PERHITUNGAN RENCANA ANGGARAN BIAYA

OPERASIONAL KANTOR

LOKASI : KANTOR PALANGKARAYA


PERIODE : TAHUN PERTAMA

TOTAL HARGA
NO. URAIAN KEGIATAN
(Rp)

I BIAYA PERSONIL 1,152,000,000.00


II BANGUNAN DAN KENDARAAN OPERASIONAL 1,650,000,000.00
III BIAYA KANTOR, BAHAN DAN PERALATAN KANTOR 169,200,000.00
IV BIAYA LAIN-LAIN 7,100,000.00

REAL COST 2,978,300,000.00


PEMBULATAN 2,978,300,000.00

Terbilang : DUA MILYAR SEMBILAN RATUS TUJUH PULUH DELAPAN JUTA TIGA RATUS RIBU RUPIAH
PERHITUNGAN RENCANA ANGGARAN BIAYA
OPERASIONAL KANTOR

LOKASI : KANTOR PALANGKARAYA


PERIODE : TAHUN PERTAMA

I. BIAYA PERSONIL

VOLUME WAKTU
NO. TENAGA AHLI M/M Salary (Rp) JUMLAH (Rp)
(MAN) (MONTH)

A. PROFESSIONAL STAFF
1 Direktur Utama 1 12.00 12.00 15,000,000.00 180,000,000.00
2 Direktur Teknik 1 12.00 12.00 10,000,000.00 120,000,000.00
3 Direktur Keuangan 1 12.00 12.00 10,000,000.00 120,000,000.00
4 Staf Teknik 2 12.00 24.00 5,000,000.00 120,000,000.00
5 Staf Keuangan 2 12.00 24.00 5,000,000.00 120,000,000.00
6 Projeck Manager 1 12.00 12.00 8,500,000.00 102,000,000.00
7 Site Manager 1 12.00 12.00 7,500,000.00 90,000,000.00
8 Logistik 1 12.00 12.00 5,000,000.00 60,000,000.00
9 Surveyor 2 12.00 24.00 5,000,000.00 120,000,000.00
10 Administrasi 2 12.00 24.00 5,000,000.00 120,000,000.00

JUMLAH 1,152,000,000.00

II. BANGUNAN DAN KENDARAAN OPERASIONAL

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOLUME SATUAN
(Rp) (Rp)

1 Sewa Bangunan Kantor 12 Bulan 100,000,000.00 1,200,000,000.00


2 Kendaraan Roda 4 (Inova) 1 unit 350,000,000.00 350,000,000.00
3 Kemdaraan Roda 2 4 Unit 25,000,000.00 100,000,000.00

JUMLAH 1,650,000,000.00

III. BIAYA KANTOR, BAHAN DAN PERALATAN KANTOR

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOLUME SATUAN
(Rp) (Rp)

1 Alat Komunikasi / Telepon/Fax 1 Unit 1,000,000.00 1,000,000.00


2 Biaya tlpn 12 Bulan 250,000.00 3,000,000.00
3 Wifi 12 Bulan 350,000.00 4,200,000.00
4 ATK 1 Bulan 2,500,000.00 2,500,000.00
5 Laptop 4 Unit 15,000,000.00 60,000,000.00
6 Komputer PC 2 Unit 7,500,000.00 15,000,000.00
7 Printer A4 4 Unit 1,500,000.00 6,000,000.00
8 Printer A3 2 Unit 4,500,000.00 9,000,000.00
9 Meja + Kursi Kerja 10 Set 3,500,000.00 35,000,000.00
10 Meja + Kursi Rapat 1 Set 10,000,000.00 10,000,000.00
11 White Board Besar 2 Unit 500,000.00 1,000,000.00
12 Lemari data 4 Unit 2,500,000.00 10,000,000.00
13 Sofa 1 Set 7,500,000.00 7,500,000.00
14 TV 32" 1 Unit 5,000,000.00 5,000,000.00

JUMLAH 169,200,000.00
IV. BIAYA LAIN-LAIN

HARGA SATUAN JUMLAH HARGA


NO. URAIAN VOLUME SATUAN
(Rp) (Rp)

1 Rice Cooker 4 Buku 500,000.00 2,000,000.00


2 Kompor Gas 4 Buku 650,000.00 2,600,000.00
3 Gas 3 Kg 4 Buku 125,000.00 500,000.00
4 Piring 2 Lusin 50,000.00 100,000.00
5 Gelas 2 Lusin 50,000.00 100,000.00
6 Sendok 2 Lusin 25,000.00 50,000.00
7 Kuali 2 buah 125,000.00 250,000.00
8 P3K 2 set 250,000.00 500,000.00
9 Obat-Obatan 2 set 500,000.00 1,000,000.00
-

JUMLAH 7,100,000.00

224,176,875.00

2,978,300,000.00