VOLUME H. SATUAN
KTGR
URAIAN SAT TOTAL SWADAYA
Total SWADAYA DANA BIAYA Rp.
1. BAHAN
1.1 Batu belah 20.00 20.00 m3 I-a 230,000 4,600,000 -
1.2 PC @ 50 kg 41.00 41.00 Zak I-b 62,000 2,542,000 -
1.3 Pasir Pasang 10.00 10.00 m3 I-a 250,000 2,500,000 -
20
DANA
4,600,000
2,542,000
2,500,000
9,642,000
8,000
75,000
-
-
60,000
83,000
1,650,000
675,000
2,325,000
12,050,000
12,050,000
12,050,000
9 Oktober 2016
buat oleh :
DAFTAR ANALIS PEKERJAAN DAN KEBUTUHAN BAHAN
3 Pekerjaan Plesteran
Campuran 1 PC : 6 Psr 4.416 kg PC @ 50 kg 8.00 0.71 0.71
Tebal = 15 mm 0.027 m3 pasir pasang 8.00 0.22 0.22
0.300 Hok pekerja 8.00 2.40 2.40
0.150 Hok tukang batu 8.00 1.20 1.20
0.015 Hok mandor - - -
4 Pekerjaan Acian
3.250 kg PC @ 50 kg 8.00 0.52 0.52
0.200 Hok pekerja 8.00 1.60 1.60
0.100 Hok tukang batu 8.00 0.80 0.80
0.010 Hok mandor - - -
TALUD Keterangan
Panjang 20 m Galian Tanah Pasangan Batu Plesteran =Acian
V =(b*h1)* Pjg L 1 = (a+b)/2*h V = (a+0,1)*Pjg
a L 2 =b*h1
### V = (L1 + L2) * Pjg
Volume Volume
### a b h h1 Pjg Vol. Galian
I h No
(m') (m') (m') (m') (m') (m3)
Pas.batu Plesteran
### (m3) (m2)
8.00
8.00