REKAPITULASI

Kegiatan     : Peningkatan Pembangunan Sarana Dan Prasarana Olahraga
Pekerjaan : Pembangunan Alun‐Alun dan Revitalisasi Lapangan Baraka, Kec. Baraka
Lokasi : Kec. Baraka
Tahun Anggaran : 2021

NO. URAIAN PEKERJAAN TOTAL KONTRAK TOTAL SUBKON


A PEKERJAAN PENDAHULUAN Rp                         61,653,793.01 Rp                           40,028,441.87
I PEKERJAAN PERSIAPAN                              49,153,793.01 Rp                            31,783,441.87
II PEKERJAAN RK3K KONSTRUKSI                              12,500,000.00 Rp                              8,245,000.00
B PEKERJAAN STRUKTUR Rp                    1,871,361,219.14 Rp                      1,234,349,860.15
I PEKERJAAN PONDASI                            162,028,580.61 Rp                          106,874,051.77
II PEKERJAAN BETON                         1,676,980,395.33 Rp                      1,106,136,268.76
III PEKERJAAN BAJA IWF                              32,352,243.20 Rp                            21,339,539.61
C PEKERJAAN ARSITEKTUR Rp                    2,024,563,663.49 Rp                      1,449,928,764.82
I PEKERJAAN DINDING                            110,042,880.81 Rp                            72,584,284.18
II PEKERJAAN PENUTUP LANTAI                            202,562,207.40 Rp                          133,610,032.00
III PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI & ROSTER                              66,286,403.54 Rp                            43,722,511.78
IV PEKERJAAN ATAP                         1,070,981,982.85 Rp                          706,419,715.89
V PEKERJAAN PLAFOND                                 4,743,901.80 Rp                              3,129,077.63
VI PEKERJAAN REALING                              42,787,500.00 Rp                            28,222,635.00
VII PEKERJAAN PENGECATAN                              87,768,508.71 Rp                            57,892,108.35
IX PEKERJAAN ALLUMINIUM COMPOSITE (ACP)                            420,390,278.38 Rp                          391,816,000.00
X PEKERJAAN  TULISAN PAPAN NAMA GEDUNG                              19,000,000.00 Rp                            12,532,400.00
D PEKERJAAN MEKANIKAL ELEKTRIKAL Rp                         82,722,908.90 Rp                           54,564,030.71
I  PEKERJAAN MEKANIKAL DAN ELEKTRIKAL                              82,722,908.90 Rp                            54,564,030.71
E PEKERJAAN LANSCAPE Rp                       431,954,886.87 Rp                         284,917,443.38
I PEKERJAAN LAMPU LAPANGAN DAN LANDMARK                            163,814,280.23 Rp                          108,051,899.24
II PEKERJAAN LAPANGAN                            268,140,606.64 Rp                          176,865,544.14
Real Cost Rp                     4,472,256,471.41 Rp                       3,063,788,540.92

TERBILAN Tiga milyar enam puluh tiga juta tujuh ratus delapan puluh delapan ribu lima ratus empat puluh rupiah
RENCANA ANGGARAN BIAYA

Kegiatan     : Peningkatan Pembangunan Sarana Dan Prasarana Olahraga
Pekerjaan : Pembangunan Alun‐Alun dan Revitalisasi Lapangan Baraka, Kec. Baraka
Lokasi : Kec. Baraka
Tahun Anggaran : 2021
68%

NO URAIAN PEKERJAAN Volume Satuan  Harga satuan (Rp.)   Jumlah Harga (Rp) 


A PEKERJAAN PENDAHULUAN
I. PEKERJAAN PERSIAPAN
1. Pengukuran & Pemasangan Bowplank 128.90 m 43,915.24                           5,660,675.02
2. Pek. Pemasangan Pagar Pengaman Seng Gelombang (Alun‐Alun) 79.20 m 106,120.04                           8,404,707.39
3. Pek. Pemasangan Tanda Pengenal Proyek 1.00 Ls 197,880.00                               197,880.00
4. Pek. Direksi Keet/Kantor Sentara 8.79 m2 876,007.77                           7,700,108.28
5. Pek. Gudang Alat 12.00 m2 651,672.60                           7,820,071.17
6. Administrasi, Dokumentasi, Dan Asbuild Drawing 1.00 Ls 2,000,000.00                           2,000,000.00
SUB TOTAL                         31,783,441.87
II. PEKERJAAN RK3K KONSTRUKSI
1. Alat Pelindung Kerja terdiri atas
‐ Topi Pelindung (Safety Helmet)  25.00 Bh 32,980.00                               824,500.00
‐ Pelindung Mata (Goggles, Spectacles) 25.00 Psg 13,192.00                               329,800.00
‐ Pelindung Pernafasan Dan Mulut (Masker) 25.00 Bh 3,298.00                                 82,450.00
‐ Sarung Tangan (Safety Gloves) 25.00 Psg 6,596.00                               164,900.00
‐ Sepatu Keselamatan (Rubber Safety Shoes and toe cap) 25.00 Psg 98,940.00                           2,473,500.00
‐ Penunjang Seluruh Tubuh (Full Body Harness) 10.00 Bh 329,800.00                           3,298,000.00
‐ Rompi Keselamatan (Safety Vest) 25.00 Bh 16,490.00                               412,250.00
2. P3K                                             ‐
‐ Peralatan P3K (Kotak P3K, Obat Luka, Perban, dll) 1.00 Ls 659,600.00                               659,600.00
SUB TOTAL                           8,245,000.00
B PEKERJAAN STRUKTUR
I. PEKERJAAN PONDASI
1. Pondasi Poer Plat
‐ Pek. Galian Tanah Pondasi 75.17 m3 62,398.16                           4,690,469.69
‐ Pek. Urugan Tanah Kembali 18.79 m3 44,984.72                               845,262.89
‐ Pek. Pasir Urug Bawah Pondasi 2.59 m3 122,735.73                               317,885.54
‐ Pek. Lantai Kerja K 100 5.18 m3 592,466.96                           3,068,978.85
‐ Pek. Bekisting (2x Pakai) 123.84 m2 62,728.29                           7,768,271.41
‐ Pek.Pembesian (Besi Beton Ulir) 5,167.22 Kg 11,657.94                         60,239,116.44
‐ Pek. Beton K250 24.55 m3 835,705.94                         20,516,580.81
2. Pondasi Rolag
‐ Pek. Galian Tanah Pondasi 6.75 m3 62,398.16                               421,187.58
‐ Pek. Pondasi Rolag 103.54 m2 86,983.76                           9,006,298.57
SUB TOTAL                       106,874,051.77
II. PEKERJAAN BETON
1. SLOOF BETON
a. Tie Beam TB.1 (30 x 60)
‐ Bekisting (2x Pakai) 154.18 m2 65,811.92                         10,146,881.79
‐ Pek.Pembesian (Besi Beton Polos) 6,114.88 Kg 11,581.75                         70,821,020.61
‐ Pek. Beton K250 39.65 m3 835,705.94                         33,135,740.49
2. KOLOM BETON
a. Kolom K1 (50 x 50) Elevasi ‐3.80 s/d +0.00 
‐ Bekisting (2x Pakai) 150.88 m2 82,764.63                         12,487,527.25
‐ Pek.Pembesian (Besi Beton Polos) 2,512.05 Kg 11,581.75                         29,093,938.86
‐ Pek. Beton K250 18.86 m3 835,705.94                         15,761,414.01
b. Kolom K1 (50 x 50) Elevasi ‐3.80 s/d +7.00                                              ‐
‐ Bekisting (2x Pakai) 226.16 m2 82,764.63                         18,718,048.54
‐ Pek.Pembesian (Besi Beton Polos) 3,765.41 Kg 11,581.75                         43,610,042.92
‐ Pek. Beton K250 28.27 m3 835,705.94                         23,625,406.90
c. Kolom KP (15 x 15) Elevasi ‐0.80 s/d +3.00                                              ‐
‐ Bekisting (2x Pakai) 33.60 m2 82,764.63                           2,780,891.54
‐ Pek.Pembesian (Besi Beton Polos) 270.01 Kg 11,581.75                           3,127,188.72
‐ Pek. Beton K250 1.26 m3 835,705.94                           1,052,989.48
3. BALOK BETON                                             ‐
a. Balok B1 (30 x 60) Elevasi ‐0.80 s/d +0.00                                             ‐
‐ Bekisting (2x Pakai) 435.14 m2 124,079.83                         53,992,097.01
‐ Pek.Pembesian (Besi Beton Polos) 10,540.91 Kg 11,581.75                       122,082,200.20
‐ Pek. Beton K250 49.73 m3 835,705.94                         41,559,656.35
b. Balok B2 (15 x 30) Elevasi ‐0.80 s/d +0.00                                             ‐
‐ Bekisting (2x Pakai) 133.52 m2 124,079.83                         16,567,138.83
NO URAIAN PEKERJAAN Volume Satuan  Harga satuan (Rp.)   Jumlah Harga (Rp) 
‐ Pek.Pembesian (Besi Beton Polos) 3,291.25 Kg 11,581.75                         38,118,439.62
‐ Pek. Beton K250 7.07 m3 835,705.94                           5,908,440.99
c. Balok B1 (30 x 60) Elevasi +3.00 s/d +7.00                                             ‐
‐ Bekisting (2x Pakai) 110.25 m2 124,079.83                         13,679,801.20
‐ Pek.Pembesian (Besi Beton Polos) 1,316.78 Kg 11,581.75                         15,250,618.74
‐ Pek. Beton K250 13.23 m3 835,705.94                         11,056,389.58
d. Balok B2 (15 x 30) Elevasi +3.00 s/d +7.00                                             ‐
‐ Bekisting (2x Pakai) 16.35 m2 124,079.83                           2,028,705.21
‐ Pek.Pembesian (Besi Beton Polos) 319.12 Kg 11,581.75                           3,695,968.54
‐ Pek. Beton K250 0.98 m3 835,705.94                               818,991.82
4. PLAT BETON Tebal 12 cm (PLAT BETON LANTAI )                                             ‐
‐ Pek. Bekisting (2x Pakai) 604.18 m2 142,581.61                         86,144,956.83
‐ Waremash m10 830.79 m2 123,509.11                       102,610,133.51
‐ Pek. Beton K250 99.69 m3 835,705.94                         83,311,525.08
5. PEK. TANGGA BELAKANG                                             ‐
 ELEVASI 0.00 s/d ‐ 3.40                                             ‐
a. Pek. Anak Tangga                                             ‐
‐ Pek. Beton K250 0.92 m3 835,705.94                               768,849.46
‐ Pek.Pembesian (Besi Beton Polos) 189.26 Kg 11,581.75                           2,191,962.29
‐ Bekisting (2x Pakai) 6.11 m2 114,375.46                               698,834.09
b. Pek. Hamparan Tangga                                             ‐
‐ Pek. Beton K250 1.56 m3 835,705.94                           1,303,701.27
‐ Pek.Pembesian (Besi Beton Polos) 161.28 Kg 11,581.75                           1,867,904.88
‐ Bekisting (2x Pakai) 13.01 m2 114,375.46                           1,488,024.79
6. PEK. TRIBUN                                             ‐
a. Balok B1 (30 x 60)                                             ‐
‐ Pek. Bekisting (2x Pakai) 57.33 m2 114,375.46                           6,557,145.38
‐ Pek.Pembesian (Besi Beton Polos) 7,484.83 Kg 11,581.75                         86,687,441.08
‐ Pek. Beton K250 6.55 m3 835,705.94                           5,473,873.90
b. Balok B2 (15 x 30)                                             ‐
‐ Pek. Bekisting (2x Pakai) 32.79 m2 114,375.46                           3,750,371.48
‐ Pek.Pembesian (Besi Beton Polos) 851.95 Kg 11,581.75                           9,867,073.19
‐ Pek. Beton K250 1.74 m3 835,705.94                           1,454,128.33
c. Plat Beton Tebal 15 cm                                              ‐
‐ Pek. Bekisting (2x Pakai) 272.49 m2 142,581.61                         38,852,062.77
‐ Waremash m10 208.00 Kg 123,509.11                         25,689,894.88
‐ Pek. Beton K250 69.76 m3 835,705.94                         58,298,846.32
SUB TOTAL                   1,106,136,268.76
IV. PEKERJAAN BAJA IWF
‐ Kolom IWF 300.150.6.5.9 880.80 Kg 23,682.28                         20,859,350.81
‐ Baut Angkur 16  24.00 Bh 11,213.20                               269,116.80
‐ Besi Plat 5 mm 4.00 Bh 52,768.00                               211,072.00
SUB TOTAL                         21,339,539.61
C PEKERJAAN ARSITEKTUR
I PEKERJAAN DINDING
a. ELEVASI +0.00 s/d 3.00
1. Pas. Dinding Bata  131.81 m2 86,983.76                         11,465,329.48
2. Pek. Plasteran Dinding 316.65 m2 44,243.20                         14,009,608.55
3. Pek. Acian Dinding 316.65 m2 30,518.87                           9,663,799.39
b. ELEVASI +3.00 s/d 7.00                                             ‐
1. Pas. Dinding Bata  158.33 m2 86,983.76                         13,772,138.82
2. Pek. Plasteran Dinding 316.65 m2 44,243.20                         14,009,608.55
3. Pek. Acian Dinding 316.65 m2 30,518.87                           9,663,799.39
SUB TOTAL                         72,584,284.18
II PEKERJAAN PENUTUP LANTAI
a. LANTAI I/ELEVASI +0.00 
1. Granit ukuran 60 x 60 Kasar Ex. Granit Cina 294.71 m2 155,721.50                         45,892,683.59
2. Granit ukuran 40 x 40 Kasar Ex. Granit Cina 351.43 m2 114,341.00                         40,182,857.77
3. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( WC ) 13.62 m2 114,341.00                           1,557,324.43
4. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( Dinding WC ) 16.00 m2 114,341.00                           1,829,456.01
5. Granit 40 x 40 Halus Ex. Granit Cina W.Kuning ( Wastafel ) 3.20 m2 114,341.00                               365,891.20
b. ELEVASI +3.40 s/d 6.80 & Tribun
1. Granit ukuran 60 x 60 Kasar Ex. Granit Cina 66.00 m2 155,721.50                         10,277,619.07
2. Granit ukuran 40 x 40 Kasar Ex. Granit Cina ( Area Tribun ) 293.02 m2 114,341.00                         33,504,199.94
SUB TOTAL                       133,610,032.00
III. PEKERJAAN KUSEN, PINTU, JENDELA, VENTILASI & ROSTER
1. Pas. Pintu Type P1 5.00 Bh 1,191,229.96                           5,956,149.81
2. Pas. Pintu Type P2  1.00 Bh 1,748,581.27                           1,748,581.27
NO URAIAN PEKERJAAN Volume Satuan  Harga satuan (Rp.)   Jumlah Harga (Rp) 
3. Pas. Jendela Type J1 2.00 Bh 4,594,753.56                           9,189,507.11
4. Pas. Ventilasi Type V1 8.00 Bh 124,070.76                               992,566.08
5. Pas. Ventilasi Type V2 1.00 Bh 5,522,006.30                           5,522,006.30
6. Pas. Ventilasi Type V3 12.00 Bh 877,268.00                         10,527,216.00
7. Pas. Ventilasi Type V4 2.00 Bh 4,893,242.60                           9,786,485.20
SUB TOTAL                         43,722,511.78
IV. PEKERJAAN ATAP
1. Pek. Pipa SCH 20, 4 Inch 15,028.31 Kg 26,122.26                       392,573,423.68
2. Reng CNP 150.50.20.2 3,992.26 Kg 19,516.64                         77,915,490.03
3. Penutup Aspal Bitumen CTI 973.34 m2 238,435.70                       232,079,008.01
4. Nok Aspal Bitumen 42.90 m2 89,785.41                           3,851,794.16
SUB TOTAL                       706,419,715.89
V PEKERJAAN PLAFOND
1. Pas. Rangka Hollow 33.00 m2 60,297.66                           1,989,822.91
2. Pas. Plafond Gypsum 9 mm 33.00 m2 34,522.87                           1,139,254.72
SUB TOTAL                           3,129,077.63
VI PEKERJAAN REALING
1. Pas. Handrail & Tiang Besi Hollow 4 x4 + 2 x 2 cm 122.25 m 230,860.00                         28,222,635.00
SUB TOTAL                         28,222,635.00
VII PEKERJAAN PENGECATAN
1. Cat Tembok (Ex Mowilex) 895.62 m2 22,173.11                         19,858,684.00
2. Pek. Cat Plafond 33.00 m2 22,173.11                               731,712.75
3. Pek. Cat Epoxy Area Lapangan Bulutangkis 166.78 m2 81,922.98                         13,663,114.54
4. Pengecatan Zinc Chromate Rangka Atap 685.71 m2 34,473.17                         23,638,597.06
SUB TOTAL                         57,892,108.35
VIII PEKERJAAN ALLUMINIUM COMPOSITE (ACP)
1. Pekerjaan Alluminium Composite Panel (ACP) TypePVDF T.4 mm + Rangka
‐Pekerjaan Alumunim Composite Panel (ACP) Fasade Atas 385.77 m2 800,000.00                       308,616,000.00
‐ Pekerjaan Alumunim Composite Panel (ACP) Kolom 104.00 m2 800,000.00                         83,200,000.00
SUB TOTAL                       391,816,000.00
IX PEKERJAAN TULISAN PAPAN NAMA GEDUNG
1. Tulisan papan nama gedung (Akrilik + Lampu Strep LED) 1.00 Ls 12,532,400.00                         12,532,400.00
SUB TOTAL                         12,532,400.00
D. PEKERJAAN MEKANIKAL ELEKTRIKAL                                             ‐
I. PEKERJAAN MEKANIKAL                                             ‐
1. PEMIPAAN AIR BERSIH                                             ‐
a. Pipa PVC AW (Incl. Fitting & Accessories)                                             ‐
‐ PVC AW 1/2 Inchi 51.40 m 21,520.11                           1,106,133.63
SUB TOTAL 1                           1,106,133.63
2. PEMIPAAN AIR KOTOR & AIR BEKAS
‐ Pipa Pvc Aw 4 Inchi (Ke Drainase) 16.00 m 118,770.54                           1,900,328.71
‐ Pipa Pvc Aw 4 Inchi (Ke Septitank ) 20.00 m 118,770.54                           2,375,410.88
3. Septik Tank 2.00 Unit 5,606,600.00                         11,213,200.00
4. Sambungan PDAM 1.00 Ls 2,968,200.00                           2,968,200.00
5. Sanitary
‐ Pas. Kloset Jongkok 4.00 Bh 2,430,879.95                           9,723,519.78
‐ Pas. Wastafel Gantung (Toto) 2.00 Bh 1,523,458.33                           3,046,916.66
‐ Pas. Kran Air  4.00 Bh 37,315.55                               149,262.20
‐ Pas. Kran Air Wastafel (Toto) 2.00 Bh 123,366.97                               246,733.93
‐ Pas. Floor drain (Toto) 4.00 Bh 265,373.57                           1,061,494.28
SUB TOTAL 2                         32,685,066.46
II. PEKERJAAN ELEKTRIKAL
1. INSTALASI PANEL
‐ Pengadaan dan pemasangan panel Box 3.00 Unit 329,800.00                               989,400.00
‐ Mcb 4.00 Unit 92,344.00                               369,376.00
2. PEMASANGAN LISTRIK BARU PLN 3500 WATT 1.00 Ls 2,638,400.00                           2,638,400.00
SUB TOTAL 3                           3,997,176.00
3. INSTALASI LAMPU, SAKLAR & STOP KONTAK
‐ Lampu Sorot LED Philips 100 W 10.00 Bh 1,100,583.83                         11,005,838.25
‐ Lampu LED Philips 18 W 9.00 Bh 90,967.09                               818,703.77
‐ Stop Kontak 1P, 220 Volt, 13A, Wall Type 4.00 Bh 54,072.36                               216,289.44
‐ Saklar 1 gang 9.00 Bh 48,086.49                               432,778.40
‐ Saklar 2 gang 1.00 Bh 58,062.94                                 58,062.94
SUB TOTAL  4                         12,531,672.79
4. INSTALASI PENERANGAN & STOP KONTAK
‐ NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Lampu 19.00 Ttk 128,605.51                           2,443,504.69
‐ NYM 3 x 2,5 mm2 + PVC Conduit dia.20 untuk Stop Kontak 14.00 Ttk 128,605.51                           1,800,477.14
SUB TOTAL 5                           4,243,981.83
NO URAIAN PEKERJAAN Volume Satuan  Harga satuan (Rp.)   Jumlah Harga (Rp) 
TOTAL 1+2+3+4+5                          54,564,030.71
E. PEKERJAAN LANSCAPE
I. PEKERJAAN LAMPU LAPANGAN DAN LANDMARK
a. PEKERJAAN LAMPU LAPANGAN
1. Tiang Lampu Menggunakan Pipa SCH  4.00 Bh 6,046,196.07                         24,184,784.27
2. Lampu Sorot LED 1000 w 4.00 Bh 14,455,876.05                         57,823,504.20
SUB TOTAL 1                         82,008,288.47
b. LANDMARK LAPANGAN
1. Signare Huruf Acrylic  1.00 Ls 9,234,400.00                           9,234,400.00
2. Dudukan                                             ‐
‐ Sloof 15x15                                             ‐
* Bekisting (2x Pakai) 10.32 m2 65,811.92                               679,179.01
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 11,657.94                           1,312,217.20
* Pek. Beton K175 0.77 m3 731,955.47                               563,605.71
‐ Kolom 15x15                                             ‐
* Bekisting (2x Pakai) 4.32 m2 82,764.63                               357,543.20
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 11,657.94                           1,312,217.20
* Pek. Beton K175 0.32 m3 731,955.47                               234,225.75
‐ Ringbalk 15x15                                             ‐
* Bekisting (2x Pakai) 27.52 m2 124,079.83                           3,414,676.91
* Pek.Pembesian (Besi Beton Polos) 112.56 Kg 11,657.94                           1,312,217.20
* Pek. Beton K175 3.61 m3 731,955.47                           2,642,359.23
‐ Pasangan Batu Merah 19.45 m2 86,983.76                           1,691,834.14
‐ Plesteran Dinding  17.70 m2 44,243.20                               783,104.60
‐ Acian Dinding 47.56 m2 30,518.87                           1,451,477.34
‐ Pengecatan Dinding 47.56 m2 22,173.11                           1,054,553.28
SUB TOTAL 2                         26,043,610.76
TOTAL 1+2                       108,051,899.24
II PEKERJAAN LAPANGAN
a. LAPANGAN VOLLY (DUA)
1. Galian  6.30 m3 62,398.16                               393,108.41
2. Pek. Rolag 35.00 m2 86,983.76                           3,044,431.62
3. Urugan Pasir T 5cm 26.40 m3 122,735.73                           3,240,223.26
4. Pek.Beton K.200 52.80 m3 757,828.01                         40,013,319.15
5. Pek. Pengecetan Lapangan Volly ( Sportkote ) 324.00 m2 26,561.66                           8,605,978.90
SUB TOTAL 1                         55,297,061.33
b. LAPANGAN BASKET
1. Galian Pondasi 4.23 m3 62,398.16                               263,944.22
2. Pek. Rolag 23.50 m2 86,983.76                           2,044,118.37
3. Urugan Pasir T 5cm 25.50 m3 122,735.73                           3,129,761.10
4. Pek.Beton K.200 51.00 m3 757,828.01                         38,649,228.72
6. Pek. Pengecetan Lapangan Basket ( Sportkote ) 510.00 m2 26,561.66                         13,546,448.26
SUB TOTAL 2                         57,633,500.68
c. TENIS LAPANGAN 
1. Galian Pondasi 2.70 m3 62,398.16                               168,475.03
2. Pek. Rolag 22.50 m2 86,983.76                           1,957,134.61
3. Urugan Pasir T 5cm 22.50 m3 122,735.73                           2,761,553.92
4. Pek.Beton K.200 45.00 m3 757,828.01                         34,102,260.64
5. Pek. Pengecetan Lapangan Tenis ( Sportkote ) 259.99 m2 26,561.66                           6,905,766.83
6. Perbaikan Rang Keliling
‐ Sloof 15x15
* Bekisting (2x Pakai) 21.60 m2 65,811.92                           1,421,537.47
* Pek.Pembesian (Besi Beton Polos) 169.07 Kg 11,657.94                           1,971,007.12
* Pek. Beton K175 1.62 m3 731,955.47                           1,185,767.85
‐ Pipa Gip 1.5 Inchi + Pengelasan 48.00 m 72,984.81                           3,503,270.69
‐ Rang Kawat Harmonika 121.00 m2 56,120.61                           6,790,594.40
7. Lampu Sorot LED 50 watt 6.00 Bh 527,935.60                           3,167,613.57
SUB TOTAL 3                         63,934,982.13
TOTAL 1+2+3                       176,865,544.14

                  3,063,788,540.92