Anda di halaman 1dari 32

HARGA DASAR SATUAN UPAH

Sumber Data : Daftar Harga Satuan Upah, Bahan, dan Peralatan Kota Semarang Tahun 2019

HARGA HARGA
No. URAIAN KODE SATUAN YG DIGUNAKAN SATUAN
( Rp.) ( Rp.)

1. Pekerja (L01) Jam 12,857.14 90,000.00


2. Tukang (L02) Jam 18,571.43 130,000.00
3. Mandor (L03) Jam 19,285.71 135,000.00
4. Operator (L04) Jam 28,571.43 200,000.00
5. Pembantu Operator (L05) Jam 21,428.57 150,000.00
6. Sopir / Driver (L06) Jam 28,571.43 200,000.00
7. Pembantu Sopir / Driver (L07) Jam 17,857.14 125,000.00
8. Mekanik (L08) Jam 17,857.14 125,000.00
9. Pembantu Mekanik (L09) Jam 17,142.86 120,000.00
10. Kepala Tukang (L10) Jam 23,269.31 162,010.14
11.
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
DAFTAR
HARGA DASAR SATUAN BAHAN

Sumber Data : Daftar Harga Satuan Upah, Bahan, dan Peralatan Kota Semarang Tahun 2019

HARGA
No. URAIAN KODE SATUAN SATUAN
( Rp.)

1 Pasir Pasang (Sedang) (M01b) M3 370,000.00


2 Pasir Beton (Kasar) (M01a) M3 380,000.00
3 Pasir Halus (untuk HRS) (M01c) M3 326,004.00
4 Pasir Urug (ada unsur lempung) (M01d) M3 220,000.00
5 Batu Kali (M02) M3 320,000.00
6 Agregat Pecah Kasar (M03) M3 340,000.00
7 Agregat Halus (M04) M3 360,000.00
8 Agregat Lolos # 1 " M3 150,301.42
9 Lolos screen1 ukuran ( 0 - 5) M3 520,000.00
10 Lolos screen2 ukuran ( 0 - 5) M3 520,000.00
11 Lolos screen2 ukuran ( 5 - 9,5) M3 520,000.00
12 Lolos screen2 ukuran ( 9.5 - 19,0) M3 520,000.00
13 Batu Pokok (Agg Dia 3-5) M3 168,973.02

14 Batu Pengunci (Agg Dia 1-2) M3 190,959.53


15 Batu Penutup M3 190,959.53
16 Aspal Liter 11,800.00
17 Filler (M05) Kg 1,137.50
18 Batu Belah / Kerakal (M06) M3 250,000.00
19 Gravel (M07) M3
20 Bahan Tanah Timbunan (M08) M3 140,000.00
21 Bahan Pilihan (M09) M3 150,000.00
22 Aspal (M10) KG 11,800.00
23 Kerosen / Minyak Tanah (M11) LITER 8,000.00
24 Semen / PC (50kg) (M12a) Zak 60,000.00
25 Semen / PC (kg) (M12) Kg 1,200.00
26 Besi Beton (M13) Kg 12,000.00
27 Kawat Beton (M14) Kg 21,000.00
28 Kawat Bronjong (M15) Kg 27,500.00
29 Sirtu (M16) M3 195,000.00
30 Cat Marka (Non Thermoplas) (M17a) Kg
31 Cat Marka (Thermoplastic) (M17b) Kg
32 Paku (M18) Kg 17,500.00
33 Kayu Perancah (M19) M3 3,000,000.00
34 Bensin (M20) LITER 8,500.00
35 Solar (M21) LITER 10,500.00
36 Minyak Pelumas / Olie (M22) LITER 30,000.00
37 Plastik Filter (M23) M2
38 Pipa Galvanis Dia. 1.6" (M24a) Batang 450,000.00
Pipa Galvanis Dia. 2.5" (M24b) Batang 752,000.00
39 Pipa Porus (M25) M'
40 Agr.Base Kelas A (M26) M3 354,286.08
41 Agr.Base Kelas B (M27) M3 296,705.98
42 Agr.Base Kelas C (M28) M3 344,264.04
43 Agr.Base Kelas C2 (M29) M3
44 Geotextile (M30) M2 48,100.00
45 Aspal Emulsi (M31) Kg 14,150.00
46 Gebalan Rumput (M32) M2 59,117.50
47 Thinner (M33) LITER 35,000.00
48 Glass Bead (M34) Kg 52,000.00
49 Pelat Rambu (Eng. Grade) (M35a) BH 285,000.00
50 Pelat Rambu (High I. Grade) (M35b) BH 295,000.00
51 Rel Pengaman (M36) M' 412,500.00
52 Beton Ready Mix K-250 (M37) M3 1,050,000.00
53 Baja Tulangan (Polos) U24 (M39a) Kg 10,000.00
54 Baja Tulangan (Ulir) D32 (M39b) Kg 13,200.00
55 Kapur (M40) M3 68,000.00
56 Chipping (M41) M3 391,204.00
57 Chipping (kg) (M41kg) Kg 207.56
58 Cat Besi (M42) Kg 40,000.00
59 Pemantul Cahaya (Reflector) (M43) Bh.
60 Pasir Urug (M44) M3 220,000.00
61 Arbocell (M45) Kg. 60,000.00
62 Baja Bergelombang (M46) Kg 12,500.00
63 Beton Ready Mix K-125 (M47) M3 948,000.00
64 Baja Struktur (M48) Kg 13,000.00
65 Tiang Pancang Baja (M49) M' 30,000.00
66 Tiang Pancang Beton Pratekan (M50) M3 489,800.00
67 Kawat Las (M51) Dos 128,500.00
68 Pipa Baja (M52) Kg 31,950.00
69 Minyak Fluks (M53) Liter 10,000.00
70 Bunker Oil (M54) Liter 5,000.00
71 Asbuton Halus (M55) Ton 420,000.00
72 Baja Prategang (M56) Kg 11,400.00
73 Baja Tulangan (Polos) U32 (M57a) Kg 10,500.00
74 Baja Tulangan (Ulir) D39 (M39c) Kg 13,800.00
75 Baja Tulangan (Ulir) D48 (M39d) Kg 14,000.00
76 PCI Girder L=17m (M58a) Buah 103,774,229.17
77 PCI Girder L=21m (M58b) Buah 117,047,677.08
78 PCI Girder L=26m (M58c) Buah 149,627,958.33
79 PCI Girder L=32m (M58d) Buah 189,448,302.08
80 PCI Girder L=36m (M58e) Buah 202,721,750.00
81 PCI Girder L=41m (M58f) Buah 231,682,000.00
82 Beton Ready Mix K-300 (M59) M3 1,104,000.00
83 Beton Ready Mix K-175 (M60) M3 990,000.00
84 Cerucuk (M61) M 23,500.00
85 Elastomer (M62) buah 32,000.00
86 Bahan pengawet: kreosot (M63) liter 5,000.00
87 Mata Kucing (M64) buah 128,000.00
88 Anchorage (M65) buah 480,000.00
89 Anti strpping agent (M66) Kg 82,500.00
90 Bahan Modifikasi (M67) Kg 1,200.00
91 Beton Ready Mix K-500 (M68) M3 1,296,000.00
92 Beton Ready Mix K-400 (M69) M3 1,236,000.00
93 Ducting (Kabel prestress) (M70) M' 240,000.00
94 Ducting (Strand prestress) (M71) M' 88,500.00
95 Beton Ready Mix K-350 (M72) M3 1,134,000.00
96 Multipleks 12 mm (M73) Lbr 110,000.00
97 Elastomer jenis 1 (M74a) buah 610,000.00
98 Elastomer jenis 2 (M74b) buah 1,010,000.00
99 Elastomer jenis 3 (M74c) buah 1,345,000.00
100 Expansion Tipe Joint Asphaltic Plug (M75d) M 1,650,000.00
101 Expansion Join Tipe Rubber (M75e) M 2,000,000.00
102 Expansion Join Baja Siku (M75f) M 440,600.00
103 Marmer (M76) Buah 750,000.00
104 Kerb Type A (Mutu K-300) (M77) Buah 44,000.00
105 Paving Block tb.8 cm Natural (M78) Buah 90,000.00
106 Mini Timber Pile (M79) Buah 44,000.00
107 Expansion Joint Tipe Torma (M80) M1 1,980,000.00
108 Strip Bearing (M81) Buah 370,500.00
109 Joint Socket Pile 35x35 (M82) Set 980,000.00
110 Joint Socket Pile 16x16x16 (M83) Set 108,000.00
111 Mikro Pile 16x16x16 (M84) M1 97,500.00
112 Matras Concrete (M85) Buah 610,000.00
113 Assetilline (M86) Botol 355,000.00
114 Oxygen (M87) Botol 175,000.00
115 Batu Bara (M88) Kg 980.00
116 Pipa Galvanis Dia 3" (M24a) M 138,000.00
117 Pipa Galvanis Dia 1,5" (M24b) M 102,000.00
118 Agregat Pecah Mesin 0-5 mm (M91) M3 210,000.00
119 Agregat Pecah Mesin 5-10 & 10-20 mm (M92) M3 215,000.00
120 Agregat Pecah Mesin 20-30 mm (M93) M3 215,000.00
121 Joint Sealent (M94) Kg 38,900.00
122 Cat Anti Karat (M95) Kg 40,000.00
123 Expansion Cap (M96) M2 6,500.00
124 Polytene 125 mikron (M97) Kg 20,300.00
125 Curing Compound (M98) Ltr 40,500.00
126 Kayu Acuan (M99) M3 3,700,000.00
127 Additive (M67a) Ltr 40,500.00
128 Casing (M100) M2 9,800.00
129 Air (M101) Ltr 4.02
130 Plastik (M102) M2 2,500.00
131 Kayu Kelas III (3xpakai) (M103) M3 4,500,000.00
132 Wiremesh Ø 6 mm (M104) Kg 11,867.09
133 Formworks (M105) Ls
134 U-Ditch 30x40x120 (M106) M' 405,800.00
135 Cover U-Ditch 30x40x60 cm (M107) M' 83,800.00
135 U-Ditch 50x70x120 (M108) M' 781,500.00
136 U-Ditch 80x70x120 (M109) M' 1,564,700.00
137 U-Ditch 80x80x100 (M110) M' 1,678,200.00
138 U-Ditch 100x100x100 (M111) M' 1,860,916.67
139 Buis Beton Diameter 40 cm (M112) M' 71,500.00
140 Perekat (M113) M' 544,500.00
141 Box Culvert 40 x 40 x 120 (M114) M' 1,152,000.00
142 Kayu Balokan 30/30 (M115a) M3 5,200,000.00
143 papan lantai kayu 6/20 (M115b) M3 5,200,000.00
144 Kayu Balokan 8/15 (M115c) M3 5,200,000.00
145 kayu balokan 5/7 (M115d) M3 5,200,000.00
146 Paku penjepit (M116) M' 25,000.00
147 Plywood tebal 9mm (M117) Lbr 120,000.00
148 Minyak Bekisting (M118) Ltr 10,000.00
149 Kayu Dolken O 8- 10 Panjang 4 m1 (M119) Btg 24,000.00
150 Kayu Meranti balok/usuk 5/7 (M120) M3 5,400,000.00
151 BBM Non Subsidi (M121) Ltr 12,500.00
152 M'
153 M'
154 M'
155 M'
156 M'
157 M'
158 M'
159 M'
160 M'
161 M'
162 M'
163 M'
164 M'

Note : Tabel harga yang kosong dikarenakan tidak ada item pekerjaan di PKP
HARGA PEROLEHAN ALAT

Sumber Data : Daftar Harga Satuan Upah, Bahan, dan Peralatan Dinas Bina Marga dan Pengairan, Standardisasi Harga Tertinggi Satuan Barang dan Jasa di Lingku

HARGA HARGA
NO JENIS ALAT KODE SATUAN YANG SATUAN
DIGUNAKAN

1 Asphalt Mixing Plant (E01) Jam 5,600,000 5,600,000


2 Asphalt Finisher (E02) Jam 350,000 350,000
3 Asphalt Sprayer (E03) Jam 140,000 140,000
4 Bulldozer 100-150 Hp (E04) Jam 700,000 700,000
5 Compressor 4000-6500 L\M (E05) Jam 320,000 320,000
6 Concrete Mixer 0.3-0.6 M3 (E06) Jam 80,000 80,000
7 Crane 10-15 Ton (E07) Jam 406,452 406,452
8 Dump Truck 3.5 Ton (E08) Jam 200,000 200,000
9 Dump Truck 10 Ton (E09) Jam 250,000 250,000
10 Excavator 80-140 Hp (E10) Jam 660,000 660,000
11 Flat Bed Truck 3-4 M3 (E11) Jam 440,000 440,000
12 Generator Set (E12) Jam 183,000 183,000
13 Motor Grader >100 Hp (E13) Jam 640,000 640,000
14 Track Loader 75-100 Hp (E14) Jam 347,631 347,631
15 Wheel Loader 1.0-1.6 M3 (E15) Jam 280,000 280,000
16 Three Wheel Roller 6-8 T (E16) Jam 191,492 191,492
17 Tandem Roller 6-8 T. (E17) Jam 216,603 216,603
18 Tire Roller 8-10 T. (E18) Jam 550,000 550,000
19 Vibratory Roller 5-8 T. (E19) Jam 510,000 510,000
20 Concrete Vibrator (E20) Jam 60,000 60,000
21 Stone Crusher (E21) Jam 900,000 900,000
22 Water Pump 70-100 Mm (E22) Jam 42,500 42,500
23 Water Tanker 3000-4500 L. (E23) Jam 290,000 290,000
24 Pedestrian Roller (E24) Jam 120,000 120,000
25 Tamper (E25) Jam 45,000 45,000
26 Jack Hammer (E26) Jam 16,000 16,000
27 Fulvi Mixer (E27) Jam 1,455,617 1,455,617
28 Concrete Pump (E28) Jam 267,136 267,136
29 Trailer 20 Ton (E29) Jam 339,000 339,000
30 Pile Driver + Hammer (E30) Jam 160,000 160,000
31 Crane On Track 35 Ton (E31) Jam 600,000 600,000
32 Welding Set (E32) Jam 200,000 200,000
33 Bore Pile Machine (E33) Jam 879,066 879,066
34 Asphalt Liquid Mixer (E34) Jam 47,691 47,691
35 Trailler 15 Ton (E35) Jam 692,186 692,186
36 Rock Drill Breaker (E36) Jam 1,800,842 1,800,842
37 Cold Milling (E37) Jam 331,669 331,669
38 Cold Recycler (E38) Jam 4,268,886 4,268,886
39 Hot Recycler (E39) Jam 8,006,126 8,006,126
40 Aggregat (chip) Spreader (E40) Jam 531,942 531,942
41 Asphalt Distribution (E41) Jam 408,210 408,210
42 Split Form Paver (E42) Jam 593,130 593,130
43 Concrete Pan Mixer (E43) Jam 650,682 650,682
44 Concrete Breaker (E44) Jam 916,799 916,799
45 Asphalt Tanker (E45) Jam 611,734 611,734
46 Cement Tanker (E46) Jam 565,314 565,314
47 Concrete Mixer (350) (E47) Jam 90,088 90,088
48 Vibrating Rammer (E48) Jam 52,833 52,833
49 Truk Mixer (E49) Jam 699,635 699,635
50 Bore Pile Machine Dia 60 (E50) Jam 654,813 654,813
51 Crane On Track 75 - 100Ton (E51) Jam 691,672 691,672
52 Blending Equipment (E52) Jam 232,535 232,535
53 Asphalt Liquid Mixer (E53) Jam 160,563 160,563
54 Cutting Equipment Machine (E54) Jam 40,000 40,000
55 Welding Set Accetilin (E55) Jam 126,753 126,753
56 Alat Bantu (E56) Jam 5,000 5,000
57 Crane 10 T - Min 5 Jam (E57) Jam 192,500 192,500
Note : Tabel harga yang kosong dikarenakan alat tidak digunakan pada pekerjaan di PKP
RENCANA ANGGARAN BIAYA

Kegiatan :
Pekerjaan : Perkerasan Jalan
Lokasi :

Jumlah Harga
No Jenis Pekerjaan Sat Volume Harga Satuan Rp
Rp

A Jalan Telford 1,000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Pemasangan Pondasi Telford - Batu Belah M2 4000 103,292.65 413,170,591.10

JUMLAH 485,620,591.10

B Jalan Lapis Penetrasi (Lapen) Makadam 1,000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Pemasangan Pondasi Telford - Batu Belah M2 4000 103,292.65 413,170,591.10
3 Pekerjaan Lapis Penetrasi Makadam M3 200 2,406,695.68 481,339,135.19

JUMLAH 966,959,726.29

C Jalan Paving Block 1000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Penghamparan Pasir Urug (5 cm) M3 200 336,202.50 67,240,500.00
2 Pemasangan Pondasi Bawah - Agregat Kelas B (15 cm) M3 600 604,954.69 362,972,815.61
3 Pemasangan Paving Block (8 cm) M2 4000 237,776.42 951,105,685.60
4 Pemasangan Beton Pengunci (f'c = 14,5 MPa / K-175) M3 75 1,137,231.38 85,292,353.65

JUMLAH 1,539,061,354.86

D Jalan Campuran Aspal Panas (Hotmix) - AC 1,000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Pemasangan Pondasi Bawah - Agregat Kelas B (15 cm) M3 600 515,471.00 309,282,601.38
2 Pemasangan Pondasi Atas - Agregat Kelas A (15 cm) M3 600 604,954.69 362,972,815.61
4 Pemasangan Lapis AC-BC Ton 552 1,400,357.93 772,997,578.37
5 Pemasangan Lapis AC-WC Ton 363.2 1,467,301.22 532,923,802.41

JUMLAH 2,050,626,797.77

E Jalan Campuran Aspal Panas (Hotmix) - HRS 1000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Pemasangan Pondasi Bawah - Agregat Kelas B (15 cm) M3 600 515,471.00 309,282,601.38
3 Pemasangan Pondasi Atas - Agregat Kelas A (15 cm) M3 600 604,954.69 362,972,815.61
4 Pemasangan Lapis HRS-Base Ton 303.8 1,256,581.88 381,749,576.65
5 Pemasangan Lapis HRS-WC Ton 260.4 1,495,694.10 389,478,743.97

JUMLAH 1,515,933,737.61

F Jalan Beton 1,000 Meter


1 Penyiapan Badan Jalan M2 4000 18,112.50 72,450,000.00
2 Pemasangan Pondasi Bawah - Agregat Kelas B (15 cm) M3 600 515,471.00 309,282,601.38
3 Pekerjaan Perkerasan Jalan Beton fc 20 mpa M3 600 2,167,139.29 1,300,283,571.62

JUMLAH 1,682,016,173.00
RENCANA ANGGARAN BIAYA

Kegiatan :
Pekerjaan : Drainase
Lokasi :

Jumlah Harga
No Jenis Pekerjaan Sat Volume Harga Satuan Rp
Rp

A Pekerjaan Saluran Tanah 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.500 50,729.96 25,364.98

JUMLAH 25,364.98

B Pekerjaan Saluran Pasangan Batu Kali T=20 cm (0.45m x 0.4m ) 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.450 50,729.96 22,828.48
2 Pemasangan Batu dengan Mortar M3 0.304 961,799.72 292,098.57

JUMLAH 314,927.06

C Pekerjaan Saluran Terbuka Beton Pracetak (U-Ditch) 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.250 50,729.96 12,677.42
2 Pekerjaan Urugan Pasir Urug T=5cm M3 0.025 336,202.50 8,236.96
3 Pemasangan U-Ditch Ukuran 30 x 40 x 1200 M1 1.000 619,203.44 619,203.44
4 Pekerjaan Urugan Tanah Kembali M3 0.040 59,512.50 2,380.50

JUMLAH 642,498.31

D Pekerjaan Saluran Tertutup Beton Pracetak (U-Ditch + Tutup) 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.250 50,729.96 12,677.42
2 Pekerjaan Urugan Pasir Urug T=5cm M3 0.025 336,202.50 8,236.96
3 Pemasangan U-Ditch Ukuran 30 x 40 x 1200 + Tutup M3 1.000 779,820.10 779,820.10
4 Pekerjaan Urugan Tanah Kembali Liter 0.040 59,512.50 2,380.50

JUMLAH 803,114.98

E Pekerjaan Gorong-gorong Buis Beton Pracetak 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.160 50,729.96 8,116.79
2 Pekerjaan Gorong-gorong Pipa Beton Bertulang, Diameter 40 cm M1 1.000 356,722.31 356,722.31

JUMLAH 364,839.10

F Pekerjaan Box Culvert Beton Pracetak 1 Meter


1 Pekerjaan Galian Saluran Drainase M3 0.160 50,729.96 8,116.79
2 Pekerjaan Box Culvert Beton Bertulang Ukuran 40 x 40 x 100 M1 1.000 1,599,297.31 1,599,297.31

JUMLAH 1,607,414.10
RENCANA ANGGARAN BIAYA

Kegiatan :
Pekerjaan : Jembatan
Lokasi :

Jumlah Harga
No Jenis Pekerjaan Sat Volume Harga Satuan Rp
Rp

A Pekerjaan Jembatan Kayu L= 4 m 5 Meter


1 Pekerjaan Jembatan Kayu m' 5.000 15,419,068.57 77,095,342.86

JUMLAH 77,095,342.86

B Pekerjaan Jembatan Gantung 15 Meter


1 Pekerjaan Persiapan -
- Pembersihan dan Perataan tanah m2 63.000 18,700.00 1,178,100.00
- Pasangan Bouwplank m' 64.000 60,863.00 3,895,232.00
2 Pekerjaan Tanah
- Galian tanah m3 33.000 50,729.96 1,674,088.72
- Urugan Pasir m3 3.000 336,202.50 1,008,607.50
3 Pekerjaan Beton Siklop Pondasi
- Pondasi Beton K 175, pilon dan angker m3 30.000 1,532,378.86 45,971,365.70
4 Pekerjaan Struktur Besi
- Pasang Angker Mur 1 inci, fy = 240 Mpa kg 243.310 24,148.46 5,875,561.57
- Pasang Tiang pilon+rol, Fy=240 Mpa kg 410.600 48,696.78 19,994,897.86
- Pasang Besi Plat, fy=240 Mpa kg 32.970 28,841.61 950,907.85
- Pasang Besi Pengaku Pilon, Fy=240 Mpa kg 10.990 30,030.71 330,037.49
- Pasang Blok Angker Iwf 150.100.5.5 L=150 cm, Fy=240 Mpa buah 4.000 1,536,682.69 6,146,730.78
- Pasang Tulangan Dia. 16 mm, Fy=400 Mpa (ulir) kg 1,107.110 18,353.43 20,319,260.35
5 Pekerjaan Kabel
- Pasang Kabel Utama 5/8", fy = 1500 Mpa m 56.000 45,285.75 2,536,001.90
- Pasang Wartel Mur diameter 5/8" buah 4.000 352,901.45 1,411,605.78
- Pasang Wartel Mur diameter 1/2" buah 22.000 283,326.45 6,233,181.80
- Pasang Klem Penggantung Atas buah 22.000 59,206.95 1,302,552.80
- Pasang Klem Penggantung Bawah buah 22.000 59,206.95 1,302,552.80
- Pasang Besi Penggantung, Besi Polos diamter 12 mm fy=240 Mpa Kg 40.000 16,277.30 651,092.06
- Pasang Klem Kabel Utama 5/8" buah 16.000 16,277.30 260,436.82
- Pasang Kabel Pengaku M 34.000 59,206.95 2,013,036.15
6 Pekerjaan lantai Kayu
- Pasang Gelagar Melintang, Kayu 8/12 m3 0.170 6,977,190.57 1,186,122.40
- Pasang Gelagar Memanjang, Kayu 6/12 m3 0.320 6,977,190.57 2,232,700.98
- Pasang Lantai, Kayu papan 3/30 m3 1.080 291,070.04 314,355.64

JUMLAH 126,788,428.94
C Pekerjaan Jembatan Beton l=4 m 6 Meter
1 Pekerjaan Tanah
- Galian tanah m3 33.33 50,729.96 1,690,748.44
- Urugan Pasir m3 0.63 336,202.50 211,807.58
2 Pekerjaan Pondasi
- Pasangan Batu Kali m3 34.700 961,799.72 33,374,450.22
3 Pekerjaan Beton
- Pekerjaan Bekisting Balok m2 35.625 602,946.53 21,479,970.31
- Pekerjaan Bekisting Pelat m2 21.000 694,716.53 14,589,047.23
- Pekerjaan Besi Balok kg 299.250 18,353.43 5,492,262.43
- Pekerjaan Besi Pelat lantai kg 724.584 28,841.61 20,898,168.45
- Pekerjaan Beton Balok fc= 20 Mpa m3 2.138 2,157,919.24 4,612,552.37
- Pekerjaan Beton Pelat lantai fc= 20 Mpa m3 6.038 2,157,919.24 13,029,947.94
4 Pekerjaan Ralling
- Pekerjaan Pemasangan Ralling Galvanis m' 11.000 1,247,211.44 13,719,325.82

JUMLAH 129,098,280.79
D Pekerjaan Tambatan Perahu 10 Meter
1 - Pekerjaan Pemancangan Kayu 15 x 15 m' 72.00 784,210.57 56,463,161.23
- Pasang Gelagar Melintang, Kayu 8/15 m3 0.768 6,977,190.57 5,358,482.36
- Pasang Gelagar Memanjang, Kayu 6/12 m3 0.576 6,977,190.57 4,018,861.77
- Pasang Lantai, Kayu papan 3/30 m3 0.612 291,070.04 178,134.86

JUMLAH 66,018,640.22
D Pekerjaan Plat Duicker L =4 m 1.43 Meter
1 Pekerjaan Tanah
- Galian tanah m3 6.40 50,729.96 324,671.75
- Urugan Pasir m3 1.14 336,202.50 384,615.66
2 Pekerjaan Pondasi
- Pasangan Batu Kali m3 6.400 961,799.72 6,155,518.20
3 Pekerjaan Beton
- Pekerjaan Bekisting Pelat m2 14.640 245,000.00 3,586,800.00
- Pekerjaan Besi Pelat lantai kg 389.760 18,353.43 7,153,430.93
- Pekerjaan Beton Pelat lantai fc= 20 Mpa m3 3.248 2,157,919.24 7,008,921.69
- Pekerjaan beton tembok Sepeda fc 14,5 mpa m3 1.440 1,532,378.86 2,206,625.55

JUMLAH 26,820,583.77
HARGA PERKIRAAN SENDIRI (HPS)
DAFTAR KUANTITAS DAN HARGA
Nama Pekerjaan : JALAN GERTAK BETON KOTA SEMARANG
Lokasi :

NO URAIAN PEKERJAAN VOLUME SAT KODE HARGA SATUAN JUMLAH HARGA


ANALISA Rp. Rp.

PEKERJAAN JALAN GERTAK BETON


II PEKERJAAN STRUKTUR
1 Pengadaan Tiang Pancang, Kedalaman pancang = 6m 1,410.00 m' M.307 318,300.00 448,803,000.00
2 Pemancangan Tiang Pancang 1,410.00 m' F.12.A 99,573.90 140,399,194.73
3 Pemotongan Kepala Tiang 235.00 bh 2.2.1.13 58,613.24 13,774,110.69

A POER KOLOM
1 Pek. Beton (K-250) 10.08 m3 B.13.i.3 1,437,755.00 14,486,280.22
2 Pek. Bekisting 143.94 m2 4.1.1.23 286,606.10 41,253,365.52
3 Pek. Besi Tulangan dia. 13 mm 3,941.97 kg 4.1.1.17 17,470.64 68,868,771.91

B BALOK
Balok Melintang
1 Pek. Beton (K-250) 30.58 m3 B.13.i.3 1,437,755.00 43,968,345.09
2 Pek. Bekisting 332.03 m2 4.1.1.23 286,606.10 95,160,390.35
3 Pek. Besi Tulangan dia. 13 mm 3,938.77 kg 4.1.1.17 17,470.64 68,812,799.54
4 Pek. Beugel dia. 8 mm 965.29 kg 4.1.1.17 17,470.64 16,864,252.26

Balok Memanjang
1 Pek. Beton (K-250) 81.55 m3 B.13.i.3 1,437,755.00 117,248,920.25
2 Pek. Bekisting 885.40 m2 4.1.1.23 286,606.10 253,761,040.94
3 Pek. Besi Tulangan dia. 13 mm 10,680.26 kg 4.1.1.17 17,470.64 186,590,959.16
4 Pek. Begel dia. 8 mm 2,207.09 kg 4.1.1.17 17,470.64 38,559,270.09

C PLAT LANTAI BETON


1 Pek. Beton (K-250) 211.50 m3 B.13.i.3 1,437,755.00 304,085,182.50
2 Pek. Bekisting 1,301.86 m2 4.1.1.24 359,503.10 468,022,705.77
3 Wiremess M5 5,119.63 kg 4.1.1.17 15,584.53 79,786,995.95
4 Plat siku 720.00 m1 25,050.00 18,036,000.00

TOTAL 2,418,481,584.97
HARGA/M' JALAN GERTAK BETON KOTA 5,189,874.65
HARGA SATUAN PEKERJAAN

No Uraian Pekerjaan Sat Harga Satuan (Rp.)

PEKERJAAN TANAH
1 Pekerjaan Galian Tanah Biasa Sedalam 1 m M3 81,506.25
2 Pekerjaan Galian Tanah Biasa Sedalam 2 m M3 100,136.25
3 Pekerjaan Galian Tanah Biasa Sedalam 3 m M3 119,076.75
4 Pekerjaan Galian Tanah Keras Sedalam 1 m M3 108,468.00
5 Pekerjaan Galian Tanah Cadas Sedalam 1 m M3 164,565.00
6 Pekerjaan Galian Tanah Lumpur Sedalam 1 m M3 131,186.25
7 Pekerjaan Stripping Tanah Tebing Setinggi 1 m M2 5,951.25
8 Pekerjaan Pembuangan Tanah Sejauh 30 m M3 35,707.50
9 Pekerjaan Pengurugan Kembali Galian Tanah M3 59,512.50
10 Pekerjaan Pemadatan Tanah (per 20 cm) M3 59,512.50
11 Pekerjaan Pengurugan dengan Pasir Urug M3 363,112.50

PEKERJAAN JALAN
1 Pekerjaan 1 M2 Penyiapan Badan Jalan M2 18,112.50
2 Pekerjaan 1M2 Pembersihan dan Pengupasan Lahan M2 195,122.81
3 Pekerjaan 1 M2 Pasangan Pondasi Telford M2 103,292.65
4 Pekerjaan 1 M3 Pondasi Agregat Kelas B M3 515,471.00
5 Pekerjaan 1 M3 Pondasi Agregat Kelas A M3 604,954.69
6 Pekerjaan 1 M3 Lapis Permukaan Penetrasi (Lapen) Makadam M3 2,406,695.68
7 Pengurugan 1 M3 dengan Pasir Urug M3 336,202.50
8 Pemasangan 1 M2 Paving Block M2 237,776.42
9 Pekerjaan Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c 0,66 (untuk beton pengunci paving block) M3 1,137,231.38
10 Pekerjaan 1 Liter Lapis Resap Pengikat - Aspal Cair Liter 12,839.58
11 Pekerjaan 1 Liter Lapis Perekat - Aspal Cair Liter 13,626.84
12 Pekerjaan 1 M2 Lapis Permukaan Laburan Aspal Lapis Satu (Burtu) Tebal 15 mm M2 17,547.98
13 Pekerjaan 1 M2 Lapis Permukaan Laburan Aspal Lapis Dua (Burda) Tebal 25 mm M2 26,825.26
14 Pekerjaan 1 Ton Lapis Pondasi (AC-Base) Ton 1,298,092.43
15 Pekerjaan 1 Ton Lapis Antara (AC-BC) Ton 1,400,357.93
16 Pekerjaan 1 Ton Lapis Aus (AC-WC) Ton 1,467,301.22
17 Pekerjaan 1 Ton Lapis Pondasi (HRS-Base) Ton 1,256,581.88
18 Pekerjaan 1 Ton Lapis Aus (HRS-WC) Ton 1,495,694.10
19 Pemasangan 1 M2 Membran Kedap Air / Plastik Cor M2 3,822.60
20 Pekerjaan 1M3 Lapis Pondasi Bawah Beton Kurus M3 1,643,774.54
21 Pekerjaan 1M3 Perkerasan Jalan Beton M3 2,167,139.29
22 Pekerjaan 1 M3 Beton Ready Mix Mutu f'c = 21,7 Mpa (K 250) M3 1,706,651.02
23 Pembesian 100 Kg Jaring Kawat (Wiremesh) untuk Pelat Beton Kg 1,475,873.54

PEKERJAAN DRAINASE
Pekerjaan 1M3 Galian untuk Selokan Drainase dan Saluran Air M3 50,729.96
Pekerjaan 1 M3 Pasangan Batu dengan Mortar M3 961,799.72
Pekerjaan Pengurugan Kembali 1 M3 Galian Tanah M3 59,512.50
Pekerjaan 1M3 Urugan Bahan Porous untuk Bahan Penyaring (Filter) M3 520,063.25
Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter 35-45 cm M1 621,043.21
Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter 55-65 cm M1 861,139.77
Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter 75-85 cm M1 1,739,013.86
Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter 95-105 cm M1 2,189,621.81
Pekerjaan 1M1 Gorong-gorong Pipa Beton Tanpa Tulangan, Diameter Dalam 20 cm M1 211,917.57
Pekerjaan 1M1 Gorong-gorong Pipa Beton Tanpa Tulangan, Diameter Dalam 30 cm M1 255,830.69
Pekerjaan 1M1 Saluran Berbentuk U Tipe DS 1 M1 527,232.00
Pekerjaan 1M1 Saluran Berbentuk U Tipe DS 2 M1 615,104.00
Pekerjaan 1M1 Saluran Berbentuk U Tipe DS 3 M1 738,125.00
Pekerjaan 1M1 Saluran U-Ditch (Pracetak) 30 x 40 x 120 Tanpa Tutup M1 619,203.44
Pekerjaan 1M1 Saluran U-Ditch (Pracetak) 30 x 40 x 120 Dengan Tutup M1 779,820.10
Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter Dalam 40 cm M1 356,722.31
Pekerjaan 1M1 Box Culvert Beton Bertulang 40 x 40 x 100 M1 1,599,297.31

PEKERJAAN STRUKTUR
Pekerjaan 1M3 Beton Mutu Tinggi fc' =45 Mpa (K-500) M3 3,119,533.56
Pekerjaan 1M3 Beton Mutu Tinggi fc' =35 Mpa (K-400) M3 3,007,042.32
Pekerjaan 1M3 Beton Mutu Sedang fc' =30 Mpa (K-350) M3 2,948,865.95
Pekerjaan 1M3 Beton Mutu Sedang fc' =25 Mpa (K-300) M3 2,209,538.14
Pekerjaan 1M3 Beton Mutu Sedang fc' =20 Mpa (K-250) M3 2,157,919.24
Pekerjaan 1M3 Beton Mutu Sedang fc' =15 Mpa (K-175) M3 1,532,378.86
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pekerjaan 1 M2 Penyiapan Badan Jalan


SATUAN : M2
HARGA SATUAN PEKERJAAN : 18,112.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1000 Pekerja (L01) OH 90,000.00 9,000.00
0.0500 Mandor (L03) OH 135,000.00 6,750.00

B BAHAN

JUMLAH 15,750.00 - - 15,750.00


OVERHEAD DAN PROFIT 15% x Jumlah 2,362.50
JUMLAH TOTAL 18,112.50

JENIS PEKERJAAN : Pekerjaan 1M2 Pembersihan dan Pengupasan Lahan


SATUAN : M2
HARGA SATUAN PEKERJAAN : 195,122.81

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0700 Pekerja (L01) Jam 12,857.14 900.00
0.0140 Mandor (L03) Jam 19,285.71 270.00

B BAHAN
1.2000 Bahan Timbunan (M08) M3 140,000.00 168,000.00

C ALAT
0.0020 Dump Truck (E09) Jam 250,000.00 502.01

JUMLAH 1,170.00 168,000.00 502.01 169,672.01


OVERHEAD DAN PROFIT 15% x Jumlah 25,450.80
JUMLAH TOTAL 195,122.81

JENIS PEKERJAAN : Pekerjaan 1 M2 Pasangan Pondasi Telford


SATUAN : M2
HARGA SATUAN PEKERJAAN : 103,292.65

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0600 Pekerja (L01) Jam 12,857.14 771.43
0.0127 Tukang (L02) Jam 18,571.43 235.86
0.0661 Mandor (L03) Jam 19,285.71 1,274.79

B BAHAN
0.2529 Batu Belah (Agg Dia20) (M06) M3 250,000.00 63,225.00
0.0395 Batu Pinggir (Agg Dia25) (M06) M3 250,000.00 9,875.00
0.0292 Batu Pengunci (Agg Dia 5/7) M3 250,000.00 7,300.00
0.0007 Pasir Urug (M01d) M3 220,000.00 154.00

C ALAT
0.0301 Dump Truck (3.5 Ton) (E08) 200,000.00 6,020.00
0.0007 Tandem Roller (E17) 216,603.27 151.62
0.0028 Water Tanker (E23) 290,000.00 812.00

JUMLAH 2,282.07 80,554.00 6,983.62 89,819.69


OVERHEAD DAN PROFIT 15% x Jumlah 13,472.95
JUMLAH TOTAL 103,292.65

JENIS PEKERJAAN : Pekerjaan 1 M3 Pondasi Agregat Kelas B


SATUAN : M3
HARGA SATUAN PEKERJAAN : 515,471.00

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0595 Pekerja (L01) Jam 12,857.14 764.57
0.0085 Mandor (L03) Jam 19,285.71 163.84

B BAHAN
1.2586 Agregat B (M27) M3 296,705.98 373,436.90

C ALAT
0.0085 Wheel Loader (E15) 280,000.00 2,378.66
0.2926 Dump Truck (E08) 200,000.00 58,529.47
0.0043 Motor Grader (E13) 640,000.00 2,726.06
0.0054 Tandem Roller (E17) 216,603.27 1,159.86
0.0141 Water Tanker (E23) 290,000.00 4,076.31
1.0000 Alat Bantu (E56) 5,000.00 5,000.00

JUMLAH 928.41 373,436.90 73,870.35 448,235.65


OVERHEAD DAN PROFIT 15% x Jumlah 67,235.35
JUMLAH TOTAL 515,471.00

JENIS PEKERJAAN : Pekerjaan 1 M3 Pondasi Agregat Kelas A


SATUAN : M3
HARGA SATUAN PEKERJAAN : 604,954.69

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0595 Pekerja (L01) Jam 12,857.14 764.57
0.0085 Mandor (L03) Jam 19,285.71 163.84

B BAHAN
1.2586 Agregat A (M26) M3 354,286.08 445,907.74

C ALAT
0.0085 Wheel Loader (E15) 280,000.00 2,378.66
0.3036 Dump Truck (E08) 200,000.00 60,724.32
ANALISA HARGA SATUAN PEKERJAAN

0.0053 Motor Grader (E13) 640,000.00 3,407.57


0.0167 Tandem Roller (E17) 216,603.27 3,624.55
0.0141 Water Tanker (E23) 290,000.00 4,076.31
1.0000 Alat Bantu (E56) 5,000.00 5,000.00

JUMLAH 928.41 445,907.74 79,211.41 526,047.56


OVERHEAD DAN PROFIT 15% x Jumlah 78,907.13
JUMLAH TOTAL 604,954.69

JENIS PEKERJAAN : Pengurugan 1 M3 dengan Pasir Urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : 336,202.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.3000 Pekerja (L01) OH 90,000.00 27,000.00
0.0100 Mandor (L10) OH 135,000.00 1,350.00

B BAHAN
1.2000 Pasir urug (M01d) M3 220,000.00 264,000.00

C ALAT

JUMLAH 28,350.00 264,000.00 - 292,350.00


OVERHEAD DAN PROFIT 15% x Jumlah 43,852.50
JUMLAH TOTAL 336,202.50
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pemasangan 1 M2 Paving Block


SATUAN : M2
HARGA SATUAN PEKERJAAN : 237,776.42

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.4016 Pekerja (L01) Jam 12,857.14 5,163.51
1.6064 Tukang (L02) Jam 18,571.43 29,833.62
2.4096 Mandor (L03) Jam 19,285.71 46,471.60

B BAHAN
1.0500 Paving Blok T=8 (K-250) (M78) M2 90,000.00 94,500.00
0.0525 Pasir urug (M01a) M3 380,000.00 19,950.00

C ALAT
0.2410 Tamper (E25) Jam 45,000.00 10,843.37

JUMLAH 81,468.73 114,450.00 10,843.37 206,762.11


OVERHEAD DAN PROFIT 15% x Jumlah 31,014.32
JUMLAH TOTAL 237,776.42
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pekerjaan Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c 0,66 (untuk beton pengunci
paving block)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 1,137,231.38

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.6500 Pekerja (L01) OH 90,000.00 148,500.00
0.2750 Tenaga Batu (L02) OH 130,000.00 35,750.00
0.0280 Kepala Tukang (L10) OH 162,010.14 4,536.28
0.0830 Mandor (L03) OH 135,000.00 11,205.00

B BAHAN
326.0000 Semen Portland (M12) Kg 1,200.00 391,200.00
760.0000 Pasir Beton (M01a) Kg 271.43 206,285.71
1029.0000 Kerikil (Maks 30 mm) (M06) Kg 185.19 190,555.56
215.0000 Air (M101) Liter 4.02 864.30

C ALAT

JUMLAH 199,991.28 788,905.57 - 988,896.85


OVERHEAD DAN PROFIT 15% x Jumlah 148,334.53
JUMLAH TOTAL 1,137,231.38

JENIS PEKERJAAN : Pekerjaan 1 M3 Lapis Permukaan Penetrasi (Lapen) Makadam


SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,406,695.68 1.00 1.00 0.05

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1417 Pekerja (L01) Jam 12,857.14 1,822.42
0.0142 Mandor (L03) Jam 19,285.71 273.36

B BAHAN
1.5528 Batu Pokok (Agg Dia 3-5) (M03) M3 340,000.00 527,957.75
0.3697 Batu Pengunci (Agg Dia 1-2) (M03) M3 340,000.00 125,704.23
0.2070 Batu Penutup (M04) M3 360,000.00 74,535.21
107.1200 Aspal (M10) Kg 11,800.00 1,264,016.00

C ALAT
0.0071 Wheel Loader (E15) Jam 280,000.00 1,984.41
0.1272 Dump Truck (E09) Jam 250,000.00 31,798.07
0.0609 3-Wheel Roller (E16) Jam 191,492.18 11,657.10
0.3788 Asp. Sprayer (E03) Jam 140,000.00 53,030.30

JUMLAH 2,095.78 1,992,213.18 98,469.89 2,092,778.85


OVERHEAD DAN PROFIT 15% x Jumlah 313,916.83
JUMLAH TOTAL 2,406,695.68

JENIS PEKERJAAN : Pekerjaan 1 Liter Lapis Resap Pengikat - Aspal Cair


SATUAN : Liter
HARGA SATUAN PEKERJAAN : 12,839.58

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0021 Pekerja (L01) Jam 12,857.14 26.79
0.0004 Mandor (L03) Jam 19,285.71 8.04

B BAHAN
0.6790 Aspal (M10) Kg 11,800.00 8,011.92
0.3708 Kerosene (M11) Liter 8,000.00 2,966.40

C ALAT
0.0002 Asp. Distributor (E41) Jam 408,209.59 85.04
0.0002 Compressor (E05) Jam 320,000.00 66.67

JUMLAH 34.82 10,978.32 151.71 11,164.85


OVERHEAD DAN PROFIT 15% x Jumlah 1,674.73
JUMLAH TOTAL 12,839.58

JENIS PEKERJAAN : Pekerjaan 1 Liter Lapis Perekat - Aspal Cair


SATUAN : Liter
HARGA SATUAN PEKERJAAN : 13,626.84

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0021 Pekerja (L01) Jam 12,857.14 26.79
0.0004 Mandor (L03) Jam 19,285.71 8.04

B BAHAN
0.8487 Aspal (M10) Kg 11,800.00 10,014.90
0.2060 Kerosene (M11) Liter 8,000.00 1,648.00

C ALAT
0.0002 Asp. Distributor (E41) Jam 408,209.59 85.04
0.0002 Compressor (E05) Jam 320,000.00 66.67

JUMLAH 34.82 11,662.90 151.71 11,849.43


OVERHEAD DAN PROFIT 15% x Jumlah 1,777.41
JUMLAH TOTAL 13,626.84
JENIS PEKERJAAN : Pekerjaan 1 M2 Lapis Permukaan Laburan Aspal Lapis Satu (Burtu) Tebal 15 mm
SATUAN : M2
HARGA SATUAN PEKERJAAN : 17,547.98

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2126 Pekerja (L01) Jam 12,857.14 2,733.62
0.0106 Mandor (L03) Jam 19,285.71 205.02
ANALISA HARGA SATUAN PEKERJAAN

B BAHAN
23.0000 Chipping (M41) Kg 207.56 4,773.82

C ALAT
0.0106 Wheel Loader (E15) Jam 280,000.00 2,976.61
0.0214 Dump Truck (E08) Jam 200,000.00 4,273.88
0.0005 P. Tyre Roller (E18) Jam 550,000.00 296.16

JUMLAH 2,938.65 4,773.82 7,546.65 15,259.11


OVERHEAD DAN PROFIT 15% x Jumlah 2,288.87
JUMLAH TOTAL 17,547.98

JENIS PEKERJAAN : Pekerjaan 1 M2 Lapis Permukaan Laburan Aspal Lapis Dua (Burda) Tebal 25 mm
SATUAN : M2
HARGA SATUAN PEKERJAAN : 26,825.26

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.3544 Pekerja (L01) Jam 12,857.14 4,556.04
0.0177 Mandor (L03) Jam 19,285.71 341.70

B BAHAN
35.0000 Chipping (M41) Kg 207.56 7,264.51

C ALAT
0.0177 Wheel Loader (E15) Jam 280,000.00 4,961.02
0.0281 Dump Truck (E08) Jam 200,000.00 5,610.73
0.0011 P. Tyre Roller (E18) Jam 550,000.00 592.31

JUMLAH 4,897.74 7,264.51 11,164.07 23,326.31


OVERHEAD DAN PROFIT 15% x Jumlah 3,498.95
JUMLAH TOTAL 26,825.26

JENIS PEKERJAAN : Pekerjaan 1 Ton Lapis Pondasi (AC-Base)


SATUAN : Ton
HARGA SATUAN PEKERJAAN : 1,298,092.43

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2008 Pekerja (L01) Jam 12,857.14 2,581.76
0.0201 Mandor (L03) Jam 19,285.71 387.26

B BAHAN
0.1331 Lolos screen2 ukuran (9.5 - 19,0) M3 520,000.00 69,211.27
0.3719 Lolos screen2 ukuran (5 - 9,5) M3 520,000.00 193,407.04
0.1759 Lolos screen2 ukuran (0 - 5) M3 520,000.00 91,463.69
9.9750 Semen (M05) Kg 1,137.50 11,346.56
49.4400 Aspal (M10) Kg 11,800.00 583,392.00

C ALAT
0.0096 Wheel Loader (E15) Jam 280,000.00 2,679.99
0.0201 AMP (E01) Jam 5,600,000.00 112,449.80
0.0201 Genset (E12) Jam 183,000.00 3,674.70
0.2589 Dump Truck (E08) Jam 200,000.00 51,785.71
0.0073 Asphalt Finisher (E02) Jam 350,000.00 2,564.54
0.0072 Tandem Roller (E17) Jam 216,603.27 1,562.31
0.0041 P. Tyre Roller (E18) Jam 550,000.00 2,269.40

JUMLAH 2,969.02 948,820.57 176,986.44 1,128,776.03


OVERHEAD DAN PROFIT 15% x Jumlah 169,316.40
JUMLAH TOTAL 1,298,092.43

JENIS PEKERJAAN : Pekerjaan 1 Ton Lapis Antara (AC-BC)


SATUAN : Ton
HARGA SATUAN PEKERJAAN : 1,400,357.93

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2008 Pekerja (L01) Jam 12,857.14 2,581.76
0.0201 Mandor (L03) Jam 19,285.71 387.26

B BAHAN
0.3887 Lolos screen2 ukuran (9.5 - 19,0) M3 520,000.00 202,136.17
0.2729 Lolos screen2 ukuran (0 - 5) M3 520,000.00 141,890.45
9.4500 Semen (M05) Kg 1,137.50 10,749.38
57.6800 Aspal (M10) Kg 11,800.00 680,624.00

C ALAT
0.0096 Wheel Loader (E15) Jam 280,000.00 2,679.99
0.0201 AMP (E01) Jam 5,600,000.00 112,449.80
0.0201 Genset (E12) Jam 183,000.00 3,674.70
0.2589 Dump Truck (E08) Jam 200,000.00 51,785.71
0.0110 Asphalt Finisher (E02) Jam 350,000.00 3,846.80
0.0108 Tandem Roller (E17) Jam 216,603.27 2,343.46
0.0046 P. Tyre Roller (E18) Jam 550,000.00 2,553.07

JUMLAH 2,969.02 1,035,399.99 179,333.54 1,217,702.55


OVERHEAD DAN PROFIT 15% x Jumlah 182,655.38
JUMLAH TOTAL 1,400,357.93

JENIS PEKERJAAN : Pekerjaan 1 Ton Lapis Aus (AC-WC)


SATUAN : Ton
HARGA SATUAN PEKERJAAN : 1,467,301.22

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2008 Pekerja (L01) Jam 12,857.14 2,581.76
0.0201 Mandor (L03) Jam 19,285.71 387.26
ANALISA HARGA SATUAN PEKERJAAN

B BAHAN
0.3305 Lolos screen2 ukuran (9.5 - 19,0) M3 520,000.00 171,874.65
0.3210 Lolos screen2 ukuran (0 - 5) M3 520,000.00 166,929.94
9.8700 Semen (M05) Kg 1,137.50 11,227.13
62.8300 Aspal (M10) Kg 11,800.00 741,394.00

C ALAT
0.0096 Wheel Loader (E15) Jam 280,000.00 2,679.99
0.0201 AMP (E01) Jam 5,600,000.00 112,449.80
0.0201 Genset (E12) Jam 183,000.00 3,674.70
0.2589 Dump Truck (E08) Jam 200,000.00 51,785.71
0.0137 Asphalt Finisher (E02) Jam 350,000.00 4,808.51
0.0135 Tandem Roller (E17) Jam 216,603.27 2,929.33
0.0058 P. Tyre Roller (E18) Jam 550,000.00 3,191.34

JUMLAH 2,969.02 1,091,425.71 181,519.37 1,275,914.10


OVERHEAD DAN PROFIT 15% x Jumlah 191,387.12
JUMLAH TOTAL 1,467,301.22

JENIS PEKERJAAN : Pekerjaan 1 Ton Lapis Pondasi (HRS-Base)


SATUAN : Ton
HARGA SATUAN PEKERJAAN : 1,256,581.88

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0286 Pekerja (L01) Jam 12,857.14 367.54
0.0041 Mandor (L03) Jam 19,285.71 78.76

B BAHAN
0.2958 Agregat ukuran 5-10 & 10-15 cm M3 215,000.00 63,591.55
0.1404 Agregat ukuran 0-5 cm M3 210,000.00 29,493.63
0.2265 Pasir Halus (M01c) M3 326,004.00 73,853.30
15.7500 Semen (M05) Kg 1,137.50 17,915.63
61.8000 Aspal (M10) Kg 11,800.00 729,240.00

C ALAT
0.0096 Wheel Loader (E15) Jam 280,000.00 2,679.99
0.0201 AMP (E01) Jam 5,600,000.00 112,449.80
0.0201 Genset (E12) Jam 183,000.00 3,674.70
0.2589 Dump Truck (E08) Jam 200,000.00 51,785.71
0.0041 Asphalt Finisher (E02) Jam 350,000.00 1,429.31
ANALISA HARGA SATUAN PEKERJAAN

0.0158 Tandem Roller (E17) Jam 216,603.27 3,411.83


0.0049 P. Tyre Roller (E18) Jam 550,000.00 2,708.16

JUMLAH 446.29 914,094.11 178,139.50 1,092,679.90


OVERHEAD DAN PROFIT 15% x Jumlah 163,901.98
JUMLAH TOTAL 1,256,581.88

JENIS PEKERJAAN : Pekerjaan 1 Ton Lapis Aus (HRS-WC)


SATUAN : Ton
HARGA SATUAN PEKERJAAN : 1,495,694.10

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1334 Pekerja (L01) Jam 12,857.14 1,715.17
0.0191 Mandor (L03) Jam 19,285.71 367.54

B BAHAN
0.2440 Agregat ukuran 5-10 & 10-15 cm M3 215,000.00 52,463.03
0.1538 Agregat ukuran 0-5 cm M3 326,004.00 50,146.48
0.2481 Pasir Halus (M01c) M3 326,004.00 80,886.95
23.1000 Semen (M05) Kg 1,137.50 26,276.25
75.1900 Aspal (M10) Kg 11,800.00 887,242.00

C ALAT
0.0096 Wheel Loader (E15) Jam 280,000.00 2,679.99
0.0201 AMP (E01) Jam 5,600,000.00 112,449.80
0.0201 Genset (E12) Jam 183,000.00 3,674.70
0.3698 Dump Truck (E08) Jam 200,000.00 73,958.33
0.0110 Asphalt Finisher (E02) Jam 350,000.00 3,846.80
0.0108 Tandem Roller (E17) Jam 216,603.27 2,343.46
0.0046 P. Tyre Roller (E18) Jam 550,000.00 2,553.07

JUMLAH 2,082.70 1,097,014.70 201,506.16 1,300,603.57


OVERHEAD DAN PROFIT 15% x Jumlah 195,090.53
JUMLAH TOTAL 1,495,694.10

JENIS PEKERJAAN : Pemasangan 1 M2 Membran Kedap Air / Plastik Cor


SATUAN : M2
HARGA SATUAN PEKERJAAN : 3,822.60

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0080 Pekerja (L01) OH 90,000.00 720.00
0.0004 Mandor (L03) OH 135,000.00 54.00

B BAHAN
1.0200 Plastik Cor (M102) M2 2,500.00 2,550.00

C ALAT

JUMLAH 774.00 2,550.00 - 3,324.00


OVERHEAD DAN PROFIT 15% x Jumlah 498.60
JUMLAH TOTAL 3,822.60

JENIS PEKERJAAN : Pekerjaan 1M3 Lapis Pondasi Bawah Beton Kurus


SATUAN : M3
HARGA SATUAN PEKERJAAN : 1,643,774.54

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.5060 Pekerja (L01) Jam 12,857.14 19,363.17
0.4016 Tukang Batu (L02) Jam 18,571.43 7,458.41
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
309.5500 Semen (M12) Kg 1,200.00 371,460.00
0.4991 Pasir (M01a) M3 380,000.00 189,656.54
0.8837 Agregat Kasar (M03) M3 340,000.00 300,456.79
0.1600 Multiplex 12 mm (M73) Lbr 110,000.00 17,600.00
0.0960 Kayu Acuan (M99) M3 3,700,000.00 355,200.00
0.2500 Paku (M18) Kg 17,500.00 4,375.00

C ALAT
0.0244 Wheel Loader (E15) Jam 280,000.00 6,835.18
0.0502 Batching Plant (E43) Jam 650,682.47 32,664.78
0.1428 Truck Mixer (E49) Jam 699,635.00 99,916.42
0.0502 Con. Vibrator (E20) Jam 60,000.00 3,012.05
0.0422 Water Tank Truck (E23) Jam 290,000.00 12,228.92
0.0037 Conc. Paver (E42) Jam 593,130.44 2,205.60
1.0000 Alat Bantu Jam 5,000.00 5,000.00

JUMLAH 28,757.89 1,238,748.32 161,862.95 1,429,369.17


OVERHEAD DAN PROFIT 15% x Jumlah 214,405.38
JUMLAH TOTAL 1,643,774.54

JENIS PEKERJAAN : Pekerjaan 1M3 Perkerasan Jalan Beton


SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,167,139.29

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.4056 Pekerja (L01) Jam 12,857.14 18,072.29
0.7028 Tukang Batu (L02) Jam 18,571.43 13,052.21
0.1506 Mandor (L03) Jam 19,285.71 2,904.48

B BAHAN
410.0000 Semen (M12) Kg 1,200.00 492,000.00
0.6237 Pasir (M01a) M3 380,000.00 236,995.77
0.7885 Agregat Kasar (M03) M3 340,000.00 268,096.07
15.8750 Baja Tulangan Polos (M39a) Kg 10,000.00 158,750.00
0.9900 Joint Sealent (M94) Kg 38,900.00 38,511.00
0.0200 Cat Anti Karat (M95) Kg 40,000.00 800.00
ANALISA HARGA SATUAN PEKERJAAN

0.1700 Expansion Cap (M96) M2 6,500.00 1,105.00


0.4375 Polytene 125 mikron (M97) Kg 20,300.00 8,881.25
0.8700 Curing Compound (M98) Ltr 40,500.00 35,235.00
0.1600 Multiplex 12 mm (M73) Lbr 110,000.00 17,600.00
0.0960 Kayu Acuan (M99) M3 3,700,000.00 355,200.00
1.0240 Paku (M18) Kg 17,500.00 17,920.00
0.9139 Additive (M67a) Ltr 40,500.00 37,013.76

C ALAT
0.0244 Wheel Loader (E15) Jam 280,000.00 6,835.18
0.0502 Batching Plant (E43) Jam 650,682.47 32,664.78
0.1689 Truck Mixer (E49) Jam 699,635.00 118,179.99
0.0502 Con. Vibrator (E20) Jam 60,000.00 3,012.05
0.0422 Water Tank Truck (E23) Jam 290,000.00 12,228.92
0.0074 Conc. Paver (E42) Jam 593,130.44 4,411.20
1.0000 Alat Bantu Jam 5,000.00 5,000.00

JUMLAH 34,028.97 1,668,107.85 182,332.12 1,884,468.94


OVERHEAD DAN PROFIT 15% x Jumlah 282,670.34
JUMLAH TOTAL 2,167,139.29
ANALISA HARGA SATUAN PEKERJAAN

DRAINASE

JENIS PEKERJAAN : Pekerjaan 1M3 Galian untuk Selokan Drainase dan Saluran Air
SATUAN : M3
HARGA SATUAN PEKERJAAN : 50,729.96

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1606 Pekerja (L01) Jam 12,857.14 2,065.40
0.0268 Mandor (L03) Jam 19,285.71 516.35

B BAHAN

C ALAT
0.0268 Excavator (E10) Jam 660,000.00 17,670.68
0.0943 Dump Truck (E08) Jam 200,000.00 18,860.57
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 2,581.76 - 41,531.25 44,113.01


OVERHEAD DAN PROFIT 15% x Jumlah 6,616.95
JUMLAH TOTAL 50,729.96

JENIS PEKERJAAN : Pekerjaan 1 M3 Pasangan Batu dengan Mortar


SATUAN : M3
HARGA SATUAN PEKERJAAN : 961,799.72

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
4.0161 Pekerja (L01) Jam 12,857.14 51,635.11
1.2048 Tukang Batu (L02) Jam 18,571.43 22,375.22
0.4016 Mandor (L03) Jam 19,285.71 7,745.27

B BAHAN
1.0800 Batu (M02) M3 320,000.00 345,600.00
161.00 Semen (PC) (M12) kg 1,200.00 193,200.00
0.4829 Pasir Pasang (M01b) M3 370,000.00 178,663.47

C ALAT
0.4016 Conc. Mixer (E06) Jam 80,000.00 32,128.51
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 81,755.59 717,463.47 37,128.51 836,347.58


OVERHEAD DAN PROFIT 15% x Jumlah 125,452.14
JUMLAH TOTAL 961,799.72

JENIS PEKERJAAN : Pekerjaan 1M1 Saluran U-Ditch (Pracetak) 30 x 40 x 120 Tanpa Tutup
SATUAN : M1
HARGA SATUAN PEKERJAAN : 619,203.44

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1571 Pekerja (L01) OH 90,000.00 14,142.86
0.0306 Mandor (L03) OH 135,000.00 4,130.36
0.4340 Operator (L04) OH 200,000.00 86,805.56

B BAHAN
0.8300 U-Ditch 30 x 40 x 120 (M106) M' 405,800.00 336,814.00

C ALAT
0.4340 Crane 10 T - Min 5 Jam (E57) Jam 192,500.00 83,545.00
0.2500 Alat Bantu ( 1 set @ 3 alat ) (E56) Jam 52,000.00 13,000.00

JUMLAH 105,078.77 336,814.00 96,545.00 538,437.77


OVERHEAD DAN PROFIT 15% x Jumlah 80,765.67
JUMLAH TOTAL 619,203.44

JENIS PEKERJAAN : Pekerjaan 1M1 Saluran U-Ditch (Pracetak) 30 x 40 x 120 Dengan Tutup
SATUAN : M1
HARGA SATUAN PEKERJAAN : 779,820.10

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1571 Pekerja (L01) OH 90,000.00 14,142.86
0.0306 Mandor (L03) OH 135,000.00 4,130.36
0.4340 Operator (L04) OH 200,000.00 86,805.56

B BAHAN
0.8300 U-Ditch 30 x 40 x 120 (M106) M' 405,800.00 336,814.00
1.6667 Cover U-Ditch 30x40x60 cm (M107) M' 83,800.00 139,666.67

C ALAT
0.4340 Crane 10 T - Min 5 Jam (E57) Jam 192,500.00 83,545.00
0.2500 Alat Bantu ( 1 set @ 3 alat ) (E56) Jam 52,000.00 13,000.00
ANALISA HARGA SATUAN PEKERJAAN

JUMLAH 105,078.77 476,480.67 96,545.00 678,104.44


OVERHEAD DAN PROFIT 15% x Jumlah 101,715.67
JUMLAH TOTAL 779,820.10
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pekerjaan 1M1 Gorong-gorong Pipa Beton Bertulang, Diameter Dalam 40 cm
SATUAN : M1
HARGA SATUAN PEKERJAAN : 356,722.31

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.2000 Pekerja (L01) OH 90,000.00 108,000.00
0.2500 Tukang (L02) OH 130,000.00 32,500.00
0.1400 Mandor (L03) OH 135,000.00 18,900.00

B BAHAN
1.0000 Buis Beton Diameter 40 cm (M112) BH 71,500.00 71,500.00
0.0700 Perekat (M113) M3 544,500.00 38,115.00
0.0800 Pasir Urug (M01d) M3 452,228.92 36,178.31

C ALAT
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 159,400.00 145,793.31 5,000.00 310,193.31


OVERHEAD DAN PROFIT 15% x Jumlah 46,529.00
JUMLAH TOTAL 356,722.31

JENIS PEKERJAAN : Pekerjaan 1M1 Box Culvert Beton Bertulang 40 x 40 x 100


SATUAN : M1
HARGA SATUAN PEKERJAAN : 1,599,297.31

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.2000 Pekerja (L01) OH 90,000.00 108,000.00
0.2500 Tukang (L02) OH 130,000.00 32,500.00
0.1400 Mandor (L03) OH 135,000.00 18,900.00

B BAHAN
1.0000 Box Culvert 40 x 40 x 100 (M114) BH 1,152,000.00 1,152,000.00
0.0700 Perekat (M113) M3 544,500.00 38,115.00
0.0800 Pasir Urug (M01d) M3 452,228.92 36,178.31

C ALAT
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 159,400.00 1,226,293.31 5,000.00 1,390,693.31


OVERHEAD DAN PROFIT 15% x Jumlah 208,604.00
JUMLAH TOTAL 1,599,297.31
ANALISA HARGA SATUAN PEKERJAAN

STRUKTUR

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Tinggi fc' =45 Mpa (K-500)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 3,119,533.56

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.8072 Tukang (L02) Jam 18,571.43 33,562.82
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
595.3400 Semen (M12) Kg 1,200.00 714,408.00
0.4345 Pasir Beton (M01a) M3 380,000.00 165,124.62
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.4000 Kayu Perancah (M19) M3 3,000,000.00 1,200,000.00
4.8000 Paku (M18) Kg 17,500.00 84,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 45,826.16 2,416,492.62 250,319.10 2,712,637.87


OVERHEAD DAN PROFIT 15% x Jumlah 406,895.68
JUMLAH TOTAL 3,119,533.56

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Tinggi fc' =35 Mpa (K-400)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 3,007,042.32

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.8072 Tukang (L02) Jam 18,571.43 33,562.82
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
492.3400 Semen (M12) Kg 1,200.00 590,808.00
0.5024 Pasir Beton (M01a) M3 380,000.00 190,906.15
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.4000 Kayu Perancah (M19) M3 3,000,000.00 1,200,000.00
4.8000 Paku (M18) Kg 17,500.00 84,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 45,826.16 2,318,674.15 250,319.10 2,614,819.41


OVERHEAD DAN PROFIT 15% x Jumlah 392,222.91
JUMLAH TOTAL 3,007,042.32

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Sedang fc' =30 Mpa (K-350)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,948,865.95

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.8072 Tukang (L02) Jam 18,571.43 33,562.82
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
469.6800 Semen (M12) Kg 1,200.00 563,616.00
0.5145 Pasir Beton (M01a) M3 380,000.00 195,510.00
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.4000 Kayu Perancah (M19) M3 3,000,000.00 1,200,000.00
3.2000 Paku (M18) Kg 17,500.00 56,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 45,826.16 2,268,086.00 250,319.10 2,564,231.26


OVERHEAD DAN PROFIT 15% x Jumlah 384,634.69
JUMLAH TOTAL 2,948,865.95

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Sedang fc' =25 Mpa (K-300)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,209,538.14

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.1044 Tukang (L02) Jam 18,571.43 20,510.61
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
469.6800 Semen (M12) Kg 1,200.00 563,616.00
0.5097 Pasir Beton (M01a) M3 380,000.00 193,668.46
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.2000 Kayu Perancah (M19) M3 3,000,000.00 600,000.00
1.6000 Paku (M18) Kg 17,500.00 28,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
ANALISA HARGA SATUAN PEKERJAAN

0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26


1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 32,773.95 1,638,244.46 250,319.10 1,921,337.51


OVERHEAD DAN PROFIT 15% x Jumlah 288,200.63
JUMLAH TOTAL 2,209,538.14

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Sedang fc' =20 Mpa (K-250)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,157,919.24

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.1044 Tukang (L02) Jam 18,571.43 20,510.61
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
422.3000 Semen (M12) Kg 1,200.00 506,760.00
0.5412 Pasir Beton (M01a) M3 380,000.00 205,638.46
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.2000 Kayu Perancah (M19) M3 3,000,000.00 600,000.00
1.6000 Paku (M18) Kg 17,500.00 28,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 32,773.95 1,593,358.46 250,319.10 1,876,451.51


OVERHEAD DAN PROFIT 15% x Jumlah 281,467.73
JUMLAH TOTAL 2,157,919.24

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Sedang fc' =15 Mpa (K-175)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 1,532,378.86

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.3655 Pekerja (L01) Jam 12,857.14 17,555.94
1.3655 Tukang (L02) Jam 18,571.43 25,358.58
0.6827 Mandor (L03) Jam 19,285.71 13,166.95

B BAHAN
327.5400 Semen (M12) Kg 1,200.00 393,048.00
0.5024 Pasir Beton (M01a) M3 380,000.00 190,906.15
0.9053 Agregat Kasar (M03) M3 340,000.00 307,785.00
0.1000 Kayu Perancah (M19) M3 3,000,000.00 300,000.00
0.8000 Paku (M18) Kg 17,500.00 14,000.00

C ALAT
0.6827 Con. Pan. Mixer (E06) Jam 80,000.00 54,618.47
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 56,081.47 1,205,739.15 70,682.73 1,332,503.35


OVERHEAD DAN PROFIT 15% x Jumlah 199,875.50
JUMLAH TOTAL 1,532,378.86
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pekerjaan Pengurugan Kembali 1 M3 Galian Tanah


SATUAN : M3
HARGA SATUAN PEKERJAAN : 59,512.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jumlah Upah Jumlah Bahan Jumlah Alat
& Alat

A TENAGA

0.5000 Pekerja (L01) OH 90,000.00 45,000.00

0.0500 Mandor (L03) OH 135,000.00 6,750.00

B BAHAN

C ALAT

JUMLAH 51,750.00 - - 51,750.00

OVERHEAD DAN PROFIT 15% x Jumlah 7,762.50

JUMLAH TOTAL 59,512.50


PEKERJAAN GALIAN TANAH

JENIS PEKERJAAN : Pekerjaan Galian Tanah Biasa Sedalam 1 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 81,506.25

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.7500 Pekerja (L01) OH 90,000.00 67,500.00
0.0250 Mandor (L03) OH 135,000.00 3,375.00

B BAHAN

C ALAT

JUMLAH 70,875.00 - - 70,875.00


OVERHEAD DAN PROFIT 15% x Jumlah 10,631.25
JUMLAH TOTAL 81,506.25

JENIS PEKERJAAN : Pekerjaan Galian Tanah Biasa Sedalam 2 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 100,136.25

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.9000 Pekerja (L01) OH 90,000.00 81,000.00
0.0450 Mandor (L03) OH 135,000.00 6,075.00

B BAHAN

C ALAT

JUMLAH 87,075.00 - - 87,075.00


OVERHEAD DAN PROFIT 15% x Jumlah 13,061.25
JUMLAH TOTAL 100,136.25

JENIS PEKERJAAN : Pekerjaan Galian Tanah Biasa Sedalam 3 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 119,076.75

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.0500 Pekerja (L01) OH 90,000.00 94,500.00
0.0670 Mandor (L03) OH 135,000.00 9,045.00

B BAHAN

C ALAT

JUMLAH 103,545.00 - - 103,545.00


OVERHEAD DAN PROFIT 15% x Jumlah 15,531.75
JUMLAH TOTAL 119,076.75

JENIS PEKERJAAN : Pekerjaan Galian Tanah Keras Sedalam 1 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 108,468.00

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.0000 Pekerja (L01) OH 90,000.00 90,000.00
0.0320 Mandor (L03) OH 135,000.00 4,320.00

B BAHAN

C ALAT

JUMLAH 94,320.00 - - 94,320.00


OVERHEAD DAN PROFIT 15% x Jumlah 14,148.00
JUMLAH TOTAL 108,468.00

JENIS PEKERJAAN : Pekerjaan Galian Tanah Cadas Sedalam 1 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 164,565.00

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.5000 Pekerja (L01) OH 90,000.00 135,000.00
0.0600 Mandor (L03) OH 135,000.00 8,100.00

B BAHAN

C ALAT

JUMLAH 143,100.00 - - 143,100.00


OVERHEAD DAN PROFIT 15% x Jumlah 21,465.00
JUMLAH TOTAL 164,565.00

JENIS PEKERJAAN : Pekerjaan Galian Tanah Lumpur Sedalam 1 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 131,186.25

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.2000 Pekerja (L01) OH 90,000.00 108,000.00
0.0450 Mandor (L03) OH 135,000.00 6,075.00

B BAHAN

C ALAT

JUMLAH 114,075.00 - - 114,075.00


OVERHEAD DAN PROFIT 15% x Jumlah 17,111.25
JUMLAH TOTAL 131,186.25

JENIS PEKERJAAN : Pekerjaan Stripping Tanah Tebing Setinggi 1 m


SATUAN : M2
HARGA SATUAN PEKERJAAN : 5,951.25

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0500 Pekerja (L01) OH 90,000.00 4,500.00
0.0050 Mandor (L03) OH 135,000.00 675.00

B BAHAN

C ALAT

JUMLAH 5,175.00 - - 5,175.00


OVERHEAD DAN PROFIT 15% x Jumlah 776.25
JUMLAH TOTAL 5,951.25

JENIS PEKERJAAN : Pekerjaan Pembuangan Tanah Sejauh 30 m


SATUAN : M3
HARGA SATUAN PEKERJAAN : 35,707.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.3300 Pekerja (L01) OH 90,000.00 29,700.00
0.0100 Mandor (L03) OH 135,000.00 1,350.00

B BAHAN

C ALAT

JUMLAH 31,050.00 - - 31,050.00


OVERHEAD DAN PROFIT 15% x Jumlah 4,657.50
JUMLAH TOTAL 35,707.50

JENIS PEKERJAAN : Pekerjaan Pengurugan Kembali Galian Tanah


SATUAN : M3
HARGA SATUAN PEKERJAAN : 59,512.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.5000 Pekerja (L01) OH 90,000.00 45,000.00
0.0500 Mandor (L03) OH 135,000.00 6,750.00

B BAHAN

C ALAT

JUMLAH 51,750.00 - - 51,750.00


OVERHEAD DAN PROFIT 15% x Jumlah 7,762.50
JUMLAH TOTAL 59,512.50

JENIS PEKERJAAN : Pekerjaan Pemadatan Tanah (per 20 cm)


SATUAN : M3
HARGA SATUAN PEKERJAAN : 59,512.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.5000 Pekerja (L01) OH 90,000.00 45,000.00
0.0500 Mandor (L03) OH 135,000.00 6,750.00

B BAHAN

C ALAT

JUMLAH 51,750.00 - - 51,750.00


OVERHEAD DAN PROFIT 15% x Jumlah 7,762.50
JUMLAH TOTAL 59,512.50

JENIS PEKERJAAN : Pekerjaan Pengurugan dengan Pasir Urug


SATUAN : M3
HARGA SATUAN PEKERJAAN : 363,112.50

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.5000 Pekerja (L01) OH 90,000.00 45,000.00
0.0500 Mandor (L03) OH 135,000.00 6,750.00

B BAHAN
1.2000 Pasir Urug (M01d) M3 220,000.00 264,000.00

C ALAT

JUMLAH 51,750.00 264,000.00 - 315,750.00


OVERHEAD DAN PROFIT 15% x Jumlah 47,362.50
JUMLAH TOTAL 363,112.50
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Jembatan kayu


SATUAN : M'
HARGA SATUAN PEKERJAAN : 15,419,068.57

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
66.0000 Pekerja (L01) Jam 12,857.14 848,571.43
66.0000 Tukang (L02) Jam 18,571.43 1,225,714.29
42.0000 Mandor (L03) Jam 19,285.71 810,000.00

B BAHAN
1.6920 Kayu Balokan 30/30 (M115a) M3 5,200,000.00 8,798,400.00
0.2700 papan lantai kayu 6/20 (M115b) M3 5,200,000.00 1,404,000.00
0.0240 Kayu Balokan 8/15 (M115c) M3 5,200,000.00 124,800.00
0.0140 kayu balokan 5/7 (M115d) M3 5,200,000.00 72,800.00
4.0500 Paku penjepit (M116) Kg 25,000.00 101,250.00
0.4000 Paku (M08) Kg 17,500.00 7,000.00
C ALAT
3.0700 Alat Bantu (E56) jam 5,000.00 15,350.00

JUMLAH 2,884,285.71 10,508,250.00 15,350.00 13,407,885.71


OVERHEAD DAN PROFIT 15% x Jumlah 2,011,182.86
JUMLAH TOTAL 15,419,068.57

JENIS PEKERJAAN : Pekerjaan 1M3 Beton Mutu Sedang fc' =20 Mpa (K-250)
SATUAN : M3
HARGA SATUAN PEKERJAAN : 2,157,919.24

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.8032 Pekerja (L01) Jam 12,857.14 10,327.02
1.1044 Tukang (L02) Jam 18,571.43 20,510.61
0.1004 Mandor (L03) Jam 19,285.71 1,936.32

B BAHAN
422.3000 Semen (M12) Kg 1,200.00 506,760.00
0.5412 Pasir Beton (M01a) M3 380,000.00 205,638.46
0.7440 Agregat Kasar (M03) M3 340,000.00 252,960.00
0.2000 Kayu Perancah (M19) M3 3,000,000.00 600,000.00
1.6000 Paku (M18) Kg 17,500.00 28,000.00

C ALAT
0.1004 Con. Pan. Mixer (E43) Jam 650,682.47 65,329.57
0.2414 Truck Mixer (E49) Jam 699,635.00 168,925.27
0.0382 Water Tanker (E23) Jam 290,000.00 11,064.26
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 32,773.95 1,593,358.46 250,319.10 1,876,451.51


OVERHEAD DAN PROFIT 15% x Jumlah 281,467.73
JUMLAH TOTAL 2,157,919.24

JENIS PEKERJAAN : Pekerjaan Baja Tulangan


SATUAN : Kg
HARGA SATUAN PEKERJAAN : 18,353.43

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.1015 Pekerja (L01) Jam 12,857.14 1,305.00
0.0350 Tukang (L02) Jam 18,571.43 650.00
0.0350 Mandor (L03) Jam 19,285.71 675.00

B BAHAN
1.1000 Besi Beton (M13) Kg 12,000.00 13,200.00
0.0025 Kawat Beton (M14) Kg 21,000.00 52.50

C ALAT
1.0000 Alat Bantu (E56) Ls 77.00 77.00

JUMLAH 2,630.00 13,252.50 77.00 15,959.50


OVERHEAD DAN PROFIT 15% x Jumlah 2,393.93
JUMLAH TOTAL 18,353.43

JENIS PEKERJAAN : Pekerjaan 1M3 Pasangan Batu dengan Mortar


SATUAN : M3
HARGA SATUAN PEKERJAAN : 961,799.72

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
4.0161 Pekerja (L01) Jam 12,857.14 51,635.11
1.2048 Tukang Batu (L02) Jam 18,571.43 22,375.22
0.4016 Mandor (L03) Jam 19,285.71 7,745.27

B BAHAN
1.0800 Batu (M02) M3 320,000.00 345,600.00
161.00 Semen (PC) (M12) kg 1,200.00 193,200.00
0.4829 Pasir Pasang (M01b) M3 370,000.00 178,663.47

C ALAT
0.4016 Conc. Mixer (E06) Jam 80,000.00 32,128.51
1.0000 Alat Bantu (E56) Ls 5,000.00 5,000.00

JUMLAH 81,755.59 717,463.47 37,128.51 836,347.58


OVERHEAD DAN PROFIT 15% x Jumlah 125,452.14
JUMLAH TOTAL 961,799.72

JENIS PEKERJAAN : Pekerjaan 1 M Ralling Galvanis


SATUAN : M'
HARGA SATUAN PEKERJAAN : 1,247,211.44

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
2.1000 Pekerja (L01) Jam 12,857.14 27,000.00
4.9000 Tukang Besi (L02) Jam 18,571.43 91,000.00
0.7000 Kepala Tukang (L10) Jam 23,269.31 16,288.51
0.7000 Mandor (L03) Jam 19,285.71 13,500.00

B BAHAN
5.5126 Pipa galvanis dia 1.5" (M24a) m' 75,000.00 413,442.66
3.16 Pipa galvanis dia 2,5" (M24b) m' 125,333.33 395,547.40

C ALAT
1.0000 Alat Las (E55) Jam 126,753.11 126,753.11
1.0000 Alat Bantu (E56) Ls 1,000.00 1,000.00

JUMLAH 147,788.51 808,990.06 127,753.11 1,084,531.69


OVERHEAD DAN PROFIT 15% x Jumlah 162,679.75
JUMLAH TOTAL 1,247,211.44
ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN : Pekerjaan Pemasangan Angker Mur Diameter 1 inchi


SATUAN : Kg
HARGA SATUAN PEKERJAAN : 24,148.46

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2625 Pekerja (L01) Jam 13,659.68 3,585.67
0.1750 Tukang (L02) Jam 19,479.60 3,408.93
0.0875 Mandor (L03) Jam 23,269.31 2,036.06

B BAHAN
1.1000 Besi Angkur & Mur (M117) Kg 10,780.00 11,858.00

C ALAT
1.0000 Alat Bantu (E56) Ls 110.00 110.00

JUMLAH 9,030.66 11,858.00 110.00 20,998.66


OVERHEAD DAN PROFIT 15% x Jumlah 3,149.80
JUMLAH TOTAL 24,148.46

JENIS PEKERJAAN : Pekerjaan Pemasangan Besi Plat


SATUAN : Kg
HARGA SATUAN PEKERJAAN : 28,841.61

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2625 Pekerja (L01) Jam 13,659.68 3,585.67
0.1750 Tukang (L02) Jam 19,479.60 3,408.93
0.0875 Mandor (L03) Jam 23,269.31 2,036.06

B BAHAN
1.1000 Baja Plat (M118) Kg 14,520.00 15,972.00

C ALAT
1.0000 Alat Bantu (E56) Ls 77.00 77.00

JUMLAH 9,030.66 15,972.00 77.00 25,079.66


OVERHEAD DAN PROFIT 15% x Jumlah 3,761.95
JUMLAH TOTAL 28,841.61

JENIS PEKERJAAN : Pekerjaan Pemasangan Tiang Pilon Diameter 5 inchi


SATUAN : Kg
HARGA SATUAN PEKERJAAN : 48,696.78

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.3733 Pekerja (L01) Jam 13,659.68 5,099.16
0.1867 Tukang (L02) Jam 19,479.60 3,636.84
0.0933 Mandor (L03) Jam 23,269.31 2,171.03

B BAHAN
1.1000 Pipa Baja (M52) Kg 28,500.00 31,350.00

C ALAT
1.0000 Alat Bantu (E56) Ls 88.00 88.00

JUMLAH 10,907.03 31,350.00 88.00 42,345.03


OVERHEAD DAN PROFIT 15% x Jumlah 6,351.75
JUMLAH TOTAL 48,696.78

JENIS PEKERJAAN : Pekerjaan Pemasangan Besi Pengaku Pilon


SATUAN : Kg
HARGA SATUAN PEKERJAAN : 30,030.71

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.2625 Pekerja (L01) Jam 13,659.68 3,585.67
0.1750 Tukang (L02) Jam 19,479.60 3,408.93
0.0875 Mandor (L03) Jam 23,269.31 2,036.06

B BAHAN
1.1000 Baja Siku 50.50.5 (M119) Kg 15,400.00 16,940.00

C ALAT
1.0000 Alat Bantu (E56) Ls 143.00 143.00

JUMLAH 9,030.66 16,940.00 143.00 26,113.66


OVERHEAD DAN PROFIT 15% x Jumlah 3,917.05
JUMLAH TOTAL 30,030.71

JENIS PEKERJAAN : Pekerjaan Blok Angker IWF 150.100.5.5 (Bentang 15 Meter)


SATUAN : Unit
HARGA SATUAN PEKERJAAN : 1,536,682.69

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
14.0000 Pekerja (L01) Jam 13,659.68 191,235.55
7.0000 Tukang (L02) Jam 19,479.60 136,357.17
7.0000 Mandor (L03) Jam 23,269.31 162,885.14

B BAHAN
24.5700 Baja Struktur (M48) Kg 28,500.00 700,245.00
8.8736 Baja Bulat Dia 60 mm (M220) Kg 14,850.00 131,772.96

C ALAT
1.0000 Alat Bantu (E56) Ls 13,750.00 13,750.00

JUMLAH 490,477.86 832,017.96 13,750.00 1,336,245.82


OVERHEAD DAN PROFIT 15% x Jumlah 200,436.87
JUMLAH TOTAL 1,536,682.69

JENIS PEKERJAAN : Pekerjaan Pemasangan Kabel Utama Baja (Diameter 5/8 inchi)
SATUAN : M'
HARGA SATUAN PEKERJAAN : 45,285.75

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.5600 Pekerja (L01) Jam 13,659.68 7,649.42
0.2800 Tukang (L02) Jam 19,479.60 5,454.29
0.1400 Mandor (L03) Jam 23,269.31 3,257.70

B BAHAN
1.1000 Kabel Baja dia 5/8" (M221) M' 20,625.00 22,687.50

C ALAT
1.0000 Alat Bantu (E56) Ls 330.00 330.00

JUMLAH 16,361.41 22,687.50 330.00 39,378.91


OVERHEAD DAN PROFIT 15% x Jumlah 5,906.84
JUMLAH TOTAL 45,285.75

JENIS PEKERJAAN : Pekerjaan Pemasangan Wartel Mur (Diameter 5/8 inchi)


SATUAN : Unit
HARGA SATUAN PEKERJAAN : 352,901.45
ANALISA HARGA SATUAN PEKERJAAN

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0933 Pekerja (L01) Jam 13,659.68 1,274.45
0.0467 Tukang (L02) Jam 19,479.60 909.70
0.0467 Mandor (L03) Jam 23,269.31 1,086.68

B BAHAN
1.1000 Turn Buckle dia 5/8" (M222) M' 275,000.00 302,500.00

C ALAT
1.0000 Alat Bantu (E56) Ls 1,100.00 1,100.00

JUMLAH 3,270.82 302,500.00 1,100.00 306,870.82


OVERHEAD DAN PROFIT 15% x Jumlah 46,030.62
JUMLAH TOTAL 352,901.45

JENIS PEKERJAAN : Pekerjaan Pemasangan Wartel Mur (Diameter 1/2 inchi)


SATUAN : Unit
HARGA SATUAN PEKERJAAN : 283,326.45

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0933 Pekerja (L01) Jam 13,659.68 1,274.45
0.0467 Tukang (L02) Jam 19,479.60 909.70
0.0467 Mandor (L03) Jam 23,269.31 1,086.68

B BAHAN
1.1000 Turn Buckle dia 1/2" (M222) M' 220,000.00 242,000.00

C ALAT
1.0000 Alat Bantu (E56) Ls 1,100.00 1,100.00

JUMLAH 3,270.82 242,000.00 1,100.00 246,370.82


OVERHEAD DAN PROFIT 15% x Jumlah 36,955.62
JUMLAH TOTAL 283,326.45

JENIS PEKERJAAN : Pekerjaan Pemasangan Klem penggantung


SATUAN : Unit
HARGA SATUAN PEKERJAAN : 59,206.95

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0350 Pekerja (L01) Jam 13,659.68 478.09
0.0350 Tukang (L02) Jam 19,479.60 681.79
0.0350 Mandor (L03) Jam 23,269.31 814.43

B BAHAN
1.1000 Klem Besi 3 mm buah 33,000.00 36,300.00
3.0000 Baut 12 mm buah 4,400.00 13,200.00
C ALAT
1.0000 Alat Bantu (E56) Ls 10.00 10.00

JUMLAH 1,974.30 49,500.00 10.00 51,484.30


OVERHEAD DAN PROFIT 15% x Jumlah 7,722.65
JUMLAH TOTAL 59,206.95

JENIS PEKERJAAN : Pekerjaan Pemasangan besi penggantng diameter 12 mm


SATUAN : Unit
HARGA SATUAN PEKERJAAN : 16,277.30

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.0700 Pekerja (L01) Jam 13,659.68 956.18
0.0700 Tukang (L02) Jam 19,479.60 1,363.57
0.0350 Mandor (L03) Jam 23,269.31 814.43

B BAHAN
1.1000 Baja Tulangan diameter 12 mm kg 10,000.00 11,000.00
C ALAT
1.0000 Alat Bantu (E56) Ls 20.00 20.00

JUMLAH 3,134.18 11,000.00 20.00 14,154.18


OVERHEAD DAN PROFIT 15% x Jumlah 2,123.13
JUMLAH TOTAL 16,277.30

JENIS PEKERJAAN : Pekerjaan Pemasangan Gelagar Melintang Kayu 8/12


SATUAN : m3
HARGA SATUAN PEKERJAAN : 6,977,190.57

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
7.0000 Pekerja (L01) Jam 13,659.68 95,617.77
9.3333 Tukang (L02) Jam 19,479.60 181,809.49
2.3333 Mandor (L03) Jam 23,269.31 54,294.97

B BAHAN
1.1000 Kayu Balok 8/12 m3 5,200,000.00 5,720,000.00
0.8000 Paku 2-5" kg 17,500.00 14,000.00
C ALAT
1.0000 Alat Bantu (E56) Ls 1,400.00 1,400.00

JUMLAH 331,722.24 5,734,000.00 1,400.00 6,067,122.24


OVERHEAD DAN PROFIT 15% x Jumlah 910,068.34
JUMLAH TOTAL 6,977,190.57

JENIS PEKERJAAN : Pekerjaan Pemasangan Gelagar Melintang Kayu 3/30


SATUAN : m3
HARGA SATUAN PEKERJAAN : 291,070.04

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
1.7500 Pekerja (L01) Jam 13,659.68 23,904.44
1.7500 Tukang (L02) Jam 19,479.60 34,089.29
0.8750 Mandor (L03) Jam 23,269.31 20,360.64

B BAHAN
0.0330 Kayu Balok 3/30 m3 5,200,000.00 171,600.00
0.1000 Paku 2-5" kg 17,500.00 1,750.00
C ALAT
1.0000 Alat Bantu (E56) Ls 1,400.00 1,400.00

JUMLAH 78,354.38 173,350.00 1,400.00 253,104.38


OVERHEAD DAN PROFIT 15% x Jumlah 37,965.66
JUMLAH TOTAL 291,070.04

JENIS PEKERJAAN : Pekerjaan Pemancangan Balok Kayu 15/15 cm


SATUAN : m'
HARGA SATUAN PEKERJAAN : 784,210.57

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
7.0000 Pekerja (L01) Jam 13,659.68 95,617.77
9.3333 Tukang (L02) Jam 19,479.60 181,809.49
2.3333 Mandor (L03) Jam 23,269.31 54,294.97

B BAHAN
0.0270 Kayu Balok 15/15 m3 5,200,000.00 140,400.00
0.8000 Paku 2-5" kg 10,500.00 8,400.00
C ALAT
ANALISA HARGA SATUAN PEKERJAAN

1.0000 Alat Bantu (E56) Ls 1,400.00 1,400.00


2.0000 Pile Driver jam 100,000.00 200,000.00
JUMLAH 331,722.24 148,800.00 201,400.00 681,922.24
OVERHEAD DAN PROFIT 15% x Jumlah 102,288.34
JUMLAH TOTAL 784,210.57
JENIS PEKERJAAN : Pekerjaan Pemasangan Bekisting Plat Lantai
SATUAN : m2
HARGA SATUAN PEKERJAAN : 694,716.53

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.6600 Pekerja (L01) OH 90,000.00 59,400.00
0.3300 Tukang Kayu (L02) OH 130,000.00 42,900.00
0.0330 Kepala Tukang OH 162,010.14 5,346.33
0.0330 Mandor (L03) OH 135,000.00 4,455.00

B BAHAN
0.0400 Kayu Kelas III (Terentang) m3 5,400,000.00 216,000.00
0.4000 Paku Biasa 2" - 5" Kg 17,500.00 7,000.00
0.2000 Minyak Bekisting Ltr 10,000.00 2,000.00
0.0150 Balok Kayu Klas II (Borneo) m3 5,400,000.00 81,000.00
0.3500 Plywood tebal 9mm Lbr 120,000.00 42,000.00
6.0000 Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 24,000.00 144,000.00

C ALAT

JUMLAH 112,101.33 492,000.00 - 604,101.33


OVERHEAD DAN PROFIT 15% x Jumlah 90,615.20
JUMLAH TOTAL 694,716.53
JENIS PEKERJAAN : Pekerjaan Pemasangan Bekisting Balok
SATUAN : m2
HARGA SATUAN PEKERJAAN : 602,946.53

Jumlah Upah, Bahan


No Indeks Uraian Satuan Harga Satuan Jmlh Upah Jml Bahan Jml Alat
& Alat

A TENAGA
0.6600 Pekerja (L01) OH 90,000.00 59,400.00
0.3300 Tukang Kayu (L02) OH 130,000.00 42,900.00
0.0330 Kepala Tukang OH 162,010.14 5,346.33
0.0330 Mandor (L03) OH 135,000.00 4,455.00

B BAHAN
0.0400 Kayu Kelas III (Terentang) m3 5,400,000.00 216,000.00
0.4000 Paku Biasa 2" - 5" Kg 17,500.00 7,000.00
0.2000 Minyak Bekisting Ltr 10,000.00 2,000.00
0.0180 Balok Kayu Klas II (Borneo) m3 5,400,000.00 97,200.00
0.3500 Plywood tebal 9mm Lbr 120,000.00 42,000.00
2.0000 Dolken Kayu Galam diameter 8 - 10 cm / 4 m Btg 24,000.00 48,000.00

C ALAT

JUMLAH 112,101.33 412,200.00 - 524,301.33


OVERHEAD DAN PROFIT 15% x Jumlah 78,645.20
JUMLAH TOTAL 602,946.53

Anda mungkin juga menyukai