OF
CCTV FOUNDATION
SAP2000 10/24/19 11:15:27
SAP2000 v14.2.2 - File:pondasi cctv - Axial Force Diagram (COMB2) - Kgf, m, C Units
SAP2000 10/24/19 11:17:36
SAP2000 v14.2.2 - File:pondasi cctv - Moment 3-3 Diagram (COMB2) - Kgf, m, C Units
PENULANGAN KOLOM K1 (30x30)
Lebar Penampang b = 30 cm
Tinggi Penampang ht = 30 cm
M 307,06
eo1 = = = 0,36 = 36,02 cm
P 852,45
1 30
eo2 = ht = = 1 cm
30 30
eo 37,02
= = 1,23403 cm
ht 30
C2 = 7,7 7,7
e1 = C1 C2 ( lk / 100.ht )2 . ht
2
= 1 7,7 ( 110 / 100 30 ) 30
= 0,311 cm
e2 = 0.15 ht = 4,50 cm
eu = eo + e1 + e2
= 37,02 + 0,311 + 4,5 = 41,83 cm
eau = eu + ( 1/2 ht )
= 41,83 + 15,0
= 56,83 cm
m = fc / (0,85 .fy)
= 390 / (0.85 . 22)
= 20,86
2
Rn = M / (φ b d )
= 4.844.597/(0.85.300.275,275)
= 0,251
= 0,00065
Dipasang tulangan 8 d - 19 (A
4 act = D 13 ( Aact = 531 mm2) Ok
Pembesian begel :
Dsengkang D8 - 200 mm
4 D13
D8 - 200
D8
200
300
300
DATA TANAH
Kedalaman fondasi, Df = 1,00 m
Berat volume tanah, γ= 17,60 kN/m3
Sudut gesek dalam, φ= 34,00
Kohesi, c= 0,00 kPa
Tahanan konus rata-rata (hasil pengujian sondir), qc = 95,00 kg/cm2
DIMENSI FONDASI
Lebar fondasi arah x, Bx = 0,90 m
Lebar fondasi arah y, By = 0,90 m
Tebal fondasi, h= 0,25 m
Lebar kolom arah x, bx = 0,30 m
Lebar kolom arah y, by = 0,30 m
Posisi kolom (dalam = 40, tepi = 30, sudut = 20) αs = 40
2
qc = tahanan konus rata-rata hasil sondir pada dasar fondasi ( kg/cm )
B = lebar fondasi (m) B = By = 0,90 m
Df = Kedalaman fondasi (m) Df = 1,00 m
Kd = 1 + 0.33 * Df / B = 1,3666667 > 1.33
diambil, Kd = 1,33
Tahanan konus rata-rata hasil sondir pada dasar fondasi, qc = 95,00 kg/cm2
qa = qc / 33 * [ ( B + 0.3 ) / B ]2 * Kd = 6,807 kg/cm2
2
Kapasitas dukung ijin tanah, qa = 680,67 kN/m
E. PEMBESIAN FOOTPLAT