Perhitungan Berat kuda kuda K1

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 A 8.13 2 2 L 70.70.7 7.38 239.998
2 B 9 2 2 L 70.70.7 7.38 265.680
3 C 0.6 12 2 L 50.50.5 3.77 54.288
4 D 1.02 12 2 L 50.50.5 3.77 92.290
5 D1 0.67 2 2 L 50.50.5 3.77 10.104
6 D2 0.67 2 2 L 50.50.5 3.77 10.104
7 E 3.8 1 2 L 50.50.5 3.77 28.652
8 F 1.88 1 2 L 50.50.5 3.77 14.175

Berat Total Kuda - kuda K1 715.290

Perhitungan Berat kuda kuda K2

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 A 9.6 2 2 L 70.70.7 7.38 283.392
2 B 10.4 2 2 L 70.70.7 7.38 307.008
3 C 0.6 12 2 L 50.50.5 3.77 54.288
4 D 1.03 12 2 L 50.50.5 3.77 93.194
5 D1 0.67 2 2 L 50.50.5 3.77 10.104
6 D2 0.67 2 2 L 50.50.5 3.77 10.104
7 E 3.8 1 2 L 50.50.5 3.77 28.652
8 F 1.9 1 2 L 50.50.5 3.77 14.326

Berat Total Kuda - kuda K1 801.068

Perhitungan Berat Jurai

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 Ju 12.5 0 2 L 50.50.5 3.77 0.000

Berat Total Kuda - kuda K1 0.000

Perhitungan Berat Gording

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 G 8.78 12 1 C.100.50.20.2,3 4.067 428.499
2 G1 15.2 2 1 C.100.50.20.2,3 4.067 123.637
3 G2 15.4 2 1 C.100.50.20.2,3 4.067 125.264
4 G3 15.6 2 1 C.100.50.20.2,3 4.067 126.890
5 G4 15.8 2 1 C.100.50.20.2,3 4.067 128.517
6 G5 16.01 2 1 C.100.50.20.2,3 4.067 130.225
7 G6 16.3 2 1 C.100.50.20.2,3 4.067 132.584
8 G7 16.5 2 1 C.100.50.20.2,3 4.067 134.211

Berat Total Gording 1,329.83


Jumlah Total kuda-kuda K1 adalah = 4 buah
sehingga berat total kuda-kuda K1 = 4 x 715.290 = 2,861.158 Kg

Jumlah Total kuda-kuda K1 adalah = 5 buah


sehingga berat total kuda-kuda K1 = 5 x 801.068 = 4,005.338 Kg

Berat Profil siku L.50.50.5 Penahan Gording

158x0,14x3,77 = 83.3924 Kg

Total Berat Struktur Atap = 6,949.889 Kg

Berat Baut Pada Struktur Atap


4%x9134,973 = - Kg

Berat Plat Penghubung ( plat simpul)


10%x6563,69 = 694.989 Kg

Berat Total Keseluruhan Struktur Atap = 7,644.878 Kg


Perhitungan Berat kuda kuda K1

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 A 8.5 2 2 L 50.50.5 3.77 128.180
2 B 9.8 2 2 L 50.50.5 3.77 147.784
3 C 0.67 12 2 L 40.40.4 2.42 38.914
4 C1 0.85 2 2 L 40.40.4 2.42 8.228
5 C2 0.95 2 2 L 40.40.4 2.42 9.196
6 D 0.8 14 2 L 40.40.4 2.42 54.208
7 D1 0.82 2 2 L 40.40.4 2.42 7.938
Berat Total Kuda - kuda K1 394.447

Perhitungan Berat kuda kuda K2

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 A 8.9 2 2 L 50.50.5 3.77 134.212
2 B 10.2 2 2 L 50.50.5 3.77 153.816
3 C 0.75 14 2 L 40.40.4 2.42 50.820
4 C 0.67 12 2 L 40.40.4 2.42 38.914
5 C2 0.95 2 2 L 40.40.4 2.42 9.196
6 D 0.8 14 2 L 40.40.4 2.42 54.208
7 D1 0.82 2 2 L 40.40.4 2.42 7.938
Berat Total Kuda - kuda K1 449.103

Perhitungan Berat Jurai

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 Ju 12.5 2 2 L 50.50.5 3.77 188.500

Berat Total Kuda - kuda K1 188.500

Perhitungan Berat Gording

No. Simbol Panjang (m) JUMLAH Profil Berat (kg/m) Berat Total (kg)
1 G1 9.37 2 1 C.100.50.20.2,3 4.067 76.216
2 G2 10.14 2 1 C.100.50.20.2,3 4.067 82.479
3 G3 10.91 2 1 C.100.50.20.2,3 4.067 88.742
4 G4 11.68 2 1 C.100.50.20.2,3 4.067 95.005
5 G5 12.44 2 1 C.100.50.20.2,3 4.067 101.187
6 G6 13.21 2 1 C.100.50.20.2,3 4.067 107.450
7 G7 13.98 2 1 C.100.50.20.2,3 4.067 113.713
8 G8 14.75 2 1 C.100.50.20.2,3 4.067 119.977
9 G9 15.52 2 1 C.100.50.20.2,3 4.067 126.240
10 Ga 2.4 2 1 C.100.50.20.2,3 4.067 19.522
11 Gb 3.22 2 1 C.100.50.20.2,3 4.067 26.191
12 Gc 4.03 2 1 C.100.50.20.2,3 4.067 32.780
13 Gd 4.85 2 1 C.100.50.20.2,3 4.067 39.450
14 Ge 5.67 2 1 C.100.50.20.2,3 4.067 46.120
15 Gf 6.49 2 1 C.100.50.20.2,3 4.067 52.790
16 Gg 7.31 2 1 C.100.50.20.2,3 4.067 59.460
17 Gh 8.13 2 1 C.100.50.20.2,3 4.067 66.129
18 Gi 18.05 2 1 C.100.50.20.2,3 4.067 146.819
19 Gj 17.9 1 1 C.100.50.20.2,3 4.067 72.799
20 Gk 17.81 1 1 C.100.50.20.2,3 4.067 72.433
21 Gl 17.71 1 1 C.100.50.20.2,3 4.067 72.027
22 Gm 17.6 1 1 C.100.50.20.2,3 4.067 71.579
23 Gn 17.5 1 1 C.100.50.20.2,3 4.067 71.173
24 Go 17.4 1 1 C.100.50.20.2,3 4.067 70.766
25 Gp 17.3 1 1 C.100.50.20.2,3 4.067 70.359
26 Gq 17.2 1 1 C.100.50.20.2,3 4.067 69.952
Berat Total Gording 1,971.36
Jumlah Total kuda-kuda K1 adalah = 4 buah
sehingga berat total kuda-kuda K1 = 4 x 394.447 = 1,577.789 Kg

Jumlah Total kuda-kuda K1 adalah = 6 buah


sehingga berat total kuda-kuda K1 = 6 x 449.103 = 2,694.619 Kg

Berat Profil Juarai = 188.500 Kg

Total berat Gording = 1,971.36 Kg

Berat Profil siku L.50.50.5 Penahan Gording

176x0,14x3,77 = 92.8928 Kg

Total Berat Struktur Atap = 6,525.157 Kg

Berat Baut Pada Struktur Atap


4%x9134,973 = 261.006 Kg

Berat Plat Penghubung ( plat simpul)


20%x9134,973 = 1,305.031 Kg

Berat Total Keseluruhan Struktur Atap = 8,091.195 Kg


REKAPITULASI
KEGIATAN : PEMBANGUNAN /REHAB/PENATAAN ANJUNGAN KALTENG TMII
PEKERJAAN : REHAB BERAT GEDUNG PANGGUNG ANJUNGAN KALTENG TMII
LOKASI : JAKARTA

NO. URAIAN PEKERJAAN BIAYA

I. PEKERJAAN PENDAHULUAN 71,923,180.56


II. PEKERJAAN KONSTRUKSI
A. PEKERJAAN TANAH 32,010,254.40
B. PEKERJAAN PONDASI 1,689,988,396.13
C. PEKERJAAN BETON 270,294,814.87
D. PEKERJAAN PASANGAN BATA DAN PLESTERAN 92,596,301.17
E. PEKERJAAN PENUTUP LANTAI 118,106,361.29
F. PEKERJAAN KAP ATAP 429,375,046.24
G. PEKERJAAN PLAFOND 79,821,370.00
H. PEKERJAAN KOZEN PINTU DAN JENDELA 87,528,876.28
I. PEKERJAAN SANITAIR 18,758,514.40
J. PEKERJAAN INSTALASI LISTRIK 26,423,900.00
K. PEKERJAAN PENGECATAN 19,014,448.27
L. PEKERJAAN LAIN-LAIN 12,250,000.00

Total 2,948,091,463.61
TOTAL DIBULATKAN 2,948,090,000.00

Terbilang : ///SATU MILYAR DUA RATUS SEPULUH JUTA RUPIAH ///

Palangka Raya, 2014

Disetujui :
Pejabat Pelaksana Teknis Kegiatan Dibuat/Direncanakan :
(PPTK) CV. KARYA BETANG MANDIRI
KONSULTAN
Pusat Palangkaraya

HANSLI, SE
NIP. 19750505 200501 1 014 SELVI, ST
Direktur
Mengetahui :
Kepala Dinas Kebudayaan dan Pariwisata
Provinsi Kalimantan Tengah

Drs. YUEL TANGGARA


Pembina Utama Muda
NIP. 19600119 198903 1 008
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN /REHAB/PENATAAN ANJUNGAN KALTENG TMII
PEKERJAAN : REHAB BERAT GEDUNG PANGGUNG ANJUNGAN KALTENG TMII
LOKASI : JAKARTA

VOLUME HARGA SATUAN TOTAL HARGA


NO. URAIAN PEKERJAAN ANALISA
SATUAN (Rp) (RP)

I. PEKERJAAN PENDAHULUAN
1 Papan nama kegiatan Ls 1.00 Pkt 400,000.00 400,000.00
2 Pengukuran dan pasangan bowplank A.2.2.1.4. 79.72 M' 46,998.00 3,746,680.56
3 Bangsal (gudang material) Ls 18.00 M2 554,000.00 9,972,000.00
4 Pagar sementara Ls 270.00 M2 153,350.00 41,404,500.00
5 Pembongkaran bangunan lama dan pembersihan lokasi Ls 1.00 ls 8,500,000.00 8,500,000.00
6 Membuang sisa bongkaran keluar lokasi Ls 1.00 ls 7,900,000.00 7,900,000.00

JUMLAH 71,923,180.56
II. PEKERJAAN KONSTRUKSI
A. PEKERJAAN TANAH
1 Galian tanah pondasi 2 SNI 6.1 48.08 M3 28,320.00 1,361,512.32
2 Urugan kembali bekas galian 2 SNI 6.9 35.58 M3 13,574.00 482,911.88
3 Urugan bawah lantai (peninggi lantai) 2 SNI 6.11 165.75 M3 177,980.00 29,500,185.00
4 Urugan bawah pondasi 2 SNI 6.11 3.74 M3 177,980.00 665,645.20
JUMLAH 32,010,254.40
B. PEKERJAAN PONDASI
1 Pek. Cor beton tumbuk lantai kerja pondasi PT1,PT2 dan PT3 t=5cm 7 SNI 6.3 1.72 M3 1,088,235.50 1,868,500.35
2 Pek. Pondasi Telapak PT 1 (110 x 110 cm)
a. Beton K 250 A.4.1.1.8. 3.63 M3 33,294,621.53 120,859,476.17
b. Besi Beton 7 SNI 6.25 535.68 Kg 15,076.60 8,076,233.09
c. Bekisting Pondasi A.4.1.1.20 13.20 M2 63,842,258.35 842,717,810.22
3 Pek. Pondasi Telapak PT 2 (70 x 70 cm)
a. Beton K 250 A.4.1.1.8. 1.57 M3 33,294,621.53 52,205,966.57
b. Besi Beton 7 SNI 6.25 285.70 Kg 15,076.60 4,307,324.31
c. Bekisting Pondasi A.4.1.1.20 8.96 M2 63,842,258.35 572,026,634.82
4 Pek. Pondasi Telapak PT 3 (160 x 0,8 cm)
a. Beton K 250 A.4.1.1.8. 0.60 M3 33,294,621.53 19,976,772.92
b. Besi Beton 7 SNI 6.25 60.71 Kg 15,076.60 915,306.42
c. Bekisting Pondasi A.4.1.1.20 1.05 M2 63,842,258.35 67,034,371.27

JUMLAH 1,689,988,396.13
C. PEKERJAAN BETON
1 Pek. Sloof S1 20/60 Cm 7 SNI 6.39.a 8.04 M3 3,853,803.00 30,984,576.12
2 Pek. Sloof S2 15/20 Cm 7 SNI 6.39.a 1.82 M3 3,853,803.00 6,994,652.45
3 Pek. Kolom K1 40/40 cm elevasi -0.75 s/d - 1.75 7 SNI 6.40.a 1.92 M3 5,288,399.00 10,153,726.08
4 Pek. Kolom K2 30/30 cm elevasi -0.35 s/d - 1.80 7 SNI 6.40.a 1.83 M3 5,288,399.00 9,661,904.97
5 Pek. Kolom K3 Bulat Dim 35 cm elevasi -0.75 s/d + 4.80 7 SNI 6.40.a 4.27 M3 5,288,399.00 22,579,427.70
6 Pek. Kolom K4 20x30 cm elevasi -0.35 s/d + 4.80 7 SNI 6.40.a 3.09 M3 5,288,399.00 16,341,152.91
7 Pek. Kolom K 5 25x100 cm 7 SNI 6.40.a 1.80 M3 5,288,399.00 9,519,118.20
8 Pek. Kolom penguat (kolom praktis) 11/11 cm 7 SNI 6.45.a 118.48 M' 141,369.21 16,749,424.30
9 Pek. Ringbalk 10x15 cm 7 SNI 6.46.a 84.40 M' 177,956.50 15,019,528.60
10 Pek. Ringbalk R1 20/30 cm 7 SNI 6.41 4.02 M3 5,173,953.20 20,799,291.86
11 Pek. Balok uperstek penahan lispalnk beton 20/20 cm 7 SNI 6.41 0.14 M3 5,173,953.20 745,049.26
12 Pek. Plat lantai penutup parit tebal 10 cm
a. Beton K 250 A.4.1.1.8. 2.25 M3 33,294,621.53 74,912,898.45
b. Besi Beton 7 SNI 6.25 307.46 Kg 15,076.60 4,635,488.58
c. Bekisting lantai 7 SNI 6.32.a 24.00 M2 136,209.80 3,269,035.20
13 Pek. Lisplank beton tebal 10 cm 7 SNI 6.41 2.56 M3 5,173,953.20 13,222,037.40
14 Pek. Cor beton tumbuk lantai tebal 5 cm 7 SNI 6.3 12.75 M3 1,088,235.50 13,875,002.63
15 Pek. Cor beton tumbuk lantai trap tangga 7 SNI 6.3 0.77 M3 1,088,235.50 832,500.16

JUMLAH 270,294,814.87

D. PEKERJAAN PASANGAN BATA DAN PLESTERAN


1 Pek. Pasangan bata dinding 4 SNI 6.11 437.13 M2 123,158.75 53,836,113.44
2 Pek. Pasangan bata trap tangga 4 SNI 6.11 31.57 M2 123,158.75 3,888,614.37
3 Pek. Plesteran dan acian 5 SNI 6.4 788.18 M2 38,717.00 30,515,988.29
4 Plesteran dan acian beton expose 5 SNI 6.4 112.50 M2 38,717.00 4,355,585.07

JUMLAH 92,596,301.17

E. PEKERJAAN PENUTUP LANTAI


1 Pas. Keramik tile 60 x 60 cm Polished 13 SNI 6.48.c 112.500 M2 391,674.30 44,063,358.75
2 Pas. Keramik tile 60 x 60 cm unpolised 13 SNI 6.48.b 133.500 M2 451,224.30 60,238,444.05
3 Pas. Keramik tile 30x30 cm Textur trap tangga 13 SNI 6.47.a 28.900 M2 176,624.30 5,104,442.27
4 Pas. Kerami tile 30x30 cm textur toilet 13 SNI 6.47.a 9.000 M2 176,624.30 1,589,618.70
5 Pas. Keramik tile 25x40 dinding toilet 13 SNI 6.63 30.240 M2 235,135.50 7,110,497.52

JUMLAH 118,106,361.29
VOLUME HARGA SATUAN TOTAL HARGA
NO. URAIAN PEKERJAAN ANALISA
SATUAN (Rp) (RP)
F. PEKERJAAN KAP ATAP
1 Pek. Kuda- kuda baja 2L 70.70.7, pengaku dan penahan gording 2L 50.50.5 SNI 7393.2008.2 6,949.889 Kg 22,269.98 154,773,849.83
2 Pek. Gording baja CNP 100.50.20.2,3 SNI 7393.2008.2 1,329.828 Kg 22,269.98 29,615,228.74
3 Plat besi simpul dan tumpuan tebal 10 mm SNI 7393.2008.2 694.989 Kg 22,269.98 15,477,384.98
4 Ikatan angin kabel baja dia. 12 mm Ls 199.600 M' 15,500.00 3,093,800.00
5 Tumbuckle Ls 18.000 Bh 50,300.00 905,400.00
6 Angkur (tumpuan) Ls 18.000 Bh 52,750.00 949,500.00
7 Pek Las Ls 272.000 Smpl 61,713.24 16,786,001.28
8 Pek. Rangka atap sirap 6 SNI 6.37 532.240 M2 112,253.68 59,745,895.98
9 Pek. Atap Sirap 8 SNI 6.33 532.240 M2 251,203.75 133,700,683.90
10 Pas. Nok bubungan 8 SNI 6.37 26.300 M' 87,841.95 2,310,243.29
11 Pek. Lisplank Kayu Borneo 6 SNI 6.46 93.000 M' 129,215.68 12,017,058.24

JUMLAH 429,375,046.24
G. PEKERJAAN PLAFOND
1 Pek. Plafond gypsumboard 9 mm + rangka metal furing Ls 255.00 M2 175,000.00 44,625,000.00
2 Pek. Plafond Kalsium silikat 4,5 mm + rangka metal furing Ls 148.74 M2 133,000.00 19,782,420.00
3 Pas. List plafond gipsum profil Ls 422.30 M' 36,500.00 15,413,950.00

JUMLAH 79,821,370.00
H. PEKERJAAN KOZEN PINTU DAN JENDELA
1 Pek. Kuzen Alumunium 4" warna coklat Ls 176.960 M' 140,300.00 24,827,488.00
2 Pek. Daun Pintu kaca rangka Aluminium Swing Ls 8.820 M2 1,571,650.00 13,861,953.00
3 Pek. Daun Pintu rangka kayu lapis plywood 2 x 4mm fins HPL (lengkap
terpasang) Ls 6.720 M2 1,850,000.00 12,432,000.00
4 Pek. Daun pintu toilet rangka alumunium lapis plywood 2 x 4mm fins HPL
(lengkap terpasang) Ls 4.410 M2 1,850,000.00 8,158,500.00
5 Pek. Daun Jendela kaca rangka aluminium Ls 16.269 M2 1,555,600.00 25,307,745.28
6 Pek. Kaca Bening 5 mm jendela kaca mati + karet/sealent Ls 16.807 M2 175,000.00 2,941,190.00

JUMLAH 87,528,876.28

I. PEKERJAAN SANITAIR
1 Pek. Klosed Jongkok 10 SNI 6.2 2.000 Bh 537,102.50 1,074,205.00
2 Pek. Klosed duduk lengkap 10 SNI 6.1 1.000 Bh 1,750,166.00 1,750,166.00
3 Pas. Floor drain 10 SNI 6.36 3.000 Bh 44,250.00 132,750.00
4 Pek. Bak air 10 SNI 6.7 2.000 Bh 587,625.92 1,175,251.84
5 Pek. Jaringan air kotor dan air bersih Ls 1.000 Pkt 2,500,000.00 2,500,000.00
6 Pas. Kran air 10 SNI 6.35 3.000 Bh 28,938.50 86,815.50
7 Pas. Wastapel lengkap terpasang 10 SNI 6.5.a 3.000 Set 927,942.02 2,783,826.06
8 Pek. Septictank Ls 2.000 Unit 4,627,750.00 9,255,500.00

JUMLAH 18,758,514.40

J. PEKERJAAN INSTRALASI LISTRIK


1 Pas. Instalasi Titik lampu NYM 3x2,5 mm2 Ls 37 Titik 379,500.00 14,041,500.00
2 Pas. Instalasi Stop kontak NYM 3x2,5 mm2 Ls 11 Titik 102,300.00 1,125,300.00
3 Pas. Lampu RMI 2x 18 watt Ls 15 Bh 416,500.00 6,247,500.00
4 Pas. Lampu Down Light +lampu Essensial 20 watt Ls 22 Bh 201,550.00 4,434,100.00
5 Pas. Sklar Tunggal Ls 5 Bh 23,000.00 115,000.00
6 Pas. Sklarar Ganda Ls 10 BH 31,050.00 310,500.00
7 Pas. MCCB 1 Group Ls 1 Unit 150,000.00 150,000.00
JUMLAH 26,423,900.00
K. PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok luar dalam 14 SNI 6.14 900.68 M2 19,973.80 17,989,974.22
2 Pek. Cat plafond 14 SNI 6.14 - M2 19,973.80 -
3 Pek. Cat kilap lisplank 14 SNI 6.7 27.90 M2 36,719.50 1,024,474.05

JUMLAH 19,014,448.27
L. PEKERJAAN LAIN-LAIN
1 Pek.Pas.ornamen Batang garing bahan kayu Ls 1.00 Bh 8,500,000.00 8,500,000.00
2 Pek.Pas.ornamen dari semen Ls 5.00 Bh 750,000.00 3,750,000.00

JUMLAH 12,250,000.00

Dibuat/Direncanakan :
CV. KARYA BETANG MANDIRI KONSULTAN
Pusat Palangkaraya

SELVI, ST
Direktur
DAFTAR HARGA SATUAN PEKERJAAN
( UNIT PRICE )
SNI.03-2835-2002
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

Anlisa BOW
F.1 1 M3 Mengerjakan Rangka Bawah Kayu Ulin
0.2500 Oh Mandor 98,000.00 24,500.00
0.7500 Oh Kepala Tukang 86,000.00 64,500.00
7.5000 Oh Tukang Kayu 79,000.00 592,500.00
5.0000 Oh Pembantu Tukang 61,000.00 305,000.00
1.1000 M3 M3 Kayu Ulin 8,855,000.00 9,740,500.00
5.0000 Kg Kg Paku Ulin 25,600.00 128,000.00
sub total 986,500.00 9,868,500.00 10,855,000.00

F.22 1 M3 Mengerjakan Rangka Badan Kayu kelas II


0.3000 Oh Mandor 98,000.00 29,400.00
1.8000 Oh Kepala Tukang 86,000.00 154,800.00
18.0000 Oh Tukang Kayu 79,000.00 1,422,000.00
6.0000 Oh Pembantu Tukang 61,000.00 366,000.00
1.1000 M3 M3 Kayu kelas II 5,442,950.00 5,987,245.00
3.0000 Kg Kg Paku 20,125.00 60,375.00
sub total 1,972,200.00 6,047,620.00 8,019,820.00

F.38 1 M2 Lantai Papan kayu kelas II tebal 2 cm


0.0200 Oh Mandor 98,000.00 1,960.00
0.1250 Oh Kepala Tukang 86,000.00 10,750.00
1.2500 Oh Tukang Kayu 79,000.00 98,750.00
0.4000 Oh Pembantu Tukang 61,000.00 24,400.00
0.0350 M3 M3 Papan Ulin 12,548,800.00 439,208.00
0.2000 Kg Kg Paku Ulin 25,600.00 5,120.00
sub total 135,860.00 444,328.00 580,188.00

F.38.c 1 M2 Lantai Papan Ulin Tebal 3 cm


0.0200 Oh Mandor 98,000.00 1,960.00
0.1250 Oh Kepala Tukang 86,000.00 10,750.00
1.2500 Oh Tukang Kayu 79,000.00 98,750.00
0.4000 Oh Pembantu Tukang 61,000.00 24,400.00
0.0350 M3 M3 Papan Ulin 12,548,800.00 439,208.00
0.2000 Kg Kg Paku Ulin 25,600.00 5,120.00
sub total 135,860.00 444,328.00 580,188.00

F.38.b 1 M2 Dindind Papan kayu kelas I diserut rapi


0.0300 Oh Mandor 98,000.00 2,940.00
0.1600 Oh Kepala tukang 86,000.00 13,760.00
1.2500 Oh Tukang kayu 79,000.00 98,750.00
0.6000 Oh Pembantu tukang 61,000.00 36,600.00
0.0350 M3 Papan kayu kelas kuat I 12,548,800.00 439,208.00
0.2000 Kg Paku 25,600.00 5,120.00
sub total 152,050.00 444,328.00 596,378.00

H. 17 1 m' Talang Patahan Seng Lebar 30cm


1.0000 M' Seng BJLS 30 13,300.00 13,300.00
0.0400 Kg Paku Biasa 20,125.00 805.00
0.5000 Tukang Kayu 79,000.00 39,500.00
0.0500 Kepala Tukang 86,000.00 4,300.00
0.0150 Mandor 98,000.00 1,470.00
sub total 45,270.00 14,105.00 59,375.00
I PEKERJAAN PERSIAPAN
L.5 1 M2 Membongkar Lantai Keramik dan membersihkan
0.1000 Oh Pekerja 61,000.00 6,100.00
0.0100 Oh Mandor 98,000.00 980.00
sub total 7,080.00 - 7,080.00

L.7 1 M2 Membongkar Genteng/Sirap tidak digunakan Lagi


0.1000 Oh Pekerja 61,000.00 6,100.00
0.0050 Oh Mandor 98,000.00 490.00
sub total 6,590.00 6,590.00

L.9 1 M2 Membongkar Usuk/reng tidak digunakan Lagi


0.1000 Oh Pekerja 61,000.00 6,100.00
0.0050 Oh Mandor 98,000.00 490.00
sub total 6,590.00 6,590.00

L.7a 1 M2 Memb.Rangka plafond tidak digunakan Lagi

0.0650 Oh Pekerja 61,000.00 3,965.00


Oh Mandor 98,000.00 -
sub total 3,965.00 3,965.00
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

II PEKERJAAN TANAH
2 SNI 6.1 1 M3 Galian Tanah Biasa sedalam 1 Meter
0.4000 Oh Pekerja 61,000.00 24,400.00
0.0400 Oh Mandor 98,000.00 3,920.00
sub total 28,320.00 28,320.00

2 SNI 6.9 Urugan Kembali


0.1920 Oh Pekerja 61,000.00 11,712.00
0.0190 Oh Mandor 98,000.00 1,862.00
sub total 13,574.00 13,574.00

2 SNI 6.11 Urugan Pasir


1.2000 M3 Pasir Urug 132,250.00 158,700.00
0.3000 Oh Pekerja 61,000.00 18,300.00
0.0100 Oh Mandor 98,000.00 980.00
sub total 19,280.00 158,700.00 177,980.00

IV PEKERJAAN PASANGAN DINDING


4 SNI 6.11 1 M2 Pasangan Batu Bata tebal 1/2 Bata 1 : 4
96.0000 Bh Batu Bata 690.00 66,240.00
11.5000 Kg Semen Portland 1,610.00 18,515.00
0.0430 M3 Pasir Pasang 201,250.00 8,653.75
0.3200 Oh Pekerja 61,000.00 19,520.00
0.0150 Oh Mandor 98,000.00 1,470.00
0.1000 Oh Tukang Batu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 29,750.00 93,408.75 123,158.75

V PEKERJAAN PLESTERAN
5 SNI 6.4 1 M2 Plesteran, tebal 15 mm Camp 1 : 4
5.2000 Kg Semen Portland 1,610.00 8,372.00
0.0200 M3 Pasir Pasang 201,250.00 4,025.00
0.2000 Oh Pekerja 61,000.00 12,200.00
0.0100 Oh Mandor 98,000.00 980.00
0.1500 Oh Tukang Batu 79,000.00 11,850.00
0.0150 Oh Kepala Tukang 86,000.00 1,290.00
sub total 26,320.00 12,397.00 38,717.00
VI PEKERJAAN KAYU

6 SNI 6.1.a 1 M3 Pasangan Kusen Pintu dan Jendela Kayu kelas I


1.1000 M3 Kayu Ulin 8,855,000.00 9,740,500.00
3.0000 Kg Paku 25,600.00 76,800.00
6.0000 Oh Pekerja 61,000.00 366,000.00
0.3000 Oh Mandor 98,000.00 29,400.00
20.0000 Oh Tukang Kayu 79,000.00 1,580,000.00
2.0000 Oh Kepala Tukang 86,000.00 172,000.00
sub total 2,147,400.00 9,817,300.00 11,964,700.00

6 SNI 6.1.b 1 M3 Pasangan Kusen Pintu dan Jendela Kayu kelas II


1.1000 M3 Kayu lanan 5,442,950.00 5,987,245.00
3.0000 Kg Paku 25,600.00 76,800.00
6.0000 Oh Pekerja 61,000.00 366,000.00
0.3000 Oh Mandor 98,000.00 29,400.00
18.0000 Oh Tukang Kayu 79,000.00 1,422,000.00
2.0000 Oh Kepala Tukang 86,000.00 172,000.00
sub total 1,989,400.00 6,064,045.00 8,053,445.00

6 SNI 6. 7 1 M2 Pasangan Pintu Panil Kayu kelas I


0.0400 M3 Kayu 12,548,800.00 501,952.00
1.0000 Oh Pekerja 61,000.00 61,000.00
0.0500 Oh Mandor 98,000.00 4,900.00
2.5000 Oh Tukang Kayu 79,000.00 197,500.00
0.2500 Oh Kepala Tukang 86,000.00 21,500.00
sub total 284,900.00 501,952.00 786,852.00
6 SNI 6. 8.a 1 M2 Pasangan Pintu Panil Kayu kelas II
0.0400 M3 Kayu 2,740,800.00 109,632.00
1.0000 Oh Pekerja 61,000.00 61,000.00
0.0500 Oh Mandor 98,000.00 4,900.00
2.5000 Oh Tukang Kayu 79,000.00 197,500.00
0.2500 Oh Kepala Tukang 86,000.00 21,500.00
sub total 284,900.00 109,632.00 394,532.00

6 SNI 6. 10.a 1 M2 Pasangan Pintu dan Jendela Kaca Kayu kelas II


0.0350 M3 Kayu 2,740,800.00 95,928.00
0.0800 Oh Pekerja 61,000.00 4,880.00
0.0400 Oh Mandor 98,000.00 3,920.00
2.0000 Oh Tukang Kayu 79,000.00 158,000.00
0.2000 Oh Kepala Tukang 86,000.00 17,200.00
sub total 184,000.00 95,928.00 279,928.00
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

6 SNI 6.28. 1 M3 Pasangan Kontruksi Kuda-Kuda Kayu kelas II


1.1000 M3 Kayu 5,442,950.00 5,987,245.00
0.8000 Kg Paku 20,125.00 16,100.00
0.0000 Kg Besi Strip 34,800.00 -
4.0000 Oh Pekerja 61,000.00 244,000.00
0.2000 Oh Mandor 98,000.00 19,600.00
12.0000 Oh Tukang Kayu 79,000.00 948,000.00
1.2000 Oh Kepala Tukang 86,000.00 103,200.00
sub total 1,314,800.00 6,003,345.00 7,318,145.00
6 SNI 6.28.a Diserutrapi + 1/2 upah 1,972,200.00 6,003,345.00 7,975,545.00

6 SNI 6.31 1 M2 Pas. Kaso + Reng Genteng Metal Kayu Lanan


0.0140 M3 Kayu 5,442,950.00 76,201.3000
0.0150 Kg Paku 20,125.00 301.8750
0.1000 Oh Pekerja 61,000.00 6,100.00
0.0050 Oh Mandor 98,000.00 490.00
0.1000 Oh Tukang Kayu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 15,350.00 76,503.18 91,853.18

6 SNI 6.31.a 1 M2 Pas. Reng Genteng Metal Kayu Lanan


0.0060 M3 Kayu 5,442,950.00 32,657.700
0.0150 Kg Paku 20,125.00 301.875
0.1000 Oh Pekerja 61,000.00 6,100.00
0.0050 Oh Mandor 98,000.00 490.00
0.1000 Oh Tukang Kayu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 15,350.00 32,959.58 48,309.58

6 SNI 6.37 1 M2 Pas. Kaso + Reng Atap sirap kayu kelas II


0.0165 M3 Balok kayu kelas II 5,442,950.00 89,808.68
0.2000 kg Paku kayu 20,125.00 4,025.00
0.0060 OH Mandor 98,000.00 588.00
0.0120 OH Kepala tukang kayu 86,000.00 1,032.00
0.1200 OH Tukang kayu 79,000.00 9,480.00
0.1200 OH Pekerja 61,000.00 7,320.00
sub total 18,420.00 93,833.68 112,253.68

6 SNI 6.40.a 1 M' Pas. Rangka Langit-Langit 60 X 120 Cm Kayu kelas II


0.0135 M3 Kayu 5,442,950.00 73,479.8250
0.1000 Kg Paku 20,125.00 2,012.5000
0.2500 Oh Pekerja 61,000.00 15,250.00
0.0125 Oh Mandor 98,000.00 1,225.00
0.3500 Oh Tukang Kayu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
sub total 47,135.00 75,492.33 122,627.33

6 SNI 6.46 1 M' Pas. Listplank 2x 2 x 20 cm, Kayu Kelas I


0.0086 M3 Kayu 12,548,800.00 107,919.68
0.0600 Kg Paku 25,600.00 1,536.00
0.1000 Oh Pekerja 61,000.00 6,100.00
0.0500 Oh Mandor 98,000.00 4,900.00
0.1000 Oh Tukang Kayu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 19,760.00 109,455.68 129,215.68
6 SNI 6.46.a + Upah membuat ukiran 250,000.00 250,000.00
379,215.68

VII PEKERJAAN BETON


7 SNI 6.3 1 M3 Membuat Beton Tumbuk Camp 1 Pc : 4 Ps : 6 Kr
173.0000 Kg Semen Portland 1,610.00 278,530.00
0.5700 M3 Pasir beton 224,250.00 127,822.50
0.8700 M3 Koral Beton 633,900.00 551,493.00
1.6500 Oh Pekerja 61,000.00 100,650.00
0.0800 Oh Mandor 98,000.00 7,840.00
0.2500 Oh Tukang Batu 79,000.00 19,750.00
0.0250 Oh Kepala Tukang 86,000.00 2,150.00
sub total 130,390.00 957,845.50 1,088,235.50

7 SNI 6.5 1 M3 Membuat beton bertulang adukan 1 pc : 2 ps : 3 kr


336.0000 Kg Semen PC 1,610.00 540,960.00
0.5400 m3 Pasir beton 224,250.00 121,095.00
0.8100 m3 Koral beton 633,900.00 513,459.00
1.0000 OH Mandor 98,000.00 98,000.00
0.0350 OH Kepala tukang batu 86,000.00 3,010.00
0.3500 OH Tukang batu 79,000.00 27,650.00
2.0000 OH Pekerja 61,000.00 122,000.00
sub total 250,660.00 1,175,514.00 1,426,174.00
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

7 SNI 6.32.a 1 m2 Pasang bekisting untuk plat lantai


0.0100 m3 Kayu kelas III 1,285,480.00 12,854.80
0.4000 kg Paku kayu 20,125.00 8,050.00
0.2000 Ltr Residu 26,600.00 5,320.00
0.0080 m3 Papan bekisting 1,644,500.00 13,156.00
0.3500 lbr Plywood 4 mm 77,500.00 27,125.00
2.0000 btg Kayu dolken 15,000.00 30,000.00
0.0030 OH Mandor 98,000.00 294.00
0.0200 OH Kepala tukang kayu 86,000.00 1,720.00
0.2300 OH Tukang kayu 79,000.00 18,170.00
0.3200 OH pekerja 61,000.00 19,520.00
sub total 39,704.00 96,505.80 136,209.80

7 SNI 6.25 1 kg Pembesian dengan besi polos atau besi ulir


1.0500 kg Besi beton polos / ulir 12,995.00 13,644.75
0.0150 kg Kawat beton 24,150.00 362.25
0.0003 OH Mandor 98,000.00 29.40
0.0007 OH Kepala tukang besi 86,000.00 60.20
0.0070 OH Tukang besi 79,000.00 553.00
0.0070 OH Pekerja 61,000.00 427.00
sub total 1,069.60 14,007.00 15,076.60

7 SNI 6.38 1 M3 Membuat pondasi beton bertulang ( 150 Kg besi + bekisting)


0.2000 M3 Kayu kelas III 1,285,480.00 257,096.00
1.5000 Kg Paku kayu 2" - 5" 20,125.00 30,187.50
0.4000 ltr Minyak bekesting 6,900.00 2,760.00
150.0000 Kg Besi beton polos 12,995.00 1,949,250.00
2.2500 Kg Kawat beton 24,150.00 54,337.50
323.0000 Kg Semen Portland 1,610.00 520,030.00
0.5200 M3 Pasir beton 224,250.00 116,610.00
0.7800 M3 Koral beton 633,900.00 494,442.00
3.9000 OH Pekerja 61,000.00 237,900.00
0.3500 OH Tukang batu 79,000.00 27,650.00
1.0400 OH Tukang kayu 79,000.00 82,160.00
1.0500 OH Tukang besi 79,000.00 82,950.00
0.2450 OH Kepala tukang 86,000.00 21,070.00
0.1650 OH Mandor 98,000.00 16,170.00
sub total 467,900.00 3,424,713.00 3,892,613.00

7 SNI 6.39.a 1 M3 Membuat Sloof Beton Bertulan (120 Kg Besi + Bekisting)


0.2700 M3 Kayu Bekisting 1,644,500.00 444,015.00
2.0000 Kg Paku 20,125.00 40,250.00
0.6000 Ltr Minyak Bekisting 6,900.00 4,140.00
120.000 Kg Besi Beton 12,995.00 1,559,400.00
3.0000 Kg Kawat Beton 24,150.00 72,450.00
323.000 Kg Semen Pc 1,610.00 520,030.00
0.5200 M3 Pasir Beton 224,250.00 116,610.00
0.7800 M3 Koral Beton 633,900.00 494,442.00
4.8500 Oh Pekerja 61,000.00 295,850.00
0.1700 Oh Mandor 98,000.00 16,660.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
1.5600 Oh Tukang Kayu 79,000.00 123,240.00
1.4000 Oh Tukang Besi 79,000.00 110,600.00
0.3310 Oh Kepala Tukang 86,000.00 28,466.00
sub total 602,466.00 3,251,337.00 3,853,803.00

7 SNI 6.40.a 1 M3 Membuat Kolom Beton Bertulang (120 Kg Besi + Bekisting)


0.4000 M3 Kayu Bekisting 1,644,500.00 657,800.00
4.0000 Kg Paku 20,125.00 80,500.00
2.0000 Ltr Minyak Bekisting 6,900.00 13,800.00
120.000 Kg Besi Beton 12,995.00 1,559,400.00
4.5000 Kg Kawat Beton 24,150.00 108,675.00
323.000 Kg Semen Pc 1,610.00 520,030.00
0.5200 M3 Pasir Beton 224,250.00 116,610.00
0.7800 M3 Koral Beton 633,900.00 494,442.00
0.1500 M3 Kayu Bekisting 1,285,480.00 192,822.00
3.5000 Lbr Playwood tebal 4 mm 77,500.00 271,250.00
20.0000 Btg Dolken Ky. Galam dia. 8-10/4 m 15,000.00 300,000.00
7.3000 Oh Pekerja 61,000.00 445,300.00
0.2500 Oh Mandor 98,000.00 24,500.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
3.3000 Oh Tukang Kayu 79,000.00 260,700.00
2.1000 Oh Tukang Besi 79,000.00 165,900.00
0.5700 Oh Kepala Tukang 86,000.00 49,020.00
sub total 973,070.00 4,315,329.00 5,288,399.00
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

7 SNI 6.41 1 M3 Membuat Balok Beton Bertulan (150 Kg Besi + Bekisting)


0.3200 M3 Kayu Bekisting 1,644,500.00 526,240.00
3.2000 Kg Paku 20,125.00 64,400.00
1.6000 Ltr Minyak Bekisting 6,900.00 11,040.00
150.000 Kg Besi Beton 12,995.00 1,949,250.00
3.0000 Kg Kawat Beton 24,150.00 72,450.00
323.000 Kg Semen PC 1,610.00 520,030.00
0.5200 M3 Pasir Beton 224,250.00 116,610.00
0.7800 M3 Koral Beton 633,900.00 494,442.00
0.1400 M3 Kayu Bekisting 1,285,480.00 179,967.20
2.8000 Lbr Playwood tebal 4 mm 77,500.00 217,000.00
16.0000 Btg Dolken Ky. Galam dia. 8-10/4 m 15,000.00 240,000.00
5.9600 Oh Pekerja 61,000.00 363,560.00
0.2080 Oh Mandor 98,000.00 20,384.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
2.8000 Oh Tukang Kayu 79,000.00 221,200.00
1.4000 Oh Tukang Besi 79,000.00 110,600.00
0.4550 Oh Kepala Tukang 86,000.00 39,130.00
sub total 782,524.00 4,391,429.20 5,173,953.20

7 SNI 6.45.a 1 m' Membuat kolom penguat beton bertulang ( 11 x 11 cm )


0.0037 m3 Papan bekisting 1,644,500.00 6,084.65
0.0186 kg Paku kayu 20,125.00 374.33
5.5785 kg Besi beton polos 12,995.00 72,492.61
0.8368 kg Kawat beton 24,150.00 20,208.72
7.438 kg Semen PC 1,610.00 11,975.18
0.0112 m3 Pasir beton 224,250.00 2,511.60
0.0167 m3 Koral beton 633,900.00 10,586.13
0.0056 OH Mandor 98,000.00 548.80
0.0112 OH Kepala tukang batu 86,000.00 963.20
0.0372 OH Tukang besi 79,000.00 2,938.80
0.0372 OH Tukang kayu 79,000.00 2,938.80
0.0372 OH Tukang batu 79,000.00 2,938.80
0.1116 OH Pekerja 61,000.00 6,807.60
sub total 17,136.00 124,233.21 141,369.21

7 SNI 6.46.a 1 m' Membuat ring balok beton bertulang ( 10 x 15 cm )


0.0060 m3 Papan bekisting 1,644,500.00 9,867.00
0.0400 kg Paku kayu 20,125.00 805.00
7.2000 kg Besi beton polos 12,995.00 93,564.00
0.1000 kg Kawat beton 24,150.00 2,415.00
11.0000 kg Semen PC 1,610.00 17,710.00
0.0180 m3 Pasir beton 224,250.00 4,036.50
0.0300 m3 Koral beton 633,900.00 19,017.00
0.0100 OH Mandor 98,000.00 980.00
0.0200 OH Kepala tukang batu 86,000.00 1,720.00
0.0660 OH Tukang besi 79,000.00 5,214.00
0.0660 OH Tukang kayu 79,000.00 5,214.00
0.0660 OH Tukang batu 79,000.00 5,214.00
0.2000 OH Pekerja 61,000.00 12,200.00
sub total 30,542.00 147,414.50 177,956.50

VIII PEKERJAAN PENUTUP ATAP


8 SNI 6.32.a 1M2 Pasang Atap Genteng Metal
1.000 M2 Genteng Metal 48,600.00 48,600.0000
0.200 kg Paku anti karat 33,500.00 6,700.0000
0.240 Oh Pekerja 61,000.00 14,640.00
0.001 Oh Mandor 98,000.00 98.00
0.100 Oh Tukang kayu 79,000.00 7,900.00
0.010 Oh Kepala Tukang 86,000.00 860.00
sub total 23,498.00 55,300.00 78,798.00

8 SNI 6.23.a 1 M' Pasang nok puncak


1.100 Lbr Nok puncak Zinculome Collor (Sakura) 30,900.00 33,990.0000
0.050 Kg Paku anti karat 33,500.00 1,675.0000
0.250 Oh Pekerja 61,000.00 15,250.00
0.013 Oh Mandor 98,000.00 1,274.00
0.150 Oh Tukang kayu 79,000.00 11,850.00
0.015 Oh Kepala Tukang 86,000.00 1,290.00
sub total 29,664.00 35,665.00 65,329.00

8 SNI 6.33 1 m2 Pasang atap sirap


0.166 Oh Pekerja 61,000.00 10,126.00
0.250 Oh Tukang Kayu 79,000.00 19,750.00
0.025 Oh Kepala Tukang 86,000.00 2,150.00
0.008 Oh Mandor 98,000.00 784.00
85.000 Lbr Sirap 2,500.00 212,500.00
0.250 Kg Paku sirap 23,575.00 5,893.75
sub total 32,810.00 218,393.75 251,203.75
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

8 SNI 6.37 1 M' Pasang nok/bubungan sirap


0.4000 lbr Seng plat lebar 30 cm 13,300.00 5,320.00
0.0600 kg Paku kayu 1 " 20,125.00 1,207.50
0.0500 kg Paku kayu 2 " - 5 " 20,125.00 1,006.25
0.0040 m3 Kayu Kelas I 2 cm 12,548,800.00 50,195.20
0.0060 OH Mandor 98,000.00 588.00
0.0250 OH Kepala tukang kayu 86,000.00 2,150.00
0.2500 OH Tukang kayu 79,000.00 19,750.00
0.1250 OH Laden tukang kayu 61,000.00 7,625.00
sub total 30,113.00 57,728.95 87,841.95

IX PEKERJAAN LANGIT - LANGIT


9. SNI 6.10 1 M2 Pasang Langi-Langit Playwood 60 x 120 cm
0.3750 Lbr Playwood 4 mm 77,500.00 29,062.50
0.030 Kg Paku 28,750.00 862.50
0.0700 Oh Pekerja 61,000.00 4,270.00
0.0035 Oh Mandor 98,000.00 343.00
0.1000 Oh Tukang Kayu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 13,373.00 29,925.00 43,298.00

9. SNI 6.10.a 1 M2 Pasang Langi-Langit kalsium silikate


0.3750 Lbr kalsium silikate 68,000.00 25,500.00
0.050 Kg Paku 28,750.00 1,437.50
0.0900 Oh Pekerja 61,000.00 5,490.00
0.0035 Oh Mandor 98,000.00 343.00
0.1000 Oh Tukang Kayu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 14,593.00 26,937.50 41,530.50

9. SNI 6.16.a 1M2 Pasang langit-langit papan moulding


13.180 M' Papan Moulding 14x85x1000 mm 40,000.00 527,200.00
0.010 Kg Paku kayu 20,125.00 201.25
0.050 Kg Paku Skrup -
0.200 Oh Pekerja 61,000.00 12,200.00
0.600 Oh Tukang Kayu 79,000.00 47,400.00
0.060 Oh Kepala Tukang 86,000.00 5,160.00
0.010 Oh Mandor 98,000.00 980.00
sub total 65,740.00 527,401.25 593,141.25

9. SNI 6.19 1 m 'List plafon profil


1.100 M' List kayu profil 12,300.00 13,530.00
0.010 Kg Paku 20,125.00 201.25
0.050 Pekerja 61,000.00 3,050.00
0.050 Tukang Kayu 79,000.00 3,950.00
0.003 Mandor 98,000.00 294.00
0.005 Kepala Tukang 86,000.00 430.00
sub total 7,724.00 13,731.25 21,455.25

X PEKERJAAN PIPA DAN SANITASI

10 SNI 6.1 Memasang 1 buah kloset duduk


1.0000 Bh Kloset duduk 1,288,000.00 1,288,000.00
0.1000 Perlengkapan 10% harga klosed 1,288,000.00 128,800.00
0.4600 OH Mandor 98,000.00 45,080.00
0.0010 OH Kepala Tukang 86,000.00 86.00
1.1000 OH Tukang Batu 79,000.00 86,900.00
3.3000 OH Pekerja 61,000.00 201,300.00
sub total 333,366.00 1,416,800.00 1,750,166.00

10 SNI 6.2 Memasang 1 buah kloset jongkok warna


1.0000 Bh Kloset jongkok warna 201,250.00 201,250.00
6.0000 kg Semen PC 1,610.00 9,660.00
0.0100 m3 Pasir pasang 201,250.00 2,012.50
0.1600 OH Mandor 98,000.00 15,680.00
1.5000 OH Kepala tukang batu 86,000.00 129,000.00
1.5000 OH Tukang batu 79,000.00 118,500.00
1.0000 OH Pekerja 61,000.00 61,000.00
sub total 324,180.00 212,922.50 537,102.50

10 SNI 6.5.a Memasang 1 Buah Wastafel


1.00 Bh Wastafel 695,800.00 695,800.00
0.12 - Perlengkapan 12% Harga Wastafel 83,496.00 10,019.52
0.00 Bh Cermin + bingkai 150,000.00 -
0.0100 M3 Pasir Pasang 201,250.00 2,012.50
6.00 Bh PC 1,610.00 9,660.00
1.2000 Oh Pekerja 61,000.00 73,200.00
0.1000 Oh Mandor 98,000.00 9,800.00
1.4500 Oh Tukang Batu 79,000.00 114,550.00
0.1500 Oh Kepala Tukang 86,000.00 12,900.00
sub total 210,450.00 717,492.02 927,942.02
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

10 SNI 6.7 Memasang 1 Buah Bak Mandi Fibreglass


1.00 Bh Bak Mandi Fibreglass 50x50 cm 200,800.00 200,800.00
0.18 - Perlengkapan 18% Harga 36,144.00 6,505.92
1.8000 Oh Pekerja 61,000.00 109,800.00
0.1100 Oh Mandor 98,000.00 10,780.00
2.7000 Oh Tukang Batu 79,000.00 213,300.00
0.5400 Oh Kepala Tukang 86,000.00 46,440.00
sub total 380,320.00 207,305.92 587,625.92

10 SNI 6.27 Memasang 1 M' Pipa PVC Type AW Dia. 4"


1.2000 M' Pipa PVC 140,300.00 168,360.0000
0.3500 - Perlengkapan 35% Harga Pipa 49,105.00 17,186.7500
0.0360 Oh Pekerja 61,000.00 2,196.00
0.0018 Oh Mandor 98,000.00 176.40
0.0600 Oh Tukang Batu 79,000.00 4,740.00
0.0060 Oh Kepala Tukang 86,000.00 516.00
sub total 7,628.40 185,546.75 193,175.15

10 SNI 6.33 Memasang 1 Buah Bak Cuci piring Aluminium 1 lobang


1.000 Bh Bak cuci piring Aluminium 1 lobang 335,200.00 335,200.00
1.000 Set Water drain + asesories 67,040.00 67,040.00
0.0015 Oh Mandor 98,000.00 147.00
0.030 Oh Kepala Tukang 86,000.00 2,580.00
0.300 Oh Tukang Batu 79,000.00 23,700.00
0.030 Oh Pekerja 61,000.00 1,830.00
sub total 28,257.00 402,240.00 430,497.00

10 SNI 6.35 Memasang 1 Buah Kran Dia. 3/4" atau 1/2"


1.0000 Bh Kran Air 19,000.00 19,000.00
0.0500 Set seal tape 1,570.00 78.50
0.0100 Oh Pekerja 61,000.00 610.00
0.0050 Oh Mandor 98,000.00 490.00
0.1000 Oh Tukang Batu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00
sub total 9,860.00 19,078.50 28,938.50

10 SNI 6.36 Memasang 1 Buah Floor Drain


1.0000 Bh Floor Drain 35,000.00 35,000.00
0.0100 Oh Pekerja 61,000.00 610.00
0.0050 Oh Mandor 98,000.00 490.00
0.1000 Oh Tukang Batu 79,000.00 7,900.00
0.0100 Oh Kepala Tukang 86,000.00 860.00

sub total 9,250.00 35,000.00 44,250.00

XII. KUNCI DAN KACA

12 SNI 6.2 1 Bh Pasang Kunci Tanam Setara Yale


1.0000 Bh Kunci Tanam Biasa Setara Yale 228,000.00 228,000.00
0.0100 Oh Pekerja 61,000.00 610.00
0.0050 Oh Mandor 98,000.00 490.00
0.5000 Oh Tukang Kayu 79,000.00 39,500.00
0.0600 Oh Kepala Tukang 86,000.00 5,160.00
sub total 45,760.00 228,000.00 273,760.00

12 SNI 6.5 1 Bh Pasang Ensel Pintu (kuningan 4")


1.0000 Bh Ensel Pintu (kuningan 4") 22,500.00 22,500.00
0.0150 Oh Pekerja 61,000.00 915.00
0.0075 Oh Mandor 98,000.00 735.00
0.1500 Oh Tukang Kayu 79,000.00 11,850.00
0.0150 Oh Kepala Tukang 86,000.00 1,290.00
sub total 14,790.00 22,500.00 37,290.00

12 SNI 6.6 1 Bh Pasang Ensel jendela 3"


1.0000 Bh Ensel jendela 3" 21,800.00 21,800.00
0.0150 Oh Pekerja 61,000.00 915.00
0.0075 Oh Mandor 98,000.00 735.00
0.1500 Oh Tukang Kayu 79,000.00 11,850.00
0.0150 Oh Kepala Tukang 86,000.00 1,290.00
sub total 14,790.00 21,800.00 36,590.00

12 SNI 6.9 1 buah pasang kait angin


0.00075 OH Mandor 98,000.00 73.50
0.0150 OH Kepala tukang kayu 86,000.00 1,290.00
0.1500 OH Tukang kayu 79,000.00 11,850.00
0.0150 OH Laden tukang kayu 61,000.00 915.00
1.0000 Bh Kait angin 26,800.00 26,800.00
sub total 14,128.50 26,800.00 40,928.50
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

12 SNI 6.11 1 Bh Pasang Kunci Selot (grendel)


1.0000 Bh Kunci Selot 3,200.00 3,200.00
0.0200 Oh Pekerja 61,000.00 1,220.00
0.0010 Oh Mandor 98,000.00 98.00
0.2000 Oh Tukang Kayu 79,000.00 15,800.00
0.0200 Oh Kepala Tukang 86,000.00 1,720.00
sub total 18,838.00 3,200.00 22,038.00

12 SNI 6.17 1 M2 Pasang Kaca , tebal 5 mm


1.1000 M2 Kaca rayben 148,000.00 162,800.00
0.0150 Oh Pekerja 61,000.00 915.00
0.0008 Oh Mandor 98,000.00 73.50
0.1500 Oh Tukang Kayu 79,000.00 11,850.00
0.0150 Oh Kepala Tukang 86,000.00 1,290.00
sub total 14,128.50 162,800.00 176,928.50

XIII PEKERJAAN LANTAI DAN DINDING

13 SNI 6.44 1 m2 Pasang lantai keramik 20 x 20 cm


1.000 Dos ubin keramik 20 x 20 cm 118,950.00 118,950.00
11.380 Kg Semen portland 1,610.00 18,321.80
0.042 M3 Pasir pasang 201,250.00 8,452.50
1.500 Kg Semen warna 12,420.00 18,630.00
0.620 Oh Pekerja 61,000.00 37,820.00
0.350 Oh Tukang Batu 79,000.00 27,650.00
0.035 Oh Kepala Tukang 86,000.00 3,010.00
0.030 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 164,354.30 235,774.30

13 SNI 6.48 1 M2 Pasang Lantai Keramikn Uk. 40 x 40 cm


1.0000 M2 Keramik 64,400.00 64,400.0000
11.3800 Kg Semen Portland 1,610.00 18,321.8000
0.0420 M3 Pasir Pasang 201,250.00 8,452.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 109,804.30 181,224.30

13 SNI 6.48.a 1 M2 Pasang Lantai Keramik warna putih Uk. 30 x 30 cm


1.0000 dos keramik 68,000.00 68,000.0000
11.3800 Kg Semen Portland 1,610.00 18,321.8000
0.0420 M3 Pasir Pasang 201,250.00 8,452.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 113,404.30 184,824.30

13 SNI 6.48.b 1 M2 Pasang Lantai Keramikn Uk. 60 x 60 cm unpolish


1.0000 M2 Keramik Unpolish 334,400.00 334,400.0000
11.3800 Kg Semen Portland 1,610.00 18,321.8000
0.0420 M3 Pasir Pasang 201,250.00 8,452.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 379,804.30 451,224.30

13 SNI 6.48.c 1 M2 Pasang Lantai Keramik Uk. 60 x 60 cm polised


1.0000 M2 Keramik polised Uk. 60 x 60 cm 274,850.00 274,850.0000
11.3800 Kg Semen Portland 1,610.00 18,321.8000
0.0420 M3 Pasir Pasang 201,250.00 8,452.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 320,254.30 391,674.30

13 SNI 6.47.a 1 M2 Pasang Lantai Keramik /ubin Uk. 30 x 30 cm textur


1.0000 m2 ubin/keramik 59,800.00 59,800.0000
11.3800 Kg Semen Portland 1,610.00 18,321.8000
0.0420 M3 Pasir Pasang 201,250.00 8,452.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.3500 Oh Tukang Batu 79,000.00 27,650.00
0.0350 Oh Kepala Tukang 86,000.00 3,010.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 71,420.00 105,204.30 176,624.30
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

13 SNI 6.58.a 1 M2 Pasang Lantai porselin Uk. 11 x 11 cm


1.0000 dos keramik 68,000.00 68,000.0000
9.3000 Kg Semen Portland 1,610.00 14,973.0000
0.0180 M3 Pasir Pasang 201,250.00 3,622.5000
1.5000 Kg Semen Warna 12,420.00 18,630.0000
0.6200 Oh Pekerja 61,000.00 37,820.00
0.5000 Oh Tukang Batu 79,000.00 39,500.00
0.0500 Oh Kepala Tukang 86,000.00 4,300.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 84,560.00 105,225.50 189,785.50

13 SNI 6.63 1 M2 Pasang Dinding keramik 25x50 cm, Warna


1.0000 dos keramik 25 x 50 cm 118,950.00 118,950.00
9.3000 Kg Semen Portland 1,610.00 14,973.00
0.0180 M3 Pasir Pasang 201,250.00 3,622.50
1.5000 Kg Semen Warna 12,420.00 18,630.00
0.6000 Oh Pekerja 61,000.00 36,600.00
0.4500 Oh Tukang Batu 79,000.00 35,550.00
0.0450 Oh Kepala Tukang 86,000.00 3,870.00
0.0300 Oh Mandor 98,000.00 2,940.00
sub total 78,960.00 156,175.50 235,135.50

XIV PEKERJAAN CAT - CATAN


14 SNI 6.1a 1 m2 Mengikis / mengerok permukaan cat tembok lama
0.0025 Oh Mandor 98,000.00 245.00
0.1500 Oh Laden tukang cat 61,000.00 9,150.00
sub total 9,395.00 - 9,395.00

14 SNI 6.7 1 m2 Pengecatan bidang kayu lama


0.1500 kg Plamir 63,400.00 9,510.0000
0.1700 kg Cat dasar 33,900.00 5,763.0000
0.1700 kg Cat penutup 60,950.00 10,361.5000
0.0700 OH Pekerja 61,000.00 4,270.00
0.0750 OH Tukang cat 79,000.00 5,925.00
0.0075 OH Kepala tukang cat 86,000.00 645.00
0.0025 OH Mandor 98,000.00 245.00
sub total 11,085.00 25,634.50 36,719.50

14 SNI 6.9 1 M2 Pengecetan Bidang Kayu Baru (1 Lapis Plamir)


1 Lapis Cat Dasar dan 3 Lapis Cat Penutup
0.2000 Kg Cat Meni 12,680.00 2,536.0000
0.1500 Kg Plamir 63,400.00 9,510.0000
0.1700 Kg Cat Dasar 33,900.00 5,763.0000
0.3500 Kg Cat Penutup 2 Kali 60,950.00 21,332.5000
0.0700 Oh Pekerja 61,000.00 4,270.00
0.1050 Oh Tukang Cat 79,000.00 8,295.00
0.0060 Oh Kepala Tukang 86,000.00 516.00
0.0025 Oh Mandor 98,000.00 245.00
sub total 13,326.00 39,141.50 52,467.50

14 SNI 6.12 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
0.3500 Ltr Residu dan Ter 26,600.00 9,310.00
0.1000 Oh Pekerja 61,000.00 6,100.00
0.0050 Oh Mandor 98,000.00 490.00
sub total 6,590.00 9,310.00 15,900.00
reng saja x 0,60 3,954.00 5,586.00 9,540.00

14 SNI 6.14 1 m2 Pengecatan tembok baru ( 1 lapis plamir -


1 lapis cat dasar - 2 lapis cat penutup )
0.1000 Kg Plamir 63,400.00 6,340.00
0.1000 Kg Cat dasar 12,680.00 1,268.00
0.2600 Kg Cat penutup 2x lapis 20,700.00 5,382.00
0.0200 Oh Pekerja 61,000.00 1,220.00
0.0630 Oh Tukang Cat 79,000.00 4,977.00
0.0063 Oh Kepala Tukang 86,000.00 541.80
0.0025 Oh Mandor 98,000.00 245.00
sub total 6,983.80 12,990.00 19,973.80
HARGA UPAH JUMLAH
ANALISA URAIAN PEKERJAAN DAN ANALISA BAHAN (Rp.)
SATUAN (Rp.) (Rp.)
(Rp.)
a b c d e f

14 SNI 6.15 1M2 Pengecatan Tembok Lama (1 Lapis Cat Dasar 2 lapis cat penutup )
0.1200 Kg Cat Dasar 12,680.00 1,521.6000
0.2800 Kg Cat Penutup 2 Kali 20,700.00 5,796.0000
0.0280 Oh Pekerja 61,000.00 1,708.00
0.0420 Oh Tukang Cat 79,000.00 3,318.00
0.0042 Oh Kepala Tukang 86,000.00 361.20
0.0025 Oh Mandor 98,000.00 245.00
sub total 5,632.20 7,317.60 12,949.80

Sup.5 1 M2 Pasangan Paving Stone


1.0000 M2 Paving stone 94,200.00 94,200.00
0.0750 M3 Pasir Pasang 201,250.00 15,093.75
0.1500 Oh Pekerja 61,000.00 9,150.00
0.0150 Oh Mandor 98,000.00 1,470.00
0.1500 Oh Tukang Batu 79,000.00 11,850.00
0.1500 Oh Kepala Tukang 86,000.00 12,900.00
sub total 35,370.00 109,293.75 144,663.75

A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank


0.012 Kg Kayu balok 5/7 1,644,500.00 19,734.00
0.020 M3 Paku 2”-3” 20,125.00 402.50
0.007 M3 Kayu papan 2/20 1,644,500.00 11,511.50
0.100 OH Pekerja 61,000.00 6,100.00
0.100 OH Tukang Kayu 79,000.00 7,900.00
0.010 OH Kepala Tukang 86,000.00 860.00
0.005 OH Mandor 98,000.00 490.00
sub total 15,350.00 31,648.00 46,998.00

A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ±
2) cm, w/c = 0,56
384.000 Kg Semen Portland 1,610.00 618,240.00
0.494 M3 Pasir Beton 224,250.00 110,843.57
0.770 M3 Kerikil (Maksimum 30mm) 201,250.00 154,887.96
215.000 ltr Air 200.00 43,000.00
1.650 OH Pekerja 61,000.00 100,650.00
0,275 OH Tukang Batu 79,000.00 21,725,000.00
0,028 OH Kepala Tukang 86,000.00 2,408,000.00
0,083 OH Mandor 98,000.00 8,134,000.00
sub total 32,367,650.00 926,971.53 33,294,621.53

A.4.1.1.20 Pemasangan 1 m2 bekisting untuk pondasi


0.013 M3 Kayu kelas III 5,442,950.00 70,758.35
0,300 Kg Paku 5 – 10 cm 20,125.00 6,037,500.00
0,100 Ltr Minyak bekisting 6,900.00 690,000.00
0,520 OH Pekerja 61,000.00 31,720,000.00
0,260 OH Tukang Kayu 79,000.00 20,540,000.00
0,026 OH Kepala Tukang 86,000.00 2,236,000.00
0,026 OH Mandor 98,000.00 2,548,000.00
sub total 57,044,000.00 6,798,258.35 63,842,258.35

SNI 7393.2008.2 Memasang 1 Kg rangka kuda-kuda baja


1.005 kg Besi Profil 12,995.00 13,059.98
0.060 OH Pekerja 61,000.00 3,660.00
0.060 OH Tukang las konstruksi 79,000.00 4,740.00
0.006 OH Kepala Tukang 86,000.00 516.00
0.003 OH Mandor 98,000.00 294.00
sub total 9,210.00 13,059.98 22,269.98

Palangka Raya, 2014

Dibuat/Direncanakan :
CV. KARYA BETANG MANDIRI KONSULTAN
Pusat Palangkaraya

SELVI, ST
Direktur
HARGA SATUAN UPAH DAN BAHAN
A. DAFTAR SATUAN HARGA UPAH :

NO URAIAN TENAGA KERJA SATUAN HARGA SATUAN


1 MANDOR Org/Hr Rp. 98,000.00
2 KEPALA TUKANG Org/Hr Rp. 86,000.00
3 TUKANG GALI TANAH Org/Hr Rp. 79,000.00
4 TUKANG BATU Org/Hr Rp. 79,000.00
5 TUKANG KAYU Org/Hr Rp. 83,000.00
6 TUKANG BESI Org/Hr Rp. 79,000.00
7 TUKANG CAT Org/Hr Rp. 79,000.00
8 PEKERJA Org/Hr Rp. 61,000.00

B. DAFTAR SATUAN HARGA BAHAN :

NO NAMA BAHAN SATUAN HARGA SATUAN


1 Ampelas Lbr Rp. 7,100.00
2 Angkur/Angker Bh Rp. 21,500.00
3 Atap multi sirap - merek multiroof M2 Rp. 73,400.00
4 Atap Zinculome Collor (Multi Roof) M2 Rp. 97,400.00
5 Atap Zinculome Collor (Sakura Elang) 2 susun Lbr Rp. 48,600.00
6 Atap Sirap kayu kelas I (tebal 3-4 mm) Lbr Rp. 2,500.00
7 Atap Bubungan (nok) genteng metal Lbr Rp. 30,900.00
8 Batu Belah M3 Rp. 373,500.00
9 Batu Bata Bh Rp. 690.00
10 Bataco 10x20x40 cm Bh Rp. 2,600.00
11 Beton Karawang Bh Rp. 36,900.00
12 Balok Kayu kruing M3 Rp. 7,761,350.00
13 Balok Kayu Borneo M3 Rp. 5,442,950.00
14 Balok Kayu Klas I (Pesanan) M3 Rp. 8,855,000.00
15 Besi Beton Polos Kg Rp. 12,995.00
16 Besi Beton Ulir (12 mm) Btg=6M' Rp. 127,400.00
17 Besi Beugel/Baut Bh Rp. 34,800.00
18 Besi Profil Kg Rp. 12,995.00
19 Besi WF kg Rp. 12,650.00
20 Bak Mandi Fibre 70 x 70 Sudut (Besar) Bh Rp. 476,000.00
21 Bak Mandi Fibre 50 x 50 Segi Empat (Sedang) Bh Rp. 200,800.00
22 Bak cuci piring aluminium 1 lobang Bh Rp. 335,200.00
23 Closet Jongkok berwarna Bh Rp. 253,000.00
24 Closet Duduk Merk Amrrican Standart Bh Rp. 1,288,000.00
25 Closet Jongkok warna putih Bh Rp. 201,250.00
26 Cat Kayu Mengkilap Kg Rp. 60,950.00
27 Cat Tembok Property Kg Rp. 20,700.00
28 Cat kayu Dasar Kg Rp. 33,900.00
29 Cat Dasar Kg Rp. 12,680.00
30 Dempul kayu Kg Rp. 35,300.00
31 Engsel Lokal 4 " ( Pintu ) Bh Rp. 22,500.00
32 Engsel Lokal 3"( Jendela) Bh Rp. 21,800.00
33 Espagnolet Tanam Besar Bh Rp. 93,600.00
34 Floordrain Bh Rp. 35,000.00
35 Gerendel Bh Rp. 3,200.00
36 Kalciboard uk. 3 mm / Nusa board Lbr Rp. 68,000.00
37 Handle jendela Bh Rp. 25,200.00
38 Hak Angin Bh Rp. 26,800.00
39 Kerikil M3 Rp. 201,250.00
40 Koral/Split M3 Rp. 633,900.00
41 Kapur Aduk/Kapur Pasang Kg Rp. 17,400.00
42 Keramik 60 x 60 cm Granit Tile (polished) Lbr Rp. 274,850.00
43 Keramik 40 x 40 cm M2 Rp. 64,400.00
44 Keramik 60 x 60 cm Granit Tile (unpolished) M2 Rp. 334,400.00
45 Keramik 25 x 50 cm polished Dos Rp. 118,950.00
46 Keramik 30 x 30 cm Textur Dos Rp. 59,800.00
47 Keramik Merek Asia warna putih 20 x 20 cm Dos Rp. 73,400.00
48 Keramik Merek Asia warna putih 30 x 30 cm Dos Rp. 68,000.00
49 Kayu Bulat Btg Rp. 15,000.00
50 Kunci Tanam Merk iseo /setara besar Bh Rp. 228,000.00
51 Kawat Beton / Bindrat Kg Rp. 24,150.00
52 Kran Bh Rp. 19,000.00
53 Kabel Listrik NYA Standard PLN Rol Rp. 313,700.00
54 Kayu Bulat (Andang) Btg Rp. 15,000.00
55 Kaca Polos 2 mm M2 Rp. 75,900.00
56 Kaca Polos 3 mm M2 Rp. 88,600.00
57 Kaca Rayband 3 mm M2 Rp. 101,200.00
No NAMA BAHAN SATUAN HARGA SATUAN
58 Kaca Rayband 5 mm M2 Rp. 148,000.00
59 Kaca Nako + Rangka 13 Daun Set Rp. 141,700.00
60 Kusen Alumunium m' Rp. 140,300.00
61 Pintu Aluminium m' Rp. 549,000.00
62 Pintu Aluminium Uk. L=70-80 cm; T=200-210 cm Unit Rp. 950,000.00
63 Pintu Kaca Rangka Aluminium Uk. L=90-150 cm; T=200-210 cm M2 Rp. 2,632,500.00
64 Lem Putih Fox (kayu) Kg Rp. 36,500.00
65 List Profil M' Rp. 12,300.00
66 Lampu TL bulat Bh Rp. 16,900.00
67 Lampu Mercuri Bh Rp. 227,700.00
68 Lampu TL Bambu 20 Watt Bh Rp. 97,200.00
69 Lampu TL Bambu 40 Watt Bh Rp. 100,400.00
70 Lampu Phillips Essential 18 White bh Rp. 31,350.00
71 Lampu RMI 2x18watt Set Rp. 416,500.00
72 Lampu Down Light 6"+lampu Essensial 18 watt Set Rp. 201,550.00
73 Minyak Cat Ltr Rp. 29,325.00
74 Moulding Papan Lap-Lapan Bengkirai Kpg Rp. 42,400.00
75 Multiplek 4 mm M2 Rp. -
76 Multiplek 6 mm M2 Rp. -
77 Multiplek 9 mm M2 Rp. 164,450.00
78 Moulding kayu kamper samarinda M' Rp. 40,000.00
79 Minyak begisting Ltr Rp. 6,900.00
80 Pasir Urug M3 Rp. 132,250.00
81 Pasir Pasang M3 Rp. 201,250.00
82 Pasir Beton M3 Rp. 224,250.00
83 Papan Kayu Klas II M3 Rp. 2,740,800.00
84 Papan Kayu Klas I (Pesanan) M3 Rp. 12,548,800.00
85 Papan Bekisting M3 Rp. 1,644,500.00
86 Plywood 3 mm Lbr Rp. 63,500.00
87 Plywood Melamin/Formika Lbr Rp. -
88 Plywood 4 mm Lbr Rp. 77,500.00
89 Teakwood 3 mm Lbr Rp. 115,100.00
90 Paku Kayu Kg Rp. 20,125.00
91 Paku Sirap Kg Rp. 23,575.00
92 Paku Ulin Kg Rp. 25,600.00
93 Paku Plywood Kg Rp. 28,750.00
94 Paku Seng Kg Rp. 27,500.00
95 Paku Genteng Metal Kg Rp. 33,500.00
96 Paving Stone M2 Rp. 94,200.00
97 Pipa PVC 3/4 " Btg Rp. 29,100.00
98 Pipa PVC 1/2 " AW tebal Btg Rp. 24,300.00
99 Pipa PVC 2 " D Btg Rp. 53,900.00
100 Pipa PVC 3 " D Btg Rp. 100,900.00
101 Pipa PVC 4" D Btg Rp. 140,300.00
102 Pipa Leideng dia. 1/2 " (G) Btg Rp. 76,400.00
103 Pipa Leideng dia. 3/4 " (G) Btg Rp. 101,300.00
104 Pipa Leideng dia. 1 " (G) Btg Rp. 172,000.00
105 Plamur Tembok 5 Kg Klg Rp. 63,400.00
106 Residu/ter Liter Rp. 26,600.00
107 Reservoir Air Rangka Kayu Ulin Kapasitas 1 M3 Bh Rp. -
108 Semen PC (Isi 40 kg/Zak) Kg Rp. 1,610.00
109 Semen warna Kg Rp. 12,420.00
110 Seng Plat BJLS (lebar 30 cm) M' Rp. 13,300.00
111 Seng Gelombang BJLS 0,20 lembar Rp. 46,000.00
112 Seng Gelombang BJLS 30 lembar Rp. -
113 Saklar Tunggal (Broco) Bh Rp. 23,000.00
114 Saklar Ganda (Broco) Bh Rp. 31,050.00
115 Stop Kontak + Instalasi (Untuk Kayu) Ttk Rp. 75,100.00
116 Stop Kontak + Instalasi (Untuk Beton) Ttk Rp. 102,300.00
117 Septictank dan Rembesan Kapasitas 3 M3 Bh Rp. 4,627,750.00
118 Tanah Urugan Biasa M3 Rp. 87,600.00
119 Tanah Pilihan M3 Rp. 183,000.00
120 Tegel Porselin 11 x 11 Dos Rp. -
121 Titik Lampu + Instalasi (Untuk Kayu) Ttk Rp. 316,300.00
122 Titik Lampu + Instalasi (Untuk Beton) Ttk Rp. 379,500.00
123 Wastapel Bh Rp. 695,800.00
124 Zekering Kast Lokal 1 Group (Broco) Bh Rp. 44,300.00
125 Zekering Kast Lokal 2 Group (Broco) Bh Rp. 25,300.00
: Harga Upah dan Bahan sudah termasuk PPN, Over Head dan Keuntungan
: Harga-harga Biaya di atas merupakan harga di dalam Ibukota Kabupaten/Kota belum termasuk ongkos angkut dll.
Palangkaraya, ................. 2014
Dibuat/Direncanakan :
CV. KARYA BETANG MANDIRI KONSULTAN
Pusat Palangkaraya

SELVI, ST
Direktur
Dibuat/Direncanakan :
CV. KARYA BETANG MANDIRI KONSULTAN
Pusat Palangkaraya

SELVI, ST
Direktur
RENCANA ANGGARAN BIAYA
PROGRAM : PROGRAM PENINGKATAN SARANA DAN PRASARANA
KEGIATAN :
PEKERJAAN :
LOKASI : PALANGKA RAYA

NO. URAIAN PEKERJAAN ANALISA

I. PEKERJAAN PENDAHULUAN
1 Papan nama kegiatan Ls
2 Pengukuran dan pasangan bowplank A.2.2.1.4. 17,21+(13,65*2)+(2*2)+(9*2)+(13,21
3 Bangsal (gudang material) Ls
4 Pagar sementara Ls

JUMLAH
II. PEKERJAAN KONSTRUKSI
A. PEKERJAAN TANAH
1 Galian tanah pondasi 2 SNI 6.1 PT 1 = 1,3*1,3*1,4*12 28.392
PT 2 =0,9*0,9*1,4*14 15.876
PT3 =1,7*0,8*1,4*2 3.808
2 Urugan kembali bekas galian 2 SNI 6.9
3 Urugan bawah lantai (peninggi lantai) 2 SNI 6.11 (11,5*7,5*0,65)+(13,5*12,5*0,65)
4 Urugan bawah pondasi 2 SNI 6.11 (1,3*1,3*0,1*12)+(0,9*0,9*0,1*14)+(1,7*1,7*0,1*2)

JUMLAH
B. PEKERJAAN PONDASI
1 Pek. Cor beton tumbuk lantai kerja (1,3*1,3*0,05*12)+(0,9*0,9*0,05*14)+(1,7*0,8*0,05*2)
1 Pek. Pondasi tapak PT 1 beton bertulang
a. Beton K 250 A.4.1.1.8. 1,1*1,1*0,25*12
b. Besi Beton 7 SNI 6.25 Tulangan pokok =(12^2)*0,0062*50*12
c. Bekisting Pondasi A.4.1.1.20 0,25*(1,1*4)*12
2 Pek. Pondasi tapak PT 2 beton bertulang
a. Beton K 250 A.4.1.1.8. 0,7*0,7*0,2*16
b. Besi Beton 7 SNI 6.25 Tulangan pokok =(12^2)*0,0062*20*16
c. Bekisting Pondasi A.4.1.1.20 (0,2*0,7*4)*16
3 Pek. Pondasi tapak PT 3 beton bertulang
a. Beton K 250 A.4.1.1.8. 1,5*0,8*0,25*2
b. Besi Beton 7 SNI 6.25 Tulangan pokok =(12^2)*0,0062*34*2
c. Bekisting Pondasi A.4.1.1.20 (0,25*1,5*2)+(0,25*0,6*2)

JUMLAH
B. PEKERJAAN BETON (11,5*1)+(7,5*2)+(12,5*2)+(13,5*1)+(1*2) 67
1 Pek. Sloof S1 20/60 Cm
a. Beton K 250 A.4.1.1.8. 0,20*0,6*67
2 Pek. Sloof S2 15/20 Cm (13,5*2)+(3,5*3)+(3*4)+(2,5*2)+(2*3) 60.5
a. Beton K 250 A.4.1.1.8. 0,2*0,3*60,5
3 Pek. Kolom K 1 40/40 cm elevasi -0.75 s/d - 1.75
a. Beton K 250 A.4.1.1.8. 0,4*0,4*1*12
4 Pek. Kolom K 2 30/30 cm elevasi -0.15 s/d - 1.95
a. Beton K 250 A.4.1.1.8. 0,3*0,3*1,45*14
5 Pek. Kolom K 3 Bulat Dim 40 cm elevasi -0.75 s/d + 4.80
a. Beton K 250 A.4.1.1.8. 3,14*(0,175^2)*5,55*8
6 Pek. Kolom K 4 30x30 cm elevasi -0.35 s/d + 4.80
a. Beton K 250 A.4.1.1.8. 0,2*0,3*5,15*10
7 Pek. Kolom K 5 25x100 cm
a. Beton K 250 A.4.1.1.8. 0,25*1,0*3,75*2
8 Pek. Kolom penguat (kolom praktis) 11/11 cm 7 SNI 6.45.a (4,95*20)+(4,55*2)+(5,19*2)
9 Ringbalk 10x15 (4,5*1)+(6,5*2)+(5*4)+(3,5*2)+(3*2)+(1,5*3)+(2*3)+(2,5*2)+(9,2*2)
10 Pek. Ringbalk R1 20/30 cm Panjang SR1=(11,5*1)+(7,5*2)+(12,5*2)+(13,1*2)+(1*2) 67
a. Beton K 250 A.4.1.1.8. 0,2*0,3*67
11 Pek. Balok uperstek penahan lispalnk beton 20/20 cm
a. Beton K 250 0,2*0,2*1,2*3
12 Pek. Plat lantai penutup parit tebal 10 cm
a. Beton K 250 A.4.1.1.8. 1,5*15*0,1
b. Besi Beton 7 SNI 6.25 Panjang Tulangan y =(15,16*11) 166.76
Total Panjang Tulangan x =1,66*107 177.62
Berat besi tulangan pokok Dia 10 mm =(12^2)*0,0062*166,76 148.8833
Berat besi tulangan pokok Dia 10 mm =(12^2)*0,0062*177,62 158.5791
c. Bekisting lantai A.4.1.1.24 16*1,5
13 Pek. Lisplank beton tebal 10 cm
a. Beton K 250 A.4.1.1.8. 0,10*0,95*13,45*2
14 Pek. Cor beton tumbuk lantai tebal 5 cm 7 SNI 6.3
a. Beton K 175 (11,5*7,5*0,05)+(13,5*12,5*0,05)
15 Pek. Cor beton tumbuk lantai trap tangga (0,9*6*0,05)+(0,9*4*0,05*2)+(0,9*3*0,05)
NO. URAIAN PEKERJAAN ANALISA
JUMLAH

C. PEKERJAAN PASANGAN BATA DAN PLESTERAN


1 Pek. Pasangan bata dinding 4 SNI 6.11 Panjang=(4,5*1)+(6,5*2)+(5*4)+(3,5*2)+(3*2)+(1,5*3)+(2*3)+(2,5*2)+(9*2) 84
Luas kotor =(84*4,75)+(0,5*11,5*6,4)+(0,5*13,5*7,3) 485.075

Luas lobang pintu & jendela=((1,4*2,1)+(0,8*2,1*4)+(0,7*2,1*3)+


((1,4*3,15)+(0,9*2,95*2))+(1,23*3,02*2)+(1,23*2*6)+(0,4*1,23*4) 47.9472
Luas Pas. Bata=485,075-47,9472
2 Pek. Pasangan bata trap tangga 4 SNI 6.11 (0,70*6)+(0,3*0,70*2)+(0,48*6)+(0,3*0,48*2)+(0,28*6)+(0,3*0,28*2) 9.966
(0,70*4*2)+(0,3*0,70*2*2)+(0,48*4*2)+(0,3*0,48*2*2)+(0,28*4*2)+(0,3*
0,28*2*2) 16.352
(0,70*3)+(0,3*0,70*2)+(0,48*3)+(0,3*0,48*2)+(0,28*3)+(0,3*0,28*2) 5.256
3 Pek. Plesteran 5 SNI 6.4 (((84*4,75)-(47,9472))*2)+(0,5*11,5*6,4)+(0,5*13,5*7,3)
(13,45*1*4)+(13,45*0,1*4)+(1,0*2,75*4)+(0,25*2,75*4)+(0,8*2,86
*2)+(0,8*1,56*2)+(0,8*1,56*2)+(0,8*1*2)+(0,8*12,5*2)+(0,8*5,5)
4 Pek. Plesteran beton expose +(0,8*5)

JUMLAH

D. PEKERJAAN PENUTUP LANTAI


1 Pas. Lantai Parkit Ls

2 Pas. Keramik tile 60 x 60 cm Polished 13 SNI 6.48.c (9*13,5)-(1,5*2*3)


Pas. Keramik tile 60 x 60 cm unpolised (11,5*7,5)+(3,5*13,5)
Pas. Keramik tile 30x30 cm Textur trap tangga (1,7*6)+(1,7*4*2)+(1,7*3)
Pas. Kerami tile 30x30 cm textur toilet (2*1,5*3)
Pas. Keramik tile 30x60 dinding toilet (6,3*1,6*3)

JUMLAH
NO. URAIAN PEKERJAAN ANALISA

E. PEKERJAAN KAP ATAP


1 Pek. Kuda- kuda baja ringan Ls
2 Pek. Gording baja CNP 100.50.20.2,3
3 Plat besi simpul dan tumpuan tebal 10 mm
Ikatan angin kabel baja dia. 12 mm
Tumbuckle
Angkur (tumpuan)
Pek Las
4 Pek. Rangka atap sirap (reng) 6 SNI 6.37 (8,7*10,1*2)+((16,2+14,8)*0,5*11,5*2) 255.84
5 Pek. Atap Sirap 8 SNI 6.33
6 Pas. Nok bubungan atap sirap 8 SNI 6.37 10,1+16,2
7 Jurai 12,5*2
8 Pek. Lisplank Kayu kelas I 6 SNI 6.46 (11,5*4)+(8,7*2)+(14,8*2)
Pas. Tawing Layar bahan GRC 9 mm rangka holow 40x40 mm Ls

JUMLAH
F. PEKERJAAN PLAFOND
2 Pek. Plafond gypsum 9 mm + rangka Ls 11,5*7,5 86.25
13,5*12,5 168.75

Pek. Plafond Kasium silikat 4,5 mm + rangka (1,2*7,5*2)+(0,6*8,5*2) 28.2


(1,2*12,5*2)+(0,6*3,5*2) 34.2
(1,2*10,1*2) 24.24
((1+1,7)*0,5*11,5*4) 62.1
3 Pas. List plafond gipsum profil (11,5*1)+(7,5*4)+(1*4)+(3,5*4)+(6,5*4)+(5*8)+(3,5*8)+(2*6)+(1,5*6)+(3*8)+(2,5*8)+(13,5*1)+(21,15*2)+(10,1*4)+(1,2*4)+
Ls

JUMLAH
G. PEKERJAAN KOZEN PINTU DAN JENDELA
1 Pek. Kuzen Alumunium 4" warna coklat Ls
2 Pek. Daun Pintu kaca rangka Alumunium Double floor hinge (lengkap) Ls 1,4*2,1*3
3 Pek. Daun Pintu rangka alumunium lapis plywood 2 x 4mm fins HPL 0,8*2,1*4
4 Pek. Daun pintu toilet rangka alumunium 0,7*2,1*3
5 Pek. Daun Jendela kaca rangka aluminium (0,56*1,56*2*6)+(0,32*1,15*10)+(0,56*0,94*2*2)

6 Pek. Kaca Bening 5 mm jendela kaca mati + karet/sealent (1,82*0,87*2*2)+(1,01*0,87*2*2)+(1,01*1,36*2)+(0,56*0,94*4*2)

JUMLAH
H. PEKERJAAN KUNCI DAN PENGGANTUNG
1 Pek.Pasangan engsel pintu 12 SNI 6.5
2 Pek.Pasangan kunci tanam pintu WC 12 SNI 6.2

JUMLAH
NO. URAIAN PEKERJAAN ANALISA

I. PEKERJAAN SANITAIR
1 Pek. Klosed Jongkok 10 SNI 6.2
2 Pas. Floor drain 10 SNI 6.36
3 Pek. Bak air 10 SNI 6.7
4 Pek. Jaringan air kotor dan air bersih Ls
5 Pas. Kran air 10 SNI 6.35
6 Pek. Septictank Ls

JUMLAH

J. PEKERJAAN INSTRALASI LISTRIK


1 Pas. Instalasi Titik lampu NYM 3x2,5 mm2 Ls
2 Pas. Instalasi Stop kontak NYM 3x2,5 mm2 Ls
3 Pas. Lampu RMI 2x36 cm+lampu 36 watt Philips Ls
4 Pas. Lampu Down Light +lampu Essensial 18 watt Ls
5 Pas. Skaklar Ls
6 Pas. MCCB 1 Group Ls
JUMLAH
K. PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok luar dalam 14 SNI 6.14
2 Pek. Cat plafond 14 SNI 6.14
3 14 SNI 6.7
4 Pek. Cat kilap lisplank 14 SNI 6.7
5 14 SNI 6.12
JUMLAH
VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)

1.00 Pkt 400,000.00 400,000.00


79.72 M' 46,998.00 3,746,680.56
M2 -
M2 -

4,146,680.56

48.076 M3 28,320.00 1,361,512.32

35.58 M3 13,574.00 482,911.88


165.75 M3 177,980.00 29,500,185.00
3.74 M3 177,980.00

31,344,609.20

1.72

3.63 M3 33,294,621.53 120,859,476.17


535.68 Kg 15,076.60 8,076,233.09
13.2 M2 63,842,258.35 842,717,810.22

1.568 M3
285.70 Kg
8.96 M2

0.6 M3
60.71 Kg
1.05 M2

971,653,519.48

8.04 M3 33,294,621.53 267,688,757.14

1.815 M3 33,294,621.53 60,429,738.08

1.92 M3 33,294,621.53 63,925,673.35

1.827 M3

4.269615 M3

3.09 M3

1.8 M3
118.48 M' 141,369.21 16,749,424.30
84.4 M'

4.02 M3 33,294,621.53 133,844,378.57

0.14 M3

2.25 M3 33,294,621.53 74,912,898.45


Kg

307.46 Kg
24.00 M2

2.5555 M3 33,294,621.53 85,084,405.33


M3 1,088,235.50 -
12.75 M3
0.765 M3
VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)
702,635,275.22

123,158.75 -

53.2692
437.1278 M2
123,158.75 -

31.57 M2

788.1806 M2 38,717.00 30,515,988.29

112.50 M2

30,515,988.29

M2 -

112.5 M2 391,674.30 44,063,358.75


133.5 M2
28.9 M2
9 M2
30.24 M2

44,063,358.75
VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)

M2 -
M2 -
M2 -
199.600 M'
18.000 Bh
18.000 Bh
272.000 spl
532.24 M2 112,253.68 59,745,895.98
532.24 M2 251,203.75 133,700,683.90
26.3 M' 87,841.95 2,310,243.29
M'
93 M' 129,215.68 12,017,058.24
12.60 -
-
207,773,881.41

255.00 M2 -

148.74 M2

422.3 M' -

176.960 M' -
8.820 M2
6.720
4.410
16.2688

16.8068

Bh -
Bh -

-
VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)

Bh 537,102.50 -
Bh 44,250.00 -
Bh 587,625.92 -
Pkt -
Bh 28,938.50 -
Pkt -

Titik -
Titik -
Set -
Set -
Bh -
Unit -
-

900.68 M2 19,973.80 17,989,974.22


- M2 19,973.80 -
M2 36,719.50 -
27.90 M2 36,719.50 1,024,474.05
M2 15,900.00 -
19,014,448.27

Dibuat/Direncanakan :
CV. LUAS CIPTA CONSULTANT
Pusat Palangkaraya

HENDRA ARIANDAYA,S.Pi
Direktur
RENCANA ANGGARAN BIAYA
PROGRAM : PROGRAM PENINGKATAN SENI BUDAYA
KEGIATAN : REHAB BANGUNAN MUSEUM
PEKERJAAN : REHAB BANGUNAN MUSEUM
LOKASI : PALANGKA RAYA

NO. URAIAN PEKERJAAN ANALISA

I. PEKERJAAN PENDAHULUAN
1 Papan nama kegiatan Ls

JUMLAH

II. REHAB BANGUNAN MUSEUM


A. PEKERJAAN BONGKARAN DAN PEMBERSIHAN
1 Membongkar atap sirap + reng Ls 3,3*5,4*2*2
2,7*5,2*2
2,75*5,2*2
(9,4+18)*0,5*3,5*2
(5+11,15)*0,5*4,6*2

2 Membongkar kasau (sebagian) Ls (9,4+18)*0,5*3,5*1

3 Membongkar gording (sebagian) Ls 0,06*0,12*13,7


0,06*0,12*14
0,06*0,12*4

4 Membongkar Jalusi atas (pada rangka atap) Ls 0,35*1,4*12

5 Membongkar plafon Ls plafon dalam


plafon luar (200,7-135,82)
tritisan atas (5,4*1,2*4)

6 Membongkar rangka plafon (sebagian) Ls 0,25*(135,82+64,88)

7 Membongkar keramik Ls 127.5


(225,719-135,82)
1*6,29)+(0,8*6,29)

8 Membongkar sekat partisi 8,35*2,87


9 Membuang bongkaran keluar area Museum Ls

JUMLAH

B. PEKERJAAN PENUTUP LANTAI DAN DINDING


1 Pas. Keramik lantai koridor 60 x 60 cm 13 SNI 6.48
2 Pas. Keramik tangga 30x30 cm 13 SNI 6.48.a
Plesteran 0,6*52,73
JUMLAH

C. PEKERJAAN ATAP KANOPI


1 Pek. Rangka atap reng 3/5 kayu kelas II 6 SNI 6.31.a
2 Pas. kasau (sebagian)
3 Pas. gording (sebagian)
4 Pas. Listpenutup atap kayu kelas I (ganti sebagian) 6 SNI 6.46 (5,4*4)+(2,75*2)
5 Pas. Penutup atap Genteng Metal 8 SNI 6.32.a
6 Pas. Bubungan (nok) genteng metal 8 SNI 6.23.a (3,2*2)+(2,5*2)+(5,2*4)
7 Pas. Seng plat plesing tawing layar dengan atap 5*2

JUMLAH

D. PEKERJAAN PLAFOND
1 Pas. Rangka plafond kayu kelas II (sebagian) 6 SNI 6.40.a
2 Pek. Plafond kalsium silikat 6mm 9. SNI 6.10.a
3 Pas. List plafond gipsum profil Ls
4 Pas. List plafond molding profil (luar ruangan) 57,3+58,3+(5,4*8)+(1*8)

JUMLAH

E. PEKERJAAN KUNCI DAN PENGGANTUNG


1 Kunci tanam pintu (penggantian kunci kamar) Ls
NO. URAIAN PEKERJAAN ANALISA
JUMLAH

F. PEKERJAAN INSTRALASI LISTRIK


1 Ls

2 Pas. Lampu TL bambu 20 watt Ls


3 Pas. Lampu TL bulat + piting Ls

JUMLAH

G. PEKERJAAN PENGECATAN
1 Pek. Cat dinding tembok luar dalam 14 SNI 6.15
2 Pek. Cat plafond 14 SNI 6.14
3 Pek. Cat kilap kuzen, daun pintu, jendela 14 SNI 6.7
4 Pek. Cat kilap lisplank dan tawing layar 14 SNI 6.7 0,25*125
0,7*4,86*2
0,5*2,31*4*4
0,35*1,4*12

JUMLAH

Kozen pintu1 4.50


5.60
0.65
5.40
1.20
17.35
34.70
VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)

1.00 Pkt 400,000.00 400,000.00

400,000.00

71.28 M2 15,000.00 1,069,200.00


28.08
28.6
95.9
74.29
298.15 M2

47.95 M2

0.09864
0.1008
0.03
0.23 M3

5.88 M2

127.50 5,000.00 637,500.00


64.88
25.92
218.30 M2

50.175 M2

127.5 M2 15,000.00 1,912,500.00


89.899
11.322
228.721

23.9645 M2
- Pkt 4,000,000.00 -

3,619,200.00

127.500 M2 181,224.30 23,106,098.25


101.221 M2 184,824.30 18,708,100.47
31.64
41,814,198.72

298.150 M2 48,309.58 14,403,499.79


47.950
0.228
27.1 M' 129,215.68 3,501,744.93
298.150 M2 78,798.00 23,493,623.70
32.2 M' 65,329.00 2,103,593.80
10.000 M'

43,502,462.21

50.18 M2 122,627.33 6,152,826.03


218.30 M2 41,530.50 9,066,108.15
56.50 M' 45,000.00 2,542,500.00
166.8 M'

17,761,434.18

19.000 Bh 220,000.00 4,180,000.00


VOLUME HARGA SATUAN TOTAL HARGA
SATUAN (Rp) (RP)
4,180,000.00

1.00 Pkt 2,500,000.00 2,500,000.00

32.00 Bh 97,200.00 3,110,400.00


8.00 Bh 36,900.00 295,200.00

5,905,600.00

M2 12,949.80 -
M2 19,973.80 -
M2 36,719.50 -
31.25 36,719.50 1,147,484.38
6.80
18.48
5.88
62.41 M2

1,147,484.38