RENCANA ANGGARAN BIAYA

PROGRAM
KEGIATAN
SUB.KEGIATAN
PEKERJAAN
LOKASI
PERUSAHAAN
BIAYA TOTAL
NO Volume
(Rp.) ( Rp.)

A BIAYA
A.1 LAPORAN PENDAHULUAN 1 7,375,000.00 7,375,000.00
A.2 LAPORAN KEGIATAN 1 80,575,000.00 80,575,000.00
JUMLAH A 87,950,000.00 87,950,000.00

JUMLAH (A) + (B) 87,950,000.00 87,950,000.00


PPN 11% 9,674,500.00 9,674,500.00
JUMLAH TOTAL 97,624,500.00 97,624,500.00

Terbilang : # Sembilan Puluh Tujuh Juta Enam Ratus Dua Puluh Empat Ribu Lima Ratus Rupiah #

Malang, 22 Maret 2022


PT. DATA TERRA SURVAITAMA

FANITA CAHYANING ARIE, ST, MT


Direktur

-
PEKERJAAN

LOKASI

II. BIAYA LANGSUNG NON PERSONIL

Harga Satuan Jumlah


No. Uraian
(Rp) (Rp)

1. Biaya Laporan Pendahuluan


Survey Data 975,000.00 975,000.00
Komunikasi 975,000.00 975,000.00
ATK / Bahan Habis Pakai 1,975,000.00 1,975,000.00
Biaya Koordinasi 1,975,000.00 1,975,000.00
Laporan Pendahuluan 1,475,000.00 1,475,000.00

TOTAL I 7,375,000.00 7,375,000.00


2. Biaya Laporan Akhir
Komunikasi 975,000.00 975,000.00
ATK / Bahan Habis Pakai 1,975,000.00 1,975,000.00
Biaya Koordinasi 1,975,000.00 1,975,000.00
Laporan Akhir 1,975,000.00 1,975,000.00
Executive summary 975,000.00 975,000.00
Box container 325,000.00 325,000.00
SSD Eksternal 2,475,000.00 2,475,000.00
Biaya Personil 69,900,000.00 69,900,000.00

TOTAL II 80,575,000.00 80,575,000.00


TOTAL 87,950,000.00
PEKERJAAN

LOKASI

A PERHITUNGAN BIAYA PERSONIL ( BILLING RATE )


A.1 TENAGA AHLI
NO JABATAN JUMLAH MAN HARGA SATUAN TOTAL
PERSONIL MONTH ORANG / BULAN DxExF
A B D E F G

A TENAGA AHLI
1 Team Leader (T. Planologi/PWK) 1 1.50 20,000,000.00 30,000,000.00
B ASISTEN TENAGA AHLI
1 Asisten Tenaga Ahli (T. Planologi/PWK) 1 1.50 18,000,000.00 27,000,000.00
JUMLAH A.1 57,000,000.00

A.2 TENAGA PENDUKUNG


NO JABATAN JUMLAH MAN HARGA SATUAN TOTAL
PERSONIL MONTH ORANG / BULAN DXEXF
C. TENAGA PENDUKUNG
1 Administrasi 1 1.00 6,950,000.00 6,950,000.00
2 Drafter 1 1.00 5,950,000.00 5,950,000.00
12,900,000.00
PENDAYAGUNAAN PERSONIL (MAN / MONTH)

N0 JENIS PEKERJAAN BULAN I BULAN 2 BULAN 3


TOTAL MONTH
1 2 3 4 1 2 3 4 1 2 3 4
1 2 3 4 5 6 7

A TENAGA AHLI
1 Team Leader (T. Planologi/PWK) 46 40 46 40 46 40 258 1.50
B ASISTEN TENAGA AHLI
1 Asisten Tenaga Ahli (T. Planologi/PWK) 23 20 20 23 20 23 20 20 23 23 20 23 258 1.50

C TENAGA PENDUKUNG
1 Administrasi 23 20 23 20 23 20 23 20 172 1.00
2 Drafter 23 20 20 23 23 23 20 20 172 1.00

KETERANGAN
ASUMSI
JUMLAH JAM PER BULAN
4 MINGGU X 5 HARI X 8 JAM = 160 JAM (SENIN- JUMAT)
2 MINGGU X 1 HARI X 6 JAM = 12 JAM (SABTU)
172
TOTAL JAM PER BULAN = 172 JAM
MAN/MONTH = JUMLAH JAM KERJA/172 JAM

258