PROGRAM
KEGIATAN
SUB.KEGIATAN
PEKERJAAN
LOKASI
PERUSAHAAN
BIAYA TOTAL
NO Volume
(Rp.) ( Rp.)
A BIAYA
A.1 LAPORAN PENDAHULUAN 1 7,375,000.00 7,375,000.00
A.2 LAPORAN KEGIATAN 1 80,575,000.00 80,575,000.00
JUMLAH A 87,950,000.00 87,950,000.00
Terbilang : # Sembilan Puluh Tujuh Juta Enam Ratus Dua Puluh Empat Ribu Lima Ratus Rupiah #
-
PEKERJAAN
LOKASI
LOKASI
A TENAGA AHLI
1 Team Leader (T. Planologi/PWK) 1 1.50 20,000,000.00 30,000,000.00
B ASISTEN TENAGA AHLI
1 Asisten Tenaga Ahli (T. Planologi/PWK) 1 1.50 18,000,000.00 27,000,000.00
JUMLAH A.1 57,000,000.00
A TENAGA AHLI
1 Team Leader (T. Planologi/PWK) 46 40 46 40 46 40 258 1.50
B ASISTEN TENAGA AHLI
1 Asisten Tenaga Ahli (T. Planologi/PWK) 23 20 20 23 20 23 20 20 23 23 20 23 258 1.50
C TENAGA PENDUKUNG
1 Administrasi 23 20 23 20 23 20 23 20 172 1.00
2 Drafter 23 20 20 23 23 23 20 20 172 1.00
KETERANGAN
ASUMSI
JUMLAH JAM PER BULAN
4 MINGGU X 5 HARI X 8 JAM = 160 JAM (SENIN- JUMAT)
2 MINGGU X 1 HARI X 6 JAM = 12 JAM (SABTU)
172
TOTAL JAM PER BULAN = 172 JAM
MAN/MONTH = JUMLAH JAM KERJA/172 JAM
258