Anda di halaman 1dari 74

Nama

NPM
No. Absen

Zona Bangkitan
Zona Tarikan
Jumlah Populasi

Rute
R-1
R-2
R-3

Pers
PA =
AB =

QAB =

TQAB =

TQAB(1) =

TQAB(2) =

TQAB(3) =
I Gede Putu Indra Aditya
1615011026
6

A 84%
B 12000
35000

Panjang To LoS Kapasistas


17 25 0.4 3000
20 40 1 2000
14 20 0.25 4000

Persamaan Demand
84% × 35000 = 29400
12000
29400 × 12000 × 0.001
TQAB
352800
TQAB

352800
QAB

Persamaan Supplay
3000 - 0.6 × QAB(1)
25 ×
3000 - QAB(1)

2000 - 0 × QAB(2)
40 ×
2000 - QAB(2)

4000 - 0.75 × QAB(3)


20 ×
4000 - QAB(3)
Jika Rute R-1 Yang Beroperasi, maka
Supplay = Demand
352800 3000 -
= 25 ×
QAB(1) 3000
1058400000 -352800 QAB(1) = 75000 QAB -15 QAB(1)^2
0 = -1058400000 + 427800 QAB(1)
Menentukan Nilai X dengan Persamaan ABC
-427800 ± √( 183012840000 - )
X1,2 =
-30
X1 = 2736.6497927 Memenuhi
X2 = 25783.350207 Tidak Mungkin
TQAB(1) = 128.91675104 Menit

Jika Rute R-2 Yang Beroperasi, maka


Supplay = Demand
352800 2000 -
= 40 ×
QAB(2) 2000
705600000 -352800 QAB(1) = 80000 QAB 0 QAB(1)^2
0 = -705600000 + 432800 QAB(1)
-432800 QAB(1) = -705600000
QAB(1) = 1630.3142329
TQAB(1) = 216.4000 Menit

Jika Rute R-3 Yang Beroperasi, maka


Supplay = Demand
352800 4000 -
= 20 ×
QAB(3) 4000
1411200000 -352800 QAB(1) = 80000 QAB -15 QAB(1)^2
0 = -1411200000 + 432800 QAB(1)
Menentukan Nilai X dengan Persamaan ABC
√( )
-432800 ± 187315840000 -
X1,2 =
-30
X1 = 3747.3075515 Memenuhi
X2 = 25106.025782 Tidak Mungkin
TQAB(1) = 94.147596682 Menit
maka Jika Yang Beroperasi 2 rute
emand
0.6 × QAB(1) TAQB -25
QAB(1) 3000
- QAB(1) TAQB -15

-15 QAB(1)^2 TAQB -40


QAB(2) 2000
TAQB
)
63504000000
TAQB -20
QAB(3) 4000
TAQB -15

maka
emand
0 × QAB(2)
- QAB(2)

0 QAB(1)^2

maka
emand
0.75 × QAB(3)
- QAB(3)

-15 QAB(1)^2
)
84672000000
Jika rute R-1 dan R-2 yang beroperasi, maka :
QAB = QAB(1) + QAB(2)
352800 TAQB -25 TAQB
= 3000 + 2000
TQAB TAQB -15 TAQB

352800 3000 TAQB -75000 2000 TAQB


= +
TQAB TAQB -15 TAQB

352.8 3 TAQB -75 2 TAQB


= +
TQAB TAQB -15 TAQB

432.8 -2 TAQB × TAQB -15 = 3


-2 TQAB^2 462.8 TQAB -6492 = 3
5 TQAB^2 -537.8 TQAB 6492 = 0
Menentukan Nilai X dengan Persamaan ABC
√( )
537.8 ± 289229 -
X1,2 =
10
X1 = 93.703532 Memenuhi
X2 = 13.856468 Tidak Mungkin
TQAB = 93.703532 Menit

Jika rute R-1 dan R-3 yang beroperasi, maka :


QAB = QAB(2) + QAB(3)
352800 TAQB -25 TAQB
= 3000 + 4000
TQAB TAQB -15 TAQB

352800 3000 TAQB -75000 4000 TAQB


= +
TQAB TAQB -15 TAQB

352.8 3 TAQB -75 4 TAQB


= +
TQAB TAQB -15 TAQB

TQAB 7 TQAB -155 = 352.8


7 TQAB^2 -507.8 TQAB 5292 =
-7 TQAB^2 507.8 TQAB -5292 = 0
Menentukan Nilai X dengan Persamaan ABC
√( )
√( )
-507.8 ± 257861 -
X1,2 =
-14
X1 = 12.615213 Tidak Mungkin
X2 = 59.927644 Memenuhi
TQAB = 59.927644 Menit

Jika rute R-3 dan R-2 yang beroperasi, maka :


QAB = QAB(3) + QAB(2)
352800 TAQB -20 TAQB
= 4000 + 2000
TQAB TAQB -15 TAQB

352800 4000 TAQB -80000 2000 TAQB


= +
TQAB TAQB -15 TAQB

352.8 4 TAQB -80 2 TAQB


= +
TQAB TAQB -15 TAQB

432.8 -2 TAQB × TAQB -15 = 4


-2 TQAB^2 462.8 TQAB -6492 = 4
6 TQAB^2 -542.8 TQAB 6492 = 0
Menentukan Nilai X dengan Persamaan ABC
± √( 294632
542.8 - )
X1,2 =
12
X1 = 76.282559 Memenuhi
X2 = 14.184107 Tidak Mungkin
TQAB = 76.282559 Menit
a: Jikas 3 rute yaitu R-1 , R-2 d
QAB = QAB(1) + QAB(2)
-40 352800 TAQB -25
= 3000
TQAB TAQB -15

-80000 352800 3000 TAQB -75000


=
TQAB TAQB -15

-80 352.8 3 TAQB -75


=
TQAB TAQB -15

TQAB^2 -75 TQAB 432.8 -2 TAQB TAQB -15


TQAB^2 -75 TQAB -2 TQAB^2 462.8 TAQB -6492
9 TQAB^2 -617.8 TAQB 6492
Menentukan Nilai X dengan Persamaan ABC
)
129840 617.8
X1,2 =

QAB(1) 2618.823 X1 = 55.692332


QAB(2) 1146.243 X2 = 12.952112
QAB 3765.066 TQAB = 55.692332

a:

-20
-15

-80000
-15

-80
-15

TAQB -5292

)
)
148176

QAB(1) 2332.26
QAB(3) 3554.84
QAB 5887.099

a:

-40

-80000

-80

TQAB^2 -80 TQAB


TQAB^2 -80 TQAB

155808 )

QAB(3) 3673.643
QAB(2) 951.2675
QAB 4624.91
as 3 rute yaitu R-1 , R-2 dan R-3 beroperasi bersamaan
+ QAB(3)
TAQB -40 TAQB -20
+ 2000 + 4000
TAQB TAQB -15

2000 TAQB -80000 4000 TAQB -80000


+ +
TAQB TAQB -15

2 TAQB -80 4 TAQB -80


+ +
TAQB TAQB -15

= TQAB 7 TAQB -155


= 7 TQAB^2 -155 TAQB
= 0

√( )
± 381677 - 233712
18
Memenuhi QAB(1) 2262.7604
Tidak Mungkin QAB(2) 563.53655
Menit QAB(3) 3508.5069
qab 6334.8038
Zona Bangkitan A 95%
Zona Tarikan B 15000
Jumlah Populasi 35000

Rute Panjang To LoS


R-1 17 25 0.4
R-2 20 40 1
R-3 14 20 0.25

95% 35000 15000


QAB =
TQAB

498750
QAB =
TQAB

4500 -0.6
TQAB = 25
4500 -

352800

Jika Yang Beroperasi 2 rute

TAQB -25
QAB(1) 3000
TAQB -15

TAQB -40
QAB(2) 2000
TAQB

TAQB -20
QAB(3) 4000
TAQB -15

Kesimpulan :
1 Pada Perhitungan Metode Matematis dapat ditentukan nilai flow dan flow time secara pasti, sed
pada metode grafis tidak dapat.
2 Pada Perhitungan metode grafis dapat digambarkan kecenderungan (trend) yang diakobatkan ole
perubahan yang terjadi pada demand maupun supply
3 Dari ketiga supply rute yaitu : S1, S2, dan S3, pada grafik tampak bahwa Q3>Q1>Q2 dan Waktu te
TQ3<TQ1<TQ2, sehingga pembangunan supply rute S3, Paling menguntungkan.
4 Apabila terjadi peningkatan pada demand (D+) maka akan terjadi penurunan Waktu Tempuh TQ
5 Peningkatan Supply dapat dilakukan dengan cara
→ Pembangunan jalan baru, dalam grafik : S1+2, S1+3 atau S1+2+3
→ Peningkatan kapasitas jalan, dalam grafik : S+
Penentuan kebijakan untuk peningkatan supply didasarkan pada pertimbangan nilai ekonominya
artinya dengan biaya relatif lebih murah dapat memberikan supply yang relatif lebih besar, aman
Qab Tqab
0 #DIV/0!
100 3528.000
200 1764.000
Kapasistas Kapasitas Awal 300 1176.000
4500 3000 400 882.000
2000 2000 500 705.600
4000 4000 600 588.000
700 504.000
800 441.000
900 392.000
0.001
1000 352.800
1100 320.727
1200 294.000
1300 271.385
1400 252.000
QAB 1500 235.200
QAB 1600 220.500
1700 207.529
1800 196.000
1900 185.684
2000 176.400
2100 168.000
2200 160.364
2300 153.391
2400 147.000
2500 141.120
2600 135.692
2700 130.667
2800 126.000
2900 121.655
3000 117.600
3100 113.806
n: 3200 110.250
ow time secara pasti, sedangkan 3300 106.909
3400 103.765
end) yang diakobatkan oleh setiap 3500 100.800
3600 98.000
Q3>Q1>Q2 dan Waktu tempuh 3700 95.351
ungkan. 3800 92.842
unan Waktu Tempuh TQ 3900 90.462
4000 88.200
4100 86.049
4200 84.000
bangan nilai ekonominya, 4300 82.047
g relatif lebih besar, aman dan nyaman 4400 80.182
4500 78.400
4600 76.696
4700 75.064
4800 73.500
4900 72.000
5000 70.560
5100 69.176
5200 67.846
5300 66.566
5400 65.333
5500 64.145
5600 63.000
5700 61.895
5800 60.828
5900 59.797
6000 58.800
6100 57.836
6200 56.903
6300 56.000
6400 55.125
6500 54.277
6600 53.455
6700 52.657
6800 51.882
6900 51.130
7000 50.400
7100 49.690
7200 49.000
7300 48.329
7400 47.676
7500 47.040
7600 46.421
7700 45.818
7800 45.231
7900 44.658
8000 44.100
8100 43.556
8200 43.024
8300 42.506
8400 42.000
8500 41.506
8600 41.023
8700 40.552
8800 40.091
8900 39.640
9000 39.200
Tqab(+) Tqab(1) Tqab(2) Tqab(3) TQab1(+) Qab(1) Qab(2)
#DIV/0! 25 40 20 25.0000
4987.5000 25.345 42.105 20.128 25.2273
2493.7500 25.714 44.444 20.263 25.4651
1662.5000 26.111 47.059 20.405 25.7143
1246.8750 26.538 50.000 20.556 25.9756
997.5000 27.000 53.333 20.714 26.2500
831.2500 27.500 57.143 20.882 26.5385
712.5000 28.043 61.538 21.061 26.8421
623.4375 28.636 66.667 21.250 27.1622
554.1667 29.286 72.727 21.452 27.5000
498.7500 30.000 80.000 21.667 27.8571
453.4091 30.789 88.889 21.897 28.2353
415.6250 31.667 100.000 22.143 28.6364
383.6538 32.647 114.286 22.407 29.0625
356.2500 33.750 133.333 22.692 29.5161
332.5000 35.000 160.000 23.000 30.0000
311.7188 36.429 200.000 23.333 30.5172
293.3824 38.077 266.667 23.696 31.0714
277.0833 40.000 400.000 24.091 31.6667
262.5000 42.273 800.000 24.524 32.3077
249.3750 45.000 #DIV/0! 25.000 33.0000 0
237.5000 48.333 25.526 33.7500 150
226.7045 52.500 26.111 34.5652 300
216.8478 57.857 26.765 35.4545 450
207.8125 65.000 27.500 36.4286 600
199.5000 75.000 28.333 37.5000 750
191.8269 90.000 29.286 38.6842 900
184.7222 115.000 30.385 40.0000 1050
178.1250 165.000 31.667 41.4706 1200
171.9828 315.000 33.182 43.1250 1350
166.2500 #DIV/0! 35.000 45.0000 1500
160.8871 37.222 47.1429 1650
155.8594 40.000 49.6154 1800 0
151.1364 43.571 52.5000 1950 100
146.6912 48.333 55.9091 2100 200
142.5000 55.000 60.0000 2250 300
138.5417 65.000 65.0000 2400 400
134.7973 81.667 71.2500 2550 500
131.2500 115.000 79.2857 2700 600
127.8846 215.000 90.0000 2850 700
124.6875 #DIV/0! 105.0000 #DIV/0! #DIV/0!
121.6463 127.5000
118.7500 165.0000
115.9884 240.0000
113.3523 465.0000
110.8333 #DIV/0!
108.4239
106.1170
103.9063
101.7857
99.7500
97.7941
95.9135
94.1038
92.3611
90.6818
89.0625
87.5000
85.9914
84.5339
83.1250
81.7623
80.4435
79.1667
77.9297
76.7308
75.5682
74.4403
73.3456
72.2826
71.2500
70.2465
69.2708
68.3219
67.3986
66.5000
65.6250
64.7727
63.9423
63.1329
62.3438
61.5741
60.8232
60.0904
59.3750
58.6765
57.9942
57.3276
56.6761
56.0393
55.4167
Qab(3) Qab(1)+Qab(2) Qab(1)+Qab(3) Qab(2)+Qab(3) Qab(1)+Qab(2)+Qab(3)
0 0 0 0
100 100 100 100
200 200 200 200
300 300 300 300
400 400 400 400
500 500 500 500
600 600 600 600
700 700 700 700
800 800 800 800
900 900 900 900
1000 1000 1000 1000
1100 1100 1100 1100
1200 1200 1200 1200
1300 1300 1300 1300
1400 1400 1400 1400
1500 1500 1500 1500
1600 1600 1600 1600
1700 1700 1700 1700
1800 1800 1800 1800
1900 1900 1900 1900
2000 2000 2000 2000
2100 150 2250 2100 2250
2200 300 2500 2200 2500
2300 450 2750 2300 2750
2400 600 3000 2400 3000
2500 750 3250 2500 3250
2600 900 3500 2600 3500
2700 1050 3750 2700 3750
2800 1200 4000 2800 4000
2900 1350 4250 2900 4250
3000 1500 4500 3000 4500
3100 1650 4750 3100 4750
3200 1800 5000 3200 5000
3300 2050 5250 3400 5350
3400 2300 5500 3600 5700
3500 2550 5750 3800 6050
3600 2800 6000 4000 6400
3700 3050 6250 4200 6750
3800 3300 6500 4400 7100
3900 3550 6750 4600 7450
#DIV/0! #DIV/0! #DIV/0! #REF! #DIV/0!
800

700

600

500
Time Flow (Menit)

400

300

200
200

100

0
0 500 1000 1500 2000
Grafik Hubungan Antara Flow dan Flow Time
1500 2000 2500 3000 3500 4000 4500

FLow (Kend/Jam)
an Flow Time
4000 4500 5000 5500 6000 6500 70

m)
6500 7000
Nama I Gede Putu Indra Aditya
NPM 1615011026
No. Absen 1

Diktehui MAT Sebagai Berikut :


3 4
1 800 400
2 400 800

S 1 ʎ 0.5

Fungsi biaya Ca(Va) Mengikut


AB c = 20 (V^2*10^-4)
AC;DB;EC;DF c = 4 (V^2*10^-4)
CD c = 4 (V^2*10^-4)/4
EF c = 20 (V^2*10^-4)

1
2

3
4

5
6

7
8

9
10

11
12

13
14

15
16

17
18

19
20

21
22
23

24

3 4
1 880 440
2 440 880
Soluton
Tabel MAT Koreksi

3 4
1 880 440
2 440 880

Intitialitation Steps
Set n 1 V
AB c = 20 (V^2*10^-4) = 20
AC;DB;EC;DF c = 4 (V^2*10^-4) = 4
CD c = 4 (V^2*10^-4)/4 = 4
EF c = 20 (V^2*10^-4) = 20

First Steps
Rute V c Konstanta Rumus
AB 0 c = 20 + 0
AC;DB;EC;DF 1320 c = 4 + 174.24
CD 2640 c = 4 + 174.24
EF 0 c = 20 + 0

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 0 880 = 440


ΣAC = ΣDB = ΣEC = ΣDF → 1320 440 = 880
ΣCD → 2640 880 = 1760
ΣEF → 0 880 = 440
Fourth Steps (Back To First)
Rute V c Konstatnta Rumus
ΣAB 440 → 20 + 19.36
ΣAC = ΣDB = ΣEC = ΣDF 880 → 4 + 77.44
ΣCD 1760 → 4 + 77.44
ΣEF 440 → 20 + 19.36

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 440 880 = 660


ΣAC = ΣDB = ΣEC = ΣDF → 880 440 = 660
ΣCD → 1760 880 = 1320
ΣEF → 440 880 = 660

First Steps
Rute V c Konstatnta Rumus
ΣAB 660 → 20 + 43.56
ΣAC = ΣDB = ΣEC = ΣDF 660 → 4 + 43.56
ΣCD 1320 → 4 + 43.56
ΣEF 660 → 20 + 43.56

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 660 880 = 770


ΣAC = ΣDB = ΣEC = ΣDF → 660 440 = 550
ΣCD → 1320 880 = 1100
ΣEF → 660 880 = 770

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 770 → 20 + 59.29
ΣAC = ΣDB = ΣEC = ΣDF 550 → 4 + 30.25
ΣCD 1100 → 4 + 30.25
ΣEF 770 → 20 + 59.29

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 770 880 = 825


ΣAC = ΣDB = ΣEC = ΣDF → 550 440 = 495
ΣCD → 1100 880 = 990
ΣEF → 770 880 = 825

First Steps
Rute V c Konstatnta Rumus
ΣAB 825 → 20 + 68.0625
ΣAC = ΣDB = ΣEC = ΣDF 495 → 4 + 24.5025
ΣCD 990 → 4 + 24.5025
ΣEF 825 → 20 + 68.0625

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5
ΣAB → 825 880 = 852.5
ΣAC = ΣDB = ΣEC = ΣDF → 495 440 = 467.5
ΣCD → 990 880 = 935
ΣEF → 825 880 = 852.5

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 852.5 → 20 + 72.675625
ΣAC = ΣDB = ΣEC = ΣDF 467.5 → 4 + 21.855625
ΣCD 935 → 4 + 21.855625
ΣEF 852.5 → 20 + 72.675625

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 852.5 880 = 866.25


ΣAC = ΣDB = ΣEC = ΣDF → 467.5 440 = 453.75
ΣCD → 935 880 = 907.5
ΣEF → 852.5 880 = 866.25

First Steps
Rute V c Konstatnta Rumus
ΣAB 866.25 → 20 + 75.038906
ΣAC = ΣDB = ΣEC = ΣDF 453.75 → 4 + 20.588906
ΣCD 907.5 → 4 + 20.588906
ΣEF 866.25 → 20 + 75.038906

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5
ΣAB → 866.25 880 = 873.125
ΣAC = ΣDB = ΣEC = ΣDF → 453.75 440 = 446.875
ΣCD → 907.5 880 = 893.75
ΣEF → 866.25 880 = 873.125

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 873.125 → 20 + 76.234727
ΣAC = ΣDB = ΣEC = ΣDF 446.875 → 4 + 19.969727
ΣCD 893.75 → 4 + 19.969727
ΣEF 873.125 → 20 + 76.234727

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 873.125 880 = 876.5625


ΣAC = ΣDB = ΣEC = ΣDF → 446.875 440 = 443.4375
ΣCD → 893.75 880 = 886.875
ΣEF → 873.125 880 = 876.5625

First Steps
Rute V c Konstatnta Rumus
ΣAB 876.5625 → 20 + 76.836182
ΣAC = ΣDB = ΣEC = ΣDF 443.4375 → 4 + 19.663682
ΣCD 886.875 → 4 + 19.663682
ΣEF 876.5625 → 20 + 76.836182

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880
Third Steps
λ 0.5

ΣAB → 876.5625 880 = 878.28125


ΣAC = ΣDB = ΣEC = ΣDF → 443.4375 440 = 441.71875
ΣCD → 886.875 880 = 883.4375
ΣEF → 876.5625 880 = 878.28125

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 878.28125 → 20 + 77.137795
ΣAC = ΣDB = ΣEC = ΣDF 441.71875 → 4 + 19.511545
ΣCD 883.4375 → 4 + 19.511545
ΣEF 878.28125 → 20 + 77.137795

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 878.28125 880 = 879.14063


ΣAC = ΣDB = ΣEC = ΣDF → 441.71875 440 = 440.85938
ΣCD → 883.4375 880 = 881.71875
ΣEF → 878.28125 880 = 879.14063

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.14063 → 20 + 77.288824
ΣAC = ΣDB = ΣEC = ΣDF 440.85938 → 4 + 19.435699
ΣCD 881.71875 → 4 + 19.435699
ΣEF 879.14063 → 20 + 77.288824

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.14063 880 = 879.57031


ΣAC = ΣDB = ΣEC = ΣDF → 440.85938 440 = 440.42969
ΣCD → 881.71875 880 = 880.85938
ΣEF → 879.14063 880 = 879.57031

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.57031 → 20 + 77.364393
ΣAC = ΣDB = ΣEC = ΣDF 440.42969 → 4 + 19.397831
ΣCD 880.85938 → 4 + 19.397831
ΣEF 879.57031 → 20 + 77.364393

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.57031 880 = 879.78516


ΣAC = ΣDB = ΣEC = ΣDF → 440.42969 440 = 440.21484
ΣCD → 880.85938 880 = 880.42969
ΣEF → 879.57031 880 = 879.78516

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.78516 → 20 + 77.402192
ΣAC = ΣDB = ΣEC = ΣDF 440.21484 → 4 + 19.378911
ΣCD 880.42969 → 4 + 19.378911
ΣEF 879.78516 → 20 + 77.402192

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.78516 880 = 879.89258


ΣAC = ΣDB = ΣEC = ΣDF → 440.21484 440 = 440.10742
ΣCD → 880.42969 880 = 880.21484
ΣEF → 879.78516 880 = 879.89258

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.89258 → 20 + 77.421095
ΣAC = ΣDB = ΣEC = ΣDF 440.10742 → 4 + 19.369454
ΣCD 880.21484 → 4 + 19.369454
ΣEF 879.89258 → 20 + 77.421095

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.89258 880 = 879.94629


ΣAC = ΣDB = ΣEC = ΣDF → 440.10742 440 = 440.05371
ΣCD → 880.21484 880 = 880.10742
ΣEF → 879.89258 880 = 879.94629

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.94629 → 20 + 77.430547
ΣAC = ΣDB = ΣEC = ΣDF 440.05371 → 4 + 19.364727
ΣCD 880.10742 → 4 + 19.364727
ΣEF 879.94629 → 20 + 77.430547
Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.94629 880 = 879.97314


ΣAC = ΣDB = ΣEC = ΣDF → 440.05371 440 = 440.02686
ΣCD → 880.10742 880 = 880.05371
ΣEF → 879.94629 880 = 879.97314

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.97314 → 20 + 77.435274
ΣAC = ΣDB = ΣEC = ΣDF 440.02686 → 4 + 19.362363
ΣCD 880.05371 → 4 + 19.362363
ΣEF 879.97314 → 20 + 77.435274

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.97314 880 = 879.98657


ΣAC = ΣDB = ΣEC = ΣDF → 440.02686 440 = 440.01343
ΣCD → 880.05371 880 = 880.02686
ΣEF → 879.97314 880 = 879.98657

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.98657 → 20 + 77.437637
ΣAC = ΣDB = ΣEC = ΣDF 440.01343 → 4 + 19.361182
ΣCD 880.02686 → 4 + 19.361182
ΣEF 879.98657 → 20 + 77.437637

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.98657 880 = 879.99329


ΣAC = ΣDB = ΣEC = ΣDF → 440.01343 440 = 440.00671
ΣCD → 880.02686 880 = 880.01343
ΣEF → 879.98657 880 = 879.99329

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.99329 → 20 + 77.438818
ΣAC = ΣDB = ΣEC = ΣDF 440.00671 → 4 + 19.360591
ΣCD 880.01343 → 4 + 19.360591
ΣEF 879.99329 → 20 + 77.438818

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.99329 880 = 879.99664


ΣAC = ΣDB = ΣEC = ΣDF → 440.00671 440 = 440.00336
ΣCD → 880.01343 880 = 880.00671
ΣEF → 879.99329 880 = 879.99664

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.99664 → 20 + 77.439409
ΣAC = ΣDB = ΣEC = ΣDF 440.00336 → 4 + 19.360295
ΣCD 880.00671 → 4 + 19.360295
ΣEF 879.99664 → 20 + 77.439409

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.99664 880 = 879.99832


ΣAC = ΣDB = ΣEC = ΣDF → 440.00336 440 = 440.00168
ΣCD → 880.00671 880 = 880.00336
ΣEF → 879.99664 880 = 879.99832

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.99832 → 20 + 77.439705
ΣAC = ΣDB = ΣEC = ΣDF 440.00168 → 4 + 19.360148
ΣCD 880.00336 → 4 + 19.360148
ΣEF 879.99832 → 20 + 77.439705

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.99832 880 = 879.99916


ΣAC = ΣDB = ΣEC = ΣDF → 440.00168 440 = 440.00084
ΣCD → 880.00336 880 = 880.00168
ΣEF → 879.99832 880 = 879.99916

First Steps
Rute V c Konstatnta Rumus
ΣAB 879.99916 → 20 + 77.439852
ΣAC = ΣDB = ΣEC = ΣDF 440.00084 → 4 + 19.360074
ΣCD 880.00168 → 4 + 19.360074
ΣEF 879.99916 → 20 + 77.439852

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.99916 880 = 879.99958


ΣAC = ΣDB = ΣEC = ΣDF → 440.00084 440 = 440.00042
ΣCD → 880.00168 880 = 880.00084
ΣEF → 879.99916 880 = 879.99958

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.99958 → 20 + 77.439926
ΣAC = ΣDB = ΣEC = ΣDF 440.00042 → 4 + 19.360037
ΣCD 880.00084 → 4 + 19.360037
ΣEF 879.99958 → 20 + 77.439926

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.99958 880 = 879.99979


ΣAC = ΣDB = ΣEC = ΣDF → 440.00042 440 = 440.00021
ΣCD → 880.00084 880 = 880.00042
ΣEF → 879.99958 880 = 879.99979
First Steps
Rute V c Konstatnta Rumus
ΣAB 879.99979 → 20 + 77.439963
ΣAC = ΣDB = ΣEC = ΣDF 440.00021 → 4 + 19.360018
ΣCD 880.00042 → 4 + 19.360018
ΣEF 879.99979 → 20 + 77.439963

Second Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Third Steps
λ 0.5

ΣAB → 879.99979 880 = 879.9999


ΣAC = ΣDB = ΣEC = ΣDF → 440.00021 440 = 440.0001
ΣCD → 880.00042 880 = 880.00021
ΣEF → 879.99979 880 = 879.9999

Fourth Steps (Back To First)


Rute V c Konstatnta Rumus
ΣAB 879.9999 → 20 + 77.439982
ΣAC = ΣDB = ΣEC = ΣDF 440.0001 → 4 + 19.360009
ΣCD 880.00021 → 4 + 19.360009
ΣEF 879.9999 → 20 + 77.439982

Fiifth Steps
ΣFAB = 880
ΣFAC = ΣFDB = ΣFEC = ΣFDF = 440
ΣFCD = 880
ΣFEF = 880

Sixth Steps
λ 0.5

ΣAB → 879.9999 880 = 879.99995


ΣAC = ΣDB = ΣEC = ΣDF → 440.0001 440 = 440.00005
ΣCD → 880.00021 880 = 880.0001
ΣEF → 879.9999 880 = 879.99995
Kesimpulan
Dari Iterasi yang dilakukan dengan bantuan "Excel" maka dapa
1 Equilibrium yang tercapai pada iterasi ke-24, menghasilkan tot
jaringan adalah sebagai berikut :
CAB =
CAC=CEC=CCD=CDB=CDF =
CEF =
2 Rute akhir terpendek adalah
A-B =
E-F =
ΣAB 0 3 Pembebanan Volume Lalu Lintas yang Terjadi pada masing-ma
ΣAC = ΣDB = ΣEC = ΣDF 1320 VAB =
ΣCD 2640 VAC=VEC=VDB=VDF =
ΣEF 0 VCD =
VEF =
4 Tingkat Konvergensei yang terjadi:
Hasil
20
178.24
178.24
20
Hasil
39.36
81.44
81.44
39.36

Hasil
63.56
47.56
47.56
63.56
Hasil
79.29
34.25
34.25
79.29

Hasil
88.0625
28.5025
28.5025
88.0625
Hasil
92.6756
25.8556
25.8556
92.6756

Hasil
95.0389
24.5889
24.5889
95.0389
Hasil
96.2347
23.9697
23.9697
96.2347

Hasil
96.8362
23.6637
23.6637
96.8362
Hasil
97.1378
23.5115
23.5115
97.1378

Hasil
97.2888
23.4357
23.4357
97.2888
Hasil
97.3644
23.3978
23.3978
97.3644

Hasil
97.4022
23.3789
23.3789
97.4022
Hasil
97.4211
23.3695
23.3695
97.4211

Hasil
97.4305
23.3647
23.3647
97.4305
Hasil
97.4353
23.3624
23.3624
97.4353

Hasil
97.4376
23.3612
23.3612
97.4376

Hasil
97.4388
23.3606
23.3606
97.4388

Hasil
97.4394
23.3603
23.3603
97.4394

Hasil
97.4397
23.3601
23.3601
97.4397
Hasil
97.4399
23.3601
23.3601
97.4399

Hasil
97.4399
23.3600
23.3600
97.4399
Hasil
97.4400
23.3600
23.3600
97.4400

Hasil
97.4400
23.3600
23.3600
97.4400
Kesimpulan
n dengan bantuan "Excel" maka dapat disimpulkan bahwa,
pada iterasi ke-24, menghasilkan total biaya masing-masing
berikut :
97.4400
23.3600
97.4400

97.4400
97.4400
u Lintas yang Terjadi pada masing-masing ruas jaringan adalah
879.99994755
440.00005245
880.0001049
879.99994755
0.0000060%