolasi
4 An.Ter Pemipaan Drain / PVC AW berisolasi
5 An.Ter Fitting-Fitting
6 An.Ter Titik Instalasi daya AC Unit
7 Ducting AC dengan isolasi
An.Ter - 55" x 25 "
An.Ter - 40" x 25 "
An.Ter - Fresh Air Grille ( FAG 25"x25")
An.Ter - Intake Air Grille ( EAG 55"x25")
V.6.2 PEKERJAAN SISTEM TATA UDARA LANTAI 1
1 Pekerjaan Unit Air Conditioning VRV System Include Outdoor
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type
2 An.Ter Pemipaan Refrigrant berisolasi
3 An.Ter Pemipaan Drain / PVC AW berisolasi
4 An.Ter Fitting-Fitting
5 An.Ter Titik Instalasi daya AC Unit
6 Ducting AC dengan isolasi
An.Ter - 55" x 25 "
- 40" x 25 "
An.Ter
- Fresh Air Grille ( FAG 25"x25")
An.Ter
- Intake Air Grille ( EAG 55"x25")
An.Ter
V.6.3 PEKERJAAN SISTEM TATA UDARA LANTAI 2
1 Pekerjaan Unit Air Conditioning VRV System
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type
2 An.Ter Pemipaan Refrigrant berisolasi
3 An.Ter Pemipaan Drain / PVC AW berisolasi
4 An.Ter Fitting-Fitting
5 An.Ter Titik Instalasi daya AC Unit
6 Ducting AC dengan isolasi
An.Ter - 55" x 25 "
An.Ter - 40" x 25 "
An.Ter - Fresh Air Grille ( FAG 25"x25")
An.Ter - Intake Air Grille ( EAG 55"x25")
V.6.4 PEKERJAAN SISTEM TATA UDARA LANTAI 3
1 Pekerjaan Unit Air Conditioning VRV System
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 2 Pk - Cassete type
An.Ter -Indoor Unit IU.2.B.13, kapasitas : 1 Pk - Wall type
2 An.Ter Pemipaan Refrigrant berisolasi
3 An.Ter Pemipaan Drain / PVC AW berisolasi
4 An.Ter Fitting-Fitting
5 An.Ter Titik Instalasi daya AC Unit
6 Ducting AC dengan isolasi
An.Ter - 55" x 25 "
An.Ter - 40" x 25 "
An.Ter - Fresh Air Grille ( FAG 25"x25")
An.Ter - Intake Air Grille ( EAG 55"x25")
TOTAL PEKERJAAN SISTEM TATA UDARA
TOTAL ITEM DIVISI 5 : PEKERJAAN MEKANIKAL

VI DIVISI 6 : PEKERJAAN ELEKTRIKAL


VI.1 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL
VI.1.1 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI BASEM
1 SDP
2 LP-B
3 PP-B
4 PP-ARUS LEMAH B
5 Pek. Instalasi Kabel Feeder
6 Dari SDP ke LP-B, NYY 4 x 4 mm2
7 Dari SDP ke PP-B, NYY 4 x 16 mm3
8 Dari SDP- ke PP - Arus Lemah B, NYY 4 x 4 mm2
9 Pek. Rak Kabel Uk. 40cm
VI.1.2 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 1
1 LP-1
2 PP-1
3 PP-ARUS LEMAH 1
4 Pek. Instalasi Kabel Feeder
5 Dari SDP ke LP-1, NYY 4 x 4 mm2
6 Dari SDP ke PP-1, NYY 4 x 16 mm3
7 Dari SDP- ke PP - Arus Lemah 1, NYY 4 x 4 mm2
8 Pek. Rak Kabel Uk. 40cm
VI.1.3 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 2
1 LP-2
2 PP-2
3 PP-ARUS LEMAH 2
4 Pek. Instalasi Kabel Feeder
5 Dari SDP ke LP-2, NYY 4 x 4 mm2
6 Dari SDP ke PP-2, NYY 4 x 16 mm3
7 Dari SDP- ke PP - Arus Lemah 2, NYY 4 x 4 mm2
8 Pek. Rak Kabel Uk. 40cm
VI.1.4 PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 3
1 LP-3
2 PP-3
3 PP-ARUS LEMAH 3
4 Pek. Instalasi Kabel Feeder
5 Dari SDP ke LP-3, NYY 4 x 4 mm2
6 Dari SDP ke PP-3, NYY 4 x 16 mm3
7 Dari SDP- ke PP - Arus Lemah 3, NYY 4 x 4 mm2
8 Pek. Rak Kabel Uk. 40cm
TOTAL PEKERJAAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL
VI.2 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN
VI.2.1 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1
1 Saklar Tunggal
2 Saklar Ganda
3 Stop Kontak
4 Instalasi penerangan, NYM 3 x 2,5 mm2
5 Instalasi stop kontak, NYM 3 x 2,5 mm2
6 Downlight 4" Type Outbow + Lampu SL 18 Watt
7 Lampu Spot
8 Downlight 4" + Lampu SL 18 Watt
9 Downlight 4" + Lampu SL 11 Watt
VI.2.2 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1
1 Saklar Tunggal
2 Saklar Ganda
3 Stop Kontak
4 Instalasi penerangan, NYM 3 x 2,5 mm2
5 Instalasi stop kontak, NYM 3 x 2,5 mm2
6 Downlight 4" Type Outbow + Lampu SL 18 Watt
7 Lampu Spot
8 Downlight 4" + Lampu SL 18 Watt
9 Downlight 4" + Lampu SL 11 Watt
VI.2.3 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 2
1 Saklar Tunggal
2 Saklar Ganda
3 Stop Kontak
4 Instalasi penerangan, NYM 3 x 2,5 mm2
5 Instalasi stop kontak, NYM 3 x 2,5 mm2
6 Downlight 4" Type Outbow + Lampu SL 18 Watt
7 Lampu Spot
8 Downlight 4" + Lampu SL 18 Watt
9 Downlight 4" + Lampu SL 11 Watt
VI.2.3 PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 3
1 Saklar Tunggal
2 Saklar Ganda
3 Stop Kontak
4 Instalasi penerangan, NYM 3 x 2,5 mm2
5 Instalasi stop kontak, NYM 3 x 2,5 mm2
6 Downlight 4" Type Outbow + Lampu SL 18 Watt
7 Lampu Spot
8 Downlight 4" + Lampu SL 18 Watt
9 Downlight 4" + Lampu SL 11 Watt
10 Test Dan Commisioning
TOTAL PEKERJAAN INSTALASI DAYA DAN ARMATUR PENERANGAN
VI.3 PEKERJAAN SISTEM TATA SUARA
VI.3.1 PEKERJAAN SISTEM TATA SUARA LANTAI BASEMENT
A Pek. Sentral
1 An.Ter Pek. Pemasangan 2x700 W Power Amplifier
2 An.Ter Instalasi Daya Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC
3 An.Ter Pek. Pemasangan CD / DVD/MP3 - Player
4 An.Ter Pek. Pemasangan Mixer
5 An.Ter Pek. Pemasangan Selector Speaker
6 An.Ter Pek. Pemasangan MDF-S
7 An.Ter Pek. Pemasangan Equalizer
9 An.Ter Pek. Pemasangan Mic Paging
10 An.Ter Pek. Pemasangan Cabinet Rack Type Standing
B Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-B
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY
3 An.Ter Pek. Pemasangan Ceiling Speaker
4 An.Ter Pek. Pemasangan Horn Speaker
5 Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
An.Ter
VI.3.2 PEKERJAAN SISTEM TATA SUARA LANTAI 1
A Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-1
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY
3 An.Ter Pek. Pemasangan Ceiling Speaker
4 An.Ter Pek. Pemasangan Horn Speaker
5 An.Ter Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
VI.3.3 PEKERJAAN SISTEM TATA SUARA LANTAI 2
A Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-2
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY
3 An.Ter Pek. Pemasangan Ceiling Speaker
4 An.Ter Pek. Pemasangan Horn Speaker
5 An.Ter Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
VI.3.4 PEKERJAAN SISTEM TATA SUARA LANTAI 3
A Pek. Instalasi
1 An.Ter Pek. Pemasangan TBS-3
2 An.Ter Pek. Pemasangan Kabel dari MDF Central ke TBS-2, NYMHY
3 An.Ter Pek. Pemasangan Ceiling Speaker
4 An.Ter Pek. Pemasangan Horn Speaker
5 An.Ter Pek. Titik Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
B An.Ter Pek. Tes dan Komisioning
TOTAL PEKERJAAN SISTEM TATA SUARA
VI.4 PEKERJAAN SISTEM MATV
VI.4.1 PEKERJAAN SISTEM MATV LANTAI BASEMENT
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way
2 An.Ter Pek. Pemasangan Spliter 2 way
3 An.Ter Pek. Pemasangan Outlet TV
4 An.Ter Pek. Pemasangan LED TV 32"
5 An.Ter Pek. Titik instalasi, Coaxial Cable RG6
VI.4.2 PEKERJAAN SISTEM MATV LANTAI 1
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way
2 An.Ter Pek. Pemasangan Spliter 2 way
3 An.Ter Pek. Pemasangan Outlet TV
4 An.Ter Pek. Pemasangan LED TV 32"
5 An.Ter Pek. Titik instalasi, Coaxial Cable RG6
VI.4.3 PEKERJAAN SISTEM MATV LANTAI 2
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way
2 An.Ter Pek. Pemasangan Spliter 2 way
3 An.Ter Pek. Pemasangan Outlet TV
4 Pek. Pemasangan LED TV 32"
An.Ter
5 Pek. Titik instalasi, Coaxial Cable RG6
An.Ter
VI.4.4 PEKERJAAN SISTEM MATV LANTAI 3
A Pek. Sentral
1 An.Ter Pek. Pemasangan Antena UHF 17 Element Lengkap Tiang Dan Dudukan
2 An.Ter Pek. Pemasangan Parabola 9 Feet Lengkap Tiang Dan Dudukan
3 An.Ter Pek. Pemasangan Booster sinyal & P.supply
4 An.Ter Instalasi Daya Dari Panel, NYM 3 x 2,5 mm2 dalam conduit PVC
5 An.Ter Pek. Pemasangan Satelite Receiver
6 An.Ter Pek. Pemasangan Modulator
7 An.Ter Pek. Pemasangan Active Combiner
8 An.Ter Pek. Pemasangan Spliter 4 way
9 An.Ter Pek. Pemasangan Head And Amplifier
10 An.Ter Pek. Pemasangan CD Player
11 An.Ter Pek. Pemasangan Cabinet Rack Standing
12 An.Ter Pek. Pemasangan Coaxial RG-11 Cable
B Pek. Instalasi
1 An.Ter Pek. Pemasangan Spliter 4 way
2 An.Ter Pek. Pemasangan Spliter 2 way
3 An.Ter Pek. Pemasangan Outlet TV
4 An.Ter Pek. Pemasangan LED TV 32"
5 An.Ter Pek. Titik instalasi, Coaxial Cable RG6
6 Test Dan Commisioning
TOTAL PEKERJAAN SISTEM MATV
VI.5 PEKERJAAN SISTEM CCTV
VI.5.1 PEKERJAAN SISTEM CCTV LANTAI BASEMENT
A Pek. Sentral
1 An.Ter Pek. Pemasangan Power Suply
2 An.Ter Instalasi Daya Dari Panel Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC
3 An.Ter Pek. Pemasangan UPS 1 Kva
4 An.Ter Pek. Pemasangan 32" LCD Monitor
5 An.Ter Pek. Pemasangan Digital Disc Recorder 8 Channel, Video real time 2 Slot HDD
6 An.Ter Pek. Pemasangan Rack CCTV
B Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera
2 An.Ter Pek. Pemasangan Instalasi Camera
VI.5.2 PEKERJAAN SISTEM CCTV LANTAI 1
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera
2 An.Ter Pek. Pemasangan Instalasi Camera
VI.5.3 PEKERJAAN SISTEM CCTV LANTAI 2
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera
2 An.Ter Pek. Pemasangan Instalasi Camera
VI.5.4 PEKERJAAN SISTEM CCTV LANTAI 3
A Pek. Instalasi
1 An.Ter Pek. Pemasangan Fixed Camera
2 An.Ter Pek. Pemasangan Instalasi Camera
6 Test Dan Commisioning
TOTAL PEKERJAAN SISTEM CCTV
VI.5 PEKERJAAN SISTEM FIRE ALARM
VI.5.1 PEKERJAAN SISTEM FIRE ALARM LANTAI BASEMENT
A Pek. Sentral
1 An.Ter MCFA, Kap.5 Zone
2 An.Ter Instalasi Daya Dari Panel, NYM 3 x 2,5 mm2 dalam conduit PVC
3 An.Ter MDF-FA
4 An.Ter Kabel dari MCFA ke MDF-FA (
5 An.Ter Instalasi AC Shut Down Dari MCFA PP AC2, NYA 2 (1x 1,5 mm2) dalam conduit PVC
B Pek. Instalasi
1 An.Ter TBFA - B
2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (
3 An.Ter ROR
4 An.Ter Smoke Detector
5 An.Ter Manual Breack Glass
6 An.Ter Bell Alarm
7 An.Ter Indicator Lamp
8 An.Ter Jack Telephone
9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2
10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2
11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2
12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2
13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
VI.5.2 PEKERJAAN SISTEM FIRE ALARM LANTAI 1
A Pek. Instalasi
1 An.Ter TBFA - 1
2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (
3 An.Ter ROR
4 An.Ter Smoke Detector
5 An.Ter Manual Breack Glass
6 An.Ter Bell Alarm
7 An.Ter Indicator Lamp
8 An.Ter Jack Telephone
9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2
10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2
11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2
12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2
13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
VI.5.3 PEKERJAAN SISTEM FIRE ALARM LANTAI 2
A Pek. Instalasi
1 An.Ter TBFA - 2
2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (
3 An.Ter ROR
4 An.Ter Smoke Detector
5 An.Ter Manual Breack Glass
6 An.Ter Bell Alarm
7 An.Ter Indicator Lamp
8 An.Ter Jack Telephone
9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2
10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2
11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2
12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2
13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
VI.5.4 PEKERJAAN SISTEM FIRE ALARM LANTAI 3
A Pek. Instalasi
1 An.Ter TBFA - 3
2 An.Ter Kabel dari MDF-FA Ke TBFA-2 (
3 An.Ter ROR
4 An.Ter Smoke Detector
5 An.Ter Manual Breack Glass
6 An.Ter Bell Alarm
7 An.Ter Indicator Lamp
8 An.Ter Jack Telephone
9 An.Ter Instalasi Detector, NYA 2(1x 1,5) mm2
10 An.Ter Instalasi Bell & Indicator, NYA 2(1x 1,5) mm2
11 An.Ter Instalasi Manual Breack Glass, NYA 2(1x 1,5) mm2
12 An.Ter Instalasi Jack Telephone, ITC 2x 0,6 mm2
13 An.Ter Instalasi Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
14 Test Dan Commisioning
TOTAL PEKERJAAN SISTEM FIRE ALARM
VI.6 PEKERJAAN SISTEM PENTANAHAN
A PEKERJAAN SISTEM PENANGKAL PETIR
1 An.Ter Pek. Arester Lighting Protection Radius 50 Meter
2 An.Ter Pek. Tiang Pipa + Aksesoris
3 An.Ter Pek. Down Conductor BC 50 mm + Aksesoris
4 An.Ter Pek. Grounding System Max. 1 Ohm
Copper Rod, Clamp Rod, BAR CU, Kontrol Box
5 An.Ter Bak Kontrol
6 An.Ter Material Bantu
B PEKERJAAN GROUNDING ARUS KUAT
1 An.Ter Pek. Kabel BC 4 mm + Aksesoris
2 An.Ter Pek. Grounding System Max. 1 Ohm
Copper Rod, Clamp Rod, BAR CU, Kontrol Box
4 An.Ter Bak Kontrol
Material Bantu
C PEKERJAAN GROUNDING ARUS LEMAH
1 An.Ter Pek. Kabel BC 4 mm + Aksesoris
2 An.Ter Pek. Grounding System Max. 1 Ohm
3 An.Ter Copper Rod, Clamp Rod, BAR CU, Kontrol Box
4 An.Ter Bak Kontrol
Material Bantu
5 An.Ter Pek. Testing & Commisioning
TOTAL PEKERJAAN SISTEM PENTANAHAN
TOTAL ITEM DIVISI 6 : PEKERJAAN ELEKTRIKAL

VII DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN


1 An.Ter Pek. Taman
- Pasangan Dinding
- Tanah Subur
- Rumput Gajah Mini

TOTAL ITEM DIVISI 7 : FASILITAS EKSTERIOR BANGUNAN


URAIAN PEKERJAAN
c
: DESIGN DEVELOPMENT
poran dan Asbuilt Drawing
najemen K3
najemen K3 terdiri penyiapan Safety Equipment, Baik Untuk Direksi maupun Tukang/Pekerja,
Pengobatan, Safety Sign serta Biaya Lain Yang Berkaitan Dengan Penanganan K3
umentasi Proyek
TOTAL ITEM DIVISI 1 : DESIGN DEVELOPMENT

: SITE WORK
AAN PERSIAPAN
r Seng Gelombang
ukuran dan Pemasangan Bow Plank

bongkaran Bangunan Eksisting


ilisasi Alat Diesel Hammer
ilisasi Alat Crane
ilisasi Alat Excavator
obilisasi Alat
n Nama Proyek

AAN PEMBERSIHAN LAHAN DAN REMOVAL


bersihan Awal Lokasi
bersihan Akhir Lokasi
ilisasi Bongkaran
BERSIHAN LAHAN DAN REMOVAL
AAN TANAH
n Tanah Area Pondasi Batu

ngan Bekas Galian


an Kembali Bekas Galian

n Tanah Area Pondasi Poer Plat

ngan Bekas Galian


an Kembali Bekas Galian

n Tanah Area Basement

ngan Bekas Galian


an Kembali Bekas Galian
n Peninggian Lantai
bunan Biasa
adatan Tanah Dengan Stamper Kuda

TOTAL PEKERJAAN TANAH


TOTAL ITEM DIVISI 2 : SITE WORK

: PEKERJAAN STRUKTURAL
AAN STRUKTURAL DI ATAS TANAH
AAN STRUKTURAL LANTAI 1
n Sloof 25x40

n Sloof 20x30

n Cor Lantai

n Kolom 50x50

n Kolom Praktis
m (Termasuk Bekisting Dan Pembesian)
n Balok 30x50

n Balok 20x40

n Core Lift

n Balok Latai
k (Termasuk Bekisting Dan Pembesian)
AAN STRUKTURAL LANTAI 2
n Plat Lantai

n Kolom 50x50

n Kolom Praktis
m (Termasuk Bekisting Dan Pembesian)
n Balok 30x50

n Balok 20x40

n Core Lift

n Balok Latai
k (Termasuk Bekisting Dan Pembesian)
AAN STRUKTURAL LANTAI 3
n Plat Lantai

n Kolom 50x50

n Kolom Praktis
m (Termasuk Bekisting Dan Pembesian)
n Balok 30x50
n Balok 20x40

n Core Lift

n Balok Latai
k (Termasuk Bekisting Dan Pembesian)
UKTURAL DI ATAS TANAH
AAN STRUKTURAL DI BAWAH TANAH
n Pondasi Batu
ngan Pondasi Batu Kali
ngan Batu Kosong
ngan Pondasi Bata
n Plat Lantai

n Dinding Penahan Tanah

n Pondasi Pancang

n Poer Plat

n Kolom 50x50
n Ground Water Tank

UKTURAL DI BAWAH TANAH


EKERJAAN STRUKTURAL

: PEKERJAAN ARSITEKTURAL
AAN FINISHING DINDING
AAN FINISHING DINDING LANTAI 1
ngan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
eran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
eran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm

ing Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air)

AAN FINISHING DINDING LANTAI 2


ngan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
eran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
eran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm

ing Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air)

AAN FINISHING DINDING LANTAI 3


ngan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
eran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
eran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm

ing Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air)

AAN FINISHING DINDING LANTAI BASEMENT


ngan Dinding 1/2 Bata, Campuran 1 Pc : 3 Ps
eran Dinding, Campuran 1 Pc : 3 Ps, tebal 15 mm
eran Beton, Campuran 1 Pc : 3 Ps, tebal 15mm

ing Keramik Ukuran 25 X 50 cm Area KM/WC (Aplikasi Tertanam Di Dinding + Tali Air)
er Proofing Membrant Asphalt Ground Water Tank
AAN FINISHING FASADE
minium Composite Panel

ing Granit Ukuran 80x80


SHING DINDING
AAN FINISHING LANTAI
AAN FINISHING LANTAI AREA LANTAI BASEMENT
ogenous Tile Ukuran 60x60
l Keramik 50x50
l Keramik Type Unpolished Ukuran 50 X 50 cm (Teras Dan WC/Kamar Mandi)
erproofing Couting Lantai KM/WC + Grouting
AAN FINISHING LANTAI AREA LANTAI 1
ogenous Tile Ukuran 60x60
l Keramik 50x50
l Keramik Type Unpolished Ukuran 50 X 50 cm (Teras Dan WC/Kamar Mandi)
erproofing Couting Lantai KM/WC + Grouting
AAN FINISHING LANTAI AREA LANTAI 2
ogenous Tile Ukuran 60x60
l Keramik 50x50
l Keramik Type Unpolished Ukuran 50 X 50 cm (Teras Dan WC/Kamar Mandi)
erproofing Couting Lantai KM/WC + Grouting
AAN FINISHING LANTAI AREA LANTAI 3
ogenous Tile Ukuran 60x60
l Keramik 50x50
l Keramik Type Unpolished Ukuran 50 X 50 cm (Teras Dan WC/Kamar Mandi)
erproofing Couting Lantai KM/WC + Grouting
SHING LANTAI
AAN PINTU DAN JENDELA
AAN PINTU DAN JENDELA LANTAI BASEMENT
u (P1) + Aksesoris
u (P2) + Aksesoris
ela (J1) + Aksesoris
ilasi (V1) + Aksesoris
AAN PINTU DAN JENDELA LANTAI 1
u (P1) + Aksesoris
u (P2) + Aksesoris
ela (J1) + Aksesoris
ilasi (V1) + Aksesoris
AAN PINTU DAN JENDELA LANTAI 2
u (P1) + Aksesoris
u (P2) + Aksesoris
ela (J1) + Aksesoris
ilasi (V1) + Aksesoris
AAN PINTU DAN JENDELA LANTAI 3
u (P1) + Aksesoris
u (P2) + Aksesoris
ela (J1) + Aksesoris
ilasi (V1) + Aksesoris
U DAN JENDELA
AAN ATAP DAN LANGIT-LANGIT
AAN ATAP
Genteng Metal + Rangka Baja Ringan
Genteng Metal
l Listplank
erproofing Couting Dak Atap
ed Dak Atap
er Proofing Membrant Asphalt Dak Atap
AAN LANGIT-LANGIT LANTAI BASEMENT
it-Langit Gypsum + Rangka Metal Hollow
ose Plat Beton
it-Langit Nusaboard + Rangka Metal Hollow (KM/WC, Teras Dan Talang)
l List Gypsum
hole Uk. 50x50
AAN LANGIT-LANGIT LANTAI 1
it-Langit Gypsum + Rangka Metal Hollow
ose Plat Beton
it-Langit Nusaboard + Rangka Metal Hollow (KM/WC, Teras Dan Talang)
l List Gypsum
hole Uk. 50x50
AAN LANGIT-LANGIT LANTAI 2
it-Langit Gypsum + Rangka Metal Hollow
ose Plat Beton
it-Langit Nusaboard + Rangka Metal Hollow (KM/WC, Teras Dan Talang)
l List Gypsum
hole Uk. 50x50
AAN LANGIT-LANGIT LANTAI 3
it-Langit Gypsum + Rangka Metal Hollow
ose Plat Beton
it-Langit Nusaboard + Rangka Metal Hollow (KM/WC, Teras Dan Talang)
l List Gypsum
hole Uk. 50x50
P DAN LANGIT-LANGIT
AAN PENGECATAN
AAN PENGECATAN LANTAI BASEMENT
Dinding Ex. Jotun (Acrylic Emultion + Weather Shield)
Langit-Langit Ex. Jotun (Acrylic Emultion)
AAN PENGECATAN LANTAI 1
Dinding Ex. Jotun (Acrylic Emultion + Weather Shield)
Langit-Langit Ex. Jotun (Acrylic Emultion)

AAN PENGECATAN LANTAI 2


Dinding Ex. Jotun (Acrylic Emultion + Weather Shield)
Langit-Langit Ex. Jotun (Acrylic Emultion)

AAN PENGECATAN LANTAI 3


Dinding Ex. Jotun (Acrylic Emultion + Weather Shield)
Langit-Langit Ex. Jotun (Acrylic Emultion)

GECATAN
EKERJAAN ARSITEKTURAL

: PEKERJAAN MEKANIKAL
AAN SANITARY
AAN SANITARY LANTAI BASEMENT
asangan Kloset Jongkok
asangan Kran Air
asangan Floor Drain

AAN SANITARY LANTAI 1


asangan Kloset Jongkok
asangan Kran Air
asangan Floor Drain

AAN SANITARY LANTAI 2


asangan Kloset Jongkok
asangan Kran Air
asangan Floor Drain

AAN SANITARY LANTAI 3


asangan Kloset Jongkok
asangan Kran Air
asangan Floor Drain

AAN INSTALASI AIR BERSIH


AAN INSTALASI AIR BERSIH LANTAI BASEMENT
Type AW Diameter 1/2" (ke Outlet)
e Dimensi 1/2"
AAN INSTALASI AIR BERSIH LANTAI 1
Type AW Diameter 1/2" (ke Outlet)
e Dimensi 1/2"

AAN INSTALASI AIR BERSIH LANTAI 2


Type AW Diameter 1/2" (ke Outlet)
e Dimensi 1/2"

AAN INSTALASI AIR BERSIH LANTAI 3


Type AW Diameter 1/2" (ke Outlet)
e Dimensi 1/2"

ALASI AIR BERSIH


AAN INSTALASI AIR BEKAS (GREY WATER)
AAN INSTALASI AIR BEKAS (GREY WATER) LANTAI BASEMENT
Type AW Diameter 3"

AAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 1


Type AW Diameter 3"

AAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 2


Type AW Diameter 3"

AAN INSTALASI AIR BEKAS (GREY WATER) LANTAI 3


Type AW Diameter 3"

ALASI AIR BEKAS (GREY WATER)


AAN INSTALASI AIR KOTOR (BLACK WATER)
AAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI BASEMENT
Type AW Diameter 4"

an Tanah + Menimbun Kembali (Civil Work)


AAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 1
Type AW Diameter 4"

an Tanah + Menimbun Kembali (Civil Work)


AAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 2
Type AW Diameter 4"

an Tanah + Menimbun Kembali (Civil Work)


AAN INSTALASI AIR KOTOR (BLACK WATER) LANTAI 3
Type AW Diameter 4"
an Tanah + Menimbun Kembali (Civil Work)
ALASI AIR KOTOR (BLACK WATER)
AAN INSTALASI PENGOLAHAN AIR LIMBAH
ktank Fiberglass + Peresapan
an Tanah + Menimbun Kembali (Civil Work)
ALASI PENGOLAHAN AIR LIMBAH
AAN SUMBER AIR BERSIH

n dan pemasangan Pompa Sumur Dalam


bmersible Pump

Dengan Screen, proteksi, instalasi kabel daya/pemipaan (casing), dll


is waterproof, lengkap Panel Kontrol, dll
sampai ke Reservoir
penunjang, Gate Valve, Check Valve, Meter air, Bak Kontrol, dan accessories lainnya.
an dalam sampai mendapatkan Kapasitas air Min. 2liter/Detik (Jernih)
n harus mengikuti/memenuhi Standard DepKes-RI
asangan Mesin Pompa (Dari Sumber Air Ke Roof Water Tank)
asangan Mesin Pompa (Dari Roof Water Tank Ke KM/WC)
asangan Water Tank
asangan Menara Air
asangan Floating Valve
asangan Gate Valve
asangan Pemipaan Utama
asangan Fitting Pipa
Dan Komisioning
TOTAL PEKERJAAN SUMBER AIR BERSIH
AAN PROTEKSI KEBAKARAN
AAN SISTEM PEMADAM KEBAKARAN LANTAI BASEMENT
paan BSP Sch. 40

ve diameter 80 mm
ve diameter 25 mm
lve diameter 25 mm

ce diameter 25 mm

asangan Fitting Pemipaan BSP


ok Dinding + Perapian
illar (HP), Two way type
Cabinet (HRC) type C
guisher 3Kg
AAN SISTEM PEMADAM KEBAKARAN LANTAI 1
paan BSP Sch. 40

ve diameter 80 mm
ve diameter 25 mm
lve diameter 25 mm

ce diameter 25 mm

asangan Fitting Pemipaan BSP


ok Dinding + Perapian
illar (HP), Two way type
Cabinet (HRC) type C
guisher 3Kg
AAN SISTEM PEMADAM KEBAKARAN LANTAI 2
paan BSP Sch. 40

ve diameter 80 mm
ve diameter 25 mm
lve diameter 25 mm

ce diameter 25 mm

asangan Fitting Pemipaan BSP


ok Dinding + Perapian
illar (HP), Two way type
Cabinet (HRC) type C
guisher 3Kg
AAN SISTEM PEMADAM KEBAKARAN LANTAI 3
paan BSP Sch. 40
ve diameter 80 mm
ve diameter 25 mm
lve diameter 25 mm

ce diameter 25 mm

asangan Fitting Pemipaan BSP


ok Dinding + Perapian
illar (HP), Two way type
Cabinet (HRC) type C
guisher 3Kg
TEKSI KEBAKARAN
AAN SISTEM TATA UDARA
AAN SISTEM TATA UDARA LANTAI BASEMENT
lasi HVAC Ruang

Construction Work
ary & Documentation
Unit Air Conditioning VRV System
nit IU.2.B.13, kapasitas : 2 Pk - Cassete type
nit IU.2.B.13, kapasitas : 1 Pk - Wall type
Refrigrant berisolasi
Drain / PVC AW berisolasi

alasi daya AC Unit


AC dengan isolasi

r Grille ( FAG 25"x25")


ir Grille ( EAG 55"x25")
AAN SISTEM TATA UDARA LANTAI 1
Unit Air Conditioning VRV System Include Outdoor
nit IU.2.B.13, kapasitas : 2 Pk - Cassete type
nit IU.2.B.13, kapasitas : 1 Pk - Wall type
Refrigrant berisolasi
Drain / PVC AW berisolasi

alasi daya AC Unit


AC dengan isolasi
r Grille ( FAG 25"x25")
ir Grille ( EAG 55"x25")
AAN SISTEM TATA UDARA LANTAI 2
Unit Air Conditioning VRV System
nit IU.2.B.13, kapasitas : 2 Pk - Cassete type
nit IU.2.B.13, kapasitas : 1 Pk - Wall type
Refrigrant berisolasi
Drain / PVC AW berisolasi

alasi daya AC Unit


AC dengan isolasi

r Grille ( FAG 25"x25")


ir Grille ( EAG 55"x25")
AAN SISTEM TATA UDARA LANTAI 3
Unit Air Conditioning VRV System
nit IU.2.B.13, kapasitas : 2 Pk - Cassete type
nit IU.2.B.13, kapasitas : 1 Pk - Wall type
Refrigrant berisolasi
Drain / PVC AW berisolasi

alasi daya AC Unit


AC dengan isolasi

r Grille ( FAG 25"x25")


ir Grille ( EAG 55"x25")
EM TATA UDARA
EKERJAAN MEKANIKAL

: PEKERJAAN ELEKTRIKAL
AAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL
AAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI BASEMENT

S LEMAH B
lasi Kabel Feeder
ke LP-B, NYY 4 x 4 mm2
ke PP-B, NYY 4 x 16 mm3
- ke PP - Arus Lemah B, NYY 4 x 4 mm2
Kabel Uk. 40cm
AAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 1

S LEMAH 1
lasi Kabel Feeder
ke LP-1, NYY 4 x 4 mm2
ke PP-1, NYY 4 x 16 mm3
- ke PP - Arus Lemah 1, NYY 4 x 4 mm2
Kabel Uk. 40cm
AAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 2

S LEMAH 2
lasi Kabel Feeder
ke LP-2, NYY 4 x 4 mm2
ke PP-2, NYY 4 x 16 mm3
- ke PP - Arus Lemah 2, NYY 4 x 4 mm2
Kabel Uk. 40cm
AAN PANEL LISTRIK, KABEL FEEDER DAN RAK KABEL LANTAI 3

S LEMAH 3
lasi Kabel Feeder
ke LP-3, NYY 4 x 4 mm2
ke PP-3, NYY 4 x 16 mm3
- ke PP - Arus Lemah 3, NYY 4 x 4 mm2
Kabel Uk. 40cm
EL LISTRIK, KABEL FEEDER DAN RAK KABEL
AAN INSTALASI DAYA DAN ARMATUR PENERANGAN
AAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1

enerangan, NYM 3 x 2,5 mm2


top kontak, NYM 3 x 2,5 mm2
t 4" Type Outbow + Lampu SL 18 Watt

t 4" + Lampu SL 18 Watt


t 4" + Lampu SL 11 Watt
AAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 1

enerangan, NYM 3 x 2,5 mm2


top kontak, NYM 3 x 2,5 mm2
t 4" Type Outbow + Lampu SL 18 Watt

t 4" + Lampu SL 18 Watt


t 4" + Lampu SL 11 Watt
AAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 2

enerangan, NYM 3 x 2,5 mm2


top kontak, NYM 3 x 2,5 mm2
t 4" Type Outbow + Lampu SL 18 Watt

t 4" + Lampu SL 18 Watt


t 4" + Lampu SL 11 Watt
AAN INSTALASI DAYA DAN ARMATUR PENERANGAN LANTAI 3

enerangan, NYM 3 x 2,5 mm2


top kontak, NYM 3 x 2,5 mm2
t 4" Type Outbow + Lampu SL 18 Watt

t 4" + Lampu SL 18 Watt


t 4" + Lampu SL 11 Watt
Commisioning
ALASI DAYA DAN ARMATUR PENERANGAN
AAN SISTEM TATA SUARA
AAN SISTEM TATA SUARA LANTAI BASEMENT

asangan 2x700 W Power Amplifier


Daya Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC
asangan CD / DVD/MP3 - Player
asangan Mixer
asangan Selector Speaker
asangan MDF-S
asangan Equalizer
asangan Mic Paging
asangan Cabinet Rack Type Standing

asangan TBS-B
asangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 )
asangan Ceiling Speaker
asangan Horn Speaker
Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
AAN SISTEM TATA SUARA LANTAI 1

asangan TBS-1
asangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 )
asangan Ceiling Speaker
asangan Horn Speaker
Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
AAN SISTEM TATA SUARA LANTAI 2

asangan TBS-2
asangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 )
asangan Ceiling Speaker
asangan Horn Speaker
Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
AAN SISTEM TATA SUARA LANTAI 3

asangan TBS-3
asangan Kabel dari MDF Central ke TBS-2, NYMHY (2 x 1,5 mm2 )
asangan Ceiling Speaker
asangan Horn Speaker
Instalasi Speaker, NYMHY 2 x 1,5 mm2 dalam conduit
dan Komisioning
EM TATA SUARA
AAN SISTEM MATV
AAN SISTEM MATV LANTAI BASEMENT

asangan Spliter 4 way


asangan Spliter 2 way
asangan Outlet TV
asangan LED TV 32"
instalasi, Coaxial Cable RG6 (dalam conduit)
AAN SISTEM MATV LANTAI 1

asangan Spliter 4 way


asangan Spliter 2 way
asangan Outlet TV
asangan LED TV 32"
instalasi, Coaxial Cable RG6 (dalam conduit)
AAN SISTEM MATV LANTAI 2

asangan Spliter 4 way


asangan Spliter 2 way
asangan Outlet TV
asangan LED TV 32"
instalasi, Coaxial Cable RG6 (dalam conduit)
AAN SISTEM MATV LANTAI 3

asangan Antena UHF 17 Element Lengkap Tiang Dan Dudukan


asangan Parabola 9 Feet Lengkap Tiang Dan Dudukan
asangan Booster sinyal & P.supply
Daya Dari Panel, NYM 3 x 2,5 mm2 dalam conduit PVC
asangan Satelite Receiver
asangan Modulator
asangan Active Combiner
asangan Spliter 4 way
asangan Head And Amplifier ( Booster )
asangan CD Player
asangan Cabinet Rack Standing
asangan Coaxial RG-11 Cable

asangan Spliter 4 way


asangan Spliter 2 way
asangan Outlet TV
asangan LED TV 32"
instalasi, Coaxial Cable RG6 (dalam conduit)
Commisioning
EM MATV
AAN SISTEM CCTV
AAN SISTEM CCTV LANTAI BASEMENT

asangan Power Suply


Daya Dari Panel Arus Lemah, NYM 3 x 2,5 mm2 dalam conduit PVC
asangan UPS 1 Kva
asangan 32" LCD Monitor
asangan Digital Disc Recorder 8 Channel, Video real time 2 Slot HDD
asangan Rack CCTV

asangan Fixed Camera


asangan Instalasi Camera
AAN SISTEM CCTV LANTAI 1

asangan Fixed Camera


asangan Instalasi Camera
AAN SISTEM CCTV LANTAI 2

asangan Fixed Camera


asangan Instalasi Camera
AAN SISTEM CCTV LANTAI 3

asangan Fixed Camera


asangan Instalasi Camera
Commisioning
EM CCTV
AAN SISTEM FIRE ALARM
AAN SISTEM FIRE ALARM LANTAI BASEMENT

ap.5 Zone (Sistem Konvensional)


Daya Dari Panel, NYM 3 x 2,5 mm2 dalam conduit PVC

i MCFA ke MDF-FA (Kabel NYA 1x1,5 mm2)


AC Shut Down Dari MCFA PP AC2, NYA 2 (1x 1,5 mm2) dalam conduit PVC

i MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2)

reack Glass

Detector, NYA 2(1x 1,5) mm2


Bell & Indicator, NYA 2(1x 1,5) mm2
Manual Breack Glass, NYA 2(1x 1,5) mm2
ack Telephone, ITC 2x 0,6 mm2
Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
AAN SISTEM FIRE ALARM LANTAI 1

i MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2)

reack Glass

Detector, NYA 2(1x 1,5) mm2


Bell & Indicator, NYA 2(1x 1,5) mm2
Manual Breack Glass, NYA 2(1x 1,5) mm2
ack Telephone, ITC 2x 0,6 mm2
Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
AAN SISTEM FIRE ALARM LANTAI 2
i MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2)

reack Glass

Detector, NYA 2(1x 1,5) mm2


Bell & Indicator, NYA 2(1x 1,5) mm2
Manual Breack Glass, NYA 2(1x 1,5) mm2
ack Telephone, ITC 2x 0,6 mm2
Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
AAN SISTEM FIRE ALARM LANTAI 3

i MDF-FA Ke TBFA-2 (Kabel NYA 2x1,5 mm2)

reack Glass

Detector, NYA 2(1x 1,5) mm2


Bell & Indicator, NYA 2(1x 1,5) mm2
Manual Breack Glass, NYA 2(1x 1,5) mm2
ack Telephone, ITC 2x 0,6 mm2
Flow Switch, NYA 2 (1x 1,5 mm2) dalam conduit PVC
Commisioning
EM FIRE ALARM
AAN SISTEM PENTANAHAN (GROUNDING)
AAN SISTEM PENANGKAL PETIR
ter Lighting Protection Radius 50 Meter
g Pipa + Aksesoris
n Conductor BC 50 mm + Aksesoris
nding System Max. 1 Ohm
od, Clamp Rod, BAR CU, Kontrol Box

AAN GROUNDING ARUS KUAT


el BC 4 mm + Aksesoris
nding System Max. 1 Ohm
od, Clamp Rod, BAR CU, Kontrol Box
AAN GROUNDING ARUS LEMAH
el BC 4 mm + Aksesoris
nding System Max. 1 Ohm
od, Clamp Rod, BAR CU, Kontrol Box

ng & Commisioning
EM PENTANAHAN (GROUNDING)
EKERJAAN ELEKTRIKAL

: FASILITAS EKSTERIOR BANGUNAN

Gajah Mini

ASILITAS EKSTERIOR BANGUNAN


BOBOT
SATUAN VOLUME
(%)
d e f

Ls 1.00 0.06
Ls 1.00 0.06
0.00
0.00
Ls 1.00 0.02
0.13
0.00
0.00
0.00
Ls 1.00 0.08
Ls 1.00 0.03
Ls 1.00 0.08
Ls 1.00 0.06
Ls 1.00 0.11
Ls 1.00 0.06
Ls 1.00 0.11
Ls 1.00 0.17
Ls 1.00 0.01
0.69
0.00
Ls 1.00 0.03
Ls 1.00 0.03
Ls 1.00 0.07
0.13
0.00
0.00
M3 231.00 0.19
M3 190.00 0.07
M3 201.00 0.07
M3 31.00 0.06
0.00
M3 151.00 0.12
M3 220.00 0.08
M3 175.00 0.06
M3 41.00 0.08
0.00
M3 300.00 0.24
M3 270.00 0.10
M3 453.00 0.15
0.00
M3 411.00 0.71
M3 411.00 0.28
M3 52.00 0.10
2.28
3.10
0.00
0.00
0.00
0.00
0.00
M3 21.50 0.31
Kg 2,900.00 0.50
M2 565.00 1.32
0.00
M3 15.00 0.22
Kg 870.00 0.15
M2 542.00 1.27
0.00
M3 43.00 0.63
0.00
M3 32.00 0.47
Kg 2,455.00 0.42
M2 533.00 2.31
0.00
M' 111.00 0.12
0.00
M3 31.50 0.46
Kg 3,200.00 0.55
M2 565.00 2.51
0.00
M3 17.00 0.25
Kg 976.00 0.17
M2 202.00 0.90
0.00
M3 12.10 0.18
Kg 1,100.00 0.19
M2 333.00 1.48
0.00
M3 15.10 0.22
Kg 988.00 0.17
M2 89.00 0.40
0.00
M' 153.00 0.20
0.00
0.00
M3 53.00 0.77
Kg 4,111.20 0.70
M2 650.00 3.65
0.00
M3 42.00 0.61
Kg 3,455.00 0.59
M2 290.00 1.26
0.00
M' 121.00 0.13
0.00
M3 31.50 0.46
Kg 3,100.00 0.53
M2 141.47 0.63
0.00
M3 17.00 0.25
Kg 1,276.00 0.22
M2 152.00 0.67
0.00
M3 12.10 0.18
Kg 1,100.00 0.19
M2 73.00 0.32
0.00
M3 15.10 0.22
Kg 988.00 0.17
M2 80.00 0.36
0.00
M' 73.00 0.09
0.00
0.00
M3 53.00 0.77
Kg 2,111.20 0.36
M2 430.00 2.42
0.00
M3 42.00 0.61
Kg 2,455.00 0.42
M2 203.00 0.88
0.00
M' 121.00 0.13
0.00
M3 31.50 0.46
Kg 3,200.00 0.55
M2 165.00 0.73
0.00
M3 17.00 0.25
Kg 576.00 0.10
M2 92.00 0.41
0.00
M3 12.10 0.18
Kg 750.00 0.13
M2 83.00 0.37
0.00
M3 15.10 0.22
Kg 388.00 0.07
M2 89.00 0.40
0.00
M' 95.00 0.12
36.93
0.00
0.00
M3 135.00 1.10
M3 75.00 0.38
M2 21.00 0.03
0.00
M3 53.00 0.77
Kg 1,911.20 0.33
M2 300.00 0.66
0.00
M3 33.00 0.48
Kg 1,011.20 0.17
M2 150.00 0.33
0.00
M3 125.00 1.83
Kg 1,150.00 0.20
M2 105.00 0.23
0.00
M3 54.00 0.60
M3 110.00 1.61
Kg 950.00 0.16
M2 180.00 0.40
0.00
M3 42.00 0.61
Kg 1,955.00 0.33
M2 233.00 1.01
0.00
M3 12.10 0.18
Kg 356.00 0.06
M2 53.00 0.24
0.00
M3 17.00 0.25
Kg 277.00 0.05
M2 55.00 0.24
12.24
49.18
0.00
0.00
0.00
0.00
M2 856.75 1.38
M2 1,713.50 1.16
M2 514.05 0.35
M2 1,713.50 0.73
M2 514.05 0.22
M2 18.29 0.08
Bh 144.00 0.07
0.00
M2 646.75 1.09
M2 1,293.50 0.93
M2 388.05 0.28
M2 1,293.50 0.55
M2 388.05 0.16
M2 18.29 0.08
Bh 144.00 0.07
0.00
M2 916.75 1.54
M2 1,833.50 1.31
M2 550.05 0.39
M2 1,833.50 0.78
M2 550.05 0.23
M2 18.29 0.08
Bh 144.00 0.07
0.00
M2 346.75 0.58
M2 693.50 0.50
M2 208.05 0.15
M2 693.50 0.29
M2 208.05 0.09
M2 18.29 0.08
M2 18.29 0.07
0.00
M2 76.75 1.45
M2 1.00 0.00
M2 110.00 0.56
M2 95.00 0.66
15.96
0.00
0.00
M2 212.85 1.08
M2 23.11 0.07
M2 28.29 0.08
M2 28.29 0.02
0.00
M2 146.85 0.00
M2 23.11 0.00
M2 28.29 0.00
M2 28.29 0.00
0.00
M2 152.85 0.00
M2 23.11 0.00
M2 28.29 0.00
M2 28.29 0.00
0.00
M2 152.85 0.00
M2 23.11 0.00
M2 28.29 0.00
M2 28.29 0.00
1.24
0.00
0.00
Set 6.00 0.00
Set 3.00 0.00
Set 12.00 0.00
Set 3.00 0.00
0.00
Set 6.00 0.17
Set 3.00 0.05
Set 12.00 0.13
Set 3.00 0.01
0.00
Set 6.00 0.00
Set 3.00 0.00
Set 12.00 0.00
Set 3.00 0.00
0.00
Set 6.00 0.00
Set 3.00 0.00
Set 12.00 0.00
Set 3.00 0.00
0.36
0.00
0.00
M2 229.07 0.66
M' 73.80 0.07
M' 118.50 0.10
M2 230.00 0.18
M2 230.00 0.16
M2 230.00 0.54
0.00
M2 584.00 0.00
M2 700.81 0.00
M2 40.77 0.00
M' 45.90 0.00
Bh 10.00 0.00
0.00
M2 584.00 1.22
M2 700.81 0.30
M2 40.77 0.08
M' 45.90 0.03
Bh 10.00 0.00
0.00
M2 584.00 0.00
M2 700.81 0.00
M2 40.77 0.00
M' 45.90 0.00
Bh 10.00 0.00
0.00
M2 584.00 0.00
M2 700.81 0.00
M2 40.77 0.00
M' 45.90 0.00
Bh 10.00 0.00
3.33
0.00
0.00
M2 2,229.50 0.00
M2 433.00 0.00
M2 122.00 0.00
0.00
M2 648.70 0.33
M2 231.00 0.12
M2 112.00 0.05
0.00
M2 1,683.50 0.00
M2 231.00 0.00
M2 111.00 0.00
0.00
M2 918.70 0.00
M2 221.00 0.00
M2 121.00 0.00
0.50
21.40
0.00
0.00
0.00
0.00
Set 9.00 0.00
Bh 9.00 0.00
Bh 9.00 0.00
Bh 9.00 0.00
0.00
Set 8.00 0.22
Bh 8.00 0.01
Bh 8.00 0.01
Bh 8.00 0.01
0.00
Set 8.00 0.00
Bh 8.00 0.00
Bh 8.00 0.00
Bh 8.00 0.00
0.00
Set 7.00 0.00
Bh 7.00 0.00
Bh 7.00 0.00
Bh 7.00 0.00
0.26
0.00
0.00
M' 284.70 0.08
Bh 5.00 0.01
Ls 1.00 0.02
0.00
M' 164.70 0.05
Bh 3.00 0.01
Ls 1.00 0.01
0.00
M' 164.70 0.05
Bh 3.00 0.01
Ls 1.00 0.01
0.00
M' 164.70 0.05
Bh 3.00 0.01
Ls 1.00 0.01
0.29
0.00
0.00
M' 61.80 0.03
Ls 1.00 0.01
0.00
M' 61.80 0.03
Ls 1.00 0.01
0.00
M' 61.80 0.03
Ls 1.00 0.01
0.00
M' 61.80 0.03
Ls 1.00 0.01
0.16
0.00
0.00
M' 90.00 0.05
Ls 1.00 0.01
M3 6.00 0.00
0.00
M' 90.00 0.05
Ls 1.00 0.01
M3 6.00 0.00
0.00
M' 90.00 0.05
Ls 1.00 0.01
M3 6.00 0.00
0.00
M' 90.00 0.05
Ls 1.00 0.01
M3 6.00 0.00
0.26
0.00
Unit 1.00 1.67
M3 13.80 0.01
1.68
0.00
Unit 1.00 2.22
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unit 1.00 0.15
Unit 2.00 0.03
Unit 2.00 0.05
Set 1.00 0.11
Bh 2.00 0.03
Bh 5.00 0.01
M' 30.00 0.02
Ls 1.00 0.00
Ls 1.00 0.02
2.66
0.00
0.00
0.00
M' 30.00 0.10
M' 32.00 0.05
M' 43.00 0.05
M' 12.00 0.01
Unit 13.00 0.06
Unit 3.00 0.06
Unit 3.00 0.02
Unit 3.00 0.02
Unit 3.00 0.09
Unit 3.00 0.01
Unit 3.00 0.08
Ls 1.00 0.04
Ls 1.00 0.01
Unit 2.00 0.12
Unit 2.00 0.08
Unit 3.00 0.05
0.00
0.00
M' 30.00 0.10
M' 32.00 0.05
M' 43.00 0.05
M' 12.00 0.01
Unit 13.00 0.06
Unit 3.00 0.06
Unit 3.00 0.02
Unit 3.00 0.02
Unit 3.00 0.09
Unit 3.00 0.01
Unit 3.00 0.08
Ls 1.00 0.04
Ls 1.00 0.01
Unit 2.00 0.12
Unit 2.00 0.08
Unit 3.00 0.05
0.00
0.00
M' 30.00 0.00
M' 32.00 0.00
M' 43.00 0.00
M' 12.00 0.00
Unit 13.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Ls 1.00 0.00
Ls 1.00 0.00
Unit 2.00 0.00
Unit 2.00 0.00
Unit 3.00 0.00
0.00
0.00
M' 30.00 0.00
M' 32.00 0.00
M' 43.00 0.00
M' 12.00 0.00
Unit 13.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Unit 3.00 0.00
Ls 1.00 0.00
Ls 1.00 0.00
Unit 2.00 0.00
Unit 2.00 0.00
Unit 3.00 0.00
1.69
0.00
0.00
Unit 1.00 3.33
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
Unit 7.00 2.05
Unit 5.00 0.29
M' 3.00 0.02
M' 1.00 0.00
Ls 1.00 0.00
Titik 12.00 0.03
0.00
M' 30.00 1.33
M' 30.00 1.00
Bh 45.00 0.45
Bh 45.00 0.60
0.00
0.00
Unit 7.00 2.05
Unit 5.00 0.29
M' 3.00 0.02
M' 1.00 0.00
Ls 1.00 0.00
Titik 12.00 0.03
0.00
M' 30.00 1.33
M' 30.00 1.00
Bh 45.00 0.45
Bh 45.00 0.60
0.00
0.00
Unit 7.00 0.00
Unit 5.00 0.00
M' 3.00 0.00
M' 1.00 0.00
Ls 1.00 0.00
Titik 12.00 0.00
0.00
M' 30.00 0.00
M' 30.00 0.00
Bh 45.00 0.00
Bh 45.00 0.00
0.00
0.00
Unit 7.00 0.00
Unit 5.00 0.00
M' 3.00 0.00
M' 1.00 0.00
Ls 1.00 0.00
Titik 12.00 0.00
0.00
M' 30.00 0.00
M' 30.00 0.00
Bh 45.00 0.00
Bh 45.00 0.00
14.88
19.22
0.00
0.00
0.00
0.00
Unit 1.00 0.21
Unit 1.00 0.04
Unit 1.00 0.05
Unit 1.00 0.05
0.00
M' 10.00 0.00
M' 10.00 0.01
M' 10.00 0.00
M' 50.00 0.36
0.00
Unit 1.00 0.04
Unit 1.00 0.05
Unit 1.00 0.05
0.00
M' 10.00 0.00
M' 10.00 0.01
M' 10.00 0.00
M' 50.00 0.36
0.00
Unit 1.00 0.04
Unit 1.00 0.05
Unit 1.00 0.05
0.00
M' 10.00 0.00
M' 10.00 0.01
M' 10.00 0.00
M' 50.00 0.36
0.00
Unit 1.00 0.04
Unit 1.00 0.05
Unit 1.00 0.05
0.00
M' 10.00 0.00
M' 10.00 0.01
M' 10.00 0.00
M' 50.00 0.36
2.27
0.00
0.00
Bh 14.00 0.01
Bh 8.00 0.01
Bh 21.00 0.02
Titik 74.00 0.15
Titik 21.00 0.04
Bh 12.00 0.03
Bh 3.00 0.02
Bh 38.00 0.08
Bh 21.00 0.04
0.00
Bh 14.00 0.01
Bh 8.00 0.01
Bh 21.00 0.02
Titik 74.00 0.15
Titik 21.00 0.04
Bh 12.00 0.03
Bh 3.00 0.02
Bh 38.00 0.08
Bh 21.00 0.04
0.00
Bh 14.00 0.00
Bh 8.00 0.00
Bh 21.00 0.00
Titik 74.00 0.00
Titik 21.00 0.00
Bh 12.00 0.00
Bh 3.00 0.00
Bh 38.00 0.00
Bh 21.00 0.00
0.00
Bh 14.00 0.00
Bh 8.00 0.00
Bh 21.00 0.00
Titik 74.00 0.00
Titik 21.00 0.00
Bh 12.00 0.00
Bh 3.00 0.00
Bh 38.00 0.00
Bh 21.00 0.00
Ls 1.00 0.00
0.79
0.00
0.00
0.00
Unit 1.00 0.07
M' 50.00 0.02
Unit 1.00 0.02
Unit 1.00 0.16
Unit 1.00 0.00
Unit 1.00 0.05
Unit 1.00 0.04
Unit 1.00 0.01
Unit 1.00 0.07
0.00
Set 1.00 0.01
M' 100.00 0.03
Bh 10.00 0.03
Bh 5.00 0.08
Titik 15.00 0.06
0.00
0.00
Set 1.00 0.01
M' 100.00 0.03
Bh 10.00 0.03
Bh 5.00 0.08
Titik 15.00 0.06
0.00
0.00
Set 1.00 0.00
M' 100.00 0.00
Bh 10.00 0.00
Bh 5.00 0.00
Titik 15.00 0.00
0.00
0.00
Set 1.00 0.00
M' 100.00 0.00
Bh 10.00 0.00
Bh 5.00 0.00
Titik 15.00 0.00
Ls 1.00 0.00
0.83
0.00
0.00
0.00
Bh 3.00 0.02
Bh 2.00 0.01
Bh 5.00 0.01
Bh 5.00 0.30
Titik 5.00 0.01
0.00
0.00
Bh 3.00 0.02
Bh 2.00 0.01
Bh 5.00 0.01
Bh 5.00 0.30
Titik 5.00 0.01
0.00
0.00
Bh 3.00 0.00
Bh 2.00 0.00
Bh 5.00 0.00
Bh 5.00 0.00
Titik 5.00 0.00
0.00
0.00
Unit 1.00 0.00
Unit 1.00 0.00
Unit 1.00 0.00
M' 50.00 0.00
Unit 10.00 0.00
Unit 10.00 0.00
Unit 1.00 0.00
Unit 2.00 0.00
Unit 1.00 0.00
Unit 1.00 0.00
Unit 1.00 0.00
M' 50.00 0.00
0.00
Bh 2.00 0.00
Bh 1.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
Titik 3.00 0.00
Ls 1.00 0.00
0.71
0.00
0.00
0.00
Bh 1.00 0.06
M' 50.00 0.02
Bh 1.00 0.06
Bh 1.00 0.06
Bh 1.00 0.13
Bh 1.00 0.03
0.00
Bh 7.00 0.23
M' 90.00 0.02
0.00
0.00
Bh 7.00 0.23
M' 90.00 0.02
0.00
0.00
Bh 7.00 0.00
M' 90.00 0.00
0.00
0.00
Bh 7.00 0.00
M' 90.00 0.00
Ls 1.00 0.00
0.86
0.00
0.00
0.00
Unit 1.00 0.11
M' 50.00 0.02
Set 1.00 0.05
M' 20.00 0.01
M' 50.00 0.01
0.00
Set 1.00 0.01
M' 100.00 0.03
Bh 10.00 0.09
Bh 10.00 0.16
Bh 3.00 0.01
Bh 3.00 0.02
Bh 3.00 0.01
Bh 3.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
0.00
0.00
Set 1.00 0.01
M' 100.00 0.03
Bh 10.00 0.09
Bh 10.00 0.16
Bh 3.00 0.01
Bh 3.00 0.02
Bh 3.00 0.01
Bh 3.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
M' 75.00 0.02
0.00
0.00
Set 1.00 0.00
M' 100.00 0.00
Bh 10.00 0.00
Bh 10.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
0.00
0.00
Set 1.00 0.00
M' 100.00 0.00
Bh 10.00 0.00
Bh 10.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
Bh 3.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
M' 75.00 0.00
Ls 1.00 0.00
1.12
0.00
0.00
Unit 1.00 0.24
Ls 1.00 0.01
M' 100.00 0.07
Ls 1.00 0.01
0.00
Unit 1.00 0.00
Ls 1.00 0.01
0.00
M' 30.00 0.01
Ls 1.00 0.01
0.00
Ls 1.00 0.00
0.00
0.00
M' 30.00 0.01
Ls 1.00 0.01
0.00
Ls 1.00 0.00
0.00
Ls 1.00 0.01
0.37
6.95
0.00
0.00
0.00
M2 3.00 0.00
M3 3.00 0.01
M2 3.00 0.01
0.00
0.02

Anda mungkin juga menyukai