Menentukan Serviceability
MR =
SN Trial
Lapisan Pers. 1 Pers. 2 Pers. 3 Pers. 4
Surface -0.3364 3.9161887839 -0.01586063662 3.832374
Base -0.3364 4.3343216775 -0.02585600103 3.423843
SubBase -0.3364 6.2539264298 -0.1407210533 1.618532
Subgrade
Sub-base course
Sub-grade
Tanah dasar
HTO 1993 Untuk Hasil Tass MAT
DD DL W18' GF 18ESAL
c d a x b x 365 e c x d x W18' x e
0.45 0.5 1087.7383378 48.919849 11972.69899265
0.45 0.5 385595.94378 48.919849 4244241.475278
0.45 0.5 122049.03529 48.919849 1343389.592051
0.45 0.5 2385500.3696 48.919849 26257121.66056
0.45 0.5 985406.57355 48.919849 10846336.73379
0.45 0.5 1831640.4618 48.919849 20160804.44102
Total 18ESAL 62,863,866.60
LOG(10)18ESAL 7.798401089888
Digunakan :
= 80
= 0.4
= -0.841
15000
Digunakan :
Surface (LASTON) :
a1 = 0.44
MS = 1000 kg
1.2
Total Sebelah
ZR So ∆PSI SN Trial
kanan
-0.841 0.4 2 1.75 7.40 OK
-0.841 0.4 2 2.05 7.40 OK
-0.841 0.4 2 3.89 7.40 OK
- - - - -
7.70
0.948438327924
1.054421008918
OK 1.054502450275
OK
OK
CBR MR
10% 15000
14
LOG(10)18ESAL LOG(10)18ESAL Keterangan
Lapisan SN
(acuan) (hasil trial) (≥ acuan)
Surface 7.80 7.40 Sesuai 1.75
Base 7.80 7.40 Sesuai 2.05
SubBase 7.80 7.40 Sesuai 3.89
subGrade 7.80 - - -
SN
< 3,00
3,00 -6,70 3,00 - 6,70
6,71 - 7,49 6,71 - 7,49
7,50 - 9,99 7,50 - 9,99
> 10,00 > 10,00
Tebal Minimum
SN Bahan
(Cm)
< 3,00 15 Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
20 Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
3,00 - 7,49
10 LASTON ATAS
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
20
7,49 - 9,99 Pndasi Macadam
15 LASTON ATAS
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
10,00 - 12,24 20
Pndasi Macadam, Lapen, Laston Atas
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
> 12,25 25
Pndasi Macadam, Lapen, Laston Atas
Batu Pecah, Stabilitas Tanah Dengan Semen, Stabilitas Tanah Dengan Ka
> 12,25 25
Pndasi Macadam, Lapen, Laston Atas
1,49
2,76
= 20 Cm
Digunakan :
Surface (LASTO
Base (Batu Pec
SubBase (Sirtu
SubGrade : CBR
tabilitas Tanah Dengan Kapur
tabilitas Tanah Dengan Kapur
1,21 = 8 Cm
= 15 Cm
20 Cm
Digunakan :
Surface (LASTON) : a1 = 0.4
Base (Batu Pecah Kelas B) : a2 = 0.13, CBR = 80%, Mr = 120000
SubBase (Sirtu Kelas B) : a3 = 0.12, CBR = 50%, Mr = 75000
SubGrade : CBR = 10 %, Mr = 1500
= 8 Cm
= 15 Cm
120000
00