A Galian pondasi dan sloop M3 26.40 B Pemasangan besi (pad dan chimny) - 8 kg /unit UNIT 71.00 C Pemasangan Bekisting pondasi - 0,72 m2/unit UNIT 71.00 D Pemasangan Tiang BRC Galvanis 240 cmx2" UNIT 71.00 E Pemasangan Besi Sloop - 5 kg/unit M1 161.00 F Pemasangan bekisting sloop - 0,5 m2/unit M1 161.00 G concrete pondasi tiang dan sloop M3 10.00 H Pemasangan Pagar BRC 190cmx240cm M1 161.00 I Pasangan Bata 15x40 cm M1 161.00
2 PEKERJAAN DRAINAGE (AMD 01 50 M1 ) M1 139.00
A Galian M3 125.00 B Pemasangan Besi 12 kg/M' M1 139.00 C Pemasangan Bekisting - 1,8 M2/M' M1 139.00 D Concrete K 225 M3 19.46
3 CROSS ROAD M1 15.00
A Galian M1 0.55 B Pemasangan Besi - 16 kg/M' M1 15.00 C Pasang Bekisting - 2,4 M2/M' M1 15.00 D Concrete K 225 M3 3.00
4 Road (New) M1 170.00
A Compact sand gravel 150mm (Amd 01 640 M2 ) M2 765.00 B Crushed stone 3-5 mm (Amd 01 640 M2 ) M2 765.00 C Asphalt Hotmix 50mm (Amd 01 640 M2 ) M2 765.00 D Asphalt Penetrasi 50mm (Amd 01 640 M2 ) M2 765.00