DESAIN INTERIOR
RAB
( RENCANA ANGGARAN BIAYA)
POLITEKNIK NEGERI SRIWIJAYA
Jalan Srijaya Negara Bukit Besar, Palembang 30139
Telepon 0711-353414 Faksimili 0711-355918
Laman : http//www.polsri.ac.id, Pos El :
info@polisriwijaya.ac.id
Total 398,875,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)
V PEKERJAAN LAIN-LAIN
1 Kipas Angin Tornado Taksir 7 6.00 bh Rp 1,500,000.00 Rp 9,000,000.00
2 Pekerjaan pemasangan exhausted fan dinding Taksir 8 4.00 bh Rp 1,150,000.00 Rp 4,600,000.00
3 Rak Display backdrop Kasir Kios ( 5 Unit) Taksir 9 14.00 m2 Rp 1,850,000.00 Rp 25,900,000.00
Sub Total VII Rp 39,500,000.00
VI PENGADAAN MEUBELAIR
1 Pintu Kaca dan Frame Taksir 7 2.00 Unit Rp 2,500,000.00 Rp 5,000,000.00
2 Meja Makan Kantin Taksir 8 24.00 bh Rp 2,650,000.00 Rp 63,600,000.00
3 rak buku & backdrop tv Taksir 9 4.00 m2 Rp 1,850,000.00 Rp 7,400,000.00
5 Sekat Ruang Asset Taksir 10 12.00 m2 Rp 159,021.85 Rp 1,908,260.00
Sub Total VIII Rp 77,908,260.00
PEKERJAAN : RENOVASI INTERIOR KANTIN DAN BOTH JUALAN KANTIN FASILITAS UMUM
POLITEKNIK NEGERI SRIWIJAYA
TAHUN : 2023
LOKASI : POLITEKNIK SRIWIJAYA
B RENOVASI INTERIOR KANTIN DAN BOTH JUALAN KANTIN FASILITAS UMUM Rp 179,497,242.00
I PEKERJAAN PERSIAPAN Rp 4,810,662.00
II PEKERJAAN LANGIT-LANGIT (PLAFOND) Rp 3,931,900.00
III PEKERJAAN KUSEN PINTU Rp 42,480,000.00
IV PEKERJAAN LANTAI DAN SANITASI Rp 36,007,550.00
V PEKERJAAN BOOTH JUALAN Rp 35,489,340.00
VI PEKERJAAN FINISHING Rp 8,019,150.00
VII PEKERJAAN INSTALASI LISTRIK Rp 19,913,640.00
VIII PENGADAAN MEUBELAIR Rp 28,095,000.00
IX PEKERJAAN AKHIR Rp 750,000.00
IX PEKERJAAN AKHIR
1 Pembersihan akhir 1.00 Ls Rp 750,000.00 Rp 750,000.00
Sub Total IX Rp 750,000.00
IX PEKERJAAN LAIN-LAIN
1 Pekerjaan Pagar Depan Teras Hollow HDB&HDU 25.20 m2 Rp 1,200,000.00 Rp 30,240,000.00
2 Pekerjaan Pengecatan Pagar Hollow A.4.7.1.16. 25.20 m2 Rp 51,865.00 Rp 1,307,000.00
Sub Total IX Rp 31,547,000.00
X PEKERJAAN AKHIR
1 Laporan dan Dokumentasi 1.00 Ls Rp 3,000,000.00 Rp 3,000,000.00
2 Pembersihan Akhir Lapangan 1.00 Ls Rp 2,500,000.00 Rp 2,500,000.00
3 Alat Bantu 1.00 Ls Rp 10,000,000.00 Rp 10,000,000.00
4 Biaya K3 1.00 Ls Rp 1,000,000.00 Rp 1,000,000.00
Sub Total X Rp 16,500,000.00
Data Rencana :
Panjang a (Pa) = 37.00 M'
Panjang (P) = 35.00 M'
Panjang (P1) = 8.00 M'
Panjang (P2) = 8.00 M'
Panjang (P3) = 3.00 M'
Panjang (P4) = 8.00 M'
Panjang (P5) = 8.00 M'
Lebar (L) = 18.00 M'
Lebar 1 (L1) = 9.00 M'
Lebar 2 (L2) = 7.00 M'
Lebar 3 (L3) = 2.00 M'
Lebar 3 (L4) = 0.80 M'
Lebar a1' (La1') = 6.10 M'
Lebar 2' (La2') = 6.10 M'
Tinggi rencana (Tr) = 6.40 M'
900
PEMBANGUNAN GEDUNG BERTINGKAT 2 LANTAI
700 200 Tinggi rencana1 (Tr1) = 4.00 M'
Tinggi rencana 2 (Tr2) = 4.00 M'
K1
K1
K1
K2
10
LANTAI 2
400
800
K1
K1
K2
I. PEKERJAAN BETON
2.1. Pekerjaan Kolom
400
K1
K1
K2
K1
K1
K2
7
400
a. Bekesting
Panjang bekesting = 104.00
K1
K1
K1
K2
Bekesting 2x Pakai
3500
300
300
K1
K1
K2
K1
K1
K2
c. Pembesian
400
Besi utama 12 D 16
K1
K1
K1
K2
K1
K1
K2
= Ttk
2
K1
K1
K2
Besi Cincin Ø 8 - 15
1
A
B
a. Bekesting
Panjang bekesting = 40.00 M'
TULANGAN 8D13 TULANGAN 8D13 Bekesting 2x Pakai
CINCIN Ø8-15 CINCIN Ø8-15
Luas pekerjaan Bekesting = 24.00 M2
BETON MUTU F'c = 21,7 Mpa
c. Pembesian
Besi utama 8 D 13
Panjang besi D 16 mm = 4.32 M'
panjang bengkokan 5d = 0.07 M'
Jumlah besi per kolom = 8.00 Btg
Jumlah Kolom = 10.00 Unit
Panjang besi yang dibutuhkan = 345.20 M'
Besi Cincin Ø 8 - 15
Panjang kolom = 4.00 M'
Jumlah balok = 10.00 Unit
Jarak cincin 15 cm = 0.15 M'
Jumlah Cincin = 267.67 Btg
Panjang besi Ø 8 mm = 1.25 M'
Panjang besi yang dibutuhkan = 334.58 M'
a. Bekesting
Panjang bekesting = 54.00 M'
Panjang bekesting dikurng lebar kolom = 49.80 M'
Bekesting 2x Pakai
Luas pekerjaan Bekesting = 39.84 M2
Besi Cincin Ø 8 - 15
Panjang balok = 49.80 M'
Jarak cincin 20 cm = 0.15 M'
Jumlah Cincin = 333.00 Btg
Panjang besi Ø 6 mm = 1.05 M'
Panjang besi yang dibutuhkan = 349.65 M'
a. Bekesting
TULANGAN 6D13 TULANGAN 6D13 TULANGAN 6D13
CINCIN Ø8-15 CINCIN Ø8-15 CINCIN Ø8-15 Panjang bekesting = 105.00 M'
BETON MUTU F'c = 21,7 Mpa
Panjang bekesting dikurng lebar kolom = 95.10 M'
Bekesting 2x Pakai
Luas pekerjaan Bekesting = 95.10 M2
c. Pembesian
Besi utama 6 D 13
Panjang besi D 13 mm = 108.19 M'
panjang overlap 40d = 0.52 M'
Jumlah Overlap = 6.00 Btg
panjang bengkokan 5d = 0.07 M'
Jumlah besi per balok = 6.00 Btg
Panjang besi yang dibutuhkan = 649.11 M'
Besi Cincin Ø 8 - 15
Panjang balok = 95.10 M'
Jarak cincin 20 cm = 0.15 M'
Jumlah Cincin = 635.00 Btg
Panjang besi Ø 6 mm = 1.25 M'
Panjang besi yang dibutuhkan = 793.75 M'
Take Of Sheet
Kegiatan RENOVASI INTERIOR RUANG DIREKTUR POLSRI PALEMBANG
Total Kebutuhan material
Luas Bekesting = 95.10 M2
Volume Beton = 7.61 M3
Panjang Butuh Besi Ø 13 mm = 649.11 M'
Berat Besi Ø 13 mm per m = 1.04 Kg/m
Berat Besi Ø 13 mm = 675.07 Kg
Panjang Butuh Besi Ø 8 mm = 793.75 M'
Berat Besi Ø 8 mm per m = 0.37 Kg/m
900 Berat Besi Ø 8 mm = 295.67 Kg
Total Berat Besi = 970.75 Kg
700 200
10
1.3. Pekerjaan Balok Literal/balok diatas kusen pintu dan jendela Uk 12/15 cm
400
BL
BL
BL
a. Bekesting
400
BL
BL
Bekesting 2x Pakai
BL
BL
300
BL
c. Pembesian
800
Besi utama 4 Ø 10
400
BL
BL
BL
Besi Cincin Ø 8 - 15
400
BL
BL
A
B
Bekesting
Panjang bekesting = 26.92 M'
Luas pekerjaan Bekesting = 6.46 M2
Pembesian
Besi utama 4 Ø 10
Panjang besi Ø 10 mm = 27.52 M'
panjang bengkokan 5d = 0.05 M'
Jumlah besi per kolom = 4.00 Btg
Panjang besi yang dibutuhkan = 110.08 M'
Besi Cincin Ø 8 - 15
Panjang balok L1 = 26.92 M'
Jarak cincin 15 cm = 0.15 M'
Jumlah Cincin = 180.47 Btg
Panjang besi Ø 8 mm = 0.33 M'
Panjang besi yang dibutuhkan = 59.55 M'
Tebeng Layar
Lebar 1 (L1) = 10.88 M'
Tinggi (T) = 2.60 M'
Jumlah = 2.00 Unit
Luas pekerjaan pemasangan Tebeng layar = 28.29 M2
400
2
400
3.5. Pekerjaan pemasangan Rangka Atap Teras Depaan dan Belakang Lanatai 1
Panjanga a (Pa) = 42.00 M'
1
A
B
c Teras Depan
Panjang (P) = 35.00 M'
Lebar 1 (L1) = 3.30 M'
Luas pemasangan Teras Depan = 115.50 M2
d Teras Belakang
Panjang (P) = 35.00 M'
Lebar 1 (L1) = 1.00 M'
Luas pemasangan Teras Belakang = 35.00 M2
b Teras Depan
Panjang (P) = 35.00 M'
Lebar 2 (L2) = 2.20 M'
Luas pekerjaan pemasangan lantai keramik warna Uk.
= 77.00 M2
40 x 40 cm
Tebeng Layar
Lebar 1 (L1) = 11.00 M'
Tinggi (T) = 2.60 M'
Jumlah = 2.00 Unit
Luas pekerjaan pemasangan Tebeng layar = 28.60 M2
Kolom Teras
Lebar 30x 30 = 1.20 M'
Tingg = 3.50 M'
Jumlah = 10.00 Unit
Luas pengecatankolom teras sama dengan plesteran
= 42.00 M2
kolom
X. PEKERJAAN AKHIR
10.1. Laporan dan Dokumentasi = 1.00 Ls
10.2. Pembersihan Akhir Lapangan = 1.00 Ls
10.3. Alat Bantu = 1.00 Ls
10.4. Biaya K3 = 1.00 Ls
DHSP
DAFTAR HARGA SATUAN PEKERJAAN
TAHUN 2022 - KOTA PALEMBANG
II - 23
ANALISA JENIS PEKERJAAN SATUAN HARGA (RP)
II - 24
ANALISA JENIS PEKERJAAN SATUAN HARGA (RP)
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
A.4.5.2.11 Pemasangan 1 m2 atap asbes gelombang 0.92 m x 1.80 m x 5 mm m2 130,710.15
A.4.5.2.22 Pemasangan 1 m' nok asbes m 107,423.80
A.4.5.2.32 Pemasangan 1 m2 genteng metal Ukuran 80 X 77 Atap m2 150,416.55
A.4.5.2.37 Pemasangan 1 m' nok genteng metal m 107,927.50
A.4.5.2.39 Pemasangan 1 m2 atap seng gelombang m2 83,446.30
A.4.5.2.40 Pemasangan 1 m' nok atap seng m 53,376.10
A.4.5.2.41 Pemasangan 1 m2 Atap Zincalume (t.0,35 mm) m2 163,971.60
A.4.5.2.42 Pemasangan 1 m' nok aluminium m 111,271.70
A.4.5.2.43 Pemasangan 1 m2 aluminium foil m2 48,093.00
II - 25
ANALISA JENIS PEKERJAAN SATUAN HARGA (RP)
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. Pemasangan 1 buah closed duduk bh 3,941,082.20
A.5.1.1.2. Pemasangan 1 buah closed jongkok bh 935,964.30
A.5.1.1.4. Pemasangan 1 buah urinoir bh 4,003,244.30
A.5.1.1.5. Pemasangan 1 buah wastafel bh 1,634,745.70
A.5.1.1.6. Pemasangan 1 buah bathcuip porselen bh 7,465,955.25
A.5.1.1.7. Pemasangan 1 buah bak fibreglass Uk. 70x70x66cm bh 1,326,410.00
A.5.1.1.12. Pemasangan 1 buah bak cuci piring stainlessteel bh 3,215,486.25
A.5.1.1.14. Pemasangan 1 buah floor drain stainless steel bh 364,118.75
A.5.1.1.18. Pemasangan 1 m' pipa galvanis diameter 1/2" m 82,127.25
A.5.1.1.19. Pemasangan 1 buah kran diameter 1/2" atau 3/4" bh 87,434.50
A.5.1.1.20. Pemasangan 1 m' pipa galvanis diameter 3/4" m 110,970.21
A.5.1.1.25. Pemasangan 1 m' pipa PVC tipe AW diameter 1/2" m 30,949.38
A.5.1.1.26. Pemasangan 1 m' pipa PVC tipe AW diameter 3/4" m 35,374.00
A.5.1.1.27. Pemasangan 1 m' pipa PVC tipe AW diameter 1" m 34,706.25
An.5.1.1.13. Pemasangan 1 m' pipa PVC tipe DW diameter 11/2" m 65,093.45
An.5.1.1.14. Pemasangan 1 m' pipa PVC tipe DW diameter 3" m 137,522.75
An.5.1.1.15. Pemasangan 1 m' pipa PVC tipe DW diameter 4" m 208,956.44
An.5.1.1.16. Pemasangan 1 m' pipa beton diameter 40 cm m 771,784.09
II - 26
HDB & HDU
DAFTAR HARGA SATUAN BAHAN DAN UPAH
TAHUN 2022 - KOTA PALEMBANG
4. GENTENG METAL Genteng metal uk. 2x4 (0.25mm) lbr 124,700.00 setara Multiroof; 1m2 @ 1,3 lbr
Genteng metal uk. 2x4 (0.3mm) lbr 51,600.00 1 m2 @ 1,62 lbr
Genteng metal berpasir 2x5 (0,45mm) lbr 138,600.00 setara Multiroof; 1m2 @ 1,3 lbr
Nok genteng metal bh 30,400.00
Nok genteng metal berpasir bh 56,700.00
7. ATAP ZINCALUME Atap Zincalume (t.0,35 mm) m' 92,000.00 uk.lebar 105 cm
Atap Zincalume warna (t. 0,35 mm) m' 105,700.00 uk.lebar 105 cm
Atap Alkan (t.0,35 mm) m' 70,600.00 uk. Lebar 105 cm
Nok Zincalume 0,30 m' 40,400.00 uk. 300x60
Atap Zincalume warna (t.022mm) lbr 70,600.00 uk. 1600 mm x 740 mm, setara soka
Atap Zincalume warna (t.045mm) m' 131,200.00 setara bluecsoope; uk.lebar 105 cm
8. ATAP BITUMEN Atap bitumen motif gelombang lbr 217,100.00 uk. 200x95x9,3 cm
Atap bitumen motif genteng lbr 61,300.00 uk. 105x40x9,3 cm
Nok atap bitumen bh 105,700.00 uk. 100cm x 50 cm
I - 28
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
V BAHAN CETAK
1. BUIS BETON Buis beton dia. 100cm m 1,096,100.00 d0=100 cm; d1=120cm
Buis beton dia. 80cm m 983,700.00 d0=80 cm; d1=100cm
Buis beton dia. 60cm m 702,600.00 d0=60 cm; d1=75cm
Buis beton dia. 40cm m 505,900.00 d0=40 cm; d1=48cm
Buis beton dia. 30cm m 387,800.00 d0=30 cm; d1=38cm
Buis beton dia. 20cm m 281,100.00 d0=20 cm; d1=25cm
I - 29
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
5. PINTU BESI Folding Gate t.0,4 mm m2 813,200.00 min. 7 m2; finish cat standar
Folding Gate t.0,6mm m2 915,800.00 min. 7 m2; finish cat standar
Folding Gate t.0,8mm (jumbo) m2 1,132,500.00 min. 7 m2; finish cat standar
Rolling door aluminum t.0,8 mm m2 848,800.00 min. 6 m2; panjang + 50 cm
Rolling door besi t.± 0,4 mm m2 441,000.00 min. 6 m2; panjang + 50 cm; finish cat standar
Rolling door galvanum t.± 0,4 mm m2 468,300.00 min. 6 m2; panjang + 50 cm
I - 30
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
VII. BAHAN PIPA
1. PIPA PVC Pipa PVC AW 1/2" btg 28,500.00 1 batang @ 4 m
Pipa PVC AW 3/4" btg 38,000.00 1 batang @ 4 m
Pipa PVC AW 1" btg 49,900.00 1 batang @ 4 m
Pipa PVC AW 3" btg 219,600.00 1 batang @ 4 m
Pipa PVC AW 4" btg 379,900.00 1 batang @ 4 m
Pipa PVC DW 1½" btg 54,600.00 1 batang @ 4 m
Pipa PVC DW 3" btg 124,600.00 1 batang @ 4 m
Pipa PVC DW 4" btg 197,100.00 1 batang @ 4 m
I - 31
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
I - 32
HARGA DASAR (Rp)
No. JENIS BAHAN SATUAN KETERANGAN
I - 33
ANALISA SATUAN
A.2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
A.2.2.1 - 1
A.2.3.1. HARGA SATUAN PEKERJAAN TANAH
A.2.3.1 - 1
A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
An.3.2.1.21 1 m2 pasang cerucup gelam untuk pondasi (p.1,5m-20 cm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang Batu L.02 OH 160,000.00 -
Kepala Tukang L.03 OH 0.030 180,000.00 5,400.00
Mandor L.04 OH 185,000.00 -
JUMLAH TENAGA KERJA 41,400.00
B BAHAN
Gelam dia.6-8 btg 6.000 11,900.00 71,400.00
JUMLAH TENAGA BAHAN 71,400.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.3.2.1 - 1
A.4.1.1. HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu F'c=7,4 Mpa, slump (3-6) cm, w/c=0,87
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.650 120,000.00 198,000.00
Tukang Batu L.02 OH 0.275 160,000.00 44,000.00
Kepala Tukang L.03 OH 0.028 180,000.00 5,040.00
Mandor L.04 OH 0.083 185,000.00 15,355.00
JUMLAH TENAGA KERJA 262,395.00
B BAHAN
Semen Portland kg 230.000 1,472.00 338,560.00
Pasir Beton kg 893.000 103.57 92,489.29
Kerikil (Maks. 30mm) kg 1027.000 351.85 361,351.85
Air Liter 200.000 40.00 8,000.00
JUMLAH TENAGA BAHAN 800,401.14
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.1.1.17 a Pembesian 10 kg dengan besi polos atau besi ulir Untuk Pengecoran Bored Pile
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.161 -
Tukang Batu L.02 OH 0.402 -
Kepala Tukang L.03 OH 0.016 -
Mandor L.04 OH
JUMLAH TENAGA KERJA -
B BAHAN
Besi beton (polos/ulir) kg 10.500 13,500.00 141,750.00
Kawat beton kg 0.150 23,700.00 3,555.00
JUMLAH TENAGA BAHAN 145,305.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
AN .4.1.1 - 1
A.4.2.1. HARGA SATUAN PEKERJAAN BESI & ALUMINIUM
A.4.2.1 - 1
A.4.4.1. HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1 - 1
A.4.4.1.7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 2 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang Batu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 185,000.00 2,775.00
JUMLAH TENAGA KERJA 56,575.00
B BAHAN
Bata merah bh 70.000 800.00 56,000.00
Semen Portland kg 18.950 1,472.00 27,894.40
Pasir pasang m3 0.038 145,000.00 5,510.00
JUMLAH TENAGA BAHAN 89,404.40
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.4.1.9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1/2 batu campuran 1 SP : 4 PP
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.300 120,000.00 36,000.00
Tukang Batu L.02 OH 0.100 160,000.00 16,000.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.015 185,000.00 2,775.00
JUMLAH TENAGA KERJA 56,575.00
B BAHAN
Bata merah bh 70.000 800.00 56,000.00
Semen Portland kg 11.500 1,472.00 16,928.00
Pasir pasang m3 0.043 145,000.00 6,235.00
JUMLAH TENAGA BAHAN 79,163.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.4.2 - 1
A.4.4.3. HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3 - 1
An.4.4.3.8. Pemasangan 1 m' plint keramik ukuran 10 cm x 40 cm unpolish
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.090 120,000.00 10,800.00
Tukang Batu L.02 OH 0.090 160,000.00 14,400.00
Kepala Tukang L.03 OH 0.035 180,000.00 6,300.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 32,425.00
B BAHAN
Plint keramik bh 2.650 3,416.67 9,054.17
Semen Portland kg 1.140 1,472.00 1,678.08
Pasir pasang kg 0.003 103.57 0.31
Semen warna kg 0.050 2,535.00 126.75
JUMLAH TENAGA BAHAN 10,859.31
C. PERALATAN
-
JUMLAH TENAGA ALAT -
An.4.5.1.6 Pemasangan 1 m2 langit-langit kalsiboard ukuran (120 x 240 x 9) mm (tebal 3,5 mm)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.100 120,000.00 12,000.00
Tukang Batu L.02 OH 0.050 160,000.00 8,000.00
Kepala Tukang L.03 OH 0.005 180,000.00 900.00
Mandor L.04 OH 0.005 185,000.00 925.00
JUMLAH TENAGA KERJA 21,825.00
B BAHAN
Kalsiboard Lembar 0.364 65,000.00 23,660.00
Paku skrup kg 0.110 102,100.00 11,231.00
Cornis kg 0.300 5,340.00 1,602.00
Lakban gypsum roll 0.070 24,300.00 1,701.00
JUMLAH TENAGA BAHAN 38,194.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.6.2 - 1
A.4.6.2.5 Pemasangan 1 buah engsel pintu biasa 4"
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 120,000.00 1,800.00
Tukang Kayu L.02 OH 0.150 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.015 180,000.00 2,700.00
Mandor L.04 OH 0.0008 185,000.00 148.00
JUMLAH TENAGA KERJA 28,648.00
B BAHAN
Engsel 4" biasa bh 1.000 52,000.00 52,000.00
JUMLAH TENAGA BAHAN 52,000.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.6.2 - 2
A.4.6.2.9 Pemasangan 1 buah kait angin
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.015 120,000.00 1,800.00
Tukang Kayu L.02 OH 0.150 160,000.00 24,000.00
Kepala Tukang L.03 OH 0.015 180,000.00 2,700.00
Mandor L.04 OH 0.0080 185,000.00 1,480.00
JUMLAH TENAGA KERJA 29,980.00
B BAHAN
Kait angin stainless stell bh 1.000 29,200.00 29,200.00
JUMLAH TENAGA BAHAN 29,200.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.6.2 - 3
A.4.6.2 .12 Pemasangan 1 buah Door handle
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.050 120,000.00 6,000.00
Tukang Kayu L.02 OH 0.500 160,000.00 80,000.00
Kepala Tukang L.03 OH 0.050 180,000.00 9,000.00
Mandor L.04 OH 0.0030 185,000.00 555.00
JUMLAH TENAGA KERJA 95,555.00
B BAHAN
Door handle bh 1.000 129,300.00 129,300.00
JUMLAH TENAGA BAHAN 129,300.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.6.2 - 4
A.4.6.2 .18 Pemasangan 1 m2 kaca tebal 8 mm
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.017 120,000.00 2,040.00
Tukang Kayu L.02 OH 0.170 160,000.00 27,200.00
Kepala Tukang L.03 OH 0.017 180,000.00 3,060.00
Mandor L.04 OH 0.0009 185,000.00 166.50
JUMLAH TENAGA KERJA 32,466.50
B BAHAN
Kaca tebal 8 mm m2 1.100 197,300.00 217,030.00
Sealent bh 0.070 35,600.00 2,492.00
JUMLAH TENAGA BAHAN 219,522.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.6.2 - 5
A.4.7.1. HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10. Pengecatan 1 m2 tembok baru untuk interior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 120,000.00 2,400.00
Tukang cat L.02 OH 0.063 160,000.00 10,080.00
Kepala tukang L.03 OH 0.0063 180,000.00 1,134.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 14,169.00
B BAHAN
Plamir L 0.100 21,400.00 2,140.00
Cat dasar Kg 0.100 51,000.00 5,100.00
Cat penutup kg 0.260 77,300.00 20,098.00
JUMLAH TENAGA BAHAN 27,338.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
D. Jumlah (A+B+C) 41,507.00
### E. Overhead & Profit 15% x D 6,226.05
F. Harga Satuan Pekerjaan (D+E) 47,733.05
A.4.7.1 - 1
Pengecatan 1 m2 tembok baru untuk exterior ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat
An. 4.7.1.11.
penutup)
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.020 120,000.00 2,400.00
Tukang cat L.02 OH 0.063 160,000.00 10,080.00
Kepala tukang L.03 OH 0.0063 180,000.00 1,134.00
Mandor L.04 OH 0.003 185,000.00 555.00
JUMLAH TENAGA KERJA 14,169.00
B BAHAN
Plamir L 0.100 21,400.00 2,140.00
Cat dasar Kg 0.100 51,000.00 5,100.00
Cat tembok eksterior L 0.260 109,200.00 28,392.00
JUMLAH TENAGA BAHAN 35,632.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
A.4.7.1 - 2
A.5.1.1. HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.2. Pemasangan 1 buah closed jongkok
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 1.000 120,000.00 120,000.00
Tukang batu L.02 OH 1.500 160,000.00 240,000.00
Kepala Tukang L.03 OH 0.150 180,000.00 27,000.00
Mandor L.04 OH 0.160 185,000.00 29,600.00
JUMLAH TENAGA KERJA 416,600.00
B BAHAN
Closed jongkok unit 1.000 387,000.00 387,000.00
Semen Portland kg 6.000 1,472.00 8,832.00
Pasir pasang m3 0.010 145,000.00 1,450.00
JUMLAH TENAGA BAHAN 397,282.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
1
Pemasangan 1 m2 rangka atap baja ringan SNI dihitung dan desain dengan program khusus oleh Vendor
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.200 120,000.00 24,000.00
Tukang L.02 OH 0.450 160,000.00 72,000.00
Kepala Tukang L.03 OH 0.010 180,000.00 1,800.00
Mandor L.04 OH 0.050 185,000.00 9,250.00
JUMLAH TENAGA KERJA 107,050.00
B BAHAN
Profil C 75.75 m 1.778 19,400.00 34,484.21
Reng AZ 0,55mm x 6m m 5.400 8,900.00 48,060.00
Screw bh 38.000 200.00 7,600.00
Dynabolt bh 1.600 16,000.00 25,600.00
TAKSIR - 1
4. Pemasangan 1 m2 paving blok segienam t. 8 cm mutu K200
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 0.350 120,000.00 42,000.00
Tukang L.02 OH 160,000.00 -
Kepala Tukang L.03 OH 180,000.00 -
Mandor L.04 OH 0.018 185,000.00 3,237.50
JUMLAH TENAGA KERJA 45,237.50
B BAHAN
Paving blok segienam t. 8 cm bh 37.000 5,000.00 185,000.00
Pasir m3 0.100 105,000.00 10,500.00
JUMLAH TENAGA BAHAN 195,500.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
TAKSIR - 2
7. Pemasangan 1 titik nyala stop kontak
No. Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
A. TENAGA
Pekerja L.01 OH 120,000.00 -
Tukang L.02 OH 0.1350 160,000.00 21,600.00
Kepala Tukang L.03 OH 0.0135 180,000.00 2,430.00
Mandor L.04 OH 0.0050 185,000.00 925.00
JUMLAH TENAGA KERJA 24,955.00
B BAHAN
NYM 3 x 2,5 mm2 m 15.000 17,800.00 267,000.00
Perlengkapan ( 35% harga conduit,klem,isolasi ) 93,450.00
JUMLAH TENAGA BAHAN 360,450.00
C. PERALATAN
-
JUMLAH TENAGA ALAT -
TAKSIR - 3
HARGA SATUAN PEKERJAAN LAIN-LAIN