Anda di halaman 1dari 164

www.emporioarchitect.

com

RAB
RENCANA ANGGARAN BIAYA

PROJECT PRIVATE HOUSE IBU LISA - JAKARTA


2023
REKAPITULASI RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023

NO URAIAN PEKERJAAN TOTAL


Rp

I PEKERJAAN PERSIAPAN Rp 60,389,809.00


TOTAL RAB PEKERJAAN PERSIAPAN Rp 60,389,809.00

PEKERJAAN MAIN BUILDING


II PEKERJAAN STRUKTUR Rp 2,064,702,053.70
II.1 Pekerjaan Struktur Lantai Dasar Rp 1,270,653,372.28
II.2 Pekerjaan Struktur Lantai Satu Rp 573,719,897.13
II.3 Pekerjaan Struktur Atap Rp 220,328,784.29

III PEKERJAAN ARSITEKTUR Rp 3,765,320,799.75


III.1 Pekerjaan Arsitektur Lantai Dasar Rp 1,795,312,381.44
III.2 Pekerjaan Arsitektur Lantai Satu Rp 1,622,477,014.52
III.3 Pekerjaan Arsitektur Atap Rp 347,531,403.79

IV PEKERJAAN MEKANIKAL, ELEKTRIKAL & PLUMBING (MEP) Rp 434,247,397.79


IV.1 Pekerjaan Arsitektur Lantai Dasar Rp 212,164,638.55
IV.2 Pekerjaan Arsitektur Lantai Satu Rp 153,787,688.55
IV.4 Pekerjaan Arsitektur Atap Rp 68,295,070.70
TOTAL RAB MAIN BUILDING Rp 6,264,270,251.24

V PEKERJAAN LAIN - LAIN Rp 124,516,000.00


TOTAL RAB PEKERJAAN LAIN - LAIN Rp 124,516,000.00

REKAPITULASI RAB (A+B) Rp 6,449,176,060.24


DIBULATKAN Rp 6,449,200,000.00
TERBILANG

Note : > Harga diatas belum termasuk pekerjaan interior


> Harga diatas belum termasuk pembelian AC ( hanya instalasi dan sparing pipa saja )
> Harga diatas belum termasuk pengurusan listrik ke PLN untuk pasang daya baru
> Harga diatas belum termasuk keamanan project
> Harga diatas belum tambahan DPT, jika terdapat perbedaan elevasi rumah dengan rumah tetangga
> Harga diatas belum termasuk water heater Solar Panel
> Harga diatas belum termasuk lampu hias gantung atau sejenisnya

Page 2
www.emporioarchitect.com

PEKERJAAN PERSIAPAN
RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023
SUBJECT : PEKERJAAN PERSIAPAN

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp

I PEKERJAAN PERSIAPAN
1 Pekerjaan Pembersihan dan Perataan Area Proyek 27 20 540 540.00 m2 A1001 Rp 14,300.00 Rp 7,722,000.00
2 Pekerjaan Bedeng Pekerja 4x4 m 3 3 9 9.00 m2 A1002 Rp 915,475.00 Rp 8,239,275.00
3 Pekerjaan Gudang Bahan dan Peralatan 4 4.00 m2 A1003 Rp 716,512.50 Rp 2,866,050.00
4 Pekerjaan Toilet Sementara Pekerja 1 1.00 ls Rp 1,500,000.00 Rp 1,500,000.00
5 Pekerjaan Pengukuran dan Pemasangan Bowplank 27 20 94 94.00 m A1004 Rp 70,895.00 Rp 6,664,130.00
6 Pekerjaan Pagar Proyek Sementara dari Seng Gelombang Tinggi 2 Meter 94 94.00 m A1005 Rp 296,791.00 Rp 27,898,354.00
7 Pekerjaan Mobilisasi dan Demobilisasi 1 1.00 ls Rp 5,000,000.00 Rp 5,000,000.00
8 Pekerjaan Listrik Kerja 1 1.00 ls Rp 500,000.00 Rp 500,000.00

TOTAL PEKERJAAN PERSIAPAN (I) 60,389,809.00


www.emporioarchitect.com

PEKERJAAN STRUKTUR
RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023
SUBJECT : PEKERJAAN STRUKTUR

HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp

II PEKERJAAN STRUKTUR
II.1 Pekerjaan Struktur Lantai Dasar
A Pekerjaan Galian Tanah dan Pondasi Batu Kali
1 Pekerjaan Galian Tanah
- Pondasi P1 1 0.8 1.55 1.5 1.86 1.86 m3 B1001 Rp 128,700.00 Rp 239,382.00
- Pondasi P2 8 0.8 1.55 1.5 14.88 14.88 m3 B1001 Rp 128,700.00 Rp 1,915,056.00
- Pondasi P3 8 0.9 0.9 1.5 9.72 9.72 m3 B1001 Rp 128,700.00 Rp 1,250,964.00
- Pondasi P4 13 0.75 0.9 1.5 13.1625 13.16 m3 B1001 Rp 128,700.00 Rp 1,694,013.75
- Pondasi P5 11 0.7 0.7 1.5 8.085 8.08 m3 B1001 Rp 128,700.00 Rp 1,040,539.50
- Pondasi P1a 5 0.8 1.55 1.5 9.3 9.30 m3 B1001 Rp 128,700.00 Rp 1,196,910.00
- Pondasi Batu Kali 1 255 1 1.1 280.5 280.50 m3 B1001 Rp 128,700.00 Rp 36,100,350.00
2 Pekerjaan Urugan Pasir
- Pondasi P1 1 0.8 1.55 0.1 0.124 0.12 m3 B1002 Rp 319,000.00 Rp 39,556.00
- Pondasi P2 8 0.8 1.55 0.1 0.992 0.99 m3 B1002 Rp 319,000.00 Rp 316,448.00
- Pondasi P3 8 0.9 0.9 0.1 0.648 0.65 m3 B1002 Rp 319,000.00 Rp 206,712.00
- Pondasi P4 13 0.75 0.9 0.1 0.8775 0.88 m3 B1002 Rp 319,000.00 Rp 279,922.50
- Pondasi P5 11 0.7 0.7 0.1 0.539 0.54 m3 B1002 Rp 319,000.00 Rp 171,941.00
- Pondasi P1a 5 0.8 1.55 0.1 0.62 0.62 m3 B1002 Rp 319,000.00 Rp 197,780.00
- Pondasi Batu Kali 1 255 1 0.1 25.5 25.50 m3 B1002 Rp 319,000.00 Rp 8,134,500.00
- Plat Lantai 27 10 0.1 27 27.00 m3 B1002 Rp 319,000.00 Rp 8,613,000.00
3 Pekerjaan Lantai Kerja
- Pondasi P1 0.062 0.06 m3 B1003 Rp 839,714.46 Rp 52,062.30
- Pondasi P2 0.496 0.50 m3 B1003 Rp 839,714.46 Rp 416,498.37
- Pondasi P3 0.324 0.32 m3 B1003 Rp 839,714.46 Rp 272,067.49
- Pondasi P4 0.43875 0.44 m3 B1003 Rp 839,714.46 Rp 368,424.72
- Pondasi P5 0.2695 0.27 m3 B1003 Rp 839,714.46 Rp 226,303.05
- Pondasi P1a 0.31 0.31 m3 B1003 Rp 839,714.46 Rp 260,311.48
- Plat Lantai 13.5 13.50 m3 B1003 Rp 839,714.46 Rp 11,336,145.27
4 Pekerjaan Urugan Tanah Kembali 60 60.00 m3 B1004 Rp 57,750.00 Rp 3,465,000.00

Page 6
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
5 Pekerjaan Plastic Cor 495 495.00 m2 Rp 10,000.00 Rp 4,950,000.00
6 Pekerjaan Semprotan Anti Rayap 495 495.00 m2 Rp 40,000.00 Rp 19,800,000.00
7 Pekerjaan Pondasi Batu Kali
- Pekerjaan Pasangan Batu Belah Campuran 1SP : 5PP 1 255 0.6 0.8 122.4 122.40 m3 B1006 Rp 929,521.37 Rp 113,773,415.39

SUB TOTAL A Rp 216,317,302.82

B Pekerjaan Struktur Beton


1 Beton Tiang pancang 200 X 200 mm, @40 titik Kedalaman 20 Meter
- - Mob Demob Alat Pancang 1 1.00 ls Rp 30,000,000.00 Rp 30,000,000.00
- - Beton Tiang Pancang 20x0 cm K-450 40 20 800.00 m Rp 260,000.00 Rp 208,000,000.00
- - Handling 40 20 800.00 m Rp 20,000.00 Rp 16,000,000.00
- - Unloading 40 20 800.00 m Rp 20,000.00 Rp 16,000,000.00
- - Pemancangan 40 20 800.00 m Rp 70,000.00 Rp 56,000,000.00
- Penyambungan Tiang Pencang 40.00 titik Rp 70,000.00 Rp 2,800,000.00
- Pemotongan Tiang Pencang 40.00 titik Rp 70,000.00 Rp 2,800,000.00
2 Pekerjaan Pondasi P1
- Beton K-300 1 0.8 1.55 0.5 0.62 0.62 m3 B1020 Rp 1,416,085.00 Rp 877,972.70
- Pembesian Tulangan Atas D16 - 125 mm 1 25.2 20.4 1.578 73.40 73.40 kg B1009 Rp 16,816.86 Rp 1,234,289.44
- Pembesian Tulangan Bawah D19 - 125 mm 1 25.2 20.4 2.23 103.72 103.72 kg B1009 Rp 16,816.86 Rp 1,744,274.69
- Bekisting Batako 1 0.8 1.55 0.5 2.35 2.35 m2 B1010 Rp 137,599.00 Rp 323,357.65
3 Pekerjaan Pondasi P2
- Beton K-300 8 0.8 1.55 0.45 4.464 4.46 m3 B1020 Rp 1,416,085.00 Rp 6,321,403.44
- Pembesian Tulangan Atas D13 - 125 mm 8 23.8 19.6 1.042 369.02 369.02 kg B1009 Rp 16,816.86 Rp 6,205,726.16
- Pembesian Tulangan Bawah D16 - 125 mm 8 23.8 19.6 1.578 558.84 558.84 kg B1009 Rp 16,816.86 Rp 9,397,923.11
- Bekisting Batako 8 0.8 1.55 0.45 16.92 16.92 m2 B1010 Rp 137,599.00 Rp 2,328,175.08
4 Pekerjaan Pondasi P3
- Beton K-300 8 0.9 0.9 0.45 2.916 2.92 m3 B1020 Rp 1,416,085.00 Rp 4,129,303.86
- Pembesian Tulangan Atas D13 - 100 mm 8 18 18 1.042 306.10 306.10 kg B1009 Rp 16,816.86 Rp 5,147,606.96
- Pembesian Tulangan Bawah D16 - 100 mm 8 18 18 1.578 463.55 463.55 kg B1009 Rp 16,816.86 Rp 7,795,512.26
- Bekisting Batako 8 0.9 0.9 0.45 12.96 12.96 m2 B1010 Rp 137,599.00 Rp 1,783,283.04
5 Pekerjaan Pondasi P4
- Beton K-300 13 0.75 0.9 0.35 3.07125 3.07 m3 B1020 Rp 1,416,085.00 Rp 4,349,151.06
- Pembesian Tulangan Atas D13 - 100 mm 13 14.5 14.4 1.042 399.31 399.31 kg B1009 Rp 16,816.86 Rp 6,715,124.77
- Pembesian Tulangan Bawah D16 - 100 mm 13 14.5 14.4 1.578 604.71 604.71 kg B1009 Rp 16,816.86 Rp 10,169,354.02
- Bekisting Batako 13 0.75 0.9 0.35 15.015 15.01 m2 B1010 Rp 137,599.00 Rp 2,066,048.98
6 Pekerjaan Pondasi P5
- Beton K-300 11 0.7 0.7 0.3 1.617 1.62 m3 B1020 Rp 1,416,085.00 Rp 2,289,809.44
- Pembesian Tulangan Atas D13 - 100 mm 11 10.4 10.4 1.043 243.41 243.41 kg B1009 Rp 16,816.86 Rp 4,093,412.40
- Pembesian Tulangan Bawah D13 - 100 mm 11 10.4 10.4 1.043 243.41 243.41 kg B1009 Rp 16,816.86 Rp 4,093,412.40
- Bekisting Batako 11 0.7 0.7 0.3 9.24 9.24 m2 B1010 Rp 137,599.00 Rp 1,271,414.76

Page 7
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
7 Pekerjaan Pondasi P1a
- Beton K-300 5 0.8 1.55 0.5 3.1 3.10 m3 B1020 Rp 1,416,085.00 Rp 4,389,863.50
- Pembesian Tulangan Atas D13 - 100 mm 5 30.6 22.95 1.042 284.58 284.58 kg B1009 Rp 16,816.86 Rp 4,785,665.84
- Pembesian Tulangan Bawah D16 - 100 mm 5 30.6 22.95 1.578 430.96 430.96 kg B1009 Rp 16,816.86 Rp 7,247,390.30
- Bekisting Batako 5 0.8 1.55 0.5 11.75 11.75 m2 B1010 Rp 137,599.00 Rp 1,616,788.25
8 Pekerjaan Beton Tie Beam S1 20/30 cm
- Beton K- 250 1 229 0.2 0.3 13.74 13.74 m3 B1020 Rp 1,416,085.00 Rp 19,457,007.90
- Tulangan Utama D13 229 6 1.043 1461.74 1,461.74 kg B1009 Rp 16,816.86 Rp 24,581,943.35
- Tulangan Sengkang Ø.8 1910.33 1 0.395 769.67 769.67 kg B1009 Rp 16,816.86 Rp 12,943,490.87
- Bekisting Batako 1 229 0.2 0.3 137.4 137.40 m2 B1010 Rp 137,599.00 Rp 18,906,102.60
9 Pekerjaan Beton Tie Beam S1a 20/30 cm
- Beton K- 250 1 32 0.2 0.3 1.92 1.92 m3 B1020 Rp 1,416,085.00 Rp 2,718,883.20
- Tulangan Utama D13 32 8 1.043 272.35 272.35 kg B1009 Rp 16,816.86 Rp 4,580,041.85
- Tulangan Sengkang Ø.8 268.67 1 0.395 108.25 108.25 kg B1009 Rp 16,816.86 Rp 1,820,354.85
- Bekisting Batako 1 32 0.2 0.3 19.2 19.20 m2 B1010 Rp 137,599.00 Rp 2,641,900.80
10 Pekerjaan Beton Tie Beam S2 15/30 cm
- Beton K- 250 1 14 0.15 0.3 0.63 0.63 m3 B1020 Rp 1,416,085.00 Rp 892,133.55
- Tulangan Utama D13 14 5 1.043 74.47 74.47 kg B1009 Rp 16,816.86 Rp 1,252,355.19
- Tulangan Sengkang Ø.8 118.67 0.9 0.395 43.03 43.03 kg B1009 Rp 16,816.86 Rp 723,624.93
- Bekisting Batako 1 14 0.15 0.3 8.4 8.40 m2 B1010 Rp 137,599.00 Rp 1,155,831.60
11 Pekerjaan Beton Tie Beam Sp 15/20 cm
- Beton K- 250 1 30 0.15 0.2 0.9 0.90 m3 B1020 Rp 1,416,085.00 Rp 1,274,476.50
- Tulangan Utama Ø.8 30 4 0.395 48.35 48.35 kg B1009 Rp 16,816.86 Rp 813,061.72
- Tulangan Sengkang Ø.6 152.00 0.7 0.395 42.87 42.87 kg B1009 Rp 16,816.86 Rp 720,914.72
- Bekisting Batako 1 30 0.15 0.2 12 12.00 m2 B1010 Rp 137,599.00 Rp 1,651,188.00
12 Pekerjaan Plat Lantai Type A
- Beton K-300 1 49.5 10 0.1 49.5 49.50 m3 B1020 Rp 1,416,085.00 Rp 70,096,207.50
- Tulangan Ø.8-125 1631.503 1621.955 3253.458 3,253.46 kg B1009 Rp 16,816.86 Rp 54,712,955.74
13 Pekerjaan Beton Kolom K1 25/65 cm
- Beton K-300 2 0.25 0.65 7 2.275 2.28 m3 B1020 Rp 1,416,085.00 Rp 3,221,593.38
- Tulangan Utama D16 2 16 1.578 7 360.5414 360.54 kg B1009 Rp 16,816.86 Rp 6,063,176.20
- Tulangan Sengkang Ø.8 2 1.8 0.395 60.33333 99.76126 99.76 kg B1009 Rp 16,816.86 Rp 1,677,671.55
- Bekisting Kayu 2 0.25 0.65 7 25.2 25.20 m2 B1011 Rp 180,510.00 Rp 4,548,852.00
14 Pekerjaan Beton Kolom K2 25/50 cm
- Beton K-300 2 0.25 0.5 7 1.75 1.75 m3 B1020 Rp 1,416,085.00 Rp 2,478,148.75
- Tulangan Utama D16 2 14 1.578 7 315.4738 315.47 kg B1009 Rp 16,816.86 Rp 5,305,279.18
- Tulangan Sengkang Ø.10 2 1.5 0.62 60.33333 133.9233 133.92 kg B1009 Rp 16,816.86 Rp 2,252,170.67
- Bekisting Kayu 2 0.25 0.5 7 21 21.00 m2 B1011 Rp 180,510.00 Rp 3,790,710.00
15 Pekerjaan Beton Kolom K3 25/25 cm
- Beton K-300 2 0.25 0.25 7 0.875 0.88 m3 B1020 Rp 1,416,085.00 Rp 1,239,074.38
- Tulangan Utama D16 2 12 1.578 7 270.4061 270.41 kg B1009 Rp 16,816.86 Rp 4,547,382.15

Page 8
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Tulangan Sengkang Ø.10 2 1 0.62 60.33333 76.3096 76.31 kg B1009 Rp 16,816.86 Rp 1,283,288.13
- Bekisting Kayu 2 0.25 0.25 7 14 14.00 m2 B1011 Rp 180,510.00 Rp 2,527,140.00
16 Pekerjaan Beton Kolom K4 20/20 cm
- Beton K-300 2 0.25 0.25 7 0.875 0.88 m3 B1020 Rp 1,416,085.00 Rp 1,239,074.38
- Tulangan Utama D13 2 4 1.043 7 59.57616 59.58 kg B1009 Rp 16,816.86 Rp 1,001,884.15
- Tulangan Sengkang Ø.8 2 1 0.395 60.33333 48.6166 48.62 kg B1009 Rp 16,816.86 Rp 817,578.73
- Bekisting Kayu 2 0.25 0.25 7 14 14.00 m2 B1011 Rp 180,510.00 Rp 2,527,140.00
17 Pekerjaan Beton Kolom K5 20/115 cm
- Beton K-300 1 0.2 1.15 7 1.61 1.61 m3 B1020 Rp 1,416,085.00 Rp 2,279,896.85
- Tulangan Utama D13 1 18 1.043 7 134.0464 134.05 kg B1009 Rp 16,816.86 Rp 2,254,239.35
- Tulangan Sengkang Ø.8 1 2.7 0.395 60.33333 76.78992 76.79 kg B1009 Rp 16,816.86 Rp 1,291,365.60
- Bekisting Kayu 1 0.2 1.15 7 18.9 18.90 m2 B1011 Rp 180,510.00 Rp 3,411,639.00
18 Pekerjaan Beton Kolom K6 15/70 cm
- Beton K-300 1 0.15 0.7 7 0.735 0.73 m3 B1020 Rp 1,416,085.00 Rp 1,040,822.47
- Tulangan Utama D13 1 10 1.043 7 74.4702 74.47 kg B1009 Rp 16,816.86 Rp 1,252,355.19
- Tulangan Sengkang Ø.8 1 1.7 0.395 60.33333 48.34921 48.35 kg B1009 Rp 16,816.86 Rp 813,082.05
- Bekisting Kayu 1 0.15 0.7 7 11.9 11.90 m2 B1011 Rp 180,510.00 Rp 2,148,069.00
19 Pekerjaan Beton Kolom K7 15/50 cm
- Beton K-300 32 0.15 0.5 7 16.8 16.80 m3 B1020 Rp 1,416,085.00 Rp 23,790,228.00
- Tulangan Utama D13 32 12 1.043 7 2859.656 2,859.66 kg B1009 Rp 16,816.86 Rp 48,090,439.39
- Tulangan Sengkang Ø.8 32 1.3 0.395 60.33333 1183.134 1,183.13 kg B1009 Rp 16,816.86 Rp 19,896,595.94
- Bekisting Kayu 32 0.15 0.5 7 291.2 291.20 m2 B1011 Rp 180,510.00 Rp 52,564,512.00
20 Pekerjaan Beton Kolom K7a Bentuk L
- Beton K-300 2 0.15 0.63 7 1.323 1.32 m3 B1020 Rp 1,416,085.00 Rp 1,873,480.45
- Tulangan Utama D13 2 12 1.043 7 178.7285 178.73 kg B1009 Rp 16,816.86 Rp 3,005,652.46
- Tulangan Sengkang Ø.8 2 1.56 0.395 60.33333 88.73502 88.74 kg B1009 Rp 16,816.86 Rp 1,492,244.70
- Bekisting Kayu 2 0.15 0.63 7 21.84 21.84 m2 B1011 Rp 180,510.00 Rp 3,942,338.40
21 Pekerjaan Beton Kolom K7b 15/50 cm
- Beton K-300 4 0.25 0.45 7 3.15 3.15 m3 B1020 Rp 1,416,085.00 Rp 4,460,667.75
- Tulangan Utama D16 4 10 1.578 7 450.6768 450.68 kg B1009 Rp 16,816.86 Rp 7,578,970.25
- Tulangan Sengkang Ø.8 4 1.4 0.395 60.33333 136.1265 136.13 kg B1009 Rp 16,816.86 Rp 2,289,220.44
- Bekisting Kayu 4 0.25 0.45 7 39.2 39.20 m2 B1011 Rp 180,510.00 Rp 7,075,992.00
20 Pekerjaan Beton Kolom K7c 15/60 cm
- Beton K-300 4 0.15 0.6 7 2.52 2.52 m3 B1020 Rp 1,416,085.00 Rp 3,568,534.20
- Tulangan Utama D16 4 12 1.578 7 540.8122 540.81 kg B1009 Rp 16,816.86 Rp 9,094,764.30
- Tulangan Sengkang Ø.10 4 1.5 0.62 60.33333 228.9288 228.93 kg B1009 Rp 16,816.86 Rp 3,849,864.39
- Bekisting Kayu 4 0.15 0.6 7 42 42.00 m2 B1011 Rp 180,510.00 Rp 7,581,420.00
22 Pekerjaan Beton Kolom K8 15/40 cm
- Beton K-300 1 0.15 0.4 7 0.42 0.42 m3 B1020 Rp 1,416,085.00 Rp 594,755.70
- Tulangan Utama D3 1 8 1.043 7 59.57616 59.58 kg B1009 Rp 16,816.86 Rp 1,001,884.15
- Tulangan Sengkang Ø.8 1 1.1 0.395 60.33333 26.73913 26.74 kg B1009 Rp 16,816.86 Rp 449,668.30

Page 9
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Bekisting Kayu 1 0.15 0.4 7 7.7 7.70 m2 B1011 Rp 180,510.00 Rp 1,389,927.00
23 Pekerjaan Beton Kolom K9 15/30 cm
- Beton K-300 1 0.15 0.3 7 0.315 0.32 m3 B1020 Rp 1,416,085.00 Rp 446,066.78
- Tulangan Utama D3 1 6 1.043 7 44.68212 44.68 kg B1009 Rp 16,816.86 Rp 751,413.12
- Tulangan Sengkang Ø.8 1 0.9 0.395 60.33333 21.87747 21.88 kg B1009 Rp 16,816.86 Rp 367,910.43
- Bekisting Kayu 1 0.15 0.3 7 6.3 6.30 m2 B1011 Rp 180,510.00 Rp 1,137,213.00
24 Pekerjaan Beton Kolom K10 15/25 cm
- Beton K-300 4 0.15 0.25 7 1.05 1.05 m3 B1020 Rp 1,416,085.00 Rp 1,486,889.25
- Tulangan Utama D3 4 6 1.043 7 178.7285 178.73 kg B1009 Rp 16,816.86 Rp 3,005,652.46
- Tulangan Sengkang Ø.8 4 0.8 0.395 60.33333 77.78656 77.79 kg B1009 Rp 16,816.86 Rp 1,308,125.97
- Bekisting Kayu 4 0.15 0.25 7 22.4 22.40 m2 B1011 Rp 180,510.00 Rp 4,043,424.00
25 Pekerjaan Beton Kolom K11 15/20 cm
- Beton K-300 4 0.15 0.2 7 0.84 0.84 m3 B1020 Rp 1,416,085.00 Rp 1,189,511.40
- Tulangan Utama D3 4 4 1.043 7 119.1523 119.15 kg B1009 Rp 16,816.86 Rp 2,003,768.31
- Tulangan Sengkang Ø.8 4 0.7 0.395 60.33333 68.06324 68.06 kg B1009 Rp 16,816.86 Rp 1,144,610.22
- Bekisting Kayu 4 0.15 0.2 7 19.6 19.60 m2 B1011 Rp 180,510.00 Rp 3,537,996.00
26 Pekerjaan Beton Kolom K12 15/15 cm
- Beton K-300 4 0.15 0.15 7 0.63 0.63 m3 B1020 Rp 1,416,085.00 Rp 892,133.55
- Tulangan Utama D3 4 4 1.043 7 119.1523 119.15 kg B1009 Rp 16,816.86 Rp 2,003,768.31
- Tulangan Sengkang Ø.8 4 0.6 0.395 60.33333 58.33992 58.34 kg B1009 Rp 16,816.86 Rp 981,094.47
- Bekisting Kayu 4 0.15 0.15 7 16.8 16.80 m2 B1011 Rp 180,510.00 Rp 3,032,568.00
27 Pekerjaan Beton Kolom Praktis
- Beton K-300 20 0.15 0.15 5.5 2.475 2.47 m3 B1020 Rp 1,416,085.00 Rp 3,504,810.37
- Tulangan Utama Ø.8 20 4 0.395 5.5 177.276 177.28 kg B1009 Rp 16,816.86 Rp 2,981,226.30
- Tulangan Sengkang Ø.6 20 0.6 0.23 47.83333 134.6604 134.66 kg B1009 Rp 16,816.86 Rp 2,264,565.57
- Bekisting Kayu 20 0.15 0.15 5.5 33 33.00 m2 B1011 Rp 180,510.00 Rp 5,956,830.00
28 Pekerjaan Beton Tangga
- Beton K-300 6 6.00 m3 B1020 Rp 1,416,085.00 Rp 8,496,510.00
- Pembesian Tulangan 150 900 900.00 kg B1009 Rp 16,816.86 Rp 15,135,177.20
- Bekisting Kayu 42 42.00 m2 B1011 Rp 180,510.00 Rp 7,581,420.00
29 Pekerjaan Beton Balok BL 15/15 cm
- Beton K-300 1 20 0.15 0.15 0.45 0.45 m3 B1020 Rp 1,416,085.00 Rp 637,238.25
- Tulangan Utama D13 20 4 1.043 85.1088 85.11 kg B1009 Rp 16,816.86 Rp 1,431,263.08
- Tulangan Sengkang Ø.8 168.6667 0.6 0.395 40.77348 40.77 kg B1009 Rp 16,816.86 Rp 685,682.05
- Bekisting Kayu 1 20 0.15 0.15 9 9.00 m2 B1011 Rp 180,510.00 Rp 1,624,590.00
30 Pekerjaan Beton Balok B3 25/45 cm
- Beton K-300 1 23 0.25 0.45 2.5875 2.59 m3 B1020 Rp 1,416,085.00 Rp 3,664,119.94
- Tulangan Utama D16 23 8 1.578 296.159 296.16 kg B1009 Rp 16,816.86 Rp 4,980,466.17
- Tulangan Samping Ø.10 23 2 0.62 29.0904 29.09 kg B1009 Rp 16,816.86 Rp 489,209.29
- Tulangan Sengkang Ø.8 193.6667 1.4 0.395 109.2396 109.24 kg B1009 Rp 16,816.86 Rp 1,837,067.78
- Bekisting Kayu 1 23 0.25 0.45 26.45 26.45 m2 B1011 Rp 180,510.00 Rp 4,774,489.50

Page 10
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
31 Pekerjaan Beton Balok B5 20/45 cm
- Beton K-300 1 17 0.2 0.45 1.53 1.53 m3 B1020 Rp 1,416,085.00 Rp 2,166,610.05
- Tulangan Utama D16 17 6 1.578 164.1751 164.18 kg B1009 Rp 16,816.86 Rp 2,760,910.59
- Tulangan Sengkang Ø.8 143.6667 1.3 0.395 75.24829 75.25 kg B1009 Rp 16,816.86 Rp 1,265,440.23
- Bekisting Kayu 1 17 0.2 0.45 18.7 18.70 m2 B1011 Rp 180,510.00 Rp 3,375,537.00
32 Pekerjaan Beton Balok B7 15/45 cm
- Beton K-300 1 30.5 0.15 0.45 2.05875 2.06 m3 B1020 Rp 1,416,085.00 Rp 2,915,364.99
- Tulangan Utama D13 30.5 6 1.043 194.6864 194.69 kg B1009 Rp 16,816.86 Rp 3,274,014.29
- Tulangan Sengkang Ø.8 256.1667 1.2 0.395 123.8515 123.85 kg B1009 Rp 16,816.86 Rp 2,082,793.10
- Bekisting Kayu 1 30.5 0.15 0.45 32.025 32.03 m2 B1011 Rp 180,510.00 Rp 5,780,832.75
33 Pekerjaan Beton Balok B7a 15/45 cm
- Beton K-300 1 9 0.15 0.45 0.6075 0.61 m3 B1020 Rp 1,416,085.00 Rp 860,271.64
- Tulangan Utama D13 9 4 1.043 38.29896 38.30 kg B1009 Rp 16,816.86 Rp 644,068.38
- Tulangan Samping D13 9 4 1.043 38.29896 38.30 kg B1009 Rp 16,816.86 Rp 644,068.38
- Tulangan Sengkang Ø.8 77 1.2 0.395 37.22796 37.23 kg B1009 Rp 16,816.86 Rp 626,057.52
- Bekisting Kayu 1 9 0.15 0.45 9.45 9.45 m2 B1011 Rp 180,510.00 Rp 1,705,819.50
34 Pekerjaan Beton Balok B9 15/30 cm
- Beton K-300 1 6 0.15 0.3 0.27 0.27 m3 B1020 Rp 1,416,085.00 Rp 382,342.95
- Tulangan Utama D13 6 6 1.043 38.29896 38.30 kg B1009 Rp 16,816.86 Rp 644,068.38
- Tulangan Sengkang Ø.8 52 0.9 0.395 18.85572 18.86 kg B1009 Rp 16,816.86 Rp 317,094.07
- Bekisting Kayu 1 6 0.15 0.3 4.5 4.50 m2 B1011 Rp 180,510.00 Rp 812,295.00
35 Pekerjaan Plat Lantai Type E
- Beton K-300 1 0.5 10 0.12 0.6 0.60 m3 B1020 Rp 1,416,085.00 Rp 849,651.00
- Tulangan Ø.8-250 24.75418 24.44797 49.20215 49.20 kg B1009 Rp 16,816.86 Rp 827,425.81
- Bekisting Kayu 1 0.5 10 0.12 5 5.00 m2 B1011 Rp 180,510.00 Rp 902,550.00
36 Pekerjaan Plat Lantai Type F
- Beton K-300 1 2.1 10 0.12 2.52 2.52 m3 B1020 Rp 1,416,085.00 Rp 3,568,534.20
- Tulangan Ø.8-120 152.6508 159.0166 311.6673 311.67 kg B1009 Rp 16,816.86 Rp 5,241,266.86
- Bekisting Kayu 1 2.1 10 0.12 21 21.00 m2 B1011 Rp 180,510.00 Rp 3,790,710.00

SUB TOTAL B Rp 1,054,336,069.46

TOTAL PEKERJAAN STRUKTUR LANTAI DASAR (Rp 1,270,653,372.28

II.2 Pekerjaan Struktur Lantai Satu


A Pekerjaan Struktur Beton
1 Pekerjaan Beton Balok B1 35/60 cm
- Beton K-300 1 9 0.35 0.6 1.89 1.89 m3 B1020 Rp 1,416,085.00 Rp 2,676,400.65
- Tulangan Utama D16 9 13 1.578 188.3185 188.32 kg B1009 Rp 16,816.86 Rp 3,166,926.86
- Tulangan Pinggang D16 9 2 1.578 28.97208 28.97 kg B1009 Rp 16,816.86 Rp 487,219.52
- Tulangan Sengkang Ø.10 77 1.9 0.62 92.52012 92.52 kg B1009 Rp 16,816.86 Rp 1,555,898.23

Page 11
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Bekisting Kayu 1 9 0.35 0.6 13.95 13.95 m2 B1011 Rp 180,510.00 Rp 2,518,114.50
2 Pekerjaan Beton Balok B1a 30/40 cm
- Beton K-300 1 9 0.3 0.4 1.08 1.08 m3 B1020 Rp 1,416,085.00 Rp 1,529,371.80
- Tulangan Utama D16 9 13 1.578 188.3185 188.32 kg B1009 Rp 16,816.86 Rp 3,166,926.86
- Tulangan Sengkang Ø.8 77 1.4 0.395 43.43262 43.43 kg B1009 Rp 16,816.86 Rp 730,400.44
- Bekisting Kayu 1 9 0.3 0.4 9.9 9.90 m2 B1011 Rp 180,510.00 Rp 1,787,049.00
3 Pekerjaan Beton Balok B2 25/50 cm
- Beton K-300 1 29 0.25 0.5 3.625 3.63 m3 B1020 Rp 1,416,085.00 Rp 5,133,308.13
- Tulangan Utama D16 29 8 1.578 373.4179 373.42 kg B1009 Rp 16,816.86 Rp 6,279,718.21
- Tulangan Pinggang Ø.10 29 2 0.62 36.6792 36.68 kg B1009 Rp 16,816.86 Rp 616,829.10
- Tulangan Sengkang Ø.8 243.6667 1.5 0.395 147.26 147.26 kg B1009 Rp 16,816.86 Rp 2,476,450.49
- Bekisting Kayu 1 29 0.25 0.5 36.25 36.25 m2 B1011 Rp 180,510.00 Rp 6,543,487.50
3 Pekerjaan Beton Balok B2a 25/50 cm
- Beton K-300 1 32 0.25 0.5 4 4.00 m3 B1020 Rp 1,416,085.00 Rp 5,664,340.00
- Tulangan Utama D16 32 10 1.578 515.0592 515.06 kg B1009 Rp 16,816.86 Rp 8,661,680.29
- Tulangan Pinggang Ø.10 32 2 0.62 40.0768 40.08 kg B1009 Rp 16,816.86 Rp 673,966.08
- Tulangan Sengkang Ø.10 268.6667 1.5 0.620 298.1829 298.18 kg B1009 Rp 16,816.86 Rp 5,014,501.55
- Bekisting Kayu 1 32 0.25 0.5 40 40.00 m2 B1011 Rp 180,510.00 Rp 7,220,400.00
4 Pekerjaan Beton Balok B3 25/45 cm
- Beton K-300 1 18 0.25 0.45 2.025 2.03 m3 B1020 Rp 1,416,085.00 Rp 2,867,572.13
- Tulangan Utama D16 18 8 1.578 231.7766 231.78 kg B1009 Rp 16,816.86 Rp 3,897,756.13
- Tulangan Pinggang Ø.10 18 2 0.62 22.5432 22.54 kg B1009 Rp 16,816.86 Rp 379,105.92
- Tulangan Sengkang Ø.8 152 1.4 0.395 100.3124 100.31 kg B1009 Rp 16,816.86 Rp 1,686,940.46
- Bekisting Kayu 1 18 0.25 0.45 20.7 20.70 m2 B1011 Rp 180,510.00 Rp 3,736,557.00
5 Pekerjaan Beton Balok B4 25/40 cm
- Beton K-300 1 54 0.25 0.4 5.4 5.40 m3 B1020 Rp 1,416,085.00 Rp 7,646,859.00
- Tulangan Utama D16 54 6 1.578 521.4974 521.50 kg B1009 Rp 16,816.86 Rp 8,769,951.29
- Tulangan Sengkang Ø.8 452 1.3 0.395 276.9905 276.99 kg B1009 Rp 16,816.86 Rp 4,658,111.90
- Bekisting Kayu 1 54 0.25 0.4 56.7 56.70 m2 B1011 Rp 180,510.00 Rp 10,234,917.00
6 Pekerjaan Beton Balok B4a 25/40 cm
- Beton K-300 1 9 0.25 0.4 0.9 0.90 m3 B1020 Rp 1,416,085.00 Rp 1,274,476.50
- Tulangan Utama D16 9 8 1.578 115.8883 115.89 kg B1009 Rp 16,816.86 Rp 1,948,878.07
- Tulangan Sengkang Ø.8 77 1.3 0.395 47.18644 47.19 kg B1009 Rp 16,816.86 Rp 793,527.91
- Bekisting Kayu 1 9 0.25 0.4 9.45 9.45 m2 B1011 Rp 180,510.00 Rp 1,705,819.50
6 Pekerjaan Beton Balok B4b 25/40 cm
- Beton K-300 1 11 0.25 0.4 1.1 1.10 m3 B1020 Rp 1,416,085.00 Rp 1,557,693.50
- Tulangan Utama D16 11 9 1.578 159.3464 159.35 kg B1009 Rp 16,816.86 Rp 2,679,707.34
- Tulangan Sengkang Ø.8 93.66667 1.3 0.395 57.39995 57.40 kg B1009 Rp 16,816.86 Rp 965,287.20
- Bekisting Kayu 1 11 0.25 0.4 11.55 11.55 m2 B1011 Rp 180,510.00 Rp 2,084,890.50
7 Pekerjaan Beton Balok B6 20/40 cm
- Beton K-300 1 74 0.2 0.4 5.92 5.92 m3 B1020 Rp 1,416,085.00 Rp 8,383,223.20

Page 12
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Tulangan Utama D16 74 6 1.578 714.6446 714.64 kg B1009 Rp 16,816.86 Rp 12,018,081.40
- Tulangan Sengkang Ø.8 618.6667 1.2 0.395 349.9622 349.96 kg B1009 Rp 16,816.86 Rp 5,885,265.95
- Bekisting Kayu 1 74 0.2 0.4 74 74.00 m2 B1011 Rp 180,510.00 Rp 13,357,740.00
8 Pekerjaan Beton Balok B6a 20/40 cm
- Beton K-300 1 24 0.2 0.4 1.92 1.92 m3 B1020 Rp 1,416,085.00 Rp 2,718,883.20
- Tulangan Utama D16 24 6 1.578 231.7766 231.78 kg B1009 Rp 16,816.86 Rp 3,897,756.13
- Tulangan Sengkang Ø.8 202 1.2 0.395 114.2657 114.27 kg B1009 Rp 16,816.86 Rp 1,921,590.07
- Bekisting Kayu 1 24 0.2 0.4 24 24.00 m2 B1011 Rp 180,510.00 Rp 4,332,240.00
8 Pekerjaan Beton Balok B6b 20/40 cm
- Beton K-300 1 33 0.2 0.4 2.64 2.64 m3 B1020 Rp 1,416,085.00 Rp 3,738,464.40
- Tulangan Utama D13 33 8 1.043 280.859 280.86 kg B1009 Rp 16,816.86 Rp 4,723,168.15
- Tulangan Sengkang Ø.8 277 1.2 0.395 156.691 156.69 kg B1009 Rp 16,816.86 Rp 2,635,051.73
- Bekisting Kayu 1 33 0.2 0.4 33 33.00 m2 B1011 Rp 180,510.00 Rp 5,956,830.00
9 Pekerjaan Beton Balok B6c 20/40 cm
- Beton K-300 1 16 0.2 0.4 1.28 1.28 m3 B1020 Rp 1,416,085.00 Rp 1,812,588.80
- Tulangan Utama D16 16 8 1.578 206.0237 206.02 kg B1009 Rp 16,816.86 Rp 3,464,672.12
- Tulangan Sengkang Ø.10 135.3333 1.2 0.620 120.1611 120.16 kg B1009 Rp 16,816.86 Rp 2,020,732.14
- Bekisting Kayu 1 16 0.2 0.4 16 16.00 m2 B1011 Rp 180,510.00 Rp 2,888,160.00
10 Pekerjaan Beton Balok B7 15/45 cm
- Beton K-300 1 16 0.15 0.45 1.08 1.08 m3 B1020 Rp 1,416,085.00 Rp 1,529,371.80
- Tulangan Utama D13 16 6 1.043 102.1306 102.13 kg B1009 Rp 16,816.86 Rp 1,717,515.69
- Tulangan Sengkang Ø.8 135.3333 1.2 0.395 76.55422 76.55 kg B1009 Rp 16,816.86 Rp 1,287,401.93
- Bekisting Kayu 1 16 0.15 0.45 16.8 16.80 m2 B1011 Rp 180,510.00 Rp 3,032,568.00
11 Pekerjaan Beton Balok B8 15/40 cm
- Beton K-300 1 17 0.15 0.4 1.02 1.02 m3 B1020 Rp 1,416,085.00 Rp 1,444,406.70
- Tulangan Utama D13 17 6 1.043 108.5137 108.51 kg B1009 Rp 16,816.86 Rp 1,824,860.42
- Tulangan Sengkang Ø.8 143.6667 1.1 0.395 74.49581 74.50 kg B1009 Rp 16,816.86 Rp 1,252,785.82
- Bekisting Kayu 1 17 0.15 0.4 16.15 16.15 m2 B1011 Rp 180,510.00 Rp 2,915,236.50
12 Pekerjaan Beton Balok B9 15/30 cm
- Beton K-300 1 17 0.15 0.3 0.765 0.76 m3 B1020 Rp 1,416,085.00 Rp 1,083,305.03
- Tulangan Utama D13 17 6 1.043 108.5137 108.51 kg B1009 Rp 16,816.86 Rp 1,824,860.42
- Tulangan Sengkang Ø.8 143.6667 0.9 0.395 60.95111 60.95 kg B1009 Rp 16,816.86 Rp 1,025,006.58
- Bekisting Kayu 1 17 0.15 0.3 12.75 12.75 m2 B1011 Rp 180,510.00 Rp 2,301,502.50
13 Pekerjaan Plat Lantai Type C
- Beton K-300 1 10.9 10 0.12 13.08 13.08 m3 B1020 Rp 1,416,085.00 Rp 18,522,391.80
- Tulangan Ø.10-240 601.1679 601.1679 1202.336 1,202.34 kg B1009 Rp 16,816.86 Rp 20,219,516.16
- Bekisting Kayu 1 10.9 10 0.12 109 109.00 m2 B1011 Rp 180,510.00 Rp 19,675,590.00
14 Pekerjaan Plat Lantai Type D
- Beton K-300 1 20.4 10 0.12 24.48 24.48 m3 B1020 Rp 1,416,085.00 Rp 34,665,760.80
- Tulangan Ø.10-120 2214.715 2201.561 4416.277 4,416.28 kg B1009 Rp 16,816.86 Rp 74,267,925.45
- Bekisting Kayu 1 20.4 10 0.12 204 204.00 m2 B1011 Rp 180,510.00 Rp 36,824,040.00

Page 13
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
15 Pekerjaan Plat Lantai Type E
- Beton K-300 1 1.2 10 0.12 1.44 1.44 m3 B1020 Rp 1,416,085.00 Rp 2,039,162.40
- Tulangan Ø.8-250 47.85807 47.57443 95.43251 95.43 kg B1009 Rp 16,816.86 Rp 1,604,875.43
- Bekisting Kayu 1 1.2 10 0.12 12 12.00 m2 B1011 Rp 180,510.00 Rp 2,166,120.00
16 Pekerjaan Plat Lantai Type F
- Beton K-300 1 0.3 10 0.12 0.36 0.36 m3 B1020 Rp 1,416,085.00 Rp 509,790.60
- Tulangan Ø.8-120 28.87987 36.69613 65.576 65.58 kg B1009 Rp 16,816.86 Rp 1,102,782.71
- Bekisting Kayu 1 0.3 10 0.12 3 3.00 m2 B1011 Rp 180,510.00 Rp 541,530.00
17 Pekerjaan Beton Kolom K2 25/50 cm
- Beton K-300 1 0.25 0.5 5.1 0.6375 0.64 m3 B1020 Rp 1,416,085.00 Rp 902,754.19
- Tulangan Utama D16 1 14 1.578 5.1 114.9226 114.92 kg B1009 Rp 16,816.86 Rp 1,932,637.41
- Tulangan Sengkang Ø.10 1 1.5 0.62 44.5 49.38886 49.39 kg B1009 Rp 16,816.86 Rp 830,565.70
- Bekisting Kayu 1 0.25 0.5 5.1 7.65 7.65 m2 B1011 Rp 180,510.00 Rp 1,380,901.50
18 Pekerjaan Beton Kolom K7b 15/50 cm
- Beton K-300 2 0.25 0.45 5.1 1.1475 1.15 m3 B1020 Rp 1,416,085.00 Rp 1,624,957.54
- Tulangan Utama D16 2 10 1.578 5.1 164.1751 164.18 kg B1009 Rp 16,816.86 Rp 2,760,910.59
- Tulangan Sengkang Ø.8 2 1.4 0.395 44.5 50.20134 50.20 kg B1009 Rp 16,816.86 Rp 844,229.09
- Bekisting Kayu 2 0.25 0.45 5.1 14.28 14.28 m2 B1011 Rp 180,510.00 Rp 2,577,682.80
19 Pekerjaan Beton Kolom K8 15/40 cm
- Beton K-300 29 0.15 0.4 5.1 8.874 8.87 m3 B1020 Rp 1,416,085.00 Rp 12,566,338.29
- Tulangan Utama D3 29 8 1.043 5.1 1258.759 1,258.76 kg B1009 Rp 16,816.86 Rp 21,168,380.91
- Tulangan Sengkang Ø.8 29 1.1 0.395 44.5 571.9367 571.94 kg B1009 Rp 16,816.86 Rp 9,618,181.36
- Bekisting Kayu 29 0.15 0.4 5.1 162.69 162.69 m2 B1011 Rp 180,510.00 Rp 29,367,171.90
20 Pekerjaan Beton Kolom K10 15/25 cm
- Beton K-300 5 0.15 0.25 5.1 0.95625 0.96 m3 B1020 Rp 1,416,085.00 Rp 1,354,131.28
- Tulangan Utama D3 5 6 1.043 5.1 162.7706 162.77 kg B1009 Rp 16,816.86 Rp 2,737,290.63
- Tulangan Sengkang Ø.8 5 0.8 0.395 44.5 71.7162 71.72 kg B1009 Rp 16,816.86 Rp 1,206,041.55
- Bekisting Kayu 5 0.15 0.25 5.1 20.4 20.40 m2 B1011 Rp 180,510.00 Rp 3,682,404.00
21 Pekerjaan Beton Kolom K12 15/15 cm
- Beton K-300 4 0.15 0.15 5.1 0.459 0.46 m3 B1020 Rp 1,416,085.00 Rp 649,983.01
- Tulangan Utama D3 4 4 1.043 5.1 86.81098 86.81 kg B1009 Rp 16,816.86 Rp 1,459,888.34
- Tulangan Sengkang Ø.8 4 0.6 0.395 44.5 43.02972 43.03 kg B1009 Rp 16,816.86 Rp 723,624.93
- Bekisting Kayu 4 0.15 0.15 5.1 12.24 12.24 m2 B1011 Rp 180,510.00 Rp 2,209,442.40
22 Pekerjaan Beton Kolom Praktis
- Beton K-300 20 0.15 0.15 5.1 2.295 2.29 m3 B1020 Rp 1,416,085.00 Rp 3,249,915.07
- Tulangan Utama Ø.8 20 4 0.395 5.1 164.3832 164.38 kg B1009 Rp 16,816.86 Rp 2,764,409.85
- Tulangan Sengkang Ø.6 20 0.6 0.23 44.5 125.2764 125.28 kg B1009 Rp 16,816.86 Rp 2,106,756.13
- Bekisting Kayu 20 0.15 0.15 5.1 30.6 30.60 m2 B1011 Rp 180,510.00 Rp 5,523,606.00
23 Pekerjaan Beton Balok Kanopi BL 15/15 cm
- Beton K-300 1 20 0.15 0.15 0.45 0.45 m3 B1020 Rp 1,416,085.00 Rp 637,238.25
- Tulangan Utama D13 20 4 1.043 85.1088 85.11 kg B1009 Rp 16,816.86 Rp 1,431,263.08

Page 14
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Tulangan Sengkang Ø.8 168.6667 0.6 0.395 40.77348 40.77 kg B1009 Rp 16,816.86 Rp 685,682.05
- Bekisting Kayu 1 20 0.15 0.15 9 9.00 m2 B1011 Rp 180,510.00 Rp 1,624,590.00
-
SUB TOTAL A Rp 553,544,772.40

B Pekerjaan Struktur Baja


1 Pekerjaan Balok Baja
- Hollow 150.75.3,2 55 11.304 621.72 621.72 kg B1021 Rp 28,847.50 Rp 17,935,067.70
- Joint Plate 24.8688 24.87 kg B1022 Rp 27,747.50 Rp 690,047.03
- Baut HTB 132 132.00 bh B1023 Rp 11,742.50 Rp 1,550,010.00
-
SUB TOTAL B Rp 20,175,124.73

TOTAL PEKERJAAN STRUKTUR LANTAI SATU (ARp 573,719,897.13

I.3 Pekerjaan Struktur Lantai Atap


A Pekerjaan Struktur Beton
1 Pekerjaan Beton Balok BR1 20/40 cm
- Beton K-300 1 136 0.2 0.4 10.88 10.88 m3 B1020 Rp 1,416,085.00 Rp 15,407,004.80
- Tulangan Utama D13 136 6 1.043 868.1098 868.11 kg B1009 Rp 16,816.86 Rp 14,598,883.39
- Tulangan Sengkang Ø.8 1135.333 1.2 0.395 548.911 548.91 kg B1009 Rp 16,816.86 Rp 9,230,960.72
- Bekisting Kayu 1 136 0.2 0.4 136 136.00 m2 B1011 Rp 180,510.00 Rp 24,549,360.00
2 Pekerjaan Beton Balok BR2 20/30 cm
- Beton K-300 1 109 0.2 0.3 6.54 6.54 m3 B1020 Rp 1,416,085.00 Rp 9,261,195.90
- Tulangan Utama D13 109 6 1.043 695.7644 695.76 kg B1009 Rp 16,816.86 Rp 11,700,575.65
- Tulangan Sengkang Ø.8 910.3333 1 0.395 366.7733 366.77 kg B1009 Rp 16,816.86 Rp 6,167,976.54
- Bekisting Kayu 1 109 0.2 0.3 87.2 87.20 m2 B1011 Rp 180,510.00 Rp 15,740,472.00
3 Pekerjaan Beton Balok BR2a 20/30 cm
- Beton K-300 1 30 0.2 0.3 1.8 1.80 m3 B1020 Rp 1,416,085.00 Rp 2,548,953.00
- Tulangan Utama D13 30 8 1.043 255.3264 255.33 kg B1009 Rp 16,816.86 Rp 4,293,789.23
- Tulangan Sengkang Ø.8 252 1 0.395 101.5308 101.53 kg B1009 Rp 16,816.86 Rp 1,707,429.61
- Bekisting Kayu 1 30 0.2 0.3 24 24.00 m2 B1011 Rp 180,510.00 Rp 4,332,240.00
3 Pekerjaan Beton Balok BR3 15/30 cm
- Beton K-300 1 17 0.15 0.3 0.765 0.76 m3 B1020 Rp 1,416,085.00 Rp 1,083,305.03
- Tulangan Utama D13 17 8 1.043 144.685 144.68 kg B1009 Rp 16,816.86 Rp 2,433,147.23
- Tulangan Sengkang Ø.8 143.6667 0.9 0.395 52.09497 52.09 kg B1009 Rp 16,816.86 Rp 876,074.00
- Bekisting Kayu 1 17 0.15 0.3 12.75 12.75 m2 B1011 Rp 180,510.00 Rp 2,301,502.50
4 Pekerjaan Beton Balok BR4 15/25 cm
- Beton K-300 1 11 0.15 0.25 0.4125 0.41 m3 B1020 Rp 1,416,085.00 Rp 584,135.06
- Tulangan Utama Ø.10 11 4 0.62 27.8256 27.83 kg B1009 Rp 16,816.86 Rp 467,939.32
- Tulangan Sengkang Ø.8 93.66667 0.8 0.395 30.19064 30.19 kg B1009 Rp 16,816.86 Rp 507,711.87

Page 15
HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN ID AHSP
Rp Rp
- Bekisting Kayu 1 11 0.15 0.25 7.15 7.15 m2 B1011 Rp 180,510.00 Rp 1,290,646.50
15 Pekerjaan Plat Lantai Type E
- Beton K-300 1 1.9 10 0.12 2.28 2.28 m3 B1020 Rp 1,416,085.00 Rp 3,228,673.80
- Tulangan Ø.8-250 70.96197 70.70089 141.6629 141.66 kg B1009 Rp 16,816.86 Rp 2,382,325.04
- Bekisting Kayu 1 1.9 10 0.12 19 19.00 m2 B1011 Rp 180,510.00 Rp 3,429,690.00
16 Pekerjaan Plat Lantai Type F
- Beton K-300 1 8.7 10 0.12 10.44 10.44 m3 B1020 Rp 1,416,085.00 Rp 14,783,927.40
- Tulangan Ø.8-120 606.4773 607.5249 1214.002 1,214.00 kg B1009 Rp 16,816.86 Rp 20,415,708.75
- Bekisting Kayu 1 8.7 10 0.12 87 87.00 m2 B1011 Rp 180,510.00 Rp 15,704,370.00
16 Pekerjaan Plat Lantai Type G
- Beton K-300 1 4.1 10 0.12 4.92 4.92 m3 B1020 Rp 1,416,085.00 Rp 6,967,138.20
- Tulangan Ø.10-100 543.9652 462.9252 1006.89 1,006.89 kg B1009 Rp 16,816.86 Rp 16,932,738.74
- Bekisting Kayu 1 4.1 10 0.12 41 41.00 m2 B1011 Rp 180,510.00 Rp 7,400,910.00
-
SUB TOTAL A Rp 220,328,784.29

TOTAL PEKERJAAN STRUKTUR ATAP (A) Rp 220,328,784.29

TOTAL PEKERJAAN STRUKTUR (I.1+I.2+I.3) Rp 2,064,702,053.70

Page 16
www.emporioarchitect.com

PEKERJAAN ARSITEKTUR
RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023
SUBJECT : PEKERJAAN ARSITEKTUR

HARGA SATUAN TOTAL HARGA


KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp

III PEKERJAAN ARSITEKTUR


III.1 Pekerjaan Arsitektur Lantai Dasar
A Pekerjaan Dinding dan Finishing Dinding
1 Pekerjaan Pas. Dinding Bata Merah 1SP : 5PP 244 4.5 957.4236 957.42 m2 C1001 Rp 166,705.00 Rp 159,607,297.07
2 Pekerjaan Plesteran Campuran 1SP : 5PP 1914.847 1,914.85 m2 C1002 Rp 61,677.21 Rp 118,102,439.33
3 Pekerjaan Acian 1569.382 1,569.38 m2 C1003 Rp 47,487.21 Rp 74,525,587.55
4 Pekerjaan Penebalan Dinding 10.125 10.13 m2 Rp 1,600,000.00 Rp 16,200,000.00
5 Pekerjaan Pas. Batu Paras Susun Jogja 165.9 165.90 m2 C1030 Rp 471,109.07 Rp 78,156,995.53
6 Pekerjaan Pas. Kamprut Halus 170.55 170.55 m2 Rp 150,000.00 Rp 25,582,500.00
7 Pekerjaan Pas. Granite Carrara Grey 60x120 cm Essenza 123.14 123.14 m2 C1061 Rp 506,495.00 Rp 62,369,794.30
8 Pekerjaan Pas. Granite Carrara Grey 60x60 cm Essenza 32.64 32.64 m2 C1063 Rp 327,470.00 Rp 10,688,620.80
9 Pekerjaan Pas. Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm 23.785 23.79 m2 C1062 Rp 1,404,920.00 Rp 33,416,022.20
10 Pekerjaan Pas. List Profilan Beton T = 11 - 20 cm 50 50.00 m Rp 350,000.00 Rp 17,500,000.00

SUB TOTAL A 596,149,256.78

B Pekerjaan Finishing Lantai


1 Pekerjaan Pas. Beton Pra Cetak Fin. Floor Hardener 94.71 94.71 m2 650,000.00 Rp 61,561,500.00
2 Pekerjaan Pas. Granite Niro Teraso Grey GTZ03 60x60 cm 80.12 80.12 m2 C1064 Rp 385,220.00 Rp 30,861,900.30
3 Pekerjaan Pas. Granite Roman Dbali Bone 60x60 cm 66.06 66.06 m2 C1065 Rp 327,470.00 Rp 21,631,030.85
4 Pekerjaan Pas. SPC Sehati Soft Brown Oak 195.62 195.62 m2 C1066 Rp 466,125.00 Rp 91,181,041.88
5 Pekerjaan Pas. Granite Roman Dcastanea Maple 20x120 cm 13.97 13.97 m2 C1067 Rp 587,345.00 Rp 8,202,272.93
6 Pekerjaan Pas. Granite Carrara Grey 60x60 cm Essenza 11.2 11.20 m2 C1063 Rp 327,470.00 Rp 3,667,664.00
7 Pekerjaan Pas. Granite Area Tangga 40.53 40.53 m2 Rp 450,000.00 Rp 18,238,500.00

SUB TOTAL B 235,343,909.95

C Pekerjaan Plafond
1 Pekerjaan Pas. Plafond Gypsum Board 9 mm + Rangka Hollow dan Aksesoris 376 376.00 m2 C1008 Rp 172,678.00 Rp 64,926,928.00
2 Pekerjaan Pas. List Gypsum 220.22 220.22 m C1009 Rp 46,090.00 Rp 10,149,939.80
3 Pekerjaan Pas. Drop Ceiling 50 50.00 m2 C1008 Rp 172,678.00 Rp 8,633,900.00
4 Pekerjaan Pas. Plafond Conwood Lath 3" 13.6 13.60 m2 C1068 Rp 863,500.00 Rp 11,743,600.00
5 Pekerjaan Pas. Kanopi Kaca Tempered 10 mm 19.2 19.20 m2 Rp 2,500,000.00 Rp 48,000,000.00

SUB TOTAL C 143,454,367.80

D Pekerjaan Pintu Jendela dan Railing


Pintu
1 Pek. Pintu P1 (4 Unit) 4
- Pekerjaan Kusen Kayu Merbau 4 0.92 2.8 6.52 26.08 26.08 m C1018 Rp 401,500.00 Rp 10,471,120.00

Page 18
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
- Pekerjaan Daun Pintu Kayu Merbau 4 0.92 2.8 2.576 10.304 10.30 m2 C1019 Rp 3,043,700.00 Rp 31,362,284.80
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 4 3 12 12.00 pcs C1014 Rp 134,475.00 Rp 1,613,700.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 4 1 4 4.00 bh C1015 Rp 488,950.00 Rp 1,955,800.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 4 1 4 4.00 bh C1016 Rp 443,712.50 Rp 1,774,850.00
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 4 26.08 26.08 m C1041 Rp 96,052.59 Rp 2,505,051.51
- Pekerjaan Pas. Finishing Daun Pintu Kayu 4 20.608 20.61 m2 C1020 Rp 288,157.77 Rp 5,938,355.23
3 Pek. Pintu P1A (1 Unit) 1
- Pekerjaan Kusen Kayu Merbau 1 1.2 2.8 6.8 6.8 6.80 m C1018 Rp 401,500.00 Rp 2,730,200.00
- Pekerjaan Daun Pintu Kayu Merbau 1 1.2 2.8 3.36 3.36 3.36 m2 C1019 Rp 3,043,700.00 Rp 10,226,832.00
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1015 Rp 488,950.00 Rp 488,950.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1016 Rp 443,712.50 Rp 443,712.50
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 1 6.8 6.80 m C1041 Rp 96,052.59 Rp 653,157.60
- Pekerjaan Pas. Finishing Daun Pintu Kayu 1 6.72 6.72 m2 C1020 Rp 288,157.77 Rp 1,936,420.18
4 Pek. Pintu P2 (2 Unit) 2
- Pekerjaan Kusen Kayu Merbau 2 0.82 2.8 6.42 12.84 12.84 m C1018 Rp 401,500.00 Rp 5,155,260.00
- Pekerjaan Daun Pintu Kayu Merbau 2 0.82 2.8 2.296 4.592 4.59 m2 C1019 Rp 3,043,700.00 Rp 13,976,670.40
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 2 3 6 6.00 pcs C1014 Rp 134,475.00 Rp 806,850.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 2 1 2 2.00 bh C1041 Rp 96,052.59 Rp 192,105.18
- Pekerjaan Pas. Lever Handle Setara Dekkson 2 1 2 2.00 bh C1011 Rp 315,706.88 Rp 631,413.75
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 2 12.84 12.84 m C1017 Rp 161,975.00 Rp 2,079,759.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 2 9.184 9.18 m2 C1060 Rp 1,624,700.00 Rp 14,921,244.80
5 Pek. Pintu P2A (1 Unit) 1
- Pekerjaan Kusen Kayu Merbau 1 1.2 2.8 6.8 6.8 6.80 m C1018 Rp 401,500.00 Rp 2,730,200.00
- Pekerjaan Daun Pintu Kayu Merbau 1 1.2 2.8 3.36 3.36 3.36 m2 C1019 Rp 3,043,700.00 Rp 10,226,832.00
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1041 Rp 96,052.59 Rp 96,052.59
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1011 Rp 315,706.88 Rp 315,706.88
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 1 6.8 6.80 m C1017 Rp 161,975.00 Rp 1,101,430.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 1 6.72 6.72 m2 C1060 Rp 1,624,700.00 Rp 10,917,984.00
6 Pek. Pintu P3 (4 Unit) 4
- Pekerjaan Kusen Aluminium 4 0.82 2.4 5.62 22.48 22.48 m C1011 Rp 315,706.88 Rp 7,097,090.55
- Pekerjaan Daun Pintu UPVC 4 0.82 2.4 1.968 7.872 7.87 m2 C1069 Rp 2,064,700.00 Rp 16,253,318.40
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 4 3 12 12.00 pcs C1014 Rp 134,475.00 Rp 1,613,700.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 4 1 4 4.00 bh C1041 Rp 96,052.59 Rp 384,210.35
- Pekerjaan Pas. Lever Handle Setara Dekkson 4 1 4 4.00 bh C1011 Rp 315,706.88 Rp 1,262,827.50
- Pekerjaan Pas. Setara Door Stopper Dekkson 4 1 4 4.00 bh C1018 Rp 401,500.00 Rp 1,606,000.00
7 Pek. Pintu P4 (1 Unit) 1
- Pekerjaan Kusen Kayu Merbau 1 0.82 2.25 5.32 5.32 5.32 m C1018 Rp 401,500.00 Rp 2,135,980.00
- Pekerjaan Daun Pintu Kayu Merbau 1 0.82 2.25 1.845 1.845 1.85 m2 C1019 Rp 3,043,700.00 Rp 5,615,626.50
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1041 Rp 96,052.59 Rp 96,052.59
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1011 Rp 315,706.88 Rp 315,706.88
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 1 5.32 5.32 m C1017 Rp 161,975.00 Rp 861,707.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 1 3.69 3.69 m2 C1060 Rp 1,624,700.00 Rp 5,995,143.00
8 Pek. Pintu P5 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 1.55 3.5 8.55 8.55 8.55 m C1011 Rp 315,706.88 Rp 2,699,293.78
- Pekerjaan Daun Pintu Aluminium 1 1.55 3.5 1.085 1.085 1.09 m2 C1012 Rp 1,954,700.00 Rp 2,120,849.50
- Pekerjaan Kaca Flutted 8 mm + Aksesoris 1 4.34 4.557 4.56 m2 C1070 Rp 860,887.50 Rp 3,923,064.34

Page 19
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 5 5 5.00 pcs C1014 Rp 134,475.00 Rp 672,375.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1015 Rp 488,950.00 Rp 488,950.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1016 Rp 443,712.50 Rp 443,712.50
- Pekerjaan Pas. Rambucis Setara Dekkson 1 2 2 2.00 bh C1042 Rp 108,075.00 Rp 216,150.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 1 1 1.00 bh C1043 Rp 330,275.00 Rp 330,275.00
9 Pek. Pintu PU1 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 1.58 2.9 7.38 7.38 7.38 m C1011 Rp 315,706.88 Rp 2,329,916.74
- Pekerjaan Daun Pintu Aluminium 1 1.58 2.9 1.1455 1.1455 1.15 m2 C1012 Rp 1,954,700.00 Rp 2,239,108.85
- Pekerjaan Kaca Flutted 8 mm + Aksesoris 1 3.4365 3.608325 3.61 m2 C1070 Rp 860,887.50 Rp 3,106,361.89
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 6 6 6.00 pcs C1014 Rp 134,475.00 Rp 806,850.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1015 Rp 488,950.00 Rp 488,950.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 1 2 2 2.00 bh C1051 Rp 2,162,325.00 Rp 4,324,650.00
10 Pek. Pintu PS (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 0.92 2.5 5.92 5.92 5.92 m C1011 Rp 315,706.88 Rp 1,868,984.70
- Pekerjaan Daun Pintu Aluminium 1 0.92 2.5 0.46 0.46 0.46 m2 C1012 Rp 1,954,700.00 Rp 899,162.00
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 1.84 1.932 1.93 m2 C1013 Rp 445,087.50 Rp 859,909.05
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 6 6 6.00 pcs C1014 Rp 134,475.00 Rp 806,850.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1015 Rp 488,950.00 Rp 488,950.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1016 Rp 443,712.50 Rp 443,712.50
11 Pek. Pintu PC (1 Unit) 1
- Pekerjaan Kusen Kayu Merbau 1 0.9 2.55 6 6 6.00 m C1018 Rp 401,500.00 Rp 2,409,000.00
- Pekerjaan Daun Pintu Kayu Merbau 1 0.9 2.55 2.295 2.295 2.30 m2 C1019 Rp 3,043,700.00 Rp 6,985,291.50
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1041 Rp 96,052.59 Rp 96,052.59
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1011 Rp 315,706.88 Rp 315,706.88
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 1 6 6.00 m C1017 Rp 161,975.00 Rp 971,850.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 1 4.59 4.59 m2 C1060 Rp 1,624,700.00 Rp 7,457,373.00

Pintu Geser
1 Pek.Pintu Geser PG1 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.05 2.8 11.75 11.75 11.75 m C1011 Rp 315,706.88 Rp 3,709,555.78
- Pekerjaan Daun Pintu Aluminium 1 2.05 2.8 1.148 1.148 1.15 m2 C1012 Rp 1,954,700.00 Rp 2,243,995.60
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 4.592 4.8216 4.82 m2 C1013 Rp 445,087.50 Rp 2,146,033.89
- Pekerjaan Pas. Sliding Rel + Aksesoris 1 4.1 4.1 4.10 m Rp 600,000.00 Rp 2,460,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 1 1 1 1.00 bh C1053 Rp 433,950.00 Rp 433,950.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 1 1 1 1.00 bh C1051 Rp 2,162,325.00 Rp 2,162,325.00
2 Pek.Pintu Geser PG2 (3 Unit) 3
- Pekerjaan Kusen Aluminium 3 4.45 3.5 20.35 61.05 61.05 m C1011 Rp 315,706.88 Rp 19,273,904.72
- Pekerjaan Daun Pintu Aluminium 3 4.45 3.5 3.115 9.345 9.35 m2 C1012 Rp 1,954,700.00 Rp 18,266,671.50
- Pekerjaan Kaca Clear 8 mm + Aksesoris 3 12.46 39.249 39.25 m2 C1013 Rp 445,087.50 Rp 17,469,239.29
- Pekerjaan Pas. Sliding Rel + Aksesoris 3 8.9 26.7 26.70 m Rp 600,000.00 Rp 16,020,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 3 1 3 3.00 bh C1053 Rp 433,950.00 Rp 1,301,850.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 3 2 6 6.00 bh C1051 Rp 2,162,325.00 Rp 12,973,950.00

Page 20
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
3 Pek.Pintu Geser PG3 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.45 3.5 14.35 14.35 14.35 m C1011 Rp 315,706.88 Rp 4,530,393.66
- Pekerjaan Daun Pintu Aluminium 1 2.45 3.5 1.715 1.715 1.71 m2 C1012 Rp 1,954,700.00 Rp 3,352,310.50
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 6.86 7.203 7.20 m2 C1013 Rp 445,087.50 Rp 3,205,965.26
- Pekerjaan Pas. Sliding Rel + Aksesoris 1 4.9 4.9 4.90 m Rp 600,000.00 Rp 2,940,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 1 1 1 1.00 bh C1053 Rp 433,950.00 Rp 433,950.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 1 2 2 2.00 bh C1051 Rp 2,162,325.00 Rp 4,324,650.00
4 Pek.Pintu Geser PG4 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.45 3.5 14.35 14.35 14.35 m C1011 Rp 315,706.88 Rp 4,530,393.66
- Pekerjaan Daun Pintu Aluminium 1 2.45 3.5 1.715 1.715 1.71 m2 C1012 Rp 1,954,700.00 Rp 3,352,310.50
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 6.86 7.203 7.20 m2 C1013 Rp 445,087.50 Rp 3,205,965.26
- Pekerjaan Pas. Sliding Rel + Aksesoris 1 4.9 4.9 4.90 m Rp 600,000.00 Rp 2,940,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 1 1 1 1.00 bh C1053 Rp 433,950.00 Rp 433,950.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 1 1 1 1.00 bh C1051 Rp 2,162,325.00 Rp 2,162,325.00

Jendela
1 Pek. Jendela J1 (2 Unit) 2
- Pekerjaan Kusen Aluminium 2 0.75 3.5 8.5 17 17.00 m C1011 Rp 315,706.88 Rp 5,367,016.88
- Pekerjaan Daun Pintu Aluminium 2 0.75 3.5 0.525 1.05 1.05 m2 C1012 Rp 1,954,700.00 Rp 2,052,435.00
- Pekerjaan Kaca Sandblast 8 mm + Aksesoris 2 2.1 4.41 4.41 m2 C1052 Rp 539,550.00 Rp 2,379,415.50
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 2 2 4 4.00 pcs C1014 Rp 134,475.00 Rp 537,900.00
- Pekerjaan Pas. Rambucis Setara Dekkson 2 1 2 2.00 bh C1042 Rp 108,075.00 Rp 216,150.00
- Pekerjaan Pas. Ramskar Setara Dekkson 2 2 4 4.00 bh C1043 Rp 330,275.00 Rp 1,321,100.00
1 Pek. Jendela J1-A (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 0.75 3.5 8.5 8.5 8.50 m C1011 Rp 315,706.88 Rp 2,683,508.44
- Pekerjaan Daun Pintu Aluminium 1 0.75 3.5 0.525 0.525 0.52 m2 C1012 Rp 1,954,700.00 Rp 1,026,217.50
- Pekerjaan Kaca Sandblast 8 mm + Aksesoris 1 2.1 2.205 2.21 m2 C1052 Rp 539,550.00 Rp 1,189,707.75
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 2 2 2.00 pcs C1014 Rp 134,475.00 Rp 268,950.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 2 2 2.00 bh C1043 Rp 330,275.00 Rp 660,550.00
2 Pek. Jendela J2 (3 Unit) 3
- Pekerjaan Kusen Aluminium 3 0.5 2.25 5.5 16.5 16.50 m C1011 Rp 315,706.88 Rp 5,209,163.44
- Pekerjaan Daun Pintu Aluminium 3 0.5 2.25 0.225 0.675 0.67 m2 C1012 Rp 1,954,700.00 Rp 1,319,422.50
- Pekerjaan Kaca Clear 8 mm + Aksesoris 3 0.9 2.835 2.84 m2 C1013 Rp 445,087.50 Rp 1,261,823.06
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 3 2 6 6.00 pcs C1014 Rp 134,475.00 Rp 806,850.00
- Pekerjaan Pas. Rambucis Setara Dekkson 3 1 3 3.00 bh C1042 Rp 108,075.00 Rp 324,225.00
- Pekerjaan Pas. Ramskar Setara Dekkson 3 2 6 6.00 bh C1043 Rp 330,275.00 Rp 1,981,650.00
3 Pek. Jendela J3 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 1 2.7 8.4 8.4 8.40 m C1011 Rp 315,706.88 Rp 2,651,937.75
- Pekerjaan Daun Pintu Aluminium 1 1 2.7 1.08 1.08 1.08 m2 C1012 Rp 1,954,700.00 Rp 2,111,076.00
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 1.62 1.701 1.70 m2 C1013 Rp 445,087.50 Rp 757,093.84
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 2 2 2.00 pcs C1014 Rp 134,475.00 Rp 268,950.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 2 2 2.00 bh C1043 Rp 330,275.00 Rp 660,550.00
4 Pek. Jendela J4 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.8 2.5 10.6 10.6 10.60 m C1011 Rp 315,706.88 Rp 3,346,492.88
- Pekerjaan Daun Pintu Aluminium 1 2.8 2.5 1.4 1.4 1.40 m2 C1012 Rp 1,954,700.00 Rp 2,736,580.00

Page 21
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 5.6 5.88 5.88 m2 C1013 Rp 445,087.50 Rp 2,617,114.50
- Pekerjaan Pas. Sliding Rel + Aksesoris 1 5.6 5.6 5.60 m Rp 600,000.00 Rp 3,360,000.00
- Pekerjaan Pas. Flush Handle Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Flush Bolt Setara Dekkson 1 1 1 1.00 bh C1043 Rp 330,275.00 Rp 330,275.00

Pintu Pagar, Garasi, Railing dan Shower Screen


1 Pek. Shower Screen PK1 2.82 m2 3,000,000.00 Rp 8,460,000.00
1 Pek. Shower Screen PK2 3.70 m2 3,000,000.00 Rp 11,100,000.00
1 Pek. Shower Screen PK3 4.14 m2 3,000,000.00 Rp 12,420,000.00
1 Pek. Pintu Pagar Lipat Aluminium + Rangka Hollow dan Aksesoris (PG-A) 1 7.4 3 22.2 22.20 m2 3,500,000.00 Rp 77,700,000.00
2 Pek. Pintu Pagar Lipat Aluminium + Rangka Hollow dan Aksesoris (PG-B) 1 5.5 3 16.5 16.50 m2 3,500,000.00 Rp 57,750,000.00
5 Pek. Railing Tangga Besi + Handrail dan Aksesoris 1 7.3 7.30 m 1,000,000.00 Rp 7,300,000.00

SUB TOTAL D 584,270,424.64

E Pekerjaan Pengecatan dan Waterproofing


1 Pekerjaan Finish Cat Interior Ex. Setara Dulux Pentalite 1015.072 1,015.07 m2 C1021 Rp 61,661.40 Rp 62,590,773.43
2 Pekerjaan Finish Cat Exterior Ex. Setara Dulux Weathershield 204.66 204.66 m2 C1022 Rp 74,861.40 Rp 15,321,134.84
3 Pekerjaan Finish Cat Waterproofing Ex. Setara Aquaproof 349.65 349.65 m2 C1023 Rp 56,711.40 Rp 19,829,142.24
4 Pekerjaan Finish Cat Plafond Ex. Setara Dulux Pentalite 376 376.00 m2 C1021 Rp 61,661.40 Rp 23,184,687.72
5 Pekerjaan Waterproofing Kamar Mandi 13.44 13.44 m2 C1024 Rp 65,241.00 Rp 876,839.04
6 Pekerjaan Finish Batu Alam Setara Propan 165.9 165.90 m2 Rp 65,000.00 Rp 10,783,500.00

SUB TOTAL E 132,586,077.27

F Pekerjaan Sanitair
Kamar Mandi Iky
1 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
2 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
3 Pekerjaan Pas. Floordrain TOTO TX1EB 1 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
4 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
5 Pekerjaan Pas. Lavatory LW625J 1 1 1.00 bh C1074 Rp 2,288,825.00 Rp 2,288,825.00
6 Pekerjaan Pas. Kran Lavatory TX115LRS 1 1 1.00 bh C1075 Rp 2,157,375.00 Rp 2,157,375.00
7 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
8 Pekerjaan Pas. Finishing Meja Wastafel 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
9 Pekerjaan Pas. Finishing Cermin 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
Kamar Mandi Orang Tua
1 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
2 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
3 Pekerjaan Pas. Floordrain TOTO TX1EB 1 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
4 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
5 Pekerjaan Pas. Lavatory LW625J 1 1 1.00 bh C1074 Rp 2,288,825.00 Rp 2,288,825.00
6 Pekerjaan Pas. Kran Lavatory TX115LRS 1 1 1.00 bh C1075 Rp 2,157,375.00 Rp 2,157,375.00
7 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
8 Pekerjaan Pas. Finishing Meja Wastafel 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
9 Pekerjaan Pas. Finishing Cermin 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
Powder Room
1 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
2 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00

Page 22
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
3 Pekerjaan Pas. Floordrain TOTO TX1EB 1 1 1.00 bh C1027 Rp 567,435.00 Rp 567,435.00
4 Pekerjaan Pas. Lavatory LW625J 1 1 1.00 bh C1074 Rp 2,288,825.00 Rp 2,288,825.00
5 Pekerjaan Pas. Kran Lavatory TX115LRS 1 1 1.00 bh C1075 Rp 2,157,375.00 Rp 2,157,375.00
6 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
7 Pekerjaan Pas. Finishing Meja Wastafel 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
8 Pekerjaan Pas. Finishing Cermin 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
Powder ART dan Kamar Mandi ART
1 Pekerjaan Pas. Closet Duduk TOTO CW637PJ 1 2 2.00 bh C1025 Rp 4,429,975.00 Rp 8,859,950.00
2 Pekerjaan Pas. Jet Washer TOTO THX20NB 1 2 2.00 bh C1077 Rp 424,435.00 Rp 848,870.00
3 Pekerjaan Pas. Floordrain TOTO TX1EB 1 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
4 Pekerjaan Pas. Shower TOTO TX471SVN 1 1 1.00 bh C1079 Rp 5,258,825.00 Rp 5,258,825.00
5 Pekerjaan Pas. Tissue Holder TOTO TX720ACRB 1 2 2.00 bh C1078 Rp 545,435.00 Rp 1,090,870.00

SUB TOTAL F 103,508,345.00

TOTAL PEKERJAAN ARSITEKTUR LANTAI DASAR (A+B+C+D+E+F) 1,795,312,381.44

III.2 Pekerjaan Arsitektur Lantai Satu


A Pekerjaan Dinding dan Finishing Dinding
1 Pekerjaan Pas. Dinding Bata Merah 1SP : 5PP 242 4.1 832.9172 832.92 m2 C1001 Rp 166,705.00 Rp 138,851,465.99
2 Pekerjaan Plesteran Campuran 1SP : 5PP 1665.834 1,665.83 m2 C1002 Rp 61,677.21 Rp 102,744,029.50
3 Pekerjaan Acian 1382.312 1,382.31 m2 C1003 Rp 47,487.21 Rp 65,642,144.74
4 Pekerjaan Penebalan Dinding 9.225 9.23 m2 Rp 1,600,000.00 Rp 14,760,000.00
5 Pekerjaan Pas. Batu Paras Susun Jogja 82.95 82.95 m2 C1030 Rp 471,109.07 Rp 39,078,497.76
6 Pekerjaan Pas. Kamprut Halus 85.275 85.27 m2 Rp 150,000.00 Rp 12,791,250.00
7 Pekerjaan Pas. Granite Carrara Grey 60x120 cm Essenza 191.52 191.52 m2 C1061 Rp 506,495.00 Rp 97,003,922.40
8 Pekerjaan Pas. Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm 9.0525 9.05 m2 C1062 Rp 1,404,920.00 Rp 12,718,038.30
9 Pekerjaan Pas. List Profilan Beton T = 11 - 20 cm 50 50.00 m Rp 350,000.00 Rp 17,500,000.00

SUB TOTAL A 501,089,348.70

B Pekerjaan Finishing Lantai


1 Pekerjaan Pas. Granite Roman Dbali Bone 60x60 cm 45.80 45.80 m2 C1065 Rp 327,470.00 Rp 14,998,126.00
2 Pekerjaan Pas. SPC Sehati Soft Brown Oak 211.68 211.68 m2 C1066 Rp 466,125.00 Rp 98,669,340.00
3 Pekerjaan Pas. Granite Roman Dcastanea Maple 20x120 cm 15.20 15.20 m2 C1067 Rp 587,345.00 Rp 8,927,644.00
4 Pekerjaan Pas. Granite Carrara Grey 60x60 cm Essenza 22.3 22.30 m2 C1063 Rp 327,470.00 Rp 7,302,581.00
5 Pekerjaan Pas. Conwood Deck 12" 21.8 21.80 m2 C1050 Rp 1,329,900.00 Rp 28,991,820.00

SUB TOTAL B 158,889,511.00

C Pekerjaan Plafond
1 Pekerjaan Pas. Plafond Gypsum Board 9 mm + Rangka Hollow dan Aksesoris 315 315.00 m2 C1008 Rp 172,678.00 Rp 54,393,570.00
2 Pekerjaan Pas. List Gypsum 215.82 215.82 m C1009 Rp 46,090.00 Rp 9,947,143.80
3 Pekerjaan Pas. Drop Ceiling 50 50.00 m2 C1008 Rp 172,678.00 Rp 8,633,900.00
4 Pekerjaan Pas. Kanopi Kaca Tempered 10 mm 8.1 8.10 m2 Rp 2,500,000.00 Rp 20,250,000.00

SUB TOTAL C 93,224,613.80

D Pekerjaan Pintu Jendela dan Railing

Page 23
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
Pintu
1 Pek. Pintu P1 (6 Unit) 6
- Pekerjaan Kusen Kayu Merbau 6 0.92 2.8 6.52 39.12 39.12 m C1018 Rp 401,500.00 Rp 15,706,680.00
- Pekerjaan Daun Pintu Kayu Merbau 6 0.92 2.8 2.576 15.456 15.46 m2 C1019 Rp 3,043,700.00 Rp 47,043,427.20
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 6 3 18 18.00 pcs C1014 Rp 134,475.00 Rp 2,420,550.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 6 1 6 6.00 bh C1015 Rp 488,950.00 Rp 2,933,700.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 6 1 6 6.00 bh C1016 Rp 443,712.50 Rp 2,662,275.00
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 6 39.12 39.12 m C1041 Rp 96,052.59 Rp 3,757,577.26
- Pekerjaan Pas. Finishing Daun Pintu Kayu 6 30.912 30.91 m2 C1020 Rp 288,157.77 Rp 8,907,532.85
2 Pek. Pintu P2 (4 Unit) 4
- Pekerjaan Kusen Kayu Merbau 4 0.82 2.8 6.42 25.68 25.68 m C1018 Rp 401,500.00 Rp 10,310,520.00
- Pekerjaan Daun Pintu Kayu Merbau 4 0.82 2.8 2.296 9.184 9.18 m2 C1019 Rp 3,043,700.00 Rp 27,953,340.80
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 4 3 12 12.00 pcs C1014 Rp 134,475.00 Rp 1,613,700.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 4 1 4 4.00 bh C1041 Rp 96,052.59 Rp 384,210.35
- Pekerjaan Pas. Lever Handle Setara Dekkson 4 1 4 4.00 bh C1011 Rp 315,706.88 Rp 1,262,827.50
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 4 25.68 25.68 m C1017 Rp 161,975.00 Rp 4,159,518.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 4 18.368 18.37 m2 C1060 Rp 1,624,700.00 Rp 29,842,489.60
3 Pek. Pintu PK1-1 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 0.92 2.8 6.52 6.52 6.52 m C1011 Rp 315,706.88 Rp 2,058,408.83
- Pekerjaan Daun Pintu Aluminium 1 0.92 2.8 0.5152 0.5152 0.52 m2 C1012 Rp 1,954,700.00 Rp 1,007,061.44
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 2.0608 2.16384 2.16 m2 C1013 Rp 445,087.50 Rp 963,098.14
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1015 Rp 488,950.00 Rp 488,950.00
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1016 Rp 443,712.50 Rp 443,712.50
4 Pek. Pintu PC (1 Unit) 1
- Pekerjaan Kusen Kayu Merbau 1 0.9 2.55 6 6 6.00 m C1018 Rp 401,500.00 Rp 2,409,000.00
- Pekerjaan Daun Pintu Kayu Merbau 1 0.9 2.55 2.295 2.295 2.30 m2 C1019 Rp 3,043,700.00 Rp 6,985,291.50
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 3 3 3.00 pcs C1014 Rp 134,475.00 Rp 403,425.00
- Pekerjaan Pas. Lockcase Cylinder Setara Dekkson 1 1 1 1.00 bh C1041 Rp 96,052.59 Rp 96,052.59
- Pekerjaan Pas. Lever Handle Setara Dekkson 1 1 1 1.00 bh C1011 Rp 315,706.88 Rp 315,706.88
- Pekerjaan Pas. Finishing Kusen Pintu Kayu 1 6 6.00 m C1017 Rp 161,975.00 Rp 971,850.00
- Pekerjaan Pas. Finishing Daun Pintu Kayu 1 4.59 4.59 m2 C1060 Rp 1,624,700.00 Rp 7,457,373.00

Pintu Geser
1 Pek.Pintu Geser PG2 (2 Unit) 2
- Pekerjaan Kusen Aluminium 2 4.45 3.5 20.35 40.7 40.70 m C1011 Rp 315,706.88 Rp 12,849,269.81
- Pekerjaan Daun Pintu Aluminium 2 4.45 3.5 3.115 6.23 6.23 m2 C1012 Rp 1,954,700.00 Rp 12,177,781.00
- Pekerjaan Kaca Clear 8 mm + Aksesoris 2 12.46 26.166 26.17 m2 C1013 Rp 445,087.50 Rp 11,646,159.53
- Pekerjaan Pas. Sliding Rel + Aksesoris 2 8.9 17.8 17.80 m Rp 600,000.00 Rp 10,680,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 2 1 2 2.00 bh C1053 Rp 433,950.00 Rp 867,900.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 2 2 4 4.00 bh C1051 Rp 2,162,325.00 Rp 8,649,300.00
2 Pek.Pintu Geser PG5 (3 Unit) 3
- Pekerjaan Kusen Aluminium 3 2.4 3.5 14.2 42.6 42.60 m C1011 Rp 315,706.88 Rp 13,449,112.87
- Pekerjaan Daun Pintu Aluminium 3 2.4 3.5 1.68 5.04 5.04 m2 C1012 Rp 1,954,700.00 Rp 9,851,688.00
- Pekerjaan Kaca Clear 8 mm + Aksesoris 3 6.72 21.168 21.17 m2 C1013 Rp 445,087.50 Rp 9,421,612.20
- Pekerjaan Pas. Sliding Rel + Aksesoris 3 4.8 14.4 14.40 m Rp 600,000.00 Rp 8,640,000.00
- Pekerjaan Pas. Lockcase Sliding Setara Dekkson 3 1 3 3.00 bh C1053 Rp 433,950.00 Rp 1,301,850.00
- Pekerjaan Pas. Pull Handle Setara Dekkson 3 1 3 3.00 bh C1051 Rp 2,162,325.00 Rp 6,486,975.00

Page 24
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
Jendela
1 Pek. Jendela J1 (2 Unit) 2
- Pekerjaan Kusen Aluminium 2 0.75 3.5 8.5 17 17.00 m C1011 Rp 315,706.88 Rp 5,367,016.88
- Pekerjaan Daun Pintu Aluminium 2 0.75 3.5 0.525 1.05 1.05 m2 C1012 Rp 1,954,700.00 Rp 2,052,435.00
- Pekerjaan Kaca Sandblast 8 mm + Aksesoris 2 2.1 4.41 4.41 m2 C1052 Rp 539,550.00 Rp 2,379,415.50
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 2 2 4 4.00 pcs C1014 Rp 134,475.00 Rp 537,900.00
- Pekerjaan Pas. Rambucis Setara Dekkson 2 1 2 2.00 bh C1042 Rp 108,075.00 Rp 216,150.00
- Pekerjaan Pas. Ramskar Setara Dekkson 2 2 4 4.00 bh C1043 Rp 330,275.00 Rp 1,321,100.00
1 Pek. Jendela J1-A (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 0.75 3.5 8.5 8.5 8.50 m C1011 Rp 315,706.88 Rp 2,683,508.44
- Pekerjaan Daun Pintu Aluminium 1 0.75 3.5 0.525 0.525 0.52 m2 C1012 Rp 1,954,700.00 Rp 1,026,217.50
- Pekerjaan Kaca Sandblast 8 mm + Aksesoris 1 2.1 2.205 2.21 m2 C1052 Rp 539,550.00 Rp 1,189,707.75
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 2 2 2.00 pcs C1014 Rp 134,475.00 Rp 268,950.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 2 2 2.00 bh C1043 Rp 330,275.00 Rp 660,550.00
5 Pek. Jendela J5 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.73 3.7 22.02 22.02 22.02 m C1011 Rp 315,706.88 Rp 6,951,865.39
- Pekerjaan Daun Pintu Aluminium 1 2.73 3.7 2.0202 2.0202 2.02 m2 C1012 Rp 1,954,700.00 Rp 3,948,884.94
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 8.0808 8.48484 8.48 m2 C1013 Rp 445,087.50 Rp 3,776,496.22
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 4 4 4.00 pcs C1014 Rp 134,475.00 Rp 537,900.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 4 4 4.00 bh C1043 Rp 330,275.00 Rp 1,321,100.00
6 Pek. Jendela J6 (3 Unit) 3
- Pekerjaan Kusen Aluminium 3 2.73 3.7 12.86 38.58 38.58 m C1011 Rp 315,706.88 Rp 12,179,971.24
- Pekerjaan Daun Pintu Aluminium 3 2.73 3.7 2.0202 6.0606 6.06 m2 C1012 Rp 1,954,700.00 Rp 11,846,654.82
- Pekerjaan Kaca Clear 8 mm + Aksesoris 3 8.0808 25.45452 25.45 m2 C1013 Rp 445,087.50 Rp 11,329,488.67
- Pekerjaan Pas. Sliding Rel + Aksesoris 3 5.46 16.38 16.38 m Rp 600,000.00 Rp 9,828,000.00
- Pekerjaan Pas. Flush Handle Setara Dekkson 3 1 3 3.00 bh C1042 Rp 108,075.00 Rp 324,225.00
- Pekerjaan Pas. Flush Bolt Setara Dekkson 3 1 3 3.00 bh C1043 Rp 330,275.00 Rp 990,825.00
7 Pek. Jendela J7 (2 Unit) 2
- Pekerjaan Kusen Aluminium 2 0.75 3.5 9.25 18.5 18.50 m C1011 Rp 315,706.88 Rp 5,840,577.19
- Pekerjaan Daun Pintu Aluminium 2 0.75 3.5 0.525 1.05 1.05 m2 C1012 Rp 1,954,700.00 Rp 2,052,435.00
- Pekerjaan Kaca Clear 8 mm + Aksesoris 2 2.1 4.41 4.41 m2 C1013 Rp 445,087.50 Rp 1,962,835.88
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 2 2 4 4.00 pcs C1014 Rp 134,475.00 Rp 537,900.00
- Pekerjaan Pas. Rambucis Setara Dekkson 2 1 2 2.00 bh C1042 Rp 108,075.00 Rp 216,150.00
- Pekerjaan Pas. Ramskar Setara Dekkson 2 2 4 4.00 bh C1043 Rp 330,275.00 Rp 1,321,100.00
8 Pek. Jendela J8 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 2.54 3 17.08 17.08 17.08 m C1011 Rp 315,706.88 Rp 5,392,273.43
- Pekerjaan Daun Pintu Aluminium 1 2.54 3 2.667 2.667 2.67 m2 C1012 Rp 1,954,700.00 Rp 5,213,184.90
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 4.953 5.20065 5.20 m2 C1013 Rp 445,087.50 Rp 2,314,744.31
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 4 4 4.00 pcs C1014 Rp 134,475.00 Rp 537,900.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 2 2 2.00 bh C1042 Rp 108,075.00 Rp 216,150.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 4 4 4.00 bh C1043 Rp 330,275.00 Rp 1,321,100.00
8 Pek. Jendela J9 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 0.93 3 8.79 8.79 8.79 m C1011 Rp 315,706.88 Rp 2,775,063.43
- Pekerjaan Daun Pintu Aluminium 1 0.93 3 0.9765 0.9765 0.98 m2 C1012 Rp 1,954,700.00 Rp 1,908,764.55
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 1.8135 1.904175 1.90 m2 C1013 Rp 445,087.50 Rp 847,524.49
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 2 2 2.00 pcs C1014 Rp 134,475.00 Rp 268,950.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00

Page 25
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
- Pekerjaan Pas. Ramskar Setara Dekkson 1 2 2 2.00 bh C1043 Rp 330,275.00 Rp 660,550.00
8 Pek. Jendela J10 (1 Unit) 1
- Pekerjaan Kusen Aluminium 1 1.5 3 13.5 13.5 13.50 m C1011 Rp 315,706.88 Rp 4,262,042.81
- Pekerjaan Daun Pintu Aluminium 1 1.5 3 1.575 1.575 1.57 m2 C1012 Rp 1,954,700.00 Rp 3,078,652.50
- Pekerjaan Kaca Clear 8 mm + Aksesoris 1 2.925 3.07125 3.07 m2 C1013 Rp 445,087.50 Rp 1,366,974.98
- Pekerjaan Pas. Engsel Pintu Setara Dekkson 1 2 2 2.00 pcs C1014 Rp 134,475.00 Rp 268,950.00
- Pekerjaan Pas. Rambucis Setara Dekkson 1 1 1 1.00 bh C1042 Rp 108,075.00 Rp 108,075.00
- Pekerjaan Pas. Ramskar Setara Dekkson 1 2 2 2.00 bh C1043 Rp 330,275.00 Rp 660,550.00

Pintu Pagar, Garasi, Railing dan Shower Screen


1 Pek. Shower Screen PK1 2.82 m2 3,000,000.00 Rp 8,460,000.00
2 Pek. Shower Screen PK3 4.14 m2 3,000,000.00 Rp 12,420,000.00
3 Pek. Shower Screen PK4 2.40 m2 3,000,000.00 Rp 7,200,000.00
4 Pek. Shower Screen PK5 4.80 m2 3,000,000.00 Rp 14,400,000.00
5 Pek. Railing Tangga Besi + Handrail dan Aksesoris 1 37.1 37.10 m 1,000,000.00 Rp 37,100,000.00

SUB TOTAL D 492,758,387.65

E Pekerjaan Pengecatan dan Waterproofing


1 Pekerjaan Finish Cat Interior Ex. Setara Dulux Pentalite 1382.312 1,382.31 m2 C1021 Rp 61,661.40 Rp 85,235,294.92
2 Pekerjaan Finish Cat Exterior Ex. Setara Dulux Weathershield 110.8575 110.86 m2 C1022 Rp 74,861.40 Rp 8,298,948.04
3 Pekerjaan Finish Cat Waterproofing Ex. Setara Aquaproof 271.42 271.42 m2 C1023 Rp 56,711.40 Rp 15,392,609.14
4 Pekerjaan Finish Cat Plafond Ex. Setara Dulux Pentalite 315.00 315.00 m2 C1021 Rp 61,661.40 Rp 19,423,342.11
5 Pekerjaan Waterproofing Kamar Mandi 26.76 26.76 m2 C1024 Rp 65,241.00 Rp 1,745,849.16
6 Pekerjaan Finish Batu Alam Setara Propan 82.95 82.95 m2 Rp 65,000.00 Rp 5,391,750.00

SUB TOTAL E 135,487,793.37

F Pekerjaan Sanitair
Kamar Mandi Anak
1 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
2 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
3 Pekerjaan Pas. Floordrain TOTO TX1EB 2 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
4 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
5 Pekerjaan Pas. Lavatory TOTO LW647J 1 1 1.00 bh C1080 Rp 2,288,825.00 Rp 2,288,825.00
6 Pekerjaan Pas. Kran Lavatory TX115LRS 1 1 1.00 bh C1075 Rp 2,157,375.00 Rp 2,157,375.00
7 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
8 Pekerjaan Pas. Finishing Meja Wastafel 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
9 Pekerjaan Pas. Finishing Cermin 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
Kamar Mandi Master 2
1 Pekerjaan Pas. Bathub + Kran Bathub 1 1 1.00 unit Rp 50,000,000.00 Rp 50,000,000.00
2 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
3 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
4 Pekerjaan Pas. Floordrain TOTO TX1EB 2 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
5 Pekerjaan Pas. Lavatory LW625J 2 2 2.00 bh C1074 Rp 2,288,825.00 Rp 4,577,650.00
6 Pekerjaan Pas. Kran Lavatory TX115LRS 2 2 2.00 bh C1075 Rp 2,157,375.00 Rp 4,314,750.00
7 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
8 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
9 Pekerjaan Pas. Finishing Meja Wastafel 2 2 2.00 bh Rp 1,000,000.00 Rp 2,000,000.00

Page 26
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
10 Pekerjaan Pas. Finishing Cermin 2 2 2.00 bh Rp 1,000,000.00 Rp 2,000,000.00
Kamar Mandi Master 1
1 Pekerjaan Pas. Bathub + Kran Bathub 1 1 1.00 unit Rp 50,000,000.00 Rp 50,000,000.00
2 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
3 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
4 Pekerjaan Pas. Floordrain TOTO TX1EB 2 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
5 Pekerjaan Pas. Lavatory LW625J 2 2 2.00 bh C1074 Rp 2,288,825.00 Rp 4,577,650.00
6 Pekerjaan Pas. Kran Lavatory TX115LRS 2 2 2.00 bh C1075 Rp 2,157,375.00 Rp 4,314,750.00
7 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
8 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
9 Pekerjaan Pas. Finishing Meja Wastafel 2 2 2.00 bh Rp 1,000,000.00 Rp 2,000,000.00
10 Pekerjaan Pas. Finishing Cermin 2 2 2.00 bh Rp 1,000,000.00 Rp 2,000,000.00
Kamar Mandi 1
1 Pekerjaan Pas. Closet Duduk TOTO CW823PJ 1 1 1.00 bh C1071 Rp 13,009,975.00 Rp 13,009,975.00
2 Pekerjaan Pas. Jet Washer TOTO TB19CSMCR 1 1 1.00 bh C1072 Rp 1,304,435.00 Rp 1,304,435.00
3 Pekerjaan Pas. Floordrain TOTO TX1EB 2 2 2.00 bh C1027 Rp 567,435.00 Rp 1,134,870.00
4 Pekerjaan Pas. Lavatory LW625J 1 1 1.00 bh C1074 Rp 2,288,825.00 Rp 2,288,825.00
5 Pekerjaan Pas. Kran Lavatory TX115LRS 1 1 1.00 bh C1075 Rp 2,157,375.00 Rp 2,157,375.00
6 Pekerjaan Pas. Tissue Holder TOTO TX703M3AV1 1 1 1.00 bh C1076 Rp 919,435.00 Rp 919,435.00
7 Pekerjaan Pas. Shower TOTO TX492SE 1 1 1.00 bh C1073 Rp 9,218,825.00 Rp 9,218,825.00
8 Pekerjaan Pas. Finishing Meja Wastafel 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00
9 Pekerjaan Pas. Finishing Cermin 1 1 1.00 bh Rp 1,000,000.00 Rp 1,000,000.00

SUB TOTAL F 241,027,360.00

TOTAL PEKERJAAN ARSITEKTUR LANTAI SATU (A+B+C+D+E+F) 1,622,477,014.52

III.3 Pekerjaan Arsitektur Atap


A Pekerjaan Dinding dan Finishing Dinding
1 Pekerjaan Pas. Dinding Bata Merah 1SP : 5PP 20 4 80 80.00 m2 C1001 Rp 166,705.00 Rp 13,336,400.00
2 Pekerjaan Plesteran Campuran 1SP : 5PP 160 160.00 m2 C1002 Rp 61,677.21 Rp 9,868,354.40
3 Pekerjaan Acian 160 160.00 m2 C1003 Rp 47,487.21 Rp 7,597,954.40

SUB TOTAL A 30,802,708.79

B Pekerjaan Plafond
1 Pekerjaan Pas. Plafond GRC Board 9 mm + Rangka Hollow dan Aksesoris 80 80.00 m2 C1059 Rp 260,953.00 Rp 20,876,240.00

SUB TOTAL C 20,876,240.00

C Pekerjaan Pengecatan dan Waterproofing


5 Pekerjaan Waterproofing Dak 150 150.00 m2 C1024 Rp 65,241.00 Rp 9,786,150.00

SUB TOTAL E 9,786,150.00

D Pekerjaan Penutup Atap


1 Pekerjaan Penutup Atap
- Pekerjaan Pas. Rangka Atap Baja Ringan + Aksesoris 232.8 232.80 m2 Rp 200,000.00 Rp 46,560,000.00

Page 27
HARGA SATUAN TOTAL HARGA
KODE
NO URAIAN PEKERJAAN VOLUME SATUAN SUB TOTAL TOTAL
AHSP
Rp Rp
- Pekerjaan Pas. Aluminium Foil 232.8 232.80 m2 Rp 20,000.00 Rp 4,656,000.00
- Pekerjaan Pas. Multiplek 232.8 232.80 m2 Rp 180,000.00 Rp 41,904,000.00
- Pekerjaan Pas. Genteng Bitumen 232.8 232.80 m2 B1015 Rp 641,850.00 Rp 149,422,680.00
- Pekerjaan Pas. Bubungan Atap Bitumen 70 70.00 m B1016 Rp 200,337.50 Rp 14,023,625.00
- Pekerjaan Pas. Listplank Conwood 118 118.00 m Rp 250,000.00 Rp 29,500,000.00

SUB TOTAL D 286,066,305.00

TOTAL PEKERJAAN ARSITEKTUR ATAP (A+B+C+D) 347,531,403.79

TOTAL PEKERJAAN ARSITEKTUR (III.1+III.2+III.3) 3,765,320,799.75

Page 28
www.emporioarchitect.com

PEKERJAAN MEP
RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023
SUBJECT : PEKERJAAN MEP

KODE HARGA SATUAN TOTAL HARGA


NO URAIAN PEKERJAAN VOLUME SATUAN
AHSP Rp Rp

IV PEKERJAAN MEP
IV.1 Pekerjaan MEP Lantai Dasar
A Pekerjaan Mekanikal
1 Pekerjaan Pas. Exhaust Fan Ex. Panasonic 8.00 unit D1001 601,150.00 Rp 4,809,200.00
2 Pekerjaan Pas. Pompa Transfer 1.00 unit D1003 8,632,140.00 Rp 8,632,140.00

SUB TOTAL A 13,441,340.00

B Pekerjaan Elektrikal
1 Pekerjaan Pas. Panel MDP Full set + Kabel Fedeer 1.00 unit D1004 10,457,700.00 Rp 10,457,700.00

Instalasi Listrik
1 Pekerjaan Instalasi Titik Lampu 94.00 titik D1006 361,460.00 Rp 33,977,240.00
2 Pekerjaan Instalasi Stop Kontak 63.00 titik D1007 405,460.00 Rp 25,543,980.00
3 Pekerjaan Instalasi Saklar Hotel 2.00 titik D1008 361,460.00 Rp 722,920.00
4 Pekerjaan Instalasi Kabel Data 5.00 titik D1010 405,460.00 Rp 2,027,300.00
5 Pekerjaan Instalasi Titik AC 8.00 titik D1012 522,060.00 Rp 4,176,480.00

Aksesoris Listrik
1 Lampu LED Bulb Downlight 8 Watt 26.00 bh D1050 145,640.00 Rp 3,786,640.00
2 Lampu LED Bulb Outbow 8 Watt 2.00 bh D1051 145,640.00 Rp 291,280.00
3 Spotlight LED 7 Watt 41.00 bh D1049 200,640.00 Rp 8,226,240.00
4 Wall Light 5 Watt 15.00 bh D1052 299,640.00 Rp 4,494,600.00
5 Hanging Lamp LED 15 Watt + Armature 3.00 bh 1,000,000.00 Rp 3,000,000.00
5 LED Strip 6 Watt 122.20 bh D1015 46,007.50 Rp 5,622,116.50
6 Stop Kontak Ex. Schneider Vivace 63.00 bh D1019 94,517.50 Rp 5,954,602.50
7 Saklar Single Ex. Schneider Vivace 7.00 bh D1016 72,517.50 Rp 507,622.50
8 Saklar Double Ex. Schneider Vivace 8.00 bh D1017 94,517.50 Rp 756,140.00
9 Saklar Triple Ex. Schneider Vivace 4.00 bh D1018 127,517.50 Rp 510,070.00
10 Saklar Hotel Single Ex. Schneider Vivace 2.00 bh D1021 94,517.50 Rp 189,035.00
11 Socket Kabel Data Ex. Schneider Vivace 2.00 bh D1024 83,517.50 Rp 167,035.00
12 Stop Kontak AC Ex. Schneider Vivace 8.00 bh D1020 182,517.50 Rp 1,460,140.00

SUB TOTAL B 111,871,141.50

Page 30
KODE HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
AHSP Rp Rp

C Pekerjaan Plumbing
1 Pekerjaan Sumur Bor Kedalaman 50 m dengan Submersible Pump 1.00 ls 1,500,000.00 1,500,000.00
2 Pekerjaan Pas. Biotank Uk.150x150x228 cm 2.00 unit D1028 13,739,224.14 Rp 27,478,448.28
3 Pekerjaan Pas. Peresapan 2.00 unit D1029 3,170,024.00 Rp 6,340,048.00
4 Instalasi Pipa Air Bersih (Clean Water PPR.PN-10 Class & Hot Water PPR.PN-20 Class)
- Pipa PPR Tipe PN10 - 20mm Ex. Rucika 75.00 m D1030 25,548.60 Rp 1,916,145.00
- Pipa PPR Tipe PN10 - 32mm Ex. Rucika 25.00 m D1032 54,543.50 Rp 1,363,587.50
- Pipa Air Panas PPR Tipe PN20 - 20mm Ex. Rucika 65.00 m D1034 35,412.85 Rp 2,301,835.25
- Pipa Air Panas PPR Tipe PN20 - 25mm Ex. Rucika 25.00 m D1035 54,706.85 Rp 1,367,671.25
5 Instalasi Pipa Air Kotor dan Air Hujan
- Pipa PVC Tipe AW Diameter 2" Ex. Rucika 30.00 m D1038 62,586.70 Rp 1,877,601.00
- Pipa PVC Tipe AW Diameter 3" Ex. Rucika 135.00 m D1039 126,447.09 Rp 17,070,357.15
- Pipa PVC Tipe AW Diameter 4" Ex. Rucika 96.00 m D1040 204,546.50 Rp 19,636,463.62
6 Pekerjaan Pas. Clean Out 4 Inch 2.00 bh 500,000.00 Rp 1,000,000.00
7 Pekerjaan Pas. Gate Valve 10.00 bh 500,000.00 Rp 5,000,000.00

SUB TOTAL C 86,852,157.05

TOTAL PEKERJAAN MEP LANTAI DASAR A+B+C) 212,164,638.55

IV.2 Pekerjaan MEP Lantai Satu


A Pekerjaan Mekanikal
1 Pekerjaan Pas. Exhaust Fan Ex. Panasonic 4.00 unit D1001 601,150.00 Rp 2,404,600.00

SUB TOTAL A 2,404,600.00

B Pekerjaan Elektrikal
1 Pekerjaan Pas. Panel SDP Full set + Kabel Fedeer 1.00 unit D1005 8,471,100.00 Rp 8,471,100.00

Instalasi Listrik
1 Pekerjaan Instalasi Titik Lampu 68.00 titik D1006 361,460.00 Rp 24,579,280.00
2 Pekerjaan Instalasi Stop Kontak 60.00 titik D1007 405,460.00 Rp 24,327,600.00
3 Pekerjaan Instalasi Saklar Hotel 2.00 titik D1008 361,460.00 Rp 722,920.00
4 Pekerjaan Instalasi Kabel Data 5.00 titik D1010 405,460.00 Rp 2,027,300.00
5 Pekerjaan Instalasi Titik AC 8.00 titik D1012 522,060.00 Rp 4,176,480.00

Aksesoris Listrik
1 Lampu LED Bulb Downlight 8 Watt 41.00 bh D1050 145,640.00 Rp 5,971,240.00
2 Lampu LED Bulb Outbow 8 Watt 16.00 bh D1051 145,640.00 Rp 2,330,240.00
3 Wall Light 5 Watt 4.00 bh D1052 299,640.00 Rp 1,198,560.00
4 Hanging Lamp LED 15 Watt + Armature 3.00 bh 1,000,000.00 Rp 3,000,000.00
5 LED Strip 6 Watt 102.50 bh D1015 46,007.50 Rp 4,715,768.75

Page 31
KODE HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
AHSP Rp Rp
6 Stop Kontak Ex. Schneider Vivace 60.00 bh D1019 94,517.50 Rp 5,671,050.00
7 Saklar Single Ex. Schneider Vivace 10.00 bh D1016 72,517.50 Rp 725,175.00
8 Saklar Double Ex. Schneider Vivace 4.00 bh D1017 94,517.50 Rp 378,070.00
9 Saklar Triple Ex. Schneider Vivace 6.00 bh D1018 127,517.50 Rp 765,105.00
10 Saklar Hotel Single Ex. Schneider Vivace 2.00 bh D1021 94,517.50 Rp 189,035.00
11 Socket Kabel Data Ex. Schneider Vivace 5.00 bh D1024 83,517.50 Rp 417,587.50
12 Stop Kontak AC Ex. Schneider Vivace 8.00 bh D1020 182,517.50 Rp 1,460,140.00

SUB TOTAL B 91,126,651.25

C Pekerjaan Plumbing
1 Pekerjaan Sumur Bor Kedalaman 50 m dengan Submersible Pump 1.00 ls 1,500,000.00 1,500,000.00
2 Pekerjaan Pas. Biotank Uk.150x150x228 cm 2.00 unit D1028 13,739,224.14 Rp 27,478,448.28
3 Pekerjaan Pas. Peresapan 2.00 unit D1029 3,170,024.00 Rp 6,340,048.00
4 Instalasi Pipa Air Bersih (Clean Water PPR.PN-10 Class & Hot Water PPR.PN-20 Class)
- Pipa PPR Tipe PN10 - 20mm Ex. Rucika 50.00 m D1030 25,548.60 Rp 1,277,430.00
- Pipa PPR Tipe PN10 - 32mm Ex. Rucika 16.00 m D1032 54,543.50 Rp 872,696.00
- Pipa Air Panas PPR Tipe PN20 - 20mm Ex. Rucika 32.00 m D1034 35,412.85 Rp 1,133,211.20
- Pipa Air Panas PPR Tipe PN20 - 25mm Ex. Rucika 8.00 m D1035 54,706.85 Rp 437,654.80
5 Instalasi Pipa Air Kotor dan Air Hujan
- Pipa PVC Tipe AW Diameter 2" Ex. Rucika 65.00 m D1038 62,586.70 Rp 4,068,135.50
- Pipa PVC Tipe AW Diameter 3" Ex. Rucika 40.00 m D1039 126,447.09 Rp 5,057,883.60
- Pipa PVC Tipe AW Diameter 4" Ex. Rucika 20.00 m D1040 204,546.50 Rp 4,090,929.92
6 Pekerjaan Pas. Roofdrain Cast Iron 4 Inch 8.00 bh 500,000.00 Rp 4,000,000.00
7 Pekerjaan Pas. Gate Valve 8.00 bh 500,000.00 Rp 4,000,000.00

SUB TOTAL C 60,256,437.30

TOTAL PEKERJAAN MEP LANTAI SATU A+B+C) 153,787,688.55

IV.4 Pekerjaan MEP Atap


A Pekerjaan Mekanikal
1 Pekerjaan Pas. Penangkal Petir 1.00 unit D1042 7,284,420.00 Rp 7,284,420.00
2 Pekerjaan Pas. Pompa Transfer 2.00 unit 4,000,000.00 Rp 8,000,000.00
3 Pekerjaan Pas. Pompa Sirkulasi Air Panas 1.00 unit 6,000,000.00 Rp 6,000,000.00

SUB TOTAL A 21,284,420.00

B Pekerjaan Elektrikal
Instalasi Listrik
1 Pekerjaan Instalasi Stop Kontak 3.00 titik D1007 405,460.00 Rp 1,216,380.00

Aksesoris Listrik

Page 32
KODE HARGA SATUAN TOTAL HARGA
NO URAIAN PEKERJAAN VOLUME SATUAN
AHSP Rp Rp
1 Stop Kontak Ex. Schneider Vivace 3.00 bh D1019 94,517.50 Rp 283,552.50

SUB TOTAL B 1,499,932.50

C Pekerjaan Plumbing
1 Pekerjaan Pas. Torrent Kap. 1000 Liter + Rangka Dudukan dan Aksesoris 2.00 unit D1048 7,170,900.00 Rp 14,341,800.00
2 Instalasi Pipa Air Bersih (Clean Water PPR.PN-10 Class & Hot Water PPR.PN-20 Class)
- Pipa PPR Tipe PN10 - 32mm Ex. Rucika 68.00 m D1032 54,543.50 Rp 3,708,958.00
- Pipa Air Panas PPR Tipe PN20 - 25mm Ex. Rucika 62.00 m D1035 54,706.85 Rp 3,391,824.70
4 Instalasi Pipa Air Hujan
- Pipa PVC Tipe AW Diameter 2" Ex. Rucika 65.00 m D1038 62,586.70 Rp 4,068,135.50
5 Pekerjaan Pas. Roofdrain Cast Iron 4 Inch 13.00 bh 500,000.00 Rp 6,500,000.00
6 Pekerjaan Pas. Gate Valve 23.00 bh 500,000.00 Rp 11,500,000.00
7 Pekerjaan Pas. Check Valve 4.00 bh 500,000.00 Rp 2,000,000.00

SUB TOTAL C 45,510,718.20

TOTAL PEKERJAAN MEP ATAP (A+B+C) 68,295,070.70

TOTAL PEKERJAAN MEP (III.1+III.2+III.3) 434,247,397.79

Page 33
www.emporioarchitect.com

PEKERJAAN LAIN - LAIN


RENCANA ANGGARAN BIAYA (RAB)

PROJECT : PEMBANGUNAN PRIVATE HOUSE IBU LISA


PEMILIK : IBU LISA
LOKASI : JAKARTA
TAHUN : 2023
SUBJECT : PEKERJAAN LAIN - LAIN

HARGA SATUAN JUMLAH HARGA


KODE
NO URAIAN PEKERJAAN VOLUME SATUAN UPAH MATERIAL SUB TOTAL UPAH MATERIAL TOTAL
AHSP
Rp Rp Rp Rp Rp Rp

V PEKERJAAN LAIN - LAIN


1 Pekerjaan Urugan Tanah Peninggian Elevasi Lantai 562.60 m3 B1005 305,800.00 Err:502 - 172,043,080.00 - -
2 Pekerjaan Kanopi Kaca Tempered 10 mm + Rangka dan Aksesoris 38.60 m2 500,000.00 2,500,000.00 3,000,000.00 19,300,000.00 96,500,000.00 115,800,000.00
3 Pekerjaan Rumput Jepang 65.20 m2 10,000.00 70,000.00 80,000.00 652,000.00 4,564,000.00 5,216,000.00
4 Pekerjaan Pas. Grease Trap 14 Liter Ex. Austindo 2.00 bh 250,000.00 1,500,000.00 1,750,000.00 500,000.00 3,000,000.00 3,500,000.00
5 Pekerjaan Pas. Fire Extangiuser 6 kg 4.00 bh D1002 2,604,778.00 Err:502 - 10,419,112.00 - -

TOTAL PEKERJAAN LAIN - LAIN 202,914,192.00 104,064,000.00 124,516,000.00

pengadaan sumur bor


penangkal petir
bioseptitank
groundtank
resapan

Page 35
Rekap Analisa Harga Satuan Dengan Overhead

ID Analisa Pekerjaan Satuan

PEKERJAAN PERSIAPAN
A1001 Pembersihan & Perataan 1m2 Area Proyek m2
A1002 Pembuatan 1m2 Bedeng Pekerja m2
A1003 Pembuatan 1m2 Gudang Bahan & Peralatan m2
A1004 Pekerjaan Pengukuran dan Pemasangan 1m' Bowplank m
A1005 Pekerjaan 1m' Pagar Proyek Sementara dari Seng Gelombang Tinggi 2 Meter m

PEKERJAAN STRUKTUR
Pekerjaan Galian dan Urugan
B1001 Penggalian 1m3 Tanah Biasa m3
B1002 Pengurugan 1m3 Dengan Pasir Urug m3
B1003 Membuat 1 m3 Lantai Kerja m3
B1004 Pengurugan Kembali 1m3 Galian Tanah + Pemadatan m3
B1005 Pengurugan 1m3 Tanah Urug Dipadatkan m3
B1006 Pemasangan 1m3 Batu Belah Campuran 1SP : 5PP m3

Pekerjaan Struktur
B1007 Pekerjaan 1m' Pengeboran Lubang Bore Pile Dia. 30 cm m
B1008 Membuat 1 m3 Beton Mutu f’c = 21,7 Mpa (K.250) m3
B1020 Membuat 1 m3 Beton Mutu f’c = 25 Mpa (K.300) m3
B1017 Membuat 1 m3 Beton Mutu f’c = 33,2 Mpa (K.400) m3
B1009 Pembesian 1 kg Dengan Besi Polos Atau Besi Ulir kg
B1010 Pemasangan 1 m2 Bekisting Batako m2
B1011 Pemasangan 1 m2 Bekisting Kayu m2
B1012 Pembesian 1 m2 Wiremesh M8 m2
B1013 Pemasangan 1 m2 Aluminium Foil m2
B1014 Pemasangan 1 m2 Multiplek 9 mm m2
B1015 Pemasangan 1 m2 Atap Bitumen m2
B1016 Pemasangan 1 m2 Bubungan Atap Bitumen m2
B1018 Pemasangan 1 m2 Atap Cisangkan m2
B1019 Pemasangan 1 m2 Bubungan Atap Cisangkan m2
B1021 Pekerjaan 1 kg Baja m2
B1022 Pekerjaan 1 kg Plat Besi m2
B1023 Pekerjaan 1 bh Baut HTB m2
PEKERJAAN ARSITEKTUR
C1001 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP m2
C1002 Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm m2
C1003 Pemasangan 1 m2 Acian m2
C1007 Pemasangan 1 m’ Plint Granite Ukuran 10 cm X 60 cm m2
Batu Alam
C1004 Pemasangan 1 m2 Batu Andesit 30x30 cm m2
C1030 Pemasangan 1 m2 Batu Paras Susun Jogja m2
C1036 Pemasangan 1 m2 Grey Cobblestone 100x100x50 mm m2
Marmer
C1029 Pemasangan 1 m2 Marmer Travertine Classic Ivory m2
C1031 Pemasangan 1 m2 Marmer Travertine White m2
C1033 Pemasangan 1 m2 Marmer Onyx White m2
C1039 Pemasangan 1 m2 Marmer Carrara White Gold m2
C1047 Pemasangan 1 m2 Marmer Bronze m2
Niro Granite
C1005 Pemasangan 1 m2 Granite Niro GNT01 Calcitte 600x600 mm m2
C1006 Pemasangan 1 m2 Granite Niro GPB05 Castle Rock 600x600 mm m2
C1032 Pemasangan 1 m2 Granite Niro Marmore GMO03 Grisia Grey 600x600 mm m2
C1034 Pemasangan 1 m2 Granite Niro Granulo GNL01 Branco 600x600 mm m2
C1035 Pemasangan 1 m2 Granite Niro GNC01 Stark Beige 600x600 mm m2
C1035 Pemasangan 1 m2 Granite Niro GNC01 Stark Beige 600x600 mm m2
C1048 Pemasangan 1 m2 Granite Niro GPD02 Ceppo 600x600 mm m2
C1049 Pemasangan 1 m2 Granite Niro GSP02 Bode 600x600 mm m2
C1064 Pemasangan 1 m2 Granite Niro GTZ03 Teraso Grey 60x60 cm m2
Quadra
C1037 Pemasangan 1 m2 Granite Quadra Bianco Lasa 1600x3200 mm m2
C1040 Pemasangan 1 m2 Granite Quadra PD Sandstone Grigio 1200x2400 mm m2
Granite Essenza
C1061 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x120 cm m2
C1063 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x60 cm m2
Wisma Sehati
C1062 Pemasangan 1 m2 Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm m2
C1066 Pemasangan 1 m2 SPC Sehati Soft Brown Oak m2
Roman
C1065 Pemasangan 1 m2 Granite Roman Dbali Bone 600x600 mm m2
C1067 Pemasangan 1 m2 Granite Roman Dcastanea Maple 200x1200 mm m2
Paving
C1038 Pemasangan 1 m2 Paving Block t = 8 cm m2
Parquet, Conwood dan WPC
C1050 Pemasangan 1 m2 Conwood Deck 12" m2
C1068 Pemasangan 1 m2 Conwood Lath 4" m2
Plafond
C1008 Pemasangan 1 m2 Plafond Gypsum Board Ukuran,Tebal 9 mm + Rangka Hollow m2
C1009 Pemasangan 1 m List Gypsum m
C1010 Pemasangan 1 m’ Shadowline m
C1059 Pemasangan 1 m2 Plafond GRC Board Ukuran,Tebal 9 mm + Rangka Hollow m
Pengecatan dan Waterproofing
C1023 Pekerjaan 1 m2 Pengecetan Aquaproof m2
C1022 Pekerjaan 1 m2 Pengecetan Ekterior m2
C1021 Pekerjaan 1 m2 Pengecetan Interior m2
C1024 Pekerjaan 1 m2 Waterproofing Coating m2
Pintu Jendela
C1041 Pemasangan 1 m Finishing Kusen Pintu Kayu m2
C1011 Pemasangan 1 m Kusen Aluminium 4" Setara YKK m
C1018 Pemasangan 1 m Kusen Kayu Merbau m
C1012 Pemasangan 1 m2 Daun Aluminium m2
C1019 Pemasangan 1 m2 Daun Kayu Merbau m2
C1060 Pemasangan 1 m2 Daun Pintu Hollow m2
C1020 Pemasangan 1 m2 Finishing Daun Pintu Kayu m2
C1013 Pemasangan 1 m2 Kaca Clear 8 mm m2
C1052 Pemasangan 1 m2 Kaca Sandblast 8 mm m2
C1014 Pemasangan 1 pcs Engsel 4 Inch Setara Dekson set
C1017 Pemasangan 1 set Door Stopper Dekson set
C1044 Pemasangan 1 set Flush Bolt Dekkson m2
C1045 Pemasangan 1 set Flush Handle Dekkson m2
C1016 Pemasangan 1 set Lever Handle Dekson set
C1015 Pemasangan 1 set Lockcase Cylinder Dekson set
C1053 Pemasangan 1 set Lockcase Sliding Dekson m2
C1051 Pemasangan 1 set Pull Handle Dekson m2
C1042 Pemasangan 1 set Rambucis Dekkson m2
C1043 Pemasangan 1 set Ramskar Dekkson m2
C1069 Pemasangan 1 m2 Daun UPVC m2
C1070 Pemasangan 1 m2 Kaca Flutted 8 mm m2
Sanitair
C1025 Pekerjaan 1 bh Closet Duduk TOTO CW637J set
C1071 Pekerjaan 1 bh Closet Duduk TOTO CW823PJ set
C1026 Pekerjaan 1 bh Jet Washer TOTO TX403SB set
C1072 Pekerjaan 1 bh Jet Washer TOTO TB19CSMCR set
C1077 Pekerjaan 1 bh Jet Washer TOTO THX20NB set
C1027 Pekerjaan 1 bh Floordrain TOTO TX1EB set
C1028 Pekerjaan 1 bh Shower TOTO TX402SPN set
C1046 Pekerjaan 1 bh Shower TOTO TX401SBN set
C1073 Pekerjaan 1 bh Shower TOTO TX492SE set
C1079 Pekerjaan 1 bh Shower TOTO TX471SVN set
C1054 Pekerjaan 1 bh Closet Duduk TOTO CW275PJ set
C1055 Pekerjaan 1 bh Shower TOTO TX492SE set
C1056 Pekerjaan 1 bh Lavatory TOTO LW818J set
C1074 Pekerjaan 1 bh Lavatory TOTO LW625J set
C1080 Pekerjaan 1 bh Lavatory TOTO LW647CJ set
C1057 Pekerjaan 1 bh Kran Lavatory TOTO TX116LQBR set
C1075 Pekerjaan 1 bh Kran Lavatory TOTO TX115LRS set
C1058 Pekerjaan 1 bh Urinoir TOTO U104 set
C1076 Pekerjaan 1 bh Tissue Holder TOTO TX703M3AV1 set
C1078 Pekerjaan 1 bh Tissue Holder TOTO TX720ACRB set

PEKERJAAN MEP
Mekanikal dan Electrical
D1001 Pekerjaan 1 Unit Pemasangan Exhaust Fan set
D1002 Pekerjaan 1 Bh Pemasangan Fire Extangiuser 6 kg set
D1003 Pemasangan 1 Unit Pompa Pendorong dari GWT Menuju Torrent set
D1004 Pemasangan 1 Unit MDP Ukuran 600X400X200 Ex Hager set
D1005 Pemasangan 1 unit SDP Ukuran 400x300x150 Ex Hager set
D1006 Pemasangan Instalasi 1 Titik Lampu ttk
D1007 Pemasangan Instalasi 1 Titik Stop Kontak ttk
D1008 Pemasangan Instalasi 1 Titik Saklar Hotel ttk
D1009 Pemasangan Instalasi 1 Titik Kabel Data ttk
D1010 Pemasangan Instalasi 1 Titik Kabel TV ttk
D1011 Pemasangan Instalasi 1 Titik Kabel Telepon ttk
D1012 Pemasangan Instalasi 1 Stop Kontak AC ttk
D1013 Pemasangan 1 bh Lampu LED Bulb Downlight 13 Watt ttk
D1050 Pemasangan 1 bh Lampu Downlight LED 8 Watt ttk
D1014 Pemasangan 1 bh Lampu LED Bulb Outbow 13 Watt ttk
D1051 Pemasangan 1 bh Lampu Downlight Outbow 8 Watt ttk
D1015 Pemasangan 1 m Lampu LED Strips 7.2 watt m
D1016 Pemasangan 1 bh Saklar Single ttk
D1017 Pemasangan 1 bh Saklar Double ttk
D1018 Pemasangan 1 bh Saklar Tripple ttk
D1019 Pemasangan 1 bh Stop Kontak ttk
D1020 Pemasangan 1 bh Stop Kontak AC ttk
D1021 Pemasangan 1 bh Saklar Hotel Single ttk
D1022 Pemasangan 1 bh Saklar Hotel Double ttk
D1023 Pemasangan 1 bh Saklar Hotel Triple ttk
D1024 Pemasangan 1 bh Socket Kabel Data ttk
D1025 Pemasangan 1 bh Socket Kabel TV ttk
D1026 Pemasangan 1 bh Socket Kabel Telepon ttk
D1043 Pemasangan 1 bh Spotlight 5 Watt ttk
D1049 Pemasangan 1 bh Spotlight 7 Watt ttk
D1044 Pemasangan 1 bh Wall Light 13 Watt ttk
D1052 Pemasangan 1 bh Wall Light 5 Watt ttk
D1045 Pemasangan 1 bh Adjustable Light 5 Watt ttk
D1046 Pemasangan 1 bh Step Light 3 Watt ttk
D1047 Pemasangan 1 bh Lampu Downlight PAR30 Double Fitting 10 Watt ttk
Plumbing
D1027 Pekerjaan Groundwater Tank Uk.145x145x180 cm unit
D1028 Pekerjaan Biotech Uk.150x150x228 cm unit
D1029 Pekerjaan Sumur Resapan unit
D1030 Pemasangan 1m Pipa PPR Tipe PN10 - 20mm m
D1031 Pemasangan 1m Pipa PPR Tipe PN10 - 25mm m
D1032 Pemasangan 1m Pipa PPR Tipe PN10 - 32mm m
D1033 Pemasangan 1m Pipa PPR Tipe PN10 - 40mm m
D1034 Pemasangan 1m Pipa PPR Tipe PN20 - 20mm m
D1035 Pemasangan 1m Pipa PPR Tipe PN20 - 25mm m
D1036 Pemasangan 1m Pipa PVC Tipe AW 3/4" m
D1037 Pemasangan 1m Pipa PVC Tipe AW 1-1/4" m
D1038 Pemasangan 1m Pipa PVC Tipe AW 2" m
D1039 Pemasangan 1m Pipa PVC Tipe AW 3" m
D1040 Pemasangan 1m Pipa PVC Tipe AW 4" m
D1041 Pemasangan 1m Pipa PVC Tipe AW 6" m
D1042 Pemasangan 1 Unit Penangkal Petir ( 1 Blitzem + 3 Tombak ) m
D1048 Pemasangan 1 unit Torrent Air Kapasitas 1000 Liter m
Harga Satuan

Rp 14,300.00
Rp 915,475.00
Rp 716,512.50
Rp 70,895.00
Rp 296,791.00

Rp 128,700.00
Rp 319,000.00
Rp 839,714.46
Rp 57,750.00
Rp 305,800.00
Rp 929,521.37

Rp 135,740.00
Rp 1,365,705.00
Rp 1,416,085.00
Rp 1,524,985.00
Rp 16,816.86
Rp 137,599.00
Rp 180,510.00
Rp 92,391.27
Rp 23,200.83
Rp 124,865.28
Rp 641,850.00
Rp 200,337.50
Rp 358,050.00
Rp 182,187.50
Rp 28,847.50
Rp 27,747.50
Rp 11,742.50
Rp 166,705.00
Rp 61,677.21
Rp 47,487.21
Rp 145,102.13

Rp 471,109.07
Rp 471,109.07
Rp 471,109.07

Rp 1,936,000.00
Rp 1,936,000.00
Rp 2,629,000.00
Rp 2,629,000.00
Rp 1,936,000.00

Rp 362,120.00
Rp 489,170.00
Rp 310,145.00
Rp 350,570.00
Rp 339,020.00
Rp 339,020.00
Rp 533,060.00
Rp 356,345.00
Rp 385,220.00

Rp 2,213,200.00
Rp 1,959,100.00

Rp 506,495.00
Rp 327,470.00

Rp 1,404,920.00
Rp 466,125.00

Rp 327,470.00
Rp 587,345.00
Rp 269,500.00

Rp 1,329,900.00
Rp 863,500.00

Rp 172,678.00
Rp 46,090.00
Rp 36,718.00
Rp 260,953.00

Rp 56,711.40
Rp 74,861.40
Rp 61,661.40
Rp 65,241.00

Rp 96,052.59
Rp 315,706.88
Rp 401,500.00
Rp 1,954,700.00
Rp 3,043,700.00
Rp 1,624,700.00
Rp 288,157.77
Rp 445,087.50
Rp 539,550.00
Rp 134,475.00
Rp 161,975.00
Rp 255,475.00
Rp 145,475.00
Rp 443,712.50
Rp 488,950.00
Rp 433,950.00
Rp 2,162,325.00
Rp 108,075.00
Rp 330,275.00
Rp 2,064,700.00
Rp 860,887.50
Rp 4,429,975.00
Rp 13,009,975.00
Rp 699,435.00
Rp 1,304,435.00
Rp 424,435.00
Rp 567,435.00
Rp 1,287,825.00
Rp 2,288,825.00
Rp 9,218,825.00
Rp 5,258,825.00
Rp 13,559,975.00
Rp 9,218,825.00
Rp 2,838,825.00
Rp 2,288,825.00
Rp 2,288,825.00
Rp 6,248,825.00
Rp 2,157,375.00
Rp 4,295,225.00
Rp 919,435.00
Rp 545,435.00

Rp 601,150.00
Rp 2,604,778.00
Rp 8,632,140.00
Rp 10,457,700.00
Rp 8,471,100.00
Rp 361,460.00
Rp 405,460.00
Rp 361,460.00
Rp 405,460.00
Rp 405,460.00
Rp 405,460.00
Rp 522,060.00
Rp 181,940.00
Rp 145,640.00
Rp 153,340.00
Rp 145,640.00
Rp 46,007.50
Rp 72,517.50
Rp 94,517.50
Rp 127,517.50
Rp 94,517.50
Rp 182,517.50
Rp 94,517.50
Rp 127,517.50
Rp 171,517.50
Rp 83,517.50
Rp 83,517.50
Rp 83,517.50
Rp 170,940.00
Rp 200,640.00
Rp 409,640.00
Rp 299,640.00
Rp 210,540.00
Rp 145,640.00
Rp 588,830.00

Rp 12,450,644.88
Rp 13,739,224.14
Rp 3,170,024.00
Rp 25,548.60
Rp 33,616.00
Rp 54,543.50
Rp 86,003.50
Rp 35,412.85
Rp 54,706.85
Rp 20,903.30
Rp 40,202.80
Rp 62,586.70
Rp 126,447.09
Rp 204,546.50
Rp 402,303.00
Rp 7,284,420.00
Rp 7,170,900.00
DAFTAR HARGA SATUAN UPAH PEKERJA
2023

Keterangan : Sel Dengan Format Ini Bisa Diedit

NO TENAGA KERJA HARGA SATUAN

1 Pekerja 120,000.00 OH
2 Tukang Gali OH
3 Tukang 150,000.00 OH
4 Tukang Batu 150,000.00 OH
5 Tukang Tembok OH
6 Tukang Kayu 150,000.00 OH
7 Tukang Besi/Besi Beton OH
8 Tukang Cat/Pelitur 150,000.00 OH
9 Tukang Pipa 150,000.00 OH
10 Tukang Style Bali OH
11 Tukang Ukir Style Bali OH
12 Tukang Ukiran Bali OH
13 Tukang Listrik 150,000.00 OH
14 Tukang Las OH
15 Tukang Alumunium OH
16 Tukang Las Biasa OH
17 Tukang Las Konstruksi OH
18 Tukang Khusus Alumunium 150,000.00 OH
19 Tukang Alumunium/ Kaca OH
20 Tukang Besi 150,000.00 OH
21 Tukang 150,000.00 OH
22 Kepala Tukang 175,000.00 OH
23 Kepala Tukang Style Bali OH
24 Mandor Style Bali OH
25 Mandor 200,000.00 OH
26 Instalasi PANEL MDP 750,000.00 LS
27 Instalasi PANEL SDP 500,000.00 LS
28 Instalasi Penangkal Petir 1,400,000.00 LS
29 Juru Ukur OH
30 Pembantu Juru Ukur OH
31 Mekanik Alat Berat OH
32 Operator Alat Berat OH
33 Pembantu Operator OH
34 Supir Truk OH
35 Kenek Truk OH
36 Juru Gambar (Drafter) OH
37 Operator Printer/Plotter OH
38 Upah Pengeboran Bored Pile 28,000.00 M
39 Upah Pemasangan Quadra 450,000.00 M2
40 Upah Pemasangan Marmer 500,000.00 M2
41 Upah Pemasangan Conwood 250,000.00 M2
42 Tenaga Ahli Utama (S1 Min 13 Th) OH
43 Tenaga Ahli Madya (S1 Min 9 Th) OH
44 Tenaga Ahli Muda (S1 Min 5 Th) OH
45 Tenaga Ahli Pratama (S1 Min 3 Th) OH

Page 48
N
DAFTAR HARGA SATUAN BAHAN A
M
2023 A

T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y
Kayu/Multiplek dan Plafond
1 Kayu 5/7 m3 Graha 3Prima
2,000,000.00
2 Kayu Dolken Ø 8 - 10 / 400 cm btg 25,000.00
###
3 Kayu Kaso m3 2,500,000.00
###
4 Kayu Kelas III m3 2,500,000.00
###
5 Kayu Papan 3/20 m3 2,500,000.00
###
6 Multiplek 9 mm lbr 110,000.00
###
7 Plywood 4 mm lbr 70,000.00
###
8 Gypsumboard 9 mm Setara Jayaboard lbr 110,000.00
###
9 List Gypsum m 20,000.00
###
10 Shadowline m 16,000.00
###
11 GRC Board 9 mm lbr 210,000.00
###
UD.Sari Buana
Paku, Ramset ###
1 Paku 10 cm kg 20,000.00
Graha Prima
2 Paku Gypsum kg 20,000.00
Graha Prima
3 Ramset/Dynabolt bh 7,000.00
Graha Prima
4 Paku Sekrup 2" kg 48,000.00
Graha Prima
5 Paku Sekrup 3,5" kg 85,000.00
Graha Prima
Mitra 10
Semen, Perekat Graha Prima
1 Compound kg 80,000.00
Graha Prima
2 Semen Gresik 40 Kg zak 60,000.00
Graha Prima
3 Semen Warna kg 20,000.00
Graha Prima
4 Tile Grout MU 408 kg 16,000.00
Graha Prima
5 Tepung Gypsum kg 25,000.00
Graha Prima
6 Sealant tube 35,000.00
Graha Prima
###
Pasir, Bata, Split, dan Tanah UD.Sari Buana
1 Batako Press bh 2,800.00
UD.Sari Buana
1 Bata Merah bh 800.00
UD.Sari Buana
2 Batu Belah m3 290,000.00
UD.Sari Buana
3 Pasir Beton m3 300,000.00
UD.Sari Buana
4 Pasir Pasang m3 290,000.00
UD.Sari Buana
5 Pasir Urug m3 210,000.00
UD.Sari Buana
6 Split m3 290,000.00
CV. Ananda Kar
7 Tanah Urug m3 200,000.00
CV. Ananda Kar
Page 49
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
8 Kerikil m3 200,000.00 E Kar
CV. Ananda
Y
9 Abu Batu m3 310,000.00
CV. Ananda Kar
Graha 3Prima
Penutup Atap CV. Ananda Kar
1 Aluminium Foil (Uk 1.2 m x 25 m) roll 500,000.00
Graha Prima
2 Atap Bitumen Setara Tegola Master m2 450,000.00
Graha Prima
3 Bubungan Atap Bitumen Setara Onduline m 115,000.00
Graha Prima
4 Seng BJLS 0,2 Gelombang lbr 65,000.00
Graha Prima
5 Atap Cisangkan Victoria 33x42 cm bh 16,000.00
Graha Prima
6 Bubungan Atap Cisangkan m 100,000.00
Graha Prima
CV. Ananda Kar
Besi Beton, Wiremesh, dan Baja
1 Besi Beton kg 11,500.00
2 Hollow 20x40 (Rangka Plafond) btg 30,000.00
3 Hollow 40x40 (Rangka Plafond) btg 45,000.00
4 Kawat Bendrat kg 25,000.00
5 Wiremesh M8 lbr 720,000.00
6 Besi Baja kg 19,000.00
7 Plat Besi kg 18,000.00
8 Baut HTB kg 8,000.00
Depo Banguna
Cat/Minyak/Finishing Graha Prima
1 Minyak Bekisting ltr 25,000.00
Graha Prima
2 Amplas lbr 10,000.00
Graha Prima
3 Dempul Setara Alfagloss kg 45,000.00
Graha Prima
4 Cat Primer Propan kg 95,000.00
Graha Prima
5 Cat Acrylic Propan kg 85,000.00
Graha Prima
6 Thinner PU ltr 35,000.00
Graha Prima
7 Clear Propan Acrylic kg 85,000.00
Graha Prima
8 Cat Alkali Primer ltr 30,000.00
Graha Prima
9 Cat Dulux Pentalite ltr 90,000.00
Graha Prima
10 Cat Dulux Weathershield ltr 130,000.00
Graha Prima
11 Cat Dulux Aquaproof ltr 75,000.00
Graha Prima
12 Sikabon kg 62,000.00
Graha Prima
13 Sikacoat kg 150,000.00
Graha Prima
14 Kuas Star 4" bh 25,000.00
Graha Prima
Graha Prima
Batu Alam Graha Prima
1 Batu Andesit 30x30 cm m2 200,000.00
Graha Prima
2 Batu Paras Susun Jogja m2 200,000.00
Graha Prima
3 Batu Cobble Grey 100x100x50 mm m2 200,000.00
Graha Prima
Graha Prima
Page 50
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Marmer MitraE10
Y
1 Marmer Travertine Classic Ivory m2 1,200,000.00
Graha Prima
2 Marmer Travertine White m2 Graha 3Prima
1,200,000.00
3 Marmer Onyx White m2 1,800,000.00
Graha Prima
4 Marmer Carrara White Gold m2 1,800,000.00
Graha Prima
5 Marmer Bronze m2 1,800,000.00
Graha Prima
Graha Prima
Niro Granite Mitra 10
1 Granite Niro GNT01 Calcite 600x600 mm m2 215,000.00
Graha Prima
2 Granite Niro GPB05 Castle Rock 600x600 mm m2 325,000.00
Graha Prima
3 Granite Niro Marmore GMO03 Grisia Grey 600x600 mm m2 170,000.00
Graha Prima
4 Granite Niro Granulo GNL01 Branco 600x600 mm m2 205,000.00
Graha Prima
5 Granite Niro GNC01 Stark Beige 600x600 mm m2 195,000.00
Graha Prima
6 Granite Niro GPD02 Ceppo 600x600 mm m2 363,000.00
Graha Prima
7 Granite Niro GTZ03 Teraso Grey 600x600 mm m2 235,000.00
Graha Prima
7 Granite Niro GSP02 Bode 600x600 mm m2 210,000.00
Graha Prima
Graha Prima
Granite Quadra Mitra 10
1 Quadra Bianco Lasa 1600x3200 mm m2 1,420,000.00
Graha Prima
2 Quadra PD Sandstone Grigio 1200x2400 mm m2 1,210,000.00
Graha Prima
Graha Prima
Granite Essenza Mitra 10
1 Granite Essenza Carrara Grey 600x1200 mm m2 340,000.00
Graha Prima
2 Granite Essenza Carrara Grey 600x600 mm m2 185,000.00
Graha Prima
Graha Prima
Roman Mitra 10
1 Granite Roman Dbali Bone 600x600 mm m2 185,000.00
Graha Prima
2 Granite Roman Dcastanea Maple 200x1200 mm m2 410,000.00
Graha Prima
Graha Prima
Wisma Sehati Mitra 10
1 Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm m2 1,060,000.00
Graha Prima
2 SPC Sehati Soft Brown Oak m2 330,000.00
Graha Prima
Graha Prima
Paving Mitra 10
1 Paving Block t = 8 cm K300 m2 160,000.00
Graha Prima
Graha Prima
Parquet, Conwood dan WPC Mitra 10
1 Conwood Deck 12" m2 690,000.00
Graha Prima
2 Conwood Lath 4" m2 350,000.00
Graha Prima
Graha Prima
Kusen Pintu Jendela dan Aksesoris CV. Ananda Kar
1 Daun Aluminium m2 1,600,000.00
Graha Prima
Page 51
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
2 Daun Pintu Hollow m2 UD.SariEBuana
1,300,000.00
Y
3 Daun Pintu Kayu Merbau m2 2,500,000.00
###
4 Door Stopper DS 009 set ### 3
125,000.00
5 Engsel 4 Inch Dekson SUS 304 pcs 100,000.00
###
6 Flush Bolt Dekkson FB 040 bh 210,000.00
###
7 Flush Handle Dekkson PP004 bh 110,000.00
###
8 Kaca Clear 8 mm m2 290,000.00
Graha Prima
9 Kaca Sandblast 8 mm m2 340,000.00
Graha Prima
10 Kusen Aluminium YKK AP 4 Inch m 250,000.00
Graha Prima
11 Kusen Kayu Merbau m 305,000.00
Graha Prima
12 Lever Handle Dekson LHP 52228 set 370,000.00
Graha Prima
13 Lockcase Cylinder Dekson MTS 84030 set 400,000.00
Graha Prima
14 Lockcase Sliding Dekkson MTS SLD DL84100 m2 350,000.00
Graha Prima
15 Pull Handle Dekkson Deluxe PH DL1868 PSS+AS 760 mm bh 1,810,000.00
###
16 Rambucis Dekkson CWH 103Z bh 76,000.00
###
17 Ramskar Dekkson AWH SQ 001 bh 278,000.00
###
18 Daun UPVC bh 1,700,000.00
###
19 Kaca Flutted 8 mm m2 650,000.00
Graha Prima
Depo Banguna
Sanitair Graha Prima
1 Closet Duduk TOTO CW637J bh 3,700,000.00
UD.Sari Buana
2 Jet Washer TOTO TX403SB bh 600,000.00
UD.Sari Buana
3 Jet Washer TOTO TB19CSMCR bh 1,150,000.00
UD.Sari Buana
3 Jet Washer TOTO THX20NB bh 350,000.00
UD.Sari Buana
4 Floordrain TOTO TX1EB bh 480,000.00
Graha Prima
5 Shower TOTO TX402SPN bh 890,000.00
Depo Banguna
6 Shower TOTO TX401SBN bh 1,800,000.00
Depo Banguna
6 Shower TOTO TX471SVN bh 4,500,000.00
Depo Banguna
7 Closet Duduk TOTO CW275PJ bh 12,000,000.00
UD.Sari Buana
8 Shower TOTO TX492SE bh 8,100,000.00
Depo Banguna
9 Lavatory TOTO LW818J bh 2,300,000.00
Depo Banguna
10 Lavatory TOTO LW625J bh 1,800,000.00
Depo Banguna
10 Lavatory TOTO LW647CJ bh 1,800,000.00
Depo Banguna
11 Kran Lavatory TOTO TX115LRS bh 1,800,000.00
Depo Banguna
11 Kran Lavatory TOTO TX116LQBR bh 5,400,000.00
Depo Banguna
12 Urinoir TOTO U104 bh 3,600,000.00
Depo Banguna
13 Closet Duduk TOTO CW823PJ bh 11,500,000.00
Depo Banguna
14 Tissue Holder TOTO TX703M3AV1 bh 800,000.00
Depo Banguna
14 Tissue Holder TOTO TX720ACRB bh 460,000.00
Depo Banguna
UD.Sari Buana
Mekanikal dan Electrical ###
1 Exhaust Fan Dia. 25 cm Panasonic FV-25TGU5 bh 500,000.00
UD.Sari Buana
Page 52
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
2 Fire Extinguizer 6 Kg Setara Servvo bh 2,300,000.00 E
Y
3 Semi Jet Pump Stainless Grundfos JP 4-47 PT-V bh 7,500,000.00
4 MCCB 80A 3P Schneider CVS100F bh 650,000.00 3
5 MCCB 25A 3P Schneider CVS100F bh 650,000.00
CV. Ananda Kar
6 MCB 16A 1P Schneider DOMF01116 bh 140,000.00
Graha Prima
7 MCB 10A 1P Schneider DOMF01110 bh 140,000.00
Graha Prima
8 MCB 6A 1P Schneider DOMF01106 bh 140,000.00
Graha Prima
9 Lamp Indikator 220V Schneider 220VAC XA2EVM1LC bh 22,000.00
Graha Prima
10 Voltmeter Digital Schneider 3P bh 390,000.00
CV. Ananda Kar
11 Ampere Meter Digital Schneider 3p DM3110 CL bh 390,000.00
CV. Ananda Kar
12 Travo Arus bh 80,000.00
CV. Ananda Kar
13 Selector Volt 7 Position Schneider K1F027MLH bh 125,000.00
CV. Ananda Kar
14 Wiring Materials ls 1,000,000.00
CV. Ananda Kar
15 Box indoor 600 x 400 x 250 Hager FL118A bh 1,600,000.00
CV. Ananda Kar
16 CU Bars + Aksesoris ls 950,000.00
CV. Ananda Kar
17 Kabel NYM 3x2,5 mm Supreme m 20,000.00
CV. Ananda Kar
18 Pipa Clipsal 20 mm btg 19,000.00
CV. Ananda Kar
19 Tee dos Clpsal 20 mm bh 9,000.00
CV. Ananda Kar
20 Sock Clipsal 20 mm bh 1,600.00
CV. Ananda Kar
21 Isolasi bh 9,500.00
CV. Ananda Kar
22 Inbow dos plastik clipsal E 157 P bh 7,000.00
CV. Ananda Kar
23 Klem Klipsal 20 mm bh 1,400.00
CV. Ananda Kar
24 Kabel NYM 3x4 mm Supreme m 34,000.00
CV. Ananda Kar
25 LED Bulb Downlight 13 Watt Philips bh 143,000.00
Graha Prima
26 LED Bulb Outbow Downlight 13 Watt Philips bh 117,000.00
CV. Ananda Kar
27 LED Strip 7,5 Watt bh 33,000.00
CV. Ananda Kar
28 Saklar Single 1 Gang 1 Arah Schneider Vivace White bh 50,000.00
CV. Ananda Kar
29 Saklar Single 2 Gang 1 Arah Schneider Vivace White bh 70,000.00
CV. Ananda Kar
30 Saklar Single 3 Gang 1 Arah Schneider Vivace White bh 100,000.00
CV. Ananda Kar
31 Stop Kontak Schneider Vivace Schuko White bh 70,000.00
CV. Ananda Kar
32 Stop Kontak AC Schneider Vivace White bh 150,000.00
CV. Ananda Kar
33 Saklar Single 1 Gang 2 Arah Schneider Vivace White bh 70,000.00
Graha Prima
34 Saklar Single 2 Gang 2 Arah Schneider Vivace White bh 100,000.00
CV. Ananda Kar
35 Saklar Single 3 Gang 2 Arah Schneider Vivace White bh 140,000.00
Graha Prima
36 Socket Kabel Data Schneider Vivace White bh 60,000.00
###
37 Socket Kabel TV Schneider Vivace White bh 60,000.00
Graha Prima
38 Socket Kabel TV Schneider Vivace White bh 60,000.00
###
39 Blacksem 1" bh 115,000.00
40 Sok Galvanis 1" bh 16,000.00
41 Pipa Galvanis 1" m 105,000.00
42 Kawat BC 50 mm2 m 80,000.00
43 Klem Begel 1" bh 3,700.00
Page 53
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
44 Klem sisir 50 mm2 bh 20,000.00 E
Y
45 Kotak Kontrol 10 cm x 15 cm bh 55,000.00
46 Perluv sok 1" bh 9,000.00 3
47 Pipa Conduit PVC 3/4" btg 27,000.00
48 Spotlight 5 Watt Philips bh 133,000.00
CV. Ananda Kar
49 Wall Light 13 Watt bh 350,000.00
CV. Ananda Kar
50 Adjustable Light 5 Watt Philips bh 169,000.00
CV. Ananda Kar
51 Step Light 3 Watt bh 110,000.00
CV. Ananda Kar
51 Lampu Downlight PAR30 Double Fitting 10 Watt bh 500,000.00
CV. Ananda Kar
52 Spotlight 7 Watt Philips bh 160,000.00
CV. Ananda Kar
53 LED Bulb Downlight 8 Watt Philips bh 110,000.00
Graha Prima
54 LED Bulb Outbow 8 Watt Philips bh 95,000.00
Graha Prima
55 Wall Light 5 Watt bh 250,000.00
CV. Ananda Kar

Plumbing ###
1 Tangki MPOIN PLUS 1200 Liter U-GROUND unit 4,000,000.00
###
2 Bioseptitank 1000 Liter Biotechno Type BT-06 unit 5,000,000.00
###
3 Ijuk kg 35,000.00
###
4 Pipa PPR PN 10, 20 mm m 12,100.00
Graha Prima
5 Pipa PPR PN 10, 25 mm m 16,000.00
Graha Prima
6 Pipa PPR PN 10, 32 mm m 26,000.00
###
7 Pipa PPR PN 10, 40 mm m 41,000.00
CV. Ananda Kar
8 Pipa PPR PN 20, 20 mm m 17,100.00
Graha Prima
9 Pipa PPR PN 20, 25 mm m 26,100.00
Graha Prima
10 Pipa PVC AW 3/4 Inch Rucika m 9,400.00
CV. Ananda Kar
11 Pipa PVC AW 1 1/4 Inch Rucika m 17,900.00
Graha Prima
12 Pipa PVC AW 2 Inch Rucika m 28,100.00
CV. Ananda Kar
13 Pipa PVC AW 3 Inch Rucika m 56,400.00
Graha Prima
14 Pipa PVC AW 4 Inch Rucika m 90,800.00
CV. Ananda Kar
15 Pipa PVC AW 6 Inch Rucika m 179,000.00
CV. Ananda Kar
16 Torrent Air Stainless 1000 Liter Pinguin TBSK1000 unit 4,200,000.00
###
Graha Prima
CV. Ananda Kar
Graha Prima

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 54
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

UD. Sari Buana


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
###
Graha Prima
Graha Prima

Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Depo Banguna
Depo Banguna
Depo Banguna
Depo Banguna
###

Graha Prima
###

Graha Prima
Graha Prima
Page 55
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
Graha Prima
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Depo Banguna
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
Page 56
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
CV. Ananda Kar
3
Depo Banguna

CV. Ananda Kar


CV. Ananda Kar
Graha Prima
Depo Banguna
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
Depo Banguna
CV. Ananda Kar
Depo Banguna
Depo Banguna

Depo Banguna
CV. Ananda Kar

CV. Ananda Kar


Graha Prima

Page 57
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y

CV. Ananda Kar


UD. Gede Pan
Graha Prima
Graha Prima
CV. Ananda Kar
###
CV. Ananda Kar
UD. Rinna Dewata
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
UD. Astiti
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
###
Graha Prima
CV. Ananda Kar
UD. Gede Pan
UD. Gede Pan
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Page 58
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
Graha Prima
Graha 3Prima
Graha Prima
Graha Prima
UD. Rinna Dewata
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
###
###
###
Graha Prima
CV. Ananda Kar

Page 59
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y

CV. Ananda Kar


Graha Prima
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 60
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
Depo Banguna
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Depo Banguna
Depo Banguna
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
Page 61
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
CV. Ananda Kar
Graha 3Prima
Mitra 10

###
###
###
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar

CV. Ananda Kar

Page 62
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


Page 63
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

Graha Prima
Graha Prima
Graha Prima
UD. Astiti
Graha Prima
Graha Prima
CV. Ananda Kar
UD. Astiti
Mitra 10

###
CV. Ananda Kar
CV. Ananda Kar
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


Page 64
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
###
Graha Prima
Mitra 10
CV. Ananda Kar
Mitra 10
CV. Ananda Kar
CV. Ananda Kar

Mitra 1
Page 65
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Mitra 1
Y
CV. Ananda Kar
3Mitra 1
Graha
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
CV. Ananda Kar
Mitra 10
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
UD. Gumuh Sari Se
Mitra 10
Mitra 10
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
Mitra 10
Mitra 1
Mitra 1
UD. As
Mitra 10
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 66
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
Mitra 10
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
Mitra 10
Mitra 10
Mitra 10
Graha Prima

Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
Graha Prima
Graha Prima
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
Graha Prima
Page 67
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
Graha Prima
3

CV. Ananda Kar


CV. Ananda Kar
###
UD. Asta Bum
CV. Ananda Kar
UD. Astiti
UD. Astiti
UD. Astiti
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

UD. Astiti
###
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Putra Karya Ston
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 68
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
CV. AnandaE Kar
Y
Putra Karya Ston
3 Ston
Putra Karya
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston

CV. Ananda Kar


Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
Putra Karya Ston
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 69
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
UD. Astiti (Truck
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

Page 70
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y
###
### 3
###
###
###
###
###
###
###
###
###
###
###

###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
Page 71
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
### E
Y
###
### 3
###
###
###

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Page 72
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
Graha Prima
Graha 3Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
###
###
CV. Ananda Kar

Graha Prima
Mitra 10
CV. Ananda Kar
CV. Ananda Kar
Page 73
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
Mitra 10
Mitra310
Mitra 10
Mitra 10

Mitra 10
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
Mitra 10
Mitra 10
Mitra 10
Mitra 10
Mitra 10
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

###
###
###
Page 74
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
### E
Y
###
### 3
###
###
###
###
###
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
UD. Astiti
Graha Prima
Graha Prima
Graha Prima
Graha Prima

CV. Ananda Kar

Graha Prima

Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar

Graha Prima
Graha Prima
Page 75
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
Graha Prima
Graha 3Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
###
Graha Prima
Graha Prima
###
###
CV. Ananda Kar
###
###
Graha Prima
UD. Gumuh Sari Se
UD. Gumuh Sari Se
CV. Ananda Kar
UD. Sari Buana
Graha Prima
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
UD. Gumuh Sari Se
CV. Ananda Kar
###
###
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 76
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
Graha Prima
Graha Prima
Graha Prima
Graha Prima
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
CV. Ananda Kar
CV. Ananda Kar
Page 77
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Graha Prima

UD. Sari Buana


UD. Sari Buana
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
Depo Banguna
UD. Sari Buana
Page 78
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
###
UD. Sari3Buana
###
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
###
UD. Sari Buana
UD. Sari Buana
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Mitra 10
CV. Ananda Kar
UD. Sari Buana
CV. Ananda Kar
CV. Ananda Kar
UD. Sari Buana
Tumas Jaya
Tumas Jaya
Tumas Jaya
Mitra 10
###
CV. Ananda Kar
Graha Prima
UD. Astiti
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Depo Banguna
Tunas Jaya
Tunas Jaya
UD. Sari Buana
UD. Sari Buana
UD. Sari Buana
###
###
###
###
Page 79
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
### E
Y
CV. Ananda Kar
### 3
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
UD. Sari Buana
CV. Ananda Kar
Tunas Jaya
###
###
###
###
###
UD. Sari Buana
###

Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Page 80
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
Graha EPrima
Y
Graha Prima
### 3
###
Graha Prima
UD.Wira Bhakt
UD.Wira Bhakt
###
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
Graha Prima
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
Graha Prima
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
Page 81
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
UD.WiraEBhakt
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
UD.Wira Bhakt
CV. Ananda Kar
CV. Ananda Kar
UD.Wira Bhakt
UD.Wira Bhakt
CV. Ananda Kar
###
UD.Wira Bhakt
CV. Ananda Kar
Page 82
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
UD.Wira Bhakt
### 3
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
CV. Ananda Kar
CV. Ananda Kar

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Ananda Kar
###
Page 83
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
CV. Griya EStyle B
Y
CV. Griya Style B
3 Kar
CV. Ananda
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Griya Style B
CV. Ananda Kar
CV. Griya Style B

###
###
###
CV. Ananda Kar
CV. Ananda Kar
###
CV. Ananda Kar
###
###
CV. Ananda Kar
###
###
###
###
###
###
###

###
###
###
###
Page 84
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
### E
Y
###
### 3
###
###
###
###
###
CV. Ananda Kar
###
###
###
###
###
###
###
###
###
###
###
###
###
###
CV. Ananda Kar
CV. Ananda Kar
###
###
###
###
###
###
###
###

CV. Ananda Kar


CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 85
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 86
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
###
###
###
###
###
Page 87
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
### E
Y
###
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 88
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
###
###
###
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 89
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 90
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 91
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 92
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
Page 93
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E Kar
CV. Ananda
Y
CV. Ananda Kar
3 Kar
CV. Ananda
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar
CV. Ananda Kar

Page 94
T
O
K
O
NO NAMA BARANG SATUAN HARGA SATUAN
S
A B C D U
R
V
E
Y

Page 95
Analisa Harga Satuan Rekap Analisa Harga Satuan Dengan Overhead

ID Uraian Satuan Koefisien Harga Satuan Jumlah Harga ID Analisa Pekerjaan Harga Satuan
0.1
A1001 Pembersihan & Perataan 1m2 Area Proyek A1001 Pembersihan & Perataan 1m2 Area Proyek 14,300.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 13,000.00
Bahan

b. Jumlah Bahan 0.00


Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 13,000.00
Overhead & Profit 10% 1,300.00
Harga Satuan Pekerjaan 14,300.00

A1002 Pembuatan 1m2 Bedeng Pekerja A1002 Pembuatan 1m2 Bedeng Pekerja 915,475.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang Kayu OH 1.00 150,000.00 150,000.00
Kepala Tukang OH 0.15 175,000.00 26,250.00
Mandor OH 0.03 200,000.00 5,000.00
a. Jumlah Upah 301,250.00
Bahan
Kayu Dolken Ø 8 - 10 / 400 cm btg 1.25 25,000.00 31,250.00
Kayu Kelas III m3 0.12 2,500,000.00 300,000.00
Paku 10 cm kg 0.30 20,000.00 6,000.00
Semen Gresik 40 Kg zak 0.23 60,000.00 13,500.00
Pasir Beton m3 0.05 300,000.00 15,000.00
Split m3 0.10 290,000.00 29,000.00
Seng BJLS 0,2 Gelombang lbr 0.75 65,000.00 48,750.00
Plywood 4 mm lbr 1.25 70,000.00 87,500.00
b. Jumlah Bahan 531,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 832,250.00
Overhead & Profit 10% 83,225.00
Harga Satuan Pekerjaan 915,475.00

A1003 Pembuatan 1m2 Gudang Bahan & Peralatan A1003 Pembuatan 1m2 Gudang Bahan & Peralatan 716,512.50
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang Kayu OH 1.00 150,000.00 150,000.00
Kepala Tukang OH 0.15 175,000.00 26,250.00
Mandor OH 0.03 200,000.00 5,000.00
a. Jumlah Upah 301,250.00
Bahan
Kayu Dolken Ø 8 - 10 / 400 cm btg 0.63 25,000.00 15,625.00
Kayu Kelas III m3 0.09 2,500,000.00 232,500.00
Paku 10 cm kg 0.15 20,000.00 3,000.00
Semen Gresik 40 Kg zak 0.23 60,000.00 13,500.00
Pasir Beton m3 0.05 300,000.00 15,000.00
Split m3 0.08 290,000.00 21,750.00
Seng BJLS 0,2 Gelombang lbr 0.75 65,000.00 48,750.00
b. Jumlah Bahan 350,125.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 651,375.00
Overhead & Profit 10% 65,137.50
Harga Satuan Pekerjaan 716,512.50

A1004 Pekerjaan Pengukuran dan Pemasangan 1m' Bowplank A1004 Pekerjaan Pengukuran dan Pemasangan 1m' Bowplank 70,895.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang Kayu OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,050.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 21,550.00
Bahan
Kayu Kelas III m3 0.01 2,500,000.00 30,000.00
Kayu Papan 3/20 m3 0.01 2,500,000.00 12,500.00
Paku 10 cm kg 0.02 20,000.00 400.00
b. Jumlah Bahan 42,900.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 64,450.00
Overhead & Profit 10% 6,445.00
Harga Satuan Pekerjaan 70,895.00

A1005 Pekerjaan 1m' Pagar Proyek Sementara dari Seng Gelombang Tinggi 2 Meter A1005 Pekerjaan 1m' Pagar Proyek Sementara dari Seng Gelomban 296,791.00
Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang Kayu OH 0.40 150,000.00 60,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 91,500.00
Bahan
Kayu Dolken Ø 8 - 10 / 400 cm btg 1.25 25,000.00 31,250.00
Semen Gresik 40 Kg zak 0.06 60,000.00 3,750.00
Seng BJLS 0,2 Gelombang lbr 1.20 65,000.00 78,000.00
Pasir Beton m3 0.01 300,000.00 1,500.00
Kayu 5/7 m3 0.03 2,000,000.00 60,000.00
Split m3 0.01 290,000.00 2,610.00
Paku 10 cm kg 0.06 20,000.00 1,200.00
b. Jumlah Bahan 178,310.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 269,810.00
Overhead & Profit 10% 26,981.00
Harga Satuan Pekerjaan 296,791.00
Analisa Harga Satuan Rekap Analisa Harga Satuan Dengan Overhead

ID Uraian Satuan Koefisien Harga Satuan Jumlah Harga ID Analisa Pekerjaan Harga Satuan
0.10 1
B1001 Penggalian 1m3 Tanah Biasa B1001 Penggalian 1m3 Tanah Biasa 128,700.00
Upah
Pekerja OH 0.90 120,000.00 108,000.00
Mandor OH 0.05 200,000.00 9,000.00
a. Jumlah Upah 117,000.00
Bahan

b. Jumlah Bahan 0.00


Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 117,000.00
Overhead & Profit 10% 11,700.00
Harga Satuan Pekerjaan 128,700.00

B1002 Pengurugan 1m3 Dengan Pasir Urug B1002 Pengurugan 1m3 Dengan Pasir Urug 319,000.00
Upah
Pekerja OH 0.30 120,000.00 36,000.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 38,000.00
Bahan
Pasir Urug m3 1.20 210,000.00 252,000.00
b. Jumlah Bahan 252,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 290,000.00
Overhead & Profit 10% 29,000.00
Harga Satuan Pekerjaan 319,000.00

B1003 Membuat 1 m3 Lantai Kerja B1003 Membuat 1 m3 Lantai Kerja 839,714.46


Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang Batu OH 0.28 150,000.00 41,250.00
Kepala Tukang OH 0.03 175,000.00 4,812.50
Mandor OH 0.08 200,000.00 16,600.00
a. Jumlah Upah 206,662.50
Bahan
Semen Gresik 40 Kg zak 6.18 60,000.00 370,500.00
Pasir Beton m3 0.62 300,000.00 186,214.29
b. Jumlah Bahan 556,714.29
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 763,376.79
Overhead & Profit 10% 76,337.68
Harga Satuan Pekerjaan 839,714.46

B1004 Pengurugan Kembali 1m3 Galian Tanah + Pemadatan B1004 Pengurugan Kembali 1m3 Galian Tanah + Pemadatan 57,750.00
Upah
Pekerja OH 0.38 120,000.00 45,000.00
Mandor OH 0.04 200,000.00 7,500.00
a. Jumlah Upah 52,500.00
Bahan

b. Jumlah Bahan 0.00


Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 52,500.00
Overhead & Profit 10% 5,250.00
Harga Satuan Pekerjaan 57,750.00

B1005 Pengurugan 1m3 Tanah Urug Dipadatkan B1005 Pengurugan 1m3 Tanah Urug Dipadatkan 305,800.00
Upah
Pekerja OH 0.40 120,000.00 48,000.00
Mandor OH 0.05 200,000.00 10,000.00
a. Jumlah Upah 58,000.00
Bahan
Tanah Urug m3 1.10 200,000.00 220,000.00
b. Jumlah Bahan 220,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 278,000.00
Overhead & Profit 10% 27,800.00
Harga Satuan Pekerjaan 305,800.00

B1006 Pemasangan 1m3 Batu Belah Campuran 1SP : 5PP B1006 Pemasangan 1m3 Batu Belah Campuran 1SP : 5PP 929,521.37
Upah
Pekerja OH 0.77 120,000.00 92,215.82
Tukang Batu OH 0.38 150,000.00 57,634.89
Kepala Tukang OH 0.04 175,000.00 6,724.07
Mandor OH 0.04 200,000.00 7,684.65
a. Jumlah Upah 164,259.43
Bahan
Batu Belah m3 1.10 290,000.00 319,000.00
Semen Gresik 40 Kg zak 3.40 60,000.00 204,000.00
Pasir Pasang m3 0.54 290,000.00 157,760.00
b. Jumlah Bahan 680,760.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 845,019.43
Overhead & Profit 10% 84,501.94
Harga Satuan Pekerjaan 929,521.37

B1007 Pekerjaan 1m' Pengeboran Lubang Bore Pile Dia. 30 cm B1007 Pekerjaan 1m' Pengeboran Lubang Bore Pile Dia. 30 cm 135,740.00
Upah
Upah Pengeboran Bored Pile m 1.00 28,000.00 28,000.00
Mesin Bor ls 1.00 95,400.00 95,400.00
a. Jumlah Upah 123,400.00
Bahan

b. Jumlah Bahan 0.00


Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 123,400.00
Overhead & Profit 10% 12,340.00
Harga Satuan Pekerjaan 135,740.00

B1008 Membuat 1 m3 Beton Mutu f’c = 21,7 Mpa (K.250) B1008 Membuat 1 m3 Beton Mutu f’c = 21,7 Mpa (K.250) 1,365,705.00
Upah
Pekerja OH 1.57 120,000.00 188,400.00
Tukang Batu OH 0.28 150,000.00 41,250.00
Kepala Tukang OH 0.03 175,000.00 4,900.00
Mandor OH 0.08 200,000.00 16,600.00
a. Jumlah Upah 251,150.00
Bahan
Semen Gresik 40 Kg zak 9.89 60,000.00 593,400.00
Pasir Beton m3 0.55 300,000.00 165,000.00
Split m3 0.80 290,000.00 232,000.00
b. Jumlah Bahan 990,400.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,241,550.00
Overhead & Profit 10% 124,155.00
Harga Satuan Pekerjaan 1,365,705.00

B1009 Pembesian 1 kg Dengan Besi Polos Atau Besi Ulir B1009 Pembesian 1 kg Dengan Besi Polos Atau Besi Ulir 16,816.86
Upah
Pekerja OH 0.01 120,000.00 1,139.29
Tukang Besi OH 0.01 150,000.00 1,424.12
Kepala Tukang OH 0.00 175,000.00 166.15
Mandor OH 0.00 200,000.00 108.50
a. Jumlah Upah 2,838.06
Bahan
Besi beton kg 1.05 11,500.00 12,075.00
Kawat Bendrat kg 0.02 25,000.00 375.00
b. Jumlah Bahan 12,450.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 15,288.06
Overhead & Profit 10% 1,528.81
Harga Satuan Pekerjaan 16,816.86

B1010 Pemasangan 1 m2 Bekisting Batako B1010 Pemasangan 1 m2 Bekisting Batako 137,599.00


Upah
Pekerja OH 0.30 120,000.00 36,000.00
Tukang batu OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.02 200,000.00 3,000.00
a. Jumlah Upah 55,750.00
Bahan
Batako Press bh 13.00 2,800.00 36,400.00
Semen Gresik 40 Kg zak 0.38 60,000.00 22,500.00
Pasir pasang m3 0.04 290,000.00 10,440.00
b. Jumlah Bahan 69,340.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 125,090.00
Overhead & Profit 10% 12,509.00
Harga Satuan Pekerjaan 137,599.00

B1011 Pemasangan 1 m2 Bekisting Kayu B1011 Pemasangan 1 m2 Bekisting Kayu 180,510.00


Upah
Pekerja OH 0.23 120,000.00 27,600.00
Tukang Kayu OH 0.16 150,000.00 24,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 59,100.00
Bahan
Kayu Kaso m3 0.01 2,500,000.00 30,000.00
Multiplek 9 mm lbr 0.35 110,000.00 38,500.00
Paku 10 cm kg 0.20 20,000.00 4,000.00
Minyak bekisting ltr 0.10 25,000.00 2,500.00
Kayu Dolken Ø 8 - 10 / 400 cm btg 1.20 25,000.00 30,000.00
b. Jumlah Bahan 105,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 164,100.00
Overhead & Profit 10% 16,410.00
Harga Satuan Pekerjaan 180,510.00

B1012 Pembesian 1 m2 Wiremesh M8 B1012 Pembesian 1 m2 Wiremesh M8 92,391.27


Upah
Pekerja OH 0.05 120,000.00 6,000.00
Tukang Besi OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 19,250.00
Bahan
Wiremesh M8 lbr 0.09 720,000.00 63,492.06
Kawat Bendrat kg 0.05 25,000.00 1,250.00
b. Jumlah Bahan 64,742.06
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 83,992.06
Overhead & Profit 10% 8,399.21
Harga Satuan Pekerjaan 92,391.27

B1013 Pemasangan 1 m2 Aluminium Foil B1013 Pemasangan 1 m2 Aluminium Foil 23,200.83


Upah
Pekerja OH 0.02 120,000.00 1,800.00
Tukang Besi OH 0.02 150,000.00 2,250.00
Kepala Tukang OH 0.00 175,000.00 175.00
Mandor OH 0.00 200,000.00 200.00
a. Jumlah Upah 4,425.00
Bahan
Aluminium Foil (Uk 1.2 m x 25 m) roll 0.03 500,000.00 16,666.67
b. Jumlah Bahan 16,666.67
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 21,091.67
Overhead & Profit 10% 2,109.17
Harga Satuan Pekerjaan 23,200.83

B1014 Pemasangan 1 m2 Multiplek 9 mm B1014 Pemasangan 1 m2 Multiplek 9 mm 124,865.28


Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang Besi OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 61,500.00
Bahan
Multiplek 9 mm lbr 0.38 110,000.00 42,013.89
Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 52,013.89
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 113,513.89
Overhead & Profit 10% 11,351.39
Harga Satuan Pekerjaan 124,865.28

B1015 Pemasangan 1 m2 Atap Bitumen B1015 Pemasangan 1 m2 Atap Bitumen 641,850.00


Upah
Pekerja OH 0.60 120,000.00 72,000.00
Tukang Besi OH 0.30 150,000.00 45,000.00
Kepala Tukang OH 0.06 175,000.00 10,500.00
Mandor OH 0.03 200,000.00 6,000.00
a. Jumlah Upah 133,500.00
Bahan
Atap Bitumen Setara Tegola Master m2 1.00 450,000.00 450,000.00
b. Jumlah Bahan 450,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 583,500.00
Overhead & Profit 10% 58,350.00
Harga Satuan Pekerjaan 641,850.00

B1016 Pemasangan 1 m2 Bubungan Atap Bitumen B1016 Pemasangan 1 m2 Bubungan Atap Bitumen 200,337.50
Upah
Pekerja OH 0.25 120,000.00 30,000.00
Tukang Besi OH 0.13 150,000.00 18,750.00
Kepala Tukang OH 0.03 175,000.00 4,375.00
Mandor OH 0.01 200,000.00 2,500.00
a. Jumlah Upah 55,625.00
Bahan
Bubungan Atap Bitumen Setara Onduline m 1.10 115,000.00 126,500.00
b. Jumlah Bahan 126,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 182,125.00
Overhead & Profit 10% 18,212.50
Harga Satuan Pekerjaan 200,337.50

B1017 Membuat 1 m3 Beton Mutu f’c = 33,2 Mpa (K.400) B1017 Membuat 1 m3 Beton Mutu f’c = 33,2 Mpa (K.400) 1,524,985.00
Upah
Pekerja OH 1.57 120,000.00 188,400.00
Tukang Batu OH 0.28 150,000.00 41,250.00
Kepala Tukang OH 0.03 175,000.00 4,900.00
Mandor OH 0.08 200,000.00 16,600.00
a. Jumlah Upah 251,150.00
Bahan
Semen Gresik 40 Kg zak 12.40 60,000.00 744,000.00
Pasir Beton m3 0.55 300,000.00 165,000.00
Split m3 0.78 290,000.00 226,200.00
b. Jumlah Bahan 1,135,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,386,350.00
Overhead & Profit 10% 138,635.00
Harga Satuan Pekerjaan 1,524,985.00

B1018 Pemasangan 1 m2 Atap Cisangkan B1018 Pemasangan 1 m2 Atap Cisangkan 358,050.00


Upah
Pekerja OH 0.60 120,000.00 72,000.00
Tukang OH 0.30 150,000.00 45,000.00
Kepala Tukang OH 0.06 175,000.00 10,500.00
Mandor OH 0.03 200,000.00 6,000.00
a. Jumlah Upah 133,500.00
Bahan
Atap Cisangkan Victoria 33x42 cm bh 12.00 16,000.00 192,000.00
b. Jumlah Bahan 192,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 325,500.00
Overhead & Profit 10% 32,550.00
Harga Satuan Pekerjaan 358,050.00

B1019 Pemasangan 1 m2 Bubungan Atap Cisangkan B1019 Pemasangan 1 m2 Bubungan Atap Cisangkan 182,187.50
Upah
Pekerja OH 0.25 120,000.00 30,000.00
Tukang OH 0.13 150,000.00 18,750.00
Kepala Tukang OH 0.03 175,000.00 4,375.00
Mandor OH 0.01 200,000.00 2,500.00
a. Jumlah Upah 55,625.00
Bahan
Bubungan Atap Cisangkan m 1.10 100,000.00 110,000.00
b. Jumlah Bahan 110,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 165,625.00
Overhead & Profit 10% 16,562.50
Harga Satuan Pekerjaan 182,187.50

B1020 Membuat 1 m3 Beton Mutu f’c = 25 Mpa (K.300) B1020 Membuat 1 m3 Beton Mutu f’c = 25 Mpa (K.300) 1,416,085.00
Upah
Pekerja OH 1.57 120,000.00 188,400.00
Tukang Batu OH 0.28 150,000.00 41,250.00
Kepala Tukang OH 0.03 175,000.00 4,900.00
Mandor OH 0.08 200,000.00 16,600.00
a. Jumlah Upah 251,150.00
Bahan
Semen Gresik 40 Kg zak 10.75 60,000.00 645,000.00
Pasir Beton m3 0.55 300,000.00 165,000.00
Split m3 0.78 290,000.00 226,200.00
b. Jumlah Bahan 1,036,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,287,350.00
Overhead & Profit 10% 128,735.00
Harga Satuan Pekerjaan 1,416,085.00

B1021 Pekerjaan 1 kg Baja B1021 Pekerjaan 1 kg Baja 28,847.50


Upah
Pekerja OH 0.03 120,000.00 3,000.00
Tukang OH 0.01 150,000.00 1,500.00
Kepala Tukang OH 0.00 175,000.00 525.00
Mandor OH 0.00 200,000.00 200.00
a. Jumlah Upah 5,225.00
Bahan
Besi Baja kg 1.00 19,000.00 19,000.00
Oksigen, LPG, dll ls 1.00 2,000.00 2,000.00
b. Jumlah Bahan 21,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 26,225.00
Overhead & Profit 10% 2,622.50
Harga Satuan Pekerjaan 28,847.50

B1022 Pekerjaan 1 kg Plat Besi B1022 Pekerjaan 1 kg Plat Besi 27,747.50


Upah
Pekerja OH 0.03 120,000.00 3,000.00
Tukang OH 0.01 150,000.00 1,500.00
Kepala Tukang OH 0.00 175,000.00 525.00
Mandor OH 0.00 200,000.00 200.00
a. Jumlah Upah 5,225.00
Bahan
Plat Besi kg 1.00 18,000.00 18,000.00
Oksigen, LPG, dll ls 1.00 2,000.00 2,000.00
b. Jumlah Bahan 20,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 25,225.00
Overhead & Profit 10% 2,522.50
Harga Satuan Pekerjaan 27,747.50

B1023 Pekerjaan 1 bh Baut HTB B1023 Pekerjaan 1 bh Baut HTB 11,742.50


Upah
Pekerja OH 0.01 120,000.00 1,200.00
Tukang OH 0.01 150,000.00 750.00
Kepala Tukang OH 0.00 175,000.00 525.00
Mandor OH 0.00 200,000.00 200.00
a. Jumlah Upah 2,675.00
Bahan
Baut HTB kg 1.00 8,000.00 8,000.00
b. Jumlah Bahan 8,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 10,675.00
Overhead & Profit 10% 1,067.50
Harga Satuan Pekerjaan 11,742.50
Analisa Harga Satuan Rekap Analisa Harga Satuan Dengan Overhead

ID Uraian Satuan Koefisien Harga Satuan Jumlah Harga ID Analisa Pekerjaan Harga Satuan
0.10 1
Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½
C1001 Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal ½ batu campuran 1SP :5PP C1001 batu campuran 1SP :5PP 166,705.00
Upah
Pekerja OH 0.30 120,000.00 36,000.00
Tukang batu OH 0.11 150,000.00 16,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.02 200,000.00 3,000.00
a. Jumlah Upah 57,250.00
Bahan
Bata Merah bh 80.00 800.00 64,000.00
Semen Gresik 40 Kg zak 0.29 60,000.00 17,250.00
Pasir pasang m3 0.05 290,000.00 13,050.00
b. Jumlah Bahan 94,300.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 151,550.00
Overhead & Profit 10% 15,155.00
Harga Satuan Pekerjaan 166,705.00

C1002 Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm C1002 Pemasangan 1 m2 Plesteran 1SP : 5PP tebal 15 mm 61,677.21
Upah
Pekerja OH 0.19 120,000.00 22,800.00
Tukang batu OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.01 175,000.00 1,596.09
Mandor OH 0.01 200,000.00 1,824.10
a. Jumlah Upah 41,220.20
Bahan
Semen Gresik 40 Kg zak 0.23 60,000.00 13,500.00
Pasir pasang m3 0.05 290,000.00 1,350.00
b. Jumlah Bahan 14,850.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 56,070.20
Overhead & Profit 10% 5,607.02
Harga Satuan Pekerjaan 61,677.21
C1003 Pemasangan 1 m2 Acian C1003 Pemasangan 1 m2 Acian 47,487.21
Upah
Pekerja OH 0.16 120,000.00 18,762.21
Tukang batu OH 0.08 150,000.00 11,726.38
Kepala Tukang OH 0.01 175,000.00 1,368.08
Mandor OH 0.01 200,000.00 1,563.52
a. Jumlah Upah 33,420.20
Bahan
Semen Gresik 40 Kg zak 0.16 60,000.00 9,750.00
b. Jumlah Bahan 9,750.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 43,170.20
Overhead & Profit 10% 4,317.02
Harga Satuan Pekerjaan 47,487.21

C1004 Pemasangan 1 m2 Batu Andesit 30x30 cm C1004 Pemasangan 1 m2 Batu Andesit 30x30 cm 471,109.07
Upah
Pekerja OH 0.78 120,000.00 93,811.07
Tukang batu OH 0.39 150,000.00 58,631.92
Kepala Tukang OH 0.04 175,000.00 6,840.39
Mandor OH 0.04 200,000.00 7,817.59
a. Jumlah Upah 167,100.98
Bahan
Batu Andesit 30x30 cm m2 1.10 200,000.00 220,000.00
Semen Gresik 40 Kg zak 0.30 60,000.00 17,700.00
Pasir Pasang m3 0.06 290,000.00 17,400.00
Tile Grout MU 408 kg 0.38 16,000.00 6,080.00
b. Jumlah Bahan 261,180.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 428,280.98
Overhead & Profit 10% 42,828.10
Harga Satuan Pekerjaan 471,109.07

C1005 Pemasangan 1 m2 Granite Niro GNT01 Calcitte 600x600 mm C1005 Pemasangan 1 m2 Granite Niro GNT01 Calcitte 600x600 mm 362,120.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GNT01 Calcite 600x600 mm m2 1.05 215,000.00 225,750.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 256,450.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 329,200.00
Overhead & Profit 10% 32,920.00
Harga Satuan Pekerjaan 362,120.00

Pemasangan 1 m2 Granite Niro GPB05 Castle Rock 600x600


C1006 Pemasangan 1 m2 Granite Niro GPB05 Castle Rock 600x600 mm C1006 mm 489,170.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GPB05 Castle Rock 600x600 mm m2 1.05 325,000.00 341,250.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 371,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 444,700.00
Overhead & Profit 10% 44,470.00
Harga Satuan Pekerjaan 489,170.00

C1007 Pemasangan 1 m’ Plint Granite Ukuran 10 cm X 60 cm C1007 Pemasangan 1 m’ Plint Granite Ukuran 10 cm X 60 cm 145,102.13
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang batu OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.02 175,000.00 3,855.14
Mandor OH 0.02 200,000.00 4,405.88
a. Jumlah Upah 35,261.02
Bahan
Granite Niro GPB05 Castle Rock 600x600 mm m2 0.23 325,000.00 74,750.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.01 290,000.00 2,900.00
Semen Warna kg 0.05 20,000.00 1,000.00
b. Jumlah Bahan 96,650.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 131,911.02
Overhead & Profit 10% 13,191.10
Harga Satuan Pekerjaan 145,102.13
Pemasangan 1 m2 Plafond Gypsum Board Ukuran,Tebal 9
C1008 Pemasangan 1 m2 Plafond Gypsum Board Ukuran,Tebal 9 mm + Rangka Hollow C1008 mm + Rangka Hollow 172,678.00
Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang kayu OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.03 175,000.00 5,250.00
Mandor OH 0.03 200,000.00 6,000.00
a. Jumlah Upah 50,250.00
Bahan
Gypsumboard 9 mm Setara Jayaboard lbr 0.42 110,000.00 45,650.00
Hollow 20x40 (Rangka Plafond) btg 0.15 30,000.00 4,500.00
Hollow 40x40 (Rangka Plafond) btg 0.36 45,000.00 16,380.00
Paku Gypsum kg 0.11 20,000.00 2,200.00
Ramset/Dynabolt bh 4.00 7,000.00 28,000.00
Compound kg 0.13 80,000.00 10,000.00
b. Jumlah Bahan 106,730.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 156,980.00
Overhead & Profit 10% 15,698.00
Harga Satuan Pekerjaan 172,678.00

C1009 Pemasangan 1 m List Gypsum C1009 Pemasangan 1 m List Gypsum 46,090.00


Upah
Pekerja OH 0.04 120,000.00 4,800.00
Tukang kayu OH 0.04 150,000.00 6,000.00
Kepala Tukang OH 0.00 175,000.00 700.00
Mandor OH 0.00 200,000.00 400.00
a. Jumlah Upah 11,900.00
Bahan
List Gypsum m 1.00 20,000.00 20,000.00
Tepung Gypsum kg 0.40 25,000.00 10,000.00
b. Jumlah Bahan 30,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 41,900.00
Overhead & Profit 10% 4,190.00
Harga Satuan Pekerjaan 46,090.00

C1010 Pemasangan 1 m’ Shadowline C1010 Pemasangan 1 m’ Shadowline 36,718.00


Upah
Pekerja OH 0.04 120,000.00 4,800.00
Tukang kayu OH 0.04 150,000.00 6,000.00
Kepala Tukang OH 0.00 175,000.00 700.00
Mandor OH 0.00 200,000.00 400.00
a. Jumlah Upah 11,900.00
Bahan
shadowline m 1.00 16,000.00 16,000.00
Tepung Gypsum kg 0.20 25,000.00 5,000.00
Paku Sekrup 2" kg 0.01 48,000.00 480.00
b. Jumlah Bahan 21,480.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 33,380.00
Overhead & Profit 10% 3,338.00
Harga Satuan Pekerjaan 36,718.00

C1011 Pemasangan 1 m Kusen Aluminium 4" Setara YKK C1011 Pemasangan 1 m Kusen Aluminium 4" Setara YKK 315,706.88
Upah
Pekerja OH 0.05 120,000.00 6,300.00
Tukang khusus alumunium OH 0.16 150,000.00 23,625.00
Kepala Tukang OH 0.02 175,000.00 2,756.25
Mandor OH 0.00 200,000.00 525.00
a. Jumlah Upah 33,206.25
Bahan
Kusen Aluminium YKK AP 4 Inch m 1.00 250,000.00 250,000.00
Paku Sekrup 3,5" kg 0.02 85,000.00 1,700.00
Sealant tube 0.06 35,000.00 2,100.00
b. Jumlah Bahan 253,800.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 287,006.25
Overhead & Profit 10% 28,700.63
Harga Satuan Pekerjaan 315,706.88

C1012 Pemasangan 1 m2 Daun Aluminium C1012 Pemasangan 1 m2 Daun Aluminium 1,954,700.00


Upah
Pekerja OH 0.80 120,000.00 96,000.00
Tukang khusus alumunium OH 0.40 150,000.00 60,000.00
Kepala Tukang OH 0.08 175,000.00 14,000.00
Mandor OH 0.04 200,000.00 7,000.00
a. Jumlah Upah 177,000.00
Bahan
Daun Aluminium m2 1.00 1,600,000.00 1,600,000.00
b. Jumlah Bahan 1,600,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,777,000.00
Overhead & Profit 10% 177,700.00
Harga Satuan Pekerjaan 1,954,700.00

C1013 Pemasangan 1 m2 Kaca Clear 8 mm C1013 Pemasangan 1 m2 Kaca Clear 8 mm 445,087.50


Upah
Pekerja OH 0.45 120,000.00 54,000.00
Tukang khusus alumunium OH 0.23 150,000.00 33,750.00
Kepala Tukang OH 0.05 175,000.00 7,875.00
Mandor OH 0.02 200,000.00 4,500.00
a. Jumlah Upah 100,125.00
Bahan
Kaca Clear 8 mm m2 1.05 290,000.00 304,500.00
b. Jumlah Bahan 304,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 404,625.00
Overhead & Profit 10% 40,462.50
Harga Satuan Pekerjaan 445,087.50

C1014 Pemasangan 1 pcs Engsel 4 Inch Setara Dekson C1014 Pemasangan 1 pcs Engsel 4 Inch Setara Dekson 134,475.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Engsel 4 Inch Dekson SUS 304 pcs 1.00 100,000.00 100,000.00
b. Jumlah Bahan 100,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 122,250.00
Overhead & Profit 10% 12,225.00
Harga Satuan Pekerjaan 134,475.00

C1015 Pemasangan 1 set Lockcase Cylinder Dekson C1015 Pemasangan 1 set Lockcase Cylinder Dekson 488,950.00
Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 44,500.00
Bahan
Lockcase Cylinder Dekson MTS 84030 set 1.00 400,000.00 400,000.00
b. Jumlah Bahan 400,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 444,500.00
Overhead & Profit 10% 44,450.00
Harga Satuan Pekerjaan 488,950.00

C1016 Pemasangan 1 set Lever Handle Dekson C1016 Pemasangan 1 set Lever Handle Dekson 443,712.50
Upah
Pekerja OH 0.15 120,000.00 18,000.00
Tukang OH 0.08 150,000.00 11,250.00
Kepala Tukang OH 0.02 175,000.00 2,625.00
Mandor OH 0.01 200,000.00 1,500.00
a. Jumlah Upah 33,375.00
Bahan
Lever Handle Dekson LHP 52228 set 1.00 370,000.00 370,000.00
b. Jumlah Bahan 370,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 403,375.00
Overhead & Profit 10% 40,337.50
Harga Satuan Pekerjaan 443,712.50

C1017 Pemasangan 1 set Door Stopper Dekson C1017 Pemasangan 1 set Door Stopper Dekson 161,975.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Door Stopper DS 009 set 1.00 125,000.00 125,000.00
b. Jumlah Bahan 125,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 147,250.00
Overhead & Profit 10% 14,725.00
Harga Satuan Pekerjaan 161,975.00

C1018 Pemasangan 1 m Kusen Kayu Merbau C1018 Pemasangan 1 m Kusen Kayu Merbau 401,500.00
Upah
Pekerja OH 0.25 120,000.00 30,000.00
Tukang Kayu OH 0.13 150,000.00 18,750.00
Kepala Tukang OH 0.05 175,000.00 8,750.00
Mandor OH 0.01 200,000.00 2,500.00
a. Jumlah Upah 60,000.00
Bahan
Kusen Kayu Merbau m 1.00 305,000.00 305,000.00
b. Jumlah Bahan 305,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 365,000.00
Overhead & Profit 10% 36,500.00
Harga Satuan Pekerjaan 401,500.00

C1019 Pemasangan 1 m2 Daun Kayu Merbau C1019 Pemasangan 1 m2 Daun Kayu Merbau 3,043,700.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang Kayu OH 0.60 150,000.00 90,000.00
Kepala Tukang OH 0.12 175,000.00 21,000.00
Mandor OH 0.06 200,000.00 12,000.00
a. Jumlah Upah 267,000.00
Bahan
Daun Pintu Kayu Merbau m2 1.00 2,500,000.00 2,500,000.00
b. Jumlah Bahan 2,500,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,767,000.00
Overhead & Profit 10% 276,700.00
Harga Satuan Pekerjaan 3,043,700.00

C1020 Pemasangan 1 m2 Finishing Daun Pintu Kayu C1020 Pemasangan 1 m2 Finishing Daun Pintu Kayu 288,157.77
Upah
Pekerja OH 0.17 120,000.00 20,730.90
Tukang cat/pelitur OH 0.26 150,000.00 38,870.43
Kepala tukang OH 0.07 175,000.00 12,093.02
Mandor OH 0.01 200,000.00 2,591.36
a. Jumlah Upah 74,285.71
Bahan
Dempul Setara Alfagloss kg 0.60 45,000.00 26,785.71
Cat Primer Propan kg 0.60 95,000.00 56,547.62
Cat Acrylic Propan kg 0.12 85,000.00 10,119.05
Clear Propan Acrylic kg 0.30 85,000.00 25,297.62
Thinner PU ltr 1.80 35,000.00 63,000.00
Amplas lbr 0.59 10,000.00 5,925.89
b. Jumlah Bahan 187,675.89
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 261,961.61
Overhead & Profit 10% 26,196.16
Harga Satuan Pekerjaan 288,157.77

C1021 Pekerjaan 1 m2 Pengecetan Interior C1021 Pekerjaan 1 m2 Pengecetan Interior 61,661.40


Upah
Pekerja OH 0.03 120,000.00 4,082.93
Tukang cat/pelitur OH 0.11 150,000.00 16,076.56
Kepala tukang OH 0.01 175,000.00 1,875.60
Mandor OH 0.01 200,000.00 1,020.73
a. Jumlah Upah 23,055.82
Bahan
Cat Alkali Primer ltr 0.15 30,000.00 4,500.00
Cat Dulux Pentalite ltr 0.30 90,000.00 27,000.00
Amplas lbr 0.15 10,000.00 1,500.00
b. Jumlah Bahan 33,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 56,055.82
Overhead & Profit 10% 5,605.58
Harga Satuan Pekerjaan 61,661.40

C1022 Pekerjaan 1 m2 Pengecetan Ekterior C1022 Pekerjaan 1 m2 Pengecetan Ekterior 74,861.40


Upah
Pekerja OH 0.03 120,000.00 4,082.93
Tukang cat/pelitur OH 0.11 150,000.00 16,076.56
Kepala tukang OH 0.01 175,000.00 1,875.60
Mandor OH 0.01 200,000.00 1,020.73
a. Jumlah Upah 23,055.82
Bahan
Cat Alkali Primer ltr 0.15 30,000.00 4,500.00
Cat Dulux Weathershield ltr 0.30 130,000.00 39,000.00
Amplas lbr 0.15 10,000.00 1,500.00
b. Jumlah Bahan 45,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 68,055.82
Overhead & Profit 10% 6,805.58
Harga Satuan Pekerjaan 74,861.40

C1023 Pekerjaan 1 m2 Pengecetan Aquaproof C1023 Pekerjaan 1 m2 Pengecetan Aquaproof 56,711.40


Upah
Pekerja OH 0.03 120,000.00 4,082.93
Tukang cat/pelitur OH 0.11 150,000.00 16,076.56
Kepala tukang OH 0.01 175,000.00 1,875.60
Mandor OH 0.01 200,000.00 1,020.73
a. Jumlah Upah 23,055.82
Bahan
Cat Alkali Primer ltr 0.15 30,000.00 4,500.00
Cat Dulux Aquaproof ltr 0.30 75,000.00 22,500.00
Amplas lbr 0.15 10,000.00 1,500.00
b. Jumlah Bahan 28,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 51,555.82
Overhead & Profit 10% 5,155.58
Harga Satuan Pekerjaan 56,711.40

C1024 Pekerjaan 1 m2 Waterproofing Coating C1024 Pekerjaan 1 m2 Waterproofing Coating 65,241.00


Upah
Pekerja OH 0.01 120,000.00 1,440.00
Tukang cat/pelitur OH 0.04 150,000.00 5,670.00
Kepala tukang OH 0.04 175,000.00 6,300.00
Mandor OH 0.02 200,000.00 3,600.00
a. Jumlah Upah 17,010.00
Bahan
Sikabon kg 0.15 62,000.00 9,300.00
Sikacoat kg 0.21 150,000.00 31,500.00
Kuas Star 4" bh 0.06 25,000.00 1,500.00
b. Jumlah Bahan 42,300.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 59,310.00
Overhead & Profit 10% 5,931.00
Harga Satuan Pekerjaan 65,241.00

C1025 Pekerjaan 1 bh Closet Duduk TOTO CW637J C1025 Pekerjaan 1 bh Closet Duduk TOTO CW637J 4,429,975.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang cat/pelitur OH 0.65 150,000.00 97,500.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 277,250.00
Bahan
Closet Duduk TOTO CW637J bh 1.00 3,700,000.00 3,700,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 3,750,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 4,027,250.00
Overhead & Profit 10% 402,725.00
Harga Satuan Pekerjaan 4,429,975.00

C1026 Pekerjaan 1 bh Jet Washer TOTO TX403SB C1026 Pekerjaan 1 bh Jet Washer TOTO TX403SB 699,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Jet Washer TOTO TX403SB bh 1.00 600,000.00 600,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 610,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 635,850.00
Overhead & Profit 10% 63,585.00
Harga Satuan Pekerjaan 699,435.00

C1027 Pekerjaan 1 bh Floordrain TOTO TX1EB C1027 Pekerjaan 1 bh Floordrain TOTO TX1EB 567,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Floordrain TOTO TX1EB bh 1.00 480,000.00 480,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 490,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 515,850.00
Overhead & Profit 10% 51,585.00
Harga Satuan Pekerjaan 567,435.00

C1028 Pekerjaan 1 bh Shower TOTO TX402SPN C1028 Pekerjaan 1 bh Shower TOTO TX402SPN 1,287,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Shower TOTO TX402SPN bh 1.00 890,000.00 890,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 940,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,170,750.00
Overhead & Profit 10% 117,075.00
Harga Satuan Pekerjaan 1,287,825.00

C1029 Pemasangan 1 m2 Marmer Travertine Classic Ivory C1029 Pemasangan 1 m2 Marmer Travertine Classic Ivory 1,936,000.00
Upah
Upah Pemasangan Marmer M2 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
Marmer Travertine Classic Ivory m2 1.00 1,200,000.00 1,200,000.00
Finishing ls 1.00 60,000.00 60,000.00
b. Jumlah Bahan 1,260,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,760,000.00
Overhead & Profit 10% 176,000.00
Harga Satuan Pekerjaan 1,936,000.00

C1030 Pemasangan 1 m2 Batu Paras Susun Jogja C1030 Pemasangan 1 m2 Batu Paras Susun Jogja 471,109.07
Upah
Pekerja OH 0.78 120,000.00 93,811.07
Tukang batu OH 0.39 150,000.00 58,631.92
Kepala Tukang OH 0.04 175,000.00 6,840.39
Mandor OH 0.04 200,000.00 7,817.59
a. Jumlah Upah 167,100.98
Bahan
Batu Paras Susun Jogja m2 1.10 200,000.00 220,000.00
Semen Gresik 40 Kg zak 0.30 60,000.00 17,700.00
Pasir Pasang m3 0.06 290,000.00 17,400.00
Tile Grout MU 408 kg 0.38 16,000.00 6,080.00
b. Jumlah Bahan 261,180.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 428,280.98
Overhead & Profit 10% 42,828.10
Harga Satuan Pekerjaan 471,109.07

C1031 Pemasangan 1 m2 Marmer Travertine White C1031 Pemasangan 1 m2 Marmer Travertine White 1,936,000.00
Upah
Upah Pemasangan Marmer M2 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
Marmer Travertine White m2 1.00 1,200,000.00 1,200,000.00
Finishing ls 1.00 60,000.00 60,000.00
b. Jumlah Bahan 1,260,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,760,000.00
Overhead & Profit 10% 176,000.00
Harga Satuan Pekerjaan 1,936,000.00

Pemasangan 1 m2 Granite Niro Marmore GMO03 Grisia Grey


C1032 Pemasangan 1 m2 Granite Niro Marmore GMO03 Grisia Grey 600x600 mm C1032 600x600 mm 310,145.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro Marmore GMO03 Grisia Grey 600x600 mm m2 1.05 170,000.00 178,500.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 209,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 281,950.00
Overhead & Profit 10% 28,195.00
Harga Satuan Pekerjaan 310,145.00

C1033 Pemasangan 1 m2 Marmer Onyx White C1033 Pemasangan 1 m2 Marmer Onyx White 2,629,000.00
Upah
Upah Pemasangan Marmer M2 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
Marmer Onyx White m2 1.00 1,800,000.00 1,800,000.00
Finishing ls 1.00 90,000.00 90,000.00
b. Jumlah Bahan 1,890,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,390,000.00
Overhead & Profit 10% 239,000.00
Harga Satuan Pekerjaan 2,629,000.00

Pemasangan 1 m2 Granite Niro Granulo GNL01 Branco


C1034 Pemasangan 1 m2 Granite Niro Granulo GNL01 Branco 600x600 mm C1034 600x600 mm 350,570.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro Granulo GNL01 Branco 600x600 mm m2 1.05 205,000.00 215,250.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 245,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 318,700.00
Overhead & Profit 10% 31,870.00
Harga Satuan Pekerjaan 350,570.00

Pemasangan 1 m2 Granite Niro GNC01 Stark Beige 600x600


C1035 Pemasangan 1 m2 Granite Niro GNC01 Stark Beige 600x600 mm C1035 mm 339,020.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GNC01 Stark Beige 600x600 mm m2 1.05 195,000.00 204,750.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 235,450.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 308,200.00
Overhead & Profit 10% 30,820.00
Harga Satuan Pekerjaan 339,020.00

C1036 Pemasangan 1 m2 Grey Cobblestone 100x100x50 mm C1036 Pemasangan 1 m2 Grey Cobblestone 100x100x50 mm 471,109.07
Upah
Pekerja OH 0.78 120,000.00 93,811.07
Tukang batu OH 0.39 150,000.00 58,631.92
Kepala Tukang OH 0.04 175,000.00 6,840.39
Mandor OH 0.04 200,000.00 7,817.59
a. Jumlah Upah 167,100.98
Bahan
Batu Cobble Grey 100x100x50 mm m2 1.10 200,000.00 220,000.00
Semen Gresik 40 Kg zak 0.30 60,000.00 17,700.00
Pasir Pasang m3 0.06 290,000.00 17,400.00
Tile Grout MU 408 kg 0.38 16,000.00 6,080.00
b. Jumlah Bahan 261,180.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 428,280.98
Overhead & Profit 10% 42,828.10
Harga Satuan Pekerjaan 471,109.07

Pemasangan 1 m2 Granite Quadra Bianco Lasa 1600x3200


C1037 Pemasangan 1 m2 Granite Quadra Bianco Lasa 1600x3200 mm C1037 mm 2,213,200.00
Upah
Upah Pemasangan Quadra M2 1.00 450,000.00 450,000.00
a. Jumlah Upah 450,000.00
Bahan
Quadra Bianco Lasa 1600x3200 mm m2 1.05 1,420,000.00 1,491,000.00
Finishing ls 1.00 71,000.00 71,000.00
b. Jumlah Bahan 1,562,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,012,000.00
Overhead & Profit 10% 201,200.00
Harga Satuan Pekerjaan 2,213,200.00

C1038 Pemasangan 1 m2 Paving Block t = 8 cm C1038 Pemasangan 1 m2 Paving Block t = 8 cm 269,500.00


Upah
Pekerja OH 0.15 120,000.00 18,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 53,500.00
Bahan
Paving Block t = 8 cm K300 m2 1.10 160,000.00 176,000.00
Abu Batu m3 0.05 310,000.00 15,500.00
b. Jumlah Bahan 191,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 245,000.00
Overhead & Profit 10% 24,500.00
Harga Satuan Pekerjaan 269,500.00

C1039 Pemasangan 1 m2 Marmer Carrara White Gold C1039 Pemasangan 1 m2 Marmer Carrara White Gold 2,629,000.00
Upah
Upah Pemasangan Marmer M2 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
Marmer Carrara White Gold m2 1.00 1,800,000.00 1,800,000.00
Finishing ls 1.00 90,000.00 90,000.00
b. Jumlah Bahan 1,890,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,390,000.00
Overhead & Profit 10% 239,000.00
Harga Satuan Pekerjaan 2,629,000.00

Pemasangan 1 m2 Granite Quadra PD Sandstone Grigio


C1040 Pemasangan 1 m2 Granite Quadra PD Sandstone Grigio 1200x2400 mm C1040 1200x2400 mm 1,959,100.00
Upah
Upah Pemasangan Quadra M2 1.00 450,000.00 450,000.00
a. Jumlah Upah 450,000.00
Bahan
Quadra PD Sandstone Grigio 1200x2400 mm m2 1.05 1,210,000.00 1,270,500.00
Finishing ls 1.00 60,500.00 60,500.00
b. Jumlah Bahan 1,331,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,781,000.00
Overhead & Profit 10% 178,100.00
Harga Satuan Pekerjaan 1,959,100.00

C1041 Pemasangan 1 m Finishing Kusen Pintu Kayu C1041 Pemasangan 1 m Finishing Kusen Pintu Kayu 96,052.59
Upah
Pekerja OH 0.06 120,000.00 6,910.30
Tukang cat/pelitur OH 0.09 150,000.00 12,956.81
Kepala tukang OH 0.02 175,000.00 4,031.01
Mandor OH 0.00 200,000.00 863.79
a. Jumlah Upah 24,761.90
Bahan
Dempul Setara Alfagloss kg 0.20 45,000.00 8,928.57
Cat Primer Propan kg 0.20 95,000.00 18,849.21
Cat Acrylic Propan kg 0.04 85,000.00 3,373.02
Clear Propan Acrylic kg 0.10 85,000.00 8,432.54
Thinner PU ltr 0.60 35,000.00 21,000.00
Amplas lbr 0.20 10,000.00 1,975.30
b. Jumlah Bahan 62,558.63
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 87,320.54
Overhead & Profit 10% 8,732.05
Harga Satuan Pekerjaan 96,052.59

C1042 Pemasangan 1 set Rambucis Dekkson C1042 Pemasangan 1 set Rambucis Dekkson 108,075.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Rambucis Dekkson CWH 103Z bh 1.00 76,000.00 76,000.00
b. Jumlah Bahan 76,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 98,250.00
Overhead & Profit 10% 9,825.00
Harga Satuan Pekerjaan 108,075.00

C1043 Pemasangan 1 set Ramskar Dekkson C1043 Pemasangan 1 set Ramskar Dekkson 330,275.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Ramskar Dekkson AWH SQ 001 bh 1.00 278,000.00 278,000.00
b. Jumlah Bahan 278,000.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 300,250.00
Overhead & Profit 10% 30,025.00
Harga Satuan Pekerjaan 330,275.00

C1044 Pemasangan 1 set Flush Bolt Dekkson C1044 Pemasangan 1 set Flush Bolt Dekkson 255,475.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Flush Bolt Dekkson FB 040 bh 1.00 210,000.00 210,000.00
b. Jumlah Bahan 210,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 232,250.00
Overhead & Profit 10% 23,225.00
Harga Satuan Pekerjaan 255,475.00

C1045 Pemasangan 1 set Flush Handle Dekkson C1045 Pemasangan 1 set Flush Handle Dekkson 145,475.00
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang OH 0.05 150,000.00 7,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 22,250.00
Bahan
Flush Handle Dekkson PP004 bh 1.00 110,000.00 110,000.00
b. Jumlah Bahan 110,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 132,250.00
Overhead & Profit 10% 13,225.00
Harga Satuan Pekerjaan 145,475.00

C1046 Pekerjaan 1 bh Shower TOTO TX401SBN C1046 Pekerjaan 1 bh Shower TOTO TX401SBN 2,288,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Shower TOTO TX401SBN bh 1.00 1,800,000.00 1,800,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 1,850,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,080,750.00
Overhead & Profit 10% 208,075.00
Harga Satuan Pekerjaan 2,288,825.00

C1047 Pemasangan 1 m2 Marmer Bronze C1047 Pemasangan 1 m2 Marmer Bronze 1,936,000.00


Upah
Upah Pemasangan Marmer M2 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
Marmer Travertine Classic Ivory m2 1.00 1,200,000.00 1,200,000.00
Finishing ls 1.00 60,000.00 60,000.00
b. Jumlah Bahan 1,260,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,760,000.00
Overhead & Profit 10% 176,000.00
Harga Satuan Pekerjaan 1,936,000.00

C1048 Pemasangan 1 m2 Granite Niro GPD02 Ceppo 600x600 mm C1048 Pemasangan 1 m2 Granite Niro GPD02 Ceppo 600x600 mm 533,060.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GPD02 Ceppo 600x600 mm m2 1.05 363,000.00 381,150.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 411,850.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 484,600.00
Overhead & Profit 10% 48,460.00
Harga Satuan Pekerjaan 533,060.00
C1049 Pemasangan 1 m2 Granite Niro GSP02 Bode 600x600 mm C1049 Pemasangan 1 m2 Granite Niro GSP02 Bode 600x600 mm 356,345.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GSP02 Bode 600x600 mm m2 1.05 210,000.00 220,500.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 251,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 323,950.00
Overhead & Profit 10% 32,395.00
Harga Satuan Pekerjaan 356,345.00

C1050 Pemasangan 1 m2 Conwood Deck 12" C1050 Pemasangan 1 m2 Conwood Deck 12" 1,329,900.00
Upah
Upah Pemasangan Conwood M2 1.00 250,000.00 250,000.00
a. Jumlah Upah 250,000.00
Bahan
Conwood Deck 12" m2 1.10 690,000.00 759,000.00
Rangka + Fitting dan Aksesoris ls 1.00 200,000.00 200,000.00
b. Jumlah Bahan 959,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,209,000.00
Overhead & Profit 10% 120,900.00
Harga Satuan Pekerjaan 1,329,900.00

C1051 Pemasangan 1 set Pull Handle Dekson C1051 Pemasangan 1 set Pull Handle Dekson 2,162,325.00
Upah
Pekerja OH 0.70 120,000.00 84,000.00
Tukang OH 0.35 150,000.00 52,500.00
Kepala Tukang OH 0.07 175,000.00 12,250.00
Mandor OH 0.04 200,000.00 7,000.00
a. Jumlah Upah 155,750.00
Bahan
Pull Handle Dekkson Deluxe PH DL1868 PSS+AS 760 mm bh 1.00 1,810,000.00 1,810,000.00
b. Jumlah Bahan 1,810,000.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 1,965,750.00
Overhead & Profit 10% 196,575.00
Harga Satuan Pekerjaan 2,162,325.00

C1052 Pemasangan 1 m2 Kaca Sandblast 8 mm C1052 Pemasangan 1 m2 Kaca Sandblast 8 mm 539,550.00


Upah
Pekerja OH 0.60 120,000.00 72,000.00
Tukang khusus alumunium OH 0.30 150,000.00 45,000.00
Kepala Tukang OH 0.06 175,000.00 10,500.00
Mandor OH 0.03 200,000.00 6,000.00
a. Jumlah Upah 133,500.00
Bahan
Kaca Sandblast 8 mm m2 1.05 340,000.00 357,000.00
b. Jumlah Bahan 357,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 490,500.00
Overhead & Profit 10% 49,050.00
Harga Satuan Pekerjaan 539,550.00

C1053 Pemasangan 1 set Lockcase Sliding Dekson C1053 Pemasangan 1 set Lockcase Sliding Dekson 433,950.00
Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang OH 0.10 150,000.00 15,000.00
Kepala Tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 44,500.00
Bahan
Lockcase Sliding Dekkson MTS SLD DL84100 m2 1.00 350,000.00 350,000.00
b. Jumlah Bahan 350,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 394,500.00
Overhead & Profit 10% 39,450.00
Harga Satuan Pekerjaan 433,950.00

C1054 Pekerjaan 1 bh Closet Duduk TOTO CW275PJ C1054 Pekerjaan 1 bh Closet Duduk TOTO CW275PJ 13,559,975.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang cat/pelitur OH 0.65 150,000.00 97,500.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 277,250.00
Bahan
Closet Duduk TOTO CW275PJ bh 1.00 12,000,000.00 12,000,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 12,050,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 12,327,250.00
Overhead & Profit 10% 1,232,725.00
Harga Satuan Pekerjaan 13,559,975.00

C1055 Pekerjaan 1 bh Shower TOTO TX492SE C1055 Pekerjaan 1 bh Shower TOTO TX492SE 9,218,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Shower TOTO TX492SE bh 1.00 8,100,000.00 8,100,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 8,150,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 8,380,750.00
Overhead & Profit 10% 838,075.00
Harga Satuan Pekerjaan 9,218,825.00

C1056 Pekerjaan 1 bh Lavatory TOTO LW818J C1056 Pekerjaan 1 bh Lavatory TOTO LW818J 2,838,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Lavatory TOTO LW818J bh 1.00 2,300,000.00 2,300,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 2,350,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,580,750.00
Overhead & Profit 10% 258,075.00
Harga Satuan Pekerjaan 2,838,825.00

C1057 Pekerjaan 1 bh Kran Lavatory TOTO TX116LQBR C1057 Pekerjaan 1 bh Kran Lavatory TOTO TX116LQBR 6,248,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Kran Lavatory TOTO TX116LQBR bh 1.00 5,400,000.00 5,400,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 5,450,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 5,680,750.00
Overhead & Profit 10% 568,075.00
Harga Satuan Pekerjaan 6,248,825.00

C1058 Pekerjaan 1 bh Urinoir TOTO U104 C1058 Pekerjaan 1 bh Urinoir TOTO U104 4,295,225.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 254,750.00
Bahan
Urinoir TOTO U104 bh 1.00 3,600,000.00 3,600,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 3,650,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 3,904,750.00
Overhead & Profit 10% 390,475.00
Harga Satuan Pekerjaan 4,295,225.00

Pemasangan 1 m2 Plafond GRC Board Ukuran,Tebal 9 mm +


C1059 Pemasangan 1 m2 Plafond GRC Board Ukuran,Tebal 9 mm + Rangka Hollow C1059 Rangka Hollow 260,953.00
Upah
Pekerja OH 0.40 120,000.00 48,000.00
Tukang kayu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.04 175,000.00 7,000.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 89,000.00
Bahan
GRC Board 9 mm lbr 0.42 210,000.00 87,150.00
Hollow 20x40 (Rangka Plafond) btg 0.15 30,000.00 4,500.00
Hollow 40x40 (Rangka Plafond) btg 0.36 45,000.00 16,380.00
Paku Gypsum kg 0.11 20,000.00 2,200.00
Ramset/Dynabolt bh 4.00 7,000.00 28,000.00
Compound kg 0.13 80,000.00 10,000.00
b. Jumlah Bahan 148,230.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 237,230.00
Overhead & Profit 10% 23,723.00
Harga Satuan Pekerjaan 260,953.00

C1060 Pemasangan 1 m2 Daun Pintu Hollow C1060 Pemasangan 1 m2 Daun Pintu Hollow 1,624,700.00
Upah
Pekerja OH 0.80 120,000.00 96,000.00
Tukang khusus alumunium OH 0.40 150,000.00 60,000.00
Kepala Tukang OH 0.08 175,000.00 14,000.00
Mandor OH 0.04 200,000.00 7,000.00
a. Jumlah Upah 177,000.00
Bahan
Daun Pintu Hollow m2 1.00 1,300,000.00 1,300,000.00
b. Jumlah Bahan 1,300,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,477,000.00
Overhead & Profit 10% 147,700.00
Harga Satuan Pekerjaan 1,624,700.00

C1061 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x120 cm C1061 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x120 cm 506,495.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Essenza Carrara Grey 600x1200 mm m2 1.05 340,000.00 357,000.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 387,700.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 460,450.00
Overhead & Profit 10% 46,045.00
Harga Satuan Pekerjaan 506,495.00

Pemasangan 1 m2 Keramik Sehati Allia Moduo Mushio 5.6 x


C1062 Pemasangan 1 m2 Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm C1062 23.2 cm 1,404,920.00
Upah
Pekerja OH 0.60 120,000.00 72,000.00
Tukang batu OH 0.30 150,000.00 45,000.00
Kepala Tukang OH 0.06 175,000.00 10,500.00
Mandor OH 0.03 200,000.00 6,000.00
a. Jumlah Upah 133,500.00
Bahan
Keramik Sehati Allia Moduo Mushio 5.6 x 23.2 cm m2 1.05 1,060,000.00 1,113,000.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 1,143,700.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,277,200.00
Overhead & Profit 10% 127,720.00
Harga Satuan Pekerjaan 1,404,920.00

C1063 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x60 cm C1063 Pemasangan 1 m2 Granite Essenza Carrara Grey 60x60 cm 327,470.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Essenza Carrara Grey 600x600 mm m2 1.05 185,000.00 194,250.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 224,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 297,700.00
Overhead & Profit 10% 29,770.00
Harga Satuan Pekerjaan 327,470.00

C1064 Pemasangan 1 m2 Granite Niro GTZ03 Teraso Grey 60x60 cm C1064 Pemasangan 1 m2 Granite Niro GTZ03 Teraso Grey 60x60 cm 385,220.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Niro GTZ03 Teraso Grey 600x600 mm m2 1.05 235,000.00 246,750.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 277,450.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 350,200.00
Overhead & Profit 10% 35,020.00
Harga Satuan Pekerjaan 385,220.00

C1065 Pemasangan 1 m2 Granite Roman Dbali Bone 600x600 mm C1065 Pemasangan 1 m2 Granite Roman Dbali Bone 600x600 mm 327,470.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Roman Dbali Bone 600x600 mm m2 1.05 185,000.00 194,250.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 224,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 297,700.00
Overhead & Profit 10% 29,770.00
Harga Satuan Pekerjaan 327,470.00

C1066 Pemasangan 1 m2 SPC Sehati Soft Brown Oak C1066 Pemasangan 1 m2 SPC Sehati Soft Brown Oak 466,125.00
Upah
Pekerja OH 0.30 120,000.00 36,000.00
Tukang batu OH 0.15 150,000.00 22,500.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 62,250.00
Bahan
SPC Sehati Soft Brown Oak m2 1.05 330,000.00 346,500.00
Perekat ls 1.00 15,000.00 15,000.00
b. Jumlah Bahan 361,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 423,750.00
Overhead & Profit 10% 42,375.00
Harga Satuan Pekerjaan 466,125.00

Pemasangan 1 m2 Granite Roman Dcastanea Maple


C1067 Pemasangan 1 m2 Granite Roman Dcastanea Maple 200x1200 mm C1067 200x1200 mm 587,345.00
Upah
Pekerja OH 0.33 120,000.00 39,000.00
Tukang batu OH 0.20 150,000.00 30,000.00
Kepala Tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 72,750.00
Bahan
Granite Roman Dcastanea Maple 200x1200 mm m2 1.05 410,000.00 430,500.00
Semen Gresik 40 Kg zak 0.30 60,000.00 18,000.00
Pasir Pasang m3 0.03 290,000.00 8,700.00
Semen Warna kg 0.20 20,000.00 4,000.00
b. Jumlah Bahan 461,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 533,950.00
Overhead & Profit 10% 53,395.00
Harga Satuan Pekerjaan 587,345.00

C1068 Pemasangan 1 m2 Conwood Lath 4" C1068 Pemasangan 1 m2 Conwood Lath 4" 863,500.00
Upah
Upah Pemasangan Conwood M2 1.00 250,000.00 250,000.00
a. Jumlah Upah 250,000.00
Bahan
Conwood Lath 4" m2 1.10 350,000.00 385,000.00
Rangka + Fitting dan Aksesoris ls 1.00 150,000.00 150,000.00
b. Jumlah Bahan 535,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 785,000.00
Overhead & Profit 10% 78,500.00
Harga Satuan Pekerjaan 863,500.00
C1069 Pemasangan 1 m2 Daun UPVC C1069 Pemasangan 1 m2 Daun UPVC 2,064,700.00
Upah
Pekerja OH 0.80 120,000.00 96,000.00
Tukang khusus alumunium OH 0.40 150,000.00 60,000.00
Kepala Tukang OH 0.08 175,000.00 14,000.00
Mandor OH 0.04 200,000.00 7,000.00
a. Jumlah Upah 177,000.00
Bahan
Daun UPVC bh 1.00 1,700,000.00 1,700,000.00
b. Jumlah Bahan 1,700,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,877,000.00
Overhead & Profit 10% 187,700.00
Harga Satuan Pekerjaan 2,064,700.00

C1070 Pemasangan 1 m2 Kaca Flutted 8 mm C1070 Pemasangan 1 m2 Kaca Flutted 8 mm 860,887.50


Upah
Pekerja OH 0.45 120,000.00 54,000.00
Tukang khusus alumunium OH 0.23 150,000.00 33,750.00
Kepala Tukang OH 0.05 175,000.00 7,875.00
Mandor OH 0.02 200,000.00 4,500.00
a. Jumlah Upah 100,125.00
Bahan
Kaca Flutted 8 mm m2 1.05 650,000.00 682,500.00
b. Jumlah Bahan 682,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 782,625.00
Overhead & Profit 10% 78,262.50
Harga Satuan Pekerjaan 860,887.50

C1071 Pekerjaan 1 bh Closet Duduk TOTO CW823PJ C1071 Pekerjaan 1 bh Closet Duduk TOTO CW823PJ 13,009,975.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang cat/pelitur OH 0.65 150,000.00 97,500.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 277,250.00
Bahan
Closet Duduk TOTO CW823PJ bh 1.00 11,500,000.00 11,500,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 11,550,000.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 11,827,250.00
Overhead & Profit 10% 1,182,725.00
Harga Satuan Pekerjaan 13,009,975.00

C1072 Pekerjaan 1 bh Jet Washer TOTO TB19CSMCR C1072 Pekerjaan 1 bh Jet Washer TOTO TB19CSMCR 1,304,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Jet Washer TOTO TB19CSMCR bh 1.00 1,150,000.00 1,150,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 1,160,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,185,850.00
Overhead & Profit 10% 118,585.00
Harga Satuan Pekerjaan 1,304,435.00

C1073 Pekerjaan 1 bh Shower TOTO TX492SE C1073 Pekerjaan 1 bh Shower TOTO TX492SE 9,218,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Shower TOTO TX492SE bh 1.00 8,100,000.00 8,100,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 8,150,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 8,380,750.00
Overhead & Profit 10% 838,075.00
Harga Satuan Pekerjaan 9,218,825.00

C1074 Pekerjaan 1 bh Lavatory TOTO LW625J C1074 Pekerjaan 1 bh Lavatory TOTO LW625J 2,288,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Lavatory TOTO LW625J bh 1.00 1,800,000.00 1,800,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 1,850,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,080,750.00
Overhead & Profit 10% 208,075.00
Harga Satuan Pekerjaan 2,288,825.00

C1075 Pekerjaan 1 bh Kran Lavatory TOTO TX115LRS C1075 Pekerjaan 1 bh Kran Lavatory TOTO TX115LRS 2,157,375.00
Upah
Pekerja OH 0.50 120,000.00 60,000.00
Tukang cat/pelitur OH 0.25 150,000.00 37,500.00
Kepala tukang OH 0.05 175,000.00 8,750.00
Mandor OH 0.03 200,000.00 5,000.00
a. Jumlah Upah 111,250.00
Bahan
Kran Lavatory TOTO TX115LRS bh 1.00 1,800,000.00 1,800,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 1,850,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 1,961,250.00
Overhead & Profit 10% 196,125.00
Harga Satuan Pekerjaan 2,157,375.00

C1076 Pekerjaan 1 bh Tissue Holder TOTO TX703M3AV1 C1076 Pekerjaan 1 bh Tissue Holder TOTO TX703M3AV1 919,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Tissue Holder TOTO TX703M3AV1 bh 1.00 800,000.00 800,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 810,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 835,850.00
Overhead & Profit 10% 83,585.00
Harga Satuan Pekerjaan 919,435.00

C1077 Pekerjaan 1 bh Jet Washer TOTO THX20NB C1077 Pekerjaan 1 bh Jet Washer TOTO THX20NB 424,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Jet Washer TOTO THX20NB bh 1.00 350,000.00 350,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 360,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 385,850.00
Overhead & Profit 10% 38,585.00
Harga Satuan Pekerjaan 424,435.00

C1078 Pekerjaan 1 bh Tissue Holder TOTO TX720ACRB C1078 Pekerjaan 1 bh Tissue Holder TOTO TX720ACRB 545,435.00
Upah
Pekerja OH 0.13 120,000.00 15,600.00
Tukang cat/pelitur OH 0.05 150,000.00 7,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 25,850.00
Bahan
Tissue Holder TOTO TX720ACRB bh 1.00 460,000.00 460,000.00
Fitting dan Aksesoris ls 1.00 10,000.00 10,000.00
b. Jumlah Bahan 470,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 495,850.00
Overhead & Profit 10% 49,585.00
Harga Satuan Pekerjaan 545,435.00

C1079 Pekerjaan 1 bh Shower TOTO TX471SVN C1079 Pekerjaan 1 bh Shower TOTO TX471SVN 5,258,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Shower TOTO TX471SVN bh 1.00 4,500,000.00 4,500,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 4,550,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 4,780,750.00
Overhead & Profit 10% 478,075.00
Harga Satuan Pekerjaan 5,258,825.00

C1080 Pekerjaan 1 bh Lavatory TOTO LW647CJ C1080 Pekerjaan 1 bh Lavatory TOTO LW647CJ 2,288,825.00
Upah
Pekerja OH 1.00 120,000.00 120,000.00
Tukang cat/pelitur OH 0.50 150,000.00 75,000.00
Kepala tukang OH 0.13 175,000.00 22,750.00
Mandor OH 0.07 200,000.00 13,000.00
a. Jumlah Upah 230,750.00
Bahan
Lavatory TOTO LW647CJ bh 1.00 1,800,000.00 1,800,000.00
Fitting dan Aksesoris ls 1.00 50,000.00 50,000.00
b. Jumlah Bahan 1,850,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,080,750.00
Overhead & Profit 10% 208,075.00
Harga Satuan Pekerjaan 2,288,825.00
Analisa Harga Satuan Rekap Analisa Harga Satuan Dengan Overhead

ID Uraian Satuan Koefisien Harga Satuan Jumlah Harga ID Analisa Pekerjaan Harga Satuan
0.10 1
D1001 Pekerjaan 1 Unit Pemasangan Exhaust Fan D1001 Pekerjaan 1 Unit Pemasangan Exhaust Fan 601,150.00
Upah
Pekerja OH 0.05 120,000.00 6,000.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.10 175,000.00 17,500.00
Mandor OH 0.10 200,000.00 20,000.00
a. Jumlah Upah 46,500.00
Bahan
Exhaust Fan Dia. 25 cm Panasonic FV-25TGU5 bh 1.00 500,000.00 500,000.00
b. Jumlah Bahan 500,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 546,500.00
Overhead & Profit 10% 54,650.00
Harga Satuan Pekerjaan 601,150.00

D1002 Pekerjaan 1 Bh Pemasangan Fire Extangiuser 6 kg D1002 Pekerjaan 1 Bh Pemasangan Fire Extangiuser 6 kg 2,604,778.00
Upah
Pekerja OH 0.38 120,000.00 45,000.00
Tukang listrik OH 0.13 150,000.00 18,750.00
Kepala tukang OH 0.02 175,000.00 3,150.00
Mandor OH 0.01 200,000.00 1,080.00
a. Jumlah Upah 67,980.00
Bahan
Fire Extinguizer 6 Kg Setara Servvo bh 1.00 2,300,000.00 2,300,000.00
b. Jumlah Bahan 2,300,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,367,980.00
Overhead & Profit 10% 236,798.00
Harga Satuan Pekerjaan 2,604,778.00

D1003 Pemasangan 1 Unit Pompa Pendorong dari GWT Menuju Torrent D1003 Pemasangan 1 Unit Pompa Pendorong dari GWT Menuju Tor8,632,140.00
Upah
Pekerja OH 1.20 120,000.00 144,000.00
Tukang pipa OH 1.20 150,000.00 180,000.00
Kepala tukang OH 0.12 175,000.00 21,000.00
Mandor OH 0.01 200,000.00 2,400.00
a. Jumlah Upah 347,400.00
Bahan
Semi Jet Pump Stainless Grundfos JP 4-47 PT-V bh 1.00 7,500,000.00 7,500,000.00
b. Jumlah Bahan 7,500,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 7,847,400.00
Overhead & Profit 10% 784,740.00
Harga Satuan Pekerjaan 8,632,140.00

D1004 Pemasangan 1 Unit MDP Ukuran 600X400X200 Ex Hager D1004 Pemasangan 1 Unit MDP Ukuran 600X400X200 Ex Hager 10,457,700.00
Upah
Instalasi PANEL MDP LS 1.00 750,000.00 750,000.00
a. Jumlah Upah 750,000.00
Bahan
MCCB 80A 3P Schneider CVS100F bh 1.00 650,000.00 650,000.00
MCCB 25A 3P Schneider CVS100F bh 1.00 650,000.00 650,000.00
MCB 16A 1P Schneider DOMF01116 bh 2.00 140,000.00 280,000.00
MCB 10A 1P Schneider DOMF01110 bh 8.00 140,000.00 1,120,000.00
MCB 6A 1P Schneider DOMF01106 bh 4.00 140,000.00 560,000.00
Lamp Indikator 220V Schneider 220VAC XA2EVM1LC bh 1.00 22,000.00 22,000.00
Voltmeter Digital Schneider 3P bh 1.00 390,000.00 390,000.00
Ampere Meter Digital Schneider 3p DM3110 CL bh 3.00 390,000.00 1,170,000.00
Travo Arus bh 3.00 80,000.00 240,000.00
Selector Volt 7 Position Schneider K1F027MLH bh 1.00 125,000.00 125,000.00
Wiring Materials ls 1.00 1,000,000.00 1,000,000.00
Box indoor 600 x 400 x 250 Hager FL118A bh 1.00 1,600,000.00 1,600,000.00
CU Bars + Aksesoris ls 1.00 950,000.00 950,000.00
b. Jumlah Bahan 8,757,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 9,507,000.00
Overhead & Profit 10% 950,700.00
Harga Satuan Pekerjaan 10,457,700.00

D1005 Pemasangan 1 unit SDP Ukuran 400x300x150 Ex Hager D1005 Pemasangan 1 unit SDP Ukuran 400x300x150 Ex Hager 8,471,100.00
Upah
Instalasi PANEL SDP LS 1.00 500,000.00 500,000.00
a. Jumlah Upah 500,000.00
Bahan
MCCB 25A 3P Schneider CVS100F bh 1.00 650,000.00 650,000.00
MCB 16A 1P Schneider DOMF01116 bh 1.00 140,000.00 140,000.00
MCB 10A 1P Schneider DOMF01110 bh 2.00 140,000.00 280,000.00
MCB 6A 1P Schneider DOMF01106 bh 8.00 140,000.00 1,120,000.00
Lamp Indikator 220V Schneider 220VAC XA2EVM1LC bh 3.00 22,000.00 66,000.00
Voltmeter Digital Schneider 3P bh 1.00 390,000.00 390,000.00
Ampere Meter Digital Schneider 3p DM3110 CL bh 1.00 390,000.00 390,000.00
Travo Arus bh 3.00 80,000.00 240,000.00
Selector Volt 7 Position Schneider K1F027MLH bh 3.00 125,000.00 375,000.00
Wiring Materials ls 1.00 1,000,000.00 1,000,000.00
Box indoor 600 x 400 x 250 Hager FL118A bh 1.00 1,600,000.00 1,600,000.00
CU Bars + Aksesoris ls 1.00 950,000.00 950,000.00
b. Jumlah Bahan 7,201,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 7,701,000.00
Overhead & Profit 10% 770,100.00
Harga Satuan Pekerjaan 8,471,100.00
D1006 Pemasangan Instalasi 1 Titik Lampu D1006 Pemasangan Instalasi 1 Titik Lampu 361,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 8.00 20,000.00 160,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 252,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 328,600.00
Overhead & Profit 10% 32,860.00
Harga Satuan Pekerjaan 361,460.00

D1007 Pemasangan Instalasi 1 Titik Stop Kontak D1007 Pemasangan Instalasi 1 Titik Stop Kontak 405,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 10.00 20,000.00 200,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 292,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 368,600.00
Overhead & Profit 10% 36,860.00
Harga Satuan Pekerjaan 405,460.00

D1008 Pemasangan Instalasi 1 Titik Saklar Hotel D1008 Pemasangan Instalasi 1 Titik Saklar Hotel 361,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 8.00 20,000.00 160,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 252,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 328,600.00
Overhead & Profit 10% 32,860.00
Harga Satuan Pekerjaan 361,460.00

D1009 Pemasangan Instalasi 1 Titik Kabel Data D1009 Pemasangan Instalasi 1 Titik Kabel Data 405,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 10.00 20,000.00 200,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 292,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 368,600.00
Overhead & Profit 10% 36,860.00
Harga Satuan Pekerjaan 405,460.00

D1010 Pemasangan Instalasi 1 Titik Kabel TV D1010 Pemasangan Instalasi 1 Titik Kabel TV 405,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 10.00 20,000.00 200,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 292,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 368,600.00
Overhead & Profit 10% 36,860.00
Harga Satuan Pekerjaan 405,460.00

D1011 Pemasangan Instalasi 1 Titik Kabel Telepon D1011 Pemasangan Instalasi 1 Titik Kabel Telepon 405,460.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x2,5 mm Supreme m 10.00 20,000.00 200,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 292,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 368,600.00
Overhead & Profit 10% 36,860.00
Harga Satuan Pekerjaan 405,460.00

D1012 Pemasangan Instalasi 1 Stop Kontak AC D1012 Pemasangan Instalasi 1 Stop Kontak AC 522,060.00
Upah
Pekerja OH 0.34 120,000.00 40,800.00
Tukang listrik OH 0.17 150,000.00 25,500.00
Kepala tukang OH 0.03 175,000.00 5,950.00
Mandor OH 0.02 200,000.00 3,400.00
a. Jumlah Upah 75,650.00
Bahan
Kabel NYM 3x4 mm Supreme m 9.00 34,000.00 306,000.00
Pipa clipsal 20 mm btg 3.00 19,000.00 57,000.00
Tee dos Clpsal 20 mm bh 2.00 9,000.00 18,000.00
Sock Clipsal 20 mm bh 3.00 1,600.00 4,800.00
Isolasi bh 0.50 9,500.00 4,750.00
Inbow dos plastik clipsal E 157 P bh 1.00 7,000.00 7,000.00
Klem Klipsal 20 mm bh 1.00 1,400.00 1,400.00
b. Jumlah Bahan 398,950.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 474,600.00
Overhead & Profit 10% 47,460.00
Harga Satuan Pekerjaan 522,060.00

D1013 Pemasangan 1 bh Lampu LED Bulb Downlight 13 Watt D1013 Pemasangan 1 bh Lampu LED Bulb Downlight 13 Watt 181,940.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
LED Bulb Downlight 13 Watt Philips bh 1.00 143,000.00 143,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 152,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 165,400.00
Overhead & Profit 10% 16,540.00
Harga Satuan Pekerjaan 181,940.00

D1014 Pemasangan 1 bh Lampu LED Bulb Outbow 13 Watt D1014 Pemasangan 1 bh Lampu LED Bulb Outbow 13 Watt 153,340.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
LED Bulb Outbow Downlight 13 Watt Philips bh 1.00 117,000.00 117,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 126,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 139,400.00
Overhead & Profit 10% 13,940.00
Harga Satuan Pekerjaan 153,340.00

D1015 Pemasangan 1 m Lampu LED Strips 7.2 watt D1015 Pemasangan 1 m Lampu LED Strips 7.2 watt 46,007.50
Upah
Pekerja OH 0.01 120,000.00 1,200.00
Tukang listrik OH 0.01 150,000.00 1,500.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 6,450.00
Bahan
LED Strip 7,5 Watt bh 1.00 33,000.00 33,000.00
Isolasi bh 0.25 9,500.00 2,375.00
b. Jumlah Bahan 35,375.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 41,825.00
Overhead & Profit 10% 4,182.50
Harga Satuan Pekerjaan 46,007.50

D1016 Pemasangan 1 bh Saklar Single D1016 Pemasangan 1 bh Saklar Single 72,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 1 Gang 1 Arah Schneider Vivace White bh 1.00 50,000.00 50,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 53,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 65,925.00
Overhead & Profit 10% 6,592.50
Harga Satuan Pekerjaan 72,517.50

D1017 Pemasangan 1 bh Saklar Double D1017 Pemasangan 1 bh Saklar Double 94,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 2 Gang 1 Arah Schneider Vivace White bh 1.00 70,000.00 70,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 73,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 85,925.00
Overhead & Profit 10% 8,592.50
Harga Satuan Pekerjaan 94,517.50

D1018 Pemasangan 1 bh Saklar Tripple D1018 Pemasangan 1 bh Saklar Tripple 127,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 3 Gang 1 Arah Schneider Vivace White bh 1.00 100,000.00 100,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 103,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 115,925.00
Overhead & Profit 10% 11,592.50
Harga Satuan Pekerjaan 127,517.50

D1019 Pemasangan 1 bh Stop Kontak D1019 Pemasangan 1 bh Stop Kontak 94,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Stop Kontak Schneider Vivace Schuko White bh 1.00 70,000.00 70,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 73,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 85,925.00
Overhead & Profit 10% 8,592.50
Harga Satuan Pekerjaan 94,517.50

D1020 Pemasangan 1 bh Stop Kontak AC D1020 Pemasangan 1 bh Stop Kontak AC 182,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Stop Kontak AC Schneider Vivace White bh 1.00 150,000.00 150,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 153,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 165,925.00
Overhead & Profit 10% 16,592.50
Harga Satuan Pekerjaan 182,517.50

D1021 Pemasangan 1 bh Saklar Hotel Single D1021 Pemasangan 1 bh Saklar Hotel Single 94,517.50
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 1 Gang 2 Arah Schneider Vivace White bh 1.00 70,000.00 70,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 73,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 85,925.00
Overhead & Profit 10% 8,592.50
Harga Satuan Pekerjaan 94,517.50

D1022 Pemasangan 1 bh Saklar Hotel Double D1022 Pemasangan 1 bh Saklar Hotel Double 127,517.50
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 2 Gang 2 Arah Schneider Vivace White bh 1.00 100,000.00 100,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 103,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 115,925.00
Overhead & Profit 10% 11,592.50
Harga Satuan Pekerjaan 127,517.50

D1023 Pemasangan 1 bh Saklar Hotel Triple D1023 Pemasangan 1 bh Saklar Hotel Triple 171,517.50
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Saklar Single 3 Gang 2 Arah Schneider Vivace White bh 1.00 140,000.00 140,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 143,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 155,925.00
Overhead & Profit 10% 15,592.50
Harga Satuan Pekerjaan 171,517.50

D1024 Pemasangan 1 bh Socket Kabel Data D1024 Pemasangan 1 bh Socket Kabel Data 83,517.50
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Socket Kabel Data Schneider Vivace White bh 1.00 60,000.00 60,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 63,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 75,925.00
Overhead & Profit 10% 7,592.50
Harga Satuan Pekerjaan 83,517.50

D1025 Pemasangan 1 bh Socket Kabel TV D1025 Pemasangan 1 bh Socket Kabel TV 83,517.50


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Socket Kabel TV Schneider Vivace White bh 1.00 60,000.00 60,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 63,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 75,925.00
Overhead & Profit 10% 7,592.50
Harga Satuan Pekerjaan 83,517.50

D1026 Pemasangan 1 bh Socket Kabel Telepon D1026 Pemasangan 1 bh Socket Kabel Telepon 83,517.50
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Socket Kabel TV Schneider Vivace White bh 1.00 60,000.00 60,000.00
Sock clipsal 20 mm bh 1.00 1,600.00 1,600.00
Isolasi bh 0.15 9,500.00 1,425.00
b. Jumlah Bahan 63,025.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 75,925.00
Overhead & Profit 10% 7,592.50
Harga Satuan Pekerjaan 83,517.50

D1027 Pekerjaan Groundwater Tank Uk.145x145x180 cm D1027 Pekerjaan Groundwater Tank Uk.145x145x180 cm 12,450,644.88
Upah
Pekerja OH 11.45 120,000.00 1,374,408.00
Tukang OH 4.87 150,000.00 731,220.00
Kepala tukang OH 0.55 175,000.00 96,411.00
Mandor OH 0.75 200,000.00 150,784.00
a. Jumlah Upah 2,352,823.00
Bahan
Pekerjaan Galian (Masuk Koef. Upah) m3 3.78 0.00 0.00
Pasir Urug m3 0.21 210,000.00 44,152.50
Lantai Kerja m3 0.11 556,714.29 61,238.57
Beton K-250 m3 1.10 990,400.00 1,089,440.00
Pembesian kg 202.40 12,450.00 2,519,880.00
Bekisting Kayu m2 10.44 105,000.00 1,096,200.00
Plesteran m2 10.44 14,850.00 155,034.00
Tangki MPOIN PLUS 1200 Liter U-GROUND unit 1.00 4,000,000.00 4,000,000.00
b. Jumlah Bahan 8,965,945.07
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 11,318,768.07
Overhead & Profit 10% 1,131,876.81
Harga Satuan Pekerjaan 12,450,644.88

D1028 Pekerjaan Biotech Uk.150x150x228 cm D1028 Pekerjaan Biotech Uk.150x150x228 cm 13,739,224.14


Upah
Pekerja OH 12.75 120,000.00 1,530,348.00
Tukang OH 4.88 150,000.00 731,325.00
Kepala tukang OH 0.53 175,000.00 93,004.41
Mandor OH 0.83 200,000.00 165,092.00
a. Jumlah Upah 2,519,769.41
Bahan
Pekerjaan Galian (Masuk Koef. Upah) m3 5.13 0.00 0.00
Pasir Urug m3 0.23 210,000.00 47,250.00
Lantai Kerja m3 0.11 556,714.29 62,630.36
Beton K-250 m3 1.10 990,400.00 1,089,440.00
Pembesian kg 202.40 12,450.00 2,519,880.00
Bekisting Kayu m2 10.44 105,000.00 1,096,200.00
Plesteran m2 10.44 14,850.00 155,034.00
Bioseptitank 1000 Liter Biotechno Type BT-06 unit 1.00 5,000,000.00 5,000,000.00
b. Jumlah Bahan 9,970,434.36
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 12,490,203.76
Overhead & Profit 10% 1,249,020.38
Harga Satuan Pekerjaan 13,739,224.14

D1029 Pekerjaan Sumur Resapan D1029 Pekerjaan Sumur Resapan 3,170,024.00


Upah
Pekerja OH 4.91 120,000.00 589,440.00
Tukang OH 0.72 150,000.00 108,000.00
Kepala tukang OH 0.12 175,000.00 21,000.00
Mandor OH 0.27 200,000.00 54,800.00
a. Jumlah Upah 773,240.00
Bahan
Pekerjaan Galian (Masuk Koef. Upah) m3 3.68 0.00 0.00
Pasangan Bata m2 2.00 94,300.00 188,600.00
Tutup Manhole ls 1.00 800,000.00 800,000.00
Ijuk kg 12.00 35,000.00 420,000.00
Kerikil m3 1.00 200,000.00 200,000.00
Pemipaan dan Aksesoris ls 1.00 500,000.00 500,000.00
b. Jumlah Bahan 2,108,600.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 2,881,840.00
Overhead & Profit 10% 288,184.00
Harga Satuan Pekerjaan 3,170,024.00

D1030 Pemasangan 1m Pipa PPR Tipe PN10 - 20mm D1030 Pemasangan 1m Pipa PPR Tipe PN10 - 20mm 25,548.60
Upah
Pekerja OH 0.02 120,000.00 1,800.00
Tukang OH 0.01 150,000.00 1,500.00
Kepala tukang OH 0.01 175,000.00 1,417.50
Mandor OH 0.00 200,000.00 540.00
a. Jumlah Upah 5,257.50
Bahan
Pipa PPR PN 10, 20 mm m 1.10 12,100.00 13,310.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 4,658.50 4,658.50
b. Jumlah Bahan 17,968.50
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 23,226.00
Overhead & Profit 10% 2,322.60
Harga Satuan Pekerjaan 25,548.60

D1031 Pemasangan 1m Pipa PPR Tipe PN10 - 25mm D1031 Pemasangan 1m Pipa PPR Tipe PN10 - 25mm 33,616.00
Upah
Pekerja OH 0.02 120,000.00 1,800.00
Tukang OH 0.02 150,000.00 2,250.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 6,800.00
Bahan
Pipa PPR PN 10, 25 mm m 1.10 16,000.00 17,600.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 6,160.00 6,160.00
b. Jumlah Bahan 23,760.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 30,560.00
Overhead & Profit 10% 3,056.00
Harga Satuan Pekerjaan 33,616.00
D1032 Pemasangan 1m Pipa PPR Tipe PN10 - 32mm D1032 Pemasangan 1m Pipa PPR Tipe PN10 - 32mm 54,543.50
Upah
Pekerja OH 0.03 120,000.00 3,600.00
Tukang OH 0.03 150,000.00 3,750.00
Kepala tukang OH 0.02 175,000.00 2,625.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 10,975.00
Bahan
Pipa PPR PN 10, 32 mm m 1.10 26,000.00 28,600.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 10,010.00 10,010.00
b. Jumlah Bahan 38,610.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 49,585.00
Overhead & Profit 10% 4,958.50
Harga Satuan Pekerjaan 54,543.50

D1033 Pemasangan 1m Pipa PPR Tipe PN10 - 40mm D1033 Pemasangan 1m Pipa PPR Tipe PN10 - 40mm 86,003.50
Upah
Pekerja OH 0.04 120,000.00 4,800.00
Tukang OH 0.04 150,000.00 5,250.00
Kepala tukang OH 0.03 175,000.00 5,250.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 17,300.00
Bahan
Pipa PPR PN 10, 40 mm m 1.10 41,000.00 45,100.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 15,785.00 15,785.00
b. Jumlah Bahan 60,885.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 78,185.00
Overhead & Profit 10% 7,818.50
Harga Satuan Pekerjaan 86,003.50

D1034 Pemasangan 1m Pipa PPR Tipe PN20 - 20mm D1034 Pemasangan 1m Pipa PPR Tipe PN20 - 20mm 35,412.85
Upah
Pekerja OH 0.02 120,000.00 1,800.00
Tukang OH 0.02 150,000.00 2,250.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 6,800.00
Bahan
Pipa PPR PN 20, 20 mm m 1.10 17,100.00 18,810.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 6,583.50 6,583.50
b. Jumlah Bahan 25,393.50
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 32,193.50
Overhead & Profit 10% 3,219.35
Harga Satuan Pekerjaan 35,412.85

D1035 Pemasangan 1m Pipa PPR Tipe PN20 - 25mm D1035 Pemasangan 1m Pipa PPR Tipe PN20 - 25mm 54,706.85
Upah
Pekerja OH 0.03 120,000.00 3,600.00
Tukang OH 0.03 150,000.00 3,750.00
Kepala tukang OH 0.02 175,000.00 2,625.00
Mandor OH 0.01 200,000.00 1,000.00
a. Jumlah Upah 10,975.00
Bahan
Pipa PPR PN 20, 25 mm m 1.10 26,100.00 28,710.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 10,048.50 10,048.50
b. Jumlah Bahan 38,758.50
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 49,733.50
Overhead & Profit 10% 4,973.35
Harga Satuan Pekerjaan 54,706.85

D1036 Pemasangan 1m Pipa PVC Tipe AW 3/4" D1036 Pemasangan 1m Pipa PVC Tipe AW 3/4" 20,903.30
Upah
Pekerja OH 0.01 120,000.00 1,200.00
Tukang OH 0.01 150,000.00 1,500.00
Kepala tukang OH 0.01 175,000.00 875.00
Mandor OH 0.00 200,000.00 200.00
a. Jumlah Upah 3,775.00
Bahan
Pipa PVC AW 3/4 Inch Rucika m 1.20 9,400.00 11,280.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 3,948.00 3,948.00
b. Jumlah Bahan 15,228.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 19,003.00
Overhead & Profit 10% 1,900.30
Harga Satuan Pekerjaan 20,903.30

D1037 Pemasangan 1m Pipa PVC Tipe AW 1-1/4" D1037 Pemasangan 1m Pipa PVC Tipe AW 1-1/4" 40,202.80
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.01 175,000.00 1,750.00
Mandor OH 0.00 200,000.00 400.00
a. Jumlah Upah 7,550.00
Bahan
Pipa PVC AW 1 1/4 Inch Rucika m 1.20 17,900.00 21,480.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 7,518.00 7,518.00
b. Jumlah Bahan 28,998.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 36,548.00
Overhead & Profit 10% 3,654.80
Harga Satuan Pekerjaan 40,202.80

D1038 Pemasangan 1m Pipa PVC Tipe AW 2" D1038 Pemasangan 1m Pipa PVC Tipe AW 2" 62,586.70
Upah
Pekerja OH 0.03 120,000.00 3,000.00
Tukang OH 0.03 150,000.00 3,750.00
Kepala tukang OH 0.02 175,000.00 2,625.00
Mandor OH 0.01 200,000.00 2,000.00
a. Jumlah Upah 11,375.00
Bahan
Pipa PVC AW 2 Inch Rucika m 1.20 28,100.00 33,720.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 11,802.00 11,802.00
b. Jumlah Bahan 45,522.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 56,897.00
Overhead & Profit 10% 5,689.70
Harga Satuan Pekerjaan 62,586.70

D1039 Pemasangan 1m Pipa PVC Tipe AW 3" D1039 Pemasangan 1m Pipa PVC Tipe AW 3" 126,447.09
Upah
Pekerja OH 0.05 120,000.00 6,000.00
Tukang OH 0.10 150,000.00 15,000.00
Kepala tukang OH 0.01 175,000.00 1,871.10
Mandor OH 0.00 200,000.00 712.80
a. Jumlah Upah 23,583.90
Bahan
Pipa PVC AW 3 Inch Rucika m 1.20 56,400.00 67,680.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 23,688.00 23,688.00
b. Jumlah Bahan 91,368.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 114,951.90
Overhead & Profit 10% 11,495.19
Harga Satuan Pekerjaan 126,447.09

D1040 Pemasangan 1m Pipa PVC Tipe AW 4" D1040 Pemasangan 1m Pipa PVC Tipe AW 4" 204,546.50
Upah
Pekerja OH 0.10 120,000.00 12,000.00
Tukang batu OH 0.15 150,000.00 22,500.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.00 200,000.00 855.36
a. Jumlah Upah 38,855.36
Bahan
Pipa PVC AW 4 Inch Rucika m 1.20 90,800.00 108,960.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 38,136.00 38,136.00
b. Jumlah Bahan 147,096.00
Alat
c. Jumlah Alat 0.00
Jumlah.a+b+c 185,951.36
Overhead & Profit 10% 18,595.14
Harga Satuan Pekerjaan 204,546.50

D1041 Pemasangan 1m Pipa PVC Tipe AW 6" D1041 Pemasangan 1m Pipa PVC Tipe AW 6" 402,303.00
Upah
Pekerja OH 0.20 120,000.00 24,000.00
Tukang batu OH 0.22 150,000.00 33,000.00
Kepala tukang OH 0.05 175,000.00 8,750.00
Mandor OH 0.05 200,000.00 10,000.00
a. Jumlah Upah 75,750.00
Bahan
Pipa PVC AW 6 Inch Rucika m 1.20 179,000.00 214,800.00
Perlengkapan (35% Dari Harga Pipa) ls 1.00 75,180.00 75,180.00
b. Jumlah Bahan 289,980.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 365,730.00
Overhead & Profit 10% 36,573.00
Harga Satuan Pekerjaan 402,303.00

D1042 Pemasangan 1 Unit Penangkal Petir ( 1 Blitzem + 3 Tombak ) D1042 Pemasangan 1 Unit Penangkal Petir ( 1 Blitzem + 3 Tombak 7,284,420.00
Upah
Instalasi Penangkal Petir LS 1.00 1,400,000.00 1,400,000.00
Biaya pengeboran LS 6.00 59,500.00 357,000.00
a. Jumlah Upah 1,757,000.00
Bahan
Blacksem 1" bh 4.00 115,000.00 460,000.00
Sok Galvanis 1" bh 4.00 16,000.00 64,000.00
Pipa Galvanis 1" m 5.00 105,000.00 525,000.00
Kawat BC 50 mm2 m 42.50 80,000.00 3,400,000.00
Klem Begel 1" bh 6.00 3,700.00 22,200.00
Klem sisir 50 mm2 bh 3.00 20,000.00 60,000.00
Kotak Kontrol 10 cm x 15 cm bh 1.00 55,000.00 55,000.00
Perluv sok 1" bh 1.00 9,000.00 9,000.00
Pipa Conduit PVC 3/4" btg 10.00 27,000.00 270,000.00
b. Jumlah Bahan 4,865,200.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 6,622,200.00
Overhead & Profit 10% 662,220.00
Harga Satuan Pekerjaan 7,284,420.00

D1043 Pemasangan 1 bh Spotlight 5 Watt D1043 Pemasangan 1 bh Spotlight 5 Watt 170,940.00


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Spotlight 5 Watt Philips bh 1.00 133,000.00 133,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 142,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 155,400.00
Overhead & Profit 10% 15,540.00
Harga Satuan Pekerjaan 170,940.00

D1044 Pemasangan 1 bh Wall Light 13 Watt D1044 Pemasangan 1 bh Wall Light 13 Watt 409,640.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Wall Light 13 Watt bh 1.00 350,000.00 350,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 359,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 372,400.00
Overhead & Profit 10% 37,240.00
Harga Satuan Pekerjaan 409,640.00

D1045 Pemasangan 1 bh Adjustable Light 5 Watt D1045 Pemasangan 1 bh Adjustable Light 5 Watt 210,540.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Adjustable Light 5 Watt Philips bh 1.00 169,000.00 169,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 178,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 191,400.00
Overhead & Profit 10% 19,140.00
Harga Satuan Pekerjaan 210,540.00

D1046 Pemasangan 1 bh Step Light 3 Watt D1046 Pemasangan 1 bh Step Light 3 Watt 145,640.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Step Light 3 Watt bh 1.00 110,000.00 110,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 119,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 132,400.00
Overhead & Profit 10% 13,240.00
Harga Satuan Pekerjaan 145,640.00

D1047 Pemasangan 1 bh Lampu Downlight PAR30 Double Fitting 10 Watt D1047 Pemasangan 1 bh Lampu Downlight PAR30 Double Fitting 1 588,830.00
Upah
Pekerja OH 0.04 120,000.00 4,800.00
Tukang listrik OH 0.04 150,000.00 6,000.00
Kepala tukang OH 0.04 175,000.00 7,000.00
Mandor OH 0.04 200,000.00 8,000.00
a. Jumlah Upah 25,800.00
Bahan
Lampu Downlight PAR30 Double Fitting 10 Watt bh 1.00 500,000.00 500,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 509,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 535,300.00
Overhead & Profit 10% 53,530.00
Harga Satuan Pekerjaan 588,830.00

D1048 Pemasangan 1 unit Torrent Air Kapasitas 1000 Liter D1048 Pemasangan 1 unit Torrent Air Kapasitas 1000 Liter 7,170,900.00
Upah
Pekerja OH 3.00 120,000.00 360,000.00
Tukang OH 3.00 150,000.00 450,000.00
Kepala tukang OH 0.20 175,000.00 35,000.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 849,000.00
Bahan
Torrent Air Stainless 1000 Liter Pinguin TBSK1000 unit 1.00 4,200,000.00 4,200,000.00
Perlengkapan ls 1.00 1,470,000.00 1,470,000.00
b. Jumlah Bahan 5,670,000.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 6,519,000.00
Overhead & Profit 10% 651,900.00
Harga Satuan Pekerjaan 7,170,900.00

D1049 Pemasangan 1 bh Spotlight 7 Watt D1049 Pemasangan 1 bh Spotlight 7 Watt 200,640.00


Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Spotlight 7 Watt Philips bh 1.00 160,000.00 160,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 169,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 182,400.00
Overhead & Profit 10% 18,240.00
Harga Satuan Pekerjaan 200,640.00

D1050 Pemasangan 1 bh Lampu Downlight LED 8 Watt D1050 Pemasangan 1 bh Lampu Downlight LED 8 Watt 145,640.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
LED Bulb Downlight 8 Watt Philips bh 1.00 110,000.00 110,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 119,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 132,400.00
Overhead & Profit 10% 13,240.00
Harga Satuan Pekerjaan 145,640.00

D1051 Pemasangan 1 bh Lampu Downlight Outbow 8 Watt D1051 Pemasangan 1 bh Lampu Downlight Outbow 8 Watt 145,640.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
LED Bulb Downlight 8 Watt Philips bh 1.00 110,000.00 110,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 119,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 132,400.00
Overhead & Profit 10% 13,240.00
Harga Satuan Pekerjaan 145,640.00

D1052 Pemasangan 1 bh Wall Light 5 Watt D1052 Pemasangan 1 bh Wall Light 5 Watt 299,640.00
Upah
Pekerja OH 0.02 120,000.00 2,400.00
Tukang listrik OH 0.02 150,000.00 3,000.00
Kepala tukang OH 0.02 175,000.00 3,500.00
Mandor OH 0.02 200,000.00 4,000.00
a. Jumlah Upah 12,900.00
Bahan
Wall Light 5 Watt bh 1.00 250,000.00 250,000.00
Isolasi bh 1.00 9,500.00 9,500.00
b. Jumlah Bahan 259,500.00
Alat

c. Jumlah Alat 0.00


Jumlah.a+b+c 272,400.00
Overhead & Profit 10% 27,240.00
Harga Satuan Pekerjaan 299,640.00