PEKERJAAN : PERENCANAAN SARANA DAN PRASARANA LOKASI EKS TRANSMIGRASI CALON DESA BERKEMBANG
LOKASI : DESA TRANS KUMANG-KUMANG, KABUPATEN KOTABARU PROVINSI KALIMANTAN SELATAN
SATUAN KERJA : DINAS TENAGA KERJA DAN TRANSMIGRASI PROVINSI KALIMANTAN SELATAN
TAHUN ANGGARAN : 2017
A. DATA KONSTRUKSI
Terbilang : : Seratus Sembilan Puluh Dua Juta Empat Ratus Lima Puluh Dua Ribu Rupiah
DAFTAR KUANTITAS DAN HARGA
HARGA
NO ANALISA JENIS PEKERJAAN SATUAN
(Rp)
1 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m m3 83,458.38
2 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah m3 61,668.75
3 #NAME? #NAME? m3 #NAME?
4 A.2.3.1.15. Pengurugan 1 m3 tanah urug m3 182,634.38
5 #NAME? #NAME? m3 #NAME?
6 A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 m3 1,120,332.23
7 A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 m3 1,487,511.54
8 A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir kg 215,391.02
9 #NAME? #NAME? m2 #NAME?
10 #NAME? #NAME? m2 #NAME?
11 #NAME? #NAME? m2 #NAME?
12 #NAME? #NAME? m2 #NAME?
13 A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm m2 80,944.95
14 A.4.4.2.27. Pemasangan 1 m2 acian m2 47,651.62
15 #NAME? #NAME? m2 #NAME?
16 #NAME? #NAME? m2 #NAME?
17 #NAME? #NAME? m2 #NAME?
18 #NAME? #NAME? m' #NAME?
19 #NAME? #NAME? m2 #NAME?
20 #NAME? #NAME? m2 #NAME?
21 #NAME? #NAME? m2 #NAME?
22 #NAME? #NAME? m2 #NAME?
23 #NAME? #NAME? m2 #NAME?
24 #NAME? #NAME? m2 #NAME?
25 #NAME? #NAME? m2 #NAME?
26 #NAME? #NAME? m2 #NAME?
27 #NAME? #NAME? bh #NAME?
28 #NAME? #NAME? bh #NAME?
29 #NAME? #NAME? bh #NAME?
30 #NAME? #NAME? bh #NAME?
31 #NAME? #NAME? m' #NAME?
32 #NAME? #NAME? m' #NAME?
33 #NAME? #NAME? m' #NAME?
34 #NAME? #NAME? bh #NAME?
35 #NAME? #NAME? bh #NAME?
36 #NAME? #NAME? bh #NAME?
Volume Pekerjaan
Tanggal: 11/09/2017
NO Gambar Kerja/Item Pekerjaan Hitungan Luas (Satuan) Keterangan
I. PEKERJAAN PERSIAPAN 0.00 M2
b. Ukuran Pondasi
Batu Gunung
a (l) 0.25 3.95 M3
b (l) 0.4
h 0.4
(keliling) 30.37
= 3.95
Batu Kosong (astamping)
l 0.5 3.04 M3
h 0.2
(keliling) 30.37
= 3.037
c. Galian Tanah Pondasi
l 0.5 9.11 M2
h 0.6
(keliling) 30.37
d. Urugan Pasir
Urugan Pasir Bawah Pondasi
l 0.5 3.154 M3
h 0.05
(keliling) 30.37
= 0.76
Urugan Pasir Dibawah Lantai
(Luasan Lantai) 47.9
(t) 0.05
= 2.395
e. Urugan Tanah Kembali
Galian Tanah 9.11 1.37 M3
b.Balok
(l) 0.15
(t) 0.15
(p)pnjng bagian b 4,95x4(sisi) 19.8
= 0.45
c. Kolom Sengkang
(l) 0.15
(t) 0.15
(p)pnjng 1,47x4(sisi) 5.88
= 0.13
g. Pasangan Dinding 1/2 Bata
(h) 3 91.11 79.42 M2
(keliling) 30.37
- KOLOM PRAKTIS DI DALAM DINDING
0,15x3,5 22 (buah) M2
= 1.16
-LUBANG PINTU,JENDELA & ROSTER
Jendela(kaca) 1.89
Rosster 1.60
Pintu 7.04
= 10.53
h. Pasangan Dinding 1/2 Bata (dinding di bawah atap)
(h) 1 0.00 M2
(keliling)
2,5x4 10
5x4 20
= 0 0
Type 2
2,2+1,4+2,2 1 (buah)
= 11.6
b. Daun Pintu Double Pabrikasi (Ulin + Kaca)
2.00 (buah)
c. Daun Pintu Single Pabrikasi (Ulin + Kaca)
2.00 (buah)
9. A.4.1.1.4. Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.2000 91,520.00 109,824.00
Tukang Batu L.02 OH 0.2000 131,560.00 26,312.00
Kepala Tukang L.03 OH 0.0200 171,600.00 3,432.00
Mandor L.04 OH 0.0600 157,300.00 9,438.00
JUMLAH TENAGA KERJA 149,006.00
B BAHAN
Semen Portland kg 230.0000 2,057.60 473,247.63
Pasir Beton kg 893.0000 161.43 144,155.71
Kerikil (Maks 30mm) kg 1027.0000 192.59 197,792.59
Air Liter 200.0000 50.00 10,000.00
JUMLAH HARGA BAHAN 825,195.94
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 974,201.94
E Profit (15%) %xD 146,130.29
F Harga Satuan Pekerjaan (D+E) 1,120,332.23
10. A.4.1.1.7. Membuat 1 m3 beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 91,520.00 151,008.00
Tukang Batu L.02 OH 0.2750 131,560.00 36,179.00
Kepala Tukang L.03 OH 0.0280 171,600.00 4,804.80
Mandor L.04 OH 0.0830 157,300.00 13,055.90
JUMLAH TENAGA KERJA 205,047.70
B BAHAN
Semen Portland kg 371.0000 2,057.60 763,369.01
Pasir Beton kg 698.0000 161.43 112,677.14
Kerikil (Maks 30mm) kg 1047.0000 192.59 201,644.44
Air Liter 215.0000 50.00 10,750.00
JUMLAH HARGA BAHAN 1,088,440.59
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 1,293,488.29
E Profit (15%) %xD 194,023.24
F Harga Satuan Pekerjaan (D+E) 1,487,511.54
ANALISA HARGA SATUAN
11. A.4.1.1.17. Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 91,520.00 6,406.40
Tukang Besi L.02 OH 0.0700 131,560.00 9,209.20
Kepala Tukang L.03 OH 0.0070 171,600.00 1,201.20
Mandor L.04 OH 0.0040 157,300.00 629.20
JUMLAH TENAGA KERJA 17,446.00
B BAHAN
Besi beton (polos/ulir) kg 10.5000 15,787.20 165,765.60
Kawat beton kg 0.1500 27,232.92 4,084.94
JUMLAH HARGA BAHAN 169,850.54
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 187,296.54
E Profit (15%) %xD 28,094.48
F Harga Satuan Pekerjaan (D+E) 215,391.02
G Harga Satuan Pekerjaan (D+E) / 1 kg 21,539.10
15. A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, untuk plafond
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3500 91,520.00 32,032.00
Tukang Kayu L.02 OH 0.3500 131,560.00 46,046.00
Kepala Tukang L.03 OH 0.0350 171,600.00 6,006.00
Mandor L.04 OH 0.0180 157,300.00 2,831.40
JUMLAH TENAGA KERJA 86,915.40
B BAHAN
Rangka metal hollow 40.40.2 mm m' 4.0000 23,437.50 93,750.00
Aksesoris (perkuatan, las dll) Ls 1.0000 23,437.50 23,437.50
JUMLAH HARGA BAHAN 117,187.50
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 204,102.90
E Profit (15%) %xD 30,615.44
F Harga Satuan Pekerjaan (D+E) 234,718.34
20. A.4.4.1.9. Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 91,520.00 27,456.00
Tukang Batu L.02 OH 0.1000 131,560.00 13,156.00
Kepala Tukang L.03 OH 0.0100 171,600.00 1,716.00
Mandor L.04 OH 0.0150 157,300.00 2,359.50
JUMLAH TENAGA KERJA 44,687.50
B BAHAN
Bata merah bh 70.0000 982.00 68,740.00
Semen Portlan Kg 11.5000 2,057.60 23,662.38
Pasir Pasang m3 0.0430 226,000.00 9,718.00
JUMLAH HARGA BAHAN 102,120.38
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 146,807.88
E Profit (15%) %xD 22,021.18
F Harga Satuan Pekerjaan (D+E) 168,829.06
ANALISA HARGA SATUAN
21. Pemasangan 1m2 dinding bataco tebal 1/4 bata campuran 1SP : 4PP
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 1.6500 91,520.00 151,008.00
Tukang Batu L.02 OH 0.2500 131,560.00 32,890.00
Kepala Tukang L.03 OH 0.0250 171,600.00 4,290.00
Mandor L.04 OH 0.0800 157,300.00 12,584.00
JUMLAH TENAGA KERJA 200,772.00
B BAHAN
Bataco bh 12.5000 2,000.00 25,000.00
Semen Portlan Kg 12.1300 2,057.60 24,958.67
Pasir Pasang m3 0.3880 226,000.00 87,688.00
JUMLAH HARGA BAHAN 137,646.67
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 338,418.67
E Profit (15%) %xD 50,762.80
F Harga Satuan Pekerjaan (D+E) 389,181.47
ANALISA HARGA SATUAN
22. A.4.4.2.4. Pemasangan 1 m2 plesteran 1SP : 4PP tebal 15 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 91,520.00 27,456.00
Tukang Batu L.03 OH 0.1500 131,560.00 19,734.00
Kepala Tukang L.03 OH 0.0150 171,600.00 2,574.00
Mandor L.04 OH 0.0150 157,300.00 2,359.50
JUMLAH TENAGA KERJA 52,123.50
B BAHAN
PC Kg 6.2400 2,057.60 12,839.41
PP m3 0.0240 226,000.00 5,424.00
JUMLAH HARGA BAHAN 18,263.41
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 70,386.91
E Profit (15%) %xD 10,558.04
F Harga Satuan Pekerjaan (D+E) 80,944.95
24. A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.1000 91,520.00 9,152.00
Tukang Kayu L.02 OH 0.0500 131,560.00 6,578.00
Kepala tukang L.03 OH 0.0050 171,600.00 858.00
Mandor L.04 OH 0.0050 157,300.00 786.50
JUMLAH TENAGA KERJA 17,374.50
B BAHAN
gypsumboard Lbr 0.3640 216,719.00 78,885.72
Paku skrup kg 0.1100 46,250.00 5,087.50
JUMLAH HARGA BAHAN 83,973.22
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 101,347.72
E Profit (15%) %xD 15,202.16
F Harga Satuan Pekerjaan (D+E) 116,549.87
ANALISA HARGA SATUAN
25. A.4.5.1.9. Pemasangan 1 m’ list langit-langit gypsum
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0500 91,520.00 4,576.00
Tukang Kayu L.02 OH 0.0500 131,560.00 6,578.00
Kepala tukang L.03 OH 0.0050 171,600.00 858.00
Mandor L.04 OH 0.0030 157,300.00 471.90
JUMLAH TENAGA KERJA 12,483.90
B BAHAN
List gypsum m 1.0500 36,500.00 38,325.00
Paku kg 0.0100 26,565.00 265.65
JUMLAH HARGA BAHAN 38,590.65
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,074.55
E Profit (15%) %xD 7,661.18
F Harga Satuan Pekerjaan (D+E) 58,735.73
29. A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0700 91,520.00 6,406.40
Tukang cat L.02 OH 0.0090 131,560.00 1,184.04
Kepala tukang L.03 OH 0.0060 171,600.00 1,029.60
Mandor L.04 OH 0.0030 157,300.00 471.90
JUMLAH TENAGA KERJA 9,091.94
B BAHAN
Cat menie Kg 0.2000 35,000.00 7,000.00
Plamuur Kg 0.1500 56,317.00 8,447.55
Cat dasar Kg 0.1700 41,250.00 7,012.50
Cat penutup Kg 0.2600 60,000.00 15,600.00
Kuas Bh 0.0100 10,000.00 100.00
Pengencer Ltr 0.0300 31,250.00 937.50
Ampelas Lbr 0.2000 15,000.00 3,000.00
JUMLAH HARGA BAHAN 42,097.55
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 51,189.49
E Profit (15%) %xD 7,678.42
F Harga Satuan Pekerjaan (D+E) 58,867.91
30. A.4.7.1.10. 1 m2 Pengecatan tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 91,520.00 1,830.40
Tukang cat L.02 OH 0.0630 131,560.00 8,288.28
Kepala tukang L.03 OH 0.0063 171,600.00 1,081.08
Mandor L.04 OH 0.0030 157,300.00 471.90
JUMLAH TENAGA KERJA 11,671.66
B BAHAN
Plamuur Kg 0.1000 56,317.00 5,631.70
Cat dasar Kg 0.1000 32,000.00 3,200.00
Cat penutup Kg 0.2600 46,250.00 12,025.00
JUMLAH HARGA BAHAN 20,856.70
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 32,528.36
E Profit (15%) %xD 4,879.25
F Harga Satuan Pekerjaan (D+E) 37,407.61
ANALISA HARGA SATUAN
31. A.4.7.1.11. 1 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
Harga Satuan Jumlah Harga
No Uraian Kode Satuan Koefisien
(Rp) (Rp)
A TENAGA
Pekerja L.01 OH 0.0280 91,520.00 2,562.56
Tukang cat L.02 OH 0.0420 131,560.00 5,525.52
Kepala tukang L.03 OH 0.0042 171,600.00 720.72
Mandor L.04 OH 0.0030 157,300.00 471.90
JUMLAH TENAGA KERJA 9,280.70
B BAHAN
Cat dasar Kg 0.1200 32,000.00 3,840.00
Cat penutup Kg 0.1800 46,250.00 8,325.00
JUMLAH HARGA BAHAN 12,165.00
C PERALATAN
-
JUMLAH HARGA ALAT -
D Jumlah (A+B+C) 21,445.70
E Profit (15%) %xD 3,216.86
F Harga Satuan Pekerjaan (D+E) 24,662.56
I HARGA UPAH
1 Pekerja OH 91,520.00 109,824.00
2 Tukang Kayu OH 131,560.00 157,872.00
3 Tukang Batu OH 131,560.00 157,872.00
4 Tukang Besi OH 131,560.00 157,872.00
5 Tukang Pipa OH 131,560.00 157,872.00
6 Tukang Cat OH 131,560.00 157,872.00
7 Tukang Listrik OH 131,560.00 157,872.00
8 Kepala Tukang OH 171,600.00 205,920.00
9 Mandor OH 157,300.00 188,760.00
II HARGA BAHAN
1 Kayu Kelas I m3 10,868,000.00 13,041,600.00
2 Kayu kelas II m3 2,550,000.00 3,060,000.00
3 Kayu kelas III m3 2,000,000.00 2,400,000.00
4 Tanah Urug m3 110,000.00 132,000.00
5 Pasir Urug m3 179,000.00 214,800.00
6 Pasir Pasang m3 226,000.00 271,200.00
7 Pasir Beton m3 226,000.00 271,200.00 kg 161.43 193.71
8 Batu Belah m3 270,000.00 324,000.00
9 Kerikil (Maks 30mm) m3 260,000.00 312,000.00 kg 192.59 231.11
10 Semen Portland zak 102,879.92 123,455.90 kg 2,057.60 2,469.12
11 Semen warna zak 99,245.00 119,094.00 kg 1,984.90 2,381.88
12 Bataco bh 2,000.00 2,400.00
13 Bata merah bh 982.00 1,178.40
14 Rooster bh
15 Besi beton (polos/ulir) kg 15,787.20 18,944.64
16 Kawat bindrat kg 27,232.92 32,679.50
17 Plywood tebal 9 mm lembar 175,770.00 210,924.00
18 Kalsi Board 3,5 mm (Setara) lembar 90,990.08 109,188.10
19 Gypum Board lembar 216,719.00 260,062.80
20 List Kayu profil m' 11,350.00 13,620.00
21 List Gypsum Dim. 15 cm m' 36,500.00 43,800.00
22 Besi Hollow 4 x 4 m' 23,437.50 28,125.00
23 Air liter 50.00 60.00
24 Paku 5 cm – 12 cm kg 26,565.00 31,878.00
25 Paku Sekrup kg 46,250.00 55,500.00
26 Minyak bekisting liter 5,000.00 6,000.00
27 Dolken kayu φ 8 - 10cm panjang 4 m batang 22,000.00 26,400.00 m' 5,500.00 6,600.00
28 Atap Genteng Metal bh 75,000.00 90,000.00
29 Nok Atap Tipe C bh 33,467.62 40,161.14
30 Kalsiplank m' 24,570.00 29,484.00
31 Plamir kg 56,317.00 67,580.40
32 Cat Dasar kg 32,000.00 38,400.00
33 Cat Tembok Penutup kg 46,250.00 55,500.00
34 Cat Menie Besi kg 35,000.00 42,000.00
35 Cat Dasar Kayu kg 41,250.00 49,500.00
36 Cat Kayu Penutup kg 60,000.00 72,000.00
37 Minyak Cat ltr 31,250.00 37,500.00
38 Kuas bh 10,000.00 12,000.00
39 Espagnolet Tanam bh 231,000.00 277,200.00
40 Kunci Tanam 2 Slaag bh 372,000.00 446,400.00
41 Engsel Pintu 5" bh 100,000.00 120,000.00
42 Ampelas lbr 15,000.00 18,000.00
43 Batu Tempel Hitam m2 241,000.00 289,200.00
44 Kaca Rayban 5mm m2 206,000.00 247,200.00
45 Pipa HDPE SNI SDR 17 PN 10 3/4" m' 28,875.00 /m'
46 Kawat m2 18,888.89 22,666.67
47 Granit Tile Warna bh 174,363.00 209,235.60
48 Straight Coupler HDPE Compression bh 64,473.75 /m'
49 End Cap HDPE Compression 2" (63 mm) bh 98,325.00 /m'
50 Elbow 90' HDPE Compression 2" (63 mm) bh 184,050.00 /m'
51 Equal Tee HDPE Compression 2" (63 mm) bh 284,850.00 /m'
52 Pipa PVC 4" bh 342,000.00 410,400.00
53 Penjaga jarak bekisting/spacer bh 50,000.00 60,000.00
54 Sewa Tripot/tackel & handle crane 2 T hari 284,625.00 341,550.00
55 Lampu HE 24 watt bh 64,000.00 76,800.00
56 Roster Beton 30 x 30 bh 19,500.00 23,400.00
57 AC bh
58 Tandon Air Kapasitas 3000 liter bh 5,737,500.00 6,885,000.00
II. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Pondasi
Segmen Jumlah Panjang Lebar Tinggi Volume
Memanjang 2 11 0.65 0.3 4.29
Melintang 4 4 0.65 0.3 3.12
WC Memanjang 1 1.5 0.65 0.3 0.2925
WC Melintang 1 2 0.65 0.3 0.39
Teras 1 11 0.65 0.3 2.145
Total 10.2375 m3
2 Urugan Tanah Kembali
Segmen Jumlah Panjang Luas Volume
Memanjang 1 11 0.66 7.26
Melintang 2 4 0.66 5.28
WC Memanjang 1 1.5 0.66 0.99
WC Melintang 1 2 0.66 1.32
Total 14.85 m3
3 Urugan Tanah Dipadatkan
Segmen Jumlah Panjang Lebar Tinggi Volume
1 1 3.255 3.755 0.45 5.500136
2 1 3.255 3.755 0.45 5.500136
3 1 2.255 1.755 0.45 1.780886
4 1 1.755 1.255 0.45 0.991136
5 1 3.755 1.755 0.45 2.965511
Total 16.7378 m3
4 Urugan Pasir Bawah Pondasi dan Lantai
Segmen Jumlah Panjang Lebar Tinggi Volume
Memanjang 2 11 0.5 0.05 0.55
Melintang 4 4 0.5 0.05 0.4
WC Memanjang 1 1.5 0.5 0.05 0.0375
WC Melintang 1 2 0.5 0.05 0.05
Total 1.0375 m3
5 Pasangan Batu Kosong
Segmen Jumlah Panjang Lebar Tinggi Volume
Memanjang 2 11 0.5 0.1 1.1
Melintang 4 4 0.5 0.1 0.8
WC Memanjang 1 1.5 0.5 0.1 0.075
WC Melintang 1 2 0.5 0.1 0.1
Total 2.075 m3
6 Pasangan Pondasi Batu Gunung Camp. 1:4
Segmen Jumlah Panjang Lebar Tinggi Volume
Memanjang 2 11 0.3 0.45 2.97
Melintang 4 4 0.3 0.45 2.16
WC Memanjang 1 1.5 0.3 0.45 0.2025
WC Melintang 1 2 0.3 0.45 0.27
Total 5.6025 m3
1.355
0.5
0.4
-11
-11.9
pekerjaan tanah belum termasuk teras
asumsi teras 1 m kedepan
pasangan batu bata sloof bertambah di teras
JADWAL PELAKSANAAN
PEKERJAAN : Pembangunan Fasilitas Kantor
LOKASI : Sungai Danau
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Awal Dan Akhir Lokasi pekerjaan bebas dari gangguan saat
pengerjaan (tanaman maupun sampah) Manual
2 Pembesian
a Sloof 12/20 Material:
Besi (Ø12 dan Ø8) SNI
Kawat Bendrat SNI
Komposisi Pembesian:
4Ø12 dan Ø8-150
b Kolom K1 15/15 Material:
Besi (Ø12 dan Ø8) SNI
Kawat Bendrat SNI
Komposisi Pembesian:
4Ø12 dan Ø8-200
c Kolom KP 12/12 Material:
Besi (Ø12 dan Ø8) SNI
Kawat Bendrat SNI
Komposisi Pembesian:
4Ø12 dan Ø8-200
d Balok 12/20 Material:
Besi (Ø12 dan Ø8) SNI
Kawat Bendrat SNI
Komposisi Pembesian:
4Ø12 dan Ø8-150
3 Bekisting
a Sloof 12/20 Material:
Kayu kelas III Papan lanan
Paku 5 cm – 10 cm Standar
Minyak bekisting Standar
b Kolom K1 15/15 Material:
Kayu kelas III Papan lanan
Paku 5 cm – 12 cm Standar
Minyak bekisting Standar
Balok kayu kelas II Balok 3/4
Plywood tebal 9 mm Lokal
Dolken kayu φ 8 - 10cm panjang 4 m Lokal
No Uraian Pekerjaan URAIAN SPESIFIKASI MERK YANG DIAJUKAN
X. PEKERJAAN ELEKTRIKAL
1 Pasangan Saklar Ganda Material:
Pipa PVC 3/4" Supernova / setara
Kabel NYA 2,5 mm Eterna / setara
Inbow dos Arrow / setara
Saklar ganda Broco (setara)
No Uraian Pekerjaan URAIAN SPESIFIKASI MERK YANG DIAJUKAN
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
A. PEKERJAAN KM/WC
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi Awal Dan Akhir - 1.00 ls Pekerja 1.0000 3.00 3.00 2.00
2 Pengukuran dan Pemasangan Bouwplank - Err:509 ls Pekerja 1.0000 3.00 3.00 1.00
1 2 3 4 5 6 7 8 9
2 Pembesian
a Sloof 12/20 A.4.1.1.17. Err:509 kg Pekerja 0.0700 3.00 3.00 3.00
Tukang Besi 0.0700 1.00 1.00 3.00
Kepala Tukang 0.0070 1.00 1.00 3.00
Mandor 0.0040 1.00 1.00 3.00
b Kolom K1 15/15 A.4.1.1.17. Err:509 kg Pekerja 0.0700 3.00 3.00 3.00
Tukang Besi 0.0700 1.00 1.00 3.00
Kepala Tukang 0.0070 1.00 1.00 3.00
Mandor 0.0040 1.00 1.00 3.00
c Kolom KP 12/12 A.4.1.1.17. Err:509 kg Pekerja 0.0700 3.00 3.00 3.00
Tukang Besi 0.0700 1.00 1.00 3.00
Kepala Tukang 0.0070 1.00 1.00 3.00
Mandor 0.0040 1.00 1.00 3.00
d Balok 12/20 A.4.1.1.17. Err:509 kg Pekerja 0.0700 3.00 3.00 3.00
Tukang Besi 0.0700 1.00 1.00 3.00
Kepala Tukang 0.0070 1.00 1.00 3.00
Mandor 0.0040 1.00 1.00 3.00
3 Bekisting
a Sloof 12/20 A.4.1.1.21. Err:509 m2 #NAME? #NAME? 3.00 3.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
b Kolom K1 15/15 A.4.1.1.22. Err:509 m2 #NAME? #NAME? 3.00 3.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
c Kolom KP 12/12 A.4.1.1.22. Err:509 m2 #NAME? #NAME? 3.00 3.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
d Balok 12/20 A.4.1.1.23. Err:509 m2 #NAME? #NAME? 3.00 3.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
4 Pasangan Dinding 1/2 Bata 1:5 A.4.4.1.10. Err:509 m2 #NAME? #NAME? 3.00 3.00 5.00
#NAME? #NAME? 1.00 1.00 5.00
#NAME? #NAME? 1.00 1.00 5.00
#NAME? #NAME? 1.00 1.00 5.00
5 Pasangan Rooster A.4.4.1.23. Err:509 m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? - - -
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
6 Pekerjaan Plesteran 1:5 t = 15 mm A.4.4.2.5. Err:509 m2 Pekerja 0.3000 4.00 3.00 4.00
Tukang Batu 0.1500 - - -
Kepala Tukang 0.0150 1.00 1.00 4.00
Mandor 0.0150 1.00 1.00 4.00
7 Pasangan Keramik Dinding 20/25 (polish) A.4.4.3.64. 35.66 m2 #NAME? #NAME? 4.00 4.00 5.00
#NAME? #NAME? - - -
#NAME? #NAME? 1.00 1.00 5.00
#NAME? #NAME? 1.00 1.00 5.00
8 Pekerjaan Acian A.4.4.2.27. Err:509 m2 Pekerja 0.2000 4.00 4.00 4.00
Tukang Batu 0.1000 - - -
Kepala Tukang 0.0100 1.00 1.00 4.00
Mandor 0.0100 1.00 1.00 4.00
1 2 3 4 5 6 7 8 9
b Pasangan Kaca Bening 3 mm A.4.6.2.16. Err:509 m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? - - -
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
1 2 3 4 5 6 7 8 9
#NAME? #NAME? 1.00 1.00 2.00
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
3 Pekerjaan Cat Pintu dan Ventilasi A.4.7.1.4. Err:509 m2 #NAME? #NAME? - - -
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
4 Pekerjaan Cat List Plank A.4.7.1.4. Err:509 m2 #NAME? #NAME? - - -
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
X. PEKERJAAN ELEKTRIKAL
1 Pasangan Saklar Ganda A.6.1.1.4. Err:509 bh #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
2 Pasangan Saklar Tunggal A.6.1.1.3. Err:509 bh #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
3 Pasangan Lampu Piting SL 18 watt - Err:509 bh Tukang Listrik 1.0000 1.00 1.00 1.00
1 2 3 4 5 6 7 8 9
5 Pasangan Shower - Err:509 unit Pekerja 1.0000 1.00 1.00 1.00
6 Instalasi Pipa Air Bersih dia. 3/4" - Err:509 ls Tukang pipa 1.0000 2.00 2.00 3.00
7 Instalasi Pipa Air Kotor dia. 3" - Err:509 ls Tukang Pipa 1.0000 2.00 2.00 1.00
8 Instalasi Pipa Air Kotor dia. 4" - Err:509 ls Tukang pipa 1.0000 2.00 2.00 1.00
9 Bio Septick Tank Kap. 5 m3 + Sumur Resapan - Err:509 unit Tukang pipa 1.0000 3.00 3.00 4.00
1 2 3 4 5 6 7 8 9
B. PEKERJAAN MENARA AIR
I. PEKERJAAN PERSIAPAN
1 Pengukuran dan Pemasangan Bouwplank - #REF! ls Pekerja 1.0000 2.00 2.00 1.00
1 2 3 4 5 6 7 8 9
Kepala Tukang 0.0280 1.00 1.00 1.00
Mandor 0.0830 1.00 1.00 1.00
h Dak Lantai t = 15 cm A.4.1.1.7. #REF! m3 Pekerja 1.6500 2.00 2.00 2.00
Tukang Batu 0.2750 1.00 1.00 2.00
Kepala Tukang 0.0280 1.00 1.00 2.00
Mandor 0.0830 1.00 1.00 2.00
i Dinding GWT t = 15 cm A.4.1.1.7. #REF! m3 Pekerja 1.6500 1.00 1.00 1.00
Tukang Batu 0.2750 1.00 1.00 1.00
Kepala Tukang 0.0280 1.00 1.00 1.00
Mandor 0.0830 1.00 1.00 1.00
3 Pembesian
a Lantai GWT t = 20 cm A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
b Sloof 20/30 A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
c Kolom K1 25/25 A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
d Kolom K2 20/20 A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
e Balok R1 20/30 A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
f Balok R2 15/25 A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
g Dak GWT t = 15 cm A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
h Dak Lantai t = 15 cm A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
Mandor 0.0040 1.00 1.00 1.00
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
i Dinding GWT t = 15 cm A.4.1.1.17. #REF! kg Pekerja 0.0700 1.00 1.00 1.00
Tukang Besi 0.0700 1.00 1.00 1.00
Kepala Tukang 0.0070 1.00 1.00 1.00
Mandor 0.0040 1.00 1.00 1.00
4 Bekisting
a Lantai GWT t = 20 cm A.4.1.1.24. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
b Sloof 20/30 A.4.1.1.21. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
c Kolom K1 25/25 A.4.1.1.22. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
d Kolom K2 20/20 A.4.1.1.22. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
e Balok R1 20/30 A.4.1.1.23. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
f Balok R2 15/25 A.4.1.1.23. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
g Dak GWT t = 15 cm A.4.1.1.24. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
h Dak Lantai t = 15 cm A.4.1.1.24. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
i Dinding GWT t = 15 cm A.4.1.1.25. #REF! m2 #NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
#NAME? #NAME? 1.00 1.00 1.00
Asumsi Kebutuhan
Volume Koefisien (OH/Satuan Kebutuhan Tenaga
No Uraian Pekerjaan Analisa Tenaga Kerja Tenaga Kerja/Hari Durasi Pekerjaan (Hari)
Pekerjaan Analisa) Kerja/Hari (Orang)
(Orang)
1 2 3 4 5 6 7 8 9
5 Pekerjaan Acian A.4.4.2.27. #REF! m2 Pekerja 0.2000 1.00 1.00 1.00
Tukang Batu 0.1000 - - -
Kepala Tukang 0.0100 1.00 1.00 1.00
Mandor 0.0100 1.00 1.00 1.00