a b c
I PEKERJAAN BETON DAN DINDING
1 Pekerjaan Kolom Kp Uk 15/15
- Beton Mutu fc' = 18,67 MPa (K 275) M3 0.07
- Besi Beton Polos Kg 19.65
- Bekisting kolom M2 2.08
2 Pekerjaan Ring Balok RB Puk.20/30
- Beton Mutu fc' = 18,67 MPa (K 275) M3 2.18
- Besi Beton Polos Kg 276.76
- Bekisting Balok M2 29.00
3 Pekerjaan Plat Dagg Tebal 12 cm
- Beton Mutu fc' = 18,67 MPa (K 275) M3 7.05
- Besi Beton Polos Kg 983.10
- Bekisting Plat M2 58.77
4 Pek. Beton LIS uk, 8 cm
- Beton mutu fc' = 18,67 MPa (K 275) M3 0.50
- Besi Beton Polos Kg 29.61
- Bekisting Balok M2 9.35
5 Pas. Batu Bata 1 : 4 M2 10.55
II PEKERJAAN PLESTERAN/AFWERKING
1 Pek. Plesteran dinding 1 : 4 M2 21.11
2 Pek. Acian M2 21.11
III PEKERJAAN PENGECATAN
1 Pek. Plengecatan Ulang Dinding M2 463.28
2 Pek. Pengecatan Plafon M2 89.32
IV PEKERJAAN LANTAI
1 Pek. Pembongkaran Lantai Lama M3 80.32
2 Pas. Homogeneus Tile 60x60 Polished M2 74.77
3 Pas. Homogeneus Tile 40x40 UnPolished (KM/WC) M2 5.55
V PEKERJAAN PLAFOND
1 Pek. Pembongkaran plafon lama M2 89.32
2 Pas. Rangka Plafond Hollow Galvanis 4x4 cm M2 89.32
3 Pas. Plafond Gypsum Tbl. 9 mm M2 89.32
4 Pas. List Profil Gypsum t = 7x7 cm M' 130.80
VI PEKERJAAN KAP DAN ATAP
1 Pek. Pembongkaran Kuda-kuda dan atap lama LS 1.00
2 Pas. Kuda-kuda Baja Ringan M² 65.33
3 Pas. Atap Spandek tbl. 0,35 mm M² 65.33
4 Pas. Nok Atas M¹ 6.70
5 Pas. Lisplank Ex. Kalsiplank GRC 08 mm H= 25 cm M' 13.40
VII PEKERJAAN PERLENGKAPAN DALAM
Pek. Instalasi Listrik
1 Pas. Instalasi Titik Lampu NYM 3 x 2.5 mm Dalam Conduit Ttk 23.00
2 Pas. Instalasi Stop Kontak (AC) Ttk 3.00
3 Pas. Sakelar Tunggal Ex. Schneider Bh 5.00
4 Pas. Sakelar Gandal Ex. Schneider Bh 7.00
5 Pas. Sakelar Triplel Ex. Schneider Bh 2.00
6 Pas. Lampu RC091V LED26S/840 PSU W60L60 G2 MR PCV Bh 6.00
7 Pas. Lampu 59464 Meson 125 13W 65K WH ID Bh 6.00
8 Pas Lampu DN027B LED20/CW D200 RD 24 Watt Bh 11.00
Pek. Air Conditioning
1 Wall Mounted MSAF-05CRN2 5.000 BTUH unit 1
2 Wall Mounted MSAF-07CRN2 7.000 BTUH unit 2
Pipe & Accessories
1 Inst. Pipa Refrigrant Tembaga Ø 1/2" - 1/4" + Isolasi M¹ 12
2 Inst. Pipa Refrigrant Tembaga Ø 1/4" - 3/8" + Isolasi M¹ 12
3 Pipa Drain + isolasi PVC Class AW M¹ 1
Cable dll
1 Instlasai cable Control Unit AC m 16.00
2 Instalasi Cable Power dari Panel ke SK AC m 24.00
3 Instalasi Cable Control dari Indoor ke Outdoor m 16.00
4 Breaket Outdoor Unit Set 3.00
5 Jasa Pemasangan Unit AC split Wall Unit 3.00
Pek. Air Bersih
1 Pas. Pipa PN 10 Pipe ID (3/4") Od 25 x 2,3 M¹ 24.00
2 Pas. Pipa PN 10 Pipe ID (1/2") OD 20 x 1,9 M¹ 6.00
VIII PEKERJAAN PERLENGKAPAN LUAR
Pek. Pagar
1 Pek Pembongkaran Pagar Lama ttk 22.25
2 Pekerjaan Sloof Uk. 15/20
- Beton Mutu fc' = 18,67 MPa (K 275) M3 0.67
- Besi Beton Polos Kg 143.54
- Bekisting Slof M2 8.90
3 Pekerjaan Kolom Uk. 20/20
- Beton Mutu fc' = 18,67 MPa (K 275) M3 0.58
- Besi Beton Polos Kg 81.50
- Bekisting Kolom M2 11.52
4 Pekerjaan Ring Balok RB Uk.20/25
- Beton Mutu fc' = 18,67 MPa (K 275) M3 0.58
- Besi Beton Polos Kg 127.60
- Bekisting Balok M2 11.79
5 Pas. Batu Bata 1 : 4 M2 31.36
6 Pek. Plesteran Dinding 1 : 4 M2 71.36
7 Pek. Acian M2 210.76
8 Pek. Pengecatan Dinding M2 210.76
Pek. Halaman
1 Pek. Pembongkaran Paving Blok Lama M2 660.95
2 Pek. Pasang Paving Blok M2 660.95
Harga Satuan (Rp.) PAJAK (%) TOTAL (Rp.) Keterangan
d e g g
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
- 11 -
no jenis barang/jasa Satuan
a b
LANTAI - 1
I PEKERJAAN PERMULAAN
1 Pembersihan Lapang M²
2 Pekerjaan Pagar Keliling M'
3 Pekerjaan Pembuatan Direksi Kett M²
4 Perlengkapan K3
- Topi Pelindung (safety helmet) bh
- Sarung Tangan (safety gloves) psg
- Masker bok
- Body Hamess Unit
- Rompi Keselamat (safety Vest) Bh
- Pelindung Mata (Goggles, Spectacles) Bh
5 Alat Pelindung Kerja (Jaringan Pengaman, Tali Keselamatan,Penahan Jatuh,Pagar Pengama ls
6 Pekerjaan Pembuangan Sisa Galian ls
II PEKERJAAN PONDASI
a Umum
1 Pass. Bouwplank M'
2 Pek. Galian Tanah Keras (slof) M3
3 Pek. Urugan Bekas Galian Tanah File Cap M3
b Pondasi Sumuran
1 Pek. Galian Tanah (Sumuran) M3
2 Pas. Cincin Sumuran Dia meter dalam 100cm M3
3 Betton Kedap Air fc' 19.3 Mpa M3
4 Pas. Beton Stek Poor fc' = 24,05 Mpa/K.275 M3
C Pondasi Batu Kali
Pek. Galian Tanah Pondasi M'
Pek. Urugan Bekas Galian Tanah File Cap M3
Pas. Aanstampang M3
Pas. Batu Kali Ad. 1:4 M3
III PEKERJAAN BETON BERTULANG
A PEKERJAAN FILE CAP
1 Pile Cap TIPE P.1
Pek. Galian Tanah Pondasi M3
- Lantai Kerja Tebal 5cm Beton Mutu fc' = 8,30 Mpa/K. 100 M3
- Beton Ready Mix fc' = 22,88 Mpa/K.275 M3
- Besi Beton Ulir kg
- Pas. Hollow Brik cetakan M2
2 Pile Cap TIPE P.2
Pek. Galian Tanah Pondasi M3
- Lantai Kerja Tebal 5cm Beton Mutu fc' = 8,30 Mpa/K. 100 M3
- Beton Ready Mix fc' = 22,88 Mpa/K.275 M3
- Besi Beton Ulir kg
- Pas. Hollow Brik cetakan M2
3 Stek Besi Poor
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
B PEKERJAAN SLOOF
1 Pek. Sloof Beton Type S1 uk. 30x50cm
- Lantai Kerja Tebal 5cm Beton Mutu fc' = 8,30 Mpa/K. 100 M3
- Beton Ready Mix fc' = 22,88 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Sloof M2
2 Pek. Sloof Beton Type S2 uk. 25x35cm
- Lantai Kerja Tebal 5cm Beton Mutu fc' = 8,30 Mpa/K. 100 M3
- Beton Ready Mix fc' = 22,88 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Sloof M2
3 Pek. Sloof Beton Type S3 uk. 30x40cm
- Lantai Kerja Tebal 5cm Beton Mutu fc' = 8,30 Mpa/K. 100 M3
- Beton Ready Mix fc' = 22,88 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Sloof M2
C PEKERJAAN TANGGA
Tangga Utama
1 Pek. Pondasi Plat Lajur Tebal 30 cm
- Beton Ready Mix fc = 22.83 Mpa/K. 275 M3
- Besi Beton Ulir Kg
- Bekisting Tangga M2
2 Pek. Plat Tangga Tebal. 15cm
- Beton Ready Mix fc = 22.83 Mpa/K. 275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Tangga M2
3 Pek. Plat Anak Tangga
- Beton Ready Mix fc = 22.83 Mpa/K. 275 M3
- Besi Beton Polos Kg
- Bekisting Tangga M2
Tangga Darurat
1 Pek. Pondasi Plat Lajur Tebal 30 cm
- Beton Ready Mix fc= 22.83 Mpa/K. 275 M3
- Besi Beton Ulir Kg
- Bekisting Tangga M2
1 Pek. Plat Tangga Tebal. 15cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Tangga M2
2 Pek. Plat Anak Tangga
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Polos Kg
- Bekisting Tangga M2
D PEKERJAAN KOLOM
1 Pek. Kolom Beton Type K1 uk.35x50cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Kolom M2
2 Pek. Kolom Beton Type K1A uk.35x50cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Kolom M2
3 Pek. Kolom Beton Type K3 uk.35x50cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Kolom M2
4 Overlap Besi Kolom pada File Cap dan slof
- Besi Beton Ulir Kg
5 Stek Besi Kolom
- Besi Beton Ulir Kg
E PEKERJAAN BALOK
1 Pek. Balok Beton Type B1 uk. 30x50cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
2 Pek. Balok Beton Type B2 uk. 25x35cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
3 Pek. Balok Beton Type B3 uk. 30x40cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
4 Pek. Balok Beton Type Ba1 uk. 20x30cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
5 Pek. Balok Beton Type Ba2 uk. 25x35cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
6 Pek. Balok Beton Type BK1 uk. 30x45cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
7 Pek. Balok Beton Type BaK1 uk. 20x30cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
8 Pek. Balok Beton Type BT1 uk. 25x35cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Ulir Kg
- Besi Beton Polos Kg
- Bekisting Balok M2
9 Pek. Balok Beton Type BT1 uk. 25x35cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Polos Kg
- Bekisting Balok M2
F PEKERJAAN PLAT LANTAI
1 Pek. Plat Lantai Beton Tebal 12cm
- Beton Ready Mix fc= 22.83 Mpa/K.275 M3
- Besi Beton Polos Kg
- Bekisting Plat M2
2 Overlap Besi Plat Lantai pada Balok
- Besi Beton Polos Kg
IV PEKERJAAN ATAP
1 Pek Pasang Gelagar Baja WF 20.10,3,2,4,5 Kg
2 Pek Pasang Gelagar Baja UNP 150.75.6,5 mm Kg
3 Pek Pasang Plat tebal 10 mm Kg
4 Pek. Baut Dynabolt hilti m16 panjang 150 mm Bh
4 Pas. Kuda - kuda Baja Ringan M²
5 Pas. Atap Spandek tbl. 0,35 mm m²
6 Pas. Nok Atas m'
7 Pas. Rangka Holow Alumunium ACP [Lispank] M2
8 Pas. Alumunium Composit Panel 0,4 mm [Lispank] M2
2 Pek. Atap Sementara Penutup tangga
1 Beton Mutu fc' = 14,53 Mpa [ K 175] M²
2 Pas. Kuda-kuda Baja Ringan m²
2 Pas. Atap Spandek tbl. 0,35 mm m²
Volume Harga Satuan (Rp.) PAJAK (%) TOTAL (Rp.) Keterangan
c d e g h
567.00 - 11 -
48.00 - 11 -
24.00 - 11 -
30 - 11 -
30 - 11 -
10 - 11 -
5 - 11 -
30 - 11 -
5 - 11 -
1 - 11 -
1.00 - 11 -
48.00 - 11 -
114.15 - 11 -
28.54 - 11 -
135.65 - 11 -
92.63 - 11 -
10.99 - 11 -
16.33 - 11 -
35.00 - 11 -
8.75 - 11 -
34.00 - 11 -
12.25 - 11 -
20.16 - 11 -
2.74 - 11 -
24.19 - 11 -
3,389.98 - 11 -
94.08 - 11 -
0.80 - 11 -
0.14 - 11 -
6.40 - 11 -
1,709.17 - 11 -
30.72 - 11 -
1,744,40 - 11 -
879.63 - 11 -
3.22 - 11 -
11.55 - 11 -
904.60 - 11 -
427.58 - 11 -
46.20 - 11 -
1.31 - 11 -
1.61 - 11 -
157.31 - 11 -
59.23 - 11 -
8.00 - 11 -
2.97 - 11 -
10.51 - 11 -
1,364.72 - 11 -
517.58 - 11 -
70.06 - 11 -
0.90 - 11 -
107.08 - 11 -
6.00 - 11 -
2.52 - 11 -
289.64 - 11 -
82.86 - 11 -
27.89 - 11 -
0.85 - 11 -
99.70 - 11 -
5.67 - 11 -
0.90 - 11 -
32.88 - 11 -
6.00 - 11 -
2.52 - 11 -
289.84 - 11 -
82.86 - 11 -
27.89 - 11 -
0.85 - 11 -
99.70 - 11 -
5.67 - 11 -
15.75 - 11 -
5,608.42 - 11 -
1,015.17 - 11 -
153.00 - 11 -
6.30 - 11 -
5,608.42 - 11 -
1,015.17 - 11 -
153.00 - 11 -
1.10 - 11 -
4,578.31 - 11 -
1,703.50 - 11 -
180.00 - 11 -
1,531.63 - 11 -
1,638.02 - 11 -
11.55 - 11 -
1,679.03 - 11 -
932.06 - 11 -
81.62 - 11 -
1.58 - 11 -
240.36 - 11 -
382.16 - 11 -
12.78 - 11 -
10.51 - 11 -
1,364.72 - 11 -
1,025.24 - 11 -
75.34 - 11 -
2.41 - 11 -
316.83 - 11 -
167.82 - 11 -
22.48 - 11 -
0.32 - 11 -
42.17 - 11 -
18.43 - 11 -
2.59 - 11 -
2.44 - 11 -
281.98 - 11 -
206.74 - 11 -
17.38 - 11 -
0.16 - 11 -
21.31 - 11 -
12.98 - 11 -
1.51 - 11 -
2.10 - 11 -
189.39 - 11 -
54.69 - 11 -
17.04 - 11 -
2.88 - 11 -
170.56 - 11 -
53.86 - 11 -
47.78 - 11 -
8,425.23 - 11 -
398.20 - 11 -
720.00 - 11 -
101.89 - 11 -
56.00 - 11 -
4.00 - 11 -
18.00 - 11 -
15.00 - 11 -
15.00 - 11 -
6.00 - 11 -
51.30 - 11 -
51.30 - 11 -
0.53 - 11 -
29.00 - 11 -
29.00 - 11 -
No Jenis Barang/Jasa Satuan
a b
LANTAI SATU
I PEKERJAAN PONDASI BATU KALI
Pek. Galian Tanah Pondasi M3
Pek. Urugan Bekas Galian Tanah File Cap M3
Pas. Aanstampang M3
Pas. Batu Kali Ad. 1:4 M3
II PEKERJAAN BETON DAN DINDING
1 Pek. Slof Beton Praktis uk. 15/20 cm (S.P)
- Beton Mutu fc' = 14,53 Mpa (K 175) M3
- Besi Beton Polos Kg
- Bekasiting Sloof M2
2 Pek. Kolom Beton Praktis uk. 13/13 cm (K.P)
- Beton Mutu fc' = 14,53 Mpa (K 175) M3
- Besi Beton Polos Kg
- Bekasiting Kolom M2
3 Pek. Balok Beton Praktis uk. 13/20 cm (Balok Latei)
- Beton Mutu fc' = 14,53 Mpa (K 175) M3
- Besi Beton Polos Kg
- Bekasiting Balok M2
4 Pek.Balok Beton Praktis uk 13x20 cm (Balok Pinggang)
- Beton Mutu fc' = 14,53 Mpa (K 175) M3
- Besi Beton Polos Kg
- Bekasiting Balok M2
5 Pas. Batu Bata 1:2 M2
6 Pas. Batu Bata 1:4 M2
III PEKERJAAN PLESTERAN/AFWERKING
1 Pek. Plesteran Dinding 1:2 M2
2 Pek. Plesteran Dinding 1:4 M2
3 Pek. Afwerking Beton M2
4 Pek. Plesteran Opening Kozen M'
5 Pek. Acian M2
6 Pas. Granit Dinding Homogeneus Tile #0x60 cm (Ex. Niro Granite/Setara M2
IV PEKERJAAN PENGECATAN
1 Pek. Pengecatan Dinding Dengan Cat Tembok M2
2 Pek. Pengecatan Plafon Dengan Cat Tembok M2
3 Pek. Pengecatan Dinding Dengan Cat Epoxy 500 micron M2
4 Pek. Pengecatan Plafon Dengan Cat Epoxy 500 micron M2
V PEKERJAAN LANTAI
1 Pek. Urugan Tanah Bawah Lantai M3
2 Pek. Pasir Bawah Lantai M3
3 Pek. Cor Beton K-100 tebal 7cm M3
4 Pas. Homogeneus Tile 60x60 Polished M2
5 Pas. Homogeneus Tile 60x60 UnPolished (Teras) M2
6 Pas. Homogeneus Tile 40x40 Unpolished (KM/WC) M2
7 Pek. Plesteran Leveling Lantai Ad 1;4 M2
8 Pek. Acial Leveling Lantai M2
9 Pek. Pengecatan Lantai Dengan Cat Epoxy 1000 micron M2
10 Pas. Plin Kurve Lantai M2
VI PEKERJAAN PLAFOND
1 Pas. Rangka Plafond Hollow Galvanis 4x4cm M2
2 Pas. Plafon Gypsum Tbl. 9mm M2
3 Pas. Plafond Kalsiboard Tbl. 6mm M2
4 Pas. Plafond Kalsiboard Tbl. 4,5mm M2
5 Pas. Plafond Aquistik Tbl 9mm + Rangka T M2
6 Pas. List Kurve Kalsiboard M'
VII PEKERJAAN PINTU DAN JENDELA
1 Kozen Pintu Type P1 (Unit)
- Pasang Kozen Allumnium 4'' Tebal 1,2mm M'
- Pasang Kaca mati Tebal 5mm M2
- Pasang Lapisan Sandblast M2
- Pasang Pintu Kaca Tebal 12mm Frameless + asesoris Unit
- Pek. Kontruksi Rangka Dari Stalbus 4x6cm Fin car anti karat M2
- Pas. Rangka Hollow Aluminium ACP (Gawangan Pintu) M2
- Pas. Alumunium Composit Panel 0,4mm (Motif Granit) M2
35.00 - 11 -
8.75 - 11 -
34.00 - 11 -
12.25 - 11 -
1.09 - 11 -
234.17 - 11 -
14.52 - 11 -
2.28 - 11 -
664.29 - 11 -
70.20 - 11 -
2.05 - 11 -
445.81 - 11 -
52.14 - 11 -
1.04 - 11 -
212.44 - 11 -
26.47 - 11 -
39.08 - 11 -
207.06 - 11 -
78.16 - 11 -
414.12 - 11 -
207.68 - 11 -
17.60 - 11 -
509.88 - 11 -
70.29 - 11 -
629.67 - 11 -
167.52 - 11 -
314.84 - 11 -
209.43 - 11 -
8.99 - 11 -
1.12 - 11 -
1.57 - 11 -
157.16 - 11 -
20.35 - 11 -
22.48 - 11 -
164.39 - 11 -
164.39 - 11 -
164.39 - 11 -
141.70 - 11 -
419.65 - 11 -
69.42 - 11 -
209.43 - 11 -
98.10 - 11 -
42.70 - 11 -
141.20 - 11 -
38.98 - 11 -
12.09 - 11 -
2.69 - 11 -
2.00 - 11 -
8.04 - 11 -
8.04 - 11 -
8.04 - 11 -
6.40 - 11 -
0.62 - 11 -
3.36 - 11 -
4.00 - 11 -
2.00 - 11 -
2.00 - 11 -
2.00 - 11 -
12.00 - 11 -
2.00 - 11 -
4.00 - 11 -
3.00 - 11 -
6.98 - 11 -
0.62 - 11 -
1.89 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
3.00 - 11 -
2.00 - 11 -
5.78 - 11 -
1.60 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
3.00 - 11 -
2.00 - 11 -
21.66 - 11 -
1.68 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
3.00 - 11 -
2.00 - 11 -
6.80 - 11 -
4.00 - 11 -
2.00 - 11 -
1.00 - 11 -
8.38 - 11 -
2.31 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
9.90 - 11 -
2.22 - 11 -
6.80 - 11 -
12.00 - 11 -
6.00 - 11 -
14.65 - 11 -
4.17 - 11 -
6.80 - 11 -
4.00 - 11 -
2.00 - 11 -
18.95 - 11 -
4.43 - 11 -
13.60 - 11 -
12.00 - 11 -
6.00 - 11 -
30.00 - 11 -
12.02 - 11 -
3.30 - 11 -
4.00 - 11 -
2.00 - 11 -
3.88 - 11 -
0.33 - 11 -
11.95 - 11 -
1.94 - 11 -
0.71 - 11 -
1.42 - 11 -
2.84 - 11 -
2.52 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
2.00 - 11 -
3.90 - 11 -
7.80 - 11 -
5.20 - 11 -
13.92 - 11 -
1.34 - 11 -
12.30 - 11 -
24.60 - 11 -
16.40 - 11 -
3.36 - 11 -
2.00 - 11 -
4.00 - 11 -
2.00 - 11 -
2.00 - 11 -
2.00 - 11 -
3.30 - 11 -
6.60 - 11 -
4.40 - 11 -
30.52 - 11 -
6.90 - 11 -
7.62 - 11 -
8.32 - 11 -
6.66 - 11 -
2.52 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
16.50 - 11 -
11.00 - 11 -
8.25 - 11 -
16.50 - 11 -
11.00 - 11 -
11.46 - 11 -
6.90 - 11 -
4.08 - 11 -
4.08 - 11 -
5.00 - 11 -
54.24 - 11 -
10.69 - 11 -
10.42 - 11 -
6.66 - 11 -
15.96 - 11 -
3.36 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
16.98 - 11 -
4.36 - 11 -
1.98 - 11 -
3.96 - 11 -
3.96 - 11 -
1.68 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.12 - 11 -
12.24 - 11 -
8.16 - 11 -
5.40 - 11 -
10.80 - 11 -
7.20 - 11 -
6.98 - 11 -
2.69 - 11 -
8.28 - 11 -
16.56 - 11 -
5.52 - 11 -
2.52 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
11.54 - 11 -
1.34 - 11 -
6.64 - 11 -
13.28 - 11 -
3.84 - 11 -
1.68 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
3.00 - 11 -
1.00 - 11 -
20.82 - 11 -
5.04 - 11 -
6.64 - 11 -
13.28 - 11 -
3.84 - 11 -
2.52 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
2.00 - 11 -
22.95 - 11 -
6.35 - 11 -
3.65 - 11 -
7.30 - 11 -
7.30 - 11 -
20.82 - 11 -
5.04 - 11 -
6.64 - 11 -
13.28 - 11 -
3.84 - 11 -
2.52 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
2.00 - 11 -
22.95 - 11 -
6.35 - 11 -
3.65 - 11 -
7.30 - 11 -
7.30 - 11 -
10.50 - 11 -
2.57 - 11 -
7.98 - 11 -
15.96 - 11 -
7.32 - 11 -
16.40 - 11 -
3.63 - 11 -
3.86 - 11 -
7.72 - 11 -
4.64 - 11 -
2.52 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
2.00 - 11 -
16.40 - 11 -
3.63 - 11 -
4.78 - 11 -
9.56 - 11 -
5.25 - 11 -
1.68 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
16.65 - 11 -
4.31 - 11 -
5.00 - 11 -
2.52 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
6.00 - 11 -
1.00 - 11 -
1.00 - 11 -
20.59 - 11 -
7.82 - 11 -
6.64 - 11 -
13.28 - 11 -
3.84 - 11 -
4.31 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
65.60 - 11 -
14.50 - 11 -
10.40 - 11 -
20.80 - 11 -
15.20 - 11 -
0.12 - 11 -
4.00 - 11 -
8.00 - 11 -
4.00 - 11 -
4.00 - 11 -
4.00 - 11 -
16.46 - 11 -
6.08 - 11 -
1.86 - 11 -
3.72 - 11 -
3.72 - 11 -
1.68 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
16.46 - 11 -
1.45 - 11 -
2.90 - 11 -
2.90 - 11 -
6.72 - 11 -
1.68 - 11 -
1.00 - 11 -
2.00 - 11 -
1.00 - 11 -
1.00 - 11 -
1.00 - 11 -
11.04 - 11 -
2.90 - 11 -
3.72 - 11 -
7.44 - 11 -
4.72 - 11 -
8.08 - 11 -
16.15 - 11 -
8.50 - 11 -
0.09 - 11 -
19.35 - 11 -
1.20 - 11 -
2.10 - 11 -
4.20 - 11 -
4.20 - 11 -
2.61 - 11 -
5.49 - 11 -
4.20 - 11 -
0.26 - 11 -
15.46 - 11 -
4.88 - 11 -