Anda di halaman 1dari 51

REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 6,330,000.00

B GEDUNG JOGLO

I PEKERJAAN ATAP DAN PLAFOND Rp 9,361,388.30

II PEKERJAAN ELEKTRIKAL Rp 414,793.39

III PEKERJAAN LANDSCAPE Rp 4,339,500.00

C GEDUNG AUDITORIUM

I PEKERJAAN ATAP DAN PLAFOND Rp 109,114,482.90

II PEKERJAAN PENGECATAN Rp 6,263,270.20

III PEKERJAAN PINTU DAN PENGUNCI Rp 3,368,209.75

IV PEKERJAAN ELEKTRIKAL Rp 4,698,063.17

V PEKERJAAN LANTAI Rp 14,755,219.88

VI PEKERJAAN SANITASI Rp 351,890.00

D GEDUNG AMPHYTHEATER

I PEKERJAAN ATAP BETON DAN PLAFOND Rp 102,635,867.28

II PEKERJAAN PENGECATAN Rp 16,143,324.18

III PEKERJAAN DAUN PINTU DAN PENGUNCI Rp 11,629,092.00

IV PEKERJAAN SUMUR BOR DAN SANITASI Rp 2,332,494.10


V PEKERJAAN ELEKTRIKAL Rp -

E GEDUNG FOODCOURT

I PEKERJAAN ATAP DAN PLAFOND 11,950,579.91


II PEKERJAAN SANITASI 5,100,000.00

F GEDUNG EXIBITION HALL


I PEKERJAAN ATAP DAN PLAFOND 150,265,527.18

II PEKERJAAN ELEKTRIKAL -
III PEKERJAAN PEREDAM -

IV PEKERJAAN PENGECATAN 988,451.64

G PERLENGKAPAN KELISTRIKAN
I PEKERJAAN LAMPU 6,000,000.00

II AUDIO DAN SOUND SYSTEM -

III KEPERLUAN GENSET -

JUMLAH ( A + B + C + D + E + F + G ) Rp 466,042,153.86
PPN 10% Rp 46,604,215.39

JUMLAH TOTAL Rp 512,646,369.25


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN : PEMELIHARAAN TAMAN BUDAYA KULON PROGO
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN P L T J VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
3 Pemindahan/Penutupan Perabot Sementara 1.00 Ls 1,000,000.00 Rp 1,000,000.00
4 Pekerjaan Lansiran 1.00 Ls 1,830,000.00 Rp 1,830,000.00
5 Pembersihan Sisa Bongkaran dan Material 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 6,330,000.00
B GEDUNG JOGLO
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Genteng Glassur 8.00 m2 2,447.50 Rp 19,580.00
2 Pasang Genteng Glassur Baru 8.00 m2 302,610.00 Rp 2,420,880.00
3 Pasang Genteng Galssur Kembali 8.00 m2 25,410.00 Rp 203,280.00
4 Bongkar Bubungan Glassur 6.00 m1 3,671.25 Rp 22,027.50
5 Pasang Bubungan Glassur Baru 6.00 m1 108,801.55 Rp 652,809.30
6 Pasang Bubungan Glassur Kembali 6.00 m1 293,918.90 Rp 1,763,513.40
7 Bongkar/Kelupas Penutup Tumpangsari 13.20 m2 4,895.00 Rp 64,614.00
8 Perbaikan/Pasang Penutup Tumpangsari 13.20 m2 319,294.25 Rp 4,214,684.10
JUMLAH I Rp 9,361,388.30
II PEKERJAAN ELEKTRIKAL
1 Pemasangan Instalasi Titik Lampu Kabel NYM 2X2,5 mm 1.00 ttk 242,024.20 Rp 242,024.20
2 Pasang Kembali Lampu Downlight 1.00 ttk 6,634.60 Rp 6,634.60
3 Pasang Lampu Downlight Baru 1.00 ttk 166,134.60 Rp 166,134.60
JUMLAH I Rp 414,793.39
III PEKERJAAN LANDSCAPE
1 Bongkar Paving Andesit 20/20 20.00 m2 8,607.50 Rp 172,150.00
2 Pasang Lantai Andesit 20/20 Baru 15.00 m2 244,805.00 Rp 3,672,075.00
3 Pasang Lantai Andesit 20/20 Kembali 5.00 m2 99,055.00 Rp 495,275.00
JUMLAH II Rp 4,339,500.00
C GEDUNG AUDITORIUM
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Plafond Gypsum 2.40 1.20 1.00 25.00 72.00 m2 4,895.00 Rp 352,440.00
2 Ganti/Pasang Plafond Gypsum Baru 2.40 1.20 1.00 25.00 72.00 m2 90,010.25 Rp 6,480,738.00
3 Bongkar List Corners Gypsum 45.00 m1 2,310.00 Rp 103,950.00
4 Pasang List Corners Gypsum 45.00 m1 18,100.50 Rp 814,522.50
5 Bongkar Genteng Metal Berpasir 16.00 m2 4,757.50 Rp 76,120.00
6 Pasang Genteng Metal Berpasir 0.80 0.80 1.00 25.00 16.00 m2 206,093.25 Rp 3,297,492.00
7 Kelupas/Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
8 Waterproofing membrane bakar + Screeding 624.00 m2 156,232.73 Rp 97,489,220.40
9 Bongkar Polycarbonat 364.00 m2 4,757.50 Rp - BELUM DIKERJAKAN
10 Ganti Polycarbonat/Pasang Spandek Metal Berpasir 52.00 3.50 1.00 2.00 364.00 m2 119,856.00 Rp - BELUM DIKERJAKAN
JUMLAH I Rp 109,114,482.90
II PEKERJAAN PENGECATAN
1 Kompon Retak Dinding Fin. Cat Dinding 16.00 m2 23,823.25 Rp 381,172.00
2 Pengelupasan Cat Dinding 32.00 1.00 1.00 4.00 128.00 m2 7,342.50 Rp 939,840.00
3 Pengecatan Dinding Interior 144.00 m2 22,880.83 Rp 3,294,838.80
4 Pengecatan Plafond 72.00 m2 22,880.83 Rp 1,647,419.40
JUMLAH II Rp 6,263,270.20
III PEKERJAAN PINTU DAN PENGUNCI
1 Bongkar Partisi Dinding (Toilet) 16.00 m2 4,895.00 Rp 78,320.00
2 Pasang Partisi (Toilet) 16.00 m2 79,945.25 Rp 1,279,124.00
3 Bongkar Daun Pintu (Toilet) 6.00 m2 1,630.75 Rp 9,784.50
4 Perbaikan Pintu (Toilet) 6.00 m2 250,000.00 Rp 1,500,000.00
5 Pasang Kait Angin Jendela (R. Auditorium Lt. 2) 7.00 bh 71,568.75 Rp 500,981.25
JUMLAH III Rp 3,368,209.75
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Instalasi Lampu (Rg. Auditorium) 5.00 ttk 65,000.00 Rp 325,000.00
2 Pemasangan Instalasi Titik Lampu Kabel NYM 2X2,5 mm (Rg. Auditorium) 5.00 ttk 242,024.20 Rp 1,210,121.00
3 Penggantian/Pasang Lampu Downlight (Rg. Auditorium) 7.00 ttk 166,134.60 Rp 1,162,942.17
4 Bongkar Instalasi CCTV (Rg. Gudang Auditorium) 5.00 ttk 65,000.00 Rp - BELUM DIKERJAKAN
5 Service CCTV dan Instalasi (Rg. Gudang Auditorium) 5.00 ttk 500,000.00 Rp - BELUM DIKERJAKAN
6 Penggantian/Pasang Instalasi CCTV (Rg. Gudang Auditorium) 5.00 ttk 216,081.25 Rp - BELUM DIKERJAKAN
7 Pasang Dome Fixed IP Camera CCTV (Rg. Gudang Auditorium) 5.00 ttk 4,432,353.75 Rp - BELUM DIKERJAKAN
8 Bongkar Instalasi AC (Rg. Indoor Theater Stage) 2.00 ttk 65,000.00 Rp - BELUM DIKERJAKAN
9 Perbaikan/Service AC (Rg. Indoor Theater Stage) 2.00 unit 1,000,000.00 Rp 2,000,000.00
JUMLAH IV Rp 4,698,063.17
V PEKERJAAN LANTAI
1 Bongkar Keramik 25/25 Lantai (Toilet) 30.00 m2 8,607.50 Rp 258,225.00
2 Bongkar Keramik 40/40 (Teras/Selasar) 51.00 m2 8,607.50 Rp 438,982.50
3 Rabat Beton Bawah Lantai (Toilet) 1.50 m3 797,651.25 Rp 1,196,476.88
4 Pasang Keramik Lantai 25/25 Anti Selip (Toilet) 30.00 m2 194,865.00 Rp 5,845,950.00
5 Pasang Keramik Lantai 40/40 Anti Selip (Teras/Selasar) 51.00 m2 137,560.50 Rp 7,015,585.50
JUMLAH V Rp 14,755,219.88
VI PEKERJAAN SANITASI
1 Ganti Kran/Saluran Inlet Air Bersih 5.00 uttk 70,378.00 Rp 351,890.00
JUMLAH V Rp 351,890.00
D GEDUNG AMPHYTHEATER
I PEKERJAAN ATAP BETON DAN PLAFOND
1 Kelupas/Pembersihan Lumut 1.00 ls 500,000.00 Rp 500,000.00
2 Kelupas Lapisan Cat Permukaan Dak Beton 461.25 m2 7,342.50 Rp 3,386,728.13
3 Waterproofing membrane bakar + Screeding 461.25 m2 156,232.73 Rp 72,062,344.41
4 Bongkar Plafond Gypsum 267.00 m2 4,895.00 Rp 1,306,965.00
5 Pasang Plafond Gypsum 267.00 m2 90,010.25 Rp 24,032,736.75
6 Bongkar List Corners Gypsum 66.00 m1 2,310.00 Rp 152,460.00
7 Pasang List Corners Gypsum 66.00 m1 18,100.50 Rp 1,194,633.00
JUMLAH I Rp 102,635,867.28
II PEKERJAAN PENGECATAN
1 Pengelupasan Cat Dinding 332.00 m2 7,342.50 Rp 2,437,710.00
2 Pengecatan Dinding Interior 332.00 m2 22,880.83 Rp 7,596,433.90
3 Pengecatan Plafond 267.00 m2 22,880.83 Rp 6,109,180.28
JUMLAH II Rp 16,143,324.18
III PEKERJAAN DAUN PINTU DAN PENGUNCI
1 Bongkar Daun Pintu 16.00 m2 1,630.75 Rp 26,092.00
2 Perbaikan Daun Pintu 16.00 m2 200,000.00 Rp 3,200,000.00
3 Ganti Daun Pintu Multiplek Baru 16.00 m2 501,000.00 Rp 8,016,000.00
4 Pasang Grendel Besar/Pengunci Pintu 9.00 bh 43,000.00 Rp 387,000.00
JUMLAH III Rp 11,629,092.00
IV PEKERJAAN SUMUR BOR DAN SANITASI
1 Perbaikan Box Tanaman 1.00 ls 750,000.00 Rp 750,000.00
2 Ganti/Pasang Jet Shower dan Perlengkapan 2.00 ttk 114,686.00 Rp 229,372.00
3 Pengerokan Bidang Cat lama 12.00 m2 13,197.25 Rp 158,367.00
4 Pengerokan karat pada permukaan baja cara manual 12.00 m2 13,651.00 Rp 163,812.00
5 Pelapisan Permukaan dengan Zinkcromate/Meni 12.00 m2 15,726.43 Rp 188,717.10
6 Pengecatan Besi Penutup Sumur Bor 12.00 m2 70,185.50 Rp 842,226.00
JUMLAH IV Rp 2,332,494.10
V PEKERJAAN ELEKTRIKAL
1 Ganti Lampu Spot Dinding Belakang Panggung Amphytheater 5.00 unit 144,134.60 Rp - BELUM DIKERJAKAN
2 Bongkar Instalasi CCTV (Rg. Pos Jaga Barat) 6.00 ttk 65,000.00 Rp - BELUM DIKERJAKAN
3 Service CCTV dan Instalasi (Rg. Pos Jaga Barat) 6.00 ttk 500,000.00 Rp - BELUM DIKERJAKAN
4 Penggantian/Pasang Instalasi CCTV (Rg. Pos Jaga Barat) 6.00 ttk 216,081.25 Rp - BELUM DIKERJAKAN
5 Pasang Dome Fixed IP Camera CCTV (Rg. Pos Jaga Barat) 6.00 ttk 4,432,353.75 Rp - BELUM DIKERJAKAN
JUMLAH V Rp -

E GEDUNG FOODCOURT
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Teras 45.00 m2 4,757.50 Rp 214,087.50
2 Pasang Spandek Metal Berpasir 45.00 m2 119,856.00 Rp 5,393,520.00
3 Kelupas/Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
4 Waterproofing membrane bakar + Screeding 9.60 m2 156,232.73 Rp 1,499,834.16
5 Bongkar Plafond Gypsum 45.00 m2 4,895.00 Rp 220,275.00
6 Pasang Palfond Gypsum 45.00 m2 90,010.25 Rp 4,050,461.25
7 Pasang List Corners Gypsum 4.00 m1 18,100.50 Rp 72,402.00
JUMLAH I Rp 11,950,579.91
II PEKERJAAN SANITASI
1 Water Torn Kapasitas 520 Ltr 4.00 unit 1,275,000.00 Rp 5,100,000.00
2 Pipa PVC 3" Air Hujan 8.00 m1 73,026.66 Rp 584,213.30
JUMLAH II Rp 5,100,000.00
F GEDUNG EXIBITION HALL
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Spandek Pasir 7.20 m2 4,757.50 Rp 34,254.00
2 Pasang Atap Spandek Pasir 7.20 m2 119,856.00 Rp 862,963.20
3 Bongkar Plafond Gypsum 43.20 m2 4,895.00 Rp 211,464.00
4 Pasang Plafond Gypsum 43.20 m2 90,010.25 Rp 3,888,442.80
5 Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
6 Waterproofing membrane bakar + Screeding 915.00 m2 156,232.73 Rp 142,952,943.38
7 Bongkar/Kelupas Penutup Tumpangsari 5.60 m2 4,895.00 Rp 27,412.00
8 Perbaikan/Pasang Penutup Tumpangsari 5.60 m2 319,294.25 Rp 1,788,047.80
JUMLAH I Rp 150,265,527.18
II PEKERJAAN PENGECATAN
1 Pengecatan Plafond 2.40 1.20 1.00 25.00 43.20 m2 22,880.83 Rp 988,451.64
JUMLAH II Rp 988,451.64
III PEMBANGUNAN TOILET BARU
1 Pek. Bongkaran dan Pembersihan Bekas Bongkaran 1.00 ls 750,000.00 Rp 750,000.00
2 Urugan Pasir Bawah Lantai 3.00 1.75 0.05 2.00 0.53 m3 307,807.50 Rp 161,598.94
3 Pek. Rabat Beton Bawah Lantai 3.00 1.75 0.05 2.00 0.53 m3 797,651.25 Rp 418,766.91
4 Sloof Beton 15/20 17.25 0.15 0.20 1.00 0.52 m3 3,858,123.50 Rp 1,996,578.91
5 Kolom Beton 20/20 5.00 0.20 0.20 6.00 1.20 m3 4,869,793.50 Rp 5,843,752.20
6 Balok Latei 15/20 6.00 0.15 0.20 1.00 0.18 m3 3,858,123.50 Rp 694,462.23
7 Ring Beton 15/20 17.25 0.15 0.20 1.00 0.52 m3 3,858,123.50 Rp 1,996,578.91
9 Pas. Dinding Bata 17.25 1.00 3.50 1.00 60.38 m2 129,406.75 Rp 7,812,932.53
10 Plesteran 1pc : 4ps 17.25 1.00 3.50 2.00 120.75 m2 50,410.80 Rp 6,087,104.10
11 Skoning 48.00 1.00 1.00 1.00 48.00 m1 12,069.75 Rp 579,348.00
12 Acian 17.25 1.00 3.50 2.00 120.75 m2 29,431.88 Rp 3,553,898.91
13 Pek. Pasang Kusen dan Daun Pintu Aluminium + Spandrel 1.00 1.00 1.00 2.00 2.00 unit 1,175,000.00 Rp 2,350,000.00
14 Pek. Pasang Boven Aluminium + Kaca 1.00 1.00 1.00 2.00 2.00 unit 780,000.00 Rp 1,560,000.00
15 Pek. Pasang Keramik Lantai 30/30 Anti Selip 3.00 1.75 1.00 2.00 10.50 m2 Rp -
16 Pek. Pasang Keramik Dinding 30/30 Polos 9.50 1.00 1.50 2.00 28.50 m2 Rp -
17 Pek. Perbaikan/Tambal Sulam Keramik Teras 3.00 m2 Rp -
18 Pek. Pasang Kloset Duduk + Perlengkapan & Instalasi 1.00 1.00 1.00 2.00 2.00 unit Rp -
19 Pek. Pasang Wastafel + Perlengkapan & Instalasi 1.00 1.00 1.00 2.00 2.00 unit Rp -
20 Pek. Pasang Floordrain 1.00 1.00 1.00 2.00 2.00 unit Rp -
21 Kran Air 3/4" 1.00 1.00 1.00 2.00 2.00 bh Rp -
22 Kran Watafel 1/2" 1.00 1.00 1.00 2.00 2.00 bh Rp -
23 Jet Shower 1.00 1.00 1.00 2.00 2.00 bh Rp -
24 Pipa PVC 3/4" Air Bersih 4.00 1.00 1.00 8.00 32.00 m1 Rp -
25 Pipa PVC 3" Air Kotor 4.00 1.00 1.00 4.00 16.00 m1 Rp -
26 Pipa PVC 4" Saluran Tinja 4.00 1.00 1.00 2.00 8.00 m1 Rp -
27 Pek. Pasang Septictank & Sumur Resapan 1.00 1.00 1.00 1.00 1.00 unit Rp -
28 Pek. Compound Plat Lantai Fin. Cat Plafond 10.50 m2 Rp -
29 Pek. Pasang Lampu + Instalasi 2.00 ttk Rp -
30 Sakelar Double + Instalasi 1.00 ttk Rp -
31 Pek. Pengecatan Dinding 120.75 m2 Rp -
JUMLAH III Rp 33,805,021.63
G PERLENGKAPAN KELISTRIKAN
I PEKERJAAN LAMPU
1 Lampu Jari 30 Watt merk PHILLIPS 200.00 bh 56,000.00 Rp - BELUM DIKERJAKAN
2 Lampu Downlight 100 Watt merk PHILLIPS 25.00 bh 275,000.00 Rp - BELUM DIKERJAKAN
3 Lampu PJU 2.00 bh 3,000,000.00 Rp 6,000,000.00
4 Lampu TL 30 watt 6.00 bh 45,000.00 Rp - BELUM DIKERJAKAN
5 Lampu TL LED 600 mm 9 watt 8.00 bh 135,000.00 Rp - BELUM DIKERJAKAN
6 Lampu LED Bulat 8 watt merk PHILLIPS 11.00 bh 46,000.00 Rp - BELUM DIKERJAKAN
7 Lampu LED 30 watt merk PHILLIPS 10.00 bh 115,000.00 Rp - BELUM DIKERJAKAN
JUMLAH I Rp 6,000,000.00
II AUDIO DAN SOUND SYSTEM
1 Kabel Microphone 5.00 roll 1,850,000.00 Rp - BELUM DIKERJAKAN
2 Jack XLR 25.00 bh 78,000.00 Rp - BELUM DIKERJAKAN
3 Jack TOA Mono 15.00 bh 45,000.00 Rp - BELUM DIKERJAKAN
4 Kabel 4 x 6 mm 6.00 bh 17,500.00 Rp - BELUM DIKERJAKAN
5 Stop Kontak 8.00 bh 18,500.00 Rp - BELUM DIKERJAKAN
6 Steker 11.00 bh 12,500.00 Rp - BELUM DIKERJAKAN
7 Kabel Listrik (2 x 1,5 mm 100 meter) 1.00 roll 850,000.00 Rp - BELUM DIKERJAKAN
8 Handy Talky 3.00 unit 875,000.00 Rp - BELUM DIKERJAKAN
9 Kabel Snak isi 16 x 25 meter 1.00 set 2,300,000.00 Rp - BELUM DIKERJAKAN
Sound Control 2.00 Unit 22,500,000.00 Rp - BELUM DIKERJAKAN
10 Clip On 6.00 set 2,800,000.00 Rp - BELUM DIKERJAKAN
JUMLAH II Rp -
III KEPERLUAN GENSET
1 Accu 100 Amphere 1.00 bh 1,475,000.00 Rp - BELUM DIKERJAKAN
2 Accu 75 Amphere 1.00 bh 1,200,000.00 Rp - BELUM DIKERJAKAN
3 Accu 50 Amphere 1.00 bh 750,000.00 Rp - BELUM DIKERJAKAN
4 Oli merk MESRAN 3.00 bh 145,000.00 Rp - BELUM DIKERJAKAN
5 Filter Oli dan Selenoid 20.00 bh 125,000.00 Rp - BELUM DIKERJAKAN
JUMLAH III Rp -
REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 6,330,000.00

B GEDUNG JOGLO

I PEKERJAAN ATAP DAN PLAFOND Rp 9,361,388.30

II PEKERJAAN ELEKTRIKAL Rp 414,793.39

III PEKERJAAN LANDSCAPE Rp 4,339,500.00

C GEDUNG AUDITORIUM

I PEKERJAAN ATAP DAN PLAFOND Rp 154,473,796.90

II PEKERJAAN PENGECATAN Rp 5,889,637.60

III PEKERJAAN PINTU DAN PENGUNCI Rp 3,368,209.75

IV PEKERJAAN ELEKTRIKAL Rp 30,895,238.17

V PEKERJAAN LANTAI Rp 14,755,219.88

VI PEKERJAAN SANITASI Rp 351,890.00

D GEDUNG AMPHYTHEATER

I PEKERJAAN ATAP BETON DAN PLAFOND Rp 102,635,867.28

II PEKERJAAN PENGECATAN Rp 16,143,324.18

III PEKERJAAN DAUN PINTU DAN PENGUNCI Rp 11,629,092.00

IV PEKERJAAN SUMUR BOR DAN SANITASI Rp 2,332,494.10


V PEKERJAAN ELEKTRIKAL Rp 32,001,282.98

E GEDUNG FOODCOURT

I PEKERJAAN ATAP DAN PLAFOND 11,950,579.91


II PEKERJAAN SANITASI 5,100,000.00

F GEDUNG EXIBITION HALL


I PEKERJAAN ATAP DAN PLAFOND 150,265,527.18

II PEKERJAAN ELEKTRIKAL -
III PEKERJAAN PEREDAM -

IV PEKERJAAN PENGECATAN 988,451.64

JUMLAH ( A + B + C + D + E + F ) Rp 563,226,293.24
PPN 10% Rp 56,322,629.32

JUMLAH TOTAL Rp 619,548,922.56


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN : PEMELIHARAAN TAMAN BUDAYA KULON PROGO
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
3 Pemindahan/Penutupan Perabot Sementara 1.00 Ls 1,000,000.00 Rp 1,000,000.00
4 Pekerjaan Lansiran 1.00 Ls 1,830,000.00 Rp 1,830,000.00
5 Pembersihan Sisa Bongkaran dan Material 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 6,330,000.00
B GEDUNG JOGLO
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Genteng Glassur 8.00 m2 2,447.50 Rp 19,580.00
2 Pasang Genteng Glassur Baru 8.00 m2 302,610.00 Rp 2,420,880.00
3 Pasang Genteng Galssur Kembali 8.00 m2 25,410.00 Rp 203,280.00
4 Bongkar Bubungan Glassur 6.00 m1 3,671.25 Rp 22,027.50
5 Pasang Bubungan Glassur Baru 6.00 m1 108,801.55 Rp 652,809.30
6 Pasang Bubungan Glassur Kembali 6.00 m1 293,918.90 Rp 1,763,513.40
7 Bongkar/Kelupas Penutup Tumpangsari 13.20 m2 4,895.00 Rp 64,614.00
8 Perbaikan/Pasang Penutup Tumpangsari 13.20 m2 319,294.25 Rp 4,214,684.10
JUMLAH I Rp 9,361,388.30
II PEKERJAAN ELEKTRIKAL
1 Pemasangan Instalasi Titik Lampu Kabel NYM 2X2,5 mm 1.00 ttk 242,024.20 Rp 242,024.20
2 Pasang Kembali Lampu Downlight 1.00 ttk 6,634.60 Rp 6,634.60
3 Pasang Lampu Downlight Baru 1.00 ttk 166,134.60 Rp 166,134.60
JUMLAH I Rp 414,793.39
III PEKERJAAN LANDSCAPE
1 Bongkar Paving Andesit 20/20 20.00 m2 8,607.50 Rp 172,150.00
2 Pasang Lantai Andesit 20/20 Baru 15.00 m2 244,805.00 Rp 3,672,075.00
3 Pasang Lantai Andesit 20/20 Kembali 5.00 m2 99,055.00 Rp 495,275.00
JUMLAH II Rp 4,339,500.00
C GEDUNG AUDITORIUM
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Plafond Gypsum 72.00 m2 4,895.00 Rp 352,440.00
2 Ganti/Pasang Plafond Gypsum Baru 72.00 m2 90,010.25 Rp 6,480,738.00
3 Bongkar List Corners Gypsum 45.00 m1 2,310.00 Rp 103,950.00
4 Pasang List Corners Gypsum 45.00 m1 18,100.50 Rp 814,522.50
5 Bongkar Genteng Metal Berpasir 16.00 m2 4,757.50 Rp 76,120.00
6 Pasang Genteng Metal Berpasir 16.00 m2 206,093.25 Rp 3,297,492.00
7 Kelupas/Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
8 Waterproofing membrane bakar + Screeding 624.00 m2 156,232.73 Rp 97,489,220.40
9 Bongkar Polycarbonat 364.00 m2 4,757.50 Rp 1,731,730.00
10 Ganti Polycarbonat/Pasang Spandek Metal Berpasir 364.00 m2 119,856.00 Rp 43,627,584.00
JUMLAH I Rp 154,473,796.90
II PEKERJAAN PENGECATAN
1 Kompon Retak Dinding Fin. Cat Dinding 8.00 m2 23,823.25 Rp 190,586.00
2 Pengelupasan Cat Dinding 128.00 m2 7,342.50 Rp 939,840.00
3 Pengecatan Dinding Interior 136.00 m2 22,880.83 Rp 3,111,792.20
4 Pengecatan Plafond 72.00 m2 22,880.83 Rp 1,647,419.40
JUMLAH II Rp 5,889,637.60
III PEKERJAAN PINTU DAN PENGUNCI
1 Bongkar Partisi Dinding (Toilet) 16.00 m2 4,895.00 Rp 78,320.00
2 Pasang Partisi (Toilet) 16.00 m2 79,945.25 Rp 1,279,124.00
3 Bongkar Daun Pintu (Toilet) 6.00 m2 1,630.75 Rp 9,784.50
4 Perbaikan Pintu (Toilet) 6.00 m2 250,000.00 Rp 1,500,000.00
5 Pasang Kait Angin Jendela (R. Auditorium Lt. 2) 7.00 bh 71,568.75 Rp 500,981.25
JUMLAH III Rp 3,368,209.75
IV PEKERJAAN ELEKTRIKAL
1 Bongkar Instalasi Lampu (Rg. Auditorium) 5.00 ttk 65,000.00 Rp 325,000.00
2 Pemasangan Instalasi Titik Lampu Kabel NYM 2X2,5 mm (Rg. Audito 5.00 ttk 242,024.20 Rp 1,210,121.00
3 Penggantian/Pasang Lampu Downlight (Rg. Auditorium) 7.00 ttk 166,134.60 Rp 1,162,942.17
4 Bongkar Instalasi CCTV (Rg. Gudang Auditorium) 5.00 ttk 65,000.00 Rp 325,000.00
5 Service CCTV dan Instalasi (Rg. Gudang Auditorium) 5.00 ttk 500,000.00 Rp 2,500,000.00
6 Penggantian/Pasang Instalasi CCTV (Rg. Gudang Auditorium) 5.00 ttk 216,081.25 Rp 1,080,406.25
7 Pasang Dome Fixed IP Camera CCTV (Rg. Gudang Auditorium) 5.00 ttk 4,432,353.75 Rp 22,161,768.75
8 Bongkar Instalasi AC (Rg. Indoor Theater Stage) 2.00 ttk 65,000.00 Rp 130,000.00
9 Perbaikan/Service AC (Rg. Indoor Theater Stage) 2.00 unit 1,000,000.00 Rp 2,000,000.00
JUMLAH IV Rp 30,895,238.17
V PEKERJAAN LANTAI
1 Bongkar Keramik 25/25 Lantai (Toilet) 30.00 m2 8,607.50 Rp 258,225.00
2 Bongkar Keramik 40/40 (Teras/Selasar) 51.00 m2 8,607.50 Rp 438,982.50
3 Rabat Beton Bawah Lantai (Toilet) 1.50 m3 797,651.25 Rp 1,196,476.88
4 Pasang Keramik Lantai 25/25 Anti Selip (Toilet) 30.00 m2 194,865.00 Rp 5,845,950.00
5 Pasang Keramik Lantai 40/40 Anti Selip (Teras/Selasar) 51.00 m2 137,560.50 Rp 7,015,585.50
JUMLAH V Rp 14,755,219.88
VI PEKERJAAN SANITASI
1 Ganti Kran/Saluran Inlet Air Bersih 5.00 uttk 70,378.00 Rp 351,890.00
JUMLAH V Rp 351,890.00
D GEDUNG AMPHYTHEATER
I PEKERJAAN ATAP BETON DAN PLAFOND
1 Kelupas/Pembersihan Lumut 1.00 ls 500,000.00 Rp 500,000.00
2 Kelupas Lapisan Cat Permukaan Dak Beton 461.25 m2 7,342.50 Rp 3,386,728.13
3 Waterproofing membrane bakar + Screeding 461.25 m2 156,232.73 Rp 72,062,344.41
4 Bongkar Plafond Gypsum 267.00 m2 4,895.00 Rp 1,306,965.00
5 Pasang Plafond Gypsum 267.00 m2 90,010.25 Rp 24,032,736.75
6 Bongkar List Corners Gypsum 66.00 m1 2,310.00 Rp 152,460.00
7 Pasang List Corners Gypsum 66.00 m1 18,100.50 Rp 1,194,633.00
JUMLAH I Rp 102,635,867.28
II PEKERJAAN PENGECATAN
1 Pengelupasan Cat Dinding 332.00 m2 7,342.50 Rp 2,437,710.00
2 Pengecatan Dinding Interior 332.00 m2 22,880.83 Rp 7,596,433.90
3 Pengecatan Plafond 267.00 m2 22,880.83 Rp 6,109,180.28
JUMLAH II Rp 16,143,324.18
III PEKERJAAN DAUN PINTU DAN PENGUNCI
1 Bongkar Daun Pintu 16.00 m2 1,630.75 Rp 26,092.00
2 Perbaikan Daun Pintu 16.00 m2 200,000.00 Rp 3,200,000.00
3 Ganti Daun Pintu Multiplek Baru 16.00 m2 501,000.00 Rp 8,016,000.00
4 Pasang Grendel Besar/Pengunci Pintu 9.00 bh 43,000.00 Rp 387,000.00
JUMLAH III Rp 11,629,092.00
IV PEKERJAAN SUMUR BOR DAN SANITASI
1 Perbaikan Box Tanaman 1.00 ls 750,000.00 Rp 750,000.00
2 Ganti/Pasang Jet Shower dan Perlengkapan 2.00 ttk 114,686.00 Rp 229,372.00
3 Pengerokan Bidang Cat lama 12.00 m2 13,197.25 Rp 158,367.00
4 Pengerokan karat pada permukaan baja cara manual 12.00 m2 13,651.00 Rp 163,812.00
5 Pelapisan Permukaan dengan Zinkcromate/Meni 12.00 m2 15,726.43 Rp 188,717.10
6 Pengecatan Besi Penutup Sumur Bor 12.00 m2 70,185.50 Rp 842,226.00
JUMLAH IV Rp 2,332,494.10
V PEKERJAAN ELEKTRIKAL
1 Ganti Lampu Spot Dinding Belakang Panggung Amphytheater 5.00 unit 144,134.60 Rp 720,672.98
2 Bongkar Instalasi CCTV (Rg. Pos Jaga Barat) 6.00 ttk 65,000.00 Rp 390,000.00
3 Service CCTV dan Instalasi (Rg. Pos Jaga Barat) 6.00 ttk 500,000.00 Rp 3,000,000.00
4 Penggantian/Pasang Instalasi CCTV (Rg. Pos Jaga Barat) 6.00 ttk 216,081.25 Rp 1,296,487.50
5 Pasang Dome Fixed IP Camera CCTV (Rg. Pos Jaga Barat) 6.00 ttk 4,432,353.75 Rp 26,594,122.50
JUMLAH V Rp 32,001,282.98

E GEDUNG FOODCOURT
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Teras 45.00 m2 4,757.50 Rp 214,087.50
2 Pasang Spandek Metal Berpasir 45.00 m2 119,856.00 Rp 5,393,520.00
3 Kelupas/Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
4 Waterproofing membrane bakar + Screeding 9.60 m2 156,232.73 Rp 1,499,834.16
5 Bongkar Plafond Gypsum 45.00 m2 4,895.00 Rp 220,275.00
6 Pasang Palfond Gypsum 45.00 m2 90,010.25 Rp 4,050,461.25
7 Pasang List Corners Gypsum 4.00 m1 18,100.50 Rp 72,402.00
JUMLAH I Rp 11,950,579.91
II PEKERJAAN SANITASI
1 Water Torn Kapasitas 520 Ltr 4.00 unit 1,275,000.00 Rp 5,100,000.00
2 Pipa PVC 3" Air Hujan 8.00 m1 73,026.66 Rp 584,213.30
JUMLAH I Rp 5,100,000.00
F GEDUNG EXIBITION HALL
I PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Spandek Pasir 7.20 m2 4,757.50 Rp 34,254.00
2 Pasang Atap Spandek Pasir 7.20 m2 119,856.00 Rp 862,963.20
3 Bongkar Plafond Gypsum 43.20 m2 4,895.00 Rp 211,464.00
4 Pasang Plafond Gypsum 43.20 m2 90,010.25 Rp 3,888,442.80
5 Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
6 Waterproofing membrane bakar + Screeding 915.00 m2 156,232.73 Rp 142,952,943.38
7 Bongkar/Kelupas Penutup Tumpangsari 5.60 m2 4,895.00 Rp 27,412.00
8 Perbaikan/Pasang Penutup Tumpangsari 5.60 m2 319,294.25 Rp 1,788,047.80
JUMLAH I Rp 150,265,527.18
II PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
2 Bongkar AC 8.00 ttk 65,000.00 Rp 520,000.00
3 Pasang Kembali Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
4 Pasang Kembali AC 8.00 ttk 65,000.00 Rp 520,000.00
JUMLAH II Rp -
III PEKERJAAN PEREDAM
1 Pasang Panel Gypsum Akustik + Peredam (Plafond) 1475.55 m2 324,362.50 Rp 478,613,086.88
JUMLAH III Rp -
II PEKERJAAN PENGECATAN
1 Pengecatan Plafond 43.20 m2 22,880.83 Rp 988,451.64
JUMLAH IV Rp 988,451.64
REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 3,500,000.00

B GEDUNG EXIBITION HALL

I PEKERJAAN ATAP DAN PLAFOND -

II PEKERJAAN ELEKTRIKAL 2,101,535.20

III PEKERJAAN PEREDAM 478,613,086.88

IV PEKERJAAN PENGECATAN -

JUMLAH ( A + B ) Rp 484,214,622.08

PPN 10% Rp 48,421,462.21

JUMLAH TOTAL Rp 532,636,084.28


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN : PEMELIHARAAN TAMAN BUDAYA KULON PROGO
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
3 Pemindahan/Penutupan Perabot Sementara 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 3,500,000.00
B GEDUNG EXIBITION HALL
II PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
2 Bongkar AC 8.00 ttk 65,000.00 Rp 520,000.00
3 Pasang Kembali Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
4 Pasang Kembali AC 8.00 ttk 65,000.00 Rp 520,000.00
JUMLAH II Rp 2,101,535.20
III PEKERJAAN PEREDAM
1 Pasang Panel Gypsum Akustik + Peredam (Plafond) 1475.55 m2 324,362.50 Rp 478,613,086.88
JUMLAH III Rp 478,613,086.88
IV PEKERJAAN PENGECATAN
1 Pengecatan Plafond 43.20 m2 22,880.83 Rp -
JUMLAH IV Rp -
G PERLENGKAPAN KELISTRIKAN
I PEKERJAAN LAMPU
1 Lampu Jari 30 Watt merk PHILLIPS 200.00 bh 56,000.00 Rp 11,200,000.00
2 Lampu Downlight 100 Watt merk PHILLIPS 25.00 bh 275,000.00 Rp 6,875,000.00
3 Lampu PJU 15.00 bh 300,000.00 Rp 4,500,000.00
4 Lampu TL 30 watt 6.00 bh 45,000.00 Rp 270,000.00
5 Lampu TL LED 600 mm 9 watt 8.00 bh 135,000.00 Rp 1,080,000.00
6 Lampu LED Bulat 8 watt merk PHILLIPS 11.00 bh 46,000.00 Rp 506,000.00
7 Lampu LED 30 watt merk PHILLIPS 10.00 bh 115,000.00 Rp 1,150,000.00
JUMLAH I Rp -
II AUDIO DAN SOUND SYSTEM
1 Kabel Microphone 5.00 roll 1,850,000.00 Rp 9,250,000.00
2 Jack XLR 25.00 bh 78,000.00 Rp 1,950,000.00
3 Jack TOA Mono 15.00 bh 45,000.00 Rp 675,000.00
4 Kabel 4 x 6 mm 6.00 bh 17,500.00 Rp 105,000.00
5 Stop Kontak 8.00 bh 18,500.00 Rp 148,000.00
6 Steker 11.00 bh 12,500.00 Rp 137,500.00
7 Kabel Listrik (2 x 1,5 mm 100 meter) 1.00 roll 850,000.00 Rp 850,000.00
8 Handy Talky 3.00 unit 875,000.00 Rp 2,625,000.00
9 Kabel Snak isi 16 x 25 meter 1.00 set 2,300,000.00 Rp 2,300,000.00
10 Clip On 6.00 set 2,800,000.00 Rp 16,800,000.00
JUMLAH II Rp -
III KEPERLUAN GENSET
1 Accu 100 Amphere 3.00 bh 1,475,000.00 Rp 4,425,000.00
2 Accu 75 Amphere 3.00 bh 1,200,000.00 Rp 3,600,000.00
3 Accu 50 Amphere 3.00 bh 750,000.00 Rp 2,250,000.00
4 Oli merk MESRAN 3.00 bh 145,000.00 Rp 435,000.00
5 Filter Oli dan Selenoid 65.00 bh 125,000.00 Rp 8,125,000.00
JUMLAH III Rp -
REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 3,500,000.00

B PEKERJAAN ATAP DAN PLAFOND Rp 194,392,672.22

C PEKERJAAN ELEKTRIKAL Rp 2,101,535.20

D PEKERJAAN PEREDAM Rp 478,613,086.88

E PEKERJAAN PENGECATAN 2,487,443.20

JUMLAH ( A + B + C + D + E ) Rp 681,094,737.49
PPN 10% Rp 68,109,473.75

JUMLAH TOTAL Rp 749,204,211.24


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN :
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
5 Pembersihan Sisa Bongkaran dan Material 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 3,500,000.00
B PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Spandek Pasir 7.20 m2 4,757.50 Rp 34,254.00
2 Pasang Atap Spandek Pasir 7.20 m2 119,856.00 Rp 862,963.20
3 Bongkar Plafond Gypsum 508.16 m2 4,895.00 Rp 2,487,443.20
4 Pasang Plafond Gypsum 508.16 m2 90,010.25 Rp 45,739,608.64
5 Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
6 Waterproofing membrane bakar + Screeding 915.00 m2 156,232.73 Rp 142,952,943.38
7 Bongkar/Kelupas Penutup Tumpangsari 5.60 m2 4,895.00 Rp 27,412.00
8 Perbaikan/Pasang Penutup Tumpangsari 5.60 m2 319,294.25 Rp 1,788,047.80
JUMLAH B Rp 194,392,672.22
C PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
2 Bongkar AC 8.00 ttk 65,000.00 Rp 520,000.00
3 Pasang Kembali Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
4 Pasang Kembali AC 8.00 ttk 65,000.00 Rp 520,000.00
JUMLAH C Rp 2,101,535.20
D PEKERJAAN PEREDAM
1 Pasang Panel Gypsum Akustik + Peredam (Plafond) 1475.55 m2 324,362.50 Rp 478,613,086.88
JUMLAH D Rp 478,613,086.88
E PEKERJAAN PENGECATAN
1 Pengecatan Plafond 508.16 m2 4,895.00 Rp 2,487,443.20
JUMLAH E Rp 2,487,443.20
REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 6,330,000.00

B PERLENGKAPAN KELISTRIKAN

I PEKERJAAN LAMPU 25,581,000.00

II AUDIO DAN SOUND SYSTEM 34,840,500.00

III KEPERLUAN GENSET 18,835,000.00

JUMLAH ( A + B ) Rp 85,586,500.00

PPN 10% Rp 8,558,650.00

JUMLAH TOTAL Rp 94,145,150.00


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN : PEMELIHARAAN TAMAN BUDAYA KULON PROGO
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
3 Pemindahan/Penutupan Perabot Sementara 1.00 Ls 1,000,000.00 Rp 1,000,000.00
4 Pekerjaan Lansiran 1.00 Ls 1,830,000.00 Rp 1,830,000.00
5 Pembersihan Sisa Bongkaran dan Material 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 6,330,000.00
B PERLENGKAPAN KELISTRIKAN
I PEKERJAAN LAMPU
1 Lampu Jari 30 Watt merk PHILLIPS 200.00 bh 56,000.00 Rp 11,200,000.00
2 Lampu Downlight 100 Watt merk PHILLIPS 25.00 bh 275,000.00 Rp 6,875,000.00
3 Lampu PJU 15.00 bh 300,000.00 Rp 4,500,000.00
4 Lampu TL 30 watt 6.00 bh 45,000.00 Rp 270,000.00
5 Lampu TL LED 600 mm 9 watt 8.00 bh 135,000.00 Rp 1,080,000.00
6 Lampu LED Bulat 8 watt merk PHILLIPS 11.00 bh 46,000.00 Rp 506,000.00
7 Lampu LED 30 watt merk PHILLIPS 10.00 bh 115,000.00 Rp 1,150,000.00
JUMLAH I Rp 25,581,000.00
II AUDIO DAN SOUND SYSTEM
1 Kabel Microphone 5.00 roll 1,850,000.00 Rp 9,250,000.00
2 Jack XLR 25.00 bh 78,000.00 Rp 1,950,000.00
3 Jack TOA Mono 15.00 bh 45,000.00 Rp 675,000.00
4 Kabel 4 x 6 mm 6.00 bh 17,500.00 Rp 105,000.00
5 Stop Kontak 8.00 bh 18,500.00 Rp 148,000.00
6 Steker 11.00 bh 12,500.00 Rp 137,500.00
7 Kabel Listrik (2 x 1,5 mm 100 meter) 1.00 roll 850,000.00 Rp 850,000.00
8 Handy Talky 3.00 unit 875,000.00 Rp 2,625,000.00
9 Kabel Snak isi 16 x 25 meter 1.00 set 2,300,000.00 Rp 2,300,000.00
10 Clip On 6.00 set 2,800,000.00 Rp 16,800,000.00
JUMLAH II Rp 34,840,500.00
III KEPERLUAN GENSET
1 Accu 100 Amphere 3.00 bh 1,475,000.00 Rp 4,425,000.00
2 Accu 75 Amphere 3.00 bh 1,200,000.00 Rp 3,600,000.00
3 Accu 50 Amphere 3.00 bh 750,000.00 Rp 2,250,000.00
4 Oli merk MESRAN 3.00 bh 145,000.00 Rp 435,000.00
5 Filter Oli dan Selenoid 65.00 bh 125,000.00 Rp 8,125,000.00
JUMLAH III Rp 18,835,000.00
REKAPITULASI

NO URAIAN PEKERJAAN TOTAL HARGA

A PEKERJAAN PERSIAPAN Rp 3,500,000.00

B PEKERJAAN ATAP DAN PLAFOND Rp 194,392,672.22

C PEKERJAAN ELEKTRIKAL Rp 2,101,535.20

D PEKERJAAN PEREDAM Rp 622,776,000.00

E PEKERJAAN PENGECATAN 2,487,443.20

JUMLAH ( A + B + C + D + E ) Rp 825,257,650.62
PPN 10% Rp 82,525,765.06

JUMLAH TOTAL Rp 907,783,415.68


PERINCIAN ANGGARAN BIAYA

KEGIATAN :
PEKERJAAN :
LOKASI : KAB. KULON PROGO
TAHUN : 2021

HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA TOTAL (Rp) KET
(Rp)

A PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 1.00 Ls 250,000.00 Rp 250,000.00
2 Pengukuran dan Bouwplank 1.00 Ls 500,000.00 Rp 500,000.00
5 Pembersihan Sisa Bongkaran dan Material 1.00 Ls 1,000,000.00 Rp 1,000,000.00
6 K3 (Keselamatan, Kesehatan kerja) 1.00 Ls 1,750,000.00 Rp 1,750,000.00
JUMLAH A Rp 3,500,000.00
B PEKERJAAN ATAP DAN PLAFOND
1 Bongkar Atap Spandek Pasir 7.20 m2 4,757.50 Rp 34,254.00
2 Pasang Atap Spandek Pasir 7.20 m2 119,856.00 Rp 862,963.20
3 Bongkar Plafond Gypsum 508.16 m2 4,895.00 Rp 2,487,443.20
4 Pasang Plafond Gypsum 508.16 m2 90,010.25 Rp 45,739,608.64
5 Pembersihan Lumut 1.00 Ls 500,000.00 Rp 500,000.00
6 Waterproofing membrane bakar + Screeding 915.00 m2 156,232.73 Rp 142,952,943.38
7 Bongkar/Kelupas Penutup Tumpangsari 5.60 m2 4,895.00 Rp 27,412.00
8 Perbaikan/Pasang Penutup Tumpangsari 5.60 m2 319,294.25 Rp 1,788,047.80
JUMLAH B Rp 194,392,672.22
C PEKERJAAN ELEKTRIKAL
1 Bongkar Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
2 Bongkar AC 8.00 ttk 65,000.00 Rp 520,000.00
3 Pasang Kembali Lampu Downlight 80.00 ttk 6,634.60 Rp 530,767.60
4 Pasang Kembali AC 8.00 ttk 65,000.00 Rp 520,000.00
JUMLAH C Rp 2,101,535.20
D PEKERJAAN PEREDAM
1 Pasang Panel Gypsum Akustik + Peredam (Plafond) 1920.00 m2 324,362.50 Rp 622,776,000.00
JUMLAH D Rp 622,776,000.00
E PEKERJAAN PENGECATAN
1 Pengecatan Plafond 508.16 m2 4,895.00 Rp 2,487,443.20
JUMLAH E Rp 2,487,443.20
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pasang 1 m2 genteng glassur baru


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.200 70,000.00 14,000.00
Tukang Kayu OH 0.100 75,000.00 7,500.00
Kepala Tukang Kayu OH 0.010 77,500.00 775.00
Mandor OH 0.010 82,500.00 825.00
JUMLAH TENAGA KERJA 23,100.00
B. BAHAN
Genteng keramik/glassur Buah 14.00 18,000.00 252,000.00
JUMLAH HARGA BAHAN 252,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 275,100.00
E. Profit 10% *D 27,510.00
F. Harga Satuan Pekerjaan (D+E) 302,610.00

Pasang 1 m2 genteng glassur kembali


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.200 70,000.00 14,000.00
Tukang Kayu OH 0.100 75,000.00 7,500.00
Kepala Tukang Kayu OH 0.010 77,500.00 775.00
Mandor OH 0.010 82,500.00 825.00
JUMLAH TENAGA KERJA 23,100.00
B. BAHAN
Genteng keramik/glassur Buah - - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 23,100.00
E. Profit 10% *D 2,310.00
F. Harga Satuan Pekerjaan (D+E) 25,410.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pasang 1 m bubungan genteng glassur


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.400 70,000.00 28,000.00
Tukang Kayu OH 0.200 75,000.00 15,000.00
Kepala Tukang Kayu OH 0.020 77,500.00 1,550.00
Mandor OH 0.020 82,500.00 1,650.00
JUMLAH TENAGA KERJA 46,200.00
B. BAHAN
Bubungan genteng kanmuri Buah 5.00 9,500.00 47,500.00
Pasir pasang kg 0.015 230,000.00 3,496.00
PC ltr 1.524 1,125.00 1,714.50
JUMLAH HARGA BAHAN 52,710.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 98,910.50
E. Profit 10% *D 9,891.05
F. Harga Satuan Pekerjaan (D+E) 108,801.55
Pasang 1 m bubungan genteng glassur lama
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.400 70,000.00 28,000.00
Tukang Kayu OH 0.200 75,000.00 15,000.00
Kepala Tukang Kayu OH 0.020 77,500.00 1,550.00
Mandor OH 0.020 82,500.00 1,650.00
JUMLAH TENAGA KERJA 46,200.00
B. BAHAN
Bubungan genteng kanmuri Buah 5.00 - -
Pasir pasang kg 0.015 1,250.00 19.00
PC ltr 1.524 145,000.00 220,980.00
JUMLAH HARGA BAHAN 220,999.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 267,199.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

E. Profit 10% *D 26,719.90


F. Harga Satuan Pekerjaan (D+E) 293,918.90
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pasang 1 m2 Plafond Gypsum


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.240 70,000.00 16,800.00
Tukang Kayu OH 0.370 75,000.00 27,750.00
Kepala Tukang Kayu OH 0.037 77,500.00 2,867.50
Mandor OH 0.012 82,500.00 990.00
JUMLAH TENAGA KERJA 48,407.50
B. BAHAN
Gypsum Board lbr 0.360 67,000.00 24,120.00
Kasa gypsum roll 0.050 12,000.00 600.00
Tepung gypsum kg 0.450 7,000.00 3,150.00
Alkasit kg 0.030 35,000.00 1,050.00
Paku Skrup kg 0.150 30,000.00 4,500.00
JUMLAH HARGA BAHAN 33,420.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 81,827.50
E. Profit 10% *D 8,182.75
F. Harga Satuan Pekerjaan (D+E) 90,010.25

Pasang 1 m1 List Corners Gypsum


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.050 70,000.00 3,500.00
Tukang kayu OH 0.050 75,000.00 3,750.00
Kepala tukang OH 0.005 77,500.00 387.50
Mandor OH 0.003 82,500.00 247.50
JUMLAH TENAGA KERJA 7,885.00
B. BAHAN
List profil gypsum m' 1.050 8,000.00 8,400.00
paku kg 0.010 17,000.00 170.00
JUMLAH HARGA BAHAN 8,570.00
C. PERALATAN
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 16,455.00
E. Profit 10% *D 1,645.50
F. Harga Satuan Pekerjaan (D+E) 18,100.50

Pasang 1 m2 Genteng Metal Pasir


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.200 70,000.00 14,000.00
Tukang kayu OH 0.100 75,000.00 7,500.00
Kepala tukang OH 0.010 77,500.00 775.00
Mandor OH 0.001 82,500.00 82.50
JUMLAH TENAGA KERJA 22,357.50
B. BAHAN
Genteng metal pasir buah 1.20 125,000.00 150,000.00
Paku biasa ½”-1” Kg 0.20 75,000.00 15,000.00

JUMLAH HARGA BAHAN 165,000.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 187,357.50
E. Profit 10% *D 18,735.75
F. Harga Satuan Pekerjaan (D+E) 206,093.25

Pasang 1 m2 Spandek Metal Berpasir


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.120 70,000.00 8,400.00
Tukang kayu OH 0.060 75,000.00 4,500.00
Kepala tukang OH 0.006 77,500.00 465.00
Mandor OH 0.006 82,500.00 495.00
JUMLAH TENAGA KERJA 13,860.00
B. BAHAN
Atap Spandek Berpasir Lbr 0.700 135,000.00 94,500.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Paku/Skrup Kg 0.020 30,000.00 600.00

JUMLAH HARGA BAHAN 95,100.00


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 108,960.00
E. Profit 10% *D 10,896.00
F. Harga Satuan Pekerjaan (D+E) 119,856.00

Compound 1 m2 Permukaan Dinding atau Dak


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.050 70,000.00 3,500.00
Tukang Cat OH 0.100 75,000.00 7,500.00
Kepala Tukang OH 0.010 77,500.00 775.00
Mandor OH 0.001 82,500.00 82.50
JUMLAH TENAGA KERJA 11,857.50
B. BAHAN
compound Kg 0.500 8,000.00 4,000.00
Cat Kg 0.200 29,000.00 5,800.00
JUMLAH HARGA BAHAN 9,800.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 21,657.50
E. Profit 10% *D 2,165.75
F. Harga Satuan Pekerjaan (D+E) 23,823.25

Pengelupasan 1 m2 Cat Dinding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.060 70,000.00 4,200.00
Mandor OH 0.030 82,500.00 2,475.00
JUMLAH TENAGA KERJA 6,675.00
B. BAHAN
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

JUMLAH HARGA BAHAN -


C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 6,675.00
E. Profit 10% *D 667.50
F. Harga Satuan Pekerjaan (D+E) 7,342.50

Pengecatan 1 m2 Dinding/Plafond Baru


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.020 70,000.00 1,400.00
Tukang Cat OH 0.063 75,000.00 4,725.00
Kepala tukang OH 0.006 77,500.00 488.25
Mandor OH 0.003 82,500.00 247.50
JUMLAH TENAGA KERJA 6,860.75
B. BAHAN
Alkali Primer kg 0.100 35,000.00 3,500.00
Cat dasar kg 0.100 29,000.00 2,900.00
Cat penutup 2 x kg 0.260 29,000.00 7,540.00
JUMLAH HARGA BAHAN 13,940.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 20,800.75
E. Profit 10% *D 2,080.08
F. Harga Satuan Pekerjaan (D+E) 22,880.83

Membuat 1 m2 Waterproofing dan Screeding


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Tukang cat OH 0.020 75,000.00 1,500.00
Kepala tukang cat OH 0.063 77,500.00 4,882.50
Pekerja OH 0.006 70,000.00 441.00
Mandor OH 0.003 82,500.00 206.25
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

JUMLAH TENAGA KERJA 7,029.75


B. BAHAN
Waterproofing membrane bakar m2 1.000 130,000.00 130,000.00
Screeding kg 1.000 5,000.00 5,000.00
JUMLAH HARGA BAHAN 135,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 142,029.75
E. Profit 10% *D 14,202.98
F. Harga Satuan Pekerjaan (D+E) 156,232.73
Pasang 1 m2 Langit-langit PVC
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.240 70,000.00 16,800.00
Tukang Kayu OH 0.370 75,000.00 27,750.00
Kepala Tukang Kayu OH 0.037 77,500.00 2,867.50
Mandor OH 0.012 82,500.00 990.00
JUMLAH TENAGA KERJA 48,407.50
B. BAHAN
Langit-langit PVC m2 1.104 215,000.00 237,360.00
Paku Skrup kg 0.150 30,000.00 4,500.00
JUMLAH HARGA BAHAN 241,860.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 290,267.50
E. Profit 10% *D 29,026.75
F. Harga Satuan Pekerjaan (D+E) 319,294.25

Memasang 1 titik Instalasi Titik Lampu


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.500 70,000.00 34,993.00
Tukang Kayu OH 0.500 75,000.00 37,500.00
Kepala Tukang OH 0.012 77,500.00 930.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Mandor OH 0.001 82,500.00 99.00


JUMLAH TENAGA KERJA 73,522.00
B. BAHAN
Kabel NYM 2x2,5 ex. Eterna m1 12.000 12,000.00 144,000.00
Pralon 5/8" m1 2.000 1,250.00 2,500.00
JUMLAH HARGA BAHAN 146,500.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 220,022.00
E. Profit 10% *D 22,002.20
F. Harga Satuan Pekerjaan (D+E) 242,024.20

Memasang 1 titik lampu downlight


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.079 70,000.00 5,530.00
Tukang Listrik OH 0.006 75,000.00 450.00
Kepala Tukang OH 0.001 77,500.00 46.50
Mandor OH 0.000 82,500.00 4.95
JUMLAH TENAGA KERJA 6,031.45
B. BAHAN
Lampu downlight bh 0.000 - -
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 6,031.45
E. Profit 10% *D 603.15
F. Harga Satuan Pekerjaan (D+E) 6,634.60
Memasang 1 titik lampu downlight
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.079 70,000.00 5,530.00
Tukang Listrik OH 0.006 75,000.00 450.00
Kepala Tukang OH 0.001 77,500.00 46.50
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Mandor OH 0.000 82,500.00 4.95


JUMLAH TENAGA KERJA 6,031.45
B. BAHAN
Lampu downlight bh 1.000 145,000.00 145,000.00
JUMLAH HARGA BAHAN 145,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 151,031.45
E. Profit 10% *D 15,103.15
F. Harga Satuan Pekerjaan (D+E) 166,134.60
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Memasang 1 titik lampu spot


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.079 70,000.00 5,530.00
Tukang Listrik OH 0.006 75,000.00 450.00
Kepala Tukang OH 0.001 77,500.00 46.50
Mandor OH 0.000 82,500.00 4.95
JUMLAH TENAGA KERJA 6,031.45
B. BAHAN
Lampu Spot bh 1.000 125,000.00 125,000.00
JUMLAH HARGA BAHAN 125,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 131,031.45
E. Profit 10% *D 13,103.15
F. Harga Satuan Pekerjaan (D+E) 144,134.60

Memasang 1 m2 andesit lama


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.500 70,000.00 35,000.00
Tukang Batu OH 0.350 75,000.00 26,250.00
Kepala Tukang OH 0.035 77,500.00 2,712.50
Mandor OH 0.035 82,500.00 2,887.50
JUMLAH TENAGA KERJA 66,850.00
B. BAHAN
Andesit 20 x 20 cm Buah 26.500 - -
Portland Semen Kg 10.400 1,125.00 11,700.00
Pasir Pasang m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 23,200.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 90,050.00
E. Profit 10% *D 9,005.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

F. Harga Satuan Pekerjaan (D+E) 99,055.00


Memasang 1 m2 andesit baru
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.500 70,000.00 35,000.00
Tukang Batu OH 0.350 75,000.00 26,250.00
Kepala Tukang OH 0.035 77,500.00 2,712.50
Mandor OH 0.035 82,500.00 2,887.50
JUMLAH TENAGA KERJA 66,850.00
B. BAHAN
Andesit 20 x 20 cm Buah 26.500 5,000.00 132,500.00
Portland Semen Kg 10.400 1,125.00 11,700.00
Pasir Pasang m3 0.050 230,000.00 11,500.00
JUMLAH HARGA BAHAN 155,700.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 222,550.00
E. Profit 10% *D 22,255.00
F. Harga Satuan Pekerjaan (D+E) 244,805.00

Membongkar 1 m2 Genteng Glassur


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.020 70,000.00 1,400.00
Tukang Kayu OH 0.010 82,500.00 825.00
JUMLAH TENAGA KERJA 2,225.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,225.00
E. Profit 10% *D 222.50
F. Harga Satuan Pekerjaan (D+E) 2,447.50
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Membongkar 1 m Bubungan Genteng Glassur


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.030 70,000.00 2,100.00
Tukang Kayu OH 0.015 82,500.00 1,237.50
JUMLAH TENAGA KERJA 3,337.50
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 3,337.50
E. Profit 10% *D 333.75
F. Harga Satuan Pekerjaan (D+E) 3,671.25
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Membongkar 1 m Plafond/Partisi
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.040 70,000.00 2,800.00
Tukang Kayu OH 0.020 82,500.00 1,650.00
JUMLAH TENAGA KERJA 4,450.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,450.00
E. Profit 10% *D 445.00
F. Harga Satuan Pekerjaan (D+E) 4,895.00
Membongkar 1 m Lantai/Batu Tempel
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.100 70,000.00 7,000.00
Tukang Kayu OH 0.010 82,500.00 825.00
JUMLAH TENAGA KERJA 7,825.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 7,825.00
E. Profit 10% *D 782.50
F. Harga Satuan Pekerjaan (D+E) 8,607.50
Membongkar 1 m List Corners
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.030 70,000.00 2,100.00
JUMLAH TENAGA KERJA 2,100.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 2,100.00
E. Profit 10% *D 210.00
F. Harga Satuan Pekerjaan (D+E) 2,310.00
Membongkar 1 m2 Genteng Metal/Polycarbonat/Asbes
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.050 70,000.00 3,500.00
Tukang Kayu OH 0.010 82,500.00 825.00
JUMLAH TENAGA KERJA 4,325.00
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,325.00
E. Profit 10% *D 432.50
F. Harga Satuan Pekerjaan (D+E) 4,757.50
Membongkar 1 m2 Daun Pintu
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.020 70,000.00 1,400.00
Tukang Kayu OH 0.001 82,500.00 82.50
JUMLAH TENAGA KERJA 1,482.50
B. BAHAN
-
JUMLAH HARGA BAHAN -
C. PERALATAN

JUMLAH HARGA ALAT -


ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

D. Jumlah (A+B+C) 1,482.50


E. Profit 10% *D 148.25
F. Harga Satuan Pekerjaan (D+E) 1,630.75
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pasang 1 m2 Partisi GRC


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.240 70,000.00 16,800.00
Tukang Kayu OH 0.370 75,000.00 27,750.00
Kepala Tukang Kayu OH 0.037 77,500.00 2,867.50
Mandor OH 0.012 82,500.00 990.00
JUMLAH TENAGA KERJA 48,407.50
B. BAHAN
Kalsi Board lbr 0.360 52,000.00 18,720.00
Alkasit kg 0.030 35,000.00 1,050.00
Paku Skrup kg 0.150 30,000.00 4,500.00
JUMLAH HARGA BAHAN 24,270.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 72,677.50
E. Profit 10% *D 7,267.75
F. Harga Satuan Pekerjaan (D+E) 79,945.25
Pasang 1 titik Instalasi CCTV
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.075 70,000.00 5,250.00
Tukang Listrik OH 0.200 75,000.00 15,000.00
Mandor OH 0.075 82,500.00 6,187.50
JUMLAH TENAGA KERJA 26,437.50
B. BAHAN
Kabel UTP Cat 6 m' 10.000 12,000.00 120,000.00
Pipa Conduit PVC 20mm m' 10.000 3,500.00 35,000.00
Material bantu ls 1.000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 170,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 196,437.50
E. Profit 10% *D 19,643.75
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

F. Harga Satuan Pekerjaan (D+E) 216,081.25

Pasang 1 unit Dome Fixed IP Camera


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.200 70,000.00 14,000.00
Tukang Listrik OH 0.200 75,000.00 15,000.00
Mandor OH 0.005 82,500.00 412.50
JUMLAH TENAGA KERJA 29,412.50
B. BAHAN
Dome Fixed IP Camera unit 1.000 4,000,000.00 4,000,000.00
JUMLAH HARGA BAHAN 4,000,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 4,029,412.50
E. Profit 10% *D 402,941.25
F. Harga Satuan Pekerjaan (D+E) 4,432,353.75

Pemasangan 1 m2 Kemamik Lantai 25/25 Anti Selip


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A Tenaga
Pekerja OH 0.70 70,000.00 49,000.00
Tukang batu OH 0.35 75,000.00 26,250.00
Kepala tukang OH 0.04 77,500.00 2,712.50
Mandor OH 0.04 82,500.00 2,887.50
80,850.00
B Bahan
Ubin keramik Doos 1.05 65,000.00 68,250.00
Semen Portland Kg 10.40 1,125.00 11,700.00
Pasir pasang m3 0.05 230,000.00 10,350.00
Semen warna Kg 0.50 12,000.00 6,000.00
96,300.00
C PERALATAN
D Jumlah A + B + C 177,150.00
E Overhead & Profit 10% 17,715.00
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

F Harga Satuan Pekerjaan (D+E) 194,865.00


ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pemasangan 1 m2 Kemamik Lantai 40/40 Anti Selip


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A Tenaga
Pekerja OH 0.25 70,000.00 17,500.00
Tukang datu OH 0.13 75,000.00 9,375.00
Kepala tukang OH 0.01 77,500.00 1,007.50
Mandor OH 0.01 82,500.00 1,072.50
28,955.00
B Bahan
Keramik Anti Selip 40/40 Bh 6.63 10,000.00 66,300.00
Semen Portland kg 9.80 1,250.00 12,250.00
Semen warna Kg 0.60 12,000.00 7,200.00
Pasir pasang M3 0.05 230,000.00 10,350.00
96,100.00
C PERALATAN
D Jumlah A + B + C 125,055.00
E Overhead & Profit 10% 12,505.50
F Harga Satuan Pekerjaan (D+E) 137,560.50
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Membuat 1 m2 Cat besi 3x serta menggosok ( tanpa meni )


Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.150 70,000.00 10,500.00
Tukang Cat OH 0.225 75,000.00 16,875.00
Kepala Tukang OH 0.023 77,500.00 1,743.75
Mandor OH 0.008 82,500.00 618.75
JUMLAH TENAGA KERJA 29,737.50
B. BAHAN
Kertas gosok lbr 1.000 6,500.00 6,500.00
Cat emco kg 0.425 56,000.00 23,800.00
Dempul kg 0.080 27,500.00 2,200.00
Minyak cat ltr 0.057 27,500.00 1,567.50
JUMLAH HARGA BAHAN 34,067.50
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 63,805.00
E. Profit 10% *D 6,380.50
F. Harga Satuan Pekerjaan (D+E) 70,185.50
Membuat 1 m2 Cat dasar ( meni )
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.030 70,000.00 2,100.00
Tukang Cat OH 0.075 75,000.00 5,625.00
Kepala Tukang OH 0.008 77,500.00 581.25
Mandor OH 0.005 82,500.00 412.50
JUMLAH TENAGA KERJA 8,718.75
B. BAHAN
Meni (besi / kayu) kg 0.084 52,000.00 4,368.00
Minyak cat ltr 0.044 27,500.00 1,210.00
JUMLAH HARGA BAHAN 5,578.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 14,296.75
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

E. Profit 10% *D 1,429.68


F. Harga Satuan Pekerjaan (D+E) 15,726.43
Pemasangan 1 bh Kait Angin
Harga Satuan (Rp) Jumlah Harga
No. Uraian Satuan Koefisien
(Rp) (Rp)
A. TENAGA
Pekerja OH 0.015 70,000.00 1,050.00
Tukang kayu OH 0.150 75,000.00 11,250.00
Kepala tukang OH 0.015 77,500.00 1,162.50
Mandor OH 0.080 82,500.00 6,600.00
JUMLAH TENAGA KERJA 20,062.50
B. BAHAN
Kait angin bh 1.000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C. PERALATAN

JUMLAH HARGA ALAT -


D. Jumlah (A+B+C) 65,062.50
E. Profit 10% *D 6,506.25
F. Harga Satuan Pekerjaan (D+E) 71,568.75

Pekerjaan 1 m2 Pengikisan/pengerokan permukaan cat lama


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A. TENAGA
Pekerja OH 0.150 70,000.00 10,500.00
Mandor OH 0.003 82,500.00 247.50
JUMLAH TENAGA KERJA 10,747.50
B. BAHAN
Soda api kg 0.050 25,000.00 1,250.00
JUMLAH HARGA BAHAN 1,250.00
C. PERALATAN
-
JUMLAH HARGA ALAT -
D. Jumlah ( A+B+C) 11,997.50
E. Profit 10% *D 1,199.75
F. Harga Satuan Pekerjaan (D+E) 13,197.25
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Pekerjaan 1 m2 Pengerokan karat pada permukaan baja cara manual


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 0.15 70,000.00 10,500.00
Mandor OH 0.01 82,500.00 660.00
11,160.00
B Bahan
Sabun kg 0.05 25,000.00 1,250.00
1,250.00
C PERALATAN
D Jumlah A + B + C 12,410.00
E Overhead & Profit 1,241.00
F Harga Satuan Pekerjaan (D+E) 13,651.00

Pemasangan 1 bh Kran Air


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 0.03 70,000.00 2,240.00
Mandor OH 0.02 82,500.00 1,320.00
3,560.00
B Bahan
Kran Air Unit 1.00 57,000.00 57,000.00
Perlengkapan Ls 0.06 57,000.00 3,420.00
60,420.00
C PERALATAN
D Jumlah A + B + C 63,980.00
E Overhead & Profit 6,398.00
F Harga Satuan Pekerjaan (D+E) 70,378.00
Pemasangan 1 bh Jet Shower
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 0.03 70,000.00 2,240.00
Mandor OH 0.02 82,500.00 1,320.00
3,560.00
B Bahan
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

Jet Shower Unit 1.00 95,000.00 95,000.00


Perlengkapan Ls 0.06 95,000.00 5,700.00
100,700.00
C PERALATAN
D Jumlah A + B + C 104,260.00
E Overhead & Profit 10,426.00
F Harga Satuan Pekerjaan (D+E) 114,686.00

Pemasangan 1 m2 Pasang Panel Gypsum Akustik + Peredam


Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 0.500 70,000.00 35,000.00
Tukang Batu OH 0.500 75,000.00 37,500.00
Kepala Tukang OH 0.100 77,500.00 7,750.00
Mandor OH 0.050 82,500.00 4,125.00
84,375.00
B Bahan
Peredam M2 1.00 25,000.00 25,000.00
Gypsum Akustik Lbr 0.50 325,000.00 162,500.00
Sekrup 2 - 5 cm Dos 0.30 20,000.00 6,000.00
Kassa Roll 0.20 12,000.00 2,400.00
Kompon Kg 0.20 8,000.00 1,600.00
Amplas Lbr 2.00 6,500.00 13,000.00
210,500.00
C PERALATAN
D Jumlah A + B + C 294,875.00
E Overhead & Profit 29,487.50
F Harga Satuan Pekerjaan (D+E) 324,362.50
Pekerjaan 1 m3 Rabat beton
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 1.650 70,000.00 115,500.00
Tukang Batu OH 0.250 75,000.00 18,750.00
Kepala Tukang OH 0.025 77,500.00 1,937.50
Mandor OH 0.080 82,500.00 6,600.00
142,787.50
ANALISIS HARGA SATUAN PEKERJAAN

PEKERJAAN
KEGIATAN
LOKASI
TAHUN

B Bahan
Krikil Beton m3 0.87 250,000.00 217,500.00
Semen Portland kg 218.00 1,125.00 245,250.00
Pasir Pasang m3 0.52 230,000.00 119,600.00
582,350.00
C PERALATAN
D Jumlah A + B + C 725,137.50
E Overhead & Profit 72,513.75
F Harga Satuan Pekerjaan (D+E) 797,651.25
Pekerjaan 1 m1 Pipa PVC 3"
Harga Satuan Jumlah Harga
No. Uraian Satuan Koefisien
(RP) (RP)
A Tenaga
Pekerja OH 0.081 70,000.00 5,670.00
Tukang Batu OH 0.135 75,000.00 10,125.00
Kepala Tukang OH 0.014 77,500.00 1,046.25
Mandor OH 0.004 82,500.00 334.13
17,175.38
B Bahan
Pipa PVC Ø 3" m' 1.20 31,750.00 38,100.00
Perlengkapan % 0.35 31,750.00 11,112.50
49,212.50
C PERALATAN
D Jumlah A + B + C 66,387.88
E Overhead & Profit 6,638.79
F Harga Satuan Pekerjaan (D+E) 73,026.66
DAFTAR HARGA SATUAN BAHAN DAN UPAH

PEKERJAAN : JASA PERENCANAAN PEMBANGUNAN POR SATLINMAS


KEGIATAN : PERENCANAAN BELANJA MODAL PEMBANGUNAN POS SAR LINMAS DI PANTAI PARANGTRTIS
LOKASI : PANTAI PARANGTRITIS KAB. BANTUL
TAHUN : 2021

NO. URAIAN SAT EE KETERANGAN

UPAH
1 Pekerja Oh 70,000.00
2 Tenaga gali tanah/pondasi Oh 70,000.00
3 Tukang batu Oh 75,000.00
4 Tukang kayu Oh 75,000.00
5 Tukang cat Oh 75,000.00
6 Tukang besi Oh 75,000.00
7 Tukang Listrik Oh 75,000.00
8 Tukang Las Konstruksi Oh 75,000.00
9 Kepala tukang batu Oh 77,500.00
10 Kepala tukang kayu Oh 77,500.00
11 Kepala tukang cat Oh 77,500.00
12 Kepala tukang besi Oh 77,500.00
13 Mandor Oh 82,500.00

BAHAN
1 Genteng keramik/glassur bh 18,000.00
2 Bubungan genteng kanmuri bh 9,500.00
3 Pasir pasang/beton m3 230,000.00
3 Pasir urug m3 215,000.00
NO. URAIAN SAT EE KETERANGAN
4 Cat emco m3 250,000.00
5 Minyak cat m3 275,000.00
6 PC kg 1,125.00
7 Gypsum Board lbr 67,000.00
8 Kasa gypsum roll 12,000.00
9 Tepung gypsum kg 7,000.00
10 Alkasit kg 35,000.00
11 Paku Skrup kg 15,000.00
12 List profil gypsum m' 8,000.00
13 paku kg 17,000.00
14 Genteng metal pasir buah 125,000.00
NO. URAIAN SAT EE KETERANGAN
15 Paku biasa ½”-1” Kg 75,000.00
16 Atap Spandek Berpasir Lbr 135,000.00
17 Paku/Skrup Kg 30,000.00
18 compound Kg 8,000.00
19 Cat Kg 29,000.00
20 Alkali Primer Kg 35,000.00
21 Waterproofing membrane bakar m2 130,000.00
22 Screeding kg 5,000.00
23 Langit-langit PVC m2 215,000.00
24 Kabel NYM 2x2,5 ex. Eterna m1 12,000.00
25 Pralon 5/8" m1 1,250.00
26 Lampu downlight bh 145,000.00
Lampu Spot bh 125,000.00
27 Andesit 20 x 20 cm m2 125,000.00
28 Kalsi Board lbr 52,000.00
29 Kabel UTP Cat 6 m' 12,000.00
30 Pipa Conduit PVC 20mm m' 3,500.00
31 Material bantu ls 15,000.00
32 Dome Fixed IP Camera unit 4,000,000.00
33 Ubin keramik doss 65,000.00
34 Semen warna kg 12,000.00
35 Keramik Anti Selip 40/40 Bh 10,000.00
36 Kertas gosok lbr 6,500.00
37 Cat emco kg 56,000.00
38 Dempul kg 27,500.00
39 Minyak cat ltr 27,500.00
40 Meni (besi / kayu) kg 52,000.00
41 Kait angin bh 45,000.00
42 Soda api kg 25,000.00
43 Sabun kg 25,000.00
NO. URAIAN SAT EE KETERANGAN
44 Kran Air bh 57,000.00
45 Jet Shower bh 95,000.00
46 Peredam M2 25,000.00
47 Gypsum Akustik Lbr 325,000.00
48 Sekrup 2 - 5 cm Dos 20,000.00
49 Krikil Beton m3 250,000.00
50 Pipa PVC Ø 3" m1 31,750.00
51 Kayu begesting m3 650,000.00
52 Paku Biasa 5 cm - 12 cm kg 17,000.00
53 Minyak Bekesting ltr 6,500.00
54 Besi beton polos kg 10,000.00
55 Kawat Beton kg 20,000.00
56 Kayu Glugu balok m3 850,000.00
57 Triplek tebal 3 mm lbr 52,000.00
58 Dolken ky.galam Ø8-10cm btg 6,500.00
59 Batu Bata bj 950.00
60
61
62
63
64
65
66
67
68
69
71
72
73
74
NO. URAIAN SAT EE KETERANGAN
75
76