IPo IPt FR DCBR(%) LET=(LEP+LEA)/2 = 1.805 DDT = 1.69 + 4.313 x Log(DCBR) = 6.345
3.7 2 1 12 LER=LETxur/10 = 3.609 Trial Harga SN =
(Subgrade) W = LERx10x360 = 12993.103
Log (W) = 4.114 Gt =Log((Ipo-Ipt)/(4.2-1.5)) = -0.201
Dari hasil perhitungan didapat : Log(W) = 9.36xLog(SN+1)-0.2+Gt/(0.4+1094/(SN+1) )+Log(1/FR)+0.372x(DDT-3) = Err:522
5.19
Koef.Bahan tebal lap. Indeks Tebal Perkerasan (ITP) LET=(LEP+LEA)/2= 845.834 DDT = 1.69 + 4.313 x Log(DCBR) = 4.287
a h(cm) axh LER=LETxur/10= 845.834
0.44 10 PAVING BLOK 4.4 W = LERx10x360= 3045003.448 Trial Harga SN = 3.954
0.04 5 PASIR 0.2 Log (W)= 6.484 Gt=Log((Ipo-Ipt)/(4.2-1.5)) = -0.201
0.13 24 BATU PECAH 3.12 Log(W) = 9.36xLog(SN+1)-0.2+Gt/(0.4+1094/(SN+1) 5.19)+Log(1/FR)+0.372x(DDT-3)= 6.484
0.11 40 SIRTU 4.4
tebal, Hada= 79.0 ITP ada = 12.12
tebal, Hmin= 20 x (P x (1 + 0.7xLog(W))/DCBR)0.5 STABILISASI SUBGRADE Disain CBR, DCBR (%) = 4
= 74.4 ITP perlu = SN x 2.54 = 10.04 Target CBR setelah stabilisasi CBR1 (%) = 15
DCBR = Rata2 CBR1&3,CBR2 (%) = 7.85
3
IPo IPt FR DCBR(%) (Z-20)xCBR11/3+20xCBR21/3+(100-Z)xCBR31/3 CBR tanah asli,CBR3 (%) = 0.7
3.7 2 1 4 100 Terbal Stabilisasi, Z (cm) = 50.387
hci conbloc
bln sal tot bln sal tot
Rp juta Rp juta Rp juta Rp juta
jan05-juli05 7 4 28 7 8 56
juli05-juli06 12 5.2 62.4 12 8 96
phk-pesangon 14 5.2 72.8 2 8 16
163.2 168