Jenis Barang/Jasa Satuan Vol

PEKERJAAN PENDAHULUAN
Pas. Papan Nama Proyek Ls 1.00
Pek. Pembongkaran Dan Pembersihan Lokasi Ls 1.00
Pek. Pelaporan Dokumentasi Ls 1.00
PEKERJAAN POS DAN GAPURA
PEKERJAAN TANAH DAN PASIR
Pek. Galian Tanah Pondasi M3 3.07
Pek. Urugan Pasir Bawah Pondasi M3 0.30
Pek. Urugan Tanah kembali M3 0.77
PEKERJAAN BATU DAN BETON
Pek. Pas, Pondasi Batu Belah Ad. 1:4 M3 2.00
Pek. Pondasi Foot Plat 60x60x20 cm
Pek. Pondasi Tapak Beton Mutu K.175
Pembesian Kg 9.86
Cor Beton K.125 M3 0.12
Pek. Balok sloof 15/20
Pembesian Kg 44.54
Bekisting M2 2.50
Cor Beton K.125 M3 0.30
Pek. Tiang Kolom 20/20
Pembesian Kg 52.59
Bekisting M2 3.20
Cor Beton K.125 M3 0.64
Pek. Kolom Utama 25/60
Pembesian Kg 66.55
Bekisting M2 10.00
Cor Beton K.125 M3 0.75
Pek. Balok Pinggang 10/20
Pembesian Kg 23.18
Bekisting M2 2.00
Cor Beton K.125 M3 0.20
Pek. Ring Balok 15/20
Pembesian Kg 23.18
Bekisting M2 2.00
Cor Beton K.125 M3 0.20
Pek. Balok Gantung 25/35
Pembesian Kg 40.66
Bekisting M2 8.00
Cor Beton K.125 M3 0.48
Pek. Plat Dak
Pembesian Kg 138.10
Bekisting M2 17.50
Cor Beton K.125 M3 1.75
Pek. Pasangan Dinding Batu Bata Pas. 1/2 Batu ad. 1 :4 M2 32.60
Pek. Plasteran Dinding Ad. 1:4 M2 72.00
Pek. Cor Lantai Beton K. 100 M3 0.60
Pek. Pas, Keramik Lantai Uk 40x40 cm M2 6.00
Pek. Kusen Pintu Kayu Klas II Lob 1.00
Daun Pintu Panil Lbr 1.00
PEKERJAAN PENDAHULUAN Lob 6.00
Pas. Papan Nama Proyek Lbr 2.00
Pek. Pembongkaran Dan Pembersihan Lokasi M2 1.60
Pek. Pelaporan Dokumentasi Bh 1.00
PEKERJAAN POS DAN GAPURA Bh 2.00
PEKERJAAN TANAH DAN PASIR Bh 3.00
Pek. Galian Tanah Pondasi Bh 4.00
Pek. Urugan Pasir Bawah Pondasi M1 8.50
Pek. Urugan Tanah kembali M 7.33
PEKERJAAN BATU DAN BETON M2 89.50
Pek. Pas, Pondasi Batu Belah Ad. 1:5 M2 6.40
Pek. Pondasi Foot Plat 60x60x20 cm M2 91.00
Pek. Pondasi Tapak Beton Mutu K.176 M3 0.21
Pembesian M3 22.92
Cor Beton K.126
Pek. Balok sloof 15/21
Pembesian M3 0.42
Bekisting M3 0.11
Cor Beton K.126
Pek. Tiang Kolom 20/21
Pembesian Kg 196.43
Bekisting M2 10.40
Cor Beton K.126 M3 2.81
Pek. Kolom Utama 25/61 M2 49.01
Pembesian M2 42.45
Bekisting M2 23.40
Cor Beton K.126 M1 31.20
Pek. Balok Pinggang 10/21 M1 10.00
Pembesian M2 79.29
Harga Pajak(%) Keterangan
10.00
100,000.00 10.00
2,000,000.00 10.00
1,000,000.00 10.00
10.00
10.00
81,950.00 10.00
138,380.00 10.00
27,316.67 10.00
10.00
817,362.70 10.00
10.00
10.00
14,890.15 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
101,751.10 10.00
68,482.00 10.00
776,131.87 10.00
247,246.12 10.00
450,000.00 10.00
800,000.00 10.00
300,000.00 10.00
350,000.00 10.00
110,000.00 10.00
250,000.00 10.00
7,000.00 10.00
25,000.00 10.00
13,000.00 10.00
70,000.00 10.00
2,200,000.00 10.00
31,917.05 10.00
62,661.50 10.00
128,456.90 10.00
776,131.87 10.00
97,515.00 10.00
10.00
10.00
81,950.00 10.00
138,380.00 10.00
10.00
10.00
14,890.15 10.00
180,719.00 10.00
817,537.76 10.00
101,751.10 10.00
68,482.00 10.00
41,154.30 10.00
840,000.00 10.00
1,344,000.00 10.00
31,917.05 10.00

Anda mungkin juga menyukai