1 2 3 4.00
A PEKERJAAN GEDUNG
I PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi & Uitset Ls 1.00
II PEKERJAAN TANAH
1 Galian tanah Pondasi M3 79.32
2 Galian Tanah Halaman M3 40.50
IV PEKERJAAN BETON
1 Beton rabat lantai T : 5 cm M3 0.74
2 Lantai Kerja T : 5 cm M3 6.90
3 Beton telapak 0.80x0.80x0.20
- Mengecor K 225 M3 3.07
- Pembesian Kg 382.20
4 Beton sloof 20/25
- Mengecor K 225 M3 6.75
- Pembesian Kg 810.00
- Bekisting M2 124.74
5 Beton sloof 15/20
- Mengecor K 225 M3 0.72
- Pembesian Kg 86.40
- Bekisting M2 13.31
6 Beton kolom 25/35
- Mengecor K 225 M3 14.16
- Pembesian Kg 1,770.00
- Bekisting M2 155.76
7 Beton kolom 25/25
- Mengecor K 225 M3 2.83
- Pembesian Kg 353.73
- Bekisting M2 31.13
8 Beton kolom 12/12
- Mengecor K225 M3 4.16
- Pembesian Kg 528.32
- Bekisting M2 102.75
9 Beton balok 20/35
- Mengecor K225 M3 4.41
- Pembesian Kg 608.58
- Bekisting M2 29.99
10 Beton balok 20/30
- Mengecor K225 M3 4.32
- Pembesian Kg 596.16
- Bekisting M2 29.38
11 Beton balok 15/20
- Mengecor M3 0.39
- Pembesian Kg 53.82
- Bekisting M2 2.65
12 Beton balok Latey 12/12
- Mengecor M3 1.96
- Pembesian Kg 270.48
- Bekisting M2 8.15
13 Beton ring balok 15/20
- Mengecor M3 4.08
- Pembesian Kg 562.80
- Bekisting M2 54.39
14 Beton plat lantai t = 12 cm
- Mengecor M3 28.44
- Pembesian Kg 3,608.47
- Bekisting M2 218.70
15 Beton Talang T : 8 cm
- Mengecor M3 1.12
- Pembesian Kg 151.20
- Bekisting M2 6.97
16 Beton plat kanopi T : 10 cm
- Mengecor M3 1.45
- Pembesian Kg 195.75
- Bekisting M2 9.02
17 Beton plat kanopi T : 10 cm
- Mengecor M3 1.15
- Pembesian Kg 155.25
- Bekisting M2 7.15
18 Pondasi Tangga 1x1.2x0.2
- Mengecor M3 0.24
- Pembesian Kg 31.20
19 Beton tumpuan Tangga 0.2x1.2x1.5
- Mengecor M3 0.36
- Pembesian Kg 45.00
- Bekisting M2 3.96
20 Beton Plat Tangga T : 12 cm
- Mengecor M3 0.36
- Pembesian Kg 45.00
- Bekisting M2 3.96
21 Beton Balok15/25 Penyangga Bordes Tangga
- Mengecor M3 3.37
- Pembesian Kg 455.02
- Bekisting M2 22.40
V PEKERJAAN DINDING
1 Pasang bata Merah 1 : 6 M2 706.96
VI PEKERJAAN PLESTERAN
1 Plesteran dinding 1 : 4 M2 1,212.08
2 Benangan / Acian M2 450.00
X PEKERJAAN ATAP
1 Rangka Atap baja ringan (Galvalum) M2 289.00
2 Pasang Genteng Mantili ex Trenggalek M2 377.00
3 Pasang Genteng Bubungan Mantili ex Trenggalek M' 56.00
4 Mahkota ( Marmer ) Bh 3.00
5 Woodplank 1x30 cm M' 83.00
6 Rangka plapon Holo + Gypsum M2 313.00
7 Talang seng L : 90 cm M' 32.00
8 Seng Gelombang (kamar mandi) M2 18.00
II PEKERJAAN PONDASI
1 Pasangan Batu kali 1 : 4 M3 34.02
IV PEKERJAAN BETON
1 Sloof 15/20
Cor Beton M3 4.02
Pembesian KG 440.08
Begisting M2 43.40
2 Kolom 12/12
Cor Beton M3 0.64
Pembesian KG 90.00
Begisting M2 10.08
JUMLAH TOTAL
PPN 10%
JUMLAH TOTAL
DIBULATKAN
Terbilang : Satu Milyar Tujuh Juta Empat Ratus Tujuh Puluh Ribu Rupiah
RAN BIAYA ( R A B )
EMBANGUNAN GEDUNGBALAI
MBANGUNAN GEDUNG BALAINIKAH
NIKAHKUA. KEC. GARUM (SBSN)
- 2,472,975.00 2,472,975.00
JUMLAH 2,472,975.00
Ls 89,205.00 26,244,111.00
Ls 89,205.00 24,665,182.50
SNI XII.15.6.17 104,895.69 8,687,461.05
Hrga Bahan 1,100,000.00 4,400,000.00
Ls 450,000.00 5,220,000.00
Ls 450,000.00 10,800,000.00
Ls 700,000.00 10,472,000.00
Ls 110,000.00 1,870,000.00
Ls 4,500,000.00 27,720,000.00
Ls 36,000.00 1,728,000.00
JUMLAH 121,806,754.55
SNI XII.3.6.5 36,724.29 1,175,177.28
SNI XII.4.6.6 19,944.36 957,329.28
Harga Bahan 20,658.00 330,528.00
Harga Bahan 20,658.00 495,792.00
SNI XII.5.6.7 25,540.80 1,225,958.40
SNI XII.9.6.11 143,648.22 2,298,371.52
JUMLAH 6,483,156.48
OL 1 53,100.00 7,593,300.00
SNI V.6.4 35,260.00 10,084,360.00
Ls 74,000.00 1,065,600.00
SNI XIV.6.6.14 14,625.86 4,182,997.10
Ls 450,000.00 1,800,000.00
Ls 450,000.00 3,600,000.00
Ls 180,000.00 1,440,000.00
Ls 1,750,000.00 1,750,000.00
OL 9 101,440.00 12,984,320.00
JUMLAH 44,500,577.10
L 915,882,102.22
91,588,210.22
L 1,007,470,312.44
1,007,470,000.00
1 2
A PEKERJAAN GEDUNG
I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH
III PEKERJAAN PONDASI
IV PEKERJAAN BETON
V PEKERJAAN DINDING
VI PEKERJAAN PLESTERAN
VII PEKERJAAN KUSEN PINTU & JENDELA
VIII PEKERJAAN KUNCI ALAT PENGGANTUNG & KACA
IX PEKERJAAN PENUTUP LANTAI DAN DINDING
X PEKERJAAN ATAP
XI PEKERJAAN INSTALASI AIR
XII PEKERJAAN INSTALASI LISTRIK
XIII PEKERJAAN PENGECATAN
B PEKERJAAN PAGAR
I PEKERJAAN TANAH
II PEKERJAAN PONDASI
III PEKERJAAN PASANGAN
IV PEKERJAAN BETON
JUMLAH
PPN 10%
JUMLAH TOTAL
JUMLAH TOTAL DIBULATKAN
Terbilang : Satu Milyar Tujuh Juta Empat Ratus Tujuh Puluh Ribu Rupiah
JUMLAH Rp.
2,472,975.00
5,257,102.50
19,634,499.86
293,011,191.22
57,539,474.40
51,737,940.80
121,806,754.55
6,483,156.48
59,580,864.16
117,990,398.40
51,486,085.66
10,975,886.50
22,850,991.93
2,459,148.34
19,439,995.87
44,500,577.10
28,655,059.45
915,882,102.22
91,588,210.22
1,007,470,312.44
1,007,470,000.00
BOBOT
NO JENIS PEKERJAAN 1 2
%
B PEKERJAAN PAGAR
Jumlah Bobot Pekerjaan 100.00 0.73 1.43 3.31 9.31 8.60 6.19
Rencana Kemajuan Fisik Pekerjaan 0 0.73 2.16 5.47 14.78 23.38 29.57
TIME SCHEDULE
2 3 4
0.71
5.61 5.61 6.66 7.03 2.46 6.18 6.18 6.18 3.32 5.02 4.32 4.32
35.18 40.80 47.46 54.49 56.95 63.13 69.31 75.50 78.82 83.84 88.16 92.48
M. NASRON WALUYO
Direktur
5 SKALA
100%
1 Maret 2017
uat Oleh
tor Pelaksana
NAR ABADI
ON WALUYO
DAFTAR ANALISA BAHAN DAN UPAH KERJA (S
DINAS PU CIPTA KARYA DAN TATA RUANG KAB. B
II.6.15.2 Tenaga
0.2500 Oh Pekerja Rp.
0.0250 Oh Mandor Rp.
III.6.9.2 Tenaga
0.780 Oh Pekerja Rp.
0.390 Oh Tukang Batu Rp.
0.039 Oh Kepala Tukang Batu Rp.
0.039 Oh Mandor Rp.
III.6.10.2 Tenaga
2.400 Oh Pekerja Rp.
0.800 Oh Tukang Batu Rp.
0.080 Oh Kepala Tukang Batu Rp.
0.119 Oh Mandor Rp.
IV.6.3.1 Tenaga
0.600 Oh Pekerja Rp.
0.200 Oh Tukang Batu Rp.
0.020 Oh Kepala Tukang Batu Rp.
0.030 Oh Mandor Rp.
IV.6.1.2 Tenaga
0.600 Oh Pekerja Rp.
0.200 Oh Tukang Batu Rp.
0.020 Oh Kepala Tukang Batu Rp.
0.030 Oh Mandor Rp.
IV.6.3.1 Tenaga
0.600 Oh Pekerja Rp.
0.200 Oh Tukang Batu Rp.
0.020 Oh Kepala Tukang Batu Rp.
0.030 Oh Mandor Rp.
IV.6.5.2 Tenaga
0.600 Oh Pekerja Rp.
0.200 Oh Tukang Batu Rp.
0.020 Oh Kepala Tukang Batu Rp.
0.030 Oh Mandor Rp.
IV.6.6 1 m-2 Pasangan Batu Merah ( 5 x 11 x 22 ) cm tebal 1 Bata, campuran 1 Pc : 3 K
IV.6.6.1 Bahan
140 bh Bata Merah Kelas I Rp.
10.080 kg Semen PC Rp.
0.093 m-3 Pasir Pasang Rp.
0.0100 Oh Kepala Tukang Batu Rp.
0.0150 Oh Mandor Rp.
IV.6.13.2 Tenaga
0.3000 Oh Pekerja Rp.
0.1000 Oh Tukang Batu Rp.
0.0100 Oh Kepala Tukang Batu Rp.
0.0150 Oh Mandor Rp.
IV.6.22.2 Tenaga
0.3000 Oh Pekerja Rp.
0.1000 Oh Tukang Batu Rp.
0.0100 Oh Kepala Tukang Batu Rp.
0.0150 Oh Mandor Rp.
IV.6.23.2 Tenaga
0.3000 Oh Pekerja Rp.
0.1000 Oh Tukang Batu Rp.
0.0100 Oh Kepala Tukang Batu Rp.
0.0150 Oh Mandor Rp.
V PEKERJAAN PLESTERAN
V.6.1.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.4 1 m-2 Plesteran 1 pc : 4 ps, Tebal 15 mm
V.6.4.1 Bahan
6.240 kg Semen PC Rp.
0.024 m3 Pasir Pasang Rp.
V.6.4.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.5.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.6.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.8.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.9 1 m-2 Plesteran 1 pc: 12 kp : 3 ps tebal 15 mm
V.6.9.1 Bahan
5.760 kg Semen pc Rp.
0.003 m-2 kapur padam Rp.
0.013 m-3 Pasir Pasang Rp.
V.6.9.2 Tenaga
0.360 Oh Pekerja Rp.
0.120 Oh Tukang Batu Rp.
0.012 Oh Kepala Tukang Batu Rp.
0.018 Oh Mandor Rp.
V.6.10.2 Tenaga
0.360 Oh Pekerja Rp.
0.120 Oh Tukang Batu Rp.
0.012 Oh Kepala Tukang Batu Rp.
0.018 Oh Mandor Rp.
V.6.19.2 Tenaga
0.150 Oh Pekerja Rp.
0.075 Oh Tukang Batu Rp.
0.008 Oh Kepala Tukang Batu Rp.
0.008 Oh Mandor Rp.
V.6.20 1 m-2 Plesteran Skoning lebar 10 mm, campuran 1 pc : 2 ps
V.6.20.1 Bahan
0.500 kg Semen PC Rp.
0.013 m-3 Pasir Pasang Rp.
V.6.20.2 Tenaga
0.080 Oh Pekerja Rp.
0.400 Oh Tukang Batu Rp.
0.040 Oh Kepala Tukang Batu Rp.
0.004 Oh Mandor Rp.
V.6.23.2 Tenaga
0.300 Oh Pekerja Rp.
0.100 Oh Tukang Batu Rp.
0.010 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.24 1 m-2 Membuat ginishing siar pas, dinding bata merah (=20 m')
V.6.24.1 Bahan
3.108 kg Semen PC Rp.
V.6.24.2 Tenaga
0.150 Oh Pekerja Rp.
0.075 Oh Tukang Batu Rp.
0.008 Oh Kepala Tukang Batu Rp.
0.008 Oh Mandor Rp.
V.6.25 1 m-2 Membuat ginishing siar pas, dinding conblock ekspose (= 8 m')
V.6.25.1 Bahan
1.600 m3 Semen pc Rp.
V.6.25.2 Tenaga
0.070 Oh Pekerja Rp.
0.035 Oh Tukang Batu Rp.
0.004 Oh Kepala Tukang Batu Rp.
0.004 Oh Mandor Rp.
V.6.26 1 m-2 Membuat ginishing siar pas. Batu kali campuran 1 pc : 2 ps
V.6.26.1 Bahan
6.340 kg Semen PC Rp.
0.012 m-3 Pasir Pasang Rp.
V.6.26.2 Tenaga
0.300 Oh Pekerja Rp.
0.150 Oh Tukang Batu Rp.
0.015 Oh Kepala Tukang Batu Rp.
0.015 Oh Mandor Rp.
V.6.27.2 Tenaga
0.200 Oh Pekerja Rp.
0.100 Oh Tukang Batu Rp.
0.010 Oh Kepala Tukang Batu Rp.
0.010 Oh Mandor Rp.
VI .6.4.2 Tenaga
0.350 Oh Pekerja Rp.
1.050 Oh Tukang Kayu Rp.
0.105 Oh Kepala Tukang Kayu Rp.
0.018 Oh Mandor Rp.
VI.6.2 1 m-3 Membuat dan Pasang Kusen Pintu/jendela/Bouvenlight, Kayu klas II ata
VI.6.2.1 Bahan
1.200 m-3 Balok Kayu klas 2 (balok kayu kamfer) Rp.
1.250 kg Paku 10 cm Rp.
NALISA BAHAN DAN UPAH KERJA (SNI)
PTA KARYA DAN TATA RUANG KAB. BLITAR
=Rp. 3,000,000.00
Sub Total =Rp. 3,000,000.00
Total =Rp. 3,000,000.00
=Rp. 2,500,000.00
Sub Total =Rp. 2,500,000.00
Total =Rp. 2,500,000.00
total 5,500,000.00
2,540.55 = 2,540.55
Sub Total =Rp. 2,540.55
Total =Rp. 145,305.08
Dibulatkan =Rp. 145,300.00
BOW
PEKERJAAN BONGKKARAN ( TAMBAHAN )
Lembar 48
5. H.18 10 m-1 Pasang Brombong Talang Dia. 12 cm
10.0000 m-1 Seng Datar ( 3'x 6' ), BJLS 27 Rp. 72,435.00
0.2500 dos Paku Sumbat Rp. 34,242.00
6. L.3 1 m-2 Membongkar Pasangan Dinding Tembok yang Lebih Tebal dari 2 Batu dan Bata
yang Masih Dapat Dipakai Dibersihkan
4.000 Oh Pekerja Rp. 45,000.00
0.400 Oh Mandor Rp. 75,000.00
7. L.4 1 m-3 Membongkar Dinding Tembok yang Tipis, Terhitung dengan Membersihkan Ba
2.000 Oh Pekerja Rp. 45,000.00
0.100 Oh Mandor Rp. 75,000.00
Lembar 49
8. L.5 10 m-2 Membongkar Lantai yang Lama, Berikut Pekerjaan Membersihkan Bata-bata a
2.000 Oh Pekerja Rp. 45,000.00
0.100 Oh Mandor Rp. 75,000.00
10. L.7 10 m-2 Menurunkan Atap Genteng atau Sirap, Jikalau Genteng atau Sirap itu Hendak
0.200 Oh Pekerja Rp. 45,000.00
0.100 Oh Mandor Rp. 75,000.00
12. L.9 10 m-2 Menurunkan Rangka Atap dari Kayu (Jikalau Kayu Bongkaran Hendak Dipakai
1.000 Oh Pekerja Rp. 45,000.00
0.250 Oh Tukang Kayu Rp. 60,000.00
0.025 Oh Kepala Tukang Kayu Rp. 65,000.00
0.050 Oh Mandor Rp. 75,000.00
Lembar 51
= Rp. 89,556.00
Sub Total =Rp. 89,556.00
= Rp. 11,250.00
= Rp 750.00
Sub Total =Rp. 12,000.00
Total =Rp 101,556.00
Dibulatkan =Rp 101,550.00
=Rp. 38,412.50
Sub Total =Rp. 38,412.50
=Rp. 9,000.00
=Rp. 6,000.00
=Rp. 650.00
=Rp. 750.00
Sub Total =Rp. 16,400.00
Total =Rp. 54,812.50
Dibulatkan =Rp. 54,810.00
=Rp. 142,675.00
Sub Total =Rp. 142,675.00
=Rp. 9,000.00
=Rp. 6,000.00
=Rp. 650.00
=Rp. 750.00
Sub Total =Rp. 16,400.00
Total =Rp. 159,075.00
Dibulatkan =Rp. 159,070.00
=Rp. 46,095.00
=Rp. 10,536.00
=Rp. 3,512.00
Sub Total =Rp. 60,143.00
=Rp. 18,000.00
=Rp. 12,000.00
=Rp. 1,300.00
=Rp. 150.00
Sub Total =Rp. 31,450.00
Total =Rp. 91,593.00
Dibulatkan =Rp. 91,590.00
Lembar 52
=Rp. 724,350.00
=Rp. 8,560.50
Sub Total =Rp. 732,910.50
=Rp. 101,250.00
=Rp. 225,000.00
=Rp. 24,375.00
=Rp. 8,250.00
Sub Total =Rp. 358,875.00
Total =Rp. 1,091,785.50
1m' pasang brombong talang =Rp. 109,178.55
Dibulatkan =Rp. 109,170.00
embok yang Lebih Tebal dari 2 Batu dan Bata dari Bongkaran
=Rp. 180,000.00
= Rp 30,000.00
Total =Rp 210,000.00
(Tidak dengan membersihkan dihitung setengahnya)
=Rp. 15,000.00
=Rp. 1,625.00
=Rp. 45,000.00
=Rp. 3,750.00
Sub Total =Rp. 65,375.00
Total =Rp. 65,375.00
1m' pasang brombong talang =Rp. 6,537.50
Dibulatkan =Rp. 6,530.00
Lembar 53
erikut Pekerjaan Membersihkan Bata-bata atau Ubin-ubin yang Dibongkar
=Rp. 90,000.00
= Rp 7,500.00
Total =Rp 97,500.00
1 m2 bongkar lantai =Rp 9,750.00
an pekerjaan membersihkan, dihitung 1/4 dari analis ini)
=Rp. 22,500.00
= Rp 1,875.00
Total =Rp 24,375.00
Dibulatkan =Rp 24,370.00
=Rp. 45,000.00
= Rp 30,000.00
Total =Rp 75,000.00
1 m2 bongkar =Rp 7,500.00
=Rp. 45,000.00
= Rp 3,750.00
Total =Rp 48,750.00
=Rp. 90,000.00
=Rp. 36,000.00
=Rp. 3,900.00
= Rp 7,500.00
Total =Rp 137,400.00
Biaya Bongkaran per 1 m2 =Rp. 13,740.00
Dibulatkan =Rp. 13,740.00
=Rp. 90,000.00
= Rp 7,500.00
Total =Rp 97,500.00
Biaya Bongkaran per 1 m2 =Rp. 9,750.00
Lembar 54
Dibulatkan =Rp. 9,750.00
=Rp. 180,000.00
=Rp. 360,000.00
=Rp. 39,000.00
= Rp 15,000.00
Total =Rp 594,000.00
=Rp. 180,000.00
= Rp 15,000.00
Total =Rp 195,000.00
=Rp 396,000.00
Lembar 55
NO. JENIS BAHAN UKURAN SATUAN
1 2 3 4
Lembar : 56
3 Kayu jati papan kualitas II, ex. Bojonegoro 2/20, 3/20, 3/25 m3
( mutu kayu klas I )
4 Kayu jati reng kualitas II, ex. Bojonegoro 2/3, 3/5 m3
( mutu kayu klas I )
5 Kayu jati balok kualitas I, lokal ( mutu kayu klas I ) 6/12, 6/15, 8/12 m3
6 Kayu jati usuk kualitas I, lokal ( mutu kayu klas I ) 4/6, 5/7 m3
7 Kayu jati papan kualitas I, lokal ( mutu kayu klas I ) 2/20, 3/20, 3/25 m3
8 Kayu jati reng kualitas I, lokal ( mutu kayu klas I ) 2/3, 3/5 m3
9 Kayu kamper, balok ( mutu kayu klas II ) 6/12, 6/15, 8/12 m3
10 Kayu kamper, papan ( mutu kayu klas II ) 2/20, 3/20, 3/25 m3
11 Kayu kamper, usuk ( mutu kayu klas II ) 4/6, 5/7 m3
12 Kayu kamper, reng ( mutu kayu klas II ) 2/3, 3/5 m3
13 Kayu meranti, balok ( mutu kayu klas III ) 6/12, 6/15, 8/12 m3
14 Kayu meranti, papan ( mutu kayu klas III ) 2/20, 3/20, 3/25 m3
15 Kayu meranti, usuk ( mutu kayu klas III ) 4/6,5/7 m3
16 Kayu meranti, reng ( mutu kayu klas III ) 2/3, 3/5 m3
17 Kayu begesting (papan randu/sengon) 3/20 - 200 m3
( mutu kayu klas IV )
18 Kayu begesting (usuk kayu sengon) 4/6 - 300 m3
( mutu kayu klas IV )
19 Papan begesting, kayu tahun ( mutu kayu klas IV ) 2/20 - 200 m3
20 Usuk bekisting, kayu tahun ( mutu kayu klas IV ) 4/6 - 300 m3
21 Kayu gelam ( mutu kayu klas IV ) Ø 10-12 x 400 cm batang
22 Kayu kruing, balok ( mutu kayu klas III ) 6/12, 6/15, 8/12 batang
23 Kayu kruing, papan ( mutu kayu klas III ) 2/20, 3/20, 3/25 batang
24 Kayu kruing, usuk ( mutu kayu klas III ) 4/6, 5/7 batang
25 Kayu kruing, reng ( mutu kayu klas III ) 2/3, 3/5 m3
26 Kayu balau, balok ( mutu kayu klas II ) 6/12, 6/15, 8/12 m3
27 Kayu balau, papan ( mutu kayu klas II ) 2/20, 3/20, 3/25 m3
28 Kayu balau, usuk ( mutu kayu klas II ) 4/6, 5/7 m3
29 Kayu balau, reng ( mutu kayu klas II ) 2/3, 3/5 m3
30 Kayu Albasiah/ Kayu Tahun ( mutu kayu klas IV ) - m3
31 List kayu tahun 1/4 m'
32 List kayu Kaca m'
33 List kayu profil 4/4 m'
34 List kayu profil 5/5 m'
35 Bambu Jawa bongkotan Ø 10-12x400cm batang
36 Bambu Ori Ø 10-12x600cm batang
37 Bambu Apus Ø 6-10x600cm batang
38 Gedek Guling ( Sesek 2/3 m ) - m2
39 Daun pintu kayu Jati, kualitas 1 90 x 210 lembar
40 Penjaga Jarak Bekisting btg
41 kusen pintu jendela alumunium 5/10 (Aleksindo) M'
42 Selimar alumunium 3/10 (Aleksindo)
Lembar : 57
6 Asbes gelombang kecil tebal 4 mm 1,05 X 1,50 lembar
7 Asbes bubung gelombang besar t = 5 mm - lembar
8 Asbes bubung gelombang kecil t = 4 mm - lembar
9 Harflek 4 mm ( 40 x 200 ) cm lembar
10 Harflek 4 mm ( 50 x 200 ) cm lembar
11 Harflek 4 mm ( 60 x 200 ) cm lembar
12 Eternit (lokal) ( 100 x 100 ) cm lembar
13 Eternit (kerang) ( 100 x 100 ) cm lembar
14 Eternit (Gresik) ( 100 x 100 ) cm lembar
15 Gypsum tebal 9 mm ( 120 x 240 ) cm lembar
16 Gypsum tebal 12 mm ( 120 x 240 ) cm lembar
17 List Gypsum l = 15 cm m'
18 List Gypsum l = 10 cm m'
19 Genteng Kanmuri Glasur - buah
20 Bubungan Kanmuri Glasur - buah
21 Genteng flam pres ex Trenggalek - buah
22 Genteng kaca (model kr.pilang) - buah
23 Genteng karang Pilang / wisma - buah
24 Genteng bubung karang pilang/wisma - buah
25 Genteng bubung Jawa / lokal - buah
26 Genteng Kodok Ex. Bambe - buah
27 Genteng Kodok Ex. Wisma - buah
28 Genteng Prentul ex.Trenggalek - buah
29 Genteng bubungan Prentul ex Trenggalek - buah
30 Genteng Mantili ex Trenggalek - buah
31 Genteng bubung Mantili ex. Trenggalek - buah
32 Genteng biasa / pres - buah
33 Genteng Beton - buah
34 Genteng Bubung Beton - buah
35 Seng Talang BJLS 30 l = 90 cm m'
36 Seng Talang BJLS 27 l = 90 cm m'
37 Seng Talang BJLS 27 l = 60 cm m'
38 Seng Talang BJLS 30 l = 45 cm m'
39 Seng Datar BJLS 27 ( 0.02 x 80 x 180 ) cm lembar
40 Seng Gelombang BJLS 40 ( 0.02 x 80 x 180 ) cm lembar
41 Seng Gelombang BJLS 30 ( 80 x 180 ) cm lembar
42 Seng Gelombang BJLS 30 ( 80 x 300 ) cm lembar
43 Seng Gelombang BJLS 30 ( 80 x 150 ) cm lembar
44 Seng Datar BJLS 27 ( 80 x 180 ) cm lembar
45 Karet Talang l = 55 cm m'
46 Karet Talang l = 90 cm m'
47 Fiber glass "Kano Flash" l = 100 cm. m'
48 Plastik Gelombang "Laser Life" ( 80 x 180 ) cm lembar
49 Plastik Gelombang "Laser Life" ( 80 x 210 ) cm lembar
50 Plastik Gelombang "Laser Life" ( 80 x 240 ) cm lembar
51 Plastik Gelombang "Laser Life" ( 80 x 300 ) cm lembar
52 Teakwood tebal 4 mm ( 120 x 240 ) cm lembar
53 Teakwood tebal 4 mm ( 110 x 210 ) cm lembar
Lembar : 58
54 Tripleks tebal 9 mm ( 120 x 240 ) cm lembar
55 Tripleks tebal 3 mm ( 120 x 240 ) cm lembar
56 Ply wood tebal 6 mm ( 120 x 240 ) cm lembar
57 Ply wood tebal 4 mm ( 110 x 210 ) cm lembar
58 Ply wood tebal 4 mm ( 120 x 240 ) cm lembar
59 Ply wood tebal 2 mm ( 120 x 240 ) cm lembar
60 Multiplek 12 mm ( 120 x 240 ) cm lembar
61 Formica ( 120 x 240 ) cm lembar
62 Dinding partisi kalsibord tebal 4 mm ( 120 x 240 ) cm lembar
IV BAHAN BESI/LOGAM
1 Besi begel/baut (untuk kuda-kuda) - kg
2 Besi beton polos - kg
3 Besi beton ulir - kg
4 Besi beton ulir defomed - kg
5 Besi pipa air medium A (warna hijau) Ø 1" - 6 m. batang
6 Baut Dekplank
7 Besi Begel Baut
8 Keni besi (elbouw) Ø 1,5" buah
9 Pipa besi galvanis medium A t 2.4 mm Ø 1/2" - 6 m. batang
10 Pipa besi galvanis medium A t 3 mm Ø 1" - 6 m. batang
11 Pipa besi galvanis medium A t 3 mm Ø 1,25" - 6 m. batang
12 Pipa besi galvanis medium A t 3 mm Ø 1,5" - 6 m. batang
13 Pipa besi galvanis medium A t 3.3 mm Ø 2" - 6 m. batang
14 Pipa besi galvanis medium A t 3.3 mm Ø 2,5" - 6 m. batang
15 Pipa besi galvanis medium A t 3.6 mm Ø 3" - 6 m. batang
16 Pipa besi galvanis medium A t 4.0 mm Ø 4" - 6 m. batang
17 Pipa besi galvanis medium A t 4.2 mm Ø 5" - 6 m. batang
18 C truss / kuda-kuda ( t = 1 ) btg
19 C truss / kuda-kuda ( t = 0.75 ) btg
20 Batten hat / reng btg
21 SDS C truss / baut bh
22 SDS batten hat / baut bh
23 Dynabolt bh
18 Besi plat 2 mm, 4' x 8' lembar
19 Besi plat alumunium tebal 2 mm 4' x 8' lembar
20 Besi plat strip panjang tebal 2 mm ( 30 x 6000 ) cm m1
21 Besi siku krakatau stell L.60.60.6 batang
22 Besi siku krakatau stell L.50.50.5 batang
23 Besi siku krakatau stell L.30.30.3 batang
24 Besi strip - kg
25 Besi canal C 125,50,3 batang
26 Kawat harmonika - m2
27 Kawat ikat beton (bendrat) - kg
28 Kawat nyamuk kasa alumunium - m2
29 Kawat ayakan pasir (untuk pasang) - m2
30 Kawat ayakan pasir (untuk plesteran) - m2
31 Kawat duri pagar - m'
32 Kawat nyamuk kasa plastik - m2
33 Kawat tali Bwg 10 Ø 3,2 mm. kg
34 Tiang pagar BRC/PMG Ø 2", t = 120 bt
35 Pagar BRC/PMG A ( 120 x 240 ) cm unit
36 Pintu Alumunium kaca 5 mm ( 70 x 200 ) cm unit
37 Pintu PVC Kwalitas Baik ( 70 x 210 ) cm unit
Lembar : 59
38 Pagar besi ulir komplit dengan mainan - m2
39 Pintu pagar besi ulir komplit dengan mainan - m2
40 Pintu rolling door - m2
41 Pintu plat harmonika - m2
42 Atap twin life rangka pipa stainlis steel - m2
43 Atap twin lite rangka pipa besi - m2
44 Teralis besi Ø 12 mm. m2
45 Railing stainless pagar tangga dia. 2 m'
46 Kusen Pintu Aluminium Silver "HC" 4/12 m'
47 Kusen Pintu Aluminium Coklat "YKK" 5/10 m'
48 Kusen Jendela Aluminium Silver "HC" 4/12 m'
49 Kusen Jendela Aluminium Coklat "YKK" 5/10 m'
50 Pintu plat alumunium KM (70 x 200 ) cm unit
51 Roling door alumunium dan perlengkapan
Lembar : 60
35 Tegel keramik, Asia Tile Warna 30 x 30 m2
36 Tegel keramik, Classic 30 x 30 m2
37 Tegel galar / trotoar 20 x 20 m2
38 List Keramik 10x20 bh
39 Marmer 40 x 60 m2
Lembar : 61
42 Kuas 2,5" - buah
43 Kuas 2" - buah
44 Kuas 1,5" - buah
45 Kalsium - kg
46 Wallpaper Kansai - m2
47 Tepung Gypsum
Lembar : 62
8 Bak Mandi Teraso 60 x 60 buah
9 Kran air stainless steel Ø 1/2" buah
10 Kran air stainless steel Ø 3/4" buah
11 Kran air biasa Ø 1/2" buah
12 Sumur Peresap Q 1.00 5m buah
13 Watermur Stainless steel Ø 3/4" buah
14 Watermur besi Ø 3/4" buah
15 Wastafel besar warna muda "INA" - buah
16 Wastafel besar warna tua "INA" - buah
17 WaterDrain & Aksesoris buah
18 Rol TBA ( seal tape ) - rol
19 Bak cuci piring stainless steel - buah
20 Bak cuci teraso - buah
21 Tempat sabun keramik "SOTENTO" - buah
22 Tempat sabun keramik "INA" - buah
23 Urinoir "INA" - set
24 Bak mandi porselin 60 x 60 buah
25 Bak mandi fiberglass 0.5 m3 buah
26 Tandon air Fiberglas Grand 550 lt buah
27 Tandon air Fiberglas Grand 700 lt buah
28 Tandon air Fiberglas Penyu 550 lt buah
29 Tandon air Fiberglas Penyu 700 lt buah
30 Floor drain stainless steel - buah
31 Kurasan Bak Mandi stainless steel - buah
32 Bak Mandi stainless steel 60 x 60 buah
Lembar : 63
XI BAHAN PIPA
1 Pipa PVC, tipe AW Dia. 1/2"- 400 batang
2 Pipa PVC, tipe AW Dia. 3/4"- 400 batang
3 Pipa PVC, tipe AW Dia. 1"- 400 batang
4 Pipa PVC, tipe D Dia. 2"- 400 batang
5 Pipa PVC, tipe D Dia. 3"- 400 batang
6 Pipa PVC, tipe D Dia. 4"- 400 batang
7 Pipa PVC, tipe D Dia. 5"- 400 batang
8 Pipa PVC, tipe AW Dia. 3"- 400 batang
9 Pipa PVC, tipe AW Dia. 4"- 400 batang
10 Pipa PVC, tipe AW Dia. 5"- 400 batang
11 Lem PVC - tube
12 Pipa PVC S-12,5 SCJ 50 mm dia 1,5" . p = 6 cm Btg / Ljr
13 Pipa PVC S-12,5 SCJ 63 mm dia 2" . p = 6 cm Btg / Ljr
14 Pipa PVC S-12,5 SCJ 75 mm dia 2,5" . p = 6 cm Btg / Ljr
15 Pipa PVC S-12,5 SCJ 90 mm dia 3" . p = 6 cm Btg / Ljr
16 Pipa PVC S-12,5 SCJ 110 mm dia 4" . p = 6 cm Btg / Ljr
17 Pipa PVC S-12,5 SCJ 160 mm dia 6" . p = 6 cm Btg / Ljr
18 Pipa GI dia 0,5" p = 6 m, t = 2.2 mm Btg / Ljr
19 Pipa GI dia 1" p = 6 m, t = 2.8 mm Btg / Ljr
20 Pipa GI dia 1,5" p = 6 m, t = 2.8 mm Btg / Ljr
21 Pipa GI dia 2" p = 6 m, t = 2.8 mm Btg / Ljr
22 Pipa GI dia 2,5" p = 6 m, t = 2.8 mm Btg / Ljr
23 Pipa GI dia 3" p = 6 m, t = 2.8 mm Btg / Ljr
24 Pipa GI dia 4" p = 6 m, t = 2.8 mm Btg / Ljr
25 AF gate valve dia 2" buah
26 AF gate valve dia 2,5" buah
27 AF gate valve dia 3" buah
28 AF gate valve dia 4" buah
29 Box valve buah
30 Single air valve dia 3/4" buah
31 Single air valve dia 1" buah
32 Single air valve dia 2" buah
33 Single air valve dia 3" buah
34 Single air valve dia 4" buah
35 Straat pot dia 2" buah
36 Straat pot dia 3" buah
37 Straat pot dia 4" buah
38 Flange socket dia 2" buah
39 Flange socket dia 2,5" buah
40 Flange socket dia 3" buah
41 Flange socket dia 4" buah
42 Flange las dia 1/5" buah
43 Flange las dia 2" buah
44 Flange las dia 2,5" buah
45 Flange las dia 3" buah
46 Flange las dia 4" buah
47 Chek valve dia 2" buah
48 Chek valve dia 3" buah
49 Chek valve dia 4" buah
Lembar : 64
50 Bend All Flange 45 dia 2" buah
51 Bend All Flange 45 dia 3" buah
52 Bend All Flange 45 dia 4" buah
53 Bend All Flange 45 dia 6" buah
54 Bend All Flange 90 dia 2" buah
55 Bend All Flange 90 dia 3" buah
56 Bend All Flange 90 dia 4" buah
57 Bend All Flange 90 dia 6" buah
58 Bend Socket Spigot 45 dia 2" buah
59 Bend Socket Spigot 45 dia 2 1/2" buah
60 Bend Socket Spigot 45 dia 3" buah
61 Bend Socket Spigot 45 dia 4" buah
62 Bend Socket Spigot 45 dia 6" buah
63 Bend Socket Spigot 90 dia 2" buah
64 Bend Socket Spigot 90 dia 2 1/2" buah
65 Bend Socket Spigot 90 dia 3" buah
66 Bend Socket Spigot 90 dia 4" buah
67 Bend Socket Spigot 90 dia 6" buah
68 Baur Mur 5/8 x 2" buah
69 Baur Mur 5/8 x 2 1/2" buah
70 Baur Mur 5/8 x 3" buah
71 Clam Sadle 2" x 1/2" buah
72 Clam Sadle 3" x 1/2" buah
73 Clam Sadle 4" x 1/2" buah
74 Clam Sadle 6+" x 1/2" buah
75 Clam Sadle 2" x 3/4" buah
76 Clam Sadle 3" x 3/4" buah
77 Clam Sadle 4" x 3/4" buah
78 Dop GI 1 1/4" buah
79 Dop GI 1 1/2" buah
80 Dop GI 2" buah
81 Dop GI 2 1/2" buah
82 Dop GI 3" buah
83 Dop GI 4" buah
84 Dop GI 6" buah
85 Dop PVC Moof 1" buah
86 Dop PVC Moof 2" buah
87 Dop PVC Moof 2 1/2" buah
88 Dop PVC Moof 3" buah
89 Dop PVC Moof 4" buah
90 Dop PVC Moof 6" buah
91 Double Neple 1" buah
92 Double Neple 1 1/4" buah
93 Double Neple 1 1/2" buah
94 Double Neple 2" buah
95 Double Neple 2 1/2" buah
96 Double Neple 3" buah
97 Double Neple 4" buah
98 Double Neple 6" buah
Lembar : 65
99 Kenie Drat GI 1/2" buah
100 Kenie Drat GI 3/4" buah
101 Kenie Drat GI 1" buah
102 Kenie Drat GI 1 1/4" buah
103 Kenie Drat GI 1 1/2" buah
104 Kenie Drat GI 2" buah
105 Kenie Drat GI 2 1/2" buah
106 Kenie Drat GI 3" buah
107 Kenie Drat GI 4" buah
108 Kenie Drat GI 6" buah
109 Manometer buah
110 Reducer PVC Moof 1/2" x 1" buah
111 Reducer PVC Moof 2 x1 1/2" buah
112 Reducer PVC Moof 2" x 1" buah
113 Reducer PVC Moof 3" x 2" buah
114 Reducer PVC Moof 4" x 2" buah
115 Reducer PVC Moof 4" x 3" buah
116 Screnner CI 2" buah
117 Screnner CI 3" buah
118 Screnner CI 4" buah
119 Screnner CI 6" buah
120 Sock Drat GI 1/2" buah
121 Sock Drat GI 3/4" buah
122 Sock Drat GI 1" buah
123 Sock Drat GI 1 1/4" buah
124 Sock Drat GI 1 1/2" buah
125 Sock Drat GI 2" buah
126 Sock Drat GI 2 1/2" buah
127 Sock Drat GI 3" buah
128 Sock Drat GI 4" buah
129 Tee All Socket PVC RR 2" x 2" buah
130 Tee All Socket PVC RR 3" x 2" buah
131 Tee All Socket PVC RR 3" x 3" buah
132 Tee All Socket PVC RR 4" x 2" buah
133 Tee All Socket PVC RR 4"x 3" buah
134 Tee All Socket PVC RR 4" x 4" buah
135 Tee Drat GI 1/2" buah
136 Tee Drat GI 3/4" buah
137 Tee Drat GI 1" buah
138 Tee Drat GI 1 1/4" buah
139 Tee Drat GI 1 1/2" buah
140 Tee Drat GI 2" buah
141 Tee Drat GI 2 1/2" buah
142 Tee Drat GI 3" buah
143 Tee Y All Flange 2" x 2" buah
144 Tee Y All Flange 3" x 2" buah
145 Tee Y All Flange 3" x 3" buah
146 Tee Y All Flange 4" x 2" buah
147 Tee Y All Flange 4" x 3" buah
148 Tee Y All Flange 4" x 4" buah
Lembar : 66
149 Verlup Sock GI 1" x 3/4" buah
150 Verlup Sock GI 1 1/2" x 1" buah
151 Verlup Sock GI 2" x 1,5" buah
152 Verlup Sock GI 2 1/2 " x 2" buah
153 Verlup Sock GI 3" x 2" buah
154 Verlup Sock GI 4" x 3" buah
155 Water Meter 1" buah
156 Water Meter 2" buah
157 Water Meter 3" buah
158 Water Meter 4" buah
159 Water Moer 1" buah
160 Water Moer 1 1/4" buah
161 Water Moer 1 1/2" buah
162 Water Moer 2" buah
163 Water Moer 2 1/2" buah
164 Water Moer 3" buah
165 Manometer kap 10kg/cm2 buah
166 Ventilasi udara GMS 2" buah
167 Pelampung / water level kontrol buah
168 Tutup manhole buah
169 Tangga monyet buah
Lembar : 67
11 Sekring MCB thermis 10 - 16 Amp. - bh
12 Sekring MCB thermis 10 Amp. bh
13 Stater lampu TL - bh
14 Bola lampu Armateur 250 watt bh
15 Lampu TL 20 W / 220 V komplit balas, (Philips) - bh
16 Lampu TL 40 W / 220 V komplit balas, (Philips) - bh
17 lampu Hemat energi 18W / 220 V (Osram) bh
18 lampu Hemat energi 18W / 220 V ( Philip ) bh
19 Kabel NYM. 1 x 2,5 focus - m'
20 Kabel NYM. 2 x 2,5 - m'
21 Kabel NYM. 3 x 2,5 - m'
22 Instalasi Listrik Titik
23 Penangkal Petir Lengkap 2 Split tinggi 10 m unit
24 Kabel Twisted 12 mm m'
25 Kabel pompa NYY 4 x 10 mm m'
26 Tiang listrik besi 3" - 2,5 " x 6 m bh
27 panel listrik 1 Unit
28 Daya listrik 1 VA
XV BAHAN ASPAL
1 Minyak tanah - lt
2 Minyak Bakar - lt
3 Minyak Pelumas - lt
4 Aspal Kemas ( 60 / 70 ) - kg
5 Aspal Curah ( 80 / 100 ) - kg
6 Premium - lt
7 Premium Industri - lt
8 Solar ( Minyak Begesting ) - lt
9 Solar ( Minyak Begesting ) industri - lt
Lembar : 68
HARGA
164,325.00
169,020.00
171,837.00
187,800.00
187,800.00
230,055.00
234,750.00
234,750.00
159,630.00
118,314.00
118,314.00
126,765.00
126,765.00
107,985.00
84,510.00
98,595.00
79,815.00
93,900.00
89,205.00
28,170.00
3,051.75
633.83
539.93
70,425.00
117,375.00
14,085.00
16,432.50
20,658.00
65,730.00
89,205.00
93,900.00
1,032,900.00
1,267,650.00
12,207.00
516,450.00
798,150.00
140,850.00
58,687.50
46,950.00
70,425.00
56,340.00
65,730.00
98,595.00
15,963.00
32,865.00
21,127.50
23,475.00
610.35
9,390.00
-
-
28,170,000.00
-
26,292,000.00
-
Lembar : 69
29,109,000.00
-
26,292,000.00
-
23,005,500.00
19,719,000.00
24,414,000.00
16,432,500.00
9,577,800.00
9,718,650.00
8,685,750.00
8,216,250.00
6,103,500.00
6,338,250.00
5,634,000.00
5,634,000.00
2,112,750.00
-
2,347,500.00
-
2,582,250.00
2,817,000.00
41,316.00
7,042,500.00
7,277,250.00
6,338,250.00
6,573,000.00
9,624,750.00
9,859,500.00
8,685,750.00
8,216,250.00
4,460,250.00
5,305.35
3,051.75
7,981.50
9,624.75
18,780.00
46,950.00
14,085.00
21,127.50
2,441,400.00
18,780.00
89,205.00
985,950.00
-
-
65,730.00
51,645.00
136,155.00
117,375.00
84,510.00
Lembar : 70
70,425.00
61,035.00
46,950.00
15,963.00
16,902.00
20,658.00
14,554.50
16,432.50
16,432.50
93,900.00
103,290.00
39,438.00
20,658.00
12,207.00
30,517.50
1,643.25
16,432.50
6,103.50
9,859.50
7,042.50
6,244.35
6,244.35
2,112.75
7,981.50
2,723.10
8,685.75
1,408.50
3,990.75
8,685.75
61,035.00
51,645.00
42,255.00
42,255.00
70,425.00
117,375.00
87,796.50
121,365.75
72,303.00
77,467.50
13,146.00
20,658.00
77,467.50
82,632.00
113,619.00
123,948.00
154,935.00
144,606.00
123,948.00
Lembar : 71
154,935.00
82,632.00
123,948.00
103,290.00
123,948.00
82,632.00
206,580.00
206,580.00
103,290.00
-
-
22,770.75
8,451.00
9,390.00
13,146.00
154,935.00
9,390.00
23,756.70
22,536.00
152,587.50
247,896.00
309,870.00
361,515.00
495,792.00
619,740.00
774,675.00
1,032,900.00
1,366,245.00
117,375.00
107,985.00
49,767.00
281.70
234.75
3,051.75
568,095.00
671,385.00
46,480.50
340,857.00
206,580.00
87,796.50
41,316.00
387,337.50
45,541.50
24,883.50
41,316.00
23,475.00
25,822.50
14,085.00
15,493.50
20,658.00
92,961.00
774,675.00
619,740.00
413,160.00
Lembar : 72
568,095.00
619,740.00
774,675.00
1,162,012.50
774,675.00
671,385.00
464,805.00
1,032,900.00
129,112.50
154,935.00
113,619.00
144,606.00
929,610.00
1,007,077.50
-
-
51,645.00
51,645.00
46,480.50
56,809.50
51,645.00
49,297.50
49,297.50
61,974.00
58,687.50
56,809.50
58,687.50
56,809.50
56,809.50
77,467.50
41,316.00
46,480.50
48,358.50
46,480.50
48,358.50
51,645.00
51,645.00
51,645.00
56,809.50
43,194.00
58,687.50
48,358.50
53,523.00
41,316.00
51,645.00
61,974.00
79,815.00
84,510.00
44,602.50
47,419.50
43,194.00
Lembar : 73
43,194.00
51,645.00
46,480.50
10,329.00
309,870.00
-
-
-
53,523.00
56,809.50
68,077.50
46,480.50
51,645.00
79,345.50
77,467.50
30,987.00
32,865.00
30,987.00
22,536.00
20,658.00
24,414.00
17,841.00
22,536.00
22,536.00
41,316.00
103,290.00
51,645.00
38,968.50
36,151.50
20,658.00
20,658.00
10,329.00
8,451.00
61,974.00
67,138.50
77,467.50
13,146.00
28,170.00
45,072.00
16,902.00
45,072.00
13,146.00
36,151.50
20,658.00
30,987.00
20,658.00
25,822.50
30,987.00
20,658.00
Lembar : 74
15,493.50
10,329.00
1,408.50
144,606.00
-
4,695.00
-
-
20,658.00
12,676.50
10,329.00
25,822.50
30,987.00
20,658.00
7,981.50
20,658.00
67,138.50
51,645.00
41,316.00
15,493.50
82,632.00
77,467.50
387,337.50
129,112.50
113,619.00
335,692.50
15,493.50
77,467.50
180,757.50
30,987.00
72,303.00
41,316.00
232,402.50
51,645.00
206,580.00
258,225.00
-
-
-
56,809.50
1,239,480.00
1,342,770.00
1,549,350.00
206,580.00
154,935.00
77,467.50
Lembar : 75
103,290.00
51,645.00
61,974.00
36,151.50
6,713,850.00
25,822.50
1,549.35
309,870.00
335,692.50
77,467.50
15,493.50
619,740.00
154,935.00
51,645.00
41,316.00
981,255.00
309,870.00
258,225.00
774,675.00
929,610.00
1,032,900.00
1,291,125.00
61,974.00
51,645.00
438,982.50
-
-
-
67,138.50
85,449.00
103,290.00
123,948.00
39,438.00
103,290.00
123,948.00
5,164.50
46,950.00
-
-
56,340.00
68,547.00
84,510.00
95,778.00
107,985.00
87,327.00
103,290.00
113,619.00
45,072.00
51,645.00
61,974.00
73,242.00
90,144.00
13,146.00
Lembar : 76
-
-
-
49,767.00
61,974.00
75,120.00
112,680.00
137,094.00
187,800.00
311,748.00
225,360.00
338,040.00
525,840.00
37,560.00
93,900.00
136,155.00
194,373.00
281,700.00
413,160.00
885,477.00
174,654.00
300,480.00
436,635.00
549,315.00
699,555.00
807,540.00
1,061,070.00
600,960.00
821,625.00
906,135.00
1,375,635.00
311,748.00
218,787.00
218,787.00
812,235.00
1,000,035.00
1,122,105.00
87,327.00
106,107.00
137,094.00
174,654.00
199,068.00
249,774.00
311,748.00
61,974.00
75,120.00
75,120.00
80,754.00
93,900.00
1,061,070.00
1,746,540.00
2,383,182.00
Lembar : 77
199,068.00
236,628.00
311,748.00
499,548.00
193,434.00
311,748.00
343,674.00
687,348.00
87,327.00
99,534.00
130,521.00
186,861.00
399,075.00
92,961.00
118,314.00
143,667.00
212,214.00
436,635.00
3,521.25
4,225.50
4,695.00
52,584.00
71,364.00
76,998.00
180,288.00
46,950.00
71,364.00
110,802.00
10,329.00
14,085.00
17,841.00
52,584.00
82,632.00
106,107.00
343,674.00
11,268.00
18,780.00
24,414.00
30,987.00
49,767.00
124,887.00
8,451.00
1,220.70
16,902.00
22,536.00
40,377.00
67,608.00
100,473.00
386,868.00
Lembar : 78
5,634.00
6,573.00
10,329.00
16,902.00
19,719.00
32,865.00
61,974.00
90,144.00
165,264.00
674,202.00
137,094.00
7,512.00
20,658.00
24,414.00
61,974.00
92,022.00
105,168.00
661,995.00
837,588.00
1,023,510.00
1,143,702.00
3,756.00
42,255.00
8,451.00
12,207.00
15,024.00
22,536.00
41,316.00
61,035.00
103,290.00
143,667.00
201,885.00
232,872.00
314,565.00
344,613.00
374,661.00
6,573.00
9,390.00
15,024.00
17,841.00
28,170.00
41,316.00
97,656.00
120,192.00
479,829.00
574,668.00
711,762.00
720,213.00
831,954.00
931,488.00
Lembar : 79
9,859.50
16,902.00
24,414.00
51,128.55
70,425.00
130,521.00
599,908.32
1,949,364.00
2,770,050.00
2,995,410.00
24,414.00
48,828.00
51,645.00
67,608.00
120,192.00
186,861.00
198,129.00
136,155.00
510,816.00
510,816.00
568,095.00
-
-
28,170.00
23,475.00
23,475.00
30,987.00
20,658.00
36,621.00
36,621.00
798.15
36,621.00
-
-
28,170.00
1,643.25
2,347.50
30,987.00
25,822.50
41,316.00
129,112.50
657.30
154,935.00
77,467.50
Lembar : 80
103,290.00
77,467.50
41,316.00
25,822.50
103,290.00
129,112.50
41,316.00
36,151.50
3,756.00
4,225.50
4,695.00
154,935.00
2,582,250.00
30,987.00
41,316.00
774,675.00
6,197,400.00
4,695.00
-
-
10,329.00
10,329.00
38,499.00
11,737.50
10,798.50
7,136.40
8,263.20
6,807.75
10,282.05
###
Lembar : 81
B. DAFTAR UPAH KERJA HARIAN
1 2 3 4
-
-
-
379296
877.5
307.50
HARGA
(Rp.)
75,120.00
65,730.00
65,730.00
65,730.00
65,730.00
65,730.00
65,730.00
65,730.00
61,035.00
61,035.00
61,035.00
61,035.00
61,035.00
61,035.00
61,035.00
61,035.00
61,035.00
46,950.00
51,645.00
49,297.50
56,340.00
51,645.00
56,340.00
51,645.00
49,297.50
49,297.50
B
l
i
t
a
r
,
PEKERJAAN TANAH
Galian tanah Pondasi M3 79.32
Galian Tanah Halaman M3 40.50